WO2021072921A1 - 基于bim+gis融合技术的灾害发生追溯方法 - Google Patents

基于bim+gis融合技术的灾害发生追溯方法 Download PDF

Info

Publication number
WO2021072921A1
WO2021072921A1 PCT/CN2019/121395 CN2019121395W WO2021072921A1 WO 2021072921 A1 WO2021072921 A1 WO 2021072921A1 CN 2019121395 W CN2019121395 W CN 2019121395W WO 2021072921 A1 WO2021072921 A1 WO 2021072921A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
information
design
gis
data module
Prior art date
Application number
PCT/CN2019/121395
Other languages
English (en)
French (fr)
Inventor
袁长丰
李亮
宋传旺
刘福顺
许洪建
高原
李兆龙
李冉
路世豹
Original Assignee
青岛理工大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 青岛理工大学 filed Critical 青岛理工大学
Publication of WO2021072921A1 publication Critical patent/WO2021072921A1/zh

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design

Definitions

  • the invention belongs to the technical field of geotechnical engineering, and in particular relates to a method for tracing the cause of a deep foundation pit disaster based on a BIM+GIS fusion technology.
  • the present invention provides a method for tracing the cause of a deep foundation pit disaster based on the BIM+GIS fusion technology, and realizes accurate, efficient and objective tracing of the deep foundation pit disaster after it occurs.
  • the technical solution adopted by the present invention to solve the technical problem is: a disaster occurrence tracing method based on BIM+GIS fusion technology, including the following steps:
  • Step 1 Build a GIS+BIM disaster traceability platform that integrates GIS technology and BIM technology through big data intelligent data analysis technology;
  • Step 2 Set up the geological data module, design data module, construction data module and supervision data module in the GIS+BIM disaster tracing platform. Each module has information that can be called by the GIS+BIM disaster tracing platform.
  • the specific design steps and content are as follows:
  • This module mainly provides the geological conditions of the deep foundation pit engineering area, and provides actual information for design and construction calculations.
  • a2 compare the stratum information exposed at the construction site with the information in the engineering site survey report in step a1, and after the supervision review, rely on GIS technology to regenerate the actual three-dimensional geology obtained due to the exposed rock and soil layers during the construction
  • the model and relying on the actual project to generate the modified geological layer, assign the modified geological layer to the same geological layer ID number as the original one, and store it in the geological data module database;
  • This module is used to store construction organization design, construction process and material related information.
  • the construction data module includes three units, namely a material information unit, a construction organization design unit, and a construction process unit;
  • the material information unit is used to store relevant information about the engineering materials used in the deep foundation pit project
  • the construction organization design unit mainly stores the construction organization design plan and related change plans, and also includes related approval procedures documents; it is convenient to trace the reasons of the construction organization through the database after a disaster accident occurs.
  • the construction process unit mainly stores unstructured information obtained through video monitoring during the construction process, and stores the video information in a video database;
  • This module mainly stores the information of the supervision work in the deep foundation pit project, which is convenient for tracing the supervision work when a disaster accident occurs.
  • the supervision module includes four units, namely, a foundation pit groove inspection unit, a material information review unit, a construction organization design review unit, and a construction process monitoring unit;
  • the foundation pit groove inspection unit is used to review the geological data module, so that the GIS+BIM disaster tracing platform can confirm the relevant geological information, and save it as an electronic file;
  • the material information review unit is used to review whether the design materials and the construction materials are in conformity with the material information required by the construction materials, so that the GIS+BIM disaster traceability platform can review the material information and save it as an electronic file;
  • the construction organization design review unit is used to review whether the construction organization process meets the requirements of the construction organization design, and the relevant materials are stored in electronic files;
  • the construction process monitoring unit mainly stores the monitoring process information of the supervision unit during the construction process, including video data and electronic files, so that the GIS+BIM disaster traceability platform can review the data provided by the construction unit and the data provided by the supervision unit;
  • Step 3 Set up the analysis model module in the GIS+BIM disaster tracing platform, and call the information of the geological data module, design data module, construction data module and supervision data module through the GIS+BIM disaster tracing platform, and then trace the disaster through simulation calculation The reason, and the retrospective results and analysis conclusions form a deep foundation pit disaster retrospective report.
  • step 3 is:
  • the GIS platform Through the GIS platform, compare the design BIM model in the design data module with the construction BIM model in the construction data module to determine whether the construction quality meets the design requirements, and then whether to trace the construction responsibility; if it does not meet the design requirements, trace the construction Responsibility, if it meets the design requirements, the GIS platform will further call the original 3D geological model of the geological data module and the construction BIM model, and further conduct simulation calculation analysis, and then whether disaster tracing is the design responsibility;
  • e5. Use the GIS platform to call the supervision data module to judge whether the supervision data in the above-mentioned geological survey process, design process and construction process are complete, and whether it is consistent with the design and site; on the one hand, when the data is incomplete, the disaster retrospective supervision responsibility, and the other On the one hand, when the data is complete, it will be used as the basic data for further disaster-tracing geological prospecting units, design units, and construction units.
  • the material information unit specifically includes: material manufacturer, material performance, material sampling test information, supervision review information on the material, and traceability of the material through the database after a disaster accident occurs. Use to meet the requirements of the design documents.
  • the construction process unit specifically includes: site safety management information during the construction process, water/electricity/gas safety measures control information, construction process video monitoring information, and third-party deep foundation pit monitoring Information, the information stored by the supervising party/party A/construction party through the video equipment carried by itself during the inspection, so that the original information of the video monitoring can be obtained through the database in the first time when a disaster accident occurs.
  • the present invention has the following beneficial effects: the method can quickly, accurately and efficiently investigate the causes of disasters through analysis of materials, design, construction and traceability models through BIM and GIS fusion technology.
  • Figure 1 is a flow chart of the method of the present invention
  • Figure 2 is a schematic flow diagram of the geological data module in Figure 1;
  • Figure 3 is a schematic flow diagram of the design data module in Figure 1;
  • Figure 4 is a schematic flow diagram of the construction data module in Figure 1;
  • FIG. 5 is a schematic flow diagram of the supervision data module in Figure 1;
  • Fig. 6 is a schematic flow chart of the analysis model module in Fig. 1.
  • the method for tracing disaster occurrence based on BIM+GIS fusion technology of the present invention includes the following steps:
  • Step 1 Build a GIS+BIM disaster traceability platform that integrates GIS technology and BIM technology through big data intelligent data analysis technology;
  • Step 2 Set up the geological data module, design data module, construction data module and supervision data module in the GIS+BIM disaster tracing platform. Each module has information that can be called by the GIS+BIM disaster tracing platform.
  • the specific design steps and content are as follows:
  • Geological data module which mainly provides the geological conditions of the deep foundation pit engineering area, and provides actual information for design and construction calculations, as shown in Figure 2.
  • a2 compare the stratum information exposed at the construction site with the information in the engineering site survey report in step a1, and after the supervision review, rely on GIS technology to regenerate the actual three-dimensional geology obtained due to the exposed rock and soil layers during the construction Model, and relying on the actual project to generate modified geological layers, and store the modified geological layers in the geological data module database;
  • the method of on-site survey is mainly used to obtain geological information and form a survey report, but the drill holes in the survey report are arranged at a certain distance, and the information between two adjacent boreholes is fuzzy. This requires continuous improvement and updating of the information in the geological survey report based on the stratum information revealed during the actual excavation process. If the obtained information does not deviate much from the geological survey report, and within the range of the design and construction safety factor, no disaster will occur. Otherwise, Easy to cause disasters.
  • Design data module as shown in Figure 3.
  • the design file of the design data module includes material selection, support method selection, design plan and calculation model selection. The specific processing steps are:
  • Construction data module which is used to store construction organization design, construction process and material related information, as shown in Figure 4.
  • the construction data module includes three units, namely a material information unit, a construction organization design unit, and a construction process unit;
  • the material information unit is used to store the relevant information of the engineering materials used in the deep foundation pit project; the material information unit includes the manufacturer of the material, the performance of the material, the test information of the material sampling, and the supervisor’s review information on the material, which is passed after a disaster accident
  • the use of traceable materials in this database shall comply with the requirements of the design documents.
  • the construction organization design unit mainly stores the construction organization design plan and related change plans, and also includes related approval procedures documents; it is convenient to trace the reasons of the construction organization through the database after a disaster accident occurs.
  • the construction process unit mainly stores unstructured information obtained through video monitoring during the construction process, and stores the video information in a video database; the construction process unit specifically includes: site safety management information during the construction process, water/power /Gas safety measures control information, construction process video monitoring information, third-party deep foundation pit monitoring information, information stored by the supervisor/Party A/construction party through their own video equipment during inspections, so that they can be passed through the database in the event of a disaster. Get the original information monitored by the video screen for the first time.
  • This module mainly stores the information of the supervision work in the deep foundation pit project, which is convenient for tracing the supervision work when a disaster accident occurs, as shown in Figure 5.
  • the supervision module includes four units, namely, a foundation pit groove inspection unit, a material information review unit, a construction organization design review unit, and a construction process monitoring unit;
  • the foundation pit groove inspection unit is used to review the geological data module, so that the GIS+BIM disaster tracing platform can confirm the relevant geological information, and save it as an electronic file;
  • the material information review unit is used to review whether the design materials and the construction materials are in conformity with the material information required by the construction materials, so that the GIS+BIM disaster traceability platform can review the material information and save it as an electronic file;
  • the construction organization design review unit is used to review whether the construction organization process meets the requirements of the construction organization design, and the relevant materials are stored in electronic files;
  • the construction process monitoring unit mainly stores the monitoring process information of the supervision unit during the construction process, including video data and electronic files, so that the GIS+BIM disaster traceability platform can review the data provided by the construction unit and the data provided by the supervision unit;
  • Step 3 Set up the analysis model module in the GIS+BIM disaster tracing platform, and call the information of the geological data module, design data module, construction data module and supervision data module through the GIS+BIM disaster tracing platform, and then trace the disaster through simulation calculation the reason.
  • step 3 is:
  • the GIS platform Through the GIS platform, compare the design BIM model in the design data module with the construction BIM model in the construction data module to determine whether the construction quality meets the design requirements, and then whether to trace the construction responsibility; if it does not meet the design requirements, trace the construction Responsibility, if it meets the design requirements, the GIS platform will further call the three-dimensional geological model of the original geological data module and the construction BIM model to further carry out simulation calculation and analysis, and then whether the disaster tracing is the design responsibility;
  • e5. Use the GIS platform to call the supervision data module to judge whether the supervision data in the above-mentioned geological survey process, design process and construction process are complete, and whether it is consistent with the design and site; on the one hand, when the data is incomplete, the disaster retrospective supervision responsibility, and the other On the one hand, when the data is complete, it will be used as the basic data for further disaster retrospective geological prospecting units, design units, and construction units.

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Graphics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Remote Sensing (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种基于BIM+GIS融合技术的深基坑灾害发生追溯方法,属于岩土工程技术领域,具体步骤包括构建GIS+BIM灾害追溯平台;在GIS+BIM灾害追溯平台中设置地质资料模块、设计资料模块、施工资料模块和监理资料模块,每个模块中均具有能够被GIS+BIM灾害追溯平台调用的信息,在GIS+BIM灾害追溯平台中设置分析模型模块,通过GIS+BIM平台对地质资料模块、设计资料模块、施工资料模块和监理资料模块的信息进行调用,进而通过仿真计算追溯灾害原因,并将追溯的结果和分析结论形成深基坑灾害追溯报告,该方法能够快速、准确、高效地排查深基坑灾害发生的原因。

Description

基于BIM+GIS融合技术的灾害发生追溯方法 技术领域
本发明属于岩土工程技术领域,尤其涉及一种基于BIM+GIS融合技术应用于深基坑灾害发生原因的追溯方法。
背景技术
近几年来,深基坑工程比之前规模更大,深度更深,深基坑工程的事故更为频繁出现,是岩土界的技术难题之一。当深基坑灾害发生后,用传统的方法追溯灾害发生的原因,具有以下缺点:
(1)耗时长。工作人员会对可能出现灾害的原因逐项排查,在排查的过程中会消耗大量的时间,影响后续工作的进行。
(2)人为干扰因素多。引发灾害的原因多种多样,在没有足够理论和数据支撑的情况下,专家组对事故现场的判定受到多方人为因素的影响。
发明内容
根据以上现有技术的不足,本发明提供了一种基于BIM+GIS融合技术应用于深基坑灾害发生原因的追溯方法,实现了对深基坑灾害发生后准确高效客观的追溯。
本发明解决的技术问题采用的技术方案为:一种基于BIM+GIS融合技术的灾害发生追溯方法,包括如下步骤,
步骤1、通过大数据智能数据分析技术,构建集成GIS技术和BIM技术的GIS+BIM灾害追溯平台;
步骤2、在GIS+BIM灾害追溯平台中设置地质资料模块、设计资料模块、施工资料模块和监理资料模块,每个模块中均具有能够被GIS+BIM灾害追溯平 台调用的信息,每个模块的具体设计步骤和内容如下:
(1)地质资料模块:
该模块主要提供深基坑工程区域的地质情况,为设计和施工计算提供符合实际的信息。
a1.基于GIS平台,通过现场钻孔取样结合工程场址地勘报告,做钻孔柱状图,基于该柱状图,利用GIS技术生成三维地质建模,建立原始地质图层,赋予每一个地质图层ID号,并存储到地质资料模块数据库中;
a2.施工时,将施工现场揭露的地层信息与步骤a1中的工程场址地勘报告中的信息对比,通过监理复核后,依托GIS技术重新生成由于施工揭露岩土层而得到的实际三维地质模型,并依托工程实际生成修改后的地质图层,将修改后的地质图层赋予和原来该地层相同的地质图层ID号,存储到地质资料模块数据库中;
a3.通过GIS(系统)的Overlay技术,将原始地质图层和修改后地质图层叠加,得到信息差异的对比文件,并将此信息差异的对比文件也存储到地质资料模块数据库中;
(2)设计资料模块:
b1.通过BIM技术把全部设计文件做成设计BIM模型,并把相关信息数据化后存储在设计BIM模型数据库中;
b2.设置设计BIM模型数据库让其格式适用于GIS平台所需的数据格式,以便于对其转化调用,通过Engine技术使得GIS和BIM可以相互调用设计BIM模型数据库进行检索分析;也就是将设计BIM模型嵌入GIS平台。
(3)施工资料模块:
该模块用于存储施工组织设计、施工过程以及材料相关信息。
所述施工资料模块包括三个单元,分别为材料信息单元、施工组织设计单元和施工过程单元;
所述材料信息单元用于存储深基坑工程所使用工程材料的相关信息;
所述施工组织设计单元主要存储施工组织设计方案以及相关变更方案,还包括相关审批手续文档;便于灾害事故发生后通过该数据库追溯施工组织方面的原因。
所述施工过程单元主要存储施工过程中的通过视频监控获得的非结构化信息,并将视频信息存储在视频数据库中;
将施工资料模块的信息内容构建施工BIM模型,并嵌入GIS平台;
(4)监理资料模块:
该模块主要对监理在深基坑工程中的工作进行信息存储,便于灾害事故发生时对监理工作进行追溯。
所述监理模块包含四个单元,分别是基坑验槽单元、材料信息复核单元、施工组织设计复核单元和施工过程监控单元;
所述基坑验槽单元用于对地质资料模块进行复核,便于GIS+BIM灾害追溯平台确认相关地质信息,以电子文档保存;
所述材料信息复核单元用于复核设计资料与施工资料所要求的材料信息是否相符合,便于GIS+BIM灾害追溯平台对材料信息进行复核,以电子文档保存;
所述施工组织设计复核单元用于复核施工组织过程是否符合施工组织设计要求,相关资料以电子文档保存;
所述施工过程监控单元主要存储施工过程中监理单位的监控过程信息,包括视频资料和电子文档,便于GIS+BIM灾害追溯平台对施工单位提供的资料和监理单位提供的资料的复核;
将监理资料模块的信息存入GIS数据库。
步骤3、在GIS+BIM灾害追溯平台中设置分析模型模块,通过GIS+BIM灾害追溯平台对地质资料模块、设计资料模块、施工资料模块和监理资料模块的信息进行调用,进而通过仿真计算追溯灾害原因,并将追溯的结果和分析结论形成深基坑灾害追溯报告。
进一步地,所述步骤3的具体实现过程为:
e1.通过GIS平台调用施工资料模块的视频数据库,查看灾害发生时现场监控信息,进而灾害追溯是否为人为管理责任;
e2.采用GIS空间分析模型,调用地质资料模块中的信息差异对比文件,通过比差异对比文件中对应的三维地质模型ID信息,得到对应地质模型差异率是否符合工程要求的判别,进而灾害追溯是否为地勘责任;
e3.通过GIS平台,将设计资料模块中的设计BIM模型与施工资料模块中的施工BIM模型相对比,判断施工质量是否符合设计要求,进而是否追溯施工责任;如果不符合设计要求,则追溯施工责任,如果符合设计要求,则GIS平台进一步调用地质资料模块的原始三维地质模型和施工BIM模型,进一步进行仿真计算分析,进而灾害追溯是否为设计责任;
e4.通过GIS平台调用设计资料模块的设计BIM模型数据库,再现设计计算时材料选取、支护方式选取、设计方案以及计算模型选取的相关信息,与施工资料模块中材料信息单元相比较,判断材料使用或者材料性能是否符合设计要求,进而灾害追溯是否为施工工程中的材料使用和进货责任;
e5.通过GIS平台调用监理资料模块,判断上述地勘过程、设计过程和施工过程中监理资料是否完备,与设计、现场是否符合;一方面,当资料不完备时,灾害追溯监理责任,另一方面,当资料完备,作为进一步灾害追溯地勘单位、 设计单位、施工单位的基础资料。
进一步地,步骤2的(3)中,所述材料信息单元具体包括:材料的生产厂家、材料的性能、材料抽检的试验信息、监理对材料复核信息,灾害事故发生后通过该数据库追溯材料的使用要符合设计文件的要求。
进一步地,步骤2的(3)中,所述施工过程单元具体包括:施工过程中现场安全管理信息、水/电/气的安全措施管控信息、施工过程视频监控信息、第三方深基坑监测信息、监理方/甲方/施工方巡视时通过自身携带的视频设备存储的信息,便于灾害事故发生时通过该数据库第一时间获取视屏监控的原始信息。
本发明具有以下有益效果:本方法通过BIM与GIS融合技术,从材料、设计、施工以及追溯模型分析,能够快速、准确、高效地排查其灾害发生的原因。
附图说明
图1是本发明所述方法的流程图;
图2是图1中地质资料模块的流程示意图;
图3是图1中设计资料模块的流程示意图;
图4是图1中施工资料模块的流程示意图;
图5是图1中监理资料模块的流程示意图;
图6是图1中分析模型模块的流程示意图。
具体实施方式
下面结合附图对本发明做进一步描述。
实施例一:
如图1所示,本发明所述的一种基于BIM+GIS融合技术的灾害发生追溯方法,包括如下步骤:
步骤1、通过大数据智能数据分析技术,构建集成GIS技术和BIM技术的GIS+BIM灾害追溯平台;
步骤2、在GIS+BIM灾害追溯平台中设置地质资料模块、设计资料模块、施工资料模块和监理资料模块,每个模块中均具有能够被GIS+BIM灾害追溯平台调用的信息,每个模块的具体设计步骤和内容如下:
(1)地质资料模块,该模块主要提供深基坑工程区域的地质情况,为设计和施工计算提供符合实际的信息,如图2所示。
a1.基于GIS平台,通过现场钻孔取样结合工程场址地勘报告,做钻孔柱状图,基于该柱状图,利用GIS技术生成三维地质建模,建立原始地质图层,并存储到地质资料模块数据库中;
a2.施工时,将施工现场揭露的地层信息与步骤a1中的工程场址地勘报告中的信息对比,通过监理复核后,依托GIS技术重新生成由于施工揭露岩土层而得到的实际三维地质模型,并依托工程实际生成修改后的地质图层,将修改后的地质图层存储到地质资料模块数据库中;
a3.通过GIS(系统)的Overlay技术,将原始地质图层和修改后地质图层叠加,得到信息差异的对比文件,并将此信息差异的对比文件也存储到地质资料模块数据库中;
由于地质信息在施工前无法得到,主要采用现场勘察的方法获取地质信息,并形成勘察报告,但是勘察报告的钻孔是按照一定距离布设的,相邻两钻孔之间的信息是模糊的,这就需要根据实际开挖过程中揭露的地层信息不断完善更新地勘报告的信息,如果获取的信息与地勘报告偏差不大,在设计和施工安全系数范围内,则不会发生灾害,否则,容易造成灾害。
(2)设计资料模块,如图3所示,设计资料模块的设计文件包括材料选取、 支护方式选取、设计方案和计算模型选取,具体处理步骤为:
b1.通过BIM技术把全部设计文件做成设计BIM模型,并把相关信息数据化后存储在设计BIM模型数据库中;
b2.设置设计BIM模型数据库让其格式适用于GIS平台所需的数据格式,以便于对其转化调用,通过Engine技术使得GIS和BIM可以相互调用设计BIM模型数据库进行检索分析;也就是将设计BIM模型嵌入GIS平台。
(3)施工资料模块,该模块用于存储施工组织设计、施工过程以及材料相关信息,如图4所示。
所述施工资料模块包括三个单元,分别为材料信息单元、施工组织设计单元和施工过程单元;
所述材料信息单元用于存储深基坑工程所使用工程材料的相关信息;材料信息单元包括材料的生产厂家、材料的性能、材料抽检的试验信息、监理对材料复核信息,灾害事故发生后通过该数据库追溯材料的使用要符合设计文件的要求。
所述施工组织设计单元主要存储施工组织设计方案以及相关变更方案,还包括相关审批手续文档;便于灾害事故发生后通过该数据库追溯施工组织方面的原因。
所述施工过程单元主要存储施工过程中的通过视频监控获得的非结构化信息,并将视频信息存储在视频数据库中;所述施工过程单元具体包括:施工过程中现场安全管理信息、水/电/气的安全措施管控信息、施工过程视频监控信息、第三方深基坑监测信息、监理方/甲方/施工方巡视时通过自身携带的视频设备存储的信息,便于灾害事故发生时通过该数据库第一时间获取视屏监控的原始信息。
将施工资料模块的信息内容构建施工BIM模型,并嵌入GIS平台;
(4)监理资料模块,该模块主要对监理在深基坑工程中的工作进行信息存储,便于灾害事故发生时对监理工作进行追溯,如图5所示。
所述监理模块包含四个单元,分别是基坑验槽单元、材料信息复核单元、施工组织设计复核单元和施工过程监控单元;
所述基坑验槽单元用于对地质资料模块进行复核,便于GIS+BIM灾害追溯平台确认相关地质信息,以电子文档保存;
所述材料信息复核单元用于复核设计资料与施工资料所要求的材料信息是否相符合,便于GIS+BIM灾害追溯平台对材料信息进行复核,以电子文档保存;
所述施工组织设计复核单元用于复核施工组织过程是否符合施工组织设计要求,相关资料以电子文档保存;
所述施工过程监控单元主要存储施工过程中监理单位的监控过程信息,包括视频资料和电子文档,便于GIS+BIM灾害追溯平台对施工单位提供的资料和监理单位提供的资料的复核;
将监理资料模块的信息存入GIS数据库。
步骤3、在GIS+BIM灾害追溯平台中设置分析模型模块,通过GIS+BIM灾害追溯平台对地质资料模块、设计资料模块、施工资料模块和监理资料模块的信息进行调用,进而通过仿真计算追溯灾害原因。
如图6所示,所述步骤3的具体实现过程为:
e1.通过GIS平台调用施工资料模块的视频数据库,查看灾害发生时现场监控信息,进而灾害追溯是否为人为管理责任;
e2.采用GIS空间分析模型,调用地质资料模块中的信息差异对比文件,通过比差异对比文件中对应的三维地质模型ID信息,得到对应地质模型差异率是 否符合工程要求的判别,进而灾害追溯是否为地勘责任;
e3.通过GIS平台,将设计资料模块中的设计BIM模型与施工资料模块中的施工BIM模型相对比,判断施工质量是否符合设计要求,进而是否追溯施工责任;如果不符合设计要求,则追溯施工责任,如果符合设计要求,则GIS平台进一步调用原始地质资料模块的三维地质模型和施工BIM模型,进一步进行仿真计算分析,进而灾害追溯是否为设计责任;
e4.通过GIS平台调用设计资料模块的设计BIM模型数据库,再现设计计算时材料选取、支护方式选取、设计方案以及计算模型选取的相关信息,与施工资料模块中材料信息单元相比较,判断材料使用或者材料性能是否符合设计要求,进而灾害追溯是否为施工工程中的材料使用和进货责任;
e5.通过GIS平台调用监理资料模块,判断上述地勘过程、设计过程和施工过程中监理资料是否完备,与设计、现场是否符合;一方面,当资料不完备时,灾害追溯监理责任,另一方面,当资料完备,作为进一步灾害追溯地勘单位、设计单位、施工单位的基础资料。
最后,将上述追溯的结果和分析结论形成深基坑灾害追溯报告,这样能够快速、准确、高效地排查其灾害发生的原因。
以上所述为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书以及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。

Claims (4)

  1. 基于BIM+GIS融合技术的灾害发生追溯方法,其特征在于,包括如下步骤:
    步骤1、通过大数据智能数据分析技术,构建集成GIS技术和BIM技术的GIS+BIM灾害追溯平台;
    步骤2、在GIS+BIM灾害追溯平台中设置地质资料模块、设计资料模块、施工资料模块和监理资料模块,每个模块中均具有能够被GIS+BIM灾害追溯平台调用的信息,每个模块的具体设计步骤和内容如下:
    (1)地质资料模块
    a1.基于GIS平台,通过现场钻孔取样结合工程场址地勘报告,做钻孔柱状图,基于该柱状图,利用GIS技术生成三维地质建模,建立原始地质图层,赋予每一个地质图层ID号,并存储到地质资料模块数据库中;
    a2.施工时,将施工现场揭露的地层信息与步骤a1中的工程场址地勘报告中的信息对比,通过监理复核后,依托GIS技术重新生成由于施工揭露岩土层而得到的实际三维地质模型,并依托工程实际生成修改后的地质图层,将修改后的地质图层赋予和原来该地层相同的地质图层ID号,存储到地质资料模块数据库中;
    a3.通过GIS(系统)的Overlay技术,将原始地质图层和修改后地质图层叠加,得到信息差异的对比文件,并将此信息差异的对比文件也存储到地质资料模块数据库中;
    (2)设计资料模块:
    b1.通过BIM技术把全部设计文件做成设计BIM模型,并把相关信息数据化后存储在设计BIM模型数据库中;
    b2.设置设计BIM模型数据库让其格式适用于GIS平台所需的数据格式,以便于对其转化调用,通过Engine技术使得GIS和BIM可以相互调用设计BIM模型数据库进行检索分析;
    (3)施工资料模块:
    所述施工资料模块包括三个单元,分别为材料信息单元、施工组织设计单元和施工过程单元;
    所述材料信息单元用于存储深基坑工程所使用工程材料的相关信息;
    所述施工组织设计单元主要存储施工组织设计方案以及相关变更方案,还包括相关审批手续文档;
    所述施工过程单元主要存储施工过程中的通过视频监控获得的非结构化信息,并将视频信息存储在视频数据库中;
    将施工资料模块的信息内容构建施工BIM模型,并嵌入GIS平台;
    (4)监理资料模块:
    所述监理模块包含四个单元,分别是基坑验槽单元、材料信息复核单元、施工组织设计复核单元和施工过程监控单元;
    所述基坑验槽单元用于对地质资料模块进行复核;
    所述材料信息复核单元用于复核设计资料与施工资料所要求的材料信息是否相符合;
    所述施工组织设计复核单元用于复核施工组织过程是否符合施工组织设计要求;
    所述施工过程监控单元主要存储施工过程中监理单位的监控过程信息,包括视频资料和电子文档;
    将监理资料模块的信息存入GIS数据库;
    步骤3、在GIS+BIM灾害追溯平台中设置分析模型模块,通过GIS+BIM灾害追溯平台对地质资料模块、设计资料模块、施工资料模块和监理资料模块的信息进行调用,进而通过仿真计算追溯灾害原因,并将追溯的结果和分析结论形成深基坑灾害追溯报告。
  2. 根据权利要求1所述的基于BIM+GIS融合技术的灾害发生追溯方法,其特征在于,所述步骤3的具体实现过程为:
    e1.通过GIS平台调用施工资料模块的视频数据库,查看灾害发生时现场监控信息,进而灾害追溯是否为人为管理责任;
    e2.采用GIS空间分析模型,调用地质资料模块中的信息差异对比文件,通过比对差异对比文件中对应的三维地质模型ID信息,得到对应地质模型差异率是否符合工程要求的判别,进而灾害追溯是否为地勘责任;
    e3.通过GIS平台,将设计资料模块中的设计BIM模型与施工资料模块中的施工BIM模型相对比,判断施工质量是否符合设计要求,进而是否追溯施工责任;如果不符合设计要求,则追溯施工责任,如果符合设计要求,则GIS平台进一步调用地质资料模块原始的三维地质模型和施工BIM模型,进一步进行仿真计算分析,进而灾害 追溯是否为设计责任;
    e4.通过GIS平台调用设计资料模块的设计BIM模型数据库,再现设计计算时材料选取、支护方式选取、设计方案以及计算模型选取的相关信息,与施工资料模块中材料信息单元相比较,判断材料使用或者材料性能是否符合设计要求,进而灾害追溯是否为施工工程中的材料使用和进货责任;
    e5.通过GIS平台调用监理资料模块,判断上述地勘过程、设计过程和施工过程中监理资料是否完备,与设计、现场是否符合;一方面,当资料不完备时,灾害追溯监理责任,另一方面,当资料完备,作为进一步灾害追溯地勘单位、设计单位、施工单位的基础资料。
  3. 根据权利要求1所述的基于BIM+GIS融合技术的灾害发生追溯方法,其特征在于,步骤2的(3)中,所述材料信息单元具体包括:材料的生产厂家、材料的性能、材料抽检的试验信息、监理对材料复核信息。
  4. 根据权利要求1所述的基于BIM+GIS融合技术的灾害发生追溯方法,其特征在于,步骤2的(3)中,所述施工过程单元具体包括:施工过程中现场安全管理信息、水/电/气的安全措施管控信息、施工过程视频监控信息、第三方深基坑监测信息、监理方/甲方/施工方巡视时通过自身携带的视频设备存储的信息。
PCT/CN2019/121395 2019-10-18 2019-11-28 基于bim+gis融合技术的灾害发生追溯方法 WO2021072921A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910992281.6 2019-10-18
CN201910992281.6A CN110751725B (zh) 2019-10-18 2019-10-18 基于bim+gis融合技术的灾害发生追溯方法

Publications (1)

Publication Number Publication Date
WO2021072921A1 true WO2021072921A1 (zh) 2021-04-22

Family

ID=69278824

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/121395 WO2021072921A1 (zh) 2019-10-18 2019-11-28 基于bim+gis融合技术的灾害发生追溯方法

Country Status (2)

Country Link
CN (1) CN110751725B (zh)
WO (1) WO2021072921A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113094800A (zh) * 2021-04-29 2021-07-09 广东明正项目管理有限公司 市政工程监理中工程质量的监理方法及系统
CN113656868A (zh) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 基于bim技术的医院建设协同管理平台
CN115034767A (zh) * 2022-07-15 2022-09-09 广州高新工程顾问有限公司 一种基于bim的深基坑施工安全智能管控方法和系统
CN115183694A (zh) * 2022-09-09 2022-10-14 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN116166729A (zh) * 2023-02-15 2023-05-26 中国科学院广州地球化学研究所 钻孔柱状图数据的处理方法、装置、电子设备及存储介质
CN116303732A (zh) * 2023-05-25 2023-06-23 山东师范大学 地理信息系统与建筑信息模型的数据转换验证方法及系统
CN117688341A (zh) * 2024-01-31 2024-03-12 安徽水安建设集团股份有限公司 基于bim技术的深基坑检测系统及方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323800A (zh) * 2020-11-03 2021-02-05 中国冶金地质总局青岛地质勘查院 钻孔灌注桩桩头静力膨胀破除方法
CN115829496A (zh) * 2022-11-17 2023-03-21 星际空间(天津)科技发展有限公司 一种基于三维gis的岩土工程bim应用系统
CN116775930B (zh) * 2023-06-14 2024-03-08 广州图石科技有限公司 一种基于bim+gis的数据结合和可视化展示的方法及系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160006441A (ko) * 2014-07-09 2016-01-19 (주)블루다솔루션 3차원 스캐닝을 활용한 재난 안전 관리 시스템, 서버 및 방법
CN107034932A (zh) * 2017-06-13 2017-08-11 南通四建集团有限公司 一种基于bim的施工过程基坑变形监测、预警平台
CN107240216A (zh) * 2017-08-08 2017-10-10 成都宗升智能科技有限公司 基于3dgis+bim技术和人工智能运维应急报警与快速响应方法
CN108470105A (zh) * 2018-03-27 2018-08-31 湖南大学 一种基于bim+3s+vr技术和地下工程案例知识库系统进行动态施工方案编制的方法
CN109447479A (zh) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 一种基于三维可视化项目管理系统
CN110211231A (zh) * 2019-05-10 2019-09-06 西南交通大学 一种三维地质灾害信息模型建模方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107492042A (zh) * 2017-07-31 2017-12-19 长江勘测规划设计研究有限责任公司 基于gis+bim的水利水电工程建设管理方法及系统
CN109033722A (zh) * 2018-09-13 2018-12-18 厦门市建筑科学研究院集团股份有限公司 一种基于bim-gis的管廊虚拟施工现场构建方法
CN109446717A (zh) * 2018-11-15 2019-03-08 中铁第六勘察设计院集团有限公司 基于bim加3dgis线性工程二三维联动展示方法
CN109460947B (zh) * 2018-12-27 2021-08-06 河南省交通规划设计研究院股份有限公司 基于bim+gis技术的公路工程工序报验系统
CN110135682A (zh) * 2019-04-03 2019-08-16 中交一公局第七工程有限公司 基于bim技术的危大工程项目监测管理方法
CN109960894A (zh) * 2019-04-11 2019-07-02 华夏天信(北京)智能低碳技术研究院有限公司 一种bim模型与3d gis平台融合的展示方法
CN110008618A (zh) * 2019-04-15 2019-07-12 华夏天信(北京)智能低碳技术研究院有限公司 一种基于gis和bim的应急辅助决策系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160006441A (ko) * 2014-07-09 2016-01-19 (주)블루다솔루션 3차원 스캐닝을 활용한 재난 안전 관리 시스템, 서버 및 방법
CN107034932A (zh) * 2017-06-13 2017-08-11 南通四建集团有限公司 一种基于bim的施工过程基坑变形监测、预警平台
CN107240216A (zh) * 2017-08-08 2017-10-10 成都宗升智能科技有限公司 基于3dgis+bim技术和人工智能运维应急报警与快速响应方法
CN108470105A (zh) * 2018-03-27 2018-08-31 湖南大学 一种基于bim+3s+vr技术和地下工程案例知识库系统进行动态施工方案编制的方法
CN109447479A (zh) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 一种基于三维可视化项目管理系统
CN110211231A (zh) * 2019-05-10 2019-09-06 西南交通大学 一种三维地质灾害信息模型建模方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113094800A (zh) * 2021-04-29 2021-07-09 广东明正项目管理有限公司 市政工程监理中工程质量的监理方法及系统
CN113094800B (zh) * 2021-04-29 2024-05-28 广东明正项目管理有限公司 市政工程监理中工程质量的监理方法及系统
CN113656868A (zh) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 基于bim技术的医院建设协同管理平台
CN115034767A (zh) * 2022-07-15 2022-09-09 广州高新工程顾问有限公司 一种基于bim的深基坑施工安全智能管控方法和系统
CN115034767B (zh) * 2022-07-15 2023-06-02 广州高新工程顾问有限公司 一种基于bim的深基坑施工安全智能管控方法和系统
CN115183694A (zh) * 2022-09-09 2022-10-14 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN115183694B (zh) * 2022-09-09 2022-12-09 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN116166729A (zh) * 2023-02-15 2023-05-26 中国科学院广州地球化学研究所 钻孔柱状图数据的处理方法、装置、电子设备及存储介质
CN116166729B (zh) * 2023-02-15 2023-11-17 中国科学院广州地球化学研究所 钻孔柱状图数据的处理方法、装置、电子设备及存储介质
CN116303732A (zh) * 2023-05-25 2023-06-23 山东师范大学 地理信息系统与建筑信息模型的数据转换验证方法及系统
CN117688341A (zh) * 2024-01-31 2024-03-12 安徽水安建设集团股份有限公司 基于bim技术的深基坑检测系统及方法
CN117688341B (zh) * 2024-01-31 2024-05-14 安徽水安建设集团股份有限公司 基于bim技术的深基坑检测系统及方法

Also Published As

Publication number Publication date
CN110751725B (zh) 2022-10-28
CN110751725A (zh) 2020-02-04

Similar Documents

Publication Publication Date Title
WO2021072921A1 (zh) 基于bim+gis融合技术的灾害发生追溯方法
WO2023185735A1 (zh) 全时空采掘过程的矿山应力场孪生建模同化系统及方法
WO2023185734A1 (zh) 一种基于三维点云数据库的矿山数字模型建立方法
Zhou et al. Building information modelling review with potential applications in tunnel engineering of China
CN105631154A (zh) 一种在bim施工管理平台上查看隧道监控量测数据的方法
Guo et al. An integrated approach to study of strata behaviour and gas flow dynamics and its application
CN210154614U (zh) 一种基于bim的基坑及其周边地层的沉降监测装置
CN114036625B (zh) 适用于大面积软弱地基原位加固的智能施工方法及系统
CN109345140B (zh) 一种煤矿突水灾害预警的辅助方法
CN109209505B (zh) 土石混合体隧道三维数字信息管理系统构建方法
CN111429471A (zh) 一种地质灾害信息管理系统及方法
CN102880918B (zh) 基于数据融合分析的深基坑风险评估方法
CN116562656A (zh) 隧道施工地质灾害预警与防控智能决策方法及辅助平台
CN113536414B (zh) 基于三维建模的岩质边坡稳定性分析方法、系统及介质
Liu et al. City pipe network intelligent service based on GIS and internet of things
Liu et al. Study of roof water inrush forecasting based on EM-FAHP two-factor model
CN110210051A (zh) 一种岩土工程云微信息化技术
CN115718946A (zh) 基于bim+gis的桥梁隧道施工安全风险管理方法
Li et al. AHP‐FSE‐Based Risk Assessment and Mitigation for Slurry Balancing Shield Tunnel Construction
CN109299886A (zh) 基于集成数据库的地铁隧道结构安全状态数值分析方法
Zeng Research on risk evaluation methods of groundwater bursting from aquifers underlying coal seams and applications to coalfields of North China
CN113326549A (zh) 一种基于bim的建筑施工管理系统及方法
Jacobs Searching for solutions to induced seismicity
Wu et al. Automatic control method of construction quality of geological survey in geotechnical engineering
Luo Design of Building Digital Dynamic Structural Deformation Monitoring and Evaluation System Based on Joint Programming

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19949163

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19949163

Country of ref document: EP

Kind code of ref document: A1