ZA200106048B - Methods and apparatus for allocating resources in the presence of uncertainty. - Google Patents

Methods and apparatus for allocating resources in the presence of uncertainty. Download PDF

Info

Publication number
ZA200106048B
ZA200106048B ZA200106048A ZA200106048A ZA200106048B ZA 200106048 B ZA200106048 B ZA 200106048B ZA 200106048 A ZA200106048 A ZA 200106048A ZA 200106048 A ZA200106048 A ZA 200106048A ZA 200106048 B ZA200106048 B ZA 200106048B
Authority
ZA
South Africa
Prior art keywords
memory portion
objects
executable program
xalloc
scenarios
Prior art date
Application number
ZA200106048A
Inventor
Joel Jameson
Original Assignee
Joel Jameson
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Joel Jameson filed Critical Joel Jameson
Publication of ZA200106048B publication Critical patent/ZA200106048B/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

Methods and Apparatus for Allocating Resources in the Presence of
Uncertainty
CROSS REFERENCE TO RELATED APPLICATIONS
The present application is a continuation of provisional patent application number 60/116,785 filed on January 21, 1999.
Background Technical Field
This invention relates to methods and systems for allocating resources in an uncertain environment.
This application is a continuation of Provisional Patent Application # 60/116,785 submitted
January 21, 1999. By reference the following documents, submitted to the Sunnyvale Center for Innovation, Invention and Ideas (SCI®) under the US Patent and Trademark Office’s
Document Disclosure Program, are hereby included: mae lvumber| ome
Method of Allocating Resources in a Stochastic S00463 July 9, 1997
Environment
Method of Allocating Resources in a Stochastic S00730 March 16, 1998
Environment — Further Considerations
Method of Allocating Resources in a Stochastic S00743 April 10, 1998
Environment — Further Considerations II
Method of Allocating Resources in a Stochastic S00764 May 11, 1998
Environment — Further Considerations III
Method of Allocating Resources in a Stochastic S00814 July 24,1998
Environment — Further Considerations IV
Methods and Apparatus for Allocating Resources | S00901 December 14, 1998 in an Uncertain Environment — PPA Draft
Methods and Apparatus for Allocating Resources | S00905 December 18, 1998 in an Uncertain Environment — PPA Draft 11
Methods and Apparatus for Allocating Resources | S00914 January 6, 1999 in an Uncertain Environment — PPA Draft Il]
Copending Patent Application Serial No. 09/070,130, filed on April 29, 1998, is incorporated herein and termed here as PRPA (Prior Relevant Patent Application), which application discloses and discusses several methods for allocating resources.
Background of Prior Art
Almost all organizations and individuals are constantly allocating material, financial, and human resources. Clearly, how best to allocate such resources is of prime importance.
Innumerable methods have been developed to allocate resources, but they usually ignore uncertainty: uncertainty as to whether the resources will be available; uncertainty as to whether the resources will accomplish what is expected; uncertainty as to whether the intended ends prove worthwhile. Arguably, as the increasingly competitive world-market develops, as technological advancements continue, and as civilization becomes ever more complex, uncertainty becomes increasingly the most important consideration for all resource allocations.
Known objective methods for allocating resources in the face of uncertainty can be classified as Detailed-calculation, stochastic programming, scenario analysis, and Financial-calculus. (The terms “Detailed-calculation”, “Financial-calculus”, “Simple-scenario analysis”, and “Convergent-scenario analysis” are being coined here to help categorize prior-art.) (These known objective methods for allocating resources are almost always implemented with the assistance of a computer.)
In Detailed-calculation, probabilistic results of different resource allocations are determined, and then an overall best allocation is selected. The first historic instance of Detailed- calculation, which led to the development of probability theory, was the determination of gambling-bet payoffs to identify the best bets. A modern example of Detailed-calculation is
US Patent Number 5,262,956, issued to DeLeeuw and assigned to Inovec, Inc., where yields for different timber cuts are probabilistically calculated, and the cut with the best probabilistic value is selected. The problem with DeLLecuw’s method, and this is a frequent problem with all Detailed-calculation, is its requirement to enumerate and evaluate a list of possible resource allocations. Frequently, because of the enormous number of possibilities, such enumeration and valuation is practically impossible.
Sometimes to allocate resources using Detailed-calculation, a computer simulation is used to evaluate: 2de = E(fac(Xac)) (1.0) where vector xg. is a resource allocation plan, the function fy. evaluates the allocation in the presence of random, probabilistic, and stochastic events or effects, and £ is the mathematical expectation operator. With such simulation capabilities, alternative resource allocations can be evaluated and, of those evaluated, the best identified. Though there are methods to optimize the function, such methods often require significant amounts of computer time and hence are frequently impractical. (See Michael C. Fu’s article “Optimization via Simulation:
A Review,” Annals of Operations Research Vol. 53 (1994), p. 199-247 and Georg Ch.
Pflug’s book Optimization of Stochastic Models: The Interface between Simulation and
Optimization, Kluwer Academic Publishers, Boston, 1996.) (Generally known approximation solution techniques for optimizing equation 1.0 include genetic algorithms and response surface methods.)
A further problem with Detailed-calculation is the difficulty of handling multiple-stage allocations. In such situations, allocations are made in stages and between stages, random variables are realized (become manifest or assume definitive values). A standard solution approach to such multiple-stage Detailed-calculation resource allocations is dynamic programming where, beginning with the last stage, Detailed-calculation is used to contingently optimize last-stage allocations; these contingent last-stage allocations are then used by Detailed-calculation to contingently optimize the next-to-the-last-stage allocations, and so forth. Because dynamic programming builds upon Detailed-calculation, the problems
~ WO 00/43926 PCT/US00/01380 _ of Detailed-calculation are exacerbated. Further, dynamic programming is frequently difficult to apply.
Stochastic programming is the specialty in operations research/management science (OR/MS) that focuses on extending deterministic optimization techniques (e.g., linear programming, non-linear programming, etc.) to consider uncertainty. The general solution approach is to construct and solve an optimization model that incorporates all the possibilities of what could happen. Unless the resulting optimization model is a linear programming model, the usual problem with such an approach is that the resulting optimization problem is too big to be solved; and aside from size considerations, is frequently unsolvable by known solution means. Creating a linear programming model, on the other hand, frequently requires accepting serious distortions and simplifications. Usually, using more than two stages in a stochastic programming problem is impractical, because the above-mentioned computational problems are seriously aggravated. Assumptions, simplifications, and multi-processor- computer techniques used in special stochastic programming situations fail to serve as a general stochastic-programming solution method.
In Simple-scenario analysis, future possible scenarios are created. The allocations for each are optimized, and then, based upon scenario probabilities, a weighted-average allocation is determined. Sometimes the scenarios and allocations are analyzed and, as a consequence, the weights adjusted. The fundamental problem with this method is that it does not consider how the resulting allocation performs against the scenarios, nor does it make any genuine attempt to develop an allocation that, overall, performs best against all individual scenarios. Related to this fundamental problem is the assumption that optimality occurs at a point central to individual scenario optimizations; in other words, that it is necessarily desirable to hedge allocations. Such hedging could, for example, lead to sub-optimality when, and if, the PRPA uses Simple-scenario analysis for allocating resources: because of economies of scale, it could be preferable to allocate large resource quantities to only a few uses, rather than allocate small quantities to many uses. Another practical example concerns allocating military warheads, where hedging can be counter-productive.
Also related to the fundamental problem of scenario analysis is its inability to accommodate utility functions in general, and von Neumann-Morgenstern (VNM) utility functions in particular. Arguably, according to economic theory, utility functions should be used for all allocations when uncertainty is present. Loosely, a utility function maps outcomes to “happiness.” The VNM utility function, in particular, maps wealth (measured in monetary units) to utility, has a positive first derivative, and, usually, has a negative second derivative.
By maximizing mathematically-expected VNM utility, rather than monetary units, preferences concerning risk are explicitly considered. (A classic example of Simple-scenario analysis theory is Roger J-B. Wets’ thesis, “The
Aggregation Principle in Scenario Analysis and Stochastic Optimization,” in: Algorithms and
Model Formulations in Mathematical Programming, S.W. Wallace (ed.), Springer-Verlag,
Berlin, 1989, p. 91-113.)
Simple-scenario analysis has been extended to what might be called Convergent-scenario analysis, which starts where Simple-scenario analysis ends. Using a weighted-average allocation, individual scenarios are re-optimized with their objective functions including penalties (or costs) for deviating from the average allocation. Afterwards, a new weighted- average allocation is determined, the penalties made more severe, and the process is repeated until the individual scenarios’ optimizations converge to yield the same allocation. The deficiencies of Simple-scenario analysis as previously described remain, though they are somewhat mitigated by the mechanism that coordinates individual-scenario optimizations.
The mechanism, however, is contingent upon arbitrary parameter valucs, and hence the mechanism itself arbitrarily forces convergence. Further, such forced convergence is done without regard to whether the current allocation actually improves. Further still, the convergent mechanism tends to overly weigh scenarios that are highly sensitive to small allocation changes, even though it could be desirable to ignore such scenarios. Incorporating penalties for deviating from the average allocation can be cumbersome, if not impossible, and a can result in significantly complicating and protracting the solution procedure.
The Progressive Hedging Algorithm is the most famous of the Convergent-scenario analysis techniques and is described in R.T Rockafellar and Roger J.-B. Wets, “Scenarios and Policy
Aggregation in Optimization Under Uncertainty” Mathematics of Operations Research Vol. 16 (1991), No. 1, p. 119-147. Other Convergent-scenario analysis techniques are described in John M. Mulvey and Andrzej Ruszczynski, “A New Scenario Decomposition Method for
Large-Scale Stochastic Optimization,” Operations Research 43 (1995), No. 3, p. 477-490, and some of the other prior-art references.
US Patent 5,148,365 issued to Dembo is another scenario-analysis method. Here, as with
Simple-scenario analysis, future possible scenarios are created and the allocations for each are optimized. Afterwards, the scenario allocations and parameters, possibly together with other data and constraints, are combined into a single optimization problem, which is solved to obtain a final allocation. Though this method mitigates some of the problems with
Simple-scenario analysis, the problems still remain. Most importantly, it does not fully consider how the resulting allocation performs against all individual scenarios. This, coupled with the disparity between objective functions used for optimization and actual objectives, results in allocations that are only fair, rather than nearly or truly optimal. Because this method sometimes uses a mechanism similar to the convergent mechanism of Convergent- scenario analysis, the previously discussed convergent mechanism problems can also occur here.
As a generalization, all types of stochastic programming (and scenario analysis is a form of stochastic programming) can have the following serious deficiencies when allocating resources. First, penalties can introduce distortions. Second, the process of forming tractable models can introduce other distortions. Third, existing techniques are frequently unable to handle discrete quantities. Fourth, constraints are not fully considered, with the result that constraints are violated with unknown ramifications, and, conversely, other constraints are overly respected. Fifth, existing techniques usually presume a single local optimum, though N multiple local optimums can be particularly probable. Sixth, existing techniques can require significant computer time to compute gradients and derivatives. Seventh, and perhaps most important, practitioners frequently do not use stochastic programming techniques, because shifting from deterministic techniques is too complex.
Theoretical finance, theoretical economics, financial engineering, and related disciplines share several methods for allocating and pricing resources in the presence of uncertainty. (Methods for valuing or pricing resources also allocate resources, since once a value or price is determined, it can be used for resource allocation internally within an organization and used to decide whether to buy or sell the resource on the open market.) These methods tend to use mathematical equations and calculus for optimization. A frequent problem, however, is that once complicating factors are introduced, the solution techniques no longer work, and either computer-simulation Detailed-calculation or stochastic-programming methods, with their associated problems, are required. A further problem is that such methods, in order to be mathematically tractable, frequently ignore VNM utility functions and work with unrealistically, infinitesimally small quantities and values.
In conclusion, though innumerable methods have been developed to determine how to allocate resources, they frequently are unable to cope with uncertainty. Attempts to include uncertainty frequently result in models that are too big to be solved, unsolvable using known techniques, or inaccurate. As a consequence, resource allocations of both organizations and individuals are not as good as they could be. It is therefore a fundamental object of the present invention to obviate or mitigate the above-mentioned deficiencies.
: ~ WO 00/43926 PCT/US00/01380 _
SUMMARY OF THE INVENTION N
Accordingly, besides the objects and advantages of the present invention described elsewhere herein, several objects and advantages of the invention are to optimally, or near optimally, allocate resources in the presence of uncertainty. Specifically, by appropriately: 1. considering how the resulting allocation performs against possible scenarios 2. utilizing von Neumann-Morgenstern or other utility functions 3. hedging and not hedging 4. handling uncertain constraints 5. handling discrete-quantity requirements 6. considering multiple local optimums 7. using and capitalizing on known methods for allocating resources that ignore, or do not explicitly consider, uncertainty : 8. using multiple processors.
Additional objects and advantages will become apparent from a consideration of the ensuing description and drawings.
The basis for achieving these objects and advantages, which will be rigorously defined hereinafter, is accomplished by programming a computer as disclosed herein, inputting the required data, executing the computer program, and then implementing the resulting allocation. The programming steps are shown in the flowchart of Figure 1.
Step 101 entails generating scenarios and optimizing scenario allocations. In Step 103, the optimized allocations are grouped into clusters. In Step 105, first-stage allocations are randomly assigned to scenario nodes and, by using an evaluation and exploration technique to be described, Guiding Beacon Scenarios (GBSs) are generated. Step 107 entails using the
GBSs and identifying the allocations within each cluster that perform best against the scenarios within the cluster. In Step 109, allocations that perform better against the scenarios within each cluster are created, typically by considering two of the better allocations, and then using line-search techniques. If there is more than one cluster, then in Step 113 the clusters N are merged into larger clusters and processing returns to Step 109. Once only a single cluster remains and Step 109 is complete, the best allocation thus far obtained is taken as the final optimal allocation and is implemented in Step 115.
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will be more readily understood with reference to the accompanying drawings, wherein:
Figure 1 shows a high-level flowchart;
Figure 2 demonstrates optimized-scenario-allocation and cluster usage;
Figures 3A, 3B, and 3C demonstrate the three line-search techniques;
Figure 4A shows an elementary scenario-tree; Figures 4A and 4B combined show the scenario-tree used by the present invention;
Figure 5 is a skeletal definition of the WiNode class;
Figure 6 is a skeletal definition of the WScenario class;
Figure 7 is a skeletal definition of the XAlloc class;
Figures 8A and 8B are skeletal definitions of the WWMatrix and AAMatrix classes;
Figure 9 is a skeletal definition of thc EvaluateXAllocAgainstWScenario function;
Figure 10 is a skeletal definition of the DefterministicOptimizer function;
Figure 11 is a skeletal definition of the ValueAllocation function;
Figure 12 is a skeletal definition of the ZCluster class; and
Figures 13A and 13B show special von Neumann-Morgenstern utility functions.
DETAILED DESCRIPTION OF THE INVENTION N
"Theory of the Invention"
Philosophy
The following philosophical assumptions are made: 1. All resource allocations should fundamentally attempt to directly or indirectly optimize one of three things: monetary gain, monetary loss, or what economists term “utility.” 2. There is no such thing as a constraint violation; for fundamentally any constraint can be violated, though with consequences. These consequences can be quantified and expressed in the terms of the range of the objective function, provided that the objective function is cast as a fundamental type. 3. The morc a constraint is violated, the larger the adverse impact on the fundamental objective being optimized. 4. The adverse effect of a constraint violation is always less than infinity. 5. Both objective and subjective probabilities are useful as imperfect estimates of what could happen. 6. Almost every decision is a resource allocation, because almost every decision directly or indirectly leads to a resource allocation. 7. Every resource allocation (and decision) would be easier and simpler if there was no uncertainty.
As an example of the first four items, a business might have a resource allocation plan that optimizes profits (monetary gain), and among other things fulfills the requirement (constraint) that contractual obligations be met. However, it may happen that fulfilling the contractual obligations becomes impossible. At this point, though the constraint is violated, itis irrelevant. What is relevant is how best to handle the contractual obligations: re- negotiating, performing restitution, fulfilling some of the obligations, etc. Whatever course is chosen, there follows an adverse impact on the business’ profits. The more numerous and onerous the contractual obligations, the larger the adverse impact. However, this adverse impact is always less than infinity. There are always degrees of catastrophe: it is better to be short 10M resource units, rather than 20M; it is better to be insolvent by $30M, rather than $50M; etc.
As an example of the fifth item, an objective probability measurement might be obtained by statistical analysis of responses to a large survey, while a subjective value by a guess.
Lacking better bases, both are usable and valuable. (Given a choice between the two, however, the objective estimate is usually preferable.)
A consequence of the fifth item is a diminishment of the usual distinction between risk and uncertainty. In common-professional usage, risk suggests known probabilities, while uncertainty suggests unknown probabilities. Philosophically, however, one always can determine a subjective probability estimate. Hence, here no distinction is made between risk and uncertainty; the two words arc used interchangeably.
This philosophical section is presented here to facilitate a deeper and broader understanding of how the present invention can be used. However, neither understanding this section nor agreeing with it are required for implementing or using this invention. Hence, this section should not be construed to bound or in any way limit the present invention.
"Mathematical Framework’
As is standard in stochastic programming, resources in this invention are allocated in one or more stages, and, between stages, what were previously uncertain values either become known, or the uncertainty of their eventual values reduced. Allocations made in one stage affect what can be accomplished in subsequent stages. Mathematically, the general stochastic resource allocation model addressed here is: maximize z = > pi f(a, WSi) += each scenano (2.0) where,
WS, is a matrix containing all the random-variable realizations for scenario i : a, is a vector containing first-stage allocations fis a function that evaluates first-stage allocations a; against scenario i pi is the probability of scenario i
Implicit within function fis the generation of a, a3,... allocations for the second, third, and so-forth stages. Also implicit is an evaluation of such allocations. (Obviously, the maximizing orientation used here could have just as easily have been reversed.)
The focus here is on determining the optimal vector a,, since those allocations are most immediately relevant, are initially implemented, and are implemented prior to any additional information becoming available.
Several strategies are used in tandem to cope with the inherent NP-hardness of stochastic programming: clustering, line-searching, statistical sampling, and unbiased approximation.
Clustering is used to divide the allocation problem into simpler sub-problems, for which determining optimal allocations is computationally simpler and faster. Optimal allocations for sub-problems are used to define spaces for line-searches; line-searches are used for optimizing allocations over ever larger sub-problems. Sampling is used to develop schemes a used to generate and evaluate allocations, especially for generating, and in turn using, GBSs.
Figures 2, 3, and 4A demonstrate some basic concepts that were developed as part of this invention: Figure 2 shows how individual-scenario optimizations can serve as good starting points for finding an overall optimal allocation and how clustering can facilitate optimization; Figure 3 shows the operation of special line-searching techniques to find better allocations; and Figure 4A shows how GBSs are generated and used to evaluate a; allocations.
Figure 2 depicts a hypothetical example with four scenarios. The a; allocations are shown collapsed into a single dimension on the horizontal axis; the vertical axis shows function f and z values. Curves 201, 202, 203, and 204 show f values as a function of a; for the first, second, third, and fourth scenarios respectively. The optimal a, values for the four scenarios are points 211,212, 213, and 214. Given the four optimal points, they are clustered: points 211 and 212 into a cluster 221; points 213 and 214 into a cluster 231. (The clusters include the scenarios themselves.) The value of z across both the first and second scenarios is shown by curve 231; stated differently, curve 231 shows the probabilistically-weighted average value of curves 201 and 202. The value of z across the third and fourth scenarios by is shown by curve 241. For both clusters, the optimal individual-scenario allocations are good starting points for finding the optimal cluster allocations. Line-search techniques, to be explained shortly, are used to locate a point 232 as the optimal allocation for cluster 221. For cluster 231, however, the third scenario’s optimal allocation (point 213) is the best cluster allocation.
Now, the iteration repeats: the two cluster allocations points 232 and 213 are clustered into a larger final cluster. The value of z across the four scenarios is shown by curve 251, and as analogous to using optimized-scenario allocations, the optimal allocations for the individual clusters serve as starting points for finding the overall optimal allocation, point 261.
Figures 3A, 3B, and 3C show the operation of the three line-search techniques, each of which approximates function z with parabolas. The three techniques build upon one another. As
~ WO 00/43926 PCT/US00/01380 before, the a; allocations are shown collapsed into a single dimension on the horizontal axis; BN the vertical axis shows function z values. Points 300 and 301 correspond to two allocations and define the line in the allocation space that is searched. (An allocation is a point in the allocation space, and for the moment the words “allocation” and “point” are used synonymously when they apply to the allocation space represented by the horizontal axis.)
These two allocations have z values as indicated by points 310 and 311 respectively. A parameter A, which can range from negative to positive infinity, governs the linear blending of allocations 300 and 301. In the first technique, Simple Parabola Search (SPS), a point 302 is selected (See Figure 3A); the associated value z, point 312, is determined; a parabola through points 310, 312, and 311 is determined (shown as parabola 391); and the optimum domain value of the parabola, point 303, is cvaluated for possibly yiclding a better z value. - Figure 3B shows allocation 303 yielding a value indicated by a point 313, which is inferior to point 310. In such a case, the second technique, Inner Compression Search (ICS), builds upon the failed SPS attempt. ICS hypothesizes that the z function is roughly like curve 392 (shown passing through points 310, 314, 313, and 311), with a local optimum near point 310 and between points 310 and 313. Initially, ICS tests the hypothesis by determining whether an allocation 304, near allocation 300, yields a z value better than allocation 300. If so, the point 313 of the SPS and the points 310 and 314 are used to detcrmine a parabola and the optimum domain value of the parabola, point 305, is evaluated for yielding a better z value.
If a better z value is not obtained, then the process repeats: using points 310, 314, and the z- value point for allocation 305, another parabola is determined, and so forth.
If the hypothesis proves incorrect (i.e., allocation 304 yields an inferior z value indicated by a point 324 in Figure 3C), then the third technique, Outer Compression Search (OCS), builds upon the failed ICS attempt. Because allocation 300 yields a higher z value than allocation 304, OCS presumes that the z function increases as 4 decreases from zero. Such is exemplified by curve 393, which passes through points 310, 324, and 311. Initially, OCS experiments with increasingly negative h values until an inferior allocation is obtained; afterwards, it applies ICS.
Figure 4A shows an elementary scenario tree, and the generation and use of Guiding Beacon
Scenarios (GBSs). GBSs are applicable when there are more than two stages. At node 411, the first-stage allocations a; are made; at nodes 421 and 422, second-stage allocations a; are made; at nodes 431, 432, 433, and 434, third-stage allocations a; are made; and at nodes 441, 442,443, 444, 445, 446, 447, and 448, fourth-stage allocations a4 are made. Here, end-node identifiers are also used to designate scenarios; it is uncertain whether scenarios 441, 442, 443, 444,445, 446, 447, or 448, will occur. (Vectors w;, w,, ws assume different realizations of random variables for the eight scenarios.) To evaluate a first stage a; allocation against, for example scenario 441, the first step is to determine the second stage allocations a;. This is done by assuming both that a; is fixed, and that the GBS of node 421 — either 441, 442, 443, or 444 — will occur with certainty. Given those two assumptions, the allocations of ag, az, and a, are re-optimized. The sccond step follows the first: Assuming that a; and a; are fixed, and that the GBS of node 431 — either 441 or 442 — will occur with certainty, a; and a, are re-optimized. The final step is to re-optimize a, holding a, a,, and a; fixed, and assuming scenario 441 occurs with certainty. The value of this final re-optimization is the value of the a; allocation against scenario 441.
To generate GBSs, initially optimized a; allocations are randomly assigned to the second and third stage nodes. Then, starting with a third stage node, for example node 431, for each assigned a; allocation, and for each subsequent node (441 and 442), what are here termed
Span Optimizations are performed: @;, a3, and a, are re-optimized, holding a; fixed, and assuming the subscquent-node scenario occurs with certainty. Afterwards, for each Span
Optimization, ay is re-optimized holding ay, a2, and a; fixed, and assuming the other subsequent node(s) occur with certainty. Finally, the Span Optimization that performs best overall is identified, and its scenario is selected as the GBS. (For example, to determine the
GBS for node 431, a3, a3, and aq are re-optimized holding a; fixed, and assuming scenario 441 occurs with certainty (Span Optimization); afterwards, a4 is re-optimized holding a;, az, and a; fixed, and assuming scenario 442 occurs with certainty. If the Span Optimization using scenario 441 performs better against scenarios 441 and 442 than the Span Optimization
IS using scenario 442, then the GBS for node 431 is scenario 441.) The same is subsequently N applied to the other third stage nodes. The GBSs for the second stage nodes are generated similarly, though the third-stage GBSs are assumed to occur with certainty.
Figures 2, 3A, 3B, 3C, and 4A, and this mathematical approach section are here to facilitate understanding, and should not be construed to define or bound the present invention. " Embodiments"
The basic embodiment of the present invention will be discussed first. Afterwards, the preferred embodiment, with its extensions of the basic embodiment, will be presented.
Here, an Object Oriented Programming (OOP) orientation is used. Pseudo-code syntax is loosely based on C++, includes expository text, and covers only the particulars of this invention. Well-known standard supporting functionality is not discussed or shown. Class names begin with a special capital letter that helps distinguish a class from the concept represented by the class. Variable names for class instances begin with a lower case letter and always include the class name. Data-types are usually implicit. Variables with suffix “Cnn” are instances of a general pointer-container class, whose elements can be fetched in a loop mechanism or referenced using an “[]” operator. The sequence in which objects are fetched from instances of the general pointer-container class is assumed to be constant; in order words, assuming the instance contains the same pointers, then every loop mechanism will always fetch the pointers in the same sequence, and similarly, the “[]” operator, with the same argument, will also fetch the same pointer. Variable voa (value of allocation), which is used in both classes and functions, contains the value of an optimized allocation or an aggregation of such values. Vectors and arrays start at element 0, which is frequently not used, so that element 1 corresponds to stage 1. Indentation is used to indicate a body of code or a line continuation. All variables (including matrixes and vectors) are passed to functions by reference. From now on, the term “optimize” (and cognates) may mean the application of formal mathematical techniques that yield global or local optimizations, but it also includes the application of any type of heuristic or rule-based decision-making procedure that would be expected to make or improve an allocation.
Figures 4A and 4B joined together show the general scenario tree used here. There are nStage allocations stages, a; through @nsege, and @pusrage is equal to, or greater than, two.
Allocations may or may not be needed for the last stage; however, to facilitate exposition, last stage allocations are presumed required and are always addressed. Though the figure shows two nodes following most nodes, any number of nodes can follow all-but-the-last-stage nodes. Each last-stage node has a pointer to a wScenario object, which contains scenario particulars. The w vectors contain different realizations of the random variables.
Figure 5 shows a skeletal definition of the WNode class. The first element, pGBS, is a pointer to a wScenario object that serves as the GBS. This element is applicable for the second through the last-stage nodes. For last-stage nodes, pWScenario is applicable, and points to a wScenario object, which defines a scenario. For the second through the next-to-the-last-stage nodes, xAllocRndCntn contains xA4lloc objects, which in turn contain a; vectors, used for generating GBSs. Data member nodeProbabiliry is the probability of reaching the node, given that the immediately preceding node has been reached. This class has a voa member.
For all but the last-stage nodes, nextWNodeCntn contains subsequent nodes.
The skeletal definition of the WScenario class is shown in Figure 6. The first element, wwMatrix, is a WWMatrix object, which is defined below and contains w vectors. The second element, pW Node, is a vector of pointers pointing to the wNodes that the scenario passes through. The probability of the scenario’s occurrence is stored in nativeProbability.
The function NativeOptimizer optimizes aj, @»,..., @asuge allocations, assuming the scenario defined in wwMatrix occurs with certainty. The resulting a ; vector is stored in native XAlloc.
Class XAlloc is a wrapper for a; vectors and is shown in Figure 7. Variable feasible is a
Boolean indicating whether vector a; is feasibie; member variable A, which is not always
~ WO 00/43926 . PCT/US00/01380 _ used, is the value that was used to combine two a; vectors to yield the instance’s a; vector. N
Member variable voa is the standard voa variable. This class also has an assignment operator to copy a; vectors and h scalars between instances and a comparison operator to compare the a; vectors of different instances. Comparisons between a; elements are done with a tolerance.
Figures 8A and 8B show class definitions of WiWMatrix and AAMatrix, which respectively : hold, as column-matrixes, vectors w and a corresponding to a complete scenario. The Oth column of both matrixes is not used so that columns correspond to stages: e.g., vector w; is stored in column ww/[][3]; vector ay is stored in column aa/][4]. All elements of vectors w and a, and in turn arrays ww and aa, hold any data or function type required to define scenarios and specify allocations. All vector and matrix elements are not necessarily used, . and no relationship or commonality necessarily exists between the elements in the same row
Le of ww (or aa). Both classes have h and voa members, as previously described. ce Figure 9 outlines the Evaluate XAllocAgainstWScenario function, which is the pseudo-code implementation of the previously mentioned function fin equation 2.0. This function evaluates the a; vector contained in the first argument against the scenario contained in the second argument. Initially, an aaMatrix object is created and column aaMatrix.aaf][1] is loaded with the first-stage allocation vector (xAlloc.al). Afterwards, stages two to nStage are iteratively re-optimized. During each iteration, the DeterministicOptimizer function is called with three arguments: iFlexStage is the starting stage for which allocations can be re- optimized; aaMatrix contains fixed allocations made prior to stage iFlexStage; and wwMatrix is the GBS for the iFlexStage stage of wScenario. The function finishes by passing voa to the first argument.
Figure 10 outlines the DeterministicOptimizer function, which takes the three arguments just described. Assuming that the scenario defined in wwMarrix occurs with certainty and holding the allocations in aaMatrix prior to stage iFlexStage fixed, this routine applies standard state-of-the-art techniques to optimize allocations for stages iFlexStage through nStage. The first step is to evaluate and respond to what transpired up until the start of the iFlexStage. This could entail allocating resources to handle already incurred obligations, and could entail determining resource quantities that are available as of the iFlexStage stage. The second step is to look forward and optimize allocations for stages iF/exStage through nStage.
This distinction between a first and second step is really artificial, since what is sought is a re-optimization of resource allocations: Given the portrayed situation, determine the optimal resource allocations for stages iFlexStage through nStage. This optimization process might entail applications of “if.... then...” logic, “rules-of-thumb,” heuristics, expert-system-like computer code, OR/MS optimization techniques, or any other data-proccss or optimization technique that helps to optimize resource allocations. Further, the flow through the routine might be contingent upon fixed-earlier-stage allocation(s) (aaMatrix), stage (iFlexStage), and/or GBS (wwMatrix), for any given function execution, multiple and on-the-fly creations/customizations of optimization models might occur and, between uses of such models, data manipulated. Here the word “optimization” and conjugates arc used loosely, since true global optimization is not necessary. What is necessary is to develop an allocation for stages iFlexStage and beyond. A simple reasonable allocation, assuming the same result for the same iFlexStage, aaMatrix, and wwMatrix combination, would suffice. Obviously, though, the better the optimization, the better the final allocation. This function finishes by setting columns iFlexStage, iFlexStage+1,..., nStage of aaMatrix.aa equal to the optimized allocations for stages iFlexStage, iFlexStage+ 1,..., nStuge, respectively; and calling the
ValueAllocation function to set the voa value.
A major advantage of the present invention is that stochastic resource-allocation optimization can be done using a deterministic perspective in the DeterministicOptimizer function.
Deterministic resource-allocation optimization is better understood, more advanced, and simpler than prior-art stochastic optimization. (Though DeterministicOptimizer function allows a deterministic perspective, such a perspective is not required. Hence, when a human expert defines DeterministicOptimizer functionality, it is acceptable to implicitly consider uncertainty.)
The ValueAllocation function, shown in Figure 11, jointly assesses a scenario and an allocation to determine a voa value. This value represents the desirability to have the scenario-allocation pair occur, as opposed to having any other scenario-allocation pair occur.
This could entail, for example, setting voa equal to: » the objective function value realized by the DeterministicOptimizer or the
NativeOptimizer functions e the cash balance at the end of the last stage » the present-value of the stages’ cash-flow stream » a VNM utility value based upon the monetary value at the end of the last stage » an aggregation of VNM utility values based upon monetary values at different stages ’ e a non-VNM utility functional value
Philosophically, the ValueAllocation function interprets and converts the results of an optimization into units of one of the three fundamental objectives: monetary gain, monetary loss,. or utility.
An advantage of the present invention is to permit the NativeOptimizer and the
DeterministicOptimizer functions to usc undefined or expedient-optimization objectives and bave the ValueAllocation function interpret and value the results, so that optimal allocations can be made in the presence of uncertainty.
Figure 12 shows the skeletal definition of the ZCluster class. The wScenarioCntn member contains wScenario objects belonging to the cluster. The first-stage allocations that perform best for the cluster are stored as xA4/loc objects in x4llocBestCnin; the optimal first-stage allocation is also stored in xAllocOpt. The function XAllocEvaluator evaluates first-stage allocation xAlloc across all scenarios within the cluster; the Consider AppendBestXAlloc function manages xAllocBestCntn. The Improver function finds better first-stage allocations by using the SimpleParabolaSearch, InnerCompressSearch, and QuterCompressSearch functions. These functions in turn use several XAlloc instances: xAlloc0 and xAllocl are two good allocations used to find better allocations (and correspond to points 300 and 301 of
Figure 3A.); x4lloch is the result of merging allocations x4/loc0 and xAllocl; xAllocOoff is an offset from xA/loc0 (and corresponds to point 304 of Figure 3B); xA/locBnd is used by
InnerCompressSearch to close-in on a better allocation (and corresponds to point 303 of
Figure 3B). Function GenxAlloch generates and evaluates xA4lloch; variable wasImproved is a Boolean indicating whether GenxAlloch yielded an overall better first-stage allocation.
Variable xAllocHurdle is an allocation to be surpassed in an iteration of Improver.
In Step 101, prior-art techniques are used to create scenarios and build a scenario tree, like that shown in combined Figures 4A and 4B, with wNode and wScenario objects. Scenario creation could be done by a human expert and/or by computer generation. Each scenario consists of a realization of exogenously-determined random variables. Scenarios may include exogenous changes to resource levels that occur during one or more of the stages. So, for example, a particular stage of each scenario may have a variable representing the realization of a contingent financial liability; such a realization changes available cash, and the optimizations/allocations are done assuming that available cash is appropriately reduced at the particular stage. (This does not rule out allowing insurance to be purchased in an earlier stage in order to offset the contingent-liability realization.)
If it is possible to obtain or calculate estimates of scenario probabilities, then such estimated values should be indicated in nativeProbability; if such estimates are not available, then all wScenario. native Probability values should be set to the inverse of the number of generated scenarios. After scenario creation, for each wScenario object, the NativeOptimizer function is called to optimize allocations for all stages within the scenario, assuming the scenario occurs with certainty. NativeOptimizer in turn calls ValueAllocation to properly determine voa. The resulting first-stage allocation is stored in nativeXAlloc, along with voa. If, in a given wScenario instance, there are multiple-globally-optimal first-stage allocations and they can easily be identified, then one should be randomly selected for storage in nativeXAlloc. (Programmatically, NativeOptimizer might call the DeterministicOptimizer function with a value for iFlexStage, an empty aaMatrix, and the wScenario’s wwMatrix.)
~ WO 00/43926 PCT/US00/01380 _
In Step 103, using the first-stage allocations contained in nativeXAlloc.al as coordinates, the wsScenario objects are clustered (many prior-art clustering techniques are available).
Clustering does not need to be academically pure: for instance, ordinal numeric values could be treated as if they were interval numeric values, some “difficult” fields ignored, etc. The value of nativeXAlloc.voa could also be used, though it is not necessary. A cluster may have one or more wScenario objects. Prior to clustering, vectors nativeXAlloc.al should temporally be normalized, so that some dimensions do not dominate the clustering process.
For each identified cluster, instances of the ZCluster class are created and wScenarioCntn member is loaded with the wScenario objects belonging to the identified cluster.
In Step 105, where Guiding Beacon Scenarios are generated, the first operation is to set the pGBS member of each the last-stage wNode equal to the instance’s member pWScenario.
Next, all xA/locRndCntn containers in all wNode objects are emptied. Afterwards, the native XAlloc objects of all wScenario objects are weighted by native Probability, are randomly selected, and are loaded into the x4llocRndCntn containers of the second through nStage-1 nodes. (When there are only two stages, this Step 105 should be skipped.) Each such xAllocRndCntn container needs to be loaded with at least one nariveXAlloc; the same nativeXAlloc may be loaded into multiple xAllocRndCntn containers. The GBSs for stages two through nStage-I are generated by:
ARMMatrix aaMatrix; for (iStage = nStage - 1; 2 <= iStage; iStage--) for (iNode = each iStage stage node) { for (jNode = each iStage + 1 stage node that follows iNode) { jNode.voa = 0; for (kxAlloc = each xAlloc contained in xAllocRndCntn of iNode) { copy vector al of kxAlloc to column-vector aaMatrix.aal)([l);
DeterministicOptimizer (2, aaMatrix, jNode.pGBS->wwMatrix); jNode.voa = jNode.voa + aaMatrix.voa * jNode.nodeProbability: for (1Node = each iStage + 1 stage node that follows iNode and is not equal jNode)
DeterministicOptimizer(iStage + 1, aaMatrix, 1Node.pGRS->wwMatrix) ; jNode.voa = jNode.voa + aaMatrix.voa * lNode.nodeProbability; } }
Set jNode = the iStage + 1 node that follows iNode and has the highest voa; iNode.pGBS = jNode.pGBS; }
In Step 107, identifying the best allocations within the clusters entails: for each cluster { clear xAllocBestCntn; xAllocOpt.voa = negative infinity; for (iwScenario = each wScenario contained in wScenarioCntn)
XAllocEvaluator!{iwScenario.nativeXAlloc, TRUE); }
The called XAllocEvaluator function member of the ZCluster class is:
ZCluster: :XAllocEvaluator (xAlloc, OKadd) {
VOA voa; voz = 0; for (iwScenario = each wScenario in wScenarioCntn) {
EvaluateXAllocAgainstWScenario(xAlloc, iwScenario); voa = voa + xAlloc.voa * iwScenario.nativeProbability; } xAlloc.voa = voa; //after the above first loop, the following is performed: if (xAllocOpt.voa < xAlloc.voa) { xAllozOpt = xAlloc; } if (xAllocHurdle.voa < xAlloc.voa) { xAllocHurdle = xAlloc; wasImprovecd = TRUE; . } if (OKadd) {
XAlloc xAllocDel; xAllocDel = xAlloc in xAllocBestCntn with lowest voa;
ConsiderAppendBestXAlloc(xAlloc, xAllocDel);
: ~ WO 00/43926 . PCT/US00/01380 _
ZCluster::ConsiderAppendBestXAlloc (xAllocAdd, xAllocDel) { if (xAllocAdd not in xAllocBestCntn) * { if (xAllocBestCntn.IsFull{()) { if (xAllocDel.voa < xAllocAdd.voa) { remove xAllocDel from xAllocBestCntn; add xAllocAdd to xAllocBestCntn; } } else add xAllocAdd to xAllocBestCntn; } else { find i such that xAllocBestCntn(i] equals xAllocAdd and xAllocBestCntn[i} .voa is minimized; if {xAllocBestCntn[i] .voa < xAllocAdd.voa) xAllocBestCntn([i] = xAllocAdd; } } # Using the comparison operator of the XAlloc class. The purpose here is to prevent xAllocBestCntn from being flooded with roughly equivalent allocations.
Step 109 entails: for each cluster
Improver{);
Cluster member function Improver entails:
Improver () {
Perform the following, one or mcre times: xAllocOpt.h = 0; xAllocO = xAllocOpt:
Randomly select an xAlloc object from xAllocBestCntn that has not previously been paired with (within current zCluster instance), and is different from, the current xAllocOpt. xAliocl = randomly selected xAlloc; xXAllocl.h = 1; xAllocHurdle = xAllocl; xAllocBnd = xAllocl; wasImproved = false;
SimpleParabolaSearch(); if (twasImproved)
InnerCompressSearch(); if (twasImproved)
OuterCompressSearch(); if (wasImproved)
ConsiderAppendBestXAiloc (xRllocHurdle, xAllocl); }
The Simple ParabolaSearch function uses the parameter 4, which can range from negative to positive infinity. The preferred values are between 0 and 1, with a slight extra preference for the value to be less than 0.5, presuming xAlloc0.voa is better than xAllocl.voa. Pseudo-code follows:
ZCluster::SimpleParabolaSearch{() {
Do the following, one or more times, each time with a different h value: {
GenxAlloch(h): if( 0 < xAlloch.h < xAllocBnd.h ) xAllocBnd = xAlloch; if (wasImproved) {
Determine the parabola passing through the following three points (where the first coordinate is the domain and the second coordinate the range): e (0, xAllocOD.voa),
e (h, xAlloch.voa), e (1, xAllocl.voa); if (such a parabola exists and has a maximal value) {
Set h2 equal to the domain value that yields the maximal value:
GenxAlloch (h2); } if( 0 < xAlloch.h < xAlloc3nd.h ) i. xAllocBnd = xAlloch; exit function; } } 2)
The GenxAlloch function, with its 2 argument, follows:
ZClustexr: :GenxAlloch (h) { for (i=0;i<number of elements in vector al; i++) if (ali) is interval or ratio numeric) { xAlloch.al[i]} = (1-h) * xAlloc0.al{i] + (h) = xAllocl.al[i); if(xAlloch.al[i] should be discrete) round xAlloch.alf{i] to be discrete; if (xAlloch.al[i] is necessarily out of bounds)
N bring xAlloch.al[i) within bounds; } else if(al[i] is an ordinal numeric) { set xAlloch.al[i] equal the ordinal value that is closest to/most associated with: (1-h) * xAllocO0.al{i} + (h) * xAllocl.al{i}; } else { if (h<=0.5) xAlloch.al [i] = xAllocO.al(i]: else ®Alloch.al({i] = xAllocl.alfi}l; } //after the above first loop, the following is performed: xBlloch.h = h; if (xAlloch.al is feasible) {
XAllocEvaluator(xaAlloch, FALSE); xAlloch. feasible = TRUE; 1 else { dis = minimum (abs (h), abs(h-1)); xAlloch.voa = (lowest voa contained in xAllocBestCntn’s xAlloc objects) - (positive constant) * dis * dis; xAlloch. feasible = FALSE:
Two approaches to “infeasible” first-stage allocations can be used. The first is simply to work with it; namely, have DeterministicOptimizer determine the result of attempting to implement such first-stage allocations. The second approach, which is shown above and is preferable, is to generate a penalty for non-feasibility. The penalty mechanism results in the allocation never being accepted, but is in keeping with the search techniques and allows processing to continue smoothly. (Note that infeasibility discussed in this paragraph is for first-stage allocations. Such allocations might result in “infeasibility” in subsequent stages, but as discussed previously, constraints can always be violated, though with consequences.
Part of the purpose of the DeterministicOptimizer function is to evaluate, and work with, such consequences.)
The InnerCompressSearch function uses a parameter h3. This parameter needs to be between zero and x4llocBnd h, such that the GenxAlloch function generates an x4/loch that is near, but not equal to, x4llocO.
ZCluster: :InnerCompressSearch() {
GenxAlloch!/h3); xAllocOoff = xAlloch; if (xAllocd.voa < xAllocOoff.voa) { do one or more times: {
Determine the parabola passing through the following three points: e (0, xAlloc0.voa), oe (xAllocOoff.h, xAllocOoff.voa), ¢ (xAllocBnd.h, xAllocBnd.voa); if (such a parabola exists and has a maximal value) {
Set hé equal to the domain value of the parabola that yields the maximal range value; if (h4 between 0 and xAllocBnd.h) {
GenxAlloch (hd); xAllocBnd = xAlloch; } else exit function; } else
{ exit function; } } } }
The OuterCompressSearch function uses a parameter 2Dec that can be any positive value.
ZCluster::OuterCompressSearch() a
XAllcc trailxAllocl, trailxAllocm, trailxAllocr;
XAlloc org0, orgl; trailxAllocm = xAllocO; } trailxAllocr = xAllccl; org0 = xAllocO; orgl = xAllocl; hS = 0; do one or more times: { hS = h5 - hDec;
GenxAlloch (h3); if (trailxAllocm.voa < xAlloch.voa) { trailxAllocr = trailxAllocm; trailxAllocm = xAlloch; } else { trailxAllocl = xAlloch; if (trailxAllocl. feasible) {
Determine the parabola passing through the following three points: e [trailxAlloci.h, trailxhllocl.voa}, es (trailxAllocm.h, trailxAllocm.voa), e¢ (trailxAllocr.h, trailxAllocr.voa}); if (such a parabola exists and has a maximal value) {
Set h5 equal to the domain value of the parabola that yields the maximal range value;
GenxAlloch (hS) ; if(trailxAllocm.h < xAllocOpt.h) trailxAllocl = trailxAllocm; } } xAllocO = xAllocOpt; xXAllocl = trailxAllocl; xAllocBnd = xAllocl; xXAllocBnd.h = 1;
InnerCompressSearch(): if (InnerCompressSearch improved xAllocHurdle)
xAllocHurdle.h = xAllocO.h - (xAllocC.h - xAllocl.h) * xAllocHurdle.h; }
XAllocO = org0; xAllocl = orqgl;: exit function; ) } }
If there is more than one cluster remaining, Step 113 is performed after Step 109. Similar to
Step 103, using the zCluster’s vector xAllocOpt.al as coordinates, the clusters are clustered into new larger clusters. For each identified new larger cluster: create zCluster instance newZCluster; for (each old cluster being merged into newZCluster) add each wScenario in oldZCluster.wScenarioCntn to newZCluster.wScenarioCntn; for (each old cluster being merged into newZ2Cluster) { for (xAllocPrev = each xAlloc in oldZCluster.xAllocBestCntn) newZCluster.XAllocEvaluator (xAllocPrev, TRUE); destroy oldZCluster; )
After the clusters have been merged, processing resumes at Step 109.
If there is only one cluster remaining, Step 115 is performed after Step 109. It entails implementing the first-stage resource allocations indicated in vector x4llocOpt.al of the last remaining zCluster. (After implementation and the subsequent actual realization of w;, the complete process described here is repeated, with the second stage having become the first stage, the third stage having become the second, and so forth.) "Miscellaneous Considerations"
Functions ZCluster::XAllocEvaluator (of each ZCluster instance), B
EvaluateXAllocAgainstWScenario, and DeterministicOptimizer should avoid repeating lengthy calculations when given the same arguments. This can be accomplished by the following: at the end of each function call, the arguments and results are stored; at the start of each function call, if the same arguments are being used again, then the associated previous results are retrieved.
Further along these lines, if the NativeOptimizer and/or DeterministicOptimizer functions generate difficult-to-reproduce intermediate results that could be used for re-optimization, then such results should be saved for reuse. "Example Resource Allocations"
The following examples are presented here to demonstrate some of the uses, usefulness, and scope of the present invention. These examples are meant to be illustrative, and should not - be construed to define or bound the present invention.
Example 1: Designing a New Manufacturing Facility with Uncertain Future Demand
Capacity requirements for a new manufacturing facility are needed, but it is uncertain what they should be, because future product demand is uncertain and seasonal.
A five-stage resource-allocation optimization is appropriate here. The first stage concerns determining capacity levels or investments, and the second through the fifth stages concern allocating that capacity to meet seasonal demand. Scenarios are generated and a scenario-tree is constructed. The NativeOptimizer function member of each wScenario object determines optimal capacity, assuming the scenario’s product-demand level (specified in wwMatrix) occurs with certainty. NativeOptimizer may entail use of cxpert-knowledge, may entail use of OR/MS optimization techniques, or may determine capacity in a crude and lax manner.
NativeOptimizer calls ValueAllocation to compute ROI (return on investment) based upon first-stage capacity investments and the return during the four seasons.
Based upon first-stage capacity levels, the wScenarios are clustered into zCluster objects.
WNode.xAllocRndCnin objects are loaded with wScenario.nativeXAlloc objects, and the
GBSs are generated. Best first-stage capacity levels are identified and improved upon.
The DeterministicOptimizer function optimizes allocations for meeting seasonal demand, which correspond to stages two through five. The capacity allocations for stages iFlexStage through stage 5 are re-optimized, holding both first-stage capacity levels and allocations for stages two through iFlexStage-1 fixed. The function concludes by calling ValueAllocation to determine the ROI based upon first-stage capacity levels and the return during the four seasons. (In this case, the DeterministicOptimizer function is very different from the
NativeOptimizer function, because the latter addresses optimizing capacity levels, given fixed demand — while the former addresses optimizing fixed-capacity allocations to best meet demand.)
Afterwards, the ZCluster::Improver function is executed for each instance and the zClusters are merged. The process repeats until only a single zCluster remains. This zCluster's xAllocOpt contains the optimal capacity levels for the new manufacturing facility.
Example 2: Cash Management with Uncertain Receipts and Uncertain Payouts
Corporate treasurers typically manage cash in order to meet cash requirements and to maximize return. Both future requirements and future returns are frequently uncertain, and this invention can help optimize in the presence of such uncertainty.
The first step is to generate scenarios. Each stage of each scenario (i.e., each w vector) has the following:
A) for each existing and possible-future investment: e cash recuirements e cash receipts e acquisition price
~ WO 00/43926 PCT/US00/01380 _ e divestiture price oC
B) contingent realizations of’ e extra cash requirements e extra cash receipts . C) status data concerning: : * interest rates o stock market conditions.
After the scenarios are generated, they are loaded into the scenario-tree and wScenario objects and, for each wScenario, the NativeOptimizer function is executed. In this case, the
NativeOptimizer function can call DeterministicOptimizer, with iFlexStage equal to one.
The DeterministicOptimizer optimizes cash management, given a deterministic situation. It may initially determine available cash for each stage and, as is possible, allocate such cash to the individual stages’ cash requirements. If extra cash is available in various stages, such cash is optimally invested with consideration of definitely-known (i.e., certain) subsequent- stage requirements, rates of return, and transaction costs. If cash is short, then investments are optimally liquidated in various stages with consideration of definitely-known subsequent- stage requirements, rates of return, and transaction costs. And finally, the investments themselves are juggled with consideration of definitely-known subsequent-stage rates of return and transaction costs. Corporate policy may dictate certain constraints and, if possible, such constraints should be respected. (The variety of approaches here is innumerable, and this is but one approach.)
The DeterministicOptimizer function in this case could, and possibly should, entertain that which is usually considered unthinkable: defaulting on bonds, missing payroll, etc. In a given execution of this function, the allocations for stages iFlexStage and beyond could initially result in certain catastrophes, for cxample: defaulting on bond obligations and missing payroll starting in stage iFlexStage+3. The optimization process might improve the matter by changing the allocations of stage iFlexStage and beyond. This might result, for example,
in meeting payroll in stage iFlexStage+3, and suffering a more serious default in stage iFlexStage—4. (Clearly, making the best of the situation, i.e., optimization, entails ethical judgments, survival considerations, and trade-offs.)
The ValueAllocation function might return the present-value of the gains and losses occurring in each stage. Alternatively, it might return the sum of VNM utilities resulting from the gains and losses occurring in each stage.
Processing proceeds as previously described until there is one remaining zCluster, with its xAllocOpt.al allocation that indicates the cash allocations that should be made in the first stage.
Example 3: Optimizing a Financial Portfolio with Uncertain Future Returns
An investor owns various financial instruments (FIs), cash, stocks, bonds, derivatives (options), commercial paper, etc. The investor wants to maximize the VNM-utility portfolio- value as of a year from now.
Scenarios are generated using state-of-the-art techniques. For each FI that is or may be owned, twelve monthly prices and returns are included in each scenario.
After the scenarios are generated, they are loaded into the scenario-tree and wScenario objects, and the NativeOptimizer function is executed. In this case, the NativeOptimizer function can call DeterministicOptimizer, with iFlexStage set equal to one.
The DeterministicOptimizer optimizes the purchases and sales of FIs, assuming the scenario occurs with certainty. This optimization may consider tax effects, transaction costs, discrete- block-size transacting requirements, etc. When first-stage allocations are optimized (i.e.,
iFlexStage = 1) and if multiple first-stage allocations yield the same returns, then a random process is used to select a first-stage allocation from among the optimal first-stage allocations.
The ValueAllocation function notes the value of the portfolio at the end of the year, and converts the portfolio’s monetary value into a VNM utility value. The VNM function can be specified by the investor using a series of connected points that map portfolio-monetary value to utility.
Processing proceeds as previously described until there is one remaining zCluster, with its xAllocOpt.al allocation that indicates which FIs the investor should presently own.
Differences with actual present ownership are resolved by buying and selling FIs.
Example 4: Portfolio Replication with Uncertain Coupling
Some investment institutions need to replicate a portfolio, but cannot obtain the portfolio’s individual financial instruments (Fls). Instead, other Fls are purchased to compose an imitation portfolio (IP) that is expected to perform like the genuine portfolio (GP).
Such mimicry can be optimized with the present invention in an manner analogous to the portfolio example immediately above. Here, only first-stage allocations (a;) that are expected to optimally endure a single realization of random events (w;) are required. Scenarios are generated using state-of-the-art techniques. Each scenario comprises single-period performance samples for each of the GP’s Fls, and for each of the FIs that can be used in the
IP.
After the scenarios are created and loaded into the scenario-tree and wScenario objects, the
NativeOptimizer function allocates cash to the FIs that can be used in the IP, such that the return of the IP equals the return of the GP contained in the wScenario object. It is likely that multiple allocations can yield the same return, and so a random process selects one such allocation.
In this example, the DeterministicOptimizer does nothing other than call the ValueAllocation function. ValueAllocation initially determines the difference between the performance of the
GP and the IP. A special VNM utility function, like those shown in Figures 13A and 13B, is used to convert the performance difference into a utility or a voa value. In other words, the domain of these special VNM utilities functions is the difference (positive or negative) between the return of the IP and the return of the GP. (The utility function in 13A dictates seeking a strict parallel performance between the GP and the IP; while the function in 13B suggests wanting a performance roughly equivalent to the GP, though with a willingness to seek superior returns with the concomitant risk that inferior returns will result.)
Processing proceeds as previously described until there is one remaining zCluster, with its xAllocOpt.al allocation that specifies the FIs’ quantities that should be owned to mimic the
GP.
Example 5: Allocating Organizational Resources in an Uncertain Environment
One of the more advanced methods for allocating resources is presented in the PRPA.
Because that method sometimes uses Simple-scenario analysis (as described earlier herein) for allocating and pricing resources in an uncertain environment, those allocations might be sub-optimal. The present invention, however, can be coupled with the PRPA to make superior allocations.
In this example, uncertainty is presumed present in resource prices, product prices, potential demands, production coefficients, allocation-to-effectiveness-function specifications, and resource quantities. This example has three stages or time periods. At least some of the groups/Apertures cross stages; hence their allocations affect multiple periods.
The first step is to generate scenarios by randomly sampling for uncertain values. The generated scenarios are loaded into the scenario-tree and wScenario objects. NativeOptimizer function optimizes allocations, as described in the PRPA.
The ValueAllocation function determines the present-value of the changes in WI Cash (or
Internal Producer’s Surplus) during each time period (stage).
The DeterministicOptimizer function performs optimizations holding first-stage, or first-and second-stage allocations fixed. Each execution entails (given the previous allocations and the fixed scenarios) determining available WI_Cash, subtracting out earlier-stage consumed resources, holding prior-stage group and non-group allocations fixed, and then re-optimizing.
Processing proceeds as previously described until only one zCluster remains. Its . xAllocOpt.al allocations are the a; allocations to be initially implemented. . "Conclusion"
As the reader who is familiar with the domain of the present invention can see, this invention thus leads to optimized, or near-optimized, resource allocations when uncertainty is present.
With such optimizations, both organizations and individuals can therefore better reach their goals.
While the above description contains many particulars, these should not be construed as limitations on the scope of the present invention; but rather, as an exemplification of one preferred embodiment thereof. As the reader who is skilled in the invention’s domain will appreciate, the invention’s description here is oriented towards facilitating ease of comprehension. Such a reader will also appreciate that the invention’s computational performance can casily be improved by applying both prior-art techniques and readily apparent improvements.
Many variations and many add-ons to the preferred embodiment are possible. Their use frequently entails a trade-off between required-computer time and final-allocation quality, and their effectiveness can be situationally contingent. Examples of variations and add-ons include, without limitation: 1. The Improver function does not necessarily need to use x4llocOpt for xAllocO.
Instead, two different xAllocs from xA4llocBestCntn could be randomly selected and copied to xAlloc0 and xAllocl, preferably with x4lloc0.voa being superior to xAlloc].voa. The random selection process should avoid repeated selection of the same pair in the same zCluster instance. Once clusters are merged, continuing to avoid repeating a pair might be desirable, since this would tend to focus searching in the space between the previous-smaller-merged clusters. 2. The Improver function can skip any or all of the three search functions (SPS, ICS,
OCS). Omission results in obtaining a final allocation faster, though it is likely be inferior to what could have otherwise been obtained. (OCS is likely the least computationally efficient of the three functions.) 3. A further variation on variation #2 is to selectively use the Improver function. If, a priori, a single local optimum can be assumed for the z function, then performance could be improved as follows. After Step 105 clusters, here termed Modal-clusters, that may contain the optimal allocations are identified: clusters that have many scenarios and/or clusters that have scenarios with particularly high voa values are good Modal-clusters choices; clusters that would contain first-stage allocations as determined by Simple-scenario analysis and/or Convergent-scenario analysis are also good choices. After one or more Modal-clusters are identified, processing proceeds as previously described, except that 1) in Step 109, the Improver function is applied only to the Modal-clusters, and 2) in Step 113, when clusters are merged, if an old non-Modal zCluster object yields a superior xAlloc for the new zCluster object, then the old zCluster object’s Improver function is immediately called, and the merging postponed until after the function is complete. (The result of merging a Modal with Nn non-Modal-cluster(s) is a Modal-cluster.) - An extreme use of Modal-clusters entails, in Step 103, using an allocation resulting from Simple-scenario analysis as a seed to build a Modal-cluster having more than one wScenario objects. Afterwards, each wScenario object not included in the
Modal-cluster is loaded into its own zCluster object (singleton). Then in each : iteration of Step 113, only the singleton clusters relatively near the Modal-cluster are merged into the Modal-cluster, while the singletons relatively far from the Modal- cluster are not merged until a subsequent iteration of Step 113. 4. Standard linc-search, non-derivative, and/or derivative based techniques could be incorporated in ZCluster::Improver for improving first-stage allocations (stored as - = xAlloc objects in xAllocBestCntn). Such techniques might require some adaptation, - including, for instance, incorporation of response surface methods (RSM techniques). : ~ (See A. R. Conn, K. Scheinberg, and Ph. L. Toint "Recent Progress in Unconstrained
Nonlinear Optimization Without Derivatives" Mathematical Programming 79 (1997), p. 397-414; and M.S. Bazaraa, H.D. Sherali, C.M. Shetty, Nonlinear Programming
Theory and Algorithms 2nd ed., John Wiley & Sons. Inc., New York, 1993, [See particularly Chapter 8: “Unconstrained Optimization” p. 265-355]. Both references also cite relevant previous publications.) Incorporation of such standard line-scarch, non-derivative, and/or derivative based techniques in ZCluster::Improver will be termed here as StandardSearch.
An example of StandardSearch is the use of the sequential simplex search technique developed by Nelder and Mead: some or all of the xAlloc objects stored in xAllocBestCntn could be used to define the simplex, which is in turn used to generate additional x4lloc objects (in a manner analogous with the GenxAlloch function), which in turn are evaluated using XAllocEvaluator, which in turn redefine the simplex, etc. — all potentially leading to a superior xAlloc.
5. Well known genetic algorithms could be incorporated into the ZCluster: :Improver function to combine existing xAlloc objects in xAllocBestCntn to form additional xAlloc objects, which are evaluated using X4/locEvaluator. Naturally, the better resulting xA4lloc objects are added to xAllocBesiCntn. Incorporation of genetic algorithms in ZCluster::Improver will be termed here as GeneticSearch.
A simple means to implement GeneticSearch is to include in the Improver function calls to a special version of GenxAlloch. This special version would be identical to the regular version, except that a different value for 2 would be randomly generated for each iteration of the first loop. 6. The equality-comparison operator of the X4/loc class could initially start with a loose tolerance, and as processing proceeds, become tighter. This might reduce potentially wasteful considerations of roughly-equal allocations, when there are numerous xAllocs in numerous zClusters. 7. If there are many scenarios in a cluster, the ZC luster: XAlloc Evaluator function could use statistical inference to consider early termination. If statistical inference suggests that the resulting voa would not be very good, then xAlloc.voa should be set to the : estimated not-very-good value, the function exited, and processing otherwise continucd. (The drawn-sample-scenario sequence should be consistent.) 8. If there are many wScenario objects, then initial clustering could be nested: clusters are initially formed based upon a; allocations, then within each such cluster, another secondary clustering is done based upon a; allocations, and so forth. The final (smallest) clusters would then be loaded into the zCluster objects.
9. The maximum number of x4/loc objects held in ZCluster::xAllocBestCntn could be N variable, and thus the thoroughness of the optimization adjusted. The /mprover function, and the functions it calls, are continuously generating reasonable x4/locs that could be saved in x4llocBestCnitn. Alternatively, after each iteration of the ~ Improver function, xAlloc0 and/or xAllocl could be removed from xAllocBestCnin if they do not equal x4/locOpt. Further, periodically the xAlloc objects in
ZCluster:.xAllocBestCntn could be evaluated for equivalence, and rough duplicates . discarded. 10. Scenario specifications, i.e., wScenario.wwMatrix, could be used as proxies for clustering based upon first-stage allocations. When scenario generation is performed by using formal sampling techniques, i.e., area sampling, cluster sampling, stratified
N sampling, systematic sampling, etc., clusters frequently automatically suggest ) themselves. Such naturally occurring clusters can be used as bases for initially ] loading the zCluster objects. 11. Within each zCluster instance, any means can be used to create first-stage allocations (xAlloc objects), which then could be evaluated by the XAllocEvaluator function.
Techniques for creating first-stage allocations include: generating a weighted average of the nativeXAllocs contained in wScenarioCntn, and generating a weighted average of the xAllocs contained in xAllocBestCntn. Any xAlloc created outside of a zCluster instance could also be used. Incorporation of such methods will be termed here as
MiscSearch. 12. When multiple processors are available, they might desirably be used for parallel execution of multiple instances of the ZCluster:: Native Optimizer and the
ZCluster::Improver functions and for parallel generation of GBSs. The generation of
GBSs could be done by having each processor handle a branch of the scenario tree.
13. The GBSs can be regenerated at any time, which beneficially calibrates the GBSs to BN the current-optimization state. This requires: 1) weighting each cluster by the cumulative probability that the scenarios within the cluster will occur, 2) randomly assigning, based upon cluster probability, the clusters’ x4{locOpt (or the xAllocs stored in the clusters’ x4llocBestCntn) to the wNode s’ xAllocRndCnin objects, and 3) proceeding with GBS generation as previously described. 14. Contingent-GBSs could result in better allocations, but require more effort to generate. Contingent-GBSs are particularly appropriate when earlier stage allocations make a significant difference for the later stages. For example, a household’s resource allocation is being optimized; a decision to buy or not buy a first home significantly affects what can be done in subsequent stages. To gencrate Contingent-
GBSs, processing proceeds as previously described for each contingent possibility: those xA4llocs in wNode.xAllocRndCnirn that result in the first variation are used to generate the first variation GBS; those that result in the second variation are used to generate the second variation GBS, and so forth. Returning to the example, suppose
Contingent-GBSs are being developed for a fifth stage node; those xA4llocs that resuit in purchasing-a-house in stages 1,2, 3, or 4 are used to generate the “house bought”
GBS; while those that result in not-purchasing-a-house are used to generate the “no house bought” GBS. (When optimizing stage 5 allocations, the “house bought” GBS is used if a house is bought during stages 1, 2, 3, or 4; otherwise, the “no house bought” GBS is used.)
The difficulty with this approach is that the xAllocs in x4llocRndCntn might not lead to every contingent variation. The simplest way around this is to suspend generating the Contingent-GBS until an xAlloc that results in the variation appears, and then using it to generate the GBS. (Such xAllocs could be accumulated, and each time one appears, the most recently accumulated xA/locs used to generate new GBSs.)
~ WO 00/43926 PCT/US00/01380 _ 15. Better GBSs can be generated by merging several scenarios to create an optimal GBS.
Merged-GBSs are particularly appropriate when a branch of the scenario-tree lacks a central scenario that can serve as a good GBS. Merged-GBSs, however, require more effort to generate.
Generating Merged-GBSs is analogous to finding optimal cluster allocations: rather than finding optimal allocations for a set of scenarios, optimal scenarios are found for a set of allocations. The following pseudo-code shows the GenMergedGBS class, which is conceptually based upon the ZCluster class, with WWMatrix replacing
XAlloc. This pseudo-code generates a Merged-GBS for an iStage-stage node named iNode; execution begins at the MainBody function. class GenMergedGBS () . { wwWwMatrixBestCntn; o R wwMatrixOpt;
WWMatrixEvaluator (wwMatrix, OKadd) . {
AAMatrix aaMatrix; } WWMatrix wwMatrixTemp; wwMatrixTemp = wwMatrix; wwMatrix.voa = 0; for{each xAlloc in iNode.xAllocRndCntn) { copy xAlloc.al to aaMatrix.aa() (1);
DeterministicOptimizer (2, aaMatrix, wwMatrixTemp): for{jNode = each iStage+l node following iNode) {
DeterministicOptimizer(iStage+l, aaMatrix, jNode.pGBS->wwMatrix) ; wwMatrix.voa = wwMatrix.voa + aaMatrix.voa * jNode.nodeProbability; } } //... BRnalogously follows code after first loop in 2Cluster: :XAllocEvaluater. ... }
ConsiderAppendBestWWMatrix (wwMatrixAdd, wwMatrixDel);
MainBody () { for (jNode = each iStage+l node following iNode)
WWMatrixEvaluator (jNode.pGBS->wwMatrix, TRUZ);
Improver (); iNode.pGBS = (pointer to, copy of) wwMatrixOpt:; }
Improver();
SimpleParabolaSearchi);
InnerCompressSearch(};
OuterCompressSearch();
GenwwMatrixh (h) {
Analogously follows ZCluster::GenxAlloch, except first loop is applied to all columns of wwMatrix. } wwMatrixHurdle; wasImproved; wwMatrix0; wwMatrixOoff; wwMatrixl; wwMatrixh; wwMatrixBnd; } 16. When scenarios cannot legitimately be merged, as is required for Merged-GBSs,
Multiple-GBSs can be used. The central idea of Multiple-GBSs is to use several
GBSs to generate multiple allocations, which in turn are merged.
Generating Multiple-GBSs is analogous to finding optimal cluster allocations: rather than finding an optimal allocation for a set of scenarios, an optimal blending of multiple allocations is determined and the blending steps are noted/recorded. Later, the blending steps are repeated for blending other allocations.
Two additional classes are required. The M4AMatrix class (meta AA Matrix) is the same as the AAMatrix class, except that it contains multiple aa arrays that are always accessed in the same order. The GenMultipleGBS class is analogous to the ZCluster class, with MAAMatrix replacing XAlloc, and is included in each wNode object having
Multiple-GBSs.
The following pseudo-code shows the process of generating Multiple-GBSs for an iStage-stage node iNode. (For ease of comprehension, each node immediately following iNode is assumed to have a single GBS, as opposed to multiple GBSs.):
MAAMatrix mAAMatrix;
AAMatrix aaMatrix;
GenMultipleGBS gmGBS; gmGBS.nElemAAMatrix3estArray = 0; gmGBS.iStage = iStage;
~ WO 00/43926 PCT/US00/01380 _ gmGBS. iNode = iNode; gmGBS. nRecorder = 0; for {jNode = each iStage+l node following iNode) { empty mAAMatrix of aa arrays; for {each xAlloc in iNode.xAllccRndCntn) { copy xAlloc.al to aaMatrix.aa(l([l);
DeterministicOptimizer (2, aaMatrix, jNode.pGBS->wwMatrix);
Add aaMatrix.aa to mAAMatrix; . } ’ gmGBS .MAAMatrixEvaluatcr (mAAMatrix, TRUE); } gmGBS. Improver{);
The GenMultipleGBS class is conceptually based upon the ZCluster class, with
MAAMatrix replacing XAlloc. class GenMultipleGBS: public... { iStage; iNode; struct { index_hoO; index_hl; h; index _hResult; } recorderi]; nRecorder; mAAMatrixBestArray[); //analcgous with xAllocBestCntn. nElemAAMatrixBestArray; mAAMatrixOpt; iMax;
MARAMatrixEvaluator (mARMatrix, OXadd) { ] mAAMatrix.voa = 0; for (jNode = each iStage+l node following iNode) { for (aaMatrix = each aa array contained in mAAMatrix) {
DeterministicOptimizer(iStage+l, aaMatrix, jNode.pGBS->wwMatrix); mAAMatrix.voa = mARMatrix.voa + aaMatrix.voa * jNode.nodePrcbability:; } } //... Analogously follows code after first loop in
ZCluster: :XAllocEvaluator. ... )
ConsiderAppendBestMAAMatrix (mMAAMatrixAdd, mAAMatrixDel) { if (nElemAAMatrixBestArray == 0 mAAMatrixBestArray[iMax].voa < mAAMatrixAdd.voa)
iMax = nElemAAMatrixBestArray; mAAMatrixBestArray[nElemAAMa<rixBestArray++] = mAAMat rixAdd; //positions need to be kept constant and elements not //removed, so that re-play works correctly. }
Improver|() {
Follows ZCluster::Improver, except that when and if
ConsiderAppendBestMAAMatrix is called because an iteration yields an improvement over the beginning mAAMatrixHurdle, the following is also done after the call to
ConsiderAppendBestMARMatrix: { recorder [nRecorder) .index_ LO = i, such that mAAMatrixBestArray(i] = mAAMatrix0; recorder [nRecorder] .index hl = i, such that mAAMatrixBestArrayf{i]) = mAAMatrixl; recorder [nRecorder)}.h = mAAMatrixHurdle.h; recorder [nRecorder].index_hResult = i, such that mARMatrixBestArray[i] = mAAMatrixHurdle: nRecorder++; } }
SimpleParabolaSearch{):
InnerCompressSearch{});
OuterCompressSearch();
GenMAAMatrixh (h) ( for (k=each aa matrix in mAAMatrix) {
Analogously apply first loop of ZCluster::GenxAlloch to merge columns 1 through iStage of kth aa array of mAAMatrix0 and mAAMatrixl into columns 1 through iStage of kth aa array of mAAMatrixh. } //... Analogously follows code after first loop in
ZCluster::GenxAlloch. “en } mAAMatrixHurdle; wasImproved; mAAMatrix0; mAAMatrixOoff; mAAMatrixl; mAAMatrixh; mAAMatrixBnd; }
Using Multiple-GBSs for generating the iStage-stage allocations for iNode entails not : directly calling the DeterministicOptimizer function in
EvaluateXAllocAgainstWScenario, but doing the following instead: { aaMatrixArray{l; // i.e., array of ARMatrix objects. i= 0;
for (jNode = each iStage+l node following iNode) {
DeterministicOptimizer (iFlexStage, aaMatrix, jNode.pGBS->wwMatrix) ; aaMatrixArray([i++] = aaMatrix; } “ for(i=0; i<gmGBS.nRecorder; i++) { - using: . aaMatrixArray(gmGBS.recorder([i).index h0].aa[] (iStage], : ® aaMatrixArray[gmGBS.recorder([i).index_hl].aa[] (iStage], e gmGBS.recorder(i].h; : apply processing analogous to first loop of Z2Cluster::GenxAlloch to create merged values for column: aaMatrixArray[gmGBS. recorder (i).index_hResult].aa(] {iStage]. }
Copy column aaMatrixArray(gmGBS.recorder (iMax].index_hResult].aa(]) (iStage] to column aaMatrix.aa(][iStagel. } : : (Note: When looping through the jNode objects, the sequence of fetching jNode objects needs to be consistent.) 17. Besides allocating resources, this invention can also value resources, which as previously described, can be used to allocate resources.
Define a function zz(g,c) that both uses this invention (with an unchanging scenario- tree and associated scenarios; {the GBSs, however, may change] ) to determinate an optimal allocation and that returns a computed z value for equation 2.0, given that the available on-hand quantity of a particular resource changes by ¢, and given that available on-hand cash changes by ¢. (Both g and c can apply to different stages.)
Given a particular ¢, well known numerical techniques can be used to find c such that: 2z(0,0) = zz(q, ¢)
By economic theory, the value of the |q| units of the particular resource is |c|: if g is negative, then c is the minimal value that should be received for selling -¢ resource units; if g is positive, then -¢ is the maximal value that should be paid for buying g resource units. For small g, |c/q| equals unit price for the particular resource and such a price can be used for pricing.
Another means to generate similar data is to generate supply and demand curves. If, ) within the scenarios, a resource can be sold and/or purchased, then resource supply and demand curves can be generated by varying resource price, performing Steps 101 through 113 with the same wScenario objects, and noting the resulting resource quantity changes. (Conceptually, produced products and services can be handled as a bundle of resources. Depending on the DeterministicOptimizer and NativeOptimizer functions, the gq discussed here could instead reference produced product and service quantities.)
Given a resource optimization method, how to value and price resources and how to beneficially use such values and prices is well known by economists. The point of this variation is that this invention can be used, as a resource optimization method, in conjunction with prior-art techniques to determine and use resource prices and values.
And once such prices and values are determined, they can be used for internal pricing and for deciding whether to buy or sell on the open market. 18. Step 103 is not necessarily required, and it is acceptable, instead, to place all scenarios created in Step 101 into a single ZCluster. This could be desirable when there are only a few scenarios (and hence clustering is not worth the effort) or when the clusters are highly disparate.

Claims (16)

  1. WHAT I CLAIM 1S: CLAIM 1. A system for optimally allocating resources comprising: a computer having at least one processor, means for data input and output, and memory means for storing data and executable programs; said memory means comprising a first memory portion storing a plurality of scenarios; a second memory portion storing an executable program means for loading said first memory portion; : a third memory portion for storing a plurality of X4lloc objects; $i - " a fourth memory portion storing an executable program means for allocating resources within each said scenario stored in said first memory portion; a fifth memory portion storing an executable program means for evaluating an allocation contained in an XAlloc object against one or more scenarios of said first memory portion; a sixth memory portion for storing an executable program means for calling executable program means of said second, fourth, and fifth memory portions and for performing executable program means on said first and third memory portions to optimally allocate said resources.
  2. CLAIM 2. The system for optimally allocating resources according to Claim 1, wherein said sixth memory portica: further comprises an sxeculan le programm means for clustering said scenarios of said first memory portion; said first memory portion further comprises a means
    ~ WO 00/43926 PCT/US00/01380 i} for storing said clusters; said sixth memory portion further comprises an executable program means for utilizing said clusters to optimally allocate said resources.
  3. CLAIM 3. The system for optimally allocating resources according to Claim 1, wherein said sixth memory portion further comprises at least one of the following executable program means: SimpleParabolaSearch, InnerCompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three.
  4. CLAIM 4. The system for optimally allocating resources according to Claim 1, wherein said sixth memory portion further comprises at least one of the following executable program means: StandardSearch, MiscSearch for generating XAlloc objects; said sixth memory portion causing only preferable said generated XA4lloc objects to be stored in said memory portion three.
  5. CLAIM 5. The system for optimally allocating resources according to Claim 1, wherein said sixth memory portion further comprises an executable program means for generating Guiding Beacon Scenarios; said fifth memory portion further comprising means for using said generated Guiding Beacon Scenarios.
  6. CLAIM 6. The system for optimally allocating resources according to Claim 5, wherein said executable program means for generating Guiding Beacon Scenarios further includes means for generating at least one of the following types of Guiding Beacon Scenarios: Contingent, Merged, and Multipie; said means for using said generated Guiding Beacon Scenarios further
    ~ WO 00/43926 PCT/US00/01380 _ includes means for using the Guiding Beacon Scenarios generated by said means for generating Guiding Beacon Scenarios.
  7. CLAIM 7. The method for optimally allocating resources according to Claim 6, wherein, at least one of the following:
    A) said sixth memory portion further stores an executable program means for clustering said scenarios of said first memory portion; said first memory portion further stores said clusters; said sixth memory portion further stores an executable program means for utilizing said clusters to optimally allocate said resources;
    B) said sixth memory portion further stores at least one of the following executable program means: SimpleParabolaSearch, Inner CompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three;
    C) said sixth memory portion further stores at least one of the following executable program means: StandardSearch, MiscSearch for generating XAlloc objects; said sixth memory portion causing only preferable said generated XA4lloc objects to be stored in said memory portion three.
  8. CLAIM 8. The method for optimally allocating resources according to Claim 1, wherein said method comprises at least two of the following:
    A) said sixth memory portion further stores an executable program means for clustering said scenarios of said first memory portion; said first memory portion further stores said clusters; said sixth memory portion further stores an executable program means for utilizing said clusters to optimally allocate said resources;
    B) said sixth memory portion further stores at least one of the following executable program means: SimpleParabaolaSearch, InnerCompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new : XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three;
    : C) said sixth memory portion further stores at least one of the following executable program means: StandardSearch, MiscSearch for generating XAlloc objects; said sixth memory portion causing only preferable said generated XAlloc objects to be
    : stored in said memory portion three.
    on D) said sixth memory portion further stores an executable program means for generating
    Ll Guiding Beacon Scenarios; said fifth memory portion further stores means for using tz said generated Guiding Beacon Scenarios.
  9. CLAIM 9. A method for optimally allocating resources, utilizing a computer having at least one processor, means for data input and output, and memory means for storing data and executable programs; said method comprising:
    storing a plurality of scenarios in a first portion of said memory means; storing in a second portion of said memory means an executable program means for loading said first memory portion; storing XAlloc objects in a third portion of said memory means; storing in a fourth portion of said memory means an executable program means for allocating resources within each said scenario stored in said first memory portion; storing in a fifth portion of said memory means an exccutable program means for evaluating an allocation contained in an X4/loc object against one or more scenarios of said first memory portion; storing in a sixth portion of said memory means an executable program means for calling executable program means of said second, fourth, and fifth memory portions and for performing executable program means on said first and third memory portions to optimally allocate said resources.
  10. CLAIM 10. The method for optimally allocating resources according to Claim 9, wherein said sixth memory portion further stores an executable program means for clustering said scenarios of said first memory portion; said first memory portion further stores said clusters; said sixth memory portion further stores an executable program means for utilizing said clusters to optimally allocate said resources.
  11. CLAIM 11. The method for optimally allocating resources according to Claim 9, wherein said sixth memory portion further stores at least one of the following executable program means: SimpleParabolaSearch, InnerCompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three.
  12. CLAIM 12. The method for optimally allocating resources according to Claim 9, wherein said sixth memory portion further stores at least one of the following executable program means: StandardSearch, MiscSearch for generating XAlloc objects; said sixth memory portion causing only preferable said generated XAlloc objects to be stored in said memory portion three.
  13. CLAIM 13. The method for optimally allocating resources according to Claim 9, wherein said sixth memory portion further stores an executable program means for generating Guiding Beacon Scenarios; said fifth memory portion further stores means for using said generated Guiding Beacon Scenarios.
  14. CLAIM 14. The method for optimally allocating resources according to Claim 13, wherein said executable program means for generating Guiding Beacon Scenarios further includes means for generating at least onc of the following types of Guiding Beacon Scenarios: Contingent, Merged, and Multiple; said means for using said generated Guiding Beacon Scenarios further including means for using the Guiding Beacon Scenarios generated by said means for generating Guiding Beacon Scenarios.
  15. CLAIM 15. The method for optimally allocating resources according to Claim 14, wherein, a at least one of the following:
    A) said sixth memory portion further stores an executable program means for clustering said scenarios of said first memory portion; said first memory portion further stores
    - ~ said clusters; said sixth memory portion further stores an executable program means : for utilizing said clusters to optimally allocate said resources.
    B) said sixth memory portion further stores at least one of the following executable program means: SimpleParabolaSearch, InnerCompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three.
    C) said sixth memory portion further stores at least onc of the following exccutable program means: StandardSearch, MiscSearch for generating Xdlloc objects; said sixth memory portion causing only preferable said generated X4l/loc objects to be stored in said memory portion three.
  16. CLAIM 16. The method for optimally allocating resources according to Claim 9, wherein, at least two of the following:
    A) said sixth memory portion further stores an exccutable program means for clustering said scenarios of said first memory portion, said first memory portion further stores said clusters; said sixth memory portion further stores an executable program means for utilizing said clusters to optimally allocate said resources.
    B) said sixth memory portion further stores at least one of the following executable program means: Simple ParabolaSearch, InnerCompressSearch, OuterCompressSearch, GeneticSearch for combining XAlloc objects to form new
    XAlloc objects; said sixth memory portion causing only preferable said new XAlloc objects to be stored in said memory portion three.
    C) said sixth memory portion further stores at least one of the following executable program means: StandardSearch, MiscSearch for generating XAlloc objects; said sixth memory portion causing only preferable said generated XAlloc objects to be stored in said memory portion three.
    D) said sixth memory portion further stores an executable program means for generating Guiding Beacon Scenarios; said fifth memory portion further stores means for using said generated Guiding Beacon Scenarios.
ZA200106048A 1999-01-21 2001-07-24 Methods and apparatus for allocating resources in the presence of uncertainty. ZA200106048B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11678599P 1999-01-21 1999-01-21

Publications (1)

Publication Number Publication Date
ZA200106048B true ZA200106048B (en) 2002-06-13

Family

ID=22369205

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA200106048A ZA200106048B (en) 1999-01-21 2001-07-24 Methods and apparatus for allocating resources in the presence of uncertainty.

Country Status (1)

Country Link
ZA (1) ZA200106048B (en)

Similar Documents

Publication Publication Date Title
US6219649B1 (en) Methods and apparatus for allocating resources in the presence of uncertainty
Van Vyve Linear prices for non-convex electricity markets: models and algorithms
Cordeau et al. An integrated model for logistics network design
Consigli et al. Dynamic stochastic programmingfor asset-liability management
Loch et al. Dynamic portfolio selection of NPD programs using marginal returns
US10311358B2 (en) Systems and methods for multi-objective evolutionary algorithms with category discovery
Issaoui et al. Smart Logistics: Blockchain trends and applications.
Ramalho et al. Multicriteria decision making under conditions of uncertainty in application to multiobjective allocation of resources
WO2014100724A1 (en) System and method for optimizing collateral management
US20090083119A1 (en) Method for business plan optimization based on attributes
US20160086277A1 (en) Stochastic Dynamic Programming in a Computer Using a Multi-Part Utility Function and Local Search to Efficiently Compute Asset Allocation and Consumption
Barro et al. Dynamic portfolio optimization: Time decomposition using the maximum principle with a scenario approach
Baldwin et al. Solving strong-substitutes product-mix auctions
Werner et al. Stochastic mixed-integer programming for integrated portfolio planning in the LNG supply chain
Nonås et al. Optimal solutions in the multi-location inventory system with transshipments
Escudero et al. A parallel computation approach for solvingmultistage stochastic network problems
Joncour et al. Generalized relax-and-fix heuristic
US20110029982A1 (en) Network balancing procedure that includes redistributing flows on arcs incident on a batch of vertices
Cherfaoui et al. Biobjective optimization over the efficient set of multiobjective integer programming problem.
ZA200106048B (en) Methods and apparatus for allocating resources in the presence of uncertainty.
Bernard et al. Cost-efficient payoffs under model ambiguity
CN112836857B (en) Oil and gas exploration optimization method and device
Orrsveden et al. Optimization of Collateral allocation for Securities Lending: An Integer Linear Programming Approach
Bendavid et al. A simulation based investigation of inventory management under working capital constraints
de Matta et al. The selection allocation problem