WO2022172065A1 - Composite joist with integrated stud of joist without welding in connections of joist - Google Patents

Composite joist with integrated stud of joist without welding in connections of joist Download PDF

Info

Publication number
WO2022172065A1
WO2022172065A1 PCT/IB2021/051888 IB2021051888W WO2022172065A1 WO 2022172065 A1 WO2022172065 A1 WO 2022172065A1 IB 2021051888 W IB2021051888 W IB 2021051888W WO 2022172065 A1 WO2022172065 A1 WO 2022172065A1
Authority
WO
WIPO (PCT)
Prior art keywords
joist
welding
stud
parts
chord
Prior art date
Application number
PCT/IB2021/051888
Other languages
French (fr)
Inventor
Arash Niazi
Armin Niazi
Mohammad Niazi
Original Assignee
Arash Niazi
Armin Niazi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Arash Niazi, Armin Niazi filed Critical Arash Niazi
Priority to CA3155059A priority Critical patent/CA3155059A1/en
Publication of WO2022172065A1 publication Critical patent/WO2022172065A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/065Light-weight girders, e.g. with precast parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

This kind of composite joists performs in such a way that in addition to complete omission of welding in the connections of the joist, by making use of extending the middle threaded rebar along with it upwards and fastening nut above it, it is applied as a stud in the ceiling. Furthermore, it is designed in such a way that in addition to the aforesaid specifications, execution of joist in the ceiling could be made with types of permanent and provisional molds.

Description

Composite joist with integrated stud of joist without welding in connections of joist
The present invention is the technical field of joists, ceilings and floors of buildings which act as the gravitational load-bearing system.
Checking CJ-Series joist system from Open Web Steel Joist (OWSJ) Association from America: By reviewing the background of open web steel joist implemented by American OWSJ Association since 1923, the required standards are compiled for calculation of this type of joists derived from ACI and AISC regulations, and among the relevant series, CJ-Series system could be named in accordance with SJI 200-2015 standard concerning the joists with composite performance. Meanwhile, other various models could be observed in Wikipedia and steeljoist.org.
Checking the joists with nut and bolt connections: By studying the models searched in international patent registration sites such as googlepatent, patentscope, espacenet, uspto, the cases such as CA2191133A1, US9587401B1 are seen concerning splice between two joists, as well as the items such as CA2409645C, KR100665959, US2002046534A1, US3106995A are seen that none of the said plans are capable of composite simultaneous performance without welding connections of the joist on which the stud is installed, and no case of joists could be executed with types of permanent and provisional filling molds.
Checking the relevant domestic and foreign regulations: In terms of technical and executive calculations, the accredited domestic and foreign regulations such as Chapter 9, 10 and 6, Standard 12977, Standard 2909, Leaflet 543, Leaflet 151, of Iran National Construction Regulations, and ACI Circular, AISC Circular, Standards SJI 200-2015, Standard SJI 100-2020, have been reviewed.
Concerning construction and assembly of the joists with bolt and nut joining, complexity of design and construction comparing simple truss, and making use of various shaped parts such as applying metal pipes, pressing and bending its two ends in vertical chord of joist as well as pressing and shaping steel strap in most components of joist, construction procedure is a time consuming activity in addition to extra expense are imposed and surplus nuts are used in construction of such kind of joists.
In execution of the joists with bolt and nut connections, in case they are implemented in the ceiling of deck, upon placing the deck sheet on the joists, the stud should be welded from deck sheet to upper chord of joist and/or screwed to a threaded stud which is a time-consuming, time-wasting and expensive actions besides regulating place of connecting stud from deck sheet and controlling welds at the end of stud.
For the execution of the joists with bolt and nut joining, the joists are designed in such a way that it is infeasible to use the covering molds among joists in order to execute concreting slab, and execution of such ceilings requires execution of deck sheet with high thickness and load-bearing.
Simplifying parts and designing joist in the form a simple truss: In this type of joist comparing the joists with bolt and nut connections, its superficial form is converted to the simplest form of a truss, thus applying less parts (T5 from ) as well as multiple bending and pressing are deleted in joist components, hence its lower chord is made of channel section or steel sheet with proper width and thickness (element 2 in T5 from ) with tensile performance, and the upper chord used in it is from channel section (element 1 in T5 from ) which has appropriate gyration radius on both directions with compression performance, and vertical middle chord is made of a rebar with compression performance (elements 3 and 4 in T5 from ), and due to special shape of joist and form of the parts, the joist could be executed with different types of permanent and provisional molds such as expanded polystyrene, provisional wooden mold, galvanized sheet etc.
Replacing middle chord as stud and omitting extra screw in connections: By making use of thread on both ending sides of middle chord and passing it through the holes made by punching device in the upper and lower chords and by fastening nuts on the two ending points of the middle chord (SECA and SECB from ), the threaded place acts as a bolt in the connections, and along with the middle vertical chord upwards and fastening the nut at its end (SECA from ), we may provide performance of stud in it without any need for welding or screwed the stud to the ceiling.
The privileges of our asserted invention are concerning optimization of the joists with nut and bolt connections which the following points are attention.
Providing integrated stud of joist.
Capability of executing joist with type of permanent and provisional molds.
Omitting extra bolt in joist connections.
Decreasing construction expenses due to deleting bending and pressing on various parts and more convenient production procedure due to simplification in truss of the joist and making use of minimum consuming iron regarding the new design.
Higher speed in assembly process.
Fig.1
includes T5, SEC A & SEC B.
T5: is general schematic of composite joist with integrated stud of joist without welding in connections of joist.
SEC A: Element details of the lower part of joist in T5.
SEC B: Element details of the upper part of joist in T5.
Element 1 in T5 includes: upper chord of joist made of channel section or by making use of any kind of proper section and applicable in such a way that radius of its gyration are supplied on both sides which are perforated with equal distances and are regarded as compression elements.
Element 2 in T5 includes: lower chord of joist made of types of steel sheets with required width and thickness in length which could be strengthened with other elements such as angle, channel etc. or by making use of any kind of authorized section and applicable in such a way that the radius of gyration are provided on both sides which are punched with equal distances and are considered as tensile elements.
Element 3 in T5 includes: vertical part of middle rebar whose both ends are threaded and repeated along with joist with equal distances, and since no welding has intervened, we may use types of high-resistant rebars with various diameters and dimensions and they are regarded as compression elements.
Element 4 in T5 includes: diagonal part of middle rebar whose both ends are threaded and they are repeated with equal distances along with joist, and since no welding has intervened, we may use types of high-resistant rebars with various diameters and they are regarded as tensile elements.
Element 5 in T5: for shear controlling due to sitting in place could be used in the form of angle or channel and/or application of any kind of authorized and applicable section is used with bolt and nut connection.
Element 6 in SEC A: which is along with element 3 in figure T5 in order to provide stud on the applied joist.
Element 7 in SEC A & SEC B: Place of installing nut.
Element 8 in SEC A & SEC B: Place of installing washer.
Element 9 in SEC A: Place of installing nut for stud performance.
Examples
Production line, regarding construction procedure:
The line of transferring parts to automatic cutting machine to supply required consumption lengths.
The line of transferring channel and strap in the place of punching machine in order to make required holes with definite distances.
The line of transferring cut parts of rebar to bending machine to provide appropriate angle at the end of diagonal rebars.
The line transferring cut parts of rebar to rolling automatic machine in order to thread two ends of the rebars.
Assembly line of connecting all parts by nut and washer together manually or automatically.
Production line of painting joist manually or automatically.
Packing and sending joists.
It should be mentioned for sending the product in bulk conveniently, we can sent the parts separately and execute [0034] in the site of project.
It is used in execution of types of ceilings in types of residential, administrative, industrial and commercial structures and also upon execution of deck ceiling and composite with types of permanent and provisional molds in various type of structural carcass.
PTL1:
NPL1:

Claims (4)

  1. Introducing a new series of joists called composite joist with integrated stud of joist without welding in fittings of joist whose main components are: The upper chord which is made of channel section in order to bear pressure force, middle chord is from threaded rebar in two sides to bear tensile and compressive force, lower chord is used steel sheet or channel section in order to tolerate tensile force which by making a hole on upper and lower chords to pass middle chord through it, and the parts are connected without welding and extra screw and just by making use of nuts.
  2. In accordance with assertion 1, in the middle chord along with vertical threaded rebars upwards and fastening nut on its lower part, it plays the role of stud in the ceiling.
  3. In accordance with assertion 1, since welding has been omitted in joist, all parts could be from the parts with higher resistance such as AIII etc.
  4. In accordance with assertion 1, optimization of parts are designed in such a way that besides composite function and integrated stud, it is made feasible to execute such joint in the ceilings with permanent and provisional molds.
PCT/IB2021/051888 2021-02-09 2021-03-06 Composite joist with integrated stud of joist without welding in connections of joist WO2022172065A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA3155059A CA3155059A1 (en) 2021-02-09 2021-03-06 Composite joist with integrated stud of joist without welding in connections of joist

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IR139950140003010042 2021-02-09
IR13993010042 2021-02-09

Publications (1)

Publication Number Publication Date
WO2022172065A1 true WO2022172065A1 (en) 2022-08-18

Family

ID=83189142

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2021/051888 WO2022172065A1 (en) 2021-02-09 2021-03-06 Composite joist with integrated stud of joist without welding in connections of joist

Country Status (2)

Country Link
CA (1) CA3155059A1 (en)
WO (1) WO2022172065A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070110513A1 (en) * 1999-12-29 2007-05-17 Nippon Steel Corporation Joint fitting between members and joint structure and joining method of upper and lower floor vertical frame members
CN211947883U (en) * 2020-01-20 2020-11-17 中铁三局集团建筑安装工程有限公司 Integrally-assembled large-span steel truss overbridge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070110513A1 (en) * 1999-12-29 2007-05-17 Nippon Steel Corporation Joint fitting between members and joint structure and joining method of upper and lower floor vertical frame members
CN211947883U (en) * 2020-01-20 2020-11-17 中铁三局集团建筑安装工程有限公司 Integrally-assembled large-span steel truss overbridge

Also Published As

Publication number Publication date
CA3155059A1 (en) 2022-08-09

Similar Documents

Publication Publication Date Title
CN107313540B (en) Fireproof and buckling-restrained fabricated composite beam and construction method
CN103216034B (en) Assembled prestressed corrugated web occlusion steel girder
CN110593419B (en) Node structure of assembled type through bolt unequal-altitude beam-square steel tube concrete column and manufacturing method
CN204609000U (en) A kind of assembling type node for building structure and assembling frame thereof
CN103255877A (en) Assembling type pre-stress honeycombed ribbed web steel beam
US8453406B2 (en) Precast composite structural girder and floor system
US8381485B2 (en) Precast composite structural floor system
CN103485479A (en) Assembly type prestress honeycombed web composite beam
WO2022172065A1 (en) Composite joist with integrated stud of joist without welding in connections of joist
CN203514542U (en) Industrial assembling type steel structure plate joint connecting device
Winter et al. Development of prefabricated timber-steel-concrete ribbed decks
CN211396201U (en) Connection structure of embedded steel beam and prefabricated composite floor slab
KR101161364B1 (en) Improved composite beam
KR102471965B1 (en) Steel Beam of Asymmetric Variable Section for the Optimum Design and method of installation of the same
CN205776981U (en) A kind of floor and the structure of making floor
CN209975752U (en) Integrated prefabricated wallboard house structure
CN113863494A (en) Assembly type concrete beam column connecting node and mounting method thereof
CN202248528U (en) Punched steel plate concrete shear wall connection beam with male pins
CN216475888U (en) Partially-coated honeycomb steel-concrete composite beam
CN210152064U (en) Combined flat beam structure for supporting floor panel by C-shaped steel component
KR0178690B1 (en) Deck girder adn panel for reinforced concrete slab
CN113738003B (en) Easy-to-disassemble and assemble stainless steel-wood-lightweight concrete combined beam-slab system and construction method
AU2007212833B2 (en) A joint system
CN220550679U (en) Beam column core area stirrup quick connect node
CN206110353U (en) Building steel structure's connecting piece

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 3155059

Country of ref document: CA

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21925553

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21925553

Country of ref document: EP

Kind code of ref document: A1