WO2021223233A1 - Inter-node signaling for nr-dc dynamic power sharing - Google Patents

Inter-node signaling for nr-dc dynamic power sharing Download PDF

Info

Publication number
WO2021223233A1
WO2021223233A1 PCT/CN2020/089248 CN2020089248W WO2021223233A1 WO 2021223233 A1 WO2021223233 A1 WO 2021223233A1 CN 2020089248 W CN2020089248 W CN 2020089248W WO 2021223233 A1 WO2021223233 A1 WO 2021223233A1
Authority
WO
WIPO (PCT)
Prior art keywords
toffset
value
scg
uplink transmission
cell group
Prior art date
Application number
PCT/CN2020/089248
Other languages
French (fr)
Inventor
Peng Cheng
Kazuki Takeda
Huichun LIU
Original Assignee
Qualcomm Incorporated
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qualcomm Incorporated filed Critical Qualcomm Incorporated
Priority to PCT/CN2020/089248 priority Critical patent/WO2021223233A1/en
Publication of WO2021223233A1 publication Critical patent/WO2021223233A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/367Power values between minimum and maximum limits, e.g. dynamic range
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/34TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
    • H04W52/346TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Example implementations include a method, apparatus and computer-readable medium for wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN), wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The implementations further include transmitting the Toffset value to the MN in response to determining the existence of the reporting condition. Additional examples of a method, apparatus and computer-readable medium for wireless communication at the MN are also described.

Description

INTER-NODE SIGNALING FOR NR-DC DYNAMIC POWER SHARING BACKGROUND
Technical Field
The present disclosure relates generally to communication systems, and more particularly, to apparatus and methods of inter-node signaling for New Radio–Dual Connectivity (NR-DC) dynamic power sharing.
Introduction
Wireless communication systems are widely deployed to provide various telecommunication services such as telephony, video, data, messaging, and broadcasts. Typical wireless communication systems may employ multiple-access technologies capable of supporting communication with multiple users by sharing available system resources. Examples of such multiple-access technologies include code division multiple access (CDMA) systems, time division multiple access (TDMA) systems, frequency division multiple access (FDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, single-carrier frequency division multiple access (SC-FDMA) systems, and time division synchronous code division multiple access (TD-SCDMA) systems.
These multiple access technologies have been adopted in various telecommunication standards to provide a common protocol that enables different wireless devices to communicate on a municipal, national, regional, and even global level. An example telecommunication standard is 5G New Radio (NR) . 5G NR is part of a continuous mobile broadband evolution promulgated by Third Generation Partnership Project (3GPP) to meet new requirements associated with latency, reliability, security, scalability (e.g., with Internet of Things (IoT) ) , and other requirements. 5G NR includes services associated with enhanced mobile broadband (eMBB) , massive machine type communications (mMTC) , and ultra-reliable low latency communications (URLLC) . Some aspects of 5G NR may be based on the 4G Long Term Evolution (LTE) standard. There exists a need for further improvements in 5G NR technology. These improvements may also be applicable to other multi-access technologies and the telecommunication standards that employ these technologies. In particular, improving network communication procedures is desired.
SUMMARY
The following presents a simplified summary of one or more aspects in order to provide a basic understanding of such aspects. This summary is not an extensive overview of all contemplated aspects, and is intended to neither identify key or critical elements of all aspects nor delineate the scope of any or all aspects. Its sole purpose is to present some concepts of one or more aspects in a simplified form as a prelude to the more detailed description that is presented later.
An example implementation includes a method of wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The method further includes transmitting the Toffset value to the MN in response to determining the existence of the reporting condition.
Another example implementation includes an apparatus for wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising a memory and a processor in communication with the memory. The processor is configured to determine existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The processor is further configured to transmit the Toffset value to the MN in response to determining the existence of the reporting condition.
Another example implementation includes an apparatus for wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising means for determining existence of a reporting condition for reporting a  time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The apparatus further includes means for transmitting the Toffset value to the MN in response to determining the existence of the reporting condition.
Another example implementation includes a computer-readable medium comprising stored instructions for wireless communication at a secondary node (SN) in a dual connectivity architecture, executable by a processor to determine existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The instructions are further executable to transmit the Toffset value to the MN in response to determining the existence of the reporting condition.
An example implementation includes a method of wireless communication at a master node (MN) in a dual connectivity architecture, comprising receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The method further includes performing dynamic power sharing with the SN.
Another example implementation includes an apparatus for wireless communication at a master node (MN) in a dual connectivity architecture, comprising a memory and a processor in communication with the memory. The processor is configured to receive a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a  user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The processor is further configured to perform dynamic power sharing with the SN.
Another example implementation includes an apparatus for wireless communication at a master node (MN) in a dual connectivity architecture, comprising means for receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The apparatus further includes means for performing dynamic power sharing with the SN.
Another example implementation includes a computer-readable medium comprising stored instructions for wireless communication at a master node (MN) in a dual connectivity architecture, executable by a processor to receive a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. The instructions are further executable to perform dynamic power sharing with the SN.
To the accomplishment of the foregoing and related ends, the one or more aspects comprise the features hereinafter fully described and particularly pointed out in the claims. The following description and the annexed drawings set forth in detail certain illustrative features of the one or more aspects. These features are indicative, however, of but a few of the various ways in which the principles of various aspects may be employed, and this description is intended to include all such aspects and their equivalents.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a diagram of an example of a wireless communications system and an access network, including base stations, such as a secondary node (SN) and a master node (MN) , configured to perform dynamic power sharing as described herein.
FIGS. 2A, 2B, 2C, and 2D are diagrams of examples of a first 5G/NR frame, DL channels within a 5G/NR subframe, a second 5G/NR frame, and UL channels within a 5G/NR subframe, respectively.
FIG. 3 is a diagram of an example of components of the base station and a user equipment (UE) .
FIG. 4 is a schematic diagram of an example dual connectivity architecture in which the features of the present disclosure may be implemented.
FIG. 5 is a timing diagram including signaling over time, wherein the signaling is carried by component carriers of the master cell group (MCG) , including the MN, and the secondary cell group (SCG) , including the SN, according to aspects described herein.
FIG. 6 is a message flow diagram of a method of wireless communications in which an MN sends a Toffset query to an SN, according to aspects described herein.
FIG. 7 is a message flow diagram of a method of wireless communications in which an SN sends a Toffset value to an MN in an unprompted manner, according to aspects described herein.
FIG. 8 is a block diagram of an SN including components for performing the actions relating to dynamic power sharing as described herein.
FIGS. 9-11 are flowcharts of a method of wireless communication by the SN for performing aspects relating to dynamic power sharing as described herein.
FIG. 12 is a block diagram of an MN including components for performing the actions relating to dynamic power sharing as described herein.
FIGS. 13-16 are flowcharts of a method of wireless communication by the MN for performing dynamic power sharing as described herein.
DETAILED DESCRIPTION
The detailed description set forth below in connection with the appended drawings is intended as a description of various configurations and is not intended to  represent the only configurations in which the concepts described herein may be practiced. The detailed description includes specific details for the purpose of providing a thorough understanding of various concepts. However, it will be apparent to those skilled in the art that these concepts may be practiced without these specific details. In some instances, well known structures and components are shown in block diagram form in order to avoid obscuring such concepts.
The present disclosure relates generally to wireless communication systems, and more particularly, to apparatus and methods of inter-node signaling for New Radio –Dual Connectivity (NR-DC) dynamic power sharing.
The present disclosure provides apparatus and methods that enable a secondary node (SN) and a master node (MN) in a dual connectivity architecture to efficiently exchange timing information, namely a Toffset value, in order to perform dynamic power sharing. The Toffset value, as described herein, relates to a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission. The time period provided by the Toffset value thereby restricts the MN from sending grants for MN UL transmissions that overlap with the SN UL transmission, thereby enabling the UE to calculate a maximum SN transmit power for the SN scheduled uplink transmission according to dynamic power sharing procedures.
In particular, the present disclosure introduces two procedures that may be utilized independently, or in combination. The first procedure is utilized by the MN to query the SN for the Toffset value. For example, the MN may be triggered to send the Toffset query based on expiration of a timer since a last Toffset query was sent (or a duration within which a secondary cell group reconfiguration message is not received) , or based on performing an SN addition procedure, or upon reception of an secondary cell group configuration message that indicates a secondary cell group (SCG) radio resource configuration (RRC) reconfiguration at the SN. The second procedure is utilized by the MN to proactively report the Toffset value to the MN, such as without receiving a Toffset query. For example, in one case, the SN may be triggered to report the Toffset value when performing an RRC reconfiguration of the SCG via a signaling radio bearer directly with the UE (and hence reconfiguration would not be visible to the MN) . Further, for example,  another case, the SN may be triggered to report the Toffset value to the MN along with an RRC reconfiguration of the SCG, e.g., sent in a container in a cell group configuration, sent via a signaling radio bearer to the MN for forwarding to the UE. In either case, the SN can avoid additional inter-node signaling with the MN by pre-emptively reporting the Toffset query.
Thus, the present solution improves the efficiency of wireless network operations at network-based entities, e.g., SNs and MNs in a dual connectivity architecture, and further improves the efficiency of dynamic power sharing procedures.
Several aspects of telecommunication systems will now be presented with reference to various apparatus and methods. These apparatus and methods will be described in the following detailed description and illustrated in the accompanying drawings by various blocks, components, circuits, processes, algorithms, etc. (collectively referred to as “elements” ) . These elements may be implemented using electronic hardware, computer software, or any combination thereof. Whether such elements are implemented as hardware or software depends upon the particular application and design constraints imposed on the overall system.
By way of example, an element, or any portion of an element, or any combination of elements may be implemented as a “processing system” that includes one or more processors. Examples of processors include microprocessors, microcontrollers, graphics processing units (GPUs) , central processing units (CPUs) , application processors, digital signal processors (DSPs) , reduced instruction set computing (RISC) processors, systems on a chip (SoC) , baseband processors, field programmable gate arrays (FPGAs) , programmable logic devices (PLDs) , state machines, gated logic, discrete hardware circuits, and other suitable hardware configured to perform the various functionality described throughout this disclosure. One or more processors in the processing system may execute software. Software shall be construed broadly to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software components, applications, software applications, software packages, routines, subroutines, objects, executables, threads of execution, procedures, functions, etc., whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise.
Accordingly, in one or more example embodiments, the functions described may be implemented in hardware, software, or any combination thereof. If implemented in software, the functions may be stored on or encoded as one or more instructions or code on a computer-readable medium. Computer-readable media includes computer storage media. Storage media may be any available media that can be accessed by a computer. By way of example, and not limitation, such computer-readable media can comprise a random-access memory (RAM) , a read-only memory (ROM) , an electrically erasable programmable ROM (EEPROM) , optical disk storage, magnetic disk storage, other magnetic storage devices, combinations of the aforementioned types of computer-readable media, or any other medium that can be used to store computer executable code in the form of instructions or data structures that can be accessed by a computer.
Referring to FIG. 1, an example of a wireless communications system and an access network 100 (also referred to as a wireless wide area network (WWAN) ) includes a base station 102, including a master node (MN) and a secondary node (SN) , in communication with a user equipment (UE) 104, wherein one or more of the base stations 102 are configured to perform efficient dynamic power sharing procedures as described herein. For example, one or more of the base stations 102 may include a secondary node (SN) 103 operating an SN power control component 105 that is configured to perform one or more procedures for reporting a timing value, e.g., a Toffset, for performing dynamic power sharing procedures in a dual connectivity scenario. Similarly, one or more of the base stations 102 may include a master node (MN) 115 operating an MN power control component 117 that is configured to perform one or more procedures for requesting or receiving a report of the timing value, e.g., the Toffset, for performing dynamic power sharing procedures in the dual connectivity scenario Details of the operation of these components is presented in more detail below. The present solution improves network communications at the SN 103 and the MN 115 and results in more efficient operations with less overhead.
In the wireless communications system and an access network 100, the base stations 102 and UEs 104 may additionally be in communication with an Evolved Packet Core (EPC) 160 and/or another core network 190, such as but not limited to a 5G Core (5GC) . The base stations 102 may include macrocells (high power cellular  base station) and/or small cells (low power cellular base station) . The macrocells include base stations. The small cells include femtocells, picocells, and microcells.
The base stations 102 configured for 4G LTE (collectively referred to as Evolved Universal Mobile Telecommunications System (UMTS) Terrestrial Radio Access Network (E-UTRAN) ) may interface with the EPC 160 through first backhaul links 132 (e.g., S1 interface) . The base stations 102 configured for 5G NR (collectively referred to as Next Generation RAN (NG-RAN) ) may interface with core network 190 through second backhaul links 184. In addition to other functions, the base stations 102 may perform one or more of the following functions: transfer of user data, radio channel ciphering and deciphering, integrity protection, header compression, mobility control functions (e.g., handover, dual connectivity) , inter-cell interference coordination, connection setup and release, load balancing, distribution for non-access stratum (NAS) messages, NAS node selection, synchronization, radio access network (RAN) sharing, multimedia broadcast multicast service (MBMS) , subscriber and equipment trace, RAN information management (RIM) , paging, positioning, and delivery of warning messages. The base stations 102 may communicate directly or indirectly (e.g., through the EPC 160 or core network 190) with each other over third backhaul links 134 (e.g., X2 interface) . The third backhaul links 134 may be wired or wireless.
The base stations 102 may wirelessly communicate with the UEs 104. Each of the base stations 102 may provide communication coverage for a respective geographic coverage area 110. There may be overlapping geographic coverage areas 110. For example, the small cell 102' may have a coverage area 110'that overlaps the coverage area 110 of one or more macro base stations 102. A network that includes both small cell and macrocells may be known as a heterogeneous network. A heterogeneous network may also include Home Evolved Node Bs (eNBs) (HeNBs) , which may provide service to a restricted group known as a closed subscriber group (CSG) . The communication links 120 between the base stations 102 and the UEs 104 may include uplink (UL) (also referred to as reverse link) transmissions from a UE 104 to a base station 102 and/or downlink (DL) (also referred to as forward link) transmissions from a base station 102 to a UE 104. The communication links 120 may use multiple-input and multiple-output (MIMO) antenna technology, including spatial multiplexing, beamforming, and/or transmit diversity. The communication links may be through one or more carriers. The base  stations 102 /UEs 104 may use spectrum up to Y MHz (e.g., 5, 10, 15, 20, 100, 400, etc. MHz) bandwidth per carrier allocated in a carrier aggregation of up to a total of Yx MHz (x component carriers) used for transmission in each direction. The carriers may or may not be adjacent to each other. Allocation of carriers may be asymmetric with respect to DL and UL (e.g., more or fewer carriers may be allocated for DL than for UL) . The component carriers may include a primary component carrier and one or more secondary component carriers. A primary component carrier may be referred to as a primary cell (PCell) and a secondary component carrier may be referred to as a secondary cell (SCell) .
Certain UEs 104 may communicate with each other using device-to-device (D2D) communication link 158. The D2D communication link 158 may use the DL/UL WWAN spectrum. The D2D communication link 158 may use one or more sidelink channels, such as a physical sidelink broadcast channel (PSBCH) , a physical sidelink discovery channel (PSDCH) , a physical sidelink shared channel (PSSCH) , and a physical sidelink control channel (PSCCH) . D2D communication may be through a variety of wireless D2D communications systems, such as for example, FlashLinQ, WiMedia, Bluetooth, ZigBee, Wi-Fi based on the IEEE 802.11 standard, LTE, or NR.
The wireless communications system may further include a Wi-Fi access point (AP) 150 in communication with Wi-Fi stations (STAs) 152 via communication links 154 in a 5 GHz unlicensed frequency spectrum. When communicating in an unlicensed frequency spectrum, the STAs 152 /AP 150 may perform a clear channel assessment (CCA) prior to communicating in order to determine whether the channel is available.
The small cell 102' may operate in a licensed and/or an unlicensed frequency spectrum. When operating in an unlicensed frequency spectrum, the small cell 102' may employ NR and use the same 5 GHz unlicensed frequency spectrum as used by the Wi-Fi AP 150. The small cell 102', employing NR in an unlicensed frequency spectrum, may boost coverage to and/or increase capacity of the access network.
base station 102, whether a small cell 102' or a large cell (e.g., macro base station) , may include and/or be referred to as an eNB, gNodeB (gNB) , or another type of base station. Some base stations 102, such as base station 180 may operate in a traditional sub 6 GHz spectrum, in millimeter wave (mmW) frequencies, and/or near mmW frequencies in communication with the UE 104. When the base station  180 operates in mmW or near mmW frequencies, the base station 180 may be referred to as an mmW base station. Extremely high frequency (EHF) is part of the RF in the electromagnetic spectrum. EHF has a range of 30 GHz to 300 GHz and a wavelength between 1 millimeter and 10 millimeters. Radio waves in the band may be referred to as a millimeter wave. Near mmW may extend down to a frequency of 3 GHz with a wavelength of 100 millimeters. The super high frequency (SHF) band extends between 3 GHz and 30 GHz, also referred to as centimeter wave. Communications using the mmW /near mmW radio frequency band (e.g., 3 GHz –300 GHz) has extremely high path loss and a short range. The mmW base station 180 may utilize beamforming 182 with the UE 104 to compensate for the extremely high path loss and short range. The base station 180 and the UE 104 may each include a plurality of antennas, such as antenna elements, antenna panels, and/or antenna arrays to facilitate the beamforming.
The base station 180 may transmit a beamformed signal to the UE 104 in one or more transmit directions 182′. The UE 104 may receive the beamformed signal from the base station 180 in one or more receive directions 182” . The UE 104 may also transmit a beamformed signal to the base station 180 in one or more transmit directions. The base station 180 may receive the beamformed signal from the UE 104 in one or more receive directions. The base station 180 /UE 104 may perform beam training to determine the best receive and transmit directions for each of the base station 180 /UE 104. The transmit and receive directions for the base station 180 may or may not be the same. The transmit and receive directions for the UE 104 may or may not be the same.
The EPC 160 may include a Mobility Management Entity (MME) 162, other MMEs 164, a Serving Gateway 166, a Multimedia Broadcast Multicast Service (MBMS) Gateway 168, a Broadcast Multicast Service Center (BM-SC) 170, and a Packet Data Network (PDN) Gateway 172. The MME 162 may be in communication with a Home Subscriber Server (HSS) 174. The MME 162 is the control node that processes the signaling between the UEs 104 and the EPC 160. Generally, the MME 162 provides bearer and connection management. All user Internet protocol (IP) packets are transferred through the Serving Gateway 166, which itself is connected to the PDN Gateway 172. The PDN Gateway 172 provides UE IP address allocation as well as other functions. The PDN Gateway 172 and the BM-SC 170 are connected to the IP Services 176. The IP Services 176  may include the Internet, an intranet, an IP Multimedia Subsystem (IMS) , a PS Streaming Service, and/or other IP services. The BM-SC 170 may provide functions for MBMS user service provisioning and delivery. The BM-SC 170 may serve as an entry point for content provider MBMS transmission, may be used to authorize and initiate MBMS Bearer Services within a public land mobile network (PLMN) , and may be used to schedule MBMS transmissions. The MBMS Gateway 168 may be used to distribute MBMS traffic to the base stations 102 belonging to a Multicast Broadcast Single Frequency Network (MBSFN) area broadcasting a particular service, and may be responsible for session management (start/stop) and for collecting eMBMS related charging information.
The core network 190 may include a Access and Mobility Management Function (AMF) 192, other AMFs 193, a Session Management Function (SMF) 194, and a User Plane Function (UPF) 195. The AMF 192 may be in communication with a Unified Data Management (UDM) 196. The AMF 192 is the control node that processes the signaling between the UEs 104 and the core network 190. Generally, the AMF 192 provides QoS flow and session management. All user Internet protocol (IP) packets are transferred through the UPF 195. The UPF 195 provides UE IP address allocation as well as other functions. The UPF 195 is connected to the IP Services 197. The IP Services 197 may include the Internet, an intranet, an IP Multimedia Subsystem (IMS) , a PS Streaming Service, and/or other IP services.
The base station may include and/or be referred to as a gNB, Node B, eNB, an access point, a base transceiver station, a radio base station, a radio transceiver, a transceiver function, a basic service set (BSS) , an extended service set (ESS) , a transmit reception point (TRP) , or some other suitable terminology. The base station 102 provides an access point to the EPC 160 or core network 190 for a UE 104. Examples of UEs 104 include a cellular phone, a smart phone, a session initiation protocol (SIP) phone, a laptop, a personal digital assistant (PDA) , a satellite radio, a global positioning system, a multimedia device, a video device, a digital audio player (e.g., MP3 player) , a camera, a game console, a tablet, a smart device, a wearable device, a vehicle, an electric meter, a gas pump, a large or small kitchen appliance, a healthcare device, an implant, a sensor/actuator, a display, or any other similar functioning device. Some of the UEs 104 may be referred to as IoT devices (e.g., parking meter, gas pump, toaster, vehicles, heart monitor, etc. ) .  The UE 104 may also be referred to as a station, a mobile station, a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communications device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handset, a user agent, a mobile client, a client, or some other suitable terminology.
Referring to FIGS. 2A to 2D, examples of different frame structures and resources may be utilized by the base station 102 and/or the UE 104 for communications as described herein. FIG. 2A is a diagram 200 illustrating an example of a first subframe within a 5G/NR frame structure. FIG. 2B is a diagram 230 illustrating an example of DL channels within a 5G/NR subframe. FIG. 2C is a diagram 250 illustrating an example of a second subframe within a 5G/NR frame structure. FIG. 2D is a diagram 280 illustrating an example of UL channels within a 5G/NR subframe. The 5G/NR frame structure may be FDD in which for a particular set of subcarriers (carrier system bandwidth) , subframes within the set of subcarriers are dedicated for either DL or UL, or may be TDD in which for a particular set of subcarriers (carrier system bandwidth) , subframes within the set of subcarriers are dedicated for both DL and UL. In the examples provided by FIGs. 2A, 2C, the 5G/NR frame structure is assumed to be TDD, with subframe 4 being configured with slot format 28 (with mostly DL) , where D is DL, U is UL, and X is flexible for use between DL/UL, and subframe 3 being configured with slot format 34 (with mostly UL) . While  subframes  3, 4 are shown with slot formats 34, 28, respectively, any particular subframe may be configured with any of the various available slot formats 0-61. Slot formats 0, 1 are all DL, UL, respectively. Other slot formats 2-61 include a mix of DL, UL, and flexible symbols. UEs are configured with the slot format (dynamically through DL control information (DCI) , or semi-statically/statically through radio resource control (RRC) signaling) through a received slot format indicator (SFI) . Note that the description infra applies also to a 5G/NR frame structure that is TDD.
Other wireless communication technologies may have a different frame structure and/or different channels. A frame (10 ms) may be divided into 10 equally sized subframes (1 ms) . Each subframe may include one or more time slots. Subframes may also include mini-slots, which may include 7, 4, or 2 symbols. Each slot may include 7 or 14 symbols, depending on the slot configuration. For slot configuration  0, each slot may include 14 symbols, and for slot configuration 1, each slot may include 7 symbols. The symbols on DL may be cyclic prefix (CP) OFDM (CP-OFDM) symbols. The symbols on UL may be CP-OFDM symbols (for high throughput scenarios) or discrete Fourier transform (DFT) spread OFDM (DFT-s-OFDM) symbols (also referred to as single carrier frequency-division multiple access (SC-FDMA) symbols) (for power limited scenarios; limited to a single stream transmission) . The number of slots within a subframe is based on the slot configuration and the numerology. For slot configuration 0, different numerologies μ 0 to 5 allow for 1, 2, 4, 8, 16, and 32 slots, respectively, per subframe. For slot configuration 1, different numerologies 0 to 2 allow for 2, 4, and 8 slots, respectively, per subframe. Accordingly, for slot configuration 0 and numerology μ, there are 14 symbols/slot and 2 μ slots/subframe. The subcarrier spacing and symbol length/duration are a function of the numerology. The subcarrier spacing may be equal to 2 μ*15 kHz, where μ is the numerology 0 to 5. As such, the numerology μ=0 has a subcarrier spacing of 15 kHz and the numerology μ=5 has a subcarrier spacing of 480 kHz. The symbol length/duration is inversely related to the subcarrier spacing. FIGs. 2A-2D provide an example of slot configuration 0 with 14 symbols per slot and numerology μ=2 with 4 slots per subframe. The slot duration is 0.25 ms, the subcarrier spacing is 60 kHz, and the symbol duration is approximately 16.67 μs.
A resource grid may be used to represent the frame structure. Each time slot includes a resource block (RB) (also referred to as physical RBs (PRBs) ) that extends 12 consecutive subcarriers. The resource grid is divided into multiple resource elements (REs) . The number of bits carried by each RE depends on the modulation scheme.
As illustrated in FIG. 2A, some of the REs carry reference (pilot) signals (RS) for the UE. The RS may include demodulation RS (DM-RS) (indicated as R x for one particular configuration, where 100x is the port number, but other DM-RS configurations are possible) and channel state information reference signals (CSI-RS) for channel estimation at the UE. The RS may also include beam measurement RS (BRS) , beam refinement RS (BRRS) , and phase tracking RS (PT-RS) .
FIG. 2B illustrates an example of various DL channels within a subframe of a frame. The physical downlink control channel (PDCCH) carries DCI within one or more control channel elements (CCEs) , each CCE including nine RE groups (REGs) ,  each REG including four consecutive REs in an OFDM symbol. A primary synchronization signal (PSS) may be within symbol 2 of particular subframes of a frame. The PSS is used by a UE 104 to determine subframe/symbol timing and a physical layer identity. A secondary synchronization signal (SSS) may be within symbol 4 of particular subframes of a frame. The SSS is used by a UE to determine a physical layer cell identity group number and radio frame timing. Based on the physical layer identity and the physical layer cell identity group number, the UE can determine a physical cell identifier (PCI) . Based on the PCI, the UE can determine the locations of the aforementioned DM-RS. The physical broadcast channel (PBCH) , which carries a master information block (MIB) , may be logically grouped with the PSS and SSS to form a synchronization signal (SS) /PBCH block. The MIB provides a number of RBs in the system bandwidth and a system frame number (SFN) . The physical downlink shared channel (PDSCH) carries user data, broadcast system information not transmitted through the PBCH such as system information blocks (SIBs) , and paging messages.
As illustrated in FIG. 2C, some of the REs carry DM-RS (indicated as R for one particular configuration, but other DM-RS configurations are possible) for channel estimation at the base station. The UE may transmit DM-RS for the physical uplink control channel (PUCCH) and DM-RS for the physical uplink shared channel (PUSCH) . The PUSCH DM-RS may be transmitted in the first one or two symbols of the PUSCH. The PUCCH DM-RS may be transmitted in different configurations depending on whether short or long PUCCHs are transmitted and depending on the particular PUCCH format used. The UE may transmit sounding reference signals (SRS) . The SRS may be transmitted in the last symbol of a subframe. The SRS may have a comb structure, and a UE may transmit SRS on one of the combs. The SRS may be used by a base station for channel quality estimation to enable frequency-dependent scheduling on the UL.
FIG. 2D illustrates an example of various UL channels within a subframe of a frame. The PUCCH may be located as indicated in one configuration. The PUCCH carries uplink control information (UCI) , such as scheduling requests, a channel quality indicator (CQI) , a precoding matrix indicator (PMI) , a rank indicator (RI) , and HARQ ACK/NACK feedback. The PUSCH carries data, and may additionally be used to carry a buffer status report (BSR) , a power headroom report (PHR) , and/or UCI.
Referring to FIG. 3, example components of the base station 102 and of the UE 104 are used for communication between one another in the access network 100. In the DL, IP packets from the EPC 160 may be provided to a controller/processor 375. The controller/processor 375 implements layer 3 and layer 2 functionality. Layer 3 includes a radio resource control (RRC) layer, and layer 2 includes a service data adaptation protocol (SDAP) layer, a packet data convergence protocol (PDCP) layer, a radio link control (RLC) layer, and a medium access control (MAC) layer. The controller/processor 375 provides RRC layer functionality associated with broadcasting of system information (e.g., MIB, SIBs) , RRC connection control (e.g., RRC connection paging, RRC connection establishment, RRC connection modification, and RRC connection release) , inter radio access technology (RAT) mobility, and measurement configuration for UE measurement reporting; PDCP layer functionality associated with header compression /decompression, security (ciphering, deciphering, integrity protection, integrity verification) , and handover support functions; RLC layer functionality associated with the transfer of upper layer packet data units (PDUs) , error correction through ARQ, concatenation, segmentation, and reassembly of RLC service data units (SDUs) , re-segmentation of RLC data PDUs, and reordering of RLC data PDUs; and MAC layer functionality associated with mapping between logical channels and transport channels, multiplexing of MAC SDUs onto transport blocks (TBs) , demultiplexing of MAC SDUs from TBs, scheduling information reporting, error correction through HARQ, priority handling, and logical channel prioritization.
The transmit (TX) processor 316 and the receive (RX) processor 370 implement layer 1 functionality associated with various signal processing functions. Layer 1, which includes a physical (PHY) layer, may include error detection on the transport channels, forward error correction (FEC) coding/decoding of the transport channels, interleaving, rate matching, mapping onto physical channels, modulation/demodulation of physical channels, and MIMO antenna processing. The TX processor 316 handles mapping to signal constellations based on various modulation schemes (e.g., binary phase-shift keying (BPSK) , quadrature phase-shift keying (QPSK) , M-phase-shift keying (M-PSK) , M-quadrature amplitude modulation (M-QAM) ) . The coded and modulated symbols may then be split into parallel streams. Each stream may then be mapped to an OFDM subcarrier, multiplexed with a reference signal (e.g., pilot) in the time and/or frequency domain,  and then combined together using an Inverse Fast Fourier Transform (IFFT) to produce a physical channel carrying a time domain OFDM symbol stream. The OFDM stream is spatially precoded to produce multiple spatial streams. Channel estimates from a channel estimator 374 may be used to determine the coding and modulation scheme, as well as for spatial processing. The channel estimate may be derived from a reference signal and/or channel condition feedback transmitted by the UE 104. Each spatial stream may then be provided to a different antenna 320 via a separate transmitter 318TX of each TX/RX 318. Each transmitter 318TX may modulate an RF carrier with a respective spatial stream for transmission.
At the UE 104, each receiver 354RX of the TX/RX 354 receives a signal through its respective antenna 352. Each receiver 354RX recovers information modulated onto an RF carrier and provides the information to the receive (RX) processor 356. The TX processor 368 and the RX processor 356 implement layer 1 functionality associated with various signal processing functions. The RX processor 356 may perform spatial processing on the information to recover any spatial streams destined for the UE 104. If multiple spatial streams are destined for the UE 104, they may be combined by the RX processor 356 into a single OFDM symbol stream. The RX processor 356 then converts the OFDM symbol stream from the time-domain to the frequency domain using a Fast Fourier Transform (FFT) . The frequency domain signal comprises a separate OFDM symbol stream for each subcarrier of the OFDM signal. The symbols on each subcarrier, and the reference signal, are recovered and demodulated by determining the most likely signal constellation points transmitted by the base station 102. These soft decisions may be based on channel estimates computed by the channel estimator 358. The soft decisions are then decoded and deinterleaved to recover the data and control signals that were originally transmitted by the base station 102 on the physical channel. The data and control signals are then provided to the controller/processor 359, which implements layer 3 and layer 2 functionality.
The controller/processor 359 can be associated with a memory 360 that stores program codes and data. The memory 360 may be referred to as a computer-readable medium. In the UL, the controller/processor 359 provides demultiplexing between transport and logical channels, packet reassembly, deciphering, header decompression, and control signal processing to recover IP packets from the EPC  160. The controller/processor 359 is also responsible for error detection using an ACK and/or NACK protocol to support HARQ operations.
Similar to the functionality described in connection with the DL transmission by the base station 102, the controller/processor 359 provides RRC layer functionality associated with system information (e.g., MIB, SIBs) acquisition, RRC connections, and measurement reporting; PDCP layer functionality associated with header compression /decompression, and security (ciphering, deciphering, integrity protection, integrity verification) ; RLC layer functionality associated with the transfer of upper layer PDUs, error correction through ARQ, concatenation, segmentation, and reassembly of RLC SDUs, re-segmentation of RLC data PDUs, and reordering of RLC data PDUs; and MAC layer functionality associated with mapping between logical channels and transport channels, multiplexing of MAC SDUs onto TBs, demultiplexing of MAC SDUs from TBs, scheduling information reporting, error correction through HARQ, priority handling, and logical channel prioritization.
Channel estimates derived by a channel estimator 358 from a reference signal or feedback transmitted by the base station 102 may be used by the TX processor 368 to select the appropriate coding and modulation schemes, and to facilitate spatial processing. The spatial streams generated by the TX processor 368 may be provided to different antenna 352 via separate transmitters 354TX of the TX/RX 354. Each transmitter 354TX may modulate an RF carrier with a respective spatial stream for transmission.
The UL transmission is processed at the base station 102 in a manner similar to that described in connection with the receiver function at the UE 104. Each receiver 318RX receives a signal through its respective antenna 320. Each receiver 318RX recovers information modulated onto an RF carrier and provides the information to a RX processor 370.
The controller/processor 375 can be associated with a memory 376 that stores program codes and data. The memory 376 may be referred to as a computer-readable medium. In the UL, the controller/processor 375 provides demultiplexing between transport and logical channels, packet reassembly, deciphering, header decompression, control signal processing to recover IP packets from the UE 104. IP packets from the controller/processor 375 may be provided to the EPC 160. The  controller/processor 375 is also responsible for error detection using an ACK and/or NACK protocol to support HARQ operations.
At the UE 104, at least one of the TX processor 368, the RX processor 356, and the controller/processor 359 may be configured to perform aspects in connection with the features discussed herein.
At the base station 102, at least one of the TX processor 316, the RX processor 370, and the controller/processor 375 may be configured to perform aspects in connection with the SN 103 and the SN power control component 105 and/or the MN 115 and the MN power control component 117 of FIG. 1 and/or as described elsewhere herein.
Referring to FIG. 4, an example of a dual connectivity architecture 400 in which features of the present disclosure may be utilized represents a Multi-Radio Dual Connectivity (MR-DC) scenario, including an NR-DC scenario.
MR-DC is a generalization of the Intra-E-UTRA Dual Connectivity (DC) , where a multiple receive/transmit (Rx/Tx) capable UEs may be configured to utilize resources provided by two different nodes, which may be connected via non-ideal backhaul, one providing NR access and the other one providing either E-UTRA or NR access. One node acts as the MN and the other as the SN. The MN and SN are connected via a network interface and at least the MN is connected to the core network. The MN and/or the SN can be operated with shared spectrum channel access. Further, all functions for a UE may be used for an IAB-MT unless otherwise stated. Similar as specified for UE, the IAB-MT can access the network using either one network node or using two different nodes with EN-DC and NR-DC architectures. In EN-DC, the backhauling traffic over the E-UTRA radio interface is not supported.
In particular, dual connectivity architecture 400 is an example of E-UTRA-NR Dual Connectivity (EN-DC) . E-UTRAN supports MR-DC via EN-DC, in which a UE is connected to one eNB that acts as a MN and one en-gNB that acts as a SN. The eNB is connected to the EPC via the S1 interface and to the en-gNB via the X2 interface. The en-gNB might also be connected to the EPC via the S1-U interface and other en-gNBs via the X2-U interface.
The present features may also be implemented in NG-RAN E-UTRA-NR Dual Connectivity (NGEN-DC) , in which a UE is connected to one ng-eNB that acts as a MN and one gNB that acts as a SN. Further, the present features may also be  implemented in NR-E-UTRA Dual Connectivity (NE-DC) , in which a UE is connected to one gNB that acts as a MN and one ng-eNB that acts as a SN.
Additionally, as generally discussed throughout this disclosure, the present features may also be implemented in NR-NR Dual Connectivity (NR-DC) , in which a UE is connected to one gNB that acts as a MN and another gNB that acts as a SN. In addition, NR-DC can also be used when a UE is connected to two gNB-DUs, one serving the MCG and the other serving the SCG, connected to the same gNB-CU, acting both as a MN and as a SN.
Referring to FIG. 5, in an NR DC dynamic power sharing scenario 500, the UE 104 splits the power between the master cell group (MCG) , including the MN 115, and the secondary cell group (SCG) , including the SN 103, based on respective uplink (UL) downlink control information (DCI) messages carried by respective component carriers (e.g., MCG CC and SCG CC) . In dynamic power sharing for an MCG UL transmission, the SCG transmission does not impact on MCG UL power control. For an SCG UL transmission, however, the maximum sum of power for the SCG = min {P SCG, P total–MCG Tx power} , wherein P SCG is a maximum transmit power of an SCG transmission, such as a PUSCH transmission indicated by a DCI, P total is a maximum total transmit power that the UE 104 may utilize, and MCG Tx power is a transmit power utilized by an MCG transmission, such as a PUSCH transmission indicated by a DCI. The MCG Tx power is calculated by the UE 104 based on the MCG DCIs received at the UE 104 until the time period T0 –Toffset, where T0 is a start time of the SCG transmission, e.g., a PUSCH, and Toffset is a backoff from T0. In other words, for example, a value of the Toffset corresponds to a cutoff time before an SN scheduled uplink transmission, e.g., PUSCH, configured by the SN for the UE 104 to receive an MN downlink control transmission, e.g., DCI, that grants resources for an MN scheduled uplink transmission, e.g., PUSCH, that overlaps with the SN scheduled uplink transmission in order for the UE 104 to calculate a maximum SN transmit power for the SN scheduled uplink transmission. After time T0–Toffset, the network, such as the MN 115, shall not schedule MCG UL overlapping with the SCG PUSCH starting at time T0.
Notably, inter-cell group (CG) sum power exchange, such as from MCG to SCG, is one way to perform dynamic power sharing. Also, for a SCG UL transmission, a maximum transmit power is not impacted after the deadline (T0–Toffset) , so there is no need to update the SCG maximum power during the middle of the SCG UL.  Further, in each CG, one or more UL carrier aggregation (CA) prioritization rules may be used.
Additionally, in some cases, the UE 104 reports the value of Toffset as a capability. The reported value may be one of: Value 1 –a maximum possible value amongst any minimum UE processing time across all the serving cells in the MCG and the SCG; and Value 2 –a maximum possible value amongst any minimum UE processing time, for
Figure PCTCN2020089248-appb-000001
which is a multiplexing processing time for channel state information (CSI) (or, in other words, the processing to multiplex channel state information (CSI) in PUSCH) , across all the serving cells in MCG and SCG. In an implementation, the Toffset should be a sufficient time gap to allow the UE 104 to complete the following procedures: decoding all the DCIs in the MCG until T0 –Toffset; identifying MCG UL transmissions that overlap with the SCG UL transmission starting at T0 and then obtaining the resultant MCG transmit power; determining the maximum available SCG UL transmit power starting at T0 as a min{P SCG, P total–MCG tx power} ; and, within the SCG, allocating transmit power to SCG UL (s) as per one or more UL-CA prioritization rules.
Regarding Toffset, in dynamic power sharing, the MN 115 needs to know Toffset of SCG used by the UE 104. Otherwise the MN 115 needs to assume the possible largest value of Toffset. For example, in one prior solution, the MN 115 decodes the SCG radio resource control (RRC) configuration in an inter-node message to obtain RRC parameters impacting various UE processing times (e.g., T proc, 2, T proc, CSI
Figure PCTCN2020089248-appb-000002
and/or
Figure PCTCN2020089248-appb-000003
as specified in 3GPP Technical Specification (TS) 38.213 and TS38.214) , to identify the Toffset used by the UE 104. Such decoding by the MN 115 is not always feasible, however, because according to some specifications, e.g., TS37.340, the MN 115 is not mandated to decode the UE SCG RRC configuration received by the SN 103. In case of an SCG RRC reconfiguration sent by the SN 103 via inter-node RRC message to the MN 115, the only action of the MN 115 may be to put this RRC message in a container and to forward it to the UE 104 via the MCG RRC reconfiguration. For example, the format of such an RRC message may be the following:
Figure PCTCN2020089248-appb-000004
Figure PCTCN2020089248-appb-000005
Other prior solutions for the MN 115 to obtain the Toffset value have introduced additional inter-gNB signaling in order to set a restriction on a maximum value of Toffset, which the UE 104 can accept or reply to with a request to increase or decrease the maximum value. Such a solution is problematic, however, in that it is difficult for the MN 115 to estimate and set the initial value of the maximum Toffset, which may then cause multiple rounds of coordination between the MN 115 and SN 103 in order to settle on an acceptable value for the Toffset. Also, in the case of performing an SN addition procedure, e.g., to configure the SN 103 in a DC relationship with the UE 104 and the MN 115, the SN 103 may have to reject the SN addition request if the MN 115 sets an unreasonable maximum value of the Toffset.
Referring to FIGS. 6 and 7, the present disclosure introduces two procedures to exchange Toffset in a more efficient way (i.e., avoiding multiple rounds of coordination between the MN 115 and the SN 103) . In a first procedure 600, referred to as Procedure 1 (see FIG. 6) , the MN 115 can query the Toffset of SCG or SN 103 via introducing an indication (e.g. query_Toffset) , such as a one bit indication, in a configuration message, such as a CG-ConfigInfo message. Upon reception of Toffset query from MN 115, the SN 103 responds with a value of the Toffset in a configuration message, such as a CG-Config message. In a second procedure 700, referred to as Procedure 2 (see FIG. 7) , which is a queryless procedure, upon an RRC reconfiguration in the SCG (as defined in more detail below) , the SN 103 includes its Toffset value in a configuration message, such as a CG-Config message, without need of the MN Toffset query. In other words, in the second procedure 700, the RRC reconfiguration in the SCG triggers the SN 103 to send the value of the Toffset.
It should be noted that Procedure 1 and procedure 2 can work at the same time. Procedure 1 is triggered at the MN 115 by an SN addition procedure or by reception of scg-CellGroupConfig (as a RRC container) via CG-Config message. In the latter case, receipt of the message implies an SCG RRC reconfiguration via a signaling radio bearer (SRB) , e.g., an SRB1 between the MN 115 and the SN 103. On the other hand, Procedure 2 is triggered at the SN 103 upon an SCG RRC reconfiguration sent to the UE 104 via an SRB, such as SRB3 between the SN 103  and the UE 104, and not involving the MN 115, which is why the SN 103 sends the Toffset information.
More specifically referring to FIG. 6, in the first procedure 600, the MN 115 can query Toffset of SCG via introducing one bit indication (e.g. query_Toffset) in CG-ConfigInfo message. The trigger condition of the Toffset query may have a number of alternatives. In a first alternative, up to MN 115 implementation (e.g. a timer) , where the MN 115 resets a timer after sending query indication. Then, upon expiry of the timer, the MN 115 sends the query to SN 103. In a second alternative, the trigger condition may be a specified condition, including upon an SN addition procedure or upon reception of scg-CellGroupConfig (as a RRC container) via CG-Config message. The latter case implies an RRC reconfiguration in the SCG via SRB1. In some implementations, the second alternative may further reduce unnecessary inter-node signaling exchange. In any case, upon reception of query from the MN 115, the SN 103 responds with its Toffset, such as in a CG-Config message. Then, the MN 115 may apply dynamic power sharing, as discussed above with respect to FIG. 5.
Further, more specifically referring to FIG. 7, in the second procedure 700, upon RRC reconfiguration in the SCG, the SN 103 includes its Toffset in a CG-Config message without need of an MN query. The “RRC reconfiguration in SCG” may have a number of alternative meanings. In a first alternative, the “RRC reconfiguration in SCG” may be an RRC reconfiguration of SCG via SRB3. In a second alternative, the “RRC reconfiguration in SCG” may be an RRC reconfiguration of SCG via either SRB1 or SRB3. In some implementations, the first alternative may be utilized in order to notify the MN 115, as the MN 115 is not aware the SCG RRC reconfiguration via SRB3 because, in the SRB3 case, the SN 103 does not send the scg-CellGroupConfig to the MN via CG-Config message. Then, the MN 115 may apply dynamic power sharing, as discussed above with respect to FIG. 5.
Referring to FIGS. 8 to 11, in operation, SN 103 in a dual connectivity architecture may perform a method 900 of wireless communication for dynamic power sharing, by such as via execution of SN power control component 105 by processor 805 and/or memory 810, which may include the TX processor 316, the RX processor 370, and the controller/processor 375 of FIG. 3.
At block 902, the method 900 includes determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. For example, in an aspect, SN 103, processor 805, memory 810, SN power control component 105, and/or determining component 820 may be configured to or may comprise means for determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission.
For example, the determining at block 902 may include the SN 103 determining reception of the Toffset query from the MN 115, such as via a configuration message carried by a wireless signal that is received and processed by the SN 103. Alternatively, the determining at block 902 may include the SN 103 determining an RRC reconfiguration as described above with regard to FIG. 7.
At block 904, the method 900 includes transmitting the Toffset value to the MN in response to determining the existence of the reporting condition. For example, in an aspect, SN 103, processor 805, memory 810, SN power control component 105, and/or transmitting component 825 may be configured to or may comprise means for transmitting the Toffset value to the MN in response to determining the existence of the reporting condition.
For example, the transmitting at block 904 may include sending a value of the Toffset in a configuration message that is wirelessly transmitted by the SN 103 to the MN 115.
In an alternative or additional optional aspect, at block 906, the method 900 may further include receiving the SN scheduled uplink transmission from the UE. For example, in an aspect, SN 103, processor 805, memory 810, SN power control  component 105, and/or receiving component 830 may be configured to or may comprise means for receiving the SN scheduled uplink transmission from the UE.
For example, the receiving at block 906 may include receiving a wireless transmission such as a PUSCH from the UE based on the dynamic power sharing principles discussed above with respect to FIG. 5.
In an additional or alternative optional aspect, referring to FIG. 10, at block 1002, the method 900 may further include receiving a Toffset query from the MN. For example, in an aspect, SN 103, processor 805, memory 810, SN power control component 105, and/or receiving component 830 may be configured to or may comprise means for receiving a Toffset query from the MN.
For example, the receiving at block 1002 may include receiving the Toffset query described above with respect to the first procedure 600 (FIG. 6) .
In this optional aspect of FIG. 10, at block 1004, the determining existence of the reporting condition for reporting the Toffset value at 902 comprises identifying receipt of the Toffset query. In other words, the SN 103 identifies that the configuration message includes the Toffset query.
In some implementations of the optional aspect of FIG. 10, at block 1006, the receiving of the Toffset query at 1002 is based on a Toffset query condition at the MN. For example, the Toffset query condition at the MN 115 is expiration of a timer having a duration within which a secondary cell group (SCG) reconfiguration message is not received. In other words, the MN 115 may periodically request a value of the Toffset, so that it has the latest value, in the absence of the Toffset query being triggered, or the Toffset value being reported, based on an RRC reconfiguration at the SCG.
In one implementation of this optional aspect of FIG. 10, the method 900 may further include receiving an SN addition request from the MN for a dual connectivity communication with the UE, wherein the Toffset query received at block 1002 is included in the secondary node (SN) addition request. In this case, the SN 103 may identify the Toffset query in the SN addition request, which the MN 115 added in order to obtain the Toffset value upon adding the SN to a dual connectivity communication with the UE 104.
In another implementation of this optional aspect of FIG. 10, the method 900 may further include transmitting, to the MN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group  (SCG) reconfiguration message for the UE, wherein receiving the Toffset query at block 1002 is in response to transmitting the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE to the MN. In this case, the SN 103 is transmitting the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE via an SRB1, e.g., an inter-node communication, which then triggers the MN 115 to send the Toffset query.
In another additional or alternative optional aspect, referring to FIG. 11, the method 900 may further include, at block 1102, reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration. In this case, at block 1104, the transmitting of the Toffset value at 904 is based on reconfiguring the UE with the SCG RRC configuration.
In one implementation of this optional aspect of FIG. 11, the reconfiguring of the UE with the SCG RRC configuration at block 1102 includes transmitting the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE, and, in this case, the transmitting of the Toffset value to the MN at block 904 then comprises transmitting a cell group configuration message including the Toffset value to the MN based on transmitting the SCG RRC configuration via the SRB directly to the UE. In other words, this case represents the scenario where the SN 103 send the configuration message via the SRB3 directly to the UE 104, and since this configuration message is not seen by the MN 115, the SN 103 recognizes that it can independently report the Toffset value to the MN 115.
In another implementation of this optional aspect of FIG. 11, the reconfiguring of the UE with the SCG RRC configuration at block 1102 includes transmitting a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) to the MN, and, in this case, the transmitting of the Toffset value to the MN at block 904 then includes adding the Toffset value to the cell group configuration message. This case again relates the an inter-node communication, e.g., via SRB1, where the SCG RRC configuration to the UE is in a container. In this situation, the SN 103 recognizes that it can independently report the Toffset value to the MN 115 in order to avoid further inter-node communication, e.g., the Toffset query and response, thereby saving network resources.
Referring to FIGS. 12 to 16, in operation, MN 115 in a dual connectivity architecture, may perform a method 1300 of wireless communication for managing power sharing, by such as via execution of MN power control component 117 by processor 1205 and/or memory 1210, which may include the TX processor 316, the RX processor 370, and the controller/processor 375 of FIG. 3.
At block 1302, the method 1300 includes receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission. For example, in an aspect, MN 115, processor 1205, memory 1210, MN power control component 1215, and/or receiving component 1220 may be configured to or may comprise means for receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission.
For example, the receiving at block 1302 may include receiving a wireless signal in a message from the SN 103 based on a reporting condition at the SN 103, such as receipt of a Toffset query or based on an SCG RRC configuration, as discussed herein.
At block 1304, the method 1300 includes performing dynamic power sharing with the SN. For example, in an aspect, MN 115, processor 1205, memory 1210, MN power control component 1215, and/or performing component 1225 may be configured to or may comprise means for performing dynamic power sharing with the SN. The performing at block 1304 may be based on the dynamic power sharing procedure described above with respect to FIG. 5.
For example, the performing at block 1304 may include performing dynamic power sharing by transmitting a grant for a subsequent MN scheduled uplink transmission on resources configured to avoid overlapping with the SN scheduled  uplink transmission, wherein the grant for the subsequent MN scheduled uplink transmission is transmitted in a time duration between a first time of the SN scheduled uplink transmission and a second time corresponding to the first time minus the Toffset value.
In an alternative or additional optional aspect, referring to FIG. 14, the method 1300 may further include, at block 1402, transmitting a Toffset query to the SN. For example, in an aspect, MN 115, processor 1205, memory 1210, MN power control component 1215, and/or transmitting component 1230 may be configured to or may comprise means for transmitting a Toffset query to the SN. The transmitting of block 1402 may relate to first procedure 600 (FIG. 6) . In an implementation, at block 1406, the transmitting of the Toffset query at block 1402 is based on a Toffset query condition at the MN. For example, the Toffset query condition at the MN may be expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received. Moreover, in some implementations, the method 1300 may include transmitting an SN addition request to the SN for a dual connectivity communication with the UE, wherein the Toffset query at block 1402 is included in the secondary node (SN) addition request. In this case, the MN 115 proactively adds the Toffset query to the SN addition request in order to avoid additional inter-node signaling, thereby saving network overhead.
In this optional aspect of FIG. 14, at block 1404, the receiving of the Toffset value at block 1302 is in response to the Toffset query.
In another alternative or additional optional aspect, referring to FIG. 15, the method 1300 may additionally include, at block 1502, receiving, from the SN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE, such as described in detail above. In this optional aspect of FIG. 15, at block 1504, the transmitting of the Toffset query at block 1402 is in response to receiving the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE.
In another alternative or additional optional aspect, referring to FIG. 16, the method 1300 may additionally include, at block 1602, a feature wherein the receiving the Toffset value at block 1302 is based on the SN reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration. For example, in one implementation as described above, receiving the Toffset value is  based on the SN reconfiguring the UE with the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE. In another implementation as described above, receiving the Toffset value includes receiving a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) with the SN, wherein the cell group configuration message includes the Toffset value.
It is understood that the specific order or hierarchy of blocks in the processes /flowcharts disclosed is an illustration of example approaches. Based upon design preferences, it is understood that the specific order or hierarchy of blocks in the processes /flowcharts may be rearranged. Further, some blocks may be combined or omitted. The accompanying method claims present elements of the various blocks in a sample order, and are not meant to be limited to the specific order or hierarchy presented.
The previous description is provided to enable any person skilled in the art to practice the various aspects described herein. Various modifications to these aspects will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other aspects. Thus, the claims are not intended to be limited to the aspects shown herein, but is to be accorded the full scope consistent with the language claims, wherein reference to an element in the singular is not intended to mean “one and only one” unless specifically so stated, but rather “one or more. ” The word “exemplary” is used herein to mean “serving as an example, instance, or illustration. ” Any aspect described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other aspects. Unless specifically stated otherwise, the term “some” refers to one or more. Combinations such as “at least one of A, B, or C, ” “one or more of A, B, or C, ” “at least one of A, B, and C, ” “one or more of A, B, and C, ” and “A, B, C, or any combination thereof” include any combination of A, B, and/or C, and may include multiples of A, multiples of B, or multiples of C. Specifically, combinations such as “at least one of A, B, or C, ” “one or more of A, B, or C, ” “at least one of A, B, and C, ” “one or more of A, B, and C, ” and “A, B, C, or any combination thereof” may be A only, B only, C only, A and B, A and C, B and C, or A and B and C, where any such combinations may contain one or more member or members of A, B, or C. All structural and functional equivalents to the elements of the various aspects described throughout this disclosure that are known or later come to be known to those of  ordinary skill in the art are expressly incorporated herein by reference and are intended to be encompassed by the claims. Moreover, nothing disclosed herein is intended to be dedicated to the public regardless of whether such disclosure is explicitly recited in the claims. The words “module, ” “mechanism, ” “element, ” “device, ” and the like may not be a substitute for the word “means. ” As such, no claim element is to be construed as a means plus function unless the element is expressly recited using the phrase “means for. ”

Claims (62)

  1. A method of wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising:
    determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    transmitting the Toffset value to the MN in response to determining the existence of the reporting condition.
  2. The method of claim 1, further comprising:
    receiving a Toffset query from the MN; and
    wherein determining existence of the reporting condition for reporting the Toffset value comprises identifying receipt of the Toffset query.
  3. The method of claim 2, wherein receiving the Toffset query is based on a Toffset query condition at the MN.
  4. The method of claim 3, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  5. The method of claim 2, further comprising:
    receiving an SN addition request from the MN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  6. The method of claim 2, further comprising:
    transmitting, to the MN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein receiving the Toffset query is in response to transmitting the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE to the MN.
  7. The method of claim 1, further comprising:
    reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration; and
    wherein transmitting the Toffset value comprises is based on reconfiguring the UE with the SCG RRC configuration.
  8. The method of claim 7, wherein reconfiguring the UE with the SCG RRC configuration includes transmitting the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE, wherein transmitting the Toffset value to the MN comprises transmitting a cell group configuration message including the Toffset value to the MN based on transmitting the SCG RRC configuration via the SRB directly to the UE.
  9. The method of claim 7, wherein reconfiguring the UE with the SCG RRC configuration includes transmitting a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) to the MN, wherein transmitting the Toffset value to the MN includes adding the Toffset value to the cell group configuration message.
  10. The method of claim 1, further comprising:
    receiving the SN scheduled uplink transmission from the UE.
  11. An apparatus for wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising:
    a memory; and
    a processor in communication with the memory configured to:
    determine existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    transmit the Toffset value to the MN in response to determine the existence of the reporting condition.
  12. The apparatus of claim 11, wherein the processor is further configured to:
    receive a Toffset query from the MN; and
    wherein to determine existence of the reporting condition for reporting the Toffset value comprises identifying receipt of the Toffset query.
  13. The apparatus of claim 12, wherein receiving the Toffset query is based on a Toffset query condition at the MN.
  14. The apparatus of claim 13, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  15. The apparatus of claim 12, wherein the processor is further configured to:
    receive an SN addition request from the MN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  16. The apparatus of claim 12, wherein the processor is further configured to:
    transmit, to the MN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein to receive the Toffset query is in response to transmit the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE to the MN.
  17. The apparatus of claim 11, wherein the processor is further configured to:
    reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration; and
    wherein to transmit the Toffset value comprises is based on reconfiguring the UE with the SCG RRC configuration.
  18. The apparatus of claim 17, wherein reconfiguring the UE with the SCG RRC configuration includes to transmit the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE, wherein to transmit the Toffset value to the MN comprises to transmit a cell group configuration message including the Toffset value to the MN based on to transmit the SCG RRC configuration via the SRB directly to the UE.
  19. The apparatus of claim 17, wherein reconfiguring the UE with the SCG RRC configuration includes to transmit a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) to the MN, wherein to transmit the Toffset value to the MN includes adding the Toffset value to the cell group configuration message.
  20. The apparatus of claim 11, wherein the processor is further configured to:
    receive the SN scheduled uplink transmission from the UE.
  21. An apparatus for wireless communication at a secondary node (SN) in a dual connectivity architecture, comprising:
    means for determining existence of a reporting condition for reporting a time offset (Toffset) value to a master node (MN) , wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    means for transmitting the Toffset value to the MN in response to determine the existence of the reporting condition.
  22. The apparatus of claim 21, further comprising:
    means for receiving a Toffset query from the MN; and
    wherein the means for determining existence of the reporting condition for reporting the Toffset value comprises identifying receipt of the Toffset query.
  23. The apparatus of claim 22, wherein the receiving the Toffset query is based on a Toffset query condition at the MN.
  24. The apparatus of claim 23, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  25. The apparatus of claim 22, further comprising:
    means for receiving an SN addition request from the MN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  26. The apparatus of claim 22, further comprising:
    means for transmitting, to the MN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein the means for receiving the Toffset query is in response to transmit the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE to the MN.
  27. The apparatus of claim 21, further comprising:
    reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration; and
    wherein the means for transmitting the Toffset value comprises is based on reconfiguring the UE with the SCG RRC configuration.
  28. The apparatus of claim 27, wherein reconfiguring the UE with the SCG RRC configuration includes transmitting the SCG RRC configuration via a signaling radio  bearer (SRB) between the SN and the UE, wherein the transmitting the Toffset value to the MN comprises transmitting a cell group configuration message including the Toffset value to the MN based on transmitting the SCG RRC configuration via the SRB directly to the UE.
  29. The apparatus of claim 27, wherein reconfiguring the UE with the SCG RRC configuration includes transmitting a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) to the MN, wherein the transmitting the Toffset value to the MN includes adding the Toffset value to the cell group configuration message.
  30. The apparatus of claim 21, further comprising:
    means for receiving the SN scheduled uplink transmission from the UE.
  31. A computer-readable medium comprising stored instructions for wireless communication at a secondary node (SN) in a dual connectivity architecture, executable by a processor to perform the method of any of claims 1 to 10.
  32. A method of wireless communication at a master node (MN) in a dual connectivity architecture, comprising:
    receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    performing dynamic power sharing with the SN.
  33. The method of claim 32, further comprising:
    transmitting a Toffset query to the SN; and
    wherein receiving the Toffset value is in response to the Toffset query.
  34. The method of claim 33, wherein transmitting the Toffset query is based on a Toffset query condition at the MN.
  35. The method of claim 34, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  36. The method of claim 33, further comprising:
    transmitting an SN addition request to the SN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  37. The method of claim 33, further comprising:
    receiving, from the SN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein transmitting the Toffset query is in response to receiving the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE.
  38. The method of claim 32, wherein receiving the Toffset value is based on the SN reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration.
  39. The method of claim 38, wherein receiving the Toffset value is based on the SN reconfiguring the UE with the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE.
  40. The method of claim 38, wherein receiving the Toffset value includes receiving a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) with the SN, wherein the cell group configuration message includes the Toffset value.
  41. The method of claim 32, wherein performing dynamic power sharing further comprises transmitting a grant for a subsequent MN scheduled uplink transmission on resources configured to avoid overlapping with the SN scheduled uplink transmission, wherein the grant for the subsequent MN scheduled uplink transmission is transmitted in a time duration between a first time of the SN scheduled uplink transmission and a second time corresponding to the first time minus the Toffset value.
  42. An apparatus for wireless communication at a master node (MN) in a dual connectivity architecture, comprising:
    a memory; and
    a processor in communication with the memory configured to:
    receive a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    perform dynamic power sharing with the SN.
  43. The apparatus of claim 42, wherein the processor is further configured to:
    transmit a Toffset query to the SN; and
    wherein to receive the Toffset value is in response to the Toffset query.
  44. The apparatus of claim 43, wherein transmitting the Toffset query is based on a Toffset query condition at the MN.
  45. The apparatus of claim 44, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  46. The apparatus of claim 43, wherein the processor is further configured to:
    transmit an SN addition request to the SN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  47. The apparatus of claim 43, wherein the processor is further configured to:
    receive, from the SN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein to transmit the Toffset query is in response to receive the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE.
  48. The apparatus of claim 42, wherein to receive the Toffset value is based on the SN reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration.
  49. The apparatus of claim 48, wherein to receive the Toffset value is based on the SN reconfiguring the UE with the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE.
  50. The apparatus of claim 48, wherein to receive the Toffset value includes to receive a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) with the SN, wherein the cell group configuration message includes the Toffset value.
  51. The apparatus of claim 42, wherein to perform dynamic power sharing the processor is further configured to transmit a grant for a subsequent MN scheduled uplink transmission on resources configured to avoid overlap with the SN scheduled uplink transmission, wherein the grant for the subsequent MN scheduled uplink transmission is transmitted in a time duration between a first time of the SN scheduled uplink transmission and a second time corresponding to the first time minus the Toffset value.
  52. An apparatus for wireless communication at a master node (MN) in a dual connectivity architecture, comprising:
    means for receiving a time offset (Toffset) value from a secondary node (SN) based on a reporting condition at the SN, wherein the Toffset value is a cutoff time  before an SN scheduled uplink transmission configured by the SN for a user equipment (UE) to receive an MN downlink control transmission that grants resources for an MN scheduled uplink transmission that overlaps with the SN scheduled uplink transmission in order to calculate a maximum SN transmit power for the SN scheduled uplink transmission; and
    means for performing dynamic power sharing with the SN.
  53. The apparatus of claim 52, further comprising:
    means for transmitting a Toffset query to the SN; and
    wherein the means for receiving the Toffset value is in response to the Toffset query.
  54. The apparatus of claim 53, wherein the transmitting the Toffset query is based on a Toffset query condition at the MN.
  55. The apparatus of claim 54, wherein the Toffset query condition at the MN is expiration of a timer having a duration within which a secondary cell group reconfiguration message is not received.
  56. The apparatus of claim 53, further comprising:
    means for transmitting an SN addition request to the SN for a dual connectivity communication with the UE, wherein the Toffset query is included in the SN addition request.
  57. The apparatus of claim 53, further comprising:
    means for receiving, from the SN, a cell group configuration message having a radio resource control (RRC) container including a secondary cell group (SCG) reconfiguration message for the UE; and
    wherein the means for transmitting the Toffset query is in response to receive the cell group configuration message having the RRC container including the SCG reconfiguration message for the UE.
  58. The apparatus of claim 52, wherein the receiving the Toffset value is based on the SN reconfiguring the UE with a secondary cell group (SCG) radio resource control (RRC) configuration.
  59. The apparatus of claim 58, wherein the receiving the Toffset value is based on the SN reconfiguring the UE with the SCG RRC configuration via a signaling radio bearer (SRB) between the SN and the UE.
  60. The apparatus of claim 58, wherein the receiving the Toffset value includes receiving a cell group configuration message having the SCG RRC configuration in an RRC container via a signaling radio bearer (SRB) with the SN, wherein the cell group configuration message includes the Toffset value.
  61. The apparatus of claim 52, wherein the performing dynamic power sharing is further configured to transmit a grant for a subsequent MN scheduled uplink transmission on resources configured to avoid overlap with the SN scheduled uplink transmission, wherein the grant for the subsequent MN scheduled uplink transmission is transmitted in a time duration between a first time of the SN scheduled uplink transmission and a second time corresponding to the first time minus the Toffset value.
  62. A computer-readable medium comprising stored instructions for wireless communication at a master node (MN) in a dual connectivity architecture, executable by a processor to perform the method of any of claims 32 to 41.
PCT/CN2020/089248 2020-05-08 2020-05-08 Inter-node signaling for nr-dc dynamic power sharing WO2021223233A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/089248 WO2021223233A1 (en) 2020-05-08 2020-05-08 Inter-node signaling for nr-dc dynamic power sharing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/089248 WO2021223233A1 (en) 2020-05-08 2020-05-08 Inter-node signaling for nr-dc dynamic power sharing

Publications (1)

Publication Number Publication Date
WO2021223233A1 true WO2021223233A1 (en) 2021-11-11

Family

ID=78468615

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/089248 WO2021223233A1 (en) 2020-05-08 2020-05-08 Inter-node signaling for nr-dc dynamic power sharing

Country Status (1)

Country Link
WO (1) WO2021223233A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023240493A1 (en) * 2022-06-15 2023-12-21 Zte Corporation Radio access network nodes with wireless communication and sensing for single connectivity

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018232245A1 (en) * 2017-06-15 2018-12-20 Convida Wireless, Llc Uplink transmit power control
CN111093275A (en) * 2019-11-08 2020-05-01 中兴通讯股份有限公司 Power determination method, device, equipment and storage medium

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018232245A1 (en) * 2017-06-15 2018-12-20 Convida Wireless, Llc Uplink transmit power control
CN111093275A (en) * 2019-11-08 2020-05-01 中兴通讯股份有限公司 Power determination method, device, equipment and storage medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
APPLE: "Feature lead summary on UL Power Control for NN-DC", 3GPP DRAFT; R1-2000846, vol. RAN WG1, 18 February 2020 (2020-02-18), pages 1 - 7, XP051853661 *
ERICSSON: "Discussion on Toffset for NR-DC power control", 3GPP DRAFT; R2-2003198, vol. RAN WG2, 9 April 2020 (2020-04-09), pages 1 - 22, XP051870279 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023240493A1 (en) * 2022-06-15 2023-12-21 Zte Corporation Radio access network nodes with wireless communication and sensing for single connectivity

Similar Documents

Publication Publication Date Title
US11324041B2 (en) Signaling of default and scheduled beam in cot
US20210250935A1 (en) Signaling-overhead reduction with resource grouping
US20200413476A1 (en) Ue assisted fast transition between rrc states
US11758547B2 (en) Default PDSCH beam selection
US10973044B1 (en) Default spatial relation for SRS/PUCCH
US20210337449A1 (en) Avoiding simultaneous conditional handover and conditional primary scg cell change
US20210045106A1 (en) Methods and apparatus to facilitate spatial relation indication for uplink control channel and sounding reference signals
US11576052B2 (en) Panel specific uplink transmission
US11330617B2 (en) Scheduling threshold report for multi-transmit/receive points
US11641301B2 (en) Methods and apparatus for TRP differentiation based on SSB grouping
US11800460B2 (en) Indication of potential NR UL transmission in NE-DC
WO2021143380A1 (en) Methods and apparatus for updating pucch spatial relation information
US11678223B2 (en) Transmission power control command accumulation for NR-dual connectivity
US20210112434A1 (en) Preconfigured gaps for measurements based on configured bwps
US11405809B2 (en) Radio link monitoring reference signals for UEs that do not support CSI-RS based radio link monitoring
WO2021223233A1 (en) Inter-node signaling for nr-dc dynamic power sharing
WO2022056799A1 (en) Fast slicing switching via scg suspension or activation
US20220209916A1 (en) Enhanced mac-ce and rrc ie for multi-carrier configurations
US11224060B2 (en) Gap transmission in channel occupancy time
US20220039006A1 (en) Dynamic cell functionality determination in l1/l2 based mobility
WO2021253267A1 (en) Method to handle out of local area data network service area
WO2021092918A1 (en) Span based pdcch scheduling and triggering

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20934753

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20934753

Country of ref document: EP

Kind code of ref document: A1