WO2023005564A1 - Super-lift pulley bracket device, arm support and crane - Google Patents

Super-lift pulley bracket device, arm support and crane Download PDF

Info

Publication number
WO2023005564A1
WO2023005564A1 PCT/CN2022/101812 CN2022101812W WO2023005564A1 WO 2023005564 A1 WO2023005564 A1 WO 2023005564A1 CN 2022101812 W CN2022101812 W CN 2022101812W WO 2023005564 A1 WO2023005564 A1 WO 2023005564A1
Authority
WO
WIPO (PCT)
Prior art keywords
bracket
limiting member
super
superlift
boom
Prior art date
Application number
PCT/CN2022/101812
Other languages
French (fr)
Chinese (zh)
Inventor
石丽君
邵吉吉
Original Assignee
湖南三一中型起重机械有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 湖南三一中型起重机械有限公司 filed Critical 湖南三一中型起重机械有限公司
Publication of WO2023005564A1 publication Critical patent/WO2023005564A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/03Cranes with arms or jibs; Multiple cranes
    • B66C2700/0392Movement of the crane arm; Coupling of the crane arm with the counterweights; Safety devices for the movement of the arm

Definitions

  • the present application relates to the technical field of construction machinery, in particular, to a superlift pulley bracket device, a jib and a crane.
  • the super-lift device is used on the crane, which includes the super-lift arm and the super-lift pulley bracket.
  • the super-lift arm needs to rotate around the hinge point of the super-lift arm and the boom before the pulley Lift off the superlift block bracket.
  • the bracket of the super-lifting pulley cannot rotate together with the super-lifting jib, otherwise the pulley will rotate together, which will cause the pulley to fail to support or directly fall off from the bracket, causing accidents.
  • the bracket needs to be transferred to the jib for fixing before the super-lift jib is raised, so as to ensure that the positions of the bracket and the jib remain unchanged during the super-lift jib.
  • the process of transferring the bracket to the jib for fixing is complicated and the installation efficiency is low.
  • the problem solved by this application is how to cancel the step of transferring the bracket to the jib for fixing when the super jib is raised, so as to improve the installation efficiency.
  • the present application provides a superlift pulley bracket device, including a fixing device, a bracket, a first limiting member, a second limiting member and a third limiting member, and the fixing device is suitable for being arranged on on the super-lifting arm;
  • the bracket is rotatably connected to the fixing device, the first limiting member is arranged on the bracket, and the second limiting member is adapted to be arranged on the lifting arm,
  • the third limiting member is arranged on the fixing device;
  • the first limiting member When the super-lifting arm is in the retracted state, the first limiting member is in contact with the second limiting member or is provided with a gap, and the bracket is in contact with the third limiting member so that the The bracket is balanced under its own weight;
  • the bracket When the super-lifting boom is widened, the bracket is separated from the third limiter, and the first limiter and the second limiter are adapted to contact so that the bracket is supported on on the boom.
  • the first limiting member includes a first plate connected to the bracket; the second limiting member includes a second plate adapted to In connection with the boom, the first board is adapted to be supported on the second board when the super boom is raised.
  • the superlift pulley bracket device also includes a first fastener, the fixing device is provided with a mounting groove and a first hole structure, the first hole structure communicates with the mounting groove, and the bracket A second hole structure is provided, a part of the bracket is adapted to extend into the installation groove, and the first fastener is adapted to pass through the first hole structure and the second hole structure to connect The bracket and the fixing device.
  • the bracket includes a first connecting portion and a second connecting portion connected to each other, the first connecting portion is provided with the second hole structure, and the first connecting portion is adapted to extend into the installation In the groove, the second connecting part is provided with the first stopper, and when the super-lifting arm is in the super-lifting state, the fixing device and the second connecting part are away from the side of the boom End contact or gap setting.
  • the third limiting member is disposed in the installation groove, the third limiting member is located on the rotation path of the first connecting part, and the third limiting member is suitable for being connected with the The first connecting portion abuts against.
  • the second connecting part includes a first body, a second body and a third body, the first body is connected to the first connecting part, and the second body and the second body are arranged at intervals On the first body, the first body is provided with a first card slot, and the second body is provided with a second card slot, and the first card slot and the second card slot are suitable for supporting the pulley assembly , so that the pulley assembly is located between the first body and the second body.
  • the superlift pulley bracket device further includes a second fastener, the bracket is provided with a third hole structure, and the second fastener is adapted to pass through the third hole structure, The second fastener is adapted to connect with the pulley assembly.
  • the present application also provides a jib, including the above-mentioned superlift pulley bracket device.
  • the boom also includes a super-lift arm and a boom, the super-lift arm and the boom are rotatably connected, and the fixing device of the super-lift pulley bracket device is arranged on the super-lift arm , the rotation axis of the bracket of the superlift pulley bracket device and the fixing device is arranged coaxially with the rotation axes of the superlift arm and the boom.
  • the present application also provides a crane, comprising the above-mentioned superlift pulley bracket device, and/or, the above-mentioned jib.
  • the fixing device is arranged on the super-lifting arm; the bracket is rotatably connected with the fixing device, since the first limiting part is arranged on the bracket, the second limiting part is suitable for being arranged on the boom, and the third limiting part is arranged on on the bracket; thus, when the super-lifting arm is in the retracted state, the first limiter and the second limiter are in contact or are arranged in a gap, and the bracket is in contact with the third limiter so that the bracket is in contact with the second limiter.
  • the bracket is separated from the third limiter, and the first limiter and the second limiter are suitable for contact so that the bracket is supported on the boom, compared to Compared with the prior art, the present application does not need to remove the bracket assembly from the super-lift arm and transfer it to the boom for fixing during the raising process of the super-lift boom. The relative position of the bracket and the boom is always kept unchanged. Improve installation efficiency.
  • Fig. 1 is an exploded schematic view of an embodiment of a superlift sheave bracket device in the present application
  • Fig. 2 is the structural schematic diagram of the connection between the fixing device and the super-lift arm in the present application
  • Fig. 3 is a structural schematic diagram of another viewing angle of the bracket in the present application.
  • Fig. 4 is the assembly schematic diagram of an embodiment of bracket and pulley assembly in the present application.
  • Fig. 5 is a schematic diagram of the assembly of the second limiting member and an embodiment of the boom in the present application;
  • Fig. 6 is a schematic diagram of the position of the super-lift arm in the retracted state, the boom and the super-lift pulley bracket device in the present application;
  • Fig. 7 is a schematic diagram of the position of the boom and the bracket device of the superlift pulley when the boom is in the superlift state in the present application.
  • Fixing device 11. Installation slot; 2. Bracket; 21. First connection part; 211. Second hole structure; 22. Second connection part; 221. First body; 222. Second body; 2221. The third hole structure; 2222, the first card slot; 223, the third body; 2231, the second card slot; 3, the first limiter; 4, the second limiter; 5, the third limiter; 6 , the first fastener; 7, the second fastener; 8, the pulley assembly; 81, the movable pulley; 82, the wheel frame; 83, the connecting shaft; 9, the lifting arm; 10, the super lifting arm.
  • the Z-axis in the drawings represents the vertical direction, that is, the up and down position, and the positive direction of the Z-axis (that is, the arrow pointing to the Z-axis) represents the top, and the reverse of the Z-axis represents the bottom;
  • the X-axis in the drawings represents the horizontal direction , and specified as the left and right positions, and the positive direction of the X-axis represents the right side, and the reverse direction of the X-axis represents the left side;
  • Reverse represents the front side; at the same time, it should be noted that the meanings of the aforementioned Z-axis, Y-axis and X-axis are only for the convenience of describing the application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific Orientation, construction and operation in a particular orientation and therefore should not be construed as limiting the application.
  • the embodiment of the present application provides a superlift pulley bracket device, including a fixing device 1, a bracket 2, a first limiter 3, a second limiter 4 and a third limiter 5, the fixing device 1 is suitable for being arranged on the super-lifting arm 10; the bracket 2 is rotatably connected with the fixing device 1, and the first limiting member 3 is arranged on the bracket 2, so that The second limiting member 4 is adapted to be arranged on the boom 9, and the third limiting member 5 is arranged on the fixing device 1; The first limiting member 3 is in contact with the second limiting member 4 or is arranged in a gap, and the bracket 2 is in contact with the third limiting member 5 so that the bracket 2 maintains balance under its own weight; When the superlift arm 10 is widened, the bracket 2 is separated from the third limiting member 5, and the first limiting member 3 and the second limiting member 4 are adapted to contact so that the The bracket 2 is supported on the boom 9 .
  • the bracket 2 and the fixing device 1 are connected in rotation through a pin shaft (described in detail later), as shown in Figure 2, the rotation axes of the bracket 2 and the fixing device 1 are suitable for The axes of rotation of the superlift arm 10 and the boom 9 are coaxial, so that when the superlift arm 10 rotates relative to the boom 9, the fixing device 1 and the bracket 2 rotate coaxially, thereby not interfering with the superlift arm 10.
  • the arm 10 swivels.
  • the retractable state of the super-lift boom 10 refers to the state when the super-lift boom 10 is not working, that is, the state that the super-lift boom 10 is supported on the boom 9 in parallel.
  • the fixing device 1 is arranged on the super lifting arm 10;
  • the stopper 4 is adapted to be arranged on the boom 9, and the third stopper 5 is arranged on the bracket 2; thus, when the super-lift arm 10 is in the retracted state, the first stopper 3 and the The second limiter 4 contacts or is arranged in a gap, and the bracket 2 contacts with the third limiter 5 so that the bracket maintains balance under its own weight; Part 5 is separated, and the first stopper 3 and the second stopper 4 are suitable for contacting so that the bracket 2 is supported on the boom 9.
  • the present application is In the process, there is no need to remove the bracket 2 from the super-lift arm 10 and transfer it to the boom 9 for fixing, and the relative position of the bracket and the boom 9 always remains unchanged, which improves the installation efficiency.
  • the first limiting member 3 includes a first plate connected to the bracket 2; the second limiting member 4 includes a second plate, The second plate is adapted to be connected with the jib 9 , and the first plate is adapted to be supported on the second plate when the super-lift jib 10 is raised.
  • the superlift pulley bracket device is generally located above the side of the boom 9, so the first plate is arranged on the side end surface of the bracket 2 facing the boom 9, which can be welded or bolted.
  • the second plate is arranged on the top of the boom 9, and it can also be welded, bolted, etc. Keeping a balance under its own weight, at this time, the first plate and the second plate are in contact or are arranged in a gap, preferably, the first plate and the second plate are just in contact.
  • the side facing each other of the first plate and the second plate can be provided with a damping plate, thus, when the super-lift arm 10 is raised, the damping plate can reduce the gap between the first plate and the second plate. contact stress between them.
  • a reinforcing plate is provided between the first plate and the side wall of the bracket 2, and the number of reinforcing plates is not limited, and it can be one, two or three.
  • the superlift pulley bracket device also includes a first fastener 6, and the fixing device 1 is provided with a mounting groove 11 and a first hole structure, and the first hole structure and the first hole structure
  • the mounting groove 11 communicates
  • the bracket 2 is provided with a second hole structure 211, a part of the bracket 2 is suitable for extending into the mounting groove 11, and the first fastener 6 is suitable for passing through the
  • the first hole structure and the second hole structure 211 are used to connect the bracket 2 and the fixing device 1 .
  • the first fastener 6 is a pin shaft
  • the fixing device 1 is provided with a mounting groove 11 and a first hole structure, wherein the first hole structure communicates with the mounting groove 11
  • the bracket 2 is provided with a second hole structure 211
  • a part of the bracket 2 is adapted to extend into the installation groove 11
  • the installation groove 11 plays a guiding role, which can limit the displacement of the bracket 2 in the X-axis direction, when the first hole structure and the second hole structure After 211 are aligned, the pin shaft passes through the first hole structure and the second hole structure 211 to connect the bracket 2 and the fixing device 1 .
  • the bracket 2 can rotate around the pin shaft, so that the fixing device 1 can rotate relative to the bracket 2 when the superlift arm 10 rotates for a width.
  • the bracket 2 includes a first connecting portion 21 and a second connecting portion 22 connected to each other, the first connecting portion 21 is provided with the second hole structure 211, the first The connecting part 21 is adapted to extend into the installation groove 11, the second connecting part 22 is provided with the first stopper 3, when the super-lifting arm 10 is in the super-lifting state, the fixing device 1 It is in contact with the side end of the second connecting portion 22 away from the boom 9 or provided with a gap.
  • the first connecting part 21 and the second connecting part 22 are connected end to end in the Y-axis direction, and the first connecting part 21 is provided with a second hole structure 211, so the first connecting part 21 is used to extend into the installation groove 11 to cooperate with the fixing device 1 to realize the rotation of the bracket 2 and the fixing device 1 .
  • the second connecting portion 22 is used for installing the pulley assembly 8 (described later), and the first plate is arranged on the second connecting portion 22 for cooperating with the second plate on the boom 9 .
  • the fixing device 1 is in contact with the side end of the second connecting portion 22 away from the boom 9 or is arranged with a gap.
  • the bracket 2 cannot rotate or the rotation range is small, and it plays a role in fixing the bracket 2.
  • the bracket 2 will not move, which reduces the occurrence of installation hazards.
  • the third limiting member 5 is arranged in the installation groove 11, the third limiting member 5 is located on the rotation path of the first connecting portion 21, and the third limiting member 5 The piece 5 is adapted to abut against the first connecting portion 21 .
  • the third limiting member 5 can be a pin shaft or a plate-shaped member, depending on actual needs, as shown in Figure 2, the third limiting member 5 is a pin shaft, which is arranged in the installation groove 11, Specifically, the fixing device 1 is provided with a pin hole communicating with the installation groove 11 , and the pin shaft passes through the pin hole, so that a part of the pin shaft is located in the installation groove 11 .
  • the third limiting member 5 is located on the rotation path of the first connecting portion 21. Since the bracket 2 needs to maintain balance under its own weight, when the third limiting member 5 is arranged above the bracket 2, its The hinge point of the bracket 2 is far away from the side where the pulley assembly 8 is set. When the third limiter 5 is arranged below the bracket 2, it is located on the side where the hinge point of the bracket 2 is close to the side where the pulley assembly 8 is set. In both configurations, the third limiting member 5 abuts against the first connecting portion 21 , so that the bracket 2 is kept balanced under its own weight.
  • the second connecting part 22 includes a first body 221, a second body 222 and a third body 223, the first body 221 is connected to the first connecting part 21, and the second body 222 and the third body 223 are arranged at intervals on the first body 221, the first body 221 is provided with a first slot 2222, the second body 222 is provided with a second slot 2231, and the first body 222 is provided with a second slot 2231.
  • a slot 2222 and the second slot 2231 are suitable for supporting the pulley assembly 8 so that the pulley assembly 8 is located between the first body 221 and the second body 222 .
  • the first body 221, the second body 222 and the third body 223 are integrally formed, and the three form a U-like structure.
  • One end surface of the first body 221 in the Y-axis direction is connected to the first connecting part 21.
  • the other end surface of the first body 221 in the Y-axis direction is connected to the second body 222 and the third body 223 .
  • the second body 222 and the third body 223 have the same structure, both are plate-shaped parts, the second body 222 and the third body 223 are arranged on the first body 221 at intervals, and the upper end surface of the first body 221 is provided with a second body.
  • a card slot 2222, the second body 222 is provided with a second card slot 2231 at the same position, the first card slot 2222 and the second card slot 2231 are suitable for supporting the pulley assembly 8, so that the pulley assembly 8 is located between the first body 221 and the second card slot Between the two bodies 222 .
  • the pulley assembly 8 of the super-lifting device includes a movable pulley 81 and a wheel frame 82.
  • the movable pulley 81 is arranged on the wheel frame 82 and is adapted to rotate relative to the wheel frame 82. Specifically, the movable pulley 81 passes through A connecting shaft 83 is limited in the rotation groove of the wheel frame 82.
  • the pulley assembly 8 is installed on the bracket 2, the two ends of the connecting shaft 83 are supported in the first slot 2222 and the second slot 2231, and the wheel frame 82 is set Between the first body 221 and the second body 222 .
  • the superlift pulley bracket device also includes a second fastener 7, the bracket 2 is provided with a third hole structure 2221, the second fastener 7 is suitable for passing through the In the third hole structure 2221 , the second fastener 7 is adapted to be connected with the pulley assembly 8 .
  • the second fastener 7 is a pin shaft
  • the second body 222 and the third body 223 of the bracket 2 are provided with a third hole structure 2221
  • the third hole structure 2221 of the second body 222 and the third body 223 The hole structure 2221 is coaxially arranged
  • the wheel frame 82 of the pulley assembly 8 is provided with a fourth hole structure.
  • the pin shaft passes through the third hole structure 2221 and the fourth hole structure to connect the wheel frame 82 and the bracket 2 .
  • the pulley assembly 8 can be limited on the bracket 2, so as to prevent the pulley assembly 8 from falling off from the bracket 2, thereby causing potential safety hazards.
  • FIGS. 6 and 7 Another embodiment of the jib of the present application, as shown in FIGS. 6 and 7 , includes the above-mentioned superlift pulley bracket device.
  • the jib also includes a superlift arm 10 and a boom 9, and the superlift arm 10 and the boom 9 are rotatably connected, and the fixing device of the superlift pulley bracket device 1 is arranged on the super-lift arm 10, the rotation axis of the bracket 2 of the super-lift pulley bracket device and the fixing device 1 is coaxial with the rotation axes of the super-lift arm 10 and the boom 9.
  • FIGS. 6 and 7 there are two super-lifting pulley bracket devices, and the two super-lifting pulley brackets are arranged symmetrically with respect to the super-lifting arm 10 .
  • the super-lift arm 10 and the boom 9 are rotatably connected by a pin shaft, and the fixing device 1 of the super-lift pulley bracket device is arranged on the super-lift arm 10, which can be welded or bolted.
  • the axis of rotation of the bracket 2 of the superlift pulley bracket device and the fixing device 1 is coaxial with the axis of rotation of the superlift arm 10 and the boom 9, thus, when the superlift arm 10 rotates the width, the bracket 2 and the The fixing device 1 rotates coaxially, thereby not interfering with the normal operation of the superlift arm 10 .
  • a crane according to yet another embodiment of the present application includes the above-mentioned superlift sheave bracket device, and/or, the above-mentioned jib.

Abstract

A super-lift pulley bracket device, an arm support and a crane. The super-lift pulley bracket device comprises a fixing device (1), a bracket (2), a first limiting member (3), a second limiting member (4) and a third limiting member (5), wherein the fixing device (1) is suitable for being arranged on a super-lift arm (10); the bracket (2) is rotationally connected to the fixing device (1), the first limiting member (3) is arranged on the bracket (2), the second limiting member (4) is suitable for being arranged on a crane boom (9), and the third limiting member (5) is arranged on the fixing device (1). When the super-lift arm (10) is in a retracting state, the first limiting member (3) and the second limiting member (4) come into contact with each other or are arranged with a clearance therebetween, and the bracket (2) comes into contact with the third limiting member (5) so as to maintain the balance of the bracket (2) under its own weight; and when the super-lifting arm (10) lifts, the bracket (2) is separated from the third limiting member (5), and the first limiting member (3) and the second limiting member (4) are suitable for coming into contact with each other, such that the bracket is supported on the crane boom.

Description

一种超起滑轮托架装置、臂架及起重机A superlift pulley bracket device, boom and crane 技术领域technical field
本申请涉及工程机械技术领域,具体而言,涉及一种超起滑轮托架装置、臂架以及起重机。The present application relates to the technical field of construction machinery, in particular, to a superlift pulley bracket device, a jib and a crane.
背景技术Background technique
目前,起重机上会用到超起装置,其包括超起臂和超起滑轮托架,使用时,超起臂需要先绕超起臂与起重臂的铰接点旋转起幅,而后才能将滑轮吊离超起滑轮托架。在超起臂起幅过程中,超起滑轮托架不能与超起臂一同旋转,否则滑轮会一同旋转,从而导致滑轮无法托架或直接从托架倾翻脱落,引起事故。目前,托架在超起臂起幅前,均需要转移至起重臂进行固定,从而保证超起臂起幅过程中,托架与起重臂的位置不动。然而,将托架转移至起重臂进行固定的过程比较复杂,安装效率低下。At present, the super-lift device is used on the crane, which includes the super-lift arm and the super-lift pulley bracket. When in use, the super-lift arm needs to rotate around the hinge point of the super-lift arm and the boom before the pulley Lift off the superlift block bracket. During the raising process of the super-lifting jib, the bracket of the super-lifting pulley cannot rotate together with the super-lifting jib, otherwise the pulley will rotate together, which will cause the pulley to fail to support or directly fall off from the bracket, causing accidents. At present, the bracket needs to be transferred to the jib for fixing before the super-lift jib is raised, so as to ensure that the positions of the bracket and the jib remain unchanged during the super-lift jib. However, the process of transferring the bracket to the jib for fixing is complicated and the installation efficiency is low.
发明内容Contents of the invention
本申请解决的问题是如何在超起臂起幅时取消托架转移至起重臂进行固定的步骤以提高安装效率。The problem solved by this application is how to cancel the step of transferring the bracket to the jib for fixing when the super jib is raised, so as to improve the installation efficiency.
为解决上述问题,本申请提供一种超起滑轮托架装置,包括固定装置、托架、第一限位件、第二限位件和第三限位件,所述固定装置适于设置于超起臂上;所述托架与所述固定装置转动连接,所述第一限位件设置于所述托架上,所述第二限位件适于设置于所述起重臂上,所述第三限位件设置于所述固定装置上;In order to solve the above problems, the present application provides a superlift pulley bracket device, including a fixing device, a bracket, a first limiting member, a second limiting member and a third limiting member, and the fixing device is suitable for being arranged on on the super-lifting arm; the bracket is rotatably connected to the fixing device, the first limiting member is arranged on the bracket, and the second limiting member is adapted to be arranged on the lifting arm, The third limiting member is arranged on the fixing device;
当所述超起臂处于收放状态时,所述第一限位件和所述第二限位件接触或者呈间隙设置,所述托架与所述第三限位件接触以使所述托架在自重下保持平衡;When the super-lifting arm is in the retracted state, the first limiting member is in contact with the second limiting member or is provided with a gap, and the bracket is in contact with the third limiting member so that the The bracket is balanced under its own weight;
当所述超起臂起幅时,所述托架与所述第三限位件分离,所述第一限位件和所述第二限位件适于接触以使所述托架支撑于所述起重臂上。When the super-lifting boom is widened, the bracket is separated from the third limiter, and the first limiter and the second limiter are adapted to contact so that the bracket is supported on on the boom.
可选地,所述第一限位件包括第一板件,所述第一板件与所述托架连接;所述第二限位件包括第二板件,所述第二板件适于与所述起重臂连接,所述 第一板件适于在所述超起臂起幅时支撑于所述第二板件上。Optionally, the first limiting member includes a first plate connected to the bracket; the second limiting member includes a second plate adapted to In connection with the boom, the first board is adapted to be supported on the second board when the super boom is raised.
可选地,该超起滑轮托架装置还包括第一紧固件,所述固定装置设有安装槽和第一孔结构,所述第一孔结构和所述安装槽相通,所述托架设有第二孔结构,所述托架的一部分适于伸入所述安装槽中,所述第一紧固件适于穿设于所述第一孔结构和所述第二孔结构以连接所述托架和所述固定装置。Optionally, the superlift pulley bracket device also includes a first fastener, the fixing device is provided with a mounting groove and a first hole structure, the first hole structure communicates with the mounting groove, and the bracket A second hole structure is provided, a part of the bracket is adapted to extend into the installation groove, and the first fastener is adapted to pass through the first hole structure and the second hole structure to connect The bracket and the fixing device.
可选地,所述托架包括相互连接的第一连接部和第二连接部,所述第一连接部设有所述第二孔结构,所述第一连接部适于伸入所述安装槽中,所述第二连接部设有所述第一限位件,当所述超起臂处于超起状态时,所述固定装置与所述第二连接部背离所述起重臂的侧端接触或者呈间隙设置。Optionally, the bracket includes a first connecting portion and a second connecting portion connected to each other, the first connecting portion is provided with the second hole structure, and the first connecting portion is adapted to extend into the installation In the groove, the second connecting part is provided with the first stopper, and when the super-lifting arm is in the super-lifting state, the fixing device and the second connecting part are away from the side of the boom End contact or gap setting.
可选地,所述第三限位件设置于所述安装槽中,所述第三限位件位于所述第一连接部的转动路径上,所述第三限位件适于与所述第一连接部抵接。Optionally, the third limiting member is disposed in the installation groove, the third limiting member is located on the rotation path of the first connecting part, and the third limiting member is suitable for being connected with the The first connecting portion abuts against.
可选地,所述第二连接部包括第一本体、第二本体和第三本体,所述第一本体和所述第一连接部连接,所述第二本体和所述第二本体间隔设置于所述第一本体上,所述第一本体设有第一卡槽,所述第二本体设有第二卡槽,所述第一卡槽和所述第二卡槽适于支撑滑轮组件,以使所述滑轮组件位于所述第一本体和所述第二本体之间。Optionally, the second connecting part includes a first body, a second body and a third body, the first body is connected to the first connecting part, and the second body and the second body are arranged at intervals On the first body, the first body is provided with a first card slot, and the second body is provided with a second card slot, and the first card slot and the second card slot are suitable for supporting the pulley assembly , so that the pulley assembly is located between the first body and the second body.
可选地,超起滑轮托架装置还包括第二紧固件,所述托架上设有第三孔结构,所述第二紧固件适于穿设于所述第三孔结构中,所述第二紧固件适于与所述滑轮组件连接。Optionally, the superlift pulley bracket device further includes a second fastener, the bracket is provided with a third hole structure, and the second fastener is adapted to pass through the third hole structure, The second fastener is adapted to connect with the pulley assembly.
本申请还提供一种臂架,包括如上所述的超起滑轮托架装置。The present application also provides a jib, including the above-mentioned superlift pulley bracket device.
可选地,该臂架还包括超起臂和起重臂,所述超起臂和所述起重臂转动连接,所述超起滑轮托架装置的固定装置设置于所述超起臂上,所述超起滑轮托架装置的托架和所述固定装置的转动轴线与所述超起臂和起重臂的转动轴线同轴设置。Optionally, the boom also includes a super-lift arm and a boom, the super-lift arm and the boom are rotatably connected, and the fixing device of the super-lift pulley bracket device is arranged on the super-lift arm , the rotation axis of the bracket of the superlift pulley bracket device and the fixing device is arranged coaxially with the rotation axes of the superlift arm and the boom.
本申请还提供一种起重机,包括如上所述的超起滑轮托架装置,和/或,如上所述的臂架。The present application also provides a crane, comprising the above-mentioned superlift pulley bracket device, and/or, the above-mentioned jib.
相比于现有技术,本申请的有益效果是:Compared with the prior art, the beneficial effects of the present application are:
固定装置设置于超起臂上;托架与固定装置转动连接,由于第一限位件设置于托架上,第二限位件适于设置于起重臂上,第三限位件设置于所述托 架上;由此,当超起臂处于收放状态时,第一限位件和第二限位件接触或者呈间隙设置,托架与第三限位件接触以使托架在自重下保持平衡;当超起臂起幅时,托架与第三限位件分离,第一限位件和第二限位件适于接触以使托架支撑于起重臂上,相比于现有技术,本申请在超起臂起幅过程中,不需要将托架组件从超起臂卸下并转移至起重臂进行固定,托架与起重臂始终保持相对位置不变,提高了安装效率。The fixing device is arranged on the super-lifting arm; the bracket is rotatably connected with the fixing device, since the first limiting part is arranged on the bracket, the second limiting part is suitable for being arranged on the boom, and the third limiting part is arranged on on the bracket; thus, when the super-lifting arm is in the retracted state, the first limiter and the second limiter are in contact or are arranged in a gap, and the bracket is in contact with the third limiter so that the bracket is in contact with the second limiter. Keep balance under its own weight; when the boom is raised, the bracket is separated from the third limiter, and the first limiter and the second limiter are suitable for contact so that the bracket is supported on the boom, compared to Compared with the prior art, the present application does not need to remove the bracket assembly from the super-lift arm and transfer it to the boom for fixing during the raising process of the super-lift boom. The relative position of the bracket and the boom is always kept unchanged. Improve installation efficiency.
附图说明Description of drawings
图1为本申请中超起滑轮托架装置一种实施方式的分解示意图;Fig. 1 is an exploded schematic view of an embodiment of a superlift sheave bracket device in the present application;
图2为本申请中固定装置与超起臂连接处的结构示意图;Fig. 2 is the structural schematic diagram of the connection between the fixing device and the super-lift arm in the present application;
图3为本申请中托架另一种视角的结构示意图;Fig. 3 is a structural schematic diagram of another viewing angle of the bracket in the present application;
图4为本申请中托架和滑轮组件一种实施方式的组装示意图;Fig. 4 is the assembly schematic diagram of an embodiment of bracket and pulley assembly in the present application;
图5为本申请中第二限位件和起重臂一种实施方式的组装示意图;Fig. 5 is a schematic diagram of the assembly of the second limiting member and an embodiment of the boom in the present application;
图6为本申请中超起臂处于收放状态下与起重臂和超起滑轮托架装置的位置示意图;Fig. 6 is a schematic diagram of the position of the super-lift arm in the retracted state, the boom and the super-lift pulley bracket device in the present application;
图7为本申请中超起臂处于超起状态下与起重臂和超起滑轮托架装置的位置示意图。Fig. 7 is a schematic diagram of the position of the boom and the bracket device of the superlift pulley when the boom is in the superlift state in the present application.
附图标记说明:Explanation of reference signs:
1、固定装置;11、安装槽;2、托架;21、第一连接部;211、第二孔结构;22、第二连接部;221、第一本体;222、第二本体;2221、第三孔结构;2222、第一卡槽;223、第三本体;2231、第二卡槽;3、第一限位件;4、第二限位件;5、第三限位件;6、第一紧固件;7、第二紧固件;8、滑轮组件;81、动滑轮;82、轮架;83、连接轴;9、起重臂;10、超起臂。1. Fixing device; 11. Installation slot; 2. Bracket; 21. First connection part; 211. Second hole structure; 22. Second connection part; 221. First body; 222. Second body; 2221. The third hole structure; 2222, the first card slot; 223, the third body; 2231, the second card slot; 3, the first limiter; 4, the second limiter; 5, the third limiter; 6 , the first fastener; 7, the second fastener; 8, the pulley assembly; 81, the movable pulley; 82, the wheel frame; 83, the connecting shaft; 9, the lifting arm; 10, the super lifting arm.
具体实施方式Detailed ways
为使本申请的上述目的、特征和优点能够更为明显易懂,下面结合附图对本申请的具体实施例做详细的说明。In order to make the above purpose, features and advantages of the present application more obvious and understandable, specific embodiments of the present application will be described in detail below in conjunction with the accompanying drawings.
附图中的Z轴表示竖直方向,也就是上下位置,且Z轴的正向(即Z轴的箭头指向)代表上方,Z轴的反向代表下方;附图中的X轴表示水平方 向,并指定为左右位置,且X轴的正向代表右侧,X轴的反向代表左侧;附图中的Y轴表示为前后位置,且Y轴的正向代表后侧,Y轴的反向代表前侧;同时需要说明的是,前述Z轴、Y轴及X轴的表示含义仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。The Z-axis in the drawings represents the vertical direction, that is, the up and down position, and the positive direction of the Z-axis (that is, the arrow pointing to the Z-axis) represents the top, and the reverse of the Z-axis represents the bottom; the X-axis in the drawings represents the horizontal direction , and specified as the left and right positions, and the positive direction of the X-axis represents the right side, and the reverse direction of the X-axis represents the left side; Reverse represents the front side; at the same time, it should be noted that the meanings of the aforementioned Z-axis, Y-axis and X-axis are only for the convenience of describing the application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific Orientation, construction and operation in a particular orientation and therefore should not be construed as limiting the application.
在本申请的描述中,应当说明的是,各实施例中的术语名词例如“上”、“下”、“前”、“后”等指示方位的词语,只是为了简化描述基于说明书附图的位置关系,并不代表所指的元件和装置等必须按照说明书中特定的方位和限定的操作及方法、构造进行操作,该类方位名词不构成对本申请的限制。In the description of the present application, it should be noted that the terms and nouns in each embodiment, such as "upper", "lower", "front", "rear" and other words indicating orientation, are only for simplifying the description based on the accompanying drawings. The positional relationship does not mean that the components and devices referred to must be operated in accordance with the specific orientation and limited operations, methods, and structures in the specification, and such orientation terms do not constitute restrictions on the application.
如图1、2所示,本申请的实施例提供一种超起滑轮托架装置,包括固定装置1、托架2、第一限位件3、第二限位件4和第三限位件5,所述固定装置1适于设置于超起臂10上;所述托架2与所述固定装置1转动连接,所述第一限位件3设置于所述托架2上,所述第二限位件4适于设置于所述起重臂9上,所述第三限位件5设置于所述固定装置1上;当所述超起臂10处于收放状态时,所述第一限位件3和所述第二限位件4接触或者呈间隙设置,所述托架2与所述第三限位件5接触以使所述托架2在自重下保持平衡;当所述超起臂10起幅时,所述托架2与所述第三限位件5分离,所述第一限位件3和所述第二限位件4适于接触以使所述托架2支撑于所述起重臂9上。As shown in Figures 1 and 2, the embodiment of the present application provides a superlift pulley bracket device, including a fixing device 1, a bracket 2, a first limiter 3, a second limiter 4 and a third limiter 5, the fixing device 1 is suitable for being arranged on the super-lifting arm 10; the bracket 2 is rotatably connected with the fixing device 1, and the first limiting member 3 is arranged on the bracket 2, so that The second limiting member 4 is adapted to be arranged on the boom 9, and the third limiting member 5 is arranged on the fixing device 1; The first limiting member 3 is in contact with the second limiting member 4 or is arranged in a gap, and the bracket 2 is in contact with the third limiting member 5 so that the bracket 2 maintains balance under its own weight; When the superlift arm 10 is widened, the bracket 2 is separated from the third limiting member 5, and the first limiting member 3 and the second limiting member 4 are adapted to contact so that the The bracket 2 is supported on the boom 9 .
如图5所示,本实施例中,托架2与固定装置1通过销轴实现转动连接(后文中具体介绍),如图2所示,托架2和固定装置1的转动轴线适于与超起臂10和起重臂9的转动轴线同轴,由此,在超起臂10相对于起重臂9转动时,固定装置1和托架2同轴转动,由此不会干涉超起臂10旋转起幅。超起臂10处于收放状态是指超起臂10未工作时的状态,即超起臂10平行支撑于起重臂9上的状态。采用本实施例的超起滑轮托架装置后,固定装置1设置于超起臂10上;托架2与固定装置1转动连接,由于第一限位件3设置于托架2上,第二限位件4适于设置于起重臂9上,第三限位件5设置于所述托架2上;由此,当超起臂10处于收放状态时,第一限位件3和第 二限位件4接触或者呈间隙设置,托架2与第三限位件5接触以使托架在自重下保持平衡;当超起臂10起幅时,托架2与第三限位件5分离,第一限位件3和第二限位件4适于接触以使托架2支撑于起重臂9上,相比于现有技术,本申请在超起臂10起幅过程中,不需要将托架2从超起臂10卸下并转移至起重臂9进行固定,托架与起重臂9始终保持相对位置不变,提高了安装效率。As shown in Figure 5, in this embodiment, the bracket 2 and the fixing device 1 are connected in rotation through a pin shaft (described in detail later), as shown in Figure 2, the rotation axes of the bracket 2 and the fixing device 1 are suitable for The axes of rotation of the superlift arm 10 and the boom 9 are coaxial, so that when the superlift arm 10 rotates relative to the boom 9, the fixing device 1 and the bracket 2 rotate coaxially, thereby not interfering with the superlift arm 10. The arm 10 swivels. The retractable state of the super-lift boom 10 refers to the state when the super-lift boom 10 is not working, that is, the state that the super-lift boom 10 is supported on the boom 9 in parallel. After adopting the super lifting pulley bracket device of the present embodiment, the fixing device 1 is arranged on the super lifting arm 10; The stopper 4 is adapted to be arranged on the boom 9, and the third stopper 5 is arranged on the bracket 2; thus, when the super-lift arm 10 is in the retracted state, the first stopper 3 and the The second limiter 4 contacts or is arranged in a gap, and the bracket 2 contacts with the third limiter 5 so that the bracket maintains balance under its own weight; Part 5 is separated, and the first stopper 3 and the second stopper 4 are suitable for contacting so that the bracket 2 is supported on the boom 9. Compared with the prior art, the present application is In the process, there is no need to remove the bracket 2 from the super-lift arm 10 and transfer it to the boom 9 for fixing, and the relative position of the bracket and the boom 9 always remains unchanged, which improves the installation efficiency.
如图1、4所示,所述第一限位件3包括第一板件,所述第一板件与所述托架2连接;所述第二限位件4包括第二板件,所述第二板件适于与所述起重臂9连接,所述第一板件适于在所述超起臂10起幅时支撑于所述第二板件上。As shown in Figures 1 and 4, the first limiting member 3 includes a first plate connected to the bracket 2; the second limiting member 4 includes a second plate, The second plate is adapted to be connected with the jib 9 , and the first plate is adapted to be supported on the second plate when the super-lift jib 10 is raised.
本实施例中,超起滑轮托架装置一般位于起重臂9的侧上方,故第一板件设置于托架2朝向起重臂9的侧端面,其可以采用焊接、螺栓连接等方式。第二板件设置于起重臂9的上方,其同样可以采用焊接、螺栓连接等方式,当超起臂10处于收放状态时,托架2主要通过与第三限位件5抵接以在自重下保持平衡,此时,第一板件和第二板件接触或者呈间隙设置,优选地,第一板件和第二板件刚好接触。In this embodiment, the superlift pulley bracket device is generally located above the side of the boom 9, so the first plate is arranged on the side end surface of the bracket 2 facing the boom 9, which can be welded or bolted. The second plate is arranged on the top of the boom 9, and it can also be welded, bolted, etc. Keeping a balance under its own weight, at this time, the first plate and the second plate are in contact or are arranged in a gap, preferably, the first plate and the second plate are just in contact.
本实施例中,第一板件和第二板件相互朝向的一面可以设置阻尼板,由此,在超起臂10起幅时,阻尼板能够减小第一板件和第二板件之间的接触应力。同时,第一板件和托架2的侧壁之间设有加强板,加强板的数量不做限制,其可以为一个、两个或者三个等。由此,在加强板的作用下,能够增强第一板件和托架2交界处的强度,避免第一板件和托架2在交界处发生断裂现象。In this embodiment, the side facing each other of the first plate and the second plate can be provided with a damping plate, thus, when the super-lift arm 10 is raised, the damping plate can reduce the gap between the first plate and the second plate. contact stress between them. At the same time, a reinforcing plate is provided between the first plate and the side wall of the bracket 2, and the number of reinforcing plates is not limited, and it can be one, two or three. Thus, under the effect of the reinforcing plate, the strength of the junction between the first board and the bracket 2 can be enhanced, and the fracture phenomenon at the junction of the first board and the bracket 2 can be avoided.
如图1、2、3所示,该超起滑轮托架装置还包括第一紧固件6,所述固定装置1设有安装槽11和第一孔结构,所述第一孔结构和所述安装槽11相通,所述托架2设有第二孔结构211,所述托架2的一部分适于伸入所述安装槽11中,所述第一紧固件6适于穿设于所述第一孔结构和所述第二孔结构211以连接所述托架2和所述固定装置1。As shown in Figures 1, 2, and 3, the superlift pulley bracket device also includes a first fastener 6, and the fixing device 1 is provided with a mounting groove 11 and a first hole structure, and the first hole structure and the first hole structure The mounting groove 11 communicates, the bracket 2 is provided with a second hole structure 211, a part of the bracket 2 is suitable for extending into the mounting groove 11, and the first fastener 6 is suitable for passing through the The first hole structure and the second hole structure 211 are used to connect the bracket 2 and the fixing device 1 .
本实施例中,第一紧固件6为销轴,固定装置1设有安装槽11和第一孔结构,其中,第一孔结构和安装槽11相通,托架2设有第二孔结构211, 托架2的一部分适于伸入安装槽11中,安装槽11起到一个导向的作用,其能够限制托架2在X轴方向上的位移,当第一孔结构和第二孔结构211对准后,销轴穿设于第一孔结构和第二孔结构211以连接托架2和固定装置1。如此设置,托架2能够绕着销轴转动,从而在超起臂10旋转起幅时,固定装置1能够相对于托架2转动。In this embodiment, the first fastener 6 is a pin shaft, the fixing device 1 is provided with a mounting groove 11 and a first hole structure, wherein the first hole structure communicates with the mounting groove 11, and the bracket 2 is provided with a second hole structure 211, a part of the bracket 2 is adapted to extend into the installation groove 11, the installation groove 11 plays a guiding role, which can limit the displacement of the bracket 2 in the X-axis direction, when the first hole structure and the second hole structure After 211 are aligned, the pin shaft passes through the first hole structure and the second hole structure 211 to connect the bracket 2 and the fixing device 1 . With such arrangement, the bracket 2 can rotate around the pin shaft, so that the fixing device 1 can rotate relative to the bracket 2 when the superlift arm 10 rotates for a width.
如图1、3所示,所述托架2包括相互连接的第一连接部21和第二连接部22,所述第一连接部21设有所述第二孔结构211,所述第一连接部21适于伸入所述安装槽11中,所述第二连接部22设有所述第一限位件3,当所述超起臂10处于超起状态时,所述固定装置1与所述第二连接部22背离所述起重臂9的侧端接触或者呈间隙设置。As shown in Figures 1 and 3, the bracket 2 includes a first connecting portion 21 and a second connecting portion 22 connected to each other, the first connecting portion 21 is provided with the second hole structure 211, the first The connecting part 21 is adapted to extend into the installation groove 11, the second connecting part 22 is provided with the first stopper 3, when the super-lifting arm 10 is in the super-lifting state, the fixing device 1 It is in contact with the side end of the second connecting portion 22 away from the boom 9 or provided with a gap.
本实施例中,第一连接部21和第二连接部22在Y轴方向上首尾连接,第一连接部21上设有第二孔结构211,故第一连接部21用于伸入安装槽11中以与固定装置1配合,从而实现托架2与固定装置1的旋转。第二连接部22用于安装滑轮组件8(后文中介绍),第二连接部22上设置第一板件,用于与起重臂9上的第二板件配合设置。当超起臂10处于超起状态时,固定装置1与第二连接部22背离起重臂9的侧端接触或者呈间隙设置。如此设置,第二连接部22上方由固定装置1进行限位,第二连接部22的下方由起重臂9进行限位,故托架2不能转动或者转动幅度细微,起到固定托架2的作用,即在超起臂10处于超起状态时,托架2不会移动,减小了安装隐患的发生。In this embodiment, the first connecting part 21 and the second connecting part 22 are connected end to end in the Y-axis direction, and the first connecting part 21 is provided with a second hole structure 211, so the first connecting part 21 is used to extend into the installation groove 11 to cooperate with the fixing device 1 to realize the rotation of the bracket 2 and the fixing device 1 . The second connecting portion 22 is used for installing the pulley assembly 8 (described later), and the first plate is arranged on the second connecting portion 22 for cooperating with the second plate on the boom 9 . When the super-lifting arm 10 is in the super-lifting state, the fixing device 1 is in contact with the side end of the second connecting portion 22 away from the boom 9 or is arranged with a gap. In this way, the upper part of the second connecting part 22 is limited by the fixing device 1, and the lower part of the second connecting part 22 is limited by the lifting arm 9, so the bracket 2 cannot rotate or the rotation range is small, and it plays a role in fixing the bracket 2. In other words, when the super-lift arm 10 is in the super-lift state, the bracket 2 will not move, which reduces the occurrence of installation hazards.
如图2所示,所述第三限位件5设置于所述安装槽11中,所述第三限位件5位于所述第一连接部21的转动路径上,所述第三限位件5适于与所述第一连接部21抵接。As shown in FIG. 2, the third limiting member 5 is arranged in the installation groove 11, the third limiting member 5 is located on the rotation path of the first connecting portion 21, and the third limiting member 5 The piece 5 is adapted to abut against the first connecting portion 21 .
本实施例中,第三限位件5可以为销轴或者板状件,根据实际需求而定,如图2所示,第三限位件5为销轴,其设置于安装槽11中,具体地,固定装置1设有与安装槽11相通的销孔,销轴穿设于销孔,由此,销轴的一部分位于安装槽11。In this embodiment, the third limiting member 5 can be a pin shaft or a plate-shaped member, depending on actual needs, as shown in Figure 2, the third limiting member 5 is a pin shaft, which is arranged in the installation groove 11, Specifically, the fixing device 1 is provided with a pin hole communicating with the installation groove 11 , and the pin shaft passes through the pin hole, so that a part of the pin shaft is located in the installation groove 11 .
本实施例中,第三限位件5位于第一连接部21的转动路径上,由于托架2需要在自重下保持平衡,当第三限位件5设置于托架2的上方时,其位 于托架2的铰接点远离设置滑轮组件8的一侧,当第三限位件5设置于托架2的下方时,其位于托架2的铰接点靠近设置滑轮组件8的一侧,上述两种设置方式,第三限位件5均与第一连接部21抵接,从而使托架2在自重下保持平衡。In this embodiment, the third limiting member 5 is located on the rotation path of the first connecting portion 21. Since the bracket 2 needs to maintain balance under its own weight, when the third limiting member 5 is arranged above the bracket 2, its The hinge point of the bracket 2 is far away from the side where the pulley assembly 8 is set. When the third limiter 5 is arranged below the bracket 2, it is located on the side where the hinge point of the bracket 2 is close to the side where the pulley assembly 8 is set. In both configurations, the third limiting member 5 abuts against the first connecting portion 21 , so that the bracket 2 is kept balanced under its own weight.
如图1所示,所述第二连接部22包括第一本体221、第二本体222和第三本体223,所述第一本体221和所述第一连接部21连接,所述第二本体222和所述第三本体223间隔设置于所述第一本体221上,所述第一本体221设有第一卡槽2222,所述第二本体222设有第二卡槽2231,所述第一卡槽2222和所述第二卡槽2231适于支撑滑轮组件8,以使所述滑轮组件8位于所述第一本体221和所述第二本体222之间。As shown in Figure 1, the second connecting part 22 includes a first body 221, a second body 222 and a third body 223, the first body 221 is connected to the first connecting part 21, and the second body 222 and the third body 223 are arranged at intervals on the first body 221, the first body 221 is provided with a first slot 2222, the second body 222 is provided with a second slot 2231, and the first body 222 is provided with a second slot 2231. A slot 2222 and the second slot 2231 are suitable for supporting the pulley assembly 8 so that the pulley assembly 8 is located between the first body 221 and the second body 222 .
本实施例中,第一本体221、第二本体222和第三本体223一体制成,三者形成类U字形结构,第一本体221在Y轴方向的一端面和第一连接部21连接,第一本体221在Y轴方向的另一端面与第二本体222和第三本体223连接。其中,第二本体222和第三本体223的结构相同,两者为板状件,第二本体222和第三本体223间隔设置于第一本体221上,第一本体221的上端面设有第一卡槽2222,第二本体222在同一位置设有第二卡槽2231,第一卡槽2222和第二卡槽2231适于支撑滑轮组件8,以使滑轮组件8位于第一本体221和第二本体222之间。In this embodiment, the first body 221, the second body 222 and the third body 223 are integrally formed, and the three form a U-like structure. One end surface of the first body 221 in the Y-axis direction is connected to the first connecting part 21. The other end surface of the first body 221 in the Y-axis direction is connected to the second body 222 and the third body 223 . Wherein, the second body 222 and the third body 223 have the same structure, both are plate-shaped parts, the second body 222 and the third body 223 are arranged on the first body 221 at intervals, and the upper end surface of the first body 221 is provided with a second body. A card slot 2222, the second body 222 is provided with a second card slot 2231 at the same position, the first card slot 2222 and the second card slot 2231 are suitable for supporting the pulley assembly 8, so that the pulley assembly 8 is located between the first body 221 and the second card slot Between the two bodies 222 .
需要理解地是,如图4所示,超起装置的滑轮组件8包括动滑轮81和轮架82,动滑轮81设置于轮架82上并适于相对于轮架82转动,具体地,动滑轮81通过一个连接轴83限位于轮架82的转动槽中,当滑轮组件8安装于托架2时,连接轴83的两端支撑于第一卡槽2222和第二卡槽2231中,轮架82设置于第一本体221和第二本体222之间。It should be understood that, as shown in FIG. 4 , the pulley assembly 8 of the super-lifting device includes a movable pulley 81 and a wheel frame 82. The movable pulley 81 is arranged on the wheel frame 82 and is adapted to rotate relative to the wheel frame 82. Specifically, the movable pulley 81 passes through A connecting shaft 83 is limited in the rotation groove of the wheel frame 82. When the pulley assembly 8 is installed on the bracket 2, the two ends of the connecting shaft 83 are supported in the first slot 2222 and the second slot 2231, and the wheel frame 82 is set Between the first body 221 and the second body 222 .
如图4所示,该超起滑轮托架装置还包括第二紧固件7,所述托架2上设有第三孔结构2221,所述第二紧固件7适于穿设于所述第三孔结构2221中,所述第二紧固件7适于与所述滑轮组件8连接。As shown in Figure 4, the superlift pulley bracket device also includes a second fastener 7, the bracket 2 is provided with a third hole structure 2221, the second fastener 7 is suitable for passing through the In the third hole structure 2221 , the second fastener 7 is adapted to be connected with the pulley assembly 8 .
本实施例中,第二紧固件7为销轴,托架2的第二本体222和第三本体223均设有第三孔结构2221,且第二本体222和第三本体223的第三孔结构2221同轴设置,滑轮组件8的轮架82设有第四孔结构,在轮架82放置于 第二本体222和第三本体223之间时,在第三孔结构2221和第四孔结构对准后,销轴穿设于第三孔结构2221和第四孔结构以连接轮架82和托架2。如此设置,能够将滑轮组件8限位于托架2上,避免滑轮组件8从托架2上脱落,从而带来安全隐患。In this embodiment, the second fastener 7 is a pin shaft, the second body 222 and the third body 223 of the bracket 2 are provided with a third hole structure 2221, and the third hole structure 2221 of the second body 222 and the third body 223 The hole structure 2221 is coaxially arranged, and the wheel frame 82 of the pulley assembly 8 is provided with a fourth hole structure. When the wheel frame 82 is placed between the second body 222 and the third body 223, the third hole structure 2221 and the fourth hole After the structures are aligned, the pin shaft passes through the third hole structure 2221 and the fourth hole structure to connect the wheel frame 82 and the bracket 2 . With such an arrangement, the pulley assembly 8 can be limited on the bracket 2, so as to prevent the pulley assembly 8 from falling off from the bracket 2, thereby causing potential safety hazards.
本申请的另一实施例的臂架,如图6、7所示,包括如上所述的超起滑轮托架装置。Another embodiment of the jib of the present application, as shown in FIGS. 6 and 7 , includes the above-mentioned superlift pulley bracket device.
如图6、7所示,该臂架还包括超起臂10和起重臂9,所述超起臂10和所述起重臂9转动连接,所述超起滑轮托架装置的固定装置1设置于所述超起臂10上,所述超起滑轮托架装置的托架2和所述固定装置1的转动轴线与所述超起臂10和起重臂9的转动轴线同轴。As shown in Figures 6 and 7, the jib also includes a superlift arm 10 and a boom 9, and the superlift arm 10 and the boom 9 are rotatably connected, and the fixing device of the superlift pulley bracket device 1 is arranged on the super-lift arm 10, the rotation axis of the bracket 2 of the super-lift pulley bracket device and the fixing device 1 is coaxial with the rotation axes of the super-lift arm 10 and the boom 9.
本实施例中,如图6、7所示,超起滑轮托架装置设有两个,两个超起滑轮托架相对于超起臂10对称设置。其中,超起臂10和起重臂9通过销轴转动连接,超起滑轮托架装置的固定装置1设置于超起臂10上,其可采用焊接或者螺栓连接的方式。超起滑轮托架装置的托架2和固定装置1的转动轴线与超起臂10和起重臂9的转动轴线同轴,由此,在超起臂10旋转起幅时,托架2和固定装置1同轴转动,由此不干扰超起臂10的正常运作。In this embodiment, as shown in FIGS. 6 and 7 , there are two super-lifting pulley bracket devices, and the two super-lifting pulley brackets are arranged symmetrically with respect to the super-lifting arm 10 . Wherein, the super-lift arm 10 and the boom 9 are rotatably connected by a pin shaft, and the fixing device 1 of the super-lift pulley bracket device is arranged on the super-lift arm 10, which can be welded or bolted. The axis of rotation of the bracket 2 of the superlift pulley bracket device and the fixing device 1 is coaxial with the axis of rotation of the superlift arm 10 and the boom 9, thus, when the superlift arm 10 rotates the width, the bracket 2 and the The fixing device 1 rotates coaxially, thereby not interfering with the normal operation of the superlift arm 10 .
本申请的又一实施例的起重机,包括如上所述的超起滑轮托架装置,和/或,如上所述的臂架。A crane according to yet another embodiment of the present application includes the above-mentioned superlift sheave bracket device, and/or, the above-mentioned jib.
虽然本公开披露如上,但本公开的保护范围并非仅限于此。本领域技术人员在不脱离本公开的精神和范围的前提下,可进行各种变更与修改,这些变更与修改均将落入本申请的保护范围。Although the present disclosure is disclosed as above, the protection scope of the present disclosure is not limited thereto. Those skilled in the art can make various changes and modifications without departing from the spirit and scope of the present disclosure, and these changes and modifications will all fall within the protection scope of the present application.

Claims (10)

  1. 一种超起滑轮托架装置,其特征在于,包括固定装置(1)、托架(2)、第一限位件(3)、第二限位件(4)和第三限位件(5),所述固定装置(1)适于设置于超起臂(10)上;所述托架(2)与所述固定装置(1)转动连接,所述第一限位件(3)设置于所述托架(2)上,所述第二限位件(4)适于设置于起重臂(9)上,所述第三限位件(5)设置于所述固定装置(1)上;A superlift pulley bracket device is characterized in that it comprises a fixing device (1), a bracket (2), a first stopper (3), a second stopper (4) and a third stopper ( 5), the fixing device (1) is suitable for being arranged on the super-lifting arm (10); the bracket (2) is rotatably connected with the fixing device (1), and the first limiting member (3) It is arranged on the bracket (2), the second limiting member (4) is suitable for being arranged on the boom (9), and the third limiting member (5) is arranged on the fixing device ( 1) on;
    当所述超起臂(10)处于收放状态时,所述第一限位件(3)和所述第二限位件(4)接触或者呈间隙设置,所述托架(2)与所述第三限位件(5)接触以使所述托架(2)在自重下保持平衡;When the super-lifting arm (10) is in the retracted state, the first limiting member (3) and the second limiting member (4) are in contact or are arranged in a gap, and the bracket (2) is in contact with the second limiting member (4). The third limiting member (5) contacts to keep the bracket (2) balanced under its own weight;
    当所述超起臂(10)起幅时,所述托架(2)与所述第三限位件(5)分离,所述第一限位件(3)和所述第二限位件(4)适于接触以使所述托架(2)支撑于所述起重臂(9)上。When the super-lifting arm (10) is widened, the bracket (2) is separated from the third limiting member (5), and the first limiting member (3) and the second limiting member The member (4) is adapted to contact so that the bracket (2) is supported on the jib (9).
  2. 根据权利要求1所述的超起滑轮托架装置,其特征在于,所述第一限位件(3)包括第一板件,所述第一板件与所述托架(2)连接;所述第二限位件(4)包括第二板件,所述第二板件适于与所述起重臂(9)连接,所述第一板件适于在所述超起臂(10)起幅时支撑于所述第二板件上。The superlift pulley bracket device according to claim 1, characterized in that, the first limiting member (3) comprises a first plate, and the first plate is connected to the bracket (2); The second limiting member (4) includes a second plate, the second plate is suitable for connecting with the boom (9), and the first plate is suitable for connecting with the boom (9). 10) It is supported on the second board during width-raising.
  3. 根据权利要求1所述的超起滑轮托架装置,其特征在于,还包括第一紧固件(6),所述固定装置(1)设有安装槽(11)和第一孔结构,所述第一孔结构和所述安装槽(11)相通,所述托架(2)设有第二孔结构(211),所述托架(2)的一部分适于伸入所述安装槽(11)中,所述第一紧固件(6)适于穿设于所述第一孔结构和所述第二孔结构(211)以连接所述托架(2)和所述固定装置(1)。The superlift pulley bracket device according to claim 1, characterized in that it also includes a first fastener (6), the fixing device (1) is provided with a mounting groove (11) and a first hole structure, the The first hole structure communicates with the installation groove (11), the bracket (2) is provided with a second hole structure (211), and a part of the bracket (2) is suitable for extending into the installation groove ( 11), the first fastener (6) is adapted to pass through the first hole structure and the second hole structure (211) to connect the bracket (2) and the fixing device ( 1).
  4. 根据权利要求3所述的超起滑轮托架装置,其特征在于,所述托架(2)包括相互连接的第一连接部(21)和第二连接部(22),所述第一连接部(21)设有所述第二孔结构(211),所述第二连接部(22)设有所述第一限位件(3),所述第一连接部(21)适于伸入所述安装槽(11)中,当所述超起臂(10)处于超起状态时,所述固定装置(1)与所述第二连接部(22)背离所述起重臂(9)的侧端接触或者呈间隙设置。The superlift pulley bracket device according to claim 3, characterized in that, the bracket (2) comprises a first connecting portion (21) and a second connecting portion (22) connected to each other, and the first connecting portion The part (21) is provided with the second hole structure (211), the second connecting part (22) is provided with the first stopper (3), and the first connecting part (21) is suitable for extending into the installation groove (11), when the super-lift arm (10) is in the super-lift state, the fixing device (1) and the second connecting part (22) are away from the boom (9 ) in contact with the side ends or in a gap setting.
  5. 根据权利要求4所述的超起滑轮托架装置,其特征在于,所述第三限 位件(5)设置于所述安装槽(11)中,所述第三限位件(5)位于所述第一连接部(21)的转动路径上,所述第三限位件(5)适于与所述第一连接部(21)抵接。The superlift pulley bracket device according to claim 4, characterized in that, the third limiting member (5) is arranged in the installation groove (11), and the third limiting member (5) is located in On the rotation path of the first connecting part (21), the third limiting member (5) is adapted to abut against the first connecting part (21).
  6. 根据权利要求4所述的超起滑轮托架装置,其特征在于,所述第二连接部(22)包括第一本体(221)、第二本体(222)和第三本体(223),所述第一本体(221)和所述第一连接部(21)连接,所述第二本体(222)和所述第二本体(222)间隔设置于所述第一本体(221)上,所述第一本体(221)设有第一卡槽(2222),所述第二本体(222)设有第二卡槽(2231),所述第一卡槽(2222)和所述第二卡槽(2231)适于支撑滑轮组件(8),以使所述滑轮组件(8)位于所述第一本体(221)和所述第二本体(222)之间。The superlift pulley bracket device according to claim 4, characterized in that, the second connecting portion (22) comprises a first body (221), a second body (222) and a third body (223), the The first body (221) is connected to the first connecting part (21), and the second body (222) and the second body (222) are arranged at intervals on the first body (221), so The first body (221) is provided with a first card slot (2222), the second body (222) is provided with a second card slot (2231), and the first card slot (2222) and the second card slot The groove (2231) is adapted to support the pulley assembly (8), so that the pulley assembly (8) is located between the first body (221) and the second body (222).
  7. 根据权利要求1所述的超起滑轮托架装置,其特征在于,还包括第二紧固件(7),所述托架(2)上设有第三孔结构(2221),所述第二紧固件(7)适于穿设于所述第三孔结构(2221)中,所述第二紧固件(7)适于与滑轮组件(8)连接。The superlift pulley bracket device according to claim 1, further comprising a second fastener (7), the bracket (2) is provided with a third hole structure (2221), the first Two fasteners (7) are adapted to pass through the third hole structure (2221), and the second fastener (7) is adapted to be connected with the pulley assembly (8).
  8. 一种臂架,其特征在于,包括如权利要求1至7中任一项所述的超起滑轮托架装置。A boom, characterized by comprising the superlift pulley bracket device according to any one of claims 1-7.
  9. 根据权利要求8所述的臂架,其特征在于,还包括超起臂(10)和起重臂(9),所述超起臂(10)和所述起重臂(9)转动连接,所述超起滑轮托架装置的固定装置(1)设置于所述超起臂(10)上,所述超起滑轮托架装置的托架(2)和所述固定装置(1)的转动轴线与所述超起臂(10)和起重臂(9)的转动轴线同轴。The jib according to claim 8, characterized in that it also comprises a super-lift arm (10) and a boom (9), and the super-lift arm (10) is rotationally connected to the boom (9), The fixing device (1) of the superlift pulley bracket device is arranged on the superlift arm (10), and the rotation of the bracket (2) of the superlift pulley bracket device and the fixing device (1) The axis is coaxial with the rotation axes of said super-lift boom (10) and boom (9).
  10. 一种起重机,其特征在于,包括如权利要求1至7中任一项所述的超起滑轮托架装置,和/或,如权利要求8至9所述的臂架。A crane, characterized by comprising the superlift sheave bracket device according to any one of claims 1-7, and/or the jib frame according to claims 8-9.
PCT/CN2022/101812 2021-07-30 2022-06-28 Super-lift pulley bracket device, arm support and crane WO2023005564A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110872212.9 2021-07-30
CN202110872212.9A CN113401818B (en) 2021-07-30 2021-07-30 Super-lifting pulley bracket device, arm support and crane

Publications (1)

Publication Number Publication Date
WO2023005564A1 true WO2023005564A1 (en) 2023-02-02

Family

ID=77688188

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/101812 WO2023005564A1 (en) 2021-07-30 2022-06-28 Super-lift pulley bracket device, arm support and crane

Country Status (2)

Country Link
CN (1) CN113401818B (en)
WO (1) WO2023005564A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113401818B (en) * 2021-07-30 2023-08-01 湖南三一中型起重机械有限公司 Super-lifting pulley bracket device, arm support and crane

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202379629U (en) * 2011-12-27 2012-08-15 徐州重型机械有限公司 Super lifting device and crane
CN103407908A (en) * 2013-08-29 2013-11-27 徐州重型机械有限公司 Crane and front tensioning system of super lifting device thereof
CN103863956A (en) * 2014-03-31 2014-06-18 徐州重型机械有限公司 Crane with self-dismounting over-lifting device and dismounting method of over-lifting device
JP2014144853A (en) * 2013-01-29 2014-08-14 Kobelco Cranes Co Ltd Boom and boom hoisting member
CN203998733U (en) * 2014-06-25 2014-12-10 徐州重型机械有限公司 A kind of boom device and super starter pulley bracket thereof
CN105460807A (en) * 2015-11-24 2016-04-06 徐州重型机械有限公司 All-terrain crane
US20190359456A1 (en) * 2018-05-23 2019-11-28 Kobelco Construction Machinery Co., Ltd. Swingable connection structure and crane provided with swingable connection structure
CN113401818A (en) * 2021-07-30 2021-09-17 湖南三一中型起重机械有限公司 Super-lifting pulley bracket device, arm support and crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202379629U (en) * 2011-12-27 2012-08-15 徐州重型机械有限公司 Super lifting device and crane
JP2014144853A (en) * 2013-01-29 2014-08-14 Kobelco Cranes Co Ltd Boom and boom hoisting member
CN103407908A (en) * 2013-08-29 2013-11-27 徐州重型机械有限公司 Crane and front tensioning system of super lifting device thereof
CN103863956A (en) * 2014-03-31 2014-06-18 徐州重型机械有限公司 Crane with self-dismounting over-lifting device and dismounting method of over-lifting device
CN203998733U (en) * 2014-06-25 2014-12-10 徐州重型机械有限公司 A kind of boom device and super starter pulley bracket thereof
CN105460807A (en) * 2015-11-24 2016-04-06 徐州重型机械有限公司 All-terrain crane
US20190359456A1 (en) * 2018-05-23 2019-11-28 Kobelco Construction Machinery Co., Ltd. Swingable connection structure and crane provided with swingable connection structure
CN113401818A (en) * 2021-07-30 2021-09-17 湖南三一中型起重机械有限公司 Super-lifting pulley bracket device, arm support and crane

Also Published As

Publication number Publication date
CN113401818B (en) 2023-08-01
CN113401818A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
WO2023005564A1 (en) Super-lift pulley bracket device, arm support and crane
WO2020118895A1 (en) Counter-balanced mobile device and crane
CN103407906B (en) A kind of super lifting device and surpassed supporting leg
WO2023274263A1 (en) Multi-working-condition lattice jib head and crane
CN202379690U (en) Laterally arranged arm frame device and elevating fire truck and overhead working truck with the device
CN102229414A (en) Crane and counterweight block thereof
WO2007134211A3 (en) Mobile lift crane with lift enhancing attachment
CN210653405U (en) Crawler chassis and engineering vehicle
CN203486799U (en) Crane boom and amplitude-variable fly jib mounting assembly thereof
WO2013120349A1 (en) Connecting beam assembly and truss arm system
CN104495644B (en) A kind of crane and crane gooseneck boom thereof
CN202924635U (en) Tower crane jib and tower crane comprising same
CN208856790U (en) A kind of hook fixing device of crane truck
CN202449765U (en) Pulling plate folding limiting device for crane and pulling plate assembly
CN103539023A (en) Structure and method for mounting balance arm and pull rod with tower head as well as tower crane
CN205616476U (en) Novel auxiliary after -poppet combined mechanism
EP1992584B1 (en) Apparatus for stowing a jib
CN220549885U (en) Movable hoisting mechanism for pipeline laying
JP3111454U (en) Pile mounting device for tower crane base frame
CN112320662B (en) Suspension bridge type turnover device
CN203845724U (en) Super-hoisting and positioning supporting frame structure of lifting arm and wheeled crane
CN217867849U (en) Tower crane dolly pulley optimizing apparatus
CN219885531U (en) Swing compensation arm of telescopic boom for crane
CN209038873U (en) A kind of rail hook gear
CN212715851U (en) Elevator shaft operating platform and elevator shaft structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22848171

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE