WO2024032768A1 - Procédé et appareil de traitement d'informations de commande, ainsi que terminal et dispositif côté réseau - Google Patents

Procédé et appareil de traitement d'informations de commande, ainsi que terminal et dispositif côté réseau Download PDF

Info

Publication number
WO2024032768A1
WO2024032768A1 PCT/CN2023/112552 CN2023112552W WO2024032768A1 WO 2024032768 A1 WO2024032768 A1 WO 2024032768A1 CN 2023112552 W CN2023112552 W CN 2023112552W WO 2024032768 A1 WO2024032768 A1 WO 2024032768A1
Authority
WO
WIPO (PCT)
Prior art keywords
control information
rnti
scs
scheduling
scrambled
Prior art date
Application number
PCT/CN2023/112552
Other languages
English (en)
Chinese (zh)
Inventor
李萍
刘思綦
纪子超
Original Assignee
维沃移动通信有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 维沃移动通信有限公司 filed Critical 维沃移动通信有限公司
Publication of WO2024032768A1 publication Critical patent/WO2024032768A1/fr

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/22Processing or transfer of terminal data, e.g. status or physical capabilities

Definitions

  • This application belongs to the field of mobile communication technology, and specifically relates to a control information processing method, device, terminal and network side equipment.
  • a Sidelink (SL) carrier associated with the cell can be scheduled through the Sidelink Downlink Control Information (SL DCI) configured in the cell.
  • SL DCI Sidelink Downlink Control Information
  • CA carrier aggregation
  • NR New Radio
  • it can support one SL DCI to schedule multiple SL carriers, or one SL DCI to schedule one SL carrier.
  • One SL DCI schedules multiple SL carriers and other scenarios. While improving the capabilities of the terminal (also called User Equipment (UE)), it also brings excessive complexity to the UE.
  • UE User Equipment
  • Embodiments of the present application provide a control information processing method, device, terminal and network side equipment, which can solve the problem of excessive terminal complexity.
  • a control information processing method is provided, which is applied to a terminal.
  • the method includes: the terminal receives first control information, and the first control information meets the requirements of the terminal capability; wherein the terminal supports the terminal capability.
  • the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the second control information.
  • a control information processing device including: a first transmission module for receiving first control information, where the first control information meets the requirements of terminal capabilities; wherein the control information processing device supports all
  • the terminal capabilities include the terminal's capability for first control information and/or the terminal's capability for second control information; a first execution module configured to process the first control information.
  • a control information processing method is provided, applied to a terminal.
  • the method includes: the terminal Within the overlapping time range of the monitoring time corresponding to the type of control information, the terminal receives one type of control information or one piece of control information from the at least two types of control information; and/or, the terminal corresponds to at least two pieces of first control information of the same type.
  • the type of the control information includes at least two of the following: first control information for dynamic scheduling, or CRC first control information scrambled by SL-RNTI; first control information used for at least one of activation, reactivation, retransmission and deactivation of the configuration authorization schedule, or the CRC is scrambled by SL-CS-RNTI first control information; first control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI Information; control information used to schedule PDSCH, or control information with CRC scrambled by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI .
  • a control information processing device including: a second transmission module configured to receive one of the at least two types of control information within an overlapping time range of monitoring times corresponding to the at least two types of control information.
  • a type of control information or a piece of control information a type of control information or a piece of control information
  • a second execution module used to process the received type of control information or a piece of control information
  • the second transmission module used to process at least two pieces of the same type of control information.
  • the type of the control information includes at least two of the following: first control information used for dynamic scheduling, or first control information with CRC scrambled by SL-RNTI; used for activating, reactivating, and reactivating configuration authorization scheduling.
  • One of the first control information, or, the CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI; the control information used for scheduling PDSCH, or, the CRC is composed of SI-RNTI, RA-RNTI, MsgB-RNTI , TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI scrambled control information.
  • a control information processing method is provided, applied to a terminal.
  • the method includes: the terminal receives first control information, the first control information is used to indicate a secondary link authorization index; wherein, the secondary link
  • the number or count of the authorization index is determined by at least one of the following: the scheduled object corresponding to the first control information; the scheduled resource pool corresponding to the first control information; the monitoring opportunity for transmitting the first control information;
  • the monitoring opportunity identification information of at least one of the first control information that indicates the physical uplink control channel PUCCH is transmitted, hybrid automatic retransmission HARQ feedback is enabled, and triggers HARQ feedback; the control channel unit where the first control information is located ;
  • the carrier on which the physical secondary link shared channel PSSCH scheduled by the first control information is located; the starting time or start time of the PSSCH scheduled by the first control information; the end time or end of the PSSCH scheduled by the first control information Time; the position of the subchannel where the PSSCH scheduled by the first control information is located; the position of the physical secondary link feedback channel P
  • a control information processing device including: a third transmission module for receiving first control information, the first control information being used to indicate a secondary link authorization index; and a third execution module for Process the first control information; wherein the number or count of the secondary link authorization index is determined by at least one of the following: the first control information The scheduled object corresponding to the information; the scheduled resource pool corresponding to the first control information; the monitoring opportunity for transmitting the first control information; used for transmitting the indicated physical uplink control channel PUCCH, enabling hybrid automatic retransmission HARQ feedback , and the monitoring opportunity identification information of at least one of the first control information that triggers HARQ feedback; the control channel unit where the first control information is located; the physical secondary link shared channel PSSCH scheduled by the first control information is located Carrier; the starting time or start time of the PSSCH scheduled by the first control information; the end time or end time of the PSSCH scheduled by the first control information; the location of the subchannel where the PSSCH scheduled by the first control information is located; The location of the physical
  • a control information processing method is provided, applied to a network side device.
  • the method includes: the network side device sends first control information to a terminal according to the terminal capability; wherein the terminal supports the terminal capability, and the The terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the second control information.
  • a control information processing device including: a fourth execution module, used to obtain the terminal capability of the terminal; a fourth transmission module, used to send the first control information to the terminal according to the terminal capability; Wherein, the terminal supports the terminal capability, and the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the second control information.
  • a control information processing method is provided, which is applied to a network side device.
  • the method includes: the network side device sends or configures the at least one control information to a terminal within an overlapping time range of monitoring times corresponding to at least two types of control information. One type of control information or one piece of control information among the two types of control information; and/or, the network side device sends a message to the terminal within the overlapping time range of the monitoring time corresponding to at least two first control information of the same type.
  • the type of the control information includes at least two of the following: first control information for dynamic scheduling, or CRC scrambled by SL-RNTI First control information; first control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or first control information with CRC scrambled by SL-CS-RNTI; with First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI; used for scheduling PDSCH Control information, or, CRC scrambled control information by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI, or MCS-RNTI.
  • a control information processing device including: a fifth execution module for determining an overlapping time range of monitoring times corresponding to at least two types of control information; and a fifth transmission module for determining at least two types of control information within an overlapping time range.
  • the fifth execution module is used to determine In the overlapping time range of the monitoring time corresponding to at least two pieces of first control information of the same type; the fifth transmission module is used to within the overlapping time range of the monitoring time corresponding to at least two pieces of first control information of the same type, Send or configure one of the at least two pieces of first control information to the terminal; wherein the type of the control information includes at least two of the following: first control information for dynamic scheduling, or CRC composed of SL- The first control information scrambled by RNTI; the first control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or the first CRC scrambled by SL-CS-RNTI Control information; used for at least one of activation, reactivation, retransmission and deactivation of semi-static
  • CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI; control information used for scheduling PDSCH, or, CRC is composed of SI-RNTI, RA-RNTI, MsgB-RNTI, TC- Control information scrambled by RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • a control information processing method which is applied to a network side device.
  • the method includes: the network side device sends first control information to a terminal, where the first control information is used to indicate a secondary link authorization index; Wherein, the number or count of the secondary link grant index is determined by at least one of the following: a scheduled object corresponding to the first control information; a scheduled resource pool corresponding to the first control information; used to transmit the first Monitoring timing of control information; monitoring timing identification information used to transmit the first control information indicating at least one of the physical uplink control channel PUCCH, enabling hybrid automatic retransmission HARQ feedback, and triggering HARQ feedback; the first The control channel unit where the control information is located; the carrier where the physical secondary link shared channel PSSCH scheduled by the first control information is located; the starting time or start time of the PSSCH scheduled by the first control information; the first control information schedule The end time or end time of the PSSCH; the location of the subchannel where the PSSCH scheduled by the first control information is located; the location of the
  • a control information processing device including: a sixth execution module for determining a secondary link authorization index; a sixth transmission module for sending first control information to a terminal, the first control The information is used to indicate the secondary link authorization index; wherein the number or count of the secondary link authorization index is determined by at least one of the following: the scheduled object corresponding to the first control information; Scheduled resource pool; monitoring opportunity for transmitting the first control information; used for transmitting the first control information indicating at least one of the physical uplink control channel PUCCH, enabling hybrid automatic retransmission HARQ feedback, and triggering HARQ feedback The monitoring opportunity identification information; the control channel unit where the first control information is located; the carrier where the physical secondary link shared channel PSSCH scheduled by the first control information is located; the starting time of the PSSCH scheduled by the first control information or The start time; the end time or end time of the PSSCH scheduled by the first control information; the location of the subchannel where the PSSCH scheduled by the first control information is located; the physical secondary link
  • a terminal in a thirteenth aspect, includes a processor and a memory.
  • the memory stores programs or instructions that can be run on the processor.
  • the program or instructions When the program or instructions are executed by the processor, the following is implemented: The steps of the method described in the first aspect.
  • a terminal including a processor and a communication interface, wherein the processor is used to process first control information, and the communication interface is used to receive the first control information.
  • a network side device in a fifteenth aspect, includes a processor and a memory.
  • the memory stores programs or instructions that can be run on the processor.
  • the program or instructions are used by the processor. When executed, the steps of the method as described in the first aspect are implemented.
  • a network side device including a processor and a communication interface, wherein the processor is used to obtain terminal capabilities, and the communication interface is used to send first control information to the terminal according to the terminal capabilities.
  • a control information processing system including: a terminal and a network side device.
  • the terminal can be used to perform the steps of the control information processing method described in the first aspect, the third aspect or the fifth aspect,
  • the network side The device may be used to perform the steps of the control information processing method described in the seventh, ninth or eleventh aspect.
  • a readable storage medium is provided. Programs or instructions are stored on the readable storage medium. When the programs or instructions are executed by a processor, the steps of the method described in the first aspect are implemented, or the steps of the method are implemented. The steps of the method as described in the third aspect.
  • a chip in a nineteenth aspect, includes a processor and a communication interface.
  • the communication interface is coupled to the processor.
  • the processor is used to run programs or instructions to implement the method described in the first aspect. method, or implement the method as described in the third aspect, or implement the method as described in the fifth aspect, or implement the method as described in the seventh aspect, or implement the method as described in the ninth aspect, or implement the method as described in the ninth aspect The method described in aspect 11.
  • a computer program/program product is provided, the computer program/program product is stored in a storage medium, and the computer program/program product is executed by at least one processor to implement the first aspect
  • the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the second control information. This limits the terminal's ability to process the first control information and effectively controls the complexity of the terminal processing the control information.
  • Figure 1 is a schematic structural diagram of a wireless communication system applicable to the embodiment of the present application.
  • FIG. 2 is a schematic flowchart of a control information processing method provided by an embodiment of the present application.
  • FIG. 3 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • FIG. 4 is a schematic flowchart of a control information processing method provided by an embodiment of the present application.
  • FIG. 5 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • FIG. 6 is a schematic flowchart of a control information processing method provided by an embodiment of the present application.
  • FIG. 7 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • FIG. 8 is a schematic flowchart of a control information processing method provided by an embodiment of the present application.
  • FIG. 9 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • FIG. 10 is a schematic flowchart of a control information processing method provided by an embodiment of the present application.
  • FIG 11 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • Figure 12 is a schematic flow chart of a control information processing method provided by an embodiment of the present application.
  • Figure 13 is a schematic structural diagram of a control information processing device provided by an embodiment of the present application.
  • Figure 14 is a schematic structural diagram of a communication device provided by an embodiment of the present application.
  • Figure 15 is a schematic structural diagram of a terminal that implements an embodiment of the present application.
  • Figure 16 is a schematic structural diagram of a network side device that implements an embodiment of the present application.
  • first, second, etc. in the description and claims of this application are used to distinguish similar objects and are not used to describe a specific order or sequence. It is to be understood that the terms so used are interchangeable under appropriate circumstances so that the embodiments of the present application can be practiced in sequences other than those illustrated or described herein, and that "first" and “second” are distinguished objects It is usually one type, and the number of objects is not limited.
  • the target object can be one or multiple.
  • “and/or” in the description and claims indicates at least one of the connected objects, and the character “/" generally indicates that the related objects are in an "or” relationship.
  • LTE Long Term Evolution
  • LTE-Advanced, LTE-A Long Term Evolution
  • LTE-A Long Term Evolution
  • CDMA Code Division Multiple Access
  • TDMA Time Division Multiple Access
  • FDMA Frequency Division Multiple Access
  • OFDMA Orthogonal Frequency Division Multiple Access
  • SC-FDMA Single-carrier Frequency Division Multiple Access
  • NR New Radio
  • FIG. 1 shows a block diagram of a wireless communication system to which embodiments of the present application are applicable.
  • the wireless communication system includes a terminal 11 and a network side device 12.
  • the terminal 11 may be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer), or a notebook computer, a personal digital assistant (Personal Digital Assistant, PDA), a palmtop computer, a netbook, or a super mobile personal computer.
  • Tablet Personal Computer Tablet Personal Computer
  • laptop computer laptop computer
  • PDA Personal Digital Assistant
  • PDA Personal Digital Assistant
  • UMPC ultra-mobile personal computer
  • UMPC mobile Internet device
  • MID mobile Internet Device
  • AR augmented reality
  • VR virtual reality
  • robots wearable devices
  • WUE Vehicle User Equipment
  • PUE Pedestrian User Equipment
  • smart home home equipment with wireless communication functions, such as refrigerators, TVs, washing machines or furniture, etc.
  • game consoles personal computers (personal computer, PC), teller machine or self-service machine and other terminal-side devices.
  • Wearable devices include: smart watches, smart bracelets, smart headphones, smart glasses, smart jewelry (smart bracelets, smart bracelets, smart rings, smart necklaces, smart anklets) bracelets, smart anklets, etc.), smart wristbands, smart clothing, etc.
  • the network side device 12 may include an access network device or a core network device, where the access network device 12 may also be called a wireless access network device, a radio access network (Radio Access Network, RAN), or a wireless access network device. Network access function or wireless access network unit.
  • the access network device 12 may include a base station, a WLAN access point or a WiFi node, etc.
  • the base station may be called a Node B, an evolved Node B (evolved Node B, eNB), an access point, or a Base Transceiver Station (Base Transceiver Station).
  • BTS Basic Service Set
  • ESS Extended Service Set
  • TRP Transmitting Receiving Point
  • the base station is not limited to specific technical terms. It should be noted that in the embodiment of this application, only the base station in the NR system is taken as an example. This introduction does not limit the specific type of base station.
  • Core network equipment may include but is not limited to at least one of the following: core network nodes, core network functions, mobility management entities (Mobility Management Entity, MME), access mobility management functions (Access and Mobility Management Function, AMF), session management functions (Session Management Function, SMF), User Plane Function (UPF), Policy Control Function (PCF), Policy and Charging Rules Function (PCRF), Edge Application Service Discovery function (Edge Application Server Discovery Function, EASDF), Unified Data Management (UDM), Unified Data Repository (UDR), Home Subscriber Server (HSS), centralized network configuration ( Centralized network configuration (CNC), Network Repository Function (NRF), Network Exposure Function (NEF), Local NEF (Local NEF, or L-NEF), Binding Support Function (Binding Support Function, BSF), application function (Application Function, AF), etc.
  • MME mobility management entities
  • AMF Access and Mobility Management Function
  • SMF Session Management Function
  • UPF User Plane Function
  • PCF Policy Control Function
  • control information processing method, device, terminal and network-side equipment provided by the embodiments of the present application will be described in detail below with reference to the accompanying drawings through some embodiments and application scenarios.
  • this embodiment of the present application provides a control information processing method.
  • the execution subject of the method is a terminal.
  • the method can be executed by software or hardware installed on the terminal.
  • the method may include the following steps.
  • the terminal receives the first control information, and the first control information meets the terminal capability requirements; wherein the terminal supports the terminal capability, and the terminal capability includes the terminal's capability for the first control information and/ Or the terminal's capability for the second control information.
  • the terminal capabilities of the terminal in the embodiment of the present application include the capability for the first control information and/or the capability for the second control information, wherein the capability for the first control information can restrict terminal monitoring. , detecting or processing the quantity of the first control information, and the ability of the terminal to monitor, detect or process the second control information may be restricted.
  • the first control information is DCI that can be used to schedule SL transmission.
  • SL DCI is used to represent the DCI that schedules SL transmission.
  • the second control information is DCI that can be used to schedule uplink and/or downlink.
  • Transmitted DCI such as unicast DCI (unicast DCI).
  • the SL DCI can be used to schedule one or more SL carriers for SL transmission.
  • the format of the SL DCI can be a related DCI format (DCI format), for example, DCI format 3_0 used to schedule one SL carrier.
  • the SL DCI can also adopt new DCI formats dedicated to SL DCI, such as DCI format 3_2.
  • the network side device may determine the terminal's capability for the first control information based on the terminal capability, and send the first control information to the terminal.
  • the terminal's capability for the first control information can be determined by at least one of the following methods:
  • Second control information Determined based on the terminal's capability for second control information, that is, the number of monitoring, detecting or processing second control information
  • the association may specifically be the association between the scheduled object of the first control information and the scheduled object of the second control information;
  • Capabilities for the first control information are obtained directly from the terminal capabilities.
  • the objects in the following embodiments may be cells, carriers, carrier units, bandwidth parts, etc.
  • scheduling objects may include scheduling cells (Scheduling cell), scheduling carrier units (Scheduling CC), scheduling bandwidth parts (Scheduling BandWidth Part, Scheduling BWP), and carriers.
  • the scheduling bandwidth part may also be the scheduling downlink bandwidth part (Scheduling Downlink BandWidth Part, Scheduling DL BWP).
  • scheduled objects may include scheduled cells (Scheduled cell), scheduled carrier units (Scheduled CC), scheduled bandwidth parts (Scheduled BandWidth Part, Scheduling BWP), and carriers.
  • the scheduled carrier unit corresponding to the first control information is the scheduled secondary link carrier unit (Scheduled SL CC)
  • the scheduled bandwidth part corresponding to the first control information is the scheduled secondary link bandwidth part (Scheduled SL BWP).
  • the scheduled bandwidth part corresponding to the second control information may include the scheduled downlink bandwidth part (Scheduled Downlink BandWidth Part, Scheduled DL BWP) and/or the scheduled uplink bandwidth part (Scheduled Uplink BandWidth Part, Scheduled UL BWP).
  • the method further includes:
  • the terminal sends the terminal capability, that is, the terminal reports the terminal capability to the network side device, so that the network side device can determine the first control information to send to the terminal based on the terminal capability.
  • the embodiments of the present application receive the first control information that meets the terminal capability requirements; wherein the terminal capabilities include the terminal's capability for the first control information and/or the terminal's capability for the third control information.
  • the ability of the second control information thus limits the terminal's ability to process the first control information and effectively controls the complexity of the terminal processing the control information.
  • the terminal capability may include the terminal's capability for the second control information, and the terminal's capability for the second control information includes the terminal monitoring, detecting or processing the second control information. Amount of information.
  • the first control information can be used as the second control information
  • the network side device can send the first control information to the terminal according to the number of the terminal monitoring, detecting or processing the second control information. information.
  • the number of the terminal monitoring, detecting or processing the second control information includes at least one of the following:
  • the terminal capability restricts the terminal from monitoring, detecting or processing the first time within one or more first times. 2. Control the amount of information.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the first scheduling object.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the Scheduling CC and/or Scheduling DL BWP corresponding to the second control information.
  • the scheduling object corresponding to the second control information can be the same as The scheduling objects of the first control information are the same;
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the first scheduled object.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the Scheduled CC, Scheduled DL BWP and/or Scheduled UL BWP corresponding to the second control information.
  • the terminal capability restricts the amount of the terminal monitoring, detecting or processing the second control information for the first SCS.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the Scheduling CC SCS and Scheduling DL BWP SCS corresponding to the second control information.
  • the first SCS may correspond to the first control information.
  • the SCS of the scheduling object is the same.
  • the terminal capability restricts the amount of the second control information that the terminal can monitor, detect or process for the second SCS. For example, the terminal capability restricts the number of the terminal monitoring, detecting or processing the second control information for the Scheduled CC SCS, Scheduled DL BWP SCS and/or Scheduled UL BWP SCS corresponding to the second control information.
  • the terminal capability limits the amount of the second control information that the terminal can monitor, detect or process for the first association relationship.
  • the first SCS pair includes the first SCS and the second SCS, which can be expressed as ⁇ first SCS, second SCS ⁇ .
  • the terminal capability limits the number of the terminal that can monitor, detect or process the second control information for the first SCS pair.
  • the first scheduling object may be a scheduling object using Time Division Duplex (TDD) or a scheduling object using Frequency Division Duplex (FDD).
  • TDD Time Division Duplex
  • FDD Frequency Division Duplex
  • the first time may include at least one of the following:
  • the span of the scheduling object (span);
  • the duration of the scheduling object (duration);
  • the periodicity of the scheduling object is the periodicity of the scheduling object.
  • the first time may be determined based on the first SCS.
  • the first association relationship may include at least one of the following:
  • the first SCS is greater than the second SCS
  • the first SCS is equal to the second SCS
  • the first SCS is smaller than the second SCS.
  • the amount of second control information corresponding to the first association relationship may include:
  • the corresponding amount of second control information when the first SCS is smaller than the second SCS.
  • one piece of the first control information corresponds to M pieces of the second control information, and M is a positive integer, That is, one piece of first control information can be regarded as M pieces of second control information.
  • the M pieces of second control information corresponding to the 1 piece of first control information include at least one of the following;
  • one piece of first control information is counted as M pieces of second control information for one or more first times.
  • one piece of the first control information is counted as M pieces of the second control information for the first scheduling object.
  • one piece of first control information is counted as M pieces of second control information for the first scheduled object.
  • one piece of the first control information is counted as M pieces of the second control information for the first SCS.
  • one piece of the first control information is counted as M pieces of the second control information for the second SCS.
  • one piece of the first control information is counted as M pieces of the second control information for the first association relationship.
  • one piece of the first control information is counted as M pieces of the second control information for the first SCS pair.
  • the UE's capability for the second control information restricts the terminal from monitoring, detecting or processing the second number of The number is 1, then the UE supports monitoring, detecting or processing 1 piece of first control information, or the UE supports monitoring, detecting or processing 1 piece of second control information; if the ability of the second control information restricts the terminal to monitor, detect or process The number of processing second quantities is 2, then the UE supports monitoring, detecting, or processing 2 pieces of first control information, or the UE supports monitoring, detecting, or processing 2 pieces of second control information, or the UE supports monitoring, detecting, or processing 1 piece of second control information.
  • first control information and 1 second control information are examples of the UE's capability for the second control information.
  • the first control information when the scheduled object corresponding to the first control information has an association relationship with the first object, the first control information can be used as the third control information, and the third control information
  • the information includes second control information of the first object for the corresponding scheduled object.
  • the terminal's ability to handle the second control information includes the amount of the terminal monitoring, detecting or processing the third control information.
  • the first object includes a first CC, a first DL BWP and/or a first UL BWP, which are respectively the CC and DL associated with the Scheduled SL CC and/or the Scheduled SL BWP corresponding to the first control information. BWP and/or UL BWP.
  • the number of third control information monitored, detected or processed by the terminal includes at least one of the following:
  • the terminal capability restricts the amount of the third control information that the terminal can monitor, detect or process within one or more second times.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the third control information for the second scheduling object.
  • the terminal capability restricts the number of third control information that the terminal monitors, detects or processes for the Scheduling CC and/or Scheduling DL BWP corresponding to the third control information.
  • the scheduling object corresponding to the third control information may be The scheduling objects corresponding to the first control information are the same.
  • the terminal capability restricts the amount of the third control information that the terminal can monitor, detect or process for the first object.
  • the terminal capability limits the amount of third control information corresponding to the first CC, the first DL BWP and/or the first UL BWP of the terminal.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the third control information for the scheduled objects corresponding to the first control information. For example, the terminal capability restricts the number of third control information that the terminal monitors, detects or processes for Scheduled SL CC and/or Scheduled SL BWP corresponding to the first control information.
  • the terminal capability restricts the amount of the terminal monitoring, detecting or processing the third control information for the third SCS.
  • the terminal capability limits the number of third control information that the terminal can monitor, detect or process for the Scheduling CC SCS and Scheduling DL BWP SCS corresponding to the third control information.
  • the third SCS can The SCS corresponding to the schedule corresponding to the first control information is the same;
  • the terminal capability restricts the amount of the third control information that the terminal can monitor, detect or process for the fourth SCS.
  • the terminal capability restricts the amount of third control information that the terminal monitors, detects or processes for the SCS of the first CC, the SCS of the first DL BWP and/or the SCS of the first UL BWP;
  • the terminal capability limits the amount of the third control information that the terminal can monitor, detect or process for the fifth SCS. For example, the terminal capability restricts the number of three control information that the terminal can monitor, detect or process for Scheduled SL CC and/or Scheduled SL BWP SCS corresponding to the first control information;
  • the terminal capability limits the amount of the third control information that the terminal can monitor, detect or process for the second association relationship.
  • the terminal capability restricts the amount of the terminal monitoring, detecting or processing the third control information for the third association relationship.
  • the number of third control information corresponding to the second SCS pair includes the third SCS and the fourth SCS, which can be expressed as ⁇ third SCS, the fourth SCS ⁇ ;
  • the terminal capability limits the number of the terminal that can monitor, detect or process the third control information for the second SCS pair.
  • the third SCS pair includes the third SCS and the fifth SCS, which can be expressed as ⁇ third SCS, the fifth SCS ⁇ ;
  • the terminal capability limits the number of the terminal that can monitor, detect or process the third control information for the third SCS pair.
  • the second scheduling object may be a TDD scheduling object or an FDD scheduling object.
  • the second time may include at least one of the following:
  • the span of the scheduling object (span);
  • the duration of the scheduling object (duration);
  • the periodicity of the scheduling object is the periodicity of the scheduling object.
  • the second time is determined based on the third SCS.
  • the second association relationship may include at least one of the following:
  • the third SCS is greater than the fourth SCS
  • the third SCS is equal to the fourth SCS
  • the third SCS is smaller than the fourth SCS.
  • the third association relationship may include at least one of the following:
  • the third SCS is greater than the fifth SCS
  • the third SCS is equal to the fifth SCS
  • the third SCS is smaller than the fifth SCS.
  • one first control information may correspond to one or more scheduled objects. If the first control information corresponds to multiple scheduled objects, each scheduled object corresponding to the first control information is associated with In the case of the same first object, the fourth SCS, the second SCS and the second association relationship pair are as described above; in each scheduled object corresponding to the first control information is associated with a different first In the case of an object, the fourth SCS is the maximum SCS or the minimum SCS among the SCS of the first object, and the second SCS can be expressed as ⁇ third SCS, the maximum SCS among the SCS of the first object or minimum SCS ⁇ , the second association relationship includes at least one of the following:
  • the third SCS is greater than the largest SCS or the smallest SCS among the SCS of the first object
  • the third SCS is equal to the maximum SCS or the minimum SCS among the SCS of the first object
  • the third SCS is less than the largest SCS or the smallest SCS among the SCS of the first subject.
  • the first control information may correspond to one or more scheduled objects.
  • the fifth SCS, the third SCS pair and The third association relationship is as described above; when the first control information corresponds to multiple scheduled objects, the fifth SCS is the largest SCS or the smallest SCS among the SCS of the multiple scheduled objects, and the The third SCS may be expressed as ⁇ third SCS, the largest SCS or the smallest SCS among the SCS of the multiple scheduled objects ⁇ , and the third association relationship may include at least one of the following:
  • the third SCS is greater than the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects
  • the third SCS is equal to the maximum SCS or the minimum SCS among the SCS of the multiple scheduled objects;
  • the third SCS is smaller than the maximum SCS or the minimum SCS among the SCSs of the plurality of scheduled objects.
  • the scheduled object corresponding to the first control information has an association relationship with the first object including:
  • the first control information on the first object schedules the scheduled object, the scheduled SL CC and/or SL BWP;
  • the first control information on the search space (Search Space) on the first object schedules the scheduled object, the scheduled SL CC and/or SL BWP.
  • one piece of the first control information corresponds to N pieces of the third control information, and N is a positive integer, That is, you can place 1 first control
  • the information is regarded as N second control information.
  • the N pieces of third control information corresponding to the 1 piece of first control information include at least one of the following;
  • one piece of the first control information is counted as N pieces of the third control information within one or more second times.
  • one piece of the first control information is counted as N pieces of the third control information for the scheduling object corresponding to the third control information.
  • one piece of the first control information is counted as N pieces of the third control information for the scheduling object corresponding to the first object.
  • one piece of the first control information is counted as N pieces of the third control information for the scheduled object corresponding to the first control information.
  • one piece of the first control information is counted as N pieces of the third control information for the third SCS.
  • one piece of the first control information is counted as N pieces of the third control information for the fourth SCS.
  • one piece of the first control information is counted as N pieces of the third control information for the fifth SCS.
  • one piece of the first control information is counted as N pieces of the third control information for the second association relationship.
  • one piece of the first control information is counted as N pieces of the third control information for the third association relationship.
  • one piece of the first control information is counted as N pieces of the third control information for the second SCS pair.
  • one piece of the first control information is counted as N pieces of the third control information for the third SCS pair.
  • the terminal capability may include the terminal's capability for the first control information
  • the terminal's capability for the first control information may include the terminal monitoring, detecting or processing the first control information. Control the amount of information.
  • the number of the terminal monitoring, detecting or processing the first control information includes at least one of the following:
  • the terminal capability restricts the number of the terminal that can monitor, detect or process the third control information within one or more third times.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the third control information for the scheduling object corresponding to the first control information.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the first control information for the Scheduling CC and/or Scheduling DL BWP corresponding to the first control information.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the third control information for the scheduled objects corresponding to the first control information.
  • the terminal capability restricts the number of the terminal monitoring, detecting or processing the first control information for the Scheduled SL CC and/or Scheduled SL BWP corresponding to the first control information.
  • the terminal capability restricts the terminal's ability to monitor, detect or process the number of third control information with respect to the number of scheduled objects corresponding to the first control information.
  • the terminal capability restricts the terminal's ability to monitor, detect or process the number of first control information for the number of Scheduled SL CCs and/or Scheduled SL BWPs corresponding to the first control information.
  • the terminal capability restricts the amount of the third control information that the terminal can monitor, detect or process for the fifth SCS.
  • the terminal capability limits the amount of first control information that the terminal monitors, detects or processes for the Scheduling CC SCS and/or Scheduling DL BWP SCS corresponding to the first control information.
  • the terminal capability restricts the amount of the third control information that the terminal can monitor, detect or process for the sixth SCS.
  • the terminal capability limits the amount of first control information that the terminal monitors, detects or processes for the Scheduled SL CC SCS and/or Scheduled SL BWP SCS corresponding to the first control information.
  • the terminal capability restricts the amount of the terminal monitoring, detecting or processing the third control information for the fourth association relationship.
  • the fourth SCS pair includes the fifth SCS and the sixth SCS, which can be expressed as ⁇ sixth SCS, fifth SCS ⁇ .
  • the terminal capability limits the number of the terminal that can monitor, detect or process the third control information for the fourth SCS pair.
  • the third scheduling object may be a TDD scheduling object or an FDD scheduling object.
  • the third time may include at least one of the following:
  • the span of the scheduling object (span);
  • the duration of the scheduling object (duration);
  • the periodicity of the scheduling object is the periodicity of the scheduling object.
  • the third time is determined based on the sixth SCS.
  • the fourth association relationship may include at least one of the following:
  • the sixth SCS is greater than the fifth SCS
  • the sixth SCS is equal to said fifth SCS
  • the sixth SCS is smaller than the fifth SCS.
  • the amount of first control information corresponding to the fourth association relationship may include:
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the first control information may correspond to one or more scheduled objects.
  • the fifth SCS, the fourth SCS pair and The fourth association relationship is as follows; when the first control information corresponds to multiple scheduled objects, the fifth SCS is the largest SCS or the smallest SCS among the SCS of the multiple scheduled objects, and the The fourth SCS pair may be represented as ⁇ sixth SCS, the largest SCS or the smallest SCS among the SCS of the plurality of scheduled objects, and the fourth association relationship may include at least one of the following:
  • the sixth SCS is greater than the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects
  • the sixth SCS is equal to the maximum SCS or the minimum SCS among the SCS of the multiple scheduled objects;
  • the sixth SCS is smaller than the largest SCS or the smallest SCS among the SCSs of the plurality of scheduled objects.
  • the terminal's capability for the second control information and/or the capability for the first control information can be obtained by indicating based on multiple indication granularities.
  • the terminal's capability for the second control information and/or the capability for the first control information includes at least one of the following:
  • Capabilities corresponding to the SCS of the scheduling object that is, for the SCS of different scheduling objects, the corresponding capabilities need to be indicated, such as Per Scheduling CC/DL BWP SCS SCS indication;
  • the capability corresponding to the maximum SCS or minimum SCS in the SCS of the scheduled object that is, for the maximum SCS or minimum SCS in the SCS of different scheduled objects, the corresponding capability needs to be indicated, such as Per minimum/maximum scheduled SL BWP/ CC SCS instructions;
  • Capabilities corresponding to the size relationship between the SCS of the scheduled object and the SCS of the scheduling object; that is, for the size relationship between the SCS of different scheduled objects and the SCS of the scheduling object, the corresponding capabilities need to be indicated, such as Per scheduling CC/DL BWP SCS> scheduled SL BWP/CC SCS indication, Per scheduling CC/DL BWP SCS scheduled SL BWP/CC SCS instructions, Per scheduled CC/DL BWP SCS ⁇ scheduled SL BWP/CC SCS instructions,
  • the capability corresponding to the size relationship between the maximum SCS or the minimum SCS in the SCS of the scheduled object and the SCS of the scheduling object is required.
  • Capabilities corresponding to scheduling objects that is, for different scheduling objects, corresponding capabilities need to be indicated, such as Per scheduling CC/DL BWP instructions;
  • the capabilities corresponding to the scheduled objects that is, for different scheduled objects, the corresponding capabilities need to be indicated, Per scheduled SL BWP/CC indication;
  • a capability corresponding to K scheduled objects where the K value is the number of supported scheduled objects; where K is a positive integer. That is, for the K value, the corresponding capability needs to be indicated, such as Per K value indication.
  • the terminal's capability for the second control information and/or the capability for the first control information may also include capabilities based on half-duplex mode, including:
  • UE capabilities can be: a), or b), or c), or a)+b)
  • every N consecutive scheduled CC slots process K1 scheduled uplink unicast DCI for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K1 unicast DCI scheduling UL per N consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for FDD scheduling CC.)
  • each N consecutive CC time slots process K2 scheduled uplink unicast DCI for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K2 unicast DCI scheduling UL per N consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for TDD scheduling CC.)
  • every N’ consecutive scheduled CC slots process K3 unicast DCI for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K3 unicast DCI scheduling UL per N’consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for FDD scheduling CC)
  • every N’ consecutive scheduled CC slots process K4 unicast DCI for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K4 unicast DCI scheduling UL per N’consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for TDD scheduling CC)
  • the maximum or minimum number of consecutive scheduled CCs in each ⁇ N, N’ ⁇ processes K3 unicast DCIs for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K3 unicast DCI scheduling UL per min/max ⁇ N,N’ ⁇ consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for FDD scheduling CC)
  • the maximum or minimum number of consecutive scheduled CCs in each ⁇ N, N’ ⁇ processes K4 unicast DCIs for each scheduled SL BWP/CC associated UL BWP/CC. (Processing K4 unicast DCI scheduling UL per min/max ⁇ N,N’ ⁇ consecutive scheduling CC slot per scheduled SL BWP/CC associated UL BWP/CC for TDD scheduling CC)
  • N is obtained based on (scheduling CC/DL BWP SCS, scheduled SL BWP/CC associated DL/UL BWP/CC SCS).
  • the corresponding (scheduling CC/DL BWP SCS, scheduled SL BWP/CC associated DL/UL BWP/CC SCS) is (60,5), (120,30);
  • Scenario 2 scheduled CC/DL BWP SCS ⁇ scheduled SL BWP/CC associated UL BWP/CC SCS; and scheduled CC/DL BWP SCS ⁇ scheduled SL BWP/CC SCS.
  • UE capabilities can be: a), or b), or a)+b)
  • UE capabilities can be: a), or b), or a)+b)
  • Processing up to X unicast DCI scheduling for UL per scheduled SL BWP/CC associated UL BWP/CC. 60),(30,120)kHz SCS can have X ⁇ 1,2,4 ⁇ while a pair of(15,30),(30,60),(60,120)kHz SCS can have applies per slot of scheduling CC.
  • UE capabilities can be: a), or b), or a)+b)
  • X Indicates the UE cross carrier scheduling processing capability for SL carrier aggregation processing up to X SL DCI scheduling for SL per scheduled SL BWP/CC.
  • the terminal in the terminal capability monitors, detects or processes the quantity of the second control information, the quantity of the third control information and/or the quantity of the first control information, to limit the terminal's ability to process the first control information, effectively controlling the complexity of the terminal processing the control information.
  • step S210 includes:
  • the terminal receives one type of control information or one piece of control information from the at least two types of control information within the overlapping time range of the monitoring time corresponding to the at least two types of control information;
  • the terminal receives one of the at least two pieces of first control information within an overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • control information includes at least two of the following:
  • the first control information for dynamic scheduling or the first control that receives the Cyclic Redundancy Check (CRC) scrambled by the Sidelink Radio Network Temporary Identifier (SL-RNTI) Information; wherein the first control information whose CRC is scrambled by SL-RNTI may be the first control information used for dynamic scheduling;
  • CRC Cyclic Redundancy Check
  • SL-RNTI Sidelink Radio Network Temporary Identifier
  • the first control information used to perform at least one of activation, reactivation, retransmission and deactivation of the configuration authorization schedule, or the CRC is composed of the Sidelink Configured Scheduling Radio Network Temporary Identifier (SL) -CS-RNTI) scrambled first control information; wherein the first control information scrambled by SL-CS-RNTI may be used to activate, reactivate, retransmit and deactivate configuration grant scheduling.
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or the CRC is temporarily identified by the sidelink semi-persistent scheduling virtual radio network (Sidelink Semi-Persistent Scheduling Virtual Radio Network Temporary Identifier, SL Semi-Persistent Scheduling V-RNTI) scrambled first control information; among them, CRC is the first control information scrambled by SL-RNTI and CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI
  • the control information may be at least one of first control information for activating, reactivating, retransmitting and deactivating semi-static scheduling;
  • PDSCH Physical Downlink Control Channel
  • CRC Used to schedule the control information of the Physical Downlink Control Channel (PDSCH), or the CRC is composed of the System Information Radio Network Temporary Identifier (SI-RNTI) and the Random Access Wireless Network Temporary Identifier (SI-RNTI).
  • SI-RNTI System Information Radio Network Temporary Identifier
  • SI-RNTI Random Access Radio Network Temporary Identifier
  • MsgB-RNTI Temporary Cell Radio Network Temporary Identifier
  • TC-RNTI Temporary Cell Radio Network Temporary Identifier
  • Paging Radio Network Temporary Identifier, P-RNTI P-RNTI
  • C-RNTI Cell Radio Network Temporary Identifier
  • Configuration Scheduling Radio Network Temporary Identifier CS-RNTI
  • MCS-RNTI Modulation and Coding Scheme Radio Network Temporary Identifier
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the first control information with CRC scrambled by SL-RNTI is received.
  • One control information or CRC is the first control information scrambled by SL-CS-RNTI;
  • the received CRC is scrambled by SL-RNTI
  • the scrambled first control information or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • At the monitoring time of the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the first control information or CRC scrambled by SL Semi-Persistent Scheduling V-RNTI is received by SI-RNTI, RA-RNTI, MsgB- Control information scrambled by RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the CRC scrambled by SL-RNTI is not received.
  • the first control information and CRC are scrambled by SL-CS-RNTI;
  • the CRC by SL-RNTI is not received
  • the scrambled first control information and CRC are scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information for deactivating configuration grant scheduling and the first control information for deactivating configuration grant scheduling are not received.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • SI-RNTI SI-RNTI
  • RA-RNTI MsgB-RNTI
  • TC-RNTI P-RNTI
  • C-RNTI C-RNTI
  • CS-RNTI or MCS -RNTI MCS-RNTI
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI is not received , P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling and the first control information for scheduling PDSCH are not received control information;
  • the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- RNTI or
  • the control information scrambled by MCS-RNTI is not received within the overlapping time range of the monitoring time.
  • the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC by SI-RNTI, RA-RNTI, MsgB-RNTI are not received.
  • TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI scrambled control information.
  • the monitoring time includes at least one of the following:
  • the terminal may receive the first control information based on the following conditions:
  • the terminal does not expect to receive multiple first control information within the same time period
  • the terminal does not expect to receive the first control information for dynamic scheduling and the first control information for at least one of activation, reactivation, retransmission and deactivation of configuration authorization within the same time period;
  • the terminal does not expect the first control information whose CRC is scrambled by SL-RNTI and the first control information whose CRC is scrambled by SL-CS-RNTI within the same time period;
  • the terminal does not expect to receive the first control information for dynamic scheduling and the first control information for at least one of activation/reactivation/retransmission/deactivation of semi-static scheduling within the same time period;
  • the terminal does not expect the first control information whose CRC is scrambled by SL-RNTI and the first control information whose CRC is scrambled by SL Semi-Persistent Scheduling V-RNTI within the same time period;
  • the terminal does not expect to receive the first control information for deactivating the configuration authorization and the control information for scheduling the PDSCH within the same time period;
  • the terminal does not expect to receive the first control information with CRC scrambled by SL-CS-RNTI and CRC consisting of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI in the same time period.
  • the terminal does not expect to receive the first control information to deactivate semi-static scheduling and the control information for scheduling PDSCH within the same time period;
  • the terminal does not expect to receive the first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI and CRC consisting of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI within the same time period. , C-RNTI, CS-RNTI or MCS-RNTI scrambled control information.
  • the first control information is used to indicate the secondary link authorization index
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, and the terminal determines the dynamic codebook for HARQ feedback according to the SAI indication.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a first transmission module 301 and a first execution module 302.
  • the first transmission module 301 is used to receive first control information, and the first control information meets the requirements of terminal capabilities; wherein the control information processing device supports the terminal capabilities, and the terminal capabilities include the terminal's ability to The capability of the first control information and/or the capability of the control information processing device for the second control information; the first execution module 302 is used to process the first control information.
  • the ability of the control information processing device to handle the second control information includes the number of the second control information that the control information processing device monitors, detects or processes.
  • the quantity of the second control information monitored, detected or processed by the control information processing device includes at least one of the following:
  • one piece of the first control information corresponds to M pieces of the second control information, and M is a positive integer.
  • the M pieces of second control information corresponding to the 1 piece of first control information include at least one of the following;
  • the terminal's ability to handle the second control information includes the terminal monitoring, detecting or processing the third control information.
  • the amount of third control information monitored, detected or processed by the control information processing device includes at least one of the following:
  • one piece of the first control information corresponds to N pieces of the third control information, and N is a positive integer.
  • the N pieces of third control information corresponding to the 1 piece of first control information include at least one of the following;
  • the second time of the scheduling object corresponding to the third control information is determined based on the third SCS.
  • the fourth SCS is the maximum SCS or the minimum SCS among the SCS of the first object.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the scheduled object corresponding to the first control information has an association relationship with the first object including:
  • the first control information on the first object schedules the scheduled object
  • First control information on the search space on the first object schedules the scheduled object.
  • the ability of the control information processing device to handle the first control information includes the amount of the first control information that the control information processing device monitors, detects or processes.
  • the number of the terminal monitoring, detecting or processing the first control information includes at least one of the following:
  • the third time of the scheduling object corresponding to the first control information is determined based on the sixth SCS.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • control information processing device's capability for the second control information and/or its capability for the first control information includes at least one of the following:
  • the first transmission module 301 is also used to send the terminal capabilities to the network side device.
  • the first transmission module 301 is configured to receive one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information;
  • the terminal receives one of the at least two pieces of first control information within an overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information in which the cyclic redundancy check CRC is scrambled by the secondary link wireless network temporary identifier SL-RNTI;
  • the first control information used to perform at least one of activation, reactivation, retransmission and deactivation of the configuration authorization schedule, or the first CRC scrambled by the secondary link configuration schedule wireless network temporary identity SL-CS-RNTI control information;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or the CRC is added by the secondary link semi-persistent scheduling virtual wireless network temporary identifier SL Semi-Persistent Scheduling V-RNTI The first control information of interference;
  • the control information used to schedule the physical downlink shared channel PDSCH, or the CRC consists of the system message wireless network temporary identifier SI-RNTI, the random access wireless network temporary identifier RA-RNTI, and the message B wireless network temporary identifier.
  • SI-RNTI system message wireless network temporary identifier
  • RA-RNTI random access wireless network temporary identifier
  • MsgB-RNTI Temporary Cell Radio Network Temporary Identity TC-RNTI
  • Paging Radio Network Temporary Identity P-RNTI Cell Radio Network Temporary Identity C-RNTI
  • Configuration Scheduling Radio Network Temporary Identity CS-RNTI or Modulation and Coding Scheme Radio Network Temporary Identifies MCS-RNTI scrambled control information.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the first control information with CRC scrambled by SL-RNTI is received.
  • One control information or CRC is the first control information scrambled by SL-CS-RNTI;
  • the received CRC is scrambled by SL-RNTI
  • the scrambled first control information or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • At the monitoring time of the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the first control information or CRC scrambled by SL Semi-Persistent Scheduling V-RNTI is received by SI-RNTI, RA-RNTI, MsgB-RNTI, Control information scrambled by TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the CRC scrambled by SL-RNTI is not received.
  • the first control information and CRC are scrambled by SL-CS-RNTI;
  • the CRC by SL-RNTI is not received
  • the scrambled first control information and CRC are scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information for deactivating configuration grant scheduling and the first control information for deactivating configuration grant scheduling are not received.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • SI-RNTI SI-RNTI
  • RA-RNTI MsgB-RNTI
  • TC-RNTI P-RNTI
  • C-RNTI C-RNTI
  • CS-RNTI or MCS -RNTI MCS-RNTI
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI is not received , P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling and the first control information for scheduling PDSCH are not received control information;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the CRC is not received.
  • the first control information is used to indicate the secondary link authorization index
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • the ability of the device to process the first control information effectively controls the complexity of processing the control information by the control information processing device.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 2 and achieve the same technical effect. To avoid duplication, the details will not be described here.
  • embodiments of the present application also provide another control information processing method.
  • the execution subject of this method is a terminal.
  • the method includes the following steps.
  • the terminal receives one type of control information or one piece of control information from the at least two types of control information within the overlapping time range of the monitoring time corresponding to the at least two types of control information;
  • the terminal receives one of the at least two pieces of first control information within an overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information with CRC scrambled by SL-RNTI;
  • First control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or first control information with CRC scrambled by SL-CS-RNTI;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • Control information used to schedule PDSCH or control information whose CRC is scrambled by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the first control information with CRC scrambled by SL-RNTI is received.
  • One control information or CRC is the first control information scrambled by SL-CS-RNTI;
  • the received CRC is scrambled by SL-RNTI
  • the scrambled first control information or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • At the monitoring time of the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the first control information or CRC scrambled by SL Semi-Persistent Scheduling V-RNTI is received by SI-RNTI, RA-RNTI, MsgB- Control information scrambled by RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the CRC scrambled by SL-RNTI is not received.
  • the first control information and CRC are scrambled by SL-CS-RNTI;
  • the CRC by SL-RNTI is not received
  • the scrambled first control information and CRC are scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information for deactivating configuration grant scheduling and the first control information for deactivating configuration grant scheduling are not received.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • SI-RNTI SI-RNTI
  • RA-RNTI MsgB-RNTI
  • TC-RNTI P-RNTI
  • C-RNTI C-RNTI
  • CS-RNTI or MCS -RNTI MCS-RNTI
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI is not received , P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling and the first control information for scheduling PDSCH are not received control information;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the CRC is not received.
  • the monitoring time includes at least one of the following:
  • the embodiments of the present application limit the complexity of the terminal processing the first control information by stipulating the reception conditions that are required to be met when receiving the first control information.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a second transmission module 501 and a second execution module 502.
  • the second transmission module 501 is configured to receive one type of control information or a piece of control information from the at least two types of control information within an overlapping time range of monitoring times corresponding to the at least two types of control information; the second execution Module 502 is used to process the received type of control information or a piece of control information;
  • the second transmission module 501 is configured to receive one of the at least two pieces of first control information within an overlapping time range of monitoring times corresponding to at least two pieces of the same type of first control information; the second execution module 502 is used to process the received piece of first control information;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information with CRC scrambled by SL-RNTI;
  • First control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or first control information with CRC scrambled by SL-CS-RNTI;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • Control information used to schedule PDSCH or control information whose CRC is scrambled by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the first control information with CRC scrambled by SL-RNTI is received.
  • One control information or CRC is the first control information scrambled by SL-CS-RNTI;
  • the monitoring time of the first control information for dynamic scheduling and for activating, reactivating, and semi-static scheduling Within the overlapping time range of the monitoring time of at least one of the first control information of retransmission and deactivation, receive the first control information for dynamic scheduling or for activating, reactivating, retransmitting and deactivating semi-static scheduling. Activating at least one of the first control information;
  • the received CRC is scrambled by SL-RNTI
  • the scrambled first control information or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • At the monitoring time of the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the first control information or CRC scrambled by SL Semi-Persistent Scheduling V-RNTI is received by SI-RNTI, RA-RNTI, MsgB- Control information scrambled by RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the second transmission module 501 is configured to monitor at least one of the first control information for dynamic scheduling and for activating, reactivating, retransmitting and deactivating the configuration authorization schedule. Within the overlapping time range of the monitoring time of the first control information, at least one of the first control information for dynamic scheduling and the activation, reactivation, retransmission and deactivation of configuration authorization scheduling is not received.
  • the first control information ;
  • the CRC scrambled by SL-RNTI is not received.
  • the first control information and CRC are scrambled by SL-CS-RNTI;
  • the CRC is scrambled by SL-RNTI at the monitoring time of the first control information and the CRC is scrambled by SL Semi-Persistent Within the overlapping time range of the monitoring time of the first control information scrambled by Scheduling V-RNTI, the CRC of the first control information scrambled by SL-RNTI and the first CRC scrambled by SL Semi-Persistent Scheduling V-RNTI are not received control information;
  • the first control information for deactivating configuration grant scheduling and the first control information for deactivating configuration grant scheduling are not received.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • SI-RNTI SI-RNTI
  • RA-RNTI MsgB-RNTI
  • TC-RNTI P-RNTI
  • C-RNTI C-RNTI
  • CS-RNTI or MCS -RNTI MCS-RNTI
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI is not received , P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling and the first control information for scheduling PDSCH are not received control information;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the CRC is not received.
  • the monitoring time includes at least one of the following:
  • the embodiments of the present application limit the complexity of the terminal processing the first control information by stipulating the reception conditions that are required to be met when receiving the first control information.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 4 and achieve the same technical effect. To avoid duplication, details will not be described here.
  • the embodiment of the present application also provides another control information processing method.
  • the execution subject of the method is a terminal, and the method includes the following steps.
  • the terminal receives the first control information.
  • the first control information is used to indicate the Sidelink Assignment Indicator (SAI).
  • SAI is used to determine the hybrid automatic retransmission (SAI) in the dynamic codebook reported by the terminal.
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the scheduled objects corresponding to the first control information can be numbered in the increasing or decreasing order of the identification information SL CC id or SL CC index, SL BWP id or SL BWP index of the scheduled objects;
  • the scheduled resource pool corresponding to the first control information for example, can be numbered in the increasing or decreasing order of the identification information SL pool id or SL pool index of the scheduled resource pool;
  • the monitoring opportunities used to transmit the first control information for example, can be numbered according to the increasing or decreasing order of the monitoring occurrence index of the identification information of the monitoring opportunities;
  • PUCCH Physical Uplink Control Channel
  • enable HARQ HARQ enable
  • trigger HARQ trigger HARQ
  • control channel element (Control Channel Element, CCE) where the first control information is located, for example, can be numbered according to the increasing or decreasing order of the identification information CEE index of the control channel;
  • the carrier where the physical sidelink shared channel (PSSCH) scheduled by the first control information is located is, for example, numbered in the order of increasing or decreasing order of the identification information CC index of the carrier unit;
  • the starting time or start time of the PSSCH scheduled by the first control information may be according to the actual time position or virtual time position, SL time position (for example, based on SL timing) or Uu time position ( For example, based on Uu timing), for example, the PSSCH can be numbered in increasing or decreasing order of the starting time or start time;
  • the end time or end time of the PSSCH scheduled by the first control information may be according to the actual time position or virtual time position, SL time position (for example, based on SL timing) or Uu time position ( For example, based on Uu timing), for example, numbering can be performed in increasing or decreasing order of the end time or end time of the PSSCH;
  • the position of the sub-channel (sub-channel) where the PSSCH scheduled by the first control information is located can be numbered in the order of increasing or decreasing order of the sub-channel identification information sub-channel index;
  • the positions of the Physical SideLink Feedback Channel (PSFCH) corresponding to the PSSCH scheduled by the first control information can be numbered in the order of increasing or decreasing order of the positions of the PSFCH corresponding to the PSSCH.
  • PSFCH Physical SideLink Feedback Channel
  • the secondary link authorization Index the starting time or start time of the PSSCH scheduled by the first control information, the end time or end time of the PSSCH scheduled by the first control information, and the position of the PSFCH corresponding to the PSSCH scheduled by the first control information. At least one is confirmed.
  • the CC of the PSSH scheduled by the first control information and the monitoring occasion of the SAI indicated by the first control information are numbered as follows:
  • condition 1 the CC where the PSSCH scheduled by different first control information is located is the same as the monitoring occasion, then the PSSCH scheduled by the first control information is numbered in the increasing/decreasing order of the starting time or start time;
  • condition 1 the numbers are first numbered in the increasing/decreasing order of the CC index where the PSSCH scheduled by the SL-DCI is located; and then numbered in the increasing/decreasing order of the PDCCH monitoring occasion index where the SL DCI is located.
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, and the terminal determines the dynamic codebook for HARQ feedback according to the SAI indication.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a third transmission module 701 and a third execution module 702.
  • the third transmission module 701 is used to receive first control information, and the first control information is used to indicate a secondary link authorization index; the third execution module 702 is used to process the first control information;
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • the secondary The link grant index is the start time or start time of the PSSCH scheduled by the first control information, the end time or end time of the PSSCH scheduled by the first control information and the PSFCH corresponding to the PSSCH scheduled by the first control information. Bit At least one of the settings is confirmed.
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, and the terminal determines the dynamic codebook for HARQ feedback according to the SAI indication.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, which is used to indicate the position of the HARQ feedback in the dynamic codebook.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 6 and achieve the same technical effect. To avoid duplication, the details will not be described here.
  • this embodiment of the present application provides a control information processing method.
  • the execution subject of the method is a network-side device.
  • the method can be executed by software or hardware installed on the network-side device.
  • the network side device sends the first control information to the terminal according to the terminal capability; wherein the terminal supports the terminal capability, and the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the third control information. 2. The ability to control information.
  • the terminal's ability to handle the second control information includes the number of the terminal monitoring, detecting or processing the second control information.
  • the number of the terminal monitoring, detecting or processing the second control information includes at least one of the following:
  • one piece of the first control information corresponds to M pieces of the second control information, and M is a positive integer.
  • the M pieces of second control information corresponding to the 1 piece of first control information include at least one of the following: one;
  • the terminal's ability to handle the second control information includes the terminal monitoring, detecting or processing the third control information.
  • the number of third control information monitored, detected or processed by the terminal includes at least one of the following:
  • one piece of the first control information corresponds to N pieces of the third control information, and N is a positive integer.
  • the N pieces of third control information corresponding to the 1 piece of first control information include at least one of the following;
  • the second time of the scheduling object corresponding to the third control information is determined based on the third SCS.
  • the fourth SCS is the maximum SCS or the minimum SCS among the SCS of the first object.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the scheduled object corresponding to the first control information has an association relationship with the first object including:
  • the first control information on the first object schedules the scheduled object
  • First control information on the search space on the first object schedules the scheduled object.
  • the terminal's ability to handle the first control information includes the number of the terminal monitoring, detecting or processing the first control information.
  • the number of the terminal monitoring, detecting or processing the first control information includes at least one of the following:
  • the third time of the scheduling object corresponding to the first control information is determined based on the sixth SCS.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the terminal's capability for the second control information and/or the capability for the first control information includes at least one of the following:
  • the method before the network side device sends the first control information to the terminal according to the terminal capability, the method further includes:
  • the network side device receives the terminal capability from the terminal.
  • Step S810 can implement the method embodiment on the terminal side and obtain the same technical effect, and the repeated parts will not be described again here.
  • the embodiment of the present application sends the first control information to the terminal according to the terminal capability; wherein the terminal supports the terminal capability, and the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the third control information. 2.
  • the ability to control information limits the complexity of the terminal.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a fourth execution module 902 and a fourth transmission module 901.
  • the fourth execution module 902 is used to obtain the terminal capability of the terminal; the fourth transmission module 901 is used to send the first control information to the terminal according to the terminal capability; wherein the terminal supports the terminal capability,
  • the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the second control information.
  • the terminal's ability to handle the second control information includes the number of the terminal monitoring, detecting or processing the second control information.
  • the number of the terminal monitoring, detecting or processing the second control information includes at least one of the following:
  • one piece of the first control information corresponds to M pieces of the second control information, and M is a positive integer.
  • the M pieces of second control information corresponding to the 1 piece of first control information include at least one of the following;
  • the terminal's ability to handle the second control information includes the terminal monitoring, detecting or processing the third control information.
  • the number of third control information monitored, detected or processed by the terminal includes at least one of the following:
  • one piece of the first control information corresponds to N pieces of the third control information, and N is a positive integer.
  • the N pieces of third control information corresponding to the 1 piece of first control information include at least one of the following;
  • the second time of the scheduling object corresponding to the third control information is determined based on the third SCS.
  • the fourth SCS is the maximum SCS or the minimum SCS among the SCS of the first object.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the scheduled object corresponding to the first control information has an association relationship with the first object including:
  • the first control information on the first object schedules the scheduled object
  • First control information on the search space on the first object schedules the scheduled object.
  • the terminal's ability to handle the first control information includes the number of the terminal monitoring, detecting or processing the first control information.
  • the number of the terminal monitoring, detecting or processing the first control information includes at least one of the following:
  • the third time of the scheduling object corresponding to the first control information is determined based on the sixth SCS.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the terminal's capability for the second control information and/or the capability for the first control information includes at least one of the following:
  • the method before the network side device sends the first control information to the terminal according to the terminal capability, the method further includes:
  • the network side device receives the terminal capability from the terminal.
  • the embodiment of the present application sends the first control information to the terminal according to the terminal capability; wherein the terminal supports the terminal capability, and the terminal capability includes the terminal's capability for the first control information and/or the terminal's capability for the third control information. 2.
  • the ability to control information limits the complexity of the terminal.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 8 and achieve the same technical effect. To avoid duplication, details will not be described here.
  • this embodiment of the present application provides a control information processing method.
  • the execution subject of the method is a network-side device.
  • the method can be executed by software or hardware installed on the network-side device.
  • the network side device sends or configures one type of control information or a piece of control information among the at least two types of control information to the terminal within the overlapping time range of the monitoring time corresponding to the at least two types of control information;
  • the network side device sends or configures one of the at least two pieces of first control information to the terminal within an overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information with CRC scrambled by SL-RNTI;
  • First control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or first control information with CRC scrambled by SL-CS-RNTI;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • Control information used to schedule PDSCH or control information whose CRC is scrambled by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the network side device sends or configures one type of control information or a piece of control information among the at least two types of control information to the terminal within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including At least one of the following:
  • the scrambled first control information or CRC is the first control information scrambled by the SL-CS-RNTI;
  • the terminal sends or configures first control information for dynamic scheduling or first control information for at least one of activation, reactivation, retransmission and deactivation of semi-static scheduling;
  • the first control information scrambled by SL-RNTI or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, Control information scrambled by TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, send or configure the CRC to the terminal by SL Semi-Persistent Scheduling V-RNTI
  • the first control information or CRC scrambled by SI-RNTI, RA- RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI scrambled control information.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • no CRC is sent or configured to the terminal
  • the first control information scrambled by SL-RNTI and CRC the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control for deactivating configuration grant scheduling is not sent or configured to the terminal.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS - Within the overlapping time range of the monitoring time of the RNTI scrambled control information, do not send or configure the CRC to the terminal.
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI , TC-RNTI, P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling is not sent or configured to the terminal and Control information used to schedule PDSCH;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, do not send or configure the CRC to the terminal.
  • the monitoring time includes at least one of the following:
  • the embodiments of the present application limit the complexity of the terminal processing the first control information by specifying the reception conditions that are required to be met when receiving the first control information.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a fifth transmission module 1101 and a fifth execution module 1102.
  • the fifth execution module 1102 is used to determine the overlapping time range of monitoring times corresponding to at least two types of control information. Inside;
  • the fifth transmission module 1101 is used to send or configure one type of control information or a piece of control information in the at least two types of control information to the terminal within the overlapping time range of the monitoring time corresponding to the at least two types of control information;
  • the fifth execution module 1102 is used to determine the overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • the fifth transmission module 1101 is configured to send or configure one of the at least two pieces of first control information to the terminal within the overlapping time range of the monitoring times corresponding to the at least two pieces of first control information of the same type. ;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information with CRC scrambled by SL-RNTI;
  • First control information used to perform at least one of activation, reactivation, retransmission and deactivation of configuration grant scheduling, or first control information with CRC scrambled by SL-CS-RNTI;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or first control information with CRC scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • Control information used to schedule PDSCH or control information whose CRC is scrambled by SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the network side device sends or configures one type of control information or a piece of control information among the at least two types of control information to the terminal within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including At least one of the following:
  • the scrambled first control information or CRC is the first control information scrambled by the SL-CS-RNTI;
  • the terminal sends or configures first control information for dynamic scheduling or first control information for at least one of activation, reactivation, retransmission and deactivation of semi-static scheduling;
  • the first control information scrambled by SL-RNTI or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI, Control information scrambled by TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, send or configure the CRC to the terminal by SL Semi-Persistent Scheduling V-RNTI
  • the first control information or CRC scrambled by SI-RNTI, RA- RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI scrambled control information.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • no CRC is sent or configured to the terminal
  • the first control information scrambled by SL-RNTI and CRC the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control for deactivating configuration grant scheduling is not sent or configured to the terminal.
  • the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS - Within the overlapping time range of the monitoring time of the RNTI scrambled control information, do not send or configure the CRC to the terminal.
  • the first control information scrambled by SL-CS-RNTI or CRC by SI-RNTI, RA-RNTI, MsgB-RNTI , TC-RNTI, P-RNTI, C-RNTI, CS-RNTI and MCS-RNTI scrambled control information;
  • the first control information for deactivating semi-persistent scheduling is not sent or configured to the terminal and Control information used to schedule PDSCH;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, do not send or configure the CRC to the terminal.
  • the monitoring time includes at least one of the following:
  • the embodiments of the present application limit the complexity of the terminal processing the first control information by specifying the reception conditions that are required to be met when receiving the first control information.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 10 and achieve the same technical effect. To avoid duplication, the details will not be described here.
  • this embodiment of the present application provides a control information processing method.
  • the execution subject of the method is a network-side device.
  • the method can be executed by software or hardware installed on the network-side device.
  • the network side device sends first control information to the terminal, where the first control information is used to indicate the secondary link authorization index;
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • the secondary The link grant index is the start time or start time of the PSSCH scheduled by the first control information, the end time or end time of the PSSCH scheduled by the first control information and the PSFCH corresponding to the PSSCH scheduled by the first control information. At least one of the locations is determined.
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, which is used to indicate the position of the HARQ feedback in the dynamic codebook.
  • the execution subject may be a control information processing device.
  • the control information processing device executing the control information processing method is taken as an example to illustrate the control information processing device provided by the embodiment of the present application.
  • control information processing device includes: a sixth transmission module 1301 and a sixth execution module 1302.
  • the sixth execution module 1301 is used to determine the secondary link authorization index; the sixth transmission module 1302 is used to send first control information to the terminal, and the first control information is used to indicate the secondary link authorization index;
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • different first control information corresponds to the same identifier of the monitoring opportunity for transmitting the first control information.
  • the secondary link grant index is the starting time or start time of the PSSCH scheduled by the first control information
  • the first control At least one of the end time or end time of the PSSCH scheduled by the information and the position of the PSFCH corresponding to the PSSCH scheduled by the first control information is determined.
  • the embodiments of the present application specify a method for determining the SAI indicated by the first control information, which is used to indicate the position of the HARQ feedback in the dynamic codebook.
  • the control information processing device in the embodiment of the present application may be an electronic device, such as an electronic device with an operating system, or may be a component in the electronic device, such as an integrated circuit or chip.
  • the electronic device may be a terminal or other devices other than the terminal.
  • terminals may include but are not limited to the types of terminals 11 listed above, and other devices may be servers, network attached storage (Network Attached Storage, NAS), etc., which are not specifically limited in the embodiment of this application.
  • control information processing device provided by the embodiment of the present application can implement each process implemented by the method embodiment in Figure 12 and achieve the same technical effect. To avoid duplication, the details will not be described here.
  • this embodiment of the present application also provides a communication device 1400, which includes a processor 1401 and a memory 1402.
  • the memory 1402 stores programs or instructions that can be run on the processor 1401, such as , when the communication device 1400 is a terminal, when the program or instruction is executed by the processor 1401, each step of the above control information processing method embodiment is implemented, and the same technical effect can be achieved.
  • the communication device 1400 is a network-side device, when the program or instruction is executed by the processor 1401, each step of the above control information processing method embodiment is implemented, and the same technical effect can be achieved. To avoid duplication, the details are not repeated here.
  • An embodiment of the present application also provides a terminal, including a processor and a communication interface.
  • the processor is used to process the first control information
  • the communication interface is used to receive the first control information.
  • This terminal embodiment corresponds to the above-mentioned terminal-side method embodiment.
  • Each implementation process and implementation manner of the above-mentioned method embodiment can be applied to this terminal embodiment, and can achieve the same technical effect.
  • FIG. 15 is a schematic diagram of the hardware structure of a terminal that implements an embodiment of the present application.
  • the terminal 1500 includes but is not limited to: a radio frequency unit 1501, a network module 1502, an audio output unit 1503, an input unit 1504, a sensor 1505, a display unit 1506, a user input unit 1507, an interface unit 1508, a memory 1509, a processor 1510, etc. At least some parts.
  • the terminal 1500 may also include a power supply (such as a battery) that supplies power to various components.
  • the power supply may be logically connected to the processor 1510 through a power management system, thereby managing charging, discharging, and power consumption through the power management system. Management and other functions.
  • the terminal structure shown in FIG. 15 does not constitute a limitation on the terminal.
  • the terminal may include more or fewer components than shown in the figure, or some components may be combined or arranged differently, which will not be described again here.
  • the input unit 1504 may include a graphics processing unit (GPU) 15041 and a microphone 15042.
  • the GPU 15041 is used for recording data generated by an image capture device (such as a camera) in the video capture mode or the image capture mode. ) to process the image data of still pictures or videos obtained.
  • the display unit 1506 may include a display panel 15061, which may be configured in the form of a liquid crystal display, an organic light emitting diode, etc. Display panel 15061.
  • the user input unit 1507 includes a touch panel 15071 and at least one of other input devices 15072 .
  • Touch panel 15071 also known as touch screen.
  • the touch panel 15071 may include two parts: a touch detection device and a touch controller.
  • Other input devices 15072 may include but are not limited to physical keyboards, function keys (such as volume control keys, switch keys, etc.), trackballs, mice, and joysticks, which will not be described again here.
  • the radio frequency unit 1501 can transmit it to the processor 1510 for processing; in addition, the radio frequency unit 1501 can send uplink data to the network side device.
  • the radio frequency unit 1501 includes, but is not limited to, an antenna, amplifier, transceiver, coupler, low noise amplifier, duplexer, etc.
  • Memory 1509 may be used to store software programs or instructions as well as various data.
  • the memory 1509 may mainly include a first storage area for storing programs or instructions and a second storage area for storing data, wherein the first storage area may store an operating system, an application program or instructions required for at least one function (such as a sound playback function, Image playback function, etc.) etc.
  • memory 1509 may include volatile memory or nonvolatile memory, or memory 1509 may include both volatile and nonvolatile memory.
  • non-volatile memory can be read-only memory (Read-Only Memory, ROM), programmable read-only memory (Programmable ROM, PROM), erasable programmable read-only memory (Erasable PROM, EPROM), electrically removable memory.
  • Volatile memory can be random access memory (Random Access Memory, RAM), static random access memory (Static RAM, SRAM), dynamic random access memory (Dynamic RAM, DRAM), synchronous dynamic random access memory (Synchronous DRAM, SDRAM), double data rate synchronous dynamic random access memory (Double Data Rate SDRAM, DDRSDRAM), enhanced synchronous dynamic random access memory (Enhanced SDRAM, ESDRAM), synchronous link dynamic random access memory (Synch link DRAM) , SLDRAM) and direct memory bus random access memory (Direct Rambus RAM, DRRAM).
  • RAM Random Access Memory
  • SRAM static random access memory
  • DRAM dynamic random access memory
  • synchronous dynamic random access memory Synchronous DRAM, SDRAM
  • Double data rate synchronous dynamic random access memory Double Data Rate SDRAM, DDRSDRAM
  • Enhanced SDRAM, ESDRAM synchronous link dynamic random access memory
  • Synch link DRAM synchronous link dynamic random access memory
  • SLDRAM direct memory bus random access memory
  • the processor 1510 may include one or more processing units; optionally, the processor 1510 integrates an application processor and a modem processor, where the application processor mainly handles operations related to the operating system, user interface, application programs, etc., Modem processors mainly process wireless communication signals, such as baseband processors. It can be understood that the above modem processor may not be integrated into the processor 1510.
  • the radio frequency unit 1501 is used to receive first control information, and the first control information meets the requirements of terminal capabilities; wherein the control information processing device supports the terminal capabilities, and the terminal capabilities include the terminal's ability to first The capability of controlling information and/or the capability of the terminal for the second control information.
  • Processor 1510 used to process the first control information.
  • the ability of the control information processing device to handle the second control information includes the number of the second control information that the control information processing device monitors, detects or processes.
  • the quantity of the second control information monitored, detected or processed by the control information processing device includes at least one of the following:
  • the number of second control information corresponding to the first scheduling object, the first scheduling object being the second control information pair The corresponding scheduling object;
  • one piece of the first control information corresponds to M pieces of the second control information, and M is a positive integer.
  • the M pieces of second control information corresponding to the 1 piece of first control information include at least one of the following;
  • the terminal's ability to handle the second control information includes the terminal monitoring, detecting or processing the third control information.
  • the amount of third control information monitored, detected or processed by the control information processing device includes at least one of the following:
  • one piece of the first control information corresponds to N pieces of the third control information, and N is a positive integer.
  • the N pieces of third control information corresponding to the 1 piece of first control information include at least one of the following;
  • the second time of the scheduling object corresponding to the third control information is determined based on the third SCS.
  • the fourth SCS is the maximum SCS or the minimum SCS among the SCS of the first object.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • the scheduled object corresponding to the first control information has an association relationship with the first object including:
  • the first control information on the first object schedules the scheduled object
  • First control information on the search space on the first object schedules the scheduled object.
  • the terminal's ability to handle the first control information includes the terminal monitoring, detecting or processing the first control information.
  • the number of the terminal monitoring, detecting or processing the first control information includes at least one of the following:
  • the third time of the scheduling object corresponding to the first control information is determined based on the sixth SCS.
  • the fifth SCS is the largest SCS or the smallest SCS among the SCSs of the multiple scheduled objects.
  • control information processing device's capability for the second control information and/or its capability for the first control information includes at least one of the following:
  • the first transmission module 301 is also used to send the terminal capabilities to the network side device.
  • the terminal receiving the first control information includes:
  • the terminal receives one type of control information or one piece of control information from the at least two types of control information within the overlapping time range of the monitoring time corresponding to the at least two types of control information;
  • the terminal receives one of the at least two pieces of first control information within an overlapping time range of monitoring times corresponding to at least two pieces of first control information of the same type;
  • control information includes at least two of the following:
  • the first control information used for dynamic scheduling or the first control information in which the cyclic redundancy check CRC is scrambled by the secondary link wireless network temporary identifier SL-RNTI;
  • the first control information used to perform at least one of activation, reactivation, retransmission and deactivation of the configuration authorization schedule, or the first CRC scrambled by the secondary link configuration schedule wireless network temporary identity SL-CS-RNTI control information;
  • First control information for at least one of activation, reactivation, retransmission and deactivation of semi-persistent scheduling, or the CRC is added by the secondary link semi-persistent scheduling virtual wireless network temporary identifier SL Semi-Persistent Scheduling V-RNTI The first control information of interference;
  • Used to schedule the control information of the physical downlink shared channel PDSCH, or the CRC consists of the system message wireless network temporary identifier SI-RNTI, the random access wireless network temporary identifier RA-RNTI, the message B wireless network temporary identifier MsgB-RNTI, and the temporary cell wireless Network temporary identity TC-RNTI, paging radio network temporary identity P-RNTI, cell radio network temporary identity C-RNTI, configuration and scheduling radio network temporary identity CS-RNTI or modulation and coding scheme radio network temporary identity MCS-RNTI scrambled control information.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the first control information with CRC scrambled by SL-RNTI is received.
  • One control information or CRC is the first control information scrambled by SL-CS-RNTI;
  • the received CRC is scrambled by SL-RNTI
  • the scrambled first control information or CRC is the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • At the monitoring time of the first control information scrambled by SL-CS-RNTI and CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS -
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the received CRC is the first control information or CRC scrambled by SL Semi-Persistent Scheduling V-RNTI by SI-RNTI, RA-RNTI, MsgB- Control information scrambled by RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI.
  • the terminal receives one type of control information or a piece of control information from the at least two types of control information within the overlapping time range of the monitoring times corresponding to the at least two types of control information, including at least one of the following:
  • the CRC scrambled by SL-RNTI is not received.
  • the first control information and CRC are scrambled by SL-CS-RNTI;
  • the CRC by SL-RNTI is not received
  • the scrambled first control information and CRC are scrambled by SL Semi-Persistent Scheduling V-RNTI;
  • the first control information for deactivating configuration grant scheduling and the first control information for deactivating configuration grant scheduling are not received.
  • the monitoring time of the first control information scrambled by SL-CS-RNTI in CRC and the CRC consists of SI-RNTI, RA-RNTI, Within the overlapping time range of the monitoring time of control information scrambled by MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS-RNTI or MCS-RNTI, the CRC scrambled by SL-CS-RNTI is not received.
  • the first control information for deactivating semi-persistent scheduling and the first control information for scheduling PDSCH are not received control information;
  • the CRC consists of the monitoring time of the first control information scrambled by SL Semi-Persistent Scheduling V-RNTI and the CRC consists of SI-RNTI, RA-RNTI, MsgB-RNTI, TC-RNTI, P-RNTI, C-RNTI, CS- Within the overlapping time range of the monitoring time of the control information scrambled by RNTI or MCS-RNTI, the CRC is not received.
  • the first control information is used to indicate the secondary link authorization index
  • the number or count of the secondary link authorization index is determined by at least one of the following:
  • the control channel unit where the first control information is located where the first control information is located
  • the starting time or start time of the PSSCH scheduled by the first control information is the starting time or start time of the PSSCH scheduled by the first control information
  • the embodiments of the present application can limit the terminal's ability to process the first control information, and effectively control the complexity of the terminal processing the control information.
  • An embodiment of the present application also provides a network side device, including a processor and a communication interface.
  • the processor is configured to send first control information to the terminal according to the terminal capability
  • the communication interface is configured to obtain the terminal capability of the terminal.
  • This network-side device embodiment corresponds to the above-mentioned network-side device method embodiment.
  • Each implementation process and implementation manner of the above-mentioned method embodiment can be applied to this network-side device embodiment, and can achieve the same technical effect.
  • the embodiment of the present application also provides a network side device.
  • the network side device 1600 includes: an antenna 161 , a radio frequency device 162 , a baseband device 163 , a processor 164 and a memory 165 .
  • the antenna 161 is connected to the radio frequency device 162 .
  • the radio frequency device 162 receives information through the antenna 161 and sends the received information to the baseband device 163 for processing.
  • the baseband device 163 processes the information to be sent and It is sent to the radio frequency device 162.
  • the radio frequency device 162 processes the received information and then sends it out through the antenna 161.
  • the method performed by the network side device in the above embodiment can be implemented in the baseband device 163, which includes a baseband processor.
  • the baseband device 163 may include, for example, at least one baseband board on which multiple chips are disposed, as shown in FIG. Program to perform the network device operations shown in the above method embodiments.
  • the network side device may also include a network interface 166, which is, for example, a common public radio interface (CPRI).
  • a network interface 166 which is, for example, a common public radio interface (CPRI).
  • CPRI common public radio interface
  • the network side device 1600 in the embodiment of the present application also includes: instructions or programs stored in the memory 165 and executable on the processor 164.
  • the processor 164 calls the instructions or programs in the memory 165 to execute Figures 9 and 11 Or the method of executing each module shown in Figure 13, and achieve the same technical effect. To avoid repetition, it will not be described in detail here.
  • Embodiments of the present application also provide a readable storage medium.
  • Programs or instructions are stored on the readable storage medium.
  • the program or instructions are executed by a processor, each process of the above control information processing method embodiment is implemented, and can achieve The same technical effects are not repeated here to avoid repetition.
  • the processor is the processor in the terminal described in the above embodiment.
  • the readable storage medium includes computer readable storage media, such as computer read-only memory ROM, random access memory RAM, magnetic disk or optical disk, etc.
  • An embodiment of the present application further provides a chip.
  • the chip includes a processor and a communication interface.
  • the communication interface is coupled to the processor.
  • the processor is used to run programs or instructions to implement the above embodiments of the control information processing method. Each process can achieve the same technical effect. To avoid repetition, we will not go into details here.
  • chips mentioned in the embodiments of this application may also be called system-on-chip, system-on-a-chip, system-on-chip or system-on-chip, etc.
  • Embodiments of the present application further provide a computer program/program product.
  • the computer program/program product is stored in a storage medium.
  • the computer program/program product is executed by at least one processor to implement the above control information processing method.
  • Each process in the example can achieve the same technical effect. To avoid repetition, we will not repeat it here.
  • Embodiments of the present application also provide a control information processing system, including: a terminal and a network side device.
  • the terminal can be used to perform the steps of the control information processing method as described above.
  • the network side device can be used to perform the steps of the control information processing method as described above. The steps of controlling the information processing method.
  • the methods of the above embodiments can be implemented by means of software plus the necessary general hardware platform. Of course, it can also be implemented by hardware, but in many cases the former is better. implementation.
  • the technical solution of the present application can be embodied in the form of a computer software product that is essentially or contributes to the existing technology.
  • the computer software product is stored in a storage medium (such as ROM/RAM, disk , CD), including several instructions to cause a terminal (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in various embodiments of this application.

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

La présente demande appartient au domaine des communications mobiles. L'invention divulgue un procédé et un appareil de traitement d'informations de commande, ainsi qu'un terminal et un dispositif côté réseau. Le procédé de traitement d'informations de commande dans les modes de réalisation de la présente demande comprend l'étape suivante : un terminal reçoit des premières informations de commande, qui satisfont une exigence de capacité de terminal, le terminal prenant en charge la capacité de terminal, qui comprend la capacité du terminal par rapport aux premières informations de commande et/ou la capacité du terminal par rapport à des secondes informations de commande.
PCT/CN2023/112552 2022-08-12 2023-08-11 Procédé et appareil de traitement d'informations de commande, ainsi que terminal et dispositif côté réseau WO2024032768A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202210969095.2 2022-08-12
CN202210969095.2A CN117676543A (zh) 2022-08-12 2022-08-12 控制信息处理方法、装置、终端及网络侧设备

Publications (1)

Publication Number Publication Date
WO2024032768A1 true WO2024032768A1 (fr) 2024-02-15

Family

ID=89850998

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2023/112552 WO2024032768A1 (fr) 2022-08-12 2023-08-11 Procédé et appareil de traitement d'informations de commande, ainsi que terminal et dispositif côté réseau

Country Status (2)

Country Link
CN (1) CN117676543A (fr)
WO (1) WO2024032768A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019047095A1 (fr) * 2017-09-07 2019-03-14 北京小米移动软件有限公司 Procédé et dispositif de détection de signalisation de programmation, équipement d'utilisateur, et station de base
US20210105105A1 (en) * 2019-10-03 2021-04-08 Qualcomm Incorporated Control channel monitoring based on sub-carrier spacing
US20210144547A1 (en) * 2018-07-23 2021-05-13 Huawei Technologies Co., Ltd. Resource configuration method and apparatus
WO2021196219A1 (fr) * 2020-04-03 2021-10-07 Nec Corporation Procédés de communication, dispositif de terminal, dispositif de réseau et support lisible par ordinateur
US20220078818A1 (en) * 2019-01-08 2022-03-10 Lenovo (Beijing) Limited Method and apparatus for a sidelink transmission

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019047095A1 (fr) * 2017-09-07 2019-03-14 北京小米移动软件有限公司 Procédé et dispositif de détection de signalisation de programmation, équipement d'utilisateur, et station de base
US20210144547A1 (en) * 2018-07-23 2021-05-13 Huawei Technologies Co., Ltd. Resource configuration method and apparatus
US20220078818A1 (en) * 2019-01-08 2022-03-10 Lenovo (Beijing) Limited Method and apparatus for a sidelink transmission
US20210105105A1 (en) * 2019-10-03 2021-04-08 Qualcomm Incorporated Control channel monitoring based on sub-carrier spacing
WO2021196219A1 (fr) * 2020-04-03 2021-10-07 Nec Corporation Procédés de communication, dispositif de terminal, dispositif de réseau et support lisible par ordinateur

Also Published As

Publication number Publication date
CN117676543A (zh) 2024-03-08

Similar Documents

Publication Publication Date Title
CN107439030A (zh) 在lte许可协助接入操作中的drx处理
WO2022194249A1 (fr) Appareil et procédé de rétroaction d'ack harq, terminal et support de stockage
WO2022199544A1 (fr) Procédé et appareil de transmission en liaison montante et équipement utilisateur
WO2022001815A1 (fr) Procédé de surveillance de canal, procédé de transmission, terminal et dispositif côté réseau
US20240023108A1 (en) Method and apparatus for determining pucch resource, and terminal
US20230412347A1 (en) Method for generating semi-static harq-ack codebook, and terminal
WO2023116591A1 (fr) Procédé et appareil de détermination de transmission, terminal, dispositif côté réseau et support de stockage
WO2024032768A1 (fr) Procédé et appareil de traitement d'informations de commande, ainsi que terminal et dispositif côté réseau
CN115189828A (zh) 传输处理方法、装置及相关设备
WO2023179652A1 (fr) Procédé et appareil de détection de défaillance de faisceau, terminal et support d'enregistrement
WO2023185901A1 (fr) Procédé et dispositif de traitement de ressources, et terminal
WO2023213277A1 (fr) Procédé et appareil pour la détermination d'un livre de codes d'accusé de réception de demande de répétition automatique hybride (harq-ack), et terminal
WO2023125953A1 (fr) Procédé de traitement de liaison de domaine temporel, terminal et dispositif côté réseau
WO2023185819A1 (fr) Procédés de surveillance de pdcch, terminal, dispositif côté réseau et support
WO2023185903A1 (fr) Procédé et appareil de traitement pour opération de couche physique, et terminal
WO2023207785A1 (fr) Procédé et appareil de fonctionnement de terminal, terminal et dispositif côté réseau
WO2023198044A1 (fr) Procédé et appareil de réception d'informations, procédé et appareil d'envoi d'informations, et dispositif
WO2024027747A1 (fr) Procédé et appareil de traitement de transmission de données, terminal, et dispositif côté réseau
EP4319023A1 (fr) Procédé et appareil d'émission de pdsch, procédé et appareil de réception de pdsch, et dispositif de communication
WO2023125304A1 (fr) Procédé d'exécution d'opération de communication, appareil, terminal et support de stockage
WO2023246562A1 (fr) Procédé et appareil de traitement de transmission de liaison latérale sur bande sans licence, et dispositif associé
WO2024022251A1 (fr) Procédé et appareil de transmission en liaison montante, et terminal et support
WO2023198122A1 (fr) Procédé et appareil de configuration de ressources et dispositif de communication
WO2024061261A1 (fr) Procédé et appareil de configuration de ressource, terminal et dispositif côté réseau
WO2024017322A1 (fr) Procédé et appareil de traitement de transmission, et terminal et dispositif côté réseau

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23851988

Country of ref document: EP

Kind code of ref document: A1