WO2021135479A1 - Prompt information processing method and apparatus, and storage medium - Google Patents

Prompt information processing method and apparatus, and storage medium Download PDF

Info

Publication number
WO2021135479A1
WO2021135479A1 PCT/CN2020/119207 CN2020119207W WO2021135479A1 WO 2021135479 A1 WO2021135479 A1 WO 2021135479A1 CN 2020119207 W CN2020119207 W CN 2020119207W WO 2021135479 A1 WO2021135479 A1 WO 2021135479A1
Authority
WO
WIPO (PCT)
Prior art keywords
time
prompt information
time axis
time point
information associated
Prior art date
Application number
PCT/CN2020/119207
Other languages
French (fr)
Chinese (zh)
Inventor
谢青
占恒
王继禹
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Publication of WO2021135479A1 publication Critical patent/WO2021135479A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • H04L41/064Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis involving time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • H04L41/065Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis involving logical or physical relationship, e.g. grouping and hierarchies

Definitions

  • This application relates to the field of Internet technology, and in particular to a method, device and storage medium for processing prompt information.
  • each node is connected through a communication medium such as optical fiber.
  • a communication medium such as optical fiber.
  • all objects related to the communication medium or the node in the network may report alarm information, thereby inducing a series of alarm information.
  • PRC probable root cause
  • the present application provides a prompt information processing method, device and storage medium, which can improve the root cause identification rate.
  • the technical solution is as follows:
  • a method for processing prompt information is provided.
  • a time axis is displayed, and a slider for responding to the movement operation is provided on the time axis.
  • display the number of prompt information associated with multiple time points in the time axis Based on the time axis, display the number of prompt information associated with multiple time points in the time axis, and display the time point associations in the time period from the start time point in the time axis to the time point indicated by the slider Prompt information.
  • the prompt information may be actively reported to the network management system by the object in the network. If an abnormal situation occurs in the network, objects related to the abnormal situation can report prompt information.
  • the prompt information may include at least one of alarm information, configuration change information, service failure information, and the like.
  • the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
  • the operation of displaying the number of prompt information associated with multiple time points in the time axis based on the time axis may be: displaying each of the multiple time points in the time axis on one or both sides of the time axis.
  • the number of prompt messages associated with each time point In this way, it is convenient for operation and maintenance personnel to quickly learn the number of prompt messages of the network at various points in time.
  • the prompt information includes different types of prompt information
  • the number of each type of prompt information is displayed respectively.
  • the prompt information includes alarm information, configuration change information, and business failure information
  • the number of alarm information, the number of configuration change information, and the number of business failure information are respectively displayed.
  • prompt information in the network can also be obtained, and the prompt information can be associated with the same time point in the time axis as the reporting time of the prompt information.
  • the prompt information in the network can be associated with a time point in the time axis.
  • the prompt information associated with a certain time point in the time axis is related to the abnormal situation that occurred at this time point. .
  • the business topology map can be constructed according to the business path in the business fault information associated with the time point indicated by the slider. Then display the business topology diagram. After that, if a query instruction is detected in the business topology diagram, the business data in the business fault information is displayed.
  • the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider.
  • the business topology map corresponding to the business fault information associated with the time point indicated by the slider will be displayed.
  • Operation and maintenance personnel can query business data by operating the business topology map. That is, the operation and maintenance personnel can carefully view the service failure information at the time point indicated by the slider by moving the slider on the time axis, and learn the service path and transmission level of the damaged service. In this way, even if the network situation changes, the operation and maintenance personnel can view the business situation before and after the business is damaged through time replay.
  • the suspected root cause probability and root cause recommendation source of the alarm information associated with the time point in the time period can also be displayed. Since the operation and maintenance personnel can view the context of the fault in the network through time playback, they can quickly infer the possible suspected root causes and roughly judge whether the suspected root causes recommended by the system are accurate enough.
  • the alarm source in the alarm information associated with the time point in the time period and the configuration change information associated with the time point in the time period can be used
  • the root cause indicator is displayed in the physical topology diagram, and the operation object in the configuration change information associated with the time point in the time period is displayed in the The operation indicator is displayed in the physical topology diagram.
  • the operation and maintenance personnel can quickly learn the suspected root cause recommended by the system and the object of the configuration change from the physical topology diagram, so that the operation and maintenance personnel can more easily understand the fault context, and then quickly find the suspected root cause.
  • the content of the prompt information associated with multiple time points in the time axis may also be displayed based on the time axis.
  • the operation and maintenance personnel can quickly view the content of the prompt information associated with multiple time points based on the time axis by operating the time axis, so that the operation and maintenance personnel can quickly understand the alarm information and configuration change information at each time point in the network And the basic content of business failure information.
  • an indication of prompt information associated with multiple time points in the time axis may also be displayed based on the time axis, and the indication of the prompt information is used to indicate that the corresponding time point has Associated prompt information.
  • a prompt information processing device in a second aspect, is provided, and the prompt information processing device has the function of realizing the behavior of the prompt information processing method in the first aspect.
  • the prompt information processing apparatus includes at least one module, and the at least one module is configured to implement the prompt information processing method provided in the first aspect.
  • a prompt information processing device in a third aspect, includes a processor and a memory, and the memory is used to store and support the prompt information processing device to perform the prompt information processing provided in the first aspect.
  • the processor is configured to execute a program stored in the memory.
  • the prompt information processing apparatus may further include a communication bus, and the communication bus is used to establish a connection between the processor and the memory.
  • a computer-readable storage medium stores instructions that, when run on a computer, cause the computer to execute the prompt information processing method described in the first aspect.
  • a computer program product containing instructions, which when running on a computer, causes the computer to execute the prompt information processing method described in the first aspect.
  • Operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
  • Fig. 1 is a schematic structural diagram of a computer device provided by an embodiment of the present application.
  • FIG. 2 is a flowchart of a method for processing prompt information provided by an embodiment of the present application
  • FIG. 3 is a schematic diagram of a management page provided by an embodiment of the present application.
  • FIG. 4 is a schematic diagram of another management page provided by an embodiment of the present application.
  • FIG. 5 is a schematic diagram of another management page provided by an embodiment of the present application.
  • Fig. 6 is a schematic structural diagram of a prompt information processing apparatus provided by an embodiment of the present application.
  • each node for example, it may be a core ring, an aggregation ring, an access ring, an access chain), the number of connected optical fibers, and the topological shape (ring/chain) may be different.
  • Each device has multiple ports, and multiple optical fibers can be connected to each other through ports to form a large network connected by the entire network. Every port, board, network element, and sub-interface in the network can detect signals and report alarms. And, the more the middle node is, the more the number of fibers connected, the more rings are involved. The more edge nodes have fewer fiber connections, and some edge nodes may not involve rings and are only connected by chains. However, the nodes in the network as a whole are connected to each other in a topology, forming a complex connected network.
  • the alarms reported by the nodes can generally refer to alarm events, abnormal events, configuration changes and/or business failures, and so on.
  • the number of alarms is also increasing exponentially, even reaching the order of millions per day.
  • the actual number of alarms caused by real failure points may be less than a thousand or even less than a hundred. It is very difficult for operation and maintenance personnel to identify the suspected root cause among the massive alarms.
  • MTTD Mean time to diagnose
  • the communication protocol is artificially modified, which causes a service interruption to report a loss of signal (LOS) alarm.
  • LOS loss of signal
  • the service configuration personnel inadvertently modified a service port mode, which caused the service to be interrupted and reported a LOS alarm.
  • the physical fiber was normally undamaged or loose. In this case, if the station is removed, the time for real fault repair will be prolonged, and the actual repair only requires the business configuration personnel to restore the business port configuration on the system.
  • Fig. 1 is a schematic structural diagram of a computer device provided by an embodiment of the present application.
  • the computer device includes at least one processor 101, a communication bus 102, a memory 103, and at least one communication interface 104.
  • the processor 101 may be a microprocessor (including a central processing unit (CPU), etc.), an application-specific integrated circuit (ASIC), or may be one or more for controlling the solution of the application Integrated circuit for program execution.
  • a microprocessor including a central processing unit (CPU), etc.
  • ASIC application-specific integrated circuit
  • the communication bus 102 may include a path for transferring information between the aforementioned components.
  • the memory 103 can be read-only memory (ROM), random access memory (RAM), electrically erasable programmable read-only memory (read-only memory, EEPROM), optical disk ( Including read-only discs (compact disc read-only memory, CD-ROM), compact discs, laser discs, digital versatile discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or can be used to carry or store The desired program code in the form of instructions or data structures and any other medium that can be accessed by the computer, but not limited to this.
  • the memory 103 may exist independently and is connected to the processor 101 through the communication bus 102.
  • the memory 103 may also be integrated with the processor 101.
  • the communication interface 104 uses any device such as a transceiver to communicate with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area network (WLAN), and so on.
  • RAN radio access network
  • WLAN wireless local area network
  • the processor 101 may include one or more CPUs, such as CPU0 and CPU1 as shown in FIG. 2.
  • the computer device may include multiple processors, such as the processor 101 and the processor 105 as shown in FIG. 2. Each of these processors can be a single-core processor or a multi-core processor.
  • the processor here may refer to one or more devices, circuits, and/or processing cores for processing data (such as computer program instructions).
  • the computer device may further include an output device 106 and an input device 107.
  • the output device 106 communicates with the processor 101 and can display information in a variety of ways.
  • the output device 106 may be a liquid crystal display (LCD), a light emitting diode (LED) display device, a cathode ray tube (CRT) display device, or a projector, etc.
  • the input device 107 communicates with the processor 101 and can receive user input in a variety of ways.
  • the input device 107 may be a mouse, a keyboard, a touch screen device, a sensor device, or the like.
  • the above-mentioned computer equipment may be a general-purpose computer equipment or a special-purpose computer equipment.
  • the computer device may be a desktop computer, a portable computer, a network server, a palmtop computer, a mobile phone, a tablet computer, a wireless terminal device, a communication device, or an embedded device.
  • the embodiment of the application does not limit the type of the computer device.
  • the memory 103 is used to store the program code 110 for executing the solution of the present application, and the processor 101 is used to execute the program code 110 stored in the memory 103.
  • the computer device can implement the prompt information processing method provided in the embodiment of FIG. 2 below through the processor 101 and the program code 110 in the memory 103.
  • Figure 2 is a flowchart of a method for processing prompt information provided by an embodiment of the present application.
  • the method is applied to a network management system.
  • the network management system is used to manage and maintain nodes in the network.
  • the computer equipment shown in 1 is realized. Referring to Figure 2, the method includes:
  • Step 201 Obtain prompt information in the network, and associate the prompt information with the same time point in the time axis as the reporting time of the prompt information.
  • the timeline can be displayed on the management page to represent a certain period of time, such as 15 minutes.
  • the time axis may include time points representing the minimum time interval, such as seconds.
  • the prompt information may be actively reported to the network management system by the object in the network. If an abnormal situation occurs in the network, objects related to the abnormal situation can report prompt information.
  • the prompt information may include at least one of alarm information, configuration change information, service failure information, and the like.
  • the prompt information in the network can be associated with a time point in the time axis.
  • the prompt information associated with a certain time point in the time axis is an abnormality that occurred at this time point. Information about the situation.
  • alarm information may include alarm name, alarm source, occurrence time (that is, reporting time), etc.
  • the alarm source may be the identification of the object reporting the alarm information (such as device name, internet protocol (IP) address, etc.).
  • the object when the configuration personnel changes the configuration of an object in the network (such as communication parameters, port parameters, service parameters, etc.), the object can report configuration change information.
  • the configuration change information may be an operation log or the like.
  • the configuration change information may include operation name, operation description, operation object, operation time (that is, report time), etc.
  • the operation object may be an identifier (such as device name, IP address, etc.) of the object that has the configuration change.
  • the object when an object in the network detects that its ongoing service has a failure (such as interruption, switching, degradation, freeze, etc.), the object can report service failure information.
  • the business failure information may include failure time (that is, reporting time), business path, and business data.
  • the service data may include service name, transmission level, and so on.
  • step 201 may include the following steps (1) to (3), and the execution order of step (1) to step (3) is not limited.
  • the embodiment of the present application may associate the alarm information in the network with the time point in the time axis, and at this time, the alarm information associated with a certain time point in the time axis is the alarm that occurred at this time point. Relevant information.
  • the embodiment of the present application may associate configuration change information in the network with a time point in the time axis, and at this time, the configuration change information associated with a certain time point in the time axis appears at this time point. Information about the configuration changes.
  • the embodiment of the present application may associate service failure information in the network with a time point in the time axis, and at this time, the service failure information associated with a certain time point in the time axis appears at this time point. Information about business failures.
  • the time axis can be displayed, and the associated prompt information can be displayed based on the time axis. Specifically, it may include the following steps 202 to 205.
  • Step 202 Display the time axis, and a slider for responding to the movement operation is provided on the time axis.
  • the time axis can be displayed on the management page, and the time axis can generally run through the page.
  • the time axis can extend from the left end to the right end of the management page.
  • Both ends of the timeline can be provided with a forward button and a back button, the time period currently displayed on the timeline can be adjusted through the forward button and the back button, and the time period can have a start time point and an end time point .
  • the forward button the time axis can be displayed at a time point after the current end time point
  • the back button the time axis can be displayed at a time point before the current start time point.
  • the slider is used to indicate a time point in the time axis
  • the time point indicated by the slider is a time point corresponding to the position of the slider in the time axis.
  • the slider may respond to a moving operation, and the moving operation may be triggered by an operation and maintenance personnel, that is, the operation and maintenance personnel may move the slider on the time axis.
  • the operation and maintenance personnel can drag the slider to move on the time axis, or the operation and maintenance personnel can directly click a time point in the time axis to quickly move the slider to the position corresponding to this time point.
  • Step 203 Display the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis.
  • the embodiment of the present application may display the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis. In this way, displaying the prompt information generated in the network in chronological order can facilitate the operation and maintenance personnel to understand the flow of network events as a whole.
  • the prompt information includes different types of prompt information
  • the number of each type of prompt information is displayed respectively.
  • the prompt information includes alarm information, configuration change information, and business failure information
  • the number of alarm information, the number of configuration change information, and the number of business failure information are respectively displayed.
  • step 203 may be: displaying the number of pieces of prompt information associated with each of the multiple time points in the time axis on one or both sides of the time axis.
  • the management page may also include first areas located on both sides of the time axis.
  • the first area can be divided into a first sub-area and a second sub-area.
  • the first sub-region is located on one side of the time axis, and the second sub-region is located on the other side of the time axis.
  • the number of prompt information associated with this time point can be displayed in the first sub-region or the second sub-region At the location corresponding to this point in time. In this way, it is convenient for the operation and maintenance personnel to quickly learn the number of prompt messages of the network at this point in time.
  • the prompt information includes alarm information and configuration change information.
  • the number of alarm information associated with this time point can be displayed in the first sub-area corresponding to this time point Location; if there is associated configuration change information at this time point, the number of configuration change information associated at this time point can be displayed in the second sub-region at the position corresponding to this time point. In this way, it is convenient for operation and maintenance personnel to quickly learn the number of alarms and configuration changes of the network at this point in time.
  • the first operation instruction may be a display enlargement instruction, which is used to instruct to enlarge the display scale of the time axis on the management page. The duration of the time period represented by the time axis will decrease.
  • the first operation instruction may also be other instructions, such as a single-click operation or a double-click operation on the time axis.
  • the first operation instruction for the time axis is received, and multiple information in the time axis are displayed based on the time axis.
  • the content of each prompt message associated at the time point For example, you can change the number of prompt information associated with multiple time points in the displayed time axis to the content of the prompt information associated with multiple time points in the time axis; or, based on the time axis, display the prompt information in the time axis synchronously.
  • the number of reminders associated with multiple time points and the content of each reminder are displayed on the management page.
  • the prompt information includes warning information.
  • the time axis is displayed normally on the management page, the number of alarm information associated with multiple time points in the time axis is displayed on the management page based on the time axis; when the time axis is displayed on the management page enlarged, the management page Based on the time axis, the alarm names of the alarm information associated with multiple time points in the time axis are displayed.
  • the operation and maintenance personnel can quickly view the content of the prompt information associated with multiple time points based on the time axis, so that the operation and maintenance personnel can quickly understand each time in the network
  • the basic content of the alarm information, configuration change information and business failure information of the point can quickly understand each time in the network.
  • the second operation instruction may be a display reduction instruction, which is used to instruct to reduce the display scale of the time axis on the management page. The duration of the time period represented by the time axis will increase.
  • the second operation instruction may also be other instructions, such as a single-click operation or a double-click operation on the time axis. The second operation instruction is different from the first operation instruction.
  • a second operation instruction for the time axis is received, and multiple items in the time axis are displayed based on the time axis.
  • the indication of the prompt information associated with the time point can use different instructions, for example, different colors and/or different patterns can be used, and so on.
  • Step 204 Display the prompt information associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider.
  • the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider.
  • the prompt information associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider will be displayed. That is, the operation and maintenance personnel can carefully view the prompt information of the network at various points in time by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time replay, and then understand the context of the failure scenario, and quickly infer more reliable suspected root causes, thereby improving the root cause recognition rate and thus MTTD.
  • the operation and maintenance personnel can infer the suspected root cause on various basis.
  • the alarm reported by the object at the bottom of the network model (such as the physical layer) is more likely to be the root cause, reported by the object upstream of the signal flow link.
  • the alarm is more likely to be the root cause, and the alarm reported by the object at the intersection of the signal flow link is more likely to be the root cause, the earlier the alarm is reported, the more likely it is the root cause, the higher the alarm level, the more likely the alarm It is the root cause and so on.
  • the prompt information includes alarm information, configuration change information, and business failure information.
  • the operation and maintenance personnel can be guided to visually and quickly understand the fault context. It is clear at a glance what configuration has been changed, what alarms have been generated, and what services have been affected at a glance, which helps operation and maintenance personnel to quickly find the suspected root cause.
  • the operation and maintenance personnel may also infer where the failure point is and which alarms are derived from the failure point. For example, an alarm may be caused by a configuration change.
  • the management page may also include a second area. For any time point in the time period from the start time point in the time axis to the time point indicated by the slider, if this time point has associated prompt information, you can associate this time point with the prompt information Shown in the second area.
  • the different types of prompt information can be displayed in different lists.
  • the prompt information includes alarm information, configuration change information, and business failure information
  • the alarm information can be displayed in the alarm list
  • the configuration change information can be displayed in the configuration change list
  • the business failure information can be displayed in the business failure list.
  • the viewing time of the prompt information and the number of currently displayed prompt information can also be displayed.
  • the viewing time of the alarm information and the number of alarm information included in the alarm list can be displayed in the alarm list
  • the viewing time of the configuration change information and the configuration change information included in the configuration change list can be displayed in the configuration change list. The number of articles.
  • the prompt information may include alarm information and configuration change information.
  • the second area can be divided into a third subarea and a fourth subarea.
  • the third subarea is used to display the alarm list
  • the fourth subarea is used to display the configuration change list.
  • the display mode when the prompt information includes alarm information and configuration change information is described below.
  • all the alarm information and the corresponding clearing time associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider can be displayed, or only the time point can be displayed.
  • the suspected root cause probability and the root cause recommendation source of the alarm information associated at the time point in the time period can also be displayed.
  • the suspected root cause probability and the recommended source of the root cause can be displayed in the alarm list.
  • the suspected root cause probability may be determined by the network management system.
  • the network management system can determine the suspected root cause probability of alarm information in various ways, such as expert rules, fault propagation diagrams, neural networks, and artificial labeling to determine the suspected root cause probability of alarm information.
  • the recommended source of root cause refers to the way to determine the probability of suspected root cause. For example, if the network management system determines the suspected root cause probability of alarm information through expert rules, the recommended source of the root cause of the alarm information is expert rules.
  • the operation and maintenance personnel can view the context of the network failure by time playback, they can quickly infer the possible suspected root causes and roughly judge the suspected suspects recommended by the system. Whether the root cause is accurate enough.
  • a physical topology diagram may be constructed according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period, and the physical topology diagram may be displayed. According to the suspected root cause probability of the alarm information associated with the time point in the time period, the root cause indicator is displayed in the physical topology diagram. According to the operation object in the configuration change information associated with the time point in the time period, the operation indicator is displayed in the physical topology diagram.
  • the physical topology diagram can reflect the connection relationship between the alarm source and the operation object.
  • both the alarm source and the operation object can be regarded as nodes in the physical topology map, and then the edges between the nodes in the physical topology map are constructed according to the physical connection relationship between the alarm source and the operation object, and the physical topology is obtained.
  • the management page may also include a third area in addition to the area displaying the time axis, the first area, and the second area.
  • the physical topology map can be displayed in the third area.
  • the suspected root cause probability of the alarm information associated with the time point in the time period when the root cause indicator is displayed in the physical topology diagram, it can be used for any time point in the time period.
  • the suspected root cause probability of the associated alarm information is greater than the preset probability, that is, if the suspected root cause probability of the alarm information is large, it can be displayed at the node corresponding to the alarm source in the alarm information in the physical topology map Root cause indicator. In this way, the operation and maintenance personnel can quickly learn the suspected root cause recommended by the system from the physical topology diagram.
  • the operation indicator when the operation indicator is displayed in the physical topology diagram, the operation indicator can be displayed in the physical topology diagram at any point in the time period.
  • the operation indicator is displayed at the node corresponding to the operation object. In this way, the operation and maintenance personnel can quickly learn the object of the configuration change from the physical topology diagram.
  • a physical topology diagram can be constructed according to the alarm source in the alarm information associated with the time point and the operation object in the configuration change information, and the root cause indicator and operation can be displayed in the physical topology diagram. indicator. In this way, it is clear at a glance where and when the alarm and configuration change occurred, so that technicians can quickly find the suspected root cause.
  • Step 205 Construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider, and display the business topology map.
  • the business topology map can reflect business path nodes and business routes.
  • the identifiers such as names, IP addresses, etc.
  • the edges between the nodes in the business topology map are constructed according to the business route to obtain the business topology Figure.
  • the service name can also be marked in the service topology diagram.
  • the management page may also include a fourth area.
  • the business topology map can be displayed in the fourth area.
  • Step 206 If a query instruction is detected in the service topology diagram, display the service data in the service fault information.
  • the query instruction can be triggered by operation and maintenance personnel, and the query instruction is used to instruct to display business data.
  • the operation and maintenance personnel can right-click in the business topology diagram to trigger the option box, and select the view details option in the option box to trigger the query command.
  • the management page it is possible to jump from the management page to another page to display the business data in the business fault information.
  • the business data in the business fault information can also be superimposed and displayed on the management page. Not limited.
  • the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider.
  • the business topology map corresponding to the business fault information associated with the time point indicated by the slider will be displayed.
  • Operation and maintenance personnel can query business data by operating the business topology map. That is, the operation and maintenance personnel can carefully view the service failure information at the time point indicated by the slider by moving the slider on the time axis, so as to learn the service path and transmission level of the damaged service. In this way, even if the network situation changes, the operation and maintenance personnel can view the business situation before and after the business is damaged through time replay.
  • the network management system receives prompt information reported by objects in the network in real time. Due to the huge amount of prompt information, the network management system usually aggregates the received prompt information to divide the prompt information into multiple prompt information groups, and each prompt information group belongs to the same network monitoring area. Then, according to the prompt information processing method provided in the embodiment of the present application, a time axis can be displayed according to the alarm information, configuration change information, and service failure information included in a certain prompt information group. Operation and maintenance personnel can view the fault context by moving the slider on the timeline, thereby determining whether there is a network configuration change in the early stage, whether there is a physical hardware failure, whether there is a business failure, etc.
  • the operation and maintenance personnel can quickly infer the possible suspected root causes based on the information of the aforementioned several dimensions, and roughly judge whether the suspected root causes recommended by the system are accurate enough. In this way, it can speed up the understanding of the fault by the operation and maintenance personnel, and then improve the efficiency of troubleshooting.
  • FIG. 3 For ease of understanding, the embodiments of the present application are illustrated below with reference to FIG. 3, FIG. 4, and FIG. 5.
  • Fig. 3 is a schematic diagram of a management page provided by an embodiment of the present application.
  • the management page includes a time axis, and a slider is provided on the time axis.
  • the number of pieces of alarm information and the number of pieces of configuration change information associated with multiple time points in the time axis are displayed below the time axis. Based on this, the operation and maintenance personnel can see that someone changed the configuration at 15:04:21, and then 4 alarms were generated. After 15:06:21, several configuration changes and alarms were generated.
  • the operation and maintenance personnel drag the slider to 15:05:01.
  • the alarm information generated between 15:04:21 and 15:05:01 is displayed in the alarm list, and 15:04 is displayed in the configuration change list.
  • the physical topology map can be displayed according to the alarm information in the alarm list and the configuration change information in the configuration change list.
  • the operation and maintenance personnel drag the slider to 15:05:01, they will find that the business is damaged at 15:05:01, and the business topology map can be displayed based on the business fault information generated at 15:05:01. After the operation and maintenance personnel operate on the business topology map to trigger a query instruction, the business data in the business fault information can be displayed.
  • the operation and maintenance personnel can view the alarm information, configuration change information, and business failure information generated by the network at various times in detail by moving the slider in the timeline.
  • the operation and maintenance personnel can quickly understand the fault context through time playback, and then can quickly locate the fault point and promote the rapid resolution of the fault.
  • Fig. 4 is a schematic diagram of another management page provided by an embodiment of the present application.
  • the management page may be displayed as FIG. 4.
  • the management page includes a time axis. Below the time axis is displayed the alarm name of each piece of alarm information associated with multiple time points in the time axis and/or the user operation corresponding to each piece of configuration change information. information.
  • the alarm name can be displayed in the area that originally displayed the number of alarm information
  • the user operation information can be displayed in the area that originally displayed the number of configuration change information.
  • the associated user operation information 1 and user operation information 2 are displayed at 15:04:21; the associated alarm name 1, alarm name 2, alarm name 3, and alarm name 4 are displayed at 15:04:36.
  • the first operation instruction is a display zoom instruction
  • the time axis can increase the display scale accordingly.
  • the time period represented by the time axis in Figure 3 ranges from 15:04:21 to 15:18:21, as shown by the time axis in Figure 4
  • the time period ranges from 15:04:21 to 15:05:31.
  • Fig. 5 is a schematic diagram of another management page provided by an embodiment of the present application.
  • the management page may be displayed as FIG. 5.
  • the management page includes a time axis, and indications of alarm information and/or configuration change information associated with multiple time points in the time axis are displayed below the time axis.
  • the second operation command is a display zoom-out command
  • the time axis can be scaled down accordingly.
  • the time period indicated by the time axis in Figure 3 ranges from 15:04:21 to 15:18:21, and the time period represented by the time axis in Figure 5 The range is 15:04:21 to 15:20:21.
  • a time axis is displayed, and a slider for responding to movement operations is provided on the time axis.
  • display the number of prompt information associated with multiple time points in the time axis and display the prompt information associated with time points in the time period from the start time point in the time axis to the time point indicated by the slider information. That is, the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
  • FIG. 6 is a schematic structural diagram of a prompt information processing apparatus provided by an embodiment of the present application.
  • the prompt information processing apparatus can be implemented as part or all of computer equipment by software, hardware, or a combination of the two.
  • the computer equipment may be as shown in Figure 1 Computer equipment shown.
  • the device includes: a first display module 401, a second display module 402, and a third display module 403.
  • the first display module 401 is configured to perform step 202 in the embodiment of FIG. 2;
  • the second display module 402 is configured to perform step 203 in the embodiment of FIG. 2;
  • the third display module 403 is configured to execute step 204 in the embodiment of FIG. 2.
  • the second display module 402 is used to:
  • the number of prompt messages associated with each time point in the multiple time points in the time axis is displayed on one or both sides of the time axis.
  • the device further includes:
  • the association module is used to associate the prompt information to the same time point in the time axis as the reporting time of the prompt information.
  • the device further includes:
  • the first building module is used to construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider;
  • the fourth display module is used to display the business topology diagram
  • the fifth display module is used to display the business data in the business failure information if the query instruction is detected in the business topology diagram.
  • the prompt information includes alarm information
  • the third display module 403 is further configured to:
  • the prompt information further includes configuration change information
  • the device further includes:
  • the second building module is used to construct a physical topology map according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period;
  • the sixth display module is used to display the physical topology diagram
  • the seventh display module is used to display the root cause indicator in the physical topology diagram according to the suspected root cause probability of the alarm information associated with the time point in the time period;
  • the eighth display module is used to display the operation indicator in the physical topology diagram according to the operation object in the configuration change information associated with the time point in the time period.
  • the device further includes:
  • the ninth display module is configured to display the content of the prompt information associated with multiple time points in the time axis based on the time axis if the first operation instruction for the time axis is received.
  • the device further includes:
  • the tenth display module is configured to, if a second operation instruction for the time axis is received, display an indication of the prompt information associated with multiple time points in the time axis based on the time axis, and the indication of the prompt information is used to indicate the corresponding time Point has associated prompt information.
  • a time axis is displayed, and a slider for responding to movement operations is provided on the time axis.
  • display the number of prompt information associated with multiple time points in the time axis and display the prompt information associated with time points in the time period from the start time point in the time axis to the time point indicated by the slider information. That is, the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
  • the prompt information processing apparatus processes prompt information
  • only the division of the above functional modules is used as an example for illustration.
  • the above functions can be allocated by different functional modules according to needs.
  • the internal structure of the device is divided into different functional modules to complete all or part of the functions described above.
  • the prompt information processing device provided in the foregoing embodiment and the prompt information processing method embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
  • the computer program product includes one or more computer instructions.
  • the computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices.
  • the computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium.
  • the computer instructions may be transmitted from a website, computer, server, or data center.
  • the computer-readable storage medium may be any available medium that can be accessed by a computer, or a data storage device such as a server or a data center integrated with one or more available media.
  • the usable medium may be a magnetic medium (for example: floppy disk, hard disk, magnetic tape), optical medium (for example: Digital Versatile Disc (DVD)) or semiconductor medium (for example: Solid State Disk (SSD)) Wait.

Abstract

Disclosed are a prompt information processing method and apparatus, and a storage medium, wherein same belong to the technical field of the Internet. The method comprises: displaying a time axis, wherein the time axis is provided with a sliding block for responding to a movement operation; and on the basis of the time axis, displaying the number of pieces of prompt information associated with a plurality of time points in the time axis, and displaying prompt information associated with a time point in a time period from a starting time point in the time axis to a time point indicated by the sliding block. In the present application, the operation and maintenance personnel can carefully view, by means of moving the sliding block on the time axis, prompt information generated by a network at each time. Therefore, the operation and maintenance personnel can view, by means of time playback, a context situation when a fault occurs in the network, and can then understand the context of a fault scenario and quickly give a more reliable probable root cause, such that a root cause identification rate can be improved.

Description

提示信息处理方法、装置和存储介质Prompt information processing method, device and storage medium
本申请要求于2019年12月30日提交的申请号为201911396981.5、发明名称为“提示信息处理方法、装置和存储介质”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of the Chinese patent application filed on December 30, 2019, with the application number 201911396981.5 and the title of the invention "Prompt Information Processing Method, Device and Storage Medium", the entire content of which is incorporated into this application by reference.
技术领域Technical field
本申请涉及互联网技术领域,特别涉及一种提示信息处理方法、装置和存储介质。This application relates to the field of Internet technology, and in particular to a method, device and storage medium for processing prompt information.
背景技术Background technique
在大型网络中通常分布有多个节点,各个节点之间通过光纤等通信介质连接。当网络中的某条通信介质发生中断或某个节点发生故障时,网络中与该通信介质或该节点有关的对象均可能上报告警信息,从而诱发一连串的告警信息。这种情况下,需要从这一连串的告警信息中识别疑似根因(probable root cause,PRC),以便于后续根据疑似根因对网络进行维护。There are usually multiple nodes distributed in a large-scale network, and each node is connected through a communication medium such as optical fiber. When a certain communication medium in the network is interrupted or a certain node fails, all objects related to the communication medium or the node in the network may report alarm information, thereby inducing a series of alarm information. In this case, it is necessary to identify the probable root cause (PRC) from this series of alarm information, so as to facilitate subsequent maintenance of the network based on the probable root cause.
发明内容Summary of the invention
本申请提供了一种提示信息处理方法、装置和存储介质,可以提高根因识别率。所述技术方案如下:The present application provides a prompt information processing method, device and storage medium, which can improve the root cause identification rate. The technical solution is as follows:
第一方面,提供了一种提示信息处理方法。在该方法中,显示时间轴,该时间轴上设有用于响应移动操作的滑块。基于该时间轴显示该时间轴中的多个时间点关联的提示信息的条数,以及显示从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的时间点关联的提示信息。In the first aspect, a method for processing prompt information is provided. In this method, a time axis is displayed, and a slider for responding to the movement operation is provided on the time axis. Based on the time axis, display the number of prompt information associated with multiple time points in the time axis, and display the time point associations in the time period from the start time point in the time axis to the time point indicated by the slider Prompt information.
需要说明的是,该提示信息可以是网络中的对象主动上报到网络管理系统中的。若该网络发生异常情况,则与该异常情况有关的对象可以上报提示信息。比如,该提示信息可以包括告警信息、配置变更信息和业务故障信息等中的至少一个。It should be noted that the prompt information may be actively reported to the network management system by the object in the network. If an abnormal situation occurs in the network, objects related to the abnormal situation can report prompt information. For example, the prompt information may include at least one of alarm information, configuration change information, service failure information, and the like.
在本申请中,运维人员可以通过在该时间轴上移动该滑块,来仔细查看网络在各个时间产生的提示信息。如此,运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,继而理解故障场景上下文,快速给出更可靠的疑似根因,从而可以提升根因识别率。In this application, the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
其中,基于该时间轴显示该时间轴中的多个时间点关联的提示信息的条数的操作可以为:在该时间轴的一侧或两侧显示该时间轴中的多个时间点中每个时间点关联的提示信息的条数。如此,可以便于运维人员快速获知网络在各个时间点的提示信息数。The operation of displaying the number of prompt information associated with multiple time points in the time axis based on the time axis may be: displaying each of the multiple time points in the time axis on one or both sides of the time axis. The number of prompt messages associated with each time point. In this way, it is convenient for operation and maintenance personnel to quickly learn the number of prompt messages of the network at various points in time.
需要说明的是,当该提示信息包括不同类型的提示信息时,是分别显示每种类型的提示信息的条数。例如,当该提示信息包括告警信息、配置变更信息和业务故障信息时,是分别显示告警信息的条数、配置变更信息的条数和业务故障信息的条数。It should be noted that when the prompt information includes different types of prompt information, the number of each type of prompt information is displayed respectively. For example, when the prompt information includes alarm information, configuration change information, and business failure information, the number of alarm information, the number of configuration change information, and the number of business failure information are respectively displayed.
进一步地,在显示时间轴之前,还可以获取网络中的提示信息,将该提示信息关联到时间轴中与该提示信息的上报时间相同的时间点。Further, before displaying the time axis, prompt information in the network can also be obtained, and the prompt information can be associated with the same time point in the time axis as the reporting time of the prompt information.
在本申请中,可以将网络中的提示信息与时间轴中的时间点相关联,此时该时间轴中的某一时间点关联的提示信息是在这一时间点出现的异常情况的有关信息。In this application, the prompt information in the network can be associated with a time point in the time axis. At this time, the prompt information associated with a certain time point in the time axis is related to the abnormal situation that occurred at this time point. .
一种可能的情况中,可以根据该滑块指示的时间点关联的业务故障信息中的业务路径,构建业务拓扑图。然后显示该业务拓扑图。之后,若在该业务拓扑图中检测到查询指令,则显示该业务故障信息中的业务数据。In a possible situation, the business topology map can be constructed according to the business path in the business fault information associated with the time point indicated by the slider. Then display the business topology diagram. After that, if a query instruction is detected in the business topology diagram, the business data in the business fault information is displayed.
在本申请中,运维人员可以将该滑块在该时间轴上进行移动,以调整该滑块指示的时间点。此时会展示该滑块指示的时间点关联的业务故障信息对应的业务拓扑图。运维人员可以通过对该业务拓扑图进行操作来查询业务数据。也即是,运维人员可以通过在该时间轴上移动该滑块,来仔细查看该滑块指示的时间点的业务故障信息,获知受损业务的业务路径和传输层次。如此,即使网络情况发生了变化,运维人员也可以通过时间回放的方式来查看业务受损前后的业务情况。In this application, the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider. At this time, the business topology map corresponding to the business fault information associated with the time point indicated by the slider will be displayed. Operation and maintenance personnel can query business data by operating the business topology map. That is, the operation and maintenance personnel can carefully view the service failure information at the time point indicated by the slider by moving the slider on the time axis, and learn the service path and transmission level of the damaged service. In this way, even if the network situation changes, the operation and maintenance personnel can view the business situation before and after the business is damaged through time replay.
进一步地,当该提示信息包括告警信息时,还可以显示该时间段中的时间点关联的告警信息的疑似根因概率和根因推荐来源。由于运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,因而其可以快速推断出可能的疑似根因,并大致评判系统推荐的疑似根因是否足够准确。Further, when the prompt information includes alarm information, the suspected root cause probability and root cause recommendation source of the alarm information associated with the time point in the time period can also be displayed. Since the operation and maintenance personnel can view the context of the fault in the network through time playback, they can quickly infer the possible suspected root causes and roughly judge whether the suspected root causes recommended by the system are accurate enough.
一种可能的情况中,当该提示信息包括告警信息和配置变更信息时,可以根据该时间段中的时间点关联的告警信息中的告警源和该时间段中的时间点关联的配置变更信息中的操作对象,构建物理拓扑图。然后显示该物理拓扑图。根据该时间段中的时间点关联的告警信息的疑似根因概率,在该物理拓扑图中显示根因指示符,以及根据该时间段中的时间点关联的配置变更信息中的操作对象,在该物理拓扑图中显示操作指示符。In a possible situation, when the prompt information includes alarm information and configuration change information, the alarm source in the alarm information associated with the time point in the time period and the configuration change information associated with the time point in the time period can be used The operation object in the construction of the physical topology map. Then display the physical topology diagram. According to the suspected root cause probability of the alarm information associated with the time point in the time period, the root cause indicator is displayed in the physical topology diagram, and the operation object in the configuration change information associated with the time point in the time period is displayed in the The operation indicator is displayed in the physical topology diagram.
如此,运维人员就可以从该物理拓扑图中快速获知系统推荐的疑似根因和进行配置变更的对象,从而便于运维人员更加容易地理解故障上下文,继而快速查找出疑似根因。In this way, the operation and maintenance personnel can quickly learn the suspected root cause recommended by the system and the object of the configuration change from the physical topology diagram, so that the operation and maintenance personnel can more easily understand the fault context, and then quickly find the suspected root cause.
进一步地,若接收到针对时间轴的第一操作指令,还可以基于时间轴显示该时间轴中的多个时间点关联的提示信息的内容。Further, if the first operation instruction for the time axis is received, the content of the prompt information associated with multiple time points in the time axis may also be displayed based on the time axis.
在本申请中,运维人员通过对时间轴进行操作,可以基于时间轴快速查看多个时间点关联的提示信息的内容,便于运维人员快速了解网络中各个时间点的告警信息、配置变更信息和业务故障信息的基本内容。In this application, the operation and maintenance personnel can quickly view the content of the prompt information associated with multiple time points based on the time axis by operating the time axis, so that the operation and maintenance personnel can quickly understand the alarm information and configuration change information at each time point in the network And the basic content of business failure information.
进一步地,若接收到针对时间轴的第二操作指令,还可以基于时间轴显示该时间轴中的多个时间点关联的提示信息的指示,该提示信息的指示用于指示对应的时间点具有关联的提示信息。Further, if a second operation instruction for the time axis is received, an indication of prompt information associated with multiple time points in the time axis may also be displayed based on the time axis, and the indication of the prompt information is used to indicate that the corresponding time point has Associated prompt information.
第二方面,提供了一种提示信息处理装置,所述提示信息处理装置具有实现上述第一方面中提示信息处理方法行为的功能。所述提示信息处理装置包括至少一个模块,所述至少一个模块用于实现上述第一方面所提供的提示信息处理方法。In a second aspect, a prompt information processing device is provided, and the prompt information processing device has the function of realizing the behavior of the prompt information processing method in the first aspect. The prompt information processing apparatus includes at least one module, and the at least one module is configured to implement the prompt information processing method provided in the first aspect.
第三方面,提供了一种提示信息处理装置,所述提示信息处理装置的结构中包括处理器和存储器,所述存储器用于存储支持提示信息处理装置执行上述第一方面所提供的提示信息处理方法的程序,以及存储用于实现上述第一方面所述的提示信息处理方法所涉及的数据。所述处理器被配置为用于执行所述存储器中存储的程序。所述提示信息处理装置还可以包括 通信总线,所述通信总线用于在所述处理器与所述存储器之间建立连接。In a third aspect, a prompt information processing device is provided. The structure of the prompt information processing device includes a processor and a memory, and the memory is used to store and support the prompt information processing device to perform the prompt information processing provided in the first aspect. The program of the method, and the data stored for realizing the prompt information processing method described in the first aspect. The processor is configured to execute a program stored in the memory. The prompt information processing apparatus may further include a communication bus, and the communication bus is used to establish a connection between the processor and the memory.
第四方面,提供了一种计算机可读存储介质,所述计算机可读存储介质中存储有指令,当其在计算机上运行时,使得计算机执行上述第一方面所述的提示信息处理方法。In a fourth aspect, a computer-readable storage medium is provided. The computer-readable storage medium stores instructions that, when run on a computer, cause the computer to execute the prompt information processing method described in the first aspect.
第五方面,提供了一种包含指令的计算机程序产品,当其在计算机上运行时,使得计算机执行上述第一方面所述的提示信息处理方法。In a fifth aspect, a computer program product containing instructions is provided, which when running on a computer, causes the computer to execute the prompt information processing method described in the first aspect.
上述第二方面、第三方面、第四方面和第五方面所获得的技术效果与上述第一方面中对应的技术手段获得的技术效果近似,在这里不再赘述。The technical effects obtained by the second, third, fourth, and fifth aspects described above are similar to those obtained by the corresponding technical means in the first aspect, and will not be repeated here.
本申请提供的技术方案至少可以带来以下有益效果:The technical solution provided in this application can at least bring about the following beneficial effects:
运维人员可以通过在该时间轴上移动该滑块,来仔细查看网络在各个时间产生的提示信息。如此,运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,继而理解故障场景上下文,快速给出更可靠的疑似根因,从而可以提升根因识别率。Operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
附图说明Description of the drawings
图1是本申请实施例提供的一种计算机设备的结构示意图;Fig. 1 is a schematic structural diagram of a computer device provided by an embodiment of the present application;
图2是本申请实施例提供的一种提示信息处理方法的流程图;FIG. 2 is a flowchart of a method for processing prompt information provided by an embodiment of the present application;
图3是本申请实施例提供的一种管理页面的示意图;FIG. 3 is a schematic diagram of a management page provided by an embodiment of the present application;
图4是本申请实施例提供的另一种管理页面的示意图;FIG. 4 is a schematic diagram of another management page provided by an embodiment of the present application;
图5是本申请实施例提供的又一种管理页面的示意图;FIG. 5 is a schematic diagram of another management page provided by an embodiment of the present application;
图6是本申请实施例提供的一种提示信息处理装置的结构示意图。Fig. 6 is a schematic structural diagram of a prompt information processing apparatus provided by an embodiment of the present application.
具体实施方式Detailed ways
为使本申请的目的、技术方案和优点更加清楚,下面将结合附图对本申请的实施方式作进一步地详细描述。In order to make the purpose, technical solutions, and advantages of the present application clearer, the implementation manners of the present application will be further described in detail below in conjunction with the accompanying drawings.
在对本申请实施例进行解释说明之前,先对本申请实施例的应用场景进行简单介绍。Before explaining the embodiments of the present application, the application scenarios of the embodiments of the present application will be briefly introduced.
对于大型网络(设备数量万级以上),网络中的各个节点之间通过光纤等通信介质相连。并且,各个节点所处的网络位置(比如,可以为核心环、汇聚环、接入环、接入链)、连接的光纤的数量、以及拓扑形状(环/链)均可能有所不同。For large-scale networks (the number of devices is more than 10,000), the various nodes in the network are connected through communication media such as optical fibers. In addition, the network location of each node (for example, it may be a core ring, an aggregation ring, an access ring, an access chain), the number of connected optical fibers, and the topological shape (ring/chain) may be different.
通常,网络中存在核心设备、汇聚设备和接入设备等。每个设备都有多个端口,设备之间可以通过端口相连多条光纤,最终组成一个全网相连的大网络。网络中的每一个端口、单板、网元、子接口都可以检测信号并上报告警。并且,越是中间位置的节点的连纤数量越多,涉及的环也越多。越是边缘位置的节点的连纤数量越少,且部分边缘位置的节点可能没有涉及环,仅使用链相连。但整体上网络中的节点都在一个拓扑上相互连接,构成了一张复杂的连通网络。Generally, there are core equipment, aggregation equipment, and access equipment in the network. Each device has multiple ports, and multiple optical fibers can be connected to each other through ports to form a large network connected by the entire network. Every port, board, network element, and sub-interface in the network can detect signals and report alarms. And, the more the middle node is, the more the number of fibers connected, the more rings are involved. The more edge nodes have fewer fiber connections, and some edge nodes may not involve rings and are only connected by chains. However, the nodes in the network as a whole are connected to each other in a topology, forming a complex connected network.
业务信号在网络中的各个节点进出流通,网络上的任何一根光纤连接中断或任意一个节点故障,都可能导致部分业务倒换(有保护时)或中断(无保护时)。并且,因为信号传递受 阻,下游节点检测不到信号时,会触发一系列的节点上报告警。此时就需要运维人员从大量告警中识别出疑似根因,以便于后续进行网络维护。其中,疑似根因为可能是真实故障点引起的告警。节点上报的告警可以泛指告警事件、异常事件、配置变更和/或业务故障,等等。Service signals flow in and out of various nodes in the network, and any fiber connection on the network is interrupted or any node fails, which may cause partial service switching (with protection) or interruption (without protection). Moreover, because the signal transmission is blocked, when the downstream node cannot detect the signal, it will trigger a series of nodes to report alarms. At this time, operation and maintenance personnel are required to identify the suspected root cause from a large number of alarms to facilitate subsequent network maintenance. Among them, the suspected root may be an alarm caused by a real failure point. The alarms reported by the nodes can generally refer to alarm events, abnormal events, configuration changes and/or business failures, and so on.
由于网络的规模日益增大,告警数量也在成倍增长,甚至达每天百万量级。但是,实际由于真实的故障点引起的告警数量可能低于千起甚至不足百起,运维人员在海量告警里识别疑似根因是很困难的。Due to the increasing scale of the network, the number of alarms is also increasing exponentially, even reaching the order of millions per day. However, the actual number of alarms caused by real failure points may be less than a thousand or even less than a hundred. It is very difficult for operation and maintenance personnel to identify the suspected root cause among the massive alarms.
当对网络影响较大的故障发生时(如关键业务受损),快速准确地识别出疑似根因尤为重要。平均故障检测时间(mean time to diagnose,MTTD)是评价维护效率的关键指标。如果系统推荐根因规则不准确,将会耽误下站维护时间窗,浪费维护人力,MTTD将会被拉大,影响客户满意度。并且,随着时间的推移,网络在不断变化,要分析网络前期的故障会变得更加困难。为此,运维人员进一步确认故障或者提供更多的疑似根因非常关键。When a fault that has a greater impact on the network occurs (such as critical business damage), it is particularly important to quickly and accurately identify the suspected root cause. Mean time to diagnose (MTTD) is a key indicator for evaluating maintenance efficiency. If the system recommended root cause rules are inaccurate, it will delay the maintenance time window and waste maintenance manpower. The MTTD will be enlarged and customer satisfaction will be affected. Moreover, as time goes by, the network is constantly changing, and it becomes more difficult to analyze the failures in the early stage of the network. For this reason, it is very important for the operation and maintenance personnel to further confirm the fault or provide more suspected root causes.
一种典型场景中,并非因硬件类故障,而是因通信协议被人为修改导致业务中断上报信号丢失(loss of signal,LOS)告警。比如,业务配置人员无意间修改了一个业务端口模式,导致业务中断而上报LOS告警,其物理光纤是正常未受损或未松动的。这种情况下,如果下站处理,将会延长真实故障修复的时间,实际修复只需业务配置人员在系统上恢复业务端口配置。In a typical scenario, it is not because of a hardware failure, but because the communication protocol is artificially modified, which causes a service interruption to report a loss of signal (LOS) alarm. For example, the service configuration personnel inadvertently modified a service port mode, which caused the service to be interrupted and reported a LOS alarm. The physical fiber was normally undamaged or loose. In this case, if the station is removed, the time for real fault repair will be prolonged, and the actual repair only requires the business configuration personnel to restore the business port configuration on the system.
图1是本申请实施例提供的一种计算机设备的结构示意图。参见图1,该计算机设备包括至少一个处理器101、通信总线102、存储器103以及至少一个通信接口104。Fig. 1 is a schematic structural diagram of a computer device provided by an embodiment of the present application. Referring to FIG. 1, the computer device includes at least one processor 101, a communication bus 102, a memory 103, and at least one communication interface 104.
处理器101可以是微处理器(包括中央处理器(central processing unit,CPU)等)、特定应用集成电路(application-specific integrated circuit,ASIC),或者可以是一个或多个用于控制本申请方案程序执行的集成电路。The processor 101 may be a microprocessor (including a central processing unit (CPU), etc.), an application-specific integrated circuit (ASIC), or may be one or more for controlling the solution of the application Integrated circuit for program execution.
通信总线102可包括一通路,用于在上述组件之间传送信息。The communication bus 102 may include a path for transferring information between the aforementioned components.
存储器103可以是只读存储器(read-only memory,ROM)、随机存取存储器(random access memory,RAM)、电可擦可编程只读存储器(electrically erasable programmable read-Only memory,EEPROM)、光盘(包括只读光盘(compact disc read-only memory,CD-ROM)、压缩光盘、激光盘、数字通用光盘、蓝光光盘等)、磁盘存储介质或者其它磁存储设备,或者是能够用于携带或存储具有指令或数据结构形式的期望的程序代码并能够由计算机存取的任何其它介质,但不限于此。存储器103可以是独立存在,并通过通信总线102与处理器101相连接。存储器103也可以和处理器101集成在一起。The memory 103 can be read-only memory (ROM), random access memory (RAM), electrically erasable programmable read-only memory (read-only memory, EEPROM), optical disk ( Including read-only discs (compact disc read-only memory, CD-ROM), compact discs, laser discs, digital versatile discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or can be used to carry or store The desired program code in the form of instructions or data structures and any other medium that can be accessed by the computer, but not limited to this. The memory 103 may exist independently and is connected to the processor 101 through the communication bus 102. The memory 103 may also be integrated with the processor 101.
通信接口104使用任何收发器一类的装置,用于与其它设备或通信网络通信,如以太网、无线接入网(radio access network,RAN)、无线局域网(wireless local area network,WLAN)等。The communication interface 104 uses any device such as a transceiver to communicate with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area network (WLAN), and so on.
在具体实现中,作为一种实施例,处理器101可以包括一个或多个CPU,如图2中所示的CPU0和CPU1。In a specific implementation, as an embodiment, the processor 101 may include one or more CPUs, such as CPU0 and CPU1 as shown in FIG. 2.
在具体实现中,作为一种实施例,计算机设备可以包括多个处理器,如图2中所示的处理器101和处理器105。这些处理器中的每一个可以是一个单核处理器,也可以是一个多核处理器。这里的处理器可以指一个或多个设备、电路、和/或用于处理数据(如计算机程序指令)的处理核。In a specific implementation, as an embodiment, the computer device may include multiple processors, such as the processor 101 and the processor 105 as shown in FIG. 2. Each of these processors can be a single-core processor or a multi-core processor. The processor here may refer to one or more devices, circuits, and/or processing cores for processing data (such as computer program instructions).
在具体实现中,作为一种实施例,计算机设备还可以包括输出设备106和输入设备107。输出设备106和处理器101通信,可以以多种方式来显示信息。例如,输出设备106可以是液晶显示器(liquid crystal display,LCD)、发光二级管(light emitting diode,LED)显示设备、阴极射线管(cathode ray tube,CRT)显示设备或投影仪(projector)等。输入设备107和处理器101通信,可以以多种方式接收用户的输入。例如,输入设备107可以是鼠标、键盘、触摸屏设备或传感设备等。In a specific implementation, as an embodiment, the computer device may further include an output device 106 and an input device 107. The output device 106 communicates with the processor 101 and can display information in a variety of ways. For example, the output device 106 may be a liquid crystal display (LCD), a light emitting diode (LED) display device, a cathode ray tube (CRT) display device, or a projector, etc. . The input device 107 communicates with the processor 101 and can receive user input in a variety of ways. For example, the input device 107 may be a mouse, a keyboard, a touch screen device, a sensor device, or the like.
上述的计算机设备可以是一个通用计算机设备或一个专用计算机设备。在具体实现中,计算机设备可以是台式机、便携式电脑、网络服务器、掌上电脑、移动手机、平板电脑、无线终端设备、通信设备或嵌入式设备,本申请实施例不限定计算机设备的类型。The above-mentioned computer equipment may be a general-purpose computer equipment or a special-purpose computer equipment. In a specific implementation, the computer device may be a desktop computer, a portable computer, a network server, a palmtop computer, a mobile phone, a tablet computer, a wireless terminal device, a communication device, or an embedded device. The embodiment of the application does not limit the type of the computer device.
其中,存储器103用于存储执行本申请方案的程序代码110,处理器101用于执行存储器103中存储的程序代码110。该计算机设备可以通过处理器101以及存储器103中的程序代码110,来实现下文图2实施例提供的提示信息处理方法。The memory 103 is used to store the program code 110 for executing the solution of the present application, and the processor 101 is used to execute the program code 110 stored in the memory 103. The computer device can implement the prompt information processing method provided in the embodiment of FIG. 2 below through the processor 101 and the program code 110 in the memory 103.
图2是本申请实施例提供的一种提示信息处理方法的流程图,该方法应用于网络管理系统,该网络管理系统用于对网络中的节点进行管理和维护,该网络管理系统可以通过图1所示的计算机设备实现。参见图2,该方法包括:Figure 2 is a flowchart of a method for processing prompt information provided by an embodiment of the present application. The method is applied to a network management system. The network management system is used to manage and maintain nodes in the network. The computer equipment shown in 1 is realized. Referring to Figure 2, the method includes:
步骤201:获取网络中的提示信息,将该提示信息关联到时间轴中与该提示信息的上报时间相同的时间点。Step 201: Obtain prompt information in the network, and associate the prompt information with the same time point in the time axis as the reporting time of the prompt information.
需要说明的是,该时间轴可以在管理页面中进行展示,用于代表一定时长的时间段,比如15分钟。该时间轴可以包括代表最小时间间隔的时间点,比如秒。It should be noted that the timeline can be displayed on the management page to represent a certain period of time, such as 15 minutes. The time axis may include time points representing the minimum time interval, such as seconds.
另外,该提示信息可以是网络中的对象主动上报到网络管理系统中的。若该网络发生异常情况,则与该异常情况有关的对象可以上报提示信息。比如,该提示信息可以包括告警信息、配置变更信息和业务故障信息等中的至少一个。In addition, the prompt information may be actively reported to the network management system by the object in the network. If an abnormal situation occurs in the network, objects related to the abnormal situation can report prompt information. For example, the prompt information may include at least one of alarm information, configuration change information, service failure information, and the like.
再者,本申请实施例中,可以将网络中的提示信息与时间轴中的时间点相关联,此时该时间轴中的某一时间点关联的提示信息是在这一时间点出现的异常情况的有关信息。Furthermore, in the embodiment of the present application, the prompt information in the network can be associated with a time point in the time axis. At this time, the prompt information associated with a certain time point in the time axis is an abnormality that occurred at this time point. Information about the situation.
其中,当该网络中的某条通信介质发生中断或某个节点发生故障时,该网络中与该通信介质或该节点有关的对象均可能上报告警信息,从而诱发一连串的告警信息。该告警信息可以包括告警名称、告警源、发生时间(即上报时间)等,该告警源可以是上报该告警信息的对象的标识(如设备名称、互联网协议(internet protocol,IP)地址等)。Wherein, when a communication medium in the network is interrupted or a node fails, objects in the network related to the communication medium or the node may report alarm information, thereby inducing a series of alarm information. The alarm information may include alarm name, alarm source, occurrence time (that is, reporting time), etc. The alarm source may be the identification of the object reporting the alarm information (such as device name, internet protocol (IP) address, etc.).
其中,当配置人员变更该网络中某个对象的配置(如通信参数、端口参数、业务参数等)时,该对象可以上报配置变更信息。比如,该配置变更信息可以是操作日志等。该配置变更信息中可以包括操作名称、操作描述、操作对象、操作时间(即上报时间)等,该操作对象可以是存在配置变更的对象的标识(如设备名称、IP地址等)。Wherein, when the configuration personnel changes the configuration of an object in the network (such as communication parameters, port parameters, service parameters, etc.), the object can report configuration change information. For example, the configuration change information may be an operation log or the like. The configuration change information may include operation name, operation description, operation object, operation time (that is, report time), etc. The operation object may be an identifier (such as device name, IP address, etc.) of the object that has the configuration change.
其中,当该网络中的某一对象检测到其正在进行的业务发生故障(如中断、倒换、降级、卡顿等)时,该对象可以上报业务故障信息。该业务故障信息可以包括故障时间(即上报时间)、业务路径和业务数据。该业务数据可以包括业务名称、传输层次等。Wherein, when an object in the network detects that its ongoing service has a failure (such as interruption, switching, degradation, freeze, etc.), the object can report service failure information. The business failure information may include failure time (that is, reporting time), business path, and business data. The service data may include service name, transmission level, and so on.
具体地,步骤201可以包括如下步骤(1)-步骤(3),步骤(1)-步骤(3)的执行顺序没有限制。Specifically, step 201 may include the following steps (1) to (3), and the execution order of step (1) to step (3) is not limited.
(1)获取网络中的告警信息,将该告警信息关联到时间轴中与该告警信息中的发生时间 相同的时间点。(1) Obtain the alarm information in the network, and associate the alarm information to the same time point in the time axis as the occurrence time in the alarm information.
需要说明的是,本申请实施例可以将网络中的告警信息与时间轴中的时间点相关联,此时该时间轴中的某一时间点关联的告警信息是在这一时间点出现的告警的有关信息。It should be noted that the embodiment of the present application may associate the alarm information in the network with the time point in the time axis, and at this time, the alarm information associated with a certain time point in the time axis is the alarm that occurred at this time point. Relevant information.
(2)获取网络中的配置变更信息,将该配置变更信息关联到时间轴中与该配置变更信息中的操作时间相同的时间点。(2) Acquire configuration change information in the network, and associate the configuration change information to the same time point in the time axis as the operation time in the configuration change information.
需要说明的是,本申请实施例可以将网络中的配置变更信息与时间轴中的时间点相关联,此时该时间轴中的某一时间点关联的配置变更信息是在这一时间点出现的配置变更的有关信息。It should be noted that the embodiment of the present application may associate configuration change information in the network with a time point in the time axis, and at this time, the configuration change information associated with a certain time point in the time axis appears at this time point. Information about the configuration changes.
(3)获取网络中的业务故障信息,将该业务故障信息关联到时间轴中与该业务故障信息中的故障时间相同的时间点。(3) Obtain service failure information in the network, and associate the service failure information to the same time point in the time axis as the failure time in the service failure information.
需要说明的是,本申请实施例可以将网络中的业务故障信息与时间轴中的时间点相关联,此时该时间轴中某一时间点关联的业务故障信息是在这一时间点出现的业务故障的相关信息。It should be noted that the embodiment of the present application may associate service failure information in the network with a time point in the time axis, and at this time, the service failure information associated with a certain time point in the time axis appears at this time point. Information about business failures.
通过上述步骤201将时间轴中的时间点与提示信息关联之后,就可以展示该时间轴,并基于该时间轴展示相关联的提示信息。具体可以包括如下步骤202-步骤205。After associating the time point in the time axis with the prompt information through the above step 201, the time axis can be displayed, and the associated prompt information can be displayed based on the time axis. Specifically, it may include the following steps 202 to 205.
步骤202:显示该时间轴,该时间轴上设有用于响应移动操作的滑块。Step 202: Display the time axis, and a slider for responding to the movement operation is provided on the time axis.
需要说明的是,可以在管理页面上显示该时间轴,该时间轴一般可以贯穿页面,比如,该时间轴可以从该管理页面的左端延伸到右端。该时间轴的两端可以设置有一个前进按钮和一个后退按钮,通过该前进按钮和该后退按钮可以调整该时间轴当前展示的时间段,该时间段可以具有一个开始时间点和一个结束时间点。其中,通过该前进按钮可以让该时间轴展示在当前的结束时间点之后的时间点,通过该后退按钮可以让该时间轴展示在当前的开始时间点之前的时间点。It should be noted that the time axis can be displayed on the management page, and the time axis can generally run through the page. For example, the time axis can extend from the left end to the right end of the management page. Both ends of the timeline can be provided with a forward button and a back button, the time period currently displayed on the timeline can be adjusted through the forward button and the back button, and the time period can have a start time point and an end time point . Wherein, through the forward button, the time axis can be displayed at a time point after the current end time point, and through the back button, the time axis can be displayed at a time point before the current start time point.
另外,该滑块用于指示该时间轴中的时间点,该滑块所指示的时间点是该滑块所在位置在该时间轴中对应的时间点。该滑块可以响应移动操作,该移动操作可以由运维人员触发,也即是,运维人员可以将该滑块在该时间轴上进行移动。比如,运维人员可以拖动该滑块在该时间轴上进行移动,或者运维人员可以直接点击该时间轴中的某个时间点来将该滑块快速移动到这个时间点对应的位置。In addition, the slider is used to indicate a time point in the time axis, and the time point indicated by the slider is a time point corresponding to the position of the slider in the time axis. The slider may respond to a moving operation, and the moving operation may be triggered by an operation and maintenance personnel, that is, the operation and maintenance personnel may move the slider on the time axis. For example, the operation and maintenance personnel can drag the slider to move on the time axis, or the operation and maintenance personnel can directly click a time point in the time axis to quickly move the slider to the position corresponding to this time point.
步骤203:基于该时间轴显示该时间轴中的多个时间点关联的提示信息的条数。Step 203: Display the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis.
需要说明的是,本申请实施例可以基于该时间轴显示该时间轴中的多个时间点关联的提示信息的条数。如此,按照时间顺序对网络中产生的提示信息进行数量展示,可以便于运维人员整体理解网络事件流。It should be noted that the embodiment of the present application may display the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis. In this way, displaying the prompt information generated in the network in chronological order can facilitate the operation and maintenance personnel to understand the flow of network events as a whole.
另外,当该提示信息包括不同类型的提示信息时,是分别显示每种类型的提示信息的条数。例如,当该提示信息包括告警信息、配置变更信息和业务故障信息时,是分别显示告警信息的条数、配置变更信息的条数和业务故障信息的条数。In addition, when the prompt information includes different types of prompt information, the number of each type of prompt information is displayed respectively. For example, when the prompt information includes alarm information, configuration change information, and business failure information, the number of alarm information, the number of configuration change information, and the number of business failure information are respectively displayed.
具体地,步骤203的操作可以为:在该时间轴的一侧或两侧显示该时间轴中的多个时间点中每个时间点关联的提示信息的条数。Specifically, the operation of step 203 may be: displaying the number of pieces of prompt information associated with each of the multiple time points in the time axis on one or both sides of the time axis.
需要说明的是,该管理页面中除显示该时间轴的区域之外,还可以包括位于该时间轴的两侧的第一区域。第一区域可以划分为第一子区域和第二子区域。第一子区域位于该时间轴的一侧,第二子区域位于该时间轴的另一侧。It should be noted that, in addition to the area displaying the time axis, the management page may also include first areas located on both sides of the time axis. The first area can be divided into a first sub-area and a second sub-area. The first sub-region is located on one side of the time axis, and the second sub-region is located on the other side of the time axis.
另外,对于该时间轴中的任意一个时间点,如果这一时间点具有关联的提示信息,则可 以将这一时间点关联的提示信息的条数显示在第一子区域或第二子区域中与这一时间点对应的位置上。如此,可以便于运维人员快速获知网络在这一时间点的提示信息数。In addition, for any point in the time axis, if the time point has associated prompt information, the number of prompt information associated with this time point can be displayed in the first sub-region or the second sub-region At the location corresponding to this point in time. In this way, it is convenient for the operation and maintenance personnel to quickly learn the number of prompt messages of the network at this point in time.
例如,该提示信息包括告警信息和配置变更信息。对于该时间轴中的任意一个时间点,如果这一时间点具有关联的告警信息,则可以将这一时间点关联的告警信息的条数显示在第一子区域中与这一时间点对应的位置上;如果这一时间点具有关联的配置变更信息,则可以将这一时间点关联的配置变更信息的条数显示在第二子区域中与这一时间点对应的位置上。如此,可以便于运维人员快速获知网络在这一时间点的告警数和配置变更数。For example, the prompt information includes alarm information and configuration change information. For any time point in the time axis, if this time point has associated alarm information, the number of alarm information associated with this time point can be displayed in the first sub-area corresponding to this time point Location; if there is associated configuration change information at this time point, the number of configuration change information associated at this time point can be displayed in the second sub-region at the position corresponding to this time point. In this way, it is convenient for operation and maintenance personnel to quickly learn the number of alarms and configuration changes of the network at this point in time.
在一种可能实现方式中,若接收到针对时间轴的第一操作指令,基于该时间轴显示该时间轴中的多个时间点关联的提示信息的内容。其中,第一操作指令可以是显示放大指令,用于指示在管理页面上放大时间轴的显示比例。该时间轴所表示时段的时长会减小。或者,第一操作指令还可以是其它指令,例如对时间轴的单击操作或双击操作等。In a possible implementation manner, if the first operation instruction for the time axis is received, the content of the prompt information associated with multiple time points in the time axis is displayed based on the time axis. Wherein, the first operation instruction may be a display enlargement instruction, which is used to instruct to enlarge the display scale of the time axis on the management page. The duration of the time period represented by the time axis will decrease. Alternatively, the first operation instruction may also be other instructions, such as a single-click operation or a double-click operation on the time axis.
可选地,当在管理页面上显示时间轴中的多个时间点关联的提示信息的条数时,接收到针对时间轴的第一操作指令,基于该时间轴显示该时间轴中的多个时间点关联的各条提示信息的内容。例如,可以将显示的时间轴中的多个时间点关联的提示信息的条数变更为该时间轴中的多个时间点关联的提示信息的内容;或者,基于时间轴同步显示该时间轴中的多个时间点关联的提示信息的条数以及各条提示信息的内容。Optionally, when the number of prompt information associated with multiple time points in the time axis is displayed on the management page, the first operation instruction for the time axis is received, and multiple information in the time axis are displayed based on the time axis. The content of each prompt message associated at the time point. For example, you can change the number of prompt information associated with multiple time points in the displayed time axis to the content of the prompt information associated with multiple time points in the time axis; or, based on the time axis, display the prompt information in the time axis synchronously. The number of reminders associated with multiple time points and the content of each reminder.
例如,该提示信息包括告警信息。当时间轴在管理页面上正常显示时,管理页面上基于该时间轴显示该时间轴中的多个时间点关联的告警信息的条数;当时间轴在管理页面上放大显示时,管理页面上基于该时间轴显示该时间轴中的多个时间点关联的告警信息的告警名称。For example, the prompt information includes warning information. When the time axis is displayed normally on the management page, the number of alarm information associated with multiple time points in the time axis is displayed on the management page based on the time axis; when the time axis is displayed on the management page enlarged, the management page Based on the time axis, the alarm names of the alarm information associated with multiple time points in the time axis are displayed.
需要说明的是,运维人员通过对时间轴进行操作,例如放大时间轴的显示比例,可以基于时间轴快速查看多个时间点关联的提示信息的内容,便于运维人员快速了解网络中各个时间点的告警信息、配置变更信息和业务故障信息的基本内容。It should be noted that by operating the time axis, such as zooming in on the display scale of the time axis, the operation and maintenance personnel can quickly view the content of the prompt information associated with multiple time points based on the time axis, so that the operation and maintenance personnel can quickly understand each time in the network The basic content of the alarm information, configuration change information and business failure information of the point.
在另一种可能实现方式中,若接收到针对时间轴的第二操作指令,基于该时间轴显示该时间轴中的多个时间点关联的提示信息的指示。该提示信息的指示用于指示对应的时间点具有关联的提示信息。其中,第二操作指令可以是显示缩小指令,用于指示在管理页面上缩小时间轴的显示比例。该时间轴所表示时段的时长会增大。或者,第二操作指令还可以是其它指令,例如对时间轴的单击操作或双击操作等。第二操作指令与第一操作指令不同。In another possible implementation manner, if a second operation instruction for a time axis is received, an indication of prompt information associated with multiple time points in the time axis is displayed based on the time axis. The indication of the prompt information is used to indicate that the corresponding time point has associated prompt information. Wherein, the second operation instruction may be a display reduction instruction, which is used to instruct to reduce the display scale of the time axis on the management page. The duration of the time period represented by the time axis will increase. Alternatively, the second operation instruction may also be other instructions, such as a single-click operation or a double-click operation on the time axis. The second operation instruction is different from the first operation instruction.
可选地,当在管理页面上显示时间轴中的多个时间点关联的提示信息的条数时,接收到针对时间轴的第二操作指令,基于该时间轴显示该时间轴中的多个时间点关联的提示信息的指示。不同类型的提示信息可以采用不同的指示,例如可以采用不同的颜色和/或不同的图案,等等。Optionally, when the number of prompt information associated with multiple time points in the time axis is displayed on the management page, a second operation instruction for the time axis is received, and multiple items in the time axis are displayed based on the time axis. The indication of the prompt information associated with the time point. Different types of prompt information can use different instructions, for example, different colors and/or different patterns can be used, and so on.
步骤204:显示从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的时间点关联的提示信息。Step 204: Display the prompt information associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider.
需要说明的是,本申请实施例中,运维人员可以将该滑块在该时间轴上进行移动,以调整该滑块指示的时间点。此时会展示从该时间轴中的开始时间点到该滑块指示的时间点的时间段内的时间点关联的提示信息。也即是,运维人员可以通过在该时间轴上移动该滑块,来仔细查看网络在各个时间点的提示信息。如此,运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,继而理解故障场景上下文,快速推断出更可靠的疑似根因,从而提升根因识别率,进而提升MTTD。It should be noted that, in this embodiment of the application, the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider. At this time, the prompt information associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider will be displayed. That is, the operation and maintenance personnel can carefully view the prompt information of the network at various points in time by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time replay, and then understand the context of the failure scenario, and quickly infer more reliable suspected root causes, thereby improving the root cause recognition rate and thus MTTD.
另外,运维人员推断疑似根因的依据可以有多种,如处于网络模型的底层(如物理层)的对象上报的告警更有可能是根因、处于信号流链路的上游的对象上报的告警更有可能是根因、处于信号流链路交叉位置处的对象上报的告警更有可能是根因、上报时间越早的告警越有可能是根因、告警级别越高的告警越有可能是根因等。In addition, the operation and maintenance personnel can infer the suspected root cause on various basis. For example, the alarm reported by the object at the bottom of the network model (such as the physical layer) is more likely to be the root cause, reported by the object upstream of the signal flow link. The alarm is more likely to be the root cause, and the alarm reported by the object at the intersection of the signal flow link is more likely to be the root cause, the earlier the alarm is reported, the more likely it is the root cause, the higher the alarm level, the more likely the alarm It is the root cause and so on.
例如,该提示信息包括告警信息、配置变更信息和业务故障信息。本申请实施例中通过引入时间回放,可以引导运维人员可视化快速理解故障上下文。网络在什么时间变更了什么配置、产生了什么告警、影响了哪些业务,都一目了然,从而有助于运维人员快速查找出疑似根因。并且,这种情况下,运维人员还有可能推断出故障点在哪里,以及哪些告警是该故障点衍生出来的告警,比如某个告警可能是因某个配置变更而导致。For example, the prompt information includes alarm information, configuration change information, and business failure information. By introducing time replay in the embodiments of the present application, the operation and maintenance personnel can be guided to visually and quickly understand the fault context. It is clear at a glance what configuration has been changed, what alarms have been generated, and what services have been affected at a glance, which helps operation and maintenance personnel to quickly find the suspected root cause. Moreover, in this case, the operation and maintenance personnel may also infer where the failure point is and which alarms are derived from the failure point. For example, an alarm may be caused by a configuration change.
需要说明的是,该管理页面中除显示该时间轴的区域和第一区域之外,还可以包括第二区域。对于从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的任意一个时间点,如果这一时间点具有关联的提示信息,则可以将这一时间点关联的提示信息显示在第二区域中。It should be noted that, in addition to the area displaying the time axis and the first area, the management page may also include a second area. For any time point in the time period from the start time point in the time axis to the time point indicated by the slider, if this time point has associated prompt information, you can associate this time point with the prompt information Shown in the second area.
另外,当该提示信息包括不同类型的提示信息时,可以将不同类型的提示信息显示在不同的列表中。例如,当该提示信息包括告警信息、配置变更信息和业务故障信息时,可以将告警信息显示在告警列表中,将配置变更信息显示在配置变更列表中,将业务故障信息显示在业务故障列表中。In addition, when the prompt information includes different types of prompt information, the different types of prompt information can be displayed in different lists. For example, when the prompt information includes alarm information, configuration change information, and business failure information, the alarm information can be displayed in the alarm list, the configuration change information can be displayed in the configuration change list, and the business failure information can be displayed in the business failure list. .
再者,在显示该提示信息的同时,还可以显示该提示信息的查看时间和当前所显示的提示信息的条数。例如,可以在告警列表中显示告警信息的查看时间和该告警列表中包括的告警信息的条数,以及在配置变更列表中显示配置变更信息的查看时间和该配置变更列表中包括的配置变更信息的条数。Furthermore, while displaying the prompt information, the viewing time of the prompt information and the number of currently displayed prompt information can also be displayed. For example, the viewing time of the alarm information and the number of alarm information included in the alarm list can be displayed in the alarm list, and the viewing time of the configuration change information and the configuration change information included in the configuration change list can be displayed in the configuration change list. The number of articles.
例如,该提示信息可以包括告警信息和配置变更信息。第二区域可以划分为第三子区域和第四子区域,第三子区域用于显示告警列表,第四子区域用于显示配置变更列表。对于从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的任意一个时间点,如果这一时间点具有关联的告警信息,则可以将这一时间点关联的告警信息显示在第三子区域中的告警列表中;如果这一时间点具有关联的配置变更信息,则可以将这一时间点关联的配置变更信息显示在第四子区域中的配置变更列表中。如此,可以便于技术人员快速获知告警和配置变更的详细情况。For example, the prompt information may include alarm information and configuration change information. The second area can be divided into a third subarea and a fourth subarea. The third subarea is used to display the alarm list, and the fourth subarea is used to display the configuration change list. For any time point in the time period from the start time point in the time axis to the time point indicated by the slider, if this time point has associated alarm information, you can associate the alarm information with this time point Displayed in the alarm list in the third sub-area; if there is associated configuration change information at this point in time, the configuration change information associated at this point in time can be displayed in the configuration change list in the fourth sub-area. In this way, it is convenient for technicians to quickly learn the details of alarms and configuration changes.
下面对该提示信息包括告警信息和配置变更信息时的显示方式进行说明。The display mode when the prompt information includes alarm information and configuration change information is described below.
一种可能的情况中,可以显示从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的时间点关联的所有告警信息和对应的清除时间,或者,可以仅显示该时间段中的时间点关联的所有告警信息中尚未清除的告警信息。In a possible situation, all the alarm information and the corresponding clearing time associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider can be displayed, or only the time point can be displayed. The alarm information that has not been cleared among all the alarm information associated with the time point in the time period.
进一步地,在显示该时间段中的时间点关联的告警信息的同时,还可以显示该时间段中的时间点关联的告警信息的疑似根因概率和根因推荐来源。具体可以在告警列表中显示该疑似根因概率和该根因推荐来源。Further, while displaying the alarm information associated with the time point in the time period, the suspected root cause probability and the root cause recommendation source of the alarm information associated at the time point in the time period can also be displayed. Specifically, the suspected root cause probability and the recommended source of the root cause can be displayed in the alarm list.
需要说明的是,该疑似根因概率可以是该网络管理系统确定得到。该网络管理系统可以通过各种方式来确定告警信息的疑似根因概率,如可以通过专家规则、故障传播图、神经网络、人为标注等方式来确定告警信息的疑似根因概率。It should be noted that the suspected root cause probability may be determined by the network management system. The network management system can determine the suspected root cause probability of alarm information in various ways, such as expert rules, fault propagation diagrams, neural networks, and artificial labeling to determine the suspected root cause probability of alarm information.
另外,根因推荐来源是指确定疑似根因概率的方式。比如,该网络管理系统通过专家规 则确定告警信息的疑似根因概率,则该告警信息的根因推荐来源是专家规则。In addition, the recommended source of root cause refers to the way to determine the probability of suspected root cause. For example, if the network management system determines the suspected root cause probability of alarm information through expert rules, the recommended source of the root cause of the alarm information is expert rules.
再者,本申请实施例中,由于运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,因而其可以快速推断出可能的疑似根因,并大致评判系统推荐的疑似根因是否足够准确。Furthermore, in the embodiments of the present application, since the operation and maintenance personnel can view the context of the network failure by time playback, they can quickly infer the possible suspected root causes and roughly judge the suspected suspects recommended by the system. Whether the root cause is accurate enough.
更进一步地,还可以根据该时间段中的时间点关联的告警信息中的告警源和该时间段中的时间点关联的配置变更信息中的操作对象构建物理拓扑图,显示该物理拓扑图。根据该时间段中的时间点关联的告警信息的疑似根因概率,在该物理拓扑图中显示根因指示符。根据该时间段中的时间点关联的配置变更信息中的操作对象,在该物理拓扑图中显示操作指示符。Furthermore, a physical topology diagram may be constructed according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period, and the physical topology diagram may be displayed. According to the suspected root cause probability of the alarm information associated with the time point in the time period, the root cause indicator is displayed in the physical topology diagram. According to the operation object in the configuration change information associated with the time point in the time period, the operation indicator is displayed in the physical topology diagram.
需要说明的是,该物理拓扑图可以反映告警源和操作对象的连接关系。具体地,可以将告警源和操作对象均作为该物理拓扑图中的结点,然后根据告警源和操作对象的物理连接关系构建该物理拓扑图中的结点之间的边,得到该物理拓扑图。It should be noted that the physical topology diagram can reflect the connection relationship between the alarm source and the operation object. Specifically, both the alarm source and the operation object can be regarded as nodes in the physical topology map, and then the edges between the nodes in the physical topology map are constructed according to the physical connection relationship between the alarm source and the operation object, and the physical topology is obtained. Figure.
另外,该管理页面中除显示该时间轴的区域、第一区域和第二区域之外,还可以包括第三区域。可以将该物理拓扑图显示在第三区域中。In addition, the management page may also include a third area in addition to the area displaying the time axis, the first area, and the second area. The physical topology map can be displayed in the third area.
其中,根据该时间段中的时间点关联的告警信息的疑似根因概率,在该物理拓扑图中显示根因指示符时,可以对于该时间段中的任一时间点,如果这一时间点关联的告警信息的疑似根因概率大于预设的概率,即如果该告警信息的疑似根因概率较大,则可以在该物理拓扑图中与该告警信息中的告警源对应的结点处显示根因指示符。如此,运维人员就可以从该物理拓扑图中快速获知系统推荐的疑似根因。Among them, according to the suspected root cause probability of the alarm information associated with the time point in the time period, when the root cause indicator is displayed in the physical topology diagram, it can be used for any time point in the time period. The suspected root cause probability of the associated alarm information is greater than the preset probability, that is, if the suspected root cause probability of the alarm information is large, it can be displayed at the node corresponding to the alarm source in the alarm information in the physical topology map Root cause indicator. In this way, the operation and maintenance personnel can quickly learn the suspected root cause recommended by the system from the physical topology diagram.
其中,根据该时间段中的时间点关联的配置变更信息中的操作对象,在该物理拓扑图中显示操作指示符时,可以对于该时间段中的任一时间点,在该物理拓扑图中与该操作对象对应的结点处显示操作指示符。如此,运维人员就可以从该物理拓扑图中快速获知进行配置变更的对象。Wherein, according to the operation object in the configuration change information associated with the time point in the time period, when the operation indicator is displayed in the physical topology diagram, the operation indicator can be displayed in the physical topology diagram at any point in the time period. The operation indicator is displayed at the node corresponding to the operation object. In this way, the operation and maintenance personnel can quickly learn the object of the configuration change from the physical topology diagram.
值得说明的是,本申请实施例中可以根据时间点关联的告警信息中的告警源和配置变更信息中的操作对象,构建物理拓扑图,并在该物理拓扑图中显示根因指示符和操作指示符。如此,告警和配置变更在哪个位置、哪个时间发生的都一目了然,从而便于技术人员快速查找出疑似根因。It is worth noting that in the embodiments of the present application, a physical topology diagram can be constructed according to the alarm source in the alarm information associated with the time point and the operation object in the configuration change information, and the root cause indicator and operation can be displayed in the physical topology diagram. indicator. In this way, it is clear at a glance where and when the alarm and configuration change occurred, so that technicians can quickly find the suspected root cause.
步骤205:根据该滑块指示的时间点关联的业务故障信息中的业务路径构建业务拓扑图,显示该业务拓扑图。Step 205: Construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider, and display the business topology map.
需要说明的是,业务拓扑图可以反映业务途径节点和业务路线。具体地,可以将业务途径的所有节点的标识(如名称、IP地址等)作为业务拓扑图中的结点,然后根据业务路线构建该业务拓扑图中的节点之间的边,得到该业务拓扑图。可选地,还可以将业务名称也标注在该业务拓扑图中。It should be noted that the business topology map can reflect business path nodes and business routes. Specifically, the identifiers (such as names, IP addresses, etc.) of all nodes in the business path can be used as nodes in the business topology map, and then the edges between the nodes in the business topology map are constructed according to the business route to obtain the business topology Figure. Optionally, the service name can also be marked in the service topology diagram.
另外,该管理页面中除显示该时间轴的区域、第一区域、第二区域和第三区域之外,还可以包括第四区域。可以将该业务拓扑图显示在第四区域中。In addition, in addition to the area, the first area, the second area, and the third area where the time axis is displayed, the management page may also include a fourth area. The business topology map can be displayed in the fourth area.
步骤206:若在该业务拓扑图中检测到查询指令,则显示该业务故障信息中的业务数据。Step 206: If a query instruction is detected in the service topology diagram, display the service data in the service fault information.
需要说明的是,查询指令可以由运维人员触发,查询指令用于指示显示业务数据。比如,运维人员可以在该业务拓扑图中进行右键点击来触发选项框,在该选项框中选择查看详情选项来触发该查询指令。It should be noted that the query instruction can be triggered by operation and maintenance personnel, and the query instruction is used to instruct to display business data. For example, the operation and maintenance personnel can right-click in the business topology diagram to trigger the option box, and select the view details option in the option box to trigger the query command.
另外,可以从该管理页面跳转到另一页面来显示该业务故障信息中的业务数据,当然, 也可以在该管理页面上叠加显示该业务故障信息中的业务数据,本申请实施例对此不作限定。In addition, it is possible to jump from the management page to another page to display the business data in the business fault information. Of course, the business data in the business fault information can also be superimposed and displayed on the management page. Not limited.
值得说明的是,本申请实施例中,运维人员可以将该滑块在该时间轴上进行移动,以调整该滑块指示的时间点。此时会展示该滑块指示的时间点关联的业务故障信息对应的业务拓扑图。运维人员可以通过对该业务拓扑图进行操作来查询业务数据。也即是,运维人员可以通过在该时间轴上移动该滑块,来仔细查看该滑块指示的时间点的业务故障信息,以获知受损业务的业务路径和传输层次。如此,即使网络情况发生了变化,运维人员也可以通过时间回放的方式来查看业务受损前后的业务情况。It is worth noting that in this embodiment of the application, the operation and maintenance personnel can move the slider on the time axis to adjust the time point indicated by the slider. At this time, the business topology map corresponding to the business fault information associated with the time point indicated by the slider will be displayed. Operation and maintenance personnel can query business data by operating the business topology map. That is, the operation and maintenance personnel can carefully view the service failure information at the time point indicated by the slider by moving the slider on the time axis, so as to learn the service path and transmission level of the damaged service. In this way, even if the network situation changes, the operation and maintenance personnel can view the business situation before and after the business is damaged through time replay.
值得注意的是,在实际的网络中,网络管理系统实时接收来自网络中的对象上报的提示信息。由于提示信息的数量巨大,因此,网络管理系统通常会对接收到的提示信息进行聚合处理,以将这些提示信息划分为多个提示信息组,每个提示信息组属于同一网络监控区域。然后可以按照本申请实施例提供的提示信息处理方法,来根据某一提示信息组包括的告警信息、配置变更信息和业务故障信息,展示出一个时间轴。运维人员通过移动该时间轴上的滑块,可以查看故障上下文,从而可以确定是否前期存在网络配置变更、是否存在物理面硬件故障、是否存在业务面故障等。运维人员根据前述几个维度的信息,可以快速推断出可能的疑似根因,并大致评判系统推荐的疑似根因是否足够准确。如此,可以加速运维人员对故障的理解,继而提升排障效率。It is worth noting that in an actual network, the network management system receives prompt information reported by objects in the network in real time. Due to the huge amount of prompt information, the network management system usually aggregates the received prompt information to divide the prompt information into multiple prompt information groups, and each prompt information group belongs to the same network monitoring area. Then, according to the prompt information processing method provided in the embodiment of the present application, a time axis can be displayed according to the alarm information, configuration change information, and service failure information included in a certain prompt information group. Operation and maintenance personnel can view the fault context by moving the slider on the timeline, thereby determining whether there is a network configuration change in the early stage, whether there is a physical hardware failure, whether there is a business failure, etc. The operation and maintenance personnel can quickly infer the possible suspected root causes based on the information of the aforementioned several dimensions, and roughly judge whether the suspected root causes recommended by the system are accurate enough. In this way, it can speed up the understanding of the fault by the operation and maintenance personnel, and then improve the efficiency of troubleshooting.
为了便于理解,下面结合图3、图4和图5来对本申请实施例进行举例说明。For ease of understanding, the embodiments of the present application are illustrated below with reference to FIG. 3, FIG. 4, and FIG. 5.
图3是本申请实施例提供的一种管理页面的示意图。参见图3,该管理页面中包括时间轴,该时间轴上设有滑块。Fig. 3 is a schematic diagram of a management page provided by an embodiment of the present application. Referring to Figure 3, the management page includes a time axis, and a slider is provided on the time axis.
该时间轴的下方显示有与该时间轴中的多个时间点关联的告警信息的条数和配置变更信息的条数。据此,运维人员可以看到在15:04:21有人变更了配置,之后产生了4个告警。在15:06:21之后又有若干配置变更和告警产生。The number of pieces of alarm information and the number of pieces of configuration change information associated with multiple time points in the time axis are displayed below the time axis. Based on this, the operation and maintenance personnel can see that someone changed the configuration at 15:04:21, and then 4 alarms were generated. After 15:06:21, several configuration changes and alarms were generated.
运维人员将该滑块拖动到15:05:01,此时告警列表中显示有15:04:21到15:05:01之间产生的告警信息,配置变更列表中显示有15:04:21到15:05:01之间产生的配置变更信息。此时根据该告警列表中的告警信息和该配置变更列表中的配置变更信息可以显示物理拓扑图。The operation and maintenance personnel drag the slider to 15:05:01. At this time, the alarm information generated between 15:04:21 and 15:05:01 is displayed in the alarm list, and 15:04 is displayed in the configuration change list. : Configuration change information generated between 21 and 15:05:01. At this time, the physical topology map can be displayed according to the alarm information in the alarm list and the configuration change information in the configuration change list.
并且,运维人员将该滑块拖动到15:05:01时,会发现在15:05:01时有业务受损,根据15:05:01产生的业务故障信息可以显示业务拓扑图。运维人员对该业务拓扑图进行操作触发查询指令后,可以显示该业务故障信息中的业务数据。Moreover, when the operation and maintenance personnel drag the slider to 15:05:01, they will find that the business is damaged at 15:05:01, and the business topology map can be displayed based on the business fault information generated at 15:05:01. After the operation and maintenance personnel operate on the business topology map to trigger a query instruction, the business data in the business fault information can be displayed.
如此,运维人员通过移动该时间轴中的滑块,就可以详细查看网络在各个时间产生的告警信息、配置变更信息和业务故障信息。运维人员通过时间回放的方式可以快速理解故障上下文,继而可以快速定位故障点,推动故障的快速解决。In this way, the operation and maintenance personnel can view the alarm information, configuration change information, and business failure information generated by the network at various times in detail by moving the slider in the timeline. The operation and maintenance personnel can quickly understand the fault context through time playback, and then can quickly locate the fault point and promote the rapid resolution of the fault.
图4是本申请实施例提供的另一种管理页面的示意图。当接收到针对如图3所示的管理页面上的时间轴的第一操作指令,该管理页面可以显示为图4。参见图4,该管理页面中包括时间轴,该时间轴的下方显示有与该时间轴中的多个时间点关联的各条告警信息的告警名称和/或各条配置变更信息对应的用户操作信息。其中,告警名称可以显示在原来显示告警信息的条数的区域,用户操作信息可以显示在原来显示配置变更信息的条数的区域。例如,在15:04:21处显示有关联的用户操作信息1和用户操作信息2;在15:04:36处显示有关联的告警名称1、告警名称2、告警名称3和告警名称4。若该第一操作指令为显示放大指令,时间 轴可以相应增大显示比例,例如图3中时间轴表示的时段范围为15:04:21至15:18:21,图4中时间轴表示的时段范围为15:04:21至15:05:31。Fig. 4 is a schematic diagram of another management page provided by an embodiment of the present application. When the first operation instruction for the time axis on the management page as shown in FIG. 3 is received, the management page may be displayed as FIG. 4. Referring to Figure 4, the management page includes a time axis. Below the time axis is displayed the alarm name of each piece of alarm information associated with multiple time points in the time axis and/or the user operation corresponding to each piece of configuration change information. information. Among them, the alarm name can be displayed in the area that originally displayed the number of alarm information, and the user operation information can be displayed in the area that originally displayed the number of configuration change information. For example, the associated user operation information 1 and user operation information 2 are displayed at 15:04:21; the associated alarm name 1, alarm name 2, alarm name 3, and alarm name 4 are displayed at 15:04:36. If the first operation instruction is a display zoom instruction, the time axis can increase the display scale accordingly. For example, the time period represented by the time axis in Figure 3 ranges from 15:04:21 to 15:18:21, as shown by the time axis in Figure 4 The time period ranges from 15:04:21 to 15:05:31.
图5是本申请实施例提供的又一种管理页面的示意图。当接收到针对如图3所示的管理页面上的时间轴的第二操作指令,该管理页面可以显示为图5。参见图5,该管理页面中包括时间轴,该时间轴的下方显示有与该时间轴中的多个时间点关联的告警信息的指示和/或配置变更信息的指示。若该第二操作指令为显示缩小指令,时间轴可以相应缩小显示比例,例如图3中时间轴表示的时段范围为15:04:21至15:18:21,图5中时间轴表示的时段范围为15:04:21至15:20:21。Fig. 5 is a schematic diagram of another management page provided by an embodiment of the present application. When a second operation instruction for the time axis on the management page shown in FIG. 3 is received, the management page may be displayed as FIG. 5. Referring to FIG. 5, the management page includes a time axis, and indications of alarm information and/or configuration change information associated with multiple time points in the time axis are displayed below the time axis. If the second operation command is a display zoom-out command, the time axis can be scaled down accordingly. For example, the time period indicated by the time axis in Figure 3 ranges from 15:04:21 to 15:18:21, and the time period represented by the time axis in Figure 5 The range is 15:04:21 to 15:20:21.
在本申请实施例中,显示时间轴,该时间轴上设有用于响应移动操作的滑块。基于该时间轴显示该时间轴中多个时间点关联的提示信息的条数,以及显示从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的时间点关联的提示信息。也即是,运维人员可以通过在该时间轴上移动该滑块,来仔细查看网络在各个时间产生的提示信息。如此,运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,继而理解故障场景上下文,快速给出更可靠的疑似根因,从而可以提升根因识别率。In the embodiment of the present application, a time axis is displayed, and a slider for responding to movement operations is provided on the time axis. Based on the time axis, display the number of prompt information associated with multiple time points in the time axis, and display the prompt information associated with time points in the time period from the start time point in the time axis to the time point indicated by the slider information. That is, the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
图6是本申请实施例提供的一种提示信息处理装置的结构示意图,该提示信息处理装置可以由软件、硬件或者两者的结合实现成为计算机设备的部分或者全部,该计算机设备可以为图1所示的计算机设备。参见图6,该装置包括:第一显示模块401、第二显示模块402和第三显示模块403。FIG. 6 is a schematic structural diagram of a prompt information processing apparatus provided by an embodiment of the present application. The prompt information processing apparatus can be implemented as part or all of computer equipment by software, hardware, or a combination of the two. The computer equipment may be as shown in Figure 1 Computer equipment shown. Referring to FIG. 6, the device includes: a first display module 401, a second display module 402, and a third display module 403.
第一显示模块401,用于执行图2实施例中的步骤202;The first display module 401 is configured to perform step 202 in the embodiment of FIG. 2;
第二显示模块402,用于执行图2实施例中的步骤203;The second display module 402 is configured to perform step 203 in the embodiment of FIG. 2;
第三显示模块403,用于执行图2实施例中的步骤204。The third display module 403 is configured to execute step 204 in the embodiment of FIG. 2.
可选地,第二显示模块402用于:Optionally, the second display module 402 is used to:
在时间轴的一侧或两侧显示时间轴中的多个时间点中每个时间点关联的提示信息的条数。The number of prompt messages associated with each time point in the multiple time points in the time axis is displayed on one or both sides of the time axis.
可选地,该装置还包括:Optionally, the device further includes:
获取模块,用于获取网络中的提示信息;Obtaining module for obtaining prompt information in the network;
关联模块,用于将提示信息关联到时间轴中与提示信息的上报时间相同的时间点。The association module is used to associate the prompt information to the same time point in the time axis as the reporting time of the prompt information.
可选地,该装置还包括:Optionally, the device further includes:
第一构建模块,用于根据滑块指示的时间点关联的业务故障信息中的业务路径,构建业务拓扑图;The first building module is used to construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider;
第四显示模块,用于显示业务拓扑图;The fourth display module is used to display the business topology diagram;
第五显示模块,用于若在业务拓扑图中检测到查询指令,则显示业务故障信息中的业务数据。The fifth display module is used to display the business data in the business failure information if the query instruction is detected in the business topology diagram.
可选地,提示信息包括告警信息,第三显示模块403还用于:Optionally, the prompt information includes alarm information, and the third display module 403 is further configured to:
显示时间段中的时间点关联的告警信息的疑似根因概率和根因推荐来源。Shows the suspected root cause probability and the recommended root cause source of the alarm information associated with the time point in the time period.
可选地,提示信息还包括配置变更信息,该装置还包括:Optionally, the prompt information further includes configuration change information, and the device further includes:
第二构建模块,用于根据时间段中的时间点关联的告警信息中的告警源和时间段中的时间点关联的配置变更信息中的操作对象,构建物理拓扑图;The second building module is used to construct a physical topology map according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period;
第六显示模块,用于显示物理拓扑图;The sixth display module is used to display the physical topology diagram;
第七显示模块,用于根据时间段中的时间点关联的告警信息的疑似根因概率,在物理拓扑图中显示根因指示符;The seventh display module is used to display the root cause indicator in the physical topology diagram according to the suspected root cause probability of the alarm information associated with the time point in the time period;
第八显示模块,用于根据时间段中的时间点关联的配置变更信息中的操作对象,在物理拓扑图中显示操作指示符。The eighth display module is used to display the operation indicator in the physical topology diagram according to the operation object in the configuration change information associated with the time point in the time period.
可选地,该装置还包括:Optionally, the device further includes:
第九显示模块,用于若接收到针对时间轴的第一操作指令,基于时间轴显示该时间轴中的多个时间点关联的提示信息的内容。The ninth display module is configured to display the content of the prompt information associated with multiple time points in the time axis based on the time axis if the first operation instruction for the time axis is received.
可选地,该装置还包括:Optionally, the device further includes:
第十显示模块,用于若接收到针对时间轴的第二操作指令,基于时间轴显示该时间轴中的多个时间点关联的提示信息的指示,该提示信息的指示用于指示对应的时间点具有关联的提示信息。The tenth display module is configured to, if a second operation instruction for the time axis is received, display an indication of the prompt information associated with multiple time points in the time axis based on the time axis, and the indication of the prompt information is used to indicate the corresponding time Point has associated prompt information.
在本申请实施例中,显示时间轴,该时间轴上设有用于响应移动操作的滑块。基于该时间轴显示该时间轴中多个时间点关联的提示信息的条数,以及显示从该时间轴中的开始时间点到该滑块指示的时间点的时间段中的时间点关联的提示信息。也即是,运维人员可以通过在该时间轴上移动该滑块,来仔细查看网络在各个时间产生的提示信息。如此,运维人员可以通过时间回放的方式来查看网络中的故障发生时的上下文情况,继而理解故障场景上下文,快速给出更可靠的疑似根因,从而可以提升根因识别率。In the embodiment of the present application, a time axis is displayed, and a slider for responding to movement operations is provided on the time axis. Based on the time axis, display the number of prompt information associated with multiple time points in the time axis, and display the prompt information associated with time points in the time period from the start time point in the time axis to the time point indicated by the slider information. That is, the operation and maintenance personnel can carefully view the prompt information generated by the network at various times by moving the slider on the time axis. In this way, the operation and maintenance personnel can view the context of the failure in the network through time playback, and then understand the context of the failure scenario, and quickly give a more reliable suspected root cause, which can improve the root cause recognition rate.
需要说明的是:上述实施例提供的提示信息处理装置在处理提示信息时,仅以上述各功能模块的划分进行举例说明,实际应用中,可以根据需要而将上述功能分配由不同的功能模块完成,即将装置的内部结构划分成不同的功能模块,以完成以上描述的全部或者部分功能。另外,上述实施例提供的提示信息处理装置与提示信息处理方法实施例属于同一构思,其具体实现过程详见方法实施例,这里不再赘述。It should be noted that when the prompt information processing apparatus provided in the above embodiment processes prompt information, only the division of the above functional modules is used as an example for illustration. In actual applications, the above functions can be allocated by different functional modules according to needs. , The internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the prompt information processing device provided in the foregoing embodiment and the prompt information processing method embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
在上述实施例中,可以全部或部分地通过软件、硬件、固件或者其任意结合来实现。当使用软件实现时,可以全部或部分地以计算机程序产品的形式实现。所述计算机程序产品包括一个或多个计算机指令。在计算机上加载和执行所述计算机指令时,全部或部分地产生按照本申请实施例所述的流程或功能。所述计算机可以是通用计算机、专用计算机、计算机网络或其他可编程装置。所述计算机指令可以存储在计算机可读存储介质中,或者从一个计算机可读存储介质向另一个计算机可读存储介质传输,例如,所述计算机指令可以从一个网站站点、计算机、服务器或数据中心通过有线(例如:同轴电缆、光纤、数据用户线(Digital Subscriber Line,DSL))或无线(例如:红外、无线、微波等)方式向另一个网站站点、计算机、服务器或数据中心进行传输。所述计算机可读存储介质可以是计算机能够存取的任何可用介质,或者是包含一个或多个可用介质集成的服务器、数据中心等数据存储设备。所述可用介质可以是磁性介质(例如:软盘、硬盘、磁带)、光介质(例如:数字通用光盘(Digital Versatile Disc,DVD))或半导体介质(例如:固态硬盘(Solid State Disk,SSD))等。In the above embodiments, it may be implemented in whole or in part by software, hardware, firmware, or any combination thereof. When implemented by software, it can be implemented in the form of a computer program product in whole or in part. The computer program product includes one or more computer instructions. When the computer instructions are loaded and executed on the computer, the processes or functions described in the embodiments of the present application are generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website, computer, server, or data center. Transmission to another website, computer, server or data center via wired (for example: coaxial cable, optical fiber, Digital Subscriber Line (DSL)) or wireless (for example: infrared, wireless, microwave, etc.). The computer-readable storage medium may be any available medium that can be accessed by a computer, or a data storage device such as a server or a data center integrated with one or more available media. The usable medium may be a magnetic medium (for example: floppy disk, hard disk, magnetic tape), optical medium (for example: Digital Versatile Disc (DVD)) or semiconductor medium (for example: Solid State Disk (SSD)) Wait.
以上所述为本申请提供的实施例,并不用以限制本申请,凡在本申请的构思和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above-mentioned examples provided for this application are not intended to limit this application. Any modification, equivalent replacement, improvement, etc. made within the concept and principle of this application shall be included in the protection scope of this application. Inside.

Claims (17)

  1. 一种提示信息处理方法,其特征在于,所述方法包括:A method for processing prompt information, characterized in that the method includes:
    显示时间轴,所述时间轴上设有用于响应移动操作的滑块;Display a time axis, and a slider for responding to movement operations is provided on the time axis;
    基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的条数;Displaying the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis;
    显示从所述时间轴中的开始时间点到所述滑块指示的时间点的时间段中的时间点关联的提示信息。Display the prompt information associated with the time point in the time period from the start time point in the time axis to the time point indicated by the slider.
  2. 如权利要求1所述的方法,其特征在于,所述基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的条数,包括:The method according to claim 1, wherein the displaying the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis comprises:
    在所述时间轴的一侧或两侧显示所述时间轴中的多个时间点中每个时间点关联的提示信息的条数。The number of pieces of prompt information associated with each time point in the multiple time points in the time axis is displayed on one or both sides of the time axis.
  3. 如权利要求1所述的方法,其特征在于,所述显示时间轴之前,还包括:The method according to claim 1, wherein before the displaying the time axis, the method further comprises:
    获取网络中的提示信息;Obtain prompt information in the network;
    将所述提示信息关联到所述时间轴中与所述提示信息的上报时间相同的时间点。Associating the prompt information to a time point in the time axis that is the same as the reporting time of the prompt information.
  4. 如权利要求1-3任一所述的方法,其特征在于,所述方法还包括:The method according to any one of claims 1-3, wherein the method further comprises:
    根据所述滑块指示的时间点关联的业务故障信息中的业务路径,构建业务拓扑图;Construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider;
    显示所述业务拓扑图;Display the business topology diagram;
    若在所述业务拓扑图中检测到查询指令,则显示所述业务故障信息中的业务数据。If a query instruction is detected in the service topology diagram, the service data in the service fault information is displayed.
  5. 如权利要求1-3任一所述的方法,其特征在于,所述提示信息包括告警信息,所述方法还包括:The method according to any one of claims 1-3, wherein the prompt information includes alarm information, and the method further comprises:
    显示所述时间段中的时间点关联的告警信息的疑似根因概率和根因推荐来源。The suspected root cause probability and root cause recommendation source of the alarm information associated with the time point in the time period are displayed.
  6. 如权利要求5所述的方法,其特征在于,所述提示信息还包括配置变更信息,所述方法还包括:The method according to claim 5, wherein the prompt information further comprises configuration change information, and the method further comprises:
    根据所述时间段中的时间点关联的告警信息中的告警源和所述时间段中的时间点关联的配置变更信息中的操作对象,构建物理拓扑图;Construct a physical topology map according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period;
    显示所述物理拓扑图;Display the physical topology diagram;
    根据所述时间段中的时间点关联的告警信息的疑似根因概率,在所述物理拓扑图中显示根因指示符;Display a root cause indicator in the physical topology map according to the suspected root cause probability of the alarm information associated with the time point in the time period;
    根据所述时间段中的时间点关联的配置变更信息中的操作对象,在所述物理拓扑图中显示操作指示符。According to the operation object in the configuration change information associated with the time point in the time period, an operation indicator is displayed in the physical topology diagram.
  7. 如权利要求1-6任一所述的方法,其特征在于,所述方法还包括:The method according to any one of claims 1-6, wherein the method further comprises:
    若接收到针对所述时间轴的第一操作指令,基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的内容。If the first operation instruction for the time axis is received, the content of the prompt information associated with multiple time points in the time axis is displayed based on the time axis.
  8. 如权利要求1-6任一所述的方法,其特征在于,所述方法还包括:The method according to any one of claims 1-6, wherein the method further comprises:
    若接收到针对所述时间轴的第二操作指令,基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的指示,所述提示信息的指示用于指示对应的时间点具有关联的提示信息。If a second operation instruction for the time axis is received, based on the time axis, an indication of prompt information associated with multiple time points in the time axis is displayed, and the indication of the prompt information is used to indicate the corresponding time point Has associated prompt information.
  9. 一种提示信息处理装置,其特征在于,所述装置包括:A prompt information processing device, characterized in that the device includes:
    第一显示模块,用于显示时间轴,所述时间轴上设有用于响应移动操作的滑块;The first display module is configured to display a time axis, and a slider for responding to movement operations is provided on the time axis;
    第二显示模块,用于基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的条数;The second display module is configured to display the number of pieces of prompt information associated with multiple time points in the time axis based on the time axis;
    第三显示模块,用于显示从所述时间轴中的开始时间点到所述滑块指示的时间点的时间段中的时间点关联的提示信息。The third display module is configured to display prompt information associated with a time point in a time period from the start time point in the time axis to the time point indicated by the slider.
  10. 如权利要求9所述的装置,其特征在于,所述第二显示模块用于:9. The device of claim 9, wherein the second display module is used for:
    在所述时间轴的一侧或两侧显示所述时间轴中的多个时间点中每个时间点关联的提示信息的条数。The number of pieces of prompt information associated with each time point in the multiple time points in the time axis is displayed on one or both sides of the time axis.
  11. 如权利要求9所述的装置,其特征在于,所述装置还包括:The device according to claim 9, wherein the device further comprises:
    获取模块,用于获取网络中的提示信息;Obtaining module for obtaining prompt information in the network;
    关联模块,用于将所述提示信息关联到所述时间轴中与所述提示信息的上报时间相同的时间点。The associating module is used for associating the prompt information to the same time point in the time axis as the reporting time of the prompt information.
  12. 如权利要求9-11任一所述的装置,其特征在于,所述装置还包括:The device according to any one of claims 9-11, wherein the device further comprises:
    第一构建模块,用于根据所述滑块指示的时间点关联的业务故障信息中的业务路径,构建业务拓扑图;The first construction module is configured to construct a business topology map according to the business path in the business fault information associated with the time point indicated by the slider;
    第四显示模块,用于显示所述业务拓扑图;The fourth display module is used to display the service topology diagram;
    第五显示模块,用于若在所述业务拓扑图中检测到查询指令,则显示所述业务故障信息中的业务数据。The fifth display module is configured to display the business data in the business fault information if a query instruction is detected in the business topology diagram.
  13. 如权利要求9-11任一所述的装置,其特征在于,所述提示信息包括告警信息,所述第三显示模块还用于:The device according to any one of claims 9-11, wherein the prompt information includes alarm information, and the third display module is further configured to:
    显示所述时间段中的时间点关联的告警信息的疑似根因概率和根因推荐来源。The suspected root cause probability and root cause recommendation source of the alarm information associated with the time point in the time period are displayed.
  14. 如权利要求13所述的装置,其特征在于,所述提示信息还包括配置变更信息,所述装置还包括:The device according to claim 13, wherein the prompt information further comprises configuration change information, and the device further comprises:
    第二构建模块,用于根据所述时间段中的时间点关联的告警信息中的告警源和所述时间段中的时间点关联的配置变更信息中的操作对象,构建物理拓扑图;The second construction module is configured to construct a physical topology map according to the alarm source in the alarm information associated with the time point in the time period and the operation object in the configuration change information associated with the time point in the time period;
    第六显示模块,用于显示所述物理拓扑图;The sixth display module is used to display the physical topology diagram;
    第七显示模块,用于根据所述时间段中的时间点关联的告警信息的疑似根因概率,在所 述物理拓扑图中显示根因指示符;The seventh display module is configured to display the root cause indicator in the physical topology diagram according to the suspected root cause probability of the alarm information associated with the time point in the time period;
    第八显示模块,用于根据所述时间段中的时间点关联的配置变更信息中的操作对象,在所述物理拓扑图中显示操作指示符。The eighth display module is configured to display an operation indicator in the physical topology diagram according to the operation object in the configuration change information associated with the time point in the time period.
  15. 如权利要求9-14任一所述的装置,其特征在于,所述装置还包括:The device according to any one of claims 9-14, wherein the device further comprises:
    第九显示模块,用于若接收到针对所述时间轴的第一操作指令,基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的内容。The ninth display module is configured to display the content of the prompt information associated with multiple time points in the time axis based on the time axis if the first operation instruction for the time axis is received.
  16. 如权利要求9-14任一所述的装置,其特征在于,所述装置还包括:The device according to any one of claims 9-14, wherein the device further comprises:
    第十显示模块,用于若接收到针对所述时间轴的第二操作指令,基于所述时间轴显示所述时间轴中的多个时间点关联的提示信息的指示,所述提示信息的指示用于指示对应的时间点具有关联的提示信息。The tenth display module is configured to: if a second operation instruction for the time axis is received, based on the time axis, display an indication of the prompt information associated with multiple time points in the time axis, and the indication of the prompt information Used to indicate that the corresponding time point has associated prompt information.
  17. 一种计算机可读存储介质,所述计算机可读存储介质中存储有指令,当其在计算机上运行时,使得计算机执行如权利要求1-8任意一项所述的方法。A computer-readable storage medium in which instructions are stored, which when run on a computer, cause the computer to execute the method according to any one of claims 1-8.
PCT/CN2020/119207 2019-12-30 2020-09-30 Prompt information processing method and apparatus, and storage medium WO2021135479A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201911396981.5A CN113132128B (en) 2019-12-30 2019-12-30 Prompt information processing method, device and storage medium
CN201911396981.5 2019-12-30

Publications (1)

Publication Number Publication Date
WO2021135479A1 true WO2021135479A1 (en) 2021-07-08

Family

ID=76687079

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/119207 WO2021135479A1 (en) 2019-12-30 2020-09-30 Prompt information processing method and apparatus, and storage medium

Country Status (2)

Country Link
CN (1) CN113132128B (en)
WO (1) WO2021135479A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115118574A (en) * 2022-06-07 2022-09-27 马上消费金融股份有限公司 Data processing method, device and storage medium
CN116486579A (en) * 2023-04-27 2023-07-25 湖北清江水电开发有限责任公司 Alarm signal management method for centralized control center monitoring system of river basin step power plant

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115576473B (en) * 2022-08-05 2023-08-04 芯华章科技(北京)有限公司 Waveform display method, computer device, and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103973496A (en) * 2014-05-21 2014-08-06 华为技术有限公司 Fault diagnosis method and device
US20150195154A1 (en) * 2014-01-08 2015-07-09 Telefonaktiebolaget L M Ericsson (Publ) Creating a Knowledge Base for Alarm Management in a Communications Network
CN106155468A (en) * 2015-04-16 2016-11-23 腾讯科技(深圳)有限公司 A kind of alarm methods of exhibiting and terminal
CN106681701A (en) * 2015-11-09 2017-05-17 华为技术有限公司 Task display method and device
CN109905436A (en) * 2017-12-08 2019-06-18 华为软件技术有限公司 Determination method, apparatus and storage medium of the root because of event

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000005594A1 (en) * 1998-07-21 2000-02-03 Conduct Ltd. Automatic network traffic analysis
CN107305518A (en) * 2016-04-20 2017-10-31 中兴通讯股份有限公司 The display methods and device of warning information
CN107547127A (en) * 2016-06-29 2018-01-05 中兴通讯股份有限公司 A kind of failure information obtaining method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150195154A1 (en) * 2014-01-08 2015-07-09 Telefonaktiebolaget L M Ericsson (Publ) Creating a Knowledge Base for Alarm Management in a Communications Network
CN103973496A (en) * 2014-05-21 2014-08-06 华为技术有限公司 Fault diagnosis method and device
CN106155468A (en) * 2015-04-16 2016-11-23 腾讯科技(深圳)有限公司 A kind of alarm methods of exhibiting and terminal
CN106681701A (en) * 2015-11-09 2017-05-17 华为技术有限公司 Task display method and device
CN109905436A (en) * 2017-12-08 2019-06-18 华为软件技术有限公司 Determination method, apparatus and storage medium of the root because of event

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115118574A (en) * 2022-06-07 2022-09-27 马上消费金融股份有限公司 Data processing method, device and storage medium
CN116486579A (en) * 2023-04-27 2023-07-25 湖北清江水电开发有限责任公司 Alarm signal management method for centralized control center monitoring system of river basin step power plant

Also Published As

Publication number Publication date
CN113132128A (en) 2021-07-16
CN113132128B (en) 2022-07-19

Similar Documents

Publication Publication Date Title
WO2021135479A1 (en) Prompt information processing method and apparatus, and storage medium
US10454753B2 (en) Ranking network anomalies in an anomaly cluster
US20200257582A1 (en) Predicting system behavior using machine data
US11151502B2 (en) Real-time adaptive operations performance management system
US20200106662A1 (en) Systems and methods for managing network health
US11012461B2 (en) Network device vulnerability prediction
US11706079B2 (en) Fault recovery method and apparatus, and storage medium
US11533216B2 (en) Aggregating alarms into clusters to display service-affecting events on a graphical user interface
US20100205483A1 (en) Operation management apparatus and method thereof
US11799748B2 (en) Mitigating failure in request handling
CN106844165A (en) Alarm method and device
CN105183619B (en) A kind of system failure method for early warning and system
US8483091B1 (en) Automatic displaying of alarms in a communications network
CN101989931A (en) Operation alarm processing method and device
WO2014169869A1 (en) Alarm processing method and alarm system
WO2020182051A1 (en) Method of recognizing a probable root cause alarm, apparatus and computer storage medium
CN115118574B (en) Data processing method, device and storage medium
CN114328107A (en) Monitoring method and system for optomagnetic fusion storage server cluster and electronic equipment
CN114257493A (en) Fault early warning method, device, medium and electronic equipment for network node
US7796500B1 (en) Automated determination of service impacting events in a communications network
CN113765698A (en) Network fault positioning and root cause detection method and system for industrial internet
CN110012490A (en) Alarm method, device, operation and maintenance center and computer readable storage medium
CN116302826A (en) Intelligent operation and maintenance monitoring platform, method, storage medium and electronic equipment
US8868712B2 (en) Effective visualization of an information technology environment through social scoring
US10432451B2 (en) Systems and methods for managing network health

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20909562

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20909562

Country of ref document: EP

Kind code of ref document: A1