WO2023111633A1 - Heating method of a metallic product - Google Patents
Heating method of a metallic product Download PDFInfo
- Publication number
- WO2023111633A1 WO2023111633A1 PCT/IB2021/061689 IB2021061689W WO2023111633A1 WO 2023111633 A1 WO2023111633 A1 WO 2023111633A1 IB 2021061689 W IB2021061689 W IB 2021061689W WO 2023111633 A1 WO2023111633 A1 WO 2023111633A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- semi
- heating
- steel product
- fluidized bed
- finished steel
- Prior art date
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/34—Methods of heating
- C21D1/53—Heating in fluidised beds
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/0081—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for slabs; for billets
Definitions
- the invention relates to a method for heating a semi-finished steel product.
- steel products need to be reheated before undergoing forming process or heat treatment. This is for example the case of billets or bloom before hot rolling which are generally reheated, from room temperature to temperature above 1000°C, in a furnace.
- the present invention relates to a method for heating a semi-finished steel product 2, comprising a pre-heating step, performed in a pre-heating device comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a heating step, performed in a furnace, wherein, said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii.
- FIG. 1 illustrated an embodiment of a device wherein the claimed method can be performed.
- Figure 2 illustrated an embodiment of multiple pre-heating device where the pre-heating is performed by at least two pre-heating devices.
- said semi-finished steel product 2 is a slab, a billet or a bloom
- This device comprises a chamber 3 containing solid particles 4, a heat exchanger 5, a support able to support a semi-finished steel product 6 and a gas injector 7.
- the chamber is preferentially able to receive more than one semi-finished steel product.
- the support 6 is preferentially able to receive more than one semi-finished steel product.
- the support can be a mesh basket.
- the chamber may be a closed chamber with a closable opening through which a semifinished steel product maybe be conveyed, but it could also have an open roof or any configuration suitable for semi-finished steel products conveying.
- step i. of the pre-heating step a gas is injected into said chamber 3 so as to form a fluidized bed 8. This injection is done by means of the gas injector 7.
- said gas injected in said chamber is heated.
- said gas has a temperature from 200 to 1000°C. It permits to reduce the energy required to heat the fluidized bed at the preferred temperature range.
- said gas is at least partly heated by a renewable energy source and/or by recovered waste heat.
- the recovered waste heat can for example come from reused fumes.
- said solid particles of said fluidized bed are in a bubbling regime.
- the gas velocity to be applied to get a bubbling regime depends on several parameters like the kind of gas used, the size and density of the particles or the size of the chamber which are easily managed by a person skilled in the art.
- step ii. the fluidized bed is heated by means of the heat exchanger.
- An entry pipe 9 is connected to said heat exchanger such that a transfer medium can be introduced into the heat exchanger by said entry pipe 9.
- An exit pipe 11 is connected to said heat exchanger such that the transfer medium can be drained away from the heat exchanger by said exit pipe 11.
- the walls of the chamber 3 can contain the heat exchanger.
- step ii. said fluidized bed is heated at a temperature from 400 to 700°C, preferably from 500 to 700°C, and even more preferably from 600 to 700°C.
- a transfer medium is circulating in said heat exchanger and is introduced into said heat exchanger at a temperature from 250°C to 1500°C.
- said transfer medium is at least partly heated by a renewable energy source.
- a transfer medium is circulating in said heat exchanger and is exiting said heat exchanger at a temperature from 150°C to 1000°C.
- said gas is at least partly heated by a renewable energy source and/ or by recovered waste heat.
- the recovered waste heat can for example come from reused fumes.
- the step ii. happens simultaneously as the step i., so that while the solid particles form a fluidized bed, they are heated.
- step iii. the semi-finished steel product is put inside the fluidized bed such that it can be heated by the fluidized bed. So, the steps i. and ii. are performed during the step iii. to allow the heat transfer from the heat exchanger to the fluidized bed and also from the heat exchanger to the semi-finished product.
- the semi-finished steel product may be conveyed inside and outside the chamber by a rolling conveyor or may be placed inside the chamber by pick up means, such as cranes or any suitable pick up mean.
- pick up means such as cranes or any suitable pick up mean.
- the system disclosed in WO 2021 064 451 can be used to as pick up means.
- said semi-finished steel product is at ambient temperature before being brought into the fluidized bed.
- the whole semi-finished steel product is inside said fluidized bed.
- step iv. the semi-finished steel product is taken out of the fluidized bed when it reaches a determined temperature.
- said semi-finished steel product is taken out when its temperature is from 500°C to 700°C. Even more preferably, said semi-finished steel product is taken out when its temperature is from 600°C to 700°C.
- the heating step the semi-finished steel product is heated in a furnace to a temperature from 1100°C to 1400°C. Such a heating range permits to perform a hot rolling.
- said method comprises a hot rolling step, after the heating step, wherein said semi-finished steel product is hot rolled.
- said gas injected in said chamber is air.
- the gas injected by the gas injector is preferably an inert gas, such as argon or helium, or nitrogen or a mix of gases.
- said gas injected in said chamber as a temperature close, or higher, to the one of the fluidised bed.
- the gas is injected at a velocity from 1 to 30 cm.s 4 .
- a velocity range requires a low ventilation power and thus a reduced energy consumption
- the solid particles have a size from 40 to 500 pm.
- the solid particles have a heat capacity comprised from 500 to 2000 J.kg'bK? 1 .
- the bulk density of the solid particles is from 1400 to 4000 kg.rn ⁇
- the solid particles are ceramic particles.
- the solid particles are made of glass or any other solid materials chemically stable up to 1000°C.
- the solid particles can be made of SiC, Olivine, steel slag or alumina.
- the solid particles are inert. It avoids any reaction with the metallic product.
- the method according to the invention permits to heat, at least partly a metallic product by means of renewable energy and/ or recovered waste energy, in the pre-heating step.
- the pre-heating step is performed by at least two pre-heating devices (1, 100).
- Said at least two pre-heating devices are arranged such that the exit pipe (11) of a first preheating device (1) is connected to an entry pipe (90) of a second pre-heating device (100).
- the pre-heating step comprises the steps of i. injecting a gas (12, 120) into the chamber (3, 30) of said first and second pre-heating devices so as to form fluidized beds (4, 40), ii. heating said fluidized beds (4, 40) by means of heat exchanger (5, 50), iii. putting said semi-finished steel product 2, into the fluidized bed (80) of said second preheating device (100) and onto said support (60) such said fluidized bed (80) is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 300°C to 500°C, v.
- Such a pre-heating steps permits to heat the semi-finished product in several steps so as to increase the efficiency of the transfer medium passing through the heat exchangers.
- the invention also relates to a method for heating a semi-finished steel product 2, comprising : a pre-heating step, performed in a pre-heating device 1 comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a rolling step performed in a rolling mill, wherein said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii.
- said rolling step comprises the step of rolling said semi-finished product at a temperature from 150 to 300°C.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
Abstract
The invention relates to a method for heating a semi-finished steel product, comprising : a pre-heating step, performed in a pre-heating device comprising a chamber containing solid particles, a heat exchanger, a support able to support said semi-finished steel product, a gas injector, and a heating step, performed in a furnace, wherein, said pre-heating step comprises the steps of : i. injecting a gas into said first chamber so as to form a first fluidized bed, ii. heating said fluidized bed by means of said heat exchanger, iii. putting said semi-finished steel product, into said fluidized bed and onto said support such said fluidized bed is able to transfer heat to said metallic product, iv. taking out said semi-finished steel product when its temperature is from 200°C to 1000°C, and said heating step comprises the step heating said semi-finished product to a temperature from 1100 to 1400°C.
Description
HEATING METHOD OF A METALLIC PRODUCT
The invention relates to a method for heating a semi-finished steel product.
In the steel production, but more generally in metal production, steel products need to be reheated before undergoing forming process or heat treatment. This is for example the case of billets or bloom before hot rolling which are generally reheated, from room temperature to temperature above 1000°C, in a furnace.
However, such a reheating consumes a great amount of energy leading to emission of greenhouse gas. It is thus desirable to develop heating methods of semi-finished product that reduce the process impact on the environment.
It is a subject of this invention to provide such a heating method.
This is achieved by providing a method according to any one of the claims 1 to 10.
Other characteristics and advantages will become apparent from the following description of the invention.
The present invention relates to a method for heating a semi-finished steel product 2, comprising a pre-heating step, performed in a pre-heating device comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a heating step, performed in a furnace, wherein, said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii. putting said semi-finished steel product 2, into said fluidized bed 8 such that said semi-finish steel product 2 is supported by said support 6 and such that said fluidized bed 8 is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 200°C to 1000°C, and said heating step comprises the step of heating said semi-finished steel product to a temperature from 1100 to 1400°C.
Figure 1 illustrated an embodiment of a device wherein the claimed method can be performed.
Figure 2 illustrated an embodiment of multiple pre-heating device where the pre-heating is performed by at least two pre-heating devices.
Preferably, said semi-finished steel product 2 is a slab, a billet or a bloom
This device comprises a chamber 3 containing solid particles 4, a heat exchanger 5, a support able to support a semi-finished steel product 6 and a gas injector 7. The chamber is preferentially able to receive more than one semi-finished steel product. The support 6 is preferentially able to receive more than one semi-finished steel product. The support can be a mesh basket.
The chamber may be a closed chamber with a closable opening through which a semifinished steel product maybe be conveyed, but it could also have an open roof or any configuration suitable for semi-finished steel products conveying.
In step i. of the pre-heating step, a gas is injected into said chamber 3 so as to form a fluidized bed 8. This injection is done by means of the gas injector 7.
Preferably, said gas injected in said chamber is heated. Even more preferably, said gas has a temperature from 200 to 1000°C. It permits to reduce the energy required to heat the fluidized bed at the preferred temperature range. Even more preferably, said gas is at least partly heated by a renewable energy source and/or by recovered waste heat. The recovered waste heat can for example come from reused fumes.
Preferably, said solid particles of said fluidized bed are in a bubbling regime. The gas velocity to be applied to get a bubbling regime depends on several parameters like the kind of gas used, the size and density of the particles or the size of the chamber which are easily managed by a person skilled in the art.
In step ii., the fluidized bed is heated by means of the heat exchanger. The heat exchanger
5 is able to transfer heat to said fluidized bed 8. An entry pipe 9 is connected to said heat exchanger
such that a transfer medium can be introduced into the heat exchanger by said entry pipe 9. An exit pipe 11 is connected to said heat exchanger such that the transfer medium can be drained away from the heat exchanger by said exit pipe 11. The walls of the chamber 3 can contain the heat exchanger.
Preferably, in step ii., said fluidized bed is heated at a temperature from 400 to 700°C, preferably from 500 to 700°C, and even more preferably from 600 to 700°C.
Preferably, a transfer medium is circulating in said heat exchanger and is introduced into said heat exchanger at a temperature from 250°C to 1500°C.
Preferably, said transfer medium is at least partly heated by a renewable energy source.
Preferably, a transfer medium is circulating in said heat exchanger and is exiting said heat exchanger at a temperature from 150°C to 1000°C.
Even more preferably, said gas is at least partly heated by a renewable energy source and/ or by recovered waste heat. The recovered waste heat can for example come from reused fumes.
The step ii. happens simultaneously as the step i., so that while the solid particles form a fluidized bed, they are heated.
In step iii., the semi-finished steel product is put inside the fluidized bed such that it can be heated by the fluidized bed. So, the steps i. and ii. are performed during the step iii. to allow the heat transfer from the heat exchanger to the fluidized bed and also from the heat exchanger to the semi-finished product.
The semi-finished steel product may be conveyed inside and outside the chamber by a rolling conveyor or may be placed inside the chamber by pick up means, such as cranes or any suitable pick up mean. For example, the system disclosed in WO 2021 064 451 can be used to as pick up means.
Preferably, said semi-finished steel product is at ambient temperature before being brought into the fluidized bed.
Preferably, the whole semi-finished steel product is inside said fluidized bed.
In step iv., the semi-finished steel product is taken out of the fluidized bed when it reaches a determined temperature.
Preferably, said semi-finished steel product is taken out when its temperature is from 500°C to 700°C. Even more preferably, said semi-finished steel product is taken out when its temperature is from 600°C to 700°C.
In the heating step, the semi-finished steel product is heated in a furnace to a temperature from 1100°C to 1400°C. Such a heating range permits to perform a hot rolling.
Preferably, said method comprises a hot rolling step, after the heating step, wherein said semi-finished steel product is hot rolled.
— PREFERRED EMBODIMENTS —
Preferably, said gas injected in said chamber is air. Alternatively, the gas injected by the gas injector is preferably an inert gas, such as argon or helium, or nitrogen or a mix of gases.
Preferably, said gas injected in said chamber as a temperature close, or higher, to the one of the fluidised bed.
Preferably, the gas is injected at a velocity from 1 to 30 cm.s4. Such a velocity range requires a low ventilation power and thus a reduced energy consumption
Preferably, the solid particles have a size from 40 to 500 pm.
Preferably, the solid particles have a heat capacity comprised from 500 to 2000 J.kg'bK?1.
Preferably, the bulk density of the solid particles is from 1400 to 4000 kg.rn \
Preferably, the solid particles are ceramic particles. Preferably, the solid particles are made of glass or any other solid materials chemically stable up to 1000°C. For example, the solid particles can be made of SiC, Olivine, steel slag or alumina.
Preferably, the solid particles are inert. It avoids any reaction with the metallic product.
The method according to the invention permits to heat, at least partly a metallic product by means of renewable energy and/ or recovered waste energy, in the pre-heating step.
Alternatively, as illustrated in Figure 2, the pre-heating step is performed by at least two pre-heating devices (1, 100).
Said at least two pre-heating devices are arranged such that the exit pipe (11) of a first preheating device (1) is connected to an entry pipe (90) of a second pre-heating device (100).
In that case, the pre-heating step comprises the steps of i. injecting a gas (12, 120) into the chamber (3, 30) of said first and second pre-heating devices so as to form fluidized beds (4, 40),
ii. heating said fluidized beds (4, 40) by means of heat exchanger (5, 50), iii. putting said semi-finished steel product 2, into the fluidized bed (80) of said second preheating device (100) and onto said support (60) such said fluidized bed (80) is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 300°C to 500°C, v. putting said semi-finished steel product 2, into the fluidized bed (8) of said second preheating device (1) and onto said support (6) such said fluidized bed (8) is able to transfer heat to said metallic product 2, vi. taking out said semi-finished steel product 2 when its temperature is from 500°C to 700°C.
Such a pre-heating steps permits to heat the semi-finished product in several steps so as to increase the efficiency of the transfer medium passing through the heat exchangers.
The invention also relates to a method for heating a semi-finished steel product 2, comprising : a pre-heating step, performed in a pre-heating device 1 comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a rolling step performed in a rolling mill, wherein said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii. putting said semi-finished steel product 2, into said fluidized bed 8 such that said semi-finish steel product 2 is supported by said support 6 and such that said fluidized bed 8 is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 150°C to 350°C, and said rolling step comprises the step of rolling said semi-finished product at a temperature from 150 to 300°C.
Claims
1. A method for heating a semi-finished steel product 2, comprising : a pre-heating step, performed in a pre-heating device 1 comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a heating step, performed in a furnace, wherein, said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii. putting said semi-finished steel product 2, into said fluidized bed 8 such that said semi-finish steel product 2 is supported by said support 6 and such that said fluidized bed 8 is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 200°C to 1000°C, and said heating step comprises the step of heating said semi-finished product to a temperature from 1100 to 1400°C. Method according to claim 1, wherein said method also comprises a hot rolling step, after the heating step, wherein said semi-finished steel product is hot rolled. Method according to claim 1 or 2, wherein said semi-finished steel product 2 is a slab a billet or a bloom. Method according to any one of the claims 1 to 3, wherein said gas injected in said chamber is air. Method according to any one of the claims 1 to 4, wherein, said solid particles of said fluidized bed are in a bubbling regime. Method according to any one of the claims 1 to 5, wherein in step ii., said fluidized bed is heated at a temperature from 400 to 700°C, preferably from 500 to 700°C, and even more preferably from 600 to 700°C.
6
Method according to any one of the claims 1 to 6, wherein semi-finished steel product is taken out when its temperature is from 500°C to 700°C. Method according to any one of the claims 1 to 7, wherein said metallic product is taken out when its temperature is from 600°C to 700°C. Method according to any one of the claims 1 to 8, wherein a transfer medium is circulating in said heat exchanger and is introduced into said heat exchanger at a temperature from 250°C to 1500°C. Method according to any one of the claims 1 to 9, wherein a transfer medium is circulating in said heat exchanger and is exiting said heat exchanger at a temperature from 150°C to 1000°C. A method for heating a semi-finished steel product 2, comprising : a pre-heating step, performed in a pre-heating device 1 comprising a chamber 3 containing solid particles 4, a heat exchanger 5, a support 6 able to support said semi-finished steel product, a gas injector 7, and a rolling step performed in a rolling mill, wherein said pre-heating step comprises the steps of : i. injecting a gas 12 into said first chamber 3 so as to form a first fluidized bed 8, ii. heating said fluidized bed 8 by means of said heat exchanger 5, iii. putting said semi-finished steel product 2, into said fluidized bed 8 such that said semi-finish steel product 2 is supported by said support 6 and such that said fluidized bed 8 is able to transfer heat to said metallic product 2, iv. taking out said semi-finished steel product 2 when its temperature is from 150°C to 350°C, and said rolling step comprises the step of rolling said semi-finished product at a temperature from 150 to 300°C.
7
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/IB2021/061689 WO2023111633A1 (en) | 2021-12-14 | 2021-12-14 | Heating method of a metallic product |
KR1020247016912A KR20240090725A (en) | 2021-12-14 | 2022-12-02 | How to heat metal products |
CA3237553A CA3237553A1 (en) | 2021-12-14 | 2022-12-02 | Heating method of a metallic product |
PCT/IB2022/061704 WO2023111760A1 (en) | 2021-12-14 | 2022-12-02 | Heating method of a metallic product |
CN202280077417.0A CN118284709A (en) | 2021-12-14 | 2022-12-02 | Method for heating metal product |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/IB2021/061689 WO2023111633A1 (en) | 2021-12-14 | 2021-12-14 | Heating method of a metallic product |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2023111633A1 true WO2023111633A1 (en) | 2023-06-22 |
Family
ID=79287968
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2021/061689 WO2023111633A1 (en) | 2021-12-14 | 2021-12-14 | Heating method of a metallic product |
PCT/IB2022/061704 WO2023111760A1 (en) | 2021-12-14 | 2022-12-02 | Heating method of a metallic product |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2022/061704 WO2023111760A1 (en) | 2021-12-14 | 2022-12-02 | Heating method of a metallic product |
Country Status (4)
Country | Link |
---|---|
KR (1) | KR20240090725A (en) |
CN (1) | CN118284709A (en) |
CA (1) | CA3237553A1 (en) |
WO (2) | WO2023111633A1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030015150A1 (en) * | 2001-07-17 | 2003-01-23 | Felix Belin | CFB with controllable in-bed heat exchanger |
US20120174406A1 (en) * | 2010-07-14 | 2012-07-12 | Benteler Automobiltechnik Gmbh | Method and production plant for making components for a motor vehicle |
WO2020012222A1 (en) * | 2018-07-11 | 2020-01-16 | Arcelormittal | Method to control the cooling of a metal product |
WO2020012378A2 (en) * | 2018-07-11 | 2020-01-16 | Arcelormittal | Method of heat transfer and associated device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA3149352A1 (en) | 2019-10-02 | 2021-04-08 | Arcelormittal | System and method for handling semi-finished metal products |
-
2021
- 2021-12-14 WO PCT/IB2021/061689 patent/WO2023111633A1/en unknown
-
2022
- 2022-12-02 WO PCT/IB2022/061704 patent/WO2023111760A1/en unknown
- 2022-12-02 KR KR1020247016912A patent/KR20240090725A/en unknown
- 2022-12-02 CN CN202280077417.0A patent/CN118284709A/en active Pending
- 2022-12-02 CA CA3237553A patent/CA3237553A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030015150A1 (en) * | 2001-07-17 | 2003-01-23 | Felix Belin | CFB with controllable in-bed heat exchanger |
US20120174406A1 (en) * | 2010-07-14 | 2012-07-12 | Benteler Automobiltechnik Gmbh | Method and production plant for making components for a motor vehicle |
WO2020012222A1 (en) * | 2018-07-11 | 2020-01-16 | Arcelormittal | Method to control the cooling of a metal product |
WO2020012378A2 (en) * | 2018-07-11 | 2020-01-16 | Arcelormittal | Method of heat transfer and associated device |
Also Published As
Publication number | Publication date |
---|---|
WO2023111760A1 (en) | 2023-06-22 |
CA3237553A1 (en) | 2023-06-22 |
KR20240090725A (en) | 2024-06-21 |
CN118284709A (en) | 2024-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0954398B1 (en) | Sand core removal and casting heat treatment | |
CN103406352A (en) | Heating and rolling method of Ni36 nickel base alloy plate | |
US2499926A (en) | Continuous circular ingot-heating furnace | |
WO2023111633A1 (en) | Heating method of a metallic product | |
CN101168827A (en) | Method for heating light metal blank | |
CN201665695U (en) | Automatic vacuum heat treatment control furnace | |
JP3845978B2 (en) | Operation method of rotary hearth furnace and rotary hearth furnace | |
CN1341758A (en) | Piling suspension chain workpiece heat treatment production line | |
CN106755888A (en) | A kind of industrial pipeline system automation heat treatment method and equipment | |
CN101440423B (en) | Automatic control furnace for vacuum heat treatment | |
WO2023209480A1 (en) | Heating method of a semi-finished metal products | |
CN102876875B (en) | Method for performing full annealing heat treatment for alloy steel pipe | |
CN201309948Y (en) | Vacuum heat-treating automatic-control furnace | |
ES2219337T3 (en) | RECOGNIZED OVEN. | |
JP2004131788A (en) | METHOD OF REFORMING Al ALLOY CASTING | |
JP2004123919A (en) | Method and apparatus for charging red-hot coke into cdq | |
JPS59143018A (en) | Heat treatment of steel material | |
CN213515045U (en) | Through forging heating furnace | |
JP2000008119A (en) | Improvement of heating furnace for steel product | |
JPS60238678A (en) | Continuous heat treatment furnace for powder metallurgical iron powder | |
CN110842196A (en) | Mesh belt furnace and application thereof | |
CN108800918A (en) | A kind of tunnel kiln and its heat recovery method for calcinating of ring type movable type | |
JPH07173471A (en) | Production of coke | |
JPS6058763B2 (en) | Charging coil heating device in continuous coil annealing furnace | |
JP2000282143A (en) | Continuous multi-zone type heating method for steel slab and continuous muti-zone type heating furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21840126 Country of ref document: EP Kind code of ref document: A1 |