WO2021037361A1 - Agencement pour système de forage, système et procédé de forage - Google Patents
Agencement pour système de forage, système et procédé de forage Download PDFInfo
- Publication number
- WO2021037361A1 WO2021037361A1 PCT/EP2019/073018 EP2019073018W WO2021037361A1 WO 2021037361 A1 WO2021037361 A1 WO 2021037361A1 EP 2019073018 W EP2019073018 W EP 2019073018W WO 2021037361 A1 WO2021037361 A1 WO 2021037361A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rig
- arrangement
- unit
- units
- suspension structure
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 101
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000000725 suspension Substances 0.000 claims abstract description 64
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 11
- 238000002360 preparation method Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 241000191291 Abies alba Species 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
- E21B19/004—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
- E21B3/04—Rotary tables
- E21B3/045—Rotary tables movably mounted on the drilling structure or platform
Definitions
- the present disclosure generally relates to an arrangement for a drilling system.
- an arrangement for a drilling system a drilling system comprising an arrangement, and a method of operating an arrangement for a drilling system, are provided.
- WO 2018031624 Ai discloses a derrick structure including a plurality of drilling rotating/hoisting/circulation (RHC) traveling block/top drive like systems that can move between and are fully functional on multiple well centers. With such a configuration, one RHC can be disconnected from the drill lines and suspended in the drilling derrick allowing two hoisting systems with separate motors to function simultaneously on a single well center.
- RHC drilling rotating/hoisting/circulation
- One object of the present disclosure is to provide an arrangement for a drilling system, which arrangement enables a reduction of a time for completing drilling.
- a further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement is cost effective.
- a further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement improves safety.
- a still further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement has a simple design.
- a still further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement has a compact design.
- a still further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement has low weight.
- a still further object of the present disclosure is to provide an arrangement for a drilling system, which arrangement solves several or all of the foregoing objects in combination.
- a still further object of the present disclosure is to provide a drilling system comprising an arrangement, which drilling system solves one, several or all of the foregoing objects.
- a still further object of the present disclosure is to provide a method of operating a drilling system, which method solves one, several or all of the foregoing objects.
- an arrangement for a drilling system such as an offshore drilling rig, the arrangement comprising a suspension structure for suspending a string of tubulars, the suspension structure comprising a support table for holding a string of tubulars through a well center in the support table; at least two rig units, each rig unit having at least one lifting device configured to lift and lower a load along a vertical axis; and a drive mechanism arranged to move the suspension structure relative to the at least two rig units such that the well center moves between the vertical axes of the at least two rig units.
- a first rig unit can thereby be provided with equipment dedicated for a particular first operation or first group of operations, while a second rig unit can be provided with equipment dedicated for a different second operation or second group of operations.
- at least two of the rig units may be configured to carry out different tasks.
- the first rig unit performs the first operation or first group of operations
- the second rig unit can be prepared for the second operation or second group of operation. In this way, the "flat periods" can be reduced, which in turn reduces the overall drilling period. Thereby, the operator can save time and money and the environmental footprint can be reduced.
- each rig unit can access and operate in the well center during the whole drilling period. Furthermore, one rig unit can always be ready for next operation. Furthermore, when a first rig unit carries out an operation through the well center and preparations are made on a second rig unit, the personnel involved in the preparations of the second rig unit are distanced from the operational first rig unit. Thereby, the safety is increased.
- the size of the rig units can be lower than a conventional rig unit or derrick equipped with machinery for all required operations through the well center.
- a conventional derrick may have a height of about 50 m and may have a footprint of about 12 m by 12 m while each rig unit according to the present disclosure may have a height of less than 20 m from the deck and may have a footprint of about 4 m by 4 m.
- the support table may be arranged to hold a string of tubulars inside a riser (which may be an additional string of tubulars). By means of the lifting device, the string can be raised or lowered, e.g. relative to a riser inside the riser.
- a string of tubulars may be a riser, a drill string and/or a casing string.
- the support table may be arranged to hold the weight of the well equipment while the active rig unit adds/removes tubular from the string.
- the well center may be said to constitute the interface between the equipment of the active rig unit and the well equipment. That is, the well center constitutes the entrance towards the reservoir.
- the support table may be a rotary table or a false rotary table. That is, the support table may or may not comprise a function for rotating a string of tubulars. In case the rotating function is provided, this function may be as backup for a top drive.
- the support table may comprise slips for holding a string of tubulars.
- the support table may be a slips table.
- Each rig unit may be a mast or derrick.
- one or more of the rig units may be modular.
- the arrangement may be provided on a jackup rig or on a ship.
- a jackup rig typically has a blow-out preventer (BOP) onboard with the riser provided between the BOP and a subsea template or Christmas tree.
- BOP blow-out preventer
- the at least two rig units may be stationary, e.g. stationary on an offshore drilling rig, and the suspension structure may be moved relative to the stationary rig units.
- the suspension structure may be stationary, e.g. stationary on an offshore drilling rig, and the at least two rig units may be moved relative to the stationary suspension structure.
- each rig unit may be moved independently relative to the suspension structure.
- the drive mechanism may be arranged to align the suspension structure with each of the at least two rig units.
- the arrangement comprises three, four, or five rig units.
- the drive mechanism may be arranged to move the suspension structure in a substantially horizontal direction, or horizontal direction.
- the support table together with the well center may be skidded between two or more of the at least two rig units.
- the lifting device may be a top drive in some or all of the rig units. By means of a top drive, tubulars can also be rotated.
- One or several lifting devices may be provided in each rig unit.
- the vertical axis of each rig unit may be substantially centered, or centered, with the respective rig unit.
- the vertical axis of each rig unit may extend through a moon pool.
- the drive mechanism may be arranged to move the suspension structure by driving the support table.
- the drive mechanism may be arranged to move the suspension structure relative to the at least two rig units substantially linearly between the vertical axis of two of the rig units.
- the at least two rig units may be substantially linearly arranged, or linearly arranged.
- the at least two rig units may comprise at least one drilling rig unit for handling a drill string when the well center is aligned with the vertical axis of the drilling rig unit.
- the at least two rig units may comprise two drilling rig units, each for handling a drill string when the well center is aligned with the vertical axis of the respective drilling rig unit. In this way, the risk for downtime due to equipment failure is reduced.
- the at least two rig units may comprise a casing rig unit for handling a casing string when the well center is aligned with the vertical axis of the casing rig unit.
- the at least two rig units may comprise a riser rig unit for handling a riser when the well center is aligned with the vertical axis of the riser rig unit.
- the at least two rig units may comprise a workover rig unit for handling workover tools when the well center is aligned with the vertical axis of the workover rig unit.
- the arrangement may comprise at least three rig units. At least two of the rig units may be configured to carry out different tasks. Alternatively, or in addition, at least two of the rig units may be configured to carry out the same task. Each rig unit may be arranged to perform drilling and/or other wellbore related activities.
- the arrangement may further comprise a storage device configured to store tubulars, wherein the storage device is movable between a position associated with each of two or more of the at least two rig units.
- the storage device may be movable to and from a storage device storage area distanced from each rig unit.
- the storage device is movable by means of the drive mechanism in common with the suspension structure to the active rig unit.
- the storage device may be moved by a dedicated moving device independently of the suspension structure.
- the arrangement may comprise one or several storage devices.
- each storage device may comprise a fingerboard device adapted to store tubulars.
- the arrangement may further comprise a moon pool, wherein the support table is movable within the moon pool.
- the drive mechanism may comprise a rack and pinion device arranged to move the support table.
- the suspension structure may comprise a diverter connected to the support table.
- the diverter may be detachably connected to the support table. By detaching the diverter from the suspension structure and "parking" the diverter, the support table can be moved independently of the diverter.
- the suspension structure may further comprise a flowline connected to the diverter.
- the suspension structure may comprise riser tensioners.
- the riser tensioners may be detachably arranged in the suspension structure. By detaching the riser tensioners from the suspension structure and "parking" the riser tensioners, the support table can be moved independently of the riser tensioners.
- the suspension structure may further comprise a tensioning system for tensioning the riser tensioners.
- a drilling system such as an offshore drilling rig, comprising an arrangement according to the present disclosure.
- a method of operating an arrangement for a drilling system comprising suspending a string of tubulars by means of a suspension structure at a first position at a first rig unit, the suspension structure comprising a support table for holding a string of tubulars through a well center in the support table, the first rig unit having at least one first lifting device configured to lift and lower a load along a first vertical axis, and wherein the well center is aligned with the first vertical axis of the first rig unit at the first position; and moving the suspension structure from the first position to a second position at a second rig unit, the second rig unit having at least one second lifting device configured to lift and lower a load along a second vertical axis, and wherein the well center is aligned with the second vertical axis of the second rig unit at the second position.
- the method may further comprise tripping out a string of tubulars through the well center by means of the first rig unit when the suspension structure is in the first position.
- the method may further comprise tripping out a string of tubulars through the well center by means of the second rig unit when the suspension structure is in the second position.
- the above two step may be alternated repeatedly.
- the first rig unit is a drilling rig unit for handling drill tubulars and the second rig unit is a casing rig unit for handling casing tubulars.
- Fig. 1 schematically represents a side view of a drilling system comprising a drilling rig and an arrangement
- Fig. 2 schematically represents a perspective view of the arrangement
- Fig. 3 schematically represents a side view of the arrangement comprising a suspension structure
- Fig. 4 schematically represents a side view of the arrangement after movement of the suspension structure
- Fig. 5 schematically represents a perspective view of the arrangement in Fig. 4
- Fig. 6 schematically represents a side view of the arrangement after further movement of the suspension structure
- Fig. 7 schematically represents a top view of the arrangement.
- Fig. 1 schematically represents a side view of a drilling system 10.
- the drilling system 10 of this example is an offshore floating drilling rig 12 having an arrangement 14.
- the drilling system 10 comprises a riser 16 and a blow-out preventer (BOP) 18 connected to a wellhead assembly 20 on a seabed 22 above a reservoir 24 containing oil or gas.
- the reservoir 24 may be located at a depth of up to 5000 m below the seabed 22.
- the drilling rig 12 floats on a surface 26 of the sea 28.
- the drilling rig 12 is here exemplified as a semi- submersible platform, but the drilling rig 12 may alternatively be provided on a ship, on a jackup rig, or on other rigs with flexible connection between the seabed 22 and the rig.
- Fig. 2 schematically represents a perspective view of the arrangement 14.
- the arrangement 14 of this example comprises a riser rig unit 30, a first drilling rig unit 32, a second drilling rig unit 34 and a casing rig unit 36.
- the second drilling rig unit 34 is optional and is used as backup should the first drilling rig unit 32 fail.
- each rig unit 30, 32, 34, 36 is secured relative to a deck 38 over a moon pool on the drilling rig 12.
- the arrangement 14 further comprises a storage device 40 storing tubulars 42.
- the storage device 40 comprises a fingerboard (not denoted) for holding the tubulars 42.
- the drilling system 10 further comprises a garage 44.
- the garage 44 may for example accommodate the BOP 18 prior to lowering and/or a subsea workover rig unit (not shown) for handling workover tools.
- FIG. 3 schematically represents a side view of the arrangement 14.
- the arrangement 14 comprises a suspension structure 48.
- the suspension structure 48 is arranged to suspend the riser 16.
- the riser 16 is a string of tubulars 42.
- the suspension structure 48 comprises a support table 50, here exemplified as a rotary table.
- the support table 50 comprises a well center 52 constituting an interface to the well equipment.
- each rig unit 30, 32, 34, 36 comprises a lifting device 46.
- Each rig unit 30, 32, 34, 36 may comprise one or several lifting devices 46.
- Each rig unit 30, 32, 34, 36 may further comprise makeup and breaking equipment (not shown).
- Each lifting device 46 is here exemplified as a top drive for rotating a tubular 42. The top drive can be driven vertically relative to the respective rig unit 30, 32, 34, 36 in order to perform drilling and tripping operations.
- the lifting device 46 of the riser rig unit 30 does however not need to be a top drive or have makeup and breaking equipment.
- the lifting device 46 of the casing rig unit 36 may however comprise makeup equipment.
- Each lifting device 46 is configured to lift and lower a load along a respective vertical axis 56. To this end, the lifting devices 46 may be driven along vertical rails (not denoted) by means of a vertical motion drive. Each vertical axis 56 is positioned over a moon pool 58. In this example, each vertical axis 56 is centered with a respective rig unit 30, 32, 34, 36.
- the suspension structure 48 further comprises a drive mechanism 60.
- the drive mechanism 60 is arranged to horizontally move the suspension structure 48 relative to the four rig units 30, 32, 34, 36. In this way, the suspension structure 48 can be moved such that the well center 52 moves from a first position, aligned with the vertical axis 56 of one of the rig units 30, 32, 34, 36, to a second position, aligned with the vertical axis 56 of any of the other rig units 30, 32, 34, 36.
- the BOP 18 has first been lowered to the seabed 22.
- the BOP 18 may for example be lowered by means of the first drilling rig unit 32 or the second drilling rig unit 34 by connecting the BOP 18 to a tubular 42 and tripping down further tubulars 42.
- the support table 50 may not be needed, e.g. if the rig unit has two lifting devices 54 with slips function.
- the riser 16 may then have been lowered by the riser rig unit 30 and now needs to be connected to the BOP 18.
- the suspension structure 48 may be completely assembled.
- the suspension structure 48 comprises a diverter 62.
- a flowline 64 is connected to the diverter 62.
- the suspension structure 48 further comprises universal joint 66, here exemplified as a ball joint.
- the suspension structure 48 further comprises a telescopic joint 68.
- the telescopic joint 68 comprises an upper inner barrel 70 and a lower inner barrel 72.
- the suspension structure 48 further comprises riser tensioners 74.
- the riser tensioners 74 form part of a tensioning system (not illustrated) for tensioning the riser 16.
- the tensioning system may further comprise a support secured to the drilling rig 12.
- the riser tensioners 74 may be wires driven by hydraulic cylinders. Vertical movements of the riser 16 are taken by the telescopic joint 68 and tilting movements of the riser 16 are taken by the universal joint 66.
- Fig. 3 further shows a riser coupling 76 to the riser 16.
- the first drilling rig unit 32 is prepared.
- the preparations may for example include moving the storage device 40 of tubulars 42 to a position close to the first drilling rig unit 32 and make all drilling equipment ready for drilling. Since the suspension structure 48 with the support table 50 and the well center 52 is aligned with the riser rig unit 30, the riser rig unit 30 is active. When the riser rig unit 30 is active, the riser rig unit 30 can perform an operation on the riser 16. In Fig. 3, the support table 50 is aligned with the riser rig unit 30 such that the vertical axis 56 of the riser rig unit 30 passes through the well center 52.
- Fig. 4 schematically represents a side view of the arrangement 14 after movement of the suspension structure 48.
- Fig. 5 schematically represents a perspective view of the arrangement 14 in Fig. 4.
- the entire structure below the suspension structure 48 in this example the support table 50, the diverter 62, the universal joint 66, the telescopic joint 68, the riser tensioners 74 and the top part of the riser 16
- the entire structure below the suspension structure 48 has been moved or skidded horizontally from the riser rig unit 30 to the first drilling rig unit 32.
- the suspension structure 48 has been moved from the riser rig unit 30 to the first drilling rig unit 32 by driving the support table 50 by means of the drive mechanism 60. During the movement, the support table 50 moves within the moon pool 58. In Figs. 4 and 5, the support table 50 is aligned with the first drilling rig unit 32 such that the vertical axis 56 of the first drilling rig unit 32 passes through the well center 52.
- the first drilling rig unit 32 Since the suspension structure 48 with the support table 50 and the well center 52 is now aligned with the first drilling rig unit 32, the first drilling rig unit 32 is active and the riser rig unit 30 is now passive. When the first drilling rig unit 32 is active, the first drilling rig unit 32 can perform an operation on a drill string 78, such as a tripping or drilling operation.
- the second drilling rig unit 34 has the same configuration as the first drilling rig unit 32.
- the second drilling rig unit 34 can be used in the same way as the first drilling rig unit 32 if needed, e.g. if the first drilling rig unit 32 should fail.
- the casing rig unit 36 is prepared.
- the preparations may for example include moving the storage device 40 of tubulars 42 to a position close to the casing rig unit 36 and make all equipment ready for running casing.
- Fig. 6 schematically represents a side view of the arrangement 14 after further movement of the suspension structure 48.
- the support table 50 is aligned with the casing rig unit 36 such that the vertical axis 56 of the casing rig unit 36 passes through the well center 52. Since the suspension structure 48 with the support table 50 and the well center 52 is now aligned with the casing rig unit 36, the casing rig unit 36 is active and the first drilling rig unit 32 is now passive.
- the casing rig unit 36 can perform an operation associated with the casing string 80, such as a tripping in and setting the casing.
- the entire structure below the suspension structure 48 (in this example the support table 50, the diverter 62, the universal joint 66, the telescopic joint 68, the riser tensioners 74 and the top part of the riser 16) has been moved or skidded further horizontally from the first drilling rig unit 32 to the casing rig unit 36.
- the first drilling rig unit 32 is prepared again. For each casing run, casing tubulars 42 with successively smaller diameters are used. The drilling by the first drilling rig unit 32 and the casing setting by the casing rig unit 36 may be alternated in this way until the reservoir 24 is reached. In this way, the use of the equipment and personnel is optimized. That is, work through the well center 52 by an active rig unit 30, 32, 34, 36 and preparation work on a passive rig unit 30, 32, 34, 36 can be carried out in parallel. Thus, a part of the activities for assembling a casing string 80 or drill string 78 is carried out simultaneously with other activities, instead of in succession, as normally occurs in the prior art.
- the tripping speed can be increased, for example from 900 m/h to 1800 m/h, further generating a considerable gain of time.
- Fig. 7 schematically represents a top view of the arrangement 14.
- the drive mechanism 60 comprises a rack 82 and pinion 84.
- the rack 82 is secured to one side of the moon pool 58.
- the pinion 84 is provided on the support table 50.
- the drive mechanism 60 further comprises a motor 86 for driving rotating the pinion 84 engaging with the rack 82 to move the support table 50 and the suspension structure 48.
- the support table 50 thereby moves along support table rails 88 in the moon pool 58.
- the motor 86 may be an electric motor.
- the storage device 40 is movable on storage device rails 90 on the deck 38, e.g. by means of a motor (not shown) or in common with suspension structure 48 by means of the drive mechanism 60.
- the storage device 40 can be moved to a position adjacent each active rig unit 30, 32, 34, 36.
- the arrangement 14 may comprise a storage device 40 on each side of the moon pool 58.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Agencement (14) pour un système de forage (10), tel qu'un appareil de forage en mer (12), l'agencement (14) comprenant une structure de suspension (48) pour suspendre un train de tiges (16, 78, 80) d'éléments tubulaires (42), la structure de suspension (48) comprenant une table de support (50) destiné à retenir un train de tiges (78, 80) d'éléments tubulaires (42) dans un centre de puits (52) dans la table de support (50) ; au moins deux unités d'installation de forage (30, 32, 34, 36), chaque unité d'installation de forage (30, 32, 34, 36) comprenant au moins un dispositif de levage (46) conçu pour lever et abaisser une charge le long d'un axe vertical (56) ; et un mécanisme d'entraînement (60) conçu pour déplacer la structure de suspension (48) par rapport aux deux unités d'installation de forage (30, 32, 34, 36) ou plus de telle sorte que le centre de puits (52) se déplace entre les axes verticaux (56) des deux unités d'installation de forage (30, 32, 34, 36) ou plus. L'invention concerne également un système de forage (10) comprenant un agencement (14) et un procédé de fonctionnement d'un agencement (14) pour un système de forage (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2019/073018 WO2021037361A1 (fr) | 2019-08-28 | 2019-08-28 | Agencement pour système de forage, système et procédé de forage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2019/073018 WO2021037361A1 (fr) | 2019-08-28 | 2019-08-28 | Agencement pour système de forage, système et procédé de forage |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021037361A1 true WO2021037361A1 (fr) | 2021-03-04 |
Family
ID=67809476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2019/073018 WO2021037361A1 (fr) | 2019-08-28 | 2019-08-28 | Agencement pour système de forage, système et procédé de forage |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2021037361A1 (fr) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010019858A1 (fr) * | 2008-08-15 | 2010-02-18 | National Oilwell Varco L.P. | Plate-forme de forage à multiples trous, multiples fonctions |
WO2016054610A1 (fr) * | 2014-10-03 | 2016-04-07 | National Oilwell Varco, L.P. | Système d'installation de forage comprenant un ensemble centre de puits mobile |
WO2018010980A1 (fr) | 2016-07-15 | 2018-01-18 | Rigtec As | Procédé et dispositif de transport de tiges de forage |
US20180044995A1 (en) * | 2016-08-09 | 2018-02-15 | Transocean Sedco Forex Ventures Limited | Redundant or combination traversing and rhc systems for derrick structures |
US10202808B2 (en) * | 2013-03-15 | 2019-02-12 | Maersk Drilling A/S | Offshore drilling rig and a method of operating the same |
-
2019
- 2019-08-28 WO PCT/EP2019/073018 patent/WO2021037361A1/fr active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010019858A1 (fr) * | 2008-08-15 | 2010-02-18 | National Oilwell Varco L.P. | Plate-forme de forage à multiples trous, multiples fonctions |
US10202808B2 (en) * | 2013-03-15 | 2019-02-12 | Maersk Drilling A/S | Offshore drilling rig and a method of operating the same |
WO2016054610A1 (fr) * | 2014-10-03 | 2016-04-07 | National Oilwell Varco, L.P. | Système d'installation de forage comprenant un ensemble centre de puits mobile |
WO2018010980A1 (fr) | 2016-07-15 | 2018-01-18 | Rigtec As | Procédé et dispositif de transport de tiges de forage |
US20180044995A1 (en) * | 2016-08-09 | 2018-02-15 | Transocean Sedco Forex Ventures Limited | Redundant or combination traversing and rhc systems for derrick structures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11002085B2 (en) | Offshore drilling vessel and method | |
US10760361B2 (en) | Wellbore drilling system | |
EP3486158B1 (fr) | Système de forage en mer, récipient et procédé | |
EP3114026B1 (fr) | Système, navire et procédés de forage en mer | |
US11781384B2 (en) | Drilling installation: handling system, method for independent operations | |
US9714546B2 (en) | Offshore drilling rig and a method of operating the same | |
US9458680B2 (en) | Drilling rig | |
US11560683B2 (en) | Offshore drilling unit | |
KR20010032905A (ko) | 관을 위한 핸들링 조립체 및 그 관련 방법 | |
WO2021037361A1 (fr) | Agencement pour système de forage, système et procédé de forage | |
EP3980326B1 (fr) | Système de forage en mer, navire et procédé | |
GB2549258A (en) | Drillship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19761829 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 01/07/2022) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19761829 Country of ref document: EP Kind code of ref document: A1 |