WO2022178875A1 - Air purification device for chemical workshop - Google Patents
Air purification device for chemical workshop Download PDFInfo
- Publication number
- WO2022178875A1 WO2022178875A1 PCT/CN2021/078293 CN2021078293W WO2022178875A1 WO 2022178875 A1 WO2022178875 A1 WO 2022178875A1 CN 2021078293 W CN2021078293 W CN 2021078293W WO 2022178875 A1 WO2022178875 A1 WO 2022178875A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- clean room
- filter
- several groups
- purification
- workshop
- Prior art date
Links
- 239000000126 substance Substances 0.000 title claims abstract description 21
- 238000004887 air purification Methods 0.000 title claims abstract description 17
- 238000000746 purification Methods 0.000 claims abstract description 69
- 238000010521 absorption reaction Methods 0.000 claims description 19
- 230000001681 protective effect Effects 0.000 claims description 3
- 239000007789 gas Substances 0.000 description 18
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 11
- 239000003546 flue gas Substances 0.000 description 11
- 230000000694 effects Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000003749 cleanliness Effects 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- QGZKDVFQNNGYKY-UHFFFAOYSA-N Ammonia Chemical compound N QGZKDVFQNNGYKY-UHFFFAOYSA-N 0.000 description 1
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000002537 cosmetic Substances 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 239000003337 fertilizer Substances 0.000 description 1
- 239000012847 fine chemical Substances 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F5/00—Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
Definitions
- the utility model relates to the technical field of air treatment in chemical workshops, in particular to air purification equipment in chemical workshops.
- the main raw materials in the production of chemical plants are natural gas and liquid ammonia, or other primary chemical raw materials.
- the products are petrochemical products and fine chemicals derived from them.
- lime, fertilizer, medical alcohol, including Cosmetics can be said to belong to chemical products.
- the chemical workshop is in the processing room. Since a large amount of flue gas is easily generated in the workshop, it is necessary to match the use of air purification equipment to purify the gas in the workshop. However, traditional purification equipment purifies The performance is poor, and it can only realize the purification treatment of local positions in the workshop, thus reducing the overall purification effect, and it cannot stably circulate and convect the gas in the workshop body, so it cannot quickly neutralize the gas in the workshop.
- the prior art has the following shortcomings: the traditional purification equipment has poor purification performance, and can only achieve purification treatment at local locations in the workshop, thus reducing the overall purification effect, and it is impossible to stably circulate the gas in the workshop body.
- the gas in the workshop cannot be quickly neutralized, and the gas in the workshop cannot be stably purified, which reduces the working environment of the staff.
- This utility model is to provide a chemical workshop air purification equipment to solve the problems raised in the above background technology.
- An air purification equipment for a chemical workshop comprising a workshop body, a No. 1 purification component, a No. 2 purification component and a circulation component.
- the No. 1 purification component is locked and installed on one side of the inner wall of the workshop body, and the No. 2 purification component is locked and installed.
- the circulation assembly is installed between the No. 1 purification assembly and the No. 2 purification assembly.
- the No. 1 purification component and the No. 2 purification component are installed correspondingly, and the No. 1 purification component and the No. 2 purification component are installed in parallel on the inner wall of the workshop body;
- the No. 1 purification assembly includes a No. 1 clean room, a No. 1 locking plate, a No. 1 absorption pipe, several groups of No. 1 filter chambers, a No. 1 exhaust pipe and several groups of No. 1 filter plates, and the No. 1 locking plates are matched and installed.
- the back of the No. 1 clean room, and the No. 1 locking plate is locked and fixed with the inner wall of the workshop body by bolts.
- the No. 1 absorption pipe is installed under the No. 1 clean room and communicated with the No. 1 clean room.
- the No. 1 row The air duct is installed above the No. 1 clean room and communicated with the No. 1 clean room.
- a No. 1 booster pump is installed at the end of the No. 1 exhaust pipe.
- Several groups of the No. 1 filter chambers are evenly distributed in the No. 1 clean room.
- the No. 1 filter plate of the group is embedded in the No. 1 filter chamber through the side wall of the No. 1 clean room;
- Limiting parts are installed on the inner walls of several groups of the No. 1 filter chamber, and the limiting parts are matched and engaged with the No. 1 filter plate;
- the No. 2 purification assembly includes a No. 2 clean room, a No. 2 locking plate, a No. 2 absorption pipe, several groups of No. 2 filter chambers, No. 2 exhaust pipes, and several groups of No. 2 filter plates, and the No. 2 locking plates are matched and installed.
- the No. 2 absorption pipe is installed under the No. 2 clean room and communicated with the No. 2 clean room.
- the No. 2 row The air duct is installed above the No. 2 clean room and communicated with the No. 2 clean room.
- a No. 2 booster pump is installed at the end of the No. 2 exhaust pipe, and several groups of the No. 2 filter chambers are evenly distributed in the No. 2 clean room.
- Several groups of the No. 2 filter plates are embedded in the No. 2 filter chamber through the side walls of the No. 2 clean room;
- the inner walls of several groups of the No. 2 filter bins are installed with limiters, and the limiters are matched and engaged with the No. 2 filter plate;
- the circulation assembly includes a circulation pipe and an air pump.
- the two ends of the circulation pipe are respectively connected to the top of the No. 1 clean room and the No. 2 clean room.
- the circulation pipe is embedded in the workshop body, and the air pump is installed at the bottom of the circulation pipe. end;
- the outer wall of the circulation pipe is wrapped with a protective cover, and the contact positions of the circulation pipe with the No. 1 clean room and the No. 2 clean room are sealed.
- the utility model is provided with the No. 1 purification component, and the flue gas enters the No. 1 filter chamber for filtration and absorption, thereby realizing the multi-stage absorption of the flue gas and ensuring the cleanliness of the gas, and then the flue gas passes through the No. Fast discharge, so the internal circulation purification of the gas in the workshop body is realized, and the flue gas in the workshop body can be quickly and comprehensively absorbed. While ensuring a good purification effect, it is convenient for the staff to clean the No. 1 filter plate.
- the utility model is provided with a circulation component, and the two ends of the circulation pipe are respectively connected with the No. 1 clean room and the No. 2 clean room. Therefore, the staff drives the gas in the No. 1 clean room and the No. 2 clean room through the electric control air pump.
- Circulation circulation accelerates the circulation of gas on both sides of the workshop body, realizes the convection of the air in the workshop body, increases the gas circulation in the workshop body, improves the working environment in the workshop body, and realizes the external environment of the workshop body. Cyclic purification treatment.
- Fig. 1 is the overall structure schematic diagram of the present utility model
- Fig. 2 is the structural representation of No. 1 purification assembly of the present invention
- FIG. 3 is a schematic diagram of the internal structure of the No. 1 clean room of the present utility model
- Fig. 5 is the enlarged schematic diagram of A in Fig. 1 of the present utility model
- An air purification equipment for a chemical workshop comprising a workshop body 1, a No. 1 purification component, a No. 2 purification component and a circulation component.
- the No. 1 purification component is locked and installed on one side of the inner wall of the workshop body 1, and the No. 2 purification component is locked. It is installed on the other side of the inner wall of the workshop body 1, and the circulation assembly is installed between the No. 1 purification assembly and the No. 2 purification assembly.
- the No. 1 purification assembly and the No. 2 purification assembly are installed correspondingly, and the No. 1 purification assembly and the No. 2 purification assembly are installed in parallel on the inner wall of the workshop body 1;
- the No. 1 purification assembly includes No. 1 clean room 2, No. 1 locking plate 3, No. 1 absorption pipe 4, several groups of No. 1 filter chambers 5, No. 1 exhaust pipe 6 and several groups of No. 1 filter plates 7.
- the No. 1 locking plate 3 is matched and installed on the back of the No. 1 clean room 2, and the No. 1 locking plate 3 is locked and fixed with the inner wall of the workshop body 1 by bolts, and the No. 1 absorption pipe 4 is installed under the No. 1 clean room 2 and Connected with the No. 1 clean room 2, the No. 1 exhaust pipe 6 is installed above the No. 1 clean room 2 and communicated with the No. 1 clean room 2, and the No. 1 exhaust pipe 6 is installed at the end of the No. 1 booster Pump, several groups of the No.
- the inner walls of several groups of the No. 1 filter chambers 5 are installed with a No. 1 limiter 8, and the No. 1 limiter 8 is matched with the No. 1 filter plate 7;
- the No. 2 purification assembly includes No. 2 clean room 9, No. 2 locking plate 10, No. 2 absorption pipe 11, several groups of No. 2 filter chambers 12, No. 2 exhaust pipes 13 and several groups of No. 2 filter plates 14.
- the No. 2 locking plate 10 is matched and installed on the back of the No. 2 clean room 9 , and the No. 2 locking plate 10 is locked and fixed with the inner wall of the workshop body 1 by bolts.
- the No. 2 absorption pipe 11 is installed under the No. 2 clean room 9 and Connected with the No. 2 clean room 9, the No. 2 exhaust pipe 13 is installed above the No. 2 clean room 9 and communicated with the No. 2 clean room 9, and the No. 2 exhaust pipe 13 is installed at the end of the No. 2 increase. Pressure pump, several groups of the No. 2 filter chambers 12 are evenly distributed in the No. 2 clean room 9, and several groups of the No. 2 filter plates 14 are embedded in the No. 2 filter chamber 12 through the side walls of the No. 2 clean room 9;
- the inner walls of several groups of the No. 2 filter chambers 12 are installed with No. 2 limiting members 15, and the No. 2 limiting members 15 are matched and engaged with the No. 2 filter plate 14;
- the circulation assembly includes a circulation pipe 16 and an air pump 17.
- the two ends of the circulation pipe 16 are respectively connected to the tops of the No. 1 clean room 2 and the No. 2 clean room 9, and the circulation pipe 16 is embedded in the workshop body 1,
- the air pump 17 is installed at the end of the circulation pipe 16, which realizes the convection of the air in the workshop body 1, increases the flow of gas in the workshop body 1, improves the working environment in the workshop body 1, and realizes the control of the workshop body 1. 1.
- the external circulation purification treatment ;
- the outer wall of the circulation pipe 16 is wrapped with a protective cover, and the contact positions of the circulation pipe 16 with the No. 1 clean room 2 and No. 2 clean room 9 are sealed to ensure the airtightness of gas circulation and avoid leakage.
- the working principle of the utility model when using, firstly install the No. 1 purification component and the No. 2 purification component in the workshop body 1 correspondingly to ensure the stability in the subsequent overall purification process.
- the No. 1 absorption pipe 4 absorbs the flue gas in the workshop, and then the flue gas enters the No. 1 filter chamber 5 for filtering and absorption, realizing multi-stage absorption of the flue gas and ensuring the cleanliness of the gas, and then the flue gas passes through the No. 1 filter chamber.
- the exhaust pipe 6 discharges quickly, thus realizing the internal circulation purification of the gas in the workshop body 1, and can quickly and comprehensively absorb the flue gas in the workshop body 1, and by using the No. 1 filter plate 7 and No. 1 filter chamber 5.
- the sliding and detachable connection method is adopted, which ensures a good purification effect and facilitates the cleaning of the No. 1 filter plate 7 by the staff.
- the No. 2 purification component By having the No. 2 purification component and repeating the above work of the No. 1 purification component, the whole can be completed.
- Purification work with the cooperation of No. 1 purification component and No. 2 purification component, a stable internal circulation purification treatment is realized in the workshop body 1.
- the two ends of the circulation pipe 16 are respectively connected with the No. 1 purification. Room 2 and No. 2 clean room 9 are connected, so the staff drives the gas in No. 1 clean room 2 and No. 2 clean room 9 to circulate through the electronically controlled air pump 17, which accelerates the flow of gas on both sides of the workshop body 1.
- the convection of the air in the workshop body 1 is realized, the working environment in the workshop body 1 is improved, the external circulation purification treatment of the workshop body 1 is realized, and the overall use effect of the device is improved.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Treating Waste Gases (AREA)
Abstract
An air purification device for a chemical workshop, comprising a workshop body, a first purification assembly, a second purification assembly and a circulation assembly; the first purification assembly is mounted on one side of the inner wall of the workshop body in a locked manner, the second purification assembly is mounted on the other side of the inner wall of the workshop body in a locked manner, and the circulation assembly is mounted between the first purification assembly and the second purification assembly in a fitting manner.
Description
本实用新型涉及化工车间空气处理技术领域,具体为一种化工车间空气净化设备。The utility model relates to the technical field of air treatment in chemical workshops, in particular to air purification equipment in chemical workshops.
笼统的讲,化工厂生产中为主原料的是天然气与液氨,或其他初级化学品原料.产品则是由它们而衍生的石油化工产品和精细化学品.比如石灰,化肥.医用酒精,包括化妆品都可以说是属于化工产品,同时化工车间在进行加工室,由于车间内极易产生大量的烟气等,因此需要匹配使用空气净化设备对车间内的气体进行净化,但是传统的净化设备净化性能较差,只能实现车间内的局部位置的净化处理,因此降低了整体净化效果,无法稳定循环的对车间本体内的气体进行循环对流,因此无法对车间内气体进行快速的中和。Generally speaking, the main raw materials in the production of chemical plants are natural gas and liquid ammonia, or other primary chemical raw materials. The products are petrochemical products and fine chemicals derived from them. Such as lime, fertilizer, medical alcohol, including Cosmetics can be said to belong to chemical products. At the same time, the chemical workshop is in the processing room. Since a large amount of flue gas is easily generated in the workshop, it is necessary to match the use of air purification equipment to purify the gas in the workshop. However, traditional purification equipment purifies The performance is poor, and it can only realize the purification treatment of local positions in the workshop, thus reducing the overall purification effect, and it cannot stably circulate and convect the gas in the workshop body, so it cannot quickly neutralize the gas in the workshop.
现有技术有以下不足:传统的净化设备净化性能较差,只能实现车间内的局部位置的净化处理,因此降低了整体净化效果,无法稳定循环的对车间本体内的气体进行循环对流,因此无法对车间内气体进行快速的中和,且不能对车间气体进行稳定的净化处理,降低了工作人员的工作环境。The prior art has the following shortcomings: the traditional purification equipment has poor purification performance, and can only achieve purification treatment at local locations in the workshop, thus reducing the overall purification effect, and it is impossible to stably circulate the gas in the workshop body. The gas in the workshop cannot be quickly neutralized, and the gas in the workshop cannot be stably purified, which reduces the working environment of the staff.
实用新型内容Utility model content
本实用新型的目的在于提供一种化工车间空气净化设备,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a chemical workshop air purification equipment to solve the problems raised in the above background technology.
为了解决上述技术问题,本实用新型提供如下技术方案:In order to solve the above-mentioned technical problems, the utility model provides the following technical solutions:
一种化工车间空气净化设备,包括车间本体、一号净化组件、二号净化组件以及循环组件,所述一号净化组件锁合安装在车间本体内壁一侧,所述二号 净化组件锁合安装在车间本体内壁另一侧,所述循环组件匹配安装在一号净化组件、二号净化组件之间。An air purification equipment for a chemical workshop, comprising a workshop body, a No. 1 purification component, a No. 2 purification component and a circulation component. The No. 1 purification component is locked and installed on one side of the inner wall of the workshop body, and the No. 2 purification component is locked and installed. On the other side of the inner wall of the workshop body, the circulation assembly is installed between the No. 1 purification assembly and the No. 2 purification assembly.
所述一号净化组件、二号净化组件对应安装,且所述一号净化组件、二号净化组件平行安装在车间本体内壁;The No. 1 purification component and the No. 2 purification component are installed correspondingly, and the No. 1 purification component and the No. 2 purification component are installed in parallel on the inner wall of the workshop body;
所述一号净化组件包括一号净化室、一号锁合板、一号吸收管、若干组一号过滤仓、一号排风管以及若干组一号过滤板,所述一号锁合板匹配安装在一号净化室背部,且所述一号锁合板通过螺栓与车间本体内壁锁合固定,所述一号吸收管安装在一号净化室下方且与一号净化室内连通,所述一号排风管安装在一号净化室上方且与一号净化室内连通,所述一号排风管端处安装有一号增压泵,若干组所述一号过滤仓均匀分布在一号净化室内,若干组所述一号过滤板穿过一号净化室侧壁嵌设在一号过滤仓内;The No. 1 purification assembly includes a No. 1 clean room, a No. 1 locking plate, a No. 1 absorption pipe, several groups of No. 1 filter chambers, a No. 1 exhaust pipe and several groups of No. 1 filter plates, and the No. 1 locking plates are matched and installed. The back of the No. 1 clean room, and the No. 1 locking plate is locked and fixed with the inner wall of the workshop body by bolts. The No. 1 absorption pipe is installed under the No. 1 clean room and communicated with the No. 1 clean room. The No. 1 row The air duct is installed above the No. 1 clean room and communicated with the No. 1 clean room. A No. 1 booster pump is installed at the end of the No. 1 exhaust pipe. Several groups of the No. 1 filter chambers are evenly distributed in the No. 1 clean room. The No. 1 filter plate of the group is embedded in the No. 1 filter chamber through the side wall of the No. 1 clean room;
若干组所述一号过滤仓内壁安装有限位件,且所述限位件与一号过滤板匹配卡合;Limiting parts are installed on the inner walls of several groups of the No. 1 filter chamber, and the limiting parts are matched and engaged with the No. 1 filter plate;
若干组所述一号过滤仓之间对应安装,所述一号过滤仓与一号净化室连通,且相邻两组所述一号过滤仓之间均连接件贯穿连通;Several groups of the No. 1 filter chambers are correspondingly installed, the No. 1 filter chambers are communicated with the No. 1 clean room, and the connecting pieces between the adjacent two groups of the No. 1 filter chambers are connected through;
所述二号净化组件包括二号净化室、二号锁合板、二号吸收管、若干组二号过滤仓、二号排风管以及若干组二号过滤板,所述二号锁合板匹配安装在二号净化室背部,且所述二号锁合板通过螺栓与车间本体内壁锁合固定,所述二号吸收管安装在二号净化室下方且与二号净化室内连通,所述二号排风管安装在二号净化室上方且与二号净化室内连通,所述二号排风管端处安装有二号增压泵,若干组所述二号过滤仓均匀分布在二号净化室内,若干组所述二号过滤板穿过二号净化室侧壁嵌设在二号过滤仓内;The No. 2 purification assembly includes a No. 2 clean room, a No. 2 locking plate, a No. 2 absorption pipe, several groups of No. 2 filter chambers, No. 2 exhaust pipes, and several groups of No. 2 filter plates, and the No. 2 locking plates are matched and installed. On the back of the No. 2 clean room, and the No. 2 locking plate is locked and fixed with the inner wall of the workshop body by bolts, the No. 2 absorption pipe is installed under the No. 2 clean room and communicated with the No. 2 clean room. The No. 2 row The air duct is installed above the No. 2 clean room and communicated with the No. 2 clean room. A No. 2 booster pump is installed at the end of the No. 2 exhaust pipe, and several groups of the No. 2 filter chambers are evenly distributed in the No. 2 clean room. Several groups of the No. 2 filter plates are embedded in the No. 2 filter chamber through the side walls of the No. 2 clean room;
若干组所述二号过滤仓内壁安装有限位件,且所述限位件与二号过滤板匹配卡合;The inner walls of several groups of the No. 2 filter bins are installed with limiters, and the limiters are matched and engaged with the No. 2 filter plate;
若干组所述二号过滤仓之间对应安装,所述二号过滤仓与二号净化室连通,且相邻两组所述二号过滤仓之间均连接件贯穿连通;Several groups of the No. 2 filter chambers are correspondingly installed, the No. 2 filter chambers are communicated with the No. 2 clean room, and the connecting pieces are connected between the adjacent two groups of the No. 2 filter chambers;
所述循环组件包括循环管、气泵,所述循环管两端分别与一号净化室、二号净化室内顶部连通,且所述循环管嵌设在车间本体内,所述气泵安装在循环管的端处;The circulation assembly includes a circulation pipe and an air pump. The two ends of the circulation pipe are respectively connected to the top of the No. 1 clean room and the No. 2 clean room. The circulation pipe is embedded in the workshop body, and the air pump is installed at the bottom of the circulation pipe. end;
所述循环管外壁包裹有防护套,且所述循环管与一号净化室、二号净化室接触位置经过密封处理。The outer wall of the circulation pipe is wrapped with a protective cover, and the contact positions of the circulation pipe with the No. 1 clean room and the No. 2 clean room are sealed.
有益效果是:The beneficial effects are:
1、本实用新型通过设有一号净化组件,烟气进入一号过滤仓内过滤吸收,实现了对烟气的多级吸收,保证了气体的洁净度,随后烟气经过一号排风管进行快速的排放,因此实现了对车间本体内气体的内循环净化,可对车间本体的烟气进行快速全面的吸收,且通过采用一号过滤板与一号过滤仓采用滑动可拆式连接方式,保证了良好的净化效果的同时便于工作人员对一号过滤板进行清理。1. The utility model is provided with the No. 1 purification component, and the flue gas enters the No. 1 filter chamber for filtration and absorption, thereby realizing the multi-stage absorption of the flue gas and ensuring the cleanliness of the gas, and then the flue gas passes through the No. Fast discharge, so the internal circulation purification of the gas in the workshop body is realized, and the flue gas in the workshop body can be quickly and comprehensively absorbed. While ensuring a good purification effect, it is convenient for the staff to clean the No. 1 filter plate.
2、本实用新型通过设有循环组件,利用循环管两端分别与一号净化室、二号净化室内连通,因此工作人员通过电控气泵,驱使一号净化室、二号净化室的气体进行循环流通,加速了车间本体内两侧气体的流通,实现了车间本体内空气的对流,加大了车间本体内气体的流通量,提升了车间本体内的工作环境,实现了对车间本体的外循环净化处理。2. The utility model is provided with a circulation component, and the two ends of the circulation pipe are respectively connected with the No. 1 clean room and the No. 2 clean room. Therefore, the staff drives the gas in the No. 1 clean room and the No. 2 clean room through the electric control air pump. Circulation circulation accelerates the circulation of gas on both sides of the workshop body, realizes the convection of the air in the workshop body, increases the gas circulation in the workshop body, improves the working environment in the workshop body, and realizes the external environment of the workshop body. Cyclic purification treatment.
图1是本实用新型的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;
图2是本实用新型的一号净化组件结构示意图;Fig. 2 is the structural representation of No. 1 purification assembly of the present invention;
图3是本实用新型的一号净化室内部结构示意图;3 is a schematic diagram of the internal structure of the No. 1 clean room of the present utility model;
图4是本实用新型的二号净化组件结构示意图;4 is a schematic structural diagram of the No. 2 purification assembly of the present invention;
图5是本实用新型的图1中A处放大示意图;Fig. 5 is the enlarged schematic diagram of A in Fig. 1 of the present utility model;
图中:1、车间本体;2、一号净化室;3、一号锁合板;4、一号吸收管;5、一号过滤仓;6、一号排风管;7、一号过滤板;8、一号限位件;9、二号净化室;10、二号锁合板;11、二号吸收管;12、二号过滤仓;13、二号排风管;14、二号过滤板;15、二号限位件;16、循环管;17、气泵。In the picture: 1. Workshop body; 2. No. 1 clean room; 3. No. 1 locking plate; 4. No. 1 absorption pipe; 5. No. 1 filter chamber; 6. No. 1 exhaust pipe; ; 8, No. 1 stopper; 9, No. 2 clean room; 10, No. 2 locking plate; 11, No. 2 absorption pipe; 12, No. 2 filter chamber; 13, No. 2 exhaust pipe; 14, No. 2 filter plate; 15, No. 2 limiter; 16, circulation pipe; 17, air pump.
请参阅图1-5,本实用新型提供以下技术方案:Please refer to Figure 1-5, the utility model provides the following technical solutions:
一种化工车间空气净化设备,包括车间本体1、一号净化组件、二号净化组件以及循环组件,所述一号净化组件锁合安装在车间本体1内壁一侧,所述二号净化组件锁合安装在车间本体1内壁另一侧,所述循环组件匹配安装在一号净化组件、二号净化组件之间。An air purification equipment for a chemical workshop, comprising a workshop body 1, a No. 1 purification component, a No. 2 purification component and a circulation component. The No. 1 purification component is locked and installed on one side of the inner wall of the workshop body 1, and the No. 2 purification component is locked. It is installed on the other side of the inner wall of the workshop body 1, and the circulation assembly is installed between the No. 1 purification assembly and the No. 2 purification assembly.
所述一号净化组件、二号净化组件对应安装,且所述一号净化组件、二号净化组件平行安装在车间本体1内壁;The No. 1 purification assembly and the No. 2 purification assembly are installed correspondingly, and the No. 1 purification assembly and the No. 2 purification assembly are installed in parallel on the inner wall of the workshop body 1;
所述一号净化组件包括一号净化室2、一号锁合板3、一号吸收管4、若干组一号过滤仓5、一号排风管6以及若干组一号过滤板7,所述一号锁合板3匹配安装在一号净化室2背部,且所述一号锁合板3通过螺栓与车间本体1内壁锁合固定,所述一号吸收管4安装在一号净化室2下方且与一号净化室2内连通,所述一号排风管6安装在一号净化室2上方且与一号净化室2内连通,所述一号排风管6端处安装有一号增压泵,若干组所述一号过滤仓5均匀分布在一号净化室2内,若干组所述一号过滤板7穿过一号净化室2侧壁嵌设在一号过滤仓5内,实现了对车间本体1内气体的内循环净化,可对车间本体1的烟气进行快速全面的吸收;The No. 1 purification assembly includes No. 1 clean room 2, No. 1 locking plate 3, No. 1 absorption pipe 4, several groups of No. 1 filter chambers 5, No. 1 exhaust pipe 6 and several groups of No. 1 filter plates 7. The No. 1 locking plate 3 is matched and installed on the back of the No. 1 clean room 2, and the No. 1 locking plate 3 is locked and fixed with the inner wall of the workshop body 1 by bolts, and the No. 1 absorption pipe 4 is installed under the No. 1 clean room 2 and Connected with the No. 1 clean room 2, the No. 1 exhaust pipe 6 is installed above the No. 1 clean room 2 and communicated with the No. 1 clean room 2, and the No. 1 exhaust pipe 6 is installed at the end of the No. 1 booster Pump, several groups of the No. 1 filter chambers 5 are evenly distributed in the No. 1 clean room 2, and several groups of the No. 1 filter plates 7 pass through the side walls of the No. 1 clean room 2 and are embedded in the No. 1 filter chamber 5 to achieve In order to purify the internal circulation of the gas in the workshop body 1, the flue gas in the workshop body 1 can be quickly and comprehensively absorbed;
若干组所述一号过滤仓5内壁安装有一号限位件8,且所述一号限位件8与一号过滤板7匹配卡合;The inner walls of several groups of the No. 1 filter chambers 5 are installed with a No. 1 limiter 8, and the No. 1 limiter 8 is matched with the No. 1 filter plate 7;
若干组所述一号过滤仓5之间对应安装,所述一号过滤仓5与一号净化室2连通,且相邻两组所述一号过滤仓5之间均连接件贯穿连通,保证了相邻的一号过滤仓5之间的连通;Several groups of the No. 1 filter chambers 5 are installed correspondingly, the No. 1 filter chambers 5 are communicated with the No. 1 clean room 2, and the connecting pieces are connected between the adjacent two groups of the No. 1 filter chambers 5 to ensure that The connection between the adjacent No. 1 filter bins 5 is achieved;
所述二号净化组件包括二号净化室9、二号锁合板10、二号吸收管11、若干组二号过滤仓12、二号排风管13以及若干组二号过滤板14,所述二号锁合板10匹配安装在二号净化室9背部,且所述二号锁合板10通过螺栓与车间本体1内壁锁合固定,所述二号吸收管11安装在二号净化室9下方且与二号净化室9内连通,所述二号排风管13安装在二号净化室9上方且与二号净化室9内连通,所述二号排风管13端处安装有二号增压泵,若干组所述二号过滤仓12均匀分布在二号净化室9内,若干组所述二号过滤板14穿过二号净化室9侧壁嵌设在二号过滤仓12内;The No. 2 purification assembly includes No. 2 clean room 9, No. 2 locking plate 10, No. 2 absorption pipe 11, several groups of No. 2 filter chambers 12, No. 2 exhaust pipes 13 and several groups of No. 2 filter plates 14. The No. 2 locking plate 10 is matched and installed on the back of the No. 2 clean room 9 , and the No. 2 locking plate 10 is locked and fixed with the inner wall of the workshop body 1 by bolts. The No. 2 absorption pipe 11 is installed under the No. 2 clean room 9 and Connected with the No. 2 clean room 9, the No. 2 exhaust pipe 13 is installed above the No. 2 clean room 9 and communicated with the No. 2 clean room 9, and the No. 2 exhaust pipe 13 is installed at the end of the No. 2 increase. Pressure pump, several groups of the No. 2 filter chambers 12 are evenly distributed in the No. 2 clean room 9, and several groups of the No. 2 filter plates 14 are embedded in the No. 2 filter chamber 12 through the side walls of the No. 2 clean room 9;
若干组所述二号过滤仓12内壁安装有二号限位件15,且所述二号限位件15与二号过滤板14匹配卡合;The inner walls of several groups of the No. 2 filter chambers 12 are installed with No. 2 limiting members 15, and the No. 2 limiting members 15 are matched and engaged with the No. 2 filter plate 14;
若干组所述二号过滤仓12之间对应安装,所述二号过滤仓12与二号净化室9连通,且相邻两组所述二号过滤仓12之间均连接件贯穿连通,保证了相邻的二号过滤仓12之间的连通;Several groups of the No. 2 filter chambers 12 are installed correspondingly, the No. 2 filter chambers 12 are communicated with the No. 2 clean room 9, and the connecting pieces are connected between the adjacent two groups of the No. 2 filter chambers 12 to ensure that The connection between the adjacent No. 2 filter bins 12 is achieved;
所述循环组件包括循环管16、气泵17,所述循环管16两端分别与一号净化室2、二号净化室9内顶部连通,且所述循环管16嵌设在车间本体1内,所述气泵17安装在循环管16的端处,实现了车间本体1内空气的对流,加大了车间本体1内气体的流通量,提升了车间本体1内的工作环境,实现了对车间本体1的外循环净化处理;The circulation assembly includes a circulation pipe 16 and an air pump 17. The two ends of the circulation pipe 16 are respectively connected to the tops of the No. 1 clean room 2 and the No. 2 clean room 9, and the circulation pipe 16 is embedded in the workshop body 1, The air pump 17 is installed at the end of the circulation pipe 16, which realizes the convection of the air in the workshop body 1, increases the flow of gas in the workshop body 1, improves the working environment in the workshop body 1, and realizes the control of the workshop body 1. 1. The external circulation purification treatment;
所述循环管16外壁包裹有防护套,且所述循环管16与一号净化室2、二号净化室9接触位置经过密封处理,保证了气体流通的密闭性,避免发生泄漏。The outer wall of the circulation pipe 16 is wrapped with a protective cover, and the contact positions of the circulation pipe 16 with the No. 1 clean room 2 and No. 2 clean room 9 are sealed to ensure the airtightness of gas circulation and avoid leakage.
本实用新型的工作原理:在使用时,首先将一号净化组件、二号净化组件对应安装在车间本体1内,保证了后续整体净化过程中的稳定性,通过设有一 号净化组件,首先利用一号吸收管4将车间内的烟气进行吸收,随后烟气进入一号过滤仓5内过滤吸收,实现了对烟气的多级吸收,保证了气体的洁净度,随后烟气经过一号排风管6进行快速的排放,因此实现了对车间本体1内气体的内循环净化,可对车间本体1的烟气进行快速全面的吸收,且通过采用一号过滤板7与一号过滤仓5采用滑动可拆式连接方式,保证了良好的净化效果的同时便于工作人员对一号过滤板7进行清理,通过设有二号净化组件,重复一号净化组件的上述工作,即可完成整体净化工作,利用一号净化组件、二号净化组件的配合使用下,实现了对车间本体1内进行稳定的内循环净化处理,通过设有循环组件,利用循环管16两端分别与一号净化室2、二号净化室9内连通,因此工作人员通过电控气泵17,驱使一号净化室2、二号净化室9的气体进行循环流通,加速了车间本体1内两侧气体的流通,实现了车间本体1内空气的对流,提升了车间本体1内的工作环境,实现了对车间本体1的外循环净化处理,提升了装置整体使用效果。The working principle of the utility model: when using, firstly install the No. 1 purification component and the No. 2 purification component in the workshop body 1 correspondingly to ensure the stability in the subsequent overall purification process. The No. 1 absorption pipe 4 absorbs the flue gas in the workshop, and then the flue gas enters the No. 1 filter chamber 5 for filtering and absorption, realizing multi-stage absorption of the flue gas and ensuring the cleanliness of the gas, and then the flue gas passes through the No. 1 filter chamber. The exhaust pipe 6 discharges quickly, thus realizing the internal circulation purification of the gas in the workshop body 1, and can quickly and comprehensively absorb the flue gas in the workshop body 1, and by using the No. 1 filter plate 7 and No. 1 filter chamber 5. The sliding and detachable connection method is adopted, which ensures a good purification effect and facilitates the cleaning of the No. 1 filter plate 7 by the staff. By having the No. 2 purification component and repeating the above work of the No. 1 purification component, the whole can be completed. Purification work, with the cooperation of No. 1 purification component and No. 2 purification component, a stable internal circulation purification treatment is realized in the workshop body 1. By providing a circulation component, the two ends of the circulation pipe 16 are respectively connected with the No. 1 purification. Room 2 and No. 2 clean room 9 are connected, so the staff drives the gas in No. 1 clean room 2 and No. 2 clean room 9 to circulate through the electronically controlled air pump 17, which accelerates the flow of gas on both sides of the workshop body 1. The convection of the air in the workshop body 1 is realized, the working environment in the workshop body 1 is improved, the external circulation purification treatment of the workshop body 1 is realized, and the overall use effect of the device is improved.
Claims (10)
- 一种化工车间空气净化设备,其特征在于:包括车间本体(1)、一号净化组件、二号净化组件以及循环组件,所述一号净化组件锁合安装在车间本体(1)内壁一侧,所述二号净化组件锁合安装在车间本体(1)内壁另一侧,所述循环组件匹配安装在一号净化组件、二号净化组件之间。An air purification equipment for a chemical workshop, which is characterized in that it comprises a workshop body (1), a No. 1 purification component, a No. 2 purification component and a circulation component, wherein the No. 1 purification component is locked and installed on one side of the inner wall of the workshop body (1). , the No. 2 purification assembly is locked and installed on the other side of the inner wall of the workshop body (1), and the circulation assembly is matched and installed between the No. 1 purification assembly and the No. 2 purification assembly.
- 根据权利要求1所述的一种化工车间空气净化设备,其特征在于:所述一号净化组件、二号净化组件对应安装,且所述一号净化组件、二号净化组件平行安装在车间本体(1)内壁。The air purification equipment for a chemical workshop according to claim 1, wherein the No. 1 purification component and the No. 2 purification component are installed correspondingly, and the No. 1 purification component and the No. 2 purification component are installed in parallel on the workshop body (1) Inner wall.
- 根据权利要求1所述的一种化工车间空气净化设备,其特征在于:所述一号净化组件包括一号净化室(2)、一号锁合板(3)、一号吸收管(4)、若干组一号过滤仓(5)、一号排风管(6)以及若干组一号过滤板(7),所述一号锁合板(3)匹配安装在一号净化室(2)背部,且所述一号锁合板(3)通过螺栓与车间本体(1)内壁锁合固定,所述一号吸收管(4)安装在一号净化室(2)下方且与一号净化室(2)内连通,所述一号排风管(6)安装在一号净化室(2)上方且与一号净化室(2)内连通,所述一号排风管(6)端处安装有一号增压泵,若干组所述一号过滤仓(5)均匀分布在一号净化室(2)内,若干组所述一号过滤板(7)穿过一号净化室(2)侧壁嵌设在一号过滤仓(5)内。The air purification equipment for a chemical workshop according to claim 1, wherein the No. 1 purification component comprises a No. 1 clean room (2), a No. 1 locking plate (3), a No. 1 absorption pipe (4), a No. Several groups of No. 1 filter chambers (5), No. 1 exhaust pipes (6) and several groups of No. 1 filter plates (7), the No. 1 locking plates (3) are matched and installed on the back of No. 1 clean room (2), And the No. 1 locking plate (3) is locked and fixed with the inner wall of the workshop body (1) by bolts, and the No. 1 absorption pipe (4) is installed under the No. 1 clean room (2) and is connected with the No. 1 clean room (2). ), the No. 1 exhaust pipe (6) is installed above the No. 1 clean room (2) and communicated with the No. 1 clean room (2), and an end of the No. 1 exhaust pipe (6) is installed with a No. 1 booster pump, several groups of No. 1 filter chambers (5) are evenly distributed in No. 1 clean room (2), and several groups of No. 1 filter plates (7) pass through the side walls of No. 1 clean room (2) Embedded in the No. 1 filter chamber (5).
- 根据权利要求3所述的一种化工车间空气净化设备,其特征在于:若干组所述一号过滤仓(5)内壁安装有一号限位件(8),且所述一号限位件(8)与一号过滤板(7)匹配卡合。The air purification equipment for a chemical workshop according to claim 3, characterized in that: a No. 1 limiter (8) is installed on the inner wall of several groups of the No. 1 filter bins (5), and the No. 1 limit piece ( 8) Match with the No. 1 filter plate (7).
- 根据权利要求3所述的一种化工车间空气净化设备,其特征在于:若干组所述一号过滤仓(5)之间对应安装,所述一号过滤仓(5)与一号净化室(2)连通,且相邻两组所述一号过滤仓(5)之间均连接件贯穿连通。The air purification equipment for a chemical workshop according to claim 3, characterized in that: several groups of the No. 1 filter chambers (5) are installed correspondingly, and the No. 1 filter chamber (5) is connected to the No. 1 clean room ( 2) Connecting, and connecting pieces are connected between the adjacent two groups of No. 1 filter bins (5).
- 根据权利要求1所述的一种化工车间空气净化设备,其特征在于:所述二号净化组件包括二号净化室(9)、二号锁合板(10)、二号吸收管(11)、 若干组二号过滤仓(12)、二号排风管(13)以及若干组二号过滤板(14),所述二号锁合板(10)匹配安装在二号净化室(9)背部,且所述二号锁合板(10)通过螺栓与车间本体(1)内壁锁合固定,所述二号吸收管(11)安装在二号净化室(9)下方且与二号净化室(9)内连通,所述二号排风管(13)安装在二号净化室(9)上方且与二号净化室(9)内连通,所述二号排风管(13)端处安装有二号增压泵,若干组所述二号过滤仓(12)均匀分布在二号净化室(9)内,若干组所述二号过滤板(14)穿过二号净化室(9)侧壁嵌设在二号过滤仓(12)内。The air purification equipment for a chemical workshop according to claim 1, wherein the No. 2 purification component comprises a No. 2 clean room (9), a No. 2 locking plate (10), a No. 2 absorption pipe (11), a No. Several groups of No. 2 filter chambers (12), No. 2 exhaust pipes (13) and several groups of No. 2 filter plates (14), the No. 2 locking plates (10) are matched and installed on the back of the No. 2 clean room (9), And the No. 2 locking plate (10) is locked and fixed with the inner wall of the workshop body (1) by bolts, and the No. 2 absorption pipe (11) is installed under the No. 2 clean room (9) and is connected with the No. 2 clean room (9). ), the No. 2 exhaust pipe (13) is installed above the No. 2 clean room (9) and communicated with the No. 2 clean room (9), and the end of the No. 2 exhaust pipe (13) is installed with No. 2 booster pump, several groups of the No. 2 filter chambers (12) are evenly distributed in the No. 2 clean room (9), and several groups of the No. 2 filter plates (14) pass through the side of the No. 2 clean room (9). The wall is embedded in the No. 2 filter chamber (12).
- 根据权利要求6所述的一种化工车间空气净化设备,其特征在于:若干组所述二号过滤仓(12)内壁安装有二号限位件(15),且所述二号限位件(15)与二号过滤板(14)匹配卡合。The air purification equipment for a chemical workshop according to claim 6, characterized in that: the inner walls of the No. 2 filter chambers (12) of several groups are installed with No. 2 limiters (15), and the No. 2 limiters (15) is matched and engaged with the No. 2 filter plate (14).
- 根据权利要求6所述的一种化工车间空气净化设备,其特征在于:若干组所述二号过滤仓(12)之间对应安装,所述二号过滤仓(12)与二号净化室(9)连通,且相邻两组所述二号过滤仓(12)之间均连接件贯穿连通。The air purification equipment for a chemical workshop according to claim 6, characterized in that: several groups of the No. 2 filter chambers (12) are correspondingly installed, and the No. 2 filter chambers (12) and the No. 2 clean room ( 9) Connected, and the connecting pieces between the adjacent two groups of No. 2 filter bins (12) are connected through.
- 根据权利要求1所述的一种化工车间空气净化设备,其特征在于:所述循环组件包括循环管(16)、气泵(17),所述循环管(16)两端分别与一号净化室(2)、二号净化室(9)内顶部连通,且所述循环管(16)嵌设在车间本体(1)内,所述气泵(17)安装在循环管(16)的端处。The air purification equipment for a chemical workshop according to claim 1, characterized in that: the circulation component comprises a circulation pipe (16) and an air pump (17), and the two ends of the circulation pipe (16) are respectively connected with the No. 1 clean room. (2) The top of the No. 2 clean room (9) is connected, and the circulation pipe (16) is embedded in the workshop body (1), and the air pump (17) is installed at the end of the circulation pipe (16).
- 根据权利要求9所述的一种化工车间空气净化设备,其特征在于:所述循环管(16)外壁包裹有防护套,且所述循环管(16)与一号净化室(2)、二号净化室(9)接触位置经过密封处理。The air purification equipment for a chemical workshop according to claim 9, characterized in that: the outer wall of the circulation pipe (16) is wrapped with a protective cover, and the circulation pipe (16) is connected to the first clean room (2), the second The contact position of the clean room (9) is sealed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2021/078293 WO2022178875A1 (en) | 2021-02-27 | 2021-02-27 | Air purification device for chemical workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2021/078293 WO2022178875A1 (en) | 2021-02-27 | 2021-02-27 | Air purification device for chemical workshop |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022178875A1 true WO2022178875A1 (en) | 2022-09-01 |
Family
ID=83047628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2021/078293 WO2022178875A1 (en) | 2021-02-27 | 2021-02-27 | Air purification device for chemical workshop |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2022178875A1 (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040096824A (en) * | 2004-09-06 | 2004-11-17 | 주식회사 코만도텍 | The decrease apparatus for VOCs |
WO2009153891A1 (en) * | 2008-06-20 | 2009-12-23 | 株式会社アモウ | Air purification system |
CN206831249U (en) * | 2017-01-23 | 2018-01-02 | 东莞市辉冠照明电器有限公司 | A kind of dust-free purification lamp for monitoring workshop condition |
CN109499329A (en) * | 2019-01-03 | 2019-03-22 | 永康市恒久涂装设备有限公司 | A kind of water paint emission-control equipment and technique |
CN209451395U (en) * | 2018-10-11 | 2019-10-01 | 苏州市远大净化设备厂 | A kind of replaceable transmission channels of dust-free workshop |
CN110604986A (en) * | 2019-09-12 | 2019-12-24 | 芜湖太阳神汽摩配制造有限公司 | Intelligent dustproof workshop for processing automobile carburetor |
CN210197587U (en) * | 2019-07-15 | 2020-03-27 | 安徽舒饰环保科技有限公司 | Air exchange system of production workshop for electroplating plastic rings |
CN210663242U (en) * | 2019-11-04 | 2020-06-02 | 付运河 | Indoor ventilation device for industrial workshop |
CN211526594U (en) * | 2019-12-31 | 2020-09-18 | 苏州天惠达工程科技有限公司 | Medical aseptic workshop that purifies of high cleanliness |
CN111765574A (en) * | 2020-07-28 | 2020-10-13 | 深圳市德尼环境技术有限公司 | New energy low-humidity clean workshop and energy-saving air conditioning system |
WO2020245494A1 (en) * | 2019-06-07 | 2020-12-10 | Wärtsilä Finland Oy | An assembly arrangement and an assembly workshop |
CN212214947U (en) * | 2020-04-13 | 2020-12-25 | 江苏亿超环境科技有限公司 | Workshop is with outer hanging dust gas cleaning device |
CN212369819U (en) * | 2020-02-21 | 2021-01-19 | 佛山市南海雄科纺织有限公司 | Weaving workshop dust removal and wet temperature adjusting device |
-
2021
- 2021-02-27 WO PCT/CN2021/078293 patent/WO2022178875A1/en active Application Filing
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040096824A (en) * | 2004-09-06 | 2004-11-17 | 주식회사 코만도텍 | The decrease apparatus for VOCs |
WO2009153891A1 (en) * | 2008-06-20 | 2009-12-23 | 株式会社アモウ | Air purification system |
CN206831249U (en) * | 2017-01-23 | 2018-01-02 | 东莞市辉冠照明电器有限公司 | A kind of dust-free purification lamp for monitoring workshop condition |
CN209451395U (en) * | 2018-10-11 | 2019-10-01 | 苏州市远大净化设备厂 | A kind of replaceable transmission channels of dust-free workshop |
CN109499329A (en) * | 2019-01-03 | 2019-03-22 | 永康市恒久涂装设备有限公司 | A kind of water paint emission-control equipment and technique |
WO2020245494A1 (en) * | 2019-06-07 | 2020-12-10 | Wärtsilä Finland Oy | An assembly arrangement and an assembly workshop |
CN210197587U (en) * | 2019-07-15 | 2020-03-27 | 安徽舒饰环保科技有限公司 | Air exchange system of production workshop for electroplating plastic rings |
CN110604986A (en) * | 2019-09-12 | 2019-12-24 | 芜湖太阳神汽摩配制造有限公司 | Intelligent dustproof workshop for processing automobile carburetor |
CN210663242U (en) * | 2019-11-04 | 2020-06-02 | 付运河 | Indoor ventilation device for industrial workshop |
CN211526594U (en) * | 2019-12-31 | 2020-09-18 | 苏州天惠达工程科技有限公司 | Medical aseptic workshop that purifies of high cleanliness |
CN212369819U (en) * | 2020-02-21 | 2021-01-19 | 佛山市南海雄科纺织有限公司 | Weaving workshop dust removal and wet temperature adjusting device |
CN212214947U (en) * | 2020-04-13 | 2020-12-25 | 江苏亿超环境科技有限公司 | Workshop is with outer hanging dust gas cleaning device |
CN111765574A (en) * | 2020-07-28 | 2020-10-13 | 深圳市德尼环境技术有限公司 | New energy low-humidity clean workshop and energy-saving air conditioning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207401299U (en) | A kind of exhaust-gas treatment environmental protecting device | |
CN103657273A (en) | Small-sized modularized waste gas treatment facility | |
CN105771595A (en) | Industrial waste gas in-depth purifying treatment system | |
WO2022178875A1 (en) | Air purification device for chemical workshop | |
CN205379779U (en) | Application exhaust gas purifying apparatus | |
CN207661903U (en) | A kind of nano photo-catalytic air purification processing preparation facilities | |
CN211051150U (en) | Poisonous and harmful gaseous pollutants administers deep purification device | |
CN205019912U (en) | Infrared desorption organic waste gas purifier is adsorbed to belt | |
CN105435590A (en) | Purification system of waste gas purification tower | |
CN205903777U (en) | Circulating waste gas purifier | |
CN115501744A (en) | Waste gas treatment system and waste gas treatment process | |
CN205392132U (en) | A carbon fiber absorber for acid mist purification tower | |
CN205627568U (en) | Organic waste gas purifying equipment | |
CN213913138U (en) | Biological filter bed exhaust gas purification device | |
CN107694280A (en) | A kind of exhaust-gas treatment absorbent charcoal adsorber | |
CN210356575U (en) | Industrial tail gas adsorption and purification device | |
CN219168066U (en) | Methane total hydrocarbon remove device in gear processing waste gas | |
CN207307497U (en) | A kind of industrial waste gas dedusting purifier with dust-like | |
CN110433604A (en) | VOC gas active carbon purifying case | |
CN205109218U (en) | Production line waste gas recovery device | |
CN218553593U (en) | VOC (volatile organic compound) waste gas treatment device for environment-friendly equipment | |
CN217431300U (en) | Industrial waste gas purification treatment device | |
CN105268266A (en) | Boiler exhaust gas treatment apparatus | |
CN109248539A (en) | A kind of air adsorption purification device | |
CN210699182U (en) | High-activity adsorption method exhaust-gas treatment equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21927310 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21927310 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 26/01/2024) |