ZA202203921B - Method for pile foundation construction of offshore platform - Google Patents

Method for pile foundation construction of offshore platform

Info

Publication number
ZA202203921B
ZA202203921B ZA2022/03921A ZA202203921A ZA202203921B ZA 202203921 B ZA202203921 B ZA 202203921B ZA 2022/03921 A ZA2022/03921 A ZA 2022/03921A ZA 202203921 A ZA202203921 A ZA 202203921A ZA 202203921 B ZA202203921 B ZA 202203921B
Authority
ZA
South Africa
Prior art keywords
pile foundation
offshore platform
foundation construction
offshore
construction
Prior art date
Application number
ZA2022/03921A
Inventor
He Junbiao
Original Assignee
China Harbour Eng Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harbour Eng Co Ltd filed Critical China Harbour Eng Co Ltd
Publication of ZA202203921B publication Critical patent/ZA202203921B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)
  • Foundations (AREA)
ZA2022/03921A 2021-08-03 2022-04-06 Method for pile foundation construction of offshore platform ZA202203921B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110886728.9A CN113404049A (en) 2021-08-03 2021-08-03 Offshore platform pile foundation construction method

Publications (1)

Publication Number Publication Date
ZA202203921B true ZA202203921B (en) 2022-09-28

Family

ID=77688263

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA2022/03921A ZA202203921B (en) 2021-08-03 2022-04-06 Method for pile foundation construction of offshore platform

Country Status (3)

Country Link
CN (1) CN113404049A (en)
WO (1) WO2023010724A1 (en)
ZA (1) ZA202203921B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404049A (en) * 2021-08-03 2021-09-17 中国港湾工程有限责任公司 Offshore platform pile foundation construction method
CN116220385A (en) * 2023-04-04 2023-06-06 北京城建集团有限责任公司 Installation method of connecting piece for building

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85101523A (en) * 1985-04-01 1987-01-17 赫尔曼J·谢尔斯特德 Single stroke slurry renew system and method thereof
JP4575061B2 (en) * 2004-07-23 2010-11-04 第一建設機工株式会社 Construction method for offshore wind power generation facilities
PL2372143T3 (en) * 2010-03-29 2019-01-31 Geosea Nv Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine
CN102767189B (en) * 2012-07-31 2014-06-25 中铁第五勘察设计院集团有限公司 Set bearing platform foundations and construction method thereof
CN202969333U (en) * 2012-12-26 2013-06-05 中交第三航务工程勘察设计院有限公司 Steel truss rock-socketed wharf structure
CN106320333B (en) * 2016-09-27 2023-12-22 中交天航南方交通建设有限公司 Combined drainage type water filling pile device and construction method
CN108570983B (en) * 2018-04-20 2021-02-09 桂林电子科技大学 Pile foundation construction method of large karst cave without filler and pile casing thereof
CN108571425B (en) * 2018-06-15 2024-03-29 中交第四航务工程局有限公司 Pile foundation cap foundation of offshore wind turbine generator set and construction method thereof
CN109914399B (en) * 2019-03-21 2021-06-01 杭州公路工程监理咨询有限公司 Environment-friendly pile foundation construction method
CN113404049A (en) * 2021-08-03 2021-09-17 中国港湾工程有限责任公司 Offshore platform pile foundation construction method

Also Published As

Publication number Publication date
CN113404049A (en) 2021-09-17
WO2023010724A1 (en) 2023-02-09

Similar Documents

Publication Publication Date Title
ZA202203921B (en) Method for pile foundation construction of offshore platform
PH12016501403A1 (en) Construction method for fixing hollow column for supporting marine sturctures and offshore platforms to a seabed
ZA202002724B (en) Double wall cofferdam and construction method for pier shaft
ATE551495T1 (en) METHOD FOR CONSTRUCTING AN UNDERGROUND STRUCTURE
EA201490691A1 (en) METHOD OF CREATING A SUPERVISION WALL AND A RELATED SUPPORTING WALL
SG10201805031TA (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
GB201901230D0 (en) A construction equipment for deep foundation pits of bridges and application methods thereof
PT3259405T (en) Method of building a foundation comprising a steel monopile and a concrete part and associated foundation for construction work
DK3872266T3 (en) Annular cofferdam using tapered square pipes, temporary structure for pit excavation construction, and construction method
ZA202207357B (en) Waterproof structure and construction method for foundation pit support
ZA202209594B (en) Method for reinforcement construction of foundation pit in silty soil layer
DK3828121T3 (en) CRANE AND METHOD OF ERECTING A TOWER
GB2584958B (en) Corrosion protection for offshore foundation structure
Verfuß Noise mitigation systems and low-noise installation technologies
EP4018045A4 (en) Subsea foundation and method of installing
ZA202303484B (en) Composite structure of navigation lamp pile foundation and maintenance channel for offshore breakwater
GB2605377B (en) Foundation for an offshore wind turbine
EP3994312C0 (en) Method of forming a wind turbine foundation
SG11202012123SA (en) Pile installation system for an offshore foundation construction and method of installing a pile
GB202304407D0 (en) Method of using hydraulic activation chambers for anchoring downhole equipment
EP2540914A3 (en) Method for creating a foundation for marine structures
EP3530814C0 (en) Method for the construction of a transformer platform and foundation set for a transformer platform
GB202400923D0 (en) Distributed pressure-grouting device and method for bridge approach pile foundation
KR102637263B9 (en) Grouting method for seawall
GB202401043D0 (en) A method for preparing building foundations