WO2022111630A1 - Procédé exécuté par un équipement utilisateur et équipement utilisateur - Google Patents

Procédé exécuté par un équipement utilisateur et équipement utilisateur Download PDF

Info

Publication number
WO2022111630A1
WO2022111630A1 PCT/CN2021/133493 CN2021133493W WO2022111630A1 WO 2022111630 A1 WO2022111630 A1 WO 2022111630A1 CN 2021133493 W CN2021133493 W CN 2021133493W WO 2022111630 A1 WO2022111630 A1 WO 2022111630A1
Authority
WO
WIPO (PCT)
Prior art keywords
user equipment
slot
resource
pssch
communication
Prior art date
Application number
PCT/CN2021/133493
Other languages
English (en)
Chinese (zh)
Inventor
赵毅男
罗超
刘仁茂
Original Assignee
夏普株式会社
赵毅男
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 夏普株式会社, 赵毅男 filed Critical 夏普株式会社
Publication of WO2022111630A1 publication Critical patent/WO2022111630A1/fr

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/53Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation

Definitions

  • the present invention relates to the technical field of wireless communication, and in particular, to a method performed by a user equipment and a corresponding user equipment.
  • D2D communication (Device-to-Device communication, direct device-to-device communication) refers to a direct communication method between two user equipments without being forwarded by a base station or a core network.
  • 3GPP 3rd Generation Partnership Project
  • the upper layer supports unicast (Unicast) and multicast (Groupcast) communication functions.
  • LTE Release 13 eD2D The main features introduced by LTE Release 13 eD2D include:
  • V2X stands for Vehicle to everything, hoping to realize the exchange of information between vehicles and all entities that may affect vehicles, with the purpose of reducing accidents, slowing traffic congestion, reducing environmental pollution and providing other information services.
  • the application scenarios of V2X mainly include four aspects:
  • V2V Vehicle to Vehicle, that is, vehicle-to-vehicle communication
  • V2P Vehicle to Pedestrian, that is, the vehicle sends a warning to pedestrians or non-motor vehicles
  • V2N Vehicle to Network, that is, the vehicle is connected to the mobile network
  • V2I Vehicle to Infrastructure, that is, communication between vehicles and road infrastructure.
  • V2X stage 1 introduces a new D2D communication interface called the PC5 interface.
  • the PC5 interface is mainly used to solve the communication problems of cellular vehicle networking in high-speed (up to 250 km/h) and high-node density environments. Vehicles can interact with information such as position, speed and direction through the PC5 interface, that is, vehicles can communicate directly through the PC5 interface.
  • the functions introduced by LTE Release 14 V2X mainly include:
  • the second phase of the V2X research topic belongs to the research scope of LTE Release 15 (see Non-Patent Document 4).
  • the main features introduced include high-order 64QAM modulation, V2X carrier aggregation, short TTI transmission, and a feasibility study of transmit diversity.
  • resource allocation mode 2 (resource allocation mode 2) based on user equipment sensing (sensing) is supported, or transmission mode 2.
  • resource allocation mode 2 the physical layer of the user equipment senses the transmission resources in the resource pool, and reports the set of available transmission resources to the upper layer. After obtaining the report of the physical layer, the upper layer selects the resources specifically used for the transmission of sideline communication.
  • the solution of this patent mainly includes a method for the user equipment to determine (or, identify) a candidate resource set in a resource allocation manner based on user equipment perception.
  • Non-patent document 1 RP-140518, Work item proposal on LTE Device to Device Proximity Services
  • Non-patent document 2 RP-142311, Work Item Proposal for Enhanced LTE Device to Device Proximity Services
  • Non-patent literature 3 RP-152293, New WI proposal: Support for V2V services based on LTE sidelink
  • Non-Patent Document 4 RP-170798, New WID on 3GPP V2X Phase 2
  • Non-Patent Document 5 RP-181480, New SID Proposal: Study on NR V2X
  • the present invention provides a method performed by a user equipment and a user equipment.
  • the method performed by the user equipment according to the first aspect of the present invention includes: acquiring sidelink communication configuration information; providing parameters for PSSCH/PSCCH transmission by a higher layer; determining or identifying candidate resources.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling; or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one slot.
  • the resource allocation method of the user equipment is a resource allocation method based on the perception of the user equipment; and/or the high layer is a medium access control MAC layer.
  • the parameter for PSSCH/PSCCH transmission includes at least the number L subCH of sub-channels used for PSSCH/PSCCH transmission.
  • a single slot candidate resource is defined as a slot in the resource pool and/or the user equipment considers or assumes that within a certain time interval, any set of the L subCH consecutive subchannels included in the resource pool corresponds to the one single-slot candidate resource.
  • the one single-slot candidate corresponding to the time slot including the PSFCH resource of the physical sidelink communication feedback channel is removed. resource.
  • the time slot The corresponding PSSCH transmission symbol number 1 d is greater than or equal to 6; and/or the one single-slot candidate resource on the time slot whose corresponding PSSCH transmission symbol number 1 d is less than 6 is removed.
  • the time slot time-domain patterns of DMRSs corresponding to one or more PSSCHs and/or removing the one single-slot candidate resource on the time-domain patterns of DMRSs that do not correspond to one or more PSSCHs.
  • a user equipment includes: a processor; and a memory storing instructions; wherein the instructions are executed by the processor when executed in the method performed by the user equipment according to the above-mentioned first aspect The method of any one.
  • the solution of the present invention can ensure that all resources included in the candidate resource set can be used for the physical sideline communication shared channel PSSCH and the resources selected by the medium access control MAC layer of the user equipment can be used for PSSCH transmission, which improves the efficiency of user equipment perception and the transmission reliability of sideline communication.
  • FIG. 1 is a schematic diagram illustrating sideline communication of an LTE V2X UE.
  • FIG. 2 is a schematic diagram illustrating a resource allocation manner of LTE V2X.
  • Fig. 3 is a schematic diagram showing the basic process of the method executed by the user equipment in the first, second and third embodiments of the invention.
  • FIG. 4 is a schematic diagram illustrating a basic process of a method performed by a user equipment in Embodiment 4 of the invention.
  • FIG. 5 is a schematic diagram illustrating a basic process of a method performed by a user equipment in Embodiment 5 of the invention.
  • FIG. 6 is a block diagram illustrating a user equipment according to an embodiment of the present invention.
  • the 5G mobile communication system and its subsequent evolved versions are used as an example application environment to specifically describe various embodiments according to the present invention.
  • the present invention is not limited to the following embodiments, but can be applied to more other wireless communication systems, such as communication systems after 5G and 4G mobile communication systems before 5G.
  • LTE Long Term Evolution, long term evolution technology
  • PDCCH Physical Downlink Control Channel, physical downlink control channel
  • DCI Downlink Control Information, downlink control information
  • PDSCH Physical Downlink Shared Channel, physical downlink shared channel
  • UE User Equipment, user equipment
  • eNB evolved NodeB, evolved base station
  • gNB NR base station
  • TTI Transmission Time Interval, transmission time interval
  • OFDM Orthogonal Frequency Division Multiplexing, Orthogonal Frequency Division Multiplexing
  • CP-OFDM Cyclic Prefix Orthogonal Frequency Division Multiplexing, Orthogonal Frequency Division Multiplexing with Cyclic Prefix
  • C-RNTI Cell Radio Network Temporary Identifier, the temporary identifier of the cell wireless network
  • CSI Channel State Information, channel state information
  • CSI-RS Channel State Information Reference Signal, channel state information reference signal
  • CRS Cell Reference Signal, cell-specific reference signal
  • PUCCH Physical Uplink Control Channel, physical uplink control channel
  • PUSCH Physical Uplink Shared Channel, physical uplink shared channel
  • UL-SCH Uplink Shared Channel, uplink shared channel
  • SCI Sidelink Control Information, side communication control information
  • PSCCH Physical Sidelink Control Channel, Physical Sidelink Communication Control Channel
  • MCS Modulation and Coding Scheme, modulation and coding scheme
  • RB Resource Block, resource block
  • CRB Common Resource Block, common resource block
  • CP Cyclic Prefix, cyclic prefix
  • PRB Physical Resource Block, physical resource block
  • PSSCH Physical Sidelink Shared Channel, Physical Sidelink Shared Channel
  • FDM Frequency Division Multiplexing, frequency division multiplexing
  • RRC Radio Resource Control
  • RSRP Reference Signal Receiving Power, reference signal receiving power
  • SRS Sounding Reference Signal, sounding reference signal
  • DMRS Demodulation Reference Signal, demodulation reference signal
  • CRC Cyclic Redundancy Check, Cyclic Redundancy Check
  • PSDCH Physical Sidelink Discovery Channel, Physical Sidelink Communication Discovery Channel
  • PSBCH Physical Sidelink Broadcast Channel, Physical Sidelink Communication Broadcast Channel
  • TDD Time Division Duplexing
  • FDD Frequency Division Duplexing, frequency division duplexing
  • SIB1 System Information Block Type 1, system information block type 1
  • SLSS Sidelink synchronization Signal, side communication synchronization signal
  • PSSS Primary Sidelink Synchronization Signal, side communication main synchronization signal
  • SSSS Secondary Sidelink Synchronization Signal, side communication auxiliary synchronization signal
  • PCI Physical Cell ID, physical cell identification
  • PSS Primary Synchronization Signal, the main synchronization signal
  • SSS Secondary Synchronization Signal, secondary synchronization signal
  • BWP BandWidth Part, Bandwidth Fragment/Part
  • GNSS Global Navigation Satellite System, global navigation satellite positioning system
  • SFN System Frame Number, system (wireless) frame number
  • DFN Direct Frame Number, direct frame number
  • SSB Synchronization Signal Block, synchronization system information block
  • EN-DC EUTRA-NR Dual Connection, LTE-NR dual connection
  • MCG Master Cell Group, the main cell group
  • SCG Secondary Cell Group, secondary cell group
  • PCell Primary Cell, the main cell
  • SCell Secondary Cell, secondary cell
  • PSFCH Physical Sidelink Feedback Channel, Physical Sidelink Communication Feedback Channel
  • SPS Semi-Persistant Scheduling, semi-static scheduling
  • PT-RS Phase-Tracking Referebee Signals, phase tracking reference signal
  • Transport Block transport block
  • CB Code Block, coding block/code block
  • QPSK Quadrature Phase Shift Keying, quadrature phase shift keying
  • 16/64/256 QAM 16/64/256 Quadrature Amplitude Modulation, Quadrature Amplitude Modulation
  • AGC Auto Gain Control, automatic gain control
  • ARFCN Absolute Radio Frequency Channel Number, absolute radio frequency channel number
  • SC-FDMA Single Carrier-Frequency Division Multiple Access, single carrier-frequency division multiplexing multiple access
  • MAC Medium Access Control, media access control layer
  • V2X in the text can also represent sidelink; similarly, sidelink in the text can also represent V2X, and no specific distinction or limitation will be made in the following text.
  • the resource allocation mode of V2X (sidelink) communication in the specification of the present invention and the transmission mode of V2X (sidelink) communication can be equivalently replaced.
  • the resource allocation method referred to in the specification may represent the transmission mode, and the transmission mode referred to may represent the resource allocation method.
  • transmission mode 1 represents a transmission mode (resource allocation method) based on base station scheduling
  • transmission mode 2 represents a transmission mode (resource allocation method) based on user equipment sensing and resource selection.
  • the PSCCH in the specification of the present invention is used to carry the SCI.
  • the PSCCH involved in the description of the present invention corresponds to, or corresponds to, or is related to, or, the scheduled PSSCH indicates the same meaning, and both indicate associated PSSCH or corresponding PSSCH.
  • the PSSCH involved in the description corresponds to, or corresponds to, or has the same meaning as the related SCI (including the first-level SCI and the second-level SCI), which means associated SCI or corresponding SCI.
  • the first-level SCI is called 1st stage SCI or SCI format 0-1, and is transmitted in PSCCH;
  • the second-level SCI is called 2nd stage SCI or SCI format 0-2, and is transmitted in the corresponding PSSCH resources .
  • a certain time interval may represent the duration of the resource selection window of the sideline communication user equipment.
  • the resource selection window is [n+T1, n+T2], where the values of T1 and T2 depend on the implementation of the UE.
  • the invention does not make any restrictions on this.
  • the specific time interval includes, but is not limited to, the above description, and can refer to any time interval.
  • both UEs performing sidelink communication have network coverage (for example, the UE detects at least one cell that satisfies the "cell selection criterion" on the frequency where sidelink communication needs to be performed, Indicates that the UE has network coverage).
  • Partial-Coverage sidelink communication one of the UEs performing sidelink communication has no network coverage, and the other UE has network coverage.
  • the UE From the UE side, the UE has only two scenarios: no network coverage and network coverage. Part of the network coverage is described in terms of sidelink communication.
  • FIG. 1 is a schematic diagram illustrating sideline communication of an LTE V2X UE.
  • UE1 sends sideline communication control information (SCI format 1) to UE2, which is carried by the physical layer channel PSCCH.
  • SCI format 1 contains PSSCH scheduling information, such as PSSCH frequency domain resources.
  • UE1 sends sideline communication data to UE2, which is carried by the physical layer channel PSSCH.
  • the PSCCH and the corresponding PSSCH are in a frequency division multiplexing manner, that is, the PSCCH and the corresponding PSSCH are located in the same subframe in the time domain, and are located in different RBs in the frequency domain.
  • a transport block TB may contain only one initial transmission, or one initial transmission and one blind retransmission (blind retransmission, which means retransmission not based on HARQ feedback).
  • SCI format 1 can be carried in PSCCH, wherein SCI format 1 at least includes frequency domain resource information of PSSCH. For example, for the frequency domain resource indication field, SCI format 1 indicates the starting sub-channel number and the number of consecutive sub-channels of the PSSCH corresponding to the PSCCH.
  • PSSCH occupies one subframe in the time domain, and adopts frequency division multiplexing (FDM) with the corresponding PSCCH.
  • PSSCH occupies one or more consecutive sub-channels in the frequency domain, sub-channels represent n subCHsize consecutive RBs in the frequency domain, n subCHsize is configured by the RRC parameter, the number of starting sub-channels and consecutive sub-channels Indicated by the frequency domain resource indication field of SCI format 1.
  • FIG. 2 shows two resource allocation methods of LTE V2X, which are respectively called resource allocation based on base station scheduling (Transmission Mode 3) and resource allocation based on UE sensing (Transmission Mode 4).
  • transmission mode 3 of LTE V2X corresponds to transmission mode 1 in NR V2X, which is based on base station scheduling
  • transmission mode 4 of LTE V2X corresponds to transmission mode 2 in NR V2X, which is based on UE perception. transfer mode.
  • the base station can configure the resource allocation mode of the UE through UE-level dedicated RRC signaling (dedicated RRC signaling) SL-V2X-ConfigDedicated, or the transmission mode of the UE. ,Specifically:
  • Resource allocation method based on base station scheduling indicates that the frequency domain resources used for sidelink communication come from the scheduling of the base station.
  • Transmission mode 3 includes two scheduling methods, namely dynamic scheduling and semi-persistent scheduling (SPS).
  • SPS semi-persistent scheduling
  • the UL grant (DCI format 5A) includes the frequency domain resources of PSSCH, and the CRC of the PDCCH or EPDCCH carrying the DCI format 5A is scrambled by SL-V-RNTI.
  • the RRC signaling SL-V2X-ConfigDedicated when the RRC signaling SL-V2X-ConfigDedicated is set to scheduled-r14, it indicates that the UE is configured as a transmission mode based on the base station scheduling.
  • the base station configures SL-V-RNTI or SL-SPS-V-RNTI through RRC signaling, and uses PDCCH or EPDCCH (DCI format 5A, the CRC is scrambled with SL-V-RNTI or scrambled with SL-SPS-V-RNTI) ) sends an uplink scheduling grant UL grant to the UE.
  • the above-mentioned uplink scheduling grant UL grant at least includes scheduling information of PSSCH frequency domain resources in sidelink communication.
  • the UE When the UE successfully monitors the PDCCH or EPDCCH scrambled by SL-V-RNTI or SL-SPS-V-RNTI, it uses the PSSCH frequency domain resource indication field in the uplink scheduling grant UL grant (DCI format 5A) as the PSCCH Indication information of the frequency domain resources of PSSCH in (SCI format 1), and send PSCCH (SCI format 1) and the corresponding PSSCH.
  • DCI format 5A the PSSCH frequency domain resource indication field in the uplink scheduling grant UL grant
  • the UE receives SL-SPS-V-RNTI scrambled DCI format 5A on downlink subframe n. If the indication information of SPS activation is included in the DCI format 5A, the UE determines the frequency domain resources of the PSSCH according to the indication information in the DCI format 5A, and determines the time domain resources of the PSSCH (the transmission subframe of the PSSCH) according to information such as subframe n.
  • Resource allocation method based on UE sensing indicates that the resources used for sidelink communication are based on the UE sensing process of the set of candidate available resources.
  • the RRC signaling SL-V2X-ConfigDedicated is set to ue-Selected-r14, it indicates that the UE is configured as the transmission mode based on UE sensing.
  • the base station configures the available transmission resource pool, and the UE determines the PSSCH sidelink transmission resources in the transmission resource pool (resource pool) according to certain rules (see the LTE V2X UE sensing process section for a detailed process description). , and send PSCCH (SCI format 1) and corresponding PSSCH.
  • the resources sent and received by the UE belong to the resource pool resource pool.
  • the base station schedules transmission resources for the sidelink UE in the resource pool, or, for the transmission mode based on UE perception in sidelink communication, the UE determines transmission resources in the resource pool.
  • the parameter set numerology includes the subcarrier spacing and the cyclic prefix CP length.
  • Table 4.2-1 shows the set of supported transmission parameters, as follows shown.
  • ⁇ ⁇ f 2 ⁇ ⁇ 15[kHz] CP (Cyclic Prefix) 0 15 normal 1 30 normal 2 60 normal, extended 3 120 normal 4 240 normal
  • each slot contains 14 OFDM symbols; for Extended CP, each slot contains 12 OFDM symbols.
  • NR and LTE have the same definition of subframe, which means 1ms.
  • subframe For the subcarrier spacing configuration ⁇ , the slot number in a subframe (1ms) can be expressed as The range is 0 to The slot number in a system frame (frame, duration 10ms) can be expressed as The range is 0 to in, and The definitions of the cases at different subcarrier spacing ⁇ are shown in the table below.
  • Table 4.3.2-1 The number of symbols contained in each slot in normal CP, the number of slots contained in each system frame, and the number of slots contained in each subframe
  • Table 4.3.2-2 The number of symbols contained in each slot when the CP is extended (60kHz), the number of slots contained in each system frame, and the number of slots contained in each subframe
  • the numbered SFN of a system frame ranges from 0 to 1023.
  • the concept of direct system frame number DFN is introduced in sideline communication, and the numbering range is also from 0 to 1023.
  • the above description of the relationship between system frames and numerology can also be applied to direct system frames.
  • the duration of a direct system frame Also equal to 10ms, for a subcarrier spacing of 15kHz, a direct system frame includes 10 slots, and so on.
  • DFN is used for timing on sidelink carriers.
  • LTE only supports subcarrier spacing of 15kHz.
  • Extended CP is supported in LTE, and normal CP is also supported.
  • the subframe subframe has a duration of 1ms, including two time slots, and each slot has a duration of 0.5ms.
  • each subframe contains 14 OFDM symbols, and each slot in the subframe contains 7 OFDM symbols; for extended CP, each subframe contains 12 OFDM symbols, and each slot in the subframe contains 6 OFDM symbols.
  • the resource block RB is defined in the frequency domain as consecutive sub-carriers, eg for a sub-carrier spacing of 15 kHz, the RB is 180 kHz in the frequency domain.
  • the resource element RE represents 1 subcarrier in the frequency domain and 1 OFDM symbol in the time domain.
  • the OFDM symbols available for sideline communication transmission in a time slot are jointly determined by RRC parameters sl-StartSymbol and sl-LengthSymbols.
  • the value range of sl-StartSymbol is 0 to 7 OFDM symbols, and the value range of sl-LengthSymbols is 7 to 14 OFDM symbols. For example, if sl-StartSymbol is configured as 3, and sl-LengthSymbols is configured as 9, in one slot, OFDM symbol 3 to OFDM symbol 11 can be used for sideline communication transmission.
  • ld represents the number of OFDM symbols for transmitting PSSCH in the NR sideline communication. It is worth noting that the number of OFDM symbols for transmitting PSSCH includes AGC symbols and does not include gap symbols (Gap symbols).
  • the AGC symbol represents the OFDM symbol corresponding to sl-StartSymbol
  • the interval symbol represents the OFDM symbol corresponding to (sl-StartSymbol+sl-LengthSymbols-1) (when the time slot does not contain PSFCH resources). Since ld does not contain the last symbol available for sideline communication, the value of ld ranges from 6 to 13.
  • the number in the DM-RS position in the table indicates the relative OFDM number relative to the OFDM symbol corresponding to sl-StartSymbol, that is, the OFDM symbol number corresponding to sl-StartSymbol is 0, and the number 1 indicates that the OFDM symbol corresponding to sl-StartSymbol is after the OFDM symbol. the next OFDM symbol.
  • the time slot contains PSFCH resources
  • the PSFCH resources occupy the last three consecutive symbols in the OFDM symbols that can be used for sideline communication transmission in the time slot, that is, symbols (sl-StartSymbol+sl-LengthSymbols-3) to (sl -StartSymbol+sl-LengthSymbols-1).
  • ld represents the OFDM symbol to symbol (sl-StartSymbol+sl- LengthSymbols -5) corresponding to sl-StartSymbol, and a total of (sl-LengthSymbols-4) symbols.
  • FIG. 3 is a schematic diagram illustrating a basic process of a method performed by a user equipment according to Embodiment 1 of the present invention.
  • the steps performed by the user equipment include:
  • step S101 the sideline communication user equipment acquires sideline communication configuration information.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling, or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one time slot slot.
  • step S102 the higher layer (for the physical layer) of the user equipment provides parameters for PSSCH/PSCCH transmission.
  • the resource allocation manner of the user equipment is a resource allocation manner based on user equipment perception.
  • the higher layer is a medium access control MAC layer.
  • the parameter for PSSCH/PSCCH transmission includes at least the number L subCH of sub-channels used for PSSCH/PSCCH transmission.
  • step S103 the user equipment determines (or identifies) candidate resources (candidate resources).
  • a candidate single-slot resource is defined as a slot in the resource pool and, optionally, the user equipment considers (or assumes, assume) that (any one of the time slots included in the resource pool) within a certain time interval in) any set of the L subCH consecutive subchannels corresponds to a single-slot candidate resource, and, optionally, except when the sl-LengthSymbols is less than or equal to 9, when the sl-LengthSymbols is less than or equal to 9, the The corresponding single-slot candidate resource on the time slot of the PSFCH resource of the feedback channel (that is, when the sl-LengthSymbols is less than or equal to 9, the user equipment considers that any time slot on the time slot including the PSFCH resource of the PSFCH a set of L subCH consecutive sub-channels does not correspond to a single-slot candidate resource),
  • a candidate single-slot resource is defined as a slot in the resource pool
  • the set of the L subCH consecutive sub-channels on the It does not contain the resources of the physical sideline communication feedback channel PSFCH.
  • the user equipment considers (or assumes, assume) that within a certain time interval, any set of the L subCH consecutive sub-channels included in the resource pool (in any one time slot) are all Corresponds to a single-slot candidate resource.
  • FIG. 3 is a schematic diagram illustrating a basic process of a method executed by a user equipment according to Embodiment 2 of the present invention.
  • the steps performed by the user equipment include:
  • step S101 the sideline communication user equipment acquires sideline communication configuration information.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling, or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one time slot slot.
  • step S102 the higher layer (for the physical layer) of the user equipment provides parameters for PSSCH/PSCCH transmission.
  • the resource allocation manner of the user equipment is a resource allocation manner based on user equipment perception.
  • the higher layer is a medium access control MAC layer.
  • the parameter for PSSCH/PSCCH transmission includes at least the number L subCH of sub-channels used for PSSCH/PSCCH transmission.
  • step S103 the user equipment determines (or identifies) candidate resources (candidate resources).
  • a candidate single-slot resource is defined as a slot in the resource pool the set of the L subCH consecutive subchannels on , and, optionally, the time slot
  • the corresponding number of PSSCH transmission symbols 1 d is greater than or equal to 6; optionally, the user equipment considers (or assumes, assume) that ( In any time slot) any set of the L subCH continuous sub-channels corresponds to a single-slot candidate resource,
  • a candidate single-slot resource is defined as a slot in the resource pool
  • Any set of the L subCH consecutive sub-channels corresponds to a single-slot candidate resource, and, optionally, removes the single-slot candidate resource on the timeslot corresponding to the PSSCH transmission symbol number 1 d is less than 6 (that is, all the The user equipment considers that any set of the L subCH consecutive subchannels on the time slot where the number of PSSCH transmission symbols 1 d (duration for transmission of PSSCH) is less than 6 does not correspond to a single-slot candidate resource).
  • FIG. 3 is a schematic diagram illustrating a basic process of a method performed by a user equipment according to Embodiment 3 of the present invention.
  • Embodiment 3 of the present invention will be described in detail with reference to the basic process diagram shown in FIG. 3 .
  • the steps performed by the user equipment include:
  • step S101 the sideline communication user equipment acquires sideline communication configuration information.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling, or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one time slot slot.
  • step S102 the higher layer (for the physical layer) of the user equipment provides parameters for PSSCH/PSCCH transmission.
  • the resource allocation mode of the user equipment is a resource allocation mode based on user equipment perception.
  • the higher layer is a medium access control MAC layer.
  • the parameter for PSSCH/PSCCH transmission includes at least the number L subCH of sub-channels used for PSSCH/PSCCH transmission.
  • step S103 the user equipment determines (or identifies) candidate resources (candidate resources).
  • a candidate single-slot resource is defined as a slot in the resource pool the set of the L subCH consecutive subchannels on , and, optionally, the time slot
  • the set of L subCH consecutive subchannels all correspond to a single-slot candidate resource
  • a candidate single-slot resource is defined as a slot in the resource pool
  • Any set of the L subCH consecutive subchannels corresponds to a single-slot candidate resource, and, optionally, a single-slot candidate resource ( That is, the user equipment considers that any set of the L subCH consecutive subchannels on the time slot of the time domain pattern of the DMRS that does not correspond to one or more PSSCHs does not correspond to a single-slot candidate resource).
  • FIG. 4 is a schematic diagram illustrating a basic process of a method performed by a user equipment according to Embodiment 4 of the present invention.
  • Embodiment 4 of the present invention will be described in detail with reference to the basic process diagram shown in FIG. 4 .
  • the steps performed by the user equipment include:
  • step S201 the sideline communication user equipment acquires sideline communication configuration information.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling, or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one time slot slot.
  • step S202 the higher layer (for the physical layer) of the user equipment provides parameters for PSSCH/PSCCH transmission.
  • the resource allocation manner of the user equipment is a resource allocation manner based on user equipment perception.
  • the higher layer is a medium access control MAC layer.
  • step S203 if a candidate resource meets one (or more) of the following conditions, the user equipment excludes the candidate resource from the candidate resource set SA :
  • the time slot where the candidate resource is located includes the physical sideline communication feedback channel PSFCH resource; or,
  • the number of symbols 1 d (duration for transmission of PSSCH) corresponding to PSSCH transmission in the time slot where the candidate resource is located is less than 6; or,
  • the time slot in which the candidate resource is located does not correspond to the time domain pattern of the DMRS of one or more PSSCHs.
  • step S204 optionally, the user equipment reports the (excluded) candidate resource set SA to the higher layer.
  • FIG. 5 is a schematic diagram illustrating a basic process of a method performed by a user equipment according to Embodiment 5 of the present invention.
  • Embodiment 5 of the present invention will be described in detail with reference to the basic process diagram shown in FIG. 5 .
  • the steps performed by the user equipment include:
  • step S301 the sideline communication user equipment acquires sideline communication configuration information.
  • the sidelink communication configuration information is sent by the base station gNB through RRC signaling, or the sidelink communication configuration information is included in the preconfiguration information SL-PreconfigurationNR.
  • the sideline communication configuration information at least includes configuration information of the start symbol sl-StartSymbol and the number of symbols sl-LengthSymbols used for sideline communication in one time slot slot.
  • step S302 the higher layer (the physical layer) of the user equipment provides parameters for PSSCH/PSCCH transmission.
  • the resource allocation manner of the user equipment is a resource allocation manner based on user equipment perception.
  • the higher layer is a medium access control MAC layer.
  • the parameter for PSSCH/PSCCH transmission includes at least the number L subCH of sub-channels used for PSSCH/PSCCH transmission.
  • step S303 the user equipment reports the (excluded) candidate resource set SA to the higher layer.
  • step S304 the upper layer of the user equipment selects resources for PSSCH/PSCCH transmission.
  • the higher layer of the user equipment randomly selects resources for PSSCH/PSCCH transmission after excluding resources meeting any of the following conditions from the reported candidate resource set.
  • the time slot where the resource is located includes the physical sideline communication feedback channel PSFCH resource; or,
  • the number of symbols 1 d (duration for transmission of PSSCH) corresponding to PSSCH transmission in the time slot where the resource is located is less than 6; or,
  • the time slot in which the resource is located does not correspond to the time domain pattern of the DMRS of one or more PSSCHs.
  • FIG. 6 is a block diagram showing a user equipment UE according to the present invention.
  • the user equipment UE80 includes a processor 801 and a memory 802 .
  • the processor 801 may include, for example, a microprocessor, a microcontroller, an embedded processor, or the like.
  • the memory 802 may include, for example, volatile memory (eg, random access memory RAM), a hard disk drive (HDD), non-volatile memory (eg, flash memory), or other memory, or the like.
  • Program instructions are stored on the memory 802 . When the instructions are executed by the processor 801, the above-mentioned method performed by the user equipment described in detail in the present invention can be executed.
  • the method of the present invention and the apparatus involved have been described above with reference to the preferred embodiments. Those skilled in the art can understand that the methods shown above are only exemplary, and the various embodiments described above can be combined with each other under the condition that no contradiction occurs.
  • the method of the present invention is not limited to the steps and sequences shown above.
  • the network node and user equipment shown above may include more modules, for example, may also include modules that can be developed or developed in the future and can be used for a base station, an MME, or a UE, and so on.
  • the various identifiers shown above are only exemplary and not restrictive, and the present invention is not limited to the specific information elements exemplified by these identifiers. Numerous changes and modifications may occur to those skilled in the art in light of the teachings of the illustrated embodiments.
  • the above-described embodiments of the present invention may be implemented by software, hardware, or a combination of both.
  • the various components inside the base station and the user equipment in the above embodiments may be implemented by various devices, including but not limited to: analog circuit devices, digital circuit devices, digital signal processing (DSP) circuits, programmable processing Controllers, Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs), Programmable Logic Devices (CPLDs), etc.
  • DSP digital signal processing
  • ASICs Application Specific Integrated Circuits
  • FPGAs Field Programmable Gate Arrays
  • CPLDs Programmable Logic Devices
  • base station may refer to a mobile communication data and control switching center with larger transmission power and wider coverage area, including functions such as resource allocation and scheduling, data reception and transmission, and the like.
  • User equipment may refer to a user mobile terminal, for example, including a mobile phone, a notebook, and other terminal equipment that can wirelessly communicate with a base station or a micro base station.
  • embodiments of the invention disclosed herein may be implemented on a computer program product.
  • the computer program product is a product having a computer-readable medium on which computer program logic is encoded that, when executed on a computing device, provides relevant operations to achieve The above technical solutions of the present invention.
  • computer program logic When executed on at least one processor of a computing system, computer program logic causes the processor to perform the operations (methods) described in the embodiments of the present invention.
  • Such arrangements of the present invention are typically provided as software, code and/or other data structures arranged or encoded on a computer readable medium such as an optical medium (eg CD-ROM), floppy or hard disk, or such as one or more Firmware or other medium of microcode on a ROM or RAM or PROM chip, or a downloadable software image in one or more modules, a shared database, etc.
  • Software or firmware or such a configuration may be installed on a computing device, so that one or more processors in the computing device execute the technical solutions described in the embodiments of the present invention.
  • each functional module or each feature of the base station device and the terminal device used in each of the above embodiments may be implemented or executed by a circuit, which is usually one or more integrated circuits.
  • Circuits designed to perform the various functions described in this specification may include general purpose processors, digital signal processors (DSPs), application specific integrated circuits (ASICs) or general purpose integrated circuits, field programmable gate arrays (FPGAs) or other Program logic devices, discrete gate or transistor logic, or discrete hardware components, or any combination of the above.
  • a general-purpose processor may be a microprocessor, or the processor may be an existing processor, controller, microcontroller, or state machine.
  • the general-purpose processor or each circuit described above may be configured by digital circuits, or may be configured by logic circuits.
  • the present invention can also use the integrated circuit obtained by using the advanced technology.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

La présente invention concerne un procédé exécuté par un équipement utilisateur et un équipement utilisateur. Le procédé comprend les étapes suivantes : des informations de configuration de communication en liaison latérale sont obtenues ; une couche élevée fournit des paramètres pour une transmission de PSSCH/PSCCH ; et des ressources candidates sont déterminées ou identifiées.
PCT/CN2021/133493 2020-11-30 2021-11-26 Procédé exécuté par un équipement utilisateur et équipement utilisateur WO2022111630A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011377123.9A CN114641066A (zh) 2020-11-30 2020-11-30 由用户设备执行的方法以及用户设备
CN202011377123.9 2020-11-30

Publications (1)

Publication Number Publication Date
WO2022111630A1 true WO2022111630A1 (fr) 2022-06-02

Family

ID=81753782

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/133493 WO2022111630A1 (fr) 2020-11-30 2021-11-26 Procédé exécuté par un équipement utilisateur et équipement utilisateur

Country Status (2)

Country Link
CN (1) CN114641066A (fr)
WO (1) WO2022111630A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023246774A1 (fr) * 2022-06-20 2023-12-28 维沃移动通信有限公司 Procédé de transmission de données sl, premier terminal et second terminal
WO2024031539A1 (fr) * 2022-08-11 2024-02-15 Zte Corporation Procédé et système de sélection de ressources de liaison latérale dans un réseau sans fil
WO2024061072A1 (fr) * 2022-09-23 2024-03-28 华为技术有限公司 Procédé et appareil de communication

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117377071A (zh) * 2022-06-27 2024-01-09 夏普株式会社 由用户设备执行的方法以及用户设备

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111294757A (zh) * 2019-04-29 2020-06-16 北京展讯高科通信技术有限公司 V2x的收发方法及装置、存储介质、终端
CN111586722A (zh) * 2019-02-15 2020-08-25 大唐高鸿数据网络技术股份有限公司 一种资源选择方法及终端
CN111601274A (zh) * 2019-02-21 2020-08-28 夏普株式会社 由用户设备执行的方法以及用户设备

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111586722A (zh) * 2019-02-15 2020-08-25 大唐高鸿数据网络技术股份有限公司 一种资源选择方法及终端
CN111601274A (zh) * 2019-02-21 2020-08-28 夏普株式会社 由用户设备执行的方法以及用户设备
CN111294757A (zh) * 2019-04-29 2020-06-16 北京展讯高科通信技术有限公司 V2x的收发方法及装置、存储介质、终端

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ANONYMOUS: "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation (Release 16)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 38.211, vol. RAN WG1, no. V16.3.0, 1 October 2020 (2020-10-01), pages 1 - 133, XP051961275 *
ANONYMOUS: "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 16)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 38.214, vol. RAN WG1, no. V16.3.0, 2 October 2020 (2020-10-02), pages 1 - 166, XP051961309 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023246774A1 (fr) * 2022-06-20 2023-12-28 维沃移动通信有限公司 Procédé de transmission de données sl, premier terminal et second terminal
WO2024031539A1 (fr) * 2022-08-11 2024-02-15 Zte Corporation Procédé et système de sélection de ressources de liaison latérale dans un réseau sans fil
WO2024061072A1 (fr) * 2022-09-23 2024-03-28 华为技术有限公司 Procédé et appareil de communication

Also Published As

Publication number Publication date
CN114641066A (zh) 2022-06-17

Similar Documents

Publication Publication Date Title
WO2022028413A1 (fr) Procédé exécuté par un dispositif utilisateur, et dispositif utilisateur
WO2022111630A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022143641A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2023040961A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2022017037A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2023131074A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022194243A1 (fr) Procédé réalisé par un équipement utilisateur et équipement utilisateur
WO2022152163A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022267943A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2022028330A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2021228138A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2021013213A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022007664A1 (fr) Procédé exécuté par un équipement d'utilisateur, et équipement d'utilisateur
WO2022063070A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022143643A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2022078292A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2023078345A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2023098812A1 (fr) Procédé exécuté par équipement d'utilisateur, et équipement d'utilisateur
WO2023051452A1 (fr) Procédé exécuté par un équipement d'utilisateur, et équipement d'utilisateur
WO2022206817A1 (fr) Procédé mis en œuvre par un équipement utilisateur, et équipement utilisateur
WO2024001958A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2024001957A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2023078389A1 (fr) Procédé exécuté par un équipement utilisateur et équipement utilisateur
WO2023001070A1 (fr) Procédé exécuté par un équipement utilisateur, et équipement utilisateur
WO2024012390A1 (fr) Procédé mis en œuvre par un équipement utilisateur et équipement utilisateur

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21897130

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21897130

Country of ref document: EP

Kind code of ref document: A1