WO2021208871A1 - Integrally assembled building stairs - Google Patents

Integrally assembled building stairs Download PDF

Info

Publication number
WO2021208871A1
WO2021208871A1 PCT/CN2021/086737 CN2021086737W WO2021208871A1 WO 2021208871 A1 WO2021208871 A1 WO 2021208871A1 CN 2021086737 W CN2021086737 W CN 2021086737W WO 2021208871 A1 WO2021208871 A1 WO 2021208871A1
Authority
WO
WIPO (PCT)
Prior art keywords
plate
platform
plates
support
integrally assembled
Prior art date
Application number
PCT/CN2021/086737
Other languages
French (fr)
Chinese (zh)
Inventor
洪求耀
薛东辉
Original Assignee
昊恒(福建)建材科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 昊恒(福建)建材科技有限公司 filed Critical 昊恒(福建)建材科技有限公司
Publication of WO2021208871A1 publication Critical patent/WO2021208871A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • E04F11/035Stairways consisting of a plurality of assembled modular parts without further support
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/09Tread-and-riser units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/104Treads
    • E04F11/112Treads of metal or with an upper layer of metal

Definitions

  • the invention relates to the field of construction, and in particular to an integrated building staircase.
  • the stairs of the existing prefabricated buildings use the traditional prefabricated staircase model. Divided into three parts, namely rest board, stair beam, stair section, and then prefabricated components in the processing plant, assembling and welding the prefabricated components during construction, on the one hand, a component is divided into three parts to increase the workload of pouring and construction, and then Increasing the cost of production and construction.
  • the disassembled stair components are not standardized products. The mold must be adjusted separately according to the height of the floor and the size of the stairwell. It is still a customized product, and the cost is still high. No less.
  • the purpose of the present invention is to provide an integrally assembled building staircase, which realizes the fully assembled design of the house staircase structure, has good structural stability and is easy to disassemble and assemble, and can also avoid missing nuts and improve installation. efficient.
  • an integrally assembled building staircase including an upper platform, a lower platform, a rest platform located between the upper platform and the lower platform, and a number of stair components. One end is connected to the rest platform, and the other end of this staircase assembly is connected to the upper platform or the lower platform;
  • the stair assembly further includes two supporting plates and a plurality of step plates which are arranged facing each other. Connect settings;
  • a connecting plate is installed on the surfaces of the two supporting plates opposite to each other.
  • the connecting plate is installed at the upper end of the supporting plate.
  • the front end of the connecting plate has a first flange portion bent in a direction opposite to the supporting plate.
  • the first flanging part is vertically arranged with the support plate and fixedly connected with the upper platform or the rest platform;
  • a plurality of first mounting through holes are opened on the connecting plate, a first nut is mounted on the first mounting through hole, and the supporting plate is provided with a connecting through hole corresponding to the first mounting through hole, a first The bolt passes through the connection through hole on the support plate and is threadedly connected with the first nut provided on the connection plate;
  • the upper and lower ends of the two support plates respectively have a second flange portion bent on the side opposite to the step plate, and the outer side of the second flange portion located at the upper end of the support plate has a downward upper bending portion , The outer side of the second flange part located at the lower end of the support plate has an upward downward bending part;
  • a buffer strip is provided between two adjacent step plates, and a buffer sheet is provided between the two ends of the step plates and the two supporting plates;
  • a second support member is installed on the two support plates of the stair assembly connected to the lower platform at the lower end.
  • the second support member is installed on the surface of the lower end of the support plate opposite to the step plate.
  • a first mounting plate connected to the support plate and a second mounting plate connected to the lower platform.
  • the first mounting plate is provided with a plurality of through holes for connecting with the support plate, and the through holes are strip-shaped through holes or It is a gourd-shaped through hole formed by connecting a number of circular through holes;
  • the rest platform further includes a bottom support beam group and a top panel installed above the bottom support beam group.
  • a number of elongated U-shaped protrusions are provided on the lower surface of the top panel at intervals.
  • the U-shaped protrusions The opposite surfaces of the parts respectively have a long strip of recessed parts.
  • the step plate further includes a horizontal panel and a vertical panel. Among the two step plates arranged adjacently, the horizontal panel of one step plate is overlapped with the vertical panel of the other step plate.
  • both ends of the horizontal panel are respectively provided with a first bending portion, and the first bending portion is in surface contact with the supporting plate and is fixedly connected by a plurality of bolts.
  • both ends of the vertical panel are respectively provided with a second bending portion, and the second bending portion is in surface contact with the supporting plate and is fixedly connected by a plurality of bolts.
  • the buffer sheet is provided between the support plate and the first bending portion, and/or between the support plate and the second bending portion.
  • the buffer strip is fixedly installed on the horizontal panel of the step board by a number of screws.
  • the vertical panel of the step plate has a bending strip in the same direction as the horizontal panel, and the bending strip is in surface contact with the buffer strip.
  • the cross-sectional shape of the recessed portion is semicircular.
  • the connecting plate and the lower end respectively have a third flange part that is in the same direction as the second flange part.
  • each of the third flanging portions is in face-to-face contact with the inner surface of the corresponding second flanging portion.
  • the present invention has the following advantages compared with the prior art:
  • the integrally assembled building staircase of the present invention realizes the fully assembled design of the house staircase structure. It only needs to use simple accessories such as screws at the construction site to realize the assembly of the house staircase, avoiding welding and other methods at the construction site Assembling the steps, simplifies the assembly process, improves the assembly speed, and realizes the integrated and convenient installation of the house stairs; in addition, there are several first installation through holes on the connecting plate, and there is a first installation through hole on the first installation through hole.
  • a first nut, a connection through hole corresponding to the first installation through hole is opened on the support plate, a first bolt passes through the connection through hole on the support plate and is threadedly connected with the first nut provided on the connection plate,
  • the arrangement of nuts on the connecting plate enables face-to-face locking and fixation between the supporting plate and the connecting plate, without distortion and deformation of the connection, with good structural stability and easy disassembly and assembly, and it can also avoid missing nuts. , Improve installation efficiency.
  • the upper and lower ends of the two support plates respectively have a second flange part bent on the side opposite to the step plate, and the second flange located at the upper end of the support plate
  • the outer side of the side part has a downward upper bending part
  • the second flange part located at the lower end of the support plate has an upward downward bending part.
  • the flange part and the bending part of the support plate are arranged to improve the support plate
  • the mechanical properties further improve the stability of the structural connection between the various components of the stair assembly, and ensure the structural strength and stability of the stair assembly.
  • connection board Furthermore, in conjunction with the setting of the third flanging part of the connecting plate, the support plate and the connection are ensured
  • the stability of the connection between the boards, and the mechanical strength of the support board is enhanced by the connection board, which further ensures the stability of the overall structure of the building components.
  • a buffer strip is arranged between two adjacent step boards, and a buffer sheet is arranged between the two ends of the step board and the two supporting boards.
  • a second support member is installed on the two support plates of the stair assembly connected to the lower platform at the lower end, and the second support member is installed at the lower end of the support plate opposite to the step plate
  • the second support includes a first mounting plate connected to the support plate and a second mounting plate connected to the lower platform.
  • the first mounting plate is provided with a plurality of communication ports for connecting with the support plate.
  • the through hole is a bar-shaped through hole or a gourd-shaped through hole formed by connecting several circular through holes.
  • the arrangement of the second support member not only realizes the stable connection between the lower part of the staircase assembly and the lower platform, It also enhances the structural stability of the building components, and further, through the adjustable through-holes on the first support plate, it is convenient to install the second support member, and the use range of the second support member is enhanced to realize the Quick disassembly and assembly of stair components.
  • the rest platform of the integrally assembled building staircase of the present invention further includes a bottom support beam group and a top panel installed above the bottom support beam group.
  • a number of long U-shaped strips are spaced on the lower surface of the top panel.
  • the opposite surfaces of the U-shaped protrusions respectively have a long strip of depressions.
  • the U-shaped protrusions on the top panel are arranged at intervals to increase the structure of the top panel without increasing the thickness of the top panel.
  • Fig. 1 is a schematic diagram of the structure of an integrally assembled building staircase according to the present invention
  • Figure 2 is a schematic diagram of a partial structure of an integrated building staircase according to the present invention.
  • Figure 3 is a schematic diagram of the structure of the step board in the integrally assembled building stairs of the present invention.
  • Fig. 4 is a schematic diagram of a partial structure of an integrated building staircase according to the present invention.
  • Fig. 5 is a schematic diagram 1 of the partial structure of the staircase assembly in the integrally assembled building staircase of the present invention.
  • Fig. 6 is a schematic diagram 2 of a partial structural decomposition of the integrally assembled building staircase of the present invention.
  • Fig. 7 is a schematic diagram 2 of the partial structure of the staircase assembly in the integrally assembled building staircase of the present invention.
  • Fig. 8 is a schematic diagram 3 of the partial structure of the staircase assembly in the integrated building staircase of the present invention.
  • Fig. 9 is a schematic diagram of a partial structure of a rest platform in an integrally assembled building staircase of the present invention.
  • connection should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or a connection. Electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the internal communication between two components.
  • Embodiment 1 An integrally assembled building staircase, comprising an upper platform 1, a lower platform 2, a rest platform 3 located between the upper platform 1, the lower platform 2, and a number of staircase assemblies 4, one end of the staircase assembly 4 is connected to The rest platform 3 is connected, and the other end of this stair assembly 4 is connected to the upper platform 1 or the lower platform 2;
  • the stair assembly 4 further includes two face-to-face support plates 41 and a plurality of step plates 42.
  • the two ends of the step plates 42 are respectively connected to the inner surfaces of the two support plates 41, and the plurality of step plates 42 are Inclined and lapped downwards successively;
  • a connecting plate 43 is installed on the surfaces of the two supporting plates 41 opposite to each other.
  • the connecting plate 43 is installed on the upper end of the supporting plate 41.
  • a first flanging portion 44, the first flanging portion 44 is arranged perpendicular to the support plate 41 and is fixedly connected to the upper platform 1 or the rest platform 3;
  • the connecting plate 43 is provided with a plurality of first mounting through holes 431, a first nut 432 is mounted on the first mounting through hole 431, and the supporting plate 41 is provided with a connection corresponding to the first mounting through hole 431 Through hole, a first bolt 433 passes through the connection through hole on the support plate 41 and is threadedly connected with the first nut 432 provided on the connection plate 43;
  • the upper and lower ends of the two support plates 41 respectively have a second flange part 411 bent on the side opposite to the step plate 42, and the outer side of the second flange part 411 located at the upper end of the support plate 41 has a downward direction
  • the upper bending portion 412 of the support plate 41 has an upward lower bending portion 413 outside of the second flange portion 411 at the lower end of the support plate 41;
  • a buffer strip 45 is provided between two adjacent step plates 42, and a buffer sheet 46 is provided between two ends of the step plates 42 and the two supporting plates 41;
  • a second support 49 is installed on the two support plates 41 of the stair assembly 4 connected to the lower platform 2 at the lower end, and the second support 49 is mounted on the surface of the support plate 41 opposite to the step plate 42 at the lower end,
  • the second supporting member 49 includes a first mounting plate 491 connected to the supporting plate 41 and a second mounting plate 492 connected to the lower platform 2.
  • the first mounting plate 491 is provided with several mounting plates for connecting with the supporting plate 41.
  • the connected through hole 493, the through hole 493 is a bar-shaped through hole or a gourd-shaped through hole formed by connecting a plurality of circular through holes;
  • the rest platform 3 further includes a bottom support beam group 31 and a top panel 32 installed above the bottom support beam group 31.
  • a plurality of elongated U-shaped protrusions 321 are provided on the lower surface of the top panel 32 at intervals. The opposite surfaces of the U-shaped protrusion 321 respectively have a long depression 322.
  • the above-mentioned stepped plate 42 further includes a horizontal panel 421 and a vertical panel 422. Among the two adjacently arranged stepped plates 42, the horizontal panel 421 of one stepped plate 42 is overlapped with the vertical panel 422 of the other stepped plate 42;
  • Both ends of the horizontal panel 421 are respectively provided with a first bending portion 423, the first bending portion 423 is in surface contact with the supporting plate 41 and is fixedly connected by a plurality of bolts; both ends of the vertical panel 422 are respectively provided with a second A bending portion 424, the second bending portion 424 is in surface contact with the support plate 41 and is fixedly connected by a number of bolts;
  • the buffer sheet 46 is provided between the support plate 41 and the first bending portion 423, and between the support plate 41 and the second bending portion 424; the buffer strip 45 is fixedly installed on the horizontal panel of the step plate 42 by a number of screws 421; the vertical panel 422 of the step plate 42 has a bending strip in the same direction as the horizontal panel 421, and the bending strip is in surface contact with the buffer strip 45.
  • Embodiment 2 An integrally assembled building staircase, comprising an upper platform 1, a lower platform 2, a rest platform 3 located between the upper platform 1, the lower platform 2, and a number of stair components 4, one end of the stair component 4 and The rest platform 3 is connected, and the other end of this stair assembly 4 is connected to the upper platform 1 or the lower platform 2;
  • the stair assembly 4 further includes two supporting plates 41 and a plurality of step plates 42 arranged facing each other.
  • the two ends of the step plates 42 are respectively connected to the inner surfaces of the two supporting plates 41, and the plurality of step plates 42 are Inclined and lapped downwards successively;
  • a connecting plate 43 is installed on the surfaces of the two supporting plates 41 opposite to each other.
  • the connecting plate 43 is installed on the upper end of the supporting plate 41.
  • a first flanging portion 44, the first flanging portion 44 is arranged perpendicular to the support plate 41 and is fixedly connected to the upper platform 1 or the rest platform 3;
  • the connecting plate 43 is provided with a plurality of first mounting through holes 431, a first nut 432 is mounted on the first mounting through hole 431, and the supporting plate 41 is provided with a connection corresponding to the first mounting through hole 431 Through hole, a first bolt 433 passes through the connection through hole on the support plate 41 and is threadedly connected with the first nut 432 provided on the connection plate 43;
  • the upper and lower ends of the two support plates 41 respectively have a second flange part 411 bent on the side opposite to the step plate 42, and the outer side of the second flange part 411 located at the upper end of the support plate 41 has a downward direction
  • the upper bending portion 412 of the support plate 41 has an upward lower bending portion 413 outside of the second flange portion 411 at the lower end of the support plate 41;
  • a buffer strip 45 is provided between two adjacent step plates 42, and a buffer sheet 46 is provided between two ends of the step plates 42 and the two supporting plates 41;
  • a second support 49 is installed on the two support plates 41 of the stair assembly 4 connected to the lower platform 2 at the lower end, and the second support 49 is mounted on the surface of the support plate 41 opposite to the step plate 42 at the lower end,
  • the second supporting member 49 includes a first mounting plate 491 connected to the supporting plate 41 and a second mounting plate 492 connected to the lower platform 2.
  • the first mounting plate 491 is provided with several mounting plates for connecting with the supporting plate 41.
  • the connected through hole 493, the through hole 493 is a bar-shaped through hole or a gourd-shaped through hole formed by connecting a plurality of circular through holes;
  • the rest platform 3 further includes a bottom support beam group 31 and a top panel 32 installed above the bottom support beam group 31.
  • a plurality of elongated U-shaped protrusions 321 are provided on the lower surface of the top panel 32 at intervals. The opposite surfaces of the U-shaped protrusion 321 respectively have a long depression 322.
  • the cross-sectional shape of the concave portion 324 is semicircular; the upper and lower ends of the connecting plate 43 respectively have a third flange portion 434 that is in the same direction as the second flange portion 411; the outer portion of each third flange portion 434 The surface is in face-to-face contact with the inner surface of the respective second flanging portion 411; the lower ends of the two support plates 41 of the stair assembly 4 connected to the rest platform 3 are respectively installed with a support 47; The connected staircase assembly 4 is connected to the rest platform 3 through a connecting piece 48.
  • the arrangement of nuts on the connecting plate enables face-to-face locking and fixing between the supporting plate and the connecting plate, without distortion and deformation of the connection, and the structure is stable and easy to disassemble, and it can also avoid the loss of nuts. Wait for the situation to improve installation efficiency;
  • the mechanical performance of the supporting plate is improved, and the stability of the structural connection between the various parts of the stair assembly is improved, and the structural strength and stability of the stair assembly is ensured.
  • it in conjunction with the setting of the third flange part of the connecting plate, it not only ensures the stability of the connection between the supporting plate and the connecting plate, but also enhances the mechanical strength of the supporting plate through the connecting plate, and further ensures the stability of the overall structure of the building assembly sex;
  • the arrangement of buffer strips elastic support is provided between adjacent step plates, which can not only improve the stability of the connection between the step plates and the adjacent components, but also further reduce resonance and enhance the shock absorption effect of the staircase structure; Furthermore, the arrangement of the buffer sheet between the support plate and the step plate not only improves the stability of the connection between the support plate and the step plate, enhances the structural strength, but also further enhances the shock absorption capacity of the overall structure of the staircase;
  • the arrangement of the second support not only realizes the stable connection between the lower part of the stair assembly and the lower platform, but also enhances the structural stability of the building assembly.
  • the setting of the through holes can be adjusted through the first support plate, It not only facilitates the installation of the second support, but also enhances the use range of the second support, and realizes the rapid disassembly and assembly of the stair assembly;
  • the structural strength of the top panel is increased without increasing the thickness of the top panel, and the bonding strength between the top panel and the filler below it (such as concrete) is enhanced.
  • the arrangement of the recesses further enhances the structural strength of the top panel and at the same time further enhances its bonding strength with the filler, thereby enhancing the overall structural strength and stability of the staircase.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

Disclosed are integrally assembled building stairs, comprising an upper-layer platform, a lower-layer platform, and a rest platform and a plurality of stair assemblies, wherein the rest platform and the plurality of stair assemblies are located between the upper-layer platform and the lower-layer platform; one end of each stair assembly is connected to the rest platform, the other end of the stair assembly is connected to the upper-layer platform or the lower-layer platform; and the stair assembly further comprises two supporting plates arranged face to face and a plurality of step plates, with two ends of each step plate being connected to inner surfaces of two supporting plates, the plurality of step plates being obliquely and sequentially arranged in a downward lapping joint manner, a buffer strip being arranged between every two adjacent step plates, and a buffer sheet being arranged between two ends of each step plate and two supporting plates. The present invention achieves a full-assembly type design of a house stairs structure, is good in terms of structure stability, is easy to disassemble and assemble, and situations, such as a nut being lost, can further be prevented, thereby improving the efficiency of mounting.

Description

一体装配的建筑楼梯One-piece building staircase 技术领域Technical field
本发明涉及建筑领域,尤其涉及一体装配的建筑楼梯。The invention relates to the field of construction, and in particular to an integrated building staircase.
背景技术Background technique
近年来,随着人们生活水平的不断提高,人们对住宅等建筑行业的建筑速度、建筑造价、施工质量及节能环保等的要求也不断提高,也为了节约资源能源、减少施工污染、提升劳动生产效率和质量安全水平、发展绿色建筑以及先进建造方式,国家从2016年开始大力提倡推行现代装配式建筑体系。In recent years, with the continuous improvement of people’s living standards, people’s requirements for the construction speed, construction cost, construction quality, energy conservation and environmental protection of housing and other construction industries have also continued to increase, also in order to save resources and energy, reduce construction pollution, and improve labor production. In terms of efficiency, quality and safety, the development of green buildings and advanced construction methods, the state has vigorously promoted the implementation of modern prefabricated building systems since 2016.
由于我国在装配式建筑领域基础弱起步晚,在该领域还存在许多不足,例如,现有装配式建筑的楼梯采用的是传统的预制楼梯的模式,在工厂根据层高和楼梯间尺寸将楼梯分成三部分,即休息板、楼梯梁、楼梯段,然后分别在加工厂预制构件,施工时装配、焊接预制构件,这样,一方面一个构件分解成三部分增加了浇筑和施工的工作量,进而增加了制作和施工的成本,另一方面,所拆解的楼梯构件并非是标准化的产品,仍然要根据层高和楼梯间尺寸单独调整模具单独浇筑,仍然是定制化的产品,成本仍然居高不下。Due to the late start of China’s weak foundation in the field of prefabricated buildings, there are still many shortcomings in this field. For example, the stairs of the existing prefabricated buildings use the traditional prefabricated staircase model. Divided into three parts, namely rest board, stair beam, stair section, and then prefabricated components in the processing plant, assembling and welding the prefabricated components during construction, on the one hand, a component is divided into three parts to increase the workload of pouring and construction, and then Increasing the cost of production and construction. On the other hand, the disassembled stair components are not standardized products. The mold must be adjusted separately according to the height of the floor and the size of the stairwell. It is still a customized product, and the cost is still high. No less.
发明内容Summary of the invention
本发明的目的是提供一种一体装配的建筑楼梯,该一体装配的建筑楼梯实现了房屋楼梯结构的全装配式设计,结构稳定性好且易于拆装,还可以避免螺母缺失等情况,提高安装效率。The purpose of the present invention is to provide an integrally assembled building staircase, which realizes the fully assembled design of the house staircase structure, has good structural stability and is easy to disassemble and assemble, and can also avoid missing nuts and improve installation. efficient.
为达到上述目的,本发明采用的技术方案是:一种一体装配的建筑楼梯,包括上层平台、下层平台、位于上层平台、下层平台之间的休息平台和若干个楼梯组件,所述楼梯组件的一端与休息平台连接,此楼梯组件的另一端与上层平台或下层平台连接;In order to achieve the above objective, the technical solution adopted by the present invention is: an integrally assembled building staircase, including an upper platform, a lower platform, a rest platform located between the upper platform and the lower platform, and a number of stair components. One end is connected to the rest platform, and the other end of this staircase assembly is connected to the upper platform or the lower platform;
所述楼梯组件进一步包括两个面对面设置的支撑板和若干个台阶板,所述台阶板的两端分别与两个支撑板的内表面连接,若干个所述台阶板呈倾斜状依次向下搭接设置;The stair assembly further includes two supporting plates and a plurality of step plates which are arranged facing each other. Connect settings;
两个所述支撑板各自相背的表面上安装有一连接板,此连接板安装于支撑板的上端部,此连接板前端具有一向相背于支撑板的方向折弯的第一翻边部,此第一翻边部与支撑板垂直设置并与上层平台或休息平台固定连接;A connecting plate is installed on the surfaces of the two supporting plates opposite to each other. The connecting plate is installed at the upper end of the supporting plate. The front end of the connecting plate has a first flange portion bent in a direction opposite to the supporting plate. The first flanging part is vertically arranged with the support plate and fixedly connected with the upper platform or the rest platform;
所述连接板上开有若干个第一安装通孔,此第一安装通孔上安装有一第一螺母,所述支撑板上开有与第一安装通孔对应的连接通孔,一第一螺栓穿过支撑板上的连接通孔并与设置于连接板上的第一螺母螺纹连接;A plurality of first mounting through holes are opened on the connecting plate, a first nut is mounted on the first mounting through hole, and the supporting plate is provided with a connecting through hole corresponding to the first mounting through hole, a first The bolt passes through the connection through hole on the support plate and is threadedly connected with the first nut provided on the connection plate;
两个所述支撑板的上、下两端分别具有一向相背于台阶板一侧折弯的第二翻边部,位于支撑 板上端的第二翻边部外侧具有一向下的上折弯部,位于支撑板下端的第二翻边部外侧具有向上的下折弯部;The upper and lower ends of the two support plates respectively have a second flange portion bent on the side opposite to the step plate, and the outer side of the second flange portion located at the upper end of the support plate has a downward upper bending portion , The outer side of the second flange part located at the lower end of the support plate has an upward downward bending part;
相邻两个所述台阶板之间设置有一缓冲条,所述台阶板的两端与两个支撑板之间设置有一缓冲片;A buffer strip is provided between two adjacent step plates, and a buffer sheet is provided between the two ends of the step plates and the two supporting plates;
下端与所述下层平台连接的楼梯组件的两个支撑板上分别安装有一第二支撑件,此第二支撑件安装于支撑板下端相背于台阶板的表面上,所述第二支撑件包括与支撑板连接的第一安装板和与下层平台连接的第二安装板,所述第一安装板上开有若干个用于与支撑板连接的通孔,此通孔为条形通孔或者为有若干个圆形通孔贯通连接而成的葫芦形通孔;A second support member is installed on the two support plates of the stair assembly connected to the lower platform at the lower end. The second support member is installed on the surface of the lower end of the support plate opposite to the step plate. A first mounting plate connected to the support plate and a second mounting plate connected to the lower platform. The first mounting plate is provided with a plurality of through holes for connecting with the support plate, and the through holes are strip-shaped through holes or It is a gourd-shaped through hole formed by connecting a number of circular through holes;
所述休息平台进一步包括底支撑梁组和安装于底支撑梁组上方的顶面板,所述顶面板的下表面上间隔设置有若干个长条状的U型凸起部,此U型凸起部相对的表面上分别具有一长条状的凹陷部。The rest platform further includes a bottom support beam group and a top panel installed above the bottom support beam group. A number of elongated U-shaped protrusions are provided on the lower surface of the top panel at intervals. The U-shaped protrusions The opposite surfaces of the parts respectively have a long strip of recessed parts.
上述技术方案中进一步改进的方案如下:The further improved solutions among the above technical solutions are as follows:
1.上述方案中,所述台阶板进一步包括水平面板和竖直面板,在相邻设置的两个台阶板中,一个台阶板的水平面板与另一个台阶板的竖直面板搭接设置。1. In the above solution, the step plate further includes a horizontal panel and a vertical panel. Among the two step plates arranged adjacently, the horizontal panel of one step plate is overlapped with the vertical panel of the other step plate.
2.上述方案中,所述水平面板的两端分别具有一第一折弯部,此第一折弯部与支撑板面接触并通过若干螺栓固定连接。2. In the above solution, both ends of the horizontal panel are respectively provided with a first bending portion, and the first bending portion is in surface contact with the supporting plate and is fixedly connected by a plurality of bolts.
3.上述方案中,所述竖直面板的两端分别具有一第二折弯部,此第二折弯部与支撑板面接触并通过若干螺栓固定连接。3. In the above solution, both ends of the vertical panel are respectively provided with a second bending portion, and the second bending portion is in surface contact with the supporting plate and is fixedly connected by a plurality of bolts.
4.上述方案中,所述支撑板与第一折弯部之间,和/或所述支撑板与第二折弯部之间设置有所述缓冲片。4. In the above solution, the buffer sheet is provided between the support plate and the first bending portion, and/or between the support plate and the second bending portion.
5.上述方案中,所述缓冲条通过若干螺钉固定安装于台阶板的水平面板上。5. In the above solution, the buffer strip is fixedly installed on the horizontal panel of the step board by a number of screws.
6.上述方案中,所述台阶板的竖直面板上具有一与水平面板同向的折弯条,此折弯条与缓冲条面接触。6. In the above solution, the vertical panel of the step plate has a bending strip in the same direction as the horizontal panel, and the bending strip is in surface contact with the buffer strip.
7.上述方案中,所述凹陷部的截面形状为半圆形。7. In the above solution, the cross-sectional shape of the recessed portion is semicircular.
8.上述方案中,所述连接板上、下端分别具有一与第二翻边部同向的第三翻边部。8. In the above solution, the connecting plate and the lower end respectively have a third flange part that is in the same direction as the second flange part.
9.上述方案中,每个所述第三翻边部的外表面与各自对应的第二翻边部的内表面面对面接触。9. In the above solution, the outer surface of each of the third flanging portions is in face-to-face contact with the inner surface of the corresponding second flanging portion.
由于上述技术方案的运用,本发明与现有技术相比具有下列优点:Due to the application of the above technical solutions, the present invention has the following advantages compared with the prior art:
1、本发明一体装配的建筑楼梯,其实现了房屋楼梯结构的全装配式设计,只需要在施工现场使用螺丝等简单配件,即可实现对房屋楼梯的组装,避免在施工现场通过焊接等方式对踏步进行组装,简化了组装工艺,提高了装配的速度,实现了房屋楼梯的一体化便捷安装;另 外,连接板上开有若干个第一安装通孔,此第一安装通孔上安装有一第一螺母,所述支撑板上开有与第一安装通孔对应的连接通孔,一第一螺栓穿过支撑板上的连接通孔并与设置于连接板上的第一螺母螺纹连接,连接板上螺母的设置,使得支撑板与连接板之间实现了面对面的锁紧固定,不会发生连接处的扭曲变形等情况,结构稳定性好且易于拆装,还可以避免螺母缺失等情况,提高安装效率。1. The integrally assembled building staircase of the present invention realizes the fully assembled design of the house staircase structure. It only needs to use simple accessories such as screws at the construction site to realize the assembly of the house staircase, avoiding welding and other methods at the construction site Assembling the steps, simplifies the assembly process, improves the assembly speed, and realizes the integrated and convenient installation of the house stairs; in addition, there are several first installation through holes on the connecting plate, and there is a first installation through hole on the first installation through hole. A first nut, a connection through hole corresponding to the first installation through hole is opened on the support plate, a first bolt passes through the connection through hole on the support plate and is threadedly connected with the first nut provided on the connection plate, The arrangement of nuts on the connecting plate enables face-to-face locking and fixation between the supporting plate and the connecting plate, without distortion and deformation of the connection, with good structural stability and easy disassembly and assembly, and it can also avoid missing nuts. , Improve installation efficiency.
2、本发明一体装配的建筑楼梯,其两个所述支撑板的上、下两端分别具有一向相背于台阶板一侧折弯的第二翻边部,位于支撑板上端的第二翻边部外侧具有一向下的上折弯部,位于支撑板下端的第二翻边部外侧具有向上的下折弯部,通过支撑板上翻边部与折弯部的设置,提高了支撑板的力学性能,进而提高了楼梯组件各个部件之间结构连接的稳定性,保证楼梯组件的结构强度和稳定性,进一步的,配合连接板上第三翻边部的设置,既保证了支撑板与连接板之间连接的稳定性,又通过连接板增强了支撑板的力学强度,进一步保证楼体组件整体结构的稳定性。2. For the integrally assembled building stairs of the present invention, the upper and lower ends of the two support plates respectively have a second flange part bent on the side opposite to the step plate, and the second flange located at the upper end of the support plate The outer side of the side part has a downward upper bending part, and the second flange part located at the lower end of the support plate has an upward downward bending part. The flange part and the bending part of the support plate are arranged to improve the support plate The mechanical properties further improve the stability of the structural connection between the various components of the stair assembly, and ensure the structural strength and stability of the stair assembly. Furthermore, in conjunction with the setting of the third flanging part of the connecting plate, the support plate and the connection are ensured The stability of the connection between the boards, and the mechanical strength of the support board is enhanced by the connection board, which further ensures the stability of the overall structure of the building components.
3、本发明一体装配的建筑楼梯,其相邻两个所述台阶板之间设置有一缓冲条,所述台阶板的两端与两个支撑板之间设置有一缓冲片,通过缓冲条的设置,在相邻台阶板之间提供弹性支撑,既可以提高台阶板与相邻各个部件之间连接的稳定性,又可以进一步减少共振,增强楼梯结构的减震效果;更进一步的,支撑板与台阶板之间缓冲片的设置,既提高了支撑板与台阶板之间连接的稳定性、增强结构强度,又进一步增强了楼梯整体结构的减震能力。3. For the integrally assembled building staircase of the present invention, a buffer strip is arranged between two adjacent step boards, and a buffer sheet is arranged between the two ends of the step board and the two supporting boards. , Provide elastic support between adjacent step plates, which can not only improve the stability of the connection between the step plates and the adjacent components, but also further reduce resonance and enhance the damping effect of the stair structure; further, the support plate and The arrangement of the buffer sheet between the step plates not only improves the stability of the connection between the support plate and the step plate, strengthens the structural strength, but also further enhances the shock absorption capacity of the overall structure of the staircase.
4、本发明一体装配的建筑楼梯,其下端与所述下层平台连接的楼梯组件的两个支撑板上分别安装有一第二支撑件,此第二支撑件安装于支撑板下端相背于台阶板的表面上,所述第二支撑件包括与支撑板连接的第一安装板和与下层平台连接的第二安装板,所述第一安装板上开有若干个用于与支撑板连接的通孔,此通孔为条形通孔或者为有若干个圆形通孔贯通连接而成的葫芦形通孔,第二支撑件的设置,既实现了将楼梯组件下部与下层平台的稳定连接,又增强了楼体组件的结构稳定性,进一步的,通过第一支撑板上可调节通孔的设置,既便于对第二支撑件的安装,又增强了第二支撑件的使用范围,实现对楼梯组件的快速拆装。4. For the integrally assembled building staircase of the present invention, a second support member is installed on the two support plates of the stair assembly connected to the lower platform at the lower end, and the second support member is installed at the lower end of the support plate opposite to the step plate On the surface, the second support includes a first mounting plate connected to the support plate and a second mounting plate connected to the lower platform. The first mounting plate is provided with a plurality of communication ports for connecting with the support plate. The through hole is a bar-shaped through hole or a gourd-shaped through hole formed by connecting several circular through holes. The arrangement of the second support member not only realizes the stable connection between the lower part of the staircase assembly and the lower platform, It also enhances the structural stability of the building components, and further, through the adjustable through-holes on the first support plate, it is convenient to install the second support member, and the use range of the second support member is enhanced to realize the Quick disassembly and assembly of stair components.
5、本发明一体装配的建筑楼梯,其休息平台进一步包括底支撑梁组和安装于底支撑梁组上方的顶面板,所述顶面板的下表面上间隔设置有若干个长条状的U型凸起部,此U型凸起部相对的表面上分别具有一长条状的凹陷部,通过顶面板上U型凸起部的间隔设置,在不增加顶面板厚度的同时增加顶面板的结构强度,同时增强了顶面板与其下方填充物(如混凝土)之间的结合强度,而凹陷部的设置,则在进一步增强顶面板结构强度的同时进一步增强其与填充物的结合强度,从而增强了楼梯整体的结构强度和稳定性。5. The rest platform of the integrally assembled building staircase of the present invention further includes a bottom support beam group and a top panel installed above the bottom support beam group. A number of long U-shaped strips are spaced on the lower surface of the top panel. Protrusions. The opposite surfaces of the U-shaped protrusions respectively have a long strip of depressions. The U-shaped protrusions on the top panel are arranged at intervals to increase the structure of the top panel without increasing the thickness of the top panel. Strength, and at the same time enhance the bonding strength between the top panel and the filler (such as concrete) below, and the arrangement of the recesses will further enhance the structural strength of the top panel while further enhancing the bonding strength between the top panel and the filler, thereby enhancing The overall structural strength and stability of the stairs.
附图说明Description of the drawings
附图1为本发明一体装配的建筑楼梯的结构示意图;Fig. 1 is a schematic diagram of the structure of an integrally assembled building staircase according to the present invention;
附图2为本发明一体装配的建筑楼梯的局部结构示意图一;Figure 2 is a schematic diagram of a partial structure of an integrated building staircase according to the present invention;
附图3为本发明一体装配的建筑楼梯中台阶板的结构示意图;Figure 3 is a schematic diagram of the structure of the step board in the integrally assembled building stairs of the present invention;
附图4为本发明一体装配的建筑楼梯的局部结构示意图;Fig. 4 is a schematic diagram of a partial structure of an integrated building staircase according to the present invention;
附图5为本发明一体装配的建筑楼梯中楼梯组件的局部结构示意图一;Fig. 5 is a schematic diagram 1 of the partial structure of the staircase assembly in the integrally assembled building staircase of the present invention;
附图6为本发明一体装配的建筑楼梯的局部结构分解示意图二;Fig. 6 is a schematic diagram 2 of a partial structural decomposition of the integrally assembled building staircase of the present invention;
附图7为本发明一体装配的建筑楼梯中楼梯组件的局部结构示意图二;Fig. 7 is a schematic diagram 2 of the partial structure of the staircase assembly in the integrally assembled building staircase of the present invention;
附图8为本发明一体装配的建筑楼梯中楼梯组件的局部结构示意图三;Fig. 8 is a schematic diagram 3 of the partial structure of the staircase assembly in the integrated building staircase of the present invention;
附图9为本发明一体装配的建筑楼梯中休息平台的局部结构示意图。Fig. 9 is a schematic diagram of a partial structure of a rest platform in an integrally assembled building staircase of the present invention.
以上附图中:1、上层平台;2、下层平台;3、休息平台;31、底支撑梁组;32、顶面板;321、U型凸起部;322、凹陷部;4、楼梯组件;41、支撑板;411、第二翻边部;412、上折弯部;413、下折弯部;434、第三翻边部;42、台阶板;421、水平面板;422、竖直面板;423、第一折弯部;424、第二折弯部;43、连接板;431、第一安装通孔;432、第一螺母;433、第一螺栓;44、第一翻边部;45、缓冲条;46、缓冲片;47、支撑件;48、连接件;49、第二支撑件;491、第一安装板;492、第二安装板;493、通孔。In the above drawings: 1. Upper platform; 2. Lower platform; 3. Resting platform; 31, Bottom support beam group; 32, top panel; 321, U-shaped raised part; 322, recessed part; 4. Stair assembly; 41. Support plate; 411, second flange part; 412, upper bending part; 413, lower bending part; 434, third flange part; 42, step plate; 421, horizontal panel; 422, vertical panel 423, the first bending part; 424, the second bending part; 43, the connecting plate; 431, the first installation through hole; 432, the first nut; 433, the first bolt; 44, the first flange part; 45. Buffer strip; 46. Buffer sheet; 47. Support; 48. Connection; 49. Second support; 491. First mounting plate; 492. Second mounting plate; 493. Through hole.
具体实施方式Detailed ways
在本专利的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制;术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性;此外,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本专利的具体含义。In the description of this patent, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the pointed device or element must have a specific orientation or a specific orientation. Therefore, the construction and operation cannot be construed as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be construed as indicating or implying relative importance; in addition, unless otherwise Clearly stipulated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or a connection. Electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the internal communication between two components. For those of ordinary skill in the art, the specific meaning of the above-mentioned terms in this patent can be understood under specific circumstances.
实施例1:一种一体装配的建筑楼梯,包括上层平台1、下层平台2、位于上层平台1、下层平台2之间的休息平台3和若干个楼梯组件4,所述楼梯组件4的一端与休息平台3连接,此楼梯组件4的另一端与上层平台1或下层平台2连接;Embodiment 1: An integrally assembled building staircase, comprising an upper platform 1, a lower platform 2, a rest platform 3 located between the upper platform 1, the lower platform 2, and a number of staircase assemblies 4, one end of the staircase assembly 4 is connected to The rest platform 3 is connected, and the other end of this stair assembly 4 is connected to the upper platform 1 or the lower platform 2;
所述楼梯组件4进一步包括两个面对面设置的支撑板41和若干个台阶板42,所述台阶板42的两端分别与两个支撑板41的内表面连接,若干个所述台阶板42呈倾斜状依次向下搭接设置;The stair assembly 4 further includes two face-to-face support plates 41 and a plurality of step plates 42. The two ends of the step plates 42 are respectively connected to the inner surfaces of the two support plates 41, and the plurality of step plates 42 are Inclined and lapped downwards successively;
两个所述支撑板41各自相背的表面上安装有一连接板43,此连接板43安装于支撑板41的上端部,此连接板43前端具有一向相背于支撑板41的方向折弯的第一翻边部44,此第一翻边部44与支撑板41垂直设置并与上层平台1或休息平台3固定连接;A connecting plate 43 is installed on the surfaces of the two supporting plates 41 opposite to each other. The connecting plate 43 is installed on the upper end of the supporting plate 41. A first flanging portion 44, the first flanging portion 44 is arranged perpendicular to the support plate 41 and is fixedly connected to the upper platform 1 or the rest platform 3;
所述连接板43上开有若干个第一安装通孔431,此第一安装通孔431上安装有一第一螺母432,所述支撑板41上开有与第一安装通孔431对应的连接通孔,一第一螺栓433穿过支撑板41上的连接通孔并与设置于连接板43上的第一螺母432螺纹连接;The connecting plate 43 is provided with a plurality of first mounting through holes 431, a first nut 432 is mounted on the first mounting through hole 431, and the supporting plate 41 is provided with a connection corresponding to the first mounting through hole 431 Through hole, a first bolt 433 passes through the connection through hole on the support plate 41 and is threadedly connected with the first nut 432 provided on the connection plate 43;
两个所述支撑板41的上、下两端分别具有一向相背于台阶板42一侧折弯的第二翻边部411,位于支撑板41上端的第二翻边部411外侧具有一向下的上折弯部412,位于支撑板41下端的第二翻边部411外侧具有向上的下折弯部413;The upper and lower ends of the two support plates 41 respectively have a second flange part 411 bent on the side opposite to the step plate 42, and the outer side of the second flange part 411 located at the upper end of the support plate 41 has a downward direction The upper bending portion 412 of the support plate 41 has an upward lower bending portion 413 outside of the second flange portion 411 at the lower end of the support plate 41;
相邻两个所述台阶板42之间设置有一缓冲条45,所述台阶板42的两端与两个支撑板41之间设置有一缓冲片46;A buffer strip 45 is provided between two adjacent step plates 42, and a buffer sheet 46 is provided between two ends of the step plates 42 and the two supporting plates 41;
下端与所述下层平台2连接的楼梯组件4的两个支撑板41上分别安装有一第二支撑件49,此第二支撑件49安装于支撑板41下端相背于台阶板42的表面上,所述第二支撑件49包括与支撑板41连接的第一安装板491和与下层平台2连接的第二安装板492,所述第一安装板491上开有若干个用于与支撑板41连接的通孔493,此通孔493为条形通孔或者为有若干个圆形通孔贯通连接而成的葫芦形通孔;A second support 49 is installed on the two support plates 41 of the stair assembly 4 connected to the lower platform 2 at the lower end, and the second support 49 is mounted on the surface of the support plate 41 opposite to the step plate 42 at the lower end, The second supporting member 49 includes a first mounting plate 491 connected to the supporting plate 41 and a second mounting plate 492 connected to the lower platform 2. The first mounting plate 491 is provided with several mounting plates for connecting with the supporting plate 41. The connected through hole 493, the through hole 493 is a bar-shaped through hole or a gourd-shaped through hole formed by connecting a plurality of circular through holes;
所述休息平台3进一步包括底支撑梁组31和安装于底支撑梁组31上方的顶面板32,所述顶面板32的下表面上间隔设置有若干个长条状的U型凸起部321,此U型凸起部321相对的表面上分别具有一长条状的凹陷部322。The rest platform 3 further includes a bottom support beam group 31 and a top panel 32 installed above the bottom support beam group 31. A plurality of elongated U-shaped protrusions 321 are provided on the lower surface of the top panel 32 at intervals. The opposite surfaces of the U-shaped protrusion 321 respectively have a long depression 322.
上述台阶板42进一步包括水平面板421和竖直面板422,在相邻设置的两个台阶板42中,一个台阶板42的水平面板421与另一个台阶板42的竖直面板422搭接设置;The above-mentioned stepped plate 42 further includes a horizontal panel 421 and a vertical panel 422. Among the two adjacently arranged stepped plates 42, the horizontal panel 421 of one stepped plate 42 is overlapped with the vertical panel 422 of the other stepped plate 42;
上述水平面板421的两端分别具有一第一折弯部423,此第一折弯部423与支撑板41面接触并通过若干螺栓固定连接;上述竖直面板422的两端分别具有一第二折弯部424,此第二折弯部424与支撑板41面接触并通过若干螺栓固定连接;Both ends of the horizontal panel 421 are respectively provided with a first bending portion 423, the first bending portion 423 is in surface contact with the supporting plate 41 and is fixedly connected by a plurality of bolts; both ends of the vertical panel 422 are respectively provided with a second A bending portion 424, the second bending portion 424 is in surface contact with the support plate 41 and is fixedly connected by a number of bolts;
上述支撑板41与第一折弯部423之间,上述支撑板41与第二折弯部424之间设置有上述缓冲片46;上述缓冲条45通过若干螺钉固定安装于台阶板42的水平面板421上;上述台阶板42的竖直面板422上具有一与水平面板421同向的折弯条,此折弯条与缓冲条45面接触。The buffer sheet 46 is provided between the support plate 41 and the first bending portion 423, and between the support plate 41 and the second bending portion 424; the buffer strip 45 is fixedly installed on the horizontal panel of the step plate 42 by a number of screws 421; the vertical panel 422 of the step plate 42 has a bending strip in the same direction as the horizontal panel 421, and the bending strip is in surface contact with the buffer strip 45.
实施例2:一种一体装配的建筑楼梯,包括上层平台1、下层平台2、位于上层平台1、下层平台2之间的休息平台3和若干个楼梯组件4,所述楼梯组件4的一端与休息平台3连接,此楼梯组件4的另一端与上层平台1或下层平台2连接;Embodiment 2: An integrally assembled building staircase, comprising an upper platform 1, a lower platform 2, a rest platform 3 located between the upper platform 1, the lower platform 2, and a number of stair components 4, one end of the stair component 4 and The rest platform 3 is connected, and the other end of this stair assembly 4 is connected to the upper platform 1 or the lower platform 2;
所述楼梯组件4进一步包括两个面对面设置的支撑板41和若干个台阶板42,所述台阶板42 的两端分别与两个支撑板41的内表面连接,若干个所述台阶板42呈倾斜状依次向下搭接设置;The stair assembly 4 further includes two supporting plates 41 and a plurality of step plates 42 arranged facing each other. The two ends of the step plates 42 are respectively connected to the inner surfaces of the two supporting plates 41, and the plurality of step plates 42 are Inclined and lapped downwards successively;
两个所述支撑板41各自相背的表面上安装有一连接板43,此连接板43安装于支撑板41的上端部,此连接板43前端具有一向相背于支撑板41的方向折弯的第一翻边部44,此第一翻边部44与支撑板41垂直设置并与上层平台1或休息平台3固定连接;A connecting plate 43 is installed on the surfaces of the two supporting plates 41 opposite to each other. The connecting plate 43 is installed on the upper end of the supporting plate 41. A first flanging portion 44, the first flanging portion 44 is arranged perpendicular to the support plate 41 and is fixedly connected to the upper platform 1 or the rest platform 3;
所述连接板43上开有若干个第一安装通孔431,此第一安装通孔431上安装有一第一螺母432,所述支撑板41上开有与第一安装通孔431对应的连接通孔,一第一螺栓433穿过支撑板41上的连接通孔并与设置于连接板43上的第一螺母432螺纹连接;The connecting plate 43 is provided with a plurality of first mounting through holes 431, a first nut 432 is mounted on the first mounting through hole 431, and the supporting plate 41 is provided with a connection corresponding to the first mounting through hole 431 Through hole, a first bolt 433 passes through the connection through hole on the support plate 41 and is threadedly connected with the first nut 432 provided on the connection plate 43;
两个所述支撑板41的上、下两端分别具有一向相背于台阶板42一侧折弯的第二翻边部411,位于支撑板41上端的第二翻边部411外侧具有一向下的上折弯部412,位于支撑板41下端的第二翻边部411外侧具有向上的下折弯部413;The upper and lower ends of the two support plates 41 respectively have a second flange part 411 bent on the side opposite to the step plate 42, and the outer side of the second flange part 411 located at the upper end of the support plate 41 has a downward direction The upper bending portion 412 of the support plate 41 has an upward lower bending portion 413 outside of the second flange portion 411 at the lower end of the support plate 41;
相邻两个所述台阶板42之间设置有一缓冲条45,所述台阶板42的两端与两个支撑板41之间设置有一缓冲片46;A buffer strip 45 is provided between two adjacent step plates 42, and a buffer sheet 46 is provided between two ends of the step plates 42 and the two supporting plates 41;
下端与所述下层平台2连接的楼梯组件4的两个支撑板41上分别安装有一第二支撑件49,此第二支撑件49安装于支撑板41下端相背于台阶板42的表面上,所述第二支撑件49包括与支撑板41连接的第一安装板491和与下层平台2连接的第二安装板492,所述第一安装板491上开有若干个用于与支撑板41连接的通孔493,此通孔493为条形通孔或者为有若干个圆形通孔贯通连接而成的葫芦形通孔;A second support 49 is installed on the two support plates 41 of the stair assembly 4 connected to the lower platform 2 at the lower end, and the second support 49 is mounted on the surface of the support plate 41 opposite to the step plate 42 at the lower end, The second supporting member 49 includes a first mounting plate 491 connected to the supporting plate 41 and a second mounting plate 492 connected to the lower platform 2. The first mounting plate 491 is provided with several mounting plates for connecting with the supporting plate 41. The connected through hole 493, the through hole 493 is a bar-shaped through hole or a gourd-shaped through hole formed by connecting a plurality of circular through holes;
所述休息平台3进一步包括底支撑梁组31和安装于底支撑梁组31上方的顶面板32,所述顶面板32的下表面上间隔设置有若干个长条状的U型凸起部321,此U型凸起部321相对的表面上分别具有一长条状的凹陷部322。The rest platform 3 further includes a bottom support beam group 31 and a top panel 32 installed above the bottom support beam group 31. A plurality of elongated U-shaped protrusions 321 are provided on the lower surface of the top panel 32 at intervals. The opposite surfaces of the U-shaped protrusion 321 respectively have a long depression 322.
上述凹陷部324的截面形状为半圆形;上述连接板43上、下端分别具有一与第二翻边部411同向的第三翻边部434;每个上述第三翻边部434的外表面与各自对应的第二翻边部411的内表面面对面接触;下端与上述休息平台3连接的楼梯组件4的两个支撑板41的下端部分别安装有一支撑件47;下端与上述休息平台3连接的楼梯组件4通过一连接件48与休息平台3连接。The cross-sectional shape of the concave portion 324 is semicircular; the upper and lower ends of the connecting plate 43 respectively have a third flange portion 434 that is in the same direction as the second flange portion 411; the outer portion of each third flange portion 434 The surface is in face-to-face contact with the inner surface of the respective second flanging portion 411; the lower ends of the two support plates 41 of the stair assembly 4 connected to the rest platform 3 are respectively installed with a support 47; The connected staircase assembly 4 is connected to the rest platform 3 through a connecting piece 48.
采用上述一体装配的建筑楼梯时,其实现了房屋楼梯结构的全装配式设计,只需要在施工现场使用螺丝等简单配件,即可实现对房屋楼梯的组装,避免在施工现场通过焊接等方式对踏步进行组装,简化了组装工艺,提高了装配的速度,实现了房屋楼梯的一体化便捷安装;When the above-mentioned integrated building stairs are used, the fully assembled design of the house staircase structure is realized. Only simple accessories such as screws are needed at the construction site to realize the assembly of the house stairs, avoiding welding and other methods at the construction site. Step-by-step assembly simplifies the assembly process, improves the assembly speed, and realizes the integrated and convenient installation of the house stairs;
另外,连接板上螺母的设置,使得支撑板与连接板之间实现了面对面的锁紧固定,不会发生 连接处的扭曲变形等情况,结构稳定性好且易于拆装,还可以避免螺母缺失等情况,提高安装效率;In addition, the arrangement of nuts on the connecting plate enables face-to-face locking and fixing between the supporting plate and the connecting plate, without distortion and deformation of the connection, and the structure is stable and easy to disassemble, and it can also avoid the loss of nuts. Wait for the situation to improve installation efficiency;
另外,通过支撑板上翻边部与折弯部的设置,提高了支撑板的力学性能,进而提高了楼梯组件各个部件之间结构连接的稳定性,保证楼梯组件的结构强度和稳定性,进一步的,配合连接板上第三翻边部的设置,既保证了支撑板与连接板之间连接的稳定性,又通过连接板增强了支撑板的力学强度,进一步保证楼体组件整体结构的稳定性;In addition, through the setting of the flanging part and the bending part of the supporting plate, the mechanical performance of the supporting plate is improved, and the stability of the structural connection between the various parts of the stair assembly is improved, and the structural strength and stability of the stair assembly is ensured. Yes, in conjunction with the setting of the third flange part of the connecting plate, it not only ensures the stability of the connection between the supporting plate and the connecting plate, but also enhances the mechanical strength of the supporting plate through the connecting plate, and further ensures the stability of the overall structure of the building assembly sex;
另外,通过缓冲条的设置,在相邻台阶板之间提供弹性支撑,既可以提高台阶板与相邻各个部件之间连接的稳定性,又可以进一步减少共振,增强楼梯结构的减震效果;更进一步的,支撑板与台阶板之间缓冲片的设置,既提高了支撑板与台阶板之间连接的稳定性、增强结构强度,又进一步增强了楼梯整体结构的减震能力;In addition, through the arrangement of buffer strips, elastic support is provided between adjacent step plates, which can not only improve the stability of the connection between the step plates and the adjacent components, but also further reduce resonance and enhance the shock absorption effect of the staircase structure; Furthermore, the arrangement of the buffer sheet between the support plate and the step plate not only improves the stability of the connection between the support plate and the step plate, enhances the structural strength, but also further enhances the shock absorption capacity of the overall structure of the staircase;
另外,第二支撑件的设置,既实现了将楼梯组件下部与下层平台的稳定连接,又增强了楼体组件的结构稳定性,进一步的,通过第一支撑板上可调节通孔的设置,既便于对第二支撑件的安装,又增强了第二支撑件的使用范围,实现对楼梯组件的快速拆装;In addition, the arrangement of the second support not only realizes the stable connection between the lower part of the stair assembly and the lower platform, but also enhances the structural stability of the building assembly. Furthermore, the setting of the through holes can be adjusted through the first support plate, It not only facilitates the installation of the second support, but also enhances the use range of the second support, and realizes the rapid disassembly and assembly of the stair assembly;
另外,通过顶面板上U型凸起部的间隔设置,在不增加顶面板厚度的同时增加顶面板的结构强度,同时增强了顶面板与其下方填充物(如混凝土)之间的结合强度,而凹陷部的设置,则在进一步增强顶面板结构强度的同时进一步增强其与填充物的结合强度,从而增强了楼梯整体的结构强度和稳定性。In addition, through the spacing of U-shaped protrusions on the top panel, the structural strength of the top panel is increased without increasing the thickness of the top panel, and the bonding strength between the top panel and the filler below it (such as concrete) is enhanced. The arrangement of the recesses further enhances the structural strength of the top panel and at the same time further enhances its bonding strength with the filler, thereby enhancing the overall structural strength and stability of the staircase.
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。The above-mentioned embodiments are only to illustrate the technical concept and characteristics of the present invention, and their purpose is to enable those familiar with the art to understand the content of the present invention and implement them accordingly, and should not limit the protection scope of the present invention. All equivalent changes or modifications made according to the spirit of the present invention should be covered by the protection scope of the present invention.

Claims (10)

  1. 一种一体装配的建筑楼梯,其特征在于:包括上层平台(1)、下层平台(2)、位于上层平台(1)、下层平台(2)之间的休息平台(3)和若干个楼梯组件(4),所述楼梯组件(4)的一端与休息平台(3)连接,此楼梯组件(4)的另一端与上层平台(1)或下层平台(2)连接;An integrally assembled building staircase, which is characterized by: comprising an upper platform (1), a lower platform (2), a rest platform (3) located between the upper platform (1) and the lower platform (2), and a number of stair components (4) One end of the staircase assembly (4) is connected to the rest platform (3), and the other end of the staircase assembly (4) is connected to the upper platform (1) or the lower platform (2);
    所述楼梯组件(4)进一步包括两个面对面设置的支撑板(41)和若干个台阶板(42),所述台阶板(42)的两端分别与两个支撑板(41)的内表面连接,若干个所述台阶板(42)呈倾斜状依次向下搭接设置;The stair assembly (4) further includes two supporting plates (41) and a plurality of step plates (42) arranged face to face, and two ends of the step plates (42) are respectively connected to the inner surfaces of the two supporting plates (41). Connected, a plurality of the step plates (42) are arranged in an inclined shape and overlapped downward;
    两个所述支撑板(41)各自相背的表面上安装有一连接板(43),此连接板(43)安装于支撑板(41)的上端部,此连接板(43)前端具有一向相背于支撑板(41)的方向折弯的第一翻边部(44),此第一翻边部(44)与支撑板(41)垂直设置并与上层平台(1)或休息平台(3)固定连接;A connecting plate (43) is installed on the surfaces of the two supporting plates (41) opposite to each other. The connecting plate (43) is installed on the upper end of the supporting plate (41). The first flanging portion (44) bent in the direction of the support plate (41), the first flanging portion (44) is arranged perpendicular to the support plate (41) and is connected to the upper platform (1) or the rest platform (3). ) Fixed connection;
    所述连接板(43)上开有若干个第一安装通孔(431),此第一安装通孔(431)上安装有一第一螺母(432),所述支撑板(41)上开有与第一安装通孔(431)对应的连接通孔,一第一螺栓(433)穿过支撑板(41)上的连接通孔并与设置于连接板(43)上的第一螺母(432)螺纹连接;A plurality of first installation through holes (431) are opened on the connecting plate (43), a first nut (432) is installed on the first installation through hole (431), and a first nut (432) is installed on the support plate (41). In the connecting through hole corresponding to the first mounting through hole (431), a first bolt (433) passes through the connecting through hole on the support plate (41) and is connected to the first nut (432) provided on the connecting plate (43). ) Threaded connection;
    两个所述支撑板(41)的上、下两端分别具有一向相背于台阶板(42)一侧折弯的第二翻边部(411),位于支撑板(41)上端的第二翻边部(411)外侧具有一向下的上折弯部(412),位于支撑板(41)下端的第二翻边部(411)外侧具有向上的下折弯部(413);The upper and lower ends of the two support plates (41) respectively have a second flanging portion (411) bent on the side opposite to the step plate (42), and the second flange portion (411) is located at the upper end of the support plate (41). The outer side of the flanging portion (411) has a downward upper bending portion (412), and the outer side of the second flanging portion (411) at the lower end of the supporting plate (41) has an upward lower bending portion (413);
    相邻两个所述台阶板(42)之间设置有一缓冲条(45),所述台阶板(42)的两端与两个支撑板(41)之间设置有一缓冲片(46);A buffer strip (45) is provided between two adjacent step plates (42), and a buffer sheet (46) is provided between the two ends of the step plate (42) and the two supporting plates (41);
    下端与所述下层平台(2)连接的楼梯组件(4)的两个支撑板(41)上分别安装有一第二支撑件(49),此第二支撑件(49)安装于支撑板(41)下端相背于台阶板(42)的表面上,所述第二支撑件(49)包括与支撑板(41)连接的第一安装板(491)和与下层平台(2)连接的第二安装板(492),所述第一安装板(491)上开有若干个用于与支撑板(41)连接的通孔(493),此通孔(493)为条形通孔或者为有若干个圆形通孔贯通连接而成的葫芦形通孔;A second support member (49) is respectively installed on the two support plates (41) of the staircase assembly (4) connected to the lower platform (2) at the lower end, and the second support member (49) is mounted on the support plate (41). ) The lower end is opposite to the surface of the step plate (42), and the second support (49) includes a first mounting plate (491) connected to the supporting plate (41) and a second mounting plate (491) connected to the lower platform (2) The mounting plate (492), the first mounting plate (491) is provided with a plurality of through holes (493) for connecting with the supporting plate (41), and the through holes (493) are bar-shaped through holes or A gourd-shaped through hole formed by connecting several circular through holes;
    所述休息平台(3)进一步包括底支撑梁组(31)和安装于底支撑梁组(31)上方的顶面板(32),所述顶面板(32)的下表面上间隔设置有若干个长条状的U型凸起部(321),此U型凸起部(321)相对的表面上分别具有一长条状的凹陷部(322)。The rest platform (3) further includes a bottom support beam group (31) and a top panel (32) installed above the bottom support beam group (31), and a number of spaces are arranged on the lower surface of the top panel (32) A long U-shaped convex portion (321) is provided with a long concave portion (322) on the opposite surface of the U-shaped convex portion (321).
  2. 根据权利要求1所述的一体装配的建筑楼梯,其特征在于:所述台阶板(42)进一步包 括水平面板(421)和竖直面板(422),在相邻设置的两个台阶板(42)中,一个台阶板(42)的水平面板(421)与另一个台阶板(42)的竖直面板(422)搭接设置。The integrally assembled building staircase according to claim 1, characterized in that: the step board (42) further comprises a horizontal panel (421) and a vertical panel (422), and the two step boards (42) are arranged adjacent to each other. In ), the horizontal panel (421) of one step plate (42) is overlapped with the vertical panel (422) of the other step plate (42).
  3. 根据权利要求2所述的一体装配的建筑楼梯,其特征在于:所述水平面板(421)的两端分别具有一第一折弯部(423),此第一折弯部(423)与支撑板(41)面接触并通过若干螺栓固定连接。The integrally assembled building staircase according to claim 2, characterized in that: both ends of the horizontal panel (421) respectively have a first bending portion (423), and the first bending portion (423) and the support The plates (41) are in surface contact and are fixedly connected by a number of bolts.
  4. 根据权利要求2或3所述的一体装配的建筑楼梯,其特征在于:所述竖直面板(422)的两端分别具有一第二折弯部(424),此第二折弯部(424)与支撑板(41)面接触并通过若干螺栓固定连接。The integrally assembled building staircase according to claim 2 or 3, characterized in that: both ends of the vertical panel (422) respectively have a second bending portion (424), and the second bending portion (424) ) Is in surface contact with the support plate (41) and is fixedly connected by a number of bolts.
  5. 根据权利要求4所述的一体装配的建筑楼梯,其特征在于:所述支撑板(41)与第一折弯部(423)之间,和/或所述支撑板(41)与第二折弯部(424)之间设置有所述缓冲片(46)。The integrally assembled building staircase according to claim 4, characterized in that: between the support plate (41) and the first bending portion (423), and/or the support plate (41) and the second bending portion (423) The buffer sheet (46) is arranged between the bent portions (424).
  6. 根据权利要求2所述的一体装配的建筑楼梯,其特征在于:所述缓冲条(45)通过若干螺钉固定安装于台阶板(42)的水平面板(421)上。The integrally assembled building staircase according to claim 2, characterized in that the buffer strip (45) is fixedly installed on the horizontal panel (421) of the step plate (42) by a plurality of screws.
  7. 根据权利要求6所述的一体装配的建筑楼梯,其特征在于:所述台阶板(42)的竖直面板(422)上具有一与水平面板(421)同向的折弯条,此折弯条与缓冲条(45)面接触。The integrally assembled building staircase according to claim 6, characterized in that: the vertical panel (422) of the step board (42) has a bending strip in the same direction as the horizontal panel (421), and the bending The strip is in surface contact with the buffer strip (45).
  8. 根据权利要求1所述的一体装配的建筑楼梯,其特征在于:所述凹陷部(324)的截面形状为半圆形。The integrally assembled building staircase according to claim 1, wherein the cross-sectional shape of the recess (324) is semicircular.
  9. 根据权利要求1所述的一体装配的建筑楼梯,其特征在于:所述连接板(43)上、下端分别具有一与第二翻边部(411)同向的第三翻边部(434)。The integrally assembled building staircase according to claim 1, characterized in that: the upper and lower ends of the connecting plate (43) respectively have a third flanging part (434) which is in the same direction as the second flanging part (411) .
  10. 根据权利要求9所述的一体装配的建筑楼梯,其特征在于:每个所述第三翻边部(434)的外表面与各自对应的第二翻边部(411)的内表面面对面接触。The integrally assembled building staircase according to claim 9, characterized in that: the outer surface of each third flanging portion (434) is in face-to-face contact with the inner surface of the respective second flanging portion (411).
PCT/CN2021/086737 2020-04-17 2021-04-12 Integrally assembled building stairs WO2021208871A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010303224.5A CN111364706B (en) 2020-04-17 2020-04-17 Integrally assembled building stair
CN202010303224.5 2020-04-17

Publications (1)

Publication Number Publication Date
WO2021208871A1 true WO2021208871A1 (en) 2021-10-21

Family

ID=71205392

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/086737 WO2021208871A1 (en) 2020-04-17 2021-04-12 Integrally assembled building stairs

Country Status (2)

Country Link
CN (1) CN111364706B (en)
WO (1) WO2021208871A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116575662A (en) * 2023-07-13 2023-08-11 中国船舶集团国际工程有限公司 Bidirectional earthquake-resistant stair and box plate assembled steel structure building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364706B (en) * 2020-04-17 2021-06-15 漳州昊恒建材有限公司 Integrally assembled building stair

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3994113A (en) * 1976-01-06 1976-11-30 Souza Jr Thomas Stairs and railing system for multi-floored buildings and method of constructing same
CN202401777U (en) * 2011-11-21 2012-08-29 南京盛圆土木工程高科技有限公司 Anti-seismic stabilizing and reinforcing structure for building concrete stairs
CN204370727U (en) * 2014-12-01 2015-06-03 河南亚鹰钢结构幕墙工程有限公司 Precast stair unit and use the staristep of this stairway unit
CN209637140U (en) * 2019-02-02 2019-11-15 河南绿建建筑科技有限公司 Light shock-proof steel concrete modular stairway
CN110700502A (en) * 2019-10-10 2020-01-17 中国电建集团贵阳勘测设计研究院有限公司 Concrete antidetonation board-like stair
CN210032407U (en) * 2019-03-22 2020-02-07 中国建筑第八工程局有限公司 Assembled shock attenuation stair structure
CN111364706A (en) * 2020-04-17 2020-07-03 漳州昊恒建材有限公司 Integrally assembled building stair

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202416743U (en) * 2012-02-28 2012-09-05 山东同圆设计集团有限公司 Concrete stair with horizontal seam on stair board of stair
CN209025337U (en) * 2018-09-27 2019-06-25 安徽一品小院建筑科技有限公司 A kind of assembled architecture modularization staircase structure
CN209686741U (en) * 2018-12-19 2019-11-26 中建集成房屋有限公司 Connecting joint structure at the top of a kind of assembled staircase of bifurcated type half space and stair
CN110005150B (en) * 2019-04-28 2021-01-05 安徽军瑶新型材料有限公司 Multi-section translation type assembly building stair
CN110158879B (en) * 2019-05-19 2020-11-06 北京工业大学 Assembled vibration reduction stair with built-in bidirectional damping particles

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3994113A (en) * 1976-01-06 1976-11-30 Souza Jr Thomas Stairs and railing system for multi-floored buildings and method of constructing same
CN202401777U (en) * 2011-11-21 2012-08-29 南京盛圆土木工程高科技有限公司 Anti-seismic stabilizing and reinforcing structure for building concrete stairs
CN204370727U (en) * 2014-12-01 2015-06-03 河南亚鹰钢结构幕墙工程有限公司 Precast stair unit and use the staristep of this stairway unit
CN209637140U (en) * 2019-02-02 2019-11-15 河南绿建建筑科技有限公司 Light shock-proof steel concrete modular stairway
CN210032407U (en) * 2019-03-22 2020-02-07 中国建筑第八工程局有限公司 Assembled shock attenuation stair structure
CN110700502A (en) * 2019-10-10 2020-01-17 中国电建集团贵阳勘测设计研究院有限公司 Concrete antidetonation board-like stair
CN111364706A (en) * 2020-04-17 2020-07-03 漳州昊恒建材有限公司 Integrally assembled building stair

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116575662A (en) * 2023-07-13 2023-08-11 中国船舶集团国际工程有限公司 Bidirectional earthquake-resistant stair and box plate assembled steel structure building
CN116575662B (en) * 2023-07-13 2023-10-10 中国船舶集团国际工程有限公司 Bidirectional earthquake-resistant stair and box plate assembled steel structure building

Also Published As

Publication number Publication date
CN111364706B (en) 2021-06-15
CN111364706A (en) 2020-07-03

Similar Documents

Publication Publication Date Title
WO2021208871A1 (en) Integrally assembled building stairs
WO2021208870A1 (en) Modular stair structure for fabricated building
CN110805139A (en) Multi-layer steel structure building frame
CN212129730U (en) Stability assembled stair structure
CN212129732U (en) House stair assembly capable of being conveniently assembled
CN214833968U (en) PCF corner board of prefabricated building
CN212453392U (en) Stair unit of modular assembly type building
CN212129725U (en) Stair unit of prefabricated building
CN212129729U (en) Assembled stair module capable of damping
CN212129731U (en) Modular assembly type stair
CN212129723U (en) Assembled stair subassembly
CN212129726U (en) Assembled house is marked time
CN201280769Y (en) Module construction module having mould-carrying function
CN212129728U (en) Step structure for assembly type building
CN220848703U (en) Connecting assembly and supporting structure for aluminum-wood combined template
CN214574894U (en) Assembled building outer wall structure
CN221168290U (en) Building curtain wind-resistant structure
CN213448993U (en) Assembled wall unit
CN214461644U (en) Detachable split open type floor support plate
CN220666735U (en) Stair tread and assembled rotary stair
CN211571974U (en) Central node unit of modular prefabricated house frame
CN220978361U (en) Structure of high-stability assembled house
CN220686429U (en) Spring pin limiting device for aluminum plate curtain wall
CN220202992U (en) Assembled building connecting piece
CN213143605U (en) Combined steel beam structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21787893

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21787893

Country of ref document: EP

Kind code of ref document: A1