WO2022228472A1 - Modular management method for freight jobs - Google Patents
Modular management method for freight jobs Download PDFInfo
- Publication number
- WO2022228472A1 WO2022228472A1 PCT/CN2022/089612 CN2022089612W WO2022228472A1 WO 2022228472 A1 WO2022228472 A1 WO 2022228472A1 CN 2022089612 W CN2022089612 W CN 2022089612W WO 2022228472 A1 WO2022228472 A1 WO 2022228472A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- task
- freight
- status
- event
- transportation
- Prior art date
Links
- 238000007726 management method Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 claims abstract description 44
- 238000007689 inspection Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
- G06Q10/0831—Overseas transactions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
- G06Q10/0833—Tracking
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
- G06Q10/1097—Task assignment
Definitions
- the present invention relates to the technical field of freight management, and more particularly, to a method for modularized management of freight tasks.
- the present invention provides a method for modularized management of freight tasks.
- the technical problem to be solved by the present invention is that there are many subdivisions in the freight industry, which not only involve international freight, but also air, sea and rail transportation. Etc., under different modes, the business processes and information involved are different. Usually, different transportation business modes are managed separately, which is more complicated, and brings certain difficulties to the flattening and intensive management of small and medium-sized enterprises.
- a method for modularized management of freight tasks comprising the following steps:
- the standard operation process is designed under different transportation modes, including order building, task arrangement, tracking status and status update business process.
- the status update business process is: first, automatically select or assign tasks according to service requirements or templates, and then determine the first After a task is scheduled to start time, the rest of the task’s planned time can be automatically jumped to the planned time according to the product, and then the actual time of updating the task’s start status is taken as the actual start time of the task, and the time of updating the task’s end status is taken as the actual end time of the task. , and finally, if the task schedule is skewed by other factors, the state estimate time needs to be updated.
- the service requirements include transportation mode, user service requirements, international trade terms, port of origin and port of destination
- the customer information includes the customer, the consignor, the consignee and the notifier
- the The cargo information includes the number of pieces, the weight of the cargo, the size of the cargo, the volume of the cargo, and the type of cargo
- the task schedule includes domestic transportation, depot port services, customs clearance, and international transportation.
- the domestic transportation includes pick-up and delivery
- the depot port service includes airport service, sea port service and depot service
- the international transportation includes sea, air and rail transportation.
- the process of querying the task status in the S4 is: query whether the task event is domestic transportation, ground/yard service or international transportation, and when the task event is international transportation, query the status of the goods to be pending Picking up, picking up, picking up, delivering or already delivered, when the task event is ground/station service, check the status of the goods to be in storage, in storage (destination port), in customs inspection, inspected , Customs detained, in the process of picking up, released by customs or delivered (port of origin), when the event task is international transportation, query the status of the cargo as booked, pending shipment, shipped or arrived at the port.
- the process of querying the operation status in S4 is: querying the event operation status as order received, scheduled, notified and settled.
- the cause of the task event in S4 is generally damage, delay or others.
- the warehoused-in (destination port) includes two states of total single batch and abnormally small cargo
- the arrived port includes two states of low cargo and batch.
- the picking up, pending storage, pending shipment and customs clearance are event task start states
- the delivery, storage (destination port), delivery (departure port), Arrival and Customs Cleared are the status of the event task end.
- the present invention redefines the business process mode of international freight transportation, changes the traditional mode of distinguishing business processes by transportation mode, and combines international freight transportation with different transportation modes.
- Different modular designs are carried out for the business, and at the same time, the standard operation processes are designed under different transportation modes, including the business process of building orders, task arrangement, tracking status and status update, and unified management through task deployment, providing freight forwarding enterprises.
- Fig. 1 is the business logic synthesis flow schematic diagram of the present invention
- Figure 2 is a schematic diagram of the status update of the goods of the present invention.
- FIG. 3 is a schematic diagram of the task event flow diagram of the present invention.
- FIG. 4 is a schematic diagram of the cargo event flow of the present invention.
- the modular management method of freight tasks includes the following steps:
- the standard operation process is designed under different transportation modes, including order building, task arrangement, status tracking and status update business process.
- the status update business process is: first, automatically select or assign tasks according to service requirements or templates, and then determine the first After the planned start time of the task, the planned time of the remaining tasks can be automatically jumped to the planned time according to the product, and then the actual time of updating the task start status is taken as the actual start time of the task, and the time of updating the task end status is taken as the actual end time of the task, and finally , if the task plan is skewed by other factors, the status estimate time needs to be updated.
- Service requirements include modes of transportation, user service requirements, international trade terms, ports of origin and destination, customer information includes customers, consignors, consignees and notifiers, and cargo information includes the number of pieces, weight, size, and size of the goods.
- Volume and cargo type, task arrangements include domestic transportation, depot port services, customs clearance and international transportation.
- Domestic transportation includes pickup and delivery
- depot port services include airport services, seaport services, and depot services
- international transportation includes ocean, air, and rail transportation.
- the process of querying the task status in S4 is: query whether the task event is domestic transportation, ground/station service or international transportation; when the task event is international transportation, query the status of the goods to be picked up, in delivery, picked up, delivered In the cargo or has been delivered, when the task event is the ground/station service, the query status of the cargo is pending storage, storage (destination port), customs inspection, inspected, customs detained, picking up, customs Released or delivered (port of origin), when the event task is international transportation, query the status of the cargo as booked, to be shipped, shipped or arrived at the port.
- the cargo event is an operation task, it can be considered that the cargo is in There is a problem during customs clearance. Check the status of the goods to be cleared, total customs clearance, waiting for tax payment, tax paid, customs inspection, inspection completed or customs clearance.
- the process of querying the operation status in S4 is as follows: querying the event operation status is order received, scheduled, notified and settled.
- the cause of task events in S4 is generally broken, delayed or otherwise.
- Warehousing (destination port) includes two states of total order and batches and abnormally small goods, and arrived at the port includes two states of small goods and batches.
- Picking up, pending storage, pending shipment and customs clearance are the start status of the event task, and delivered, stocked (destination port), delivered (departure port), arrived at the port and customs cleared are the event task end status.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention specifically relates to the technical field of freight management. Disclosed is a modular management method for freight jobs. The method comprises the following step: service logic design, involving: in view of the universal service logic of international freight, redefining a service flow mode of international freight, such that same involves four items, i.e., service requirements, client information, cargo information and job arrangement. In the present invention, by taking universal service logic in the freight industry as a basis and in view of the universal service logic of international freight, a service flow mode of international freight is redefined, so as to change a traditional mode in which service flows are distinguished according to transportation modes, and different modular designs are respectively made for international freight services in different transportation modes; moreover, standard operation flows in different transportation modes are designed, which involve service flows of order creation, job arrangement, state tracking and state update, and unified management is performed by means of job allocation, such that an effective technical means is provided for freight forwarding enterprises to perform flat and intensive management.
Description
本发明涉及货运管理技术领域,更具体地说,本发明涉及货运任务模块化管理方法。The present invention relates to the technical field of freight management, and more particularly, to a method for modularized management of freight tasks.
货运行业细分领域众多,不仅涉及到国际货运,还涉及空运、海运和铁路运输等,不同模式下,所涉及业务流程,信息各不相同,通常不同运输业务模式都分开管理,比较复杂,对中小企业的扁平化,集约化管理带来一定难度,因此,研究一种货运任务模块化管理方法具有重要意义。There are many subdivisions in the freight industry, not only involving international freight, but also air, sea and rail transportation. Under different modes, the business processes and information involved are different. Usually, different transportation business modes are managed separately, which is more complicated. The flattening and intensive management of small and medium-sized enterprises bring certain difficulties. Therefore, it is of great significance to study a modular management method of freight tasks.
发明内容SUMMARY OF THE INVENTION
为了克服现有技术的上述缺陷,本发明提供了货运任务模块化管理方法,本发明所要解决的技术问题是:货运行业细分领域众多,不仅涉及到国际货运,还涉及空运、海运和铁路运输等,不同模式下,所涉及业务流程,信息各不相同,通常不同运输业务模式都分开管理,比较复杂,对中小企业的扁平化,集约化管理带来一定难度的问题。In order to overcome the above-mentioned defects of the prior art, the present invention provides a method for modularized management of freight tasks. The technical problem to be solved by the present invention is that there are many subdivisions in the freight industry, which not only involve international freight, but also air, sea and rail transportation. Etc., under different modes, the business processes and information involved are different. Usually, different transportation business modes are managed separately, which is more complicated, and brings certain difficulties to the flattening and intensive management of small and medium-sized enterprises.
为实现上述目的,本发明提供如下技术方案:货运任务模块化管理方法,包括以下步骤:To achieve the above purpose, the present invention provides the following technical solutions: a method for modularized management of freight tasks, comprising the following steps:
S1、业务逻辑设计:S1, business logic design:
从国际货运的通用业务逻辑出发,重新定义国际货运的业务流程模式,使其包括服务要求、客户信息和货物信息任务安排四个大项,改变以运输方式来区分业务流程的传统模式,在新的业务逻辑模式下,将所有的运输方式在统一的操作模式下进行管理。Starting from the general business logic of international freight, redefine the business process model of international freight to include four major items: service requirements, customer information and cargo information task arrangement, and change the traditional mode of distinguishing business processes by means of transportation. In the business logic mode, all transportation modes are managed in a unified operation mode.
S2、任务模块化:S2, task modularization:
不同国际运输方式选择不同的任务模块,要求对不同任务进行模块化设计,其中包括任务状态和业务信息设计。Different international transportation modes choose different task modules, which require modular design for different tasks, including task status and business information design.
S3、流程标准化:S3. Process standardization:
设计在不同运输模式下,标准的操作流程,包括建单、任务安排、跟踪状况和状态更新业务流程,所述状态更新业务流程为:首先根据服务要求或者模板自动选择或分配任务,然后确定第一个任务计划开始时间后,其余任务计划时间可以自动根据产品跳转计划时间,然后以更新任务开始状态的实际时间作为任务的实际开始时间,并且以更新任务结束状态的时间作为任务实际结束时间,最后,如果任务计划受到其他因素出现偏差,则需要更新状态预计时间。The standard operation process is designed under different transportation modes, including order building, task arrangement, tracking status and status update business process. The status update business process is: first, automatically select or assign tasks according to service requirements or templates, and then determine the first After a task is scheduled to start time, the rest of the task’s planned time can be automatically jumped to the planned time according to the product, and then the actual time of updating the task’s start status is taken as the actual start time of the task, and the time of updating the task’s end status is taken as the actual end time of the task. , and finally, if the task schedule is skewed by other factors, the state estimate time needs to be updated.
S4、接收任务事件:S4. Receive task events:
当任务事件发布时,接收任务事件的原因,并记录发生的事件情况,然后对任务事件的任务状态和操作状态进行查询。When a task event is published, the reason for the task event is received, the event situation is recorded, and then the task status and operation status of the task event are queried.
作为本发明的进一步方案:所述服务要求包括运输方式、用户服务要求、国际贸易条款、始发港和目的港,所述客户信息包括客户、发货人、收货人和通知人,所述货物信息包括货物件数、货物重量、货物尺寸、货物体积和货物类型,所述任务安排包括国内运输、场站港口服务、清关和国际运输。As a further solution of the present invention: the service requirements include transportation mode, user service requirements, international trade terms, port of origin and port of destination, the customer information includes the customer, the consignor, the consignee and the notifier, the The cargo information includes the number of pieces, the weight of the cargo, the size of the cargo, the volume of the cargo, and the type of cargo, and the task schedule includes domestic transportation, depot port services, customs clearance, and international transportation.
作为本发明的进一步方案:所述国内运输包括提货和送货,所述场站港口服务包括空港服务、海港服务和场站服务,所述国际运输包括海运、空运和铁路运输。As a further solution of the present invention: the domestic transportation includes pick-up and delivery, the depot port service includes airport service, sea port service and depot service, and the international transportation includes sea, air and rail transportation.
作为本发明的进一步方案:所述S4中对任务状态进行查询的流程为:查询任务事件为国内运输、地面/场站服务或是国际运输,当任务事件为国际运输时,查询货物状态为待提货、提货中、已提货、送货中或是已送货,当任务事件为地面/场站服务时,查询货物状态为待入库、已入库(目的港)、海关查验中、已查验、海关扣货、提货中、海关放行或是已交付(始发港),当事件任务为国际运输时,查询货物状态为已订舱、待起运、已起运或是已到港,当货物事件为操作任务时,可以认为货物在清关时出现了问题,查询 货物状态为待清关、清关总、等待付税、已付税、海关查验、查验完成或是已清关。As a further solution of the present invention: the process of querying the task status in the S4 is: query whether the task event is domestic transportation, ground/yard service or international transportation, and when the task event is international transportation, query the status of the goods to be pending Picking up, picking up, picking up, delivering or already delivered, when the task event is ground/station service, check the status of the goods to be in storage, in storage (destination port), in customs inspection, inspected , Customs detained, in the process of picking up, released by customs or delivered (port of origin), when the event task is international transportation, query the status of the cargo as booked, pending shipment, shipped or arrived at the port. When it is an operation task, it can be considered that there is a problem with the goods during customs clearance, and the status of the goods to be checked is pending customs clearance, total customs clearance, waiting for tax payment, tax paid, customs inspection, inspection completed or customs clearance.
作为本发明的进一步方案:所述S4中对操作状态进行查询的流程为:查询事件操作状态为已接单、已安排、已通知和已结单。As a further solution of the present invention: the process of querying the operation status in S4 is: querying the event operation status as order received, scheduled, notified and settled.
作为本发明的进一步方案:所述S4中任务事件的原因一般为破损、延误或其他。As a further solution of the present invention: the cause of the task event in S4 is generally damage, delay or others.
作为本发明的进一步方案:所述已入库(目的港)包括总单分批和不正常少货两种状态,所述已到港包括少货和分批两种状态。As a further solution of the present invention: the warehoused-in (destination port) includes two states of total single batch and abnormally small cargo, and the arrived port includes two states of low cargo and batch.
作为本发明的进一步方案:所述提货中、待入库、待启运和清关中为事件任务开始状态,所述已送货、已入库(目的港)、已交付(始发港)、已到港和已清关为事件任务结束状态。As a further solution of the present invention: the picking up, pending storage, pending shipment and customs clearance are event task start states, and the delivery, storage (destination port), delivery (departure port), Arrival and Customs Cleared are the status of the event task end.
本发明的有益效果在于:The beneficial effects of the present invention are:
本发明通过以货运行业通用的业务逻辑为依据,从国际货运的通用业务逻辑出发,重新定义国际货运的业务流程模式,改变以运输方式来区分业务流程的传统模式,将不同运输模式的国际货运业务分别进行不同的模块化设计,同时设计在不同运输模式下,标准的操作流程,包括建单、任务安排、跟踪状况和状态更新业务流程,并通过任务调配的方式进行统一管理,为货代企业进行扁平化集约化管理提供有效技术手段。Based on the general business logic of the freight industry, the present invention redefines the business process mode of international freight transportation, changes the traditional mode of distinguishing business processes by transportation mode, and combines international freight transportation with different transportation modes. Different modular designs are carried out for the business, and at the same time, the standard operation processes are designed under different transportation modes, including the business process of building orders, task arrangement, tracking status and status update, and unified management through task deployment, providing freight forwarding enterprises. Provide effective technical means for flattening and intensive management.
图1为本发明业务逻辑综合流程示意图;Fig. 1 is the business logic synthesis flow schematic diagram of the present invention;
图2为本发明货物状态更新示意图;Figure 2 is a schematic diagram of the status update of the goods of the present invention;
图3为本发明任务事件流程示意图;3 is a schematic diagram of the task event flow diagram of the present invention;
图4为本发明货物事件流程示意图。FIG. 4 is a schematic diagram of the cargo event flow of the present invention.
下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所 描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
如图1-4所示,货运任务模块化管理方法,包括以下步骤:As shown in Figure 1-4, the modular management method of freight tasks includes the following steps:
S1、业务逻辑设计:S1, business logic design:
从国际货运的通用业务逻辑出发,重新定义国际货运的业务流程模式,使其包括服务要求、客户信息和货物信息任务安排四个大项,改变以运输方式来区分业务流程的传统模式,在新的业务逻辑模式下,将所有的运输方式在统一的操作模式下进行管理。Starting from the general business logic of international freight, redefine the business process model of international freight to include four major items: service requirements, customer information and cargo information task arrangement, and change the traditional mode of distinguishing business processes by means of transportation. In the business logic mode, all transportation modes are managed in a unified operation mode.
S2、任务模块化:S2, task modularization:
不同国际运输方式选择不同的任务模块,要求对不同任务进行模块化设计,其中包括任务状态和业务信息设计。Different international transportation modes choose different task modules, which require modular design for different tasks, including task status and business information design.
S3、流程标准化:S3. Process standardization:
设计在不同运输模式下,标准的操作流程,包括建单、任务安排、跟踪状况和状态更新业务流程,状态更新业务流程为:首先根据服务要求或者模板自动选择或分配任务,然后确定第一个任务计划开始时间后,其余任务计划时间可以自动根据产品跳转计划时间,然后以更新任务开始状态的实际时间作为任务的实际开始时间,并且以更新任务结束状态的时间作为任务实际结束时间,最后,如果任务计划受到其他因素出现偏差,则需要更新状态预计时间。The standard operation process is designed under different transportation modes, including order building, task arrangement, status tracking and status update business process. The status update business process is: first, automatically select or assign tasks according to service requirements or templates, and then determine the first After the planned start time of the task, the planned time of the remaining tasks can be automatically jumped to the planned time according to the product, and then the actual time of updating the task start status is taken as the actual start time of the task, and the time of updating the task end status is taken as the actual end time of the task, and finally , if the task plan is skewed by other factors, the status estimate time needs to be updated.
S4、接收任务事件:S4. Receive task events:
当任务事件发布时,接收任务事件的原因,并记录发生的事件情况,然后对任务事件的任务状态和操作状态进行查询。When a task event is published, the reason for the task event is received, the event situation is recorded, and then the task status and operation status of the task event are queried.
服务要求包括运输方式、用户服务要求、国际贸易条款、始发港和目的港,客户信息包括客户、发货人、收货人和通知人,货物信息包括货物件数、 货物重量、货物尺寸、货物体积和货物类型,任务安排包括国内运输、场站港口服务、清关和国际运输。Service requirements include modes of transportation, user service requirements, international trade terms, ports of origin and destination, customer information includes customers, consignors, consignees and notifiers, and cargo information includes the number of pieces, weight, size, and size of the goods. Volume and cargo type, task arrangements include domestic transportation, depot port services, customs clearance and international transportation.
国内运输包括提货和送货,场站港口服务包括空港服务、海港服务和场站服务,国际运输包括海运、空运和铁路运输。Domestic transportation includes pickup and delivery, depot port services include airport services, seaport services, and depot services, and international transportation includes ocean, air, and rail transportation.
S4中对任务状态进行查询的流程为:查询任务事件为国内运输、地面/场站服务或是国际运输,当任务事件为国际运输时,查询货物状态为待提货、提货中、已提货、送货中或是已送货,当任务事件为地面/场站服务时,查询货物状态为待入库、已入库(目的港)、海关查验中、已查验、海关扣货、提货中、海关放行或是已交付(始发港),当事件任务为国际运输时,查询货物状态为已订舱、待起运、已起运或是已到港,当货物事件为操作任务时,可以认为货物在清关时出现了问题,查询货物状态为待清关、清关总、等待付税、已付税、海关查验、查验完成或是已清关。The process of querying the task status in S4 is: query whether the task event is domestic transportation, ground/station service or international transportation; when the task event is international transportation, query the status of the goods to be picked up, in delivery, picked up, delivered In the cargo or has been delivered, when the task event is the ground/station service, the query status of the cargo is pending storage, storage (destination port), customs inspection, inspected, customs detained, picking up, customs Released or delivered (port of origin), when the event task is international transportation, query the status of the cargo as booked, to be shipped, shipped or arrived at the port. When the cargo event is an operation task, it can be considered that the cargo is in There is a problem during customs clearance. Check the status of the goods to be cleared, total customs clearance, waiting for tax payment, tax paid, customs inspection, inspection completed or customs clearance.
S4中对操作状态进行查询的流程为:查询事件操作状态为已接单、已安排、已通知和已结单。The process of querying the operation status in S4 is as follows: querying the event operation status is order received, scheduled, notified and settled.
S4中任务事件的原因一般为破损、延误或其他。The cause of task events in S4 is generally broken, delayed or otherwise.
已入库(目的港)包括总单分批和不正常少货两种状态,已到港包括少货和分批两种状态。Warehousing (destination port) includes two states of total order and batches and abnormally small goods, and arrived at the port includes two states of small goods and batches.
提货中、待入库、待启运和清关中为事件任务开始状态,已送货、已入库(目的港)、已交付(始发港)、已到港和已清关为事件任务结束状态。Picking up, pending storage, pending shipment and customs clearance are the start status of the event task, and delivered, stocked (destination port), delivered (departure port), arrived at the port and customs cleared are the event task end status.
最后应说明的几点是:虽然,上文中已经用一般性说明及具体实施例对本发明作了详尽的描述,但在本发明的基础上,以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术 方案的范围。The last points that should be explained are: although the present invention has been described in detail with general description and specific embodiments above, on the basis of the present invention, the above embodiments are only used to illustrate the technical solutions of the present invention , rather than limiting it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that it is still possible to modify the technical solutions described in the foregoing embodiments, or to modify some of them. Or all technical features are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims (8)
- 货运任务模块化管理方法,其特征在于,包括以下步骤:The method for modularized management of freight tasks is characterized by comprising the following steps:S1、业务逻辑设计:S1, business logic design:从国际货运的通用业务逻辑出发,重新定义国际货运的业务流程模式,使其包括服务要求、客户信息和货物信息任务安排四个大项,改变以运输方式来区分业务流程的传统模式,在新的业务逻辑模式下,将所有的运输方式在统一的操作模式下进行管理;Starting from the general business logic of international freight, redefine the business process model of international freight to include four major items: service requirements, customer information and cargo information task arrangement, and change the traditional mode of distinguishing business processes by means of transportation. Under the business logic mode, all modes of transportation are managed under a unified operation mode;S2、任务模块化:S2, task modularization:不同国际运输方式选择不同的任务模块,要求对不同任务进行模块化设计,其中包括任务状态和业务信息设计;Different international transportation modes choose different task modules, which require modular design for different tasks, including task status and business information design;S3、流程标准化:S3. Process standardization:设计在不同运输模式下,标准的操作流程,包括建单、任务安排、跟踪状况和状态更新业务流程,所述状态更新业务流程为:首先根据服务要求或者模板自动选择或分配任务,然后确定第一个任务计划开始时间后,其余任务计划时间可以自动根据产品跳转计划时间,然后以更新任务开始状态的实际时间作为任务的实际开始时间,并且以更新任务结束状态的时间作为任务实际结束时间,最后,如果任务计划受到其他因素出现偏差,则需要更新状态预计时间;The standard operation process is designed under different transportation modes, including order building, task arrangement, tracking status and status update business process. The status update business process is: first, automatically select or assign tasks according to service requirements or templates, and then determine the first After a task is scheduled to start time, the rest of the task’s planned time can be automatically jumped to the planned time according to the product, and then the actual time of updating the task’s start status is taken as the actual start time of the task, and the time of updating the task’s end status is taken as the actual end time of the task. , and finally, if the task plan is deviated by other factors, the estimated time of the state needs to be updated;S4、接收任务事件:S4. Receive task events:当任务事件发布时,接收任务事件的原因,并记录发生的事件情况,然后对任务事件的任务状态和操作状态进行查询。When a task event is published, the reason for the task event is received, the event situation is recorded, and then the task status and operation status of the task event are queried.
- 根据权利要求1所述的货运任务模块化管理方法,其特征在于:所述服务要求包括运输方式、用户服务要求、国际贸易条款、始发港和目的港,所述客户信息包括客户、发货人、收货人和通知人,所述货物信息包括货物件数、货物重量、货物尺寸、货物体积和货物类型,所述任务安排包括国内运输、场站港口服务、清关和国际运输。The method for modularized management of freight tasks according to claim 1, wherein the service requirements include transportation mode, user service requirements, international trade terms, origin and destination ports, and the customer information includes customer, delivery Person, consignee and notify person, the cargo information includes the number of pieces, the weight of the cargo, the size of the cargo, the volume of the cargo and the type of the cargo, and the task arrangement includes domestic transportation, depot port services, customs clearance and international transportation.
- 根据权利要求2所述的货运任务模块化管理方法,其特征在于:所述国内运输包括提货和送货,所述场站港口服务包括空港服务、海港服务和场站服务,所述国际运输包括海运、空运和铁路运输。The method for modularized management of freight tasks according to claim 2, wherein: the domestic transportation includes pickup and delivery, the depot port service includes airport service, sea port service and depot service, and the international transportation includes Sea, air and rail transport.
- 根据权利要求1所述的货运任务模块化管理方法,其特征在于:所述S4中对任务状态进行查询的流程为:查询任务事件为国内运输、地面/场站服务或是国际运输,当任务事件为国际运输时,查询货物状态为待提货、提货中、已提货、送货中或是已送货,当任务事件为地面/场站服务时,查询货物状态为待入库、已入库(目的港)、海关查验中、已查验、海关扣货、提货中、海关放行或是已交付(始发港),当事件任务为国际运输时,查询货物状态为已订舱、待起运、已起运或是已到港,当货物事件为操作任务时,可以认为货物在清关时出现了问题,查询货物状态为待清关、清关总、等待付税、已付税、海关查验、查验完成或是已清关。The method for modularized management of freight tasks according to claim 1, wherein: the process of querying the task status in the S4 is: the query task event is domestic transportation, ground/yard service or international transportation. When the event is international transportation, query the status of the goods to be picked up, in delivery, picked up, in delivery, or delivered, and when the task event is ground/yard service, the status of the goods to be queried is to be put in storage or in storage. (port of destination), under inspection by customs, inspected, detained by customs, in delivery, released by customs or delivered (port of origin), when the event task is international transportation, the status of the inquired goods is booked, pending shipment, It has been shipped or has arrived at the port. When the cargo event is an operational task, it can be considered that there is a problem with the cargo during customs clearance. The query status of the cargo is pending customs clearance, total customs clearance, waiting for tax payment, tax paid, customs inspection, inspection completed or is cleared.
- 根据权利要求1所述的货运任务模块化管理方法,其特征在于:所述S4中对操作状态进行查询的流程为:查询事件操作状态为已接单、已安排、已通知和已结单。The method for modularized management of freight tasks according to claim 1, wherein the process of querying the operation status in S4 is: querying the event operation status as order received, scheduled, notified and settled.
- 根据权利要求1所述的货运任务模块化管理方法,其特征在于:所述S4中任务事件的原因一般为破损、延误或其他。The method for modularized management of freight tasks according to claim 1, characterized in that: the cause of the task event in S4 is generally damage, delay or others.
- 根据权利要求4所述的货运任务模块化管理方法,其特征在于:所述已入库(目的港)包括总单分批和不正常少货两种状态,所述已到港包括少货和分批两种状态。The method for modularized management of freight tasks according to claim 4, characterized in that: the warehoused-in (destination port) includes two states of total orders and batches and abnormally less cargo, and the arrived port includes less cargo and less cargo. Two states in batches.
- 根据权利要求4所述的货运任务模块化管理方法,其特征在于:所述提货中、待入库、待启运和清关中为事件任务开始状态,所述已送货、已入库(目的港)、已交付(始发港)、已到港和已清关为事件任务结束状态。The method for modularized management of freight tasks according to claim 4, characterized in that: said picking up, pending storage, pending shipment and customs clearance are in the status of event task start; ), Delivered (Departure Port), Arrival and Customs Cleared are the statuses of the event task end.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110484466.3A CN113095765A (en) | 2021-04-30 | 2021-04-30 | Freight task modular management method |
CN202110484466.3 | 2021-04-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022228472A1 true WO2022228472A1 (en) | 2022-11-03 |
Family
ID=76681139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2022/089612 WO2022228472A1 (en) | 2021-04-30 | 2022-04-27 | Modular management method for freight jobs |
Country Status (2)
Country | Link |
---|---|
CN (2) | CN113095765A (en) |
WO (1) | WO2022228472A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113095765A (en) * | 2021-04-30 | 2021-07-09 | 上海如智信息科技有限公司 | Freight task modular management method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102360463A (en) * | 2011-10-09 | 2012-02-22 | 无锡恺易物联网科技发展有限公司 | Logistic information real-time management method and system |
CN103544587A (en) * | 2013-10-28 | 2014-01-29 | 上海天行健国际物流有限公司 | International freight forwarding function operating information system based on technology of Internet of things |
CN106157081A (en) * | 2015-04-15 | 2016-11-23 | 金忠国 | A kind of international logistics e-commerce platform application system based on technology of Internet of things |
CN111126901A (en) * | 2019-12-11 | 2020-05-08 | 程凤凤 | Transportation system is made in multiple type of production |
CN112241858A (en) * | 2019-07-18 | 2021-01-19 | 润泰救援装备科技河北有限公司 | Equipment material management system |
CN113095765A (en) * | 2021-04-30 | 2021-07-09 | 上海如智信息科技有限公司 | Freight task modular management method |
-
2021
- 2021-04-30 CN CN202110484466.3A patent/CN113095765A/en active Pending
- 2021-04-30 CN CN202211600936.9A patent/CN115907587A/en active Pending
-
2022
- 2022-04-27 WO PCT/CN2022/089612 patent/WO2022228472A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102360463A (en) * | 2011-10-09 | 2012-02-22 | 无锡恺易物联网科技发展有限公司 | Logistic information real-time management method and system |
CN103544587A (en) * | 2013-10-28 | 2014-01-29 | 上海天行健国际物流有限公司 | International freight forwarding function operating information system based on technology of Internet of things |
CN106157081A (en) * | 2015-04-15 | 2016-11-23 | 金忠国 | A kind of international logistics e-commerce platform application system based on technology of Internet of things |
CN112241858A (en) * | 2019-07-18 | 2021-01-19 | 润泰救援装备科技河北有限公司 | Equipment material management system |
CN111126901A (en) * | 2019-12-11 | 2020-05-08 | 程凤凤 | Transportation system is made in multiple type of production |
CN113095765A (en) * | 2021-04-30 | 2021-07-09 | 上海如智信息科技有限公司 | Freight task modular management method |
Non-Patent Citations (2)
Title |
---|
丁铭 (DING, MING): ""物流运输管理"实训教学的模块化设计与实施 (Modulation Design and Implementation in Practical Teaching of Logistics Transportation Management)", 《扬州教育学院学报》 (JOURNAL OF YANGZHOU COLLEGE OF EDUCATION), vol. 29, no. 1, 31 March 2011 (2011-03-31), pages 88 - 90, XP009540543 * |
李志勇 等 (LI, ZHIYONG ET AL.): "国际物流实训任务书 (International Logistics Training Mission Statement)", 《国际物流实训任务书》 (INTERNATIONAL LOGISTICS TRAINING MISSION STATEMENT), 31 January 2011 (2011-01-31), XP009540538 * |
Also Published As
Publication number | Publication date |
---|---|
CN115907587A (en) | 2023-04-04 |
CN113095765A (en) | 2021-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11403585B2 (en) | Gateway balancing | |
Ramaa et al. | Impact of warehouse management system in a supply chain | |
Goksoy et al. | Gaining competitive advantage through innovation strategies: an application in warehouse management processes | |
US9126235B2 (en) | Enhanced postal data modeling framework | |
CN106920060A (en) | A kind of warehouse management system | |
CN109949015A (en) | One kind being based on B/S structure container storage yard management information system | |
US11640580B2 (en) | Inventory ready date trailer prioritization system | |
WO2022228472A1 (en) | Modular management method for freight jobs | |
CN112766857B (en) | Intelligent warehouse management platform, system and method | |
US8639591B1 (en) | System and method for generating a visual display indicating the status of multiple shipping loads | |
TW510998B (en) | On-site production management and storage system | |
US8311906B1 (en) | Computerized system and method for managing parts shortages | |
US8131584B2 (en) | Gateway balancing | |
US20220207449A1 (en) | Order management with supply chain management system and platform | |
WO2000043931A2 (en) | Distribution center management system | |
JP2002205818A (en) | Inventory control method and inventory control system | |
KR102666347B1 (en) | Method and system for replacing shipping containers | |
Kappauf et al. | Warehouse logistics and inventory management | |
US20220198391A1 (en) | Supply chain management system and platform | |
Harrison et al. | Optimized analysis based on the characteristics of cross-border E-commerce logistics business | |
Murray et al. | Warehouse Management with SAP ERP: Functionality and Technical Configuration | |
Prabhu et al. | Development of lean assembly line using 5S and RFID technique | |
Goyal et al. | Impact of warehouse management system in a supply chain | |
US11328330B2 (en) | System for invoice processing for overseas vendors and carriers | |
CN220913657U (en) | Digital storage stock management system based on multi-service line requirements of supply chain of nuclear power station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22794942 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 22794942 Country of ref document: EP Kind code of ref document: A1 |