WO2021053601A1 - Wheel weight pressure power system and improvement thereof - Google Patents

Wheel weight pressure power system and improvement thereof Download PDF

Info

Publication number
WO2021053601A1
WO2021053601A1 PCT/IB2020/058713 IB2020058713W WO2021053601A1 WO 2021053601 A1 WO2021053601 A1 WO 2021053601A1 IB 2020058713 W IB2020058713 W IB 2020058713W WO 2021053601 A1 WO2021053601 A1 WO 2021053601A1
Authority
WO
WIPO (PCT)
Prior art keywords
rod
engines
electricity
wheel weight
improved system
Prior art date
Application number
PCT/IB2020/058713
Other languages
French (fr)
Inventor
Jalindar TATOBA JAGTAP
Original Assignee
Tatoba Jagtap Jalindar
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tatoba Jagtap Jalindar filed Critical Tatoba Jagtap Jalindar
Publication of WO2021053601A1 publication Critical patent/WO2021053601A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03GSPRING, WEIGHT, INERTIA OR LIKE MOTORS; MECHANICAL-POWER PRODUCING DEVICES OR MECHANISMS, NOT OTHERWISE PROVIDED FOR OR USING ENERGY SOURCES NOT OTHERWISE PROVIDED FOR
    • F03G7/00Mechanical-power-producing mechanisms, not otherwise provided for or using energy sources not otherwise provided for
    • F03G7/08Mechanical-power-producing mechanisms, not otherwise provided for or using energy sources not otherwise provided for recovering energy derived from swinging, rolling, pitching or like movements, e.g. from the vibrations of a machine

Definitions

  • Atomic fuel is required to create electricity by atomic energy projects and availability of uranium (atomic fuel) is very less In our county. Hence, government has to import atomic fuel from other countries. And therefore, we have to spend slate and foreign currency in huge amount. In situation of earth-quake and other natural calamities, such projects are prone to accidents and damages and great disaster can happened. And therefore, out of fear of these disasters, establishment of such projects are opposed highly.
  • the present embodiment herein provides an improved wheel weight pressure power system.
  • the system includes a plurality of wheel weight engines (h) each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having an overhead wire (i) for electric supply to the engines; a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a rod (k) which is placed within the engines; a plurality of springs (f) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.
  • the engines when started moves at a uniform speed of 30 km per hour.
  • the electricity generation capacity is increased by increasing the number of engines.
  • each of the engines require l.Skv of power to mobilize.
  • each of the spring is compressed for 1.2 after being pressured from the engine. The spring may retract within 0.6seconds before the next engine arrives. The system generates 8000Mega watts of electricity.
  • he wheel weight engines are diesel powered.
  • the turbines are located on either side of the springs.
  • the engines maintain a distance of 10 feet between each other.
  • FIG. 1 illustrates a schematic view of an improved wheel weight pressure power system according to an embodiment mentioned herein;
  • FIG. 2 illustrates a singular wheel weight engines according to an embodiment mentioned herein;
  • FIG. 3 illustrates a diesel and electric power system which can alternately power the engines according to an embodiment mentioned herein;
  • FIG. 4 illustrates a rod that pushes horizontal rod of spring mechanism downwards when the engine moves through the rod according to an embodiment mentioned herein;
  • FIG. 5 illustrates a spring mechanism connected to a turbine which rotates lever of the turbine to generate electricity according to an embodiment mentioned herein;
  • FIG. 6 illustrates connections wherein the turbines are connected to a transformer according to an embodiment mentioned herein;
  • FIG. 7 illustrates connections from a transformer wherein one connection is given to the present system and other to an electricity grid according to an embodiment mentioned herein.
  • Rods measuring 25 ft in length for revolving gear wheel attached with shaft of the turbine 800 number.
  • the iron bridge of 4 km length and 10 mtrs width shall be constructed at open land on the 5 km dia.
  • the bearing and axles shall be attached to the pointed track. Between two pressure rods there shall be space of 5 meters. 8) To connect this gear wheel of 5 ft. height with main excel of electricity producing turbine.
  • the pressure rods at other end should be attached to spring of length 15 ft. There should be 10 ft high foundation below the spring and the lower part has to be fixed and the pointed track should be 5 ft. above. The back part has to be fixed with the track.
  • long circular track shall have 49 wheel weight and after that one electric engine shall be attached.
  • 400 wheel weight circular shall comprise 4 km. long chain.
  • FIG. 1 illustrates a schematic view of an improved wheel weight pressure power system according to an embodiment mentioned herein.
  • the system includes a plurality of wheel weight engines (h) having gear wheels (d) each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having a pentagon for connection with an overhead wire (i) for electric supply to the engines, a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a rod (k) which is placed within the engines, a plurality of springs (f) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.
  • FIG. 2 illustrates a singular wheel weight engines according to an embodiment mentioned herein.
  • the engines when started travels at a uniform speed of 30 km per hour.
  • the electricity generation capacity is increased by increasing the number of engines.
  • the engines maintain a distance of 10 feet between each other.
  • FIG. 3 illustrates a diesel and electric power system which can alternately power the engines according to an embodiment mentioned herein.
  • each of the engines require 1 5kv of power to mobilize.
  • FIG. 4 illustrates a rod that pushes horizontal rod of spring mechanism downwards when the engine moves through the rod according to an embodiment mentioned herein.
  • each of the spring is compressed for 1.2 seconds while passing through the engine, wherein the spring is retracts within 0.6 seconds before the next engine arrives.
  • FIG. 5 illustrates a spring mechanism connected to a turbine which rotates lever of the turbine to generate electricity according to an embodiment mentioned herein;
  • FIG. 6 illustrates connections wherein the turbines are connected to a transformer according to an embodiment mentioned herein.
  • the system generates 8000 Megawatts of electricity the turbines are located on either side of the springs.
  • FIG. 7 illustrates connections from a transformer wherein one connection is given to the present system and other to an electricity grid according to an embodiment mentioned herein.
  • the means or equipment as shown in Fig. 1 is as under a. Turbine b. Rod c. Iron track d. Gearwheel e. Pressure rod f. Spring g. chain of 7 ton wheel weights h. Electric/ fuel wheel weight engine/coach of 7 ton i. Overhead wire j Transformer
  • the improvement is related to addition of pressure rod e in the iron track c section.
  • the Electric wheel weight engine h moves over the iron track c it pushes one of the end of pressure rod e such that the rod retracts through a spring action.
  • the other end of the rod is connected to the spring f, which in turn is connected to the turbine a.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)

Abstract

An improved wheel weight pressure power system is provided herein. The system includes a plurality of wheel weight engines (h) each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having an overhead wire (i) for electric supply to the engines; a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a rod (k) which is placed within the engines; a plurality of springs (f) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.

Description

WHEEL WEIGHT PRESSURE POWER SYSTEM AND IMPROVEMENT
THEREOF
Technical field - The application is generally related to an improvement of patent application 201827017044 A.
BACKGROUND
Demand of electricity is kept on increasing in every field of our country as well as approximately all other countries. But, approximately all the electricity making projects, who create electricity in traditional way, it is not possible to them to create an electricity with its full capability, due to geographical, natural, technical or any other reasons. And because of this, it is impossible for the concern system/ department to fulfill the increasing demand of electricity. And it adversely affects the productivity of all fields. To tackle with this situation, I have innovational/ discovered a totally different project of electricity making. By using this innovational technology, it will be possible to create electricity in large quantity.
Spatiatity of my innovational project of electricity making is that, to create electricity by this project, it does not require resources like water, coal, gas, sun light, air, atomic fuel or any other fuel etc. as required by other projects in vogue. Hence, electricity created under this project, will be a pollution free, sate, profuse and cheap.
Therefore, because of producing electricity in large quantity, it will be helpful for increasing production in agricultural, industrial and all other fields. And government can get success in fulfilling essential needs like food, doth, shelter and employment of increasing population.
My Innovational project of electricity making is named as - "Wheel Weight Pressure Power Project".
My innovational Energy/Power Project namely Wheel Weight Pressure Power Project is safety from any natural calamity and this project is the necessity for the country and the world at large. History before innovation
Before this innovation I had come to Know that, demand of electricity is increasing approximately in all the countries in the world. But. due to geographical, natural, technical and many other problems, there Is a limitation In creating continuous and uninterrupted electricity by all electricity generation projects till today. And it Is adversely affecting the productivity of industrial, agricultural and many other fields.
To get rid of this increasing trouble and to fulfill the increasing demand of electricity, I felt it Important to Innovation and discover more in electricity generation filed. And I innovated, discovered this totally different, technical electricity making project.
While creating electricity by vogue and traditional projects, one have to face some unavoidable problems and defects. Resources like water, coal. gas. air. sun light, atomic fuel etc. are required in creating electricity by such projects. And for foundation of such projects, huge land is required. Huge amount of water is required in creating electricity by water- electricity projects. Many a times when monsoon does not come in time, at that time, problem of shortage of water gets occurred and work of electricity generation by such water-electricity projects gets stopped. And therefore, it causes to face shortage of electricity. Large amount of heat and carbon get discharged while creating electncity by thermal industry centers. And air, land, water get polluted. And It also causes global warming. It adversely affects every creature and plant. Many a times when such electricity centers do not get water or coal in adequate quantity, at that time, work of making electricity gets reduced or stopped. And therefore, it causes to face shortage of electricity.
To create electricity by gas energy project, it is required to have gas in adequate quantity. Many a times when such energy projects do not get gas in adequate quantity or in cheap rate, work of making electricity gets stopped. As a result, it causes to face shortage of electricity.
Project suitable land is required for establishing solar energy and wind energy projects. And for that purpose, many a times such projects get established on agricultural lands And due to this, agricultural lands are getting reduced. And there is no fertilization on the land, where such projects get established. And therefore, there can be a shortage of provisions In future. Adequate amount of sun light Is required for creating electricity by solar energy project, and if it has not so. then electricity cannot gel created by such solar energy projects. And to create electricity with full capacity from wind energy projects, adequate pressure of air is required. And if adequate pressure of air is not gained then, electricity cannot get created with full capacity by such wind energy projects. And It causes to face shortage of electricity.
Atomic fuel is required to create electricity by atomic energy projects and availability of uranium (atomic fuel) is very less In our county. Hence, government has to import atomic fuel from other countries. And therefore, we have to spend slate and foreign currency in huge amount. In situation of earth-quake and other natural calamities, such projects are prone to accidents and damages and great disaster can happened. And therefore, out of fear of these disasters, establishment of such projects are opposed highly.
Many countries in the world are running hidden program of atomic growth, under the name of creating electricity by atomic fuel. But actually they do work of making nuclear weapons If such nuclear weapons get in the hands of terrorists or if such countries if use these nuclear weapons for bad purpose, then entire world will have to face huge disaster. Therefore, such warnings are being given by the experts who are working in this field.
To create electricity in adequate quantity, governments of our country as well as government of other countries give subsidy and other facilities in huge amount to the enterprises for establishing private electricity making projects. But many a times, It seems that, such facilities are being misused also.
Hence, as mentioned above, there are many obstacles and limitations in creating electricity. And it causes to face shortage of electricity. This increasing inadequacy of electricity is adversely affecting every field. And this is how the trouble of shortage of electricity has become global trouble.
To take out India and all other countries in the world from the trouble of electricity, my innovational project of electricity making will be helpful. If electricity generation project gets established as per my innovation, and if work of creating electricity gets started by this project, then thousands and lacks of mega vat electricity will be produced in permanent form and in minimum place. Resources like water, coal, gas, sun light air. atomic fuel etc. wtfl not bo required to create electricity by this project Hence, electricity created by this project, wil be safe and pollution free and inexpensive. This project will always be creating unlimited, uninterrupted and continuous form of electricity. Because, there is no need of water, air, sun light in creating electricity by this project, hence, there will be a saving of water and such saved water will get in used in agriculture and therefore, productivity of provisions wil get increased and will help in fulfilling need of food, cloth, shelter of increasing population.
There is no need of coal, gas and atomic fuel or any other fuel to create electricity by this project: hence. 100% state and foreign currency of India as wel as all other countries in the world will be saved from spending in excavation or import of such fuels and resources.
There will be a creation of unlimited electricity by this project and this project will be helpful in getting rid of by shortage of electricity and there will not be a need of private projects for creating electricity.
If our government of India as well as government of aB other countries m the world propagates this technology then, none of the countries in the world will have to depend on atomic fuel for creating electricity and none of them wil get chance to make nuclear weapons under the name of electricity making. And this is how the technology of this project will help in solving the global problem of shortage of electricity. SUMMARY
The present embodiment herein provides an improved wheel weight pressure power system. The system includes a plurality of wheel weight engines (h) each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having an overhead wire (i) for electric supply to the engines; a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a rod (k) which is placed within the engines; a plurality of springs (f) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.
In an embodiment, the engines when started moves at a uniform speed of 30 km per hour. The electricity generation capacity is increased by increasing the number of engines. In another embodiment, each of the engines require l.Skv of power to mobilize. Here, each of the spring is compressed for 1.2 after being pressured from the engine. The spring may retract within 0.6seconds before the next engine arrives. The system generates 8000Mega watts of electricity.
In an embodiment, he wheel weight engines are diesel powered. The turbines are located on either side of the springs. The engines maintain a distance of 10 feet between each other.
These and other aspects of the embodiments herein will be better appreciated and understood when considered in conjunction with the following description and the accompanying drawings. It should be understood, however, that the following descriptions, while indicating preferred embodiments and numerous specific details thereof, are given by way of illustration and not of limitation. Many changes and modifications may be made within the scope of the embodiments herein without departing from the spirit thereof, and the embodiments herein include all such modifications.
BRIEF DESCRIPTION OF DRAWINGS
Reference will be made to embodiments of the invention, examples of which may be illustrated in the accompanying figures. These figures are intended to be illustrative, not limiting. Although the invention is generally described in the context of these embodiments, it should be understood that it is not intended to limit the scope of the invention to these particular embodiments.
The embodiments herein will be better understood from the following detailed description with reference to the drawings, in which:
FIG. 1 illustrates a schematic view of an improved wheel weight pressure power system according to an embodiment mentioned herein;
FIG. 2 illustrates a singular wheel weight engines according to an embodiment mentioned herein;
FIG. 3 illustrates a diesel and electric power system which can alternately power the engines according to an embodiment mentioned herein;
FIG. 4 illustrates a rod that pushes horizontal rod of spring mechanism downwards when the engine moves through the rod according to an embodiment mentioned herein;
FIG. 5 illustrates a spring mechanism connected to a turbine which rotates lever of the turbine to generate electricity according to an embodiment mentioned herein; FIG. 6 illustrates connections wherein the turbines are connected to a transformer according to an embodiment mentioned herein; FIG. 7 illustrates connections from a transformer wherein one connection is given to the present system and other to an electricity grid according to an embodiment mentioned herein.
Throughout the drawings, it should be noted that like reference numbers are used to depict the same or similar elements, features, and structures.
Description
(Wheel weight pressure power project) Equipments/ land needed for the project
The diagram of the equipment necessary for establishing the project and how the project shall be executed is given in figure at page no. 14 & 15 of the document.
1) 800 turbines producing electricity having capacity of 10 megawatt each turbine. (Turbine means electricity producing generator)
2) Iron track measuring 4 km. in length and 5 mt. in breadth.
3) To speed the rotation of the main excel of the turbine a gear wheel of 5ft height based on specialized technology (800 number).
4) Rods measuring 25 ft in length for revolving gear wheel attached with shaft of the turbine (800 number).
5) Bearings and axles of appropriate measurement.
6) 5 meter length, ½ feet width and ¾ feet height pressure rod (400 number).
7) Spring of 15 ft. length and 1 meter breadth that can bear weight of 5 tons (400 number).
8) 392 wheel weights of 7 ton weight measuring 5 meter length and 5 meter breadth.
9) 8 wheel weight electric engines weighting 7 ton and measuring 5 meter length and 5 meter breadth which are controlled by the help of automatic computer. (This engines run on electricity supplied from overhead wire and will be controlled by computer from control room. Every engine runs on electricity supply of 1.5 kv).
10) 4 km. long overhead wire supplying 12 kv. Electricity
11) Control room.
12) Rod that rotates the wheel and pushes the rod back and forth (1600 number).
13) Transformer with necessary capacity for electricity supply (800 numbers). This project shall be Installed as follows:·
(Wheel weight pressure power projector should be installed as per diagram shown on Rage No.14 & 15)
1) The iron bridge of 4 km length and 10 mtrs width shall be constructed at open land on the 5 km dia.
2) Over the bridge two iron tracks separating 5 meters in circular shape and 4 km long iron track to be placed on it
3) Beneath the iron tracks on both sides two turbines be placed at a safe distance. (5 meter width and 4 km long track should be kept at the center and both sides of the land shall have track of length 10 meter and 50 meter width).
4) To establish a turbine both sides of 20 meter land is required and 20 meters of land is required for installing the other turbine and its transformer. Thus in one part of 10x50 mt two turbines and two transformers shall be installed.
5) 4 km. long track shall divided into 400 parts and in those 400 parts 800 and 800 transformers are to be installed
6) On one side of the iron track pressure rod shall be attached (pressure rod 5 meter length and 5 ft. in height).
7) The bearing and axles shall be attached to the pointed track. Between two pressure rods there shall be space of 5 meters. 8) To connect this gear wheel of 5 ft. height with main excel of electricity producing turbine.
9) The pressure rods at other end should be attached to spring of length 15 ft. There should be 10 ft high foundation below the spring and the lower part has to be fixed and the pointed track should be 5 ft. above. The back part has to be fixed with the track.
10) The pointed spring attached to the gear wheel should be fixed to that part.
11) When due to pressure of the wheel weight the rod moves up and down then there shall be a rod to pull and to push that rod thus for 800 rods there shall be 1600 such rods.
12)4 km. long circular track shall have 49 wheel weight and after that one electric engine shall be attached. Thus 400 wheel weight circular shall comprise 4 km. long chain.
13 To rotate the chain of the electric wheel weight engines for power supply wheel weight chain 4 km. long chain over head wire shall be installed.
14) To control the wheel weight chain a control room with modern equipment shall be established. Description and operative procedures of my innovation Wheel weight pressure power project:
This project for electricity generation shall operate as describe below. After the project work is completed the electricity shall be generated as mentioned herein below: It shown on diagram on Rg. No.14 & 15.
1) After receiving electricity from the overhead through 8 electricity wheels weight engines is started and thereafter all the engines shall started from the control room.
2) After the wheel weight engines are started the 4 km. long wheel weight chain moves at a speed of 30 km Z hr. on the track circularly.
3) This wheel weight exerts pressure over the rod and one wheel weight takes 1 2 seconds to pass over one pressure rod.
4) When every wheel weight exerts it pressure towards ground and moves through tracks then the gear wheel exerts its pressure downwards then the rear handle rod moves and the gear wheel moves with the rod clockwise for half a round which would put pressure on the spring attached to the pressure rod whereby the spring is released.
5) When the underweight pressure rod moves away from the first wheel weight and before the second wheel weight pressure rod arrives in the 0.60 seconds period upwards and then the rod attached moves for 1.2 seconds after being pressured downwards then the gear wheel shall complete one full round and this process continues.
6) Thus the 4 km. integrated wheel weight chain moves 30 km. per hour at normal and safe speed, then ih one minute 50 wheel weight passes and in one minute the gear wheel completes 50 round and the turbines main shaft moves 4 times faster. And thus electricity is generated to its full capacity through all turbines. (The main excel of the wind mill turbines moves 22 to 25 rounds in a one minute in full air pressure and comparatively the velocity of the main excel of the turbines In wheel weight pressure power project's is definitely many times more).
7) To start engine of the wheel weight chain 12 kv. External electricity is required for one time only (for a single engine 1.5 kv And for 8 engines 12 kv. electricity is required), when the wheel weight chain moves 30 km. per hour at normal and safe speed on the Integrated circular track then every turbine generates 10 mw. of electricity. 10 mega watts of electricity is generated and 800 turbines produce 8000 mega watts of electricity (in a limited area and in a short of space, probably no electricity project in any country of the world generates electricity at such a huge scale) and that will be a great project.
8) Thereafter with the help of engines controlled the self-generated electricity keeps it rotating And forever optimum capacity of 8000 mega watts of electricity will be generated with the help of 12 kv electricity.
9) Thus, when electricity is generated then the need for external electricity does not arises and the electricity generated is safe and nonstop and the project is completely safe and secure.
10) In this project for the production of electricity in one of its part 4 turbines also can be used instead of 2 turbines and thus number of turbines thereby producing 16000 mega watt of power instead of 8000 mega watts.
11) If the capacity has to be enhanced (hen turbines got to be Increased and the weight of wheel weight and capacity of engines got to be increased and accordingly equipments will need to be changed. 12) If more electricity needs to be generated then the project can be extended to 5 floors and every floor shall have 1600 turbines thus v5 floors in total shall have 8000 turbines and out of 8000 turbines 80,000 mega watts of electricity can be generated.
13) If the capacity needs to be enhanced then 5 floors three separate 24,000 turbines can be installed and 2,40,000 mega watts electricity can be generated. Thus more the turbines more the electricity will be generated.
14) When this project is completed and started generating electricity then maintenance costs and labor and very less other cost towards production will incurred.
Thus the innovated project of mine is totally safe and incorporates modern technology. This is the only one of its kind of project anywhere in the world. The electricity generated is safe, continuous, long lasting and pollution free.
FIG. 1 illustrates a schematic view of an improved wheel weight pressure power system according to an embodiment mentioned herein. The system includes a plurality of wheel weight engines (h) having gear wheels (d) each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having a pentagon for connection with an overhead wire (i) for electric supply to the engines, a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a rod (k) which is placed within the engines, a plurality of springs (f) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.
FIG. 2 illustrates a singular wheel weight engines according to an embodiment mentioned herein. In an embodiment, the engines when started travels at a uniform speed of 30 km per hour. In one embodiment, the electricity generation capacity is increased by increasing the number of engines. The engines maintain a distance of 10 feet between each other.
FIG. 3 illustrates a diesel and electric power system which can alternately power the engines according to an embodiment mentioned herein. In one embodiment, each of the engines require 1 5kv of power to mobilize.
FIG. 4 illustrates a rod that pushes horizontal rod of spring mechanism downwards when the engine moves through the rod according to an embodiment mentioned herein. In an embodiment, each of the spring is compressed for 1.2 seconds while passing through the engine, wherein the spring is retracts within 0.6 seconds before the next engine arrives. FIG. 5 illustrates a spring mechanism connected to a turbine which rotates lever of the turbine to generate electricity according to an embodiment mentioned herein;
FIG. 6 illustrates connections wherein the turbines are connected to a transformer according to an embodiment mentioned herein. The system generates 8000 Megawatts of electricity the turbines are located on either side of the springs.
FIG. 7 illustrates connections from a transformer wherein one connection is given to the present system and other to an electricity grid according to an embodiment mentioned herein. The means or equipment as shown in Fig. 1 is as under a. Turbine b. Rod c. Iron track d. Gearwheel e. Pressure rod f. Spring g. chain of 7 ton wheel weights h. Electric/ fuel wheel weight engine/coach of 7 ton i. Overhead wire j Transformer
Here the improvement is related to addition of pressure rod e in the iron track c section. Wherein when the Electric wheel weight engine h moves over the iron track c it pushes one of the end of pressure rod e such that the rod retracts through a spring action. The other end of the rod is connected to the spring f, which in turn is connected to the turbine a. This new improvement results in additional generation of power compared to the invention proposed in the earlier application. The foregoing description of the specific embodiments will so fully reveal the general nature of the embodiments herein that others can, by applying current knowledge, readily modify and/or adapt for various applications such specific embodiments without departing from the generic concept, and, therefore, such adaptations and modifications should and are intended to be comprehended within the meaning and range of equivalents of the disclosed embodiments. It is to be understood that the phraseology or terminology employed herein is for the purpose of description and not of limitation. Therefore, while the embodiments herein have been described in terms of preferred embodiments, those skilled in the art will recognize that the embodiments herein can be practiced with modification within the spirit and scope.

Claims

CLAIMS I Claim:
1. A wheel weight pressure power system comprising: a plurality of wheel weight engines (h) having a gearwheel (d), each powered electrically and weighing minimum 7 tons is placed on a circular track (c) having a pentagon for connection with an overhead wire (i) for electric supply to the engines; a plurality of iron rod (b) placed within the circular track (c) in an improvement thereof, wherein characterized in that the rod is placed in an angular manner such that to allow the engines to pass through a pressure rod (e) which is placed within the engines; a plurality of springs (i) connected on either side of the rod wherein the spring compresses when the engine is over the rod and the rod retracts to original position when the engine passes through the rod; and a plurality of turbines (a) connected to a gearwheel (d) which rotates the turbine, wherein the turbines are connected to transformers (j) to generate electricity.
2. The improved system as claimed in claim 1, wherein the engines when started travels at a uniform speed of 30 km per hour.
3. The improved system as claimed in claim 1, wherein the electricity generation capacity is increased by increasing the number of engines.
4. The improved system as claimed in claim 1, wherein each of the engines require 1.5kv of power to mobilize.
5. The improved system as claimed in claim 1, wherein each of the spring is compressed for 1.2 seconds while passing through the engine. 6. The improved system as claimed in claim 1, wherein the spring is retracts within 0.
6 seconds before the next engine arrives.
7. The improved system as claimed in claim 1, wherein the system generates 8000 Megawatts of electricity.
8. The improved system as claimed in claim 1, wherein the wheel weight engines are diesel powered.
9. The improved system as claimed in claim 1, wherein the turbines are located on either side of the springs.
10. The improved system as claimed in claim 1, wherein the engines maintain a distance of 10 feet between each other.
Dated 18th September, 2020
PCT/IB2020/058713 2019-09-18 2020-09-18 Wheel weight pressure power system and improvement thereof WO2021053601A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IN201923037622 2019-09-18
IN201923037622 2019-09-18

Publications (1)

Publication Number Publication Date
WO2021053601A1 true WO2021053601A1 (en) 2021-03-25

Family

ID=74883041

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2020/058713 WO2021053601A1 (en) 2019-09-18 2020-09-18 Wheel weight pressure power system and improvement thereof

Country Status (1)

Country Link
WO (1) WO2021053601A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016060711A1 (en) * 2014-10-16 2016-04-21 De Asis Samuel S Drive-in electric turbine (d-iet)
US20160233755A1 (en) * 2013-09-24 2016-08-11 Hami BAYRAKDAR Wheeled power plant with renewable energy
WO2017060915A1 (en) * 2015-10-10 2017-04-13 Jalindar Tatoba Jagtap Wheel weight pressure power project

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160233755A1 (en) * 2013-09-24 2016-08-11 Hami BAYRAKDAR Wheeled power plant with renewable energy
WO2016060711A1 (en) * 2014-10-16 2016-04-21 De Asis Samuel S Drive-in electric turbine (d-iet)
WO2017060915A1 (en) * 2015-10-10 2017-04-13 Jalindar Tatoba Jagtap Wheel weight pressure power project

Similar Documents

Publication Publication Date Title
Haaf et al. Solar chimneys part I: principle and construction of the pilot plant in Manzanares
US20220235745A1 (en) Gravity Field Energy Storage and Recovery System
CN100504064C (en) Full-automatic speed-regulating wind motor
Wadhwa Generation, distribution and utilization of electrical energy
WO2017060915A1 (en) Wheel weight pressure power project
WO2021053601A1 (en) Wheel weight pressure power system and improvement thereof
Hameed et al. Design and analysis of hydroelectric generation using waterwheel
Charvat et al. Feasibility of replacement of nuclear power with other energy sources in the Czech republic
WO1997021922A1 (en) Total electric water system
Uchegbulam et al. Assesment of Power Generation Resources in Nigeria
Mounfield The location of nuclear power stations in the United Kingdom
Evans et al. Sustainability assessment of geothermal power generation
McCaull Windmills
Amjad Sources of power generation in Pakistan—A feasibility study
US20100109332A1 (en) Floating electricity generating plant
Roushenas et al. Gravity energy storage
Tucker Hydro-electricity for public supply in Britain, 1881-1894
Sesto et al. Wind energy in Europe
Atoyebi et al. The Development of Micro-Hydropower Project: A Case Study of River Otin, Osun State, Nigeria
Samrat et al. Wave energy in Bangladesh
Sanchez Improving Efficiency and Capacity of Hydro-Turbines in the Western United States, Hoover Dam
CN105626399A (en) Kinetic-energy gravity engine technology
Adams Developments in Electric Power Generation in Ontario
Kyaw A Study on Electric Power Generation Improvementin Myanmar (Win Kyaw, 2023)
JP2020169636A (en) [japanese technology combined power generation system] common name 1: new pumped storage power generation system common name 2: fushimi type power generation

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20865238

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20865238

Country of ref document: EP

Kind code of ref document: A1