WO2023211070A1 - 비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치 - Google Patents

비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치 Download PDF

Info

Publication number
WO2023211070A1
WO2023211070A1 PCT/KR2023/005486 KR2023005486W WO2023211070A1 WO 2023211070 A1 WO2023211070 A1 WO 2023211070A1 KR 2023005486 W KR2023005486 W KR 2023005486W WO 2023211070 A1 WO2023211070 A1 WO 2023211070A1
Authority
WO
WIPO (PCT)
Prior art keywords
link
base station
ntn
terminal
satellite
Prior art date
Application number
PCT/KR2023/005486
Other languages
English (en)
French (fr)
Inventor
서영길
홍의현
한진백
김현진
Original Assignee
현대자동차주식회사
기아 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대자동차주식회사, 기아 주식회사 filed Critical 현대자동차주식회사
Publication of WO2023211070A1 publication Critical patent/WO2023211070A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • H04B7/185Space-based or airborne stations; Stations for satellite systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • H04B7/185Space-based or airborne stations; Stations for satellite systems
    • H04B7/1851Systems using a satellite or space-based relay
    • H04B7/18513Transmission in a satellite or space-based system
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/15Setup of multiple wireless link connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/02Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
    • H04W84/04Large scale networks; Deep hierarchical networks
    • H04W84/06Airborne or Satellite Networks

Definitions

  • the present disclosure relates to non-terrestrial network technology, and more particularly to discovery technology of low-latency links in non-terrestrial networks.
  • Communication networks are being developed to provide improved communication services than existing communication networks (e.g., LTE (long term evolution), LTE-A (advanced), etc.).
  • 5G communication networks e.g., new radio (NR) communication networks
  • NR new radio
  • the 5G communication network can support a variety of communication services and scenarios compared to the LTE communication network. For example, usage scenarios of 5G communication networks may include enhanced Mobile BroadBand (eMBB), Ultra Reliable Low Latency Communication (URLLC), massive Machine Type Communication (mMTC), etc.
  • eMBB enhanced Mobile BroadBand
  • URLLC Ultra Reliable Low Latency Communication
  • mMTC massive Machine Type Communication
  • the 6G communication network can support a variety of communication services and scenarios compared to the 5G communication network.
  • 6G communication networks can meet the requirements of ultra-performance, ultra-bandwidth, ultra-space, ultra-precision, ultra-intelligence, and/or ultra-reliability.
  • 6G communication networks can support various and wide frequency bands and can be applied to various usage scenarios (e.g., terrestrial communication, non-terrestrial communication, sidelink communication, etc.) there is.
  • a communication network may provide communication services to terminals located on the ground.
  • the demand for communication services for not only terrestrial but also non-terrestrial airplanes, drones, and satellites is increasing, and for this purpose, technologies for non-terrestrial networks (NTN) are being discussed. It is becoming.
  • Non-terrestrial networks may be implemented based on 5G communication technology, 6G communication technology, etc.
  • communication between a satellite and a terrestrial communication node or a non-terrestrial communication node e.g., airplane, drone, etc.
  • satellites may perform the function of a base station in a communication network (eg, 5G communication network, 6G communication network, etc.).
  • the terminal can connect to multiple base stations through Multi-Transmission/Reception Point (Multi-TRP) or multi-connection technology.
  • Multi-TRP Multi-Transmission/Reception Point
  • Data can be received from some of the
  • the transmission delay time between the terminal and the base station is determined depending on the location of the satellite (altitude, elevation angle, etc.), the location of the terminal, and the location of the ground gateway, and multiple connection services are provided.
  • the latency of the links provided can have very large differences, ranging from a few milliseconds (ms) to hundreds of milliseconds (ms).
  • HARQ hybrid automatic repeat request
  • the purpose of the present disclosure to solve the above problems is to provide a method and device for searching and operating a low-latency link in a multi-connection environment of a non-terrestrial network.
  • the method of the first base station for achieving the above object is to provide a second configuring the first NTN link as a temporary low-latency link when the second NTN link is established via a satellite; Obtaining first low-latency link-related information for nodes of the first NTN link; Obtaining second low-latency link-related information for nodes of the second NTN link; Determining a low-delay link based on the first low-delay link-related information and the second low-delay link-related information; And transmitting information on the determined low-delay link to the terminal.
  • the nodes of the first NTN link include a first gateway directly connected to the first base station, a first satellite connected to the first gateway and a first feeder link, and a first service link connected to the first satellite. It may include the terminal.
  • the nodes of the second NTN link include a second base station, a second gateway directly connected to the second base station, a second satellite connected to the second gateway and a second feeder link, and a second service connected to the second satellite. It may include the terminal connected by a link.
  • Transmitting the low-latency link information to the second base station may further include.
  • the NTN link state information may include information on whether the terminal performs a random access procedure.
  • Each node of the second NTN link is connected to the first gateway directly connected to the first base station, a second satellite connected to the first gateway and a second feeder link, and a second service link to the second satellite. It may include the terminal being connected.
  • the low-delay link-related information for the first NTN link includes at least one of location information of the first NTN nodes or delay time information between the first NTN nodes, and low-delay link-related information for the second NTN link.
  • the information may include at least one of location information of the second NTN nodes or delay time information between the second NTN nodes.
  • the step of determining the low-delay link includes obtaining a first propagation delay time of an NTN link having the minimum delay time among NTN links that are not currently low-delay links; calculating a difference between the second propagation delay time of the current low-delay link and the first propagation delay time; and determining an NTN link having the first propagation delay time as the low-delay link when the calculated difference is greater than a predetermined value.
  • a method of a first base station includes the steps of establishing a first non-terrestrial network (NTN) link with a terminal through a first satellite; Receiving a request for low-delay link-related information from a second base station of a second NTN link preset before establishing the first NTN link with the terminal; Transmitting low-delay related information of the first NTN link to the second base station according to the request; Obtaining low-delay link-related information of all NTN links established with the terminal in a preset time unit when low-delay link information setting the first base station to a low-delay link is received from the second base station; Determining a low-delay link based on low-delay link-related information of all NTN links obtained; And transmitting information on the determined low-delay link to the terminal.
  • NTN non-terrestrial network
  • the nodes of the first NTN link include a first gateway directly connected to the first base station, a first satellite connected to the first gateway and a first feeder link, and a first satellite connected to the first service link. It may include the terminal.
  • the nodes of the second NTN link include a second base station, a second gateway directly connected to the second base station, a second satellite connected to the second gateway and a second feeder link, and a second service connected to the second satellite. It may include the terminal connected by a link.
  • the low-delay link-related information for the first NTN link includes at least one of location information of the first NTN nodes or delay time information between the first NTN nodes, and a low-delay link for the second NTN link.
  • the related information may include at least one of location information of the second NTN nodes or delay time information between the second NTN nodes.
  • Determining the low-delay link includes obtaining the propagation delay time of an NTN link with the minimum delay among NTN links that are not currently low-delay links; calculating the difference between the propagation delay time of the current low-latency link and the propagation delay time of the NTN link with the minimum delay; and, if the calculated difference is greater than a predetermined value, determining an NTN link having the minimum propagation delay time as the low-delay link.
  • a first base station for achieving the above object includes a processor, wherein the processor includes the first base station,
  • the first NTN link is a temporary low-latency link. set to; Obtain low-latency link-related information for nodes of the first NTN link; Obtain low-latency link-related information for nodes of the second NTN link; Determine a low-delay link based on low-delay link-related information for each node of the first NTN link and low-delay link-related information for each node of the second NTN link; And it can cause the low-delay link information to be transmitted to the terminal.
  • NTN non-terrestrial network
  • the processor may cause the first base station to:
  • the processor may cause the first base station to:
  • the low-delay link-related information for the first NTN link includes at least one of location information of the first NTN nodes or delay time information between the first NTN nodes, and low-delay link-related information for the second NTN link.
  • the information may include at least one of location information of the second NTN nodes or delay time information between the second NTN nodes.
  • 1A is a conceptual diagram showing a first embodiment of a non-terrestrial network.
  • Figure 1B is a conceptual diagram showing a second embodiment of a non-terrestrial network.
  • Figure 2a is a conceptual diagram showing a third embodiment of a non-terrestrial network.
  • Figure 2b is a conceptual diagram showing a fourth embodiment of a non-terrestrial network.
  • Figure 2c is a conceptual diagram showing a fifth embodiment of a non-terrestrial network.
  • Figure 3 is a block diagram showing a first embodiment of a communication node constituting a non-terrestrial network.
  • Figure 4 is a block diagram showing a first embodiment of communication nodes performing communication.
  • Figure 5A is a block diagram showing a first embodiment of a transmission path.
  • Figure 5b is a block diagram showing a first embodiment of a receive path.
  • FIG. 6A is a conceptual diagram illustrating a first embodiment of a user plane protocol stack in a transparent payload-based non-terrestrial network.
  • FIG. 6B is a conceptual diagram illustrating a first embodiment of a control plane protocol stack in a transparent payload-based non-terrestrial network.
  • 7A is a conceptual diagram illustrating a first embodiment of a user plane protocol stack in a regenerative payload-based non-terrestrial network.
  • 7B is a conceptual diagram illustrating a first embodiment of a control plane protocol stack in a regenerative payload-based non-terrestrial network.
  • FIG. 8 is a conceptual diagram illustrating a plurality of satellites and base stations corresponding to each satellite for providing multiple connectivity services to one terminal to explain an embodiment of the present disclosure.
  • FIG. 9 is a conceptual diagram illustrating a case where multiple satellites are connected to one base station to provide a multiple connection service to one terminal to explain another embodiment of the present disclosure.
  • Figure 10a is a portion of a signal flow diagram according to a low-delay link discovery method using location information of a terminal and a base station according to an embodiment of the present disclosure.
  • Figure 10b is a remaining portion of a signal flow diagram according to a low-delay link discovery method using location information of a terminal and a base station according to an embodiment of the present disclosure.
  • Figure 11a is a portion of a signal flow diagram according to a low-delay link discovery method using location information of a terminal and a base station according to another embodiment of the present disclosure.
  • FIG. 11B is a remaining portion of a signal flow diagram according to a low-delay link discovery method using location information of a terminal and a base station according to another embodiment of the present disclosure.
  • Figure 12 is a flowchart of the operation of the NTN network according to the first embodiment of the present disclosure.
  • Figure 13 is a flowchart of the operation of the NTN network according to the second embodiment of the present disclosure.
  • Figure 14 is a flowchart of the operation of the NTN network according to the third embodiment of the present disclosure.
  • Figure 15 is a flowchart of the operation of the NTN network according to the fourth embodiment of the present disclosure.
  • first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The above terms are used only for the purpose of distinguishing one component from another. For example, a first component may be referred to as a second component, and similarly, the second component may be referred to as a first component without departing from the scope of the present disclosure.
  • the term “and/or” can mean any one of a plurality of related stated items or a combination of a plurality of related stated items.
  • “at least one of A and B” may mean “at least one of A or B” or “at least one of combinations of one or more of A and B.” Additionally, in the present disclosure, “one or more of A and B” may mean “one or more of A or B” or “one or more of combinations of one or more of A and B.”
  • (re)transmit can mean “transmit,” “retransmit,” or “transmit and retransmit,” and (re)set can mean “set,” “reset,” or “set and reset.” can mean “connection,” “reconnection,” or “connection and reconnection,” and (re)connection can mean “connection,” “reconnection,” or “connection and reconnection.” It can mean.
  • the corresponding second communication node is similar to the method performed in the first communication node.
  • a method eg, receiving or transmitting a signal
  • the corresponding base station can perform an operation corresponding to the operation of the UE.
  • the corresponding UE may perform an operation corresponding to the operation of the base station.
  • NTN non-terrestrial network
  • the operation of the base station may refer to the operation of the satellite
  • the operation of the satellite may refer to the operation of the base station. can do.
  • the base station is NodeB, evolved NodeB, gNodeB (next generation node B), gNB, device, apparatus, node, communication node, BTS (base transceiver station), RRH ( It may be referred to as a radio remote head (radio remote head), transmission reception point (TRP), radio unit (RU), road side unit (RSU), radio transceiver, access point, access node, etc. .
  • UE is a terminal, device, device, node, communication node, end node, access terminal, mobile terminal, station, subscriber station, mobile station. It may be referred to as a mobile station, a portable subscriber station, or an on-broad unit (OBU).
  • OFU on-broad unit
  • signaling may be at least one of upper layer signaling, MAC signaling, or PHY (physical) signaling.
  • Messages used for upper layer signaling may be referred to as “upper layer messages” or “higher layer signaling messages.”
  • the message used for MAC signaling may be referred to as a “MAC message” or “MAC signaling message.”
  • MAC messages Messages used for PHY signaling may be referred to as “PHY messages” or “PHY signaling messages.”
  • Upper layer signaling may refer to transmission and reception operations of system information (e.g., master information block (MIB), system information block (SIB)) and/or RRC messages.
  • MAC signaling may refer to the transmission and reception operations of a MAC CE (control element).
  • PHY signaling may refer to the transmission and reception of control information (e.g., downlink control information (DCI), uplink control information (UCI), and sidelink control information (SCI)).
  • DCI downlink control information
  • UCI uplink control information
  • setting an operation means “setting information (e.g., information element, parameter) for the operation” and/or “performing the operation.” This may mean that “indicating information” is signaled. “An information element (e.g., a parameter) being set” may mean that the information element is signaled.
  • signal and/or channel may mean a signal, a channel, or “signal and channel,” and signal may be used to mean “signal and/or channel.”
  • Communication systems include terrestrial networks, non-terrestrial networks, 4G communication networks (e.g., long-term evolution (LTE) communication networks), 5G communication networks (e.g., new radio (NR) communication networks), Or it may include at least one of 6G communication networks.
  • Each of the 4G communication network, 5G communication network, and 6G communication network may include a terrestrial network and/or a non-terrestrial network.
  • the non-terrestrial network may operate based on at least one communication technology among LTE communication technology, 5G communication technology, or 6G communication technology.
  • Non-terrestrial networks can provide communication services in various frequency bands.
  • the communication network to which the embodiment is applied is not limited to the content described below, and the embodiment may be applied to various communication networks (eg, 4G communication network, 5G communication network, and/or 6G communication network).
  • communication network may be used in the same sense as communication system.
  • 1A is a conceptual diagram showing a first embodiment of a non-terrestrial network.
  • the non-terrestrial network may include a satellite 110, a communication node 120, a gateway 130, a data network 140, etc.
  • a unit including the satellite 110 and the gateway 130 may be a remote radio unit (RRU).
  • the non-terrestrial network shown in FIG. 1A may be a transparent payload-based non-terrestrial network.
  • Satellite 110 may be a low earth orbit (LEO) satellite, a medium earth orbit (MEO) satellite, a geostationary earth orbit (GEO) satellite, a high elliptical orbit (HEO) satellite, or an unmanned aircraft system (UAS) platform.
  • the UAS platform may include a high altitude platform station (HAPS).
  • Non-GEO satellites may be LEO satellites and/or MEO satellites.
  • the communication node 120 may include a communication node located on the ground (eg, UE, terminal) and a communication node located on the non-ground (eg, airplane, drone).
  • a service link may be established between the satellite 110 and the communication node 120, and the service link may be a radio link.
  • Satellite 110 may be referred to as an NTN payload.
  • Gateway 130 may support multiple NTN payloads.
  • Satellite 110 may provide communication services to communication node 120 using one or more beams.
  • the shape of the beam reception range (footprint) of the satellite 110 may be oval or circular.
  • the service link may be provided by beam(s) that continuously cover the same geographic area at all times (e.g. Geosynchronous Orbit (GSO) satellite)
  • GSO Geosynchronous Orbit
  • the service link may be provided by beam(s) covering one geographical area during a limited period and a different geographical area during another period (e.g., non-GSO (NGSO) satellites that produce steerable beams)
  • NGSO non-GSO
  • the service link may be provided by beam(s) moving over the Earth's surface (e.g., an NGSO satellite producing fixed beams or non-steerable beams)
  • beam(s) moving over the Earth's surface e.g., an NGSO satellite producing fixed beams or non-steerable beams
  • the communication node 120 may perform communication (eg, downlink communication, uplink communication) with the satellite 110 using 4G communication technology, 5G communication technology, and/or 6G communication technology. Communication between satellite 110 and communication node 120 may be performed using an NR-Uu interface and/or a 6G-Uu interface. If dual connectivity (DC) is supported, the communication node 120 may be connected to the satellite 110 as well as other base stations (e.g., base stations supporting 4G functions, 5G functions, and/or 6G functions), DC operation may be performed based on technologies defined in the 4G standard, 5G standard, and/or 6G standard.
  • DC dual connectivity
  • the gateway 130 may be located on the ground, and a feeder link may be established between the satellite 110 and the gateway 130.
  • the feeder link may be a wireless link.
  • Gateway 130 may be referred to as a “non-terrestrial network (NTN) gateway.” Communication between the satellite 110 and the gateway 130 may be performed based on an NR-Uu interface, a 6G-Uu interface, or a satellite radio interface (SRI).
  • NTN non-terrestrial network
  • SRI satellite radio interface
  • the gateway 130 may be connected to the data network 140.
  • a “core network” may exist between the gateway 130 and the data network 140. In this case, the gateway 130 may be connected to the core network, and the core network may be connected to the data network 140.
  • the core network may support 4G communication technology, 5G communication technology, and/or 6G communication technology.
  • the core network may include an access and mobility management function (AMF), a user plane function (UPF), a session management function (SMF), etc.
  • AMF access and mobility management function
  • UPF user plane function
  • SMF session management function
  • Communication between the gateway 130 and the core network may be performed based on the NG-C/U interface or 6G-C/U interface.
  • a base station and a core network may exist between the gateway 130 and the data network 140 in a transparent payload-based non-terrestrial network.
  • Figure 1B is a conceptual diagram showing a second embodiment of a non-terrestrial network.
  • a gateway may be connected to a base station, the base station may be connected to a core network, and the core network may be connected to a data network.
  • Each of the base station and core network may support 4G communication technology, 5G communication technology, and/or 6G communication technology.
  • Communication between the gateway and the base station may be performed based on the NR-Uu interface or 6G-Uu interface, and communication between the base station and the core network (e.g., AMF, UPF, SMF) may be performed based on the NG-C/U interface or 6G-Uu interface. It can be performed based on the C/U interface.
  • Figure 2a is a conceptual diagram showing a third embodiment of a non-terrestrial network.
  • the non-terrestrial network may include satellite #1 (211), satellite #2 (212) communication node 220, gateway 230, data network 240, etc.
  • the non-terrestrial network shown in FIG. 2A may be a regenerative payload-based non-terrestrial network.
  • Satellite #1 (211) and Satellite #2 (212) each receive information from another entity (e.g., communication node 220, gateway 230) constituting a non-terrestrial network.
  • a regeneration operation eg, a demodulation operation, a decoding operation, a re-encoding operation, a re-modulation operation, and/or a filtering operation
  • Satellite #1 (211) and Satellite #2 (212) may each be a LEO satellite, MEO satellite, GEO satellite, HEO satellite, or UAS platform.
  • the UAS platform may include HAPS.
  • Satellite #1 (211) may be connected to satellite #2 (212), and an inter-satellite link (ISL) may be established between satellite #1 (211) and satellite #2 (212).
  • ISL can operate at radio frequency (RF) frequencies or optical bands.
  • RF radio frequency
  • ISL can be set as optional.
  • the communication node 220 may include a communication node located on the ground (eg, UE, terminal) and a communication node located on the non-ground (eg, airplane, drone).
  • a service link eg, wireless link
  • Satellite #1 (211) may be referred to as the NTN payload. Satellite #1 (211) may provide communication services to the communication node 220 using one or more beams.
  • the communication node 220 may perform communication (e.g., downlink communication, uplink communication) with satellite #1 211 using 4G communication technology, 5G communication technology, and/or 6G communication technology. Communication between satellite #1 (211) and communication node 220 may be performed using the NR-Uu interface or 6G-Uu interface. If DC is supported, communication node 220 may be connected to satellite #1 211 as well as other base stations (e.g., base stations supporting 4G capabilities, 5G capabilities, and/or 6G capabilities), and 4G specifications. , DC operation may be performed based on technologies defined in the 5G standard, and/or the 6G standard.
  • Gateway 230 may be located on the ground, and a feeder link may be established between satellite #1 (211) and gateway 230, and a feeder link may be established between satellite #2 (212) and gateway 230. there is.
  • the feeder link may be a wireless link. If ISL is not set between satellite #1 (211) and satellite #2 (212), a feeder link between satellite #1 (211) and gateway 230 may be set mandatory. Communication between each of satellite #1 (211) and satellite #2 (212) and the gateway 230 may be performed based on the NR-Uu interface, 6G-Uu interface, or SRI.
  • the gateway 230 may be connected to the data network 240.
  • a “core network” may exist between the gateway 230 and the data network 240.
  • FIG. 2B is a conceptual diagram showing a fourth embodiment of a non-terrestrial network
  • FIG. 2C is a conceptual diagram showing a fifth embodiment of a non-terrestrial network.
  • the gateway may be connected to the core network, and the core network may be connected to the data network.
  • the core network may support 4G communication technology, 5G communication technology, and/or 6G communication technology.
  • the core network may include AMF, UPF, SMF, etc.
  • Communication between the gateway and the core network can be performed based on the NG-C/U interface or 6G-C/U interface.
  • the function of a base station may be performed by a satellite. That is, the base station may be located on a satellite.
  • the payload can be processed by a base station located on the satellite.
  • Base stations located on different satellites can be connected to the same core network.
  • One satellite may have one or more base stations. In the non-terrestrial network of FIG. 2B, the ISL between satellites may not be set, and in the non-terrestrial network of FIG. 2C, the ISL between satellites may be set.
  • the entities constituting the non-terrestrial network shown in FIGS. 1A, 1B, 2A, 2B, and/or 2C are as follows: It can be configured as follows.
  • an entity may be referred to as a communication node.
  • Figure 3 is a block diagram showing a first embodiment of a communication node constituting a non-terrestrial network.
  • the communication node 300 may include at least one processor 310, a memory 320, and a transmitting and receiving device 330 that is connected to a network and performs communication. Additionally, the communication node 300 may further include an input interface device 340, an output interface device 350, a storage device 360, etc. Each component included in the communication node 300 is connected by a bus 370 and can communicate with each other.
  • each component included in the communication node 300 may be connected through an individual interface or individual bus centered on the processor 310, rather than the common bus 370.
  • the processor 310 may be connected to at least one of the memory 320, the transmission/reception device 330, the input interface device 340, the output interface device 350, or the storage device 360 through a dedicated interface. there is.
  • the processor 310 may execute program commands stored in at least one of the memory 320 or the storage device 360.
  • the processor 310 may refer to a central processing unit (CPU), a graphics processing unit (GPU), or a dedicated processor on which methods according to embodiments are performed.
  • Each of the memory 320 and the storage device 360 may be comprised of at least one of a volatile storage medium or a non-volatile storage medium.
  • the memory 320 may be comprised of at least one of read only memory (ROM) or random access memory (RAM).
  • communication nodes that perform communication in a communication network may be configured as follows.
  • the communication node shown in FIG. 4 may be a specific embodiment of the communication node shown in FIG. 3.
  • Figure 4 is a block diagram showing a first embodiment of communication nodes performing communication.
  • each of the first communication node 400a and the second communication node 400b may be a base station or UE.
  • the first communication node 400a may transmit a signal to the second communication node 400b.
  • the transmission processor 411 included in the first communication node 400a may receive data (eg, data unit) from the data source 410. Transmitting processor 411 may receive control information from controller 416.
  • Control information may be at least one of system information, RRC configuration information (e.g., information set by RRC signaling), MAC control information (e.g., MAC CE), or PHY control information (e.g., DCI, SCI). It can contain one.
  • the transmission processor 411 may generate data symbol(s) by performing processing operations (eg, encoding operations, symbol mapping operations, etc.) on data.
  • the transmission processor 411 may generate control symbol(s) by performing processing operations (eg, encoding operations, symbol mapping operations, etc.) on control information. Additionally, the transmit processor 411 may generate synchronization/reference symbol(s) for the synchronization signal and/or reference signal.
  • the Tx MIMO processor 412 may perform spatial processing operations (e.g., precoding operations) on data symbol(s), control symbol(s), and/or synchronization/reference symbol(s). there is.
  • the output (eg, symbol stream) of the Tx MIMO processor 412 may be provided to modulators (MODs) included in the transceivers 413a to 413t.
  • a modulator (MOD) may generate modulation symbols by performing processing operations on the symbol stream, and may perform additional processing operations (e.g., analog conversion operations, amplification operations, filtering operations, upconversion operations) on the modulation symbols.
  • a signal can be generated by performing Signals generated by the modulators (MODs) of the transceivers 413a through 413t may be transmitted through antennas 414a through 414t.
  • Signals transmitted by the first communication node 400a may be received at the antennas 464a to 464r of the second communication node 400b. Signals received from the antennas 464a to 464r may be provided to demodulators (DEMODs) included in the transceivers 463a to 463r.
  • a demodulator (DEMOD) may obtain samples by performing processing operations (eg, filtering operation, amplification operation, down-conversion operation, digital conversion operation) on the signal.
  • a demodulator (DEMOD) may perform additional processing operations on the samples to obtain symbols.
  • MIMO detector 462 may perform MIMO detection operation on symbols.
  • the receiving processor 461 may perform processing operations (eg, deinterleaving operations, decoding operations) on symbols.
  • the output of receiving processor 461 may be provided to data sink 460 and controller 466. For example, data may be provided to data sink 460 and control information may be provided to controller 466.
  • the second communication node 400b may transmit a signal to the first communication node 400a.
  • the transmission processor 468 included in the second communication node 400b may receive data (e.g., a data unit) from the data source 467 and perform a processing operation on the data to generate data symbol(s). can be created.
  • Transmission processor 468 may receive control information from controller 466 and may perform processing operations on the control information to generate control symbol(s). Additionally, the transmit processor 468 may generate reference symbol(s) by performing a processing operation on the reference signal.
  • the Tx MIMO processor 469 may perform spatial processing operations (e.g., precoding operations) on data symbol(s), control symbol(s), and/or reference symbol(s).
  • the output (e.g., symbol stream) of the Tx MIMO processor 469 may be provided to modulators (MODs) included in the transceivers 463a to 463t.
  • a modulator (MOD) may generate modulation symbols by performing processing operations on the symbol stream, and may perform additional processing operations (e.g., analog conversion operations, amplification operations, filtering operations, upconversion operations) on the modulation symbols.
  • a signal can be generated by performing Signals generated by the modulators (MODs) of the transceivers 463a through 463t may be transmitted through antennas 464a through 464t.
  • Signals transmitted by the second communication node 400b may be received at the antennas 414a to 414r of the first communication node 400a. Signals received from the antennas 414a to 414r may be provided to demodulators (DEMODs) included in the transceivers 413a to 413r.
  • a demodulator (DEMOD) may obtain samples by performing processing operations (eg, filtering operation, amplification operation, down-conversion operation, digital conversion operation) on the signal.
  • a demodulator (DEMOD) may perform additional processing operations on the samples to obtain symbols.
  • the MIMO detector 420 may perform a MIMO detection operation on symbols.
  • the receiving processor 419 may perform processing operations (eg, deinterleaving operations, decoding operations) on symbols.
  • the output of receive processor 419 may be provided to data sink 418 and controller 416. For example, data may be provided to data sink 418 and control information may be provided to controller 416.
  • Memories 415 and 465 may store data, control information, and/or program code.
  • the scheduler 417 may perform scheduling operations for communication.
  • the processors 411, 412, 419, 461, 468, 469 and the controllers 416, 466 shown in FIG. 4 may be the processor 310 shown in FIG. 3 and are used to perform the methods described in this disclosure. can be used
  • FIG. 5A is a block diagram showing a first embodiment of a transmit path
  • FIG. 5B is a block diagram showing a first embodiment of a receive path.
  • the transmit path 510 may be implemented in a communication node that transmits a signal
  • the receive path 520 may be implemented in a communication node that receives a signal.
  • the transmission path 510 includes a channel coding and modulation block 511, a serial-to-parallel (S-to-P) block 512, an Inverse Fast Fourier Transform (N IFFT) block 513, and a P-to-S (parallel-to-serial) block 514, a cyclic prefix (CP) addition block 515, and up-converter (UC) 516.
  • S-to-P serial-to-parallel
  • N IFFT Inverse Fast Fourier Transform
  • P-to-S (parallel-to-serial) block 514 a cyclic prefix (CP) addition block 515
  • UC up-converter
  • the reception path 520 includes a down-converter (DC) 521, a CP removal block 522, an S-to-P block 523, an N FFT block 524, a P-to-S block 525, and a channel decoding and demodulation block 526.
  • DC down-converter
  • CP CP removal block
  • S-to-P S-to-P block
  • N FFT block 524 N FFT block
  • P-to-S block 525 a channel decoding and demodulation block 526.
  • N may be a natural number.
  • Information bits in the transmission path 510 may be input to the channel coding and modulation block 511.
  • the channel coding and modulation block 511 performs coding operations (e.g., low-density parity check (LDPC) coding operations, polar coding operations, etc.) and modulation operations (e.g., low-density parity check (LDPC) coding operations, etc.) on information bits. , QPSK (Quadrature Phase Shift Keying), QAM (Quadrature Amplitude Modulation), etc.) can be performed.
  • the output of channel coding and modulation block 511 may be a sequence of modulation symbols.
  • the S-to-P block 512 can convert frequency domain modulation symbols into parallel symbol streams to generate N parallel symbol streams.
  • N may be the IFFT size or the FFT size.
  • the N IFFT block 513 can generate time domain signals by performing an IFFT operation on N parallel symbol streams.
  • the P-to-S block 514 may convert the output (e.g., parallel signals) of the N IFFT block 513 to a serial signal to generate a serial signal.
  • the CP addition block 515 can insert CP into the signal.
  • the UC 516 may up-convert the frequency of the output of the CP addition block 515 to a radio frequency (RF) frequency. Additionally, the output of CP addition block 515 may be filtered at baseband prior to upconversion.
  • RF radio frequency
  • a signal transmitted in the transmission path 510 may be input to the reception path 520.
  • the operation in the receive path 520 may be the inverse of the operation in the transmit path 510.
  • DC 521 may down-convert the frequency of the received signal to a baseband frequency.
  • CP removal block 522 may remove CP from the signal.
  • the output of CP removal block 522 may be a serial signal.
  • the S-to-P block 523 can convert serial signals into parallel signals.
  • the N FFT block 524 can generate N parallel signals by performing an FFT algorithm.
  • P-to-S block 525 can convert parallel signals into a sequence of modulation symbols.
  • the channel decoding and demodulation block 526 can perform a demodulation operation on the modulation symbols and can restore data by performing a decoding operation on the result of the demodulation operation.
  • FIGS. 5A and 5B Discrete Fourier Transform (DFT) and Inverse DFT (IDFT) may be used instead of FFT and IFFT.
  • DFT Discrete Fourier Transform
  • IDFT Inverse DFT
  • Each of the blocks (eg, components) in FIGS. 5A and 5B may be implemented by at least one of hardware, software, or firmware.
  • some blocks may be implemented by software, and other blocks may be implemented by hardware or a “combination of hardware and software.”
  • 5A and 5B one block may be subdivided into a plurality of blocks, a plurality of blocks may be integrated into one block, some blocks may be omitted, and blocks supporting other functions may be added. It can be.
  • NTN reference scenarios can be defined as Table 1 below.
  • NTN shown in Figure 1 NTN shown in Figure 2
  • GEO Scenario A Scenario B LEO (adjustable beam)
  • Scenario C1 Scenario D1 LEO (beam moving with satellite)
  • Scenario C2 Scenario D2
  • Satellite 110 in the non-terrestrial network shown in FIGS. 1A and/or 1B is a GEO satellite (e.g., a GEO satellite that supports transparent functionality), this may be referred to as “Scenario A.”
  • each of Satellite #1 (211) and Satellite #2 (212) is a GEO satellite (e.g., a GEO that supports regeneration functionality). , which may be referred to as “Scenario B”.
  • Satellite 110 in the non-terrestrial network shown in FIGS. 1A and/or 1B is a LEO satellite with steerable beams, this may be referred to as “Scenario C1.” If satellite 110 in the non-terrestrial network shown in FIGS. 1A and/or 1B is a LEO satellite with beams moving with the satellite, this may be referred to as “Scenario C2.” If Satellite #1 (211) and Satellite #2 (212) in the non-terrestrial network shown in FIGS. 2A, 2B, and/or 2C are each LEO satellites with steerable beams, this is referred to as “Scenario D1” can be referred to.
  • Satellite #1 211 and Satellite #2 212 in the non-terrestrial network shown in FIGS. 2A, 2B, and/or 2C are each LEO satellites with beams moving with the satellite, this is the “scenario It may be referred to as “D2”.
  • delay constraints can be defined as shown in Table 3 below.
  • FIG. 6A is a conceptual diagram showing a first embodiment of a protocol stack of the user plane in a transparent payload-based non-terrestrial network
  • FIG. 6B is a transparent payload-based non-terrestrial network.
  • user data can be transmitted and received between the UE and the core network (e.g., UPF), and control Data (eg, control information) may be transmitted and received between the UE and the core network (eg, AMF).
  • User data and control data may each be transmitted and received via satellite and/or gateway.
  • the protocol stack of the user plane shown in FIG. 6A can be applied identically or similarly to a 6G communication network.
  • the protocol stack of the control plane shown in FIG. 6B can be applied identically or similarly to a 6G communication network.
  • FIG. 7A is a conceptual diagram illustrating a first embodiment of a protocol stack of the user plane in a non-terrestrial network based on a regenerative payload
  • FIG. 7B is a first embodiment of a protocol stack of the control plane in a non-terrestrial network based on a regenerative payload. This is a conceptual diagram showing an embodiment.
  • each of user data and control data may be transmitted and received through an interface between the UE and a satellite (eg, base station).
  • User data may refer to a user PDU (protocol data unit).
  • the protocol stack of a satellite radio interface (SRI) may be used to transmit and receive user data and/or control data between a satellite and a gateway.
  • SRI satellite radio interface
  • User data can be transmitted and received through a general packet radio service (GPRS) tunneling protocol (GTP)-U tunnel between the satellite and the core network.
  • GPRS general packet radio service
  • a base station may transmit system information (eg, SIB19) including satellite assistance information for NTN access.
  • the UE may receive system information (e.g., SIB19) from the base station, check satellite assistance information included in the system information, and perform communication (e.g., non-terrestrial communication) based on the satellite assistance information. It can be done.
  • SIB19 may include information element(s) defined in Table 4 below.
  • NTN-Config defined in Table 4 may include information element(s) defined in Table 5 below.
  • NTN-Config-r17 SEQUENCE ⁇ epochTime-r17 EpochTime-r17 ntn-UlSyncValidityDuration-r17 ENUMERATED ⁇ s5, s10, s15, s20, s25, s30, s35, s40, s45, s50, s55, s60, s120, s180, s240, s900 ⁇ cellSpecificKoffset-r17 INTEGER(1..1023) kmac-r17 INTEGER(1..512) ta-Info-r17 TA-Info-r17 ntn-PolarizationDL-r17 ENUMERATED ⁇ rhcp,lhcp,linear ⁇ ntn-PolarizationUL-r17 ENUMERATED ⁇ rhcp,lhcp,linear ⁇ ephemerisInfo-r17 EphemerisInfo-r17 ta-Report-r17 ENUMERATED
  • EphemerisInfo defined in Table 5 may include information element(s) defined in Table 6 below.
  • satellites can be largely divided into transparent repeaters and regenerative repeaters.
  • satellites that operate as transparent repeaters are also called transparent satellites.
  • Transparent satellites only perform the operation of amplifying the received signal and delivering it to the destination.
  • a transparent satellite receives an RF signal to be transmitted from a gateway to a terminal, it can only perform the role of amplifying the RF signal received from the gateway and transmitting it to the terminal.
  • the transparent satellite performs not only downlink transmission to the terminal but also uplink transmission from the terminal in the same manner.
  • the transparent satellite does not demodulate the received signal and only performs the role of transmitting it to the downlink or uplink. Therefore, these satellites are also called bent-pipe satellites.
  • the NTN may include a terminal, a transparent satellite orbiting a specific Earth orbit, an NTN gateway on the ground, and a base station on the ground.
  • the link between the terminal and the satellite is called a service link
  • the link between the transparent satellite and the NTN gateway is called a feeder link.
  • the gateway may be included in the base station or may be a separate configuration as illustrated in FIG. 1B.
  • the NTN gateway and satellite can be understood as a remote radio unit (RRU), as illustrated in Figure 1b.
  • RRU remote radio unit
  • a base station can be the subject of data transmission/reception and scheduling, and when the gateway and transparent satellite operate as an RRU, the RRU can be understood as performing a relay function between the base station and the terminal. .
  • Satellites that operate as regenerative repeaters are also called on-board processing repeaters or regenerative satellites.
  • the regenerative satellite demodulates the received RF signal, restores it to a baseband signal, remodulates the recovered baseband signal again, converts it to an RF signal, and transmits it.
  • a regenerative satellite receives an RF signal to be transmitted from a gateway to a terminal, it converts the received signal into a baseband signal and then demodulates it. Then, the regenerative satellite remodulates the demodulated signal to generate an RF signal to be transmitted in the downlink and transmits it to the terminal.
  • the regenerative satellite performs not only downlink transmission to the terminal but also uplink transmission from the terminal in the same manner.
  • a regenerative satellite when a regenerative satellite receives an RF signal from a terminal, it demodulates the received RF signal, restores it to a baseband signal, remodulates the recovered baseband signal again, converts it into an RF signal, and transmits it to the gateway.
  • the configuration of the regenerative satellite may be the same as the configuration of FIG. 2b described above.
  • the NTN may include a terminal, a regenerative satellite orbiting a specific Earth orbit, and an NTN gateway.
  • Figure 2b illustrates a form in which a base station is included in a satellite, but a base station can be installed between the gateway and the core network.
  • the base station can be a central unit (CU)
  • the satellite can be a distributed unit (DU). Therefore, the satellite can operate as a base station-DU (gNB-DU), and the base station can operate as a base station-CU (gNB-CU).
  • Division into DU and CU can be one of the methods of configuring a 5G network, which is one of the 3GPP standards.
  • the F1 interface can be set between the base station and the satellite.
  • the connection between the satellite and the gateway is based on SRI as seen above, the F1 interface over SRI (F1 over SRI) can be used.
  • FIG. 2B may include a regenerative satellite (gNB-DU) orbiting a specific orbit on the Earth, an NTN gateway on the ground, and a base station-CU (gNB-CU) on the ground. Even in this case, the link between the terminal and the satellite is called a service link. Additionally, since the satellite is a gNB-DU, it can perform data transmission/reception and scheduling.
  • gNB-DU regenerative satellite
  • NTN gateway on the ground
  • gNB-CU base station-CU
  • the transparent satellite link is divided into a service link and a feeder link. While a service link may have a different link length for each terminal, a feeder link has the same length for all terminals communicating with a specific satellite. Therefore, in order to efficiently manage the propagation delay time occurring in NR NTN, the timing information of the feeder link (propagation delay time) and the timing information of the service link are provided to the terminal, and through this information, the timing is calculated as shown in Equation 1 below.
  • the timing advance (TA) value can be calculated.
  • N TA has the same role as N TA in the existing terrestrial network, and N TA,UE-specific and N TA,common are additionally defined for TA information in NTN.
  • N TA,UE-specific is UE-specific TA information for each terminal generated by propagation delay occurring in the service link and/or feeder link
  • N TA,common is information on the service link and/or feeder link. This is UE-common TA information within a satellite caused by propagation delay
  • N TA,offset refers to the TA value to be applied UE-common
  • T c is the basic time unit mainly used in the NR physical layer.
  • a constant (4096*480*1000) means 1 second.
  • the present disclosure proposes a method for searching for the lowest delay link in a multi-connection environment.
  • the present disclosure which will be described below, can be applied to both network configurations using transparent satellites and network configurations using regenerative satellites. However, for convenience of explanation, the description will be made based on transparent satellites in this disclosure. However, the present disclosure described below can be applied in the same form to regenerative satellites.
  • FIG. 8 is a conceptual diagram illustrating a plurality of satellites and base stations corresponding to each satellite for providing multiple connectivity services to one terminal to explain an embodiment of the present disclosure.
  • FIG. 8 three different satellites (811, 812, 813), terrestrial gateway/base stations (831, 832, 833), and satellites (811-813) corresponding to each of the satellites (811-813).
  • 813) illustrates a core network 840 to which a terminal 821 capable of satellite communication and gateways/base stations 831-833 are connected.
  • Each of the gateways/base stations 831-833 illustrated in FIG. 8 may be implemented in a form in which a base station and a gateway are connected, a base station includes a gateway, or a gateway includes a base station.
  • the diagram assumes that the terminal 821 does not establish a direct link with the base station.
  • the satellites 811-813 in FIG. 8 may be quasi-earth-fixed and/or earth-moving satellites rather than earth-fixed satellites in geostationary orbit.
  • each satellite 811-813 illustrated in FIG. 8 will be described assuming the case that it is a transparent satellite.
  • the first satellite 811 is connected to the first gateway/base station 831 and can communicate with the terminal 821
  • the second satellite 812 is connected to the second gateway/base station 832 to communicate with the terminal 821
  • the third satellite 813 is connected to the third gateway/base station 833 and can communicate with the terminal 821. Since the first to third satellites 811 to 831 are not satellites located in geostationary orbit, as the satellites move, gateways/base stations 831-833 on the ground are connected to each of the satellites 811-813. may vary depending on the movement of the satellite. Therefore, the connection between the satellites 811-813 and the gateway/base stations 831-833 illustrated in FIG. 8 may be a connection at a specific point in time.
  • the connection between the terminal 821 and the first gateway/base station 831 includes a first feeder link, which is a link between the first satellite 811 and the first gateway/base station 831, and a first satellite ( It consists of a first service link between 811) and the terminal 821.
  • the connection between the terminal 821 and the second gateway/base station 832 includes a second feeder link, which is a link between the second satellite 812 and the second gateway/base station 832, and a second feeder link between the second satellite 812 and the terminal 821.
  • ) consists of a second service link between And the connection between the terminal 821 and the third gateway/base station 833 is a third feeder link, which is a link between the third satellite 813 and the third gateway/base station 833, and the third satellite 813 and the terminal 821. ) consists of a third service link between
  • the distances of feeder links between satellites 811-813 and gateways/base stations 831-833 and service links between satellites 811-813 and terminal 821 are determined by the satellite's altitude or Depending on the elevation angle, the location of the base station, and the location of the terminal, the shortest distance of the feeder link (e.g., Line of Sight (LOS) distance) and the shortest distance of the service link (e.g., LOS distance) may be determined. In other words, the shortest distance of the feeder links and the shortest distance of the service links may vary depending on the altitude or elevation angle of the satellite, the location of the base station, and the location of the terminal.
  • LOS Line of Sight
  • the shortest distance between feeder links may be the first feeder link and the second feeder link may be the longest, and the shortest distance between service links may be the first service link being the shortest and the third service link being the longest. You can. Therefore, the second feeder link may be longer than the first feeder link and shorter than the third feeder link, and the second service link may also be longer than the first service link and shorter than the third service link.
  • the present disclosure may provide a method for searching for a low-latency link in the terminal 821 and/or in the base stations 831-833 for the terminal 821 that can have multiple connections. Additionally, the present disclosure may provide a method for operating a discovered low-latency link.
  • FIG. 9 is a conceptual diagram illustrating a case where multiple satellites are connected to one base station to provide a multiple connection service to one terminal to explain another embodiment of the present disclosure.
  • FIG. 9 satellite communication with three different satellites (911, 912, 913) and one gateway/base station (931) connected to the satellites (911-913) and each of the satellites (811-813)
  • the gateway/base station 931 illustrated in FIG. 9 may be implemented in a form in which a base station and a gateway are connected, a base station includes a gateway, or a gateway includes a base station.
  • the diagram assumes that the terminal 921 does not establish a direct link with the base station 931.
  • the satellites 911-913 in FIG. 9 may be quasi-earth-fixed and/or earth-moving satellites rather than earth-fixed satellites in geostationary orbit.
  • each satellite 911-913 illustrated in FIG. 9 will be described assuming the case that it is a transparent satellite.
  • the first satellite 911 is connected to the gateway/base station 931 and can communicate with the terminal 821
  • the second satellite 912 is connected to the gateway/base station 831 and can communicate with the terminal 821
  • the third satellite 913 is connected to the gateway/base station 831 and can communicate with the terminal 821. Since the first to third satellites 811 to 831 are not satellites located in geostationary orbit, as the satellites move, the distance between the satellites 811 to 813 and the gateway/base station 831 increases with the satellites 911 to 831. 913) may vary depending on the movement.
  • the connection between the terminal 921 and the gateway/base station 931 is a first feeder link, which is a link between the first satellite 911 and the gateway/base station 931, and the first satellite 911 and the terminal. It consists of a first service link between (821).
  • the connection between the terminal 921 and the gateway/base station 931 includes a second feeder link, which is a link between the second satellite 912 and the gateway/base station 931, and a second feeder link between the second satellite 912 and the terminal 921. It consists of service links.
  • connection between the terminal 821 and the gateway/base station 931 is a third feeder link, which is a link between the third satellite 913 and the gateway/base station 931, and a third feeder link between the third satellite 913 and the terminal 921. It consists of service links.
  • the distances of the feeder links between the satellites 911-913 and the gateway/base station 931 and the service links between the satellites 911-913 and the terminal 921 are determined by the altitude or elevation angle of the satellite and the base station.
  • the shortest distance of the feeder link e.g., LOS distance
  • the shortest distance of the service link e.g., LOS distance
  • the shortest distance of the feeder links and the shortest distance of the service links may vary depending on the altitude or elevation angle of the satellite, the location of the base station, and the location of the terminal.
  • the shortest distance between feeder links may be the first feeder link and the second feeder link
  • the shortest distance between service links may be the first service link, which is the shortest and the third service link, the longest. You can. Therefore, the second feeder link may be longer than the first feeder link and shorter than the third feeder link, and the second service link may also be longer than the first service link and shorter than the third service link.
  • the example of FIG. 9 may correspond to a multi-TRP because multiple satellites 911-913 are connected to one base station. Also, in the case of FIG. 9, although all satellites 911-913 are connected to the same gateway/base station 931, in this case also the length of the service link and the length of the feeder link may vary depending on the location of the satellite. I looked to see if it was there.
  • the present disclosure can provide a method for searching for a low-latency link in the terminal 921 and/or in the base stations 931 for the terminal 921 that can have multiple connections. Additionally, the present disclosure may provide a method for operating a discovered low-latency link.
  • a link with low latency among several links to a terminal with multiple connections in an NTN environment is named "low-latency link ( QuickLink )" and a method for finding it is presented.
  • QuickLink a link with low latency among several links to a terminal with multiple connections in an NTN environment.
  • FIG. 10A is a portion of a signal flow diagram according to a low-delay link search method using location information of a terminal and a base station according to an embodiment of the present disclosure
  • FIG. 10B is location information of a terminal and a base station according to an embodiment of the present disclosure. This is the remaining part of the signal flow diagram according to the low-latency link search method using .
  • FIGS. 10A and 10B may be a continuous signal flow diagram. Therefore, the flowchart of FIG. 10b can be performed continuously after the flowchart of FIG. 10a. Additionally, some operations in the flowcharts of FIGS. 10A and 10B may be omitted, and other operations may be additionally performed. In addition, the sequential operations of some operations in the flowcharts of FIGS. 10A and 10B may be changed. These details will become clearer through the explanation below.
  • FIGS. 10A and 10B Components in FIGS. 10A and 10B are given reference numerals using the components illustrated in FIG. 8.
  • the terminal 821, the first base station 831, the second base station 832, and the third base station 833 are illustrated, and each base station 831-833 has corresponding satellites (FIGS. 10A and 10B (not shown) can be connected to a feeder link. It should be noted that satellites are omitted in FIGS. 10A and 10B due to complexity. Additionally, each base station 831-833 may be connected to corresponding gateways. In describing FIGS. 10A and 10B, it should be noted that base stations 831-833 may be base stations connected to corresponding gateways.
  • the terminal 821 may be communicating with the first base station 831 over the first NTN link.
  • the link through which the terminal 821 communicates with the first base station 831 through the first NTN link will be examined with reference to FIG. 8 described above.
  • the terminal 821 may be connected to the first satellite 811 through a service link, and the first satellite 811 may be connected to the first base station 831 through a feeder link. Accordingly, the terminal 821 can communicate with the first base station 831 through the first satellite 811 and the first NTN link.
  • the entire link in which a terminal and a base station are connected via satellite will be referred to as an NTN link. Accordingly, the entire link where the terminal 821 is connected to the first base station 831 through the first satellite 811 will be referred to as the first NTN link.
  • an NTN link may be additionally formed with another base station through another satellite.
  • step S1010 the terminal 821 exemplifies the operation of establishing a second NTN link through the second base station 832 and the second satellite 812.
  • the terminal 821 can form a second NTN link with the second base station 832 through the second satellite 812.
  • the second base station 832 can confirm that the terminal 821 has the first NTN link established, and based on this, the second base station 832 sets the second NTN link to the first base station 831. You can also inform.
  • a method for the second base station 832 to confirm that a preset NTN link exists in the terminal 821 may be as follows.
  • the second base station 832 may receive information from a higher layer, for example, from the 5G core network, that the first NTN link has already been established in the terminal 821. Based on this, the second base station 832 can confirm that another NTN link, for example, a first NTN link, has already been established in the terminal 821.
  • the second base station 832 can already check the first NTN link configuration status based on the information reported by the terminal 821. For example, when the terminal 821 performs a connection procedure to the second base station 832, it may report information on the currently connected NTN link. In this case, the second base station 832 can confirm that another NTN link, for example, a first NTN link, has already been established in the terminal 821.
  • the second base station 832 can confirm the existence of another NTN link during the operation of establishing the second NTN link. And, if another NTN link exists, the second base station 832 can inform the base station corresponding to the other link, for example, the first base station 831, that the second NTN link has been established.
  • the core network of a communication system for example, a 5G communication system
  • a 5G communication system is connected to the first base station 831 and the second base station 832.
  • the communication system will be described using a 5G communication system as an example.
  • the present disclosure should not be understood as being limited to the 5G communication system, and may also be applied to all other communication systems to which the contents of the present disclosure can be applied.
  • the terminal 821 may additionally set up a third NTN link through the third base station 833 and the third satellite 813.
  • the terminal 821 can form a third NTN link with the third base station 833 through the third satellite 813.
  • the third base station 833 connects the third base station 833 to base stations corresponding to other NTN links set in the terminal 821, for example, the first base station 831 and the second base station 832.
  • the settings of the NTN link can be announced.
  • the core network of the 5G communication system may provide NTN information currently connected to the terminal 821 to the first base station 831, the second base station 832, and the third base station 833, respectively.
  • step S1010 that is, the terminal 821 forms a second NTN link with the second base station 832
  • step S1020 that is, a third NTN link is formed with the third base station 833.
  • the setup procedure for the NTN link may change.
  • the terminal 821 may first establish the third NTN link with the third base station 833, and then establish the second NTN link with the second base station 832.
  • Figure 10a illustrates a case in which a third NTN link is additionally established after the terminal 821 establishes the second NTN link.
  • the terminal 821 may establish only one additional NTN link after establishing the first NTN link.
  • the terminal 821 may additionally configure only the second NTN link with the second base station 832 through the second satellite 812, and the terminal 821 may set up only the second NTN link through the second satellite 812.
  • only the third base station 833 and the third NTN link may be additionally established through the third satellite 813.
  • the first base station 831 may temporarily set the first NTN link between the current first base station 831 and the terminal 821 as a quick link (QuickLink).
  • QickLink quick link
  • it is intended to determine which NTN link, that is, which NTN link among the first NTN link, second NTN link, and third NTN link is the QuickLink, and to present an operation method for this.
  • the first base station 831 may need to perform a procedure to determine which NTN link is QuickLink.
  • the first base station 831 may perform a procedure for obtaining the location of the first NTN link.
  • acquiring the location of the NTN link may include procedures for acquiring the location of the base station, the location of the terminal, and the location of the satellite.
  • the base station since the location of the base station is already known, no additional acquisition procedure is required. Additionally, since the base station is connected to the gateway, it is assumed that the base station knows not only its own location but also the location of the gateway. Now, we will look in detail below at the procedure for acquiring the location of the terminal and satellite among the location acquisition procedures for the NTN link.
  • the first base station 831 may transmit a location information report request to the terminal 821 through the first satellite 811.
  • the first base station 831 may request only the location information of the terminal 821, or may request the locations of the terminal 821 and the first satellite 811 together.
  • the first base station 831 can only request location information of the terminal 821 if it knows the location of the first satellite 811 or can confirm it through calculation.
  • the first base station 831 may request the locations of the terminal 821 and the first satellite 811 together.
  • the base station knows the location of the satellite or can confirm it through calculation. Therefore, in a general case, the first base station 831 can only request the location of the terminal 821 in step S1042. It should be noted that in FIG. 10A according to the present disclosure, the example includes the case where the first base station 831 does not know the location of the first satellite 811.
  • the first base station 831 since the first base station 831 already knows its own location, it does not require separate operations to obtain the locations of other nodes and the first base station 831 in order to obtain its own location.
  • the terminal 821 may transmit its location information to the first satellite 811 through a location information report message. Then, the first satellite 811 can transmit a location information report message to the first base station 831 by including the location information of the first satellite 811 in the location information report message. Through this procedure, the first base station 831 can confirm the location of the terminal 821 and the location of the first satellite.
  • the first base station 831 may perform a procedure for obtaining the location of the second NTN link.
  • the location acquisition procedure of the second NTN link may be a procedure for acquiring the locations of the second base station 832, the second satellite 812, and the terminal 821 that constitute the second NTN link.
  • the location acquisition procedure of the second NTN link may be a procedure for acquiring the locations of the second base station 832 and the second satellite 812.
  • the first base station 8131 acquires the location of the previous first NTN link, the terminal 821 It may be the case that the location of has already been obtained. Therefore, since there is no need to repeatedly acquire the location of the terminal 821, the location acquisition procedure of the second NTN link may not require obtaining the location of the terminal.
  • the first base station 831 may transmit a location information request message.
  • the location information request message may request at least one of the location of the second base station 832 forming the second NTN link, the location of the second satellite 812, and the location of the terminal 821.
  • the location of the second satellite 812 may be an essential factor. This is because the location of the second base station 832 may be obtained in advance when setting up the second NTN link described above. Additionally, since the location of the terminal 821 has already been acquired in the location acquisition procedure of the first NTN link, duplicate acquisition may not be necessary.
  • step S1054 the second base station 832 may transmit a location information report request to the terminal 821 through the second satellite 812. Step S1054 may not be performed if acquisition of the terminal's location is unnecessary, as described above. Additionally, if the second base station 832 knows the location information of the second satellite 812 in advance or can obtain it through calculation, step S1054 may not be performed. If there is no need to check the location of the terminal 821 and only the location of the second satellite 812 is needed, step S1054 may be transmitted only to the second satellite 812.
  • the terminal 821 may transmit a location information report to the second base station 832.
  • the location information report may include only the location of the terminal 821 or may include both the location of the terminal 821 and the location information of the second satellite 812.
  • the second base station 832 may report location information including information about the second satellite 812 to the first base station 831.
  • the location information may additionally include at least one of the location of the terminal 821 and/or the location of the second base station 832.
  • steps S1054 and S1056 may be unnecessary operations in a general NTN environment using satellite.
  • each base station or gateway knows the location of a satellite connected to itself or can obtain the location of the satellite through calculation.
  • the NTN environment is not limited to satellites, and can also utilize flying vehicles such as drones and/or ad balloons that can stay in a specific orbit. Therefore, in order to enable the base station according to the present disclosure to be applied even when the exact positions of these aircraft are not known at every moment, steps S1054 and S1056 are exemplified in the present disclosure.
  • the first base station 831 may perform a location acquisition procedure for the third NTN link.
  • the location acquisition procedure of the third NTN link can be obtained similarly to the location acquisition procedure of the second NTN link described above. Therefore, additional description of the location acquisition procedure of the third NTN link, which overlaps with the location acquisition procedure of the second NTN link, will be omitted.
  • the first base station 831 can obtain the location of each node corresponding to the first NTN link, the location of each node corresponding to the second NTN link, and the location of each node corresponding to the third NTN link.
  • NTN links using three different satellites are described in FIGS. 10a and 10b, the same can be applied to two NTN links as explained in steps S1010 and S1020. Additionally, even when four or more satellites are used, the location information of each NTN link can be equally obtained based on the contents described in this disclosure.
  • the first base station 831 may determine the QuickLink based on the location information obtained for each NTN link.
  • the QuickLink decision may be determined based on the distance corresponding to the service link between the terminal and the satellite communicating with the terminal, the distance corresponding to the feeder link between the satellite and the corresponding base station, and the distance between the gateway and the base station.
  • Each of these distances can be expressed as a time value, and may be calculated based on the TA value described in ⁇ Equation 1> above, or a method other than the TA value may be used.
  • the first base station 831 may transmit the determined QuickLink information to the terminal 821 through the first satellite 811. That is, the first base station 831 can transmit QuickLink information to the terminal 821 through the first NTN link.
  • the first base station 831 may transmit the determined QuickLink information to the second base station 832. Additionally, the first base station 831 may transmit QuickLink information to the third base station 833 in step S1072c.
  • Figure 10b illustrates an example assuming that the third NTN link is determined through QuickLink. Therefore, in step S1074, the third base station 833 can operate as QuickLink.
  • FIG. 11A is a portion of a signal flow diagram according to a low-delay link search method using location information of a terminal and a base station according to another embodiment of the present disclosure
  • FIG. 11B is location information of a terminal and a base station according to another embodiment of the present disclosure. This is the remaining part of the signal flow diagram according to the low-latency link search method using .
  • FIG. 11A and 11B may be a continuous signal flow diagram. Therefore, the flowchart of FIG. 11b can be performed continuously after the flowchart of FIG. 11a. Additionally, some operations in the flowcharts of FIGS. 11A and 11B may be omitted, and other operations may be additionally performed. In addition, the sequential operations of some operations in the flowcharts of FIGS. 11A and 11B may be changed. These details will become clearer through the explanation below.
  • FIGS. 11A and 11B Components in FIGS. 11A and 11B are given reference numerals using the components illustrated in FIG. 9.
  • the terminal 921, the base station 931, the first satellite 911, the second satellite 912, and the third satellite 913 are exemplified.
  • the satellites 911-913 and the terminal 921 may be connected through a service link, and the satellites 911-913 and the base station 931 may be connected through a feeder link.
  • the base station 931 may be connected to a corresponding gateway.
  • the base station 931 may be a base station connected to a corresponding gateway.
  • the terminal 921 may be communicating with the base station 931 over the first NTN link.
  • the link through which the terminal 921 communicates with the base station 831 over the first NTN link will be examined with reference to FIG. 9 described above.
  • the terminal 921 may be connected to the first satellite 911 through a service link, and the first satellite 911 may be connected to the base station 931 through a feeder link. Therefore, the terminal 921 can communicate with the base station 931 through the first satellite 911 and the first NTN link.
  • the entire link in which a terminal and a base station are connected via satellite will be referred to as an NTN link. Accordingly, the entire link where the terminal 921 is connected to the base station 931 through the first satellite 911 will be referred to as the first NTN link.
  • an NTN link may be additionally formed with another base station through another satellite.
  • step S1110 the terminal 921 exemplifies the operation of establishing a second NTN link through the base station 931 and the second satellite 912.
  • the terminal 921 can form a second NTN link with the base station 931 through the second satellite 912.
  • the base station 931 can confirm that the terminal 921 has the first NTN link established.
  • the terminal 921 may additionally establish a third NTN link through the base station 931 and the third satellite 913.
  • the terminal 921 can form a third NTN link with the base station 931 through the third satellite 913.
  • the base station 931 can check other NTN links set up in the terminal 921.
  • step S1110 that is, the terminal 921 forms a second NTN link with the second satellite 912
  • step S1120 that is, the third NTN link is formed with the third satellite 913.
  • the setup procedure for the NTN link may change.
  • the terminal 921 may first establish the third NTN link with the third satellite 913, and then establish the second NTN link with the second satellite 912.
  • Figure 11a illustrates a case in which a third NTN link is additionally established after the terminal 921 establishes the second NTN link.
  • the terminal 921 may establish only one additional NTN link after establishing the first NTN link.
  • the terminal 921 may additionally configure only the second NTN link with the base station 931 through the second satellite 912, and the terminal 921 communicates through the first NTN link.
  • only the base station 931 and the third NTN link can be additionally set up through the third satellite 913.
  • the base station 931 may temporarily set the first NTN link between the first satellite 911 and the terminal 921 as a low-latency link (QuickLink).
  • QuickLink low-latency link
  • it is intended to determine which NTN link, that is, which NTN link among the first NTN link, second NTN link, and third NTN link is the QuickLink, and to present an operation method for this.
  • the base station 931 may need to perform a procedure to determine which NTN link is QuickLink.
  • the base station 931 may perform a procedure for obtaining the location of the first NTN link.
  • acquiring the location of the NTN link may include procedures for acquiring the location of the base station, the location of the terminal, and the location of the satellite.
  • the base station since the location of the base station is already known, no additional acquisition procedure is required. Additionally, since the base station is connected to the gateway, it is assumed that the base station knows not only its own location but also the location of the gateway. Now, we will look in detail below at the procedure for acquiring the location of the terminal and satellite among the location acquisition procedures for the NTN link.
  • the base station 931 may transmit a location information report request to the terminal 921 through the first satellite 911.
  • the base station 931 may request only the location information of the terminal 921, or may request the locations of the terminal 921 and the first satellite 911 together. If the base station 931 knows the location of the first satellite 911 or can confirm it through calculation, it can only request location information of the terminal 921. On the other hand, if the location of the first satellite 911 is not known and cannot be confirmed through calculation, the base station 931 may request the locations of the terminal 921 and the first satellite 911 together.
  • the base station knows the location of the satellite or can confirm it through calculation. Therefore, in a general case, the base station 931 can only request the location of the terminal 921 in step S1142. It should be noted that in FIG. 11A according to the present disclosure, the example includes operations when the base station 931 does not know the location of the first satellite 911.
  • the base station 931 since the base station 931 already knows its own location, it does not require separate operations to obtain the locations of other nodes and the base station 931 in order to obtain its own location.
  • the first satellite 911 may transmit a location report request message to the terminal 921.
  • the terminal 921 may transmit its location information as a location information report message to the first satellite 911.
  • the first satellite 811 Based on the location information report message transmitted by the terminal 921, the first satellite 811 transmits the location information report message as is to the base station 931 in step S1148 or sends the location information report message to the location information report message of the first satellite 911. It can be transmitted to the base station 931 including location information. Through this procedure, the base station 931 can confirm the location of the terminal 921 or the location of the terminal 921 and the location of the first satellite 911.
  • the base station 931 may perform a procedure for obtaining the location of the second NTN link.
  • the base station 931 knows the location of the second satellite 912 or can obtain it through calculation. Therefore, the location acquisition procedure of the second NTN link can be obtained based on the known location information of the second satellite 912.
  • the base station 931 may perform a location acquisition procedure for the third NTN link. As previously explained in step S1150, the base station 931 knows the location of the third satellite 913 or can obtain it through calculation. Therefore, the location acquisition procedure of the third NTN link can be obtained based on the known location information of the second satellite 912.
  • the case where the base station 931 performs steps S1150 and S1160 may be an unusual case.
  • the NTN environment is not limited to satellites, and can also utilize flying vehicles such as drones and/or ad balloons that can stay in a specific orbit.
  • the base station may not be able to know the exact location of these aircraft at every moment.
  • This disclosure exemplifies steps S1150 and S1160 to apply even when the exact location of the aircraft is unknown. Additionally, it should be noted that steps S1150 and S1160 can be performed only when necessary, so they are indicated with dotted lines.
  • the base station 931 may determine the QuickLink based on the location information obtained for each NTN link.
  • the QuickLink decision may be determined based on the distance corresponding to the service link between the terminal and the satellite communicating with the terminal, the distance corresponding to the feeder link between the satellite and the corresponding base station, and the distance between the gateway and the base station.
  • Each of these distances can be expressed as a time value, and may be calculated based on the TA value described in Equation 1 above, or a method other than the TA value may be used.
  • the base station 931 may transmit the determined QuickLink information through the determined QuickLink. For example, if the first NTN link is determined to be QuickLink, the base station 931 may inform the terminal 921 through the first satellite 911 that the QuickLink determined is the link of the first satellite 911. As another example, when the second NTN link is determined to be QuickLink, the base station 931 may inform the terminal 921 through the second satellite 912 that the QuickLink determined is the link of the second satellite 912. As another example, if the third NTN link is determined to be QuickLink, the base station 931 may inform the terminal 921 through the third satellite 913 that the QuickLink determined is the link of the third satellite 913.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911, which is the initially established NTN link.
  • the base station 931 may transmit the determined QuickLink information through the link with the highest signal strength based on link signal strength information reported by the terminal 921.
  • the base station 931 may receive periodic location information from the terminal 921.
  • the base station 931 can set the NTN link through a specific control message, for example, an RRC message. Accordingly, the terminal 921 can report the location information of the terminal 921 to the base station 931 through the known QuickLink in step S1172.
  • the base station 931 may reset QuickLink based on the location information reported by the terminal 921. If the terminal 921 moves at high speed or the elevation angle with the satellites changes based on the movement of the terminal 921 even if the terminal 921 does not move at high speed, the distance between the satellites and the terminal 921 may change. You can. In particular, if the NTN network does not use satellites but uses flying vehicles such as drones or air balloons, it may have a lower altitude than the satellite. Therefore, as the terminal 921 moves, the elevation angle between the terminal 921 and the aircraft may change significantly. A change in elevation angle may ultimately mean that the distance between the terminal and the aircraft changes.
  • the base station 931 may need to periodically re-determine QuickLink. For this periodic re-determination, the location information of the terminal 921 reported from the terminal 921 can be used.
  • the base station 931 may transmit the redetermined QuickLink information to the terminal 921 through the redetermined QuickLink or a preset specific link.
  • Figure 12 is a flowchart of the operation of the NTN network according to the first embodiment of the present disclosure.
  • step S1200 the terminal and the base station can establish a single NTN link and communicate over the single NTN link.
  • the first base station 831 establishes a first NTN link with the terminal 821 through the first satellite 811, and establishes a first NTN link with the terminal 821 through the established first NTN link. Can communicate.
  • the base station 931 establishes a first NTN link with the terminal 921 through the first satellite 911 and communicates with the terminal 921 through the established first NTN link. can do. Therefore, the terminal can communicate with the base station through a single NTN link connected to one satellite.
  • the terminal may establish multiple connections or multiple TRP connections by connecting to at least one other satellite in addition to the single connected satellite.
  • a case may occur in which the terminal 821 can also receive a signal from the second satellite 812 while communicating with the first base station 831 through the first NTN link. . If the terminal 821 can receive signals from both the first satellite 811 and the second satellite 812, multiple connections can be made to the terminal 821 through multiple satellites.
  • Each base station 831-833 can set its own communication area based on the beam transmitted by the corresponding satellites 811-813. And each base station (831-833) may attempt multiple connections to a terminal located within its communication area. Since the manner in which multiple connections are made itself is beyond the scope of the present disclosure, it will not be discussed in detail here.
  • the second base station 832 can establish a second NTN link with the terminal 821 through the second satellite 812 and communicate with the terminal 821 through the established second NTN link.
  • the third base station 833 can establish a third NTN link with the terminal 821 through the third satellite 813 and communicate with the terminal 821 through the established third NTN link. In this way, when at least one NTN link of the second NTN link or the third NTN link is additionally set while the first NTN link is set in the terminal 821, the terminal 821 can make multiple connections through a plurality of satellites. there is.
  • the base station 931 determines that the terminal 921 is within the communication area of the first satellite 911, and at the same time, the terminal 921 is within the communication area of the second satellite 912 and/or the third satellite 913. You can check whether it is within the communication area. Additionally, when transmitting data to the terminal 921, the base station 931 may need to transmit data using two or more satellites, such as when the amount of data to be transmitted to the terminal 921 increases rapidly. In this case, the base station 931 may additionally configure links other than the currently configured NTN link among the plurality of satellites.
  • the base station 931 When data needs to be transmitted to the terminal 921 through multiple NTN links, the base station 931 establishes a second NTN link with the terminal 921 through the second satellite 912, and establishes a second NTN link with the terminal 921 through the established second NTN link. You can communicate with (921).
  • the base station 931 can establish a third NTN link with the terminal 921 through the third satellite 913 and communicate with the terminal 921 through the established third NTN link. In this way, when at least one of the second NTN link or the third NTN link is additionally set while the first NTN link is set in the terminal 921, each satellite may be set to multiple TRPs.
  • the base station may set a single NTN link as a temporary QuickLink (QuickLink_tmp) and set the base station as base station Q.
  • base station Q may be a base station with QuickLink.
  • Base station Q can announce QuickLink_tmp to other nodes, for example, terminals and base stations, or terminals and satellites. If the QuickLink decision can be made quickly, base station Q may be configured not to announce QuickLink_tmp to other nodes.
  • the first base station 831 may set the first NTN link connected to the terminal 821 through the first satellite 811 to QuickLink_tmp. And since the first base station 831 is a base station that only has a single NTN link, it can set itself as base station Q.
  • the first base station 831 may include a gateway connected to the first base station 831. Additionally, the first base station 831 may inform other base stations, such as the second base station 832 and/or the third base station 833, of information that it is the base station Q. Additionally, the first base station 831 may inform the terminal 821 of information that it is base station Q.
  • the base station 931 may set the first NTN link connected to the terminal 921 through the first satellite 911 to QuickLink_tmp. And the base station 931 can inform the terminal 921 that the first NTN link has been selected through QuickLink_tmp.
  • the first base station 931 since a plurality of satellites are connected to the base station 931, the setting operation of base station Q is not necessary. Therefore, the first base station 931 can only inform the terminal 921 of QuickLink_tmp information.
  • step S1206 the base station may request location information of the terminal through the link of the configured QuickLink_tmp.
  • the first embodiment of the present disclosure describes a method for searching for a low-latency link using location information. Therefore, the operation of step S1206 can be a method of using location information as low-latency link-related information.
  • Location information mentioned in this disclosure may include the following information. First, location information may simply be information about the current location. Second, location information may include additional information to the current location. Location additional information can be information for predicting the location at a specific time. Examples of location additional information include calculating the near future location (or (prediction) may include information that can be predicted. In the following description, location information may include additional information if the node is not a fixed node.
  • the terminal's request for location information may be notified to the terminal by transmitting a specific indicator to “report the current location information of the terminal” or using a specific message.
  • the reason the base station needs the location information of the terminal is to know the length of the service link. Therefore, the base station can transmit an indicator or message to the terminal to report its current location information to the base station.
  • These messages or indicators may be implemented differently depending on each communication system. For example, the base station can use the RRC message to set the location report and location report period to the terminal. As another example, if the standard allows adding a location report indicator to downlink control information (DCI), the base station can instruct the terminal to report location through DCI.
  • DCI downlink control information
  • the first base station 831 set as base station Q requests the terminal 821 to report the location information of the terminal through the first satellite 811 of the first NTN link set as QuickLink_tmp.
  • a message or location report indicator may be transmitted.
  • the base station 831 sends a terminal location information report request message or a location report indicator to the terminal 921 through the first satellite 911 of the first NTN link set to QuickLink_tmp. Can be transmitted.
  • base station Q may request the satellite location of each link and location information of other ground base stations and/or gateways connected to other base stations.
  • the locations of other terrestrial base stations and satellites, or the locations of gateways and satellites connected to other terrestrial base stations, are necessary to determine the length of the service link and the feeder link or the time delay of the service link and the time delay of the feeder link.
  • the first base station 831 set as base station Q is the second base station 832 and/or the third base station 833, the location of the satellite to which each base station is connected, and the gateway to which each base station is connected. And/or location information of the base station may be requested.
  • the first base station 831 requests the second base station 832 and/or the third base station 833 for the location of the satellite connected to each base station, the location of the base station, and/or the location of the gateway to which the base station is connected. You can request it using (backhaul) or using the Xn interface.
  • the base station 931 may request location information from each satellite 911-913. If the base station 931 knows the positions of each satellite 911-913 in advance or can obtain them through calculation, step S1208 may not be performed.
  • step S1208 was performed after performing step S1206.
  • steps S1206 and S1208 may be performed simultaneously, or step S1208 may be performed first and step S1206 may be performed later.
  • the terminal may generate location information based on the location information report request in step S1206 and report the location information to base station Q through the satellite of the NTN link that received the location information request.
  • the terminal 821 generates the location information of the terminal based on the location information request received in step S1206, and transmits the location information report message of the terminal to the first satellite (the first NTN link). It can be reported to the first base station 831 through 811).
  • This operation may be an operation corresponding to step S1044 previously described in FIG. 10A.
  • the terminal 921 generates the location information of the terminal based on the location information request received in step S1206, and transmits the location information report message of the terminal to the first satellite (the first NTN link). It can be reported to the base station (931) through 911). This operation may correspond to steps S1146 to S1148 previously described in FIG. 11A.
  • step S1212 other base station(s) and/or other satellite(s) may generate their own location information based on the location information request in step S1208 and report the generated location information to base station Q.
  • steps S1208 and S1212 may be a procedure for base station Q to obtain location information of another base station (or base station and gateway) and location information of a satellite. Therefore, when a new QuickLink is established, the new base station Q can perform steps S1208 and S1212. Additionally, the location of the base station and/or gateway generally has a fixed location. Therefore, when a new QuickLink is established, the old base station Q can provide the location information of the base station and/or gateway to the base station Q of the new QuickLink. In this way, if the old base station Q provides the location information of the base station and/or gateway to the base station Q of the new QuickLink, the base station Q of the new QuickLink may not request the location information of the base station and/or gateway having a different NTN link.
  • the old base station Q may provide the new QuickLink base station Q with the location of the satellite having a feeder link corresponding to each base station and additional satellite information, such as the satellite's altitude, movement speed, and movement path. In this way, if the old base station Q provides additional information about each satellite to the new QuickLink base station Q, and the position of the satellite can be predicted based on this, the new QuickLink base station Q will not even request location information about the satellite. You can.
  • the base station Q of the new QuickLink can perform steps S1208 and S1212 at least once. Additionally, to obtain satellite information, the new QuickLink's base station Q can perform steps S1208 and S1212 in certain time units.
  • the second base station 832 reports its own location information and/or the location information of the gateway connected to the second base station 832 based on the location information request in step S1208. It can be generated as a location information reporting message and transmitted to the first base station 831. At this time, the location information reporting message transmitted from the second base station 832 to the first base station 831 may be transmitted through a backhaul or Xn interface connected between base stations. Additionally, the third base station 833 can transmit a location information report message to the first base station 831 using the same method as the second base station 832.
  • the second satellite 912 may generate its own location information as a location information report message based on the location information request of step S1208 and transmit it to the base station 931.
  • the location information reporting message transmitted from the second satellite 912 to the base station 931 may be transmitted through a feeder link.
  • the operation of step S1212 can be omitted in a multi-TRP environment as shown in FIG. 9.
  • the case where the base station cannot know the location information of the satellite may include the case of an aircraft other than a satellite, as previously described in FIGS. 10A and 10B or FIGS. 11A and 11B.
  • base station Q can receive location information of the terminal, location information of each satellite, and location information of the gateway and base stations communicating with the satellite. Therefore, base station Q can determine QuickLink based on the received location information. QuickLink can be determined based on the length of the service link (distance between nodes of the service link) and the length of the feeder link (distance between nodes of the feeder link). This can obtain the length of the service link based on the location of the terminal and the location of the satellite. Additionally, the distance of the feeder link can be obtained based on the distance between the satellite and the gateway or the distance between the satellite and the base station (if the base station is located in the same place as the gateway or the base station and gateway are configured as one).
  • one satellite corresponds to one NTN link. Therefore, there may be several ways to identify which satellite link has low delay. In this disclosure, we will look at one of these methods as an example.
  • the low-latency link according to the present disclosure that is, QuickLink, can be calculated as shown in Equation 2 below.
  • T QL represents the propagation delay time in the current QuickLink wireless channel (service link + feeder link). If QuickLink is not set, it is replaced by the propagation delay time of QuickLink_tmp.
  • T min is the sum of the propagation delay times of the service link and the feeder link for each link in a multi-link or multi-TRP, and the minimum value among the T i values is T min . define. and is an arbitrary threshold.
  • the change sensitivity of QuickLink can be adjusted using the threshold. For example, if you set the threshold large, QuickLink changes will not occur quickly, and if you set the threshold small, QuickLink changes will occur quickly. Therefore, based on the result of ⁇ Equation 2>, it can be decided whether to update or maintain the new QuickLink. If the new link is updated as QuickLink, the link corresponding to T min can be selected as QuickLink.
  • step S1216 the base station operating as Q_tmp can transmit the determined QuickLink information to the terminal and other base stations.
  • the first base station 831 operating as base station Q can transmit the determined QuickLink information to the terminal 821 through the first NTN link, which is QuickLink_tmp. Additionally, the first base station 831 operating as base station Q may transmit the determined QuickLink information to the second base station 832 and/or the third base station 833 using a backhaul or Xn interface connected between base stations.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 since there are no other base stations, there is no need to transmit the determined QuickLink information to other base stations.
  • QuickLink information transmitted in step S1216 may include the following two types of information.
  • step S1218 the terminal and base stations can set the corresponding base station as base station Q based on QuickLink information.
  • the first base station 831 can set QuickLink and base station Q based on the QuickLink determined in step S1214. Additionally, the second base station 832 and the third base station 833 can also set QuickLink and base station Q based on the QuickLink determined in step S1214. Then, the terminal 821 can delete QuickLink_tmp and set QuickLink based on the information received in step S1214. In other words, all base stations can identify which base station QuickLink and base station Q are.
  • the first base station 831 may set itself as base station Q and the first NTN link through itself is QuickLink. there is. Accordingly, the first base station 831 can subsequently perform the operation corresponding to base station Q described in FIG. 12.
  • the second base station 832 may set itself to base station Q and the second NTN link through itself is QuickLink. there is. Accordingly, the second base station 832 can subsequently perform the operation corresponding to base station Q described in FIG. 12.
  • the first base station 831 may be a base station other than base station Q.
  • the base station 931 can set the QuickLink based on the QuickLink determined in step S1214.
  • base station Q since each satellite (911-913) operates as a TRP, base station Q may not be changed or base station Q may not be defined. However, the base station can determine whether the QuickLink is the first NTN link, the second NTN link, or the third NTN link.
  • steps S1216 and S1218 may be operations for transmitting information and setting base station Q when a new QuickLink is determined. Therefore, if there is no change in QuickLink based on the decision in step S1214, steps S1216 and S1218 can be omitted.
  • Step S1220 may be an operation performed when base station Q is set to report location information to the terminal at regular intervals. Therefore, base station Q can proceed to step S1210 when periodic location information is updated from the terminal.
  • step S1206 If the terminal is not set to report location information at regular intervals, you can proceed to step S1206. In addition, when proceeding to step S1206, it can be done in preset time units, and when performing step S1206, step S1208 can also be performed. For example, as described above, if the NTN network includes satellites and/or aircraft, step S1208 needs to be additionally included. Therefore, when receiving a location signal from the terminal, step S1210 can be performed alone, or steps S1208 and S1210 can be performed together.
  • Figure 13 is a flowchart of the operation of the NTN network according to the second embodiment of the present disclosure.
  • step S1300 the terminal and the base station can establish a single NTN link and communicate over the single NTN link.
  • the first base station 831 establishes a first NTN link with the terminal 821 through the first satellite 811, and establishes a first NTN link with the terminal 821 through the established first NTN link. Can communicate.
  • the base station 931 establishes a first NTN link with the terminal 921 through the first satellite 911 and communicates with the terminal 921 through the established first NTN link. can do. Therefore, the terminal can communicate with the base station through a single NTN link connected to one satellite.
  • the terminal can establish multiple connections or multiple TRP connections by connecting to at least one other satellite in addition to the single connected satellite.
  • a case may occur where the terminal 821 can also receive a signal from the second satellite 812 while communicating with the first base station 831 through the first NTN link. . If the terminal 821 can receive signals from both the first satellite 811 and the second satellite 812, multiple connections can be made to the terminal 821 through multiple satellites.
  • Each base station 831-833 can set its own communication area based on the beam transmitted by the corresponding satellites 811-813. And each base station (831-833) may attempt multiple connections to a terminal located within its communication area. Since the manner in which multiple connections are made itself is beyond the scope of the present disclosure, it will not be discussed in detail here.
  • the second base station 832 can establish a second NTN link with the terminal 821 through the second satellite 812 and communicate with the terminal 821 through the established second NTN link.
  • the third base station 833 can establish a third NTN link with the terminal 821 through the third satellite 813 and communicate with the terminal 821 through the established third NTN link. In this way, when at least one NTN link of the second NTN link or the third NTN link is additionally set while the first NTN link is set in the terminal 821, the terminal 821 can make multiple connections through a plurality of satellites. there is.
  • the base station 931 determines that the terminal 921 is within the communication area of the first satellite 911, and at the same time, the terminal 921 is within the communication area of the second satellite 912 and/or the third satellite 913. You can check whether it is within the communication area. Additionally, when transmitting data to the terminal 921, the base station 931 may need to transmit data using two or more satellites, such as when the amount of data to be transmitted to the terminal 921 increases rapidly. In this case, the base station 931 may additionally configure links other than the currently configured NTN link among the plurality of satellites.
  • the base station 931 When data needs to be transmitted to the terminal 921 through multiple NTN links, the base station 931 establishes a second NTN link with the terminal 921 through the second satellite 912, and establishes a second NTN link with the terminal 921 through the established second NTN link. You can communicate with (921).
  • the base station 931 can establish a third NTN link with the terminal 921 through the third satellite 913 and communicate with the terminal 921 through the established third NTN link. In this way, when at least one of the second NTN link or the third NTN link is additionally set while the first NTN link is set in the terminal 921, each satellite may be set to multiple TRPs.
  • the base station may set a single NTN link as a temporary QuickLink (QuickLink_tmp) and set the base station as base station Q.
  • base station Q may be a base station with QuickLink.
  • Base station Q can announce QuickLink_tmp to other nodes, for example, terminals and base stations, or terminals and satellites. If the QuickLink decision can be made quickly, base station Q may be configured not to announce QuickLink_tmp to other nodes.
  • the first base station 831 may set the first NTN link connected to the terminal 821 through the first satellite 811 to QuickLink_tmp. And since the first base station 831 is a base station that only has a single NTN link, it can set itself as base station Q.
  • the first base station 831 may include a gateway connected to the first base station 831. Additionally, the first base station 831 may inform other base stations, such as the second base station 832 and/or the third base station 833, of information that it is the base station Q. Additionally, the first base station 831 may inform the terminal 821 of information that it is base station Q.
  • the base station 931 may set the first NTN link connected to the terminal 921 through the first satellite 911 to QuickLink_tmp. And the base station 931 can inform the terminal 921 that the first NTN link has been selected through QuickLink_tmp.
  • the first base station 931 since a plurality of satellites are connected to the base station 931, the setting operation of base station Q is not necessary. Therefore, the first base station 931 can only inform the terminal 921 of QuickLink_tmp information.
  • step S1306 the base station may transmit an indicator to the terminal to report delay time information of all NTN links communicating through the set QuickLink_tmp link.
  • the second embodiment of the present disclosure describes a method for searching for a low-delay link using delay time information. Therefore, the operation of step S1306 can be a method of using delay time information as low-delay link-related information.
  • the base station may instruct the terminal to report delay time information in preset periodic units.
  • step S1306 Since there is no particular difference in the operation of step S1306 between the case of FIG. 8 and the case of FIG. 9, separate description will be omitted. However, when satellites operate with multiple TRPs as shown in Figure 9, all satellites can be connected to one base station. Therefore, if satellites operate with multiple TRPs, step S1310 can be omitted.
  • base station Q may request common delay time information for each link from each base station.
  • the first base station 831 operating as base station Q, is connected to the second base station 832 and/or the third base station 833 of the NTN link through the satellite to which each base station is connected.
  • Common latency information can be requested.
  • the common delay time in each of the NTN links may be the delay time of the feeder link. Because base stations and gateways are always located in specific locations on the ground, they do not move, and only the satellites connected to each base station move. Therefore, the delay time of the feeder link can be a common delay time for all terminals connected to the satellite. Therefore, the common delay time information can be the delay time information of the feeder link for each of the NTN links.
  • a request for feeder link delay time or common delay time information for each of the NTN links connected to each base station from the first base station 831 to the second base station 832 and/or the third base station 833 is a backhaul between base stations ( You can request it using the backhaul or the Xn interface.
  • step S1308 In the case of FIG. 9 in which a plurality of satellites operate with multiple TRPs, the operation in step S1308 is not performed because there is only one base station. That is, since the base station 931 knows the feeder link delay time for each of the satellites 911-913, there is no need to perform step S1308. Therefore, in the case of FIG. 9 in which a plurality of satellites operate with multiple TRPs, the base station does not perform step S1312, which will be explained below.
  • step S1308 was performed after step S1306.
  • steps S1306 and S1308 may be performed simultaneously, or step S1308 may be performed first, and then step S1306 may be performed.
  • the terminal may generate delay time information for all NTN links for each link based on the delay time information report request for all NTN links in step S1306. Then, the terminal configures the generated delay time information for each link into each message, or creates one message and reports the location information to base station Q through the satellite of the NTN link that has received the delay time information reporting request for all NTN links. You can. At this time, if the terminal does not know the feeder link delay time for one of the NTN links, it can report delay time information excluding the feeder link delay time of the corresponding NTN link to the base station.
  • the terminal may report that there is no feeder link delay in the delay time of the corresponding NTN link for the NTN link without the feeder link delay time and include it in the message so that it can be identified. .
  • step S1310 Since the operation of step S1310 does not differ depending on the multiple connection and multiple TRP environments, descriptions referring to FIGS. 8 and 9 will be omitted. However, when satellites operate with multiple TRPs as shown in Figure 9, all satellites can be connected to one base station. Therefore, if satellites operate with multiple TRPs, step S1310 can be omitted.
  • step S1312 other base stations can report delay time information for the feeder link between themselves and the satellite to base station Q based on the common delay time information report request in step S1308.
  • steps S1308 and S1312 may be a procedure for base station Q to obtain common delay time information of another base station (or base station and gateway). Therefore, when a new QuickLink is established, the new base station Q can perform steps S1308 and S1312.
  • step S1314 base station Q receives delay time information for each NTN link and common delay time information from each base station from the terminal, so it can determine QuickLink based on this. Given the delay time information of each NTN link, base station Q may have several ways to identify which satellite link has low delay. One of these methods can use the method of ⁇ Equation 2> described above. Since ⁇ Equation 2> was explained in the first embodiment, redundant explanation will be omitted.
  • base station Q can transmit the determined QuickLink information to the terminal and other base stations.
  • the first base station 831 operating as base station Q can transmit the determined QuickLink information to the terminal 821 through the first NTN link, which is QuickLink_tmp. Additionally, the first base station 831 operating as base station Q may transmit the determined QuickLink information to the second base station 832 and/or the third base station 833 using a backhaul or Xn interface connected between base stations.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 since there are no other base stations, there is no need to transmit the determined QuickLink information to other base stations.
  • QuickLink information transmitted in step S1316 may include the following two types of information.
  • step S1318 the terminal and base stations can set the corresponding base station as base station Q based on QuickLink information.
  • the first base station 831 can set QuickLink and base station Q based on the QuickLink determined in step S1314. Additionally, the second base station 832 and the third base station 833 can also set QuickLink and base station Q based on the QuickLink determined in step S1314. Then, the terminal 821 can delete QuickLink_tmp and set QuickLink based on the information received in step S1314. In other words, all base stations can identify which base station QuickLink and base station Q are.
  • the first base station 831 may set itself as base station Q and the first NTN link through itself is QuickLink. there is. Accordingly, the first base station 831 can subsequently perform the operation corresponding to base station Q described in FIG. 12.
  • the second base station 832 is set to base station Q and the second NTN link is determined to be QuickLink
  • the second base station 832 may set itself to base station Q and the second NTN link through itself is QuickLink. there is.
  • the first base station 831 may be a base station other than base station Q.
  • step S1318 can be omitted.
  • steps S1316 and S1318 may be operations for transmitting information and setting base station Q when a new QuickLink is determined. Therefore, if there is no change in QuickLink based on the decision in step S1314, steps S1316 and S1318 can be omitted.
  • Step S1320 may be an operation performed when base station Q is set to report (or update) delay time information to the terminal at regular intervals. Therefore, base station Q can proceed to step S1310 when periodic delay time information is reported (or updated) from the terminal.
  • step S1306 If the terminal is not set to report delay time information at regular intervals, you can proceed to step S1306. Additionally, when proceeding to step S1306, it can be done in preset time units, and when performing step S1306, step S1308 can also be performed.
  • the second embodiment described above has similar procedures to the first embodiment described above.
  • location information of the terminal was used, but in the second embodiment, there is a difference in that low-delay links are found by collecting delay time information for each link.
  • the delay time information described above can collectively refer to data that can tell the propagation delay time in a wireless link.
  • a representative example of propagation delay time is the timing TA value.
  • the TA value may include information as previously described in ⁇ Equation 1>. Therefore, when using the TA value, the common delay time information is as described in ⁇ Equation 1> It can mean.
  • the terminal does not perform a random access procedure on a random NTN link, the terminal cannot know delay time information (e.g. TA) occurring in the feeder link for the NTN link. Therefore, the terminal cannot report delay time information occurring in the feeder link of the corresponding NTN link to the base station before performing the random access procedure. Therefore, in preparation for this case, base station Q can receive the delay time in the feeder link from the base station by performing steps S1308 and S1312.
  • delay time information e.g. TA
  • all time information eg, TA
  • base station Q can check whether the terminal has performed random access to the NTN link, it can determine whether to perform steps S1308 and S1312 for each base station. For example, if it can be confirmed that all terminals have performed random access procedures for all NTN links, base station Q can omit steps S1308 and S1312.
  • Figure 14 is a flowchart of the operation of the NTN network according to the third embodiment of the present disclosure.
  • step S1400 the terminal and the base station can establish a single NTN link and communicate over the single NTN link. Since step S1400 is the same as step S1200 or step S1300 previously described in FIGS. 12 and 13, the same detailed description with reference to FIGS. 8 and 9 will be omitted.
  • step S1402 the terminal can establish multiple connections or multiple TRP connections by connecting to at least one other satellite in addition to the single connected satellite. Since step S1402 is also the same as step S1202 or step S1302 previously described in FIGS. 12 and 13, the same detailed description with reference to FIGS. 8 and 9 will be omitted.
  • the base station may set a single NTN link as a temporary QuickLink (QuickLink_tmp) and set the base station as base station Q.
  • base station Q may be a base station with QuickLink.
  • Base station Q can announce QuickLink_tmp to other nodes, for example, terminals and base stations, or terminals and satellites. If the QuickLink decision can be made quickly, base station Q may be configured not to announce QuickLink_tmp to other nodes.
  • step S1404 is also the same as step S1204 or step S1304 previously described in FIGS. 12 and 13, the same detailed description with reference to FIGS. 8 and 9 will be omitted.
  • step S1406 the base station may request delay time information for each NTN link from each base station forming an NTN link with the terminal.
  • the third embodiment of the present disclosure describes a method for searching for a low-delay link using delay time information. Therefore, the operation of step S1406 can be a method of using delay time information as low-delay link-related information.
  • the first base station 831 operating as base station Q is the second base station 832 and/or the third base station 833 of the NTN link through the satellite to which each base station is connected. You can request delay time information.
  • the first base station 831 requests delay time information for each of the NTN links connected to the second base station 832 and/or the third base station 833 using backhaul between base stations or You can request it using the interface.
  • step S1406 In the case of FIG. 9 in which a plurality of satellites operate with multiple TRPs, the operation of step S1406 is not performed because there is only one base station. That is, since the base station 931 knows the link delay time for each of the NTN links, there is no need to perform step S1406. Therefore, in the case of FIG. 9 in which a plurality of satellites operate with multiple TRPs, base station Q does not perform step S1408, which will be explained below.
  • step S1408 other base stations can report delay time information about themselves and the NTN link connected to the terminal via satellite to base station Q based on the delay time information report request in step S1406.
  • roundtrip time can be measured.
  • the base station can transmit a signal for RTT measurement to the terminal through the NTN link and check the delay of the NTN link using the RTT signal returned from the terminal.
  • the delay time for a feeder link between a satellite and a base station can be calculated based on the altitude and location of the satellite. Additionally, the link delay for a service link can be calculated by using the average value for the service link within the cell radius provided by the satellite at the altitude and location of the satellite. Also, if the satellite is a vent-pipe satellite, the base station can receive the time value at which the signal is processed from the satellite. Therefore, using the sum of these delay time values, the base station may calculate and obtain the delay time to the terminal connected through the satellite.
  • the base station can check the delay time of the NTN link connected to the corresponding terminal.
  • Each base station can check the delay time of the NTN link like this and report the delay time information to base station Q in step S1408.
  • step S1408 can be applied in the case of multiple connections in which multiple satellites are connected through each base station, as shown in FIG. 8. In other words, if satellites operate with multiple TRPs as shown in FIG. 9, it can be omitted.
  • step S1410 base station Q receives delay time information for each NTN link and common delay time information from each base station from the terminal, so it can determine QuickLink based on this.
  • base station Q may have several ways to identify which satellite link has low delay. One of these methods can use the method of ⁇ Equation 2> described above. Since ⁇ Equation 2> was explained in the first embodiment, redundant explanation will be omitted.
  • step S1410 in an environment where a plurality of satellites operate with multiple TRPs as shown in FIG. 9, the base station 931 can determine QuickLink based on the delay time through each satellite.
  • step S1412 base station Q can transmit the determined QuickLink information to the terminal and other base stations.
  • the first base station 831 operating as base station Q can transmit the determined QuickLink information to the terminal 821 through the first NTN link, which is QuickLink_tmp. Additionally, the first base station 831 operating as base station Q may transmit the determined QuickLink information to the second base station 832 and/or the third base station 833 using a backhaul or Xn interface connected between base stations.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 may transmit the determined QuickLink information to the terminal 921 through the first satellite 911 of the first NTN link, which is QuickLink_tmp.
  • the base station 931 since there are no other base stations, there is no need to transmit the determined QuickLink information to other base stations.
  • QuickLink information transmitted in step S1412 may include the following two types of information.
  • step S1414 the terminal and base stations can set the corresponding base station as base station Q based on QuickLink information.
  • the first base station 831 can set QuickLink and base station Q based on the QuickLink determined in step S1410. Additionally, the second base station 832 and the third base station 833 can also set QuickLink and base station Q based on the QuickLink determined in step S1410. And the terminal 821 can delete QuickLink_tmp and set QuickLink based on the information received in step S1410. In other words, all base stations can identify which base station QuickLink and base station Q are.
  • the first base station 831 may set itself as base station Q and the first NTN link through itself is QuickLink. there is. Accordingly, the first base station 831 can subsequently perform the operation corresponding to base station Q described in FIG. 12.
  • the second base station 832 is set to base station Q and the second NTN link is determined to be QuickLink
  • the second base station 832 may set itself to base station Q and the second NTN link through itself is QuickLink. there is.
  • the base station corresponding to the previous QuickLink is the first base station 831
  • the first base station 831 may be a base station other than base station Q.
  • steps S1412 and S1414 may not be performed.
  • step S1414 can be omitted.
  • Step S1416 may be an operation performed when base station Q is set to report (or update) delay time information to the terminal at a certain period. Therefore, base station Q can proceed to step S1410 when periodic delay time information is reported (or updated) from the terminal.
  • step S1408 If the terminal is not set to report delay time information at regular intervals, the process can proceed to step S1408. Additionally, when proceeding to step S1408, it may be done in preset time units.
  • the third embodiment described above has similar procedures to the second embodiment described above.
  • delay time information of the corresponding terminal is requested from base stations participating in multiple connections, and QuickLink is set through the information.
  • the base stations of each link can know the delay time of the feeder link regardless of whether the terminal has performed random access. However, if the terminal does not perform random access, the delay in the service link cannot be confirmed. Therefore, this disclosure may correspond to a terminal after random access. In other words, if the terminal performs a random access procedure, the base station can also know the delay time of the service link. Therefore, if the terminal does not perform a random access procedure, the base station uses values such as the maximum delay time, minimum delay time, and average delay time of the service link in the area served by the satellite to replace the delay time of the service link. You can utilize it.
  • Figure 15 is a flowchart of the operation of the NTN network according to the fourth embodiment of the present disclosure.
  • Step S1500 refers to when the QuickLink selection procedure begins.
  • Step S1500 may correspond to steps S1200 to S1204 previously described in FIG. 12.
  • a second satellite and/or a third satellite may be connected, resulting in a multi-connection or multi-TRP environment.
  • it may include setting a specific base station, for example, a base station in a single NTN environment, as a temporary base station Q.
  • base station Q may request link state information for each NTN link from other base stations, for example, the second base station and/or the third base station.
  • link state information refers to whether a terminal, for example, a user equipment (UE) has performed a random access procedure, whether the UE knows delay time information (e.g., TA), and whether the base station has delay time information on the link with the terminal. This can be information about whether the location information of the terminal is known or how accurate the location information is.
  • UE user equipment
  • step S1502 is an operation to request link status information from another base station, it can only be performed in the case of multiple connections as described above in FIG. 8. In other words, when satellites operate with multiple TRPs as shown in FIG. 9, step S1502 can be omitted.
  • step S1504 other base stations may transmit NTN link state information to base station Q based on the request in step S1502. Therefore, base station Q can receive NTN link status information from other base stations in step S1504.
  • base station Q may request information for QuickLink decision for each NTN link.
  • the information for determining QuickLink can be a process of obtaining information related to a low-latency link.
  • Information related to the low-latency link may be the information described in the first to third embodiments above. Therefore, the information for quick link determination for each NTN link can be obtained by applying the first embodiment described above, the second embodiment, or the method of the third embodiment.
  • step S1506 can perform steps S1206-S1210 and steps S1208-S1212 described in FIG. 12.
  • the information related to the low-latency link may be location information about the nodes of each NTN link mentioned in the first embodiment.
  • step S1506 can perform steps S1306-S1310 and steps S1308-S1312 described in FIG. 13.
  • the information related to the low-delay link may be the delay time information for each NTN link mentioned in the second embodiment.
  • step S1506 may perform steps S1406 to S1408 described in FIG. 14.
  • the information related to the low-delay link may be the delay time information for each NTN link mentioned in the third embodiment.
  • step S1508 base station Q can determine QuickLink based on information received for each NTN link.
  • the QuickLink determination method in step S1508 if information is requested according to the method of FIG. 12 in step S1506, the method described in step S1214 can be used.
  • the QuickLink determination method in step S1508 can be done by using the method described in step S1314 when information is requested according to the method of FIG. 13 in step S1506.
  • the QuickLink determination method in step S1508 can be used as described in step S1410 when information is requested according to the method of FIG. 14 in step S1506.
  • step S1510 base station Q can notify other base stations and terminals of the determined QuickLink.
  • the operation of step S1510 may be performed in steps after S1216, such as steps S1216 and S1218. Additionally, since notification to other base stations is limited to multiple connections as shown in FIG. 8, QuickLink can only be transmitted to the terminal in a multi-TRP environment as shown in FIG. 9.
  • step S1510 uses the second embodiment of FIG. 13, steps after S1316, such as steps S1316 and S1318, may be performed. Also, in the second embodiment, the case of notifying other base stations is limited to the case of multiple connections as shown in FIG. 8, so QuickLink can be transmitted only to the terminal in a multi-TRP environment as shown in FIG. 9.
  • step S1510 uses the third embodiment of FIG. 14, steps after S1412, such as steps S1412 and S1416, may be performed. Also, in the third embodiment, the case of notifying other base stations is limited to the case of multiple connections as shown in FIG. 8, so QuickLink can be transmitted only to the terminal in a multi-TRP environment as shown in FIG. 9.
  • FIG. 15 The operation of FIG. 15 described above may be performed repeatedly in specific time units because the state information of each link may change.
  • the low-latency link described above can be used in various fields.
  • a low-latency link can be used when relatively urgent data needs to be transmitted, such as retransmission of data or transmission of important control messages.
  • Computer-readable recording media include all types of recording devices that store information that can be read by a computer system. Additionally, computer-readable recording media can be distributed across networked computer systems so that computer-readable programs or codes can be stored and executed in a distributed manner.
  • computer-readable recording media may include hardware devices specially configured to store and execute program instructions, such as ROM, RAM, or flash memory.
  • Program instructions may include not only machine language code such as that created by a compiler, but also high-level language code that can be executed by a computer using an interpreter or the like.
  • a block or device corresponds to a method step or feature of a method step.
  • aspects described in the context of a method may also be represented by corresponding blocks or items or features of a corresponding device.
  • Some or all of the method steps may be performed by (or using) a hardware device, such as, for example, a microprocessor, programmable computer, or electronic circuit. In some embodiments, at least one or more of the most important method steps may be performed by such a device.
  • a programmable logic device e.g., a field programmable gate array
  • a field-programmable gate array may operate in conjunction with a microprocessor to perform one of the methods described in this disclosure. In general, it is desirable for the methods to be performed by some hardware device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Astronomy & Astrophysics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

본 개시는 비-지상 네트워크(non-terrestrial network; NTN)에서 저지연 링크의 탐색을 위한 방법 및 장치가 개시된다. 본 개시의 일 실시예에 따른 제1 기지국의 방법은, 제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크가 설정된 상태에서 상기 단말에 제2 위성을 통해 제2 NTN 링크가 설정되는 경우 제1 NTN 링크를 임시 저지연 링크로 설정하는 단계; 상기 제1 NTN 링크의 노드들에 대한 제1 저지연 링크 관련 정보를 획득하는 단계; 상기 제2 NTN 링크의 노드들에 대한 제2 저지연 링크 관련 정보를 획득하는 단계; 상기 제1 저지연 링크 관련 정보와 상기 제2 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하는 단계; 및 상기 결정된 저지연 링크의 정보를 상기 단말로 전송하는 단계;를 포함할 수 있다.

Description

비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치
본 개시는 비-지상 네트워크 기술에 관한 것으로, 더욱 상세하게는 비-지상 네트워크에서 저지연 링크의 탐색 기술에 관한 것이다.
기존 통신 네트워크(예를 들어, LTE(long term evolution), LTE-A(advanced) 등)보다 향상된 통신 서비스를 제공하기 위한 통신 네트워크(예를 들어, 5G 통신 네트워크, 6G 통신 네트워크 등)는 개발되고 있다. 5G 통신 네트워크(예를 들어, NR(new radio) 통신 네트워크)는 6GHz 이하의 주파수 대역뿐만 아니라 6GHz 이상의 주파수 대역을 지원할 수 있다. 즉, 5G 통신 네트워크는 FR1 대역 및/또는 FR2 대역을 지원할 수 있다. 5G 통신 네트워크는 LTE 통신 네트워크에 비해 다양한 통신 서비스 및 시나리오를 지원할 수 있다. 예를 들어, 5G 통신 네트워크의 사용 시나리오(usage scenario)는 eMBB(enhanced Mobile BroadBand), URLLC(Ultra Reliable Low Latency Communication), mMTC(massive Machine Type Communication) 등을 포함할 수 있다.
6G 통신 네트워크는 5G 통신 네트워크에 비해 다양한 통신 서비스 및 시나리오를 지원할 수 있다. 6G 통신 네트워크는 초성능, 초대역, 초공간, 초정밀, 초지능, 및/또는 초신뢰의 요구사항들을 만족할 수 있다. 6G 통신 네트워크는 다양하고 넓은 주파수 대역을 지원할 수 있고, 다양한 사용 시나리오들(예를 들어, 지상(terrestrial) 통신, 비-지상(non-terrestrial) 통신, 사이드링크(sidelink) 통신 등)에 적용될 수 있다.
통신 네트워크(예를 들어, 5G 통신 네트워크, 6G 통신 네트워크 등)는 지상에 위치한 단말들에 통신 서비스를 제공할 수 있다. 지상 뿐만 아니라 비-지상에 위치한 비행기, 드론(drone), 위성(satellite) 등을 위한 통신 서비스의 수요가 증가하고 있으며, 이를 위해 비-지상 네트워크(non-terrestrial network; NTN)를 위한 기술들이 논의되고 있다. 비-지상 네트워크는 5G 통신 기술, 6G 통신 기술 등에 기초하여 구현될 수 있다. 예를 들어, 비-지상 네트워크에서 위성과 지상에 위치한 통신 노드 또는 비-지상에 위치한 통신 노드(예를 들어, 비행기, 드론 등) 간의 통신은 5G 통신 기술, 6G 통신 기술 등에 기초하여 수행될 수 있다. 비-지상 네트워크에서 위성은 통신 네트워크(예를 들어, 5G 통신 네트워크, 6G 통신 네트워크 등)에서 기지국의 기능을 수행할 수 있다.
한편, 단말에 서비스할 수 있는 지상 기지국과 위성이 복수 개가 존재하는 환경에서, 단말은 다중-송/수신 점(Multi-Transmission/Reception Point, Multi-TRP)나 다중 연결 기술을 통해 복수개의 기지국들 중의 일부로부터 데이터를 수신할 수 있다. 특히 위성 기지국(bent-pipe유형)을 활용하는 경우에, 위성의 위치 (고도, 앙각 등), 단말의 위치 및 지상 게이트웨이의 위치에 따라서 단말과 기지국간의 전송 지연시간이 결정되며, 다중 연결 서비스를 제공하는 링크들의 지연시간들은 수 밀리 초(ms)에서 수백 밀리 초(ms)에 이르는 매우 큰 편차를 가질 수 있다. 이런 경우, 다중 링크(혹은 Multi-TRP) 환경에서 저지연 링크를 적절하게 활용하면 이득을 가질 수 있는 경우가 존재할 수 있다. 예를 들어, 다중 연결을 통해서 수신한 데이터(예를 들어, PDSCH)들에 대한 복합 자동 재전송 요청(hybrid automatic repeat request, HARQ) 피드백(Feedback)을 저지연 링크를 통해 모두 전달하면, HARQ Feedback 지연으로 인한 혼잡을 줄일 수 있을 것이다. 이와 같은 기술을 구현하기 위해 저지연 링크를 찾는 방법이 필요하다.
상기와 같은 문제점을 해결하기 위한 본 개시의 목적은 비-지상 네트워크의 다중 연결 환경에서 저지연 링크의 탐색 및 운영 방법 및 장치를 제공하는 데 있다.
상기 목적을 달성하기 위한 본 개시의 실시예에 따른 제1 기지국의 방법은, 제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크가 설정된 상태에서 상기 단말에 제2 위성을 통해 제2 NTN 링크가 설정되는 경우 제1 NTN 링크를 임시 저지연 링크로 설정하는 단계; 상기 제1 NTN 링크의 노드들에 대한 제1 저지연 링크 관련 정보를 획득하는 단계; 상기 제2 NTN 링크의 노드들에 대한 제2 저지연 링크 관련 정보를 획득하는 단계; 상기 제1 저지연 링크 관련 정보와 상기 제2 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하는 단계; 및 상기 결정된 저지연 링크의 정보를 상기 단말로 전송하는 단계;를 포함할 수 있다.
상기 제1 NTN 링크의 노드들은, 상기 제1 기지국과 직접 연결되는 제1 게이트웨이, 상기 제1 게이트웨이와 제1 피더 링크로 연결되는 상기 제1 위성, 및 상기 제1 위성과 제1 서비스 링크로 연결되는 상기 단말을 포함할 수 있다.
상기 제2 NTN 링크의 노드들은, 제2 기지국, 상기 제2 기지국과 직접 연결되는 제2 게이트웨이, 상기 제2 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및 상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함할 수 있다.
상기 저지연 링크 정보를 상기 제2 기지국으로 전송하는 단계;를 더 포함할 수 있다.
제2 NTN 링크 상태 정보를 상기 제2 기지국으로 요청하는 단계; 및 상기 제2 기지국으로부터 상기 제2 NTN 링크 상태 정보를 수신하는 단계;를 더 포함할 수 있으며,
상기 NTN 링크 상태 정보는 상기 단말의 임의 접속 절차 수행 여부 정보를 포함할 수 있다.
상기 제2 NTN 링크의 각 노드들은, 상기 제1 기지국과 직접 연결되는 상기 제1 게이트웨이, 상기 제1 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및 상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함할 수 있다.
상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함할 수 있다.
상기 상기 단말로부터 주기적인 위치 또는 지연 시간 정보가 수신될 시 상기 저지연 링크를 재결정하는 단계;를 더 포함할 수 있다.
상기 저지연 링크를 결정하는 단계는, 현재 저지연 링크가 아닌 NTN 링크들 중 최소 지연 시간을 갖는 NTN 링크의 제1 전파 지연 시간을 획득하는 단계; 상기 현재 저지연 링크의 제2 전파 지연 시간과 상기 제1 전파 지연 시간 간의 차를 계산하는 단계; 및 상기 계산된 차가 미리 결정된 값보다 큰 경우 상기 제1 전파 지연 시간을 갖는 NTN 링크를 상기 저지연 링크로 결정하는 단계;를 포함할 수 있다.
상기 목적을 달성하기 위한 본 개시의 실시예에 따른 제1 기지국의 방법은, 제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크를 설정하는 단계; 상기 단말과 상기 제1 NTN 링크 설정 전에 기 설정된 제2 NTN 링크의 제2 기지국으로부터 저지연 링크 관련 정보의 요청을 수신하는 단계; 상기 요청에 따라 상기 제1 NTN 링크의 저지연 관련 정보를 상기 제2 기지국으로 전송하는 단계; 상기 제2 기지국으로부터 상기 제1 기지국을 저지연 링크로 설정한 저지연 링크 정보가 수신될 시 미리 설정된 시간 단위로 상기 단말과 설정된 모든 NTN 링 크들의 저지연 링크 관련 정보를 획득하는 단계; 상기 획득된 모든 NTN 링크들의 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하는 단계; 및 상기 결정된 저지연 링크의 정보를 상기 단말로 전송하는 단계;를 포함할 수 있다.
상기 제1 NTN 링크의 노드들은, 상기 제1 기지국과 직접 연결되는 제1 게이트웨이, 상기 제1 게이트웨이와 제1 피더 링크로 연결되는 제1 위성, 및 상기 제1 위성과 제1 서비스 링크로 연결되는 상기 단말을 포함할 수 있다.
상기 제2 NTN 링크의 노드들은, 제2 기지국, 상기 제2 기지국과 직접 연결되는 제2 게이트웨이, 상기 제2 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및 상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함할 수 있다.
상기 제1 NTN 링크의 설정 후 상기 제2 기지국으로부터 상기 단말의 임의 접속 절차의 수행 여부 정보를 포함하는 제1 NTN 링크 상태 정보의 요청을 수신하는 단계; 및 상기 요청에 따라 상기 제2 기지국으로 상기 제1 NTN 링크 상태 정보를 전송하는 단계;를 더 포함할 수 있다.
상기 상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함할 수 있다.
상기 단말로부터 주기적인 위치 또는 지연 시간 정보가 수신될 시 상기 저지연 링크를 재결정하는 단계;를 더 포함할 수 있다.
상기 저지연 링크를 결정하는 단계는, 현재 저지연 링크가 아닌 NTN 링크들 중 최소 지연을 갖는 NTN 링크의 전파 지연 시간을 획득하는 단계; 현재 저지연 링크의 전파 지연 시간과 상기 최소 지연을 갖는 NTN 링크의 전파 지연 시간 간의 차를 계산하는 단계; 및 상기 계산된 차가 미리 결정된 값보다 큰 경우 상기 최소 전파 지연 시간을 갖는 NTN 링크를 상기 저지연 링크로 결정하는 단계;를 포함할 수 있다.
상기 목적을 달성하기 위한 본 개시의 실시예에 따른 제1 기지국은, 프로세서(processor)를 포함하며, 상기 프로세서는 상기 제1 기지국이,
제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크가 설정된 상태에서 상기 단말에 제2 위성을 통해 제2 NTN 링크가 설정되는 경우 제1 NTN 링크를 임시 저지연 링크로 설정하고; 상기 제1 NTN 링크의 노드들에 대한 저지연 링크 관련 정보를 획득하고; 상기 제2 NTN 링크의 노드들에 대한 저지연 링크 관련 정보를 획득하고; 상기 제1 NTN 링크의 각 노드들에 대한 저지연 링크 관련 정보와 상기 제2 NTN 링크의 각 노드들에 대한 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하고; 및 상기 저지연 링크 정보를 상기 단말로 전송하도록 야기할 수 있다.
상기 프로세서는 상기 제1 기지국이:
상기 저지연 링크 정보를 상기 제2 기지국으로 전송하도록 더 야기할 수 있다.
상기 프로세서는 상기 제1 기지국이:
제2 NTN 링크 상태 정보를 상기 제2 기지국으로 요청하고, 상기 제2 기지국으로부터 상기 제2 NTN 링크 상태 정보를 수신하도록 더 야기할 수 있고, 상기 NTN 링크 상태 정보는 상기 단말의 임의 접속 절차 수행 여부 정보를 포함할 수 있다.
상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함할 수 있다.
본 개시에 의하면, 비-지상 네트워크의 다중 연결 환경에서 저지연 링크의 탐색할 수 있고, 탐색된 저지연 링크를 효율적으로 운영할 수 있는 이점이 있다.
도 1a는 비-지상 네트워크의 제1 실시예를 도시한 개념도이다.
도 1b는 비-지상 네트워크의 제2 실시예를 도시한 개념도이다.
도 2a는 비-지상 네트워크의 제3 실시예를 도시한 개념도이다.
도 2b는 비-지상 네트워크의 제4 실시예를 도시한 개념도이다.
도 2c는 비-지상 네트워크의 제5 실시예를 도시한 개념도이다.
도 3은 비-지상 네트워크를 구성하는 통신 노드의 제1 실시예를 도시한 블록도이다.
도 4는 통신을 수행하는 통신 노드들의 제1 실시예를 도시한 블록도이다.
도 5a는 송신 경로의 제1 실시예를 도시한 블록도이다.
도 5b는 수신 경로의 제1 실시예를 도시한 블록도이다.
도 6a는 트랜스패런트 페이로드 기반의 비-지상 네트워크에서 사용자 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.
도 6b는 트랜스패런트 페이로드 기반의 비-지상 네트워크에서 제어 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.
도 7a는 재생성 페이로드 기반의 비-지상 네트워크에서 사용자 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.
도 7b는 재생성 페이로드 기반의 비-지상 네트워크에서 제어 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.
도 8은 본 개시의 일 실시예를 설명하기 위해 하나의 단말로 다중 연결 서비스를 제공하기 위한 복수의 위성들과 각 위성에 대응하는 기지국들을 예시한 개념도이다.
도 9는 본 개시의 다른 실시예를 설명하기 위해 하나의 단말로 다중 연결 서비스를 제공하기 위한 복수의 위성들 및 복수의 위성들이 하나의 기지국들에 연결되는 경우를 예시한 개념도이다.
도 10a는 본 개시의 일 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 일부이다.
도 10b는 본 개시의 일 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 나머지 일부이다.
도 11a는 본 개시의 다른 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 일부이다.
도 11b는 본 개시의 다른 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 나머지 일부이다.
도 12는 본 개시의 제1 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
도 13은 본 개시의 제2 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
도 14는 본 개시의 제3 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
도 15는 본 개시의 제4 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
본 개시는 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세하게 설명하고자 한다. 그러나, 이는 본 개시를 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 개시의 사상 및 기술 범위에 포함되는 모든 변경, 균등물, 및 대체물을 포함하는 것으로 이해되어야 한다.
제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 개시의 권리 범위를 벗어나지 않으면서 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다. "및/또는" 이라는 용어는 복수의 관련된 기재된 항목들의 조합 또는 복수의 관련된 기재된 항목들 중의 어느 항목을 의미할 수 있다.
본 개시에서, “A 및 B 중에서 적어도 하나”는 “A 또는 B 중에서 적어도 하나” 또는 “A 및 B 중 하나 이상의 조합들 중에서 적어도 하나”를 의미할 수 있다. 또한, 본 개시에서, “A 및 B 중에서 하나 이상”은 “A 또는 B 중에서 하나 이상” 또는 “A 및 B 중 하나 이상의 조합들 중에서 하나 이상”을 의미할 수 있다.
본 개시에서, (재)전송은 “전송”, “재전송”, 또는 “전송 및 재전송”을 의미할 수 있고, (재)설정은 “설정”, “재설정”, 또는 “설정 및 재설정”을 의미할 수 있고, (재)연결은 “연결”, “재연결”, 또는 “연결 및 재연결”을 의미할 수 있고, (재)접속은 “접속”, “재접속”, 또는 “접속 및 재접속”을 의미할 수 있다.
어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.
본 개시에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 개시를 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 개시에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.
다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 개시가 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가진 것으로 해석되어야 하며, 본 개시에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.
이하, 첨부한 도면들을 참조하여, 본 개시의 바람직한 실시예를 보다 상세하게 설명하고자 한다. 본 개시를 설명함에 있어 전체적인 이해를 용이하게 하기 위하여 도면상의 동일한 구성요소에 대해서는 동일한 참조부호를 사용하고 동일한 구성요소에 대해서 중복된 설명은 생략한다. 본 개시에서 명시적으로 설명되는 실시예들 뿐만 아니라, 실시예들의 조합, 실시예들의 확장, 및/또는 실시예들의 변형에 따른 동작들은 수행될 수 있다. 일부 동작의 수행은 생략될 수 있고, 동작의 수행 순서는 변경될 수 있다.
실시예에서 통신 노드들 중에서 제1 통신 노드에서 수행되는 방법(예를 들어, 신호의 전송 또는 수신)이 설명되는 경우에도 이에 대응하는 제2 통신 노드는 제1 통신 노드에서 수행되는 방법과 상응하는 방법(예를 들어, 신호의 수신 또는 전송)을 수행할 수 있다. 즉, UE(user equipment)의 동작이 설명된 경우에 이에 대응하는 기지국은 UE의 동작과 상응하는 동작을 수행할 수 있다. 반대로, 기지국의 동작이 설명된 경우에 이에 대응하는 UE는 기지국의 동작과 상응하는 동작을 수행할 수 있다. 비-지상 네트워크(non-terrestrial network; NTN)(예를 들어, 페이로드(payload) 기반의 NTN)에서, 기지국의 동작은 위성의 동작을 의미할 수 있고, 위성의 동작은 기지국의 동작을 의미할 수 있다.
기지국은 노드B(NodeB), 고도화 노드B(evolved NodeB), gNodeB(next generation node B), gNB, 디바이스(device), 장치(apparatus), 노드, 통신 노드, BTS(base transceiver station), RRH(radio remote head), TRP(transmission reception point), RU(radio unit), RSU(road side unit), 무선 트랜시버(radio transceiver), 액세스 포인트(access point), 액세스 노드(node) 등으로 지칭될 수 있다. UE는 단말(terminal), 디바이스, 장치, 노드, 통신 노드, 엔드(end) 노드, 액세스 터미널(access terminal), 모바일 터미널(mobile terminal), 스테이션(station), 가입자 스테이션(subscriber station), 모바일 스테이션(mobile station), 휴대 가입자 스테이션(portable subscriber station), OBU(on-broad unit) 등으로 지칭될 수 있다.
본 개시에서 시그널링(signaling)은 상위계층 시그널링, MAC 시그널링, 또는 PHY(physical) 시그널링 중에서 적어도 하나일 수 있다. 상위계층 시그널링을 위해 사용되는 메시지는 “상위계층 메시지” 또는 “상위계층 시그널링 메시지”로 지칭될 수 있다. MAC 시그널링을 위해 사용되는 메시지는 “MAC 메시지” 또는 “MAC 시그널링 메시지”로 지칭될 수 있다. PHY 시그널링을 위해 사용되는 메시지는 “PHY 메시지” 또는 “PHY 시그널링 메시지”로 지칭될 수 있다. 상위계층 시그널링은 시스템 정보(예를 들어, MIB(master information block), SIB(system information block)) 및/또는 RRC 메시지의 송수신 동작을 의미할 수 있다. MAC 시그널링은 MAC CE(control element)의 송수신 동작을 의미할 수 있다. PHY 시그널링은 제어 정보(예를 들어, DCI(downlink control information), UCI(uplink control information), SCI(sidelink control information))의 송수신 동작을 의미할 수 있다.
본 개시에서 “동작(예를 들어, 전송 동작)이 설정되는 것”은 “해당 동작을 위한 설정 정보(예를 들어, 정보 요소(information element), 파라미터)” 및/또는 “해당 동작의 수행을 지시하는 정보”가 시그널링 되는 것을 의미할 수 있다. “정보 요소(예를 들어, 파라미터)가 설정되는 것”은 해당 정보 요소가 시그널링 되는 것을 의미할 수 있다. 본 개시에서 “신호 및/또는 채널”은 신호, 채널, 또는 “신호 및 채널”을 의미할 수 있고, 신호는 “신호 및/또는 채널”의 의미로 사용될 수 있다.
통신 시스템은 지상(terrestrial) 네트워크, 비-지상 네트워크, 4G 통신 네트워크(예를 들어, LTE(long-term evolution) 통신 네트워크), 5G 통신 네트워크(예를 들어, NR(new radio) 통신 네트워크), 또는 6G 통신 네트워크 중에서 적어도 하나를 포함할 수 있다. 4G 통신 네트워크, 5G 통신 네트워크, 및 6G 통신 네트워크 각각은 지상 네트워크 및/또는 비-지상 네트워크를 포함할 수 있다. 비-지상 네트워크는 LTE 통신 기술, 5G 통신 기술, 또는 6G 통신 기술 중에서 적어도 하나의 통신 기술에 기초하여 동작할 수 있다. 비-지상 네트워크는 다양한 주파수 대역에서 통신 서비스를 제공할 수 있다.
실시예가 적용되는 통신 네트워크는 아래 설명된 내용에 한정되지 않으며, 실시예는 다양한 통신 네트워크(예를 들어, 4G 통신 네트워크, 5G 통신 네트워크, 및/또는 6G 통신 네트워크)에 적용될 수 있다. 여기서, 통신 네트워크는 통신 시스템과 동일한 의미로 사용될 수 있다.
도 1a는 비-지상 네트워크의 제1 실시예를 도시한 개념도이다.
도 1a를 참조하면, 비-지상 네트워크는 위성(110), 통신 노드(120), 게이트웨이(gateway)(130), 데이터 네트워크(140) 등을 포함할 수 있다. 위성(110)과 게이트웨이(130)를 포함하는 유닛(unit)은 RRU(remote radio unit)일 수 있다. 도 1a에 도시된 비-지상 네트워크는 트랜스패런트(transparent) 페이로드 기반의 비-지상 네트워크일 수 있다. 위성(110)은 LEO(low earth orbit) 위성, MEO(medium earth orbit) 위성, GEO(geostationary earth orbit) 위성, HEO(high elliptical orbit) 위성, 또는 UAS(unmanned aircraft system) 플랫폼일 수 있다. UAS 플랫폼은 HAPS(high altitude platform station)를 포함할 수 있다. 비(non)-GEO 위성은 LEO 위성 및/또는 MEO 위성일 수 있다.
통신 노드(120)는 지상에 위치한 통신 노드(예를 들어, UE, 단말) 및 비-지상에 위치한 통신 노드(예를 들어, 비행기, 드론)를 포함할 수 있다. 위성(110)과 통신 노드(120) 간에 서비스 링크(service link)가 설정될 수 있으며, 서비스 링크는 무선 링크(radio link)일 수 있다. 위성(110)은 NTN 페이로드(payload)로 지칭될 수 있다. 게이트웨이(130)는 복수의 NTN 페이로드들을 지원할 수 있다. 위성(110)은 하나 이상의 빔들을 사용하여 통신 노드(120)에 통신 서비스를 제공할 수 있다. 위성(110)의 빔의 수신 범위(footprint)의 형상은 타원형 또는 원형일 수 있다.
비-지상 네트워크에서 아래와 같이 세 가지 타입의 서비스 링크들은 지원될 수 있다.
- 지구 고정(earth-fixed): 서비스 링크는 항상 동일한 지리적 영역을 연속적으로 커버하는 빔(들)에 의해 제공될 수 있음(예를 들어, GSO(Geosynchronous Orbit) 위성)
- 의사 지구 고정(quasi-earth-fixed): 서비스 링크는 제한된 기간(period) 동안에 하나의 지리적 영역을 커버하고 다른 기간 동안에 다른 지리적 영역을 커버하는 빔(들)에 의해 제공될 수 있음(예를 들어, 조향 가능한(steerable) 빔들을 생성하는 NGSO(non-GSO) 위성)
- 지구 이동(earth-moving): 서비스 링크는 지구 표면을 이동하는 빔(들)에 의해 제공될 수 있음(예를 들어, 고정 빔들 또는 비-조향 가능한 빔들을 생성하는 NGSO 위성)
통신 노드(120)는 4G 통신 기술, 5G 통신 기술, 및/또는 6G 통신 기술을 사용하여 위성(110)과 통신(예를 들어, 하향링크 통신, 상향링크 통신)을 수행할 수 있다. 위성(110)과 통신 노드(120) 간의 통신은 NR-Uu 인터페이스 및/또는 6G-Uu 인터페이스를 사용하여 수행될 수 있다. DC(dual connectivity)가 지원되는 경우, 통신 노드(120)는 위성(110)뿐만 아니라 다른 기지국(예를 들어, 4G 기능, 5G 기능, 및/또는 6G 기능을 지원하는 기지국)과 연결될 수 있고, 4G 규격, 5G 규격, 및/또는 6G 규격에 정의된 기술에 기초하여 DC 동작을 수행할 수 있다.
게이트웨이(130)는 지상에 위치할 수 있으며, 위성(110)과 게이트웨이(130) 간에 피더(feeder) 링크가 설정될 수 있다. 피더 링크는 무선 링크일 수 있다. 게이트웨이(130)는 "NTN(non-terrestrial network) 게이트웨이"로 지칭될 수 있다. 위성(110)과 게이트웨이(130) 간의 통신은 NR-Uu 인터페이스, 6G-Uu 인터페이스, 또는 SRI(satellite radio interface)에 기초하여 수행될 수 있다. 게이트웨이(130)는 데이터 네트워크(140)와 연결될 수 있다. 게이트웨이(130)와 데이터 네트워크(140)의 사이에 "코어 네트워크"가 존재할 수 있다. 이 경우, 게이트웨이(130)는 코어 네트워크와 연결될 수 있고, 코어 네트워크는 데이터 네트워크(140)와 연결될 수 있다. 코어 네트워크는 4G 통신 기술, 5G 통신 기술, 및/또는 6G 통신 기술을 지원할 수 있다. 예를 들어, 코어 네트워크는 AMF(access and mobility management function), UPF(user plane function), SMF(session management function) 등을 포함할 수 있다. 게이트웨이(130)와 코어 네트워크 간의 통신은 NG-C/U 인터페이스 또는 6G-C/U 인터페이스에 기초하여 수행될 수 있다.
아래 도 1b의 실시예와 같이, 트랜스패런트 페이로드 기반의 비-지상 네트워크에서 게이트웨이(130)와 데이터 네트워크(140) 사이에 기지국과 코어 네트워크가 존재할 수 있다.
도 1b는 비-지상 네트워크의 제2 실시예를 도시한 개념도이다.
도 1b를 참조하면, 게이트웨이는 기지국과 연결될 수 있고, 기지국은 코어 네트워크와 연결될 수 있고, 코어 네트워크는 데이터 네트워크와 연결될 수 있다. 기지국 및 코어 네트워크 각각은 4G 통신 기술, 5G 통신 기술, 및/또는 6G 통신 기술을 지원할 수 있다. 게이트웨이와 기지국 간의 통신은 NR-Uu 인터페이스 또는 6G-Uu 인터페이스에 기초하여 수행될 수 있고, 기지국과 코어 네트워크(예를 들어, AMF, UPF, SMF) 간의 통신은 NG-C/U 인터페이스 또는 6G-C/U 인터페이스에 기초하여 수행될 수 있다.
도 2a는 비-지상 네트워크의 제3 실시예를 도시한 개념도이다.
도 2a를 참조하면, 비-지상 네트워크는 위성 #1(211), 위성 #2(212) 통신 노드(220), 게이트웨이(230), 데이터 네트워크(240) 등을 포함할 수 있다. 도 2a에 도시된 비-지상 네트워크는 재생성(regenerative) 페이로드 기반의 비-지상 네트워크일 수 있다. 예를 들어, 위성 #1(211) 및 위성 #2(212) 각각은 비-지상 네트워크를 구성하는 다른 엔터티(entity)(예를 들어, 통신 노드(220), 게이트웨이(230))로부터 수신한 페이로드에 대한 재생성 동작(예를 들어, 복조 동작, 복호화 동작, 재-부호화 동작, 재-변조 동작, 및/또는 필터링 동작)을 수행할 수 있고, 재생성된 페이로드를 전송할 수 있다.
위성 #1(211) 및 위성 #2(212) 각각은 LEO 위성, MEO 위성, GEO 위성, HEO 위성, 또는 UAS 플랫폼일 수 있다. UAS 플랫폼은 HAPS를 포함할 수 있다. 위성 #1(211)은 위성 #2(212)와 연결될 수 있고, 위성 #1(211)과 위성 #2(212) 간에 ISL(inter-satellite link)이 설정될 수 있다. ISL은 RF(radio frequency) 주파수 또는 광(optical) 대역에서 동작할 수 있다. ISL은 선택적(optional)으로 설정될 수 있다. 통신 노드(220)는 지상에 위치한 통신 노드(예를 들어, UE, 단말) 및 비-지상에 위치한 통신 노드(예를 들어, 비행기, 드론)를 포함할 수 있다. 위성 #1(211)과 통신 노드(220) 간에 서비스 링크(예를 들어, 무선 링크)가 설정될 수 있다. 위성 #1(211)은 NTN 페이로드로 지칭될 수 있다. 위성 #1(211)은 하나 이상의 빔들을 사용하여 통신 노드(220)에 통신 서비스를 제공할 수 있다.
통신 노드(220)는 4G 통신 기술, 5G 통신 기술, 및/또는 6G 통신 기술을 사용하여 위성 #1(211)과 통신(예를 들어, 하향링크 통신, 상향링크 통신)을 수행할 수 있다. 위성 #1(211)과 통신 노드(220) 간의 통신은 NR-Uu 인터페이스 또는 6G-Uu 인터페이스를 사용하여 수행될 수 있다. DC가 지원되는 경우, 통신 노드(220)는 위성 #1(211)뿐만 아니라 다른 기지국(예를 들어, 4G 기능, 5G 기능, 및/또는 6G 기능을 지원하는 기지국)과 연결될 수 있고, 4G 규격, 5G 규격, 및/또는 6G 규격에 정의된 기술에 기초하여 DC 동작을 수행할 수 있다.
게이트웨이(230)는 지상에 위치할 수 있으며, 위성 #1(211)과 게이트웨이(230) 간에 피더 링크가 설정될 수 있고, 위성 #2(212)와 게이트웨이(230) 간에 피더 링크가 설정될 수 있다. 피더 링크는 무선 링크일 수 있다. 위성 #1(211)과 위성 #2(212) 간에 ISL이 설정되지 않은 경우, 위성 #1(211)과 게이트웨이(230) 간의 피더 링크는 의무적으로(mandatory) 설정될 수 있다. 위성 #1(211) 및 위성 #2(212) 각각과 게이트웨이(230) 간의 통신은 NR-Uu 인터페이스, 6G-Uu 인터페이스, 또는 SRI에 기초하여 수행될 수 있다. 게이트웨이(230)는 데이터 네트워크(240)와 연결될 수 있다.
아래 도 2b 및 도 2c의 실시예와 같이, 게이트웨이(230)와 데이터 네트워크(240)의 사이에 "코어 네트워크"가 존재할 수 있다.
도 2b는 비-지상 네트워크의 제4 실시예를 도시한 개념도이고, 도 2c는 비-지상 네트워크의 제5 실시예를 도시한 개념도이다.
도 2b 및 도 2c를 참조하면, 게이트웨이는 코어 네트워크와 연결될 수 있고, 코어 네트워크는 데이터 네트워크와 연결될 수 있다. 코어 네트워크는 4G 통신 기술, 5G 통신 기술, 및/또는 6G 통신 기술을 지원할 수 있다. 예를 들어, 코어 네트워크는 AMF, UPF, SMF 등을 포함할 수 있다. 게이트웨이와 코어 네트워크 간의 통신은 NG-C/U 인터페이스 또는 6G-C/U 인터페이스에 기초하여 수행될 수 있다. 기지국의 기능은 위성에 의해 수행될 수 있다. 즉, 기지국은 위성에 위치할 수 있다. 페이로드는 위성에 위치한 기지국에 의해 처리될 수 있다. 서로 다른 위성들에 위치한 기지국은 동일한 코어 네트워크에 연결될 수 있다. 하나의 위성은 하나 이상의 기지국들을 가질 수 있다. 도 2b의 비-지상 네트워크에서 위성들 간의 ISL은 설정되지 않을 수 있고, 도 2c의 비-지상 네트워크에서 위성들 간의 ISL은 설정될 수 있다.
한편, 도 1a, 도 1b, 도 2a, 도 2b, 및/또는 도 2c에 도시된 비-지상 네트워크를 구성하는 엔터티들(예를 들어, 위성, 기지국, UE, 통신 노드, 게이트웨이 등)은 다음과 같이 구성될 수 있다. 본 개시에서 엔터티는 통신 노드로 지칭될 수 있다.
도 3은 비-지상 네트워크를 구성하는 통신 노드의 제1 실시예를 도시한 블록도이다.
도 3을 참조하면, 통신 노드(300)는 적어도 하나의 프로세서(310), 메모리(320) 및 네트워크와 연결되어 통신을 수행하는 송수신 장치(330)를 포함할 수 있다. 또한, 통신 노드(300)는 입력 인터페이스 장치(340), 출력 인터페이스 장치(350), 저장 장치(360) 등을 더 포함할 수 있다. 통신 노드(300)에 포함된 각각의 구성 요소들은 버스(bus)(370)에 의해 연결되어 서로 통신을 수행할 수 있다.
다만, 통신 노드(300)에 포함된 각각의 구성요소들은 공통 버스(370)가 아니라, 프로세서(310)를 중심으로 개별 인터페이스 또는 개별 버스를 통하여 연결될 수도 있다. 예를 들어, 프로세서(310)는 메모리(320), 송수신 장치(330), 입력 인터페이스 장치(340), 출력 인터페이스 장치(350), 또는 저장 장치(360) 중에서 적어도 하나와 전용 인터페이스를 통하여 연결될 수도 있다.
프로세서(310)는 메모리(320) 또는 저장 장치(360) 중에서 적어도 하나에 저장된 프로그램 명령(program command)을 실행할 수 있다. 프로세서(310)는 중앙 처리 장치(central processing unit, CPU), 그래픽 처리 장치(graphics processing unit, GPU), 또는 실시예들에 따른 방법들이 수행되는 전용의 프로세서를 의미할 수 있다. 메모리(320) 및 저장 장치(360) 각각은 휘발성 저장 매체 또는 비휘발성 저장 매체 중에서 적어도 하나로 구성될 수 있다. 예를 들어, 메모리(320)는 읽기 전용 메모리(read only memory, ROM) 또는 랜덤 액세스 메모리(random access memory, RAM) 중에서 적어도 하나로 구성될 수 있다.
한편, 통신 네트워크(예를 들어, 비-지상 네트워크)에서 통신을 수행하는 통신 노드들은 다음과 같이 구성될 수 있다. 도 4에 도시된 통신 노드는 도 3에 도시된 통신 노드에 대한 구체적인 실시예일 수 있다.
도 4는 통신을 수행하는 통신 노드들의 제1 실시예를 도시한 블록도이다.
도 4를 참조하면, 제1 통신 노드(400a) 및 제2 통신 노드(400b) 각각은 기지국 또는 UE일 수 있다. 제1 통신 노드(400a)는 제2 통신 노드(400b)에 신호를 전송할 수 있다. 제1 통신 노드(400a)에 포함된 송신 프로세서(411)는 데이터 소스(410)로부터 데이터(예를 들어, 데이터 유닛)을 수신할 수 있다. 송신 프로세서(411)는 제어기(416)로부터 제어 정보를 수신할 수 있다. 제어 정보는 시스템 정보, RRC 설정 정보(예를 들어, RRC 시그널링에 의해 설정되는 정보), MAC 제어 정보(예를 들어, MAC CE), 또는 PHY 제어 정보(예를 들어, DCI, SCI) 중에서 적어도 하나를 포함할 수 있다.
송신 프로세서(411)는 데이터에 대한 처리 동작(예를 들어, 인코딩 동작, 심볼 매핑 동작 등)을 수행하여 데이터 심볼(들)을 생성할 수 있다. 송신 프로세서(411)는 제어 정보에 대한 처리 동작(예를 들어, 인코딩 동작, 심볼 매핑 동작 등)을 수행하여 제어 심볼(들)을 생성할 수 있다. 또한, 송신 프로세서(411)는 동기 신호 및/또는 참조 신호에 대한 동기/참조 심볼(들)을 생성할 수 있다.
Tx MIMO 프로세서(412)는 데이터 심볼(들), 제어 심볼(들), 및/또는 동기/참조 심볼(들)에 대한 공간 처리 동작(예를 들어, 프리코딩(precoding) 동작)을 수행할 수 있다. Tx MIMO 프로세서(412)의 출력(예를 들어, 심볼 스트림)은 트랜시버들(413a 내지 413t)에 포함된 변조기(MOD)들에 제공될 수 있다. 변조기(MOD)는 심볼 스트림에 대한 처리 동작을 수행하여 변조 심볼들을 생성할 수 있고, 변조 심볼들에 대한 추가 처리 동작(예를 들어, 아날로그 변환 동작, 증폭 동작, 필터링 동작, 상향 변환 동작)을 수행하여 신호를 생성할 수 있다. 트랜시버들(413a 내지 413t)의 변조기(MOD)들에 의해 생성된 신호들은 안테나들(414a 내지 414t)을 통해 전송될 수 있다.
제1 통신 노드(400a)가 전송한 신호들은 제2 통신 노드(400b)의 안테나들(464a 내지 464r)에서 수신될 수 있다. 안테나들(464a 내지 464r)에서 수신된 신호들은 트랜시버들(463a 내지 463r)에 포함된 복조기(DEMOD)들에 제공될 수 있다. 복조기(DEMOD)는 신호에 대한 처리 동작(예를 들어, 필터링 동작, 증폭 동작, 하향 변환 동작, 디지털 변환 동작)을 수행하여 샘플들을 획득할 수 있다. 복조기(DEMOD)는 샘플들에 대한 추가 처리 동작을 수행하여 심볼들을 획득할 수 있다. MIMO 검출기(462)는 심볼들에 대한 MIMO 검출 동작을 수행할 수 있다. 수신 프로세서(461)는 심볼들에 대한 처리 동작(예를 들어, 디인터리빙 동작, 디코딩 동작)을 수행할 수 있다. 수신 프로세서(461)의 출력은 데이터 싱크(460) 및 제어기(466)에 제공될 수 있다. 예를 들어, 데이터는 데이터 싱크(460)에 제공될 수 있고, 제어 정보는 제어기(466)에 제공될 수 있다.
한편, 제2 통신 노드(400b)는 제1 통신 노드(400a)에 신호를 전송할 수 있다. 제2 통신 노드(400b)에 포함된 송신 프로세서(468)는 데이터 소스(467)로부터 데이터(예를 들어, 데이터 유닛)을 수신할 수 있고, 데이터에 대한 처리 동작을 수행하여 데이터 심볼(들)을 생성할 수 있다. 송신 프로세서(468)는 제어기(466)로부터 제어 정보를 수신할 수 있고, 제어 정보에 대한 처리 동작을 수행하여 제어 심볼(들)을 생성할 수 있다. 또한, 송신 프로세서(468)는 참조 신호에 대한 처리 동작을 수행하여 참조 심볼(들)을 생성할 수 있다.
Tx MIMO 프로세서(469)는 데이터 심볼(들), 제어 심볼(들), 및/또는 참조 심볼(들)에 대한 공간 처리 동작(예를 들어, 프리코딩 동작)을 수행할 수 있다. Tx MIMO 프로세서(469)의 출력(예를 들어, 심볼 스트림)은 트랜시버들(463a 내지 463t)에 포함된 변조기(MOD)들에 제공될 수 있다. 변조기(MOD)는 심볼 스트림에 대한 처리 동작을 수행하여 변조 심볼들을 생성할 수 있고, 변조 심볼들에 대한 추가 처리 동작(예를 들어, 아날로그 변환 동작, 증폭 동작, 필터링 동작, 상향 변환 동작)을 수행하여 신호를 생성할 수 있다. 트랜시버들(463a 내지 463t)의 변조기(MOD)들에 의해 생성된 신호들은 안테나들(464a 내지 464t)을 통해 전송될 수 있다.
제2 통신 노드(400b)가 전송한 신호들은 제1 통신 노드(400a)의 안테나들(414a 내지 414r)에서 수신될 수 있다. 안테나들(414a 내지 414r)에서 수신된 신호들은 트랜시버들(413a 내지 413r)에 포함된 복조기(DEMOD)들에 제공될 수 있다. 복조기(DEMOD)는 신호에 대한 처리 동작(예를 들어, 필터링 동작, 증폭 동작, 하향 변환 동작, 디지털 변환 동작)을 수행하여 샘플들을 획득할 수 있다. 복조기(DEMOD)는 샘플들에 대한 추가 처리 동작을 수행하여 심볼들을 획득할 수 있다. MIMO 검출기(420)는 심볼들에 대한 MIMO 검출 동작을 수행할 수 있다. 수신 프로세서(419)는 심볼들에 대한 처리 동작(예를 들어, 디인터리빙 동작, 디코딩 동작)을 수행할 수 있다. 수신 프로세서(419)의 출력은 데이터 싱크(418) 및 제어기(416)에 제공될 수 있다. 예를 들어, 데이터는 데이터 싱크(418)에 제공될 수 있고, 제어 정보는 제어기(416)에 제공될 수 있다.
메모리들(415 및 465)은 데이터, 제어 정보, 및/또는 프로그램 코드를 저장할 수 있다. 스케줄러(417)는 통신을 위한 스케줄링 동작을 수행할 수 있다. 도 4에 도시된 프로세서(411, 412, 419, 461, 468, 469) 및 제어기(416, 466)는 도 3에 도시된 프로세서(310)일 수 있고, 본 개시에서 설명되는 방법들을 수행하기 위해 사용될 수 있다.
도 5a는 송신 경로의 제1 실시예를 도시한 블록도이고, 도 5b는 수신 경로의 제1 실시예를 도시한 블록도이다.
도 5a 및 도 5b를 참조하면, 송신 경로(510)는 신호를 전송하는 통신 노드에서 구현될 수 있고, 수신 경로(520)는 신호를 수신하는 통신 노드에서 구현될 수 있다. 송신 경로(510)는 채널 코딩 및 변조 블록(511), S-to-P(serial-to-parallel) 블록(512), N IFFT(Inverse Fast Fourier Transform) 블록(513), P-to-S(parallel-to-serial) 블록(514), 및 CP(cyclic prefix) 추가 블록(515), 및 UC(up-converter)(UC)(516)를 포함할 수 있다. 수신 경로(520)는 DC(down-converter)(521), CP 제거 블록(522), S-to-P 블록(523), N FFT 블록(524), P-to-S 블록(525), 및 채널 디코딩 및 복조 블록(526)을 포함할 수 있다. 여기서, N은 자연수일 수 있다.
송신 경로(510)에서 정보 비트들은 채널 코딩 및 변조 블록(511)에 입력될 수 있다. 채널 코딩 및 변조 블록(511)은 정보 비트들에 대한 코딩 동작(예를 들어, LDPC(low-density parity check)(LDPC) 코딩 동작, 폴라(polar) 코딩 동작 등) 및 변조 동작(예를 들어, QPSK(Quadrature Phase Shift Keying), QAM(Quadrature Amplitude Modulation) 등)을 수행할 수 있다. 채널 코딩 및 변조 블록(511)의 출력은 변조 심볼들의 시퀀스일 수 있다.
S-to-P 블록(512)은 N개의 병렬 심볼 스트림들을 생성하기 위하여 주파수 도메인의 변조 심볼들을 병렬 심볼 스트림들로 변환할 수 있다. N은 IFFT 크기 또는 FFT 크기일 수 있다. N IFFT 블록(513)은 N개의 병렬 심볼 스트림들에 대한 IFFT 동작을 수행하여 시간 도메인의 신호들을 생성할 수 있다. P-to-S 블록(514)은 직렬 신호를 생성하기 위하여 N IFFT 블록(513)의 출력(예를 들어, 병렬 신호들)을 직렬 신호로 변환할 수 있다.
CP 추가 블록(515)은 CP를 신호에 삽입할 수 있다. UC(516)는 CP 추가 블록(515)의 출력의 주파수를 RF(radio frequency) 주파수로 상향 변환할 수 있다. 또한, CP 추가 블록(515)의 출력은 상향 변환 전에 기저 대역에서 필터링 될 수 있다.
송신 경로(510)에서 전송된 신호는 수신 경로(520)에 입력될 수 있다. 수신 경로(520)에서 동작은 송신 경로(510)에서 동작의 역 동작일 수 있다. DC(521)는 수신된 신호의 주파수를 기저 대역의 주파수로 하향 변환할 수 있다. CP 제거 블록(522)은 신호에서 CP를 제거할 수 있다. CP 제거 블록(522)의 출력은 직렬 신호일 수 있다. S-to-P 블록(523)은 직렬 신호를 병렬 신호들로 변환할 수 있다. N FFT 블록(524)은 FFT 알고리즘을 수행하여 N개의 병렬 신호들을 생성할 수 있다. P-to-S 블록(525)은 병렬 신호들을 변조 심볼들의 시퀀스로 변환할 수 있다. 채널 디코딩 및 복조 블록(526)은 변조 심볼들에 대한 복조 동작을 수행할 수 있고, 복조 동작의 결과에 대한 디코딩 동작을 수행하여 데이터를 복원할 수 있다.
도 5a 및 도 5b에서 FFT 및 IFFT 대신에 DFT(Discrete Fourier Transform) 및 IDFT(Inverse DFT)는 사용될 수 있다. 도 5a 및 도 5b에서 블록들(예를 들어, 컴포넌트) 각각은 하드웨어, 소프트웨어, 또는 펌웨어 중에서 적어도 하나에 의해 구현될 수 있다. 예를 들어, 도 5a 및 도 5b에서 일부 블록들은 소프트웨어에 의해 구현될 수 있고, 나머지 블록들은 하드웨어 또는 "하드웨어와 소프트웨어의 조합"에 의해 구현될 수 있다. 도 5a 및 도 5b에서, 하나의 블록은 복수의 블록들로 세분화될 수 있고, 복수의 블록들은 하나의 블록으로 통합될 수 있고, 일부 블록은 생략될 수 있고, 다른 기능을 지원하는 블록은 추가될 수 있다.
한편, NTN 참조 시나리오들은 아래 표 1과 같이 정의될 수 있다.
도 1에 도시된 NTN 도 2에 도시된 NTN
GEO 시나리오 A 시나리오 B
LEO
(조정 가능한 빔)
시나리오 C1 시나리오 D1
LEO(위성과 함께 이동하는 빔) 시나리오 C2 시나리오 D2
도 1a 및/또는 도 1b에 도시된 비-지상 네트워크에서 위성(110)이 GEO 위성(예를 들어, 트랜스패런트 기능을 지원하는 GEO 위성)인 경우, 이는 "시나리오 A"로 지칭될 수 있다. 도 2a, 도 2b, 및/또는 도 2c에 도시된 비-지상 네트워크에서 위성 #1(211) 및 위성 #2(212) 각각이 GEO 위성인(예를 들어, 재생성 기능을 지원하는 GEO)경우, 이는 "시나리오 B"로 지칭될 수 있다.
도 1a 및/또는 도 1b에 도시된 비-지상 네트워크에서 위성(110)이 조정 가능한(steerable) 빔들을 가지는 LEO 위성인 경우, 이는 "시나리오 C1"로 지칭될 수 있다. 도 1a 및/또는 도 1b에 도시된 비-지상 네트워크에서 위성(110)이 위성과 함께 이동하는 빔들(beams move with satellite)을 가지는 LEO 위성인 경우, 이는 "시나리오 C2"로 지칭될 수 있다. 도 2a, 도 2b, 및/또는 도 2c에 도시된 비-지상 네트워크에서 위성 #1(211) 및 위성 #2(212) 각각이 조정 가능한 빔들을 가지는 LEO 위성인 경우, 이는 "시나리오 D1"로 지칭될 수 있다. 도 2a, 도 2b, 및/또는 도 2c에 도시된 비-지상 네트워크에서 위성 #1(211) 및 위성 #2(212) 각각이 위성과 함께 이동하는 빔들을 가지는 LEO 위성인 경우, 이는 "시나리오 D2"로 지칭될 수 있다.
표 1에 정의된 NTN 참조 시나리오들을 위한 파라미터들은 아래 표 2와 같이 정의될 수 있다.
시나리오 A 및 B 시나리오 C 및 D
고도 35,786km 600km
1,200km
스펙트럼 (서비스 링크) < 6GHz (e.g., 2GHz)
> 6GHz (e.g., DL 20GHz, UL 30GHz)
최대 채널 대역폭 캐퍼빌러티(서비스 링크) 30MHz for band < 6GHz
1GHz for band > 6GHz
최소 고각(elevation angle)
에서 위성과 통신 노드(e.g., UE) 간의 최대 거리
40,581km 1,932km (600km 고도)
3,131km (1,200km 고도)
최대 RTD(round trip delay)(오직 전파 지연) 시나리오 A: 541.46ms (서비스 및 피더 링크들)

시나리오 B: 270.73ms (오직 서비스 링크)
시나리오 C: (트랜스패런트 페이로드: 서비스 및 피더 링크들)
- 25.77ms (600km 고도)
- 41.77ms (1200km 고도)

시나리오 D: (재생성 페이로드: 오직 서비스 링크)
- 12.89ms (600km 고도)
- 20.89ms (1200km 고도)
하나의 셀 내에서최대 차이(differential) 지연 10.3m 3.12ms (600km 고도)
3.18ms (1200km 고도)
서비스 링크 NR 또는 6G
피더 링크 3GPP 또는 비(non)-3GPP에서 정의된 무선 인터페이스
또한, 표 1에 정의된 NTN 참조 시나리오에서 지연 제약(delay constraint)은 아래 표 3과 같이 정의될 수 있다.
시나리오 A 시나리오 B 시나리오 C1-2 시나리오 D1-2
위성 고도 35,786km 600km
기지국과 UE 간의 무선 인터페이스에서 최대 RTD 541.75ms
(최악의
케이스)
270.57ms 28.41ms 12.88ms
기지국과 UE 간의 무선 인터페이스에서 최소 RTD 477.14ms 238.57ms 8ms 4ms
도 6a는 트랜스패런트 페이로드 기반의 비-지상 네트워크에서 사용자 평면(user plane)의 프로토콜 스택(protocol stack)의 제1 실시예를 도시한 개념도이고, 도 6b는 트랜스패런트 페이로드 기반의 비-지상 네트워크에서 제어 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.도 6a 및 도 6b를 참조하면, 사용자 데이터는 UE와 코어 네트워크(예를 들어, UPF) 간에 송수신될 수 있고, 제어 데이터(예를 들어, 제어 정보)는 UE와 코어 네트워크(예를 들어, AMF) 간에 송수신될 수 있다. 사용자 데이터 및 제어 데이터 각각은 위성 및/또는 게이트웨이를 통해 송수신될 수 있다. 도 6a에 도시된 사용자 평면의 프로토콜 스택은 6G 통신 네트워크에 동일 또는 유사하게 적용될 수 있다. 도 6b에 도시된 제어 평면의 프로토콜 스택은 6G 통신 네트워크에 동일 또는 유사하게 적용될 수 있다.
도 7a는 재생성 페이로드 기반의 비-지상 네트워크에서 사용자 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이고, 도 7b는 재생성 페이로드 기반의 비-지상 네트워크에서 제어 평면의 프로토콜 스택의 제1 실시예를 도시한 개념도이다.
도 7a 및 도 7b를 참조하면, 사용자 데이터 및 제어 데이터(예를 들어, 제어 정보) 각각은 UE와 위성(예를 들어, 기지국) 간의 인터페이스를 통해 송수신될 수 있다. 사용자 데이터는 사용자 PDU(protocol data unit)를 의미할 수 있다. SRI(satellite radio interface)의 프로토콜 스택은 위성과 게이트웨이 간에 사용자 데이터 및/또는 제어 데이터를 송수신하기 위해 사용될 수 있다. 사용자 데이터는 위성과 코어 네트워크 간의 GTP(GPRS(general packet radio service) tunneling protocol)-U 터널을 통해 송수신될 수 있다.
한편, 비-지상 네트워크에서 기지국은 NTN 접속을 위한 위성 지원 정보(satellite assistance information)을 포함하는 시스템 정보(예를 들어, SIB19)를 전송할 수 있다. UE는 기지국으로부터 시스템 정보(예를 들어, SIB19)를 수신할 수 있고, 시스템 정보에 포함된 위성 지원 정보를 확인할 수 있고, 위성 지원 정보에 기초하여 통신(예를 들어, 비-지상 통신)을 수행할 수 있다. SIB19는 아래 표 4에 정의된 정보 요소(들)을 포함할 수 있다.
SIB19-r17 ::= SEQUENCE {
ntn-Config-r17 NTN-Config-r17
t-Service-r17 INTEGER(0..549755813887)
referenceLocation-r17 ReferenceLocation-r17
distanceThresh-r17 INTEGER(0..65525)
ntn-NeighCellConfigList-r17 NTN-NeighCellConfigList-r17
lateNonCriticalExtension OCTET STRING
...,
[[
ntn-NeighCellConfigListExt-v1720 NTN-NeighCellConfigList-r17
]]
}

NTN-NeighCellConfigList-r17 ::= SEQUENCE (SIZE(1..maxCellNTN-r17)) OF NTN-NeighCellConfig-r17

NTN-NeighCellConfig-r17 ::= SEQUENCE {
ntn-Config-r17 NTN-Config-r17
carrierFreq-r17 ARFCN-ValueNR
physCellId-r17 PhysCellId
}
표 4에 정의된 NTN-Config는 아래 표 5에 정의된 정보 요소(들)을 포함할 수 있다.
NTN-Config-r17 ::= SEQUENCE {
epochTime-r17 EpochTime-r17
ntn-UlSyncValidityDuration-r17 ENUMERATED{ s5, s10, s15, s20, s25, s30, s35, s40, s45, s50, s55, s60, s120, s180, s240, s900}
cellSpecificKoffset-r17 INTEGER(1..1023)
kmac-r17 INTEGER(1..512)
ta-Info-r17 TA-Info-r17
ntn-PolarizationDL-r17 ENUMERATED {rhcp,lhcp,linear}
ntn-PolarizationUL-r17 ENUMERATED {rhcp,lhcp,linear}
ephemerisInfo-r17 EphemerisInfo-r17
ta-Report-r17 ENUMERATED {enabled}
...
}

EpochTime-r17 ::= SEQUENCE {
sfn-r17 INTEGER(0..1023),
subFrameNR-r17 INTEGER(0..9)
}

TA-Info-r17 ::= SEQUENCE {
ta-Common-r17 INTEGER(0..66485757),
ta-CommonDrift-r17 INTEGER(-257303..257303)
ta-CommonDriftVariant-r17 INTEGER(0..28949)
}
표 5에 정의된 EphemerisInfo는 아래 표 6에 정의된 정보 요소(들)을 포함할 수 있다.
EphemerisInfo-r17 ::= CHOICE {
positionVelocity-r17 PositionVelocity-r17,
orbital-r17 Orbital-r17
}

PositionVelocity-r17 ::= SEQUENCE {
positionX-r17 PositionStateVector-r17,
positionY-r17 PositionStateVector-r17,
positionZ-r17 PositionStateVector-r17,
velocityVX-r17 VelocityStateVector-r17,
velocityVY-r17 VelocityStateVector-r17,
velocityVZ-r17 VelocityStateVector-r17
}

Orbital-r17 ::= SEQUENCE {
semiMajorAxis-r17 INTEGER (0..8589934591),
eccentricity-r17 INTEGER (0..1048575),
periapsis-r17 INTEGER (0..268435455),
longitude-r17 INTEGER (0..268435455),
inclination-r17 INTEGER (-67108864..67108863),
meanAnomaly-r17 INTEGER (0..268435455)
}

PositionStateVector-r17 ::= INTEGER (-33554432..33554431)

VelocityStateVector-r17 ::= INTEGER (-131072..131071)
한편, 위성은 크게 트랜스패런트(Transparent) 중계기와 재생성(Regenerative) 중계기로 구분될 수 있다.
먼저 트랜스패런트 중계기로 동작하는 위성은 트랜스패런트(Transparent) 위성이라고도 한다. 트랜스패런트 위성은 수신된 신호를 증폭하여 목적지로 전달하는 동작만을 수행한다. 예를 들어, 트랜스패런트 위성은 게이트웨이로부터 단말로 전송할 RF 신호를 수신하면, 게이트웨이로부터 수신된 RF 신호를 증폭하여 단말로 전달하는 역할만을 수행할 수 있다. 트랜스패런트 위성은 단말로의 다운링크 전송 뿐 아니라 단말로부터의 업링크 전송도 동일하게 수행한다. 예를 들어 트랜스패런트 위성은 단말로부터 RF 신호를 수신하는 경우 수신된 RF 신호를 증폭하여 게이트웨이로 전송하는 동작만을 수행한다. 그러므로, 트랜스패런트 위성은 수신된 신호를 복조하지 않고, 다운링크 또는 업링크로 전달하는 역할만을 수행한다. 따라서 이러한 위성을 벤트-파이프(bent-pipe) 위성이라 부르기도 한다.
위성이 트랜스패런트 중계기로 구현되는 경우는 앞서 설명한 도 1b의 구성과 동일한 형태가 될 수 있다. 도 1b를 참조하여 이를 다시 살펴보면, NTN은 단말, 지구 특정 궤도를 돌고 있는 트랜스패런트 위성, 지상의 NTN 게이트웨이 및 지상의 기지국을 포함할 수 있다. 앞서 도 1b에 예시한 바와 같이 단말과 위성 사이의 링크를 서비스 링크라 하며, 트랜스패런트 위성과 NTN 게이트웨이 사이의 링크를 피더 링크라 한다. 또한 게이트웨이는 기지국에 포함되어 구성될 수도 있고, 도 1b에 예시한 바와 같이 별도의 구성이 될 수도 있다.
NTN에서 NTN 게이트웨이와 위성은 도 1b에 예시한 바와 같이 원격 라디오 유닛(Remote Radio Unit, RRU)로 이해될 수 있다. 일반적으로 3GPP 통신 시스템에서 기지국은 데이터 송/수신 및 스케줄링의 주체가 될 수 있고, 게이트웨이와 트랜스패런트 위성이 RRU로 동작하는 경우 RRU는 기지국과 단말 사이의 릴레이 기능을 수행하는 것으로 이해될 수 있다.
다음으로, 위성이 재생성 중계기로 구현되는 경우를 살펴보기로 한다.
재생성 중계기로 동작하는 위성을 온-보드 처리 중계기(on-board processing repeater) 또는 재생성(Regenerative) 위성이라고도 한다. 재생성 위성은 수신된 RF 신호를 복조하여 기저대역(baseband) 신호로 복구하고, 복구된 기저대역 신호를 다시 재변조하여 RF 신호로 변환한 후 전송한다. 예를 들어 재생성 위성은 게이트웨이로부터 단말로 전송할 RF 신호를 수신하면, 수신된 신호를 기저대역 신호로 변환한 후 복조한다. 그리고 재생성 위성은 복조된 신호를 재변조하여 다운링크로 전송할 RF 신호를 생성하고, 이를 단말로 전송한다. 재생성 위성은 단말로의 다운링크 전송 뿐 아니라 단말로부터의 업링크 전송도 동일하게 수행한다. 예를 들어 재생성 위성은 단말로부터 RF 신호를 수신하는 경우 수신된 RF 신호를 복조하여 기저대역 신호로 복구하고, 복구된 기저대역 신호를 다시 재변조하여 RF 신호로 변환한 후 게이트웨이로 전송한다.
위성이 재생성 중계기로 구현되는 경우 다시 말해, 재생성 위성의 구성은 앞서 설명한 도 2b의 구성과 동일한 형태가 될 수 있다.
도 2b를 참조하면, NTN은 단말, 지구 특정 궤도를 돌고 있는 재생성 위성, NTN 게이트웨이를 포함할 수 있다. 또한 도 2b에서는 기지국이 위성에 포함되는 형태를 예시하였으나, 게이트웨이와 코어 네트워크 사이에 기지국을 가질 수 있다. 게이트웨이와 코어 네트워크 사이에 기지국이 위치하는 경우 기지국은 중앙 장치(Central Unit, CU)가 될 수 있고, 위성은 분산 장치(Distribute Unit, DU)가 될 수 있다. 그러므로, 위성은 기지국-DU(gNB-DU)로 동작하고, 기지국은 기지국-CU(gNB-CU)로 동작할 수 있다. DU 및 CU로의 구분은 3GPP 표준 중 하나인 5G 네트워크의 구성 방법 중 하나의 방법이 될 수 있다. CU와 DU 간은 F1 인터페이스를 사용하므로, 기지국과 위성 간은 F1 인터페이스가 설정될 수 있다. 이러한 경우 위성과 게이트웨이 간은 앞서 살핀 바와 같이 SRI에 기초하므로, SRI를 통한 F1 인터페이스(F1 over SRI)가 이용될 수 있다.
이상의 설명에 기초하여 도 2b의 구성을 전체적으로 다시 살펴보면, 지구 상의 특정 궤도를 돌고 있는 재생성 위성(gNB-DU)과 지상의 NTN 게이트웨이, 지상의 기지국-CU(gNB-CU)를 포함할 수 있다. 이때에도 단말과 위성 사이의 링크를 서비스 링크라 한다. 또한 위성은 gNB-DU이므로, 데이터 송수신 및 스케쥴링을 수행할 수 있다.
이상에서 도 1b 및 도 2b를 참조하여 설명한 바와 같이 트랜스패런트 위성의 링크는 서비스 링크와 피더 링크로 나뉜다. 서비스 링크는 각 단말마다 링크의 길이가 달라질 수 있는 반면, 피더 링크는 특정 위성과 통신하는 모든 단말에 대해 동일한 길이를 가진다. 따라서 NR NTN에서 발생하는 전파 지연시간을 효율적으로 관리하기 위해, 피더 링크의 타이밍(전파지연 시간) 정보와 서비스 링크의 타이밍 정보를 단말에 제공하고 이 정보를 통해 다음 <수학식 1>과 같이 타이밍 어드밴스(timing advance, TA) 값을 계산할 수 있다.
Figure PCTKR2023005486-appb-img-000001
<수학식 1>에서 NTA는 기존의 지상 네트워크에서의 NTA와 같은 역할이고, NTN에서의 TA 정보를 위해 NTA,UE-specific과 NTA,common이 추가로 정의된다. 여기서 NTA,UE-specific은 서비스 링크 및/또는 피더 링크에서 발생하는 전파 지연에 의해 발생되는 각각의 단말들에 대한 UE-specific TA정보이고, NTA,common은 서비스 링크 및/또는 피더 링크에 발생하는 전파 지연에 의해 발생되는 한 위성 내에서 UE-common한 TA정보이고, NTA,offset은 UE-common 하게 적용할 TA 값을 의미하고, Tc는 NR 물리 계층에서 주로 사용하는 시간 기본 단위 상수로 (4096*480*1000)-1 초를 의미한다.
이하에서 설명될 본 개시에서는 다중 연결 환경에서 최저 지연 링크 탐색 방법을 제안한다. 이하에서 설명될 본 개시에서는 트랜스패런트 위성을 이용하는 네트워크의 구성과 재생성 위성을 이용하는 네트워크 구성에 모두 적용할 수 있다. 다만, 설명의 편의를 위해 본 개시에서는 트랜스패런트 위성을 기준으로 설명하기로 한다. 하지만 이하에서 설명되는 본 개시가 재생성 위성에도 동일한 형태로 적용할 수 있다.
도 8은 본 개시의 일 실시예를 설명하기 위해 하나의 단말로 다중 연결 서비스를 제공하기 위한 복수의 위성들과 각 위성에 대응하는 기지국들을 예시한 개념도이다.
도 8을 참조하면, 서로 다른 3개의 위성들(811, 812, 813)과 위성들(811-813) 각각에 대응하는 지상의 게이트웨이/기지국들(831, 832, 833), 위성들(811-813) 각각과 위성 통신이 가능한 단말(821) 그리고 게이트웨이/기지국들(831-833)이 연결되는 코어 네트워크(840)를 예시하고 있다. 도 8에 예시한 게이트웨이/기지국(831-833) 각각은 기지국과 게이트웨이 간 연결된 형태를 가지거나 또는 기지국이 게이트웨이를 포함하는 형태를 가지거나 또는 게이트웨이가 기지국을 포함하는 형태로 구현될 수 있다. 아울러, 도 8에서 단말(821)은 기지국과 직접 링크를 형성하지 않는 경우를 가정한 도면이다.
또한 도 8에 위성들(811-813)은 정지 궤도인 지구 고정(earth-fixed) 위성이 아닌 의사 지구 고정(quasi-earth-fixed) 및/또는 지구 이동(earth-moving) 위성일 수도 있다. 그리고 도 8에 예시한 각 위성들(811-813)은 트랜스패런트 위성인 경우를 가정하여 설명하기로 한다.
제1 위성(811)은 제1 게이트웨이/기지국(831)과 연결되어 단말(821)과 통신할 수 있고, 제2 위성(812)은 제2 게이트웨이/기지국(832)과 연결되어 단말(821)과 통신할 수 있으며, 제3 위성(813)은 제3 게이트웨이/기지국(833)과 연결되어 단말(821)과 통신할 수 있다. 이러한 제1 위성(811) 내지 제3 위성(831)은 정지 궤도에 위치한 위성이 아니기 때문에 위성이 이동함에 따라 위성들(811-813) 각각과 연결되는 지상의 게이트웨이/기지국들(831-833)은 위성의 이동에 따라 달라질 수 있다. 따라서 도 8에 예시한 위성들(811-813)과 게이트웨이/기지국들(831-833) 간의 연결은 특정한 시점에서의 연결일 수 있다.
도 8의 예시에 따르면, 단말(821)과 제1 게이트웨이/기지국(831) 간의 연결은 제1 위성(811)과 제1 게이트웨이/기지국(831) 간의 링크인 제1 피더 링크 및 제1 위성(811)과 단말(821) 간의 제1 서비스 링크로 구성된다. 또한 단말(821)과 제2 게이트웨이/기지국(832) 간의 연결은 제2 위성(812)과 제2 게이트웨이/기지국(832) 간의 링크인 제2 피더 링크 및 제2 위성(812)과 단말(821) 간의 제2 서비스 링크로 구성된다. 그리고 단말(821)과 제3 게이트웨이/기지국(833) 간의 연결은 제3 위성(813)과 제3 게이트웨이/기지국(833) 간의 링크인 제3 피더 링크 및 제3 위성(813)과 단말(821) 간의 제3 서비스 링크로 구성된다.
도 8에 예시한 바와 같이 위성들(811-813)과 게이트웨이/기지국들(831-833) 간의 피더 링크들 및 위성들(811-813)과 단말(821) 간의 서비스 링크들의 거리는 위성의 고도나 앙각, 기지국의 위치, 단말기의 위치에 따라 피더 링크의 최단 거리(예를 들어 LOS(Line of Sight) 거리) 및 서비스 링크의 최단 거리(예: LOS 거리)가 결정될 수 있다. 다시 말해 피더 링크들의 최단 거리 및 서비스 링크들의 최단 거리는 위성의 고도나 앙각, 기지국의 위치, 단말기의 위치에 따라 달라질 수 있다.
도 8에 예시한 위성들(811-813)을 이용하여 피더 링크들의 거리 및 서비스 링크들의 거리의 차이를 예를 들어 살펴보기로 한다.
도 8을 참조하면, 피더 링크들간 최단 거리는 제1 피더 링크가 가장 짧고, 제2 피더 링크가 가장 길 수 있으며, 서비스 링크들 간의 최단 거리는 제1 서비스 링크가 가장 짧고, 제3 서비스 링크가 가장 길 수 있다. 따라서 제2 피더 링크는 제1 피더 링크 보다 길고, 제3 피더 링크보다 짧으며, 제2 서비스 링크도 제1 서비스 링크보다 길고, 제3 서비스 링크보다 짧은 경우가 될 수 있다.
본 개시에서는 이와 같이 다중 연결을 가질 수 있는 단말(821)에 대하여 단말(821)에서 및/또는 기지국들(831-833)에서 저지연 링크를 탐색할 수 있는 방법을 제공할 수 있다. 또한 본 개시에서는 탐색된 저지연 링크를 운용하기 위한 방법을 제공할 수 있다.
도 9는 본 개시의 다른 실시예를 설명하기 위해 하나의 단말로 다중 연결 서비스를 제공하기 위한 복수의 위성들 및 복수의 위성들이 하나의 기지국들에 연결되는 경우를 예시한 개념도이다.
도 9를 참조하면, 서로 다른 3개의 위성들(911, 912, 913)과 위성들(911-913)과 연결되는 하나의 게이트웨이/기지국(931) 및 위성들(811-813) 각각과 위성 통신이 가능한 단말(821)을 예시하고 있다. 도 9에 예시한 게이트웨이/기지국(931)은 기지국과 게이트웨이 간 연결된 형태를 가지거나 또는 기지국이 게이트웨이를 포함하는 형태를 가지거나 또는 게이트웨이가 기지국을 포함하는 형태로 구현될 수 있다. 아울러, 도 9에서 단말(921)은 기지국(931)과 직접 링크를 형성하지 않는 경우를 가정한 도면이다.
또한 도 9에 위성들(911-913)은 정지 궤도인 지구 고정(earth-fixed) 위성이 아닌 의사 지구 고정(quasi-earth-fixed) 및/또는 지구 이동(earth-moving) 위성일 수도 있다. 그리고 도 9에 예시한 각 위성들(911-913)은 트랜스패런트 위성인 경우를 가정하여 설명하기로 한다.
제1 위성(911)은 게이트웨이/기지국(931)과 연결되어 단말(821)과 통신할 수 있고, 제2 위성(912)은 게이트웨이/기지국(831)과 연결되어 단말(821)과 통신할 수 있으며, 제3 위성(913)은 게이트웨이/기지국(831)과 연결되어 단말(821)과 통신할 수 있다. 이러한 제1 위성(811) 내지 제3 위성(831)은 정지 궤도에 위치한 위성이 아니기 때문에 위성이 이동함에 따라 위성들(811-813)과 게이트웨이/기지국(831) 간의 거리가 위성들(911-913)의 이동에 따라 달라질 수 있다.
도 9의 예시에 따르면, 단말(921)과 게이트웨이/기지국(931) 간의 연결은 제1위성(911)과 게이트웨이/기지국(931) 간의 링크인 제1 피더 링크 및 제1 위성(911)과 단말(821) 간의 제1서비스 링크로 구성된다. 또한 단말(921)과 게이트웨이/기지국(931) 간의 연결은 제2 위성(912)과 게이트웨이/기지국(931) 간의 링크인 제2 피더 링크 및 제2 위성(912)과 단말(921) 간의 제2 서비스 링크로 구성된다. 그리고 단말(821)과 게이트웨이/기지국(931) 간의 연결은 제3 위성(913)과 게이트웨이/기지국(931) 간의 링크인 제3 피더 링크 및 제3 위성(913)과 단말(921) 간의 제3 서비스 링크로 구성된다.
도 9에 예시한 바와 같이 위성들(911-913)과 게이트웨이/기지국(931) 간의 피더 링크들 및 위성들(911-913)과 단말(921) 간의 서비스 링크들의 거리는 위성의 고도나 앙각, 기지국의 위치, 단말기의 위치에 따라 피더 링크의 최단 거리(예: LOS 거리) 및 서비스 링크의 최단 거리(예: LOS 거리)가 결정될 수 있다. 다시 말해 피더 링크들의 최단 거리 및 서비스 링크들의 최단 거리는 위성의 고도나 앙각, 기지국의 위치, 단말기의 위치에 따라 달라질 수 있다.
도 9에 예시한 위성들(911-913)을 이용하여 피더 링크들의 거리 및 서비스 링크들의 거리의 차이를 예를 들어 살펴보기로 한다.
도 9을 참조하면, 피더 링크들간 최단 거리는 제1 피더 링크가 가장 짧고, 제2 피더 링크가 가장 길 수 있으며, 서비스 링크들 간의 최단 거리는 제1 서비스 링크가 가장 짧고, 제3 서비스 링크가 가장 길 수 있다. 따라서 제2 피더 링크는 제1 피더 링크 보다 길고, 제3 피더 링크보다 짧으며, 제2 서비스 링크도 제1 서비스 링크보다 길고, 제3 서비스 링크보다 짧은 경우가 될 수 있다.
도 9의 예시는 하나의 기지국에 복수의 위성들(911-913)이 연결된 상황이기 때문에 다중 TRP(multi-TRP)에 해당할 수 있다. 또한 도 9의 경우에서는 모든 위성들(911-913)이 동일한 하나의 게이트웨이/기지국(931)에 연결됨에도 불구하고, 이 경우 역시 서비스 링크의 길이와 피더 링크의 길이가 위성의 위치로 인해 달라질 수 있음을 살펴보았다.
따라서 본 개시에서는 이와 같이 다중 연결을 가질 수 있는 단말(921)에 대하여 단말(921)에서 및/또는 기지국들(931)에서 저지연 링크를 탐색할 수 있는 방법을 제공할 수 있다. 또한 본 개시에서는 탐색된 저지연 링크를 운용하기 위한 방법을 제공할 수 있다.
이하의 본 개시에서는 NTN 환경에서 다중 연결을 갖는 단말로의 여러 링크들 중에 지연시간이 낮은 링크를 "저지연 링크(QuickLink)"라 명명하고, 이를 찾는 방법을 제시한다. 단순히 생각하면, 최단 지연시간을 갖는 위성은 최저 고도를 공전하는 위성으로 생각하기 쉽지만, 서비스 링크의 단말 위치나 피더 링크의 게이트웨이/기지국 위치에 따라서 링크 길이 다를 수 있다. 따라서, 위성의 고도만을 가지고 최저 지연시간을 갖는 위성을 특정할 수 없고, 좀 더 복잡한 절차를 통해 최저 지연시간을 갖는 위성을 찾아야 한다.
[제1 실시예: 위치 정보를 활용한 저지연 링크 탐색]
도 10a는 본 개시의 일 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 일부이고, 도 10b는 본 개시의 일 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 나머지 일부이다.
도 10a 및 도 10b는 연속된 신호 흐름도일 수 있다. 따라서 도 10a의 흐름도 이후에 도 10b의 흐름도가 연속하여 이루어질 수 있다. 또한 도 10a 및 도 10b의 흐름도 중 일부 동작은 생략될 수 있고, 다른 동작이 추가로 이루어질 수도 있다. 아울러, 도 10a 및 도 10b의 흐름도 중 일부 동작의 선후 동작은 바뀔 수도 있다. 이러한 내용들은 이하의 설명을 통해 보다 명확해질 것이다.
도 10a 및 도 10b의 구성 요소들은 도 8에 예시한 구성 요소들을 이용하여 참조부호를 부여하였다. 다시 말해 단말(821), 제1 기지국(831), 제2 기지국(832) 및 제3 기지국(833)을 예시하였으며, 각 기지국들(831-833)은 대응하는 위성들(도 10a 및 도 10b에 미도시)과 피더 링크로 연결될 수 있다. 도 10a 및 도 10b에서는 복잡도로 인해 위성들은 생략되었음에 유의해야 한다. 또한 각 기지국들(831-833)은 각각 대응하는 게이트웨이들에 연결된 형태일 수 있다. 도 10a 및 도 10b를 설명함에 있어, 기지국들(831-833)은 대응하는 게이트웨이에 연결된 기지국들일 수 있음에 유의해야 한다.
S1000단계에서 단말(821)은 제1 기지국(831)과 제1 NTN 링크로 통신하는 중일 수 있다. 단말(821)이 제1 기지국(831)과 제1 NTN 링크로 통신하는 링크를 앞서 설명한 도 8을 참조하여 살펴보기로 한다. 단말(821)은 제1 위성(811)과 서비스 링크를 통해 연결될 수 있고, 제1 위성(811)은 제1 기지국(831)과 피더 링크로 연결될 수 있다. 따라서 단말(821)은 제1 위성(811)을 통해 제1 기지국(831)과 제1 NTN 링크로 통신을 수행할 수 있다. 이하의 설명에서 단말과 기지국이 위성을 통해 연결된 전체 링크를 NTN 링크라 칭하기로 한다. 이에 따라 단말(821)이 제1 위성(811)을 통해 제1 기지국(831)과 연결된 링크 전체를 제1 NTN 링크라 칭하기로 한다.
한편, 단말(821)이 제1 기지국(831)과 제1 NTN 링크를 통해 통신하는 중에 다른 위성을 통해 다른 기지국과 NTN 링크가 추가로 형성될 수 있다.
S1010단계에서 단말(821)은 제2 기지국(832)과 제2 위성(812)을 통해 제2 NTN 링크가 설정되는 동작을 예시하였다. 이를 다시 도 8을 참조하여 살펴보면, 단말(821)은 제2 위성(812)을 통해 제2 기지국(832)과 제2 NTN 링크를 형성할 수 있다. 이때, 제2 기지국(832)은 단말(821)이 제1 NTN 링크가 설정된 상태임을 확인할 수 있고, 이에 기초하여 제2 기지국(832)은 제1 기지국(831)으로 제2 NTN 링크의 설정을 알릴 수도 있다.
제2 기지국(832)이 단말(821)에 미리 설정된 NTN 링크가 존재함을 확인하는 방법은 아래와 같은 경우들이 될 수 있다.
첫째, 제2 기지국(832)은 상위 계층으로부터 예를 들어 5G 코어 네트워크로부터 단말(821)에 이미 제1 NTN 링크가 설정된 상태라는 정보를 수신할 수 있다. 이에 기초하여 제2 기지국(832)은 단말(821)에 이미 다른 NTN 링크 예를 들어 제1 NTN 링크가 설정된 상태를 확인할 수 있다.
둘째, 제2 기지국(832)은 단말(821)이 보고하는 정보에 기초하여 이미 제1 NTN 링크 설정 상태를 확인할 수 있다. 가령 단말(821)은 제2 기지국(832)에 접속 절차를 수행할 때, 현재 연결된 NTN 링크의 정보를 보고할 수 있다. 이러한 경우 제2 기지국(832)은 단말(821)에 이미 다른 NTN 링크 예를 들어 제1 NTN 링크가 설정된 상태를 확인할 수 있다.
이상에서 설명한 2가지 방법 또는 그 밖의 다른 방법들을 통해 제2 기지국(832)은 제2 NTN 링크를 설정하는 동작에서 다른 NTN 링크가 존재함을 확인할 수 있다. 그리고 제2 기지국(832)는 다른 NTN 링크가 존재하는 경우 다른 링크에 대응하는 기지국 예를 들어 제1 기지국(831)으로 제2 NTN 링크가 설정되었음을 알릴 수 있다.
제1 기지국(831)과 제2 기지국(832)이 다른 NTN 링크의 설정을 확인할 수 있는 다른 예로, 통신 시스템 예를 들어 5G 통신 시스템의 코어 네트워크가 제1 기지국(831)과 제2 기지국(832)으로 각각 현재 단말(821)에 연결된 NTN 정보를 제공할 수도 있다. 본 개시를 설명함에 있어 통신 시스템을 5G 통신 시스템을 예로 설명할 것이다. 하지만, 본 개시가 5G 통신 시스템에 한정되는 것으로 이해되어서는 안되며, 본 개시의 내용을 적용할 수 있는 다른 모든 통신 시스템에도 적용될 수 있음에 유의해야 한다.
한편, 도 10a의 NTN 링크의 추가 설정 절차는 본 개시의 범위를 벗어나기 때문에 NTN 링크의 추가 설정에 관련된 다른 동작들의 상세한 설명은 생략하기로 한다.
S1020단계에서 단말(821)은 제3 기지국(833)과 제3 위성(813)을 통해 제3 NTN 링크를 추가로 설정할 수 있다. 이를 다시 도 8을 참조하여 살펴보면, 단말(821)은 제3 위성(813)을 통해 제3 기지국(833)과 제3 NTN 링크를 형성할 수 있다. 이러한 NTN 링크의 설정이 이루어질 경우 제3 기지국(833)은 단말(821)에 설정된 다른 NTN 링크들에 대응하는 기지국들 예를 들어, 제1 기지국(831) 및 제2 기지국(832)으로 제3 NTN 링크의 설정을 알릴 수 있다. 다른 방법으로 5G 통신 시스템의 코어 네트워크가 제1 기지국(831), 제2 기지국(832) 및 제3 기지국(833)으로 각각 현재 단말(821)에 연결된 NTN 정보를 제공할 수도 있다.
도 10a에서는 S1010단계 즉, 단말(821)이 제2 기지국(832)과 제2 NTN 링크를 형성한 후 S1020단계 즉, 제3 기지국(833)과 제3 NTN 링크가 형성되는 경우를 가정하여 설명하였다. 하지만, NTN 링크의 설정 절차가 바뀔 수도 있다. 다시 말해 단말(821)은 제3 기지국(833)과 제3 NTN 링크를 먼저 설정하고, 제2 기지국(832)과 제2 NTN 링크를 설정할 수도 있다.
또한 도 10a에서는 단말(821)이 제2 NTN 링크를 설정한 이후에 제3 NTN 링크가 추가로 설정되는 경우를 예시하였다. 하지만, 단말(821)은 제1 NTN 링크 설정 이후에 하나의 추가 NTN 링크만 설정할 수도 있다. 예를 들어 단말(821)은 제1 NTN 링크로 통신하는 중에 제2 위성(812)을 통해 제2 기지국(832)과 제2 NTN 링크만 추가 설정할 수도 있고, 단말(821)은 제1 NTN 링크로 통신하는 중에 제3 위성(813)을 통해 제3 기지국(833)과 제3 NTN 링크만 추가 설정할 수도 있다.
S1030단계에서 제1 기지국(831)은 현재 제1 기지국(831)과 단말(821) 간의 제1 NTN 링크를 빠른 링크(QuickLink)로 임시 설정할 수 있다. 본 개시에서는 어떠한 NTN 링크 즉, 제1 NTN 링크, 제2 NTN 링크 및 제3 NTN 링크 중 어느 NTN 링크가 QuickLink인가를 결정하고, 이에 대한 운영 방법을 제시하고자 한다.
따라서 제1 기지국(831)은 어떠한 NTN 링크가 QuickLink인가를 판단하기 위한 절차를 수행해야 할 수 있다.
S1040단계에서 제1 기지국(831)은 제1 NTN 링크의 위치 획득 절차를 수행할 수 있다. 여기서 NTN 링크의 위치 획득은 기지국의 위치, 단말의 위치 및 위성의 위치를 획득하는 절차를 포함할 수 있다. 이때, 기지국의 위치는 자신이 이미 알고 있는 경우이므로, 추가적인 획득 절차가 필요하지는 않다. 또한 기지국은 게이트웨이와 연결되어 있으므로, 기지국은 자신의 위치 뿐 아니라 게이트웨이의 위치도 알고 있는 경우를 가정한다. 그러면, 이하에서 NTN 링크의 위치 획득 절차 중 단말 및 위성의 위치를 획득하는 절차에 대하여 구체적으로 살펴보기로 한다.
S1042단계에서 제1 기지국(831)은 제1 위성(811)을 통해 단말(821)로 위치 정보 보고 요청을 전송할 수 있다. 이때, 제1 기지국(831)은 위치 정보 보고 요청 시 단말(821)의 위치 정보만 요청할 수도 있고, 단말(821)과 제1 위성(811)의 위치를 함께 요청할 수도 있다. 제1 기지국(831)은 제1 위성(811)의 위치를 알고 있거나 계산을 통해 확인할 수 있는 경우 단말(821)의 위치 정보만 요청할 수 있다. 반면에 제1 위성(811)의 위치를 알지 못하고, 계산을 통해서도 확인할 수 없는 경우 제1 기지국(831)은 단말(821)과 제1 위성(811)의 위치를 함께 요청할 수 있다.
일반적으로 기지국은 위성의 위치를 알고 있거나 계산을 통해 확인할 수 있다. 따라서 일반적인 경우에 S1042단계에서 제1 기지국(831)은 단말(821)의 위치만을 요청할 수 있다. 본 개시에 따른 도 10a에서는 제1 기지국(831)이 제1 위성(811)의 위치를 모르는 경우를 포함하여 예시하였음에 유의해야 한다.
또한 제1 기지국(831)은 자신의 위치는 이미 알고 있으므로, 자신의 위치를 획득하기 위해 다른 노드와 제1 기지국(831)의 위치 획득을 위한 별도의 동작을 필요로 하지 않는다.
S1044단계에서 단말(821)은 자신의 위치 정보를 위치 정보 보고 메시지를 통해 제1 위성(811)로 전송할 수 있다. 그러면 제1 위성(811)은 위치 정보 보고 메시지에 제1 위성(811)의 위치 정보를 포함하여 제1 기지국(831)로 위치 정보 보고 메시지를 전송할 수 있다. 이러한 절차를 통해 제1 기지국(831)은 단말(821)의 위치 및 제1 위성의 위치를 확인할 수 있다.
S1050단계에서 제1 기지국(831)은 제2 NTN 링크의 위치 획득 절차를 수행할 수 있다. 제2 NTN 링크의 위치 획득 절차는 제2 NTN 링크를 구성하는 제2 기지국(832), 제2 위성(812) 및 단말(821)의 위치를 획득하는 절차가 될 수 있다. 다른 예로, 제2 NTN 링크의 위치 획득 절차는 제2 기지국(832) 및 제2 위성(812)의 위치를 획득하는 절차가 될 수도 있다. 제2 NTN 링크의 위치 획득 절차는 제2 기지국(832) 및 제2 위성(812)의 위치만을 획득하는 경우는 제1 기지국(8131)이 앞선 제1 NTN 링크의 위치 획득 절차에서 단말(821)의 위치를 이미 획득한 경우가 될 수 있다. 따라서 단말(821)의 위치를 중복하여 획득할 필요가 없기 때문에 제2 NTN 링크의 위치 획득 절차는 단말의 위치 획득이 불필요할 수 있다.
그러면 이하에서 제2 NTN 링크의 위치 획득 절차에 대하여 좀 더 구체적으로 살펴보기로 한다.
S1052단계에서 제1 기지국(831)은 위치 정보 요청 메시지를 전송할 수 있다. 위치 정보 요청 메시지는 제2 NTN 링크를 형성하는 제2 기지국(832)의 위치, 제2 위성(812)의 위치, 단말(821)의 위치 중 적어도 하나를 요청할 수 있다. 이때, 제2 위성(812)의 위치는 필수 요소가 될 수 있다. 왜냐하면, 제2 기지국(832)의 위치는 앞서 설명한 제2 NTN 링크 설정 시 미리 획득할 수도 있기 때문이다. 또한 단말(821)의 위치는 제1 NTN 링크의 위치 획득 절차에서 이미 획득하였으므로, 중복 획득이 불필요할 수도 있기 때문이다.
S1054단계에서 제2 기지국(832)은 제2 위성(812)를 통해 단말(821)로 위치 정보 보고 요청을 전송할 수 있다. S1054단계는 위에서 설명한 바와 같이 단말의 위치 획득이 불필요한 경우 수행되지 않을 수도 있다. 또한 제2 기지국(832)가 제2 위성(812)의 위치 정보를 미리 알고 있거나 또는 계산을 통해 획득할 수 있는 경우 S1054단계는 수행되지 않을 수도 있다. 만일 단말(821)의 위치를 확인할 필요가 없고, 제2 위성(812)의 위치만 필요로 하는 경우 S1054단계는 제2 위성(812)로만 전송될 수도 있다.
S1056단계에서 단말(821)은 위치 정보 보고를 제2 기지국(832)으로 전송할 수 있다. 위치 정보 보고는 단말(821)의 위치만 포함하거나 또는 단말(821)의 위치와 제2 위성(812)의 위치 정보를 모두 포함할 수 있다.
S1058단계에서 제2 기지국(832)은 제2 위성(812)의 정보를 포함하는 위치 정보를 제1 기지국(831)로 보고할 수 있다. 이때, 위치 정보는 추가적으로 단말(821)의 위치 및/또는 제2 기지국(832)의 위치 중 적어도 하나를 더 포함할 수도 있다.
이상에서 설명한 S1050단계 중 S1054단계 및 S1056단계는 위성을 이용하는 일반적인 NTN 환경에서는 불필요한 동작이 될 수 있다. 일반적으로 각 기지국 또는 게이트웨이는 자신과 연결된 위성의 위치를 알고 있거나 또는 계산을 통해 위성의 위치를 획득할 수 있다. 하지만, NTN 환경이 위성에 국한되지 않고, 드론과 같은 비행체 및/또는 특정한 궤도 상에 머무를 수 있는 어드벌룬 등을 활용할 수도 있다. 따라서 본 개시에 따른 기지국은 이러한 비행체들의 정확한 위치를 매 순간 알 수 없는 경우에도 적용할 수 있도록 하기 위해 본 개시에서는 S1054단계 및 S1056단계를 예시하였다.
S1060단계에서 제1 기지국(831)은 제3 NTN 링크의 위치 획득 절차를 수행할 수 있다. 제3 NTN 링크의 위치 획득 절차는 앞서 설명한 제2 NTN 링크의 위치 획득 절차와 유사하게 획득할 수 있다. 따라서 제2 NTN 링크의 위치 획득 절차와 중복되는 제3 NTN 링크의 위치 획득 절차에 대해서 추가적인 설명은 생략하기로 한다.
이상의 동작들을 통해 제1 기지국(831)은 제1 NTN 링크에 대응하는 각 노드들의 위치와 제2 NTN 링크에 대응하는 각 노드들의 위치 및 제3 NTN 링크에 대응하는 각 노드들의 위치를 획득할 수 있다. 또한 도 10a 및 도 10b에서는 서로 다른 3개의 위성이 이용되는 NTN 링크들에 대하여 설명하였으나, S1010단계 및 S1020단계에서 설명한 바와 같이 2개의 NTN 링크들에 대해서도 동일하게 적용할 수 있다. 또한 4개 이상의 위성이 이용되는 경우에도 본 개시에서 설명된 내용에 기초하여 동일하게 각 NTN 링크의 위치 정보들을 획득할 수 있다.
S1070단계에서 제1 기지국(831)은 각 NTN 링크들에 대하여 획득한 위치 정보에 기초하여 QuickLink를 결정할 수 있다. QuickLink의 결정은 단말과 통신하는 위성과 단말 간의 서비스 링크에 대응하는 거리, 해당 위성과 대응하는 기지국 간의 피더 링크에 대응하는 거리 그리고 게이트웨이와 기지국 간의 거리에 기초하여 결정될 수 있다. 이러한 거리는 각각 시간 값으로 나타낼 수 있으며, 위의 <수학식 1>에서 설명한 TA 값에 기초하여 계산될 수도 있고, TA 값이 아닌 다른 방식을 이용할 수도 있다.
S1072a단계에서 제1 기지국(831)은 결정된 QuickLink 정보를 제1 위성(811)을 통해 단말(821)로 전송할 수 있다. 즉, 제1 기지국(831)은 제1 NTN 링크를 통해 QuickLink 정보를 단말(821)로 전송할 수 있다.
S1072b단계에서 제1 기지국(831)은 결정된 QuickLink 정보를 제2 기지국(832)로 전송할 수 있다. 또한 제1 기지국(831)은 S1072c단계에서 제3 기지국(833)으로 QuickLink 정보를 전송할 수 있다.
도 10b에서는 QuickLink로 제3 NTN 링크가 결정된 경우를 가정하여 예시한 경우이다. 따라서 S1074단계에서 제3 기지국(833)은 QuickLink로 동작할 수 있다.
도 11a는 본 개시의 다른 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 일부이고, 도 11b는 본 개시의 다른 실시예에 따라 단말과 기지국의 위치 정보를 활용한 저지연 링크 탐색 방법에 따른 신호 흐름도의 나머지 일부이다.
도 11a 및 도 11b는 연속된 신호 흐름도일 수 있다. 따라서 도 11a의 흐름도 이후에 도 11b의 흐름도가 연속하여 이루어질 수 있다. 또한 도 11a 및 도 11b의 흐름도 중 일부 동작은 생략될 수 있고, 다른 동작이 추가로 이루어질 수도 있다. 아울러, 도 11a 및 도 11b의 흐름도 중 일부 동작의 선후 동작은 바뀔 수도 있다. 이러한 내용들은 이하의 설명을 통해 보다 명확해질 것이다.
도 11a 및 도 11b의 구성 요소들은 도 9에 예시한 구성 요소들을 이용하여 참조부호를 부여하였다. 다시 말해 단말(921), 기지국(931), 제1 위성(911), 제2 위성(912) 및 제3 위성(913)을 예시하였다. 위성들(911-913)과 단말(921) 간은 서비스 링크로 연결될 수 있고, 위성들(911-913)과 기지국(931) 간은 피더 링크로 연결될 수 있다. 또한 기지국(931)은 대응하는 게이트웨이에 연결된 형태일 수 있다. 도 11a 및 도 11b를 설명함에 있어, 기지국(931)은 대응하는 게이트웨이에 연결된 기지국일 수 있음에 유의해야 한다.
S1100단계에서 단말(921)은 기지국(931)과 제1 NTN 링크로 통신하는 중일 수 있다. 단말(921)이 기지국(831)과 제1 NTN 링크로 통신하는 링크를 앞서 설명한 도 9을 참조하여 살펴보기로 한다. 단말(921)은 제1 위성(911)과 서비스 링크를 통해 연결될 수 있고, 제1 위성(911)은 기지국(931)과 피더 링크로 연결될 수 있다. 따라서 단말(921)은 제1 위성(911)을 통해 기지국(931)과 제1 NTN 링크로 통신을 수행할 수 있다. 이하의 설명에서 단말과 기지국이 위성을 통해 연결된 전체 링크를 NTN 링크라 칭하기로 한다. 이에 따라 단말(921)이 제1 위성(911)을 통해 기지국(931)과 연결된 링크 전체를 제1 NTN 링크라 칭하기로 한다.
한편, 단말(921)이 기지국(931)과 제1 NTN 링크를 통해 통신하는 중에 다른 위성을 통해 다른 기지국과 NTN 링크가 추가로 형성될 수 있다.
S1110단계에서 단말(921)은 기지국(931)과 제2 위성(912)을 통해 제2 NTN 링크가 설정되는 동작을 예시하였다. 이를 다시 도 9를 참조하여 살펴보면, 단말(921)은 제2 위성(912)을 통해 기지국(931)과 제2 NTN 링크를 형성할 수 있다. 이때, 기지국(931)은 단말(921)이 제1 NTN 링크가 설정된 상태임을 확인할 수 있다.
한편, 도 11a의 NTN 링크의 추가 설정 절차는 본 개시의 범위를 벗어나기 때문에 NTN 링크의 추가 설정에 관련된 다른 동작들의 상세한 설명은 생략하기로 한다.
S1120단계에서 단말(921)은 기지국(931)과 제3 위성(913)을 통해 제3 NTN 링크가 추가로 설정할 수 있다. 이를 다시 도 9를 참조하여 살펴보면, 단말(921)은 제3 위성(913)을 통해 기지국(931)과 제3 NTN 링크를 형성할 수 있다. 이러한 NTN 링크의 설정이 이루어질 경우 기지국(931)은 단말(921)에 설정된 다른 NTN 링크들을 확인할 수 있다.
도 11a에서는 S1110단계 즉, 단말(921)이 제2위성(912)과 제2 NTN 링크를 형성한 후 S1120단계 즉, 제3 위성(913)과 제3 NTN 링크가 형성되는 경우를 가정하여 설명하였다. 하지만, NTN 링크의 설정 절차가 바뀔 수도 있다. 다시 말해 단말(921)은 제3 위성(913)과 제3 NTN 링크를 먼저 설정하고, 제2 위성(912)과 제2 NTN 링크를 설정할 수도 있다.
또한 도 11a에서는 단말(921)이 제2 NTN 링크를 설정한 이후에 제3 NTN 링크가 추가로 설정되는 경우를 예시하였다. 하지만, 단말(921)은 제1 NTN 링크 설정 이후에 하나의 추가 NTN 링크만 설정할 수도 있다. 예를 들어 단말(921)은 제1 NTN 링크로 통신하는 중에 제2 위성(912)을 통해 기지국(931)과 제2 NTN 링크만 추가 설정할 수도 있고, 단말(921)은 제1 NTN 링크로 통신하는 중에 제3 위성(913)을 통해 기지국(931)과 제3 NTN 링크만 추가 설정할 수도 있다.
S1130단계에서 기지국(931)은 제1 위성(911)과 단말(921) 간의 제1 NTN 링크를 저지연 링크(QuickLink)로 임시 설정할 수 있다. 본 개시에서는 어떠한 NTN 링크 즉, 제1 NTN 링크, 제2 NTN 링크 및 제3 NTN 링크 중 어느 NTN 링크가 QuickLink인가를 결정하고, 이에 대한 운영 방법을 제시하고자 한다.
따라서 기지국(931)은 어떠한 NTN 링크가 QuickLink인가를 판단하기 위한 절차를 수행해야 할 수 있다.
S1140단계에서 기지국(931)은 제1 NTN 링크의 위치 획득 절차를 수행할 수 있다. 여기서 NTN 링크의 위치 획득은 기지국의 위치, 단말의 위치 및 위성의 위치를 획득하는 절차를 포함할 수 있다. 이때, 기지국의 위치는 자신이 이미 알고 있는 경우이므로, 추가적인 획득 절차가 필요하지는 않다. 또한 기지국은 게이트웨이와 연결되어 있으므로, 기지국은 자신의 위치 뿐 아니라 게이트웨이의 위치를 알고 있는 경우를 가정한다. 그러면, 이하에서 NTN 링크의 위치 획득 절차 중 단말 및 위성의 위치를 획득하는 절차에 대하여 구체적으로 살펴보기로 한다.
S1142단계에서 기지국(931)은 제1 위성(911)을 통해 단말(921)로 위치 정보 보고 요청을 전송할 수 있다. 이때, 기지국(931)은 위치 정보 보고 요청 시 단말(921)의 위치 정보만 요청할 수도 있고, 단말(921)과 제1 위성(911)의 위치를 함께 요청할 수도 있다. 기지국(931)은 제1 위성(911)의 위치를 알고 있거나 계산을 통해 확인할 수 있는 경우 단말(921)의 위치 정보만 요청할 수 있다. 반면에 제1 위성(911)의 위치를 알지 못하고, 계산을 통해서도 확인할 수 없는 경우 기지국(931)은 단말(921)과 제1 위성(911)의 위치를 함께 요청할 수 있다.
일반적으로 기지국은 위성의 위치를 알고 있거나 계산을 통해 확인할 수 있다. 따라서 일반적인 경우에 S1142단계에서 기지국(931)은 단말(921)의 위치만을 요청할 수 있다. 본 개시에 따른 도 11a에서는 기지국(931)이 제1 위성(911)의 위치를 모르는 경우의 동작을 포함하여 예시하였음에 유의해야 한다.
또한 기지국(931)은 자신의 위치는 이미 알고 있으므로, 자신의 위치를 획득하기 위해 다른 노드와 기지국(931)의 위치 획득을 위한 별도의 동작을 필요로 하지 않는다.
S1144단계에서 제1 위성(911)은 위치 보고 요청 메시지를 단말(921)로 전송할 수 있다. S1146단계에서 단말(921)은 자신의 위치 정보를 위치 정보 보고 메시지를 제1 위성(911)로 전송할 수 있다. 단말(921)이 전송한 위치 정보 보고 메시지에 기초하여 제1 위성(811)은 S1148단계에서 위치 정보 보고 메시지를 그대로 기지국(931)으로 전송하거나 또는 위치 정보 보고 메시지에 제1 위성(911)의 위치 정보를 포함하여 기지국(931)로 전송할 수 있다. 이러한 절차를 통해 기지국(931)은 단말(921)의 위치 또는 단말(921)의 위치와 제1 위성(911)의 위치를 확인할 수 있다.
S1150단계에서 기지국(931)은 제2 NTN 링크의 위치 획득 절차를 수행할 수 있다. 일반적으로 기지국(931)은 제2 위성(912)의 위치를 알고 있거나 계산을 통해 획득할 수 있다. 따라서 제2 NTN 링크의 위치 획득 절차는 제2 위성(912)의 알고 있는 위치 정보에 기초하여 획득할 수 있다.
S1160단계에서 기지국(931)은 제3 NTN 링크의 위치 획득 절차를 수행할 수 있다. 앞서 S1150단계에서 설명한 바와 같이 기지국(931)은 제3 위성(913)의 위치를 알고 있거나 계산을 통해 획득할 수 있다. 따라서 제3 NTN 링크의 위치 획득 절차는 제2 위성(912)의 알고 있는 위치 정보에 기초하여 획득할 수 있다.
따라서, 기지국(931)이 S1150단계 및 S1160단계를 수행하는 경우는 일반적이지 않은 경우가 될 수 있다. 예를 들어, NTN 환경이 위성에 국한되지 않고, 드론과 같은 비행체 및/또는 특정한 궤도 상에 머무를 수 있는 어드벌룬 등을 활용할 수도 있다. 이러한 경우 기지국은 이러한 비행체들의 정확한 위치를 매 순간 알 수 없을 수 있다. 본 개시는 이처럼 비행체들의 정확한 위치를 알 수 없는 경우에도 적용하기 위해 S1150단계 및 S1160단계를 예시하였다. 또한 S1150단계 및 S1160단계는 필요한 경우에만 수행할 수 있으므로, 점선으로 표시하였음에 유의해야 한다.
S1170단계에서 기지국(931)은 각 NTN 링크들에 대하여 획득한 위치 정보에 기초하여 QuickLink를 결정할 수 있다. QuickLink의 결정은 단말과 통신하는 위성과 단말 간의 서비스 링크에 대응하는 거리, 해당 위성과 대응하는 기지국 간의 피더 링크에 대응하는 거리 그리고 게이트웨이와 기지국 간의 거리에 기초하여 결정될 수 있다. 이러한 거리는 각각 시간 값으로 나타낼 수 있으며, 위 <수학식 1>에서 설명한 TA 값에 기초하여 계산될 수도 있고, TA 값이 아닌 다른 방식을 이용할 수도 있다.
S1172단계에서 기지국(931)은 결정된 QuickLink 정보를 결정된 QuickLink를 통해 전송할 수 있다. 가령, 제1 NTN 링크가 QuickLink로 결정된 경우 기지국(931)은 제1 위성(911)을 통해 단말(921)로 결정된 QuickLink가 제1 위성(911)의 링크임을 알릴 수 있다. 다른 예로, 제2 NTN 링크가 QuickLink로 결정된 경우 기지국(931)은 제2 위성(912)을 통해 단말(921)로 결정된 QuickLink가 제2 위성(912)의 링크임을 알릴 수 있다. 또 다른 예로 제3 NTN 링크가 QuickLink로 결정된 경우 기지국(931)은 제3 위성(913)을 통해 단말(921)로 결정된 QuickLink가 제3 위성(913)의 링크임을 알릴 수 있다.
다른 예로, 기지국(931)은 결정된 QuickLink의 정보를 최초 설정된 NTN 링크인 제1 위성(911)을 통해 단말(921)로 전송할 수도 있다.
또 다른 예로, 기지국(931)은 결정된 QuickLink의 정보를 단말(921)이 보고한 링크 신호 세기 정보에 기초하여 가장 신호 세기가 높은 링크를 통해 결정된 QuickLink 정보를 전송할 수도 있다.
S1174단계에서 기지국(931)은 단말(921)로부터 주기적인 위치 정보를 수신할 수 있다. 단말(921)이 주기적으로 위치 정보를 전송하는 경우는 기지국(931)에서 NTN 링크의 설정 시에 특정한 제어 메시지 예를 들어, RRC 메시지를 통해 설정할 수 있다. 이에 따라 단말(921)은 S1172단계에서 알려진 QuickLink를 통해 단말(921)의 위치 정보를 기지국(931)로 보고할 수 있다.
S1176단계에서 기지국(931)은 단말(921)이 보고한 위치 정보에 기초하여 QuickLink를 재설정할 수 있다. 단말(921)이 고속으로 이동하거나 또는 단말(921)이 고속으로 이동하지 않더라도 단말(921)의 이동에 기초하여 위성들과의 앙각이 변화하는 경우 위성들과 단말(921) 간의 거리가 변경될 수 있다. 특히 NTN 네트워크가 위성을 이용하지 않고, 드론이나 에드벌룬과 같은 비행체를 이용하는 경우 위성보다 낮은 고도를 가질 수 있다. 따라서 단말(921)의 이동에 따라 단말(921)과 비행체 간의 앙각의 변화가 심할 수 있다. 앙각의 변화는 결국 단말과 비행체 간의 거리가 달라짐을 의미할 수 있다.
뿐만 아니라 위성들은 매우 고속으로 이동할 수 있다. 따라서 위성들이 고속으로 이동함에 따라 위성과 단말 간의 앙각이 변화할 수 있다. 이러한 변화에 기초하여 단말과 위성 간의 거리가 변경될 수 있다. 따라서 기지국(931)은 주기적으로 QuickLink를 재결정해야 할 수 있다. 이러한 주기적 재결정을 위해 단말(921)로부터 보고되는 단말(921)의 위치 정보를 이용할 수 있다.
S1178단계에서 기지국(931)은 재결정된 QuickLink 정보를 재결정된 QuickLink를 통해 전송하거나 또는 미리 설정된 특정 링크를 통해 단말(921)로 전송할 수 있다.
도 12는 본 개시의 제1 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
이하 도 12를 참조하여 앞서 도 10a 및 도 10b에서 설명한 실시예와 도 11a 및 도 11b에서 설명한 실시예에 대한 전체 동작을 살펴보기로 한다.
S1200단계에서 단말과 기지국은 단일 NTN 링크를 설정하고, 단일 NTN 링크로 통신할 수 있다.
S1200단계를 도 8을 참조하여 살펴보면, 제1 기지국(831)은 제1 위성(811)을 통해 단말(821)과 제1 NTN 링크를 설정하고, 설정된 제1 NTN 링크를 통해 단말(821)과 통신할 수 있다.
S1200단계를 도 9를 각각 참조하여 살펴보면, 기지국(931)은 제1 위성(911)을 통해 단말(921)과 제1 NTN 링크를 설정하고, 설정된 제1 NTN 링크를 통해 단말(921)과 통신할 수 있다. 따라서, 단말은 하나의 위성과 연결된 단일 NTN 링크를 통해 기지국과 통신할 수 있다.
S1202단계에서 단말은 단일 연결된 위성 외의 적어도 하나의 다른 위성과 연결됨으로써 다중 연결이 이루어지거나 또는 다중 TRP 연결이 이루어질 수 있다.
S1202단계를 도 8을 참조하여 살펴보면, 단말(821)은 제1 NTN 링크를 통해 제1 기지국(831)과 통신하는 중에 제2 위성(812)으로부터도 신호를 수신할 수 있는 경우가 발생할 수 있다. 단말(821)이 제1 위성(811)과 제2 위성(812) 모두로부터 신호를 수신할 수 있는 경우 단말(821)로 다중 위성을 통한 다중 연결이 이루어질 수 있다. 각 기지국들(831-833)은 대응하는 위성들(811-813)이 송신하는 빔에 기초하여 자신의 통신 영역을 설정할 수 있다. 그리고 각 기지국들(831-833)은 자신의 통신 영역 내에 위치하는 단말에 대하여 다중 연결을 시도할 수 있다. 다중 연결이 이루어지는 방식 자체는 본 개시의 범위를 벗어나므로, 여기서는 자세히 살피지 않기로 한다.
다중 연결이 요구되는 경우 제2 기지국(832)은 제2 위성(812)을 통해 단말(821)과 제2 NTN 링크를 설정하고, 설정된 제2 NTN 링크를 통해 단말(821)과 통신할 수 있다. 뿐만 아니라 제3 기지국(833)은 제3 위성(813)을 통해 단말(821)과 제3 NTN 링크를 설정하고, 설정된 제3 NTN 링크를 통해 단말(821)과 통신할 수 있다. 이처럼 단말(821)에 제1 NTN 링크가 설정된 상태에서 제2 NTN 링크 또는 제3 NTN 링크 중 적어도 하나의 NTN 링크가 추가로 설정되는 경우 단말(821)은 복수의 위성들을 통한 다중 연결이 이루어질 수 있다.
S1202단계를 도 9를 각각 참조하여 살펴보면, 기지국(931)은 단말(921)이 제1 위성(911)의 통신 영역 내에 있으며, 동시에 제2 위성(912) 및/또는 제3 위성(913)의 통신 영역 내에 있는지 여부를 확인할 수 있다. 또한 기지국(931)은 단말(921)로 데이터 전송 시에 단말(921)로 전송해야 할 데이터의 양이 급격히 많아지는 경우 등과 같이 둘 이상의 위성들을 이용하여 데이터를 전송할 필요가 있을 수 있다. 이러한 경우 기지국(931)은 복수의 위성들 중 현재 설정된 NTN 링크 외에 다른 링크를 추가로 설정할 수 있다.
단말(921)에 다중 NTN 링크를 통해 데이터를 전송해야 하는 경우 기지국(931)은 제2 위성(912)을 통해 단말(921)과 제2 NTN 링크를 설정하고, 설정된 제2 NTN 링크를 통해 단말(921)과 통신할 수 있다. 여기서는 제2 NTN 링크 다시 말해 제2 위성(912)를 통해 단말과 연결되는 경우를 언급하였으나, 제2 NTN 링크 대신 제3 NTN 링크가 연결될 수도 있다. 다시 말해 기지국(931)은 제3 위성(913)을 통해 단말(921)과 제3 NTN 링크를 설정하고, 설정된 제3 NTN 링크를 통해 단말(921)과 통신할 수 있다. 이처럼 단말(921)에 제1 NTN 링크가 설정된 상태에서 제2 NTN 링크 또는 제3 NTN 링크 중 적어도 하나가 추가로 설정되는 경우 각 위성들을 다중 TRP로 설정하는 경우가 될 수 있다.
S1204단계에서 기지국은 단일 NTN 링크를 임시 QuickLink(QuickLink_tmp)로 설정하고, 해당 기지국을 기지국Q로 설정할 수 있다. 본 개시에서 기지국Q는 QuickLink를 갖는 기지국이 될 수 있다. 기지국Q는 QuickLink_tmp를 다른 노드들 예를 들어, 단말과 기지국들 또는 단말과 위성들에게 알릴 수 있다. 만일 QuickLink의 결정이 빠르게 이루어질 수 있는 경우라면, 기지국Q는 QuickLink_tmp를 다른 노드들에게 알리지 않도록 구성할 수도 있다.
S1204단계를 도 8을 참조하여 살펴보면, 제1 기지국(831)은 제1 위성(811)을 통해 단말(821)과 연결된 제1 NTN 링크를 QuickLink_tmp로 설정할 수 있다. 그리고 제1 기지국(831)은 단일 NTN 링크만을 가지고 있던 기지국이 자신이기 때문에, 자신을 기지국Q로 설정할 수 있다. 여기서 제1 기지국(831)은 제1 기지국(831)과 연결되는 게이트웨이를 포함할 수 있다. 그리고, 제1 기지국(831)은 자신이 기지국Q라는 정보를 다른 기지국 예를 들어, 제2 기지국(832) 및/또는 제3 기지국(833)들로 알릴 수 있다. 또한 제1 기지국(831)은 자신이 기지국Q라는 정보를 단말(821)로 알릴 수 있다.
S1204단계를 도 9를 참조하여 살펴보면, 기지국(931)은 제1 위성(911)을 통해 단말(921)과 연결된 제1 NTN 링크를 QuickLink_tmp로 설정할 수 있다. 그리고 기지국(931)은 QuickLink_tmp로 제1 NTN 링크가 선택되었음을 단말(921)로 알릴 수 있다. 도 9의 경우 기지국(931)에 복수의 위성들이 연결되는 경우이기 때문에 기지국Q의 설정 동작은 필요하지 않다. 따라서 제1 기지국(931)은 단말(921)로 QuickLink_tmp 정보만 알릴 수 있다.
S1206단계에서 기지국은 설정된 QuickLink_tmp의 링크를 통해 단말의 위치 정보를 요청할 수 있다. 본 개시의 제1 실시예에서는 위치 정보를 이용하여 저지연 링크를 탐색하기 위한 방안에 대하여 설명하고 있다. 그러므로, S1206단계의 동작은 저지연 링크 관련 정보로 위치 정보를 이용하는 방법이 될 수 있다. 본 개시에서 언급되는 위치 정보는 아래의 정보들을 포함할 수 있다. 첫째, 위치 정보는 단순히 현재의 위치에 대한 정보일 수 있다. 둘째, 위치 정보는 현재의 위치에 부가 정보를 포함할 수 있다. 위치 부가 정보는 특정한 시간에서의 위치를 예측하기 위한 정보가 될 수 있다. 위치 부가 정보의 예로, 특정 노드의 소정 시간 동안의 이동에 대한 1차 미분값(속도) 및/또는 소정 시간 동안의 이동에 대한 2차 미분값(가속도) 등과 같이 가까운 미래의 위치를 계산(또는 예측)할 수 있는 정보를 포함할 수 있다. 이하의 설명에서 위치 정보는 고정된 노드가 아닌 경우 부가 정보를 포함할 수 있다.
또한 단말의 위치 정보 요청은 "단말의 현재 위치 정보를 보고"하도록 하는 특정한 지시자를 전송하거나 또는 특정 메시지를 이용하여 단말에게 알릴 수 있다. 기지국이 단말의 위치 정보를 필요로 하는 이유는 서비스 링크의 길이를 알기 위해서이다. 따라서 기지국은 단말에게 단말의 현재 자신의 위치 정보를 기지국에 보고하라는 지시자 또는 메시지를 전송할 수 있다. 이러한 메시지 또는 지시자는 각 통신 시스템에 따라 다르게 구현될 수 있다. 가령 기지국은 RRC 메시지를 이용하여 단말에 위치 보고 및 위치 보고 주기를 설정할 수 있다. 다른 예로, 표준에서 다운링크 제어 정보(Downlink Control Information, DCI)에 위치 보고 지시자를 추가할 수 있는 경우 기지국은 DCI를 통해 단말에 위치 보고를 지시할 수 있다.
S1206단계의 동작을 도 8을 참조하여 살펴보면, 기지국Q로 설정된 제1 기지국(831)은 QuickLink_tmp로 설정된 제1 NTN 링크의 제1 위성(811)을 통해 단말(821)로 단말의 위치 정보 보고 요청 메시지 또는 위치 보고 지시자를 전송할 수 있다.
S1206단계의 동작을 도 9를 참조하여 살펴보면, 기지국(831)은 QuickLink_tmp로 설정된 제1 NTN 링크의 제1 위성(911)을 통해 단말(921)로 단말의 위치 정보 보고 요청 메시지 또는 위치 보고 지시자를 전송할 수 있다.
S1208단계에서 기지국Q는 각 링크의 위성 위치 및 다른 지상 기지국 및/또는 다른 기지국과 연결되는 게이트웨이의 위치 정보를 요청할 수 있다. 다른 지상 기지국과 위성의 위치 또는 다른 지상 기지국과 연결되는 게이트웨이와 위성의 위치는 서비스 링크와 피더 링크의 길이 또는 서비스 링크의 시간 지연과 피더 링크의 시간 지연을 결정하기 위해 필요하다.
S1208단계를 도 8을 참조하여 살펴보면, 기지국Q로 설정된 제1 기지국(831)은 제2 기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 위성의 위치와 각 기지국이 연결된 게이트웨이 및/또는 기지국의 위치 정보를 요청할 수 있다. 제1 기지국(831)이 제2기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 위성의 위치와 기지국의 위치 및/또는 기지국이 연결된 게이트웨이의 위치를 요청하는 것은 기지국 간의 백홀(backhaul)을 이용하거나 또는 Xn 인터페이스를 이용하여 요청할 수 있다.
S1208단계를 도 9를 참조하여 살펴보면, 기지국(931)은 각 위성들(911-913)로 위치 정보를 요청할 수 있다. 만일 기지국(931)이 각 위성들(911-913)의 위치를 미리 알고 있거나 또는 계산을 통해 획득할 수 있는 경우 S1208단계는 수행되지 않을 수도 있다.
또한 설명의 순서 및 도면 번호의 순서에 따르면, S1206단계를 수행한 후 S1208단계가 수행되는 것처럼 설명되었다. 하지만, S1206단계와 S1208단계는 동시에 수행될 수도 있고, S1208단계를 먼저 수행하고, S1206단계가 나중에 수행될 수도 있다.
S1210단계에서 단말은 S1206단계의 위치 정보 보고 요청에 기초하여 위치 정보를 생성하고, 위치 정보 요청을 수신한 NTN 링크의 위성을 통해 기지국Q로 위치 정보를 보고할 수 있다.
S1210단계를 도 8을 참조하여 살펴보면, 단말(821)은 S1206단계에서 수신된 위지 정보 요청에 기초하여 단말의 위치 정보를 생성하고, 단말의 위치 정보 보고 메시지를 제1 NTN 링크인 제1 위성(811)을 통해 제1 기지국(831)으로 보고할 수 있다. 이 동작은 앞서 도 10a에서 설명한 S1044단계에 대응하는 동작이 될 수 있다.
S1210단계를 도 9를 참조하여 살펴보면, 단말(921)은 S1206단계에서 수신된 위지 정보 요청에 기초하여 단말의 위치 정보를 생성하고, 단말의 위치 정보 보고 메시지를 제1 NTN 링크인 제1 위성(911)을 통해 기지국(931)으로 보고할 수 있다. 이 동작은 앞서 도 11a에서 설명한 S1146단계 내지 S1148단계에 대응하는 동작이 될 수 있다.
S1212단계에서 타 기지국(들)은 및/또는 타 위성(들)은 S1208단계의 위치 정보 요청에 기초하여 자신의 위치 정보를 생성하고, 생성된 위치 정보를 기지국Q로 보고할 수 있다.
한편, S1208단계 및 S1212단계는 기지국Q에서 타 기지국(또는 기지국과 게이트웨이)의 위치 정보와 위성의 위치 정보를 획득하는 절차가 될 수 있다. 따라서 새로운 QuickLink가 설정될 경우 새로운 기지국Q는 S1208단계 및 S1212단계를 수행할 수 있다. 또한 기지국 및/또는 게이트웨이의 위치는 일반적으로 고정된 위치를 가진다. 따라서 새로운 QuickLink가 설정될 경우 이전 기지국Q가 새로운 QuickLink의 기지국Q에게 기지국 및/또는 게이트웨이의 위치 정보를 제공할 수 있다. 이처럼 이전 기지국Q가 새로운 QuickLink의 기지국Q에게 기지국 및/또는 게이트웨이의 위치 정보를 제공하는 경우 새로운 QuickLink의 기지국Q는 다른 NTN 링크를 갖는 기지국 및/또는 게이트웨이의 위치 정보를 요청하지 않을 수도 있다.
또한 이전 기지국Q가 새로운 QuickLink의 기지국Q에게 각 기지국에 대응하여 피더 링크를 갖는 위성의 위치 및 위성의 부가 정보 예를 들어 위성의 고도, 이동 속도 및 이동 경로 등의 정보를 제공할 수도 있다. 이처럼 이전 기지국Q가 새로운 QuickLink의 기지국Q에게 각 위성들에 대한 부가 정보를 추가로 제공하고, 이에 기초하여 위성의 위치를 예측할 수 있는 경우 새로운 QuickLink의 기지국Q는 위성에 대한 위치 정보도 요청하지 않을 수 있다.
다른 한편, 만일 이전 기지국Q가 이상에서 설명한 정보들을 새로운 QuickLink의 기지국Q에게 제공하지 않는 경우, 새로운 QuickLink의 기지국Q는 적어도 한 번은 S1208단계 및 S1212단계를 수행할 수 있다. 또한 위성의 정보를 획득하기 위해 새로운 QuickLink의 기지국Q는 일정한 시간 단위로 S1208단계 및 S1212단계를 수행할 수도 있다.
S1212단계의 동작을 도 8을 참조하여 살펴보면, 제2 기지국(832)은 S1208단계의 위치 정보 요청에 기초하여 자신의 위치 정보 및/또는 제2 기지국(832)와 연결된 게이트웨이의 위치 정보를 보고하기 위한 위치 정보 보고 메시지로 생성하고, 이를 제1 기지국(831)로 전송할 수 있다. 이때, 제2 기지국(832)가 제1 기지국(831)로 전송하는 위치 정보 보고 메시지는 기지국간 연결되는 백홀 또는 Xn 인터페이스를 통해 전송될 수 있다. 또한 제3 기지국(833)의 경우도 제2 기지국(832)와 동일한 방법을 이용하여 위치 정보 보고 메시지를 제1 기지국(831)으로 전송할 수 있다.
S1212단계의 동작을 도 9를 참조하여 살펴보면, 제2 위성(912)은 S1208단계의 위치 정보 요청에 기초하여 자신의 위치 정보를 위치 정보 보고 메시지로 생성하고, 이를 기지국(931)로 전송할 수 있다. 이때, 제2 위성(912)이 기지국(931)으로 전송하는 위치 정보 보고 메시지는 피더 링크를 통해 전송될 수 있다. 또한 위에서 살핀 바와 같이 기지국(931)이 모든 위성의 위치와 이동 경로 및 속도 등을 알고 있는 경우라면, 도 9와 같은 다중 TRP 환경에서는 S1212단계의 동작이 생략될 수 있다.
이상에서 설명한 S1208단계 및 S1212단계에서 위성의 위치 정보를 해당 기지국이 알 수 없는 경우는 앞서 도 10a 및 도 10b 또는 도 11a 및 도 11b에서 설명한 바와 같이 위성이 아닌 비행체인 경우를 포함할 수 있다.
S1214단계에서 기지국Q는 단말의 위치 정보와 각 위성들의 위치 정보, 위성과 통신하는 게이트웨이 및 기지국들의 위치 정보를 수신할 수 있다. 따라서 기지국Q는 수신된 위치 정보에 기초하여 QuickLink를 결정할 수 있다. QuickLink는 서비스 링크의 길이(서비스 링크의 노드들 간 거리)와 피더 링크의 길이(피더 링크의 노드들 간 거리)에 기초하여 결정될 수 있다. 이는 단말의 위치와 위성의 위치에 기초하여 서비스 링크의 길이를 획득할 수 있다. 또한 위성과 게이트웨이의 거리 또는 위성과 기지국(게이트웨이와 동일한 장소에 기지국이 위치하거나 기지국과 게이트웨이가 하나로 구성되는 경우)의 거리에 기초하여 피더 링크의 거리를 획득할 수 있다.
도 8에서 설명한 다중 연결 위성 또는 도 9에서 설명한 다중 TRP 위성의 경우 모두 하나의 위성은 하나의 NTN 링크에 대응한다. 따라서 어떠한 위성에 대한 링크가 낮은 지연을 갖는 링크인지를 식별하는 방법은 여러 가지 방법이 있을 수 있다. 본 개시에서는 이러한 방법들 중 하나의 방법을 예시적으로 살펴보기로 한다.
본 개시에 따른 저지연 링크 즉, QuickLink는 아래 <수학식 2>와 같이 계산할 수 있다.
Figure PCTKR2023005486-appb-img-000002
<수학식 2>에서 TQL은 현재 QuickLink의 무선 채널(서비스 링크 + 피더 링크)에서의 전파 지연 시간을 나타낸다. QuickLink가 미설정 상태라면 QuickLink_tmp의 전파 지연 시간으로 대체한다. Tmin은 QuickLink를 선정하거나 갱신하는 시점에서, 다중 링크 또는 다중 TRP에서의 링크들 각각에 대한 서비스 링크와 피더 링크의 전파 지연시간 합을 Ti라고 할 때, Ti 값들 중에 최소값을 Tmin로 정의한다. 그리고
Figure PCTKR2023005486-appb-img-000003
는 임의의 임계값이다.
위에 설정된 방식에서는 임계값을 이용하여 QuickLink의 변경 민감도를 조절할 수 있다. 예를 들어, 임계값을 크게 설정하면 QuickLink의 변경이 빠르게 이루어지지 않게 될 것이며, 임계값을 작게 설정하면 QuickLink의 변경이 빠르게 변경되도록 동작될 것이다. 따라서 <수학식 2>의 결과에 기초하여 새로운 QuickLink를 업데이트할지 아니면 유지할지를 결정할 수 있다. 만일 새로운 링크가 QuickLink 로 업데이트된다면, Tmin에 해당하는 링크를 QuickLink로 선택할 수 있다.
S1216단계에서 Q_tmp로 동작하는 기지국은 결정된 QuickLink 정보를 단말과 타 기지국으로 전송할 수 있다.
S1216단계를 도 8을 참조하여 살펴보면, 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크를 통해 단말(821)로 전송할 수 있다. 또한 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 기지국간 연결된 백홀 또는 Xn 인터페이스를 이용하여 제2 기지국(832) 및/또는 제3 기지국(833)으로 전송할 수 있다.
S1216단계를 도 9을 참조하여 살펴보면, 기지국(931)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크의 제1 위성(911)을 통해 단말(921)로 전송할 수 있다. 도 9의 경우에는 다른 기지국들이 존재하지 않기 때문에 다른 기지국으로 결정된 QuickLink 정보를 전송하는 동작은 필요하지 않는다.
S1216단계에서 전송되는 QuickLink 정보는 아래의 2가지 정보를 포함할 수 있다.
(1) 새로 지정될 QuickLink에 대한 위성 및/또는 그 위성과 연결된 기지국을 식별할 수 있는 정보: 이 정보를 통해, 단말과 기지국들은 어떤 링크가 QuickLink인지 알 수 있다. 만약 다중 TRP인 경우, 모든 링크는 하나의 기지국에 연결되어 있으므로, 어느 링크/위성이 QuickLink인지를 단말에게 알려야 한다.
(2) 새로 지정될 QuickLink에 대한 적용 시점: 단말과 다중 링크에 참여하는 모든 기지국이 새로 지정될 QuickLink를 적용할 시점을 동기화하기 위해, 프레임 번호(Frame number) 또는 서브프레임 번호(Sub-frame number) 등과 같은 시간 정보를 알림으로써, QuickLink를 적용할 동기화 시점을 일치시킬 수 있다.
S1218단계에서 단말과 기지국들은 QuickLink 정보에 기초하여 해당하는 기지국을 기지국Q로 설정할 수 있다.
S1218단계를 도 8을 참조하여 살펴보면, 제1 기지국(831)은 S1214단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 또한 제2 기지국(832)과 제3 기지국(833) 또한 S1214단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 그리고 단말(821)은 QuickLink_tmp를 삭제하고, S1214단계에서 수신된 정보에 기초하여 QuickLink를 설정할 수 있다. 다시 말해 모든 기지국들이 QuickLink와 기지국Q가 어느 기지국인지를 식별할 수 있다.
예를 들어 제1 기지국(831)이 기지국Q로 설정되고, 제1 NTN 링크가 QuickLink로 결정된 경우 제1 기지국(831)은 자신을 통한 제1 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 따라서 제1 기지국(831)은 도 12에서 설명된 기지국Q에 대응하는 동작을 이후에도 수행할 수 있다. 다른 예로 제2 기지국(832)이 기지국Q로 설정되고, 제2 NTN 링크가 QuickLink로 결정된 경우, 제2 기지국(832)은 자신을 통한 제2 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 따라서 제2 기지국(832)은 도 12에서 설명된 기지국Q에 대응하는 동작을 이후에도 수행할 수 있다. 이때 이전 QuickLink에 대응한 기지국이 제1 기지국(831)인 경우 제1 기지국(831)은 기지국Q가 아닌 기지국이 될 수 있다.
S1218단계를 도 9를 참조하여 살펴보면, 기지국(931)은 S1214단계에서 결정된 QuickLink에 기초하여 QuickLink를 설정할 수 있다. 도 9의 경우는 각 위성들(911-913)이 TRP로 동작하는 경우이므로, 기지국Q가 변경되지 않거나 기지국Q를 정의하지 않을 수도 있다. 다만, 기지국은 QuickLink가 제1 NTN 링크인지 또는 제2 NTN 링크인지 또는 제3 NTN 링크인지를 결정할 수 있다.
한편, 이상에서 설명된 동작들, 구체적으로 S1216단계 및 S1218단계는 새로운 QuickLink가 결정된 경우에 정보를 전송하고, 기지국Q를 설정하는 동작일 수 있다. 따라서 S1214단계의 결정에 기초하여 QuickLink의 변경이 없는 경우라면, S1216단계 및 S1218단계는 생략될 수 있다.
S1220단계는 기지국Q가 단말에 일정한 주기로 위치 정보를 보고하도록 설정한 경우에 이루어지는 동작일 수 있다. 따라서 기지국Q는 단말로부터 주기적인 위치 정보 갱신이 이루어진 경우 S1210단계로 진행할 수 있다.
만일 단말에 일정한 주기로 위치 정보를 보고하도록 설정하지 않은 경우 S1206단계로 진행할 수 있다. 또한 S1206단계로 진행하는 경우는 미리 설정된 시간 단위로 이루어질 수 있으며, S1206단계를 수행할 때, S1208단계가 함께 이루어지도록 구현할 수도 있다. 예를 들어, 위에서 설명한 바와 같이 NTN 네트워크가 위성 및/또는 비행체들을 포함하는 경우 S1208단계가 추가로 포함되어야 할 필요가 있다. 따라서 단말로부터 위치 신호를 수신하는 경우 S1210단계만 수행하거나 또는 S1208단계와 S1210단계를 함께 수행하도록 설정할 수 있다.
[제2 실시예: 링크 별 지연 시간 정보를 활용한 저지연 링크 탐색]
도 13은 본 개시의 제2 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
이하 도 13을 참조하여 본 개시의 제2 실시예에 대한 전체 동작을 살펴보기로 한다.
S1300단계에서 단말과 기지국은 단일 NTN 링크를 설정하고, 단일 NTN 링크로 통신할 수 있다.
S1300단계를 도 8을 참조하여 살펴보면, 제1 기지국(831)은 제1 위성(811)을 통해 단말(821)과 제1 NTN 링크를 설정하고, 설정된 제1 NTN 링크를 통해 단말(821)과 통신할 수 있다.
S1300단계를 도 9를 각각 참조하여 살펴보면, 기지국(931)은 제1 위성(911)을 통해 단말(921)과 제1 NTN 링크를 설정하고, 설정된 제1 NTN 링크를 통해 단말(921)과 통신할 수 있다. 따라서, 단말은 하나의 위성과 연결된 단일 NTN 링크를 통해 기지국과 통신할 수 있다.
S1302단계에서 단말은 단일 연결된 위성 외에 적어도 하나의 다른 위성과 연결됨으로써 다중 연결 또는 다중 TRP 연결이 이루어질 수 있다.
S1302단계를 도 8을 참조하여 살펴보면, 단말(821)은 제1 NTN 링크를 통해 제1 기지국(831)과 통신하는 중에 제2 위성(812)으로부터도 신호를 수신할 수 있는 경우가 발생할 수 있다. 단말(821)이 제1 위성(811)과 제2 위성(812) 모두로부터 신호를 수신할 수 있는 경우 단말(821)로 다중 위성을 통한 다중 연결이 이루어질 수 있다. 각 기지국들(831-833)은 대응하는 위성들(811-813)이 송신하는 빔에 기초하여 자신의 통신 영역을 설정할 수 있다. 그리고 각 기지국들(831-833)은 자신의 통신 영역 내에 위치하는 단말에 대하여 다중 연결을 시도할 수 있다. 다중 연결이 이루어지는 방식 자체는 본 개시의 범위를 벗어나므로, 여기서는 자세히 살피지 않기로 한다.
다중 연결이 요구되는 경우 제2 기지국(832)은 제2 위성(812)을 통해 단말(821)과 제2 NTN 링크를 설정하고, 설정된 제2 NTN 링크를 통해 단말(821)과 통신할 수 있다. 뿐만 아니라 제3 기지국(833)은 제3 위성(813)을 통해 단말(821)과 제3 NTN 링크를 설정하고, 설정된 제3 NTN 링크를 통해 단말(821)과 통신할 수 있다. 이처럼 단말(821)에 제1 NTN 링크가 설정된 상태에서 제2 NTN 링크 또는 제3 NTN 링크 중 적어도 하나의 NTN 링크가 추가로 설정되는 경우 단말(821)은 복수의 위성들을 통한 다중 연결이 이루어질 수 있다.
S1302단계를 도 9를 각각 참조하여 살펴보면, 기지국(931)은 단말(921)이 제1 위성(911)의 통신 영역 내에 있으며, 동시에 제2 위성(912) 및/또는 제3 위성(913)의 통신 영역 내에 있는지 여부를 확인할 수 있다. 또한 기지국(931)은 단말(921)로 데이터 전송 시에 단말(921)로 전송해야 할 데이터의 양이 급격히 많아지는 경우 등과 같이 둘 이상의 위성들을 이용하여 데이터를 전송할 필요가 있을 수 있다. 이러한 경우 기지국(931)은 복수의 위성들 중 현재 설정된 NTN 링크 외에 다른 링크를 추가로 설정할 수 있다.
단말(921)에 다중 NTN 링크를 통해 데이터를 전송해야 하는 경우 기지국(931)은 제2 위성(912)을 통해 단말(921)과 제2 NTN 링크를 설정하고, 설정된 제2 NTN 링크를 통해 단말(921)과 통신할 수 있다. 여기서는 제2 NTN 링크 다시 말해 제2 위성(912)를 통해 단말과 연결되는 경우를 언급하였으나, 제2 NTN 링크 대신 제3 NTN 링크가 연결될 수도 있다. 다시 말해 기지국(931)은 제3 위성(913)을 통해 단말(921)과 제3 NTN 링크를 설정하고, 설정된 제3 NTN 링크를 통해 단말(921)과 통신할 수 있다. 이처럼 단말(921)에 제1 NTN 링크가 설정된 상태에서 제2 NTN 링크 또는 제3 NTN 링크 중 적어도 하나가 추가로 설정되는 경우 각 위성들을 다중 TRP로 설정하는 경우가 될 수 있다.
S1304단계에서 기지국은 단일 NTN 링크를 임시 QuickLink(QuickLink_tmp)로 설정하고, 해당 기지국을 기지국Q로 설정할 수 있다. 본 개시에서 기지국Q는 QuickLink를 갖는 기지국이 될 수 있다. 기지국Q는 QuickLink_tmp를 다른 노드들 예를 들어, 단말과 기지국들 또는 단말과 위성들에게 알릴 수 있다. 만일 QuickLink의 결정이 빠르게 이루어질 수 있는 경우라면, 기지국Q는 QuickLink_tmp를 다른 노드들에게 알리지 않도록 구성할 수도 있다.
S1304단계를 도 8을 참조하여 살펴보면, 제1 기지국(831)은 제1 위성(811)을 통해 단말(821)과 연결된 제1 NTN 링크를 QuickLink_tmp로 설정할 수 있다. 그리고 제1 기지국(831)은 단일 NTN 링크만을 가지고 있던 기지국이 자신이기 때문에, 자신을 기지국Q로 설정할 수 있다. 여기서 제1 기지국(831)은 제1 기지국(831)과 연결되는 게이트웨이를 포함할 수 있다. 그리고, 제1 기지국(831)은 자신이 기지국Q라는 정보를 다른 기지국 예를 들어, 제2 기지국(832) 및/또는 제3 기지국(833)들로 알릴 수 있다. 또한 제1 기지국(831)은 자신이 기지국Q라는 정보를 단말(821)로 알릴 수 있다.
S1304단계를 도 9를 참조하여 살펴보면, 기지국(931)은 제1 위성(911)을 통해 단말(921)과 연결된 제1 NTN 링크를 QuickLink_tmp로 설정할 수 있다. 그리고 기지국(931)은 QuickLink_tmp로 제1 NTN 링크가 선택되었음을 단말(921)로 알릴 수 있다. 도 9의 경우 기지국(931)에 복수의 위성들이 연결되는 경우이기 때문에 기지국Q의 설정 동작은 필요하지 않다. 따라서 제1 기지국(931)은 단말(921)로 QuickLink_tmp 정보만 알릴 수 있다.
S1306단계에서 기지국은 설정된 QuickLink_tmp의 링크를 통해 통신하는 모든 NTN 링크의 지연 시간 정보를 보고할 것을 지시하는 지시자를 단말로 전송할 수 있다. 본 개시의 제2 실시예에서는 지연 시간 정보를 이용하여 저지연 링크를 탐색하기 위한 방안에 대하여 설명하고 있다. 그러므로, S1306단계의 동작은 저지연 링크 관련 정보로 지연 시간 정보를 이용하는 방법이 될 수 있다. 이때, 기지국은 지연 시간 정보를 미리 설정된 주기 단위로 보고하도록 단말에 지시할 수도 있다.
S1306단계의 동작은 도 8의 경우와 도 9의 경우에 특별한 차이가 없으므로, 구분하여 설명하는 것은 생략하기로 한다. 다만 도 9와 같이 위성들이 다중 TRP로 동작하는 경우 하나의 기지국에 모든 위성들이 연결될 수 있다. 따라서 위성들이 다중 TRP로 동작하는 경우 S1310단계는 생략될 수 있다.
S1308단계에서 기지국Q는 각 링크의 공통 지연 시간 정보를 각 기지국으로 요청할 수 있다.
S1308단계의 동작을 도 8을 참조하여 살펴보면, 기지국Q로 동작하는 제1 기지국(831)은 제2 기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 위성을 통한 NTN 링크의 공통 지연 시간 정보를 요청할 수 있다. NTN 링크들 각각에서 공통 지연 시간은 피더 링크의 지연 시간이 될 수 있다. 왜냐하면, 기지국과 게이트웨이는 항상 지상의 특정 장소에 위치하기 때문에 이동하지 않고, 각 기지국에 연결된 위성만 이동하게 된다. 따라서 피더 링크의 지연 시간은 해당 위성에 연결된 모든 단말에 공통된 지연 시간이 될 수 있다. 따라서 공통 지연 시간 정보는 NTN 링크들 각각에 대한 피더 링크의 지연 시간 정보가 될 수 있다. 제1 기지국(831)이 제2기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 NTN 링크들 각각에 대한 피더 링크의 지연 시간 또는 공통 지연 시간 정보의 요청은 기지국 간의 백홀(backhaul)을 이용하거나 또는 Xn 인터페이스를 이용하여 요청할 수 있다.
복수의 위성들이 다중 TRP로 동작하는 도 9의 경우 기지국이 하나만 존재하기 때문에 S1308단계의 동작은 수행되지 않는다. 즉, 기지국(931)은 위성들(911-913) 각각에 대한 피더 링크 지연 시간을 알고 있기 때문에 S1308단계를 수행할 필요가 없다. 따라서 이하에서 설명될 S1312단계도 복수의 위성들이 다중 TRP로 동작하는 도 9의 경우 기지국은 수행하지 않는다.
또한 설명의 순서 및 도면 번호의 순서에 따르면, S1306단계를 수행한 후 S1308단계가 수행되는 것처럼 설명되었다. 하지만, S1306단계와 S1308단계는 동시에 수행될 수도 있고, S1308단계를 먼저 수행하고, S1306단계가 수행될 수도 있다.
S1310단계에서 단말은 S1306단계의 모든 NTN 링크의 지연 시간 정보 보고 요청에 기초하여 모든 NTN 링크의 지연 시간 정보를 각 링크 별로 생성할 수 있다. 그리고 단말은 생성된 링크 별 지연 시간 정보를 각각의 메시지로 구성하거나 또는 하나의 메시지로 생성하여 모든 NTN 링크의 지연 시간 정보 보고 요청을 수신한 NTN 링크의 위성을 통해 기지국Q로 위치 정보를 보고할 수 있다. 이때, 단말이 NTN 링크들 중 어느 하나의 NTN 링크에 대하여 피더 링크 지연 시간을 알지 못하는 경우 해당 NTN 링크의 피더 링크 지연 시간을 제외한 지연 시간 정보를 기지국에 보고할 수 있다. 만일 특정 NTN 링크의 피더 링크 지연 시간을 제외하는 경우 단말은 피더 링크의 지연 시간이 없는 NTN 링크에 대하여 해당 NTN 링크의 지연 시간에 피더 링크 지연이 없음을 보고 메시지에 식별할 수 있도록 포함할 수 있다.
S1310단계의 동작은 다중 연결과 다중 TRP 환경에 따른 차이가 없으므로, 도 8 및 도 9를 참조한 설명은 생략하기로 한다. 다만 도 9와 같이 위성들이 다중 TRP로 동작하는 경우 하나의 기지국에 모든 위성들이 연결될 수 있다. 따라서 위성들이 다중 TRP로 동작하는 경우 S1310단계는 생략될 수 있다.
S1312단계에서 타 기지국들은 S1308단계의 공통 지연 시간 정보 보고 요청에 기초하여 자신과 위성 간의 피더 링크에 대한 지연 시간 정보를 기지국Q로 보고할 수 있다.
한편, S1308단계 및 S1312단계는 기지국Q에서 타 기지국(또는 기지국과 게이트웨이)의 공통 지연 시간 정보를 획득하는 절차가 될 수 있다. 따라서 새로운 QuickLink가 설정될 경우 새로운 기지국Q는 S1308단계 및 S1312단계를 수행할 수 있다.
S1314단계에서 기지국Q는 단말로부터 각 NTN 링크의 지연 시간 정보와 각 기지국으로부터의 공통 지연 시간 정보를 수신하였으므로, 이에 기초하여 QuickLink를 결정할 수 있다. 각 NTN 링크의 지연 시간 정보기 주어진 경우 기지국Q는 어떠한 위성에 대한 링크가 낮은 지연을 갖는 링크인지를 식별하는 방법은 여러 가지 방법이 있을 수 있다. 이러한 방법들 중 하나의 방법은 위에서 설명한 <수학식 2>의 방법을 이용할 수 있다. <수학식 2>에 대해서는 제1 실시예에서 설명하였으므로, 중복 설명은 생략하기로 한다.
S1316단계에서 기지국Q는 결정된 QuickLink 정보를 단말과 타 기지국으로 전송할 수 있다.
S1316단계의 동작을 도 8을 참조하여 살펴보면, 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크를 통해 단말(821)로 전송할 수 있다. 또한 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 기지국간 연결된 백홀 또는 Xn 인터페이스를 이용하여 제2 기지국(832) 및/또는 제3 기지국(833)으로 전송할 수 있다.
S1316단계의 동작을 도 9을 참조하여 살펴보면, 기지국(931)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크의 제1 위성(911)을 통해 단말(921)로 전송할 수 있다. 도 9의 경우에는 다른 기지국들이 존재하지 않기 때문에 다른 기지국으로 결정된 QuickLink 정보를 전송하는 동작은 필요하지 않는다.
S1316단계에서 전송되는 QuickLink 정보는 아래의 2가지 정보를 포함할 수 있다.
(1) 새로 지정될 QuickLink에 대한 위성 및/또는 그 위성과 연결된 기지국을 식별할 수 있는 정보: 이 정보를 통해, 단말과 기지국들은 어떤 링크가 QuickLink인지 알 수 있다. 만약 다중 TRP인 경우, 모든 링크는 하나의 기지국에 연결되어 있으므로, 어느 링크/위성이 QuickLink인지를 단말에게 알려야 한다.
(2) 새로 지정될 QuickLink에 대한 적용 시점: 단말과 다중 링크에 참여하는 모든 기지국이 새로 지정될 QuickLink를 적용할 시점을 동기화하기 위해, 프레임 번호(Frame number) 또는 서브프레임 번호(Sub-frame number) 등과 같은 시간 정보를 알림으로써, QuickLink를 적용할 동기화 시점을 일치시킬 수 있다.
S1318단계에서 단말과 기지국들은 QuickLink 정보에 기초하여 해당하는 기지국을 기지국Q로 설정할 수 있다.
S1318단계의 동작을 도 8을 참조하여 살펴보면, 제1 기지국(831)은 S1314단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 또한 제2 기지국(832)과 제3 기지국(833) 또한 S1314단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 그리고 단말(821)은 QuickLink_tmp를 삭제하고, S1314단계에서 수신된 정보에 기초하여 QuickLink를 설정할 수 있다. 다시 말해 모든 기지국들이 QuickLink와 기지국Q가 어느 기지국인지를 식별할 수 있다.
예를 들어 제1 기지국(831)이 기지국Q로 설정되고, 제1 NTN 링크가 QuickLink로 결정된 경우 제1 기지국(831)은 자신을 통한 제1 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 따라서 제1 기지국(831)은 도 12에서 설명된 기지국Q에 대응하는 동작을 이후에도 수행할 수 있다. 다른 예로 제2 기지국(832)이 기지국Q로 설정되고, 제2 NTN 링크가 QuickLink로 결정된 경우, 제2 기지국(832)은 자신을 통한 제2 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 이때 이전 QuickLink에 대응한 기지국이 제1 기지국(831)인 경우 제1 기지국(831)은 기지국Q가 아닌 기지국이 될 수 있다.
또한 도 9와 같이 위성들이 다중 TRP로 동작하는 경우 하나의 기지국에 모든 위성들이 연결될 수 있다. 따라서 위성들이 다중 TRP로 동작하는 경우 S1318단계는 생략될 수 있다.
한편, 이상에서 설명된 동작들, 구체적으로 S1316단계 및 S1318단계는 새로운 QuickLink가 결정된 경우에 정보를 전송하고, 기지국Q를 설정하는 동작일 수 있다. 따라서 S1314단계의 결정에 기초하여 QuickLink의 변경이 없는 경우라면, S1316단계 및 S1318단계는 생략될 수 있다.
S1320단계는 기지국Q가 단말에 일정한 주기로 지연 시간 정보를 보고(또는 갱신)하도록 설정한 경우에 이루어지는 동작일 수 있다. 따라서 기지국Q는 단말로부터 주기적인 지연 시간 정보가 보고(또는 갱신)되는 경우 S1310단계로 진행할 수 있다.
만일 단말에 일정한 주기로 지연 시간 정보를 보고하도록 설정하지 않은 경우 S1306단계로 진행할 수 있다. 또한 S1306단계로 진행하는 경우는 미리 설정된 시간 단위로 이루어질 수 있으며, S1306단계를 수행할 때, S1308단계가 함께 이루어지도록 구현할 수도 있다.
이상에서 설명한 제2 실시예는 앞서 설명한 제1 실시예와 유사한 절차를 가진다. 제1 실시예에서는 단말의 위치 정보를 이용하였으나, 제2 실시예에서는 각 링크에 대한 지연 시간 정보를 수집하여 저지연 링크를 찾는다는 점에서 차이가 있다. 이상에서 설명한 지연 시간 정보란 무선 링크에서의 전파 지연 시간을 알 수 있는 데이터들을 통칭할 수 있다. 전파 지연 시간의 대표적인 예로 타이밍 TA 값이 있다. NTN에서 TA 값은 앞서 <수학식 1>에서 설명한 바와 같은 정보들을 포함할 수 있다. 따라서 TA 값을 이용하는 경우 공통 지연 시간 정보는 <수학식 1>에서 설명한 바와 같이
Figure PCTKR2023005486-appb-img-000004
를 의미할 수 있다.
단말이 임의의 NTN 링크에 대하여, 임의 접속(Random Access) 절차를 수행하기 전이라면, 해당 NTN 링크에 대한 피더 링크에서 발생하는 지연 시간 정보(예: TA)를 단말이 알 수 없다. 따라서 단말은 임의 접속 절차를 수행하기 전에는 해당 NTN 링크의 피더 링크에서 발생하는 지연 시간 정보를 기지국에 보고할 수 없다. 따라서 이런 경우를 대비하여 기지국Q는 S1308단계 및 S1312단계를 수행함으로써 Feeder Link에서의 지연 시간을 해당 기지국으로부터 수신할 수 있다.
그러므로, 단말이 해당하는 NTN 링크에 대하여 임의 접속 절차를 수행한 이후라면, 해당 NTN 링크에 대한 서비스 링크 및 피더 링크에서 발생하는 시간 정보(예: TA)를 모두 알 수 있다. 그러므로, 기지국Q가 단말이 NTN 링크에 대하여 임의 접속을 수행하였는지 여부를 확인할 수 있는 경우 각 기지국들에 대하여 S1308단계 및 S1312단계를 수행 여부를 결정할 수 있다. 예를 들어 모든 단말이 모든 NTN 링크에 대하여 임의 접속 절차를 수행하였음을 확인할 수 있는 경우 기지국Q는 S1308단계 및 S1312단계를 생략할 수 있다.
[제3 실시예: 링크 별 지연 시간 정보를 활용한 저지연 링크 탐색]
도 14는 본 개시의 제3 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
이하 도 14를 참조하여 본 개시의 제3 실시예에 대한 전체 동작을 살펴보기로 한다.
S1400단계에서 단말과 기지국은 단일 NTN 링크를 설정하고, 단일 NTN 링크로 통신할 수 있다. S1400단계는 앞서 도 12 및 도 13에서 설명한 S1200단계 또는 S1300단계와 동일하므로, 도 8 및 도 9를 참조한 동일한 부연 설명은 생략하기로 한다.
S1402단계에서 단말은 단일 연결된 위성 외에 적어도 하나의 다른 위성과 연결됨으로써 다중 연결 또는 다중 TRP 연결이 이루어질 수 있다. S1402단계 또한 앞서 도 12 및 도 13에서 설명한 S1202단계 또는 S1302단계와 동일하므로, 도 8 및 도 9를 참조한 동일한 부연 설명은 생략하기로 한다.
S1404단계에서 기지국은 단일 NTN 링크를 임시 QuickLink(QuickLink_tmp)로 설정하고, 해당 기지국을 기지국Q로 설정할 수 있다. 본 개시에서 기지국Q는 QuickLink를 갖는 기지국이 될 수 있다. 기지국Q는 QuickLink_tmp를 다른 노드들 예를 들어, 단말과 기지국들 또는 단말과 위성들에게 알릴 수 있다. 만일 QuickLink의 결정이 빠르게 이루어질 수 있는 경우라면, 기지국Q는 QuickLink_tmp를 다른 노드들에게 알리지 않도록 구성할 수도 있다.
S1404단계 또한 앞서 도 12 및 도 13에서 설명한 S1204단계 또는 S1304단계와 동일하므로, 도 8 및 도 9를 참조한 동일한 부연 설명은 생략하기로 한다.
S1406단계에서 기지국은 단말과 NTN 링크를 형성하는 각 기지국으로 각 NTN 링크에 대한 지연 시간 정보를 요청할 수 있다. 본 개시의 제3 실시예에서는 지연 시간 정보를 이용하여 저지연 링크를 탐색하기 위한 방안에 대하여 설명하고 있다. 그러므로, S1406단계의 동작은 저지연 링크 관련 정보로 지연 시간 정보를 이용하는 방법이 될 수 있다.
S1406단계의 동작을 도 8을 참조하여 살펴보면, 기지국Q로 동작하는 제1 기지국(831)은 제2 기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 위성을 통한 NTN 링크의 지연 시간 정보를 요청할 수 있다. 제1 기지국(831)이 제2기지국(832) 및/또는 제3 기지국(833)으로 각 기지국이 연결된 NTN 링크들 각각에 대한 지연 시간 정보의 요청은 기지국 간의 백홀(backhaul)을 이용하거나 또는 Xn 인터페이스를 이용하여 요청할 수 있다.
복수의 위성들이 다중 TRP로 동작하는 도 9의 경우 기지국이 하나만 존재하기 때문에 S1406단계의 동작은 수행되지 않는다. 즉, 기지국(931)은 NTN 링크들 각각에 대한 링크 지연 시간을 알고 있기 때문에 S1406단계를 수행할 필요가 없다. 따라서 복수의 위성들이 다중 TRP로 동작하는 도 9의 경우 이하에서 설명될 S1408단계도 기지국Q는 수행하지 않는다.
S1408단계에서 타 기지국들은 S1406단계의 지연 시간 정보 보고 요청에 기초하여 자신과 위성을 통해 단말과 연결된 NTN 링크에 대한 지연 시간 정보를 기지국Q로 보고할 수 있다.
기지국이 특정 NTN 링크의 지연 시간을 획득하는 방법 중 하나로, 왕복 시간(roundtrip time, RTT)을 측정할 수 있다. 예를 들어, 기지국은 RTT 측정을 위한 신호를 NTN 링크를 통해 단말로 전송하고, 단말로부터 회송되는 RTT 신호를 이용하여 NTN 링크의 지연을 확인할 수 있다.
기지국이 특정 NTN 링크의 지연 시간을 획득하는 방법 중 다른 하나의 예로, 위성과 기지국(또는 게이트웨이) 간의 피더 링크에 대한 지연 시간은 위성의 고도 및 위치에 기초하여 계산할 수 있다. 또한 위성의 고도 및 위치에서 위성이 제공하는 셀 반경 내의 서비스 링크에 대한 평균 값을 이용함으로써 서비스 링크에 대한 링크 지연을 계산할 수 있다. 그리고, 기지국은 위성이 벤트-파이프 위성인 경우 위성에서 신호가 처리되는 시간 값을 위성으로부터 제공받을 수 있다. 따라서 이러한 지연 시간 값들의 합을 이용하여 기지국은 위성을 통해 연결되는 단말로의 지연 시간을 계산하여 획득할 수도 있다.
본 개시에서는 NTN 링크의 지연 시간을 획득할 수 있는 다양한 방법들 중 2가지 방법을 설명하였다. 하지만 본 개시에서는 위에서 설명된 방법 외에 NTN 링크의 지연 시간을 획득할 수 있는 다른 어떤 방법을 사용하여도 무방하다. 다시 말해 본 개시에서는 NTN 링크의 지연 시간을 획득하는 방법에 대한 제한을 두지 않는다.
이상에서 설명한 방식들 또는 그 밖의 다른 방법들을 이용하여 기지국은 해당 단말과 연결된 NTN 링크의 지연 시간을 확인할 수 있다. 각 기지국들은 이처럼 NTN 링크의 지연 시간을 확인하고, S1408단계에서 기지국Q로 지연 시간 정보를 보고할 수 있다. 위에서 설명한 바와 같이 S1408단계는 도 8과 같이 복수의 위성들이 각각의 기지국을 통해 연결되는 다중 연결인 경우에 적용될 수 있다. 다시 말해 도 9와 같이 위성들이 다중 TRP로 동작하는 경우에는 생략될 수 있다.
S1410단계에서 기지국Q는 단말로부터 각 NTN 링크의 지연 시간 정보와 각 기지국으로부터의 공통 지연 시간 정보를 수신하였으므로, 이에 기초하여 QuickLink를 결정할 수 있다. 각 NTN 링크의 지연 시간 정보기 주어진 경우 기지국Q는 어떠한 위성에 대한 링크가 낮은 지연을 갖는 링크인지를 식별하는 방법은 여러 가지 방법이 있을 수 있다. 이러한 방법들 중 하나의 방법은 위에서 설명한 <수학식 2>의 방법을 이용할 수 있다. <수학식 2>에 대해서는 제1 실시예에서 설명하였으므로, 중복 설명은 생략하기로 한다.
또한 S1410단계가 도 9와 같이 복수의 위성들이 다중 TRP로 동작하는 환경에서는 기지국(931)은 각 위성들을 통한 지연 시간에 기초하여 QuickLink를 결정할 수 있다.
S1412단계에서 기지국Q는 결정된 QuickLink 정보를 단말과 타 기지국으로 전송할 수 있다.
S1412단계의 동작을 도 8을 참조하여 살펴보면, 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크를 통해 단말(821)로 전송할 수 있다. 또한 기지국Q로 동작하는 제1 기지국(831)은 결정된 QuickLink 정보를 기지국간 연결된 백홀 또는 Xn 인터페이스를 이용하여 제2 기지국(832) 및/또는 제3 기지국(833)으로 전송할 수 있다.
S1412단계의 동작을 도 9을 참조하여 살펴보면, 기지국(931)은 결정된 QuickLink 정보를 QuickLink_tmp인 제1 NTN 링크의 제1 위성(911)을 통해 단말(921)로 전송할 수 있다. 도 9의 경우에는 다른 기지국들이 존재하지 않기 때문에 다른 기지국으로 결정된 QuickLink 정보를 전송하는 동작은 필요하지 않는다.
S1412단계에서 전송되는 QuickLink 정보는 아래의 2가지 정보를 포함할 수 있다.
(1) 새로 지정될 QuickLink에 대한 위성 및/또는 그 위성과 연결된 기지국을 식별할 수 있는 정보: 이 정보를 통해, 단말과 기지국들은 어떤 링크가 QuickLink인지 알 수 있다. 만약 다중 TRP인 경우, 모든 링크는 하나의 기지국에 연결되어 있으므로, 어느 링크/위성이 QuickLink인지를 단말에게 알려야 한다.
(2) 새로 지정될 QuickLink에 대한 적용 시점: 단말과 다중 링크에 참여하는 모든 기지국이 새로 지정될 QuickLink를 적용할 시점을 동기화하기 위해, 프레임 번호(Frame number) 또는 서브프레임 번호(Sub-frame number) 등과 같은 시간 정보를 알림으로써, QuickLink를 적용할 동기화 시점을 일치시킬 수 있다.
S1414단계에서 단말과 기지국들은 QuickLink 정보에 기초하여 해당하는 기지국을 기지국Q로 설정할 수 있다.
S1414단계의 동작을 도 8을 참조하여 살펴보면, 제1 기지국(831)은 S1410단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 또한 제2 기지국(832)과 제3 기지국(833) 또한 S1410단계에서 결정된 QuickLink에 기초하여 QuickLink와 기지국Q를 설정할 수 있다. 그리고 단말(821)은 QuickLink_tmp를 삭제하고, S1410단계에서 수신된 정보에 기초하여 QuickLink를 설정할 수 있다. 다시 말해 모든 기지국들이 QuickLink와 기지국Q가 어느 기지국인지를 식별할 수 있다.
예를 들어 제1 기지국(831)이 기지국Q로 설정되고, 제1 NTN 링크가 QuickLink로 결정된 경우 제1 기지국(831)은 자신을 통한 제1 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 따라서 제1 기지국(831)은 도 12에서 설명된 기지국Q에 대응하는 동작을 이후에도 수행할 수 있다. 다른 예로 제2 기지국(832)이 기지국Q로 설정되고, 제2 NTN 링크가 QuickLink로 결정된 경우, 제2 기지국(832)은 자신을 통한 제2 NTN 링크가 QuickLink이고, 자신을 기지국Q로 설정할 수 있다. 이때 이전 QuickLink에 대응한 기지국이 제1 기지국(831)인 경우 제1 기지국(831)은 기지국Q가 아닌 기지국이 될 수 있다. 또한 이전 QuickLink에 대응한 기지국이 제1 기지국(831)이고, S1410단계에서 결정된 QuickLink에 대응한 기지국이 제1 기지국(831)인 경우 S1412단계 및 S1414단계는 수행되지 않을 수도 있다.
또한 도 9와 같이 위성들이 다중 TRP로 동작하는 경우 하나의 기지국에 모든 위성들이 연결될 수 있다. 따라서 위성들이 다중 TRP로 동작하는 경우 S1414단계는 생략될 수 있다.
S1416단계는 기지국Q가 단말에 일정한 주기로 지연 시간 정보를 보고(또는 갱신)하도록 설정한 경우에 이루어지는 동작일 수 있다. 따라서 기지국Q는 단말로부터 주기적인 지연 시간 정보가 보고(또는 갱신)되는 경우 S1410단계로 진행할 수 있다.
만일 단말에 일정한 주기로 지연 시간 정보를 보고하도록 설정하지 않은 경우 S1408단계로 진행할 수 있다. 또한 S1408단계로 진행하는 경우는 미리 설정된 시간 단위로 이루어질 수도 있다.
이상에서 설명한 제3 실시예는 앞서 설명한 제2 실시예와 유사한 절차를 가진다. 본 개시의 제3 실시예에서는 단말의 각 링크에 대한 TA정보를 수집하기 위해 다중 연결에 참여하는 기지국들에게 해당 단말의 지연 시간 정보를 요청하고, 그 정보를 통해 QuickLink를 설정한다.
또한 S1410단계에서 각 링크의 기지국들은 단말이 임의 접속을 수행했는지 여부와 관계없이 피더 링크의 지연시간을 알 수 있다. 다만, 단말이 임의 접속을 수행하지 않은 경우 서비스 링크의 지연은 확인할 수 없다. 따라서 본 개시에서는 임의 접속 이후의 단말에 대응하는 경우가 될 수 있다. 다시 말해 단말이 임의 접속 절차를 수행한 이후라면, 기지국은 서비스 링크의 지연 시간도 알 수 있다. 따라서 만일 단말이 임의 접속 절차를 수행하지 않은 경우라면, 기지국은 서비스 링크의 지연 시간을 대신하기 위해, 위성이 서비스하는 지역의 서비스 링크의 최대 지연시간, 최소 지연시간, 평균 지연시간 등의 값을 활용할 수 있다.
[제4 실시예: 제1 실시예 내지 제3 실시예를 이용한 저지연 링크 탐색]
도 15는 본 개시의 제4 실시예에 따른 NTN 네트워크의 동작에 대한 흐름도이다.
S1500단계는 QuickLink 선택 절차가 시작되는 경우를 의미한다. S1500단계는 앞서 도 12에서 설명한 S1200단계 내지 S1204단계에 대응할 수 있다. 다시 말해 단일 NTN 링크가 설정되어 특정 단말로 NTN 서비스가 제공되는 중에 제2 위성 및/또는 제3 위성이 연결되어 다중 연결 또는 다중 TRP 환경으로 진행하는 경우가 될 수 있다. 아울러, 특정한 하나의 기지국 예를 들어 단일 NTN 환경에서의 기지국이 임시 기지국Q로 설정되는 단계를 포함할 수 있다.
이상에서 S1500를 도 12의 경우를 예로 설명하였으나, 당업자라면 도 13의 S1300단계 내지 S1304단계 또는 도 14의 S1400단계 내지 S1404단계의 경우에도 적용됨을 알 수 있을 것이다.
S1502단계에서 기지국Q는 다른 기지국들 예를 들어, 제2 기지국 및/또는 제3 기지국으로 NTN 링크 별 링크 상태 정보를 요청할 수 있다. 본 개시에서 링크 상태 정보는 단말 예를 들어 UE(user equipment)가 임의 접속 절차를 수행한 상태인지, UE가 지연시간 정보(예: TA)를 알고 있는지, 기지국이 단말과의 링크의 지연시간 정보를 알고 있는지, 단말의 위치 정보가 얼마나 정확한지에 대한 정보가 될 수 있다.
또한 S1502단계는 다른 기지국으로 링크 상태 정보를 요청하는 동작이기 때문에 앞서 도 8에서 설명한 다중 연결의 경우에만 수행할 수 있다. 다시 말해 도 9와 같이 위성들이 다중 TRP로 동작하는 경우 S1502단계는 생략될 수 있다.
S1504단계에서 다른 기지국들은 S1502단계의 요청에 기초하여 NTN 링크 상태 정보를 기지국Q로 전송할 수 있다. 따라서 기지국Q는 S1504단계에서 다른 기지국들로부터 NTN 링크 상태 정보를 수신할 수 있다.
S1506단계에서 기지국Q는 NTN 링크 별로 QuickLink 결정을 위한 정보를 요청할 수 있다. 여기서 QuickLink 결정을 위한 정보는 저지연 링크에 관련된 정보를 획득하는 과정이 될 수 있다. 저지연 링크에 관련된 정보는 위의 제1 실시예 내지 제3 실시예에서 설명한 정보들이 될 수 있다. 따라서 NTN 링크 별로 Quick 링크 결정을 위한 정보는 앞서 설명한 제1 실시예를 적용하거나 또는 제2 실시예를 적용하거나 또는 제3 실시예의 방법을 적용할 수 있다.
제1 실시예가 적용되는 경우 S1506단계는 도 12에서 설명한 S1206단계-S1210단계 및 S1208단계-S1212단계들을 수행할 수 있다. 다시 말해 저지연 링크에 관련된 정보는 제1 실시예에서 언급한 각 NTN 링크의 노드들에 대한 위치 정보가 될 수 있다.
제2 실시예가 적용되는 경우 S1506단계는 도 13에서 설명한 S1306단계-S1310단계 및 S1308단계-S1312단계들을 수행할 수 있다. 다시 말해 저지연 링크에 관련된 정보는 제2 실시예에서 언급한 각 NTN 링크 별 지연 시간 정보가 될 수 있다.
제3 실시예가 적용되는 경우 S1506단계는 도 14에서 설명한 S1406단계-S1408단계들을 수행할 수 있다. 다시 말해 저지연 링크에 관련된 정보는 제3 실시예에서 언급한 각 NTN 링크 별 지연 시간 정보가 될 수 있다.
S1508단계에서 기지국Q는 각 NTN 링크 별로 수신된 정보에 기초하여 QuickLink를 결정할 수 있다. S1508단계의 QuickLink 결정 방법은 앞서 S1506단계에서 도 12의 방법에 따라 정보를 요청한 경우 S1214단계에서 설명된 방식이 이용될 수 있다. 또한 S1508단계의 QuickLink 결정 방법은 앞서 S1506단계에서 도 13의 방법에 따라 정보를 요청한 경우 S1314단계에서 설명된 방식이 이용될 수 있다. 그리고 S1508단계의 QuickLink 결정 방법은 앞서 S1506단계에서 도 14의 방법에 따라 정보를 요청한 경우 S1410단계에서 설명된 방식이 이용될 수 있다.
S1510단계에서 기지국Q는 결정된 QuickLink를 타 기지국 및 단말에 통지할 수 있다. S1510단계의 동작은 도 12의 제1 실시예를 이용하는 경우 S1216단계 및 S1218단계 등과 같이 S1216 이후 단계들이 수행될 수 있다. 또한 다른 기지국에 통지하는 경우는 도 8과 같이 다중 연결인 경우에만 한정되기 때문에 도 9와 같이 다중 TRP 환경에서는 단말로만 QuickLink를 전송할 수 있다.
S1510단계의 동작이 도 13의 제2 실시예를 이용하는 경우 S1316단계 및 S1318단계 등과 같이 S1316 이후 단계들이 수행될 수 있다. 또한 제2 실시예에서도 다른 기지국에 통지하는 경우는 도 8과 같이 다중 연결인 경우에만 한정되기 때문에 도 9와 같이 다중 TRP 환경에서는 단말로만 QuickLink를 전송할 수 있다.
S1510단계의 동작이 도 14의 제3 실시예를 이용하는 경우 S1412단계 및 S1416단계 등과 같이 S1412 이후 단계들이 수행될 수 있다. 또한 제3 실시예에서도 다른 기지국에 통지하는 경우는 도 8과 같이 다중 연결인 경우에만 한정되기 때문에 도 9와 같이 다중 TRP 환경에서는 단말로만 QuickLink를 전송할 수 있다.
이상에서 설명된 도 15의 동작은 각 링크의 상태 정보가 바뀔 수 있으므로, 특정한 시간 단위로 반복적으로 수행될 수 있다.
한편, 이상에서는 저지연 링크(QuickLink)를 탐색하는 방법들을 설명하였다. 이상에서 설명된 저지연 링크는 다양한 분야에 활용될 수 있다. 예를 들어, 비교적 긴급한 데이터를 전송해야 하는 경우 또는 데이터의 재전송이나 중요한 제어 메시지의 전송 등에 저지연 링크를 활용할 수 있다.
본 개시에 따른 방법의 동작은 컴퓨터로 읽을 수 있는 기록매체에 컴퓨터가 읽을 수 있는 프로그램 또는 코드로서 구현하는 것이 가능하다. 컴퓨터가 읽을 수 있는 기록매체는 컴퓨터 시스템에 의해 읽혀질 수 있는 정보가 저장되는 모든 종류의 기록장치를 포함한다. 또한 컴퓨터가 읽을 수 있는 기록매체는 네트워크로 연결된 컴퓨터 시스템에 분산되어 분산 방식으로 컴퓨터로 읽을 수 있는 프로그램 또는 코드가 저장되고 실행될 수 있다.
또한, 컴퓨터가 읽을 수 있는 기록매체는 롬(rom), 램(ram), 플래시 메모리(flash memory) 등과 같이 프로그램 명령을 저장하고 수행하도록 특별히 구성된 하드웨어 장치를 포함할 수 있다. 프로그램 명령은 컴파일러(compiler)에 의해 만들어지는 것과 같은 기계어 코드뿐만 아니라 인터프리터(interpreter) 등을 사용해서 컴퓨터에 의해 실행될 수 있는 고급 언어 코드를 포함할 수 있다.
본 개시의 일부 측면들은 장치의 문맥에서 설명되었으나, 그것은 상응하는 방법에 따른 설명 또한 나타낼 수 있고, 여기서 블록 또는 장치는 방법 단계 또는 방법 단계의 특징에 상응한다. 유사하게, 방법의 문맥에서 설명된 측면들은 또한 상응하는 블록 또는 아이템 또는 상응하는 장치의 특징으로 나타낼 수 있다. 방법 단계들의 몇몇 또는 전부는 예를 들어, 마이크로프로세서, 프로그램 가능한 컴퓨터 또는 전자 회로와 같은 하드웨어 장치에 의해(또는 이용하여) 수행될 수 있다. 몇몇의 실시예에서, 가장 중요한 방법 단계들의 적어도 하나 이상은 이와 같은 장치에 의해 수행될 수 있다.
프로그램 가능한 로직 장치(예를 들어, 필드 프로그래머블 게이트 어레이)는 본 개시에서 설명된 방법들의 기능의 일부 또는 전부를 수행하기 위해 사용될 수 있다. 필드 프로그래머블 게이트 어레이(field-programmable gate array)는 본 개시에서 설명된 방법들 중 하나를 수행하기 위한 마이크로프로세서(microprocessor)와 함께 작동할 수 있다. 일반적으로, 방법들은 어떤 하드웨어 장치에 의해 수행되는 것이 바람직하다.
이상 본 개시의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 개시의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 개시를 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.

Claims (20)

  1. 제1 기지국의 방법에 있어서,
    제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크가 설정된 상태에서 상기 단말에 제2 위성을 통해 제2 NTN 링크가 설정되는 경우 제1 NTN 링크를 임시 저지연 링크로 설정하는 단계;
    상기 제1 NTN 링크의 노드들에 대한 제1 저지연 링크 관련 정보를 획득하는 단계;
    상기 제2 NTN 링크의 노드들에 대한 제2 저지연 링크 관련 정보를 획득하는 단계;
    상기 제1 저지연 링크 관련 정보와 상기 제2 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하는 단계; 및
    상기 결정된 저지연 링크의 정보를 상기 단말로 전송하는 단계;를 포함하는,
    제1 기지국의 방법.
  2. 청구항 1에 있어서,
    상기 제1 NTN 링크의 노드들은,
    상기 제1 기지국과 직접 연결되는 제1 게이트웨이,
    상기 제1 게이트웨이와 제1 피더 링크로 연결되는 상기 제1 위성, 및
    상기 제1 위성과 제1 서비스 링크로 연결되는 상기 단말을 포함하는,
    제1 기지국의 방법.
  3. 청구항 2에 있어서,
    상기 제2 NTN 링크의 노드들은,
    제2 기지국,
    상기 제2 기지국과 직접 연결되는 제2 게이트웨이,
    상기 제2 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및
    상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함하는,
    제1 기지국의 방법.
  4. 청구항 3에 있어서,
    상기 저지연 링크 정보를 상기 제2 기지국으로 전송하는 단계;를 더 포함하는,
    제1 기지국의 방법.
  5. 청구항 3에 있어서,
    제2 NTN 링크 상태 정보를 상기 제2 기지국으로 요청하는 단계; 및
    상기 제2 기지국으로부터 상기 제2 NTN 링크 상태 정보를 수신하는 단계;를 더 포함하며,
    상기 NTN 링크 상태 정보는 상기 단말의 임의 접속 절차 수행 여부 정보를 포함하는,
    제1 기지국의 방법.
  6. 청구항 2에 있어서,
    상기 제2 NTN 링크의 각 노드들은,
    상기 제1 기지국과 직접 연결되는 상기 제1 게이트웨이,
    상기 제1 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및
    상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함하는,
    제1 기지국의 방법.
  7. 청구항 1에 있어서,
    상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하는,,
    제1 기지국의 방법.
  8. 청구항 1에 있어서,
    상기 단말로부터 주기적인 위치 또는 지연 시간 정보가 수신될 시 상기 저지연 링크를 재결정하는 단계;를 더 포함하는,
    제1 기지국의 방법.
  9. 청구항 1에 있어서,
    상기 저지연 링크를 결정하는 단계는,
    현재 저지연 링크가 아닌 NTN 링크들 중 최소 지연 시간을 갖는 NTN 링크의 제1 전파 지연 시간을 획득하는 단계;
    상기 현재 저지연 링크의 제2 전파 지연 시간과 상기 제1 전파 지연 시간 간의 차를 계산하는 단계; 및
    상기 계산된 차가 미리 결정된 값보다 큰 경우 상기 제1 전파 지연 시간을 갖는 NTN 링크를 상기 저지연 링크로 결정하는 단계;를 포함하는,
    제1 기지국의 방법.
  10. 제1 기지국의 방법에 있어서,
    제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크를 설정하는 단계;
    상기 단말과 상기 제1 NTN 링크 설정 전에 기 설정된 제2 NTN 링크의 제2 기지국으로부터 저지연 링크 관련 정보의 요청을 수신하는 단계;
    상기 요청에 따라 상기 제1 NTN 링크의 저지연 관련 정보를 상기 제2 기지국으로 전송하는 단계;
    상기 제2 기지국으로부터 상기 제1 기지국을 저지연 링크로 설정한 저지연 링크 정보가 수신될 시 미리 설정된 시간 단위로 상기 단말과 설정된 모든 NTN 링크들의 저지연 링크 관련 정보를 획득하는 단계;
    상기 획득된 모든 NTN 링크들의 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하는 단계; 및
    상기 결정된 저지연 링크의 정보를 상기 단말로 전송하는 단계;를 포함하는,
    제1 기지국의 방법.
  11. 청구항 10에 있어서,
    상기 제1 NTN 링크의 노드들은,
    상기 제1 기지국과 직접 연결되는 제1 게이트웨이,
    상기 제1 게이트웨이와 제1 피더 링크로 연결되는 제1 위성, 및
    상기 제1 위성과 제1 서비스 링크로 연결되는 상기 단말을 포함하는,
    제1 기지국의 방법.
  12. 청구항 10에 있어서,
    상기 제2 NTN 링크의 노드들은,
    제2 기지국,
    상기 제2 기지국과 직접 연결되는 제2 게이트웨이,
    상기 제2 게이트웨이와 제2 피더 링크로 연결되는 제2 위성, 및
    상기 제2 위성과 제2 서비스 링크로 연결되는 상기 단말을 포함하는,
    제1 기지국의 방법.
  13. 청구항 12에 있어서,
    상기 제1 NTN 링크의 설정 후 상기 제2 기지국으로부터 상기 단말의 임의 접속 절차의 수행 여부 정보를 포함하는 제1 NTN 링크 상태 정보의 요청을 수신하는 단계; 및
    상기 요청에 따라 상기 제2 기지국으로 상기 제1 NTN 링크 상태 정보를 전송하는 단계;를 더 포함하는,
    제1 기지국의 방법.
  14. 청구항 10에 있어서,
    상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하는,제1 기지국의 방법.
  15. 청구항 10에 있어서,
    상기 단말로부터 주기적인 위치 또는 지연 시간 정보가 수신될 시 상기 저지연 링크를 재결정하는 단계;를 더 포함하는,제1 기지국의 방법.
  16. 청구항 10에 있어서,
    상기 저지연 링크를 결정하는 단계는,
    현재 저지연 링크가 아닌 NTN 링크들 중 최소 지연을 갖는 NTN 링크의 전파 지연 시간을 획득하는 단계;
    현재 저지연 링크의 전파 지연 시간과 상기 최소 지연을 갖는 NTN 링크의 전파 지연 시간 간의 차를 계산하는 단계; 및
    상기 계산된 차가 미리 결정된 값보다 큰 경우 상기 최소 전파 지연 시간을 갖는 NTN 링크를 상기 저지연 링크로 결정하는 단계;를 포함하는,
    제1 기지국의 방법.
  17. 제1 기지국에 있어서,
    프로세서(processor)를 포함하며,
    상기 프로세서는 상기 제1 기지국이,
    제1 위성을 통해 단말과 제1 비지상 네트워크(non-terrestrial network, NTN) 링크가 설정된 상태에서 상기 단말에 제2 위성을 통해 제2 NTN 링크가 설정되는 경우 제1 NTN 링크를 임시 저지연 링크로 설정하고;
    상기 제1 NTN 링크의 노드들에 대한 저지연 링크 관련 정보를 획득하고;
    상기 제2 NTN 링크의 노드들에 대한 저지연 링크 관련 정보를 획득하고;
    상기 제1 NTN 링크의 각 노드들에 대한 저지연 링크 관련 정보와 상기 제2 NTN 링크의 각 노드들에 대한 저지연 링크 관련 정보에 기초하여 저지연 링크를 결정하고; 및
    상기 저지연 링크 정보를 상기 단말로 전송하도록 야기하는,
    제1 기지국.
  18. 청구항 17에 있어서,
    상기 프로세서는 상기 제1 기지국이:
    상기 저지연 링크 정보를 상기 제2 기지국으로 전송하도록 더 야기하는,
    제1 기지국.
  19. 청구항 18에 있어서,
    상기 프로세서는 상기 제1 기지국이:
    제2 NTN 링크 상태 정보를 상기 제2 기지국으로 요청하고,
    상기 제2 기지국으로부터 상기 제2 NTN 링크 상태 정보를 수신하도록 더 야기하며,
    상기 NTN 링크 상태 정보는 상기 단말의 임의 접속 절차 수행 여부 정보를 포함하는,
    제1 기지국.
  20. 청구항 17에 있어서,
    상기 제1 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제1 NTN 노드들의 위치 정보 또는 상기 제1 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하고, 상기 제2 NTN 링크에 대한 저지연 링크 관련 정보는 상기 제2 NTN 노드들의 위치 정보 또는 상기 제2 NTN 노드들 간의 지연 시간 정보 중 적어도 하나를 포함하는,
    제1 기지국.
PCT/KR2023/005486 2022-04-26 2023-04-21 비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치 WO2023211070A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2022-0051546 2022-04-26
KR20220051546 2022-04-26

Publications (1)

Publication Number Publication Date
WO2023211070A1 true WO2023211070A1 (ko) 2023-11-02

Family

ID=88519338

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2023/005486 WO2023211070A1 (ko) 2022-04-26 2023-04-21 비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치

Country Status (2)

Country Link
KR (1) KR20230151912A (ko)
WO (1) WO2023211070A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117856877A (zh) * 2024-03-06 2024-04-09 广东世炬网络科技有限公司 Ntn网络中的数据中转方法、装置、设备及存储介质

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090073917A1 (en) * 2001-04-27 2009-03-19 The Directv Group, Inc. Feeder link configurations to support layered modulation for digital signals
US7970345B2 (en) * 2005-06-22 2011-06-28 Atc Technologies, Llc Systems and methods of waveform and/or information splitting for wireless transmission of information to one or more radioterminals over a plurality of transmission paths and/or system elements
US8923857B2 (en) * 2009-04-20 2014-12-30 Telefonaktiebolaget L M Ericsson (Publ) Method of frequency search
KR101929721B1 (ko) * 2015-08-05 2019-03-14 퀄컴 인코포레이티드 위성 통신 시스템에서의 위성 대 위성 핸드오프
US20220007267A1 (en) * 2018-11-01 2022-01-06 Telefonaktiebolaget Lm Ericsson (Publ) Methods for Tracking Area Management for Moving RAN

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090073917A1 (en) * 2001-04-27 2009-03-19 The Directv Group, Inc. Feeder link configurations to support layered modulation for digital signals
US7970345B2 (en) * 2005-06-22 2011-06-28 Atc Technologies, Llc Systems and methods of waveform and/or information splitting for wireless transmission of information to one or more radioterminals over a plurality of transmission paths and/or system elements
US8923857B2 (en) * 2009-04-20 2014-12-30 Telefonaktiebolaget L M Ericsson (Publ) Method of frequency search
KR101929721B1 (ko) * 2015-08-05 2019-03-14 퀄컴 인코포레이티드 위성 통신 시스템에서의 위성 대 위성 핸드오프
US20220007267A1 (en) * 2018-11-01 2022-01-06 Telefonaktiebolaget Lm Ericsson (Publ) Methods for Tracking Area Management for Moving RAN

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117856877A (zh) * 2024-03-06 2024-04-09 广东世炬网络科技有限公司 Ntn网络中的数据中转方法、装置、设备及存储介质

Also Published As

Publication number Publication date
KR20230151912A (ko) 2023-11-02

Similar Documents

Publication Publication Date Title
EP3610675A1 (en) Apparatus and method for supporting handover in a wireless communication system
WO2021006691A1 (en) Method and device for routing data packet, and method and device for controlling data packet transmission
WO2019031915A1 (en) METHOD AND DEVICE FOR ESTABLISHING DOUBLE CONNECTIVITY
WO2020116899A1 (en) Method and equipment for handover
WO2019160321A1 (en) Method and apparatus for transmitting and receiving duplicated data in wireless communication system
WO2018203734A1 (en) Apparatus and method for supporting handover in a wireless communication system
WO2018212606A1 (ko) 무선 통신 시스템에서 하향링크 채널을 수신하는 방법 및 이를 위한 장치
WO2018084412A1 (ko) 무선 통신 시스템에서 하향링크 채널을 수신하는 방법 및 이를 위한 장치
WO2018151341A1 (ko) 무선 통신 시스템에서 빔 측정을 수행하는 방법 및 이를 위한 장치
WO2022010287A1 (en) Method and apparatus for transmitting and receiving signals in wireless communication system
WO2021010688A1 (ko) 무선 통신 시스템에서 차량 통신을 지원하기 위한 장치 및 방법
WO2023211070A1 (ko) 비-지상 네트워크에서 저지연 링크 탐색 방법 및 장치
EP3424237A1 (en) Method for controlling wireless local area network aggregation and associated equipment
WO2022203478A1 (en) Method and apparatus for a minimisation of drive test in a wireless communication system
WO2019194596A1 (en) Method and apparatus for configuring a relay node
WO2022231385A1 (en) Positioning configuration method and electronic device
WO2022158822A1 (ko) 무선 통신 시스템에서 중계 단말을 통한 원격 단말의 연결 설정 방법 및 장치
EP3750358A1 (en) Method and apparatus for transmitting and receiving duplicated data in wireless communication system
WO2024096529A1 (ko) 비-지상 네트워크에서 데이터 전송 방법 및 장치
WO2023214807A1 (ko) 비-지상 네트워크에서 harq를 위한 방법 및 장치
WO2023146168A1 (en) Method and apparatus for providing timing synchronization in wireless communication system
WO2023172041A1 (ko) 다중 연결 환경에서 복합 자동 재전송 요청 방법 및 장치
WO2023172043A1 (ko) 위성 간 다중 연결 환경에서 복합 자동 재전송 요청 방법 및 장치
WO2024010411A1 (ko) 비-지상 네트워크에서 편파 다중 신호 전송을 위한 방법 및 장치
WO2023153823A1 (ko) 비-지상 네트워크에서 복합 자동 재전송 요청을 위한 방법 및 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23796717

Country of ref document: EP

Kind code of ref document: A1