WO2023120718A1 - Dispositif de store et procédé de commande - Google Patents

Dispositif de store et procédé de commande Download PDF

Info

Publication number
WO2023120718A1
WO2023120718A1 PCT/JP2022/047705 JP2022047705W WO2023120718A1 WO 2023120718 A1 WO2023120718 A1 WO 2023120718A1 JP 2022047705 W JP2022047705 W JP 2022047705W WO 2023120718 A1 WO2023120718 A1 WO 2023120718A1
Authority
WO
WIPO (PCT)
Prior art keywords
slats
blind device
power
slat
control
Prior art date
Application number
PCT/JP2022/047705
Other languages
English (en)
Japanese (ja)
Inventor
紳之介 牛尾
太佑 西村
哲也 竹中
雅博 馬場
雅也 高橋
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Publication of WO2023120718A1 publication Critical patent/WO2023120718A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B5/00Doors, windows, or like closures for special purposes; Border constructions therefor
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/264Combinations of lamellar blinds with roller shutters, screen windows, windows, or double panes; Lamellar blinds with special devices
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/26Lamellar or like blinds, e.g. venetian blinds
    • E06B9/38Other details
    • E06B9/386Details of lamellae
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S30/00Structural details of PV modules other than those related to light conversion
    • H02S30/20Collapsible or foldable PV modules

Definitions

  • the present disclosure relates to blind devices and control methods.
  • One aspect of the disclosure includes two or more slats having a function of a photovoltaic cell, and a controller that controls the two or more slats, and the controller controls the two or more slats when a specific condition is satisfied.
  • This is a blind device that executes a specific control that restricts an operation to change the angle of the slats of the slat to an angle outside a predetermined range.
  • One aspect of the disclosure includes a step A of controlling two or more slats having a function of a solar cell, and the step A controls the angles of the two or more slats outside a predetermined range when a specific condition is met.
  • a control method including the step of executing a specific control that limits an operation to change the angle.
  • FIG. 1 is a diagram showing a power management system 1 according to an embodiment.
  • FIG. 2 is a diagram showing a facility 100 according to an embodiment.
  • FIG. 3 is a diagram showing a blind device 140 according to an embodiment.
  • FIG. 4 is a diagram showing the EMS 160 according to the embodiment.
  • FIG. 5 is a diagram for explaining the slat group according to the embodiment.
  • a power management system (power management system) A power management system according to an embodiment will be described below.
  • a power management system may simply be referred to as a power system.
  • the power management system 1 has a facility 100.
  • the power management system 1 may include a power management server 200.
  • FIG. 1
  • the facility 100 and the power management server 200 are configured to be able to communicate via the network 11.
  • the network 11 may include the Internet, may include a dedicated line such as a VPN (Virtual Private Network), or may include a mobile communication network.
  • VPN Virtual Private Network
  • the facility 100 is interconnected with the power system 12 and may be supplied with power from the power system 12 or may be supplied with power to the power system 12 .
  • Power from power system 12 to facility 100 may be referred to as tidal power, purchased power, or demand power.
  • Power from facility 100 to power system 12 may be referred to as reverse flow power or sold power.
  • FIG. 1 as the facility 100, facilities 100A to 100C are illustrated.
  • the facility 100 may be a facility such as a residence, a facility such as a store, or an office.
  • Facility 100 may be an apartment complex containing two or more residences.
  • the facility 100 may be a complex facility including at least two or more facilities of residences, shops, and offices. Details of facility 100 will be described later (see FIG. 2).
  • the power management server 200 may be managed by a business operator such as a local power company.
  • a local power company may be a power company operated by a municipality or the like.
  • the power management server 200 is a server managed by businesses such as a power generation business, a power transmission and distribution business, a retail business, and a resource aggregator.
  • the resource aggregator may be a power company that adjusts the power supply and demand balance of the power grid 12 in a VPP (Virtual Power Plant).
  • the adjustment of the power supply and demand balance may include trading (hereinafter referred to as negawatt trading) in which the reduced power of the facility 100 (tidal power) is exchanged for value. Adjusting the power supply and demand balance may include trading increased power of reverse flow power for value.
  • the resource aggregator may be an electric power company that provides reverse flow power to power generation companies, power transmission/distribution companies, retailers, and the like in the VPP.
  • the facility 100 has a solar cell device 110 , a power storage device 120 , a fuel cell device 130 , a blind device 140 , a load device 150 and an EMS (Energy Management System) 160 .
  • Facility 100 may have measurement device 190 .
  • facility 100 may have controller 170 .
  • the solar cell device 110 is a distributed power source that generates power according to light such as sunlight.
  • the solar cell device 110 is composed of a PCS (Power Conditioning System) and a solar panel.
  • the solar cell device 110 may be an example of a power generation device installed at the facility 100 .
  • the power storage device 120 is a distributed power source that charges and discharges power.
  • the power storage device 120 is composed of PCS and power storage cells.
  • power storage device 120 may be an example of a power storage device installed in facility 100 .
  • the fuel cell device 130 is a distributed power source that uses fuel to generate power.
  • the fuel cell device 130 is composed of PCS and fuel cells.
  • the fuel cell device 130 may be a solid oxide fuel cell (SOFC; Solid Oxide Fuel Cell) or a polymer electrolyte fuel cell (PEFC; Polymer Electrolyte Fuel Cell). It may be a type fuel cell (PAFC; Phosphoric Acid Fuel Cell) or a molten carbonate type fuel cell (MCFC; Molten Carbonate Fuel Cell).
  • SOFC Solid Oxide Fuel Cell
  • PEFC Polymer Electrolyte Fuel Cell
  • PAFC Phosphoric Acid Fuel Cell
  • MCFC Molten Carbonate Fuel Cell
  • the blind device 140 is a device that is attached to a window in a predetermined space and has a solar battery cell (hereinafter referred to as a PV (Photovoltaic) cell).
  • the predetermined space may be a room in the facility 100 or the floor of the facility 100 . It is a device that can block the sunlight to a predetermined space where the blind device 140 is installed.
  • the blind device 140 may be attached inside the predetermined space relative to the window, or may be attached outside the predetermined space relative to the window.
  • the blind device 140 is a device that has a plurality of slats and operates the plurality of slats with a motor or the like.
  • the slat has a rectangular front surface and a rectangular back surface.
  • the rectangular front surface may be a slightly curved convex surface (hereinafter referred to as convex surface).
  • the rectangular back surface may be a concave surface (hereinafter referred to as a concave surface) that is slightly curved.
  • Controlling the slats may include controlling at least one of hoisting of the slats, payout of the slats, and angle adjustment of the slats. Also, controlling the slats may include controlling some of the slats. That is, the control of the slats may include control of a predetermined number of slats among the plurality of slats.
  • the blind device 140 may be of a horizontal type in which slats extending horizontally with respect to the ground or floor are arranged vertically with respect to the ground or floor.
  • the slats extending along the direction may be of the vertical type arranged horizontally with respect to the ground or floor surface.
  • the blind device 140 may be referred to as an electric blind.
  • the blind device 140 may be referred to as a PV-powered blind.
  • the blind device 140 has slats on which PV cells are arranged. PV cells are placed on the surface of the slats. Specifically, the PV cells are placed on the convex side of the slats. It may also be arranged on the concave surface of the slat, or on both the convex and concave surfaces of the slat. Therefore, the blind device 140 may be considered to be an example of a distributed power source that generates power according to light such as sunlight.
  • the blind device 140 may or may not include a PCS.
  • the PCS of the solar cell device 110 may be used as the PCS of the PV cells arranged on the slats. Details of the blind device 140 will be described later (see FIG. 3).
  • the load device 150 is a device that consumes power.
  • the load device 150 may include an air conditioner that adjusts the temperature of the predetermined space, or a lighting device that adjusts the illuminance of the predetermined space.
  • Air conditioners and lighting devices are examples of predetermined devices that adjust the environment of a predetermined space. Air conditioners and lighting devices may be considered devices affected by the operation of the blind device 140 .
  • the load device 150 may include video equipment, audio equipment, refrigerators, washing machines, personal computers, and the like.
  • the EMS 160 manages power related to the facility 100.
  • EMS 160 may control solar cell device 110 , power storage device 120 , fuel cell device 130 , blind device 140 and load device 150 .
  • the EMS 160 is exemplified as a device that receives control commands from the power management server 200, but such a device may be called a Gateway or simply a control unit. Details of the EMS 160 will be described later (see FIG. 4).
  • the controller 170 is a controller for controlling the blind device 140.
  • the controller 170 may be a controller that directly communicates with the blind device 140 by infrared communication or short-range wireless communication such as Bluetooth (registered trademark). It may be a controller that communicates indirectly with 140 .
  • the controller 170 may be a controller dedicated to the blind device 140, or may be a communication device such as a smart phone or a tablet terminal.
  • the measuring device 190 measures tidal power from the power system 12 to the facility 100 .
  • Measurement device 190 may measure reverse power flow from facility 100 to power system 12 .
  • the metering device 190 may be a Smart Meter belonging to a power company.
  • the measuring device 190 may transmit to the EMS 160 every first interval an information element indicating the measurement result (integrated value of the power flow or reverse flow power) at the first interval (for example, 30 minutes).
  • the measurement device 190 may send an information element to the EMS 160 indicating the measurement result at a second interval (eg, 1 minute) that is shorter than the first interval.
  • blind device 140 A blind device according to an embodiment will be described below. As shown in FIG. 3, the blind device 140 has a communication section 141, a slat 142, and a control section 143. As shown in FIG. 3, the blind device 140 has a communication section 141, a slat 142, and a control section 143. As shown in FIG. 3, the blind device 140 has a communication section 141, a slat 142, and a control section 143. As shown in FIG.
  • the communication unit 141 is configured by a communication module.
  • the communication module can be a wireless communication module that conforms to standards such as IEEE802.11a/b/g/n/ac/ax, ZigBee, Wi-SUN, LTE, 5G, 6G, and standards such as IEEE802.3 may be a wired communication module conforming to
  • the communication unit 141 controls communication between the blind device 140 and the EMS 160.
  • communication unit 141 communicates with EMS 160 .
  • Such communication is performed using a protocol conforming to the second protocol.
  • ECHONET Lite registered trademark
  • ECHONET Lite registered trademark
  • the information element included in the message used for communication may include an information element for specifying the operation mode of the blind device 140.
  • Such messages may include messages (eg, SET commands) instructing to control the blind device 140 in an operating mode, and messages requesting the operating mode being applied to the blind device 140 (eg, GET commands). ) may be included.
  • Such messages may include messages (eg, GET response commands, INF commands) that inform the operating mode being applied to the blind device 140 .
  • a GET response command is a command transmitted in response to a GET command
  • an INF command is a message autonomously transmitted by the blind device 140.
  • the SET command includes an information element for the blind device 140 to specify the operation mode of the blind device 140.
  • the GET response command and the INF command contain information elements for EMS 160 to identify the operating mode of blind device 140 .
  • the slat 142 is a member that adjusts the sunlight in the space where the blind device 140 is installed. PV cells may be placed on the surface of the slats 142 .
  • the control unit 143 may include at least one processor. At least one processor may be composed of a single integrated circuit (IC), or may be composed of a plurality of communicatively coupled circuits (such as integrated circuits and/or discrete circuit(s)). good too.
  • IC integrated circuit
  • communicatively coupled circuits such as integrated circuits and/or discrete circuit(s)
  • control unit 143 controls the blind device 140.
  • the control unit 143 may control at least one of winding up the slats 142 , extending the slats 142 , and adjusting the angle of the slats 142 .
  • the control unit 143 may control some of the slats 142 . That is, the control unit 143 may control a predetermined number of slats among the plurality of slats.
  • the operation modes of the blind device 140 may include at least one of the following operation modes (first to fifth operation modes).
  • the first operation mode is an operation mode that adjusts the angle of the slats 142 so as to maximize the power generated by the PV cells. That is, in the first operation mode, the power generated by the PV cells is prioritized over the sunlight in the predetermined space.
  • the first operating mode may be referred to as a power generation priority mode.
  • the second operation mode is an operation mode for searching for the angle of the slats 142 that maximizes the power generated by the PV cells. Specifically, in the second operation mode, the angle of the slats 142 that maximizes the power generated by the PV cells is searched for by measuring the power generated by the PV cells while gradually changing the angle of the slats 142 .
  • the slats 142 whose angles are changed in the second operating mode may be part of a plurality of slats 142 provided in the blind device 140 .
  • the third operation mode is an operation mode that adjusts the angle of the slats 142 based on at least one of the illuminance and temperature of the predetermined space. Specifically, in the third operation mode, the angles of the slats 142 may be adjusted so that the illuminance of the predetermined space becomes the target illuminance. A sensor that detects illuminance may be provided in the blind device 140 and may be configured to communicate with the blind device 140 . The target illuminance may be set by the user. In the third operation mode, the angle of the slats 142 may be adjusted so that the temperature of the predetermined space reaches the target temperature. A sensor that detects temperature may be provided in the blind device 140 and may be configured to communicate with the blind device 140 . A target temperature may be set by the user. A third operating mode with respect to the temperature of the predetermined space may be referred to as room temperature priority mode.
  • the fourth operation mode is an operation mode that adjusts the angle of the slats 142 so as to maximize the illuminance of the predetermined space. That is, in the fourth operation mode, the sunlight in the predetermined space is prioritized over the power generated by the PV cells.
  • a fourth operation mode may be referred to as a lighting priority mode.
  • a fifth operation mode is an operation mode in which the angle of the slats 142 is adjusted based on the power consumption of the predetermined device and the power generated by the PV cells.
  • the fifth operation mode is an operation mode for minimizing the power consumption of a given device minus the power generated by the PV cells.
  • the fifth operation mode may be considered as an operation mode for maximizing the power generated by the PV cells minus the power consumed by the predetermined device.
  • the fifth operation mode may be called a power consumption priority mode.
  • the EMS 160 has a first communication section 161, a second communication section 162, and a control section 163.
  • the first communication unit 161 is composed of communication modules.
  • the communication module can be a wireless communication module that conforms to standards such as IEEE802.11a/b/g/n/ac/ax, ZigBee, Wi-SUN, LTE, 5G, 6G, and standards such as IEEE802.3 may be a wired communication module conforming to
  • the first communication unit 161 communicates with the power management server 200 via the network 11.
  • the first communication unit 161 performs communication according to the first protocol, as described above.
  • the first communication unit 161 receives the first message from the power management server 200 according to the first protocol.
  • the first communication unit 161 transmits the first message response to the power management server 200 according to the first protocol.
  • the second communication unit 162 is composed of communication modules.
  • the communication module can be a wireless communication module that conforms to standards such as IEEE802.11a/b/g/n/ac/ax, ZigBee, Wi-SUN, LTE, 5G, 6G, and standards such as IEEE802.3 may be a wired communication module conforming to
  • the second communication unit 162 communicates with devices included in the facility 100 (the solar cell device 110, the power storage device 120, the fuel cell device 130, or the blind device 140).
  • the second communication unit 162 communicates according to the second protocol, as described above.
  • the second communication unit 162 transmits the second message to the distributed power sources according to the second protocol.
  • the second communication unit 162 receives the second message response from the distributed power sources according to the second protocol.
  • the second message may be a message containing an information element for specifying the operating mode of the blind device 140.
  • the control unit 163 may include at least one processor. At least one processor may be composed of a single integrated circuit (IC), or may be composed of a plurality of communicatively coupled circuits (such as integrated circuits and/or discrete circuit(s)). good too.
  • IC integrated circuit
  • communicatively coupled circuits such as integrated circuits and/or discrete circuit(s)
  • control unit 163 controls each configuration installed in the EMS 160 .
  • control unit 163 instructs the blind device 140 to set the operation mode by transmitting the second message.
  • (Slat group) A slat group according to the embodiment will be described below.
  • two or more slats 142 of the blind device 140 are schematically represented.
  • two or more slats are classified into one of two or more first slat groups 142A and classified into one of two or more second slat groups 142B.
  • Each of the two or more first slat groups 142A is a group of slats having PV cells electrically connected in series. Specifically, the PV cells of slats 142 forming first slat group 142A are electrically connected in series by power line 145 . The PV cells of the slats 142 forming one end of the first slat group 142A are connected to extraction electrodes 146. As shown in FIG. The PV cells of the slats 142 forming the other end of the first slat group 142A are also connected to the extraction electrodes, but such a configuration is omitted in FIG. 5 for simplicity of explanation.
  • FIG. 5 illustrates a case where one first slat group 142A includes five slats 142, but the number of slats 142 included in one first slat group 142A should be two or more. Therefore, the number of slats 142 included in one first slat group 142A may be four or less, or six or more. The number of slats 142 included in first slat group 142A may differ for each first slat group 142A.
  • first slat groups 142A that is, first slat group 142A-1 to first slat group 142A-3.
  • the number of one slat group 142A should be two or more. Therefore, the number of first slat groups 142A may be two, or four or more.
  • Each of the two or more second slat groups 142B is a group of slats that can be controlled by the EMS160.
  • Each of the two or more second slat groups 142B may be considered as a group of slats that can be driven by one motor 148.
  • slats 142 forming second slat group 142B are connected to motor 148 by power line 147 .
  • the second slat group 142B-1 and the second slat group 142B-2 are illustrated as the second slat group 142B.
  • a case where the second slat group 142B-1 includes five slats 142 and the second slat group 142B-2 includes ten slats 142 is illustrated.
  • the slats 142 forming the second slat group 142B-1 are connected to the motor 148X
  • the slats 142 forming the second slat group 142B-2 are connected to the motor 148Y.
  • FIG. 5 illustrates a case where one second slat group 142B includes five or ten slats 142, but the number of slats 142 included in one second slat group 142B is two or more. good. Therefore, the number of slats 142 included in one second slat group 142B may be 4 or less, 6 or more, 9 or less, or 11 or more. The number of slats 142 included in second slat group 142B may differ for each second slat group 142B.
  • the blind device 140 has two second slat groups 142B (that is, the second slat group 142B-1 to the second slat group 142B-2).
  • the number of two-slat groups 142B should be two or more. Therefore, the number of second slat groups 142B may be three or more.
  • the first slat group 142A and the second slat group 142B are a group of slats summarized from different points of view. Therefore, all of the two or more slats 142 of the blind device 140 are classified into one of the two or more first slat groups 142A. Similarly, all of the two or more slats 142 of the blind device 140 are classified into one of the two or more second slat groups 142B.
  • each of the two or more first slat groups 142A is included in any one of the two or more second slat groups 142B without straddling the boundaries of the two or more second slat groups 142B.
  • At least one of the two or more second slat groups 142B may include multiple first slat groups 142A.
  • the first slat group 142A-1 is included in the second slat group 142B-1 without straddling the boundary between the second slat group 142B-1 and the second slat group 142B-2.
  • the first slat group 142A-2 is included in the second slat group 142B-2 without straddling the boundary between the second slat group 142B-1 and the second slat group 142B-2.
  • the first slat group 142A-3 is included in the second slat group 142B-2 without straddling the boundary between the second slat group 142B-1 and the second slat group 142B-2.
  • the second slat group 142B-2 includes two first slat groups 142A (first slat group 142A-2 and first slat group 142A-3).
  • the second slat group 142B is a group of slats that can be controlled by the EMS 160, similar control may be applied to two or more second slat groups 142B at the same time.
  • Controllable groups of slats 142 may be managed by EMS 160 as EMS 160 settings (eg, motion limits).
  • a group of controllable slats may thus be driven by more than one motor 148 .
  • a different motor 148 may be connected to each of all the slats 142 of the blind device 140 .
  • control unit 143 executes specific control to limit the operation of changing the angles of the two or more slats 142 to angles outside the predetermined range.
  • Specific control may be considered to be control that restricts operations using the controller 170 (hereinafter referred to as manual operations).
  • the control unit 143 may execute specific control for each of the two or more second slat groups.
  • the specific condition may be considered to be a condition that should be satisfied prior to control in which the angles of two or more slats 142 are changed to angles outside the predetermined range.
  • the control unit 143 receives an operation to change the angles of the two or more slats 142 from a first angle within a predetermined range to a second angle within a predetermined range. In this case, if an operation to change the third angle within the predetermined range to the fourth angle outside the predetermined range is received without executing the specific control, the specific control is executed. In other words, when a specific condition is satisfied and the angles of the two or more slats 142 fluctuate within a predetermined range, the control unit 143 executes control to allow an operation to change the angles of the two or more slats 142.
  • the specific condition may include a condition (hereinafter referred to as the first condition) under which a specific operation mode set by a control device (for example, EMS 160) capable of communicating with the blind device 140 is applied. Operation based on a particular mode of operation may be referred to as automatic operation to distinguish it from manual operation.
  • a control device for example, EMS 160
  • the specific operation mode may include a first operation mode (power generation priority mode) that adjusts the angle of the slats 142 so as to maximize the power generated by the PV cells.
  • the specific operation mode may include a fifth operation mode (power consumption priority mode) that adjusts the angle of the slats 142 based on the power consumption of the predetermined device and the power generated by the PV cells.
  • the specific operation mode may include at least one of the second to fourth operation modes described above.
  • the specific condition may include a condition under which the power generated by the PV cell is extracted (hereinafter referred to as the second condition).
  • the second condition may be a condition in which the PV cell is generating power and power line 145 is not cut off from extraction electrode 146 .
  • the blind device 140 may have a switch that can switch whether or not to cut off the power line 145 from the extraction electrode 146 .
  • the specific condition may include a condition that the generated power of the PV cell is equal to or less than the threshold (hereinafter referred to as the third condition).
  • the threshold may include 0.
  • the specific condition may include a condition that the temperature of the PV cell is below the threshold (hereinafter referred to as the fourth condition).
  • the temperature of the PV cell may be measured by a temperature sensor provided on the surface of the PV cell.
  • a temperature sensor may be installed in a PV cell located on at least one slat 142 included in the second slat group.
  • the specific conditions may include two or more conditions selected from the first to fourth conditions described above.
  • the specific control is control that restricts the operation of changing the angles of the two or more slats 142 to angles outside the predetermined range.
  • the predetermined range may be defined based on the current slat 142 angle.
  • the predetermined range may be an angle range within which the angle of the slat 142 is allowed to change.
  • the predetermined range may be a range of angles within which fluctuations in power generated by the PV cells are equal to or less than a threshold.
  • the predetermined range may be a range in which the speed of changing the angle of the slats 142 is equal to or less than a threshold.
  • the predetermined range may be set in the blind device 140 in advance. Although not particularly limited, the predetermined range may be 0.
  • the operation itself to change the angle of the slat 142 from the current angle is restricted.
  • the predetermined range may be the range of angles of the slats 142 that must be met to achieve maximization of PV cell power generation by the first mode of operation.
  • the specific control may include control for notifying the user that such an operation is restricted when an operation to change the angle of the two or more slats 142 to an angle outside a predetermined range is received. It may include control for notifying a predetermined terminal managed by the user that such an operation is restricted. For example, when the first condition is satisfied, the user may be notified that the specific operation mode is applied, and the predetermined terminal managed by the user is notified that the specific operation mode is applied. may According to such a configuration, for example, in a situation where power generated by the PV cells should be given priority over sunlight in a predetermined space, the user applies a specific operation mode such as the first operation mode (power generation priority mode). However, it can be grasped that the angle of two or more slats 142 should not be changed to an angle outside the predetermined range.
  • the blind device 140 executes specific control to limit the operation of changing the angles of the two or more slats 142 to angles outside a predetermined range when a specific condition is satisfied. According to such a configuration, it is possible to suppress unexpected failure of the PV cells due to arbitrarily changing the angle of the slats 142 by manual operation or the like.
  • the specific conditions may include a first condition under which a specific operation mode set by a control device (for example, EMS 160) capable of communicating with blind device 140 is applied.
  • a control device for example, EMS 160
  • the blind device 140 may perform specific control for each of the two or more second slat groups 142B. According to such a configuration, unexpected failure of PV cells can be suppressed for each second slat group 142B.
  • each of the two or more first slat groups 142A may be included in any one of the two or more second slat groups 142B without straddling the boundaries of the two or more second slat groups 142B. good. According to such a configuration, even if different controls are applied to each of the two or more second slat groups 142B, the behavior of the slats 142 constituting the first slat group 142A is unified. Damage to the power line 145 that connects the PV cells in series can be suppressed. That is, it is possible to individually control the first slat group 142A including two or more slats 142 while improving the extraction efficiency of the power generated by the PV cells.
  • the above disclosure exemplifies the slats 142 on which the PV cells are arranged.
  • the blind device 140 only needs to have slats 142 that function as PV solar cells.
  • the slats 142 themselves may be composed of PV cells.
  • control may include control to limit the hoisting of the slats 142 and control to limit the extension of the slats 142 .
  • the case where the specific control is executed when the angles of the two or more slats 142 are changed from the angle within the predetermined range to the angle outside the predetermined range is exemplified.
  • the disclosure described above is not limited to this, and the inside of the predetermined range may be read as outside the predetermined range, and the outside of the predetermined range may be read as within the predetermined range.
  • controller 170 is separate from the blind device 140 .
  • the controller 170 may be integrated with the blind device 140 or may be connected to the blind device 140 by wire.
  • each of the two or more second slat groups 142B is a group of slats that can be driven by one motor 148 has been exemplified.
  • the above disclosure is not so limited.
  • each of the two or more second slat groups 142B may be considered to be a group of slats whose angles can be controlled by the EMS160.
  • a group of slats whose angles can be controlled may be managed in EMS 160 as EMS 160 settings (eg, motion limits).
  • EMS 160 settings eg, motion limits
  • a group of slats whose angle can be controlled may be driven by two or more motors 148 .
  • a different motor 148 may be connected to each of all the slats 142 of the blind device 140 .
  • the second slat group 142B is a group of slats whose angles can be controlled, the angles of two or more slats 142 constituting the second slat group 142B may be simultaneously controlled to a predetermined angle.
  • each of the two or more second slat groups 142B may be considered as a group of slats to which the EMS 160 can apply operation modes (eg, first to fifth operation modes).
  • the group of slats to which the operational modes may apply may be managed in EMS 160 as EMS 160 settings (eg, operational limits).
  • a group of slats to which an operating mode can be applied may thus be driven by two or more motors 148 .
  • a different motor 148 may be connected to each of all the slats 142 of the blind device 140 .
  • the second slat group 142B is a group of slats to which an operation mode can be applied, one operation mode may be applied simultaneously to two or more second slat groups 142B.
  • control of different angles of the mutually adjacent slats 142 is allowed as long as the angle difference between the mutually adjacent slats 142 does not exceed the threshold value. good too.
  • the second slat group 142B may be considered as a group of slats forming the smallest unit controllable by the EMS160.
  • the smallest controllable unit may be two slats 142 (a group of slats).
  • 4 slats 142 (2 granules) may be controlled simultaneously
  • 8 slats 142 (4 granules) may be controlled simultaneously. That is, the EMS 160 does not necessarily apply different control to each minimum unit, and may apply the same control to two or more minimum units.
  • first slat group 142A is a group of slats having PV cells electrically connected in series.
  • the first slat group 142A may be a group of slats having PV cells electrically connected in parallel.
  • the operation mode may be read as an operation state.
  • ECHONET Lite registered trademark
  • SEP2.0 SEP2.0
  • KNX KNX
  • EMS 160 may be executed by a server arranged on the network 11.
  • EMS 160 may be provided by a cloud service.
  • the above disclosure may have the following problems and effects.
  • SYMBOLS 1... Power management system 11... Network, 12... Power system, 100... Facility, 110... Solar cell device, 120... Power storage device, 130... Fuel cell device, 140... Blind device, 141... Communication part, 142... Slat, 142A... First slat group, 142B... Second slat group, 143... Control unit, 145... Power line, 146... Extraction electrode, 147... Power line, 148... Motor, 150... Load device, 160... EMS, 161... First communication Unit, 162...Second communication unit, 163...Control unit, 170...Controller, 190...Measurement device, 200...Power management server

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Blinds (AREA)

Abstract

[Problème] Fournir un dispositif de store et un procédé de commande avec lesquels il est possible de commander de manière appropriée des lamelles ayant la fonctionnalité de cellules photovoltaïques. [Solution] Ce dispositif de store comprend deux lamelles ou plus ayant la fonctionnalité de cellules photovoltaïques, et une unité de commande qui commande les deux lamelles ou plus. L'unité de commande exécute une commande spécifique qui limite l'opération de changement de l'angle des deux lamelles ou plus à un angle à l'extérieur d'une plage prédéterminée lorsqu'une condition spécifique est satisfaite.
PCT/JP2022/047705 2021-12-24 2022-12-23 Dispositif de store et procédé de commande WO2023120718A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021211322 2021-12-24
JP2021-211322 2021-12-24

Publications (1)

Publication Number Publication Date
WO2023120718A1 true WO2023120718A1 (fr) 2023-06-29

Family

ID=86902861

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/047705 WO2023120718A1 (fr) 2021-12-24 2022-12-23 Dispositif de store et procédé de commande

Country Status (1)

Country Link
WO (1) WO2023120718A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009270382A (ja) * 2008-05-09 2009-11-19 Harumi Takeda 電動ブラインド
JP2010258023A (ja) * 2009-04-21 2010-11-11 Toyota Motor Corp 発電ブラインド装置
US20180030781A1 (en) * 2016-07-27 2018-02-01 David R. Hall Solar-Powered Window Covering
JP2019510905A (ja) * 2016-04-06 2019-04-18 ソルグリッド インコーポレイテッド 太陽光モジュールを用いた追跡式ブラインド装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009270382A (ja) * 2008-05-09 2009-11-19 Harumi Takeda 電動ブラインド
JP2010258023A (ja) * 2009-04-21 2010-11-11 Toyota Motor Corp 発電ブラインド装置
JP2019510905A (ja) * 2016-04-06 2019-04-18 ソルグリッド インコーポレイテッド 太陽光モジュールを用いた追跡式ブラインド装置
US20180030781A1 (en) * 2016-07-27 2018-02-01 David R. Hall Solar-Powered Window Covering

Similar Documents

Publication Publication Date Title
US20230082950A1 (en) Power management for electrochromic window networks
US9178356B2 (en) Low voltage solar electric energy distribution
US20140062206A1 (en) Low Voltage Solar Electric Energy Distribution
US20140062191A1 (en) Low Voltage Solar Electric Energy Distribution
CN106385024B (zh) 一种模块化电能路由器装置及其实现方法
KR20140020964A (ko) 에너지 분배 네트워크에서의 데이터 통신을 위한 장치 및 방법
KR20190000992A (ko) 배터리의 모듈식 관리 및 제어가 가능한 에너지 저장 시스템
KR101956232B1 (ko) 최대 운전 효율 관리가 가능한 에너지저장장치(ess)의 에너지 관리 시스템 및 방법
US20150057823A1 (en) Control apparatus, control system, and control method
KR102421893B1 (ko) 에너지 저장 시스템
US20140244060A1 (en) Power management system, power management method, and upper power management apparatus
WO2023120718A1 (fr) Dispositif de store et procédé de commande
JP2020205746A (ja) 電力変換装置及びその制御方法
JP2023145711A (ja) 電力管理サーバ及び電力管理方法
JP2023082529A (ja) ブラインド装置
JP2023095436A (ja) 制御装置及び制御方法
WO2023074369A1 (fr) Système d'alimentation et procédé de commande
WO2023095912A1 (fr) Terminal de communication et dispositif d'affichage
WO2022138773A1 (fr) Dispositif de store
JP2023065116A (ja) 電力システム
EP2763262B1 (fr) Système de gestion de l'alimentation, méthode de gestion de l'alimentation, et appareil supérieure de gestion de l'alimentation
WO2023095911A1 (fr) Système d'alimentation et procédé de commande
JP2023109296A (ja) 電力システム及び制御方法
CN117859250A (zh) 电力管理装置以及电力管理方法
WO2024058039A1 (fr) Dispositif de communication, alimentation électrique distribuée et procédé de communication

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22911419

Country of ref document: EP

Kind code of ref document: A1