WO2024082687A1 - 一种储能系统和供电系统 - Google Patents

一种储能系统和供电系统 Download PDF

Info

Publication number
WO2024082687A1
WO2024082687A1 PCT/CN2023/102933 CN2023102933W WO2024082687A1 WO 2024082687 A1 WO2024082687 A1 WO 2024082687A1 CN 2023102933 W CN2023102933 W CN 2023102933W WO 2024082687 A1 WO2024082687 A1 WO 2024082687A1
Authority
WO
WIPO (PCT)
Prior art keywords
flow port
flow
liquid
port
single valve
Prior art date
Application number
PCT/CN2023/102933
Other languages
English (en)
French (fr)
Inventor
蒙浩
徐春霞
Original Assignee
华为数字能源技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为数字能源技术有限公司 filed Critical 华为数字能源技术有限公司
Publication of WO2024082687A1 publication Critical patent/WO2024082687A1/zh

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/02Heating, cooling or ventilating [HVAC] devices the heat being derived from the propulsion plant
    • B60H1/03Heating, cooling or ventilating [HVAC] devices the heat being derived from the propulsion plant and from a source other than the propulsion plant
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60KARRANGEMENT OR MOUNTING OF PROPULSION UNITS OR OF TRANSMISSIONS IN VEHICLES; ARRANGEMENT OR MOUNTING OF PLURAL DIVERSE PRIME-MOVERS IN VEHICLES; AUXILIARY DRIVES FOR VEHICLES; INSTRUMENTATION OR DASHBOARDS FOR VEHICLES; ARRANGEMENTS IN CONNECTION WITH COOLING, AIR INTAKE, GAS EXHAUST OR FUEL SUPPLY OF PROPULSION UNITS IN VEHICLES
    • B60K11/00Arrangement in connection with cooling of propulsion units
    • B60K11/02Arrangement in connection with cooling of propulsion units with liquid cooling
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/60Heating or cooling; Temperature control
    • H01M10/61Types of temperature control
    • H01M10/617Types of temperature control for achieving uniformity or desired distribution of temperature
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/60Heating or cooling; Temperature control
    • H01M10/65Means for temperature control structurally associated with the cells
    • H01M10/656Means for temperature control structurally associated with the cells characterised by the type of heat-exchange fluid
    • H01M10/6567Liquids
    • H01M10/6568Liquids characterised by flow circuits, e.g. loops, located externally to the cells or cell casings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present application relates to the technical field of power supply equipment, and in particular to an energy storage system and a power supply system.
  • containers have also been widely used as a way of energy storage.
  • the above-mentioned container can be an energy storage system, and a power supply system may include multiple energy storage systems.
  • the energy storage system may specifically include a battery pack and a power conversion component. During the operation of the energy storage system, both the battery pack and the power conversion component will generate heat. Therefore, the energy storage system also includes a temperature control system, which is used to control the temperature of the battery pack and the power conversion component so that the battery pack and the power conversion component can operate in a more suitable temperature environment. In the prior art, two independent temperature control systems are used to control the temperature of the battery pack and the power conversion component respectively. The temperature control system of the entire energy storage system is large in size and is not conducive to energy saving.
  • the present application provides an energy storage system and a power supply system.
  • the energy storage system can adjust the temperature control scheme according to the working state, reduce the space occupied by the energy storage system, reduce power consumption, and save energy.
  • the present application provides an energy storage system, which includes a battery pack, a power conversion component, a first liquid flow channel, a second liquid flow channel, a first drive device, a second drive device and a diverter.
  • the first liquid flow channel is in thermal contact with the battery pack, and the first drive device is in communication with the first liquid flow channel, and is used to drive the liquid working medium to flow in the first liquid flow channel, thereby controlling the temperature of the battery pack.
  • the second liquid flow channel is in thermal contact with the power conversion component, and the second drive device is in communication with the second liquid flow channel, and is used to drive the liquid working medium to flow in the second liquid flow channel, thereby controlling the temperature of the power conversion component.
  • the diverter is in communication with the first liquid flow channel and the second liquid flow channel, respectively, and the diverter includes a first working state and a second working state.
  • the diverter is in the first working state, and the first liquid flow channel and the second liquid flow channel are isolated to form two independent circuits.
  • the first liquid flow channel can be used to control the temperature of the battery pack
  • the second liquid flow channel can be used to control the power conversion component. It can be controlled separately according to the temperature requirements of the battery pack and the power conversion component, which is conducive to improving the temperature control effect and saving energy consumption.
  • the diverter is in the second working state, and the first liquid flow channel and the second liquid flow channel are connected to form an integral circuit.
  • the heat of the power conversion component can be used to heat the battery pack, which is beneficial to saving energy.
  • two heat exchangers can be used to cool the liquid cooling medium to improve the heat dissipation efficiency of the battery pack.
  • the above-mentioned flow diverter includes a first flow port, a second flow port, a third flow port and a fourth flow port.
  • the above-mentioned first flow port and the second flow port are arranged on the first liquid flow channel, and when the first flow port and the second flow port are connected, the above-mentioned first liquid flow channel forms a loop.
  • the third flow port and the fourth flow port are arranged on the second liquid flow channel, and when the third flow port and the fourth flow port are connected, the above-mentioned second liquid flow channel forms a loop.
  • the first flow port When the flow diverter is in the first working state, the first flow port is connected with the second flow port, and the third flow port is connected with the fourth flow port, so that the first liquid flow channel and the second liquid flow channel form independent loops.
  • the above-mentioned flow diverter is in the second working state, the first flow port is connected with the third flow port, and the second flow port is connected with the fourth flow port, so that the first liquid flow channel and the second liquid flow channel are connected to form an integral loop.
  • the flow divider may be a four-way valve, the four valve holes of which are the first flow port, the second flow port, the third flow port and the fourth flow port.
  • the flow divider is small in size, which is conducive to reducing the space occupied by the energy storage system.
  • the above-mentioned diverter can also be a first valve group.
  • the first valve group includes a first single valve, a second single valve, a third single valve and a fourth single valve.
  • the above-mentioned first single valve is connected between the first flow port and the second flow port
  • the second single valve is connected between the second flow port and the third flow port
  • the third single valve is connected between the third flow port and the fourth flow port
  • the fourth single valve is connected between the fourth flow port and the first flow port.
  • the flow dividing member may also be a liquid storage tank, and the first flow port, the second flow port, the third flow port and the fourth flow port are connected to the storage tank.
  • the cavity of the liquid tank is connected.
  • the liquid tank includes a partition, the flow divider is in a first working state, the partition divides the liquid tank into a first liquid storage cavity and a second liquid storage cavity, the first flow port and the second flow port are connected to the first liquid storage cavity, and the third flow port and the fourth flow port are connected to the second liquid storage cavity.
  • the flow divider is in a second working state, and the partition combines the first liquid storage cavity and the second liquid storage cavity into a connected cavity.
  • the first drive device further includes a first heat exchanger
  • the second drive device further includes a second heat exchanger.
  • the flow divider includes a fifth flow port, a sixth flow port, a seventh flow port, an eighth flow port, a ninth flow port, a tenth flow port, an eleventh flow port, and a twelfth flow port.
  • the fifth flow port and the sixth flow port are opened on the first liquid flow channel
  • the seventh flow port and the eighth flow port are opened on the second liquid flow channel
  • the first heat exchanger is connected between the ninth flow port and the tenth flow port
  • the second heat exchanger is connected between the eleventh flow port and the twelfth flow port.
  • the flow divider is in a first working state, the fifth flow port is connected to the ninth flow port, the sixth flow port is connected to the tenth flow port, the seventh flow port is connected to the eleventh flow port, and the eighth flow port is connected to the twelfth flow port.
  • the first liquid flow channel and the second liquid flow channel are two independent circuits.
  • the flow divider is in a second working state, the fifth flow port is connected to the seventh flow port, the sixth flow port is connected to the eighth flow port, and the ninth flow port, the tenth flow port, the eleventh flow port, and the twelfth flow port are closed. At this time, the first liquid flow channel and the second liquid flow channel are connected to form a circuit.
  • the above-mentioned diverter also includes a third working state.
  • the fifth flow port is connected with the sixth flow port
  • the seventh flow port is connected with the tenth flow port and the eleventh flow port in sequence
  • the eighth flow port is connected with the ninth flow port and the twelfth flow port.
  • the above-mentioned diverter also includes a fourth working state.
  • the fifth flow port is connected with the ninth flow port and the twelfth flow port
  • the sixth flow port is connected with the tenth flow port and the eleventh flow port
  • the seventh flow port is connected with the eighth flow port.
  • the above-mentioned diverter can specifically be a second valve group, which includes a fifth single valve, a sixth single valve, a seventh single valve, an eighth single valve, a ninth single valve, a tenth single valve, an eleventh single valve and a twelfth single valve.
  • the fifth single valve is connected to the fifth flow port
  • the sixth single valve is connected to the sixth flow port
  • the seventh single valve is connected to the seventh flow port
  • the eighth single valve is connected to the eighth flow port
  • the ninth single valve is connected to the ninth flow port
  • the tenth single valve is connected to the tenth flow port
  • the eleventh single valve is connected to the eleventh flow port
  • the twelfth single valve is connected to the twelfth flow port.
  • the energy storage system also includes a heater, which is connected to the first cooling channel and is used to heat the liquid working medium in the first cooling channel.
  • the heater can heat the liquid working medium when the energy storage system is started in a relatively cold environment to adjust the temperature of the battery pack.
  • the diverter can be placed in the second working state, and the heater and the power conversion component heat the liquid working medium at the same time, so that the temperature of the battery pack is quickly raised to a better temperature, so that the energy storage system can enter a better working state more quickly, and can also save power consumption.
  • the energy storage system may further include a condenser, which is connected to the first cooling channel and is used to cool the liquid working medium in the first cooling channel.
  • a condenser which is connected to the first cooling channel and is used to cool the liquid working medium in the first cooling channel.
  • an external coolant may be used to cool the liquid working medium, thereby improving the heat dissipation capacity of the first liquid channel and improving the heat dissipation effect on the battery pack.
  • the present application also provides a power supply system, which includes a power distribution device and at least one energy storage system provided in the first aspect.
  • the power distribution device is electrically connected to the energy storage system, and the power distribution device is also electrically connected to the user, and is used to process the electricity in the energy storage system and distribute it to the user for use.
  • the energy storage system in the power supply system can adjust the temperature control scheme according to the working state, reduce the space occupied by the energy storage system, reduce power consumption, and save energy.
  • FIG1 is a schematic diagram of a structure of an energy storage system in the prior art
  • FIG2a is a schematic structural diagram of a working state of an energy storage system in an embodiment of the present application.
  • FIG2b is a schematic structural diagram of another working state of the energy storage system in an embodiment of the present application.
  • FIG3a is a schematic structural diagram of a flow divider in a working state in an embodiment of the present application.
  • FIG3 b is a schematic structural diagram of another working state of the flow divider in the embodiment of the present application.
  • FIG4a is a schematic structural diagram of a flow diverter in a working state in an embodiment of the present application.
  • FIG4 b is a schematic structural diagram of another working state of the flow divider in the embodiment of the present application.
  • FIG5a is a schematic structural diagram of another working state of the energy storage system in an embodiment of the present application.
  • FIG5 b is a schematic structural diagram of another working state of the energy storage system in an embodiment of the present application.
  • FIG5c is a schematic structural diagram of another working state of the energy storage system in an embodiment of the present application.
  • FIG5 d is a schematic structural diagram of another working state of the energy storage system in an embodiment of the present application.
  • 16-condenser 161-first flow channel
  • references to "one embodiment” or “a specific embodiment” described in this specification mean that one or more embodiments of the present application include a particular feature, structure or characteristic described in conjunction with the embodiment.
  • the terms “include”, “comprising”, “having” and their variations all mean “including but not limited to”, unless otherwise specifically emphasized.
  • the energy storage system is a highly integrated energy storage device with multiple battery clusters placed inside.
  • the battery cluster includes a battery pack and a power conversion component.
  • the above-mentioned battery cluster is connected to external devices through a small number of interfaces. It has the characteristics of high integration, small footprint and good scalability. It is an important part of the development of distributed energy, smart grid and energy Internet.
  • the battery pack and the power conversion component will generate heat. Heat dissipation of the battery pack and the conversion unit is an important part of ensuring the normal operation of the energy storage system.
  • the battery pack needs to be heated to improve the discharge efficiency of the battery pack. Therefore, a temperature control system is needed to control the temperature of the energy storage system.
  • FIG1 is a schematic diagram of a structure of an energy storage system in the prior art.
  • the temperature control system in the prior art includes two sets of independent temperature control circuits.
  • the two sets of independent temperature control circuits are in thermal contact with the battery pack 1 and the power conversion component 2, respectively.
  • the temperature control circuit can cool the battery pack 1 and the power conversion component 2; on the other hand, when the energy storage system is started in a low temperature environment, the temperature control circuit can also heat up the battery pack 1.
  • the temperature control circuit in thermal contact with the battery pack 1 can be connected to a heater 12.
  • the temperature control system in this solution has a large structural volume and occupies more space.
  • Figure 2a is a schematic diagram of the structure of one working state of the energy storage system in the embodiment of the present application
  • Figure 2b is a schematic diagram of the structure of another working state of the energy storage system in the embodiment of the present application.
  • the energy storage system includes a battery pack 1, a power conversion component 2, a first liquid flow channel 3, a second liquid flow channel 4, a first drive device 5, a second drive device 6 and a diverter 7.
  • the first liquid flow channel 3, the second liquid flow channel 4, the first drive device 5, the second drive device 6 and the diverter 7 belong to a temperature control system, which is used to control the temperature of the battery pack 1 and the power conversion component 2.
  • the first liquid flow channel 3 is in thermal contact with the battery pack 1, and the first drive device 5 is connected to the first liquid flow channel 3, which is used to drive the liquid working medium to flow in the first liquid flow channel 3, thereby controlling the temperature of the battery pack 1.
  • the second liquid flow channel 4 is in thermal contact with the power conversion component 2, and the second drive device 6 is connected to the second liquid flow channel 4, which is used to The liquid working medium is driven to flow in the second liquid flow channel 4, thereby controlling the temperature of the power conversion component 2. That is to say, for the temperature control of the battery pack 1 and the temperature control of the power conversion component 2, the present application provides two independent driving devices, which are used to drive the liquid working medium to control the temperature of the battery pack 1 and the temperature of the power conversion component 2, respectively.
  • the present application also provides a diverter 7, which is connected to the first liquid flow channel 3 and the second liquid flow channel 4, respectively.
  • the above-mentioned diverter 7 includes a first working state and a second working state; as shown in Figure 2a, when the diverter 7 is in the first working state, the first liquid flow channel 3 and the second liquid flow channel 4 are isolated, that is, the first driving device 5 drives the liquid working medium to flow in the first liquid flow channel 3, and will not flow into the second liquid flow channel 4; the second driving device 6 drives the liquid working medium to flow in the second liquid flow channel 4, and will not flow into the first liquid flow channel 3; forming two independent loops.
  • thermal contact between A and B means that heat can be exchanged between A and B.
  • a and B can be directly contacted and connected to exchange heat; or A and B can be indirectly contacted and connected through a heat-conducting structure such as a heat-conducting layer to exchange heat.
  • a and B can exchange heat, it will be fine.
  • the temperature control system may further include a first liquid storage tank 8, a first heat exchanger 9, a second liquid storage tank 10 and a second heat exchanger 11.
  • the first liquid storage tank 8 and the first heat exchanger 9 are in communication with the first liquid flow channel 3, the first liquid storage tank 8 is used to store liquid working fluid, the first heat exchanger 9 is used to exchange heat for the liquid working fluid to reduce the temperature of the liquid working fluid, and the first driving device 5 drives the liquid working fluid to flow in the first liquid storage tank 8, the first heat exchanger 9 and the first liquid flow channel 3.
  • the second liquid storage tank 10 and the second heat exchanger 11 are in communication with the second liquid flow channel 4, the second liquid storage tank 10 is used to store liquid working fluid, the second heat exchanger 11 is used to exchange heat for the liquid working fluid to reduce the temperature of the liquid working fluid, and the second driving device 6 drives the liquid working fluid to flow in the second liquid storage tank 10, the second heat exchanger 11 and the second liquid flow channel 4.
  • both the battery pack 1 and the power conversion assembly 2 When the energy storage system is in a stable operation stage, both the battery pack 1 and the power conversion assembly 2 generate heat. At this time, the flow divider 7 can be placed in the first working state to control the temperature of the battery pack 1 and the power conversion assembly 2 respectively. Since the heat generated by the battery pack 1 is greater than that generated by the power conversion assembly 2, the first drive device 5 and the second drive device 6 can be at different powers according to the needs, and the liquid cooling medium in the first liquid flow channel 3 can be controlled to have different flow rates. The first heat exchanger 9 and the second heat exchanger 11 can also be at different heat exchange efficiencies, which is conducive to saving energy.
  • the first drive device 5 drives the liquid working medium to flow in the first liquid flow channel 3, only dissipating heat for the battery pack 1, which is conducive to improving the heat dissipation effect for the battery pack 1.
  • the temperature of the battery pack 1 is low, and the temperature of the battery pack 1 needs to be increased to improve the working efficiency of the battery pack.
  • the flow divider 7 can be placed in the second working state, as shown in Figure 2b, and the liquid working medium flows between the first liquid flow channel 3 and the second liquid flow channel 4. In this state, the first heat exchanger 9 and the second heat exchanger 11 can be closed, that is, the liquid working medium will not be cooled.
  • the heat generated by the power conversion component 2 can be transferred to the liquid working fluid, and the liquid working fluid heats the battery pack. Therefore, there is no need to connect the first liquid flow channel 3 to the heater, which is conducive to reducing power consumption, reducing the space occupied by the temperature control system, and reducing costs.
  • the battery pack 1 when the energy storage system stops working after working for a period of time, the battery pack 1 must be cooled to increase the service life of the battery pack 1.
  • the diverter 7 can also be placed in the second working state, in which the liquid working fluid flows between the first liquid flow channel 3 and the second liquid flow channel 4. At this time, the first heat exchanger 9 and the second heat exchanger 11 are still in the open state, and the two heat exchangers cool the liquid working fluid at the same time.
  • the heat exchange efficiency is high, so that the temperature of the battery pack 1 can be rapidly reduced. It is worth noting that the heat stored in the power conversion component 2 is relatively small. When the power conversion component 2 stops working, the temperature can be rapidly reduced. Therefore, the two heat exchangers are mainly used to dissipate heat for the battery pack 1.
  • a heater 12 may be further provided in the first liquid flow channel 3.
  • the heater 12 may heat the liquid working medium when the energy storage system is started in a relatively cold environment to adjust the temperature of the battery pack 1.
  • the flow divider 7 may be placed in the second working state, and the heater 12 and the power conversion assembly 2 may heat the liquid working medium at the same time, so that the temperature of the battery pack 1 is rapidly raised to a better temperature, so that the energy storage system enters a better working state relatively quickly, and power consumption may also be saved.
  • the flow divider 7 includes a first flow port 71, a second flow port 72, a third flow port 73 and a fourth flow port 74.
  • the first flow port 71 and the second flow port 72 are opened in the first liquid flow channel 3. It can be considered that the first flow port 71 and the second flow port 72 are connected to the two ends of the first liquid flow channel 3.
  • the liquid medium flows between the first flow port 71 and the second flow port 72, so that the first liquid flow channel 3 forms a loop.
  • the third flow port 73 and the fourth flow port 74 are opened in the second liquid flow channel 4.
  • the third flow port 73 and the fourth flow port 74 are connected to the two ends of the second liquid flow channel 4.
  • the liquid medium flows between the third flow port 73 and the fourth flow port 74, and the second liquid flow channel 4 forms a loop.
  • the first flow port 71 is connected to the second flow port 72, and the first liquid flow channel 3 is formed into an independent loop;
  • the third flow port 73 is connected to the fourth flow port 74, and the second liquid flow channel 4 is formed into an independent loop, so that the first liquid flow channel 3 and the second liquid flow channel 4 are independent of each other.
  • the first flow port 71 is connected to the second flow port 72, and the first liquid flow channel 3 is formed into an independent loop; the third flow port 73 is connected to the fourth flow port 74, and the second liquid flow channel 4 is formed into an independent loop.
  • the first flow port 71 is connected to the third flow port 73, and the second flow port 72 is connected to the fourth flow port 74.
  • the first liquid flow channel 3 and the second liquid flow channel 4 are connected in series to form an integral loop.
  • Figure 3a is a structural schematic diagram of a diverter in an embodiment of the present application in one working state
  • Figure 3b is a structural schematic diagram of another working state of the diverter in an embodiment of the present application.
  • the above-mentioned diverter 7 is a liquid storage tank 13, or in other words, the above-mentioned diverter 7 and the liquid storage tank 13 are an integrated structure.
  • the above-mentioned first flow port 71, the second flow port 72, the third flow port 73 and the fourth flow port 74 are connected to the cavity of the liquid storage tank 13.
  • the above-mentioned liquid storage tank 13 may include a partition 131, which is movably installed in the cavity of the liquid storage tank 13, and the partition 131 can be movable.
  • the partition 131 is in a state that can separate the liquid storage tank 13 into two liquid storage chambers, and the above-mentioned two liquid storage chambers may include a first liquid storage chamber 132 and a second liquid storage chamber 133.
  • the partition 131 is in another state, so that the interior of the liquid storage tank 13 is a connected cavity, or it can be understood that the first liquid storage cavity 132 and the second liquid storage cavity 133 are connected to each other.
  • the liquid storage tank 13 in this embodiment can be understood as the first liquid storage tank 8 and the second liquid storage tank 10 are an integrated structure.
  • the partition 131 divides the liquid storage tank 13 into a first liquid storage chamber 132 and a second liquid storage chamber 133, and the first liquid storage chamber 132 and the second liquid storage chamber 133 are independent of each other.
  • the first flow port 71 and the second flow port 72 are connected to the first liquid storage chamber 132, so that the first liquid storage chamber 132 is connected to the first liquid flow channel 3, and the temperature of the battery pack 1 is controlled by the cooling medium in the first liquid storage chamber 132.
  • the third flow port 73 and the fourth flow port 74 are connected to the second liquid storage chamber 133, so that the second liquid storage chamber 133 is connected to the second liquid flow channel 4, and the liquid medium in the second liquid storage chamber 133 is used to dissipate heat for the power conversion component 2.
  • the partition 131 When the flow dividing member 7 is in the second working state, the partition 131 combines the first liquid storage chamber 132 and the second liquid storage chamber 133 into a connected chamber, that is, the first flow port 71, the second flow port 72, the third flow port 73 and the fourth flow port 74 are connected to each other, and the first liquid flow channel 3 and the second liquid flow channel 4 are connected to each other.
  • the liquid storage tank 13 and the flow dividing member 7 are an integrated structure, which is conducive to simplifying the structure of the temperature control system.
  • the diverter 7 can be a four-way valve, and the four valve holes of the four-way valve are the first flow port 71, the second flow port 72, the third flow port 73 and the fourth flow port 74.
  • the four-way valve in this embodiment is relatively small in size, which is also beneficial to reducing the volume of the diverter 7.
  • the isolation between the liquid working medium in the first liquid flow channel 3 and the liquid cooling working medium in the second liquid flow channel 4 is relatively high, and the heat between the two is isolated from each other, which is beneficial to improve the heat isolation between the first liquid flow channel 3 and the second liquid flow channel 4, and improve the heat dissipation effect.
  • FIG4a is a schematic diagram of the structure of a working state of the flow divider in the embodiment of the present application
  • FIG4b is a schematic diagram of the structure of another working state of the flow divider in the embodiment of the present application.
  • the flow divider 7 can be a first valve group 14, and the first valve group 14 includes a first single valve 141, a second single valve 142, a third single valve 143 and a fourth single valve 144.
  • the first single valve 141 is connected between the first flow port 71 and the second flow port 72
  • the second single valve 142 is connected between the second flow port 72 and the third flow port 73
  • the third single valve 143 is connected between the third flow port 73 and the fourth flow port 74
  • the fourth single valve 144 is connected between the fourth flow port 74 and the first flow port 71.
  • This scheme can control the working state of each single valve separately.
  • the first single valve 141 and the third single valve 143 are opened, and the second single valve 142 and the fourth single valve 144 are closed, so that the first liquid flow channel 3 and the second liquid flow channel 4 are independent of each other and work separately.
  • the second single valve 142 and the fourth single valve 144 are opened, and the first single valve 141 and the third single valve 143 are closed, so that the first liquid flow channel 3 and the second liquid flow channel 4 are interconnected.
  • FIG5a to FIG5d are schematic diagrams of another structure of the energy storage system in different states in the embodiment of the present application. Please refer to FIG5a to FIG5d.
  • the above-mentioned diverter 7 may also include more flow ports, so that the temperature control system has more connection schemes, so that the temperature control system has more working modes.
  • the above-mentioned diverter 7 may include eight flow ports, and the eight flow ports are respectively the fifth flow port 75, the sixth flow port 76, the seventh flow port 77, the eighth flow port 78, the ninth flow port 79, the tenth flow port 710, the eleventh flow port 711 and the twelfth flow port 712.
  • the above-mentioned fifth flow port 75 is opened in the first liquid flow channel 3
  • the above-mentioned seventh flow port 77 and the eighth flow port 78 are opened in the second liquid flow channel 4
  • the first heat exchanger 9 is connected between the ninth flow port 79 and the tenth flow port 710
  • the second heat exchanger 11 is connected between the eleventh flow port 711 and the twelfth flow port 712.
  • the fifth flow port 75 is connected to the ninth flow port 79, and the sixth flow port 76 is connected to the tenth flow port 710, so that the first heat exchanger 9 is connected to the first liquid flow channel 3, and the first heat exchanger 9 is used to cool the liquid-cooling medium in the first liquid flow channel 3.
  • the seventh flow port 77 is connected to the eleventh flow port 711, and the eighth flow port 78 is connected to the twelfth flow port 712.
  • the fifth flow port 75 is connected to the seventh flow port 77
  • the sixth flow port 76 is connected to the eighth flow port 78
  • the ninth flow port 79, the tenth flow port 710, the eleventh flow port 711 and the twelfth flow port 712 are closed.
  • the solution is to close the first heat exchanger 9 and the second heat exchanger 11, so that the first liquid flow channel 3 and the second liquid flow channel 4 are connected in series to form an integral loop.
  • the energy storage system may further include a condenser 16, which is connected to the first liquid flow channel 3 and is used to cool the liquid working medium in the first liquid flow channel 3.
  • the condenser 16 includes a first flow channel 161 and a second flow channel 162, wherein the first flow channel 161 is connected to the first liquid flow channel 3, so that the liquid working medium in the first liquid flow channel 3 flows through the first flow channel 161, and the external coolant flows through the second flow channel 162, and the external coolant is used to dissipate heat for the liquid working medium.
  • This solution can improve the heat dissipation capacity of the first liquid flow channel 3 and improve the heat dissipation effect on the battery pack 1.
  • the above-mentioned diverter 7 can also include a third working state. As shown in FIG. 5c, when the diverter 7 is in the third working state, the above-mentioned fifth flow port 75 is connected with the sixth flow port 76, the seventh flow port 77 is connected with the tenth flow port 710 and the eleventh flow port 711, and the eighth flow port 78 is connected with the ninth flow port 79 and the twelfth flow port 712.
  • the condenser 16 can be started, and the condenser 16 is used to cool the liquid working medium in the first liquid flow channel 3 to dissipate heat for the battery pack 1, and the heat dissipation capacity is relatively strong; the first heat exchanger 9 and the second heat exchanger 11 are used to cool the liquid-cooled working medium in the second liquid flow channel 4 to dissipate heat for the power conversion component 2.
  • it is suitable for the energy storage system to work in a high temperature environment.
  • the heat exchange capacity of the first heat exchanger 9 and the second heat exchanger 11 is too low to support the heat dissipation requirements of the battery pack 1. Therefore, the battery pack 1 is cooled by the condenser 16 to ensure the normal operation of the battery pack.
  • the above-mentioned diverter 7 can also include a fourth working state. As shown in FIG5d, when the diverter 7 is in the fourth working state, the fifth flow port 75 is connected with the ninth flow port 79 and the twelfth flow port 712, the sixth flow channel 76 is connected with the tenth flow port 710 and the eleventh flow port 711 in sequence, and the seventh flow port 77 is connected with the eighth flow port 78.
  • the first heat exchanger 9 and the second heat exchanger 11 are both connected with the first liquid flow channel 3, which are used to cool the liquid-cooling medium in the first liquid flow channel 3.
  • the heat exchange efficiency is high, which improves the cooling effect of the first liquid flow channel 3, so that the temperature of the battery pack 1 can be quickly reduced.
  • the flow dividing member 7 may be a second valve group 15, which includes a fifth single valve 151, a sixth single valve 152, a seventh single valve 153, an eighth single valve 154, a ninth single valve 155, a tenth single valve 156, an eleventh single valve 157 and a twelfth single valve 158.
  • the fifth single valve 151 is connected to the fifth flow port 75
  • the sixth single valve 152 is connected to the sixth flow port 76
  • the seventh single valve 153 is connected to the seventh flow port 77
  • the eighth single valve 154 is connected to the eighth flow port 78
  • the ninth single valve 155 is connected to the ninth flow port 79
  • the tenth single valve 156 is connected to the tenth flow port 710
  • the eleventh single valve 157 is connected to the eleventh flow port 711
  • the twelfth single valve 158 is connected to the twelfth flow port 712.
  • the specific type of the first heat exchanger 9 and the specific type of the second heat exchanger 11 are not limited.
  • the first heat exchanger 9 can be a radiator, which uses fresh air to dissipate the heat of the liquid working medium
  • the first heat exchanger 9 can also be a condenser, which uses an external coolant to dissipate the heat of the liquid working medium.
  • the second heat exchanger 11 can be a radiator, which uses fresh air to dissipate the heat of the liquid working medium
  • the second heat exchanger 11 can also be a condenser, which uses an external coolant to dissipate the heat of the liquid working medium.
  • the present application also provides a power supply system, which includes the energy storage system in any of the above embodiments, and also includes a power distribution device.
  • the above-mentioned power distribution device is electrically connected to the energy storage system, and the power distribution device is also electrically connected to the user, and is used to process the electricity in the energy storage system and distribute it to the user for use.
  • the energy storage system in the power supply system can adjust the temperature control scheme according to the working state, reduce the space occupied by the energy storage system, reduce power consumption, and save energy.
  • the specific form of the power supply system is not limited.
  • the power supply system may be a large power station. Or a micro power station, which may be located in an industrial park or a community.
  • the power supply system may also be a household power supply system or a power supply system for equipment such as a vehicle.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Electrochemistry (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Transportation (AREA)
  • Thermal Sciences (AREA)
  • Secondary Cells (AREA)

Abstract

本申请提供了一种储能系统和供电系统。该储能系统包括电池包、功率变换组件、第一液体流道、第二液体流道、第一驱动装置、第二驱动装置和分流件。第一液体流道与电池包导热接触,第一驱动装置与第一液体流道连通。第二液体流道与功率变换组件导热接触,第二驱动装置与第二液体流道连通。分流件与第一液体流道和第二液体流道分别连通。分流件处于第一工作状态,第一液体流道和第二液体流道隔离。可以根据电池包和功率变换组件的温度需求分别控制。分流件处于第二工作状态,第一液体流道和第二液体流道连通,形成一个整体的回路,利用功率变换组件的热量来为电池包加热。可以根据工作状态调节温度控制的方案,减少储能系统占用的空间,降低功耗。

Description

一种储能系统和供电系统
相关申请的交叉引用
本申请要求在2022年10月21日提交中国专利局、申请号为202211293758.X、申请名称为“一种储能系统和供电系统”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本申请涉及供电设备技术领域,尤其涉及到一种储能系统和供电系统。
背景技术
在全球加大对新能源技术发展的背景下,各种与储能相关的技术得了广泛的应用。具体的,以集装箱作为储能的方式也得到了广泛的应用。具体的,上述集装箱可以为储能系统,一个供电系统中可能包括多个储能系统。
储能系统具体可以包括电池包和功率变换组件。储能系统在工作过程中,电池包和功率变换组件都会产生热量,因此,储能系统还包括温控系统,该温控系统用于控制电池包和功率变换组件的温度,以使电池包和功率变换组件工作在较为合适的温度环境中。现有技术中利用两个相互独立的温控系统分别控制电池包和功率变换组件的温度,整个储能系统的温控系统体积较大,且不利于节能。
发明内容
本申请提供了一种储能系统和供电系统,储能系统可以根据工作状态调节温度控制的方案,减少储能系统占用的空间,降低功耗,节约能源。
第一方面,本申请提供了一种储能系统,该储能系统包括电池包、功率变换组件、第一液体流道、第二液体流道、第一驱动装置、第二驱动装置和分流件。上述第一液体流道与电池包导热接触,且第一驱动装置与第一液体流道连通,用于驱动液体工质在第一液体流道流动,从而控制电池包的温度。上述第二液体流道与功率变换组件导热接触,且第二驱动装置与第二液体流道连通,用于驱动液体工质在第二液体流道流动,从而控制功率变换组件的温度。上述分流件与第一液体流道和第二液体流道分别连通,分流件包括第一工作状态和第二工作状态。分流件处于第一工作状态,第一液体流道和第二液体流道隔离,形成两个相互独立的回路。此时,可以利用第一液体流道控制电池包的温度,第二液体流道控制功率变换组件。可以根据电池包和功率变换组件的温度需求分别控制,有利于提升温度控制效果,节约能耗。上述分流件处于第二工作状态,第一液体流道和第二液体流道连通,形成一个整体的回路。此时可以利用功率变换组件的热量来为电池包加热,从而有利于节约能源。此外,还可以利用两个换热器来为液冷工质降温,以提升电池包的散热效率。
具体的技术方案中,上述分流件包括第一流口、第二流口、第三流口和第四流口。上述第一流口和第二流口开设在第一液体流道上,当第一流口和第二流口连通时,上述第一液体流道形成回路。第三流口和第四流口开设在第二液体流道上,桑第三流口和第四流口连通时,上述第二液体流道形成回路。当分流件处于第一工作状态,第一流口与第二流口连通,第三流口与第四流口连通,从而使得第一液体流道和第二液体流道形成相互独立的回路。上述分流件处于第二工作状态,第一流口与第三流口连通,第二流口与第四流口连通,使得第一液体流道和第二液体流道连通,形成一个整体的回路。
上述分流件具体可以为四通阀,该四通阀的四个阀孔即分别为上述第一流口、第二流口、第三流口和第四流口。该方案中,分流件的体积较小,有利于减小储能系统占用的空间。
另一种技术方案中,上述分流件还可以为第一阀组。该第一阀组包括第一单阀、第二单阀、第三单阀和第四单阀。上述第一单阀连接于第一流口与第二流口之间,第二单阀连接于第二流口与第三流口之间,第三单阀连接于第三流口与第四流口之间,第四单阀连接于第四流口与第一流口之间。当分流件处于第一工作状态时,上述第一单阀和第三单阀打开,第二单阀和第四单阀关闭,从而使得第一液体流道和第二液体流道相互独立,分别工作。当分流件处于第二工作状态时,上述第二单阀和第四单阀打开,第一单阀和第三单阀关闭,从而使得第一液体流道和第二液体流道相互连通。
再一种技术方案中,上述分流件还可以为储液箱,第一流口、第二流口、第三流口和第四流口与储 液箱的腔体连通。储液箱内包括分隔件,分流件处于第一工作状态,分隔件将储液箱分隔为第一储液腔和第二储液腔,第一流口和第二流口与第一储液腔连通,第三流口和第四流口与第二储液腔连通。分流件处于第二工作状态,分隔件使第一储液腔和第二储液腔合为连通的腔体。
一种技术方案中,上述第一驱动装置还包括第一换热器,第二驱动装置还包括第二换热器。上述分流件包括第五流口、第六流口、第七流口、第八流口、第九流口、第十流口、第十一流口和第十二流口。第五流口和第六流口开设在第一液体流道上,第七流口和第八流口开设在第二液体流道上,第一换热器连接于第九流口和第十流口之间,第二换热器连接于第十一流口和第十二流口之间。分流件处于第一工作状态,第五流口与第九流口连通,第六流口与第十流口连通,第七流口与第十一流口连通,第八流口与第十二流口连通。此时,第一液体流道和第二液体流道为两个独立的回路。分流件处于第二工作状态,第五流口与第七流口连通,第六流口与第八流口连通,第九流口、第十流口、第十一流口和第十二流口关闭。此时,第一液体流道和第二液体流道连通成一个回路。
进一步的技术方案中,上述分流件还包括第三工作状态,分流件处于第三工作状态,第五流口与第六流口连通,第七流口与第十流口和第十一流口依次连通,第八流口与第九流口和第十二流口连通。
再一种技术方案中,上述分流件还包括第四工作状态,分流件处于第四工作状态,第五流口与第九流口和第十二流口连通,第六流口与第十流口和第十一流口连通,第七流口与第八流口连通。
上述分流件具体可以为第二阀组,该第二阀组包括第五单阀、第六单阀、第七单阀、第八单阀、第九单阀、第十单阀、第十一单阀和第十二单阀,第五单阀与第五流口连通,第六单阀与第六流口连通,第七单阀与第七流口连通,第八单阀与第八流口连通,第九单阀与第九流口连通,第十单阀与第十流口连通,第十一单阀与第十一流口连通,第十二单阀与第十二流口连通。
另一种技术方案中,储能系统还包括加热器,该加热器与第一冷却流道连通,用于为第一冷却流道内的液体工质加热。该方案中,加热器可以在储能系统在较冷的环境下启动时,加热液体工质,用于调节电池包的温度。此时,可以使分流件处于第二工作状态,加热器和功率变换组件同时加热液体工质,使得电池包的温度迅速提升至较好的温度,使得储能系统较为快速的进入较好的工作状态,还可以节省功耗。
上述储能系统还可以包括冷凝器,冷凝器与第一冷却流道连通,用于为第一冷却流道内的液体工质降温。该方案中,可以利用外部冷却液来为液体工质降温,提升第一液体流道的散热能力,提升对电池包的散热效果。
第二方面,本申请还提供了一种供电系统,该储能系统包括配电设备和至少一个上述第一方面提供的储能系统。该配电设备与储能系统电连接,且配电设备还与用户电连接,用于对储能系统内的电进行处理后分配至用户使用。该技术方案中,供电系统中的储能系统可以根据工作状态调节温度控制的方案,减少储能系统占用的空间,降低功耗,节约能源。
附图说明
图1为现有技术中储能系统的一种结构示意图;
图2a为本申请实施例中储能系统的一种工作状态的结构示意图;
图2b为本申请实施例中储能系统的另一种工作状态的结构示意图;
图3a为本申请实施例中分流件一种工作状态的结构示意图;
图3b为本申请实施例中分流件的另一种工作状态的结构示意图;
图4a为本申请实施例中分流件一种工作状态的结构示意图;
图4b为本申请实施例中分流件的另一种工作状态的结构示意图;
图5a为本申请实施例中储能系统另一种工作状态的结构示意图;
图5b为本申请实施例中储能系统另一种工作状态的结构示意图;
图5c为本申请实施例中储能系统另一种工作状态的结构示意图;
图5d为本申请实施例中储能系统另一种工作状态的结构示意图。
附图标记:
1-电池包;                 2-功率变换组件;
3-第一液体流道;           4-第二液体流道;
5-第一驱动装置;           6-第二驱动装置;
7-分流件;                 71-第一流口;
72-第二流口;              73-第三流口;
74-第四流口;              75-第五流口;
76-第六流口;              77-第七流口;
78-第八流口;              79-第九流口;
710-第十流口;             711-第十一流口;
712-第十二流口;           8-第一储液箱;
9-第一换热器;             10-第二储液箱;
11-第二换热器;            12-加热器;
13-储液箱;                131-分隔件;
132-第一储液腔;           133-第二储液腔;
14-第一阀组;              141-第一单阀;
142-第二单阀;             143-第三单阀;
144-第四单阀;             15-第二阀组;
151-第五单阀;             152-第六单阀;
153-第七单阀;             154-第八单阀;
155-第九单阀;             156-第十单阀;
157-第十一单阀;           158-第十二单阀;
16-冷凝器;                161-第一流道;
162-第二流道。
具体实施方式
为了使本申请的目的、技术方案和优点更加清楚,下面将结合附图对本申请作进一步地详细描述。
以下实施例中所使用的术语只是为了描述特定实施例的目的,而并非旨在作为对本申请的限制。如在本申请的说明书和所附权利要求书中所使用的那样,单数表达形式“一个”、“一种”、“所述”、“上述”、“该”和“这一”旨在也包括例如“一个或多个”这种表达形式,除非其上下文中明确地有相反指示。
在本说明书中描述的参考“一个实施例”或“具体的实施例”等意味着在本申请的一个或多个实施例中包括结合该实施例描述的特定特征、结构或特点。术语“包括”、“包含”、“具有”及它们的变形都意味着“包括但不限于”,除非是以其他方式另外特别强调。
为了方便理解本申请实施例提供的储能系统和供电系统,下面首先介绍一下其应用场景。
随着供电系统的快速发展,储能系统应用的范围也越来越广泛,其中,储能系统是一种高度集成的储能装置,内部放置有多个电池簇,电池簇中包括电池包和功率变换组件。上述电池簇通过少量的接口与外部设备进行连接,具有集成度高、占地面积小以及扩展性好的特点,是分布式能源、智能电网、能源互联网发展的重要组成部分。储能系统在工作时,电池包和功率变换组件都会产生热量,对电池包和变换单元散热是保证储能系统正常工作的重要环节。此外,在低温环境中启动储能系统时,需要对电池包加热,以提升电池包的放电效率。因此需要利用温控系统来控制储能系统的温度。
图1为现有技术中储能系统的一种结构示意图,如图1所示,现有技术中的温控系统包括两组独立的温度控制回路。两组独立的温度控制回路分别与电池包1和功率变换组件2导热接触,一方面,温度控制回路可以为电池包1和功率变换组件2降温;另一方面,储能系统在低温环境启动时,温度控制回路还可以为电池包1升温,此时,可以使与电池包1导热接触的温度控制回路连接有加热器12。该方案中的温控系统的结构体积较大,占用空间较多。
图2a为本申请实施例中储能系统的一种工作状态的结构示意图,图2b为本申请实施例中储能系统的另一种工作状态的结构示意图。如图2a和图2b所示,一种具体的实施例中,上述储能系统包括电池包1、功率变换组件2、第一液体流道3、第二液体流道4、第一驱动装置5、第二驱动装置6和分流件7。上述第一液体流道3、第二液体流道4、第一驱动装置5、第二驱动装置6和分流件7属于温控系统,用于控制电池包1和功率变换组件2的温度。具体的,上述第一液体流道3与电池包1导热接触,且第一驱动装置5与第一液体流道3连通,用于驱动液体工质在第一液体流道3流动,从而控制电池包1的温度。第二液体流道4与功率变换组件2导热接触,且第二驱动装置6与第二液体流道4连通,用于 驱动液体工质在第二液体流道4流动,从而控制功率变换组件2的温度。也就是说,针对电池包1的温度控制和功率变换组件2的温度控制,本申请提供了两个独立的驱动装置,分别用于驱动液体工质控制电池包1的温度和功率变换组件2的温度。此外,本申请还提供了一种分流件7,该分流件7与第一液体流道3和第二液体流道4分别连通。具体的,上述分流件7包括第一工作状态和第二工作状态;如图2a所示,当分流件7处于第一工作状态时,第一液体流道3和第二液体流道4隔离,也就是说,第一驱动装置5驱动液体工质在第一液体流道3内流动,而不会流动至第二液体流道4内;第二驱动装置6驱动液体工质在第二液体流道4内流动,而不会流动至第一液体流道3内;形成两个相互独立的回路。如图2b所示,当分流件7处于第二工作状态时,第一液体流道3和第二液体流道4连通,则液体工质可以依次流过第一液体流道3和第二液体流道4,形成一个整体的回路。
值得说明的是,本申请实施例中A与B“导热接触”指的是A与B之间可以进行热量交换,具体可以使A与B直接接触连接,以进行换热;或者,还可以使A与B通过导热层等导热结构间接接触连接,以进行换热。总之,只要使A与B能够进行换热即可。
图2a和图2b所示的实施例中,上述温控系统还可以包括第一储液箱8、第一换热器9、第二储液箱10和第二换热器11。上述第一储液箱8和第一换热器9与第一液体流道3连通,第一储液箱8用于存储液体工质,第一换热器9用于为液体工质换热,以降低液体工质的温度,第一驱动装置5驱动液体工质在第一储液箱8、第一换热器9和第一液体流道3内流动。上述第二储液箱10和第二换热器11与第二液体流道4连通,上述第二储液箱10用于存储液体工质,第二换热器11用于为液体工质换热,以降低液体工质的温度,第二驱动装置6驱动液体工质在第二储液箱10、第二换热器11和第二液体流道4内流动。
在储能系统处于稳定运行阶段,电池包1和功率变换组件2都产生热量,此时可以使分流件7处于第一工作状态,分别控制电池包1和功率变换组件2的温度。由于电池包1的发热量比功率变换组件2的发热量大,因此,第一驱动装置5和第二驱动装置6可以根据需求处于不同的功率,控制第一液体流道3内的液冷工质具有不同的流速,还可以使第一换热器9和第二换热器11处于不同的换热效率,有利于节省能源。此外,第一驱动装置5驱动液体工质在第一液体流道3内流动,只为电池包1散热,从而有利于提升对于电池包1的散热效果。当储能系统在较冷的环境下启动时,电池包1的温度较低,需要提升电池包1的温度,以提升电池包的工作效率。此时可以使分流件7处于第二工作状态,如图2b所示,液体工质在第一液体流道3和第二液体流道4之间流动,在该状态下可以关闭第一换热器9和第二换热器11,也就是不会对液体工质进行降温。功率变换组件2产生的热量可以传递给液体工质,液体工质再为电池包加热。因此不需使第一液体流道3连接加热器,有利于减少功耗,降低温控系统占用的空间,降低成本。此外,当储能系统在工作一段时间后停止工作时,要对电池包1进行冷却,以提升电池包1的使用寿命。此时,也可以使分流件7也处于第二工作状态,在该状态下液体工质在第一液体流道3和第二液体流道4之间流动,此时,第一换热器9和第二换热器11仍然处于开启状态,两个换热器同时为液体工质降温,换热效率较高,使得电池包1的温度可以迅速降低。值得说明的是,功率变换组件2中存储的热量较少,当功率变换组件2停止工作时,温度可以迅速降低,因此两个换热器主要是为电池包1散热。
请继续参考图2a和图2b,在进一步的实施例中,第一液体流道3中还可以设置有加热器12,该加热器12可以在储能系统在较冷的环境下启动时,加热液体工质,用于调节电池包1的温度。此时,可以使分流件7处于第二工作状态,加热器12和功率变换组件2同时加热液体工质,使得电池包1的温度迅速提升至较好的温度,使得储能系统较为快速的进入较好的工作状态,还可以节省功耗。
请继续参考图2a和图2b,具体的实施例中,上述分流件7包括第一流口71、第二流口72、第三流口73和第四流口74。上述第一流口71与第二流口72开设在第一液体流道3。可以认为第一流口71和第二流口72连接于第一液体流道3的两端,当第一流口71和第二流口72连通时,液体工质在上述第一流口71和第二流口72之间流动,使得上述第一液体流道3形成回路。上述第三流口73与第四流口74开设于第二液体流道4,可以认为第三流口73和第四流口74连接于第二液体流道4的两端,当第三流口73和第四流口74连通时,液体工质在上述第三流口73和第四流口74之间流动,上述第二液体流道4形成回路。如图2a所示,分流件7处于第一工作状态时,第一流口71与第二流口72连通,此时第一液体流道3形成为独立的回路;第三流口73与第四流口74连通,此时第二液体流道4形成为独立的回路,从而可以使得第一液体流道3与第二液体流道4相互独立。如图2b所示,当分流件7处 于第二工作状态时,第一流口71与第三流口73连通,第二流口72与第四流口74连通,此时第一液体流道3与第二液体流道4串联,可以形成一个整体的回路。
上述分流件7的具体结构在本申请不做限制。图3a为本申请实施例中分流件一种工作状态的结构示意图,图3b为本申请实施例中分流件的另一种工作状态的结构示意图。如图3a和图3b所示,一种可选的实施例中,上述分流件7为储液箱13,或者说,上述分流件7与储液箱13为一体结构。上述第一流口71、第二流口72、第三流口73和第四流口74与储液箱13的腔体连通。具体的实施例中,上述储液箱13可以包括分隔件131,该分隔件131活动安装于储液箱13的腔体内,该分隔件131可以进行活动。如图3a所示,分隔件131处于一种状态下,可以将储液箱13分隔成两个储液腔,上述两个储液腔可以包括第一储液腔132和第二储液腔133。如图3b所示,分隔件131处于另一种状态下,可以使得储液箱13的内部为一个连通的腔体,或者可以理解为上述第一储液腔132和第二储液腔133相互连通。该实施例中的储液箱13可以理解为第一储液箱8和第二储液箱10为一体结构。
在工作过程中,当分流件7处于上述第一工作状态时,分隔件131将储液箱13分隔为第一储液腔132和第二储液腔133,上述第一储液腔132和第二储液腔133相互独立。上述第一流口71和第二流口72与第一储液腔132连通,使得第一储液腔132与第一液体流道3连通,利用第一储液腔132内的冷却工质来控制电池包1的温度。上述第三流口73和第四流口74与第二储液腔133连通,使得第二储液腔133与第二液体流道4连通,利用第二储液腔133内的液体工质来为功率变换组件2散热。当分流件7处于上述第二工作状态时,分隔件131使第一储液腔132和第二储液腔133合为连通的腔体,也就是说第一流口71、第二流口72、第三流口73和第四流口74相互连通,第一液体流道3和第二液体流道4连通相互连通。该实施例中,储液箱13与分流件7为一体结构,有利于简化温控系统的结构。
请继续参考图2a和图2b,另一种实施例中,上述分流件7可以为四通阀,则该四通阀的四个阀孔分别为上述第一流口71、第二流口72、第三流口73和第四流口74。本实施例中的四通阀的体积较小,也有利于减小分流件7的体积。此外,相对比上述实施例中利用储液箱13作为分流件7,当第一液体流道3与第二液体流道4相互独立时,第一液体流道3内的液体工质与第二液体流道4内的液冷工质之间的隔离度较高,两者之间热量相互隔离,有利于提升第一液体流道3和第二液体流道4之间的热量隔离度,提升散热效果。
图4a为本申请实施例中分流件一种工作状态的结构示意图,图4b为本申请实施例中分流件的另一种工作状态的结构示意图。如图4a和图4b所示,再一种实施例中,上述分流件7可以为第一阀组14,上述第一阀组14包括第一单阀141、第二单阀142、第三单阀143和第四单阀144。上述第一单阀141连接于第一流口71与第二流口72之间,第二单阀142连接于第二流口72与第三流口73之间,第三单阀143连接于第三流口73与第四流口74之间,第四单阀144连接于第四流口74与第一流口71之间。该方案可以分别控制各个单阀的工作状态,当分流件7处于第一工作状态时,上述第一单阀141和第三单阀143打开,第二单阀142和第四单阀144关闭,从而使得第一液体流道3和第二液体流道4相互独立,分别工作。当分流件7处于第二工作状态时,上述第二单阀142和第四单阀144打开,第一单阀141和第三单阀143关闭,从而使得第一液体流道3和第二液体流道4相互连通。
图5a~图5d为本申请实施例中储能系统另一种结构在不同状态的示意图,请参考图5a~图5d,上述分流件7还可以包括更多个流口,以使得温控系统具有更多种的连通方案,以使得温控系统具有更多的工作模式。例如,一种具体的实施例中,上述分流件7可以包括八个流口,八个流口分别为第五流口75、第六流口76、第七流口77、第八流口78、第九流口79、第十流口710、第十一流口711和第十二流口712。上述第五流口75开设于第一液体流道3,上述第七流口77与第八流口78开设于第二液体流道4,第一换热器9连接于第九流口79和第十流口710之间,第二换热器11连接于第十一流口711和第十二流口712之间。
如图5a所示,当上述分流件7处于上述第一工作状态时,上述第五流口75与第九流口79连通,第六流口76与第十流口710连通,使得第一换热器9与第一液体流道3连通,利用第一换热器9为第一液体流道3内的液冷工质制冷。第七流口77与第十一流口711连通,第八流口78与第十二流口712连通。该方案使得第一换热器9与第一液体流道3连通,第二换热器11与第二液体流道4连通,且使得第一液体流道3与第二液体流道4相互独立。
如图5b所示,当上述分流件7处于第二工作状态时,上述第五流口75与第七流口77连通,第六流口76与第八流口78连通,第九流口79、第十流口710、第十一流口711和第十二流口712关闭。该 方案可以关闭第一换热器9和第二换热器11,使第一液体流道3与第二液体流道4串联,可以形成一个整体的回路。
请继续参考图5a~图5d,另一种实施例中,上述储能系统还可以包括冷凝器16,该冷凝器16与第一液体流道3连通,用于为第一液体流道3内的液体工质降温。具体的,该冷凝器16包括第一流道161和第二流道162,其中,第一流道161与第一液体流道3连通,从而第一液体流道3内的液体工质从上述第一流道161流过,外部冷却液从第二流道162流过,外部冷却液用于为液体工质散热。该方案可以提升第一液体流道3的散热能力,提升对电池包1的散热效果。
此外,上述分流件7还可以包括第三工作状态,如图5c所示,当分流件7处于第三工作状态时,上述第五流口75与第六流口76连通,第七流口77与第十流口710和第十一流口711连通,第八流口78与第九流口79和第十二流口712连通。该状态下,可以启动冷凝器16,利用冷凝器16对第一液体流道3内的液体工质降温,为电池包1散热,散热能力较强;利用第一换热器9和第二换热器11共同为第二液体流道4内的液冷工质降温,为功率变换组件2散热。此时适用于储能系统工作在高温环境时,第一换热器9和第二换热器11的换热能力过低,难以支持电池包1的散热需求,因此利用冷凝器16对电池包1降温,可以保证电池包的正常工作。
上述分流件7还可以包括第四工作状态,如图5d所示,当分流件7处于第四工作状态时,第五流口75与第九流口79和第十二流口712连通,第六流道76与第十流口710和第十一流口711依次连通,第七流口77与第八流口78连通。该状态下,第一换热器9和第二换热器11都与第一液体流道3连通,用于为第一液体流道3内的液冷工质冷却,换热效率较高,提升第一液体流道3的冷却效果,使得电池包1的温度可以迅速降低。此时适用于储能系统在工作一段时间后停止工作时,要对电池包1进行冷却的情况下。当功率变换组件2停止工作时,可以自行冷却,因此,无需利用换热器对功率变换组件2散热。
具体的实施例中,上述分流件7可以为第二阀组15,该第二阀组15包括第五单阀151、第六单阀152、第七单阀153、第八单阀154、第九单阀155、第十单阀156、第十一单阀157和第十二单阀158。第五单阀151与第五流口75连通,第六单阀152与第六流口76连通,第七单阀153与第七流口77连通,第八单阀154与第八流口78连通,第九单阀155与第九流口79连通,第十单阀156与第十流口710连通,第十一单阀157与第十一流口711连通,第十二单阀158与第十二流口712连通。上述各个单阀之间可以进行连通和断开,以实现上述各种工作状态。
此外,具体的实施例中,上述第一换热器9的具体类型和第二换热器11的具体类型也不做限制,例如,第一换热器9可以为散热器,利用新风为液体工质散热,第一换热器9还可以为冷凝器,利用外部冷却液为液体工质散热。或者,第二换热器11可以为散热器,利用新风为液体工质散热,第二换热器11还可以为冷凝器,利用外部冷却液为液体工质散热。
基于相同的发明构思,本申请还提供了一种供电系统,该供电系统包括上述任一实施例中的储能系统,还包括配电设备。上述配电设备与储能系统电连接,且配电设备还与用户电连接,用于对储能系统内的电进行处理后分配至用户使用。该实施例中,供电系统中的储能系统可以根据工作状态调节温度控制的方案,减少储能系统占用的空间,降低功耗,节约能源。
具体的实施例中,上述供电系统的具体形式不做限制,例如,该供电系统可以为大型的电站。或者微型的电站,该微型的电站具体可以位于工业园区或者小区内。或者,该供电系统还可以为家庭供电系统或者车辆等设备的供电系统。
以上,仅为本申请的具体实施方式,但本申请的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本申请揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本申请的保护范围之内。因此,本申请的保护范围应以权利要求的保护范围为准。

Claims (12)

  1. 一种储能系统,其特征在于,包括电池包、功率变换组件、第一液体流道、第二液体流道、第一驱动装置、第二驱动装置和分流件,其中:
    所述第一液体流道与所述电池包导热接触,且所述第一驱动装置与所述第一液体流道连通,用于驱动液体工质在所述第一液体流道流动;
    所述第二液体流道与所述功率变换组件导热接触,且所述第二驱动装置与所述第二液体流道连通,用于驱动液体工质在所述第二液体流道流动;
    所述分流件与所述第一液体流道和所述第二液体流道分别连通,所述分流件包括第一工作状态和第二工作状态;所述分流件处于所述第一工作状态,所述第一液体流道和所述第二液体流道隔离;所述分流件处于所述第二工作状态,所述第一液体流道和所述第二液体流道连通。
  2. 如权利要求1所述的储能系统,其特征在于,所述分流件包括第一流口、第二流口、第三流口和第四流口,所述第一流口和所述第二流口开设在所述第一液体流道上,所述第三流口和所述第四流口开设在所述第二液体流道上;
    所述分流件处于所述第一工作状态,所述第一流口与所述第二流口连通,所述第三流口与所述第四流口连通;所述分流件处于所述第二工作状态,所述第一流口与所述第三流口连通,所述第二流口与所述第四流口连通。
  3. 如权利要求2所述的储能系统,其特征在于,所述分流件为四通阀,所述四通阀的四个阀孔分别为所述第一流口、所述第二流口、所述第三流口和所述第四流口。
  4. 如权利要求2所述的储能系统,其特征在于,所述分流件为第一阀组,所述第一阀组包括第一单阀、第二单阀、第三单阀和第四单阀,所述第一单阀连接于所述第一流口与所述第二流口之间,所述第二单阀连接于所述第二流口与所述第三流口之间,所述第三单阀连接于所述第三流口与所述第四流口之间,所述第四单阀连接于所述第四流口与所述第一流口之间。
  5. 如权利要求2所述的储能系统,其特征在于,所述分流件为储液箱,所述第一流口、所述第二流口、所述第三流口和所述第四流口与所述储液箱的腔体连通;
    所述储液箱内包括分隔件,所述分流件处于所述第一工作状态,所述分隔件将所述储液箱分隔为第一储液腔和第二储液腔,所述第一流口和所述第二流口与所述第一储液腔连通,所述第三流口和所述第四流口与所述第二储液腔连通;所述分流件处于所述第二工作状态,所述分隔件使所述第一储液腔和所述第二储液腔合为连通的腔体。
  6. 如权利要求1所述的储能系统,其特征在于,所述第一驱动装置还包括第一换热器,所述第二驱动装置还包括第二换热器,所述分流件包括第五流口、第六流口、第七流口、第八流口、第九流口、第十流口、第十一流口和第十二流口,所述第五流口和所述第六流口开设在所述第一液体流道上,所述第七流口和所述第八流口开设在所述第二液体流道上,所述第一换热器连接于所述第九流口和所述第十流口之间,所述第二换热器连接于所述第十一流口和所述第十二流口之间;
    所述分流件处于所述第一工作状态,所述第五流口与所述第九流口连通,所述第六流口与所述第十流口连通,所述第七流口与所述第十一流口连通,所述第八流口与所述第十二流口连通;所述分流件处于所述第二工作状态,所述第五流口与所述第七流口连通,所述第六流口与所述第八流口连通,所述第九流口、第十流口、第十一流口和第十二流口关闭。
  7. 如权利要求6所述的储能系统,其特征在于,所述分流件还包括第三工作状态,所述分流件处于所述第三工作状态,所述第五流口与所述第六流口连通,所述第七流口与所述第十流口和所述第十一流口依次连通,所述第八流口与所述第九流口和所述第十二流口连通。
  8. 如权利要求6或7所述的储能系统,其特征在于,所述分流件还包括第四工作状态,分流件处于所述第四工作状态,所述第五流口与所述第九流口和所述第十二流口连通,所述第六流口与所述第十流口和所述第十一流口连通,所述第七流口与所述第八流口连通。
  9. 如权利要求6~8任一项所述的储能系统,其特征在于,所述分流件包括第五单阀、第六单阀、第七单阀、第八单阀、第九单阀、第十单阀、第十一单阀和第十二单阀,所述第五单阀与所述第五流口连通,所述第六单阀与所述第六流口连通,所述第七单阀与所述第七流口连通,所述第八单阀与所述第八流口连通,所述第九单阀与所述第九流口连通,所述第十单阀与所述第十流口连通,所述第十一单阀与 所述第十一流口连通,所述第十二单阀与所述第十二流口连通。
  10. 如权利要求1~9任一项所述的储能系统,其特征在于,还包括加热器,所述加热器与所述第一冷却流道连通,用于为所述第一冷却流道内的液体工质加热。
  11. 如权利要求1~10任一项所述的储能系统,其特征在于,还包括冷凝器,所述冷凝器与所述第一冷却流道连通,用于为所述第一冷却流道内的液体工质降温。
  12. 一种供电系统,其特征在于,包括配电设备和至少一个如权利要求1~11任一项所述的储能系统,所述配电设备与储能系统电连接。
PCT/CN2023/102933 2022-10-21 2023-06-27 一种储能系统和供电系统 WO2024082687A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202211293758.X 2022-10-21
CN202211293758.XA CN115663357A (zh) 2022-10-21 2022-10-21 一种储能系统和供电系统

Publications (1)

Publication Number Publication Date
WO2024082687A1 true WO2024082687A1 (zh) 2024-04-25

Family

ID=84990240

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2023/102933 WO2024082687A1 (zh) 2022-10-21 2023-06-27 一种储能系统和供电系统

Country Status (2)

Country Link
CN (1) CN115663357A (zh)
WO (1) WO2024082687A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115663357A (zh) * 2022-10-21 2023-01-31 华为数字能源技术有限公司 一种储能系统和供电系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106080225A (zh) * 2015-04-28 2016-11-09 源捷公司 Ev多模式热控制系统
CN111231618A (zh) * 2018-11-29 2020-06-05 比亚迪股份有限公司 车辆热管理系统及其控制方法、车辆
CN112428768A (zh) * 2020-05-29 2021-03-02 杭州三花研究院有限公司 热管理系统
KR20210157169A (ko) * 2020-06-19 2021-12-28 현대위아 주식회사 차량의 통합 열관리 시스템
CN115000570A (zh) * 2022-05-31 2022-09-02 小米汽车科技有限公司 热管理集成单元、热管理系统及车辆
CN115663357A (zh) * 2022-10-21 2023-01-31 华为数字能源技术有限公司 一种储能系统和供电系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106080225A (zh) * 2015-04-28 2016-11-09 源捷公司 Ev多模式热控制系统
CN111231618A (zh) * 2018-11-29 2020-06-05 比亚迪股份有限公司 车辆热管理系统及其控制方法、车辆
CN112428768A (zh) * 2020-05-29 2021-03-02 杭州三花研究院有限公司 热管理系统
KR20210157169A (ko) * 2020-06-19 2021-12-28 현대위아 주식회사 차량의 통합 열관리 시스템
CN115000570A (zh) * 2022-05-31 2022-09-02 小米汽车科技有限公司 热管理集成单元、热管理系统及车辆
CN115663357A (zh) * 2022-10-21 2023-01-31 华为数字能源技术有限公司 一种储能系统和供电系统

Also Published As

Publication number Publication date
CN115663357A (zh) 2023-01-31

Similar Documents

Publication Publication Date Title
CN109466380B (zh) 氢燃料电池车的热管理系统及具有其的车辆
CN205921051U (zh) 一种电池包的液冷式热管理系统
WO2019062967A1 (zh) 电池包以及电池热管理系统和车辆
CN105633508B (zh) 电池系统及其控制方法
WO2024082687A1 (zh) 一种储能系统和供电系统
CN112117511A (zh) 一种基于半导体的风冷液冷耦合式电池热管理系统
CN108470959A (zh) 一种动力电池包热管理总成
CN113547957B (zh) 一种电动汽车的热管理集成模块及其热管理系统
CN111312954B (zh) 一种电动汽车电池热管理装置及热管理方法
CN108075081A (zh) 电池组、电池包及具有该电池包的车辆
CN210478446U (zh) 一种混合动力汽车集成式热管理系统
CN216659503U (zh) 车辆热管理系统
WO2024002201A1 (zh) 直冷板、换热器、动力电池包及车辆
CN219696549U (zh) 一种新型风电储能电池的热管理机组
CN209766598U (zh) 一种电池热管理系统
CN207883761U (zh) 电池组、电池包及具有该电池包的车辆
CN115101850A (zh) 新能源汽车智能调节电池仓
CN113328168B (zh) 一种基于水冷板的电池组冷却结构及其冷却方法
CN220021289U (zh) 一种换热装置、电池热管理系统及车辆
CN117039269B (zh) 一种储能系统及其温控方法、计算机可读存储介质
CN219144290U (zh) 一种电池温控系统
CN216648427U (zh) 换电站制冷系统及换电站
CN220400706U (zh) 一种电池冷却板、电池热管理系统及汽车
CN220742639U (zh) 一种整车热管理系统及车辆
CN220253324U (zh) 储能系统的热管理系统、储能系统和光伏储能系统