WO2022172065A1 - Composite joist with integrated stud of joist without welding in connections of joist - Google Patents
Composite joist with integrated stud of joist without welding in connections of joist Download PDFInfo
- Publication number
- WO2022172065A1 WO2022172065A1 PCT/IB2021/051888 IB2021051888W WO2022172065A1 WO 2022172065 A1 WO2022172065 A1 WO 2022172065A1 IB 2021051888 W IB2021051888 W IB 2021051888W WO 2022172065 A1 WO2022172065 A1 WO 2022172065A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- joist
- welding
- stud
- parts
- chord
- Prior art date
Links
- 238000003466 welding Methods 0.000 title claims abstract description 11
- 239000002131 composite material Substances 0.000 title claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000005457 optimization Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 7
- 238000005452 bending Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000003825 pressing Methods 0.000 description 4
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- ROXBGBWUWZTYLZ-UHFFFAOYSA-N [6-[[10-formyl-5,14-dihydroxy-13-methyl-17-(5-oxo-2h-furan-3-yl)-2,3,4,6,7,8,9,11,12,15,16,17-dodecahydro-1h-cyclopenta[a]phenanthren-3-yl]oxy]-4-methoxy-2-methyloxan-3-yl] 4-[2-(4-azido-3-iodophenyl)ethylamino]-4-oxobutanoate Chemical compound O1C(C)C(OC(=O)CCC(=O)NCCC=2C=C(I)C(N=[N+]=[N-])=CC=2)C(OC)CC1OC(CC1(O)CCC2C3(O)CC4)CCC1(C=O)C2CCC3(C)C4C1=CC(=O)OC1 ROXBGBWUWZTYLZ-UHFFFAOYSA-N 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000005304 joining Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 101001109518 Homo sapiens N-acetylneuraminate lyase Proteins 0.000 description 1
- 102100022686 N-acetylneuraminate lyase Human genes 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004794 expanded polystyrene Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/065—Light-weight girders, e.g. with precast parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This kind of composite joists performs in such a way that in addition to complete omission of welding in the connections of the joist, by making use of extending the middle threaded rebar along with it upwards and fastening nut above it, it is applied as a stud in the ceiling. Furthermore, it is designed in such a way that in addition to the aforesaid specifications, execution of joist in the ceiling could be made with types of permanent and provisional molds.
Description
The present invention is the technical field of joists, ceilings and floors of buildings which act as the gravitational load-bearing system.
Checking CJ-Series joist system from Open Web Steel Joist (OWSJ) Association from America: By reviewing the background of open web steel joist implemented by American OWSJ Association since 1923, the required standards are compiled for calculation of this type of joists derived from ACI and AISC regulations, and among the relevant series, CJ-Series system could be named in accordance with SJI 200-2015 standard concerning the joists with composite performance. Meanwhile, other various models could be observed in Wikipedia and steeljoist.org.
Checking the joists with nut and bolt connections: By studying the models searched in international patent registration sites such as googlepatent, patentscope, espacenet, uspto, the cases such as CA2191133A1, US9587401B1 are seen concerning splice between two joists, as well as the items such as CA2409645C, KR100665959, US2002046534A1, US3106995A are seen that none of the said plans are capable of composite simultaneous performance without welding connections of the joist on which the stud is installed, and no case of joists could be executed with types of permanent and provisional filling molds.
Checking the relevant domestic and foreign regulations: In terms of technical and executive calculations, the accredited domestic and foreign regulations such as Chapter 9, 10 and 6, Standard 12977, Standard 2909, Leaflet 543, Leaflet 151, of Iran National Construction Regulations, and ACI Circular, AISC Circular, Standards SJI 200-2015, Standard SJI 100-2020, have been reviewed.
Concerning construction and assembly of the joists with bolt and nut joining, complexity of design and construction comparing simple truss, and making use of various shaped parts such as applying metal pipes, pressing and bending its two ends in vertical chord of joist as well as pressing and shaping steel strap in most components of joist, construction procedure is a time consuming activity in addition to extra expense are imposed and surplus nuts are used in construction of such kind of joists.
In execution of the joists with bolt and nut connections, in case they are implemented in the ceiling of deck, upon placing the deck sheet on the joists, the stud should be welded from deck sheet to upper chord of joist and/or screwed to a threaded stud which is a time-consuming, time-wasting and expensive actions besides regulating place of connecting stud from deck sheet and controlling welds at the end of stud.
For the execution of the joists with bolt and nut joining, the joists are designed in such a way that it is infeasible to use the covering molds among joists in order to execute concreting slab, and execution of such ceilings requires execution of deck sheet with high thickness and load-bearing.
Simplifying parts and designing joist in the form a simple truss: In this type of joist comparing the joists with bolt and nut connections, its superficial form is converted to the simplest form of a truss, thus applying less parts (T5 from
) as well as multiple bending and pressing are deleted in joist components, hence its lower chord is made of channel section or steel sheet with proper width and thickness (element 2 in T5 from
) with tensile performance, and the upper chord used in it is from channel section (element 1 in T5 from
) which has appropriate gyration radius on both directions with compression performance, and vertical middle chord is made of a rebar with compression performance (elements 3 and 4 in T5 from
), and due to special shape of joist and form of the parts, the joist could be executed with different types of permanent and provisional molds such as expanded polystyrene, provisional wooden mold, galvanized sheet etc.
Replacing middle chord as stud and omitting extra screw in connections: By making use of thread on both ending sides of middle chord and passing it through the holes made by punching device in the upper and lower chords and by fastening nuts on the two ending points of the middle chord (SECA and SECB from
), the threaded place acts as a bolt in the connections, and along with the middle vertical chord upwards and fastening the nut at its end (SECA from
), we may provide performance of stud in it without any need for welding or screwed the stud to the ceiling.
The privileges of our asserted invention are concerning optimization of the joists with nut and bolt connections which the following points are attention.
Providing integrated stud of joist.
Capability of executing joist with type of permanent and provisional molds.
Omitting extra bolt in joist connections.
Decreasing construction expenses due to deleting bending and pressing on various parts and more convenient production procedure due to simplification in truss of the joist and making use of minimum consuming iron regarding the new design.
Higher speed in assembly process.
T5: is general schematic of composite joist with integrated stud of joist without welding in connections of joist.
SEC A: Element details of the lower part of joist in T5.
SEC B: Element details of the upper part of joist in T5.
Element 1 in T5 includes: upper chord of joist made of channel section or by making use of any kind of proper section and applicable in such a way that radius of its gyration are supplied on both sides which are perforated with equal distances and are regarded as compression elements.
Element 4 in T5 includes: diagonal part of middle rebar whose both ends are threaded and they are repeated with equal distances along with joist, and since no welding has intervened, we may use types of high-resistant rebars with various diameters and they are regarded as tensile elements.
Element 5 in T5: for shear controlling due to sitting in place could be used in the form of angle or channel and/or application of any kind of authorized and applicable section is used with bolt and nut connection.
Element 6 in SEC A: which is along with element 3 in figure T5 in order to provide stud on the applied joist.
Element 7 in SEC A & SEC B: Place of installing nut.
Element 8 in SEC A & SEC B: Place of installing washer.
Element 9 in SEC A: Place of installing nut for stud performance.
Examples
Production line, regarding construction procedure:
The line of transferring parts to automatic cutting machine to supply required consumption lengths.
The line of transferring channel and strap in the place of punching machine in order to make required holes with definite distances.
The line of transferring cut parts of rebar to bending machine to provide appropriate angle at the end of diagonal rebars.
The line transferring cut parts of rebar to rolling automatic machine in order to thread two ends of the rebars.
Assembly line of connecting all parts by nut and washer together manually or automatically.
Production line of painting joist manually or automatically.
Packing and sending joists.
It should be mentioned for sending the product in bulk conveniently, we can sent the parts separately and execute [0034] in the site of project.
It is used in execution of types of ceilings in types of residential, administrative, industrial and commercial structures and also upon execution of deck ceiling and composite with types of permanent and provisional molds in various type of structural carcass.
PTL1:
NPL1:
Claims (4)
- Introducing a new series of joists called composite joist with integrated stud of joist without welding in fittings of joist whose main components are: The upper chord which is made of channel section in order to bear pressure force, middle chord is from threaded rebar in two sides to bear tensile and compressive force, lower chord is used steel sheet or channel section in order to tolerate tensile force which by making a hole on upper and lower chords to pass middle chord through it, and the parts are connected without welding and extra screw and just by making use of nuts.
- In accordance with assertion 1, in the middle chord along with vertical threaded rebars upwards and fastening nut on its lower part, it plays the role of stud in the ceiling.
- In accordance with assertion 1, since welding has been omitted in joist, all parts could be from the parts with higher resistance such as AIII etc.
- In accordance with assertion 1, optimization of parts are designed in such a way that besides composite function and integrated stud, it is made feasible to execute such joint in the ceilings with permanent and provisional molds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA3155059A CA3155059A1 (en) | 2021-02-09 | 2021-03-06 | Composite joist with integrated stud of joist without welding in connections of joist |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IR139950140003010042 | 2021-02-09 | ||
IR13993010042 | 2021-02-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022172065A1 true WO2022172065A1 (en) | 2022-08-18 |
Family
ID=83189142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2021/051888 WO2022172065A1 (en) | 2021-02-09 | 2021-03-06 | Composite joist with integrated stud of joist without welding in connections of joist |
Country Status (2)
Country | Link |
---|---|
CA (1) | CA3155059A1 (en) |
WO (1) | WO2022172065A1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070110513A1 (en) * | 1999-12-29 | 2007-05-17 | Nippon Steel Corporation | Joint fitting between members and joint structure and joining method of upper and lower floor vertical frame members |
CN211947883U (en) * | 2020-01-20 | 2020-11-17 | 中铁三局集团建筑安装工程有限公司 | Integrally-assembled large-span steel truss overbridge |
-
2021
- 2021-03-06 WO PCT/IB2021/051888 patent/WO2022172065A1/en active Application Filing
- 2021-03-06 CA CA3155059A patent/CA3155059A1/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070110513A1 (en) * | 1999-12-29 | 2007-05-17 | Nippon Steel Corporation | Joint fitting between members and joint structure and joining method of upper and lower floor vertical frame members |
CN211947883U (en) * | 2020-01-20 | 2020-11-17 | 中铁三局集团建筑安装工程有限公司 | Integrally-assembled large-span steel truss overbridge |
Also Published As
Publication number | Publication date |
---|---|
CA3155059A1 (en) | 2022-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313540B (en) | Fireproof and buckling-restrained fabricated composite beam and construction method | |
CN103216034B (en) | Assembled prestressed corrugated web occlusion steel girder | |
CN110593419B (en) | Node structure of assembled type through bolt unequal-altitude beam-square steel tube concrete column and manufacturing method | |
CN204609000U (en) | A kind of assembling type node for building structure and assembling frame thereof | |
CN103255877A (en) | Assembling type pre-stress honeycombed ribbed web steel beam | |
US8453406B2 (en) | Precast composite structural girder and floor system | |
US8381485B2 (en) | Precast composite structural floor system | |
CN103485479A (en) | Assembly type prestress honeycombed web composite beam | |
WO2022172065A1 (en) | Composite joist with integrated stud of joist without welding in connections of joist | |
CN203514542U (en) | Industrial assembling type steel structure plate joint connecting device | |
Winter et al. | Development of prefabricated timber-steel-concrete ribbed decks | |
CN211396201U (en) | Connection structure of embedded steel beam and prefabricated composite floor slab | |
KR101161364B1 (en) | Improved composite beam | |
KR102471965B1 (en) | Steel Beam of Asymmetric Variable Section for the Optimum Design and method of installation of the same | |
CN205776981U (en) | A kind of floor and the structure of making floor | |
CN209975752U (en) | Integrated prefabricated wallboard house structure | |
CN113863494A (en) | Assembly type concrete beam column connecting node and mounting method thereof | |
CN202248528U (en) | Punched steel plate concrete shear wall connection beam with male pins | |
CN216475888U (en) | Partially-coated honeycomb steel-concrete composite beam | |
CN210152064U (en) | Combined flat beam structure for supporting floor panel by C-shaped steel component | |
KR0178690B1 (en) | Deck girder adn panel for reinforced concrete slab | |
CN113738003B (en) | Easy-to-disassemble and assemble stainless steel-wood-lightweight concrete combined beam-slab system and construction method | |
AU2007212833B2 (en) | A joint system | |
CN220550679U (en) | Beam column core area stirrup quick connect node | |
CN206110353U (en) | Building steel structure's connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 3155059 Country of ref document: CA Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21925553 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 21925553 Country of ref document: EP Kind code of ref document: A1 |