WO2023286514A1 - 運行提案システム、及び運行提案作成方法 - Google Patents

運行提案システム、及び運行提案作成方法 Download PDF

Info

Publication number
WO2023286514A1
WO2023286514A1 PCT/JP2022/023912 JP2022023912W WO2023286514A1 WO 2023286514 A1 WO2023286514 A1 WO 2023286514A1 JP 2022023912 W JP2022023912 W JP 2022023912W WO 2023286514 A1 WO2023286514 A1 WO 2023286514A1
Authority
WO
WIPO (PCT)
Prior art keywords
stay
operation proposal
proposal
information
demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2022/023912
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
三揮 米原
讓 真矢
剛 皆川
智之 望月
博貴 森部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to EP22841858.8A priority Critical patent/EP4328846A4/en
Publication of WO2023286514A1 publication Critical patent/WO2023286514A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B61—RAILWAYS
    • B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10—Operations, e.g. scheduling or time tables
    • B61L27/12—Preparing schedules
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B61—RAILWAYS
    • B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10—Operations, e.g. scheduling or time tables
    • B61L27/16—Trackside optimisation of vehicle or train operation
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00—Machine learning
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047—Optimisation of routes or paths, e.g. travelling salesman problem
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063—Operations research, analysis or management
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10—Services
    • G06Q50/14—Travel agencies
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40—Business processes related to the transportation industry
    • G—PHYSICS
    • G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16Y—INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y10/00—Economic sectors
    • G16Y10/40—Transportation
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00—Computing arrangements based on biological models
    • G06N3/02—Neural networks
    • G06N3/08—Learning methods

Definitions

  • the present invention relates to an operation proposal system that creates operation proposals.
  • Patent Document 1 International Publication No. 2018/087811 describes a data server that stores information about passengers collected at a plurality of stations, a calculation server that stores a program for predicting the number of passengers waiting for a vehicle and a program for determining an increase or decrease in the number of vehicles.
  • the calculation server executes a vehicle waiting passenger number prediction program and a vehicle number increase/decrease determination program at predetermined time intervals, respectively, and the vehicle waiting passenger number prediction program is based on information on passengers Predicting the number of passengers waiting for vehicles at a plurality of stations in a predetermined time period, the program for determining increase or decrease in the number of vehicles determines the increase or decrease in the number of vehicles in a predetermined time period based on the number of passengers waiting for vehicles at a plurality of stations during the predetermined time period.
  • a timetable proposal system for determining necessity is described.
  • the task of the present invention is to create operation proposals that match people's stay demand, which changes according to operation conditions and surrounding conditions.
  • an operation proposal system for creating an operation proposal for a means of transportation comprising an arithmetic device that executes a predetermined process, and a storage device that can be accessed by the arithmetic device, and the arithmetic device stores a stay demand prediction model.
  • a stay demand forecasting unit that predicts stay demand of passengers at the time of transfer using a travel demand prediction unit that generates an operation proposal with a favorable operation proposal evaluation value based on the predicted stay demand, and an operation proposal unit that generates an operation proposal with a favorable operation proposal evaluation value characterized by having
  • FIG. 1 is a block diagram showing the logical configuration of an operation suggestion system according to an embodiment of the present invention
  • FIG. It is a block diagram which shows the physical structure of an operation proposal system. It is a flowchart of the main process which an operation proposal system performs. It is a flow chart of stay demand prediction model estimation processing. It is a flow chart of stay demand prediction processing. It is a flowchart of operation proposal creation processing. It is a figure which shows the structural example of the peripheral information stored in a peripheral information storage part. It is a figure which shows the structural example of the passenger information (attribute) stored in a passenger information accumulation part. It is a figure which shows the structural example of the passenger information (consumption) stored in a passenger information accumulation part.
  • FIG. 4 is a diagram showing an example of a travel demand forecast model stored in a travel demand forecast model storage unit; It is a figure which shows the example of the stay demand forecast model stored in the stay demand forecast model storage part. It is a figure which shows the example of the transfer time prediction model stored in a transfer time prediction model storage part. It is a figure which shows the example of the stay demand which a stay demand forecast part predicts. It is a figure which shows the structural example of the data on the day of the passenger information (movement) stored in a passenger information accumulation part.
  • the operation proposal system 10 of the present embodiment collects operation information, passenger information, and peripheral information of transportation means such as trains and buses, estimates stay information from the operation information and passenger information, and predicts movement demand from the stay information and peripheral information. Estimating model, stay demand forecasting model and transit time model. After that, the stay demand (stay distribution) is predicted from the passenger information of the day using the stay demand prediction model and the transfer time prediction model. Furthermore, according to the operation proposal KPI weighting and the operation proposal constraint conditions, an operation proposal for a transportation means that optimizes the operation proposal evaluation value (KPI) from the stay distribution is created.
  • KPI operation proposal evaluation value
  • FIG. 1 is a block diagram showing the logical configuration of the operation proposal system 10 of the embodiment of the present invention.
  • the operation proposal system 10 includes a peripheral information acquisition unit 11, a passenger information acquisition unit 12, an operation information acquisition unit 13, a peripheral information storage unit 14, a passenger information storage unit 15, an operation information storage unit 16, a prediction model estimation unit 17, and a travel demand. It has a prediction model accumulation unit 18 , a stay demand prediction model accumulation unit 19 , a transfer time prediction model accumulation unit 20 , a stay demand prediction unit 21 and an operation proposal unit 22 .
  • the peripheral information acquisition unit 11 acquires peripheral information (for example, input information for predicting travel demand, such as weather forecasts and information on events along railway lines) acquired from the open data system 50, and accumulates peripheral information. Store in section 14 .
  • the peripheral information stored in the peripheral information accumulation unit 14 will be described later with reference to FIG.
  • the open data system 50 is a computer system that provides data that affects human behavior, such as weather forecasts and local information.
  • the peripheral information acquisition unit 11 may acquire data that is provided individually (for example, for a fee) in addition to open data that is open to the public.
  • the passenger information acquisition unit 12 acquires passenger information from the ticket gate system 60 and the payment system 70 and stores it in the passenger information storage unit 15. Passenger information stored in the passenger information storage unit 15 will be described later with reference to FIGS. 8, 9 and 10.
  • the ticket gate system 60 is a computer system that collects entry/exit data of railway ticket gates and boarding/alighting data of fare boxes of shared buses.
  • the payment system 70 is a computer system that manages purchase records, and is a computer system that collects purchasers, purchase dates, and purchase amounts based on, for example, cashless payments and credit card usage histories.
  • the operation information acquisition unit 13 acquires operation information from the operation management system 80 and stores it in the operation information storage unit 16. Operation information stored in the operation information accumulation unit 16 will be described later with reference to FIG.
  • the operation management system 80 is a computer system used by railway companies and shared bus companies to manage the operation of railways and buses.
  • the prediction model estimating unit 17 uses the data stored in the peripheral information accumulating unit 14, the passenger information accumulating unit 15, and the operation information accumulating unit 16 to generate a travel demand prediction model, a stay demand prediction model, and a transfer time prediction model. , are stored in the movement demand prediction model accumulation unit 18, the stay demand prediction model accumulation unit 19, and the transfer time prediction model accumulation unit 20, respectively.
  • the travel demand forecast model stored in the travel demand forecast model storage unit 18 will be described later with reference to FIG.
  • the stay demand forecast model stored in the stay demand forecast model accumulation unit 19 will be described later with reference to FIG.
  • the transfer time prediction model stored in the transfer time prediction model storage unit 20 will be described later with reference to FIG.
  • the stay demand prediction unit 21 inputs the data of the day of the surrounding information, the data of the passenger information of the day, and the data of the operation information of the day into the movement demand prediction model, the stay demand prediction model, and the transfer time prediction model, and calculates the stay demand of the passengers. to predict.
  • the operation proposal unit 22 uses the stay demand predicted by the stay demand prediction unit 21 to create a train or bus operation proposal and transmits it to the operation management system 80 .
  • FIG. 2 is a block diagram showing the physical configuration of the operation proposal system 10. As shown in FIG.
  • the operation proposal system 10 is composed of a computer having a processor (CPU) 1, a memory 2, an auxiliary storage device 3, and a communication interface 4.
  • the trip suggestion system 10 may have an input interface 5 and an output interface 6 .
  • the processor 1 is an arithmetic device that executes programs stored in the memory 2 .
  • each functional unit of the operation proposal system 10 for example, the peripheral information acquisition unit 11, the passenger information acquisition unit 12, the operation information acquisition unit 13, the prediction model estimation unit 17, the stay demand prediction 21, operation proposal unit 22, etc.
  • part of the processing performed by the processor 1 by executing the program may be performed by another arithmetic device (for example, hardware such as ASIC and FPGA).
  • the memory 2 includes ROM, which is a non-volatile storage element, and RAM, which is a volatile storage element.
  • ROM stores immutable programs (eg, BIOS) and the like.
  • RAM is a high-speed and volatile storage device such as DRAM (Dynamic Random Access Memory), and temporarily stores programs executed by processor 1 and data used during program execution.
  • the auxiliary storage device 3 is, for example, a large-capacity, non-volatile storage device such as a magnetic storage device (HDD) or flash memory (SSD).
  • the auxiliary storage device 3 stores data used by the processor 1 when executing programs (for example, the peripheral information accumulation unit 14, the passenger information accumulation unit 15, the operation information accumulation unit 16, etc.) and the programs executed by the processor 1. do. That is, the program is read from the auxiliary storage device 3, loaded into the memory 2, and executed by the processor 1, thereby realizing each function of the operation proposal system 10.
  • the communication interface 4 is a network interface device that controls communication with other devices (for example, the operation management system 80) according to a predetermined protocol.
  • the input interface 5 is an interface to which an input device such as a keyboard 7 and a mouse 8 is connected and which receives input from an operator.
  • the output interface 6 is an interface to which output devices such as a display device 9 and a printer (not shown) are connected, and which outputs results of program execution in a format that can be visually recognized by the operator.
  • a terminal connected via a network may provide the input interface 5 and the output interface 6 .
  • Programs executed by the processor 1 are provided to the operation proposal system 10 via removable media (CD-ROM, flash memory, etc.) or a network, and stored in the non-volatile auxiliary storage device 3, which is a non-temporary storage medium. . Therefore, the operation proposal system 10 preferably has an interface for reading data from removable media.
  • the operation proposal system 10 is a computer system configured on one physical computer or on a plurality of logically or physically configured computers, and is built on a plurality of physical computer resources. It may operate on a virtual machine.
  • the peripheral information acquisition unit 11, the passenger information acquisition unit 12, the operation information acquisition unit 13, the prediction model estimation unit 17, the stay demand prediction unit 21, and the operation proposal unit 22 operate on separate physical or logical computers. It may be one that operates on one physical or logical computer by combining a plurality of computers.
  • FIG. 3 is a flowchart of main processing executed by the operation proposal system 10.
  • the peripheral information acquisition unit 11 acquires peripheral information from the open data system 50 and stores the acquired peripheral information in the peripheral information storage unit 14 .
  • the passenger information acquisition unit 12 also acquires passenger information from the ticket gate system 60 and the payment system 70 and stores the acquired passenger information in the passenger information storage unit 15 .
  • the operation information acquisition unit 13 also acquires operation information from the operation management system 80 and stores the acquired operation information in the operation information accumulation unit 16 (100).
  • the prediction model estimation unit 17 estimates stay information based on the passenger information stored in the passenger information storage unit 15 and the operation information stored in the operation information storage unit 16 (101). For example, by comparing passenger information (movement) and passenger information (consumption) using a passenger ID, if there is a purchase behavior during movement, it is estimated that the passenger is staying for shopping at a transfer station. Also, if the transfer time greatly exceeds the standard transfer time, it is presumed that the user is staying at the transfer station for unknown purposes.
  • the prediction model estimating unit 17 performs a transfer based on the peripheral information stored in the peripheral information accumulating unit 14, the passenger information stored in the passenger information accumulating unit 15, and the operation information stored in the operation information accumulating unit 16.
  • a time model is estimated and stored in the transfer time prediction model accumulation unit 20 (102).
  • transfer attributes location, means of transportation, time of day
  • the transfer time prediction model may be composed of a neural network trained using passenger information and operation information as teacher data, or may generate a regression prediction model by multivariate analysis of passenger information and operation information.
  • the prediction model estimating unit 17 estimates in step 101 the peripheral information stored in the peripheral information accumulating unit 14, the passenger information stored in the passenger information accumulating unit 15, and the operation information stored in the operation information accumulating unit 16. Based on the received stay information, a travel demand forecast model is estimated and stored in the travel demand forecast model storage unit 18 (103). For example, the entry station and entry time are used as explanatory variables, and the destination probability is used as the objective variable. Create a model that requires the number of people going to a particular destination.
  • the travel demand forecasting model may be composed of a neural network that learns surrounding information, passenger information, operation information, and stay information as teacher data, and performs regression through multivariate analysis of the surrounding information, passenger information, operation information, and stay information. A predictive model may be generated.
  • the prediction model estimating unit 17 estimates in step 101 the peripheral information stored in the peripheral information accumulating unit 14, the passenger information stored in the passenger information accumulating unit 15, and the operation information stored in the operation information accumulating unit 16. Based on the obtained stay information, a stay demand forecast model is estimated and stored in the stay demand forecast model storage unit 19 (104).
  • a method of estimating the stay demand prediction model will be described later with reference to FIG.
  • the stay demand prediction model may be composed of a neural network that learns surrounding information, passenger information, operation information, and stay information as teacher data, and performs regression by multivariate analysis of the surrounding information, passenger information, operation information, and stay information.
  • a predictive model may be generated.
  • the peripheral information acquisition unit 11 acquires the peripheral information for the current day from the open data system 50 and stores the acquired peripheral information in the peripheral information storage unit 14 .
  • the passenger information acquisition unit 12 also acquires the passenger information of the day from the ticket gate system 60 and the settlement system 70 and stores the acquired passenger information in the passenger information storage unit 15 .
  • the operation information acquisition unit 13 acquires the operation information of the current day from the operation management system 80, and stores the acquired operation information in the operation information storage unit 16 (105).
  • the stay demand forecasting unit 21 inputs the day data of the operation information into the movement demand forecasting model to forecast the movement demand of passengers (106).
  • the stay demand prediction unit 21 inputs the predicted stay demand into the stay demand prediction model to predict the stay demand of passengers (107).
  • the stay demand prediction process will be described later with reference to FIG. 5, and the predicted stay demand will be described later with reference to FIG.
  • the operation proposal unit 22 creates an operation proposal with a good KPI based on the predicted stay demand distribution (108).
  • the operation proposal creating process will be described later with reference to FIG.
  • FIG. 4 is a flowchart of the stay demand forecast model estimation process.
  • the prediction model estimation unit 17 clusters the entry station of the passenger information (movement), the last exit station of the series of movements, the passenger information (attribute), the passenger information (consumption), and the peripheral information, N groups of clusters are generated (110), and the processes of steps 111 to 113 are repeatedly executed for each cluster.
  • the prediction model estimation unit 17 calculates the occurrence probability by dividing the number of passengers belonging to the cluster with stay information for each train delay by the total number of passengers belonging to the cluster with stay demand, A prediction model of stay demand is created based on the train delay of the calculated probability of occurrence (111).
  • the prediction model estimating unit 17 calculates the number of stations where stays occur for each train delay among the passengers belonging to the cluster, and the number of stays at each station is calculated as the total number of data where stays occur. to calculate the occurrence location distribution, and create a regression prediction model based on the train delay portion of the occurrence probability (112).
  • the prediction model estimating unit 17 divides the stay time into predetermined sections to calculate the number of cases, divides the calculated number of stays by the total number of stays, calculates the probability of each section, and calculates the stay demand. Create (113).
  • FIG. 5 is a flowchart of stay demand prediction processing.
  • the stay demand prediction unit 21 clusters the travel demand predicted in step 106 for each combination of entry station, occupation type, and final departure station, generates N groups of clusters (120), and performs steps 121- 122 is repeatedly executed.
  • the stay demand forecasting unit 21 identifies a model that matches the cluster among the stay demand forecast models (121).
  • the stay demand prediction unit 21 predicts the number of occurrences of stays and locations where stays occur, and creates a stay demand distribution for each cluster (122).
  • steps 121 and 122 above is executed for each cluster, and the processing is repeated until all clusters are completed.
  • the stay demand prediction unit 21 superimposes the stay demand for each cluster for each place to create a stay demand for each place (123).
  • FIG. 6 is a flowchart of operation proposal creation processing.
  • the operation proposal unit 22 repeats the processing of steps 130 to 133 a predetermined number of times for each predicted stay demand.
  • the operation proposal unit 22 applies the change in the randomly selected bus departure time or the addition of the extra bus to the operation information to create a new operation change proposal (130).
  • the operation proposal unit 22 calculates the number of passengers on each bus based on the created operation change plan and the predicted stay demand (131).
  • the operation proposal unit 22 evaluates the created operation change proposal and the KPI of the number of passengers on each bus, and calculates the evaluation value of each operation change proposal from the operation proposal KPI weighting and the operation proposal constraint conditions. (132).
  • the evaluation value is obtained by summing up the product of each KPI weighting and the evaluation value of each KPI using, for example, the linear weighted sum method to obtain a single value.
  • a predetermined penalty is subtracted from the evaluation value when the service change proposal does not satisfy the service constraint. Penalties can be adjusted by setting a very large value (or infinite) for operation constraints that must be observed, and by setting a finite value for operation constraints that must be observed as much as possible. good too.
  • the operation proposal unit 22 adopts the current operation change proposal, and the evaluation value of the current operation change proposal is higher than the evaluation value of the previous operation change proposal. If it is lower than the evaluation value of the operation change plan, the current operation change plan is discarded and the process proceeds to the next iteration (133).
  • steps 130 to 133 above is repeated a predetermined number of times, and an operation change plan with a high evaluation value is selected for each stay demand. This processing is executed for each stay demand, and the processing is repeated until all stay demands are completed.
  • FIG. 7 is a diagram showing a configuration example of peripheral information stored in the peripheral information accumulation unit 14.
  • Surrounding information is railroad data obtained from the open data system 50 (e.g., weather forecasts and information on railroad events) and is used to predict travel demand, including date, range, and content.
  • the date is the date when the event described in the contents column occurs.
  • the scope is the area affected by the event.
  • the content is the content of the event.
  • Passenger information consists of passenger information (attributes) that represents the attributes of passengers, passenger information (consumption) that represents the purchasing behavior of passengers, and passenger information (movement) that represents passenger movements. They may be configured in one table in association with each other.
  • FIG. 8 is a diagram showing a configuration example of passenger information (attributes) stored in the passenger information storage unit 15.
  • Passenger information is information representing a passenger's attribute, and may be information registered at the time of purchase of a transportation IC card, for example.
  • Passenger information includes passenger ID and occupation.
  • Passenger information may include age, gender, address, etc., as long as they are effective information for classifying the behavior of passengers.
  • FIG. 9 is a diagram showing a configuration example of passenger information (consumption) stored in the passenger information storage unit 15.
  • Passenger information is information representing the purchasing behavior of passengers acquired from the payment system 70, and may be cashless payment or credit card usage history, for example.
  • Passenger information includes passenger ID, date and time, and store. The date and time is the date and time when the passenger's purchasing behavior was performed. The store is the name of the store where the passenger's purchasing behavior was performed.
  • Passenger information (consumption) may record purchase amounts and the like, as long as the information is effective for classifying the purchasing behavior of passengers.
  • FIG. 10 is a diagram showing a configuration example of passenger information (movement) stored in the passenger information storage unit 15.
  • Passenger information is information representing movement of a passenger obtained from the ticket gate system 60, and may be, for example, OD data such as entrance/exit data for a railway ticket gate or boarding/alighting data for a shared bus fare box.
  • Passenger information (movement) includes passenger ID, entry station, entry date and time, departure station, and departure date and time.
  • the entry station and entry date and time are the place and time at which the passenger boarded the means of transportation. Departure station and departure date and time are the place and time at which the passenger got off the transportation means.
  • FIG. 11 is a diagram showing a configuration example of operation information stored in the operation information accumulation unit 16.
  • the operation information is information on the predetermined operation time of trains and buses created by railway operators and shared bus operators, which is acquired from the operation management system 80, and includes transportation means ID, station, arrival time, departure time, and Daily data including delays.
  • the transportation ID is unique identification information for trains and buses.
  • a station is a place (station or bus stop) where the train or bus arrives and departs.
  • the arrival time is the arrival time of the train or bus, and the departure time is the departure time of the train or bus.
  • the delay is the difference between the actual departure time of the train or bus and the scheduled departure time.
  • FIG. 12 is a diagram showing an example of a travel demand forecast model stored in the travel demand forecast model storage unit 18.
  • the travel demand prediction model uses the entry station and entry time zone as explanatory variables, and the final destination and the probability of traveling to the final destination as objective variables.
  • FIG. 13 is a diagram showing an example of a stay demand forecast model stored in the stay demand forecast model storage unit 19.
  • the stay demand forecast model uses the entry station, entry time zone, final destination, operation status, passenger attributes (occupation), and surrounding information as explanatory variables to calculate the probability of stay occurrence, stay purpose, occurrence location distribution, and stay Let demand be the objective variable.
  • the occurrence probability is the probability that the stay will occur.
  • Occurrence location distribution is a set of location and probability that the stay occurs.
  • Stay demand is represented by links to other information.
  • FIG. 14 is a diagram showing an example of a transfer time prediction model stored in the transfer time prediction model accumulation unit 20.
  • the transfer time prediction model uses the target transfer as an explanatory variable, and the stay time section and the probability of the section as objective variables.
  • FIG. 15 is a diagram showing an example of stay demand predicted by the stay demand prediction unit 21.
  • the stay demand is represented by the distribution of the number of stayers by location of occurrence, and includes links to the number of stayers/total number of transfers, purpose of stay, place of stay occurrence, and stay distribution.
  • the stay distribution represents the number of people for each combination of stay purpose and stay time interval.
  • FIG. 16 is a diagram showing a configuration example of data of the day of passenger information (movement) stored in the passenger information storage unit 15.
  • the passenger information (movement) data for the day has the same format as the passenger information (movement) shown in FIG. It's becoming Since the passenger information (movement) data for the day is used for predicting the demand for stay, it is the data of the passengers who are currently moving, and the departure station and departure time are "not yet". Others are the same as the passenger information (movement) shown in FIG.
  • FIG. 17 is a diagram showing a configuration example of today's data of the operation information stored in the operation information accumulation unit 16.
  • the data of the current day of the operation information has the same format as the operation information shown in FIG. 11, but since it is the current operation information of the current day, the departure/arrival is "Not yet" for the current time shift. Others are the same as the operation information shown in FIG.
  • FIG. 18 is a diagram illustrating an example of operation proposal KPI weighting coefficients.
  • the weighting coefficient indicates a KPI that is emphasized in the operation proposal, reduces the imbalance in the number of passengers, aims to disperse congestion, and shortens the waiting time of passengers by changing the timetable.
  • weighting setting 2 has a larger numerical value, so an operation proposal with a smaller timetable change amount is likely to be output.
  • FIG. 19 is a diagram explaining an example of operation proposal constraint conditions.
  • the operation proposal constraints include the number of temporary flights and the overtime hours of the crew.
  • Condition 1 no penalty is given until the number of temporary flights is 0, but if the number of temporary flights exceeds 0, a penalty is given and an operation proposal for setting a temporary flight is not output.
  • condition 2 no penalty is given when the number of temporary flights is up to 2, but a penalty is given when the number of temporary flights exceeds 2, and an operation proposal is output in which 0 to 2 temporary flights are set. be.
  • no penalty is given for overtime work of 60 minutes or less, and overtime work exceeding 60 minutes is subject to a prescribed penalty. Given.
  • FIG. 20 and 21 are diagrams showing output examples of operation proposals.
  • FIG. 20 shows output example 1 when weighting setting 1 and condition 1 are selected
  • FIG. 21 shows output example 1 when weighting setting 2 and condition 2 are selected.
  • Output example 2 in the case of The illustrated output example may be displayed on the display device 9 of the operation proposal system 10, or may be output from the communication interface 4 in a predetermined data exchange format.
  • the timetable change weighting is 0 due to the weighting setting 1, so the timetable change time is increased to reduce the waiting time.
  • the timetable change weighting is 1 due to the weighting setting 2, so the timetable change time becomes short, and the condition 2 sets the extra flight.
  • the embodiment of the present invention it is possible to estimate the demand of people in the middle of their movement with high accuracy, and to propose an operation change plan according to the demand. Then, it becomes possible to perform traffic control that optimizes KPIs such as congestion distribution so as to match people's stay demand, which changes according to the situation.
  • the present invention is not limited to the above-described embodiments, and includes various modifications and equivalent configurations within the scope of the attached claims.
  • the above-described embodiments have been described in detail for easy understanding of the present invention, and the present invention is not necessarily limited to those having all the described configurations.
  • part of the configuration of one embodiment may be replaced with the configuration of another embodiment.
  • the configuration of another embodiment may be added to the configuration of one embodiment.
  • additions, deletions, and replacements of other configurations may be made for a part of the configuration of each embodiment.
  • each configuration, function, processing unit, processing means, etc. described above may be realized by hardware, for example, by designing a part or all of them with an integrated circuit, and the processor realizes each function. It may be realized by software by interpreting and executing a program to execute.
  • Information such as programs, tables, and files that implement each function can be stored in storage devices such as memory, hard disks, SSDs (Solid State Drives), or recording media such as IC cards, SD cards, and DVDs.
  • storage devices such as memory, hard disks, SSDs (Solid State Drives), or recording media such as IC cards, SD cards, and DVDs.
  • control lines and information lines indicate those that are considered necessary for explanation, and do not necessarily indicate all the control lines and information lines necessary for implementation. In practice, it can be considered that almost all configurations are interconnected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Software Systems (AREA)
  • Mechanical Engineering (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Medical Informatics (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Accounting & Taxation (AREA)
  • Evolutionary Computation (AREA)
  • Data Mining & Analysis (AREA)
  • Artificial Intelligence (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
PCT/JP2022/023912 2021-07-15 2022-06-15 運行提案システム、及び運行提案作成方法 Ceased WO2023286514A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP22841858.8A EP4328846A4 (en) 2021-07-15 2022-06-15 TRANSACTION PROPOSAL SYSTEM AND METHOD FOR GENERATING TRANSACTION PROPOSALS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021116878A JP7693430B2 (ja) 2021-07-15 2021-07-15 運行提案システム、及び運行提案作成方法
JP2021-116878 2021-07-15

Publications (1)

Publication Number Publication Date
WO2023286514A1 true WO2023286514A1 (ja) 2023-01-19

Family

ID=84919264

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/023912 Ceased WO2023286514A1 (ja) 2021-07-15 2022-06-15 運行提案システム、及び運行提案作成方法

Country Status (3)

Country Link
EP (1) EP4328846A4 (enExample)
JP (1) JP7693430B2 (enExample)
WO (1) WO2023286514A1 (enExample)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220042825A1 (en) * 2020-08-04 2022-02-10 Toyota Jidosha Kabushiki Kaisha Tire proposal system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019101917A1 (en) * 2017-11-24 2019-05-31 H. Lundbeck A/S New catecholamine prodrugs for use in the treatment of parkinson's disease
JP2024110699A (ja) * 2023-02-03 2024-08-16 東芝テック株式会社 情報処理装置及び情報処理プログラム

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017097520A (ja) * 2015-11-20 2017-06-01 株式会社日立製作所 資源運用計画支援装置および資源運用計画支援方法
WO2018087811A1 (ja) 2016-11-08 2018-05-17 株式会社日立製作所 交通システム、ダイヤ提案システム及び車両運行システム
JP2019001448A (ja) * 2017-06-13 2019-01-10 公益財団法人鉄道総合技術研究所 プログラム及び旅客移動経路推定装置
JP2019073146A (ja) * 2017-10-16 2019-05-16 株式会社日立製作所 ダイヤ作成装置および自動列車制御システム
JP2021116878A (ja) 2020-01-28 2021-08-10 ユーキャン株式会社 自動排液装置及び自動排液装置の配設構造

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10430736B2 (en) * 2012-05-25 2019-10-01 Conduent Business Services, Llc System and method for estimating a dynamic origin-destination matrix

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017097520A (ja) * 2015-11-20 2017-06-01 株式会社日立製作所 資源運用計画支援装置および資源運用計画支援方法
WO2018087811A1 (ja) 2016-11-08 2018-05-17 株式会社日立製作所 交通システム、ダイヤ提案システム及び車両運行システム
JP2019001448A (ja) * 2017-06-13 2019-01-10 公益財団法人鉄道総合技術研究所 プログラム及び旅客移動経路推定装置
JP2019073146A (ja) * 2017-10-16 2019-05-16 株式会社日立製作所 ダイヤ作成装置および自動列車制御システム
JP2021116878A (ja) 2020-01-28 2021-08-10 ユーキャン株式会社 自動排液装置及び自動排液装置の配設構造

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4328846A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220042825A1 (en) * 2020-08-04 2022-02-10 Toyota Jidosha Kabushiki Kaisha Tire proposal system
US11781884B2 (en) * 2020-08-04 2023-10-10 Toyota Jidosha Kabushiki Kaisha Tire proposal system

Also Published As

Publication number Publication date
JP2023013012A (ja) 2023-01-26
EP4328846A1 (en) 2024-02-28
EP4328846A4 (en) 2025-04-23
JP7693430B2 (ja) 2025-06-17

Similar Documents

Publication Publication Date Title
JP6872331B2 (ja) 評価システム及び評価方法
Horn Multi-modal and demand-responsive passenger transport systems: a modelling framework with embedded control systems
Rahimi et al. System modeling of demand responsive transportation services: Evaluating cost efficiency of service and coordinated taxi usage
Hsu et al. Competition between high-speed and conventional rail systems: A game theoretical approach
Sivilevičius et al. The criteria for identifying the quality of passengers’ transportation by railway and their ranking using AHP method
JP7693430B2 (ja) 運行提案システム、及び運行提案作成方法
JP2023013012A5 (enExample)
Yoon et al. A simulation sandbox to compare fixed-route, semi-flexible transit, and on-demand microtransit system designs
JP6902481B2 (ja) リソース調停システムおよびリソース調停装置
JP2016168970A (ja) 評価システム及び運行情報の評価方法
Petrik et al. Uncertainty analysis of an activity-based microsimulation model for Singapore
CN112949926A (zh) 一种基于乘客需求重识别的收入最大化票额分配方法
Li et al. Passenger satisfaction evaluation of public transport using alternative queuing method under hesitant linguistic environment
Tsai et al. Optimizing distance-based fares and headway of an intercity transportation system with elastic demand and trip length differentiation
Hadiuzzaman et al. Modeling passengers’ perceptions of intercity train service quality for regular and special days: M. Hadiuzzaman et al.
Ruch et al. The impact of fleet coordination on taxi operations
Li et al. Path‐Based Approach for Expanding Rail Transit Network in a Metropolitan Area
Yang et al. Temporal and spatial evolution of passenger flow in an urban rail transit network during station closure
CN112734206B (zh) 基于用户画像的轨道交通清分方法、装置、设备及介质
Hrushevska et al. Modeling the impact of technology and arranging commuter passenger transportation by competing modes of transport
CN112529288A (zh) 一种多列车差异化定价策略优化方法及系统
JP7611759B2 (ja) 連携システム、及び連携支援方法
Klumpenhouwer et al. Cost-of-crowding model for light rail train and platform length
Tang et al. High‐speed rail cost recovery time based on an integer optimization model
Kato et al. Cost-benefit analysis for improvement of transfer at urban railway stations

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22841858

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2022841858

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2022841858

Country of ref document: EP

Effective date: 20231120

NENP Non-entry into the national phase

Ref country code: DE