WO2023222853A2 - Système de bâtiment hybride, bâtiment et procédé - Google Patents
Système de bâtiment hybride, bâtiment et procédé Download PDFInfo
- Publication number
- WO2023222853A2 WO2023222853A2 PCT/EP2023/063435 EP2023063435W WO2023222853A2 WO 2023222853 A2 WO2023222853 A2 WO 2023222853A2 EP 2023063435 W EP2023063435 W EP 2023063435W WO 2023222853 A2 WO2023222853 A2 WO 2023222853A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- building
- building section
- section
- internal volume
- final location
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 155
- 238000010276 construction Methods 0.000 claims abstract description 274
- 239000002184 metal Substances 0.000 claims description 89
- 229910052751 metal Inorganic materials 0.000 claims description 89
- 238000009423 ventilation Methods 0.000 claims description 63
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 30
- 239000004567 concrete Substances 0.000 claims description 25
- 238000009414 blockwork Methods 0.000 claims description 22
- 238000010438 heat treatment Methods 0.000 claims description 16
- 239000004566 building material Substances 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims description 3
- -1 sewerage Substances 0.000 claims 2
- 239000007769 metal material Substances 0.000 claims 1
- 239000000463 material Substances 0.000 description 77
- 239000002023 wood Substances 0.000 description 33
- 229910000831 Steel Inorganic materials 0.000 description 30
- 230000008901 benefit Effects 0.000 description 30
- 239000010959 steel Substances 0.000 description 30
- 239000011449 brick Substances 0.000 description 27
- 239000004568 cement Substances 0.000 description 27
- 238000004891 communication Methods 0.000 description 26
- 230000004048 modification Effects 0.000 description 26
- 238000012986 modification Methods 0.000 description 26
- 238000004519 manufacturing process Methods 0.000 description 24
- 239000002131 composite material Substances 0.000 description 21
- 238000009434 installation Methods 0.000 description 20
- 230000008569 process Effects 0.000 description 15
- 238000012423 maintenance Methods 0.000 description 13
- 238000000605 extraction Methods 0.000 description 11
- 238000003032 molecular docking Methods 0.000 description 11
- 238000005253 cladding Methods 0.000 description 10
- 239000011150 reinforced concrete Substances 0.000 description 10
- 238000007789 sealing Methods 0.000 description 10
- 238000003860 storage Methods 0.000 description 10
- 238000001816 cooling Methods 0.000 description 9
- 239000004927 clay Substances 0.000 description 8
- 230000009970 fire resistant effect Effects 0.000 description 8
- 238000012384 transportation and delivery Methods 0.000 description 8
- 239000002699 waste material Substances 0.000 description 8
- 239000000853 adhesive Substances 0.000 description 7
- 230000001070 adhesive effect Effects 0.000 description 7
- 238000013459 approach Methods 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 7
- 230000000694 effects Effects 0.000 description 7
- 238000009413 insulation Methods 0.000 description 7
- 239000004033 plastic Substances 0.000 description 7
- 229920003023 plastic Polymers 0.000 description 7
- 238000009428 plumbing Methods 0.000 description 7
- 239000007787 solid Substances 0.000 description 7
- 238000010146 3D printing Methods 0.000 description 6
- 230000004888 barrier function Effects 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 6
- 230000001066 destructive effect Effects 0.000 description 6
- 238000009432 framing Methods 0.000 description 6
- 239000012774 insulation material Substances 0.000 description 6
- 239000011521 glass Substances 0.000 description 5
- 230000008520 organization Effects 0.000 description 5
- 239000011505 plaster Substances 0.000 description 5
- 230000001629 suppression Effects 0.000 description 5
- 238000012360 testing method Methods 0.000 description 5
- 230000007704 transition Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 229920002430 Fibre-reinforced plastic Polymers 0.000 description 4
- 238000009435 building construction Methods 0.000 description 4
- 239000011151 fibre-reinforced plastic Substances 0.000 description 4
- 239000011800 void material Substances 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 230000003750 conditioning effect Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 239000000835 fiber Substances 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000005304 joining Methods 0.000 description 3
- 238000003908 quality control method Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 238000007493 shaping process Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 239000002351 wastewater Substances 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 241000928624 Coula edulis Species 0.000 description 2
- 229920002522 Wood fibre Polymers 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 239000010797 grey water Substances 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000011810 insulating material Substances 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000005399 mechanical ventilation Methods 0.000 description 2
- 229910001092 metal group alloy Inorganic materials 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 239000011120 plywood Substances 0.000 description 2
- 239000002990 reinforced plastic Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009418 renovation Methods 0.000 description 2
- 238000009416 shuttering Methods 0.000 description 2
- 230000007480 spreading Effects 0.000 description 2
- 238000003892 spreading Methods 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 239000003818 cinder Substances 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 238000010411 cooking Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000010616 electrical installation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
- E04H1/04—Apartment houses arranged in two or more levels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34838—Elements not integrated in a skeleton the supporting structure consisting of wood
Definitions
- the present disclosure relates to a hybrid building system, a hybrid building and a method of constructing a hybrid building.
- the present disclosure also relates to first and second building sections forming part of such buildings.
- Prefabricated housing has been developed in an attempt to meet these challenges.
- Prefabricated housing may refer to buildings having built in components (e.g. panels), modules, or transportable sections.
- commercially available prefabricated houses and methods of construction do not suitably address the problems identified above.
- Examples of known prefabricated housing include so-called “modulai” buildings. These are buildings which are assembled using an arrangement of prefabricated units or sections that have been constructed in a factory or facility, and then shipped to a final location for the building. Whilst manufacture of the building units in a factory addresses some of the problems with conventional construction methods, there remain significant disadvantages with buildings of this type.
- the building units each comprise an internal void or volume which defines part of the total volume of the assembled building, and are transported to the building site in that form.
- a consequence of this is that there is a requirement to construct and store all of the finished building units at the factory location, which takes up significant space. A large premises is therefore required.
- Some modular buildings comprise pre-constructed building units of this type, and a flat panel or frame-type structure which is connected to the pre-constructed building unit at the final location, in order to form the completed building.
- these panel or frame-type structures still have to be stored at a factory, and transported to the final location for subsequent assembly. Although this can reduce the volume of some of the structures that have to be transported, they are still comparatively bulky, and can be relatively costly to manufacture.
- the part of the building formed from the flat panel/frame-type structure is not self-supporting, and relies on the pre-constructed unit for support. As a result, the preconstructed unit must be placed at the final location before any further assembly work can take place.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which the first and second building sections are configured so that an access route between the upper and lower living spaces of the first building section passes through the second building section.
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for a building and comprising a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; and a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which the first and second building sections are configured, in use, so that an access route between the upper and lower living spaces of the first building section passes through the second building section.
- the access route may facilitate movement between the upper and lower living spaces of the first building section by an occupant of the building (and so may provide a ‘walkable’ route or space).
- the access route may pass from the internal volume of one of the upper and lower storeys of the first building section, into the internal volume of the second building section, and from the internal volume of the second building section to the internal volume of the other one of the upper and lower storeys.
- a majority or all of the access route may be defined by the second building section. However, part of the access route may be defined by the first building section.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and comprises a lower storey and an upper storey, each storey defining a respective internal volume that provides a living space within the building, the internal volume of the lower storey optionally being isolated from the internal volume of the upper storey; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which: the second building section is configured to provide access between the internal volumes of the upper and lower storeys of the first building section when the first and second building sections are connected; or the first and second building sections are configured so that access between the internal volumes of the upper and lower storeys of the first building section is provided through the second building section when the first and second building sections are connected; or the second building section is configured so that its internal volume communicates with both the internal
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for a building and comprising a lower storey and an upper storey, each storey defining a respective internal volume that provides a living space within the building, the internal volume of the lower storey optionally being isolated from the internal volume of the upper storey; and a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which: the second building section is configured, in use, to provide access between the internal volumes of the upper and lower storeys of the first building section; or the first and second building sections are configured, in use, so that access between the internal volumes of the upper and lower storeys of the first building section is provided through the second building section; or the second building section is configured, in use, so that its internal volume communicates both with the internal volume defined by the
- the second building section may facilitate movement between the upper and lower living spaces of the first building section by an occupant of the building.
- An occupant may pass from the internal volume/living space of one of the upper and lower storeys of the first building section into the internal volume of the second building section, and from the internal volume of the second building section to the internal volume/living space of the other one of the upper and lower storeys.
- the internal volumes may be isolated in that they may be physically out of communication with one another, so that it is not possible to pass from one of the internal volumes to the other internal volume solely within the first building section.
- the second building section may provide a ‘walkable’ route or space between said volumes/living spaces.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and defines an internal volume that provides a living space within the building; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which: the second building section is configured to provide an access route between an exterior of the building and the internal volume of the first building section; or the first and second building sections are configured so that access between an exterior of the building and the internal volume of the first building section is provided through the second building section; or the second building section is configured so that its internal volume communicates both with the exterior of the building and the internal volume of the first building section, to thereby connect the internal volume of the first building section with the building exterior.
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for a building and defining an internal volume that provides a living space within the building; and a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which: the second building section is configured, in use, to provide an access route between an exterior of the building and the internal volume of the first building section; or the first and second building sections are configured, in use, so that access between an exterior of the building and the internal volume of the first building section is provided through the second building section; or the second building section is configured, in use, so that its internal volume communicates both with the exterior of the building and the internal volume of the first building section, to thereby connect the internal volume of the first building section with the building exterior.
- the access route may be or may provide a main accessway into the first building section and/or the building (and so again may provide a ‘walkable’ route or space).
- the access that is provided may be a main access into the first building section and/or the building.
- the second building section may comprise a doorway which: provides the access route into the first building section; facilitates access between the exterior of the building and the first building section; or facilitates communication between the internal volume of the second building section and the building exterior.
- the doorway may be a main doorway of the building.
- the first building section may be devoid of a doorway (or at least a main doorway) to the building exterior.
- the second building section may define a circulation space/zone or transition space/zone for the building.
- the circulation space may: define or comprise at least part of the access route; provide the required access; and/or facilitate the communication between the internal volume of the second building section and the building exterior. Access into the first building section from the building exterior may be provided via the circulation space.
- the first building section may be free-standing and/or self-supporting.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and comprises an internal volume that provides a first living space within the building and at least one further living space within the building, the first living space and the at least one further living space optionally being isolated from one another within the first building section; the second building section defines an internal volume and is transportable to the final location for the building in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which: the second building section is configured to provide access between the first living space and the at least one further living space of the first building section when the first and second building sections are connected; or the first and second building sections are configured so that access between the first living space and the at least one further living space of the first building section is provided through the second building section, when the first and second building sections are connected; or the second building section is configured so that its internal volume communicates both with
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for the building and comprising an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; a second building section which defines an internal volume, and which is transportable to the final location for the building in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which: the second building section is configured, in use, to provide access between the first living space and the at least one further living space of the first building section (when the first and second building sections are connected); or the first and second building sections are configured, in use, so that access between the first living space and the at least one further living space of the first building section is provided through the second building section (when the first and second building sections are connected); or the second building section is configured, in use,
- the first and further living spaces may be isolated in that they may be physically out of communication with one another, so that it is not possible to pass from one of the living spaces to the other living space solely within the first building section.
- the second building section may again provide a ‘walkable’ route or space between said living spaces.
- the first and further living spaces may be provided in a common storey, and/or at a common level, within the first building section.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which the second building section defines a circulation space for the building, access between the upper and lower living spaces of the first building section being provided via the circulation space.
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for the building and comprising a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which the second building section is configured, in use, to define a circulation space for the building, access between the upper and lower living spaces of the first building section being provided via the circulation space.
- Access into the first building section from the outside of the building may be provided via the circulation space.
- An access route between an exterior of the building and the first building section may be provided by the circulation space.
- the circulation space may be arranged to provide access between an exterior of the building and the first building section.
- the circulation space (also referred to herein as a circulation zone or transition space/zone) of the second building section may define or comprise at least part of an access route between the upper and lower living spaces of the first building section; and/or may facilitate communication between the internal volume defined by the upper storey of the first building section, and the internal volume defined by the lower storey of the first building section, to thereby connect the internal volumes.
- the circulation space may comprise one or more of: a staircase/ stairs, hallway, landing, and one or more doorway.
- the circulation space may comprise a doorway into the second building section, which may provide a main access route into the first building section (and so the building).
- the doorway may form a main or front doorway of the building.
- the first building section may be devoid of a main or front doorway, the doorway being provided by the second building section, when connected to the first building section.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and defines an internal volume that provides a living space within the building; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which: the second building section defines a circulation space for the building, access into the first building section from the outside of the building being provided via the circulation space; or the second building section defines a circulation space for the building, an access route between an exterior of the building and the first building section being provided by the circulation space; or the second building section defines a circulation space for the building, the circulation space being arranged to provide access between an exterior of the building and the first building section.
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for the building and comprising an internal volume that provides a living space within the building; a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which: the second building section, in use, defines a circulation space for the building, access into the first building section from the outside of the building being provided via the circulation space; or the second building section, in use, defines a circulation space for the building, an access route between an exterior of the building and the first building section being provided by the circulation space; or the second building section, in use, defines a circulation space for the building, the circulation space being arranged to provide access between an exterior of the building and the first building section.
- a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and comprises an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; the second building section defines an internal volume and is transportable to the final location for the building in a substantially assembled form; the first and second building sections are connected at the final location to form the building; and optionally in which: the second building section defines a circulation space which provides an access route between the first living space and the at least one further living space of the first building section; or the second building section defines a circulation space which provides access between the first living space and the at least one further living space of the first building section; or the second building section defines a circulation space which communicates with both the first living space of the first building section and the at least one further living space of the first building section,
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for the building and comprising an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; a second building section defining an internal volume and which is transportable to the final location for the building in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building; and optionally in which: the second building section defines a circulation space which provides an access route between the first living space and the at least one further living space of the first building section, when the first and second building sections are connected; or the second building section defines a circulation space which provides access between the first living space and the at least one further living space of the first building section, when the first and second building sections are connected; or the second building section defines a circulation space which communicates with both the first living space
- the residential building is a hybrid in that part of the building is an on-site construction at the final location (the first building section), and part is constructed separately and transported to the final location (the second building section).
- the building is formed at the final location by connecting the first and second building sections together.
- first building section being an on-site construction. This should be taken to mean that the first building section is constructed at the site using an arrangement of parts, components and/or materials which are provided at the site. This is in contrast for example to modular buildings which are assembled at a final location using building units or sections that have been constructed off-site (e.g. in a construction facility or factory) and which, in their constructed form, define part of an internal volume of the finished building.
- the second building section may be constructed away from the final location.
- the second building section may be an offsite construction, and may be transportable to the site in the substantially assembled form.
- the first building section may be constructed first, and the second building section subsequently connected to the first building section to form the building.
- the second building section may be located on the site, and the first building section subsequently constructed and connected to the second building section (suitably during the construction process).
- the first building section may be built on or from the second building section, for example using the second building section as a support or platform for part or parts of the first building section.
- the second building section will generally be constructed away from the site.
- Options include a factory or facility that is distanced from the site, and accessible by road and/or rail from the site.
- Other options include a factory or facility provided on or as part e.g. of such a larger building site (but distanced from the plot), for constructing a plurality of second building sections which are to be used in the construction of a plurality of buildings.
- a hybrid residential building comprising the first and second building sections offers numerous advantages over prior buildings and associated construction techniques, including over prior modular buildings.
- construction of the first building section at the final location enables the use of conventional (non-modular) construction techniques. These can be relatively simple, enabling construction of the first building section in a time and cost-effective manner. A relatively large proportion of the total building volume may be provided by the first building section, and so construction using conventional techniques can be beneficial in minimising costs.
- Prior units of this type each define an internal void or volume which forms part of the total volume of the assembled building. This can provide the related benefits that: it is not necessary to provide a large assembly space within the facility for constructing the modular building units; it is not necessary to transport such bulky units from the facility to the site (e.g. by road/rail); and it is not necessary to provide space for storing such bulky units either at the facility, or at the site where the building is to be formed.
- the second building section can be transported on-site for use in construction of the hybrid residential building as and when required.
- the second building section may comprise more complex parts of the finished building, such as a staircase/stairs, bathroom, room, and a W. C./washroom, amongst other things. Construction away from the final location by dedicated workers may facilitate the construction process and improve quality control. Limiting such construction to the more complex second building section enables these positive outcomes to be achieved whilst minimising transportation of bulky components to the final location. It may also simplify construction of the first building section.
- a balance can therefore be reached in which the first building section can be constructed at the final location in a cost and time-effective manner using simple conventional techniques, whereas the more complex second building section can be constructed in a reliable and quality -controlled manner whilst minimising the size (volume) of components that need to be transported to the final location.
- Wear and tear occurring e.g. due to the movement of people between the upper and lower living spaces may occur primarily (and optionally entirely) in the second building section.
- the second building section may be releasably connected to the first building section. Constructing the second building section away from the final location and making it transportable means that it can readily be removed and replaced, for example in the event of maintenance being required to address such wear and tear, and/or if replacement of the section is required.
- Providing an access route/access passing through the second building section, and the second building section so that it provides the specified communication may also reduce the complexity of the first building section, enabling it to be constructed relatively quickly and cheaply.
- the second building section may comprise or contain a staircase/ stairs, which may: define at least part of the access route; provide the required access; and/or facilitate the internal volume relationship/intemal communication. Provision of the staircase in the second building section may enhance the structural stiffness/ rigidity of the building section, which may in- tum facilitate its transportation.
- the staircase/stairs may be in or may provide part of the circulation space.
- Construction of the second building section away from the final location may facilitate reliable construction in a controlled environment, with enhanced quality control.
- the first building section may be of any type that is suitable for on-site construction, but may exclude modular-type constructions.
- a modular-type construction in this context, should be taken to mean a construction in which all (or substantially all) of a final volume of a building is pre-formed, comprising a series of building parts or units each defining a portion of the final volume of the building, for subsequent transportation to a final location for the building.
- the first building section may be of a construction selected from the group comprising: a blockwork/masonry construction e.g. of clay bricks and/or cement blocks; a timber frame and blockwork/masonry construction; a timber frame and cladding construction; a metal frame construction (optionally comprising panels coupled to the frame e.g.
- the first building section may be or may comprise a kit of building materials (e.g. blocks, timber frame components, metal structural elements) which can be used in the on-site construction of the building section.
- the second building section being transportable to the final location in a substantially assembled form. This may be taken to mean that the second building section is constructed to a state in which: it can be transported safely (i.e. it has sufficient structural integrity/rigidity for transport purposes); minimal further work is required to be carried out on the second building section in order to connect it to the first building section; and/or minimal (optionally no) further work is required to complete a portion of the building formed by the second building section.
- Such further work may be of a structural and/or weatherproofing nature, and may exclude work associated with a final fit-out of the second building section, for example of a decorative nature (in particular the application of ‘perishable’ materials such as plaster/plasterboard, decorative panels and surface finishes such as paint).
- the second building section may comprise a plurality of subsections or units which may be configured to be fitted or coupled together to form the completed building section.
- the subsections may be independently transportable, and connected at the site to form the completed second building section.
- the reference to the second building section being transportable to the final location in a substantially assembled form should be taken to mean that the subsections are each transportable in a substantially assembled form (and does not require the subsections to be connected prior to transport to the final location).
- the reference to the second building section being transportable to the final location in a substantially assembled form therefore encompasses constructing such subsections to substantially assembled forms, transporting the subsections to the final location in their assembled forms, and then connecting the subsections at the final location to form the second building section.
- the first building section may have a total internal volume, which may be the sum of: the internal volume defined by its lower storey; and the internal volume defined by its upper storey (or all its storeys where there are more than two). If there is only one storey then the total internal volume is the volume of that storey.
- the hybrid residential building may have a total internal volume, which may be the sum of the total internal volume of the first building section, and the internal volume of the second building section.
- the second building section may define at least around 15% of the total internal volume of the building, optionally at least around 20%, optionally at least around 25%, optionally at least around 30%, optionally at least around 35%, and optionally up to around 40% of said volume .
- the first building section may define no more than around 85% of the total internal volume of the building, optionally no more than around 80%, optionally no more than around 75%, optionally no more than around 70%, optionally no more than around 65%, and optionally no more than around 60% of said volume.
- a ratio of the total internal volume of the building provided by the second building section relative to the total internal volume of the building provided by the first building section may be around 15:85, optionally around 20:80, optionally around 25:75, optionally around 30:70, optionally around 35:65, and optionally around 40:60.
- a particularly preferred internal volume provided by the second building section may be in a range of around 28% to around 36% (and so first building section internal volume of around 72% to around 64%, and ratio in a range of around 28:72 to around 36:64).
- the second building section could provide up to around 50% of the total internal volume of the building (and so around a 50:50 ratio of second building section volume relative to the total).
- Arranging the second building section to provide between around 15% to 40% of the total internal volume of the building, and in particular between around 28 and 36% of the internal volume, may provide sufficient volume for a usable space (optionally a living space) within the second building section, and for the required access to be provided passing through it. Restricting the proportion of the total living space provided by the second building section to no more than around 36% may also facilitate construction of the second building section, and/or its transportation to the final location (by effectively limiting its size).
- the access route which is provided by the second building section may be the sole access route, and/or the second building section may provide sole access (between the upper and lower storeys of the first building section; between the building exterior and the internal volume of the first building section; and/or between living spaces of the first building section).
- the first building section may be devoid of an access route, and/or may not provide access (absent the second building section).
- another access route may be provided directly from the exterior into the first building section, e.g. it may include a back or side door.
- a living space should be taken to mean an area within which a person can live, and which may exclude: storage areas (e.g. cupboards, closets, garage); technical areas (e.g. boiler rooms or cupboards, water storage tank cupboards); attics, lofts, basements and cellars (unless they provide a livable space e.g. a bedroom); and outdoor spaces (e.g. decks, patios, balconies and verandas). Living spaces will typically be covered or enclosed (in the completed building), and heated.
- a non-limiting list of rooms or areas that may fall within the definition of ‘living space’ includes: kitchens, bedrooms, living/sitting rooms and leisure areas, dining rooms, bathrooms, W/Cs and room s.
- the second building section internal volume may provide a further living space within the building.
- the second building section may provide usable space within the building, which may be non-living space such as storage or technical space (and which for example may comprise one or more of a boiler room/cupboard, a storage cupboard/closet, a water storage tank cupboard, a delivery drop-off area, and a porch).
- the second building section may comprise or contain one or more of a hallway and a landing, each of which may : define at least part of the access route; at least partly provide the required access; or facilitate the internal volume relationship/communication.
- the hallway and/or landing may be provided in, or may define at least part of, the circulation space.
- the second building section may comprise or contain one or more of: a W/C, a washroom, a delivery drop-off area, a bathroom, an enclosure, a front or main doorway and/or door, a further (e.g. side) doorway and/or door, and one or more window.
- a W/C Wideband/C
- a washroom a delivery drop-off area
- a bathroom an enclosure
- an enclosure a doorway
- a further (e.g. side) doorway and/or door e.g. side doorway and/or door
- one or more window e.g. side
- the second building section may comprise or contain one or more of: a W/C, a washroom, a delivery drop-off area, a bathroom, an enclosure, a front or main doorway and/or door, a further (e.g. side) doorway and/or door, and one or more window.
- upgrade and modification can be made easier, as the second building section may be capable of being removed from connection
- the second building section can optionally include one or more bedroom.
- Living space or spaces provided by the first building section may form at least part of one or more room.
- the one or more room may be selected from the group comprising: a kitchen; a dining room; a living or sitting room or leisure room; a bedroom; and an open plan room comprising a plurality of different usage areas.
- the usage areas may be selected from the group comprising: a kitchen area; a dining area; and a living, sitting or leisure area. Whilst it may be preferable to provide a kitchen in the first building section, the second building section could optionally include a kitchen.
- the upper living space will form at least part of one or more bedroom
- the lower living space will form at least part of: a kitchen; a dining room; a living or sitting room; and/or an open plan room comprising a plurality of different usage areas of the type set out above.
- the room or rooms provided by the upper and lower living spaces may be reversed.
- the lower living space may provide at least part of a bedroom or bedrooms
- the upper living space may provide at least part of a kitchen, dining room and/or living room. Bedrooms could be provided in both living spaces.
- the internal volume defined by the second building section may form at least part of one or more room.
- the one or more room may be selected from the group comprising: a W/C; a washroom; a bathroom; an enclosure (which may comprise a bath and/or shower, and optionally a toilet); and a kitchen.
- the first building section may comprise a kitchen. At least part of the kitchen (e.g. kitchen units) may be adjacent the second building section. At least part of the kitchen may be connected or coupled to the second building section. Services for the kitchen (including electrical power, water supply, sewerage/wastewater outlet and/or gas supply) may be provided by the second building section.
- the second building section may comprise connectors for providing the services to the kitchen. At least part of the kitchen may be mounted to or on a wall of the second building section, which may be an external wall of the section (said wall optionally forming an internal wall of the building when the building sections are connected).
- the kitchen may comprise a mounting panel to which at least part of the kitchen (e.g. some kitchen units) is mounted, the panel being coupled or connected to the external wall of the second building section.
- the second building section may comprise a kitchen, or at least part of a kitchen. This may apply particularly to smaller buildings.
- At least one room may be defined jointly by a living space of the first building section and by the second building section (suitably its living space). Connection of the building sections may therefore complete the room or rooms.
- the upper living space of the first building section may define part of a bedroom
- the living space of the second building section may define a further part of the bedroom. When the building sections are connected, said parts may together define the complete bedroom.
- the first building section may be configured so that the internal volume defined by the lower storey is isolated from the internal volume defined by the upper storey. Said internal volumes may be isolated in that they may be physically out of communication with one another, so that it is not possible to pass from one of the internal volumes to the other internal volume solely within the first building section.
- the first and second building sections may be configured so that access between the internal volumes of the upper and lower storeys of the first building section is provided through the second building section. The access route passing through the second building section may permit passage between the isolated volumes.
- the second building section may be configured to provide access between the internal volumes of the upper and lower storeys of the first building section when the first and second building sections are connected.
- the first and second building sections may be configured so that access between the internal volumes of the upper and lower storeys of the first building section is provided through the second building section. Access may be via the access route.
- the second building section may be configured so that its internal volume communicates with both the internal volume defined by the upper storey of the first building section, and the internal volume defined by the lower storey of the first building section, to thereby connect or couple the internal volumes of the upper and lower storeys, when the building sections are connected.
- the second building section may be configured so that its internal volume communicates with the building exterior, and with the internal volume of the first building section.
- the second building section in particular its internal volume, may define at least part of a circulation space/zone (or transition space/zone) for the building. Access into the first building section from the outside of the building may be provided via the circulation space. Access between the upper and lower living spaces of the first building section may be provided via the circulation space.
- the circulation space may: define or comprise at least part of the access route; provide the required access; and/or facilitate the internal volume relationship/communication.
- the circulation space may comprise one or more of: a staircase/stairs, hallway, landing, and one or more doorway.
- the circulation space may comprise a doorway into the second building section, which may provide a main access route into the first building section (and so the building).
- the doorway may form a main or front doorway of the building.
- the first building section may be devoid of a main or front doorway, the doorway being provided by the second building section, when connected to the first building section.
- the second building section in particular the circulation space, may be configured to provide all of the doorways within the building, or at least a majority of the doorways. This may simplify construction of the first building section.
- the doorways may be internal and/or external doorways.
- Doorways provided by the second building section may be at least around 800mm in width, and optionally up to around 900mm in width.
- a sum of the widths of the doorways provided by the second building section, optionally for each storey of the first building section, may be greater than about 1800mm (i.e. more than two doorways per storey), may be at least about 2400mm (i.e. at least three doorways), and may be at least about 2700mm.
- the circulation space may be configured to provide access to a plurality of rooms of the building (optionally three or more), which rooms may all be provided by a living space of the first building section, optionally by a living space of one of the storeys of the first building section and/or at a common level in said section.
- the circulation space may be configured to provide access to a plurality of rooms of the building provided by the lower storey living space of the first building section, and/or a plurality of rooms of the building provided by the upper storey living space of the first building section. Where further storeys are provided, the circulation space may provide access to a plurality of rooms of the further storey. Access may be via doorways.
- the circulation space may be configured to provide access to a plurality of different areas (which may be usage areas) of a single room, each area optionally being accessed by a different doorway.
- the circulation space may comprise one or both of a hallway and a landing, and a plurality of doorways (which may each open on to a respective room or area of one room).
- the hallway /landing and doorways may provide the required access route/access.
- the circulation space may include all doorways required to gain access to the rooms/areas within the first building section. This may be of particular benefit as the fitting of doorways (and mounting of doors in the doorways) is a skilled job which can be carried out in a verifiable manner in an off-site facility.
- light switches are typically provided adjacent doorways. The invention may allow all (or most) of the switches associated with lights in the first building section rooms/areas to be provided in or by the second building section.
- a benefit of this is that power for operating the lights can be routed into the second section and then to the light switches, simplifying construction of the first building section. It may then only be necessary to connect light fittings in the rooms to the switches, which may be via connectors provided on or in the second building section.
- the first building section may comprise all (or a majority) of the bedrooms of the building. Access between all (or at least a majority) of the bedrooms may be provided by the second building section circulation space, or by the access route/access which said section provides. This may simplify on-site construction of the first building section.
- the same principle may apply to room types other than bedrooms, e.g. to kitchen, living/ sitting rooms, dining rooms, bathrooms, WCs and compartments. Access to such rooms will therefore depend on the particular layout of rooms in the building.
- the or a living space of the first building section may comprise a first living space part and at least one further living space part.
- the living space parts may be isolated from one another within the first building section.
- the living space parts may be isolated in that they may be physically out of communication with one another, so that it is not possible to pass from one of the living space parts to the other one of said living space parts solely within the first building section.
- the second building section may be configured to provide access between the first living space part and the at least one further living space part when the first and second building sections are connected. Access may be via an access route (which may be a further access route), and/or provided by the circulation space, of the second building section.
- the second building section may be configured so that its internal volume communicates both with the first living space part and with the further living space part of the first building section, to thereby connect said living space parts, when the first and second building sections are connected.
- the lower living space of the first building section may comprise a first lower living space part and at least one further lower living space part.
- the second building section may be configured to provide access between the first lower living space part and the at least one further lower living space part of the first building section when the first and second building sections are connected. Access may be via an access route, and/or provided by the circulation space, of the second building section.
- the upper living space of the first building section may comprise a first upper living space part and at least one further upper living space part.
- the second building section may be configured to provide access between the first upper living space part and the at least one further upper living space part of the first building section when the first and second building sections are connected. Access may be via an access route, and/or provided by the circulation space, of the second building section.
- the second building section may be configured so that its internal volume communicates both with the lower living space of the first building section and the upper living space of the first building section, to thereby connect said living spaces, when the first and second building sections are connected.
- the second building section may comprise a plurality of subsections or units which may be configured to be fitted or coupled together to form the completed building section.
- Each subsection may define a respective part of the internal building volume of the second building section.
- the subsections may be configured so that said parts of the internal building volume communicate with one-another, to permit movement (i.e. access) between the different parts.
- Two or more (and optionally each) of said parts may: define a respective portion of the access route; together provide for the required access; together facilitate the internal volume relationship/communication; or provide the circulation space or spaces.
- the subsections may be independently transportable and adapted to be connected at the site.
- the subsections may be stackable (directly or indirectly), and may be arranged so that they can be stacked one on top of the other.
- the subsections may interconnect.
- An intermediate component may be provided between the subsections, e.g. a floor or frame section, which might form a part of the first building section. At least some subsections may have common floor plans and/or shapes.
- One subsection may comprise or form a roof, or may be configured to receive a roof.
- the second building section may comprise a lower subsection and an upper subsection.
- the lower subsection may form a lower storey of the second building section, which may communicate with the internal volume defined by the lower storey of the first building section.
- the lower storey formed by the lower subsection may comprise a floor, and the floor may be at a level which is substantially the same as that of a floor of the first building section lower storey.
- the upper subsection may form an upper storey of the second building section, which may communicate with the internal volume defined by the upper storey of the first building section.
- the upper storey formed by the upper subsection may comprise a floor, and the floor may be at a level which is substantially the same as that of a floor of the first building section upper storey. It will be understood that the floor level of the first building section upper storey is typically vertically above the floor level of the first building section lower storey.
- the lower subsection may comprise a staircase/ stairs.
- the upper subsection may comprise an aperture or opening which communicates with the staircase when the subsections are connected, to permit passage between the lower and upper subsections via the staircase.
- the aperture may open on to a landing defined by or provided within the upper subsection.
- the staircase and the aperture may both be provided on/in, or may form part of, the circulation space; the access route; may provide for the required access; or may facilitate the internal volume relationship/communication.
- the second building section may comprise more than one upper subsection, and may comprise: a lower subsection, a first upper subsection, and a second upper subsection.
- the first upper subsection may form a middle subsection
- the second upper subsection may form a top subsection.
- the top subsection may be stacked or seated on the middle subsection
- the middle subsection may be stacked or seated upon the lower subsection.
- the lower subsection may comprise a lower staircase/stairs.
- the middle subsection may comprise a middle staircase/stairs.
- the lower staircase and the middle staircase may communicate with one another, or be otherwise associated, so to permit passage between the lower and upper subsections.
- the middle subsection may comprise an aperture or opening which communicates with the staircase in the lower subsection, when the subsections are connected, to permit passage between the lower and middle subsections via the lower staircase.
- the aperture may open on to a middle landing defined by or within the middle subsection.
- the top subsection may comprise an aperture or opening which communicates with the staircase in the middle subsection, when the subsections are connected, to permit passage between the middle and top subsections via the middle staircase.
- the aperture may open on to a top landing defined by or within the top subsection.
- the second building section may be provided as a single unit or structure defining a lower subsection/portion and an upper subsection/portion, and optionally at least one further subsection/portion (e.g. lower, middle and top).
- the subsections may be provided within a single or unitary outer structure or envelope which contains all of the subsections.
- the first building section may comprise a middle storey defining an internal volume, which may provide a middle living space within the building.
- the middle subsection may form a middle storey of the second building section, which may communicate with the internal volume defined by the middle storey of the first building section.
- the middle storey formed by the middle subsection may comprise a floor, and the floor may be at a level which is substantially the same as that of a floor of the first building section middle storey.
- the first and/or second building sections may comprise more than two storeys.
- the number of storeys in the first and second building sections may be equal.
- one of the first and second building sections may comprise more stories than the other section.
- one of the building sections may comprise a top (third) storey which is positioned above the upper storey of the other building section when the sections are connected.
- the building may comprise a ventilation system.
- the ventilation system may be configured: to supply external air into the building; and/or to withdraw internal air from the building and to discharge it to the building exterior, to thereby control ventilation of the building.
- the ventilation system may be provided in the first or second building section. Parts of the ventilation system may be provided in both of the building sections. It may however be preferable that the ventilation system is provided in the second building section, so that the system can be installed in an off-site facility as discussed elsewhere in this document (providing similar benefits).
- the ventilation system may be configured to supply external air into the (or each) internal volume of the first building section.
- the ventilation system may be configured to supply external air directly or indirectly into said internal volume.
- the external air may be supplied directly into said internal volume via at least one vent provided in a wall of the second building section.
- the external air may be supplied indirectly into said internal volume via one or more duct/conduit in the first building section.
- the ventilation system may comprise one or more duct/conduit in the second building section, which may connect with the or a duct/conduit in the first building section for the supply of air.
- the ventilation system may be configured to supply external air into the internal volume of one of the building sections (e.g. the second building section), for subsequent flow/bleed into the other one of the building sections (e.g. the first building section).
- the bleed may occur e.g. under positive pressure applied to the air in the internal volume of the building section into which the external air is supplied.
- the ventilation system may be configured to supply external air into a space or cavity between the first and second building sections, for subsequent flow/bleed into the first building section (e.g. under positive pressure), and optionally into the second building section.
- the ventilation system may be configured to withdraw internal air from the (or each) internal volume of the first building section.
- the ventilation system may be configured to withdraw internal air directly or indirectly from said internal volume.
- the internal air may be withdrawn directly from said internal volume via at least one vent provided in a wall of the second building section.
- the internal air may be withdrawn indirectly from said internal volume via one or more duct/conduit in the first building section.
- the ventilation system may comprise one or more duct/conduit in the second building section, which may connect with the or a duct/conduit in the first building section for the withdrawal of air.
- the ventilation system may be configured to withdraw internal air from the internal volume of the second building section, to thereby draw internal air from the first building section (e.g. under negative pressure applied to the air in the or each internal volume of the second building section).
- the ventilation system may be configured to withdraw internal air from a space or cavity between the first and second building sections (e.g. under negative pressure).
- the ventilation system may be configured to supply air into a first area of the building, and to withdraw air from a further area which is spaced or distanced from the first area. This may promote a flow of air within the building.
- the ventilation system may be configured to draw external air from an exterior of the building, and to discharge the air into the building.
- the ventilation system may be configured to discharge internal air drawn from the interior of the building to an exterior of the building.
- the ventilation system may comprise a control unit for controlling the supply of external air into, and the withdrawal of internal air from, the building.
- the ventilation system may comprise a heat exchanger, which may be for transferring thermal energy: from internal air drawn from the building to the incoming external air (to heat the incoming external air); and/or from incoming external air to the internal air drawn from the building (to cool the incoming external air).
- the heating or cooling effect applied will depend on factors including a temperature differential between the external and internal air, and a desired temperature for the air within the building.
- the ventilation system may take the form of a Mechanical Ventilation and Heat Recovery (MVHR) system, also known as an MHRV system.
- the ventilation system may comprise a filter for filtering the external air prior to supplying the air into an internal volume of the building.
- the ventilation system may comprise, or may be configured to cooperate with, a heating and/or cooling device, for heating or cooling the external air prior to discharge into the building.
- the heat exchanger, filter and/or heating/cooling device may form part of a conditioning unit of the ventilation system.
- the ventilation system may be configured to supply external air into the internal volume of the second building section, and to withdraw internal air from the internal volume of the second building section.
- the ventilation system may comprise at least one supply duct in the second building section, and at least one extraction duct in the second building section.
- the ventilation system may comprise at least one supply duct in the second building section, which connects with the supply duct in the first building section and/or with the supply vent in the wall of the second building section; and at least one extraction duct in the second building section, which connects with the extraction duct in the first building section, and/or with the extraction vent in the wall of the second building section.
- the ventilation system may comprise a manifold in the second building section, which may provide the required duct/ducts.
- the first building section may be constructed at a final, fixed, on-site location of the building, and may be configured to receive the second building section.
- the second building section may be connected to and received by the first building section.
- the first building section may be preconfigured, during on-site construction of the building section (i.e. at the final location), to receive the second building section. That is, the first building section is constructed in the knowledge that a second building section is to be connected. In this way, build-times are reduced as the first building section may not need to be further modified to facilitate the connection of a second building section.
- the first building section may be configured to removably receive the second building section.
- the second building section may be portable, in a form to be connected to and received by the first building section. Providing a second building section which is portable, and configuring the first building section to removably receive it, may facilitate disconnection of the second building section from the first building section, for example for replacement and/or maintenance purposes.
- the second building section may be removable from the final location.
- the second building section may be replaceable with a third building section configured in the same way as the second building section. Accordingly, the third building section may define an internal volume, which may provide a further living space within the building, and may be transportable to the final location in a substantially assembled form.
- the first and third building sections may be connected at the site to form the building.
- the first and third building sections may be configured so that an access route passes through the third building section (or alternatively to provide the access, facilitate the internal volume relationship/communication, or provide the circulation space(s), specified above in relation to the second building section).
- maintenance may be carried out on the second building section, suitably off-site, and the second building section subsequently reconnected to the first building section to provide the access route (or access/intemal volume relationship or communication, or circulation space).
- the first building section may have one or more open faces, and may be configured to removably receive or connect to the second building section at the one or more open faces.
- the second building section may be docked to or with the first building section, and may thereby close the one or more open faces of the first building section.
- the second building section may close two or more open faces of the first building section.
- the or each face may be in a vertical plane, and/or formed or defined by a vertical plane of the first building section.
- the second building section may define or may form at least one comer of the building, when connected to the first building section.
- the second building section may have one or more external walls, and may be connected to the first building section thereby to provide the one or more external walls as one or more internal walls of the first building section.
- the one or more external walls of the second building section may form a separating wall between the second building section and the first building section.
- the first building section may be configured to receive the second building section, and the second building section may be connected to and received by the first building section.
- the building may be serviced with one or more services via the second building section.
- the one or more services may be received by the second building section from external to one or more of the first building section, second building section and building.
- the one or more services may be: water; gas; heating; electric; telecoms; and/or air supply.
- the one more services may comprise an electrical power supply and/or telecoms, and the electrical power and/or telecoms may be wirelessly transmitted to the first building section from the second building section.
- the one or more services may comprise a heat supply.
- the one or more services may comprise a water supply, and all (or at least one or more) wet facilities may be (e.g. entirely) provided within the second building section.
- the building may comprise a services hub.
- the second building section may be serviced with one or more services via the services hub.
- the services hub may be a specific hub (which could be a boiler room or plant room), which may house fuse boxes, a boiler, and other apparatus.
- the services hub may be provided separately, and/or may not form part of the building.
- the services hub may be housed within the first building section or the second building section.
- the services hub may be accessible from the exterior of the building.
- the services hub may be thermally isolated from a remainder of the building, e.g. from the first or second building section where housed within one of the sections. Thermal isolation may be via suitable insulation.
- the services may be terminated at the first building section, optionally in the services hub, and may then be routed from there to the second building section for supply into the first building section e.g. to its living space(s).
- the first building section may take the form of a dock, and may be constructed at the final location of the building (which may be a fixed, on-site location).
- the dock may be configured to receive a module.
- the second building section may take the form of or may provide the module.
- the module may be connected to and received by the dock.
- a ‘residential’ building In the context of the invention, this should be taken to mean a building in which sleeping accommodation is provided for normal residential purposes, preferably with cooking and dining facilities.
- Non-limiting examples of residential buildings falling with the scope of the invention include houses (detached, semi-detached, and terraced), as well as apartments and flats.
- Some of the aspects and/or principles of the invention can be applied to single storey residential buildings, which may be a single storey house/bungalow.
- the first building section may be free-standing and/or self-supporting.
- the first building section may not therefore require the second building section to be present to ensure its structural integrity, or for support. This may facilitate on-site construction of the first building section without requiring the second building section to be present on the site.
- the second building section may, however, provide additional support to the first building section, and therefore to the building, once connected.
- the second building section may comprise a metal (e.g. steel) frame support structure. This may facilitate construction in a factory or facility away from the final location for the building, and may provide sufficient rigidity for the second building section to be transported to the final location.
- the first building section may be connected to and/or supported by the second building section, in particular by the metal frame structure.
- the first building section may comprise structural elements such as beams and/or columns, and at least some of the structural elements may be connected to and/or supported by the second building section.
- the metal frame structure may comprise hot-formed (e.g. hot rolled) structural elements. This may be beneficial as such hot-formed structural elements can span reasonably large distances, which can facilitate the formation of apertures (e.g. doorways) at a perimeter of the building section.
- the first building section may comprise a metal (e.g. steel) frame support structure, which may have features similar to those set out above for the second building section.
- the second building section may comprise one or more of: a main doorway, which may provide a main accessway into the first building section (and so the building); a stairs/ staircase, which may provide access between the upper and lower storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to a different room of the building, or to different areas of a single room; and a landing, which may provide an accessway from the stairs/staircase to one or more doorways or rooms (or different areas of a single room) provided in the upper storey of the first building section, and/or between the rooms themselves (or different areas of a room).
- a main doorway which may provide a main accessway into the first building section (and so the building); a stairs/ staircase, which may provide access between the upper and lower storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to
- the hallway may also connect the main doorway with one or more internal doorways/rooms/room areas.
- the second building section may comprise all, or a majority of, the doorways for the building.
- the second building section may comprise all, or at least a majority of, the wet facilities for the building. These may include one or more of: a bathroom; a W/C; an enclosure; water supply for other purposes including to a kitchen; and sewerage/wastewater connections.
- the second building section may provide a fire escape route for the building.
- the fire escape route may comprise the main doorway (and/or another doorway providing a route into the building), the stairs/staircase, the hallway, and optionally the landing.
- the second building section may comprise fire-proof or fire-resistant structures defining the fire escape route.
- the fire escape route may be bound or bordered by fire-resistant or fire-proof walls, and optionally by fire-resistant or fire-proof doors mounted in any doorways opening on to, or provided in, the fire escape route.
- the second building section may comprise a fire suppression system.
- the fire suppression system may be selectively operable: to define the fire escape route; to suppress a fire within the fire escape route; or to suppress a fire to restrict or prevent it from spreading into the fire escape route.
- the fire escape route may include at least part of one or more of the circulation spaces defined elsewhere in this document.
- the first and/or second building sections may be configured so that there is a substantially air-tight seal between the first and second building sections. This may be advantageous in restricting air ingress into the building, and air egress from the building, at an interface between the building sections.
- the seal may be between an external surface of the second building section and an external surface of the first building section (which surfaces may face each other when the sections are connected).
- the seal may be provided at an interface between the building sections.
- One of the first and second building sections may carry or may comprise one or more sealing element or structure, which may be adapted to sealingly abut the other one of the first and second building sections to provide the required seal between the building sections.
- Said other one of the building sections may define or may comprise a surface configured to cooperate with the sealing element to provide the required seal.
- the seal may be substantially air-tight in that air egress/ingress between the building sections at the region of the interface may be restricted, and optionally substantially entirely prevented.
- the first building section may comprise at least one open face, and the second building section may be connected to the first building section so that it closes the at least one open face.
- the second building section may thereby define at least part of an external surface of the building, and the interface may be at least partly disposed on, in or at the external surface.
- the building sections may be arranged so that the seal (in particular the sealing element/ structure) is compressed when the sections are connected.
- the seal may be arranged to overlie at least part of one of the building sections, and may be arranged so that it overlies the interface.
- the seal (in particular the sealing element/ structure) may overlie a roof or roof portion of one or both of the building sections.
- the building may have an external surface and/or a perimeter, which may be provided by walls of the building (and may exclude a roof of the building). Part of the external surface/perimeter may be provided by the first building section, and part by the second building section. At least one wall of the second building section may therefore provide an external or outwardly facing wall of the building (or may define part of its perimeter).
- the second building section may define at least around 20% of the total surface area of the building (defined by the external surface/perimeter), optionally at least around 25%, and optionally up to around 30% of said surface area. In a preferred option, the second building section may define between around 24% and around 28% of said surface area.
- the first building section may define no more than around 80% of the total surface area of the building, optionally no more than around 75%, and optionally no more than around 70% of said surface area.
- Arranging the second building section to provide between around 15% to 30% of the total surface area of the building, and in particular up to around 0% of the surface area may provide sufficient usable internal space (optionally a living space) within the second building section, and for the required access passing through it. Restricting the proportion of the total surface area (and so internal space) provided by the second building section to no more than around 30% may also facilitate construction of the second building section, and/or its transportation to the final location. In a variation, which may apply particularly to smaller buildings, the second building section could provide up to around 50% of the total surface area of the building.
- each subsection may define part of a lift (e.g. a part of a lift shaft), which parts may cooperate when the subsections are connected, so that a lift vehicle may move between the storeys (e.g. through the aligned shaft parts).
- the first building section may comprise first and second portions which together define the first building section, and which may be arranged (e.g. connected) so that the first and second portions are disposed at a non-parallel angle relative to one another.
- the first and second portions may be substantially elongate.
- the first and second portions may have respective main axes.
- the first and second portions may be arranged so that the first portion main axis is disposed at a non-parallel angle (e.g. substantially perpendicular) relative to the second portion main axis.
- the second building section may be connected to both of the first and second portions.
- the first building section may comprise at least one further portion which may be arranged relative to an adjacent portion (e.g.
- the first and/or second portion so that said portions are disposed at such a non-parallel angle relative to one another. Axes of said portions may be disposed as set out above.
- the second building section may be connected to two, or more than two, of such portions.
- the first building section may have a cross-section, in plan view, having two substantially perpendicularly connected elongate regions.
- the second building section may be connected to both elongate regions.
- the first building section may have a substantially L-shaped cross-section, in plan view.
- the second building section may be connected to both the first and second portions (or both of the elongate regions) of, or forming, the L-shaped crosssection.
- the second building section may comprise first and second external walls, which may be disposed adjacent one another, and which may together form a comer of the second building section.
- the first and second external walls may be disposed at non-parallel angles relative to one another, e.g. substantially perpendicular.
- the first and second external walls may each be connected to a respective one of the first and second portions (or elongate regions) of the first building section, so that the comer of the second building section is disposed within the building when the building sections are connected.
- the angle between the first and second portions of the first building section may be the same as the angle between the first and second external walls of the second building section.
- a first building section of a hybrid residential building in which the first building section is an on-site constmction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; and optionally in which the first building section is configured so that it does not provide a complete access route between its upper and lower living spaces.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use, to provide at least part of an access route between an upper living space provided by an internal volume of an upper storey of the first building section and a lower living space provided by an internal volume of a lower storey of the first building section.
- the second building section may provide a living space within the building.
- the second building section may comprise one or more of: a main doorway, which may provide a main accessway into the first building section (and so the building); a stairs/staircase, which may provide access between storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to a different room of the building, or to different areas of a single room; and a landing, which may provide an accessway from the stairs/staircase to one or more doorways/rooms (or different areas of a single room), and/orbetween the rooms themselves (or different areas of a room).
- the first building section may not provide a complete access route either in that: it only forms part of an access route and requires connection of the second building section in order to complete the route; or in that no part of an access route is provided by the first building section.
- first and second building sections of the fifteenth and sixteenth aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the first aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; and optionally in which the first building section is configured, in use: so that access between the upper and lower living spaces within the first building section is prevented; or so that access between the internal volumes of the upper and lower storeys of the first building section within the first building section is prevented; or so that the internal volume defined by the upper storey is out of communication with the internal volume defined by the lower storey.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use: to provide access between an upper living space provided by an internal volume of an upper storey of the first building section and a lower living space provided by an internal volume of a lower storey of the first building section; or so that access between internal volumes of upper and lower storeys of the first building section is provided through the second building section; or so that its internal volume communicates with both an internal volume defined by an upper storey of the first building section, and an internal volume defined by a lower storey of the first building section, to thereby connect the internal volumes of the upper and lower storeys.
- the second building section may provide a living space within the building.
- the second building section may comprise one or more of: a main doorway, which may provide a main accessway into the first building section (and so the building); a stairs/staircase, which may provide access between storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to a different room of the building, or to different areas of a single room; and a landing, which may provide an accessway from the stairs/staircase to one or more doorways/rooms (or different areas of a single room), and/orbetween the rooms themselves (or different areas of a room).
- first and second building sections of the seventeenth and eighteenth aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the third aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section defines an internal volume that provides a living space within the building; and optionally in which the first building section is configured, in use (following connection to the second building section): so that it does not provide a complete access route between its internal volume and an exterior of the building; or so that direct access between an exterior of the building and its internal volume is prevented.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use: to provide an access route between an exterior of the building and the first building section; or so that access between an exterior of the building and the first building section is provided through the second building section; or so that its internal volume communicates both with an exterior of the building and an internal volume of the first building section, to thereby connect the internal volume of the first building section with the building exterior.
- the second building section may provide a living space within the building.
- the second building section may comprise one or more of: a main doorway, which may provide a main accessway into the first building section (and so the building); a stairs/staircase, which may provide access between storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to a different room of the building, or to different areas of a single room; and a landing, which may provide an accessway from the stairs/staircase to one or more doorways/rooms (or different areas of a single room), and/orbetween the rooms themselves (or different areas of a room).
- the first building section may not provide a complete access route either in that: it only forms part of an access route and requires connection of the second building section in order to complete the route; or in that no part of an access route is provided by the first building section.
- first and second building sections of the nineteenth and twentieth aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the fifth aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; and optionally in which the first building section is configured, in use: so that it does not provide a complete access route between the first living space and the at least one further living space within the first building section; or so that access between the first living space and the at least one further living space solely within the first building section is prevented; or so that the first living space is out of communication with the at least one further living space.
- the first building section may not provide a complete access route either in that: it only forms part of an access route and requires connection of the second building section in order to complete the route; or in that no part of an access route is provided by the first building section.
- the first and further living spaces may be out of communication (prior to connection of the second building section) in that it may not be possible to transit from one of the living spaces to the other within the first building section, i.e. without stepping out of the first building section.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use: to provide access between a first living space and at least one further living space of the first building section when the first and second building sections are connected; so that access between a first living space and at least one further living space of the first building section is provided through the second building section; or so that its internal volume communicates with both a first living space of the first building section and at least one further living space of the first building section, to thereby connect said living spaces.
- the second building section may provide a living space within the building.
- the second building section may comprise one or more of: a main doorway, which may provide a main accessway into the first building section (and so the building); a stairs/staircase, which may provide access between storeys of the first building section; a hallway, which may connect the main doorway with the stairs/staircase; one or more internal doorways, which may each provide access to a different room of the building, or to different areas of a single room; and a landing, which may provide an accessway from the stairs/staircase to one or more doorways/rooms (or different areas of a single room), and/orbetween the rooms themselves (or different areas of a room).
- the first and further living spaces may be provided in a common storey, and/or at a common level, within the first building section.
- first and second building sections of the twenty -first and twenty -second aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the seventh aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; and optionally in which the first building section is configured so that it does not provide a circulation space for access between its upper and lower living spaces.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use, to define a circulation space for the building which provides access between an upper living space provided by an internal volume of an upper storey of the first building section and a lower living space provided by an internal volume of a lower storey of the first building section.
- first and second building sections of the twenty -third and twenty -fourth aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the ninth aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section defines an internal volume that provides a living space within the building; and optionally in which the first building section is configured, in use: so that it does not comprise a circulation space providing a complete access route between its internal volume and an exterior of the building; or so that it does not comprise a circulation space providing direct access between an exterior of the building and its internal volume.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use: to define a circulation space for the building, to provide an access route between an exterior of the building and the first building section; or to define a circulation space for the building, which provides access between an exterior of the building and the first building section; or to define a circulation space for the building, which communicates both with an exterior of the building and an internal volume of the first building section, to thereby connect the internal volume of the first building section with the building exterior.
- first and second building sections of the twenty -fifth and twenty-sixth aspects of the invention may be derived from the text set out elsewhere in this document, including from the text set out above relating to the hybrid residential building of the eleventh aspect.
- a first building section of a hybrid residential building in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; and optionally in which the first building section is configured, in use: so that it does not comprise a circulation space providing a complete access route between the first living space and the at least one further living space within the first building section; or so that it does not comprise a circulation space providing direct access between the first living space and the at least one further living space within the first building section.
- a second building section of a hybrid residential building in which the second building section is transportable to a final location for the building in a substantially assembled form and configured to be connected with or to a first building section of the building which is an on-site construction, the second building section comprising an internal volume; and optionally in which the second building section is configured, in use: to define a circulation space for the building, to provide an access route between a first living space and at least one further living space of the first building section; or to define a circulation space for the building which provides access between a first living space and at least one further living space of the first building section; or to define a circulation space for the building which communicates both with a first living space and at least one further living space of the first building section, to thereby connect the living spaces.
- Further features of the first and second building sections of the twenty -seventh and twenty -eighth aspects of the invention may be derived from the text set out elsewhere in this document, including from the
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of arranging the first and second building sections so that an access route between the upper and lower living spaces of the first building section passes through the second building section.
- the method may comprise arranging the first and second building sections so that the access route passes from the internal volume of one of the upper and lower storeys of the first building section, into the internal volume of the second building section, and from the internal volume of the second building section to the other one of the internal volumes of the upper and lower storeys.
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building, the internal volume of the lower storey optionally being isolated from the internal volume of the upper storey; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of: arranging the second building section so that it provides access between the internal volumes of the upper and lower storeys of the first building section when the first and second building sections are
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with an internal volume that provides a living space within the building; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of: arranging the second building section so that it provides an access route between an exterior of the building and the first building section; or arranging the first and second building sections so that access between an exterior of the building and the first building section is provided through the second building section; or arranging the second building so that its internal volume communicates both with the exterior of the building and the internal volume of the first building section,
- the method may comprise arranging the second building section so that the access route passes from the building exterior into the internal volume of the second building section, and from the internal volume of the second building section into the internal volume of the first building section.
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of: arranging the second building section so that it provides access between the first living space and the at least one further living space of the first building section when the first and second building sections are connected; or arranging the first and second building sections so that access between the first
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of arranging the second building section so that it defines a circulation space for the building, access between the upper and lower living spaces of the first building section being provided via the circulation space.
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with an internal volume that provides a living space within the building; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of: arranging the second building section so that it defines a circulation space for the building which provides an access route between an exterior of the building and the first building section; or arranging the second building section so that it defines a circulation space for the building which provides access between an exterior of the building and the first building section; or arranging the second building section so that it defines a circulation space for the building
- a method of constructing a hybrid residential building comprising the steps of: constructing a first building section at a final location for the building; at a location away from the final location, constructing a second building section to a substantially assembled form; transporting the second building section to the final location in the substantially assembled form; and connecting the first and second building sections to form the building; in which the step of constructing the first building section comprises providing the first building section with an internal volume that provides a first living space within the building and at least one further living space, the first living space and the at least one further living space optionally being isolated from one another within the first building section; in which the step of constructing the second building section comprises providing the second building section with an internal volume; and optionally in which the method comprises the further step of: arranging the second building section so that it defines a circulation space for the building which provides an access route between the first living space and the at least one further living space of the first building section; or arranging the second building section so that it
- the step of constructing the second building section may comprise arranging its internal volume so that it provides a further living space within the building.
- the method may comprise constructing the first building section at the final location, and then connecting the second building section to the first building section.
- the second building section may be transported to the final location following construction of the first building section (or optionally following commencement of its construction, but prior to its completion).
- the method may comprise transporting the second building to the final location, and then constructing the first building section and connecting it to the second building section.
- the second building section may be located on or in the final location prior to construction of the first building section.
- the first building section may be connected to the second building section during the construction process.
- the method may comprise building the first building section on or from the second building section, for example using the second building section as a support or platform.
- the second building section may be constructed away from a site which forms the final location for the building, for example in a factory or facility that is distanced from the site, and which may be accessible by road and/or rail from the site.
- the second building section may be constructed in a factory or facility provided on or as part of a (larger) building site, away from a plot on the building site which may form the final location.
- the step of connecting the building sections may comprise releasably connecting the second building section to the first building section.
- the method may comprise subsequently disconnecting the second building section from the first building section; transporting the second building section to a maintenance facility and performing maintenance on the second building section; and then transporting the second building section back to the final location and reconnecting it to the first building section.
- the method may comprise subsequently disconnecting the second building section from the first building section; transporting a further second building section (which may form a third building section) to the final location in a substantially assembled form; and connecting the further second building section to the first building section.
- the transport step may be carried out before or after the disconnection step.
- the third building section may have similar features to the second.
- the step of constructing the first building section may comprise forming the first building section of: a blockwork/masonry construction; a timber frame and blockwork/masonry construction; a timber frame and cladding construction; a metal frame construction (optionally comprising panels connected to the frame e.g. structural insulated ‘SIP’ panels); a time -setting 3D printed construction; or combinations thereof.
- the step of constructing the second building section may comprise providing the second building section with a staircase/stairs which: defines at least part of the access route; provides the required access; facilitates the internal volume relationship; or provides at least part of the relevant circulation space.
- the step of constructing the second building section may comprise providing the section with one or more of a hallway and a landing, each of which may: define at least part of the access route; provide for the required access; facilitate the internal volume relationship; or provides at least part of the relevant circulation space.
- the step of constructing the second building section may comprise providing the section with one or more of: a W/C, a washroom, a delivery drop-off area, a bathroom, an enclosure, a front door/doorway, a side door/doorway, and one or more window.
- the step of constructing the second building section may comprise constructing a plurality of subsections or units which are configured to be fitted or coupled together to form the completed building section.
- the subsections may be independently transported to the final location (i.e. in a disconnected or decoupled state).
- the method may comprise connecting the subsections together at the final location, for example by stacking the subsections one on top of the other.
- the subsections may comprise a lower subsection and an upper subsection.
- the method may comprise arranging the second building section so that a majority or all of the access route is defined by the second building section.
- the method may comprise arranging the living space of the first building section so that it forms at least part of one or more room, which may be selected from the group comprising: a kitchen; a dining room; a living or sitting room; a bedroom; and an open plan room comprising a plurality of different usage areas.
- the method may comprise arranging the first and second building sections so that at least one room is defined jointly by a living space of the first building section and a living space of the second building section.
- the method may comprise configuring the first building section so that the internal volume defined by the lower storey is isolated from the internal volume defined by the upper storey.
- the method may comprise configuring the second building section so that it provides access between internal volumes of upper and lower storeys of the first building section when the first and second building sections are connected.
- the method may comprise configuring the first and second building sections so that access between internal volumes of upper and lower storeys of the first building section is provided through the second building section.
- the method may comprise configuring the second building section so that its internal volume communicates with both an internal volume defined by an upper storey of the first building section, and an internal volume defined by a lower storey of the first building section. In this way, the internal volumes of the upper and lower storeys are connected/ coupled, when the building sections are connected.
- the step of constructing the second building section may comprise providing at least part of a circulation space/zone (or transition space/zone) for the building within the second building section.
- the method may comprise configuring the circulation space to provide access into the first building section from the outside of the building.
- the method may comprise configuring the circulation space to provide access between upper and lower living spaces of the first building section.
- the circulation space may therefore define or may comprise at least part of the access route.
- the method may comprise arranging the circulation space so that it provides one or more of a staircase/stairs, hallway, landing, and one or more doorways.
- the circulation space may form a doorway into the second building section, which may provide a main access route into the first building section (and so the building).
- the doorway may form a main or front doorway of the building.
- the method may comprise configuring the first building section so that it is devoid of a main or front doorway, the doorway being provided by the second building section.
- the method may comprise dividing a living space of the first building section into a first living space part and at least one further living space part.
- the method may comprise configuring the first living space part and the at least one further living space part so that they are isolated from one another within the first building section.
- the method may comprise configuring the second building section so that it provides access between the first living space part and the at least one further living space part of the first building section. This may be via the access route and/or circulation space.
- the method may comprise dividing one or both of the living spaces into such living space parts.
- the method may comprise configuring the second building section so that its internal volume communicates with both a lower living space of the first building section and an upper living space of the first building section, to thereby connect said living spaces, when the first and second building sections are connected.
- the method may comprise providing the building with a ventilation system, and configuring the ventilation system: to supply external air into the building; and to withdraw internal air from the building and to discharge it to the building exterior, to thereby control ventilation of the first building section.
- the method may comprise configuring the ventilation system to draw external air from the exterior of the building, and to discharge the air into the internal volume of the first building section.
- the method may comprise configuring the ventilation system to supply external air directly or indirectly into said internal volume.
- the method may comprise configuring the ventilation system to supply external air into the internal volume of the second building section.
- the method may comprise constructing the first building section at the final location, which may be a fixed, on-site location of the building, and configuring the first building section to receive the second building section.
- the method may comprise connecting the second building section to the first building section so that the second building section is received by the first building section.
- the method may comprise pre-configuring the first building section, during on-site construction at the final location, to receive the second building section.
- the step of constructing the first building section may comprise configuring the first building section to removably receive the second building section.
- the second building section may be portable, in a form to be connected to and received by the first building section.
- the method may comprise the further step of disconnecting the second building section from the first building section, for example for replacement and/or maintenance purposes.
- the second building section may thenbe removed from the final location.
- the second building section may be replaced with a third building section having an internal volume that provides a further living space within the building.
- the third building section may be transported to the final location in a substantially assembled form.
- the first and third building sections may be connected at the site to form the building.
- the method may comprise arranging the third building section in the same way as the second building section.
- the method may comprise performing maintenance on the second building section, suitably off-site, and subsequently reconnecting the second building section to the first building section.
- the step of constructing the first building section may comprise providing the first building section with one or more open faces, and configuring it to removably receive or connect to the second building section at the one or more open faces.
- the method may comprise docking the second building section with or to the first building section to close the one or more open faces.
- the step of constructing the second building section may comprise providing the second building section with one or more external walls, and connecting it to the first building section to provide the one or more external walls as one or more internal walls of the first building section.
- the method may comprise arranging one or more external walls of the second building section to form a separating wall between the second building section and the first building section.
- the method may comprise servicing the building with one or more services via the second building section.
- the one or more services may be received by the second building section from external to one or more of the first building section, second building section and building.
- the method may comprise providing the building, optionally the first building section, with a services hub.
- the method may comprise servicing the second building section with one or more services via the services hub.
- the step of constructing the first building section may comprise forming the section as a free-standing and/or self-supporting structure. Connecting the second building section with or to the first building section may provide additional support to the first building section.
- the step of constructing the second building section may comprise providing the second building section with a metal (e.g. steel) frame support structure, optionally in a factory or facility away from the final location for the building.
- the step of connecting the second building section to the first building section may comprise securing one or more structural element of the first building section to the second building section, suitably to the metal frame.
- a first building section of a hybrid residential building (which may form part of any of the hybrid residential buildings defined in this document), in which the first building section is an on-site construction configured to be connected with or to a second building section of the building transported to a final location for the building in a substantially assembled form, and in which the first building section comprises a lower storey defining an internal volume that provides a lower living space within the building, and an upper storey defining an internal volume that provides an upper living space within the building; and optionally in which the constructed first building section is configured without a staircase between its upper and lower storeys, and/or without a main doorway (the second building section optionally providing the staircase and/or main doorway into the first building section, and so into the building).
- first building section of this aspect may be derived from the text set out elsewhere in this document.
- Further aspects and other optional features of the invention are defined in the accompanying claims, or can be derived from the text set out elsewhere in this document. These include claims directed to a hybrid residential building/system comprising: a ventilation system; a substantially air-tight seal at an interface between building sections; a second building section which defines a proportion of a total internal volume and/or an external surface area of the building; and a first building section having first and second non-parallel portions, the second building section being connected to both portions; as well as first and second building sections of such buildings and associated methods. Further features of such buildings, systems, building sections and methods may be derived from the text set out elsewhere in this document, particularly from dependent claims directed to buildings.
- aspects of the present invention provide a hybrid residential building comprising a first building section and a second building section, in which: the first building section is an on-site construction at a final location for the building and defines an internal volume that provides a living space within the building; the second building section defines an internal volume and is transportable to the final location in a substantially assembled form; and the first and second building sections are connected at the final location to form the building.
- a hybrid residential building system comprising: a first building section configured to be constructed on-site at a final location for a building and defining an internal volume that provides a living space within the building; and a second building section defining an internal volume, and which is transportable to the final location in a substantially assembled form; in which the first and second building sections are adapted to be connected at the final location to form the building.
- the first building section may comprise a plurality of load-bearing walls.
- the second building section may comprise a plurality of load-bearing walls.
- the load-bearing walls of the first and/or second building section may each comprise, or may define, a load bearing support structure.
- the load-bearing support structure of at least some (optionally all) of the first building section load-bearing walls may be different from the load-bearing support structure of at least some (optionally all) of the second building section load-bearing walls.
- a majority (optionally all) of the load-bearing walls may be external walls.
- the load bearing support structure of at least some of the load-bearing walls of the first and/or second building sections may be an inner load bearing support structure (also referred to herein as a ‘core’). At least some of the load-bearing walls of the first and/or second building sections may comprise an outer surface structure, and/or an outer surface finish, which may be disposed on or outwardly of their inner load bearing support structures.
- the outer surface structure/finish may define a decorative surface finish.
- the load-bearing walls of the first and/or second building section may each comprise first and second surfaces arranged to face in opposed first and second directions. One of the first and second surfaces may be an internal surface and the other an external surface. The internal surface may be arranged to face internally of the building during use. The external surface may be arranged to face externally of the building during use.
- An outer surface structure/finish may be provided which defines the internal surface.
- An outer surface structure/finish may be provided which defines the external surface.
- the second building section may be constructed to a substantially assembled form at a location away from the final location defining the internal volume, and transportable to the final location in the substantially assembled form.
- the first building section may be constructed at the site using an arrangement of parts, components and/or materials which are provided at the site.
- the first building section can comprise a kit of building materials (e.g. blocks, timber frame components, metal structural elements) which can be used in the on-site construction of the building section.
- a range of construction options for the first building section described elsewhere in this document includes: a blockwork/masonry construction; a timber frame (and blockwork/masonry, or cladding, construction); a metal frame construction (optionally comprising panels coupled to the frame, which may be composite panels comprising insulation material); a structure comprising SIPs; a time-setting 3D printed construction; and combinations thereof.
- Suitable timber frame constructions can include a stick-built construction, and a (factory supplied) timber frame kit.
- a stick- built construction may be one in which structural components of the timber frame (e.g. load bearing support structures of walls) are constructed on site using a supply of timber (wood or wood-based products) cut to required sizes at the construction site.
- a timber frame kit construction may be one comprising pre-constructed structural components which are connected at the site to form the frame.
- Options for timber frame kit constructions include ‘turnkey’ framing comprising preformed panels, and pre-cut framing in which structural elements are supplied in the correct sizes/ dimensions to be formed into panels or other structures at the site.
- Timber frame kit constructions which can be employed may comprise open wall panels, comprising a timber support structure which is closed on a first side (comprising a surface defining a wall or face of the panel), but open on a second, opposed side. This may facilitate the installation of services such as electrical supply and/or telecommunication cables/wires, and fluid conduits such as water supply pipes and sewerage pipes.
- the second, opposed side may be closed using a suitable facing panel, e.g. following installation of any required services at the site. It will be understood that stick-built and timber frame kit constructions of these types will have a similar appearance, and may differ only in their method of construction.
- Panels employed in metal frame constructions can be of any suitable material(s)/construction, including but not restricted to metal/metallic, cementitious and other composite structures.
- Cementitious materials are particularly suited to use in 3D printing construction techniques, but other materials may be, or may become, suitable.
- Another construction option involves the use of site-poured time-setting materials (e.g. of a cementitious material such as concrete).
- a particular option may be reinforced concrete. This typically involves the construction/positioning of moulds known as shuttering at the final location, into which the time-setting material is poured (optionally following location of reinforcing rods in the moulds), and which cures to form structural components.
- a further construction option involves the use of structural panels, which may be of a cementitious material (e.g. concrete, particularly reinforced concrete).
- the structural panels may be constructed off site, or on site for example at the final location or in a factory or facility on a larger site distanced from a plot forming the final location (for subsequent use in constructing the first building section).
- panels such as SIPs are disclosed, optionally in conjunction with a metal frame construction. It will be understood that panels (including SIPs) with sufficient structural strength and/or rigidity may be employed which may dispense with the need for a metal (or other material) frame construction to support the panels.
- Other composite panels such as Karrier® panels commercially available from the Kingspan Group, may however be used with a metal frame support construction. Panels of this type comprise a core of an insulating material covered with internal and external skins e.g. of a metal or plastics material.
- the use of certain panels, in particular composite panels like Karrier® panels may negate a requirement to provide a vapour barrier (of a type which permits passage of watervapourbut restricts passage of liquid water). This is because the panels provide the required barrier, and are connected to one or more other panels to provide a continuous barrier layer.
- a solid wall construction in this context, may be one in which the load bearing support structure of the relevant wall or walls accommodates substantially an entire span of the relevant wall (which may be taken in width and height directions). This contrasts for example with a steel or other frame structure, in which open cells or spaces exist between structural support members of the load bearing structure.
- Examples of such a solid wall construction may include blockwork, structural panels (e.g. concrete panels, SIPs), 3D printed walls, poured concrete and solid wooden structures.
- first building section may be formed from a range of construction options.
- a range of construction options may be employed for the construction of different parts, sections or zones of the first building section.
- the first building section comprises a lower storey and at least one upper storey
- different storeys may be of different constructions, or at least partly different.
- All of the construction options described above represent different methods for forming the load-bearing walls, and/or the load-bearing structure of such walls, of the first building section.
- the blockwork e.g. bricks and/or cement blocks
- the blockwork form the load-bearing structure of the wall.
- a construction option for the second building section described elsewhere in this document is the provision of a metal (e.g. steel) frame support structure, suitably forming external walls of the second building section.
- a metal e.g. steel
- the metal frame support structure may comprise a plurality of structural elements (e.g. beams, columns) which are arranged to form the frame structure, each structural element being connected to at least one adjacent structural element. It may be preferred to connect the structural elements using a welding process, so that the adjacent elements are welded to one another. This may provide a homogeneous support structure, which may assist in distributing loads applied to the section across the structure.
- welding processes may be of particular use where hot-formed metal is employed for structural elements (described elsewhere in this document). In composite frame structures partly comprising such hot-formed elements, only the hot formed elements may be welded. In a variation, other joining methods may be employed, including mechanical connectors (e.g. nut and bolt) and bonding such as with an adhesive.
- mechanical connectors e.g. nut and bolt
- Another construction option for the second building section is the use of timber/wood (or wood-based products/ composites) for the frame support structure.
- wood-based products/composites include laminates such as plywood, and products made from wood fibres or particles.
- Structural elements of the frame may be connected using mechanical fixings and/or adhesive.
- Another construction option for the second building section is the use of cement-based products for the frame support structure.
- Examples include concrete (suitably reinforced concrete), which may have a use particularly in the formation of structural elements of the frame support structure .
- a panel-based approach may be taken, in which the second building section is assembled from a series of cement-based (e.g. concrete such as reinforced concrete) panels.
- the panels may form at least part of a wall, floor and/or roof of the second building section (and such is not limited to cement-based panels).
- the panels may be self-supporting and/or may comprise an integral support, which may negate the need for a support structure such as a frame.
- Each panel may be connected to at least one adjacent panel. Connection may be achieved using mechanical fixings, adhesive and/or by shaping edge regions of the panels to define connectors which engage with a corresponding connector on the adjacent panel(s).
- one or more panel may be coupled to the frame, to form at least part of a wall, floor and/or roof of the second building section.
- Suitable materials for forming the panels including metals/metal alloys, cement-based (e.g. concrete such as reinforced concrete), wood or wood-based, plastics (polymeric) materials, and composite materials such as fibre (e.g. glass, carbon) reinforced plastics.
- the second building section comprises a plurality of subsections or units, as described elsewhere in this document, at least one of the subsections may be (at least partly) of a different construction to at least one other.
- the support structure may comprise a plurality of primary load-bearing columns or posts.
- the second building section may comprise a plurality of comers (e.g. it may be generally quadrilateral in shape, such as rectangular, having four comers).
- a primary load-bearing column or post may be provided at, adjacent or near each comer, or may each define a comer, of the second building section.
- the frame support structure may also comprise a plurality of roof beams, which may together define (or support) a roof of the section. Each roof beam may be disposed at, or may define part of, a perimeter of the frame support structure. The roof beams may each be connected between a pair of the primary load-bearing columns.
- the primary load-bearing columns and roof beams may together define a perimeter frame support structure.
- the frame support structure may also comprise a plurality of floor beams, which may together define (or support) a floor of the section. Each floor beam may be disposed at, or may define part of, a perimeter of the frame support structure.
- the structural elements forming the frame support structure may be provided as a kit of parts which can be assembled in a factory or facility.
- the factory or facility may be provided offsite, or onsite (e.g. as part of a larger building site, remote from a plot forming a final location for the building). This may facilitate construction of the second building section, to form the internal volume of the second building section, in the facto ry/facility.
- metal frame construction options for the first and/or second building sections comprise hot-formed (e.g. hot-rolled) structural elements.
- Alternative construction options can employ cold- formed metal structural elements, including light gauge steel frame (LGSF) structural elements.
- LGSF light gauge steel frame
- a metal frame construction may be employed which comprises both hot and cold-formed structural elements.
- a perimeter frame support structure may comprise hot-formed structural elements (such as beams and columns) as described above, and a plurality of support trusses comprising cold-formed metal structural elements, which may be arranged between and/or connected to: a pair of beams in the support structure; a pair of load-bearing support columns; and/or at least one beam and at least one load-bearing support column.
- hot-formed metal structural elements may provide a degree of strength and rigidity, facilitating transport of the second building section, construction of the building at the final location, and resistance to applied loading during use.
- the use of cold-formed metal may have speed and cost benefits during construction. Providing a combination of hot and cold- formed metal structural elements may allow a balance of these benefits to be achieved.
- a purely hot-formed metal structure of the type described above may provide a point loaded structure (in which loads are transferred from beams to the comer support columns/posts).
- Providing a purely cold-formed metal structure may however provide a line loaded structure, in which loads applied to a beam are supported along its length, by an arrangement of trusses connected to the beam.
- a combination of hot and cold-formed metal structural elements may provide a combined line and point-loaded support structure. Handling (lifting) of a point loaded structure may also be easier, in comparison to a line loaded one.
- first and/or second building sections A wide range of outer (exterior) surface finishes may be employed for the first and/or second building sections.
- options for constructing the first building section include clay bricks and/or cement blocks, a timber frame and blockwork/masonry construction, a timber frame and cladding construction, and a metal frame construction optionally comprising panels coupled to the frame (and combinations thereof). It will be understood that the bricks/blocks, cladding and panels may form an outer surface finish on or of the first building section.
- Other options include, but are not limited to: a wooden or wood-based finish (e.g.
- panels/boards or planks a cement-based render/plaster finish (or other suitable time-setting materials); a panel (or board) finish comprising cement-based, metal/metallic, plastics (polymeric), or fibre reinforced plastics material; a tiled finish e.g. of clay and/or cement-based material; solar (e.g. photovoltaic) panels; and glass arranged for example as a curtain wall suspended from a support frame.
- a core of the building section) s which may be or may define the load bearing support structure. Any desired combination of core and outer finish disclosed in this document may be selected.
- the outer finish of at least some (optionally all) walls of the first building section may be different from the outer finish of at least some (optionally all) of the externally facing walls of the second building section.
- One or more wall of the first and/or second building section may have a different outer finish to at least one other wall of the respective section) s).
- All of the cement-based products described herein may be manufactured using any suitable process, including but not limited to 3D printing.
- One particular option is the 3D printing of panels and structural elements, optionally in a factory or facility provided at the site (but spaced from a plot forming a final location for the building).
- the second building section may be arranged so that it is built-in to the building, which may be achieved by encapsulating or enveloping the second building section within an outer layer of the building.
- the outer layer may cover two or more (and optionally all) external walls of the second building section, which external walls may face outwardly of the building following connection of the first and second sections.
- the outer layer may comprise any of the material options set out above as outer surface finishes, including brick/block, panels/boards, render etc.
- One such built-in construction option comprises forming the first building section from a series of structural panels (e.g. SIPs, concrete, wood or wood-based) to define an outer perimeter of the building, and then positioning the second building section within said perimeter.
- the panels may comprise an insulation material/layer (or may be subsequently insulated).
- the second building section may be insulated by the insulation of/applied to the panels of the first section. This option may be particularly suited to a second building section comprising a metal frame support structure.
- first and second building sections optionally in which the second building section provides between around 15% to 30% of the total surface area of the building.
- different outer finishes are applied to the first and second building sections (or at least to one or more wall of each section, in comparison to one or more wall of the other section)
- up to around 70% of the external surface of the building may have a first outer finish
- up to around 30% may have a second (different) outer finish.
- This may be achieved by providing the first outer finish on the first building section.
- up to around 70% of said outer finish may be brick (or brick effect e.g. brick slips, which may be mounted on panels or boards), and may be applied to/form the first building section.
- An outer finish other than bricks or a brick effect may be provided for the second building section.
- a roof of the building which may be a single/common roof structure, may overlie both the first and second building sections. This may serve to tie (or connect) the first building section relative to the second section, to provide structural rigidity to the constructed building.
- the roof may be supported by and/or connected to one or more of the building sections.
- the roof may comprise a plurality of roof trasses, each of which may be supported by and/or connected to one or more of the building sections.
- the roof trusses can be formed of any suitable material, including but not restricted to wood and wood-based products/composites, and cold-formed metal (e.g. LGSF). It will be understood that, in a roof constructed using roof trusses, the trasses are pre-formed and brought to the final location for installation.
- the trusses may be constructed offsite, or onsite e.g. in a factory or facility forming part of a larger plot, as described elsewhere in this document.
- the roof may be a stick-built construction, in which structural components of the roof (e.g. load bearing support structures of the roof) are constructed on site using a supply of timber cut to required sizes.
- Further options include panels or boards, which may be secured to a roof support frame structure, or which may be self-supporting. Suitable materials for the panels or boards include those described above, in particular cement-based panels, composite e.g. SIP panels, and woodbased panels.
- Other options include forming panels using cold-formed metal (e.g. LGSF), hot-formed metal (e.g. steel) structures, and combinations of the two.
- the first building section may have a total internal floor space. Where the first building section comprises lower and upper storeys, this may be the sum of: an internal floor space defined by its lower storey; and an internal floor space defined by its upper storey (or all its storeys where there are more than two). If there is only one storey then the total internal floor space is the floor space of that storey.
- the hybrid residential building may have a total internal floor space, which may be the sum of the total internal floor space of the first building section, and an internal floor space of the second building section.
- the second building section may define at least around 15% of the total internal floor space of the building, optionally at least around 20%, optionally at least around 25%, optionally at least around 30%, optionally at least around 35%, and optionally up to around 40% of said floor space.
- the first building section may define no more than around 85% of the total internal floor space of the building, optionally no more than around 80%, optionally no more than around 75%, optionally no more than around 70%, optionally no more than around 65%, and optionally no more than around 60% of said floor space.
- a ratio of the total internal floor space of the building provided by the second building section relative to the total internal floor space of the building provided by the first building section may be around 15:85, optionally around 20:80, optionally around 25:75, optionally around 30:70, optionally around 35:65, and optionally around 40:60.
- a particularly preferred internal floor space provided by the second building section may be in a range of around 28% to around 36% (and so first building section internal floor space of around 72% to around 64%, and ratio in a range of around 28:72 to around 36:64).
- the second building section could provide up to around 50% of the total internal floor space of the building (and so around a 50:50 ratio of second building section floor space relative to the total).
- Arranging the second building section to provide between around 15% to 40% of the total internal floor space of the building, and in particular between around 28 and 36%, may provide similar benefits to those described elsewhere in this document, in relation particularly to internal volumes.
- a further benefit applying to both floor space and volume proportions disclosed herein may be that it maximises the space in the second building sections available for providing the circulation spaces/access/access routes described elsewhere in this document. This may apply particularly in embodiments in which a kitchen is provided in the first building section, thereby freeing up space in the second building section for other purposes.
- a kitchen is provided in the first building section, optionally serviced by the second building section, a plurality of potential positions or locations for the kitchen may be defined, suitably within the first building section. This may provide flexibility of a kitchen position to suit particular needs/desires of an occupant, and/or future adjustment of a kitchen position e.g. during a renovation.
- a plurality of different sets of connectors may be provided by the second building section, to suit the different kitchen positions.
- the building may comprise a ventilation system.
- the first building section comprises one or more duct (for the supply of external air into, and the withdrawal of internal air from, the first building section)
- said duct(s) may be installed in the first building section during (or after) construction of the section at the final location.
- a majority (or all) of any conduits, cables, wires or the like required for the provision of services into the first building section may be installed during (or after) its construction at the final location.
- This contrasts with ducts, conduits etc. in the second building section which may be installed during construction of the second building section away from the final location, suitably prior to its transport to the final location. Decisions e.g. on routing of the services can therefore be made and/or adjusted as required at the construction site.
- the second building section may comprise a plurality of subsections or units, which may together form the building section, and/or may each form part of the second building section.
- the subsections may be spaced apart so that they are not in contact with one another (or at least not in direct contact), or so that they are in contact e.g. stacked one on top of another or side-by-side.
- Subsections may be spaced apart at a common level within the constructed building (e.g. at or on the same storey), spaced vertically (e.g. at or on different storeys), and/or spaced horizontally at different levels (e.g. at or on different storeys). Where subsections are stacked, they may be aligned, or may partially overlap (e.g. so that part of an upper subsection only partly overlaps a lower subsection, or part of either subsection extends beyond a boundary of the other subsection, considered in plan view).
- the subsections may be arranged so that one of the subsections services one or more other subsection.
- the services may be water, gas etc. Where the subsections are spaced apart, the services may pass from the subsection providing the services, via (e.g. through) the first building section to the one or more other subsection.
- services include e.g. sewerage, it will be understood that flow of grey water/waste may occur from the serviced subsection to the servicing subsection. This may also apply in relation to sewerage flow between the first and second building sections, described elsewhere in this document.
- the services may be supplied to the subsection which is arranged to provide the services by the services hub referred to elsewhere in this document.
- the building may comprise at least one further building section which defines an internal volume and is transportable to the final location in a substantially assembled form, in like fashion to the second building section.
- the at least one further building section may be arranged to be connected to one or both of the first and second building sections, or to be provided separately (e.g. spaced from and out of contact with) one or both of said sections.
- the at least one further section may be provided with services by the second building section, optionally by one of its subsections (where applicable).
- Options for insulating the building include constructing the first and/or second building section from panels which comprise (integral) insulation material. In other options, insulation may be applied to the first building section, and/or optionally to the second building, at the final location and so during construction of the building (e.g. following construction of the first building section, and/or following connection of the first and second sections).
- Internal walls of the first building section are disclosed herein as being potentially removable and/or being absent a support structure (non load-bearing) . Such internal walls may be capable of being totally removed so that the first section can be stripped back to perimeter walls, e.g. in a remediation or upgrade.
- the second building section may comprise more than one bathroom, and may (particularly for larger buildings) comprise two bathrooms (or combinations of bathrooms, washrooms and containers). Two or more of bathrooms/ensuites/washrooms (e.g. two bathrooms orbathroom/ensuite) may share a common (single thickness) wall.
- the second building section can comprise one or more of a door and a window. Such may be fitted offsite, prior to transportation of the section to the final location (i.e. in a factory or facility).
- the second building section can provide a circulation space, which may provide: access between upper and lower living spaces of the first building section; access into the first building section from the outside of the building; and/or access between (isolated) first and at least one further living space of the first building section.
- a majority of the total circulation space in the building may be provided by the second building section.
- the second building section can provide between around 60% to around 100% of the total circulation space.
- the circulation space may be considered to include space providing a pathway: from a front (or main) doorway of the building provided by the second building section to a stairs or other means (e.g. a lift) providing access to another storey; and/or from the second building section into the first building section (e.g. at a same level or storey, such as from the second building section into a room of the first building section, such as a living room).
- hybrid residential building forming a domestic dwelling such as a house (including but not restricted to detached, semi-detached, terraced and single storey /bungalow). It will be understood that the dwelling will typically be a single family (or single residential group) occupancy building or property, as is the case with the exemplary houses listed.
- hybrid residential building, system and method set out above may have any of the other features disclosed elsewhere in this document, particularly in or with reference to any one or more of the first to thirty -fifth aspects of the invention.
- Fig. 1 is a perspective view of a hybrid residential building according to an embodiment of the invention
- Fig. 2 is a plan cross-sectional view of the building shown in Fig. 1 ;
- Fig. 3 is a cut-away perspective view of a first building section of the building shown in Fig. 1, with a second building section of the building removed;
- Fig. 4 illustrates general methodology principles of the invention
- Fig. 5 illustrates a hybrid residential building system or kit according to an embodiment of the invention
- Fig. 6 illustrates further general methodology principles of the invention
- Figs. 7 and 8 illustrate steps in methods of modifying a hybrid residential building according to embodiments of the invention
- Fig. 9 illustrates another hybrid residential building system or kit according to an embodiment of the invention.
- Fig. 10 illustrates further general methodology principles of the invention
- Fig. 11 illustrates a further hybrid residential building system or kit according to an embodiment of the invention
- Fig. 12 illustrates further general methodology principles of the invention
- Fig. 13 illustrates another hybrid residential building system or kit according to an embodiment of the invention
- Fig. 14 illustrates further general methodology principles of the invention
- Fig. 15 illustrates another hybrid residential building system or kit according to an embodiment of the invention.
- Figure 16 is a perspective view of a hybrid residential building in accordance with another embodiment of the invention.
- Figure 16A is an enlarged cross-sectional side view of the building shown in Figure 16, illustrating an interface between first and second building sections of the building;
- Figures 17 and 18 are plan cross-sectional views of the building illustrated in Figure 16, showing lower and upper storeys respectively of the building;
- Figures 19 and 20 are further views of the building corresponding to those of Figures 17 and 18, showing other features;
- Figures 21 and 22 are further views of the building corresponding to those of Figures 17 and 18, showing other features;
- Figures 23 and 24 are plan cross-sectional views of a building according to another embodiment of the invention, showing lower and upper storeys respectively of the building;
- Figures 25 and 26 are plan cross-sectional views of a building according to another embodiment of the invention, showing lower and upper storeys respectively of the building;
- Figures 27 and 28 are further views of the building corresponding to those of Figures 25 and 26, showing other features;
- Figure 29 is a partially cut-away perspective view of the building shown in Figure 25;
- Figure 30 is a plan cross-sectional view of a building according to another embodiment of the invention, showing a lower storey of the building;
- Figure 31 shows plan cross-sectional views of lower and upper storeys of a building according to another embodiment of the invention, the storeys presented side-by-side;
- Figure 32 is a partially cut-away perspective view of a wall structure forming part of an external wall of the first building section of the building shown in Figures 16 to 22;
- Figure 33 is a partially cut-away perspective view of a wall structure forming part of an external wall of the second building section of the building shown in Figures 16 to 22;
- Figure 34 is a front view of an alternative wall structure forming part of an external wall of the first building section of the building shown in Figures 16 to 22;
- Figure 35 is a simple perspective outline of the first building section, illustrating walls that can incorporate the wall structure of Figure 34;
- Figure 36 is a partially cut-away perspective view of another alternative wall structure forming part of an external wall of the first building section of the building shown in Figures 16 to 22;
- Figure 37 is a partially cut-away perspective view of another wall structure forming part of an external wall of the first building section of the building shown in Figures 16 to 22;
- Figure 38 is a perspective view of the building shown in Figure 25, similar to the view of Figure 29, illustrating a frame support structure of its second building section;
- Figure 39 is a front view of an alternative wall structure forming part of an external wall of the second building section of the building shown in Figures 25 to 29;
- Figure 40 is a wire-frame perspective view of the building shown in Figures 25 to 29, illustrating a roof structure of the building;
- Figure 41 (on the same sheet as Figure 39) is a front view of a roof truss forming part of the roof structure shown in Figure 40;
- Figures 42 to 44 are views of the building shown in Figure 16, illustrating various different outer surface finishes on its first and second sections;
- Figure 45 is a solid perspective view of the building shown in Figure 40, illustrating an outer finish on its building sections;
- Figures 46 and 47 are plan cross-sectional views of a hybrid residential building in accordance with another embodiment of the invention.
- a hybrid building 100 (which may also be referred to as a modular building) is shown which comprises a first building section 110 and a second building section 120.
- the building 100 is a residential building, or a domestic dwelling, for example a detached house.
- the first building section 110 can take the form of a dock, reference to which may be made throughout this document.
- the term “dock” is used to describe a building section to which another building section may be docked, installed, connected, or attached.
- the first building section 110 is an on-site construction at a final location of the building 100, which may be a fixed, on-site location. That is, the building 100 has a final, fixed, on-site location. In this exemplary embodiment, said final, fixed, on-site location is determined by construction plans and fixed by virtue of building foundations.
- the term “on-site location” is used to refer to the building site, which will be understood to refer to the immediate proximity of the building 100 and the entire building site, including housing estate, on which the building 100 is to be built. It will be understood that the site may be a large building/construction site comprising a plurality of plots, the final location for the building 100 being provided by one of said plots.
- the second building section 120 can take the form of a module, reference to which may be made throughout this document.
- module is used to describe a building section which is dockable, installable, connectable, or attachable to another building section, particularly a first building section in the form of a dock.
- the second building section 120 is transportable to the final location in a substantially assembled form.
- the first building section 110 is configured to receive the second building section 120.
- the second building section 120 is connected to and received by the first building section 110.
- the second building section 120 is connected to the first building section 110 at the final location of the building 100, thereby to provide said building 100 at the final, fixed, on-site location.
- the first building section 110 is preconfigured to receive the second building section 120. That is, the first building section 110 is constructed with the knowledge and design that a second building section is to be subsequently connected, and the first building section 110 is thus preconfigured for connection and receipt of the second building section. This could relate to the shaping of the first building section 110, through to sealing and connection features.
- the first building section 110 in the illustrated embodiment, is configured to removably receive the second building section 120. That is, the first building section 110 is configured to receive the second building section 120 in a receivable manner such that the second building section 120 canbe removed, if and when desired, to facilitate replacement and/or modification of the second building section 120.
- the second building section 120 is portable, in a form to be connected to and received by the first building section 110. That is, the second building section 120 canbe formed in a single piece, or as a structural whole, so that it canbe transported to the first building section 110 in a constructed or substantially constructed form, to be connected to the first building section.
- the first building section 110 is configured to receive the second building section 120, so that the first and second building sections may be connected.
- the first building section 110 and the second building section 120 may be provided with malefemale structures, for facilitating the connection, or guiding the connection. This might also facilitate an at least partial sealing of or between the second building section 120 and the first building section 110.
- the first building section 110 might closely abut against the second building section 120, and there may be no male-female structures. This might also facilitate an at least partial sealing of or between the second building section 120 and the first building section 110.
- the first building section 110 has first and second portions 112 and 114 which together define the first building section, and which are connected so that the first and second portions are disposed at a non-parallel angle relative to one another.
- the first and second portions 112 and 114 are substantially elongate, and have respective main axes 112a and 114a.
- the first and second portions 112 and 114 are arranged so that the first portion main axis 112a is disposed at a non-parallel angle relative to the second portion main axis 114a.
- the second building section 120 is connected to both of the first and second portions 112, 114.
- the illustrated first building section 110 has a substantially L- shaped cross-section in plan view, the first and second axes 112a and 114a being disposed substantially perpendicular to one another.
- first building section 110 has an L-shaped cross section, having two elongate regions 112, 114 perpendicularly connected and the second building section 120 is connected to both elongate regions 112, 114 of the L-shaped cross-section.
- the second building section 120 comprises first and second external walls 120a and 120b disposed adjacent one another, and which together form a comer 120c of the second building section.
- the first and second external walls 120a, b are disposed at non-parallel angles relative to one another, and in the illustrated embodiment are substantially perpendicular.
- the first and second external walls 120a, b are each connected to a respective one of the first and second portions 112, 114 of the first building section 110, so that the comer 120c of the second building section 120 is disposed within the building 100, when the building sections are connected.
- the angle between the first and second portions 112, 114 of the first building section 110 is the same as the angle between the first and second external walls 120a, b of the second building section 120.
- the first building section 110 has one or more open faces 130.
- the module has two open faces.
- the first building section 110 is configured to removably receive the second building section 120 at the two open faces 130 of the dock.
- a method of constructing a hybrid residential building 100 is shown.
- Step 400 comprises forming a first building section 110 at a final (fixed, on-site) location of the building 100, the first building section 110 being configured to receive a second building section.
- Step 410 comprises transporting a second building section 120 from a different location to the on-site location.
- Step 420 comprises connecting the second building section 120 to the first building section 110 thereby to construct the building 100.
- the illustrated steps need not necessarily be carried out in the specified order.
- the second building section 120 could be transported to the site and positioned at the final location of the building 100, and the first building section 110 then constructed and connected to the second building section.
- Optional step 430 comprises manufacturing the second building section at the different location.
- the different location is an off-site location.
- the different location is a manufacturing factory/facility , or manufacturing building, for manufacturing the second building section to be used in constructing the building.
- the manufacturing facility is generally provided away from the construction of the first building section 110, and generally off-site, where there is space for a large-scale facility for manufacturing the second building sections 120.
- the manufacturing facility could be provided on or as part of such a larger building site (but distanced from a plot forming a final location for the building 100), and could be used for constructing a plurality of second building sections which are to be used in the construction of a plurality of buildings.
- the building system 500 comprises a first building section 510 (which again may take the form of a dock) configured to be constructed on-site at a final location for a building 100, and which is configured to receive a second building section.
- the building system 500 further comprises a second building section 520 (which may take the form of a module) which is connectable to and receivable by the first building section 510.
- the first building section 510 and second building section 520 may be the first building section 110 and second building section 120 as described above and herein in relation to the building 100.
- the building 100 comprises a first building section 110 (which again may take the form of a dock) constructed at a final location of the building 100.
- the first building section 110 is configured to receive a second building section.
- the modular building 100 further comprises a connected second building section 120 (which may take the form of a module).
- the second building section 120 is removably connected to the first building section 110 in the constructed building 100.
- Step 600 comprises removing the second building section 120 from connection with the first building section 110.
- Step 610 comprises connecting a further second building section 150 to the first building section 110 thereby to modify the building 100.
- the method of modifying the building 100 comprises modifying the second building section 120 and connecting the modified building section, as the further second building section 150, to the first building section.
- the second building section 120 is transported to an off-site location.
- the second building section 120 is moved to a module modification facility for modifying the second building section 120 to form the further second building section 150, which is to be connected to the first building section 110.
- the further second building section 150 is then transported back to the final (fixed, on-site location) where the building 100 is located.
- the second building sections 120 and 150 are both portable.
- a further second building section 150 is manufactured without modification of the original second building section 120. That is, the further second building section 150 is manufactured independently without using or starting from the original second building section 120.
- the further second building section 150 has newer components than the original second building section 120.
- the further second building section 150 is separately constructed off-site and can be manufactured in a module manufacturing facility. The further second building section 150 is then transported from the module manufacturing facility to the location of the building 100.
- the second building section 120 and/or the further second building section 150 of either embodiment contains a staircase, W/C, washroom, delivery drop off area, hallway, bathroom, an en-suite, front doorway (and door), side doorway (and door), and windows.
- the skilled person will appreciate that the second building sections 120, 150 therefore comprise almost all of the important facilities and rooms of a residential building. In this way, modification of the building 100 is readily performed, by replacement of the original second building section 120 with the further second building section 150.
- the building system 900 comprises a first building section 910 (which again may take the form of a dock) configured to receive a second building section.
- the building system 900 further comprises a second building section 920 (which may take the form of a module).
- the building system further comprises a further second building section 950, which may again take the form of a module.
- the first building section 910 and second building section 920 may be the first building section 110 and second building section 120 as described above and herein in relation to the building 100.
- Step 1000 comprises providing a second building section 120, the second building section 120 having one or more external walls.
- Step 1010 comprises connecting the second building section 120 to the first building section 110 thereby to provide the one or more external walls of the second building section 120 as one or more internal walls of the first building section 110. That is, the second building section 120 is connected to the first building section 110 so that the external walls of the second building section 120 are provided as internal walls of the building 100.
- Connecting the second building section 120 to the first building section 110 provides the one or more external walls of the second building section 120 as one or more separating walls between the second building section 120 and the first building section 110.
- the separating walls provide a fire break between the second building section 120 and the first building section 110. That is, the separating walls may be fire-resistant, or fire-proof, walls.
- the one or more external walls of the second building section 120 provide all walkway exits from the first building section 110. That is, the external walls of the second building section 120 comprise doors and other walkway openings from the first building section 110 to the second building section 120, and furthermore to outside the building 100 (and so to the building exterior).
- the first building section 110 has one or more open faces.
- Step 1020 comprises docking the second building section 120 to the first building section 110 to close the one or more open faces and thereby construct the building 100. Connecting the second building section 120 to the first building section 110 to provide the one or more internal walls of the first building section 110 closes internal building volumes provided within the first and second building sections 110 and 120.
- the second building section 120 and the first building section 110 are each self-supporting. That is, the second building section 120 and the first building section 110 are constructible independently as separate building section structures.
- the first building section 110 comprises external walls comprising a support structure for supporting the building section, and one or more internal walls. When the second building section 120 is connected to the first building section 110, the one or more external walls of the second building section 120 provide structural support to the first building section 110.
- Each of the second building section 120 and first building section 110 comprise a metal (typically steel) frame support structure, which is provided in the external walls of the second building section 120 and the first building section 110. Parts of the steel frame support structure of the first building section 110 are shown in Figure 3 and indicated by reference numeral 198.
- the steel frame support structure comprises structural elements including e.g. beams and columns, which are typically hot-formed (e.g. hot rolled) and may for example be I-beams.
- the first building section 110 also comprises one or more relocatable (i.e. moveable) and removable internal walls. Said internal walls are absent the steel frame support structure.
- the metal frame structure of the first and/or second building sections may comprise hot-formed (e.g. hot rolled) structural elements. This may be beneficial as such hot-formed structural elements can span reasonably large distances, which can facilitate the formation of apertures (e.g. doorways) at perimeters of the building sections.
- a hybrid residential building 100 comprises a first building section 110 (which again may take the form of a dock) and a second building section 120 (which may take the form of a module).
- the second building section 120 has one or more external walls and is connected to the first building section 110 thereby to provide one or more external walls as one or more internal walls of the first building section 110.
- the one or more external walls of the second building section 120 form a separating wall between the second building section 120 and the first building section 110.
- the building system 1100 comprises a first building section 1110 (which again may take the form of a dock).
- the building system 1100 further comprises a second building section 1120 (which may take the form of a module), the second building section 1120 having one or more external walls providable as one or more internal walls of the first building section 1110.
- the second building section 1120 is connectable to and receivable by the first building section 1110 to provide the external walls as one or more internal walls of the first building section.
- the first building section 1110 and second building section 1120 may be the first building section 110 and second building section 120 as described above and herein in relation to the building 100.
- a hybrid residential building 100 comprises a first building section 110 (which again may take the form of a dock), the first building section 110 being configured to receive a second building section.
- a second building section 120 (which may take the form of a module) is connected to and received by the first building section 110.
- the building 100 is serviced with one or more services via the second building section 120.
- the one or more services are optionally received by the second building section 120 from external to the building 100.
- the one or more services are water; gas; electric; telecoms and air supply.
- the electrical power and telecoms can be wirelessly transmitted to the first building section 110 by the second building section 120, for example using a wireless power transfer (WPT) system and Wi-Fi technology.
- the second building section 120 and first building section 110 comprise connectors between the building sections for facilitating the provision of services from the second building section 120 to the first building section 110.
- the one or more services comprise a water supply
- all wet facilities may be provided within the second building section 120, which leads to a better arrangement of fluidic conduits and management of water flow in the building 100.
- the first building section 110 comprises internal walls 116.
- the internal walls 116 are devoid of electrical cabling and fluidic conduits.
- the internal walls 116 are relocatable (i.e. moveable) and removable. As described above, said internal walls 116 are absent the steel frame support structure.
- the first building section 110 further comprises a services hub 140.
- a services hub 140 is sometimes referred to as a “plant room”, “mechanical room” or “boiler room” .
- the second building section 120 is serviced with one or more services via the services hub 140. That is, the second building section 120 is serviced with one or more services via the services hub 140, and the building 100 is serviced with one or more services via the second building section 120.
- the services hub 140 is accessible externally to the building 100.
- the services hub 140 is only accessible externally to the building 100, although options include an internal access route.
- the services hub 140 is thermally insulated relative to a remainder of the building, and may comprise a thermal envelope which insulates the remainder of the building from air exterior to the building. This can be achieved by insulating walls of the building defining the hub, or indeed walls of the hub itself.
- the services hub 140 does not form part of the modular building, and may be, for example, an outbuilding.
- the building 100 comprises a first building section 110 (which again may take the form of a dock), the first building section 110 being configured to receive a second building section.
- the building 100 further comprises a second building section 120 (which may take the form of a module), which is connected to and received by the first building section 110.
- Step 1200 comprises servicing the building 100 with one or more services via the second building section 120.
- the building system 1300 comprises a first building section 1310 (which again may take the form of a dock), the first building section 1310 being configured to receive a second building section.
- the building system 1300 further comprises a second building section 1320 (which may take the form of a module), which is connectable to and receivable by the first building section to form a hybrid residential building 1330.
- the building 1330 is serviceable with one or more services via the second building section 1320 when connected to the first building section 1310.
- the first building section 1310 and second building section 1320 forming the building 1330 may be the first building section 110 and second building section 120 as described above and herein in relation to the building 100.
- a hybrid residential building 100 comprises a first building section 110 (which again may take the form of a dock) having one or more open faces 130.
- the building 100 further comprises a second building section 120 (which may take the form of a module) docked to the first building section 110 and closing the one or more open faces 130.
- the first building section 110 has two open faces 130.
- the second building section 120 and the first building section 110 are each self-supporting. That is, the second building section 120 and the first building section 110 are constructible independently as separate building section structures.
- the first building section 110 comprises external walls comprising a support structure for supporting the first building section 110, and one or more internal walls. When the second building section 120 is connected to the first building section 110, the one or more external walls of the second building section 120 provide structural support to the first building section 110.
- Each of the second building section 120 and the first building section 110 comprise a metal (e.g. steel) frame support structure, which is provided in the external walls of the building sections.
- the first building section 110 comprises one or more relocatable (i.e. moveable) and removable internal walls. Said internal walls are absent the steel frame support structure.
- the second building section 120 extends over the open face of the first building section 110.
- the second building section 120 connects to the first building section structure, thereby to form the hybrid residential building 100.
- Step 1400 comprises providing a second building section 120.
- Step 1410 comprises docking the second building section 120 to the first building section 110 to close the one or more open faces.
- Docking the second building section 120 to the first building section 110 to close the one or more open faces closes internal building volumes defined within the first and second building sections. Docking the second building section 120 to the first building section 110 closes all open faces of the first building section 110. Docking the second building section 120 to the first building section 110 to close the open faces provides the external structure of the building 100 and some of the external walls of the building 100, which are provided by some of the external walls of the second building section 120.
- step 1420 comprises connecting the second building section 120 to the first building section 110 thereby to provide the one or more external walls of the second building section 120 as one or more internal walls of the first building section 110.
- the building system 1500 comprises a first building section 1510 (which again may take the form of a dock) having one or more open faces.
- the building system 1500 further comprises a second building section 1520 (which may take the form of a module) dockable to the first building section to close the one or more open faces of the first building section 1510.
- the first building section 1510 and second building section 1520 may be the first building section 110 and second building section 120 as described above and herein in relation to the building 100.
- the hybrid residential buildings shown in Figures 1 to 15 and described above can be formed by constructing the respective first building section at the final, fixed, on-site location of the building and then connecting their second building section to the dock.
- the buildings can also be formed by transporting their respective second building section to the site and positioning them at the final location, and then constructing their first building section and connecting it to the second building section.
- FIG 16 there is shown a perspective view of a hybrid residential building in accordance with another embodiment of the invention, the building indicated generally by reference numeral 1600.
- Figures 17 and 18 are also referred to, which are plan cross-sectional views showing lower and upper storeys respectively of the building 1600.
- the building 1600 again takes the form of a detached house or dwelling, and comprises a first building section 1610 and a second building section 1620.
- the first building section 1610 is an on-site construction at a final location for the building, and comprises a lower storey 1611 defining an internal volume 1613 that provides a lower living space 1615 within the building, and an upper storey 1617 defining an internal volume 1619 that provides an upper living space 1621 within the building 1600.
- the second building section 1620 also defines an internal volume 1623, and is transportable to the final location (e.g. from an off-site manufacturing facility) in a substantially assembled form.
- the first and second building sections 1610 and 1620 are connectable at the final location to form the building 1600.
- the residential building 1600 is a hybrid building in that part of the building is an on-site construction at the final location (the first building section 1610), and part is constructed separately and transported to the final location (the second building section 1620).
- the building 1600 is formed at the final location by connecting the first and second building sections 1610 and 1620 together. It will be understood that this definition of a hybrid residential building applies to the further buildings described elsewhere in this document, including the embodiments of Figures 1 to 15.
- the first and second building sections 1610 and 1620 are configured so that an access route between the upper and lower living spaces 1621 and 1615 of the first building section 1610 passes through the second building section 1620.
- the access route is shown schematically in Figures 16 to 18, and indicated by reference numeral 1625.
- the access route 1625 facilitates movement between the upper and lower living spaces 1621, 1615 of the first building section 1610 by an occupant of the building.
- the access route 1625 passes from the internal volume of one of the upper and lower storeys 1617, 1611 of the first building section 1610, into the internal volume 1623 of the second building section 1620, and from the internal volume of the second building section to the internal volume of the other one of the upper and lower storeys of the first building section.
- substantially the entire access route 1625 is defined by the second building section 1620.
- an access route 1625 which passes through the second building section 1620 offers numerous advantages which are discussed elsewhere in this document. Particular advantages however include that: wear and tear occurring due to the movement of people between the upper and lower living spaces 1621 and 1615 occurs primarily in the second building section 1620 (which can be removable and replaceable); and that on-site construction of the first building section 1610 can be achieved relatively cheaply and quickly.
- the first building section 1610 is an on-site construction in that it is constructed on the building site, at the final location for the building 1600, suitably using an arrangement of parts, components and/or materials which are provided at the site.
- Options include: a blockwork/masonry construction e.g. of clay bricks and/or cement blocks; a timber frame and blockwork/masonry construction; a timber frame and cladding construction; a metal frame construction (optionally comprising panels coupled to the frame e.g. structural insulated ‘ SIP’ panels); a time-setting 3D printed construction e.g. of a cementitious material; and combinations thereof.
- the second building section 1620 is transportable to the final location in a substantially assembled form.
- the second building section 1620 is constructed to a state in which: it can be transported safely to the site for connection to the first building section 1610 (i.e. it has sufficient structural integrity/rigidity for transport purposes); minimal further work is required to be carried out in order to connect the second building section 1620 to the first building section 1610; and/or minimal further work is required to complete a portion of the building 1600 formed by the second building section 1620.
- Such further work may be of a structural and/or weatherproofing nature, and may exclude work associated with a final fit-out of the second building section 1620, for example of a decorative nature (in particular the application of ‘perishable’ materials such as plaster/plasterboard, decorative panels and surface finishes such as paint).
- the first building section 1610 is substantially L-shaped, as discussed above.
- the second building section 1620 defines orforms a comer (external) of the building, when connected to the first building section 1610, and closes two open faces 1630 of the first section.
- the second building section 1620 also includes a comer disposed within the building 1600, when the sections 1610 and 1620 are connected, which is defined by first and second perpendicularly disposed (adjacent) external walls of the second section, which form internal walls in the assembled building.
- the access route 1625 passing through the second building section 1620 is defined primarily by a staircase 1627 provided within the second building section, which is shown in the plan sectional views of Figures 17 and 18.
- the staircase 1627 passes upwardly from a ground level 1629 of the second building section 1620 to an upper floor level 1631.
- the internal volume 1613 of the first building section lower storey 1611 is isolated from the internal volume 1619 of its upper storey 1617.
- the internal volumes 1613 and 1619 are isolated in that they are physically out of communication with one another.
- the second building section 1620 provides access between the internal volumes of the different storeys 1611 and 1617 when the first and second building sections 1610 and 1620 are connected, the access being provided through the second building section.
- An occupant wishing to pass from the lower storey internal volume 1613 to the upper storey internal volume 1619 (or vice-versa) must therefore enter the second building section 1620 in order to access the staircase 1627.
- the second building section 1620 is configured so that its internal volume 1623 communicates with both the internal volume 1619 defined by the upper storey 1617 of the first building section 1610, and with the internal volume 1613 defined by the lower storey 1611 of the first building section, when the first and second building sections are connected.
- the second building section 1620 therefore serves to connect the internal volumes 1613 and 1619 of the lower and upper storeys 1611 and 1617.
- the second building section 1620 is additionally configured to facilitate access between an exterior 1637 of the building 1600 and the internal volumes 1613, 1619 of the first building section 1610 (and so into the building 1600). This is best shown in Figure 19, which is a view of the building 1600 corresponding to that of Figure 17, and so showing its lower storey 1611. As can be seen, the second building section 1620 provides an access route 1635 between the building exterior 1637 and the lower storey internal volume 1613. The access route 1635 passes through or includes a main/front doorway 1639 for the building 1600, which is provided in the second building section 1620. Access between the building exterior 1637 and the lower storey internal volume 1613 is therefore provided through the main doorway 1639 into the second building section internal volume 1623.
- the second building section 1620 is configured so that its internal volume 1623 communicates both with the building exterior 1637 and the internal volume 1613 of the first building section lower storey, to thereby connect the internal volume 1613 with the exterior.
- the front doorway 1639 also provides access to the staircase 1627 (which is within the second building section internal volume 1623), and so to the internal volume 1613 of the upper storey 1611.
- FIG 20 there is shown a view of the building 1600 corresponding to that of Figure 18, and so showing its upper storey 1617.
- the internal volume 1619 defined by the upper storey 1617 provides a first living space 1641 within the building 1600, and at least one further living space.
- the internal volume 1619 defines two such further living spaces, indicated by reference numerals 1643 and 1645.
- the first living space 1641 forms a master bedroom of the building 1600, whilst the living spaces 1643 and 1645 eachform further bedrooms.
- These living spaces 1641 to 1645 are isolated from one another within the first building section 1610, so that access between the bedrooms cannot be achieved from solely within the first building section.
- internal walls within the building 1600 canbe movable and/or removable to define a desired arrangement of rooms/living spaces.
- the second building section 1620 is configured to provide access between the living spaces 1641 to 1645, and so between the various bedrooms, when the first 1610 and second 1620 building sections are connected.
- the access between the living spaces 1641 to 1645 is provided through the second building section 1620.
- the first and second building sections 1610 and 1620 can be configured so that an access route 1647 between the various living spaces 1641 to 1645 of the first building section 1610 passes through the second building section 1620.
- the second building section is additionally configured so that its internal volume 1623 communicates with both the first living space 1641 of the first building section 1610, and with the further living spaces 1643 and 1645, when the first and second building sections are connected.
- the second building section 1620 serves to connect the living spaces 1641 to 1645, and so the various bedrooms.
- FIGs. 21 and 22 there are shown views of the building 1600 corresponding respectively to Figures 17 and 18, and so of its lower and upper storeys 1611 and 1617.
- the second building section 1620 (in particular its internal volume 1623) defines a circulation space or zone for the building 1600.
- the circulation space is indicated in cross-hatching and given the reference numeral 1649.
- the circulation space 1649 may also be referred to in this document as a transition space or zone, and can have various functions.
- access between the upper living space 1621 and the lower the living space 1615 of the first building section 1610 is provided via the circulation space 1649.
- the circulation space 1649 defines the access route 1625 between the living spaces 1615 and 1621, and provides the required access.
- Access into the first building section 1610 from the outside or exterior 1623 of the building 1600 is also provided via the circulation space 1649.
- the circulation space 1649 defines the access route 1635 between the building exterior 1637 and the lower storey internal volume 1613 (and also the upper storey internal volume 1619, via the staircase 1627).
- the circulation space 1649 also facilitates communication between the internal volume 1623 of the second building section 1620 and the internal volumes 1613 and 1619 of the first building section lower and upper storeys 1611 and 1617.
- the circulation space 1649 also provides access between different living spaces within the first building section 1610, as well as between different usage areas of the building section. Specifically, the circulation space 1649 provides the access route 1647 between the various bedrooms 1641 to 1645 in the upper storey 1617 of the first building section 1610. The circulation space 1649 also provides access/an access route between different usage areas 1615a to c of the first building section 1610. The circulation space 1649 communicates with both the various usage areas 1615a to c, and with the various bedrooms 1641 to 1645, to thereby connect these different usage areas/living spaces.
- the circulation space 1649 comprises the staircase 1627, a downstairs or lower storey hallway 1651, an upstairs orupper storey landing 1653, and one or more doorway.
- the second building section 1620 provides all doorways between the building exterior 1637 and the interior of the building 1600, as well as between different rooms or areas of the first building section 1610 and the second building section itself.
- the circulation space 1649 therefore includes all doorways required to gain access to the rooms/areas within the first building section 1610. This is of particular benefit as the fitting of doorways (and mounting of doors in the doorways) is a skilled job which can be carried out in a verifiable manner in the off-site manufacturing facility.
- light switches are typically provided adjacent doorways. Providing the circulation space 1649 including all such doorways allows all (or most) of the switches associated with lights in the first building section rooms 1641 to 1645, and areas 1615a to 1615c, to be provided in the second building section 1620. A benefit of this is that power for operating the lights can be routed into the second building section 1620 (optionally via a services hub as described elsewhere in this document), and then to the light switches. This can simplify construction of the first building section 1610, as it may then only be necessary to connect light fittings in the rooms/areas to the switches, which may be via connectors provided on or in the second building section 1620 (orvia wireless transmission, as explained elsewhere in this document).
- the doorways include the front doorway 1639, and internal doorways 1655a to g.
- the internal doorways 1655a and b provide access between the second building section 1620 and the different usage areas 1615a to c of an open plan room of the lower living space 1615.
- Doorway 1655a provides access to a leisure/living area 1615a of the open plan room 1615, whilst doorway 1655b provides access to a dining area 1615b and a kitchen area 1615c.
- Doorway 1655c provides access between the kitchen area 1615c and a utility room 1657 in the second building section 1620.
- Doorways 1655d to f provide access respectively to the bedrooms 1641 to 1645.
- Doorway 1655g provides access between the master bedroom 1641 and an enclosure 1659 in the second building section 1620.
- a void or space 1665c can be provided in the utility room 1657 (or between a wall of the utility room and an external wall of the building section 1620), which can be used as a riser or passage for passing services upwardly within the second building section 1620 (such as water pipes, air ducts, and electrical, data or telecommunication cables).
- Options for the leisure/living area include a home office, and play, gaming or cinema rooms.
- the first building section 1610 is devoid of a main or front doorway, the main doorway 1639 being provided by the second building section 1620, when connected.
- the first building section 1610 is devoid of any doorway to the building exterior 1637, so that the sole access route/access between the exterior 1637 and the interior of the first building section is provided by the main doorway 1639 in the second building section 1620.
- the first building section 1610 is also devoid of any internal doorways, all doorways providing access within the completed building 1600 being in the second building section 1620.
- the second building section 1620 in particular its circulation space 1649, is therefore configured to provide the doorway 1639 which communicates with the exterior 1637, and all of the internal doorways 1639 and 1655a-g which permit circulation within the building 1600 and between the building sections (or in a variation, a majority of the internal doorways).
- Residential building doorways are typically at least around 800mm in width, and optionally up to around 900mm in width.
- a sum of the widths of the doorways provided by the second building section 1620 which communicate with the first building section 1610, optionally for each storey of the first building section is typically: greater than about 1800mm (i.e. more than two doorways per storey); optionally at least about 2400mm (i.e. at least three doorways); and may be at least about 2700mm.
- a sum of the width of such doorways at a lower storey level of the second building section 1620 (comprising doorways 1639 and 1655a to c) is at least 3200mm, and optionally up to 3600mm.
- a sum of the width of such doorways at an upper storey level of the second building section 1620 (comprising doorways 1655d to g) is similarly at least 3200mm, and optionally up to 3600mm.
- the circulation space 1649 in the building 1600 provides functions including access between upper and lower storeys 1617 and 1611 of its first building section 1610
- the circulation space 1649 also has a use in single storey residential buildings of the type described above. Specifically, the circulation space 1649 can provide access/an access route into a first building section of such a building.
- the circulation space 1649 is configured to provide access to three or more rooms of the building, which rooms are all be provided by a living space of the first building section 1610, and can be on a single level or storey of the building 1600.
- the circulation space 1649 provides access to the three bedrooms 1641 to 1645 in the first building section upper storey 1617, which are defined by the upper living space 1621, and at a common level.
- the circulation space 1649 can also be configured to provide access to a plurality of rooms of the building 1600 provided by the lower storey living space 1615 of the first building section 1610.
- the circulation space 1649 provides access to the plurality of different usage areas 1615a to c of the single room defined by the lower living space 1615, some of the areas (and optionally all in other embodiments) being accessed using different doorways 1655a/b.
- the first building section 1610 has a total internal volume, which is the sum of the internal volume defined by its lower storey 1611, and the internal volume defined by its upper storey 1617. In situations where there is only one storey then the total internal volume would be the volume of that storey. In situations where there are more than two storeys then the total internal volume would be the sum of the volumes of all its storeys.
- the hybrid residential building 1600 also has a total internal volume, which is the sum of the total internal volume of the first building section 1610, and the internal volume 1623 of the second building section 1620.
- the second building section 1620 suitably defines at least around 15% of the total internal volume of the building 1600, optionally at least around 20%, optionally at least around 25%, optionally at least around 30%, optionally at least around 35%, and optionally up to around 40% of said volume.
- the first building section 1610 suitably defines no more than around 85% of the total internal volume of the building 1600, optionally no more than around 80%, optionally no more than around 75%, optionally no more than around 70%, optionally no more than around 65%, and optionally no more than around 60% of said volume.
- a ratio of the total internal volume of the building provided by the second building section relative to the total internal volume of the building provided by the first building section may be around 15:85, optionally around 20:80, optionally around 25:75, optionally around 30:70, optionally around 35:65, and optionally around 40:60.
- a particularly preferred internal volume provided by the second building section in the illustrated embodiments may be in a range of around 28% to around 36% (and so first building section internal volume of around 72% to around 64%, and ratio in a range of around 28:72 to around 36:64).
- the second building section could provide up to around 50% of the total internal volume of the building (and so around a 50:50 ratio of second building section volume relative to the total).
- the first building section 1620 also has a total internal floor space, which is the sum of an internal floor space defined by its lower storey 1611, and an internal floor space defined by its upper storey 1617. If there were more than two storeys then it would be the sum of the floor spaces of all of the storeys. If there was only one storey then it would be the floor space of that storey.
- the hybrid residential building 1600 has a total internal floor space, which is the sum of the total internal floor space of the first building section 1610, and an internal floor space of the second building section 1620.
- the second building section 1620 suitably defines at least around 15% of the total internal floor space of the building, optionally at least around 20%, optionally at least around 25%, optionally at least around 30%, optionally at least around 35%, and optionally up to around 40% of said floor space.
- the first building section 1610 suitably defines no more than around 85% of the total internal floor space of the building, optionally no more than around 80%, optionally no more than around 75%, optionally no more than around 70%, optionally no more than around 65%, and optionally no more than around 60% of said floor space.
- a ratio of the total internal floor space of the building 1600 provided by the second building section 1620 relative to the total internal floor space of the building provided by the first building section 1610 may be around 15:85, optionally around 20:80, optionally around 25:75, optionally around 30:70, optionally around 35:65, and optionally around 40:60.
- a particularly preferred internal floor space provided by the second building section may be in a range of around 28% to around 36% (and so first building section internal floor space of around 72% to around 64%, and ratio in a range of around 28:72 to around 36:64).
- the second building section could provide up to around 50% of the total internal floor space of the building (and so around a 50:50 ratio of second building section floor space relative to the total).
- Arranging the second building section 1620 to provide between around 15% to 40% of the total internal floor space of the building 1600, and in particular between around 28 and 36%, may provide similar benefits to those described elsewhere in this document, in relation particularly to internal volumes.
- a further benefit applying to both floor space and volume proportions disclosed herein may be that it maximises the space in the second building sections available for providing the circulation spaces/access/access routes described elsewhere in this document. This may apply particularly in embodiments in which a kitchen is provided in the first building section, thereby freeing up space in the second building section for other purposes.
- the internal volume 1623 of the second building section 1620 provides a further living space within the building 1600.
- the second building section 1620 living space comprises: the utility room 1657 and a W/C 1661 (both at the ground or lower storey level 1629); the enclosure 1659 and a bathroom 1663 (both at the upper floor or storey level 1631).
- the second building section 1620 can also provide further usable space within the building 1600, which may be non-living space such as storage or technical space.
- the second building section 1620 comprises a service hub 1640, storage cupboard/closet 1665a and a water storage tank cupboard 1665b.
- the second building section 1620 may be considered to define ‘transient space’ (e.g. that comprising or providing the access routes/circulation space discussed herein), as well as ‘stationary space’ (e.g. living space such as that providing a W/C, bathroom or room, as well as other usable non-living space).
- ‘transient space’ e.g. that comprising or providing the access routes/circulation space discussed herein
- ‘stationary space’ e.g. living space such as that providing a W/C, bathroom or room, as well as other usable non-living space.
- the building 1600 also has an external (or outer) surface 1603, which is provided by walls 1604 to 1609 and 1658 of the building (and which excludes a roof of the building).
- Part of the external surface 1603 is provided by the first building section 1610, and part by the second building section 1620.
- the part of the external surface 1603 provided by the first building section 1610 comprises the external surfaces of the walls 1604, 1605, 1606, 1607 and 1658.
- the part of the external surface 1603 provided by the second building section 1620 comprises the external surfaces of the walls 1608 and 1609.
- the walls 1608 and 1609 of the second building section 1620 therefore provide an external or outwardly facing wall of the building 1600.
- the second building section 1620 suitably defines at least around 20% of the total external surface area of the building 1600 (provided by the extemal/outer surface 1603), optionally at least around 25%, and optionally up to around 30% of said surface area. In a preferred option, the second building section 1620 defines between around 24% and around 28% of said surface area.
- the first building section 1610 defines no more than around 80% of the total surface area of the building 1600, optionally no more than around 75%, and optionally no more than around 70% of said surface area. Arranging the second building section 1620 so that it provides between around 15% to 30% of the total surface area of the building 1600, and in particular up to around 30% of the surface area, provides sufficient usable internal space within the second building section, and for the required access passing through it.
- Restricting the proportion of the total surface area (and so internal space) provided by the second building section 1620 to no more than around 30% also facilitates construction of the second building section, and its transportation to the final location.
- the second building section could provide up to around 50% of the total surface area of the building.
- the principles of the invention apply to buildings of alternative types, including semi-detached and terraced houses (one of which will be described below). It will be understood that buildings of these further types share one or more wall with an adjacent building. In buildings of these types, at least some of the walls that form a perimeter of the building may not be external walls, in that they may be shared with an adjacent building (and so effectively form interior walls of the buildings). In these situations, the surface area sharing principles outlined above may apply to proportions of a perimeter of the building defined by first and second building sections (including any such shared internal walls), and/or portions of the external surface defined by such internal walls may comprise surfaces which face outwardly of the building e.g. into an adjacent building.
- a living space should be taken to mean an area within which a person can live, and which may exclude: storage areas (e.g. cupboards, closets, garage); technical areas (e.g. boiler rooms or cupboards, water storage tank cupboards); attics, lofts, basements and cellars (unless they provide a livable space e.g. a bedroom); and outdoor spaces (e.g. decks, patios, balconies and verandas). Living spaces will typically be covered or enclosed (in the completed building), and heated.
- a non-limiting list of rooms or areas that may fall within the definition of ‘living space’ includes: kitchens, bedrooms, living/sitting and leisure rooms, dining rooms, bathrooms, W/Cs and compartments.
- living spaces provided by the first building section 1610 form at least part of a plurality of rooms.
- the one or more room may be selected from the group comprising: a kitchen; a dining room; a living or sitting room (or leisure room); a bedroom; and an open plan room comprising a plurality of different usage areas.
- the usage areas may be selected from the group comprising: a kitchen area; a dining area; and a living, sitting and/or leisure area.
- the second building section 1620 could optionally include a kitchen.
- the upper living space 1621 of the first building section 1610 forms the bedrooms 1641 to 1645
- the lower living space 1615 forms the open plan room 1615 (which includes the living/ leisure, dining and kitchen areas 1615a to c).
- the lower living space 1615 may however comprise at least some separate rooms, which are isolated from one another within the first building section 1610 (in a similar way to the bedrooms 1641 to 1645), and which may e.g. define a living or sitting room, dining room and/or kitchen.
- the room or rooms provided by the upper 1621 and lower 1615 living spaces may be reversed, or varied from that shown.
- the lower living space 1615 may provide at least part of a bedroom or bedrooms
- the upper living space 1621 may provide at least part of a kitchen, dining room and/or living room. Bedrooms could be provided in both living spaces 1615 and 1621.
- the open plan room 1615 comprises a kitchen area 1615c.
- a kitchen positioned in the kitchen area 1615c comprises two sets of kitchen units 1667a and 1667b ( Figure 17), which are disposed adjacent the second building section 1620. Parts of the kitchen are connected or coupled to the second building section 1620. Specifically, an end of the set of kitchen units 1667a is connected to the second building section 1620, which serves for locating the set of units within the kitchen area 1615a. An end of the other set of kitchen units 1667b may also be connected to the second building section 1620.
- the set of units 1667b is located adjacent a gable end wall portion 1669 of the first building unit 1610, and may be connected to the gable end wall portion instead of (or in addition to) the second building section 1620.
- Services for the kitchen are provided by the second building section 1620.
- the second building section 1620 comprises connectors (indicated schematically at 1671) for providing the services to the kitchen.
- the set of kitchen units 1667a (and optionally set 1667b) can be connected to an external wall 1673 of the second building section 1620, which forms an internal wall of the building 1600 when the building sections 1610 and 1620 are connected.
- the kitchen units 1667a/b can be hung from the external wall 1673 if desired.
- the kitchen may comprise a mounting panel (not shown) to which the set of kitchen units 1667a is mounted, the panel being coupled or connected to the external wall 1673.
- Figure 17 also indicates alternative potential positions or locations for the kitchen area 1615c within the first building section. This is achieved by providing additional sets of connectors 1671a and b in the second building section 1620, for servicing the kitchen. This provides flexibility of a kitchen position to suit particular needs/desires of an occupant, and/or future adjustment of a kitchen position e.g. during a renovation.
- the second building section 1620 comprises a plurality of subsections or units which are configured to be fitted or coupled together to form the completed building section.
- the second building section 1620 comprises a lower subsection 1675 and an upper subsection 1677, each of which defines a respective part 1623a/1623b of the internal building volume 1623 of the second building section.
- the subsections 1675 and 1677 are configured so that the parts 1623a and 1623b of the internal building volume 1623 communicate with one-another, to permit movement (i.e. access) between the different parts.
- the volume parts 1623a and 1623b define respective portions of the access route 1625 between the first building section storeys 1611 and 1617; together provide for the required access between the storeys; and together facilitate the internal volume relationship/communication set out above.
- the subsections 1675 and 1677 are independently transportable and connectable onthe building site (at the final location).
- the subsections 1675 and 1677 are stackable (directly or indirectly), and suitably arranged so that they can be stacked one on top of the other, as shown in Figure 16.
- the subsections 1675 and 1677 interconnect, suitably via male and female connectors (not shown) provided on the subsections.
- the subsections 1675 and 1677 have common floor plans and shapes, so that they reside within a common perimeter. In a variation however, one of the subsections may have a different shape or perimeter, e.g. an upper subsection (optionally a third or top subsection) could be provided which has a different shape and/or smaller or larger perimeter.
- the upper subsection 1677 comprises a roof 1679 for the second building section 1620, orthe roof 1679 can be provided as a separate subsection and connected to the upper subsection 1679 on-site.
- the lower subsection 1675 forms a lower storey of the second building section 1620, which communicates with the internal volume 1613 defined by the lower storey 1611 of the first building section 1610.
- the lower subsection 1675 comprises a floor 1681 which is at a level that is substantially the same as that of a floor 1683 of the first building section lower storey 1611.
- the upper subsection 1677 forms an upper storey of the second building section 1620, which communicates with the internal volume 1619 defined by the upper storey 1617 of the first building section 1610.
- the upper subsection comprises a floor 1685 which is at a level that is substantially the same as that of a floor 1687 of the first building section upper storey 1617 (and which is vertically above the floor level 1683 of the first building section lower storey 1611).
- the lower subsection 1675 comprises the staircase 1627.
- the upper subsection 1677 comprises an aperture or opening 1689 which communicates with the staircase 1627 when the subsections 1675 and 1677 are connected, to permit passage between the subsections via the staircase.
- the aperture 1689 opens on to the landing 1653 ( Figure 22) within the upper subsection 1677.
- the staircase 1627 and the aperture 1689 are both provided on/in, or form part of: the circulation space 1649; and the access route 1625; and/or: provide for the required access; and facilitate the internal volume relationship/communication outlined above.
- the first and second building sections 1610 and 1620 can also be configured so that there is a substantially air-tight seal between the building sections. This may be advantageous in restricting air ingress into the building 1600, and air egress from the building, at an interface 1652 ( Figure 16) between the building sections 1610 and 1620.
- the seal may be between an external surface 1654 of the second building section 1620 and an external surface 1656 of the first building section 1610, and may be provided at the interface 1652.
- one of the first and second building sections 1610, 1620 can including sealing elements or structures, one shown and given the reference numeral 1648.
- seal elements 1648 sealingly abut the other one of the first and second building sections 1610, 1620 to provide the required seal between the building sections.
- the other one of the building sections 1610, 1620 defines or comprises a surface configured to cooperate with the seal elements 1648 to provide the required seal, which may simply be a suitably arranged part of the relevant external surface 1654 or 1656.
- the seal elements 1648 are compressed when the building sections 1610, 1620 are connected.
- the seal that is provided by the seal elements 1648 is substantially air-tight in that air egress/ingress between the building sections 1610, 1620 at the region of the interface 1652 is restricted, and optionally substantially entirely prevented.
- the seal elements 1648 may suitably extend around an entire perimeter of the interface 1652 between the building sections 1610, 1620.
- a seal may be provided which is arranged to overlie at least part of one of the building sections 1610 and 1620, and may be arranged so that it overlies the interface 1652.
- An exemplary seal element 1648a providing such a seal is shown in Figure 16A, which overlies the roof 1679 of the second building section 1620 (or which could be provided between the roof and the upper subsection 1677). It will be understood that a plurality of such sealing elements 1648a may be provided extending around the entire perimeter of the interface 1652. A combination of the two different sealing elements 1648 and 1648a may be used if desired.
- Figures 23 and 24 are now referred to, which illustrate a building 1700 according to another embodiment of the invention.
- Figure 23 is a plan cross-sectional view of a lower storey of the building 1700
- Figure 24 a plan cross-sectional view of an upper storey of the building.
- the building 1700 comprises first and second building sections 1710 and 1720 which share many of the features of the first and second building sections 1610 and 1620 forming the building 1600.
- the building 1700 differs from the building 1600 largely in terms of dimensions and internal layouts of the first and second building sections 1710 and 1720, in comparison to the first and second building sections 1610 and 1620. Mainly substantive differences will be described here.
- the building 1700 again takes the form of a detached house, and its first building section 1710 has a lower storey 1711 and an upper storey 1717.
- the lower storey 1711 has an internal volume 1713 defining a lower living space 1715, which again forms an open plan room.
- the open plan room 1715 includes a living/leisure area 1715a, dining area 1715b and kitchen area 1715c.
- the upper storey 1717 has an internal volume 1719 defining an upper living space 1721.
- the upper living space 1721 provides a masterbedroom 1741, as well as further bedrooms 1743, 1745 and 1793, plus a supplementary bedroom (or family room/office) 1791.
- the second building section 1720 again comprises a main or front doorway 1739, and a staircase 1727.
- An access route 1725 between the upper and lower living spaces 1721 and 1715 of the first building section 1710 again passes through the second building section 1720.
- the second building section 1720 is configured so that its internal volume 1723 (comprising lower and upper storey parts 1723a and b) communicates with both the internal volume 1719 defined by the upper storey 1717 of the first building section 1710, and with the internal volume 1713 defined by the lower storey 1711 of the first building section, when the first and second building sections are connected.
- the second building section 1720 is additionally configured to facilitate access between an exterior 1737 of the building 1700 and the internal volumes 1713, 1719 of the first building section 1710 (and so into the building 1700).
- the second building section 1720 provides an access route 1735 between the building exterior 1737 and the lower storey internal volume 1713.
- the access route 1735 passes through or includes the main doorway 1739.
- the first and second building sections 1710 and 1720 are also configured so that an access route 1747 between the various bedrooms 1741 to 1745, 1791 and 1793 passes through the second building section 1720.
- the second building section 1720 (in particular its internal volume 1723 ) further defines a circulation space or zone for the building 1700 (not shown, but similar to that shown at 1649 in Figures 21 and 22).
- first and second building sections 1710 and 1720 are therefore configured in a similar way to the building sections 1610 and 1620 in terms of the access routes, access, internal volume communication and circulation space which is provided within the building 1700. Certain areas of difference are however as follows.
- the second building section 1720 includes a delivery drop-off area 1795 which can be accessed from the building exterior 1737 via a doorway 1797.
- a utility room 1757 in the second building section 1720 can again be accessed from its kitchen area 1715c, but in this case also provides access to the delivery drop-off area 1795, through an internal doorway 1799.
- a further access route from the building exterior 1737 into the first building section 1710 can therefore be provided through the drop-off area 1795 and the utility room 1757.
- a services hub 1740 is once again accessible from the building exterior 1737, but could potentially be accessed also via the utility room 1757 (e.g. via another internal doorway).
- the second building section includes an upstairs W/C 1761a.
- Figures 25 and 26 are now referred to, which illustrate a building 1800 according to another embodiment of the invention.
- Figure 25 is a plan cross-sectional view of a lower storey of the building 1800
- Figure 26 a plan cross-sectional view of an upper storey of the building.
- the building 1800 comprises first and second building sections 1810 and 1820 which share many of the features of the first and second building sections 1610 and 1620 forming the building 1600.
- the building 1800 differs from the building 1600 largely in terms of dimensions and internal layouts of the first and second building sections 1810 and 1820, in comparison to the first and second building sections 1610 and 1620. Mainly substantive differences will be described here.
- the building 1800 in this embodiment takes the form of a semi-detached house.
- the further building 1800a shares a common wall with the building 1800, and is a mirror image of the building 1800.
- the first building section 1810 has a lower storey 1811 and an upper storey 1817.
- the lower storey 1811 has an internal volume 1813 defining a lower living space 1815, which forms an open plan room.
- the open plan room 1815 includes a living/leisure area 1815a, dining area 1815b and kitchen area 1815c.
- the upper storey 1817 has an internal volume 1819 defining an upper living space 1821. In this case, the upper living space 1821 provides a master bedroom 1841, and further bedrooms 1843 and 1845.
- the second building section 1820 again comprises a main or front doorway 1839, and a staircase 1827. It will be understood from Figures 25 and 26, and the discussion of the buildings 1600 and 1700, that the first and second building sections 1810 and 1820 are configured in a similar way to the building sections 1610/1620 and 1710/1720 in terms of the access routes, access, internal volume communication and circulation space which is provided within the building 1800. Certain areas of difference are however as follows.
- the second building section 1820 includes a patio-type doorway 1839a which provides a further access route from the building exterior 1837 into the first building section 1810, in this case directly into the first building section.
- the second building section 1820 again includes a services hub 1840 which is accessible from the building exterior.
- the second building section also comprises a ventilation system which is controlled from the services hub 1840, the ventilation system indicated generally by reference numeral 1860.
- the ventilation system 1860 is configured to supply external air into the building 1800, and to withdraw internal air from the building and to discharge it to the building exterior 1837, to thereby control ventilation of the building.
- the ventilation system 1860 is configured to supply external air into the internal volumes 1813 and 1821 of the first building section, as well as into an internal volume 1823 of the second building section 1820.
- the ventilation system 1860 is configured to supply external air both directly and indirectly into these internal volumes 1813, 1821 and 1823. This is achieved using an arrangement of ducts/ conduits and vents in the first and second building sections 1810 and 1820, which are shown in Figures 27 and 28 (which drawings correspond respectively to Figures 25 and 26).
- Supply ducts 1862a, b and c in the first building section 1810 connect with the ventilation system 1860 for the supply of external air into different regions of the open plan room 1815.
- each one of the ducts 1862a, b and c is associated with a different usage area of the room, respectively the living area 1815a, dining area 1815b and kitchen area 1815c.
- the ducts 1862a to c connect with a supply manifold 1864 in the second building section, for the indirect supply of external air into the room 1815 via respective vents 1866a to c.
- the supply manifold 1864 extends around both the lower and upper subsections 1875 and 1877 of the second building section 1820.
- the supply manifold 1864 also comprises various vents 1868a to e which serve for supplying external air to different rooms/areas in the first and second building sections 1810 and 1820.
- the ducts 1862a to c and the various vents 1868a to e are supplied with external air via the supply manifold 1864.
- the ventilation system 1860 comprises an integral filter and heat exchanger (not shown) positioned in the services hub 1840, which serve for conditioning the air prior to discharge into the building 1800.
- the external air is drawn in from the building exterior 1837 by a pump (not shown) in the ventilation system 1860, passing through the heat exchanger and the filter before flowing into the supply manifold 1864.
- the filter serves for removing contaminants (e.g.
- the ventilation system 1860 may also comprise, or may be configured to cooperate with, a heating and/or cooling device (not shown), for heating or cooling the external air prior to discharging it into the building 1800.
- the heating device may be a conventional boiler or other heat source (such as a heat pump), and the cooling device may be an air conditioning device.
- the heat exchanger, filter and/or heating/cooling device may form part of a conditioning unit of the ventilation system 1860.
- extraction ducts in the first building section 1810 similarly connect with the ventilation system 1860, for the indirect withdrawal of internal air from within the first building section.
- An extraction duct 1872a is provided in the kitchen area 1815c of the open plan room 1815.
- Extraction ducts 1872b to d are also provided in the bedrooms 1841 to 1845.
- the ducts 1872a to d connect with an extraction manifold 1874 in the second building section 1820.
- Internal air is drawn into the extraction manifold 1874 by a pump (not shown) in the ventilation system 1860, before being discharged to the exterior 1837.
- the internal air passes through the heat exchanger before exiting the building 1800, to transfer thermal energy to or from the incoming external air, as discussed above.
- Branch ducts 1876a to d are distributed around the second building section 1820 and connect with the extraction manifold 1874, for withdrawing internal air from various areas, specifically: a W/C 1861; a utility room 1857; an enclosure 1859; and a bathroom 1863.
- the ducts 1872a to c comprise respective vents 1878a to c through which air is drawn into the ducts.
- Vents 1878d and e are also provided in the second building section 1820, for drawing air directly from the living and dining areas 1815a and b of the room 1815.
- the ducts 1876a to d similarly comprise respective vents 1880a to d through which air is drawn into the ducts.
- ducts 1872a to d in the first building section 1810 will typically be installed in the first building section during construction of the section at the final location.
- any conduits, cables, wires or the like required for the provision of services into the first building section 1810 will typically be installed during (or after) its construction at the final location.
- the ventilation system 1860 is configured to supply air into certain areas of the building 1800, and to withdraw air from further areas which are spaced or distanced from the supply areas. This promotes a flow of air within the building 1800.
- external air is supplied into the living area 1815a through the supply vent 1866a, and internal is withdrawn from the living area through the extraction vent 1878d, which is spaced (vertically and/or horizontally) from the supply vent.
- the ventilation system 1860 also comprises a control unit 1882 for controlling the supply of external air into, and the withdrawal of internal air from, the building 1800.
- the control unit 1882 is also arranged to monitor operation of the filter and the heat exchanger, and to cooperate with a heating system (not shown) of the building to achieve an optimum desired temperature in the building 1800. It will be understood that the heating or cooling effect applied will depend on factors including a temperature differential between the external and internal air, and a desired temperature for the air within the building.
- the ventilation system 1860 can take the form of a Mechanical Ventilation and Heat Recovery (MVHR) system, in which the heat exchanger provides the heat recovery function.
- MVHR Mechanical Ventilation and Heat Recovery
- the heat exchanger can also beneficially remove moisture from the incoming external air, which may be drained from the heat exchanger.
- the ventilation system 1860 can be configured to supply external air into the internal volume 1823 of the second building section 1820, for subsequent flow or bleed into the first building section 1810 (e.g. under positive pressure - above the pressure in the first building section - applied to the air in the internal volume of the second building section). This may be achieved by directing external air into the volume 1823 through suitable vents.
- the ventilation system 1860 may similarly be configured to withdraw internal air from the internal volume 1823 of the second building section 1820, to thereby draw internal air from the first building section 1810 (e.g. under negative pressure applied to the air in the internal volume of the second building section) . Again this can be achieved using suitable vents.
- the ventilation system 1860 may be configured to supply external air into a space or cavity between the first and second building sections 1810 and 1820, for subsequent flow or bleed into the first building section (e.g. under positive pressure), and optionally also into the second building section.
- the ventilation system 1860 may similarly be configured to withdraw internal air from the space or cavity between the first and second building sections (e.g. under negative pressure). The location of one such space is indicated by numeral 1830 in Figure 25.
- the ventilation system 1860 may be provided in the first building section 1810.
- the arrangement of ducts/vents set out above may then be reversed, for example with ducts in the second building section 1820 which connect with ducts of the ventilation system in the first building section 1810.
- Parts of the ventilation system could be provided in both of the building sections, and ducts/vents provided as appropriate.
- FIG 29 there is shown a partially cut-away perspective view of the building 1800 shown in Figure 25. Only part of the building 1800 is shown in the drawing.
- the second building section 1820 comprises a metal (e.g. steel) frame support structure, which is indicated generally at 1896 in the drawing. In line with the discussion above, this facilitates construction in a factory or facility away from the final location for the building, and provides sufficient rigidity forthe second building section 1820 to be transported to the final location.
- Certain structural elements 1896a to 1896m of the steel frame support structure 1896 are shown, and together form a structural frame for an upper subsection 1877 of the second building section 1820.
- the structural elements comprise beams 1896a-d forming a roof portion of the structural frame, beams 1896j-m forming a floor portion, and main columns 1896e-i which connect the floor and roof portions.
- the structural elements of the frame structure 1896 are hot-formed (e.g. hot rolled), and may for example be I-beams. Hot- formed structural elements are beneficial as they can support relatively high loads (including point loads), and can span reasonably large distances. This may facilitate the formation of apertures (e.g. doorways and window apertures) such as at a perimeter of the second building section 1820.
- the first building section 1810 is connected to and supported by the second building section 1820, in particular by the metal frame structure 1896.
- the first building section 1810 comprises structural elements 1898a-c, at least some of which are connected to and supported by the second building section 1820.
- the structural elements are floor joists 1898a and 1898b, and roof beams 1898c (typically also hot formed steel, but optionally wooden).
- the floor joists 1898a, b and roof joists 1898c are directly connected to (and so supported by) the metal frame structure 1896 in the second building section 1820, suitably via releasable connectors such as nuts and bolts.
- the second building section 1820 provides support for the first building section 1810 both during construction, and subsequently during use of the building 1800. This can be advantageous for numerous reasons.
- the second building section 1820 can provide predetermined anchor or connection points for parts of the first building section 1810, in particular its various structural elements 1898.
- the connection between the structural elements 1898 and the metal frame structure 1896 is also such that the metal frame structure provides support for the first building section 1810 both during construction, and during subsequent use of the building 1800.
- the first and second building sections 1810 and 1820 can flex and/or move under applied external loading (e.g. due to wind loading or ground settlement) in a relatively homogenous manner. This can reduce a likelihood of relative movement between the building sections 1810 and 1820, which could otherwise lead to shear loads and potentially cracking and/or water ingress.
- the second building section 1820 is transported to the site and positioned at the final location, suitably on a pre-prepared foundation.
- the first building section 1810 is then constructed and connected to the second building section 1820 employing any one of the techniques described elsewhere in this document. In this way, the second building section 1820 is effectively constructed from (or around) the first building section 1810.
- FIG. 30 illustrates a building 1900 according to another embodiment of the invention.
- the drawing shows a plan cross-sectional view of a lower storey of the building 1900.
- the building 1900 comprises first and second building sections 1910 and 1920 which share many of the features of the first and second building sections 1610 and 1620 forming the building 1600.
- the building 1900 differs from the building 1600 largely in terms of dimensions and internal layouts of the first and second building sections 1910 and 1920, in comparison to the first and second building sections 1610 and 1620. Only substantive differences will be described here.
- the building 1900 in this embodiment again takes the form of a semi-detached house, and is very similar to the building 1800. Part of a further building of the same type is therefore shown to the right in the drawing and indicated at 1900a.
- the further building 1900a shares a common wall with the building 1900, and is a mirror image of the building 1900.
- the first building section 1910 has a lower storey 1911 comprising an internal volume 1913 which defines a lower living space 1915.
- the lower living space 1915 comprises an open plan room 1915a providing living and dining areas, and a kitchen 1915b.
- the second building section 1920 again comprises a main or front doorway 1939, and a staircase 1927. It will be understood from Figure 29, and the discussion of the buildings 1600 to 1800, that the first and second building sections 1910 and 1920 are configured in a similar way to the previously described building sections in terms of the access routes, access, internal volume communication and circulation space which is provided within the building 1900.
- the second building section 1920 provides a fire escape route 1984 for the building.
- the fire escape route 1984 comprises the main doorway 1939, the staircase 1927, and a hallway 1951, all of which are provided by the second building section 1920.
- the fire escape route can optionally include further parts of the second building section 1920, for example an upstairs landing (not shown).
- the second building section 1920 comprises fire-proof or fire-resistant structures which define the fire escape route 1984.
- the fire escape route 1984 is bound or bordered by fire-resistant or fireproof walls of the second building section 1920, which walls provide at least part of the staircase 1927 and the hallway 1951, and which connect the main doorway 1939 to the staircase. Walls or wall portions forming the fire escape route 1984 are indicated in heavy outline and marked with the reference numeral 1986.
- Doors of the second building section in the fire escape route are fire-resistant or fire-proof.
- a main or front door 1988 and internal doors 1990a to c are fire-resistant.
- the fire escape route may include at least part of one or more of the circulation spaces defined by the building (similar to those explained elsewhere in this document).
- the second building section 1920 can additionally or alternatively comprise a fire suppression system.
- the fire suppression system may be operable: to define the fire escape route 1984; to suppress a fire within the fire escape route; or to suppress a fire in order to restrict or prevent it from spreading into the fire escape route.
- the fire suppression system may comprise a plurality of fire alarms and/or detectors 1992a to c, and a plurality of water sprinklers 1994a to c (or other fluid suppressant delivery devices).
- FIG. 31 shows plan cross-sectional views of lower and upper storeys of a building 2000 according to another embodiment of the invention.
- the building 2000 comprises first and second building sections 2010 and 2020 which share many of the features of the first and second building sections 1610 and 1620 forming the building 1600.
- the building 2000 differs from the building 1600 largely in terms of dimensions and internal layouts of the first and second building sections 2000 and 2000, in comparison to the first and second building sections 1610 and 1620. Only substantive differences will be described here.
- the building 2000 in this embodiment again takes the form of a semi-detached house.
- the first building section 2010 has a lower storey 2011 comprising an internal volume 2013 which defines a lower living space 2015.
- the lower living space 2015 is an open plan room comprising a living area 2015a and a dining area 2015b.
- the first building section lower storey 2011 also comprises a main or front doorway 2039 providing access into the building 2000.
- the first building section 2010 also has an upper storey 2017 comprising an internal volume 2019 which defines an upper living space 2021.
- the upper living space 2021 comprises a master bedroom 2041, and further bedrooms 2043 and 2045.
- the second building section 2020 in this embodiment again comprises a staircase 2027. It will be understood from Figure 31, and the discussion of the buildings 1600 to 1900, that the first and second building sections 2010 and 2020 are configured in a similar way to the previously described building sections in terms of relevant access routes, access, internal volume communication and circulation space which is provided within the building 2000. These apply to movement between the upper and lower storeys 2011 and 2017, as well as between the living and dining areas 2015a/b, and the bedrooms 2041 to 2045.
- the second building section 2020 also comprises a kitchen 2015c at a ground level 2029.
- the provision of a kitchen 2015c in the second building section 2020 may be more suited to smaller buildings, in particular a smaller semi-detached building of the type shown.
- the second building section 2020 further comprises a W/C 2061 and a cupboard 2065 at its ground level 2029.
- An enclosure 2069 and bathroom 2063 are provided at an upper level 2031, as well as a landing 2053.
- the landing 2053 provides access to all of the bedrooms 2041 to 2045, as well as to the bathroom 2063.
- the second building section 2020 is positioned within a structure of the building 2000 provided by the first building section 2010.
- the first building section 2010 is constructed so that it includes a cavity shaped to receive the second building section 2020 (or is built around the second building section so that the second section is positioned within the first structure on completion).
- the first and second building sections 2010, 2020 are arranged so that access between the living room 2015a and dining room 2015b is provided through the second building section, specifically through its kitchen 2015c.
- the second building section 2020 can form part of the external surface of the building, for example with a wall 2008 of the second building section defining part of the external building surface.
- the second building section 2020 can be arranged so that it is built-in to the building 2000. This may be achieved by encapsulating or enveloping the second building section 2020 within an outer layer of the building 2000, which might for example be formed using blocks (e.g. clay bricks) or cladding panels (not shown).
- each subsection may define part of a lift (e.g. a part of a lift shaft), which parts may cooperate when the subsections are connected, so that a lift vehicle may move between the storeys (e.g. through the aligned shaft parts).
- FIG 32 there is shown a partially cut-away perspective view of a wall structure forming part of an external wall of the first building section 1610 of the building 1600 shown in Figures 16 to 22.
- the external wall illustrated in the drawing is the front wall 1604 shown in Figure 17.
- Like components with previously described embodiments share the same reference numerals (incremented or decremented as appropriate).
- Newly discussed components employ a restarted numbering system, distinguished from previously discussed components by use of the suffix ’ .
- the external walls 1604 to 1607 and 1658 of the first building section 1610 are load-bearing walls, which each comprise or define a load bearing support structure or core.
- the load-bearing structure will be described in relation to the wall 1604 shown in Figure 32. It will be understood however that the remaining external walls have a similar structure.
- the external wall 1604 is of a ‘brick and block’ type, comprising an inner wall part 1604a and an outer wall part 1604b.
- the inner wall part 1604a is constructed from concrete blocks (also known as ‘breeze’ or ‘cinder’ blocks), arranged in a conventional pattern, and bonded using mortar.
- the outer wall part 1604b is constructed from clay bricks which are similarly arranged and bonded.
- the inner wall part 1604a forms the primary load bearing support structure for the building section 1610, the outer wall part serving mainly to define a decorative outer surface structure/finish. It will be understood however that at least part of the load on the first building section 1610 may be borne by the outer wall part 1604b (e.g. a roof structure may be supported at least partly by the outer wall part).
- a decorative internal wall panel 1614’ which may for example be a plasterboard panel, is secured to an inner surface 1616’ of the inner wall part 1604a, and can then be completed in a conventional fashion, e.g. by application of a plaster skim.
- Insulation material indicated at 1618’ is installed between the wall parts 1604a, b during construction, and canbe of any suitable known material.
- Figure 33 is a partially cut-away perspective view of a wall structure forming part of an external wall of the second building section 1620 of the building 1600.
- the external wall illustrated in the drawing is the front wall 1609 shown in Figure 17.
- Further external walls 1608, 1673 and 1673a are shown in Figure 17, the walls 1673 and 1673a forming internal walls in the constructed building 1600.
- the second building section 1620 external walls 1608, 1609, 1673 and 1673a are load-bearing walls.
- the second building section 1620 has a hot-rolled steel frame support structure 1696 (Figure 17) comprising structural elements including beams and columns, which provide the load-bearing walls.
- Figure 33 shows an internally positioned comer 1620c of the second building section 1620, including a support column or post 169611, and floor beams 1696j , m.
- the externally facing walls 1608 and 1609 can be completed by providing any suitable outer surface structure or finish.
- Figure 33 shows a panel type outer surface structure 1620’ secured to structural elements of the steel frame structure 1696, and comprising an insulation panel 1622’ and a decorative outer panel 1624’ (which can be of any desired type including but not limited to metallic, polymeric, fibre reinforced polymeric, cement board and wood/wood-based products). Internal surfaces of the walls defined by the second building section 1620 can be finished in any suitable way, and which again may include panelbased options.
- the load-bearing support structure of the first building section 1610 load-bearing walls 1604 to 1607 and 1658 is different from the load-bearing support structure of the second building section 1620 load-bearing walls 1608, 1609, 1673 and 1673a (blockwork compared to steel frame support structure).
- a range of construction options for the first building section described elsewhere in this document includes: a blockwork/masonry construction; a timber frame (and blockwork/masonry, or cladding, construction); a metal frame construction (optionally comprising panels coupled to the frame); structural panels such as SIPs; a time-setting 3D printed construction; and combinations thereof.
- Suitable timber frame constructions can include a stick-built construction, and a (factory supplied) timber frame kit. These options are both illustrated in Figure 34, which will now be referred to.
- This drawing shows a front view of an alternative wall structure forming part of the external wall 1604 of the first building section 1610, but can be applied to all its external walls 1604 to 1607 and 1658, shown cross-hatched in the simple perspective view of Figure 35. It will be understood that structural framing (not shown) forming the open faces 1630 of the first building section 1610 may similarly be of a timber frame type.
- FIG. 34 shows a timber frame panel structure 1626’ comprising primary support columns or posts 1628’, primary support beams 1630’, secondary support columns/posts 1632’ and 1633’, and secondary support beams 1634’ and 1636’ (the latter framing a window aperture 1638’). Each of these columns and beams is therefore constructed on site.
- the completed wall frame is then insulated and clad with finishing panels, boards etc. as desired.
- options include ‘turnkey’ framing in which preformed panels 1626’ are supplied to the site for use in constructing the first building section 1610, and pre-cut framing in which structural elements are supplied in the correct sizes/dimensions to be formed into panels 1626’ (or other structures) at the site.
- Timber frame kit constructions may comprise open wall panels, one such panel being shown in the partially cut-away perspective view of Figure 36 and indicated by numeral 1640’ .
- the panel 1640’ comprises a timber support structure indicated generally at 1642’, which is closed on a first side 1644’ by a facing panel or board 1646’, but open on a second opposed side 1648’ .
- the facing board 1646’ has a surface 1650’ defining a wall or face of the panel 1640’.
- This arrangement facilitates installation of services such as electrical supply and/or telecommunication cables/wires 1652’, and fluid conduits such as water supply pipes and/or sewerage pipes, one shown and indicated at 1654’.
- the second, opposed side 1648’ is closed using a suitable facing panel or board 1656’, e.g. following installation of the required services at the site.
- Panels employed in metal frame constructions can be of any suitable material(s)/construction, including but not restricted to metal/metallic, cementitious, and other composite structures. Cementitious materials are particularly suited to use in 3D printing construction techniques, but other materials may be, or may become, suitable.
- Structural panels such as SIPs typically form their own structural support, but can optionally be used in conjunction with a metal frame construction. It will be understood that panels with sufficient structural strength and/or rigidity may be employed which may dispense with the need for a metal (or other material) frame construction to support the panels.
- Another construction option for the first building section involves the use of site-poured time-setting materials (e.g. of a cementitious material such as concrete).
- a particular option may be reinforced concrete. This typically involves the construction/positioning of moulds known as shuttering at the final location, into which the time-setting material is poured (optionally following location of reinforcing rods in the moulds), and which cures to form structural components.
- Such techniques are well known and need not be described in more detail here.
- a further construction option for the first building section involves the use of structural panels, which can be of a cementitious material (e.g. concrete, particularly reinforced concrete).
- the first building section 1610 is assembled from a series of these concrete panels 1658’, the panels forming at least part of a wall, floor and/or roof. This is illustrated in Figure 37, which is a partially cut-away perspective view of another wall structure forming part of the external wall 1604 of the first building section 1610.
- the structural panels 1658’ are constructed off site, or on site for example at the final location or in a factory or facility on a larger site distanced from a plot forming the final location (for subsequent use in constructing the first building section 1610).
- the panels 1658’ are each self-supporting, which negates the need for a support structure such as a frame.
- Each panel 1658’ in the wall 1604 is connected to at least one adjacent panel. Connection can be achieved using mechanical fixings and/or adhesive. However, another option includes the shaping of edge regions of the panels to define connectors which engage with a corresponding connector on the adjacent panel(s). This is shown in Figure 37, each panel 1658’ comprising respective male 1660’and female 1662’ connectors.
- a female connector 1662’ on one panel receives a male connector 1660’ on an adjacent panel for connecting the two together.
- Adhesive or some other suitable bonding material may be applied to the joint.
- An outer surface finish applied to the concrete panels 1658’ is also panel-based, comprising panels 1659’ having an insulation core 1661’ of a suitable material sandwiched between facing panels 1663’.
- SIPs panels such as SIPs.
- Panels including SIPs with sufficient structural strength and/or rigidity avoid the need for a metal (or other material) frame construction to support the panels.
- SIP panels have a similar general appearance/structure, and be connected in a similar way, to the concrete panels 1658’.
- a solid wall construction in this context, may be one in which the load bearing support structure of the relevant wall or walls accommodates substantially an entire span of the relevant wall (which may be taken in width and height directions). This contrasts for example with a steel or other frame structure, in which open cells or spaces exist between structural support members of the load bearing structure.
- Examples of such a solid wall construction may include blockwork, structural panels (e.g. concrete panels, SIPs) and 3D printed walls.
- first building section A range of construction options may be employed for the construction of different parts, sections or zones of the first building section. Where the first building section comprises a lower storey and at least one upper storey, different storeys may be of different constructions, or at least partly different. All of the construction options described above represent different methods for forming the load-bearing walls, and/or the load-bearing structure of such walls, of the first building section. For example, in the case of a load-bearing wall comprising a blockwork construction, the blockwork (e.g. bricks and/or cement blocks) form the load-bearing structure of the wall.
- the blockwork e.g. bricks and/or cement blocks
- a construction option for the second building sections described in this document is the provision of a metal (e.g. steel) frame support structure, suitably forming external walls of the second building section. Examples are shown in Figures 29 and 33. As also explained elsewhere, it will be understood that one or more external wall of the second building section may form an internal wall of the first building section, and/or in the constructed building (when the sections are connected). Examples are shown in Figures 2, 17 and 29.
- a metal e.g. steel
- the metal frame support structures in each case comprise a plurality of structural elements (e.g. beams, columns) which are arranged to form the frame structure, each structural element being connected to at least one adjacent structural element. It may be preferred to connect the structural elements using a welding process, so that the adjacent elements are welded to one another. This may provide a homogeneous support structure, which may assist in distributing loads applied to the section across the structure. Such may apply particularly to hot-formed structural elements. Other joining options include mechanical fixings (e.g. nut and bolt), and adhesives.
- Another construction option for the second building section is the use of timber/wood (or wood-based products/ composites) for the frame support structure.
- wood-based products/composites include laminates such as plywood, and products made from wood fibres or particles.
- Structural elements of the frame may be connected using mechanical fixings and/or adhesive.
- Another construction option for the second building section is the use of cement-based products for the frame support structure. Examples include concrete (suitably reinforced concrete), which may have a use particularly in the formation of structural elements of the frame support structure.
- a frame support structure constructed employing either of these techniques may have a similar structural shape and/or components as, for example, the steel frame support structure 1696 shown in Figures 17 and 33, or the structure 1896 shown in Figure 29.
- a panel-based approach may be taken, in which the second building section is assembled from a series of cement-based (e.g. concrete such as reinforced concrete) panels. This may be substantially as described above in Figure 37, in relation to the first building section 1610.
- the panels may form at least part of a wall, floor and/or roof of the second building section, and may again be self-supporting and/or comprise an integral support, and be connected in a similar fashion.
- SIPs may be employed to form the second building section.
- one or more panel is coupled to the frame, to form at least part of a wall, floor and/or roof of the second building section.
- Suitable materials for forming the panels including metals/metal alloys, cement based (e.g. concrete such as reinforced concrete), wood or wood-based, plastics (polymeric) materials, and composite materials such as fibre (e.g. glass, carbon) reinforced plastics.
- the second building section comprises a plurality of subsections or units, as described elsewhere in this document, at least one of the subsections may be of a different construction to at least one other.
- FIG 38 there is shown a perspective view of the building 1800 shown in Figure 25, similar to the view of Figure 29, but illustrating further detail on the frame support structure 1896 of its second building section 1820.
- the support structure 1896 comprises a plurality of main (or primary) load-bearing columns or posts 1896e O to i (a further such post 1896i’ being shown in Figure 38).
- the second building section 1820 comprises a plurality of comers.
- the section 1820 is generally quadrilateral in shape, in particularly rectangular, having four comers 1864a’ to d’.
- the posts 1896e, g, h and i provided at (adjacent or near) the comers 1864a’ to d’ form primary load-bearing posts, and/or can be considered to define the respective comers.
- Providing such structural posts at the comers may offer advantages including layout flexibility (large spans can be provided between comer posts facilitating e.g. provision of circulation space/access routes), and easing structural engineering requirements in comparison to e.g. timber frames, as the structure has a reliably calculable performance under load.
- the frame support structure 1896 also comprises the roof beams 1896a to d, which together define or support a roof of the section 1820.
- Each roof beam 1896a to d is disposed at, or defines part of, a perimeter of the frame support structure 1896.
- the roof beams 1896a to d are each connected between a pair of the primary load-bearing posts or columns. In this way, loads applied to the roof beams during use are transmitted to the primary load-bearing columns.
- the primary load-bearing columns 1896e, g, h and i and roof beams 1896a to d together define a perimeter frame type support structure.
- the frame support structure 1896 also comprises a plurality of floor beams 1866a’ to d’, which together define (or support) a floor of the section 1820.
- Each floor beam is disposed at, or defines part of, the perimeter of the frame support structure 1896.
- the illustrated second building section 1820 comprises lower and upper subsections 1875 and 1877, which are stacked one on top of the other. It will be understood that each subsection 1875, 1877 comprises a respective frame support structure of the type described above.
- an outer surface structure providing an outer finish on the second building section 1820 can be seen.
- the outer surface structure comprises panels which are applied to the metal frame structure 1896 to clad the structure and present an external surface finish.
- Three such panels 1868a’ to c’ are shown in the drawing, applied to a face of the upper subsection 1877 forming part of an end wall 1808 of the second building section 1820.
- the panels 1868a’ to c’ are insulated metal panels, but can have any of the alternative structures or forms described in this document.
- the structural elements forming the frame support structure 1896 may be provided as a kit of parts which can be assembled in a factory or facility.
- the factory or facility may be provided offsite, or onsite (e.g. as part of a larger building site, remote from a plot forming a final location for the building). This may facilitate construction of the second building section, to form the internal volume of the second building section, in the factory/facility.
- the first building section can also comprise a metal frame support structure.
- a similar approach to that described above in relation to the second building section 1820 may be taken for the metal frame support structure of the first building section 1810, if used.
- metal frame construction options for the first and/or second building sections comprise hot-formed (e.g. hot-rolled) structural elements.
- Alternative construction options can employ cold- formed metal structural elements, including light gauge steel frame (LGSF) structural elements. Joining methods other than welding may be preferred for cold-formed metal structural elements.
- LGSF light gauge steel frame
- a metal frame construction may be employed which comprises both hot and cold-formed structural elements.
- Figure 39 is a front view of an alternative wall structure forming part of an external wall 1808 of the second building section 1820 shown in Figures 25 to 29.
- the perimeter frame support structure 1896 comprises hot-formed structural elements in the form of posts or columns 1870a’ and 1870b’ (as described above), and hot-formed roof and floor beams 1872a’ and 1872b’ coupled to the columns.
- a plurality of support trasses 1874a’ to e’ comprising cold-formed metal structural elements are arranged between and connected to the beams 1872a’ and b’ in the support structure.
- end trasses 1874a’ and e’ are connected respectively to the columns 1870a’ and b’ .
- the hot-formed columns and beams are connected using a welding process.
- the cold-formed trusses are formed from structural elements that are connected to one another using mechanical fixings and/or by bonding, and the trusses themselves are also connected to one another (or to hot-formed columns/beams) by fixings and/or bonding.
- hot-formed metal structural elements may provide a degree of strength and rigidity, facilitating transport of the second building section, construction of the building at the final location, and resistance to applied loading during use.
- the use of cold-formed metal may have speed and cost benefits during construction. Providing a combination of hot and cold- formed metal structural elements may allow a balance of these benefits to be achieved.
- a purely hot-formed metal structure of the type described above may provide a point loaded structure (in which loads are transferred from beams to the comer support columns/posts).
- Providing a purely cold-formed metal structure may however provide a line loaded structure, in which loads applied to a beam are supported along its length, by an arrangement of trusses connected to the beam.
- a combination of hot and cold-formed metal structural elements may therefore provide a combined line and point-loaded support structure.
- Construction options for the first building section can apply to the second building section, and vice versa. This applies particularly in relation to the use of metal frame support structures (comprising hot-formed, cold-formed or a combination of structural elements), concrete structural elements (columns, beams and/or panels), timber frame structure options and other structural panel options.
- FIG 40 is a wire-frame perspective view of the building 1800 shown in Figures 25 to 29, illustrating a roof structure 1876’ of the building.
- the roof structure 1876’ which is a single/common roof structure, overlies both the first and second building sections 1810 and 1820.
- the roof 1876’ ties the first building section 1810 relative to the second section 1820, to provide structural rigidity to the constructed building 1800.
- the roof 1876’ is supported by and connected to both of the building sections 1810, 1820 but can be arranged to be supported by or from one of the building sections and arranged to extend over the other section.
- the roof 1876’ comprises a plurality of roof trusses, one of which is shown and indicated by numeral 1878’ (and shown separately in the front view of Figure 41).
- the roof trusses 1878’ are each supported by and connected to the building sections 1810, 1820, and formed of any suitable material, including but not restricted to wood and wood-based products/composites, and cold-formed metal (e.g. LGSF). It will be understood that, in a roof constructed using roof trasses, the trasses are pre-formed and brought to the final location for installation.
- the trasses 1878’ may therefore be constructed offsite, or onsite e.g. in a factory or facility forming part of a larger plot, as described elsewhere in this document.
- the roof 1876’ may be a stick-built construction, in which structural components of the roof (e.g. load bearing support structures of the roof) are constructed on site using a supply of timber cut to required sizes at the site. It will be understood that, in this example, a stick structure may be arranged which essentially forms a series of trusses like the truss 1878’ shown in Figures 40 and 41, but constructed on site at the final location for the building 1800.
- roof 1876’ Further options for forming the roof 1876’ include panels or boards, which may be secured to a roof support frame structure, or which may be self-supporting. Suitable materials for the panels or boards include those described above, in particular cement-based panels, composite e.g. SIP panels, and wood-based panels. Other options include forming panels using cold- formed metal (e.g. LGSF), hot-formed metal (e.g. steel) structures, and combinations of the two. Reference is made particularly to Figures 34, 37 and 39 and the accompanying description for details on the structural features and construction methods that could be employed in forming such roof structures.
- Suitable materials for the panels or boards include those described above, in particular cement-based panels, composite e.g. SIP panels, and wood-based panels.
- Other options include forming panels using cold- formed metal (e.g. LGSF), hot-formed metal (e.g. steel) structures, and combinations of the two.
- first and/or second building sections A wide range of outer (exterior) surface finishes may be employed for the first and/or second building sections.
- options for constructing the first building section include clay bricks and/or cement blocks, a timber frame and blockwork/masonry construction, a timber frame and cladding construction, and a metal frame construction optionally comprising panels coupled to the frame (and combinations thereof). It will be understood that the bricks/blocks, cladding and panels may form an outer surface finish on or of the first building section.
- Other options include, but are not limited to: a wooden or wood-based finish (e.g.
- panels/boards or planks a cement-based render/plaster finish (or other suitable time-setting materials); a panel (or board) finish comprising cement-based, metal/metallic, plastics (polymeric), or fibre reinforced plastics material; a tiled finish e.g. of clay and/or cement-based material; solar (e.g. photovoltaic) panels; and glass arranged for example as a curtain wall suspended from a support frame.
- a core of the building section) s which may be or may define the load bearing support structure. Any desired combination of core and outer finish disclosed in this document may be selected.
- Figure 1 Numerous such options are shown in Figure 1, as well as Figures 42 to 44 (which are views of the building 1600 shown in Figures 16, illustrating different such options).
- Figure 1 shows an option in which the first building section 110 has been clad with an outer layer or ‘skin’ of bricks, or alternatively panels comprising brick slips, as indicated at 180’ in the drawing.
- the second building section 120 in contrast has been clad with an outer layer of panels or planks 182’ which can be of any suitable material, including metal, plastics, wood or wood-based, and composite materials.
- Figure 42 shows an option in which the first building section 1610 has been clad with an outer layer of a cement-based render 184’, whilst the second building section 1620 has been clad with an outer layer of panels 186’, which again can be of any suitable material.
- Figure 43 shows an option in which the first building section 1610 has been clad with an outer layer of metal panels 186’, whilst the second building section 1620 has been clad with an outer layer of wooden panels or planks 1682’ .
- Figure 44 shows an option in which the first building section 1610 has been clad with an outer layer of wooden panels or planks 190’, whilst the second building section 1620 has been clad with a curtain wall comprising a support frame (not shown) and glass windows 192’ (or alternatively solar e.g. PV panels).
- the outer finish of at least some (optionally all) walls of the first building section may be different from the outer finish of at least some (optionally all) of the externally facing walls of the second building section.
- One or more wall of the first and/or second building section may additionally or alternatively have a different outer finish to at least one other wall of the respective section(s).
- All of the cement-based products described herein may be manufactured using any suitable process, including but not limited to 3D printing.
- One particular option is the 3D printing of panels and structural elements, optionally in a factory or facility provided at the site (but spaced from a plot forming a final location for the building).
- the second building section may be arranged so that it is built-in to the building, which may be achieved by encapsulating or enveloping the second building section within an outer layer of the building (Figure 31).
- Figure 45 shows another suchbuilt-in option, the drawing illustrating a solid perspective view of the building 1800 shown in Figure 40, including an outer finish on its building sections 1810 and 1820.
- the outer layer covers all of the walls of the second building section 1820 which face outwardly of the building 1800 following connection of the first and second sections 1810, 1820.
- the outer layer may comprise any of the material options set out above as outer surface finishes, including brick/block, panels/boaids, render etc. In the illustrated embodiment however, the outer layer comprises bricks (orpanels comprising brick slips), as shown at 1880’ in the drawing.
- Another built-in construction option comprises forming the first building section from a series of structural panels (e.g. SIPs, concrete, wood or wood-based) to define an outer perimeter of the building, and then positioning the second building section within said perimeter.
- the panels may comprise an insulation material/layer (or may be subsequently insulated).
- the second building section may be insulated by the insulation of/applied to the panels of the first section.
- This option may be particularly suited to a second building section comprising a metal frame support structure.
- the first and second building sections may be self-supporting, and the second section may not be tied into the first building structure so as to provide support to it.
- first and second building sections optionally in which the second building section provides between around 15% to 30% of the total surface area of the building.
- different outer finishes are applied to the first and second building sections (or at least to one or more wall of each section, in comparison to one or more wall of the other section)
- up to around 70% of the external surface of the building may have a first outer finish
- up to around 30% may have a second (different) outer finish.
- This may be achieved by providing the first outer finish on the first building section.
- up to around 70% of said outer finish may be brick (or brick effect e.g. brick slips, which may be mounted on panels or boards), and may be applied to/form the first building section.
- An outer finish other than bricks or a brick effect may be provided for the second building section.
- Figure 1 One such example of this is shown in Figure 1.
- the building 2100 takes the form of a single storey building or bungalow, and comprises a first building section 2110 and a second building section 2120.
- the second building section 2120 again comprises two subsections (or units) 2175 and 2177, which together define the second building section.
- the subsections 2175, 2177 are spaced apart so that they are not in contact with one another, at a common level within the constructed building 2100.
- the second building subsections may be spaced apart on the same storey, spaced vertically (e.g.
- the first subsection 2175 is shown in Figure 47 comprising an optional staircase 2127, which could provide access to an upper storey of a two-storey building, or indeed an upstairs dormer area or attic in the bungalow 2100.
- subsections may be aligned, or may partially overlap (e.g. so that part of an upper subsection only partly overlaps a lower subsection, or part of either subsection extends beyond a boundary of the other subsection, considered in plan view).
- the subsections 2175, 2177 are arranged so that one of the subsections services the other subsection.
- the first subsection 2175 services the second subsection 2177, as indicated schematically at 194’ in the drawing.
- the services may be water, gas etc.
- the subsections are spaced apart horizontally, the services passing from the subsection 2175 providing the services, via (in this case through) the first building section 2110 to the other subsection 2177.
- the services can be supplied to the subsection 2175 by a services hub (not shown) of the type referred to elsewhere in this document.
- services include e.g. sewerage
- flow of grey water/waste may occur from the serviced subsection 2177 to the servicing subsection 2175 (and so that the subsection 2177 may service the subsection 2175 by receiving the sewerage). This may also apply in relation to sewerage flow between the first and second building sections, as described elsewhere in this document.
- the building 2100 may comprise at least one further building section (not shown) defining an internal volume and which is transportable to the final location in a substantially assembled form, in like fashion to the second building section 2120 (specifically its subsections 2175, 2177).
- the at least one further building section may be arranged to be connected to one or both of the first and second building sections, or to be provided separately (e.g. spaced from and out of contact with) one or both of said sections.
- the further subsection could be provided elsewhere in the building 2100 (on the same storey or an upper storey if present), or even potentially outside the perimeter of the building 2100 shown in the drawings, for example in a garden or yard of the property.
- the at least one further section may similarly be provided with services by the second building section, optionally by its subsection 2175.
- Options for insulating the buildings disclosed in this document include constructing the first and/or second building sections from panels which comprise (integral) insulation material. In other options, insulation may be applied to the first building section, and/or optionally to the second building, at the final location and so during construction of the building (e.g. following construction of the first building section, and/or following connection of the first and second sections).
- Options for constructing the second building sections disclosed in this document include in a factory or facility provided on or as part e.g. of a larger building site (but distanced from a plot forming the final location), for constructing a plurality of second building sections which are to be used in the construction of a plurality of buildings.
- components of the first building section and or a roof of the building may similarly be constructed in such a factory, e.g. timber frame constructions, hot formed steel frames, roof trusses and the like.
- the factory or facility may be temporary, and removed following completion of a building g programme for a number of buildings, and so may for example be a tent -like or other suitable collapsible structure.
- hybrid residential building forming a domestic dwelling such as a house (including but not restricted to detached, semi-detached, terraced and single storey /bungalow). It will be understood that the dwelling will typically be a single family (or single residential group) occupancy building or property, as is the case with the exemplary houses listed.
- a modular building (which may be a hybrid residential building) comprising: a first building section in the form of a dock constructed at a final, fixed, on-site location of the building, the dock optionally being configured to receive a module; and a second building section in the form of a module, the module connected to (and optionally received by) the dock.
- the dock is preconfigured, during construction of the dock at the on-site location, to receive the module.
- the dock is preconfigured, during construction of the dock to receive the module. That is, the dock is constructed in the knowledge that a module is to be connected. In this way, build-times are reduced as the dock need not be further modified to facilitate the connection of a module.
- the dock is configured to receive the module without removal or modification of external walls of the dock and/or the module.
- Conventional construction techniques require removal or modification of external walls to facilitate connection of further building sections, for example removal of a wall to build an extension onto a house.
- the present invention is absent this requirement. In this way, construction is simplified. Moreover, the construction process is less destructive and disruptive. Material waste is also reduced.
- the dock comprises wall regions configured to be removable to facilitate connection of additional second building sections.
- the wall regions are window regions.
- the window regions may be removable to provide a walkway or doorway.
- a second building section in the form of a module may be connectable to and receivable by the dock.
- the module may be connectable to and receivable by the dock at, over or around the walkway or doorway.
- the wall regions, or window regions, or regions surrounding the wall region or window region may be originally arranged (that is, upon construction) to receive a module, and following removal of the wall region or window region a module may be connected to the dock. In this way, a plurality of second building sections in the form of modules are connectable to and receivable by the dock.
- the dock is configured to removably receive the module.
- the module may be readily removed to facilitate replacement and/or modification of the module.
- the dock remains structurally sound despite removal or absence of the module, which simplifies the construction process and amount of support equipment and size of the construction team necessary to perform removal and installation of the module.
- removal of the module from the dock does not impact or damage the components, fixtures and fittings, or decor of the dock.
- the dock need not require substantial alteration or redecoration following connection of a further module to the dock, which may for example be a second module.
- removal of the module from the dock does not impact or damage the components, fixtures and fittings, or decor of the module.
- the module may retain its appearance and need not require modification or upgrading, or require substantial alteration or redecoration, beyond that planned in order to modify the module, for example to provide a second module for subsequent reconnection to the dock.
- the module may be conveniently and relatively simply undocked from the dock.
- the dock comprises an internal building volume, which might define a living or working space. That is, the dock is not simply a foundation structure, such as a concrete slab. Instead, the dock has an internal volume or internal space, defined in some examples by walls, ceiling and floor.
- the module is portable, in a form to be connected to and received by the dock. In one example, the module is moveable and/or transportable in a single-piece form, or substantially constructed form.
- the module is moveable and/or transportable, for example on a flatbed truck.
- the module may be substantially or wholly constructed at a site away from the dock, transported to the dock and connected to the dock. Skilled tradespeople may work remotely from the dock to construct the module and install, for example, electrics and plumbing, which can be tested in a controlled environment away from the dock. The constructed and tested module can then be transported to the site for connection to the dock.
- the module could be lowered into position, and/or be provided with one or more rollers or slide elements, allowing the module to be rolled or slid into connection with the dock.
- each of the dock and the module are absent any perishable material (e.g. prior to connection).
- the connected dock and module do not (immediately) comprise any perishable material. Such material may be added at a later time.
- Perishable materials include timber, plasterboard, and other materials which are impacted by weather, and might include furnishings or final fittings.
- the connected dock and module not comprising perishable material may be the structure formed immediately after connection and prior to any finalising of the building.
- the connected dock and module may then provide a weatherproof internal building volume, such that perishable materials can be introduced without risk of weather damage.
- the dock has one or more open faces, and the dock is configured to removably receive the module at the one or more open faces of the dock.
- the dock can be constructed from less material, as one or more faces are left open where the module is to be received. Installation of the module is also less destructive and disruptive, as walls need not be removed to connect the module to the dock.
- the dock and/or module has a cross-section having two elongate regions perpendicularly connected and the module and/or dock is connected to both elongate regions.
- the module can provide a connection between the regions of the dock.
- a building in a more traditional rectangular shape is thereby constructed, which improves use of the building volume.
- the dock has an L-shaped cross-section and the module is connected to both elongate regions of the L-shaped cross-section.
- the module has an L-shaped cross-section and the module is connected to the dock at both elongate regions of the L-shaped cross-section of the module.
- the dock and/or module has a H-shaped cross-section and the module and/or dock has a rectangular cross-section.
- the dock in plan view, has an internal opening, such as a courtyard, and the module is provided to substantially fill the opening. In this way, a courtyard space may be repurposed as additional building volume of the building.
- the module can then provide connection between regions of the dock. Any building cross-section is possible where the building has intersecting external walls (i.e. a vertex between two external walls). Although typically angular, the module or dock could define a curved surface, and a curved section of the module could be received by and be connected to a curved section of the dock.
- the modular building is a residential building.
- the modular building is a commercial building and/or an office space. Reducing buildtimes and costs are highly desirable in the constructing of commercial buildings and office space.
- a method of constructing a modular building comprising: forming a first building section, in the form of a dock, at a final, fixed, on-site location of the building, the dock optionally being configured to receive a module; transporting a second building section, in the form of a module, from a different location to the on-site location; and connecting the module and the dock (optionally the module to the dock) thereby to construct the modular building.
- Module installation is facilitated as the dock is configured to receive a module when the dock is initially formed.
- Transporting the module from a different location to the on-site location allows the module to be constructed remotely from the on-site location, which allows the module construction team to be based off site, and advantageously in a specific module construction facility. Build times can be shortened, as construction of the dock does not impact construction of the module and vice versa.
- the method further comprises manufacturing the module at the different location.
- the different location is an off-site location.
- the different location is a module manufacturing facility for manufacturing the module to be used in constructing the modular building.
- the module manufacturing facility may be an on-site facility or an off-site facility. Benefits are obtained by reducing the amount of constmction, installation and testing which is to be performed on-site in that build times are reduced leading to reduced build costs.
- the method further comprises forming the dock to provide at least one open face for receiving the module, the module being connected to the dock thereby to close the open face.
- the dock can be constructed from less material, as one or more faces are left open where the module is to be received. Installation of the module is also less destructive and disruptive, as walls need not be removed to connect the module to the dock.
- the method comprises connecting the module to the dock, the module and dock not comprising perishable materials.
- method comprises connecting the module to the dock to form the building and subsequently incorporating all perishable materials into the building.
- the method comprises connecting the module to the dock before plastering the module and/or dock.
- the module is portable, in a form to be connected to and received by the dock. That is, the module is moveable and/or transportable, for example on a flatbed truck.
- the module may be substantially or wholly constructed at a site away from the dock, transported to the dock and connected to the dock. Skilled tradespeople may work remotely from the dock to construct the module and install, for example, electrics and plumbing, which can be tested in a controlled environment away from the dock. The constructed and tested module can then be transported to the site for connection to the dock.
- the module could be lowered into position, and/or be provided with one or more rollers or slide elements, allowing the module to be rolled or slid into connection with the dock.
- a modular building kit (which may be a hybrid residential building kit or system) comprising a first building section in the form of a dock optionally configured to receive a module; and a second building section in the form of a module connectable with or to (and optionally receivable by) the dock.
- Such a modular building kit has numerous advantages, including reduced build times, reduced costs, and better organization of teams of tradespeople.
- a method of modifying a constructed modular building (which may be a hybrid residential building), the modular building comprising a first building section in the form of a dock constructed at a final, fixed, on-site location of the building, the dock optionally being configured to receive a module; and a connected second building section in the form of a first module, the first module being removably connected to the dock in the constructed building, the method comprising: removing the first module from connection with the dock; and connecting a second module to the dock thereby to modify the building.
- the modular building is modifiable by connection of a second module.
- the second module may comprise new and upgraded componentry, as required or desired by building regulations and/or desires of the consumer.
- the first module being removably connected to the dock facilitates removal of said module and replacement with a second module.
- the dock comprises an internal building volume. That is, the dock is not simply a foundation structure, such as a concrete slab. Instead, the dock has an internal volume or internal space, defined in some examples by walls, ceiling and floor.
- the method comprises modifying the first module and connecting the modified first module, as the second module, to the dock. That is, the first module can be removed, modified (which may involve upgrading or replacing components) and reconnected to the dock, thereby to modify the building. This is advantageous in reducing costs and material use, as the modules are reusable.
- the method further comprises transporting the first module to an off-site location.
- work on the first module to is facilitated, by transporting the module to a location suited to module modification.
- disposal of the first module is made possible away from the site, where it may be desired to minimise building construction (for example, on a residential housing estate).
- the method further comprises moving the first module to a module modification facility for modifying the first module to be used in connecting the modified first module, as the second module, to the dock.
- Modifying the first module at a module modification facility is beneficial as it allows tradespeople to work in an environment suited to module modification. In this way, it is not necessary to modify the module on-site, where conditions may be inappropriate for electrical/plumbing installation, for example.
- modifying the module in a specially designed facility improves efficiency, as teams of people can be easily organised and collaborative work is facilitated.
- modules from different sites may be brought to the same module modification facility for modification, before transport back to their respective sites.
- the module modification facility may be provided on-site. This is particularly advantageous where many, for example 500, modular buildings at a single site are to be provided with modified modules. That is, the first modules may be removed from connection with a plurality of buildings and moved to the module modification facility for modification.
- the method further comprises transporting the second module back to the final, fixed, on-site location where the modular building is located. In this way, the second module is brought to the site for installation. In this way, the second module need only be installed, and not constructed, tested or modified, on site which improves efficiency and resulting in reduced build times and increased cost savings.
- the first module and second module are portable. That is, the first module and second module are moveable and/or transportable, for example on a flatbed truck.
- the second module may be substantially or wholly constructed at a site away from the dock, transported to the dock and connected to the dock. Skilled tradespeople may work remotely from the dock to construct the or modify the modules and install, for example, electrics and plumbing, which can be tested in a controlled environment away from the dock. The constructed and tested modules can then be transported to the site for connection to the dock.
- the method comprises manufacturing a second module. That is, the second module may be a newly constructed module. After a period of reuse of the first module (or even without reuse of the first module) it may be appropriate or necessary to manufacture a new second module.
- the second module may be manufactured at a module manufacturing facility.
- the module manufacturing facility may be provided on-site or off-site.
- second modules may be manufactured with improved efficiency as teams of people can be easily organised and collaborative work is facilitated in such a facility, whilst it is not necessary to transport second modules long distances to their respective docks.
- conditions for module manufacture may be improved and large teams of tradespeople need not be present on-site.
- the second module is separately manufactured off-site. Benefits are obtained by reducing the amount of construction, installation and testing which is to be performed on-site in that build times are reduced leading to reduced build costs.
- the first and/or second module contains one or more of: staircase, W/C, washroom, delivery drop off area, hallway, bathroom, en-suites, front door, side door, and windows.
- staircase In traditional construction, replacement of components in these areas or performing upgrades and/or testing in these areas is costly and time consuming.
- upgrade and modification is made easier as the module can be removed from connection with the dock.
- a constructed modular building which may be a hybrid residential building
- the modular building is a residential building. In this way, construction of residential buildings is improved. Build-times are shortened, and costs are reduced, as the building sections are constructed more efficiently and with reduced material waste.
- the modular building is a commercial building and/or an office space. Reducing buildtimes and costs are highly desirable in the constructing of commercial buildings and office space.
- a modular building kit (which may be a hybrid residential building kit or system) comprising a first building section in the form of a dock which is optionally configured to receive a module, a second building section in the form of a first module, a third building section in the form of a second module.
- Such a modular building kit has numerous advantages, including reduced build times, reduced costs, and better organization of teams of tradespeople.
- a method of constructing a modular building (which may be a hybrid residential building) from a first building section in the form of a dock optionally configured to receive a second building section in the form of a module, comprising: providing a module, the module having one or more external walls; and connecting the module and the dock (optionally the module to the dock) thereby to provide the one or more external walls of the module as one or more internal walls of the dock.
- construction of the dock is simplified as internal walls of the dock are provided by external walls of the module, without the need to construct some internal walls of the dock. That is, in some instances, providing external walls of the module as internal walls of the dock is simpler than providing internal walls of the dock and subsequently connecting the module to the dock.
- this might be alternatively or additionally defined or described as providing the one or more external walls of the module as one or more internal walls of the building. This is because, when connected, the dock and module will together form the building. In other words, the one or more external walls of the module provide walls to the dock and the building, and these are internal to the building.
- the dock comprises an internal building volume. That is, the dock is not simply a foundation structure, such as a concrete slab. Instead, the dock has an internal volume or internal space, defined in some examples by walls, ceiling and floor.
- connecting the module to the dock provides the one or more external walls of the module as one or more separating walls between the module and dock. In this way, a double wall construction is avoided. Moreover, the external walls of the module provide internal separating walls in the constructed modular building. In this way, the amount of material required to construct the modular building is reduced.
- the one or more separating walls provide a fire break between the module and dock. Building safety is thereby improved.
- the one or more external walls of the module provide all walkway exits from the dock. Construction of the dock is thereby simplified, as walkway exits need not be provided in the dock and may instead be provided in the module.
- the dock has one or more open faces, the method further comprising: docking the module to the dock to close the one or more open faces and thereby construct the modular building. In this way, the dock can be constmcted from less material, as one or more faces are left open where the module is to be received. Installation of the module is also less destructive and disruptive, as walls need not be removed to connect the module to the dock.
- connecting the module to the dock to provide the one or more internal walls of the dock defines an internal building volume within the module and dock. In this way, simple construction of a modular building is facilitated by connection of a dock and module.
- the module and dock are each self-supporting. In this way, the dock and module can be constmcted separately. Moreover, the module can be removed from the dock without either the dock or module requiring a support structure to be temporarily installed.
- the dock comprises: external walls comprising a support structure for supporting the dock; and one or more internal walls.
- the external walls provide the necessary structural support to the dock, which is particularly advantageous when the dock and module are disconnected.
- the internal walls may be absent a support structure.
- the internal walls may be readily removable or removable, for example to easily create an open plan space.
- the internal walls being readily removeable facilitates a reorganisation of the internal structure of the building without substantial modification or redecoration of the dock. Moving or removing the internal walls does not impact or damage the components, fixtures and fittings, or decor of the dock.
- one or more external walls of the module when the module is connected to the dock, provide structural support to the dock. That is, connecting the module to the dock may provide some level of additional structural support to the dock, thereby to provide a structurally sound modular building.
- the external walls of the module and/or the external walls of the dock comprise a steel frame support structure.
- Steel frame support structures are particularly advantageous in modular building construction.
- the dock comprises one or more removable and/or relocatable internal walls.
- the internal walls may be removed or repositioned, as desired by the homeowner.
- an open plan living space may be easily formed, or room shapes and sizes may be adjusted without structural modification.
- a modular building (which may be a hybrid residential building) comprising: a first building section in the form of a dock; and a second building section in the form of a module, the module having one or more external walls, wherein the module and the dock are connected (optionally the module is connected to the dock) thereby to provide the one or more external walls as one or more internal walls of the dock.
- construction of the dock is simplified as internal walls of the dock are provided by external walls of the module, without the need to construct some internal walls of the dock. That is, in some instances, providing external walls of the module as internal walls of the dock is simpler than providing internal walls of the dock and subsequently connecting the module to the dock.
- the one or more external walls of the module forms a separating wall between the module and dock. In this way, a double wall construction is avoided. Moreover, the external walls of the module provide internal separating walls in the constructed modular building. In this way, the amount of material required to construct the modular building is reduced.
- the modular building is a residential building. In this way, construction of residential buildings is improved. Build-times are shortened, and costs are reduced, as the building sections are constructed more efficiently and with reduced material waste.
- the modular building is a commercial building and/or an office space. Reducing buildtimes and costs are highly desirable in the constructing of commercial buildings and office space.
- a modular building kit (which may be a hybrid residential building kit or system) comprising a first building section in the form of a dock, a second building section in the form of a module, the module having one or more external walls providable as one or more internal walls of the dock.
- Such a modular building kit has numerous advantages, including reduced build times, reduced costs, and better organization of teams of tradespeople.
- a modular building (which may be a hybrid residential building) comprising: a first building section in the form of a dock, the dock optionally being configured to receive a module; and a second building section in the form of a module connected to (and optionally received by) the dock, wherein the modular building is serviced with one or more services via the module.
- servicing the building with services via the module enables all complex cabling and plumbing to be localized at the module, which increases ease of maintenance of the modular building.
- thinking, planning, and implementation of the provision of services is made more focused and efficient.
- improvements in safety of the building are obtained.
- the one or more services are received by the module from external to one or more of the dock, module and building. That is, services are routed through the module and into the building from external to the building. In one example, services are received by the module from external to the dock and module, and are received at a services hub which is external to the module.
- the services hub may be separate to, attached to, or integral with the dock.
- the one or more services are: water; gas; heating; electric; telecoms; air supply. It is advantageous to simplify provision of such services to the modular building by servicing the building via the module.
- the one more services comprise an electrical power supply and/or telecoms, and the electrical power and/or telecoms is wirelessly transmitted to the dock from the module.
- Wireless power and/or telecoms transmission reduces the need to install cabling within the dock, which allows the walls of the dock to be absent cabling, or have reduced complexity of cabling, thereby enabling flexibility of internal wall placement within the dock.
- the module and dock comprise one or more connectors for facilitating the provision of services from the module to the dock. That is, in one example, the module and dock may be electrically and/or fhiidically connected. The provision of services to the dock is simplified by such connectors as the module can be connected to the dock in a “plug-and- play” manner, without further wiring or other modification of the dock or module by the user. Additionally, in some examples, the connectors may facilitate the provision of services from the dock to the module. In one example, the one or more services comprise a heat supply. The one or more connectors may facilitate the provision of thermal energy from the module to the dock. That is, in one example, the module and dock are thermally connected.
- the provision of services to the dock is simplified by such connectors as any requirement for the dock to comprise a dedicated heat supply or heating system may be negated by the provision of a module comprising a heat supply or heating system and the dock being in thermal connection with the module.
- the module and dock may be configured and/or connected to facilitate the transfer of thermal energy from the module to the dock.
- the module may comprise a heat exchanger.
- the heat exchanger may be located so that, when the module is connected to the dock, the heat exchanger is between the module and the dock.
- the heat exchanger may be located so that, when the module is connected to the dock, the heat exchanger is between the module and the dock.
- the heat exchangers may be configured to connect, or be in thermal connection, with each other.
- the heat exchangers may provide a thermal coupling, or thermal interface, between the dock and module.
- the dock comprises internal walls, the internal walls being devoid of electrical cabling and/or fluidic conduits.
- the walls may be entirely or largely devoid of electrical cabling and/or fluidic conduits. If largely devoid, this might mean that the majority of any conduits for the building are present in the module. Construction of the dock is thereby greatly simplified. Moreover, subsequent modification and/or upgrade of the modular building is easier as, in some cases, only the module need be removed and worked upon to upgrade the electrics and/or plumbing of the building.
- the dock need only provide conduit outlets or connection points.
- the internal walls are relocatable and/or moveable. In this way, the internal walls may be removed or repositioned, as desired by the homeowner.
- an open plan living space may be easily formed, or room shapes and sizes may be adjusted without structural modification.
- the dock comprises a services hub and the module is serviced with one or more services via the services hub.
- the services hub is a specific hub (also known as a boiler room or plant room) which houses fuse boxes, the boiler, and other apparatus. Providing these in a services hub can improve building safety, simplify construction, and also simplify ongoing maintenance of the building. For example, meter readings can be performed simply by access to the services hub which is accessible from outside of the modular building.
- a modular building (which may be a hybrid residential building) according to the preceding aspect and a services hub wherein the module is serviced with one or more services via the services hub, wherein the services hub does not form part of the modular building.
- Such a construction can improve building safety. Moreover, further advantages are obtained in that inspection and maintenance (e.g., meter readings) can be performed without access to the modular building.
- inspection and maintenance e.g., meter readings
- the modular building is a residential building. In this way, construction of residential buildings is improved. Build-times are shortened, and costs are reduced, as the building sections are constructed more efficiently and with reduced material waste.
- the modular building is a commercial building and/or an office space. Reducing buildtimes and costs are highly desirable in the constructing of commercial buildings and office space.
- the services hub is accessible externally to the modular building, optionally wherein the services hub is only accessible externally to the modular building. In this way, meter readings and maintenance may be performed without access to the modular building.
- the one or more services comprise a water supply, and all (or at least one or more) wet facilities are (e.g. entirely) provided within the module.
- wet facilities include bathroom facilities. In this way, building safety is improved, as is ease of maintenance. For example, in the event of leaking, water can be directed to flow away from the dock to prevent flooding. Also, little or no access or action may be required with regard to the dock.
- a method of servicing a modular building comprising a first building section in the form of a dock, the dock optionally being configured to receive a module; and a second building section in the form of a module connected to (and optionally received by) the dock, the method comprising servicing the modular building with one or more services via the module.
- servicing the building with services via the module enables all complex cabling and plumbing to be localized at the module, which increases ease of maintenance of the modular building. Moreover, improvements in safety of the building are obtained.
- a modular building kit (which may be a hybrid residential building kit or system) comprising: a first building section in the form of a dock, the dock optionally being configured to receive a module; and a second building section in the form of a module connectable to (and optionally receivable by) the dock to form a modular building, wherein the modular building is serviceable with one or more services via the module when connected to the dock.
- Such a modular building kit has numerous advantages, including reduced build times, reduced costs, improved building safety and better organization of teams of tradespeople.
- a method of constructing a modular building (which may be a hybrid residential building) from a first building section in the form of a dock configured to be connected to (and optionally to receive) a second building section in the form of a module, the dock having one or more open faces, the method comprising: providing a module; and docking the module and the dock (optionally the module to the dock) to close the one or more open faces.
- the dock can be constructed from less material, as one or more faces are left open where the module is to be received. Installation of the module is also less destructive and disruptive, as walls need not be removed to connect the module to the dock. Closing the one or more open faces weatherproofs and seals the building.
- the docking the module to the dock to close the open or more open faces defines an internal building volume within the module and dock. In this way, simple construction of a modular building is facilitated by connection of a dock and module.
- the method further comprises docking the module to the dock to close all open faces of the dock. In this way, construction is simplified as additional external walls need not be built, installed or fitted to the dock to close the open faces. Connection of the module to the dock closes the open faces in a single installation step.
- the method comprises docking the module to the dock to close the one or more open faces thereby to provide the external structure and/or one or more external walls of the modular building. In this way, construction of the building structure and/or the provision of external building walls is simplified.
- the module comprises one or more external walls
- the method comprises: connecting the module to the dock thereby to provide the one or more external walls of the module as one or more internal walls of the dock.
- a modular building (which may be a hybrid residential building) comprising: a first building section in the form of a dock having one or more open faces; and a second building section in the form of a module docked with or to the dock and closing the one or more open faces of the dock.
- the dock can be constructed from less material, as one or more faces are left open where the module is to be received. Installation of the module is also less destructive and disruptive, as walls need not be removed to connect the module to the dock. Closing the one or more open faces weatherproofs and seals the building.
- the module and dock are each self-supporting. In this way, the dock and module can be constructed separately. Moreover, the module can be removed from the dock without either the dock or module requiring a support structure to be temporarily installed.
- the dock comprises: external walls comprising a support structure for supporting the dock; and one or more internal walls.
- the external walls provide the necessary structural support to the dock, which is particularly advantageous when the dock and module are disconnected.
- the internal walls may be absent a support structure.
- the internal walls may be readily removable or removable, for example to easily create an open plan space.
- the internal walls being readily removeable facilitates a reorganisation of the internal structure of the building without substantial modification or redecoration of the dock. Moving or removing the internal walls does not impact or damage the components, fixtures and fittings, or decor of the dock.
- one or more external walls of the module when connected to the dock, provide structural support to the dock. That is, connecting the module to the dock may provide some level of additional structural support to the dock, thereby to provide a structurally sound modular building.
- the external walls of the module and/or the external walls of the dock comprise a steel frame support structure.
- Steel frame support structures are particularly advantageous in modular building construction.
- the module extends over the open face of the dock. In this way, simple construction of a modular building is facilitated by connection of a dock and module.
- the module connects to the dock structure.
- the dock and module may provide mutual structural support to one another.
- the modular building is a residential building. In this way, construction of residential buildings is improved. Build-times are shortened, and costs are reduced, as the building sections are constructed more efficiently and with reduced material waste.
- the modular building is a commercial building and/or an office space. Reducing buildtimes and costs are highly desirable in the constructing of commercial buildings and office space.
- a modular building kit (which may be a hybrid residential building kit or system) comprising a first building section in the form of a dock having one or more open faces; and a second building section in the form of a module dockable with or to the dock to close the one or more open faces of the dock.
- Such a modular building kit has numerous advantages, including reduced build times, reduced costs, and better organization of teams of tradespeople.
- the second building section can comprise more than one upper subsection, and may comprise: a lower subsection, a first upper subsection, and a second upper subsection.
- the first upper subsection may form a middle subsection, and the second upper subsection a top subsection.
- the top subsection may be stacked or seated on the middle subsection.
- the middle subsection may be stacked or seated upon the lower subsection.
- the lower subsection may comprise a lower staircase/stairs.
- the middle subsection may comprise a middle staircase/stairs.
- the lower staircase and the middle staircase may communicate with one another, or be otherwise associated, so to permit passage between the lower and upper subsections.
- the middle subsection may comprise an aperture or opening which communicates with the staircase in the lower subsection, when the subsections are connected, to permit passage between the lower and middle subsections via the lower staircase.
- the aperture may open on to a middle landing defined by or within the middle subsection.
- the top subsection may comprise an aperture or opening which communicates with the staircase in the middle subsection, when the subsections are connected, to permit passage between the middle and top subsections via the middle staircase.
- the aperture may open on to a top landing defined by or within the top subsection.
- the second building section may be provided as a single unit or structure defining a lower subsection/portion and an upper subsection/portion, and optionally at least one further subsection/portion (e.g. lower, middle and top).
- the subsections may be provided within a single or unitary outer structure or envelope which contains all of the subsections.
- the first building section may comprise a middle storey defining an internal volume, which may provide a middle living space within the building.
- the middle subsection may form a middle storey of the second building section, which may communicate with the internal volume defined by the middle storey of the first building section.
- the middle storey formed by the middle subsection may comprise a floor, and the floor may be at a level which is substantially the same as that of a floor of the first building section middle storey.
- the first and/or second building sections may comprise more than two storeys.
- the number of storeys in the first and second building sections may be equal.
- one of the first and second building sections may comprise more stories than the other section.
- the second building section may comprise a top (third) storey which is positioned above the upper storey of the first building section when the sections are connected.
- At least one room of the building may be defined jointly by a living space of a first building section and by a second building section (suitably its living space). Connection of the building sections may therefore complete the room or rooms.
- an upper living space of a first building section may define part of a bedroom
- a living space of a second building section may define a further part of the bedroom.
- said parts may together define the complete bedroom.
- the second building section can optionally include one or more bedroom, and can include a kitchen or at least part of a kitchen.
- the first building section comprises first and second portions which together define the first building section
- the first building section may comprise at least one further portion which may be arranged relative to an adjacent portion (e.g. the first and/or second portion) so that said portions are disposed at such a non-parallel angle relative to one another. Axes of said portions may be disposed as set out in relation to said first and second portions.
- the second building section may be connected to two, or more than two, of such portions.
- any method or process disclosed in this document need not necessarily be performed in the precise order set out in the relevant text and/or drawings. Accordingly, any method or process disclosed in this document may be capable of being performed in an order other than that specifically set out in the relevant text/drawings, if circumstances permit.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Residential Or Office Buildings (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Sont divulgués des bâtiments hybrides, des systèmes de bâtiment hybrides et des procédés de construction de bâtiments hybrides. Sont également divulgués des première et seconde sections de bâtiment faisant partie de tels bâtiments. Un tel bâtiment résidentiel hybride (1600) comprend une première section de bâtiment (1610) et une seconde section de bâtiment (1620). La première section de bâtiment est une construction sur site à un emplacement final du bâtiment et comprend un volume interne (1613) qui constitue un espace de vie (1615) à l'intérieur du bâtiment. La seconde section de bâtiment délimite un volume interne (1623) et peut être transportée vers l'emplacement final sous une forme sensiblement assemblée. Les première et seconde sections de bâtiment sont reliées au niveau de l'emplacement final pour former le bâtiment. La première section de bâtiment comprend une pluralité de murs porteurs (1604 à 1607 et 1658) et la seconde section de bâtiment comprend une pluralité de murs porteurs (1608, 1609, 1673 et 1673a), les murs porteurs des première et seconde sections de bâtiment comprenant chacune une structure de support porteuse (1604a ; 1696), la structure de support porteuse d'au moins certains des premiers murs porteurs de section de bâtiment étant différente de la structure de support porteuse d'au moins certains des seconds murs porteurs de section de bâtiment.
Applications Claiming Priority (18)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/GB2022/051273 WO2022243696A1 (fr) | 2021-05-20 | 2022-05-19 | Construction modulaire, kit et procédé |
GB2207378.7A GB2608693B (en) | 2021-05-20 | 2022-05-19 | Hybrid building system, building and method |
GBPCT/GB2022/051270 | 2022-05-19 | ||
GBPCT/GB2022/051273 | 2022-05-19 | ||
GB2207379.5A GB2606863B (en) | 2021-05-20 | 2022-05-19 | Hybrid residential building construction method |
GBPCT/GB2022/051272 | 2022-05-19 | ||
PCT/GB2022/051270 WO2022243693A2 (fr) | 2021-05-20 | 2022-05-19 | Système de bâtiment hybride, bâtiment et procédé |
GBPCT/GB2022/051271 | 2022-05-19 | ||
GB2207381.1 | 2022-05-19 | ||
GB2207379.5 | 2022-05-19 | ||
GB2207380.3A GB2606864B (en) | 2021-05-20 | 2022-05-19 | Hybrid building system, building and method |
GB2207380.3 | 2022-05-19 | ||
PCT/GB2022/051272 WO2022243695A2 (fr) | 2021-05-20 | 2022-05-19 | Système de bâtiment hybride, bâtiment et procédé |
PCT/GB2022/051271 WO2022243694A2 (fr) | 2021-05-20 | 2022-05-19 | Système de bâtiment hybride, bâtiment et procédé |
GB2207378.7 | 2022-05-19 | ||
GB2207381.1A GB2606865B (en) | 2021-05-20 | 2022-05-19 | Modular building, kit and method |
GB2217325.6A GB2619107A (en) | 2021-05-20 | 2022-11-18 | Hybrid building system, building and method |
GB2217325.6 | 2022-11-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2023222853A2 true WO2023222853A2 (fr) | 2023-11-23 |
WO2023222853A3 WO2023222853A3 (fr) | 2024-02-08 |
Family
ID=86693211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2023/063435 WO2023222853A2 (fr) | 2022-05-19 | 2023-05-18 | Système de bâtiment hybride, bâtiment et procédé |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2023222853A2 (fr) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4513545A (en) * | 1982-09-20 | 1985-04-30 | Hopkins Jr George D | Apparatus for and method of constructing, transporting and erecting a structure of two or more stories comprised of a plurality of prefabricated core modules and panelized room elements |
US8919049B2 (en) * | 2009-08-21 | 2014-12-30 | Rick M. Meserini | Prefabricated temporary house addition |
WO2014008551A1 (fr) * | 2012-07-11 | 2014-01-16 | 1 Space Pty Ltd | Constructions modulaires |
CA3063280A1 (fr) * | 2016-05-13 | 2017-11-16 | Lendlease Manufactured Products Pty Limited | Module de batiment prefabrique |
FR3084381B1 (fr) * | 2018-07-24 | 2020-10-23 | Littow Arch | Module prefabrique pour un batiment et procede de construction |
-
2023
- 2023-05-18 WO PCT/EP2023/063435 patent/WO2023222853A2/fr active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2023222853A3 (fr) | 2024-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2021200954B2 (en) | Modular Building | |
US6651393B2 (en) | Construction system for manufactured housing units | |
US11885145B2 (en) | Hybrid building system, building and method | |
IES20060907A2 (en) | Construction of buildings | |
EP2175088B1 (fr) | Procédé d'installation sur un site d'un module préfabriqué semi-résistant pour la construction | |
CN103821229A (zh) | 一种快速装配式集成化房屋及安装方法 | |
EP3889374A1 (fr) | Procédé de construction d'immeubles | |
WO2023222853A2 (fr) | Système de bâtiment hybride, bâtiment et procédé | |
US20210071409A1 (en) | High-rise self-supporting formwork building system | |
CN117813439A (zh) | 混合建筑系统、建筑和方法 | |
WO2024103128A1 (fr) | Procédé et panneau de bâtiment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 18709723 Country of ref document: US |