WO2022032969A1 - Delay valve device and faucet - Google Patents
Delay valve device and faucet Download PDFInfo
- Publication number
- WO2022032969A1 WO2022032969A1 PCT/CN2020/139800 CN2020139800W WO2022032969A1 WO 2022032969 A1 WO2022032969 A1 WO 2022032969A1 CN 2020139800 W CN2020139800 W CN 2020139800W WO 2022032969 A1 WO2022032969 A1 WO 2022032969A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- valve
- rod
- groove
- cavity
- valve body
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K31/00—Actuating devices; Operating means; Releasing devices
- F16K31/12—Actuating devices; Operating means; Releasing devices actuated by fluid
- F16K31/36—Actuating devices; Operating means; Releasing devices actuated by fluid in which fluid from the circuit is constantly supplied to the fluid motor
- F16K31/38—Actuating devices; Operating means; Releasing devices actuated by fluid in which fluid from the circuit is constantly supplied to the fluid motor in which the fluid works directly on both sides of the fluid motor, one side being connected by means of a restricted passage and the motor being actuated by operating a discharge from that side
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K15/00—Check valves
- F16K15/18—Check valves with actuating mechanism; Combined check valves and actuated valves
Definitions
- the invention relates to the technical field of waterway control, in particular to a delay valve device and a faucet.
- the existing time delay valve device includes a valve body part, a valve core and a drive rod; the valve body part includes a valve body, the valve body and the valve core cooperate to form a pilot valve, and the drive rod is slidably connected to the valve body part and drives The rod and the valve core are assembled together to control the switch of the pilot valve by sliding the driving rod.
- the pressure change controls the pilot valve switch. For example, after the pressure relief water circuit is closed, the water pressure controls the pilot valve to close. There is a time difference between the pressure relief water circuit closing and the pilot valve closing, and the time difference acts as a delay.
- the valve core not only plays the role of controlling the opening and closing of the pilot valve, but also plays the role of time delay. The time delay of the time delay valve device cannot be adjusted, so further improvement is necessary.
- the present invention provides a delay valve device and a faucet, which overcome the shortcomings of the delay valve device in the background art.
- a delay valve device including a valve body part, a valve core and a driving rod;
- the valve body part includes a valve body, and the valve body and the valve core cooperate to form a pilot valve;
- the drive rod is slidably connected to the valve body part, and the pilot valve switch is controlled by sliding the drive rod;
- the drive rod is equipped with a check valve, and the gap between the drive rod and the valve body part is divided into a first air cavity by the check valve and the second air cavity, the gas of the second air cavity can enter the first air cavity through the one-way valve,
- the driving rod is provided with a connecting channel connecting the first air cavity and the second air cavity, and the driving rod is also movably connected
- There is an adjustment rod and the air passage area of the connecting channel can be adjusted through the movement of the adjustment rod to adjust the delay time.
- an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first through groove connecting the first air cavity and a second air cavity passing through the inside and outside of the attaching groove.
- the second through groove, the connecting channel includes the above-mentioned first through groove, the second through groove and the area between the first through groove and the second through groove;
- the gap area between the adjusting rod and the groove wall of the connecting groove constitutes the air passage area of the connecting channel.
- the first air cavity and the second air cavity are respectively arranged on the upper and lower sides of the one-way valve, and the first through groove and the second through groove are respectively arranged on the upper and lower sides of the one-way valve.
- the attachment slot has an attachment section and an adjustment section, the adjustment section is located between the first through slot and the second through slot;
- the adjustment rod has a connecting section and a conical section, the connecting section is screwed on The attachment segment and the tapered segment are at least partially inserted into the adjustment segment to control the gap area by the depth of insertion of the adjustment rod.
- a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body presses against the driving rod and pushes the driving rod outside.
- the driving rod includes a central rod and a linkage rod
- the linkage rod is arranged in the valve body
- the outer end of the linkage rod passes through the pressure relief hole and protrudes out of the valve body
- the outer end of the linkage rod is fixedly located outside the valve body
- the valve body is provided with a pressure relief hole, and whether the pressure relief hole is sealed is controlled by sliding the linkage rod, and a second elastic body is arranged between the valve core and the valve body.
- the one-way valve is installed outside the center rod, the first air cavity and the second air cavity are both formed between the center rod and the valve body part, and the adjustment rod is connected to the center rod.
- the valve body includes a connecting seat and a cover body with a sealing and fixing cover connected to the connecting seat, a valve cavity is formed between the connecting seat and the cover body, and the valve core is arranged in the valve cavity and divides the valve cavity into two parts. forming a pressure cavity and a water outlet cavity, the cover body is provided with the above-mentioned pressure relief hole, and the pressure relief hole is connected to form a pressure cavity and is arranged through; the valve body part also includes a center seat, the center seat is fixed on the cover body and A pressure relief waterway connected to the pressure relief hole is arranged between the center seat and the cover body; the center rod is slidably connected in the center seat, and the outer end of the linkage rod extends into the center seat.
- the first air cavity and the second air cavity are arranged in the gap formed between the center seat and the center rod.
- the valve body part further includes a base part, and the base part is provided with two water inlets that can be connected to cold and hot water respectively;
- the valve body can be rotatably connected to the base part, and the valve body is provided with a valve cavity and
- the mixed water circuit is connected to the valve cavity, and the valve core is arranged in the valve cavity.
- the mixed water circuit cooperates with the two inlet water paths to control the water temperature of the mixed water circuit through the rotation of the valve body.
- a delay valve device including a valve body part, a valve core and a driving rod;
- the valve body part includes a valve body, the valve body is provided with a valve cavity, and the valve body is provided with a valve cavity.
- the core is arranged in the valve cavity and divides the valve cavity into a pressure cavity and a water outlet cavity.
- the valve body and the valve core cooperate to form a pilot valve;
- the driving rod is slidably connected to the valve body part, and the driving rod and the valve core are assembled together to form a pilot valve.
- the pilot valve switch is controlled by sliding the driving rod; the valve core is equipped with a one-way valve, and the water flow of the pressure cavity can enter the water outlet cavity through the one-way valve.
- the driving rod is also movably connected with an adjusting rod, and the water passing area of the connecting channel is movably adjusted by the adjusting rod to adjust the delay time.
- an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first through groove connected to the water outlet cavity and a second through groove connected to the water outlet cavity through the inside and outside of the attachment groove , the connecting channel includes the first through slot, the second through slot and the area between the first through slot and the second through slot; the adjustment rod can be adjusted in the attachment slot, the The gap area between the adjusting rod and the wall of the connecting groove constitutes the water passing area of the connecting channel.
- the valve body is provided with a water outlet hole that penetrates inside and outside to connect to the water outlet cavity;
- the driving rod includes a central rod and a linkage rod, and the inner end of the central rod passes through the water outlet hole from the outside to the inside and extends into the valve cavity
- the central rod is provided with a sealing ring that can seal the water outlet
- the linkage rod is fixed on the inner end of the central rod;
- an attachment segment, an adjustment segment is recessed at the bottom of the groove of the second attachment segment, the adjustment rod has a connection segment and a conical segment, the connection segment is attached to the first attachment segment, and the conical segment is at least partially inserted into the adjustment segment , so as to control the gap area through the insertion depth of the adjusting rod;
- the connecting groove includes the above-mentioned first connecting section, second connecting section and adjusting section.
- the first through groove is disposed through the first attachment section, and the second through groove is disposed through the inner end of the adjustment section.
- the valve body is provided with a water outlet hole that penetrates through the inside and outside to connect to the water outlet cavity and a recessed fitting groove that is connected to the pressure cavity; the inner end of the central rod passes through the water outlet hole from the outside to the inside and extends into the water outlet hole.
- a first sealing ring capable of sealing the water outlet hole is arranged outside the central rod, the linkage rod is fixed on the inner end of the central rod, and a second sealing ring is fixed outside the linkage rod, and the second sealing ring is slidably connected In the matching groove; the first sealing ring is balanced by the water pressure force and the second sealing ring is subjected to the water pressure force.
- a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body presses against the driving rod and pushes the driving rod outside.
- the third technical solution adopted by the present invention to solve the technical problem is: a faucet, which is provided with the delay valve device.
- the valve core only acts as a switch and does not function as a delay time, so the delay will not be greatly affected by the water pressure; the medium is air, and the water temperature changes. The time has little effect on the delay time; the principle of pilot valve is adopted, and the operating force value is small.
- the connecting channel includes the first through slot, the second through slot and the area between the first through slot and the second through slot, and the gap area between the adjusting rod and the wall of the connecting slot constitutes the air passage area of the connecting channel ,
- the adjustment is convenient and fast, and the structure is compact.
- the connecting section is screwed on the connecting section and the tapered section is inserted into the adjusting section at least partially, so as to control the gap area through the insertion depth of the adjusting rod, the adjustment is convenient and fast, and the structure is compact.
- Both the first air cavity and the second air cavity are formed between the central rod and the valve body part to avoid the delay caused by the water temperature.
- the drive rod is also movably connected with an adjustment rod, through which the water passage area of the connecting channel can be adjusted to adjust the delay time. too big.
- the central rod is provided with a first attachment section arranged through it, the end face of the linkage rod is concavely provided with a second attachment section, the groove bottom of the second attachment section is concavely provided with an adjustment section, the adjustment rod has a connection section and a conical section, and the connection section Attached to the first attachment section, the tapered section is at least partially inserted into the adjustment section, so as to control the gap area through the insertion depth of the adjustment rod, the adjustment is convenient and fast, and the structure is compact.
- the force of the first sealing ring and the force of the second sealing ring are balanced by the water pressure, reducing the pressing force and preventing the water pressure from affecting the pressing.
- FIG. 1 is a three-dimensional half-section exploded schematic diagram of a delay valve device according to a first embodiment.
- FIG. 2 is a three-dimensional half-section schematic diagram of a center rod according to Embodiment 1.
- FIG. 2 is a three-dimensional half-section schematic diagram of a center rod according to Embodiment 1.
- FIG. 3 is a three-dimensional half-section schematic diagram of the adjusting rod according to the first embodiment.
- FIG. 4 is one of the schematic cross-sectional views of the delay valve device according to the first embodiment.
- the on-off valve closes the water and is in the first delay state.
- FIG 5 is the second schematic cross-sectional view of the delay valve device according to the first embodiment, the switch valve is boiling water and is in the second delay state.
- FIG. 6 is the third schematic sectional view of the delay valve device in the first embodiment, the on-off valve closes the water.
- FIG. 7 is one of the schematic cross-sectional views of the delay valve device in the second embodiment, the on-off valve closes the water.
- FIG. 8 is the second schematic cross-sectional view of the delay valve device according to the second embodiment, the switch valve boils water.
- Fig. 9 is one of the cross-sectional schematic diagrams of the delay valve device in the third embodiment, the on-off valve closes the water.
- Fig. 10 is the second schematic diagram of the section of the delay valve device in the third embodiment, the switch valve boils water.
- FIG. 11 is one of the schematic cross-sectional views of the delay valve device in the fourth embodiment, the on-off valve closes the water.
- Figure 12 is the second schematic cross-sectional view of the delay valve device in the fourth embodiment, the switch valve boils water.
- FIG. 13 is a three-dimensional schematic diagram of the faucet according to the fourth embodiment.
- FIG. 14 is a schematic cross-sectional view of the faucet according to the fourth embodiment.
- Example 1 Labels: valve body part 1, valve core 2, driving rod 3; valve body 11, base part 12, center seat 13, second elastic body 14, water replenishment hole 15; connecting seat 111, cover body 112, valve cavity 113.
- Labels of the second embodiment forming a pressure seat 21, a second Y-shaped ring 22;
- Reference numerals of the fourth embodiment reaming hole 323 , connecting head 324 , third through groove 325 , button 5 .
- valve body part 1 valve core 2 and drive rod 3.
- the valve body part 1 includes a valve body 11 , a base part 12 and a center seat 13 .
- the valve body 11 includes a connecting seat 111 and a cover body 112 which is sealed and fixed on the connecting seat 111.
- a valve cavity 113 is formed between the connecting seat 111 and the cover body 112.
- the connecting seat 111 is provided with a water mixing channel 114 arranged therethrough.
- the cover body 112 is provided with a pressure relief hole 115 disposed therethrough.
- the center seat 13 is fixed on the cover body 112, and a pressure relief water channel 116 connected to the pressure relief hole 115 is arranged between the center seat 13 and the cover body 112, and the pressure relief water channel is connected to the water outlet of the delay valve device (the valve body is connected to A water outlet that leads out of the water cavity to allow water to flow out).
- the base member 12 is provided with two water inlet passages 121 that can be respectively connected to hot and cold water; the connecting seat 111 can be rotatably connected to the base member 12, the mixed water passage 114 is connected to the valve cavity 113, the mixed water passage 114 and the two water inlet passages 121 cooperate to control the water temperature of the mixed water circuit 114 through the rotation of the central seat 13 and the valve body 11 together.
- a casing 1301 is also provided outside the central seat, and the central seat and the valve body are fixedly mounted together through the casing.
- the outer port of the center seat is fixed with an outer cover 1302, and the outer end of the center rod protrudes out of the outer cover.
- the valve core 2 is arranged in the valve cavity 113 and divides the valve cavity 113 into a pressure cavity 117 and a water outlet cavity 118 .
- the valve body 11 cooperates with the valve core 2 to form a pilot valve.
- the drive rod 3 is slidably connected to the valve body part 1 , and the pilot valve switch is controlled by sliding the drive rod 3 .
- the pressure forming cavity 117 is provided with a second elastic body 14 , and the second elastic body abuts between the valve core and the cover body 112 .
- the valve core 2 includes a cup and a cup seat 201 , the periphery of the cup is fixed on the inner wall of the valve body 11 , and the cup is mounted outside the cup seat 201 .
- the driving rod 3 includes a central rod 31 and a linkage rod 32 , the central rod 31 is slidably connected in the central seat 13 , and the outer end of the linkage rod 32 slides from the inside of the valve body 11 through the pressure relief hole 115 and extends out of the valve body 11 The inner end of the central rod 31 which extends into the central seat and is fixed outside the valve body 11 . Whether the pressure relief hole 115 is sealed is controlled by sliding the linkage rod 32 to control the opening and closing of the pilot valve, as shown in FIG. 4 and FIG. 5 .
- the drive rod 3 and the spool 2 are attached together to control the pilot valve on/off by controlling the spool to slide or deform as needed.
- the central rod 31 is provided with a one-way valve 311, and the gap between the central rod 31 and the central seat 13 is divided into a first air cavity 312 and a second air cavity 313 by the one-way valve 311, and the first air cavity can be connected to
- the first air cavity 312 and the second air cavity 313 are respectively arranged on the upper and lower sides of the one-way valve 311, and the central rod 31 is provided with a connection to the first air cavity 312 and the second air cavity.
- the connecting channel of 313, the center rod 31 is also movably connected with an adjusting rod 33, and the air passage area of the connecting channel is adjusted through the adjusting rod 33 to adjust the delay time.
- a first elastic body 34 is disposed between the center rod 31 and the bottom wall of the center seat 13 , the first elastic body 34 abuts the center rod 31 and the outer driving rod, the first elastic body is such as a spring, and the spring is sleeved on the center rod 31 Outside and abuts against the bottom wall of the center seat 13 and the outer end of the center rod 31 protruding ring convex.
- an attachment groove is concavely formed on the outer end surface of the central rod 31, and the central rod 31 is further provided with a first through groove 314 connecting the first air cavity and connecting the second air cavity through the inside and outside of the attaching groove
- the second through groove 315, the first through groove 314 and the second through groove 315 are respectively arranged on the upper and lower sides of the one-way valve 311, and the connecting channel includes the first through groove, the second through groove and the connecting groove.
- the adjusting rod 33 has a connecting section 331 and a conical section 332, the connecting section 331 is screwed on the connecting section and the conical section 332 is at least partially inserted into the adjusting section 317, and the gap area between the conical section 332 and the groove wall of the adjusting section 317
- the air passage area of the connecting channel is formed to control the gap area by adjusting the insertion depth of the rod;
- the one-way valve 311 is provided with a convex part on the outer ring of the central rod, and the outer peripheral surface of the convex part is concavely provided with a ring groove, and the ring groove is installed in the ring groove.
- the first Y-ring realizes the one-way function through the deformation of the first Y-ring.
- the center rod 31 is pressed to move downward, and the air quickly enters the first air chamber 312 from the second air chamber 313 through the one-way valve 311 ; after releasing the pressing, the center The rod 31 moves upward under the action of the first elastic body 34, and the gas in the first air chamber 312 enters the second air chamber 313 through the connecting channel. Due to the small taper gap, the time for the central rod to move upward can be very long. The size of the gap with taper, so that the delay time can be adjusted.
- the delay valve device of the first embodiment As shown in FIG. 4 and FIG. 5 , after the cold and hot water from the bottom inlet are mixed, when the linkage rod seals the pressure relief hole 115 , the water enters from the water mixing channel and the water replenishment hole 15 .
- the pressure chamber 117 is formed.
- the valve core is sealed by the back pressure of the pressure chamber 117, and the pilot valve is closed; when the center rod moves downward and is separated from the pressure relief hole, that is, when the pressure relief hole is opened, the pressure chamber 117 is released at this time. Pressure, open the pilot valve, so as to discharge water.
- the valve core When the valve core is subjected to the upward force of the water pressure, the water channel is opened; the delayed water outlet state: cancel the pressing, the center rod is recovered upward by the upward force of the first elastic body, and when the linkage rod closes the pressure relief hole, the water will be replenished from the water.
- the hole is filled with water and pressurized into the pressure chamber, coupled with the elastic force of the second elastic body, the valve core is slowly pushed down to the closed position of the water passage; delay time adjustment: by turning the adjusting rod with the tool to move up or down, The hole gap between the center rod and the adjustment rod will become larger or smaller, and the delay time will be changed.
- the delay valve device of the first embodiment can produce the following technical effects: 1.
- the traditional pilot-operated cup not only acts as a switch, but also acts as a delay, so that when the water pressure is high, it will have an impact on pressure relief or water replenishment, Therefore, the delay time is affected, and the leather cup in this embodiment only acts as a switch, and the delay mechanism (connecting channel, adjusting rod, etc.) is separated from the switch mechanism and does not affect each other, so it will not be greatly affected by the water pressure;
- the medium is air, and the change of water temperature has little effect on the delay time; 3.
- the principle of pilot valve is adopted, and the operating force value is small.
- valve core 2 includes a pressure-forming seat 21 and a Y-ring 22 fixedly sleeved on the pressure-forming seat 21 , and the lower end of the linkage rod 32 can pass through
- the pressing seat 21 is formed, and the gap between the pressing seat 21 and the linkage rod 32 constitutes the above-mentioned water replenishing hole 15 .
- the cover body of the valve body 11 is provided with a water outlet hole 119 that penetrates through the inside and outside to connect to the water outlet cavity 118; the inner end of the center rod 31 goes from the outside to the inside Passing through the water outlet hole 119 and extending into the valve cavity 113 , the linkage rod 32 is arranged in the valve cavity 113 , and the linkage rod 32 is assembled with the valve core 2 to control the pilot valve switch by sliding the driving rod 3 .
- the valve core 2 is provided with a one-way valve 311.
- the water flow of the pressure-forming cavity 117 can enter the water-outlet cavity 118 through the one-way valve 311.
- An adjusting rod 33 is also movably connected to the rod 3, and the water passing area of the connecting channel is adjusted movably through the adjusting rod 33 to adjust the delay time.
- the central rod 31 is provided with a first attachment section 318 disposed therethrough, the end face of the linkage rod 32 is concavely provided with a second attachment section 321, and the second attachment section 321 is concavely provided with an adjustment section 317 at the bottom of the groove.
- 331 is screwed on the first attachment section 318, and the tapered section 332 is at least partially inserted into the adjustment section 317 to control the gap area through the insertion depth of the adjustment rod;
- the attachment groove includes the above-mentioned first attachment section, second attachment section segment and adjustment segment.
- the central rod 31 is also provided with a first through groove 314 that penetrates the inside and outside of the first attachment section 318 and is connected to the water outlet cavity, and the linkage rod 32 is provided with a second through groove that penetrates the inner end of the adjustment section 317 and is connected to form a pressure cavity , the connecting channel includes the first through groove, the second through groove and the area between the first through groove and the second through groove.
- the bottom surface of the connecting seat 111 of the valve body 11 is concavely provided with a matching groove 1111 which is connected to form a pressure cavity; the inner end of the center rod 31 passes through the water outlet hole from the outside to the inside and extends into the valve cavity.
- the first sealing ring 319 sealing the water outlet, the linkage rod 32 is fixed with a second sealing ring 322, and the second sealing ring 322 is slidably connected in the matching groove 1111; The two sealing rings are balanced by the force of water pressure to reduce the pressing force.
- the linkage rod 32 is arranged through the linkage rod 32 , a reaming hole 323 is arranged at the lower part of the linkage rod 32 , and a connecting head 324 is fixed in the lower port of the reaming hole 323 .
- the hole 323 is provided with a third through groove 325 which penetrates inside and outside; the adjusting rod passes through the connecting head 323 , and the connecting passage includes the third through groove, the reaming hole and the gap between the adjusting rod and the connecting head.
- FIG. 13 and FIG. 14 are application examples of the above-mentioned embodiments, specifically the application example of the fourth embodiment, the center rod is fixed with a button 5 , and the first elastic body abuts between the center seat base and the button , the above-mentioned delay valve device is installed in the faucet body 51 .
- the drive rod of the delay valve device of the present invention is provided with a one-way valve outside, and is divided into two air chambers through the one-way valve, a connecting channel is set between the two air chambers, and the gas in the second air chamber enters the first air chamber through the one-way valve, and is adjusted
- the rod adjusts the air passage area of the connecting channel to adjust the delay time, so the delay will not be greatly affected by the water pressure.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Multiple-Way Valves (AREA)
Abstract
A delay valve device and a faucet. The delay valve device comprises a valve body component (1), a valve core (2), and a driving rod (3); the valve body component (1) comprises a valve body (11); the valve body (11) mates with the valve core (2) to constitute a pilot valve; the driving rod (3) is slidably connected to the valve body component (1), and the opening and closing of the pilot valve is slidably controlled by means of the driving rod (3); a one-way valve (311) is provided outside the driving rod (3), and a gap between the driving rod (3) and the valve body component (1) is divided into a first air cavity (312) and a second air cavity (313) by means of the one-way valve (311); air in the second air cavity (313) can enter the first air cavity (312) through the one-way valve (311); the driving rod (3) is provided with a communication channel for enabling the first air cavity (312) to be communicated with the second air cavity (313); the driving rod (3) is further movably connected to an adjustment rod (33); an air passing area of the communication channel is movably adjusted by means of the adjustment rod (33) to adjust a delay duration; the valve core only serves as a switch and does not play a role in the delay duration; the delay is not greatly affected by a water pressure.
Description
本发明涉及水路控制技术领域,尤其涉及一种延时阀装置及龙头。The invention relates to the technical field of waterway control, in particular to a delay valve device and a faucet.
现有延时阀装置,它包括阀体部件、阀芯和驱动杆;该阀体部件包括阀体,该阀体和阀芯配合以构成先导阀,该驱动杆滑接在阀体部件且驱动杆和阀芯装接在一起以通过驱动杆滑动控制先导阀开关,具体来说,它是通过驱动杆控制阀芯活动以控制泄压水路通断,之后再利用泄压水路作用而导致的水压变化控制先导阀开关,如,在泄压水路关闭后通过水压控制先导阀关闭,该泄压水路关闭至先导阀关闭存在有时间差,该时间差起延时作用。现有延时阀装置,该阀芯既起到控制先导阀开关的作用,又起到延时的作用,延时阀装置的延时无法调节,因此有进一步改进之必要。The existing time delay valve device includes a valve body part, a valve core and a drive rod; the valve body part includes a valve body, the valve body and the valve core cooperate to form a pilot valve, and the drive rod is slidably connected to the valve body part and drives The rod and the valve core are assembled together to control the switch of the pilot valve by sliding the driving rod. The pressure change controls the pilot valve switch. For example, after the pressure relief water circuit is closed, the water pressure controls the pilot valve to close. There is a time difference between the pressure relief water circuit closing and the pilot valve closing, and the time difference acts as a delay. In the existing time delay valve device, the valve core not only plays the role of controlling the opening and closing of the pilot valve, but also plays the role of time delay. The time delay of the time delay valve device cannot be adjusted, so further improvement is necessary.
发明内容SUMMARY OF THE INVENTION
本发明提供了延时阀装置及龙头,其克服了背景技术中延时阀装置所存在的不足。The present invention provides a delay valve device and a faucet, which overcome the shortcomings of the delay valve device in the background art.
本发明解决其技术问题的所采用的技术方案之一是:延时阀装置,包括阀体部件、阀芯和驱动杆;该阀体部件包括阀体,该阀体和阀芯配合以构成先导阀;该驱动杆滑接在阀体部件且通过驱动杆滑动控制先导阀开关;该驱动杆外装设有单向阀且通过单向阀将驱动杆和阀体部件间的间隙分成第一气腔和第二气腔,该第二气腔气体能经单向阀进入第一气腔,该驱动杆设有接通第一气腔和第二气腔的连通道,该驱动杆上还活动连接有调节杆,通过调节杆活动调节连通道之过气面积以调节延时时长。One of the technical solutions adopted by the present invention to solve the technical problem is: a delay valve device, including a valve body part, a valve core and a driving rod; the valve body part includes a valve body, and the valve body and the valve core cooperate to form a pilot valve; the drive rod is slidably connected to the valve body part, and the pilot valve switch is controlled by sliding the drive rod; the drive rod is equipped with a check valve, and the gap between the drive rod and the valve body part is divided into a first air cavity by the check valve and the second air cavity, the gas of the second air cavity can enter the first air cavity through the one-way valve, the driving rod is provided with a connecting channel connecting the first air cavity and the second air cavity, and the driving rod is also movably connected There is an adjustment rod, and the air passage area of the connecting channel can be adjusted through the movement of the adjustment rod to adjust the delay time.
一实施例之中:该驱动杆外端面凹设形成有装接槽,该驱动杆还设有贯穿装接槽内外的接通第一气腔的第一通槽和接通第二气腔的第二通槽,该连通道包括上述的第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域;该调节杆能调节地连接在装接槽内,该调节杆和装接槽槽壁间的间隙面积构成连通道之过气面积。In one embodiment, an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first through groove connecting the first air cavity and a second air cavity passing through the inside and outside of the attaching groove. The second through groove, the connecting channel includes the above-mentioned first through groove, the second through groove and the area between the first through groove and the second through groove; In the groove, the gap area between the adjusting rod and the groove wall of the connecting groove constitutes the air passage area of the connecting channel.
一实施例之中:该第一气腔和第二气腔分别布置在单向阀上下两侧,该第一通 槽和第二通槽分别布置在单向阀上下两侧。In one embodiment: the first air cavity and the second air cavity are respectively arranged on the upper and lower sides of the one-way valve, and the first through groove and the second through groove are respectively arranged on the upper and lower sides of the one-way valve.
一实施例之中:该装接槽具有装接段和调节段,该调节段位于第一通槽和第二通槽间;该调节杆具有连接段和锥形段,该连接段螺接在装接段且锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积。In one embodiment: the attachment slot has an attachment section and an adjustment section, the adjustment section is located between the first through slot and the second through slot; the adjustment rod has a connecting section and a conical section, the connecting section is screwed on The attachment segment and the tapered segment are at least partially inserted into the adjustment segment to control the gap area by the depth of insertion of the adjustment rod.
一实施例之中:该驱动杆和阀体部件间设第一弹性体,该第一弹性体顶抵驱动杆以外顶驱动杆。In one embodiment, a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body presses against the driving rod and pushes the driving rod outside.
一实施例之中:该驱动杆包括中心杆和联动杆,该联动杆设于阀体内,该联动杆外端穿过泄压孔并伸出阀体外,该联动杆外端固接位于阀体外的中心杆;该阀体设有泄压孔,通过联动杆滑动控制是否密封泄压孔,该阀芯和阀体间设第二弹性体。In one embodiment: the driving rod includes a central rod and a linkage rod, the linkage rod is arranged in the valve body, the outer end of the linkage rod passes through the pressure relief hole and protrudes out of the valve body, and the outer end of the linkage rod is fixedly located outside the valve body The valve body is provided with a pressure relief hole, and whether the pressure relief hole is sealed is controlled by sliding the linkage rod, and a second elastic body is arranged between the valve core and the valve body.
一实施例之中:该单向阀装设在中心杆外,该第一气腔和第二气腔都形成在中心杆和阀体部件间,该调节杆连接在中心杆。In one embodiment: the one-way valve is installed outside the center rod, the first air cavity and the second air cavity are both formed between the center rod and the valve body part, and the adjustment rod is connected to the center rod.
一实施例之中:该阀体包括连接座和密封固定盖接在连接座上的盖体,该连接座和盖体间形成阀腔,该阀芯设在阀腔内且将阀腔分为成压腔和出水腔,该盖体设有上述的泄压孔,该泄压孔接通成压腔且贯穿设置;该阀体部件还包括中心座,该中心座固接在盖体上且中心座和盖体间设接通泄压孔的泄压水路;该中心杆滑接在中心座内,该联动杆外端伸入中心座内。In one embodiment, the valve body includes a connecting seat and a cover body with a sealing and fixing cover connected to the connecting seat, a valve cavity is formed between the connecting seat and the cover body, and the valve core is arranged in the valve cavity and divides the valve cavity into two parts. forming a pressure cavity and a water outlet cavity, the cover body is provided with the above-mentioned pressure relief hole, and the pressure relief hole is connected to form a pressure cavity and is arranged through; the valve body part also includes a center seat, the center seat is fixed on the cover body and A pressure relief waterway connected to the pressure relief hole is arranged between the center seat and the cover body; the center rod is slidably connected in the center seat, and the outer end of the linkage rod extends into the center seat.
一实施例之中:该第一气腔和第二气腔设于中心座和中心杆间形成的间隙。In one embodiment, the first air cavity and the second air cavity are arranged in the gap formed between the center seat and the center rod.
一实施例之中:该阀体部件还包括底座部件,该底座部件设有两能分别接通冷热水的进水路;该阀体能转动连接在底座部件上,该阀体设有阀腔和混水路,该混水路接通阀腔,该阀芯设在阀腔内,该混水路和两进水路配合以通过阀体转动控制混水路水温。In one embodiment: the valve body part further includes a base part, and the base part is provided with two water inlets that can be connected to cold and hot water respectively; the valve body can be rotatably connected to the base part, and the valve body is provided with a valve cavity and The mixed water circuit is connected to the valve cavity, and the valve core is arranged in the valve cavity. The mixed water circuit cooperates with the two inlet water paths to control the water temperature of the mixed water circuit through the rotation of the valve body.
本发明解决其技术问题的所采用的技术方案之二是:延时阀装置,包括阀体部件、阀芯和驱动杆;该阀体部件包括阀体,该阀体设有阀腔,该阀芯设在阀腔内且将阀腔分为成压腔和出水腔,该阀体和阀芯配合构成先导阀;该驱动杆滑接在阀体部件且驱动杆和阀芯装接在一起以通过驱动杆滑动控制先导阀开关;该阀芯外设单向阀,该成压腔水流能经单向阀进入出水腔,该驱动杆设有接通成压腔和出水腔的连通道,该驱动杆上还活动连接有调节杆,通过调节杆活动调节连通道之过水面积以调节延时时长。The second technical solution adopted by the present invention to solve the technical problem is: a delay valve device, including a valve body part, a valve core and a driving rod; the valve body part includes a valve body, the valve body is provided with a valve cavity, and the valve body is provided with a valve cavity. The core is arranged in the valve cavity and divides the valve cavity into a pressure cavity and a water outlet cavity. The valve body and the valve core cooperate to form a pilot valve; the driving rod is slidably connected to the valve body part, and the driving rod and the valve core are assembled together to form a pilot valve. The pilot valve switch is controlled by sliding the driving rod; the valve core is equipped with a one-way valve, and the water flow of the pressure cavity can enter the water outlet cavity through the one-way valve. The driving rod is also movably connected with an adjusting rod, and the water passing area of the connecting channel is movably adjusted by the adjusting rod to adjust the delay time.
一实施例之中:该驱动杆外端面凹设形成有装接槽,该驱动杆还设有贯穿装接槽内外的接通出水腔的第一通槽和接通出水腔的第二通槽,该连通道包括上述的第 一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域;该调节杆能调节地连接在装接槽内,该调节杆和装接槽槽壁间的间隙面积构成连通道之过水面积。In one embodiment, an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first through groove connected to the water outlet cavity and a second through groove connected to the water outlet cavity through the inside and outside of the attachment groove , the connecting channel includes the first through slot, the second through slot and the area between the first through slot and the second through slot; the adjustment rod can be adjusted in the attachment slot, the The gap area between the adjusting rod and the wall of the connecting groove constitutes the water passing area of the connecting channel.
一实施例之中:该阀体设有贯穿内外以接通出水腔的出水孔;该驱动杆包括中心杆和联动杆,该中心杆内端自外往内穿过出水孔且伸入阀腔内,该中心杆外设有能密封出水孔的密封圈,该联动杆固接在中心杆内端;该中心杆设有贯穿设置的第一装接段,该联动杆端面凹设有第二装接段,该第二装接段槽底凹设有调节段,该调节杆具有连接段和锥形段,该连接段装接在第一装接段,该锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积;该装接槽包括上述的第一装接段、第二装接段和调节段。In one embodiment: the valve body is provided with a water outlet hole that penetrates inside and outside to connect to the water outlet cavity; the driving rod includes a central rod and a linkage rod, and the inner end of the central rod passes through the water outlet hole from the outside to the inside and extends into the valve cavity Inside, the central rod is provided with a sealing ring that can seal the water outlet, the linkage rod is fixed on the inner end of the central rod; an attachment segment, an adjustment segment is recessed at the bottom of the groove of the second attachment segment, the adjustment rod has a connection segment and a conical segment, the connection segment is attached to the first attachment segment, and the conical segment is at least partially inserted into the adjustment segment , so as to control the gap area through the insertion depth of the adjusting rod; the connecting groove includes the above-mentioned first connecting section, second connecting section and adjusting section.
一实施例之中:该第一通槽贯穿第一装接段设置,该第二通槽贯穿调节段内端设置。In one embodiment, the first through groove is disposed through the first attachment section, and the second through groove is disposed through the inner end of the adjustment section.
一实施例之中:该阀体设有贯穿内外以接通出水腔的出水孔及凹设有接通成压腔的配合槽;该中心杆内端自外往内穿过出水孔且伸入阀腔内,该中心杆外设有能密封出水孔的第一密封圈,该联动杆固接在中心杆内端,该联动杆外固设有第二密封圈,该第二密封圈滑接在配合槽内;该第一密封圈受水压作用力和第二密封圈受水压作用力相平衡。In one embodiment: the valve body is provided with a water outlet hole that penetrates through the inside and outside to connect to the water outlet cavity and a recessed fitting groove that is connected to the pressure cavity; the inner end of the central rod passes through the water outlet hole from the outside to the inside and extends into the water outlet hole. In the valve cavity, a first sealing ring capable of sealing the water outlet hole is arranged outside the central rod, the linkage rod is fixed on the inner end of the central rod, and a second sealing ring is fixed outside the linkage rod, and the second sealing ring is slidably connected In the matching groove; the first sealing ring is balanced by the water pressure force and the second sealing ring is subjected to the water pressure force.
一实施例之中:该驱动杆和阀体部件间设第一弹性体,该第一弹性体顶抵驱动杆以外顶驱动杆。In one embodiment, a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body presses against the driving rod and pushes the driving rod outside.
本发明解决其技术问题的所采用的技术方案之三是:龙头,该龙头上设有所述的延时阀装置。The third technical solution adopted by the present invention to solve the technical problem is: a faucet, which is provided with the delay valve device.
本技术方案与背景技术相比,它具有如下优点:Compared with the background technology, the technical solution has the following advantages:
通过调节杆活动调节连通道之过气面积以调节延时时长,阀芯只充当开关作用且不起延时时长作用,则延时不会受水压影响太大;介质是空气,水温变化的时候对延时时间影响很小;采用先导阀原理,操作力值小。Adjust the air passage area of the connecting channel through the movement of the adjusting rod to adjust the delay time. The valve core only acts as a switch and does not function as a delay time, so the delay will not be greatly affected by the water pressure; the medium is air, and the water temperature changes. The time has little effect on the delay time; the principle of pilot valve is adopted, and the operating force value is small.
连通道包括第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域,调节杆和装接槽槽壁间的间隙面积构成连通道之过气面积,调节方便快速,结构紧凑。The connecting channel includes the first through slot, the second through slot and the area between the first through slot and the second through slot, and the gap area between the adjusting rod and the wall of the connecting slot constitutes the air passage area of the connecting channel , The adjustment is convenient and fast, and the structure is compact.
连接段螺接在装接段且锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积,调节方便快速,结构紧凑。The connecting section is screwed on the connecting section and the tapered section is inserted into the adjusting section at least partially, so as to control the gap area through the insertion depth of the adjusting rod, the adjustment is convenient and fast, and the structure is compact.
第一气腔和第二气腔都形成在中心杆和阀体部件间,避免水温影响延时。Both the first air cavity and the second air cavity are formed between the central rod and the valve body part to avoid the delay caused by the water temperature.
驱动杆上还活动连接有调节杆,通过调节杆活动调节连通道之过水面积以调节延时时长,阀芯只充当开关作用且不起延时时长作用,则延时不会受水压影响太大。The drive rod is also movably connected with an adjustment rod, through which the water passage area of the connecting channel can be adjusted to adjust the delay time. too big.
中心杆设有贯穿设置的第一装接段,联动杆端面凹设有第二装接段,第二装接段槽底凹设有调节段,调节杆具有连接段和锥形段,连接段装接在第一装接段,该锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积,调节方便快速,结构紧凑。The central rod is provided with a first attachment section arranged through it, the end face of the linkage rod is concavely provided with a second attachment section, the groove bottom of the second attachment section is concavely provided with an adjustment section, the adjustment rod has a connection section and a conical section, and the connection section Attached to the first attachment section, the tapered section is at least partially inserted into the adjustment section, so as to control the gap area through the insertion depth of the adjustment rod, the adjustment is convenient and fast, and the structure is compact.
第一密封圈受水压作用力和第二密封圈受水压作用力相平衡,降低按压力度,避免水压影响按压。The force of the first sealing ring and the force of the second sealing ring are balanced by the water pressure, reducing the pressing force and preventing the water pressure from affecting the pressing.
下面结合附图和具体实施方式对本发明作进一步说明。The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
图1是实施例一延时阀装置立体半剖分解示意图。FIG. 1 is a three-dimensional half-section exploded schematic diagram of a delay valve device according to a first embodiment.
图2是实施例一中心杆立体半剖示意图。FIG. 2 is a three-dimensional half-section schematic diagram of a center rod according to Embodiment 1. FIG.
图3是实施例一调节杆立体半剖示意图。FIG. 3 is a three-dimensional half-section schematic diagram of the adjusting rod according to the first embodiment.
图4是实施例一延时阀装置剖面示意图之一,开关阀关水且处第一延时状态。FIG. 4 is one of the schematic cross-sectional views of the delay valve device according to the first embodiment. The on-off valve closes the water and is in the first delay state.
图5是实施例一延时阀装置剖面示意图之二,开关阀开水且处第二延时状态。5 is the second schematic cross-sectional view of the delay valve device according to the first embodiment, the switch valve is boiling water and is in the second delay state.
图6是实施例一延时阀装置剖面示意图之三,开关阀关水。FIG. 6 is the third schematic sectional view of the delay valve device in the first embodiment, the on-off valve closes the water.
图7是实施例二延时阀装置剖面示意图之一,开关阀关水。FIG. 7 is one of the schematic cross-sectional views of the delay valve device in the second embodiment, the on-off valve closes the water.
图8是实施例二延时阀装置剖面示意图之二,开关阀开水。FIG. 8 is the second schematic cross-sectional view of the delay valve device according to the second embodiment, the switch valve boils water.
图9是实施例三延时阀装置剖面示意图之一,开关阀关水。Fig. 9 is one of the cross-sectional schematic diagrams of the delay valve device in the third embodiment, the on-off valve closes the water.
图10是实施例三延时阀装置剖面示意图之二,开关阀开水。Fig. 10 is the second schematic diagram of the section of the delay valve device in the third embodiment, the switch valve boils water.
图11是实施例四延时阀装置剖面示意图之一,开关阀关水。FIG. 11 is one of the schematic cross-sectional views of the delay valve device in the fourth embodiment, the on-off valve closes the water.
图12是实施例四延时阀装置剖面示意图之二,开关阀开水。Figure 12 is the second schematic cross-sectional view of the delay valve device in the fourth embodiment, the switch valve boils water.
图13是实施例四龙头立体示意图。FIG. 13 is a three-dimensional schematic diagram of the faucet according to the fourth embodiment.
图14是实施例四龙头剖面示意图。FIG. 14 is a schematic cross-sectional view of the faucet according to the fourth embodiment.
标号说明:Label description:
实施例一标号:阀体部件1、阀芯2、驱动杆3;阀体11、底座部件12、中心座13、第二弹性体14、补水孔15;连接座111、盖体112、阀腔113、混水路114、泄压孔115、泄压水路116、成压腔117、出水腔118、进水路121;中心杆31、联动杆32、调节杆33、第一弹性体34;单向阀311、第一气腔312、第二气腔313、第一通槽314、第二通槽315、装接段316、调节段317、连接段331、锥形段332;Example 1 Labels: valve body part 1, valve core 2, driving rod 3; valve body 11, base part 12, center seat 13, second elastic body 14, water replenishment hole 15; connecting seat 111, cover body 112, valve cavity 113. Mixing water circuit 114, pressure relief hole 115, pressure relief water circuit 116, pressure forming chamber 117, water outlet chamber 118, water inlet circuit 121; central rod 31, linkage rod 32, adjusting rod 33, first elastic body 34; one-way valve 311, the first air cavity 312, the second air cavity 313, the first through groove 314, the second through groove 315, the attachment section 316, the adjustment section 317, the connection section 331, the conical section 332;
实施例二标号:成压座21、第二Y形圈22;Labels of the second embodiment: forming a pressure seat 21, a second Y-shaped ring 22;
实施例三标号:出水孔119、第一装接段318、第二装接段321、配合槽1111、第二密封圈322;The symbols of the third embodiment: the water outlet hole 119 , the first attachment section 318 , the second attachment section 321 , the matching groove 1111 , and the second sealing ring 322 ;
实施例四标号:扩孔323、连接头324、第三通槽325、按钮5。Reference numerals of the fourth embodiment: reaming hole 323 , connecting head 324 , third through groove 325 , button 5 .
实施例一Example 1
请查阅图1至图6,延时阀装置,包括阀体部件1、阀芯2和驱动杆3。Please refer to Figure 1 to Figure 6, the delay valve device, including valve body part 1, valve core 2 and drive rod 3.
该阀体部件1包括阀体11、底座部件12和中心座13。该阀体11包括连接座111和密封固定盖接在连接座111上的盖体112,该连接座111和盖体112间形成阀腔113,该连接座111设有贯穿设置的混水路114,该盖体112设有贯穿设置的泄压孔115。该中心座13固接在盖体112上且中心座13和盖体112间设接通泄压孔115的泄压水路116,该泄压水路接通延时阀装置的出水路(阀体接通出水腔以能向外出水的出水路)。该底座部件12设有两能分别接通冷热水的进水路121;该连接座111能转动连接在底座部件12上,该混水路114接通阀腔113,该混水路114和两进水路121配合以通过中心座13、阀体11一起转动控制混水路114水温。具体结构中,该中心座外还设有壳体1301,通过壳体将中心座和阀体固装在一起。该中心座外端口固设有外盖1302,该中心杆外端伸出外盖外。The valve body part 1 includes a valve body 11 , a base part 12 and a center seat 13 . The valve body 11 includes a connecting seat 111 and a cover body 112 which is sealed and fixed on the connecting seat 111. A valve cavity 113 is formed between the connecting seat 111 and the cover body 112. The connecting seat 111 is provided with a water mixing channel 114 arranged therethrough. The cover body 112 is provided with a pressure relief hole 115 disposed therethrough. The center seat 13 is fixed on the cover body 112, and a pressure relief water channel 116 connected to the pressure relief hole 115 is arranged between the center seat 13 and the cover body 112, and the pressure relief water channel is connected to the water outlet of the delay valve device (the valve body is connected to A water outlet that leads out of the water cavity to allow water to flow out). The base member 12 is provided with two water inlet passages 121 that can be respectively connected to hot and cold water; the connecting seat 111 can be rotatably connected to the base member 12, the mixed water passage 114 is connected to the valve cavity 113, the mixed water passage 114 and the two water inlet passages 121 cooperate to control the water temperature of the mixed water circuit 114 through the rotation of the central seat 13 and the valve body 11 together. In the specific structure, a casing 1301 is also provided outside the central seat, and the central seat and the valve body are fixedly mounted together through the casing. The outer port of the center seat is fixed with an outer cover 1302, and the outer end of the center rod protrudes out of the outer cover.
该阀芯2设在阀腔113内且将阀腔113分为成压腔117和出水腔118,该泄压孔115接通成压腔117,该混水路114接通出水腔118。该阀体11和阀芯2配合以构成先导阀,该驱动杆3滑接在阀体部件1且通过驱动杆3滑动控制先导阀开关。该成压腔117内设第二弹性体14,该第二弹性体顶抵在阀芯和盖体112间。本实施例之中,该阀芯2包括皮碗和皮碗座201,该皮碗周边固接在阀体11内壁,该皮碗装接在该皮碗座201外。The valve core 2 is arranged in the valve cavity 113 and divides the valve cavity 113 into a pressure cavity 117 and a water outlet cavity 118 . The valve body 11 cooperates with the valve core 2 to form a pilot valve. The drive rod 3 is slidably connected to the valve body part 1 , and the pilot valve switch is controlled by sliding the drive rod 3 . The pressure forming cavity 117 is provided with a second elastic body 14 , and the second elastic body abuts between the valve core and the cover body 112 . In this embodiment, the valve core 2 includes a cup and a cup seat 201 , the periphery of the cup is fixed on the inner wall of the valve body 11 , and the cup is mounted outside the cup seat 201 .
该驱动杆3包括中心杆31和联动杆32,该中心杆31滑接在中心座13内,该联动杆32外端自阀体11内滑动穿过泄压孔115并伸出阀体11外伸入中心座内且固接位于阀体11外的中心杆31内端。通过联动杆32滑动控制是否密封泄压孔115,以控制先导阀开关,如图4和图5所示。根据需要,该驱动杆3和阀芯2装接在一起以通过控制阀芯滑动或变形以控制先导阀开关。The driving rod 3 includes a central rod 31 and a linkage rod 32 , the central rod 31 is slidably connected in the central seat 13 , and the outer end of the linkage rod 32 slides from the inside of the valve body 11 through the pressure relief hole 115 and extends out of the valve body 11 The inner end of the central rod 31 which extends into the central seat and is fixed outside the valve body 11 . Whether the pressure relief hole 115 is sealed is controlled by sliding the linkage rod 32 to control the opening and closing of the pilot valve, as shown in FIG. 4 and FIG. 5 . The drive rod 3 and the spool 2 are attached together to control the pilot valve on/off by controlling the spool to slide or deform as needed.
该中心杆31外装设有单向阀311且通过单向阀311将中心杆31和中心座13间的间隙分成第一气腔312和第二气腔313,根据需要该第一气腔可接通外界,也 可不接通外界,该第一气腔312和第二气腔313分别布置在单向阀311上下两侧,该中心杆31设有接通第一气腔312和第二气腔313的连通道,该中心杆31上还活动连接有调节杆33,通过调节杆33活动调节连通道之过气面积以调节延时时长,间隙越小,延时时长越长,如图4和图5所示,表示不同延时时长。该中心杆31和中心座13的底壁间设第一弹性体34,该第一弹性体34顶抵中心杆31以外顶驱动杆,该第一弹性体如弹簧,该弹簧套接中心杆31外且顶抵在中心座13底壁和中心杆31外端外凸的环凸间。具体结构中:该中心杆31外端面凹设形成有装接槽,该中心杆31还设有贯穿装接槽内外的接通第一气腔的第一通槽314和接通第二气腔的第二通槽315,该第一通槽314和第二通槽315分别布置在单向阀311上下两侧,该连通道包括上述的第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域;该装接槽具有装接段316和呈圆柱形的调节段317,该调节段317位于第一通槽和第二通槽间;该调节杆33具有连接段331和锥形段332,该连接段331螺接在装接段且锥形段332至少部分插入调节段317,该锥形段332和调节段317槽壁间的间隙面积构成连通道之过气面积,以通过调节杆插入深度控制间隙面积;该单向阀311如中心杆外环凸设有凸部,该凸部外周面凹设有环槽,该环槽内装接第一Y型圈,通过第一Y形圈变形实现单向功能。The central rod 31 is provided with a one-way valve 311, and the gap between the central rod 31 and the central seat 13 is divided into a first air cavity 312 and a second air cavity 313 by the one-way valve 311, and the first air cavity can be connected to The first air cavity 312 and the second air cavity 313 are respectively arranged on the upper and lower sides of the one-way valve 311, and the central rod 31 is provided with a connection to the first air cavity 312 and the second air cavity. The connecting channel of 313, the center rod 31 is also movably connected with an adjusting rod 33, and the air passage area of the connecting channel is adjusted through the adjusting rod 33 to adjust the delay time. The smaller the gap, the longer the delay time, as shown in Figure 4 and As shown in Figure 5, different delay time lengths are represented. A first elastic body 34 is disposed between the center rod 31 and the bottom wall of the center seat 13 , the first elastic body 34 abuts the center rod 31 and the outer driving rod, the first elastic body is such as a spring, and the spring is sleeved on the center rod 31 Outside and abuts against the bottom wall of the center seat 13 and the outer end of the center rod 31 protruding ring convex. In the specific structure, an attachment groove is concavely formed on the outer end surface of the central rod 31, and the central rod 31 is further provided with a first through groove 314 connecting the first air cavity and connecting the second air cavity through the inside and outside of the attaching groove The second through groove 315, the first through groove 314 and the second through groove 315 are respectively arranged on the upper and lower sides of the one-way valve 311, and the connecting channel includes the first through groove, the second through groove and the connecting groove. The area between the first through slot and the second through slot; the attachment slot has an attachment section 316 and a cylindrical adjustment section 317, the adjustment section 317 is located between the first through slot and the second through slot; the The adjusting rod 33 has a connecting section 331 and a conical section 332, the connecting section 331 is screwed on the connecting section and the conical section 332 is at least partially inserted into the adjusting section 317, and the gap area between the conical section 332 and the groove wall of the adjusting section 317 The air passage area of the connecting channel is formed to control the gap area by adjusting the insertion depth of the rod; the one-way valve 311 is provided with a convex part on the outer ring of the central rod, and the outer peripheral surface of the convex part is concavely provided with a ring groove, and the ring groove is installed in the ring groove. The first Y-ring realizes the one-way function through the deformation of the first Y-ring.
本实施例一的延时阀装置,如图5所示,按压中心杆31往下运动,空气从第二气腔313通过单向阀311快速进入第一气腔312;放开按压后,中心杆31在第一弹性体34作用下往上运动,第一气腔312气体会通过连通道进入第二气腔313,由于带锥度间隙小,从而中心杆往上运动的时间可以很长,调节带锥度的间隙大小,从而可以调节延时时间。In the delay valve device of the first embodiment, as shown in FIG. 5 , the center rod 31 is pressed to move downward, and the air quickly enters the first air chamber 312 from the second air chamber 313 through the one-way valve 311 ; after releasing the pressing, the center The rod 31 moves upward under the action of the first elastic body 34, and the gas in the first air chamber 312 enters the second air chamber 313 through the connecting channel. Due to the small taper gap, the time for the central rod to move upward can be very long. The size of the gap with taper, so that the delay time can be adjusted.
本实施例一的延时阀装置,如图4和图5所示,底进水的冷热水进水混合后,当联动杆密封泄压孔115时候,水从混水路、补水孔15进入成压腔117,这时候阀芯受成压腔117背压密封,关闭先导阀;当中心杆往下运动与泄压孔分开的时候,即打开泄压孔时,此时成压腔117泄压,打开先导阀,从而出水。具体如下说明:关闭状态:当联动杆向上活动密封泄压孔时,上腔(成压腔)充满水,阀芯受上腔水压及第一弹性体的弹簧力,使得阀芯向下与连接座密封,通水水路被关闭;开启状态:按压中心杆向下活动,联动杆向下活动,泄压孔打开,阀芯上腔(成压腔)水排出到出水路且泄压,这时阀芯受到水压向上的力,使得通水水路被打开;延时出水状态:取消按压,中心杆受到第一弹性体向上的力向上回复,当联动杆关闭泄 压孔,水会从补水孔往成压腔补水加压,再加上第二弹性体弹力,阀芯被往下慢慢推到通水路关闭位置;延时时间调节:通过工具转动调节杆转动往上或往下运动,中心杆与调节杆之间互配的孔间隙会变大或变小,延时时间即被改变。In the delay valve device of the first embodiment, as shown in FIG. 4 and FIG. 5 , after the cold and hot water from the bottom inlet are mixed, when the linkage rod seals the pressure relief hole 115 , the water enters from the water mixing channel and the water replenishment hole 15 . The pressure chamber 117 is formed. At this time, the valve core is sealed by the back pressure of the pressure chamber 117, and the pilot valve is closed; when the center rod moves downward and is separated from the pressure relief hole, that is, when the pressure relief hole is opened, the pressure chamber 117 is released at this time. Pressure, open the pilot valve, so as to discharge water. The details are as follows: Closed state: when the linkage rod moves upward to seal the pressure relief hole, the upper chamber (a pressure chamber) is filled with water, and the valve core is subjected to the water pressure of the upper chamber and the spring force of the first elastic body, so that the valve core downwards and The connection seat is sealed, and the water passage is closed; in the open state: the central rod is pressed to move downward, the linkage rod moves downward, the pressure relief hole is opened, and the water in the upper chamber of the valve core (a pressure chamber) is discharged to the water outlet and the pressure is released. When the valve core is subjected to the upward force of the water pressure, the water channel is opened; the delayed water outlet state: cancel the pressing, the center rod is recovered upward by the upward force of the first elastic body, and when the linkage rod closes the pressure relief hole, the water will be replenished from the water. The hole is filled with water and pressurized into the pressure chamber, coupled with the elastic force of the second elastic body, the valve core is slowly pushed down to the closed position of the water passage; delay time adjustment: by turning the adjusting rod with the tool to move up or down, The hole gap between the center rod and the adjustment rod will become larger or smaller, and the delay time will be changed.
本实施例一的延时阀装置能产生如下技术效果:1、传统先导式的皮碗既要充当开关作用,又要起延时左右,则水压高时会对泄压或补水有影响,从而影响延时时长,而本实施例的皮碗只充当开关作用,延时机构(连通道、调节杆等)跟开关机构分开,互不影响,则不会受水压影响太大;2、介质是空气,水温变化的时候对延时时间影响很小;3、采用先导阀原理,操作力值小。The delay valve device of the first embodiment can produce the following technical effects: 1. The traditional pilot-operated cup not only acts as a switch, but also acts as a delay, so that when the water pressure is high, it will have an impact on pressure relief or water replenishment, Therefore, the delay time is affected, and the leather cup in this embodiment only acts as a switch, and the delay mechanism (connecting channel, adjusting rod, etc.) is separated from the switch mechanism and does not affect each other, so it will not be greatly affected by the water pressure; 2. The medium is air, and the change of water temperature has little effect on the delay time; 3. The principle of pilot valve is adopted, and the operating force value is small.
实施例二 Embodiment 2
请查阅图7和图8,它与实施例一不同之处在于:该阀芯2包括成压座21和固套在成压座21上的Y形圈22,该联动杆32下端能穿过成压座21,该成压座21和联动杆32间的间隙构成上述的补水孔15。Please refer to FIG. 7 and FIG. 8 , it differs from the first embodiment in that: the valve core 2 includes a pressure-forming seat 21 and a Y-ring 22 fixedly sleeved on the pressure-forming seat 21 , and the lower end of the linkage rod 32 can pass through The pressing seat 21 is formed, and the gap between the pressing seat 21 and the linkage rod 32 constitutes the above-mentioned water replenishing hole 15 .
实施例三 Embodiment 3
请查阅图9和图10,它与实施例一不同之处在于:该阀体11的盖体设有贯穿内外以接通出水腔118的出水孔119;该中心杆31内端自外往内穿过出水孔119且伸入阀腔113内,该联动杆32设在阀腔113内,该联动杆32和阀芯2装接在一起以通过驱动杆3滑动控制先导阀开关。该阀芯2外设单向阀311,该成压腔117水流能经单向阀311进入出水腔118,该驱动杆3设有接通成压腔117和出水腔118的连通道,该驱动杆3上还活动连接有调节杆33,通过调节杆33活动调节连通道之过水面积以调节延时时长。Please refer to FIG. 9 and FIG. 10. The difference from the first embodiment is that: the cover body of the valve body 11 is provided with a water outlet hole 119 that penetrates through the inside and outside to connect to the water outlet cavity 118; the inner end of the center rod 31 goes from the outside to the inside Passing through the water outlet hole 119 and extending into the valve cavity 113 , the linkage rod 32 is arranged in the valve cavity 113 , and the linkage rod 32 is assembled with the valve core 2 to control the pilot valve switch by sliding the driving rod 3 . The valve core 2 is provided with a one-way valve 311. The water flow of the pressure-forming cavity 117 can enter the water-outlet cavity 118 through the one-way valve 311. An adjusting rod 33 is also movably connected to the rod 3, and the water passing area of the connecting channel is adjusted movably through the adjusting rod 33 to adjust the delay time.
该中心杆31设有贯穿设置的第一装接段318,该联动杆32端面凹设有第二装接段321,该第二装接段321槽底凹设有调节段317,该连接段331螺接在第一装接段318,该锥形段332至少部分插入调节段317,以通过调节杆插入深度控制间隙面积;该装接槽包括上述的第一装接段、第二装接段和调节段。该中心杆31还设有贯穿第一装接段318内外且接通出水腔的第一通槽314,该联动杆32设有贯穿调节段317内端且接通成压腔的第二通槽,该连通道包括上述的第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域。The central rod 31 is provided with a first attachment section 318 disposed therethrough, the end face of the linkage rod 32 is concavely provided with a second attachment section 321, and the second attachment section 321 is concavely provided with an adjustment section 317 at the bottom of the groove. 331 is screwed on the first attachment section 318, and the tapered section 332 is at least partially inserted into the adjustment section 317 to control the gap area through the insertion depth of the adjustment rod; the attachment groove includes the above-mentioned first attachment section, second attachment section segment and adjustment segment. The central rod 31 is also provided with a first through groove 314 that penetrates the inside and outside of the first attachment section 318 and is connected to the water outlet cavity, and the linkage rod 32 is provided with a second through groove that penetrates the inner end of the adjustment section 317 and is connected to form a pressure cavity , the connecting channel includes the first through groove, the second through groove and the area between the first through groove and the second through groove.
该阀体11的连接座111底面凹设有接通成压腔的配合槽1111;该中心杆31内端自外往内穿过出水孔且伸入阀腔内,该中心杆外设有能密封出水孔的第一密封圈319,该联动杆32外固设有第二密封圈322,该第二密封圈322滑接在配合槽1111 内;该第一密封圈受水压作用力和第二密封圈受水压作用力相平衡,以减少按压力。The bottom surface of the connecting seat 111 of the valve body 11 is concavely provided with a matching groove 1111 which is connected to form a pressure cavity; the inner end of the center rod 31 passes through the water outlet hole from the outside to the inside and extends into the valve cavity. The first sealing ring 319 sealing the water outlet, the linkage rod 32 is fixed with a second sealing ring 322, and the second sealing ring 322 is slidably connected in the matching groove 1111; The two sealing rings are balanced by the force of water pressure to reduce the pressing force.
实施例四Embodiment 4
请查阅图11和图12,它与实施例三不同之处在于:该联动杆32贯穿设置,该联动杆32下部设扩孔323,该扩孔323下端口内固设连接头324,该扩孔323设有贯穿内外的第三通槽325;该调节杆穿过连接头323,该连通道包括第三通槽、扩孔及调节杆和连接头的间隙。Please refer to FIG. 11 and FIG. 12 . The difference from the third embodiment is that the linkage rod 32 is arranged through the linkage rod 32 , a reaming hole 323 is arranged at the lower part of the linkage rod 32 , and a connecting head 324 is fixed in the lower port of the reaming hole 323 . The hole 323 is provided with a third through groove 325 which penetrates inside and outside; the adjusting rod passes through the connecting head 323 , and the connecting passage includes the third through groove, the reaming hole and the gap between the adjusting rod and the connecting head.
请查阅图13和图14,它系上述实施例的应用实例,具体如实施例四的应用实例,该中心杆外固设有按钮5,该第一弹性体顶抵在中心座底座和按钮间,上述延时阀装置装接在龙头本体51内。Please refer to FIG. 13 and FIG. 14 , which are application examples of the above-mentioned embodiments, specifically the application example of the fourth embodiment, the center rod is fixed with a button 5 , and the first elastic body abuts between the center seat base and the button , the above-mentioned delay valve device is installed in the faucet body 51 .
以上所述,仅为本发明较佳实施例而已,故不能依此限定本发明实施的范围,即依本发明专利范围及说明书内容所作的等效变化与修饰,皆应仍属本发明涵盖的范围内。The above descriptions are only preferred embodiments of the present invention, so the scope of implementation of the present invention cannot be limited accordingly, that is, equivalent changes and modifications made according to the patent scope of the present invention and the contents of the description should still be covered by the present invention. within the range.
本发明延时阀装置的驱动杆外装设有单向阀且通过单向阀分两气腔,两气腔间设连通道,第二气腔气体经单向阀进第一气腔,通过调节杆调节连通道之过气面积以调节延时时长,因此延时不会受水压影响太大。The drive rod of the delay valve device of the present invention is provided with a one-way valve outside, and is divided into two air chambers through the one-way valve, a connecting channel is set between the two air chambers, and the gas in the second air chamber enters the first air chamber through the one-way valve, and is adjusted The rod adjusts the air passage area of the connecting channel to adjust the delay time, so the delay will not be greatly affected by the water pressure.
Claims (17)
- 延时阀装置,包括阀体部件、阀芯和驱动杆;该阀体部件包括阀体,该阀体和阀芯配合以构成先导阀;该驱动杆滑接在阀体部件且通过驱动杆滑动控制先导阀开关;其特征在于:该驱动杆外装设有单向阀且通过单向阀将驱动杆和阀体部件间的间隙分成第一气腔和第二气腔,该第二气腔气体能经单向阀进入第一气腔,该驱动杆设有接通第一气腔和第二气腔的连通道,该驱动杆上还活动连接有调节杆,通过调节杆活动调节连通道之过气面积以调节延时时长。A delay valve device includes a valve body part, a valve core and a driving rod; the valve body part includes a valve body, and the valve body and the valve core cooperate to form a pilot valve; the driving rod is slidably connected to the valve body part and slides through the driving rod Control pilot valve switch; it is characterized in that: the drive rod is equipped with a one-way valve, and the gap between the drive rod and the valve body is divided into a first air cavity and a second air cavity through the one-way valve, and the second air cavity gas It can enter the first air cavity through the one-way valve. The driving rod is provided with a connecting channel connecting the first air cavity and the second air cavity. The driving rod is also movably connected with an adjusting rod. Air passage area to adjust the delay time.
- 根据权利要求1所述的延时阀装置,其特征在于:该驱动杆外端面凹设形成有装接槽,该驱动杆还设有贯穿装接槽内外的接通第一气腔的第一通槽和接通第二气腔的第二通槽,该连通道包括上述的第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域;该调节杆能调节地连接在装接槽内,该调节杆和装接槽槽壁间的间隙面积构成连通道之过气面积。The delay valve device according to claim 1, wherein an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first air cavity that penetrates inside and outside the attachment groove and is connected to the first air chamber. a through groove and a second through groove connected to the second air cavity, the connecting channel includes the area between the first through groove and the second through groove among the first through groove, the second through groove and the attachment groove; The adjusting rod can be adjusted in the connecting groove, and the gap area between the adjusting rod and the wall of the connecting groove constitutes the air passage area of the connecting channel.
- 根据权利要求2所述的延时阀装置,其特征在于:该第一气腔和第二气腔分别布置在单向阀上下两侧,该第一通槽和第二通槽分别布置在单向阀上下两侧。The delay valve device according to claim 2, wherein the first air cavity and the second air cavity are respectively arranged on the upper and lower sides of the one-way valve, and the first through groove and the second through groove are respectively arranged in the single-way valve. to the upper and lower sides of the valve.
- 根据权利要求2所述的延时阀装置,其特征在于:该装接槽具有装接段和调节段,该调节段位于第一通槽和第二通槽间;该调节杆具有连接段和锥形段,该连接段螺接在装接段且锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积。The delay valve device according to claim 2, characterized in that: the attachment slot has an attachment section and an adjustment section, the adjustment section is located between the first through slot and the second through slot; the adjustment rod has a connection section and The conical section is screwed on the attachment section and the conical section is at least partially inserted into the adjustment section, so as to control the gap area through the insertion depth of the adjustment rod.
- 根据权利要求1或2或3或4所述的延时阀装置,其特征在于:该驱动杆和阀体部件间设第一弹性体,该第一弹性体顶抵驱动杆以外顶驱动杆。The delay valve device according to claim 1 or 2 or 3 or 4, wherein a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body abuts the driving rod and pushes the driving rod outside.
- 根据权利要求1或2或3或4所述的延时阀装置,其特征在于:该驱动杆包括中心杆和联动杆,该联动杆设于阀体内,该联动杆外端穿过泄压孔并伸出阀体外,该联动杆外端固接位于阀体外的中心杆;该阀体设有泄压孔,通过联动杆滑动控制是否密封泄压孔,该阀芯和阀体间设第二弹性体。The delay valve device according to claim 1 or 2 or 3 or 4, wherein the driving rod comprises a central rod and a linkage rod, the linkage rod is arranged in the valve body, and the outer end of the linkage rod passes through the pressure relief hole and extend out of the valve body, the outer end of the linkage rod is fixedly connected to the central rod located outside the valve body; the valve body is provided with a pressure relief hole, and the sliding of the linkage rod controls whether the pressure relief hole is sealed or not, and a second valve core and the valve body are arranged between the valve body Elastomer.
- 根据权利要求6所述的延时阀装置,其特征在于:该单向阀装设在中心杆外,该第一气腔和第二气腔都形成在中心杆和阀体部件间,该调节杆连接在中心杆。The delay valve device according to claim 6, wherein the one-way valve is installed outside the center rod, the first air cavity and the second air cavity are both formed between the center rod and the valve body part, the adjustment The rod is attached to the center rod.
- 根据权利要求6所述的延时阀装置,其特征在于:该阀体包括连接座和密封固定盖接在连接座上的盖体,该连接座和盖体间形成阀腔,该阀芯设在阀腔内且将 阀腔分为成压腔和出水腔,该盖体设有上述的泄压孔,该泄压孔接通成压腔且贯穿设置;该阀体部件还包括中心座,该中心座固接在盖体上且中心座和盖体间设接通泄压孔的泄压水路;该中心杆滑接在中心座内,该联动杆外端伸入中心座内。The delay valve device according to claim 6, wherein the valve body comprises a connecting seat and a cover body with a sealing and fixing cover connected to the connecting seat, a valve cavity is formed between the connecting seat and the cover body, and the valve core is provided with Inside the valve cavity and dividing the valve cavity into a pressure cavity and a water outlet cavity, the cover body is provided with the above-mentioned pressure relief hole, and the pressure relief hole is connected to form a pressure cavity and is arranged through it; the valve body part also includes a center seat, The center seat is fixedly connected to the cover body, and a pressure relief water channel connected to the pressure relief hole is arranged between the center seat and the cover body; the center rod is slidably connected in the center seat, and the outer end of the linkage rod extends into the center seat.
- 根据权利要求8所述的延时阀装置,其特征在于:该第一气腔和第二气腔设于中心座和中心杆间形成的间隙。The delay valve device according to claim 8, wherein the first air cavity and the second air cavity are arranged in the gap formed between the center seat and the center rod.
- 根据权利要求1或2或3或4所述的延时阀装置,其特征在于:该阀体部件还包括底座部件,该底座部件设有两能分别接通冷热水的进水路;该阀体能转动连接在底座部件上,该阀体设有阀腔和混水路,该混水路接通阀腔,该阀芯设在阀腔内,该混水路和两进水路配合以通过阀体转动控制混水路水温。The delay valve device according to claim 1 or 2 or 3 or 4, characterized in that: the valve body part further comprises a base part, and the base part is provided with two water inlet channels which can be respectively connected to cold and hot water; the valve body part further comprises a base part. The body is rotatably connected to the base part, the valve body is provided with a valve cavity and a water mixing circuit, the mixing water circuit is connected to the valve chamber, the valve core is arranged in the valve chamber, and the mixing water circuit and the two inlet water circuits cooperate to be controlled by the rotation of the valve body Mixed water temperature.
- 延时阀装置,包括阀体部件、阀芯和驱动杆;该阀体部件包括阀体,该阀体设有阀腔,该阀芯设在阀腔内且将阀腔分为成压腔和出水腔,该阀体和阀芯配合构成先导阀;该驱动杆滑接在阀体部件且驱动杆和阀芯装接在一起以通过驱动杆滑动控制先导阀开关;其特征在于:该阀芯外设单向阀,该成压腔水流能经单向阀进入出水腔,该驱动杆设有接通成压腔和出水腔的连通道,该驱动杆上还活动连接有调节杆,通过调节杆活动调节连通道之过水面积以调节延时时长。The delay valve device includes a valve body part, a valve core and a driving rod; the valve body part includes a valve body, the valve body is provided with a valve cavity, and the valve core is arranged in the valve cavity and divides the valve cavity into a pressure cavity and a valve cavity. The water outlet cavity, the valve body and the valve core cooperate to form a pilot valve; the driving rod is slidably connected to the valve body part, and the driving rod and the valve core are assembled together to control the pilot valve switch through the sliding of the driving rod; it is characterized in that: the valve core Peripheral check valve, the water flow into the pressure cavity can enter the water outlet cavity through the check valve, the driving rod is provided with a connecting channel connecting the pressure cavity and the water outlet cavity, the driving rod is also movably connected with an adjustment rod, through the adjustment The rod movement adjusts the water passing area of the connecting channel to adjust the delay time.
- 根据权利要求11所述的延时阀装置,其特征在于:该驱动杆外端面凹设形成有装接槽,该驱动杆还设有贯穿装接槽内外的接通出水腔的第一通槽和接通出水腔的第二通槽,该连通道包括上述的第一通槽、第二通槽及装接槽之介于第一通槽和第二通槽间的区域;该调节杆能调节地连接在装接槽内,该调节杆和装接槽槽壁间的间隙面积构成连通道之过水面积。The delay valve device according to claim 11, wherein an attachment groove is concavely formed on the outer end surface of the drive rod, and the drive rod is further provided with a first through groove that penetrates the inside and outside of the attachment groove and is connected to the water outlet cavity. and a second through groove connected to the water outlet cavity, the connecting channel includes the area between the first through groove and the second through groove among the first through groove, the second through groove and the attachment groove; the adjustment rod can It is adjusted and connected in the connecting groove, and the gap area between the adjusting rod and the groove wall of the connecting groove constitutes the water passing area of the connecting channel.
- 根据权利要求12所述的延时阀装置,其特征在于:该阀体设有贯穿内外以接通出水腔的出水孔;该驱动杆包括中心杆和联动杆,该中心杆内端自外往内穿过出水孔且伸入阀腔内,该中心杆外设有能密封出水孔的密封圈,该联动杆固接在中心杆内端;该中心杆设有贯穿设置的第一装接段,该联动杆端面凹设有第二装接段,该第二装接段槽底凹设有调节段,该调节杆具有连接段和锥形段,该连接段装接在第一装接段,该锥形段至少部分插入调节段,以通过调节杆插入深度控制间隙面积;该装接槽包括上述的第一装接段、第二装接段和调节段。The delay valve device according to claim 12, characterized in that: the valve body is provided with a water outlet hole that penetrates inside and outside to connect to the water outlet cavity; the driving rod comprises a center rod and a linkage rod, and the inner end of the center rod goes from the outside to the outside. The inner rod passes through the water outlet hole and extends into the valve cavity, the central rod is provided with a sealing ring that can seal the water outlet hole, the linkage rod is fixed on the inner end of the central rod; the central rod is provided with a first attachment section arranged through , the end face of the linkage rod is concavely provided with a second attachment section, the groove bottom of the second attachment section is concavely provided with an adjustment section, the adjustment rod has a connection section and a conical section, and the connection section is attached to the first attachment section , the tapered section is at least partially inserted into the adjustment section to control the gap area through the insertion depth of the adjustment rod; the attachment groove includes the first attachment section, the second attachment section and the adjustment section.
- 根据权利要求13所述的延时阀装置,其特征在于:该第一通槽贯穿第一装接段设置,该第二通槽贯穿调节段内端设置。The delay valve device according to claim 13, wherein the first through groove is disposed through the first attachment section, and the second through groove is disposed through the inner end of the adjustment section.
- 根据权利要求13所述的延时阀装置,其特征在于:该阀体设有贯穿内外以 接通出水腔的出水孔及凹设有接通成压腔的配合槽;该中心杆内端自外往内穿过出水孔且伸入阀腔内,该中心杆外设有能密封出水孔的第一密封圈,该联动杆固接在中心杆内端,该联动杆外固设有第二密封圈,该第二密封圈滑接在配合槽内;该第一密封圈受水压作用力和第二密封圈受水压作用力相平衡。The delay valve device according to claim 13, characterized in that: the valve body is provided with a water outlet hole that penetrates inside and outside to connect to the water outlet cavity and a recessed matching groove that is connected to the pressure cavity; the inner end of the center rod is self The center rod is provided with a first sealing ring that can seal the water outlet, the linkage rod is fixed on the inner end of the center rod, and the linkage rod is externally fixed with a second seal ring. A sealing ring, the second sealing ring is slidably connected in the matching groove; the water pressure acting force of the first sealing ring and the water pressure acting force of the second sealing ring are balanced.
- 根据权利要求11所述的延时阀装置,其特征在于:该驱动杆和阀体部件间设第一弹性体,该第一弹性体顶抵驱动杆以外顶驱动杆。The delay valve device according to claim 11, wherein a first elastic body is arranged between the driving rod and the valve body part, and the first elastic body presses against the driving rod and pushes the driving rod outside.
- 龙头,其特征在于:该龙头上设有根据权利要求1或11所述的延时阀装置。The faucet is characterized in that: the faucet is provided with the delay valve device according to claim 1 or 11.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010795854.9A CN114076225A (en) | 2020-08-10 | 2020-08-10 | Time delay valve device and faucet |
CN202010795854.9 | 2020-08-10 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022032969A1 true WO2022032969A1 (en) | 2022-02-17 |
Family
ID=80247652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2020/139800 WO2022032969A1 (en) | 2020-08-10 | 2020-12-27 | Delay valve device and faucet |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN114076225A (en) |
WO (1) | WO2022032969A1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5862311A (en) * | 1981-10-12 | 1983-04-13 | Nissan Motor Co Ltd | Cooling water temperature controller of internal- combustion engine |
DE2600134C2 (en) * | 1976-01-03 | 1983-11-10 | Karl Dungs Gmbh & Co, 7067 Urbach | Hydraulic delay solenoid valve |
CN2042551U (en) * | 1988-08-16 | 1989-08-09 | 姚守信 | Time delay self-closing valve for saving water |
CN2142910Y (en) * | 1992-05-23 | 1993-09-29 | 朱兆礼 | pedal hydraulic delay valve |
CN2147403Y (en) * | 1993-01-14 | 1993-11-24 | 赵正兴 | Time-delay self-closing water-saving tap |
CN203926976U (en) * | 2014-06-20 | 2014-11-05 | 玉环县家家卫浴配件厂(普通合伙) | Delay water faucet |
CN204176071U (en) * | 2014-08-18 | 2015-02-25 | 玉环县家家卫浴配件厂(普通合伙) | Air energy water-saving mangetic core assembly and delay water faucet |
CN212643696U (en) * | 2020-08-10 | 2021-03-02 | 厦门松霖科技股份有限公司 | Time delay valve device and faucet |
-
2020
- 2020-08-10 CN CN202010795854.9A patent/CN114076225A/en active Pending
- 2020-12-27 WO PCT/CN2020/139800 patent/WO2022032969A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2600134C2 (en) * | 1976-01-03 | 1983-11-10 | Karl Dungs Gmbh & Co, 7067 Urbach | Hydraulic delay solenoid valve |
JPS5862311A (en) * | 1981-10-12 | 1983-04-13 | Nissan Motor Co Ltd | Cooling water temperature controller of internal- combustion engine |
CN2042551U (en) * | 1988-08-16 | 1989-08-09 | 姚守信 | Time delay self-closing valve for saving water |
CN2142910Y (en) * | 1992-05-23 | 1993-09-29 | 朱兆礼 | pedal hydraulic delay valve |
CN2147403Y (en) * | 1993-01-14 | 1993-11-24 | 赵正兴 | Time-delay self-closing water-saving tap |
CN203926976U (en) * | 2014-06-20 | 2014-11-05 | 玉环县家家卫浴配件厂(普通合伙) | Delay water faucet |
CN204176071U (en) * | 2014-08-18 | 2015-02-25 | 玉环县家家卫浴配件厂(普通合伙) | Air energy water-saving mangetic core assembly and delay water faucet |
CN212643696U (en) * | 2020-08-10 | 2021-03-02 | 厦门松霖科技股份有限公司 | Time delay valve device and faucet |
Also Published As
Publication number | Publication date |
---|---|
CN114076225A (en) | 2022-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5340018A (en) | Thermostatically controlled mixing valve | |
US7434780B2 (en) | Pilot-type two-port valve | |
CN100471577C (en) | Outlet water control mechanism for shower nozzle | |
CA2307406A1 (en) | Pilot solenoid control valve with pressure responsive diaphragm | |
WO2018082171A1 (en) | Switching valve core for water shutoff | |
US20220379322A1 (en) | Showerhead | |
EP3417195A1 (en) | Safety valve | |
WO2022032969A1 (en) | Delay valve device and faucet | |
CN212643696U (en) | Time delay valve device and faucet | |
JP4602857B2 (en) | Pilot type flow control device and main valve unit used therefor | |
US4165857A (en) | Dashpot mechanism for self-closing plumbing valves | |
CN211039725U (en) | Switching valve device and faucet | |
US20100229971A1 (en) | Back-pressure responsive valve | |
CN211738108U (en) | Novel push type air tightness temperature adjustment ceramic valve core | |
CN218236239U (en) | Temp. regulating delay valve | |
CN112145715A (en) | Regulating valve | |
JP4738078B2 (en) | Pilot flow control device | |
JP4035711B2 (en) | Pressure control device | |
JP4291403B1 (en) | Pilot back pressure valve with check function | |
CN213361195U (en) | Pilot valve and control valve device | |
JP2613528B2 (en) | Valve device | |
JPS5910230Y2 (en) | flash valve | |
CN215257959U (en) | Float valve device and water tank device | |
CN212480229U (en) | Temperature-adjusting pressure balance valve with switching function and water outlet device | |
CN113864487A (en) | Pilot valve and control valve device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20949460 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20949460 Country of ref document: EP Kind code of ref document: A1 |