ZA200502771B - System and method(s) of blended mine planning, desing and processing. - Google Patents

System and method(s) of blended mine planning, desing and processing. Download PDF

Info

Publication number
ZA200502771B
ZA200502771B ZA200502771A ZA200502771A ZA200502771B ZA 200502771 B ZA200502771 B ZA 200502771B ZA 200502771 A ZA200502771 A ZA 200502771A ZA 200502771 A ZA200502771 A ZA 200502771A ZA 200502771 B ZA200502771 B ZA 200502771B
Authority
ZA
South Africa
Prior art keywords
block
determining
blocks
clump
cone
Prior art date
Application number
ZA200502771A
Other languages
English (en)
Inventor
Gary A Froyland
Merab Menabde
Original Assignee
Bhp Billiton Innovation Pty
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2002951898A external-priority patent/AU2002951898A0/en
Application filed by Bhp Billiton Innovation Pty filed Critical Bhp Billiton Innovation Pty
Publication of ZA200502771B publication Critical patent/ZA200502771B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q99/00Subject matter not provided for in other groups of this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Processing Of Solid Wastes (AREA)
ZA200502771A 2002-10-09 2005-04-06 System and method(s) of blended mine planning, desing and processing. ZA200502771B (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
AU2002951957A AU2002951957A0 (en) 2002-10-09 2002-10-09 System and method(s) of mine planning, design and processing
AU2002951895A AU2002951895A0 (en) 2002-10-09 2002-10-09 System and Method(s) of Mine Planning, Design and Processing
AU2002951892A AU2002951892A0 (en) 2002-10-09 2002-10-09 Mining process and design
AU2002951898A AU2002951898A0 (en) 2002-10-09 System and method(s) of mine planning, design and processing
AU2002952654A AU2002952654A0 (en) 2002-10-09 2002-11-14 System and Method(s) of Blended Mine Planning, Design and Processing
AU2002952681A AU2002952681A0 (en) 2002-10-09 2002-11-14 System and Method(s) of Mine Planning, Design and Processing
AU2003266821A AU2003266821B2 (en) 2002-10-09 2003-10-02 System and method(s) of blended mine planning, design and processing

Publications (1)

Publication Number Publication Date
ZA200502771B true ZA200502771B (en) 2006-06-28

Family

ID=40875205

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA200502771A ZA200502771B (en) 2002-10-09 2005-04-06 System and method(s) of blended mine planning, desing and processing.

Country Status (9)

Country Link
US (1) US7925474B2 (zh)
CN (1) CN1723333B (zh)
AU (7) AU2002951895A0 (zh)
BR (1) BR0315239B1 (zh)
CA (1) CA2501844C (zh)
CL (1) CL2008002468A1 (zh)
NZ (2) NZ560458A (zh)
WO (1) WO2004033854A1 (zh)
ZA (1) ZA200502771B (zh)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2005254579B2 (en) * 2004-06-21 2010-03-11 Bhp Billiton Innovation Pty Ltd Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
WO2005124104A1 (en) * 2004-06-21 2005-12-29 Bhp Billiton Innovation Pty Ltd Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
NZ561668A (en) 2005-04-11 2010-06-25 Bhp Billiton Innovation Pty Mining optimisation through modeling of material extraction over time period
RU2431041C2 (ru) * 2005-12-30 2011-10-10 БиЭйчПи БИЛЛИТОН ИННОВЕЙШН ПТИ ЛТД Устранение пустой породы при выемке карьера
US7729942B2 (en) * 2006-09-29 2010-06-01 At&T Intellectual Property I, L.P. Consumer targeting methods, systems, and computer program products using multifactorial marketing models
US9235334B2 (en) * 2008-05-09 2016-01-12 Genesis Industries, Llc Managing landbases and machine operations performed thereon
AU2009304592B2 (en) * 2008-10-16 2015-10-08 Technological Resources Pty. Limited A method of sorting mined, to be mined or stockpiled material to achieve an upgraded material with improved economic value
US9449351B2 (en) * 2009-06-17 2016-09-20 Technological Resources Pty, Limited Method of characterising a resource
BRPI1011584A2 (pt) * 2009-06-29 2016-03-22 Genesis Ind Llc método e sistema para monitoramento de produtividade associada a uma máquina
PE20142017A1 (es) * 2011-07-08 2014-12-12 Tech Resources Pty Ltd Clasificacion en una operacion de explotacion minera
US20130262045A1 (en) 2012-03-28 2013-10-03 Trimble Navigation Limited Open pit mine designer
US9552445B2 (en) * 2012-03-28 2017-01-24 Trimble Inc. Automatic change propagation in an area-based open pit mine designer
US9534901B2 (en) * 2014-12-11 2017-01-03 International Business Machines Corporation Access route optimization for harvestable resources
CN105045969B (zh) * 2015-06-30 2017-12-26 中国矿业大学 一种地应力型冲击地压危险性多元信息耦合预测方法
US11061876B2 (en) * 2016-11-15 2021-07-13 Sap Se Fast aggregation on compressed data
RU2642903C1 (ru) * 2017-05-11 2018-01-29 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Способ открытой разработки месторождений полезных ископаемых
US10852707B2 (en) 2017-07-27 2020-12-01 Caterpillar Inc. Blend control truck assignment monitoring system and method
CN108287953B (zh) * 2018-01-08 2022-02-08 中国恩菲工程技术有限公司 存储空间的确定方法、装置、存储介质和处理器
BR112020024085A2 (pt) * 2018-05-28 2021-02-09 The University Of Melbourne método de projeto e planejamento de mina implementado por computador e método de projetar rampas
US10995615B2 (en) * 2018-07-03 2021-05-04 Caterpillar Inc. Method for optimizing mining production
CA3123401A1 (en) * 2021-06-28 2022-12-28 Pristine Mining Inc. Method of trading in minerals
CN114677236A (zh) * 2021-12-13 2022-06-28 东北大学 一种考虑设备配置的露天开采方案确定方法及系统
CN114594744B (zh) * 2022-03-14 2023-11-28 武汉理工大学 一种分布式工厂生产配送集成调度方法和系统
CN115908728A (zh) * 2022-11-08 2023-04-04 宁夏沁瑞矿山设备有限公司 一种智能煤矿井下监控系统、方法、终端设备及存储介质
CN116050952B (zh) * 2023-04-03 2023-06-20 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) 一种露天矿山生态修复管理评价方法
CN116108696B (zh) * 2023-04-04 2023-06-23 山东拓新电气有限公司 一种采煤机截割滚筒的高度路径规划方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE330519C (sv) * 1969-10-31 1977-01-24 S T Henriksson Sett vid gruvbrytning enligt dagbrottmetoden
CN85107072A (zh) * 1985-09-25 1987-04-08 卡托维兹煤炭协会 用在维护永久控制地表变形的开采矿床方法,尤其在受影响范围内采矿
CN1114712A (zh) * 1994-06-04 1996-01-10 崔正洙 矿山采选工艺新模型
CN1165237A (zh) * 1997-04-24 1997-11-19 张中科 边界上(下)山沿空掘巷前进式开采方法

Also Published As

Publication number Publication date
CA2501844C (en) 2013-01-08
AU2002952681A0 (en) 2002-11-28
CN1723333B (zh) 2011-11-02
NZ560458A (en) 2007-11-30
AU2002951957A0 (en) 2002-10-24
WO2004033854A1 (en) 2004-04-22
AU2002951892A0 (en) 2002-10-24
AU2003266821B2 (en) 2009-05-21
AU2002952654A0 (en) 2002-11-28
CL2008002468A1 (es) 2008-10-10
BR0315239B1 (pt) 2014-07-01
BR0315239A (pt) 2005-08-23
AU2009202456B2 (en) 2011-01-20
CN1723333A (zh) 2006-01-18
AU2002951895A0 (en) 2002-10-24
US20060265342A1 (en) 2006-11-23
NZ539420A (en) 2007-10-26
AU2009202456A1 (en) 2009-07-09
CA2501844A1 (en) 2004-04-22
US7925474B2 (en) 2011-04-12
AU2003266821A1 (en) 2004-05-04

Similar Documents

Publication Publication Date Title
AU2009202456B2 (en) System and method(s) of blended mine planning, design and processing
US7957941B2 (en) System and method(s) of mine planning, design and processing
Topal et al. A new algorithm for stope boundary optimization
US20210208305A1 (en) Mine planning method and system
Whittle et al. Combined optimisation of an open-pit mine outline and the transition depth to underground mining
Froyland et al. The value of additional drilling to open pit mining projects
US20070185750A1 (en) Method, apparatus and computer program for scheduling the extraction of a resource and for determining the net present value of an extraction schedule
Noriega et al. A two-step mathematical programming framework for undercut horizon optimization in block caving mines
ZA200502772B (en) System and method(s) of mine planning, desing and processing
Morales High-order simulation of geological domains of a gold deposit and its effects on the simultaneous stochastic optimization of a mining complex
AU2003266820B2 (en) System and method(s) of mine planning, design and processing
Kaydım Long-term production scheduling optimization for a polymetallic open pit mine
Afum Open pit-underground mining options and transitions planning: a mathematical programming framework for optimal resource extraction evaluation
Agrawal et al. Optimization of opencast mines using minimum cut algorithm-a case study from iron mine.
Lin Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints
Salinas Calibration of a mixing model for sublevel caving
MacNeil Determining optimal open pit to underground mine transition depth using stochastic mine planning techniques
Both Simultaneous Short-Term Decision-Making in Mining Complexes Integrating Geometallurgy Assisted By Production Data
Noriega Production scheduling and boundary optimization in block caving mines under geologic and material flow uncertainty
Levinson Connecting Planning Horizons in Mining Complexes with Reinforcement Learning and Stochastic Programming: Integrating Additional Information, Preconcentration, Reclamation and Waste Management
Xinchun et al. Mineral resource evaluation based on AHP
Ding Examining the planning stages in underground metal mines
Kozan et al. Operations Research for Mining: A Classification and Literature
Grobler Optimised decision-making under grade uncertainty in surface mining