WO2022120846A1 - 一种调度方式的切换方法及装置 - Google Patents

一种调度方式的切换方法及装置 Download PDF

Info

Publication number
WO2022120846A1
WO2022120846A1 PCT/CN2020/135940 CN2020135940W WO2022120846A1 WO 2022120846 A1 WO2022120846 A1 WO 2022120846A1 CN 2020135940 W CN2020135940 W CN 2020135940W WO 2022120846 A1 WO2022120846 A1 WO 2022120846A1
Authority
WO
WIPO (PCT)
Prior art keywords
dci
terminal
scheduling mode
scheduling
target
Prior art date
Application number
PCT/CN2020/135940
Other languages
English (en)
French (fr)
Inventor
朱亚军
Original Assignee
北京小米移动软件有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京小米移动软件有限公司 filed Critical 北京小米移动软件有限公司
Priority to PCT/CN2020/135940 priority Critical patent/WO2022120846A1/zh
Priority to CN202080003942.9A priority patent/CN114930961A/zh
Publication of WO2022120846A1 publication Critical patent/WO2022120846A1/zh
Priority to US18/332,293 priority patent/US20230354295A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • H04W72/232Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the physical layer, e.g. DCI signalling

Definitions

  • the present disclosure relates to the technical field of mobile communications, and in particular, to a scheduling method switching method and device.
  • Cellular mobile communication technology is in the evolution stage of a new generation technology.
  • An important feature of the new generation technology is to support flexible configuration of multiple business types.
  • the initial deployment of a new generation of mobile communication technology usually occurs in areas with high traffic density and high requirements for new services, and then gradually expands the coverage.
  • the mixed coverage of new technologies and old technologies has become a requirement of the operator's network.
  • older technologies must also be retained and co-exist for a considerable period of time to ensure continued service to older equipment that does not support the new technology.
  • New technologies can be deployed in the same spectrum as older technologies, allowing total spectrum capacity to be dynamically shared between the two technologies to improve spectrum utilization.
  • the embodiment of the first aspect of the present disclosure proposes a scheduling method switching method, which is applied to a terminal, and the method includes:
  • the switching of the scheduling mode is performed, wherein the first DCI is used to indicate the target scheduling mode of the terminal.
  • DCI Downlink Control Information
  • the switching of the scheduling mode based on the acquired first DCI includes:
  • the current scheduling mode is maintained.
  • the switching of the scheduling mode based on the acquired first DCI includes:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit corresponding to the terminal in the first DCI.
  • the method further includes: determining, based on the obtained terminal grouping indication message, a target RNTI corresponding to the group where the terminal is located.
  • the switching of the scheduling mode based on the acquired first DCI includes:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • the switching of the scheduling mode based on the acquired first DCI includes:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • the method further includes:
  • the first DCI is acquired in a terminal UE-specific search space (USS, U-specific Search Space).
  • USS terminal UE-specific Search Space
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • the embodiment of the second aspect of the present disclosure proposes a scheduling method switching method, which is applied to a base station, and the method includes:
  • a first DCI is sent, where the first DCI is used to indicate a target scheduling mode of the terminal.
  • the sending the first DCI includes:
  • the first DCI is sent within the USS of the secondary cell.
  • the method further includes:
  • each terminal corresponds to one RNTI, or multiple terminals correspond to one RNTI.
  • the value of the specified information field in the first DCI is a first specified value.
  • the method further includes: based on the determined scheduling mode of any terminal, determining that the number of bits included in the first DCI is a second specified value.
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • the embodiment of the third aspect of the present disclosure provides a scheduling mode switching device, which is applied to a terminal, and the device includes:
  • the processing module is configured to switch the scheduling mode based on the acquired first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • processing module is configured to:
  • the current scheduling mode is maintained.
  • processing module is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit corresponding to the terminal in the first DCI.
  • the device also includes:
  • the determining module is configured to determine, based on the acquired terminal grouping indication message, a target RNTI corresponding to the group where the terminal is located.
  • processing module is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • processing module is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • the device further includes: an acquisition module configured to:
  • the first DCI is acquired within the USS.
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • the embodiment of the fourth aspect of the present disclosure provides a scheduling mode switching device, which is applied to a base station, and the device includes:
  • the sending module is configured to send a first DCI, where the first DCI is used to indicate a target scheduling mode of the terminal.
  • the sending module is configured to:
  • the first DCI is sent within the USS of the secondary cell.
  • the device also includes:
  • a first determining module configured to determine the current value of the target bit corresponding to the any terminal in the first DCI based on the determined scheduling mode of any terminal;
  • the scrambling module is configured to scramble the CRC in the first DCI based on the target RNTI corresponding to any terminal.
  • each terminal corresponds to one RNTI, or multiple terminals correspond to one RNTI.
  • the device also includes:
  • the second determining module is configured to determine, based on the determined scheduling mode of any terminal, the value of the specified information field in the first DCI as the first specified value.
  • the device also includes:
  • the third determining module is configured to, based on the determined scheduling mode of any terminal, determine that the number of bits included in the first DCI is the second specified value.
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • Embodiments of the fifth aspect of the present disclosure provide a communication device, including: a transceiver; a memory; and a processor, respectively connected to the transceiver and the memory, and configured to execute computer-executable instructions on the memory, Control the transceiver to send and receive wireless signals, and can implement the method described in the embodiment of the first aspect or the method described in the embodiment of the second aspect.
  • Embodiments of the sixth aspect of the present disclosure provide a computer storage medium, wherein the computer storage medium stores computer-executable instructions; after the computer-executable instructions are executed by a processor, the computer-executable instructions can implement the above-mentioned first aspect embodiment.
  • the computer storage medium stores computer-executable instructions; after the computer-executable instructions are executed by a processor, the computer-executable instructions can implement the above-mentioned first aspect embodiment.
  • the base station indicates the target scheduling mode of the terminal through DCI, and the terminal switches the scheduling mode according to the target scheduling mode of the terminal indicated by the DCI, which realizes the self-scheduling and cross-border scheduling.
  • Fast switching between carrier scheduling can better adapt to changes in link quality and load, and improve the utilization of system resources.
  • FIG. 1 is a schematic flowchart of a scheduling method switching method provided by an embodiment of the present disclosure
  • FIG. 2 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure
  • FIG. 3 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 4 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 5 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 6 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 7 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 8 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 9 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 10 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • FIG. 11 is a schematic structural diagram of a switching device of a scheduling mode provided by an embodiment of the present disclosure.
  • FIG. 12 is a schematic structural diagram of a switching apparatus of a scheduling mode provided by an embodiment of the present disclosure.
  • FIG. 13 is a schematic structural diagram of a switching apparatus of another scheduling method provided by an embodiment of the present disclosure.
  • FIG. 14 is a schematic structural diagram of a switching apparatus of another scheduling method provided by an embodiment of the present disclosure.
  • FIG. 15 is a block diagram of an electronic device for implementing the scheduling method switching method according to the embodiment of the present disclosure.
  • Radio Resource Control configures carriers for self-scheduling or scheduling.
  • Self-scheduling that is, receiving DCI on the current carrier and scheduling the Physical Downlink Shared Channel (PDSCH, Physical Downlink Shared Channel) or Physical Uplink Shared Channel (PUSCH, Physical Uplink Shared Channel) on the current carrier.
  • Scheduled that is, receiving DCI on another carrier and scheduling PDSCH or PUSCH on that carrier.
  • RRC configures a carrier (referred to as carrier C) to be scheduled
  • RRC needs to configure the scheduling carrier index of carrier C (that is, which carrier schedules carrier C) and configure the CIF value of carrier C in the scheduling carrier.
  • the DCI schedules the CrossCarrierSchedulingConfig configuration on the carrier C.
  • the schedulingCellId configuration in the CrossCarrierSchedulingConfig information element configures the scheduling carrier index, and the cifInSchedulingCell configuration in the CrossCarrierSchedulingConfig information element
  • the CIF value of the carrier in the scheduling carrier Assuming that the RRC configuration carrier C is scheduled across carriers by carrier A and the CIF of the configuration carrier C in the scheduling carrier is 1, when the CIF indicated by the CIF field of the DCI on carrier A is 1, then this DCI is in the carrier C PDSCH or PUSCH is scheduled on it.
  • DCI formats 1_0 and 0_0 also known as fallback downlink control information fallback DCI
  • DCI formats 1_0 and 0_0 can only be used for self-scheduling but not for cross-carrier scheduling
  • DCI format CIF fields can be configured in 0_1, DCI format 0_2, DCI format 1_1, and DCI format 1_2 (also referred to as non-fallback downlink control information non-fallback DCI), which can be used for cross-carrier scheduling.
  • DCI format 1_0 can only be used to schedule PDSCH on this carrier
  • DCI format 0_0 can only be used to schedule PUSCH on this carrier
  • DCI format 1_1 and CIF 0 and DCI format 1_2 and
  • the CIF field of the DCI (DCI format 0_1, DCI format 0_2, DCI format 1_1 and DCI format 1_2) on the scheduling carrier indicates the value of the CIF in the scheduling carrier configured for the carrier.
  • the carrier is scheduled across carriers, and one CIF value can only correspond to one carrier.
  • a carrier can only be configured as self-scheduling or scheduled, and cannot be configured as self-scheduling and scheduled at the same time.
  • the primary cell can only be configured for self-scheduling, so the PDCCH capacity is limited during DSS, resulting in a high load of the 5G system to transmit control signaling.
  • the switching between self-scheduling and cross-carrier scheduling in the new technology is indicated by high-layer signaling, such as RRC signaling, and the switching speed is relatively slow.
  • the embodiments of the present disclosure provide a scheduling method switching method and apparatus.
  • FIG. 1 is a schematic flowchart of a scheduling method switching method provided by an embodiment of the present disclosure. The method is executed by a terminal. By switching the scheduling method based on DCI, fast switching between self-scheduling and cross-carrier scheduling can be realized. Better adapt to changes in link quality and load, and improve the utilization of system resources.
  • the switching method of the scheduling mode includes the following steps:
  • Step 101 switching the scheduling mode based on the acquired first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • the terminal may obtain the DCI sent by the base station, which is referred to as the first DCI herein for the convenience of distinction.
  • the first DCI is used to indicate the target scheduling mode of the terminal.
  • the scheduling mode may refer to whether the downlink control channel and the data channel are on the same carrier or on different carriers.
  • Scheduling methods may include self-scheduling and cross-carrier scheduling.
  • Self-scheduling may mean that downlink control channels and data channels are on the same carrier
  • cross-carrier scheduling may mean that downlink control channels and data channels are on different carriers.
  • the terminal switches the scheduling mode according to the first DCI based on the acquired first DCI. For example, if the first DCI indicates that the target scheduling mode of the terminal is self-scheduling, the terminal may switch from the current scheduling mode to the self-scheduling mode.
  • the scheduling mode switching method of the embodiment of the present disclosure realizes the fast switching between self-scheduling and cross-carrier scheduling by switching the scheduling mode according to the target scheduling mode of the terminal indicated by the DCI, and can better adapt to the link quality And load changes, improve the utilization of system resources.
  • FIG. 2 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure. The method is executed by the terminal, and switches the scheduling mode based on whether the scheduling mode indicated by the first DCI is different from the current scheduling mode.
  • the switching method of the scheduling mode includes:
  • Step 201 in response to the acquired target scheduling mode indicated in the first DCI being different from the current scheduling mode, switch the scheduling mode; or, in response to the acquired target scheduling mode indicated in the first DCI being the same as the current scheduling mode, keep The current scheduling method.
  • the terminal may acquire the first DCI sent by the base station, where the first DCI is used to indicate the target scheduling of the terminal, and the first DCI may include the target scheduling mode of at least one terminal.
  • the scheduling mode may include self-scheduling and cross-carrier scheduling.
  • the terminal may acquire the first DCI in the CSS, or acquire the first DCI in the USS.
  • the length of the first DCI may be different from the length of any other DCI.
  • the length of the first DCI may be the same as the length of the fallback DCI. Since the length of the first DCI is the same as the length of the fallback DCI, the number of blind checks of the terminal will not be increased.
  • the terminal may compare the target scheduling mode indicated by the first DCI with the current scheduling mode, and in response to the target scheduling mode being different from the current scheduling mode, the terminal switches the current scheduling mode to the target scheduling mode to realize switching of the scheduling mode.
  • the terminal continues to maintain the current scheduling manner in response to the target scheduling manner indicated in the first DCI being the same as the current scheduling manner.
  • the terminal switches from self-scheduling to cross-carrier scheduling. If the current scheduling mode of the terminal is cross-carrier scheduling, the terminal continues to maintain cross-carrier scheduling.
  • the terminal switches from cross-carrier scheduling to self-scheduling. If the current scheduling mode of the terminal is self-scheduling, the terminal continues to maintain self-scheduling.
  • the scheduling mode switching method of the embodiment of the present disclosure realizes fast switching between self-scheduling and cross-carrier scheduling by determining whether to switch the scheduling mode based on whether the scheduling mode indicated by the DCI is different from the current scheduling mode. It adapts well to changes in link quality and load, and improves the utilization of system resources.
  • FIG. 3 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method is executed by the terminal, and in response to the RNTI in the first DCI being the RNTI of the group where the terminal is located, based on the current value of the target bit corresponding to the terminal in the first DCI, the target scheduling mode is determined, and the target scheduling mode is determined according to the target scheduling mode and the current value of the current value. Scheduling mode, to determine whether to switch the scheduling mode.
  • the switching method of the scheduling mode includes:
  • Step 301 Obtain a first DCI based on the target RNTI corresponding to the terminal.
  • the terminal may acquire the terminal grouping indication message sent by the base station, and determine the target RNTI corresponding to the group where the terminal is located by analyzing the acquired terminal grouping indication message.
  • the terminal grouping indication message obtained by the terminal may only indicate the target RNTI of the group where the terminal is located, or may include the target RNTI of the group where multiple terminals are located, and the terminal may, according to the mapping relationship between the terminal identifier and the RNTI, Determine the target RNTI corresponding to itself.
  • the base station may first use the RNTI to scramble the CRC code attached to the first DCI, and send the first DCI attached with the scrambled CRC to the terminal.
  • the terminal may perform blind detection on the downlink transmission including the DCI on the common control channel, so as to obtain the DCI corresponding to the terminal, that is, the first DCI, according to the corresponding target RNTI.
  • the terminal uses the target RNTI associated with itself to descramble the scrambled CRC in the downlink transmission on the common control channel to obtain the descrambled CRC, and uses the CRC to check the DCI. If the verification is successful, the downlink transmission is received. And if the check fails, the downlink transmission is discarded.
  • the terminal may acquire the first DCI in the CSS, or acquire the first DCI in the USS.
  • the length of the first DCI may be different from the length of any other DCI.
  • the length of the first DCI may be the same as the length of the fallback DCI. Since the length of the first DCI is the same as the length of the fallback DCI, the number of blind checks of the terminal will not be increased.
  • Step 302 Determine the target scheduling mode of the terminal according to the current value of the target bit corresponding to the terminal in the first DCI.
  • the first DCI may include bits corresponding to one or more terminals respectively, and the value of the bits may be used to indicate the target scheduling mode of the corresponding terminal. That is to say, the first DCI may include the target scheduling mode of at least one terminal.
  • the target bit corresponding to each terminal in the first DCI may be predetermined, for example, may be predetermined by a standard, or may be determined by the terminal according to an instruction sent by the base station indicating its target bit. Then, the terminal can determine the corresponding target bit in the first DCI.
  • the values of the target bits corresponding to the terminal in the first DCI are different, and may represent different scheduling modes. Then, the terminal can determine the target scheduling mode of the terminal according to the current value of the target bit.
  • a value of 0 indicates self-scheduling
  • a value of 1 indicates cross-carrier scheduling. If the current value of the target bit corresponding to a terminal in the first DCI is 1, it can be determined that the target scheduling mode of the terminal is cross-carrier scheduling. .
  • bit bit and the corresponding scheduling mode are merely examples, which can be set according to actual needs, which are not limited in this embodiment.
  • the value of the bit may only indicate whether the corresponding terminal should switch the scheduling mode. For example, the bit value is 0, which can indicate that the current scheduling mode is maintained. The bit value is 1, which can indicate the switching scheduling mode.
  • the target bits may be multiple bits to represent a specific number of scheduling modes.
  • the target bits are 2 bits, 00 represents the first scheduling method, 01 represents the second scheduling method, 10 represents the third scheduling method, 11 represents the fourth scheduling method, and so on.
  • Step 303 in response to the acquired target scheduling mode indicated in the first DCI being different from the current scheduling mode, switch the scheduling mode; or, in response to the acquired target scheduling mode indicated in the first DCI being the same as the current scheduling mode, keep The current scheduling method.
  • step 303 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the first DCI is obtained based on the target RNTI corresponding to the terminal, and the target scheduling mode of the terminal is determined according to the current value of the target bit corresponding to the terminal in the first DCI, According to the target scheduling method and the current scheduling method, it is determined whether to switch the scheduling method, which realizes the fast switching between self-scheduling and cross-carrier scheduling, which can better adapt to the changes of link quality and load, and improve the utilization of system resources. Rate.
  • FIG. 4 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method is executed by the terminal, and in response to the value of the specified information field in the first DCI being the first specified value, based on the current value of the target bit corresponding to the terminal in the first DCI, the target scheduling mode is determined, and according to the target scheduling mode and the current scheduling mode to determine whether to switch the scheduling mode.
  • the switching method of the scheduling mode includes:
  • Step 401 in response to the acquired value of the specified information field in the first DCI being the first specified value, determine the current value of the target bit corresponding to the terminal in the first DCI.
  • the value of the specified information field in the first DCI may be a specified value, which is referred to as the first specified value here for the convenience of distinction. value.
  • the first specified value can be set as required.
  • the first DCI may include bits corresponding to one or more terminals respectively, and the value of the bits may be used to indicate the target scheduling mode of the corresponding terminal.
  • the terminal may determine the current value of the target bit corresponding to the terminal in the first DCI in response to the acquired value of the specified information field in the first DCI being the first specified value.
  • Step 402 Determine the target scheduling mode of the terminal according to the current value of the target bit.
  • step 402 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the first DCI may also include other information, such as other indication information from the base station to the terminal, and the like, which is not limited in this embodiment of the present disclosure.
  • Step 403 in response to the acquired target scheduling mode indicated in the first DCI being different from the current scheduling mode, switch the scheduling mode; or, in response to the acquired target scheduling mode indicated in the first DCI being the same as the current scheduling mode, keep The current scheduling method.
  • step 403 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the target scheduling is determined based on the current value of the target bit corresponding to the terminal in the first DCI in response to the value of the specified information field in the first DCI being the first specified value. According to the target scheduling method and the current scheduling method, it is determined whether to switch the scheduling method, which realizes the fast switching between self-scheduling and cross-carrier scheduling, which can better adapt to changes in link quality and load, and improve system resources. utilization rate.
  • FIG. 5 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method is executed by the terminal, and in response to the number of bits contained in the first DCI being the second specified value, and based on the current value of the target bits corresponding to the terminal in the first DCI, the target scheduling mode is determined, and the target scheduling mode is determined according to the target scheduling mode. and the current scheduling mode to determine whether to switch the scheduling mode.
  • the switching method of the scheduling mode includes:
  • Step 501 in response to the acquired number of bits contained in the first DCI being the second specified value, determine the current value of the target bits corresponding to the terminal in the first DCI.
  • the number of bits included in the first DCI may be a second specified value.
  • the second specified value is different from the number of bits included in other DCIs, and the second specified value can be set as required.
  • the first DCI may include bits corresponding to one or more terminals respectively, and the value of the bits may be used to indicate the target scheduling mode of the corresponding terminal.
  • the terminal may determine the current value of the target bit corresponding to the terminal in the first DCI in response to the acquired number of bits included in the first DCI being the second specified value.
  • Step 502 Determine the target scheduling mode of the terminal according to the current value of the target bit.
  • step 502 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the first DCI may also include other information, such as other indication information from the base station to the terminal, and the like, which is not limited in this embodiment of the present disclosure.
  • Step 503 in response to the acquired target scheduling mode indicated in the first DCI being different from the current scheduling mode, switch the scheduling mode; or, in response to the acquired target scheduling mode indicated in the first DCI being the same as the current scheduling mode, keep The current scheduling method.
  • step 503 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the target scheduling method is determined based on the current value of the target bit corresponding to the terminal in the first DCI in response to the number of bits included in the first DCI being the second specified value. , according to the target scheduling method and the current scheduling method, it is determined whether to switch the scheduling method, which realizes the fast switching between self-scheduling and cross-carrier scheduling, can better adapt to the changes of link quality and load, and improves the utilization of system resources. utilization.
  • FIG. 6 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method can be executed by a base station, and a target scheduling method of a terminal is indicated through DCI, so that the terminal can quickly switch between self-scheduling and cross-carrier scheduling , which can better adapt to changes in link quality and load, and improve the utilization of system resources.
  • the switching method of the scheduling mode includes:
  • Step 601 Send a first DCI, where the first DCI is used to indicate a target scheduling mode of the terminal.
  • the base station can indicate the target scheduling mode of the terminal through DCI, which is referred to as the first DCI here for the convenience of distinction.
  • the base station can send the first DCI to the terminal, so that the terminal can switch the scheduling mode according to the obtained first DCI. .
  • the scheduling methods may include self-scheduling and cross-carrier scheduling.
  • Self-scheduling may mean that the downlink control channel and data channel are on the same carrier
  • cross-carrier scheduling may mean that the downlink control channel and data channel are on different carriers.
  • the first DCI may include target scheduling modes of one or more terminals, and then the base station may send the first DCI to each terminal.
  • the base station may, in response to the deterioration of the link quality of the secondary cell of the scheduling primary cell/primary/secondary cell, or that the physical downlink control channel (PDCCH, Physical Downlink Control Channel) resources of the primary cell/primary/secondary cell are sufficient, send the request to the secondary cell.
  • the terminal sends the first DCI.
  • the scheduling mode switching method of the embodiment of the present disclosure indicates the target scheduling mode of the terminal through DCI, so that the terminal can quickly switch between self-scheduling and cross-carrier scheduling, which can better adapt to changes in link quality and load, and improve utilization of system resources.
  • FIG. 7 is a schematic flowchart of another scheduling method handover method provided by an embodiment of the present disclosure.
  • the method may be executed by a base station by sending the first DCI in the CSS or in the USS.
  • the switching method of the scheduling mode includes:
  • Step 701 Send the first DCI in the CSS of the primary cell/primary-secondary cell; or, send the first DCI in the CSS of the secondary cell; or, send the first DCI in the USS of the secondary cell.
  • the base station may send the first DCI to the terminal within the CSS of the primary cell/primary/secondary cell.
  • the base station may send the first DCI to the terminal within the CSS of the secondary cell, so as to use the secondary frequency band to send the first DCI.
  • the first DCI is sent within the USS of the secondary cell.
  • the first DCI is used to indicate the target scheduling mode of the terminal.
  • the scheduling mode includes self-scheduling or cross-carrier scheduling.
  • the length of the first DCI may be different from the length of any other DCI.
  • the length of the first DCI may be the same as the length of the fallback DCI. Since the length of the first DCI is the same as the length of the fallback DCI, the number of blind checks of the terminal will not be increased.
  • the first DCI may include the target scheduling mode of at least one terminal, and the base station may send the first DCI to each terminal respectively, so that each terminal performs the scheduling mode according to its target scheduling mode indicated by the first DCI. switch.
  • the base station can indicate the target scheduling mode of one or more terminals through the first DCI.
  • the first DCI is sent in the CSS of the primary cell/primary and secondary cells, or the first DCI is sent in the CSS of the secondary cell, or the first DCI is sent in the USS of the secondary cell, and the first DCI is sent in the CSS of the secondary cell.
  • Sending the DCI indicating the target scheduling mode of the terminal to the terminal enables the terminal to quickly switch between self-scheduling and cross-carrier scheduling, which can better adapt to changes in link quality and load and improve the utilization of system resources.
  • FIG. 8 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method may be executed by a base station.
  • determine the scheduling method of any terminal according to the target RNTI corresponding to any terminal, determine the first RNTI in DCI.
  • the switching method of the scheduling mode includes:
  • Step 801 Based on the determined scheduling mode of any terminal, determine the current value of the target bit corresponding to any terminal in the first DCI.
  • the base station can determine the scheduling mode of any terminal according to the current link quality or load condition. For example, if the link quality of the secondary cell of the currently scheduled primary cell/primary/secondary cell deteriorates, or the PDCCH resources of the primary cell/primary/secondary cell are sufficient, the base station may determine that the scheduling mode of a terminal is self-scheduling.
  • the first DCI may include bits corresponding to one or more terminals, and the base station may determine the corresponding bits of any terminal in the first DCI according to the pre-agreed target bits corresponding to each terminal in the first DCI. target bit, and according to the determined scheduling mode of any terminal, determine the current value of the target bit corresponding to any terminal in the first DCI. The current value of the target bit corresponding to any terminal in the first DCI is used to indicate the target scheduling mode of any terminal.
  • a value of 0 indicates self-scheduling
  • a value of 1 indicates cross-carrier scheduling. If the base station determines that the scheduling mode of a terminal is cross-carrier scheduling, the base station determines the current value of the target bit corresponding to the terminal in the first DCI. The value is 1.
  • bit bit and the corresponding scheduling mode are merely examples, which can be set according to actual needs, which are not limited in this embodiment.
  • the value of the bit may only indicate whether the corresponding terminal should switch the scheduling mode. For example, the bit value is 0, which can indicate that the current scheduling mode is maintained. The bit value is 1, which can indicate the switching scheduling mode.
  • the target bits may be multiple bits to represent a specific number of scheduling modes.
  • the target bits are 2 bits, 00 represents the first scheduling method, 01 represents the second scheduling method, 10 represents the third scheduling method, 11 represents the fourth scheduling method, and so on.
  • Step 802 scramble the CRC in the first DCI based on the target RNTI corresponding to any terminal.
  • each terminal may correspond to one RNTI, and the base station may use the RNTI corresponding to any terminal to scramble the CRC code appended to the first DCI.
  • the base station may also group the terminals according to the type of the terminals or other information.
  • each group corresponds to one PNTI
  • the RNTI can be used to indicate the identity of the group where the terminal is located.
  • the terminals in the same group correspond to one RNTI. If there are multiple terminals in the group, then the multiple terminals correspond to one RNTI.
  • the base station may use the target RNTI corresponding to any terminal to scramble the CRC code appended to the first DCI.
  • the number of terminals included in each group may be one or multiple, and the number of terminals included in each group may be determined according to implementation requirements.
  • Step 803 Send the first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • the base station may send the first DCI attached with the scrambled CRC to the terminal.
  • the terminal may perform blind detection on the downlink transmission including the DCI on the common control channel, so as to obtain the DCI corresponding to the terminal, that is, the first DCI, according to the corresponding target RNTI.
  • the terminal uses the target RNTI associated with itself to descramble the scrambled CRC in the downlink transmission on the common control channel to obtain the descrambled CRC, and uses the CRC to check the DCI. If the verification is successful, the downlink transmission is received. And if the check fails, the downlink transmission is discarded.
  • the current value of the target bit corresponding to any terminal in the first DCI is determined based on the determined scheduling mode of any terminal, and based on the target RNTI corresponding to any terminal, Scrambling the CRC in the first DCI, and sending the first DCI, so that the terminal uses the target RNTI associated with itself to obtain the first DCI corresponding to the terminal, and switches based on the target scheduling mode indicated by the first DCI.
  • the scheduling method enables the terminal to quickly switch between self-scheduling and cross-carrier scheduling, which can better adapt to changes in link quality and load, and improve the utilization of system resources.
  • FIG. 9 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method can be executed by a base station.
  • the value of the specified information field in the first DCI is determined as the value of The first specified value.
  • the switching method of the scheduling mode includes:
  • Step 1001 Based on the determined scheduling mode of any terminal, determine that the value of the specified information field in the first DCI is a first specified value.
  • the base station can determine the scheduling mode of any terminal according to the current link quality or load condition. For example, if the link quality of the secondary cell of the currently scheduled primary cell/primary/secondary cell deteriorates, or the PDCCH resources of the primary cell/primary/secondary cell are sufficient, the base station may determine that the scheduling mode of a terminal is self-scheduling.
  • the value of the specified information field in the first DCI may be a specified value, which is referred to as the first specified value here for the convenience of distinction. value.
  • the first specified value may be set as required, which is not limited in this embodiment.
  • the base station may determine the value of the specified information field in the first DCI to be the first specified value according to the scheduling mode of any terminal.
  • Step 1002 Send the first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • step 1002 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the scheduling mode switching method of the embodiment of the present disclosure in response to determining the scheduling mode of any terminal, determining the value of the specified information field in the first DCI as the first specified value, and using the value of the specified information field as the specified value DCI indicates the target scheduling mode of the terminal, which enriches the diversification of DCI formats.
  • FIG. 10 is a schematic flowchart of another scheduling method switching method provided by an embodiment of the present disclosure.
  • the method can be executed by a base station.
  • it is determined that the number of bits included in the first DCI is the number of bits included in the first DCI. 2 Specify the value.
  • the switching method of the scheduling mode includes:
  • Step 1101 Based on the determined scheduling mode of any terminal, determine that the number of bits included in the first DCI is the second specified value.
  • the base station can determine the scheduling mode of any terminal according to the current link quality or load condition. For example, if the link quality of the secondary cell of the currently scheduled primary cell/primary/secondary cell deteriorates, or the PDCCH resources of the primary cell/primary/secondary cell are sufficient, the base station may determine that the scheduling mode of a terminal is self-scheduling.
  • the number of bits included in the first DCI may be a second specified value.
  • the second specified value is different from the number of bits included in other DCIs, and the second specified value can be set as required.
  • the base station may determine the number of bits included in the first DCI to be the second specified value based on determining the scheduling mode of any terminal.
  • Step 1102 Send the first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • step 1102 may be implemented in any of the various embodiments of the present disclosure, which is not limited in the embodiments of the present disclosure, and will not be described again.
  • the scheduling method switching method of the embodiment of the present disclosure in response to determining the scheduling mode of any terminal, determining the number of bits included in the first DCI to be the second specified value, and using the DCI indication that the number of bits included is the specified value.
  • the target scheduling mode of the terminal enriches the diversification of DCI formats.
  • the switching method of the scheduling mode is further described below, and the switching method of the scheduling mode can be performed by the base station.
  • the switching of the scheduling mode can be implemented in the following ways:
  • Manner 1 Use group common DCI to perform cross-carrier scheduling indication, and send DCI on the primary cell/primary/secondary cell, or the CSS of the secondary cell.
  • the terminals may be grouped, and the base station designates an RNTI for each terminal group.
  • the length of the DCI and the fallback DCI on the CSS are kept consistent.
  • each terminal may correspond to one bit in the DCI.
  • the value of the bit corresponding to the terminal is 0, indicating self-scheduling; the value of the bit corresponding to the terminal is 1, indicating cross-carrier scheduling.
  • the value of the bit may only indicate whether the corresponding terminal should switch the scheduling mode. For example, the bit value is 0, which can indicate that the current scheduling mode is maintained. The bit value is 1, which can indicate the switching scheduling mode.
  • the target bits may also be multiple bits to represent a specific number of scheduling modes.
  • the target bits are 2 bits, 00 represents the first scheduling method, 01 represents the second scheduling method, 10 represents the third scheduling method, 11 represents the fourth scheduling method, and so on.
  • Manner 2 Use a new DCI format for cross-carrier scheduling indication, and send DCI on the CSS of the primary cell/primary and secondary cells, or on the USS of the secondary cell.
  • the design method of DCI format is as follows:
  • a new DCI format can be defined to ensure that the number of bits of the DCI is different from the number of bits of the existing DCI format.
  • a new DCI format can be defined, using the same number of bits as an existing DCI format, and setting the new DCI information field to a specified value (denoted as the first specified value) to represent the new DCI format. DCI format.
  • the present disclosure also provides a scheduling method switching device, because the scheduling method switching device provided by the embodiments of the present disclosure is the same as the scheduling methods provided by the above-mentioned embodiments. Therefore, the implementation of the switching method in the scheduling mode is also applicable to the switching device in the scheduling mode provided in this embodiment, and will not be described in detail in this disclosure.
  • 11-12 are schematic structural diagrams of a switching apparatus in a scheduling manner according to an embodiment of the present disclosure. The device can be applied to a terminal.
  • the switching device 1200 of the scheduling mode includes:
  • the processing module 1210 is configured to switch the scheduling mode based on the acquired first DCI, where the first DCI is used to indicate the target scheduling mode of the terminal.
  • the scheduling mode may refer to whether the downlink control channel and the data channel are on the same carrier or on different carriers.
  • Scheduling methods may include self-scheduling and cross-carrier scheduling.
  • Self-scheduling may mean that downlink control channels and data channels are on the same carrier
  • cross-carrier scheduling may mean that downlink control channels and data channels are on different carriers.
  • processing module 1210 is configured to:
  • the current scheduling mode is maintained.
  • processing module 1210 is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit corresponding to the terminal in the first DCI.
  • the device further includes:
  • the determining module 1220 is configured to determine, based on the acquired terminal grouping indication message, a target RNTI corresponding to the group where the terminal is located.
  • processing module 1210 is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • processing module 1210 is configured to:
  • the target scheduling mode of the terminal is determined according to the current value of the target bit.
  • the device further includes: an acquisition module configured to:
  • the first DCI is acquired within the USS.
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • the device for switching the scheduling mode performs the switching of the scheduling mode according to the target scheduling mode of the terminal indicated by the DCI, thereby realizing fast switching between self-scheduling and cross-carrier scheduling, and can better adapt to the link quality And load changes, improve the utilization of system resources.
  • the present disclosure also provides a scheduling method switching device. Therefore, the implementation of the switching method in the scheduling mode is also applicable to the switching device in the scheduling mode provided in this embodiment, and will not be described in detail in this disclosure.
  • 13-14 are schematic structural diagrams of a switching apparatus in another scheduling manner provided by an embodiment of the present disclosure. The apparatus can be applied to a base station.
  • the switching device 1400 of the scheduling mode includes:
  • the sending module 1410 is configured to send a first DCI, where the first DCI is used to indicate a target scheduling mode of the terminal.
  • the sending module 1410 is configured to:
  • the first DCI is sent within the USS of the secondary cell.
  • the device further includes:
  • the first determining module 1420 is configured to determine the current value of the target bit corresponding to the any terminal in the first DCI based on the determined scheduling mode of any terminal;
  • the scrambling module 1430 is configured to scramble the cyclic redundancy check code CRC in the first DCI based on the target RNTI corresponding to any one of the terminals.
  • each terminal corresponds to one RNTI, or multiple terminals correspond to one RNTI.
  • the device also includes:
  • the second determining module is configured to determine, based on the determined scheduling mode of any terminal, the value of the specified information field in the first DCI as the first specified value.
  • the device also includes:
  • the third determining module is configured to, based on the determined scheduling mode of any terminal, determine that the number of bits included in the first DCI is the second specified value.
  • the length of the first DCI is different from the length of any other DCI, or the length of the first DCI is the same as the length of the fallback DCI.
  • the first DCI includes a target scheduling mode of at least one terminal.
  • the device for switching the scheduling mode in the embodiment of the present disclosure indicates the target scheduling mode of the terminal through DCI, so that the terminal can quickly switch between self-scheduling and cross-carrier scheduling, which can better adapt to changes in link quality and load, and improve utilization of system resources.
  • the present disclosure also provides a communication device and a readable storage medium.
  • Communication devices are intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. Communication devices may also represent various forms of mobile devices, such as personal digital processors, cellular phones, smart phones, wearable devices, and other similar computing devices.
  • the components shown herein, their connections and relationships, and their functions are by way of example only, and are not intended to limit implementations of the disclosure described and/or claimed herein.
  • the communication device includes: one or more processors 1610, a memory 1620, and interfaces for connecting various components, including a high-speed interface and a low-speed interface.
  • the various components are interconnected using different buses and may be mounted on a common motherboard or otherwise as desired.
  • the processor may process instructions executed within the communication device, including instructions stored in or on memory to display graphical information of the GUI on an external input/output device, such as a display device coupled to the interface.
  • multiple processors and/or multiple buses may be used with multiple memories and multiple memories, if desired.
  • multiple communication devices may be connected, with each device providing some of the necessary operations (eg, as a server array, a group of blade servers, or a multi-processor system).
  • a processor 1610 is used as an example.
  • the memory 1620 is the non-transitory computer-readable storage medium provided by the present disclosure.
  • the memory stores instructions executable by at least one processor, so that the at least one processor executes the scheduling method switching method provided by the present disclosure.
  • the non-transitory computer-readable storage medium of the present disclosure stores computer instructions, and the computer instructions are used to cause the computer to execute the scheduling method switching method provided by the present disclosure.
  • the memory 1620 can be used to store non-transitory software programs, non-transitory computer-executable programs, and modules, such as program instructions/modules (eg, program instructions/modules corresponding to the scheduling mode switching method in the embodiments of the present disclosure).
  • the processor 1610 executes various functional applications and data processing of the server by running the non-transitory software programs, instructions and modules stored in the memory 1620, that is, to implement the scheduling method switching method in the above method embodiments.
  • the memory 1620 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to the use of the positioning communication device, and the like. Additionally, memory 1620 may include high-speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid-state storage device. Optionally, memory 1620 may optionally include memory located remotely from processor 1610, and these remote memories may be connected to the positioning communication device via a network. Examples of such networks include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
  • the communication device for switching the scheduling mode may further include: an input device 1630 and an output device 1640 .
  • the processor 1610, the memory 1620, the input device 1630, and the output device 1640 may be connected through a bus or in other ways, and the connection through a bus is taken as an example in FIG. 15 .
  • the input device 1630 can receive input numerical or character information and generate key signal input related to user settings and functional control of the positioning communication device, such as a touch screen, keypad, mouse, trackpad, touchpad, pointing stick, one or more Input devices such as mouse buttons, trackballs, joysticks, etc.
  • the output device 1640 may include a display device, auxiliary lighting devices (eg, LEDs), haptic feedback devices (eg, vibration motors), and the like.
  • the display device may include, but is not limited to, a liquid crystal display (LCD), a light emitting diode (LED) display, and a plasma display. In some implementations, the display device may be a touch screen.
  • Various implementations of the systems and techniques described herein can be implemented in digital electronic circuitry, integrated circuit systems, application specific ASICs (application specific integrated circuits), computer hardware, firmware, software, and/or combinations thereof. These various embodiments may include being implemented in one or more computer programs executable and/or interpretable on a programmable system including at least one programmable processor that The processor, which may be a special purpose or general-purpose programmable processor, may receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device an output device.
  • the processor which may be a special purpose or general-purpose programmable processor, may receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device an output device.
  • machine-readable medium and “computer-readable medium” refer to any computer program product, apparatus, and/or apparatus for providing machine instructions and/or data to a programmable processor ( For example, magnetic disks, optical disks, memories, programmable logic devices (PLDs), including machine-readable media that receive machine instructions as machine-readable signals.
  • machine-readable signal refers to any signal used to provide machine instructions and/or data to a programmable processor.
  • the systems and techniques described herein may be implemented on a computer having a display device (eg, a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user ); and a keyboard and pointing device (eg, a mouse or trackball) through which a user can provide input to the computer.
  • a display device eg, a CRT (cathode ray tube) or LCD (liquid crystal display) monitor
  • a keyboard and pointing device eg, a mouse or trackball
  • Other kinds of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (eg, visual feedback, auditory feedback, or tactile feedback); and can be in any form (including acoustic input, voice input, or tactile input) to receive input from the user.
  • the systems and techniques described herein may be implemented on a computing system that includes back-end components (eg, as a data server), or a computing system that includes middleware components (eg, an application server), or a computing system that includes front-end components (eg, a user computer having a graphical user interface or web browser through which a user may interact with implementations of the systems and techniques described herein), or including such backend components, middleware components, Or any combination of front-end components in a computing system.
  • the components of the system may be interconnected by any form or medium of digital data communication (eg, a communication network). Examples of communication networks include: Local Area Networks (LANs), Wide Area Networks (WANs), and the Internet.
  • a computer system can include clients and servers.
  • Clients and servers are generally remote from each other and usually interact through a communication network.
  • the relationship of client and server arises by computer programs running on the respective computers and having a client-server relationship to each other.
  • the base station indicates the target scheduling mode of the terminal through DCI, and the terminal switches the scheduling mode according to the target scheduling mode of the terminal indicated by the DCI, so as to realize the switching between self-scheduling and cross-carrier scheduling.
  • Fast handover can better adapt to changes in link quality and load, and improve the utilization of system resources.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本公开提出了一种调度方式的切换方法及装置,涉及移动通信技术领域。该方案为:基于获取的第一DCI,进行调度方式的切换,其中,第一DCI用于指示终端的目标调度方式。该方案通过根据DCI指示的终端的目标调度方式,进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。

Description

一种调度方式的切换方法及装置 技术领域
本公开涉及移动通信技术领域,特别是指一种调度方式的切换方法及装置。
背景技术
蜂窝移动通信技术正处于新一代技术的演进阶段。新一代技术的一个重要特点是要支持多种业务类型的灵活配置。新一代移动通信技术的初始部署通常发生在流量密度高,对新业务要求高的区域,然后逐步扩展覆盖。在逐步部署新的接入技术的过程中,新技术和旧技术的混合覆盖成为运营商网络的需求。通常在已经部署了新技术的区域中,也须保留较早的技术并在相当长的时间内同时存在,以确保为不支持新技术的旧设备提供持续的服务。
新技术可以与旧技术部署在相同的频谱中,从而可以在两种技术之间动态共享总频谱容量,以提高频谱利用率。
发明内容
本公开第一方面实施例提出了一种调度方式的切换方法,应用于终端,该方法包括:
基于获取的第一下行控制信息(DCI,Downlink Control Information),进行调度方式的切换,其中,所述第一DCI用于指示终端的目标调度方式。
可选地,所述基于获取的第一DCI,进行调度方式的切换,包括:
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;
或者,
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
可选地,所述基于获取的第一DCI,进行调度方式的切换,包括:
基于所述终端对应的目标无线网络临时标识(RNTI,RadioNetworkTemporaryIdentifie),获取所述第一DCI;
根据所述第一DCI中与所述终端对应的目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,该方法还包括:基于获取的终端分组指示消息,确定所述终端所在的组对应的目标RNTI。
可选地,所述基于获取的第一DCI,进行调度方式的切换,包括:
响应于获取的所述第一DCI中指定信息域的取值为第一指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,所述基于获取的第一DCI,进行调度方式的切换,包括:
响应于获取的第一DCI中包含的比特位数量为第二指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,该方法还包括:
在公共搜索空间(CSS,Common Search Space)内获取所述第一DCI;
或者,
在终端UE专属搜索空间(USS,U-specific Search Space)内获取所述第一DCI。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。
本公开第二方面实施例提出了一种调度方式的切换方法,应用于基站,该方法包括:
发送第一DCI,其中,所述第一DCI用于指示终端的目标调度方式。
可选地,所述发送第一DCI,包括:
在主小区/主辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的USS内发送所述第一DCI。
可选地,该方法还包括:
基于确定的任一终端的调度方式,确定所述第一DCI中与所述任一终端对应的目标比特位的当前取值;
基于所述任一终端对应的目标RNTI,对所述第一DCI中的循环冗余校验(CRC,Cyclic Redundancy Check)进行加扰。
可选地,每个终端对应一个RNTI,或者,多个终端对应一个RNTI。
可选地,基于确定的任一终端的调度方式,确定所述第一DCI中指定信息域的取值为第一指定值。
可选地,该方法还包括:基于确定的任一终端的调度方式,确定所述第一DCI中包含的比特位数量为第二指定值。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。
本公开第三方面实施例提出了一种调度方式的切换装置,应用于终端,该装置包括:
处理模块,被配置为基于获取的第一DCI,进行调度方式的切换,其中,所述第一DCI用于指示终端的目标调度方式。
可选地,所述处理模块,被配置为:
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;
或者,
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
可选地,所述处理模块,被配置为:
基于所述终端对应的目标RNTI,获取所述第一DCI;
根据所述第一DCI中与所述终端对应的目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,该装置还包括:
确定模块,被配置为基于获取的终端分组指示消息,确定所述终端所在的组对应的目标RNTI。
可选地,所述处理模块,被配置为:
响应于获取的所述第一DCI中指定信息域的取值为第一指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,所述处理模块,被配置为:
响应于获取的第一DCI中包含的比特位数量为第二指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,该装置还包括:获取模块,被配置为:
在CSS内获取所述第一DCI;
或者,
在USS内获取所述第一DCI。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。
本公开第四方面实施例提出了一种调度方式的切换装置,应用于基站,该装置包括:
发送模块,被配置为发送第一DCI,其中,所述第一DCI用于指示终端的目标调度方式。
可选地,所述发送模块,被配置为:
在主小区/主辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的USS内发送所述第一DCI。
可选地,该装置还包括:
第一确定模块,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中与所述任一终端对应的目标比特位的当前取值;
加扰模块,被配置为基于所述任一终端对应的目标RNTI,对所述第一DCI中的CRC进行加扰。
可选地,每个终端对应一个RNTI,或者,多个终端对应一个RNTI。
可选地,该装置还包括:
第二确定模块,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中指定信息域的取值为第一指定值。
可选地,该装置还包括:
第三确定模块,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中包含的比特位数量为第二指定值。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。本公开第五方面实施例提出了一种通信设备,包括:收发器;存储器;处理器,分别与所述收发器及所述存储器连接,配置为通过执行所述存储器上的计算机可执行指令,控制所述收发器的无线信号收发,并能够实现上述第一方面实施例所述的方法、或上述第二方面实施例所述的方法。
本公开第六方面实施例提出了一种计算机存储介质,其中,所述计算机存储介质存储有计算机可执行指令;所述计算机可执行指令被处理器执行后,能够实现上述第一方面实施例所述的方法、或上述第二方面实施例所述的方法。
本公开实施例提供的一种调度方式的切换方法及装置,基站通过DCI指示终端的目标调度方式,终端根据DCI指示的终端的目标调度方式,进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
本公开附加的方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本公开的实践了解到。
附图说明
本公开上述的和/或附加的方面和优点从下面结合附图对实施例的描述中将变得明显和容易理解,其中:
图1为本公开实施例提供的一种调度方式的切换方法的流程示意图;
图2为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图3为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图4为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图5为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图6为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图7为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图8为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图9为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图10为本公开实施例提供的另一种调度方式的切换方法的流程示意图;
图11为本公开实施例提供的一种调度方式的切换装置的结构示意图;
图12为本公开实施例提供的一种调度方式的切换装置的结构示意图;
图13为本公开实施例提供的另一种调度方式的切换装置的结构示意图;
图14为本公开实施例提供的另一种调度方式的切换装置的结构示意图;
图15是用来实现本公开实施例的调度方式的切换方法的电子设备的框图。
具体实施方式
下面详细描述本公开的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,旨在用于解释本公开,而不能理解为对本公开的限制。
在现有5G系统及标准中,无线资源控制(RRC,Radio Resource Control)配置载波进行自调度或被调度。自调度,即在当前载波上接收DCI并调度当前载波上的物理下行共享信道(PDSCH,Physical Downlink Shared Channel)或物理上行共享信道(PUSCH,Physical Uplink Shared Channel)。被调度,即在另外一个载波上接收DCI而调度该载波上的PDSCH或PUSCH。当RRC配置一个载波(记为载波C)为被调度时,RRC需要配置载波C的调度载波索引(即由哪个载波调度载波C)并且配置载波C在调度载波中的CIF取值。主调载波上的DCI中的CIF域指示载波C在调度载波中的CIF取值时,则该DCI在载波 C上调度CrossCarrierSchedulingConfig配置CrossCarrierSchedulingConfig信元中schedulingCellId配置调度载波索引,CrossCarrierSchedulingConfig信元中的cifInSchedulingCell配置载波在调度载波中的CIF取值。假设RRC配置载波C由载波A跨载波调度并且配置载波C在调度载波中的CIF取值为1,当载波A上的DCI的CIF域指示的CIF取值为1时,则此DCI在载波C上调度PDSCH或PUSCH。
需要说明的是,DCI格式1_0和0_0(也称为回退下行控制信息fallback DCI)中不能配置CIF域,所以DCI格式1_0和0_0只能用于自调度而不能用于跨载波调度;DCI格式0_1、DCI格式0_2、DCI格式1_1和DCI格式1_2(也称为非回退下行控制信息non-fallback DCI)中可以配置CIF域,它们可以用于跨载波调度。
当RRC配置载波为自调度时,DCI格式1_0只能用于调度本载波上的PDSCH,DCI格式0_0只能用于调度本载波上的PUSCH,DCI格式1_1且CIF=0时和DCI格式1_2且CIF=0时用于调度本载波上的PDSCH,DCI格式0_1且CIF=0时和DCI格式0_2且CIF=0时用于调度本载波上的PUSCH。当RRC配置载波为被调度时,调度载波上的DCI(DCI格式0_1、DCI格式0_2、DCI格式1_1和DCI格式1_2)的CIF域指示为该载波配置的在调度载波中的CIF取值时表示跨载波调度该载波,一个CIF取值只能对应一个载波。目前一个载波只能配置为自调度或被调度,不能同时被配置为自调度和被调度。目前主小区只能配置为自调度,因此导致在DSS时PDCCH容量受限,导致5G系统传输控制信令的负载较高。
相关技术中,对于新技术与旧技术部署在相同的频谱的情况,新技术中自调度与跨载波调度之间的切换,是通过高层信令,比如RRC信令指示的,切换速度比较慢。
针对这一问题,本公开实施例提供了调度方式的切换方法及装置。
图1为本公开实施例提供的一种调度方式的切换方法的流程示意图,该方法由终端执行,通过基于DCI进行调度方式的切换,以实现在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高系统资源的利用率。
如图1所示,该调度方式的切换方法包括以下步骤:
步骤101,基于获取的第一DCI,进行调度方式的切换,其中,第一DCI用于指示终端的目标调度方式。
本公开中,终端可获取基站发送的DCI,为了便于区分,这里称为第一DCI。其中,第一DCI用于指示终端的目标调度方式。
调度方式,可以是指下行控制信道与数据信道,是在同一载波上,还是在不同载波上。调度方式可包括自调度和跨载波调度,自调度可以指下行控制信道与数据信道在同一个载波上,跨载波调度可以指下行控制信道与数据信道在不同的载波上。
终端基于获取的第一DCI,根据第一DCI,进行调度方式的切换。比如,第一DCI指示终端的目标调度方式为自调度,那么终端可从当前的调度方式切换为自调度方式。
本公开实施例的调度方式的切换方法,通过根据DCI指示的终端的目标调度方式,进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图2为本公开实施例提供的另一种调度方式的切换方法的流程示意图。该方法由终端执行,通过基于第一DCI指示的调度方式与当前调度方式是否不相同,进行调度方式的切换。
如图2所示,该调度方式的切换方法包括:
步骤201,响应于获取的第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;或者,响应于获取的第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
本公开中,终端可获取基站发送的第一DCI,其中,第一DCI用于指示终端的目标调度,第一DCI中可包括至少一个终端的目标调度方式。其中,调度方式可包括自调度和跨载波调度。
可选地,终端可在CSS内获取第一DCI,或者,在USS内获取第一DCI。
可选地,第一DCI的长度可以与其他任一DCI的长度不同。
由于终端的盲检次数与DCI的长度有关,为了不增加终端的盲检次数,可选地,第一DCI的长度可与回退DCI的长度相同。由于第一DCI的长度,与回退DCI的长度相同,因此不会增加终端的盲检次数。
终端可将第一DCI指示的目标调度方式与当前调度方式进行比较,终端响应于目标调度方式与当前调度方式不同,将当前调度方式切换为目标调度方式,以实现调度方式的切换。
或者,终端响应于第一DCI中指示的目标调度方式与当前调度方式相同,继续保持当前的调度方式。
比如,第一DCI中指示的目标调度方式为跨载波调度,终端当前的调度方式为自调度,那么终端从自调度切换为跨载波调度。若终端当前的调度方式为跨载波调度,那么终端继续保持跨载波调度。
又如,第一DCI中指示的目标调度方式为自调度,终端当前的调度方式为跨载波调度,那么终端从跨载波调度切换为自调度。若终端当前的调度方式为自调度,那么终端继续保持自调度。
本公开实施例的调度方式的切换方法,通过基于DCI指示的调度方式与当前调度方式是否不相同,确定是否进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图3为本公开实施例提供的另一种调度方式的切换方法的流程示意图。该方法由终端执行,通过响应于第一DCI中的RNTI为终端所在组的RNTI,基于第一DCI中与终端对应的目标比特位的当前取值,确定目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换。
如图3所示,该调度方式的切换方法包括:
步骤301,基于终端对应的目标RNTI,获取第一DCI。
本公开中,终端可获取基站发送的终端分组指示消息,通过对获取的终端分组指示消息进行解析,确定终端所在的组对应的目标RNTI。其中,该终端获取的终端分组指示消息中可以是只指示了该终端所在组的目标RNTI,也可包括多个终端所在组的目标RNTI,该终端可根据终端标识与RNTI之间的映射关系,确定本身对应的目标RNTI。
基站可先用RNTI对附加在第一DCI之后CRC码进行加扰,将附接(attach)有经过加扰后CRC的第一DCI发送给终端。终端可对公共控制信道上的包含有DCI的下行传输进行盲检,以根据其对应的目标RNTI,得到与该终端相对应的DCI,即第一DCI。例如,终端利用与自己相关联的目标RNTI,对公共控制信道上的下行传输中的被加扰的CRC进行解扰,以得到解扰后的CRC,并利用该CRC对DCI进行校验。如果校验成功,则接收该下行传输。而如果校验失败,则丢弃该下行传输。
可选地,终端可在CSS内获取第一DCI,或者,在USS内获取第一DCI。
可选地,第一DCI的长度可以与其他任一DCI的长度不同。
由于终端的盲检次数与DCI的长度有关,为了不增加终端的盲检次数,可选地,第一DCI的长度可与回退DCI的长度相同。由于第一DCI的长度,与回退DCI的长度相同,因此不会增加终端的盲检次数。
步骤302,根据第一DCI中与终端对应的目标比特位的当前取值,确定终端的目标调度方式。
在本公开中,第一DCI中可包括与一个或多个终端分别对应的比特位,比特位的取值可用于指示对应终端的目标调度方式。也就是说,第一DCI中可包括至少一个终端的目标调度方式。
第一DCI中每个终端对应的目标比特位,可以是预先约定的,比如可以是标准预先规定,也可以是终端根据基站发送的指示其目标特位的指令确定的。那么,终端可确定第一DCI中与其对应的目标比特位。
本公开中,第一DCI中与终端对应的目标比特位的取值不同,可表示不同的调度方式。那么,终端可根据目标比特位的当前取值,确定终端的目标调度方式。
比如,取值为0表示自调度,取值为1表示跨载波调度,若第一DCI中某终端对应的目标比特位的当前取值为1,可以确定该终端的目标调度方式为跨载波调度。
需要说明的是,比特位的取值为0或1及对应的调度方式,仅是示例,可根据实际需要设置,本实施例对此不作限定。
在一种实施方式中,比特位的取值可以仅仅指示相应的终端是否应该切换调度方式。例如,比特位取值为0,可以指示保持当前的调度方式。而比特位取值为1,可以指示切换调度方式。
在一种实施方式中,目标比特位可以为多个比特位,以表示特定数量的调度方式。例如,目标比特位为2位,00表示第一调度方式,01表示第二调度方式,10表示第三调度方式,11表示第四调度方式,以此类推。
步骤303,响应于获取的第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;或者,响应于获取的第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
本公开中,步骤303可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
本公开实施例的调度方式的切换方法,通过基于于终端对应的目标RNTI,获取第一DCI,并根据第一DCI中与终端对应的目标比特位的当前取值,确定终端的目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图4为本公开实施例提供的另一种调度方式的切换方法的流程示意图。该方法由终端执行,通过响应于第一DCI中指定信息域的取值为第一指定值,基于第一DCI中与终端对应的目标比特位的当前取值,确定目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换。
如图4所示,该调度方式的切换方法包括:
步骤401,响应于获取的第一DCI中指定信息域的取值为第一指定值,确定第一DCI中与终端对应的目标比特位的当前取值。
由于第一DCI与其他DCI的长度相同,为了区分第一DCI与其他DCI,本公开中,第一DCI中的指定信息域的取值可以为指定值,为了便于区分,这里称为第一指定值。其中,第一指定值可根据需要设定。
本公开中,第一DCI中可包括与一个或多个终端分别对应的比特位,比特位的取值可用于指示对应终端的目标调度方式。终端可响应于获取的第一DCI中指定信息域的取值为第一指定值,确定第一DCI中与终端对应的目标比特位的当前取值。
步骤402,根据目标比特位的当前取值,确定终端的目标调度方式。
本公开中,步骤402可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
可选地,第一DCI中也可包括其他信息,比如基站给终端的其他指示信息等,本公开实施例对其他信息不作限定。
步骤403,响应于获取的第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;或者,响应于获取的第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
本公开中,步骤403可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
本公开实施例的调度方式的切换方法,通过响应于第一DCI中指定信息域的取值为第一指定值,基于第一DCI中与终端对应的目标比特位的当前取值,确定目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图5为本公开实施例提供的另一种调度方式的切换方法的流程示意图。该方法由终端执行,通过响应于第一DCI中包含的比特位数量为第二指定值,基于第一DCI中与终端对应的目标比特位的当前取值,确定目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换。
如图5所示,该调度方式的切换方法包括:
步骤501,响应于获取的第一DCI中包含的比特位数量为第二指定值,确定第一DCI中与终端对应的目标比特位的当前取值。
为了区分第一DCI与其他DCI,本公开中,第一DCI中包含的比特位数量可以为第二指定值。其中,第二指定值与其他DCI中包含的比特位数量不同,第二指定值可根据需要设定。
本公开中,第一DCI中可包括与一个或多个终端分别对应的比特位,比特位的取值可用于指示对应终端的目标调度方式。终端可响应于获取的第一DCI中包含的比特位数量为第二指定值,确定第一DCI中与终端对应的目标比特位的当前取值。
步骤502,根据目标比特位的当前取值,确定终端的目标调度方式。
本公开中,步骤502可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
可选地,第一DCI中也可包括其他信息,比如基站给终端的其他指示信息等,本公开实施例对其他信息不作限定。
步骤503,响应于获取的第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;或者,响应于获取的第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
本公开中,步骤503可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
本公开实施例的调度方式的切换方法,通过响应于第一DCI中包含的比特位数量为第二指定值,基于第一DCI中与终端对应的目标比特位的当前取值,确定目标调度方式,根据目标调度方式和当前调度方式,确定是否进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图6为本公开实施例提供的另一种调度方式的切换方法的流程示意图,该方法可由基站执行,通过DCI指示终端的目标调度方式,以使终端在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高系统资源的利用率。
如图6所示,该调度方式的切换方法包括:
步骤601,发送第一DCI,其中,第一DCI用于指示终端的目标调度方式。
本公开中,基站可通过DCI指示终端的目标调度方式,为了便于区分,这里称为第一DCI,基站可向终端发送第一DCI,以使终端根据获取的第一DCI,进行调度方式的切换。
其中,调度方式可包括自调度和跨载波调度,自调度可以指下行控制信道与数据信道在同一个载波上,跨载波调度可以指下行控制信道与数据信道在不同的载波上。
可选地,第一DCI中可包括一个或者多个终端的目标调度方式,那么基站可向每个终端发送第一DCI。
可选地,基站可响应于调度主小区/主辅小区的辅小区的链路质量发生恶化,或者,主小区/主辅小区的物理下行控制信道(PDCCH,Physical Downlink Control Channel)资源充足,向终端发送第一DCI。
本公开实施例的调度方式的切换方法,通过DCI指示终端的目标调度方式的,以使终端在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图7为本公开实施例提供的另一种调度方式的切换方法的流程示意图,该方法可由基站执行,通过在CSS内或者USS内发送第一DCI。
如图7所示,该调度方式的切换方法包括:
步骤701,在主小区/主辅小区的CSS内发送第一DCI;或者,在辅小区的CSS内发送第一DCI;或者,在辅小区的USS内发送第一DCI。
本公开中,基站可在主小区/主辅小区的CSS内,向终端发送第一DCI。或者,基站可在辅小区的CSS内,向终端发送第一DCI,以使用辅频带发送第一DCI。或者,在辅小区的USS内发送第一DCI。其中,第一DCI用于指示终端的目标调度方式。其中,调度方式包括自调度或者跨载波调度。
可选地,第一DCI的长度可以与其他任一DCI的长度不同。
由于终端的盲检次数与DCI的长度有关,为了不增加终端的盲检次数,可选地,第一DCI的长度可与回退DCI的长度相同。由于第一DCI的长度,与回退DCI的长度相同,因此不会增加终端的盲检次数。
可选地,第一DCI中可包括至少一个终端的目标调度方式,基站可分别向每个终端发送第一DCI,以使每个终端根据第一DCI指示的其目标调度方式,进行调度方式的切换。由此,基站可通过第一DCI指示一个或者多个终端的目标调度方式。
本公开实施例的调度方式的切换方法,通过在主小区/主辅小区的CSS内发送第一DCI,或者辅小区的CSS内发送第一DCI,或者辅小区的USS内发送第一DCI,通过向终端发送指示终端的目标调度方式的DCI,以使终端在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图8为本公开实施例提供的另一种调度方式的切换方法的流程示意图,该方法可由基站执行,通过响应于确定任一终端的调度方式,根据任一终端对应的目标RNTI,确定第一DCI中的RNTI。
如图8所示,该调度方式的切换方法包括:
步骤801,基于确定的任一终端的调度方式,确定第一DCI中与任一终端对应的目标比特位的当前取值。
本公开中,基站可根据当前的链路质量或者负载情况,确定任一终端的调度方式。比如,当前调度主小区/主辅小区的辅小区的链路质量发生恶化,或者主小区/主辅小区的PDCCH资源充足,基站可确定某终端的调度方式为自调度。
其中,第一DCI中可包括与一个或多个终端分别对应的比特位,基站可根据预先约定的各个终端在第一DCI中对应的目标比特位,确定任一终端在第一DCI中对应的目标比特位,并根据确定的任一终端的调度方式,确定第一DCI中与任一终端对应的目标比特位的当前取值。其中,第一DCI中与任一终端对应的目标比特位的当前取值,用于指示任一终端的目标调度方式。
比如,取值为0表示自调度,取值为1表示跨载波调度,若基站确定某终端的调度方式为跨载波调度,那么基站确定第一DCI中与该终端对应的目标比特位的当前取值为1。
需要说明的是,比特位的取值为0或1及对应的调度方式,仅是示例,可根据实际需要设置,本实施例对此不作限定。
在一种实施方式中,比特位的取值可以仅仅指示相应的终端是否应该切换调度方式。例如,比特位取值为0,可以指示保持当前的调度方式。而比特位取值为1,可以指示切换调度方式。
在一种实施方式中,目标比特位可以为多个比特位,以表示特定数量的调度方式。例如,目标比特位为2位,00表示第一调度方式,01表示第二调度方式,10表示第三调度方式,11表示第四调度方式,以此类推。
步骤802,基于任一终端对应的目标RNTI,对第一DCI中的CRC进行加扰。
本公开中,每个终端可对应一个RNTI,基站可用任一终端对应的RNTI对附加在第一DCI之后的CRC码进行加扰。
可选地,基站也可根据终端的类型或者其他信息,对终端进行分组。其中,每个组对应一个PNTI,RNTI可用于表示终端所在组的标识,同一组内的终端对应一个RNTI,若组内有多个终端,那么多个终端对应一个RNTI。基站可用任一终端对应的目标RNTI对附加在第一DCI之后的CRC码进行加扰。
需要说明的是,每组中包含的终端的数量,可以是一个,也可以是多个,每组包含的终端的数量可根据实现需要确定。
步骤803,发送第一DCI,其中,第一DCI用于指示终端的目标调度方式。
本公开中,基站可将附接(attach)有经过加扰后CRC的第一DCI发送给终端。终端可对公共控制信道上的包含有DCI的下行传输进行盲检,以根据其对应的目标RNTI,得到与该终端相对应的DCI,即第一DCI。例如,终端利用与自己相关联的目标RNTI,对公共控制信道上的下行传输中的被加扰的CRC进行解扰,以得到解扰后的CRC,并利用该CRC对DCI进行校验。如果校验成功,则接收该下行传输。而如果校验失败,则丢弃该下行传输。
本公开实施例的调度方式的切换方法,通过基于确定的任一终端的调度方式,确定第一DCI中与任一终端对应的目标比特位的当前取值,基于任一终端对应的目标RNTI,对第一DCI中的CRC进行加扰,并发送第一DCI,以使终端利用与自己相关联的目标RNTI,获取与终端对应的第一DCI,并基于第一DCI指示的目标调度方式,切换调度方式,使终端在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
图9为本公开实施例提供的另一种调度方式的切换方法的流程示意图,该方法可由基站执行,通过响应于确定任一终端的调度方式,确定第一DCI中指定信息域的取值为第一指定值。
如图9所示,该调度方式的切换方法包括:
步骤1001,基于确定的任一终端的调度方式,确定第一DCI中指定信息域的取值为第一指定值。
本公开中,基站可根据当前的链路质量或者负载情况,确定任一终端的调度方式。比如,当前调度主小区/主辅小区的辅小区的链路质量发生恶化,或者主小区/主辅小区的PDCCH资源充足,基站可确定某终端的调度方式为自调度。
由于第一DCI与其他DCI的长度相同,为了区分第一DCI与其他DCI,本公开中,第一DCI中的指定信息域的取值可以为指定值,为了便于区分,这里称为第一指定值。其中,第一指定值可根据需要设定,本实施例对此不作限定。基站可根据确定任一终端的调度方式,确定第一DCI中指定信息域的取值为第一指定值。
步骤1002,发送第一DCI,其中,第一DCI用于指示终端的目标调度方式。
本公开中,步骤1002可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
本公开实施例的调度方式的切换方法,通过响应于确定任一终端的调度方式,确定第一DCI中指定信息域的取值为第一指定值,利用指定信息域的取值为指定值的DCI指示终端的目标调度方式,丰富了DCI格式的多样化。
图10为本公开实施例提供的另一种调度方式的切换方法的流程示意图,该方法可由基站执行,通过响应于确定任一终端的调度方式,确定第一DCI中包含的比特位数量为第二指定值。
如图10所示,该调度方式的切换方法包括:
步骤1101,基于确定的任一终端的调度方式,确定第一DCI中包含的比特位数量为第二指定值。
本公开中,基站可根据当前的链路质量或者负载情况,确定任一终端的调度方式。比如,当前调度主小区/主辅小区的辅小区的链路质量发生恶化,或者主小区/主辅小区的PDCCH资源充足,基站可确定某终端的调度方式为自调度。
为了区分第一DCI与其他DCI,本公开中,第一DCI中包含的比特位数量可以为第二指定值。其中,第二指定值与其他DCI中包含的比特位数量不同,第二指定值可根据需要设定。基站可基于确定任一终端的调度方式,确定第一DCI中包含的比特位数量为第二指定值。
步骤1102,发送第一DCI,其中,第一DCI用于指示终端的目标调度方式。
本公开中,步骤1102可以分别采用本公开的各实施例中的任一种方式实现,本公开实施例并不对此作出限定,也不再赘述。
本公开实施例的调度方式的切换方法,通过响应于确定任一终端的调度方式,确定第一DCI中包含的比特位数量为第二指定值,利用包含的比特位数量为指定值的DCI指示终端的目标调度方式,丰富了 DCI格式的多样化。
下面对调度方式的切换方法作进一步说明,该调度方式的切换方法可由基站执行。本公开中,可通过以下方式实现调度方式的切换:
方式一:使用组公共DCI进行跨载波调度指示,在主小区/主辅小区,或者辅小区的CSS上发送DCI。
可选地,可对终端进行分组,基站为每一个终端组指定一个RNTI。
可选地,为了不增加终端的盲检测次数,该DCI与CSS上的回退DCI的长度保持一致。
可选地,每个终端可对应DCI中的一个比特位。比如,终端对应比特位的取值为0,表示自调度;终端对应的比特位的取值为1,表示跨载波调度。
在一种实施方式中,比特位的取值也可以仅仅指示相应的终端是否应该切换调度方式。例如,比特位取值为0,可以指示保持当前的调度方式。而比特位取值为1,可以指示切换调度方式。
在一种实施方式中,目标比特位也可以为多个比特位,以表示特定数量的调度方式。例如,目标比特位为2位,00表示第一调度方式,01表示第二调度方式,10表示第三调度方式,11表示第四调度方式,以此类推。
方式二:使用新的DCI格式进行跨载波调度指示,在主小区/主辅小区的CSS上,或者在辅小区的USS上发送DCI。其中,DCI格式的设计方法如下:
一是,可定义一种新的DCI格式,确保该DCI的比特数与已有DCI格式的比特数不同。
二是,可定义一种新的DCI格式,使用与已有的某个DCI格式相同的比特数,并将新的DCI信息域设置为指定值(记为第一指定值),以表征新的DCI格式。
与上述几种实施例提供的调度方式的切换方法相对应,本公开还提供一种调度方式的切换装置,由于本公开实施例提供的调度方式的切换装置与上述几种实施例提供的调度方式的切换方法相对应,因此在调度方式的切换方法的实施方式也适用于本实施例提供的调度方式的切换装置,在本公开中不再详细描述。图11-图12为本公开实施例提供的一种调度方式的切换装置的结构示意图。该装置可应用于终端。
如图11所示,该调度方式的切换装置1200包括:
处理模块1210,被配置为基于获取的第一DCI,进行调度方式的切换,其中,所述第一DCI用于指示终端的目标调度方式。
本公开中,调度方式,可以是指下行控制信道与数据信道,是在同一载波上,还是在不同载波上。调度方式可包括自调度和跨载波调度,自调度可以指下行控制信道与数据信道在同一个载波上,跨载波调度可以指下行控制信道与数据信道在不同的载波上。
可选地,所述处理模块1210,被配置为:
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;
或者,
响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
可选地,所述处理模块1210,被配置为:
基于所述终端对应的目标RNTI,获取所述第一DCI;
根据所述第一DCI中与所述终端对应的目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,如图12所示,该装置还包括:
确定模块1220,被配置为基于获取的终端分组指示消息,确定所述终端所在的组对应的目标RNTI。
可选地,所述处理模块1210,被配置为:
响应于获取的所述第一DCI中指定信息域的取值为第一指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,所述处理模块1210,被配置为:
响应于获取的第一DCI中包含的比特位数量为第二指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
可选地,该装置还包括:获取模块,被配置为:
在CSS内获取所述第一DCI;
或者,
在USS内获取所述第一DCI。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI 的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。
本公开实施例的调度方式的切换装置,通过根据DCI指示的终端的目标调度方式,进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
与上述几种实施例提供的调度方式的切换方法相对应,本公开还提供一种调度方式的切换装置,由于本公开实施例提供的调度方式的切换装置与上述几种实施例提供的调度方式的切换方法相对应,因此在调度方式的切换方法的实施方式也适用于本实施例提供的调度方式的切换装置,在本公开中不再详细描述。图13-图14为本公开实施例提供的另一种调度方式的切换装置的结构示意图。该装置可应用于基站。
如图13所示,该调度方式的切换装置1400包括:
发送模块1410,被配置为发送第一DCI,其中,所述第一DCI用于指示终端的目标调度方式。
可选地,所述发送模块1410,被配置为:
在主小区/主辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的CSS内发送所述第一DCI;
或者,
在辅小区的USS内发送所述第一DCI。
可选地,如图14所示,该装置还包括:
第一确定模块1420,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中与所述任一终端对应的目标比特位的当前取值;
加扰模块1430,被配置为基于所述任一终端对应的目标RNTI,对所述第一DCI中的循环冗余校验码CRC进行加扰。
可选地,每个终端对应一个RNTI,或者,多个终端对应一个RNTI。
可选地,该装置还包括:
第二确定模块,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中指定信息域的取值为第一指定值。
可选地,该装置还包括:
第三确定模块,被配置为基于确定的任一终端的调度方式,确定所述第一DCI中包含的比特位数量为第二指定值。
可选地,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
可选地,所述第一DCI中包括至少一个终端的目标调度方式。
本公开实施例的调度方式的切换装置,通过DCI指示终端的目标调度方式的,以使终端在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
根据本公开的实施例,本公开还提供了一种通信设备和一种可读存储介质。
图15示出了可以用来实施本公开的实施例的示例通信设备1600的示意性框图。通信设备旨在表示各种形式的数字计算机,诸如,膝上型计算机、台式计算机、工作台、个人数字助理、服务器、刀片式服务器、大型计算机、和其它适合的计算机。通信设备还可以表示各种形式的移动装置,诸如,个人数字处理、蜂窝电话、智能电话、可穿戴设备和其它类似的计算装置。本文所示的部件、它们的连接和关系、以及它们的功能仅仅作为示例,并且不意在限制本文中描述的和/或者要求的本公开的实现。
如图15所示,该通信设备包括:一个或多个处理器1610、存储器1620,以及用于连接各部件的接口,包括高速接口和低速接口。各个部件利用不同的总线互相连接,并且可以被安装在公共主板上或者根据需要以其它方式安装。处理器可以对在通信设备内执行的指令进行处理,包括存储在存储器中或者存储器上以在外部输入/输出装置(诸如,耦合至接口的显示设备)上显示GUI的图形信息的指令。在其它实施方式中,若需要,可以将多个处理器和/或多条总线与多个存储器和多个存储器一起使用。同样,可以连接多个通信设备,各个设备提供部分必要的操作(例如,作为服务器阵列、一组刀片式服务器、或者多处理器系统)。图15中以一个处理器1610为例。
存储器1620即为本公开所提供的非瞬时计算机可读存储介质。其中,所述存储器存储有可由至少一个处理器执行的指令,以使所述至少一个处理器执行本公开所提供的调度方式的切换方法。本公开的非瞬时计算机可读存储介质存储计算机指令,该计算机指令用于使计算机执行本公开所提供的调度方式 的切换方法。
存储器1620作为一种非瞬时计算机可读存储介质,可用于存储非瞬时软件程序、非瞬时计算机可执行程序以及模块,如本公开实施例中的调度方式的切换方法对应的程序指令/模块(例如,附图11所示的处理模块1210或者附图13所示发送模块1410)。处理器1610通过运行存储在存储器1620中的非瞬时软件程序、指令以及模块,从而执行服务器的各种功能应用以及数据处理,即实现上述方法实施例中的调度方式的切换方法。
存储器1620可以包括存储程序区和存储数据区,其中,存储程序区可存储操作系统、至少一个功能所需要的应用程序;存储数据区可存储根据定位通信设备的使用所创建的数据等。此外,存储器1620可以包括高速随机存取存储器,还可以包括非瞬时存储器,例如至少一个磁盘存储器件、闪存器件、或其他非瞬时固态存储器件。可选地,存储器1620可选包括相对于处理器1610远程设置的存储器,这些远程存储器可以通过网络连接至定位通信设备。上述网络的实例包括但不限于互联网、企业内部网、局域网、移动通信网及其组合。
调度方式的切换的通信设备还可以包括:输入装置1630和输出装置1640。处理器1610、存储器1620、输入装置1630和输出装置1640可以通过总线或者其他方式连接,图15中以通过总线连接为例。
输入装置1630可接收输入的数字或字符信息,以及产生与定位通信设备的用户设置以及功能控制有关的键信号输入,例如触摸屏、小键盘、鼠标、轨迹板、触摸板、指示杆、一个或者多个鼠标按钮、轨迹球、操纵杆等输入装置。输出装置1640可以包括显示设备、辅助照明装置(例如,LED)和触觉反馈装置(例如,振动电机)等。该显示设备可以包括但不限于,液晶显示器(LCD)、发光二极管(LED)显示器和等离子体显示器。在一些实施方式中,显示设备可以是触摸屏。
此处描述的系统和技术的各种实施方式可以在数字电子电路系统、集成电路系统、专用ASIC(专用集成电路)、计算机硬件、固件、软件、和/或它们的组合中实现。这些各种实施方式可以包括:实施在一个或者多个计算机程序中,该一个或者多个计算机程序可在包括至少一个可编程处理器的可编程系统上执行和/或解释,该可编程处理器可以是专用或者通用可编程处理器,可以从存储系统、至少一个输入装置、和至少一个输出装置接收数据和指令,并且将数据和指令传输至该存储系统、该至少一个输入装置、和该至少一个输出装置。
这些计算程序(也称作程序、软件、软件应用、或者代码)包括可编程处理器的机器指令,并且可以利用高级过程和/或面向对象的编程语言、和/或汇编/机器语言来实施这些计算程序。如本文使用的,术语“机器可读介质”和“计算机可读介质”指的是用于将机器指令和/或数据提供给可编程处理器的任何计算机程序产品、设备、和/或装置(例如,磁盘、光盘、存储器、可编程逻辑装置(PLD)),包括,接收作为机器可读信号的机器指令的机器可读介质。术语“机器可读信号”指的是用于将机器指令和/或数据提供给可编程处理器的任何信号。
为了提供与用户的交互,可以在计算机上实施此处描述的系统和技术,该计算机具有:用于向用户显示信息的显示装置(例如,CRT(阴极射线管)或者LCD(液晶显示器)监视器);以及键盘和指向装置(例如,鼠标或者轨迹球),用户可以通过该键盘和该指向装置来将输入提供给计算机。其它种类的装置还可以用于提供与用户的交互;例如,提供给用户的反馈可以是任何形式的传感反馈(例如,视觉反馈、听觉反馈、或者触觉反馈);并且可以用任何形式(包括声输入、语音输入或者、触觉输入)来接收来自用户的输入。
可以将此处描述的系统和技术实施在包括后台部件的计算系统(例如,作为数据服务器)、或者包括中间件部件的计算系统(例如,应用服务器)、或者包括前端部件的计算系统(例如,具有图形用户界面或者网络浏览器的用户计算机,用户可以通过该图形用户界面或者该网络浏览器来与此处描述的系统和技术的实施方式交互)、或者包括这种后台部件、中间件部件、或者前端部件的任何组合的计算系统中。可以通过任何形式或者介质的数字数据通信(例如,通信网络)来将系统的部件相互连接。通信网络的示例包括:局域网(LAN)、广域网(WAN)和互联网。
计算机系统可以包括客户端和服务器。客户端和服务器一般远离彼此并且通常通过通信网络进行交互。通过在相应的计算机上运行并且彼此具有客户端-服务器关系的计算机程序来产生客户端和服务器的关系。
本公开实施例提供的调度方式的切换装置,基站通过DCI指示终端的目标调度方式,终端根据DCI指示的终端的目标调度方式,进行调度方式的切换,实现了在自调度和跨载波调度之间快速切换,可以更好的适应链路质量和负载的变化,提高了系统资源的利用率。
应该理解,可以使用上面所示的各种形式的流程,重新排序、增加或删除步骤。例如,本发申请中记载的各步骤可以并行地执行也可以顺序地执行也可以不同的次序执行,只要能够实现本公开公开的技 术方案所期望的结果,本文在此不进行限制。
上述具体实施方式,并不构成对本公开保护范围的限制。本领域技术人员应该明白的是,根据设计要求和其他因素,可以对公开中的方法、装置及设备实施例中的方法步骤、装置或设备单元进行各种修改、组合、子组合和替代。任何在本公开的精神和原则之内所作的修改、等同替换和改进等,均应包含在本公开保护范围之内。

Claims (21)

  1. 一种调度方式的切换方法,其特征在于,应用于终端,所述方法包括:
    基于获取的第一下行控制信息DCI,进行调度方式的切换,其中,所述第一DCI用于指示终端的目标调度方式。
  2. 如权利要求1所述的方法,其特征在于,所述基于获取的第一下行控制信息DCI,进行调度方式的切换,包括:
    响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式不同,进行调度方式的切换;
    或者,
    响应于获取的所述第一DCI中指示的目标调度方式与当前调度方式相同,保持当前的调度方式。
  3. 如权利要求2所述的方法,其特征在于,所述基于获取的第一下行控制信息DCI,进行调度方式的切换,包括:
    基于所述终端对应的目标无线网络临时标识RNTI,获取所述第一DCI;
    根据所述第一DCI中与所述终端对应的目标比特位的当前取值,确定所述终端的目标调度方式。
  4. 如权利要求3所述的方法,其特征在于,还包括:
    基于获取的终端分组指示消息,确定所述终端所在的组对应的目标RNTI。
  5. 如权利要求2所述的方法,其特征在于,所述基于获取的第一下行控制信息DCI,进行调度方式的切换,包括:
    响应于获取的所述第一DCI中指定信息域的取值为第一指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
    根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
  6. 如权利要求2所述的方法,其特征在于,所述基于获取的第一下行控制信息DCI,进行调度方式的切换,包括:
    响应于获取的第一DCI中包含的比特位数量为第二指定值,确定所述第一DCI中与所述终端对应的目标比特位的当前取值;
    根据所述目标比特位的当前取值,确定所述终端的目标调度方式。
  7. 如权利要求1-6任一所述的方法,其特征在于,还包括:
    在公共搜索空间CSS内获取所述第一DCI;
    或者,
    在终端UE专属搜索空间USS内获取所述第一DCI。
  8. 如权利要求1-6任一所述的方法,其特征在于,所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
  9. 如权利要求1-6任一所述的方法,其特征在于,所述第一DCI中包括至少一个终端的目标调度方式。
  10. 一种调度方式的切换方法,其特征在于,应用于基站,所述方法包括:
    发送第一下行控制信息DCI,其中,所述第一DCI用于指示终端的目标调度方式。
  11. 如权利要求10所述的方法,其特征在于,所述发送第一下行控制信息DCI,包括:
    在主小区/主辅小区的公共搜索空间CSS内发送所述第一DCI;
    或者,
    在辅小区的公共搜索空间CSS内发送所述第一DCI;
    或者,
    在辅小区的终端UE专属搜索空间USS内发送所述第一DCI。
  12. 如权利要求10所述的方法,其特征在于,还包括:
    基于确定的任一终端的调度方式,确定所述第一DCI中与所述任一终端对应的目标比特位的当前取值;
    基于所述任一终端对应的目标RNTI,对所述第一DCI中的循环冗余校验码CRC进行加扰。
  13. 如权利要求12所述的方法,其特征在于,每个终端对应一个RNTI,或者,多个终端对应一个RNTI。
  14. 如权利要求10所述的方法,其特征在于,还包括:
    基于确定的任一终端的调度方式,确定所述第一DCI中指定信息域的取值为第一指定值。
  15. 如权利要求10所述的方法,其特征在于,还包括:
    响应于确定任一终端的调度方式,确定所述第一DCI中包含的比特位数量为第二指定值。
  16. 如权利要求10-15任一所述的方法,其特征在于,
    所述第一DCI的长度与其他任一DCI的长度不同,或者,所述第一DCI的长度与回退DCI的长度相同。
  17. 如权利要求10-15任一所述的方法,其特征在于,所述第一DCI中包括至少一个终端的目标调度方式。
  18. 一种调度方式的切换装置,其特征在于,应用于终端,所述装置包括:
    处理模块,被配置为基于获取的第一下行控制信息DCI,进行调度方式的切换,其中,所述第一DCI用于指示终端的目标调度方式。
  19. 一种调度方式的切换装置,其特征在于,应用于基站,所述装置包括:
    发送模块,被配置为发送第一DCI,其中,所述第一DCI用于指示终端的目标调度方式。
  20. 一种通信设备,其特征在于,包括:收发器;存储器;处理器,分别与所述收发器及所述存储器连接,配置为通过执行所述存储器上的计算机可执行指令,控制所述收发器的无线信号收发,并能够实现权利要求1至9、或10至17任一项所述的方法。
  21. 一种计算机存储介质,其中,所述计算机存储介质存储有计算机可执行指令;所述计算机可执行指令被处理器执行后,能够实现权利要求1至9、或10至17任一项所述的方法。
PCT/CN2020/135940 2020-12-11 2020-12-11 一种调度方式的切换方法及装置 WO2022120846A1 (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/CN2020/135940 WO2022120846A1 (zh) 2020-12-11 2020-12-11 一种调度方式的切换方法及装置
CN202080003942.9A CN114930961A (zh) 2020-12-11 2020-12-11 一种调度方式的切换方法及装置
US18/332,293 US20230354295A1 (en) 2020-12-11 2023-06-09 Method and apparatus for switching scheduling mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/135940 WO2022120846A1 (zh) 2020-12-11 2020-12-11 一种调度方式的切换方法及装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/332,293 Continuation US20230354295A1 (en) 2020-12-11 2023-06-09 Method and apparatus for switching scheduling mode

Publications (1)

Publication Number Publication Date
WO2022120846A1 true WO2022120846A1 (zh) 2022-06-16

Family

ID=81974164

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/135940 WO2022120846A1 (zh) 2020-12-11 2020-12-11 一种调度方式的切换方法及装置

Country Status (3)

Country Link
US (1) US20230354295A1 (zh)
CN (1) CN114930961A (zh)
WO (1) WO2022120846A1 (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102201885A (zh) * 2010-03-25 2011-09-28 电信科学技术研究院 一种载波调度信息传输方法及其装置
WO2020033893A1 (en) * 2018-08-10 2020-02-13 Qualcomm Incorporated Cross-carrier scheduling enhancements in new radio (nr)
CN111865541A (zh) * 2019-04-30 2020-10-30 华为技术有限公司 一种调度切换方法及装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102201885A (zh) * 2010-03-25 2011-09-28 电信科学技术研究院 一种载波调度信息传输方法及其装置
WO2020033893A1 (en) * 2018-08-10 2020-02-13 Qualcomm Incorporated Cross-carrier scheduling enhancements in new radio (nr)
CN111865541A (zh) * 2019-04-30 2020-10-30 华为技术有限公司 一种调度切换方法及装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ASUSTEK: "Open issues on SCell fast activation and deactivation", 3GPP DRAFT; R1-1906879 OPEN ISSUES ON SCELL FAST ACTIVATION AND DEACTIVATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Reno, USA; 20190513 - 20190517, 13 May 2019 (2019-05-13), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051728330 *

Also Published As

Publication number Publication date
US20230354295A1 (en) 2023-11-02
CN114930961A (zh) 2022-08-19

Similar Documents

Publication Publication Date Title
US11595964B2 (en) Method and device for determining information domain value in DCI
EP3965341A1 (en) Rate matching method, device and storage medium
WO2022126318A1 (zh) 直连通信方法、装置、通信设备和存储介质
CN111149404B (zh) Sps的激活确定方法以及用户设备
US20240057057A1 (en) Method and apparatus for determining uplink antenna panel, and communication device
WO2022178779A1 (zh) 波束指示方法及装置
US20230421335A1 (en) Transmission method and apparatus
WO2022120846A1 (zh) 一种调度方式的切换方法及装置
US20220030609A1 (en) Communication method and apparatus
CN111194523A (zh) 一种用于极化码的速率匹配交织方法及装置
WO2022151102A1 (zh) 调度请求资源的确定方法、装置及通信设备
WO2022165760A1 (zh) 提前终止方法、装置、通信设备及存储介质
US20240107586A1 (en) Random access response sending method and receiving method, and apparatus and terminal device
CN112153725A (zh) 一种无线通信的方法、设备及系统
CN115066920B (zh) 波束指示方法及装置以及波束确定方法及装置
WO2022151228A1 (zh) 一种pucch资源指示方法以及装置
WO2022165761A1 (zh) 提前终止方法、装置、设备及存储介质
US20240106603A1 (en) Communication method and apparatus
US20230413330A1 (en) Data transmission method and apparatus, base station, user terminal, and electronic device
WO2022109934A1 (zh) 一种信号传输方法及装置
WO2022237650A1 (zh) Dci大小对齐方法和设备
CN112913270B (zh) 上行覆盖增强方法、装置、通信设备及存储介质
US20240187151A1 (en) Frequency hopping control method and apparatus

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20964782

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20964782

Country of ref document: EP

Kind code of ref document: A1