WO2021036712A1 - Upgrading method, communication device and computer-readable storage medium - Google Patents
Upgrading method, communication device and computer-readable storage medium Download PDFInfo
- Publication number
- WO2021036712A1 WO2021036712A1 PCT/CN2020/106846 CN2020106846W WO2021036712A1 WO 2021036712 A1 WO2021036712 A1 WO 2021036712A1 CN 2020106846 W CN2020106846 W CN 2020106846W WO 2021036712 A1 WO2021036712 A1 WO 2021036712A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- main control
- control board
- new
- version
- storage medium
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
Definitions
- the present invention relates to the field of communication technology, and more specifically, to an upgrade method, a communication device, and a computer-readable storage medium.
- equipment upgrades may be mainly software upgrades, and software upgrades are currently classified in terms of their impact on services in two ways: interrupted service upgrades and uninterrupted service upgrades.
- the interrupted service upgrade is mainly because the two versions before and after the upgrade have incompatibility that cannot be solved.
- the uninterrupted service upgrade is realized by protection switching or CPU soft reset while ensuring the compatibility of the software before and after.
- the service interruption time includes the start-up time of the new main control board, the new main control board resume service configuration time, the line card start time, etc.
- the new main control board resumes business time longer. The entire upgrade process will have a longer business interruption.
- the upgrading method, the communication device and the computer-readable storage medium provided by the embodiments of the present invention mainly solve the technical problem that the operation of upgrading the communication device in the related technology is complicated, and the service interruption time of the upgrade process is long and the upgrade efficiency is low.
- an embodiment of the present invention provides an upgrade method, which is applied to a communication device including a first main control board and a second main control board, including:
- the second main control board is upgraded.
- the embodiment of the present invention also provides a communication device, the communication device including a processor, a memory, and a communication bus;
- the communication bus is configured to realize connection and communication between the processor and the memory
- the processor is configured to execute one or more computer programs stored in the memory to implement the steps of the upgrade method described above.
- the embodiment of the present invention also provides a computer-readable storage medium, and the computer-readable storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the upgrade method as described above. A step of.
- the upgrade method, communication equipment, and computer-readable storage medium provided by the embodiments of the present invention use the first main control board and the second main control board to perform centralized management, maintain the normal operation of the second main control board, and provide the first main control board to the first main control board.
- the control board is upgraded.
- the second main control board is upgraded; it solves the complicated operation of the communication equipment upgrade in the related technology, and the business interruption time of the upgrade process is longer, The problem of low upgrade efficiency.
- the upgrade method, communication device, and computer-readable storage medium provided by the embodiments of the present invention maintain the normal operation of the second main control board when the first main control board is upgraded, and the service interruption time is short during the upgrade process And the upgrade process is simple to operate, no need to pay attention to the status of the equipment all the time, and smooth upgrade of the business is realized.
- FIG. 1 is a schematic diagram of the basic flow of an upgrade method provided by Embodiment 1 of the present invention
- FIG. 2 is a schematic diagram of a basic flow after replacing the first main control board with the first new main control board according to the first embodiment of the present invention
- FIG. 3 is a schematic diagram of a basic flow after a second main control board resets as a standby main control board according to the first embodiment of the present invention
- FIG. 4 is a schematic diagram of centralized management of communication device versions according to Embodiment 2 of the present invention.
- FIG. 5 is a schematic diagram of a version file change of a communication device board replacement upgrade provided in the third embodiment of the present invention.
- FIG. 6 is a schematic diagram of the basic flow of a specific upgrade method provided by Embodiment 4 of the present invention.
- FIG. 7 is a schematic structural diagram of a communication device according to Embodiment 5 of the present invention.
- an upgrade method is provided in an embodiment of the present invention, by adopting a first main control board and a second main control board.
- the second main control board performs centralized management, maintains the normal operation of the second main control board, and upgrades the first main control board.
- the second main control board is upgraded ; Please refer to Figure 1, which is a schematic diagram of the basic flow of the upgrade method provided in this embodiment.
- the communication device in this embodiment adopts two main control boards for centralized management.
- the main control board supports 1+1 protection, and one of the main control boards serves as the main control board during normal operation. It is also called the master main control board, and the other main control board serves as the protection main control board during abnormal operation, and is also called the standby main control board.
- S101 Maintain the normal operation of the second main control board, and upgrade the first main control board.
- upgrading the first main control board in this embodiment includes: replacing the first main control board with the first new main control board.
- the first new main control board serves as a backup main control board; among them, the first new main control board includes high-standard version files, and the first main control board includes low-standard version files.
- the first new main control board includes 5G version Files, the first main control board includes 4G version files.
- the first new main control board downloads the board replacement upgrade identification file and the service configuration file from the second main control board.
- the board replacement upgrade identification file on the second main control board can be manually configured by the staff when replacing the first main control board with the first new main control, and the replacement upgrade identification file is used for the first new main control board.
- the control board sets the first new main control board as the active main control board according to the board replacement upgrade identification file.
- the first new main control board can only download the service configuration file from the second main control board without downloading the replacement upgrade identification file.
- the second main control board sends the upgrade identification file to the first new one according to the replacement upgrade identification file on it.
- the main control board only needs to issue an identification or command to set it as the main control board.
- the service configuration file includes an integrated communication device network attribute configuration file.
- S202 Close the inter-board communication between the first new main control board and other single boards, and set the first new main control board as the active main control board.
- the other boards in this embodiment all refer to the second main control board and line card on the communication device, that is, close the connection between the first new main control board and the second main control board and line card. Board-to-board communication.
- S203 The first new main control board loads the service configuration file to restore the service configuration information.
- the service configuration file is loaded on the first new main control board to restore the service configuration information.
- the service configuration file before loading the service configuration file, it further includes: converting the service configuration file so that the first new main control board can recognize the configuration file.
- the first new main control board loads the service configuration file and restores all service configuration information, it notifies the second main control board to reset or restart.
- the first new main control board uses logic hardware The connection method informs the second main control board to reset.
- the first new main control board loads the service configuration file and restores all service configuration information
- it also includes: resetting the second main control board within the first preset time period. Monitor whether the main control board is reset. When it is detected that the second main control board is not reset, a notification message is issued again to inform the second main control board that the reset is required; among them, in practical applications, the first preset time The period can be flexibly set by the developer according to experiment or experience, for example, the first preset time period is set to 15 minutes.
- S205 The second main control board is reset as the standby main control board.
- the second main control board resets after receiving the reset notification.
- the second main control board serves as a standby main control board.
- the second main control board is reset as the standby main control board in this embodiment, it also includes at least the following steps, as shown in Figure 3:
- S301 The first new main control board notifies all line cards to reset.
- the second main control board after the second main control board is reset as the standby main control board, it can wait for the second preset time period to ensure that the first new main control board can manage all the line cards mechanically or in hardware.
- the second preset time period can be flexibly set by the developer based on experiments or experience, for example, the first preset time period is set to 30 seconds.
- the method further includes: enabling the inter-board communication between the first main control board and other boards to respond to the version request of the other boards.
- the high-standard version file can be requested from the first new main control board to operate normally, and the communication equipment business returns to normal; for the second main control board, it may be because of the first new main control board.
- the high-standard version file stored on the control board is not supported and cannot be started, that is, the reset fails.
- the second main control board can be upgraded.
- the service recovery of communication equipment refers to the original service on the communication equipment. If the communication equipment needs to support new services, such as 5G services, it needs to insert a new line card that supports 5G services; for high and low standard version files, the original communication equipment Some service configurations may be incompatible.
- the service can be restored by loading the txt script. If the txt script is not compatible, the first new main control board performs compatibility conversion and converts the txt script into A txt script that can be recognized by high-standard version files.
- upgrading the second main control board in this embodiment includes: replacing the second main control board with a second new main control board.
- the first new main control board since the first new main control board is operating normally at this time, the first new main control board is used as the main main control board, and the second new main control board after replacement is used as the standby main control board;
- the new main control board includes high-standard version files, and the second main control board includes low-standard version files.
- the second new main control board includes 5G version files, and the second main control board includes 4G version files.
- the line card in this embodiment carries a storage medium or does not carry a storage medium.
- the storage medium may or may not store the version file; when the storage medium stores the version file
- filing include at least the following three methods:
- Method 1 Download and run the version file of the first new main control board based on the version file of the first new main control board.
- Method 2 Run the version file based on the version file stored in the storage medium of the line card.
- Method 3 Compare the version file of the first new main control board with the version file in the line card storage medium.
- the version file of the first new main control board is the latest version
- download and run the version file of the first new main control board
- run the version file is the version file in the line card storage medium.
- the upgrade method provided by the embodiment of the present invention uses the first main control board and the second main control board for centralized management, maintains the normal operation of the second main control board, and upgrades the first main control board.
- the second main control board is upgraded; it solves the problems of complicated operation of the communication device upgrade in related technologies, long service interruption time in the upgrade process, and low upgrade efficiency. That is to say, the upgrade method provided by the embodiment of the present invention maintains the normal operation of the second main control board when the first main control board is upgraded, and maintains the first successful upgrade when the second main control board is upgraded.
- the service interruption time during the upgrade process only depends on the start-up time of the line card, not the start-up time of the main control board, the time when the main control board loads the service configuration, and the line card start-up time. It can be seen that the whole The service interruption time is significantly shortened, which greatly improves the efficiency of communication equipment upgrades.
- the embodiment of the present invention provides a centralized management mode of the version file of the communication device, that is, the software, as shown in Figure 4:
- the active main control board is recorded as MSC
- the standby main control board is recorded as SSC
- the line card is recorded as NSC.
- the communication device has two main control boards and multiple line cards.
- the hardware of the main control board is 1+1 protection, that is, the main main control board MSC and the standby main control board SSC, where the main main control board MSC Both the SSC and the standby main control board have storage media, such as SSD cards; the line card NSC may have no storage media, or storage media, such as fash.
- the line card NSC does not have a storage medium, if the version file corresponding to the line card NSC stored on the main main control board MSC is BaseVer21.bin, then the line card NSCboot will directly download the file from the main main control board MSC to the memory In, and then run;
- the startup process is the same as that of the board without the storage medium; if there is a saved version file in the storage medium, for example, the version of the version file is BaseVer31.bi n .
- the running version can be determined according to different usage strategies. For example, the MSC version of the main main control board shall prevail, and the MSC version of the main main control board shall be downloaded first; if the NSC version of the line card shall prevail, the line card shall be run first The version saved by the NSC itself; the version number can also be compared, and the new version of the version number shall prevail.
- a strategy based on the version of the main control board MSC may be adopted to facilitate the user to manage the version information of the communication device.
- the embodiment of the present invention takes a relatively specific upgrade process as an example for description.
- Step 1 Insert the new main control board into the spare main control slot of the communication device.
- the original main control board is running version V2.0, and the new main control board is running version V5.0;
- the new main control board inserted at this time is used as the backup main control board, and the original main control board is still used as the main main control board.
- Step 2 After the new main control board is started, immediately cut off the inter-board communication with the original main control board and line card, and press the main main control board to start.
- the new main control board at this time serves as the main main control board.
- Step 3 After the new main control board is started and the service configuration is restored, the original main control board is notified to reset, and then all line cards are notified to reset after a period of time; if the original main control board is not supported by V5.0, it will not be able to Start, all line cards support, request V5.0 version from the new main control board again, and run the new V5.0 version.
- the new main control board at this time is used as the main main control board, and the original main control board is reset as the standby main control board.
- both the main main control board and line card are running the new V5.0 version to complete the communication equipment software upgrade and the hardware upgrade of the main main control board; the original main main control board can basically make it clear that it cannot meet the new business needs. Therefore, it will also be unplugged and replaced with a new main control board.
- the line card may also need to be replaced with a single board to support new business requirements.
- the embodiment of the present invention takes another more specific upgrade process as an example for description.
- both the main control board and the line card may need to be upgraded to new hardware.
- the line card It may be necessary to retain some of the original old boards, as shown in Figure 6:
- the main control board of the communication device includes the first main control board A1 in the standby main control slot, and the second main control board A2 in the main main control slot. At this time, replace it with the first new main control board B1
- the new main control board requests a board replacement to upgrade the identification file and the service configuration file from the original main control board.
- the second main control board A2 is configured with a board replacement upgrade identification file, including a specific directory and File: /sysdisk0/sscupgrade/upgradecfg.ini file; at the same time, the first new main control board B1 downloads the business configuration file startrun.dat from the second main control board A2.
- the first new main control board B1 successfully downloads the replacement upgrade identification file and the service configuration file from the second main control board A2, shut down the first new main control board B1 and the second communication device Inter-board communication between the main control board A2 and other line cards.
- the new main control board converts the downloaded service configuration file into a service configuration file that the board can recognize, and then loads the service configuration file when the software starts.
- the first new main control board B1 converts the downloaded startrun.dat file into a business configuration file that can be recognized by the board, and then loads the business configuration file startrun.dat when the software starts.
- the second main control board A2 is notified to reset by way of logical hardware connection.
- the second main control board A2 monitors whether the second main control board A2 is reset within the first preset time period, and when it is detected that the second main control board A2 has not been reset, a notification message is issued again to inform the second main control The board A2 needs to be reset, and the first preset time period can be 15 minutes.
- the second main control board A2 can wait for a second preset time period to ensure that the first new main control board B1 can manage all the line cards mechanically or in hardware, where the second preset time The segment can take 15 seconds.
- the new main control board opens the board-to-board communication between this board and other boards, and responds to the version requests of other boards. All boards that can request the version file will run the new version.
- the high-standard version files contained in the new main control board will generally contain all the new software version files required by the original line card.
- the first new main control board B1 opens its inter-board communication with the second main control board A2 and all line cards, and all line cards run the high-standard version files on the first new main control board B1 .
- the communication device includes a processor 701, a memory 702, and a communication bus 703.
- the communication bus 703 in this embodiment is set to realize the connection and communication between the processor 701 and the memory 702, and the processor 701 is set to execute one or more programs stored in the memory 702 to implement the following steps:
- the second main control board is upgraded.
- the communication device in this embodiment adopts two main control boards for centralized management.
- the main control board supports 1+1 protection, and one of the main control boards serves as the main control board during normal operation. It is also called the master main control board, and the other main control board serves as the protection main control board during abnormal operation, and is also called the standby main control board.
- upgrading the first main control board in this embodiment includes: replacing the first main control board with the first new main control board.
- the first new main control board serves as a backup main control board; among them, the first new main control board includes high-standard version files, and the first main control board includes low-standard version files.
- the first new main control board includes 5G version Files, the first main control board includes 4G version files.
- the method further includes at least the following steps:
- the first new main control board downloads the board replacement upgrade identification file and the service configuration file from the second main control board;
- the first new main control board loads the service configuration file to restore the service configuration information
- the first new main control board After the first new main control board has restored all service configuration information, the first new main control board notifies the second main control board to reset;
- the second main control board is reset as the standby main control board.
- the board replacement upgrade identification file on the second main control board can be manually configured by the staff when replacing the first main control board with the first new main control.
- the replacement upgrade identification file is used for the first new main control board.
- the control board sets the first new main control board as the active main control board according to the board replacement upgrade identification file.
- the first new main control board can only download the service configuration file from the second main control board without downloading the replacement upgrade identification file.
- the second main control board sends the upgrade identification file to the first new one according to the replacement upgrade identification file.
- the main control board only needs to issue an identification or command to set it as the main control board.
- the service configuration file includes an integrated communication device network attribute configuration file.
- the other boards in this embodiment all refer to the second main control board and line card on the communication device, that is, close the connection between the first new main control board and the second main control board and line card. Board-to-board communication.
- the service configuration file is loaded on the first new main control board to restore the service configuration information.
- the service configuration file before loading the service configuration file, it further includes: converting the service configuration file so that the first new main control board can recognize the configuration file.
- the first new main control board loads the service configuration file and restores all service configuration information, it notifies the second main control board to reset or restart.
- the first new main control board uses logic hardware The connection method informs the second main control board to reset.
- the first new main control board loads the service configuration file and restores all service configuration information
- it also includes: resetting the second main control board within the first preset time period. Monitor whether the main control board is reset. When it is detected that the second main control board is not reset, a notification message is issued again to inform the second main control board that the reset is required; among them, in practical applications, the first preset time The period can be flexibly set by the developer according to experiment or experience, for example, the first preset time period is set to 15 minutes.
- the second main control board resets after receiving the reset notification.
- the second main control board serves as a standby main control board.
- the second main control board is reset as the standby main control board in this embodiment, it further includes at least the following steps:
- the first new main control board notifies all line cards to reset
- the second main control board after the second main control board is reset as the standby main control board, it can wait for the second preset time period to ensure that the first new main control board can manage all the line cards mechanically or in hardware.
- the second preset time period can be flexibly set by the developer based on experiments or experience, for example, the first preset time period is set to 30 seconds.
- the method further includes: enabling the inter-board communication between the first main control board and other boards to respond to the version request of the other boards.
- the high-standard version file can be requested from the first new main control board to operate normally, and the communication equipment business returns to normal; for the second main control board, it may be because of the first new main control board.
- the high-standard version file stored on the control board is not supported and cannot be started, that is, the reset fails.
- the second main control board can be upgraded.
- the service recovery of communication equipment refers to the original service on the communication equipment. If the communication equipment needs to support new services, such as 5G services, it needs to insert a new line card that supports 5G services; for high and low standard version files, the original communication equipment Some service configurations may be incompatible.
- the service can be restored by loading the txt script. If the txt script is not compatible, the first new main control board performs compatibility conversion and converts the txt script into A txt script that can be recognized by high-standard version files.
- upgrading the second main control board in this embodiment includes: replacing the second main control board with a second new main control board.
- the first new main control board since the first new main control board is operating normally at this time, the first new main control board is used as the main main control board, and the second new main control board after replacement is used as the standby main control board;
- the new main control board includes high-standard version files, and the second main control board includes low-standard version files.
- the second new main control board includes 5G version files, and the second main control board includes 4G version files.
- the line card in this embodiment carries a storage medium or does not carry a storage medium.
- the storage medium may or may not store the version file; when the storage medium stores the version file
- filing include at least the following three methods:
- Method 1 Download and run the version file of the first new main control board based on the version file of the first new main control board.
- Method 2 Run the version file based on the version file stored in the storage medium of the line card.
- Method 3 Compare the version file of the first new main control board with the version file in the line card storage medium.
- the version file of the first new main control board is the latest version
- download and run the version file of the first new main control board
- run the version file is the version file in the line card storage medium.
- the communication device provided by the embodiment of the present invention uses the first main control board and the second main control board for centralized management, maintains the normal operation of the second main control board, and upgrades the first main control board.
- the second main control board is upgraded; it solves the problems of complicated operation of the communication device upgrade in related technologies, long service interruption time in the upgrade process, and low upgrade efficiency. That is to say, the communication device provided by the embodiment of the present invention maintains the normal operation of the second main control board when the first main control board is upgraded, and maintains the successful upgrade of the second main control board when the second main control board is upgraded.
- the service interruption time during the upgrade process only depends on the startup time of the line card, not the startup time of the main control board, the time when the main control board loads the service configuration, and the line card startup time. It can be seen that the whole The service interruption time is significantly shortened, and the communication equipment upgrade efficiency is greatly improved; therefore, the communication equipment upgrade process provided by the embodiment of the present invention is simple to operate. During the entire main control board and software upgrade process, only a new main control board needs to be inserted. Yes, the smooth upgrade of the business has been realized.
- the embodiments of the present invention also provide a computer-readable storage medium.
- the computer-readable storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the above-mentioned embodiments. Steps from one to three of the upgrade method.
- the computer-readable storage medium includes volatile or nonvolatile, removable or Non-removable media.
- Computer-readable storage media include but are not limited to RAM (Random Access Memory), ROM (Read-Only Memory, read-only memory), EEPROM (Electrically Erasable Programmable read only memory, charged Erasable Programmable Read-Only Memory) ), flash memory or other memory technology, CD-ROM (Compact Disc Read-Only Memory), digital versatile disk (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, Or any other medium that can be used to store desired information and that can be accessed by a computer.
- the functional modules/units in the system, and the device can be implemented as software (which can be implemented by the program code executable by the computing device) , Firmware, hardware and their appropriate combination.
- the division between functional modules/units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may consist of several physical components. The components are executed cooperatively.
- Some physical components or all physical components can be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or as hardware, or as an integrated circuit, such as an application specific integrated circuit .
- the computer-readable medium may include computer storage. Medium (or non-transitory medium) and communication medium (or temporary medium).
- medium or non-transitory medium
- communication medium or temporary medium
- the term computer storage medium includes volatile and non-volatile data implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Sexual, removable and non-removable media.
- communication media usually contain computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as carrier waves or other transmission mechanisms, and may include any information delivery media. . Therefore, the present invention is not limited to any specific combination of hardware and software.
- the normal operation of the second main control board is maintained, and the first main control board is upgraded.
- Upgrade the second main control board solve the problem of complicated operation of communication equipment upgrade in related technologies, long service interruption time in the upgrade process, and low upgrade efficiency. That is, the upgrade method, communication device, and computer-readable storage medium provided by the embodiments of the present invention maintain the normal operation of the second main control board when the first main control board is upgraded, and the service interruption time is short during the upgrade process And the upgrade process is simple to operate, no need to pay attention to the status of the equipment all the time, and smooth upgrade of the business is realized.
Abstract
Description
Claims (10)
- 一种升级方法,应用于包括第一主控板和第二主控板的通信设备,包括:An upgrade method, applied to a communication device including a first main control board and a second main control board, includes:保持所述第二主控板的正常运行,对所述第一主控板进行升级;Maintaining the normal operation of the second main control board, and upgrading the first main control board;在所述第一主控板升级成功后,对所述第二主控板进行升级。After the first main control board is successfully upgraded, the second main control board is upgraded.
- 如权利要求1所述的升级方法,其中,所述对所述第一主控板进行升级,包括:The upgrading method according to claim 1, wherein said upgrading said first main control board comprises:用第一新主控板替换所述第一主控板,所述第一新主控板作为备用主控板,所述第一新主控板包括高制式版本文件,所述第一主控板包括低制式版本文件。Replace the first main control board with a first new main control board, the first new main control board serves as a backup main control board, the first new main control board includes a high-standard version file, the first main control board The board includes low-standard version files.
- 如权利要求2所述的升级方法,其中,所述用第一新主控板替换第一主控板之后,还包括:The upgrading method according to claim 2, wherein, after replacing the first main control board with the first new main control board, the method further comprises:所述第一新主控板从所述第二主控板下载换板升级标识文件与业务配置文件;The first new main control board downloads the board replacement upgrade identification file and the service configuration file from the second main control board;关闭所述第一新主控板与其他单板的板间通信,设置所述第一新主控板为主用主控板;Close the inter-board communication between the first new main control board and other single boards, and set the first new main control board as the active main control board;所述第一新主控板加载所述业务配置文件以恢复业务配置信息;The first new main control board loads the service configuration file to restore service configuration information;在所述第一新主控板恢复完所有业务配置信息后,所述第一新主控板通知所述第二主控板复位;After the first new main control board recovers all service configuration information, the first new main control board notifies the second main control board to reset;所述第二主控板进行复位作为备用主控板。The second main control board is reset as a standby main control board.
- 如权利要求3所述的升级方法,其中,所述第二主控板进行复位作为备用主控板之后,还包括:The upgrade method according to claim 3, wherein after the second main control board is reset as the standby main control board, the method further comprises:所述第一新主控板通知所有线卡复位;The first new main control board notifies all line cards to reset;所述所有线卡进行复位。All the line cards are reset.
- 如权利要求3所述的升级方法,其中,在所述第二主控板进行复位失败时,对所述第二主控板进行升级;The upgrade method according to claim 3, wherein when the reset of the second main control board fails, the second main control board is upgraded;所述对所述第二主控板进行升级,包括:The upgrading of the second main control board includes:用第二新主控板替换所述第二主控板,所述第二新主控板作为备用主控板,所述第二新主控板包括高制式版本文件,所述第二主控板包括低制式版本文件。Replace the second main control board with a second new main control board. The second new main control board serves as a backup main control board. The second new main control board includes a high-standard version file. The board includes low-standard version files.
- 如权利要求4所述的升级方法,其中,所述所有线卡进行复位之后,还包括:The upgrade method according to claim 4, wherein after all the line cards are reset, the method further comprises:开启所述第一主控板与其他单板的板间通信。Enable inter-board communication between the first main control board and other boards.
- 如权利要求4所述的升级方法,其中,所述线卡携带存储介质或不携带存储介质;The upgrade method according to claim 4, wherein the line card carries a storage medium or does not carry a storage medium;当所述线卡携带存储介质时,所述存储介质中存储有版本文件或未存储版本文件。When the line card carries a storage medium, a version file or no version file is stored in the storage medium.
- 如权利要求7所述的升级方法,其中,所述存储介质中存储有版本文件时,包括:8. The upgrade method according to claim 7, wherein when a version file is stored in the storage medium, it comprises:以所述第一新主控板的版本文件为准,下载并运行所述第一新主控板的版本文件;Download and run the version file of the first new main control board based on the version file of the first new main control board;或,以所述线卡存储介质中存储的版本文件为准,运行所述版本文件;Or, run the version file based on the version file stored in the line card storage medium;或,比较所述第一新主控板的版本文件与所述线卡存储介质中的版本文件,当所述第一新主控板的版本文件为最新版本时,下载并运行所述第一新主控板的版本文件,当所述线卡存储介质中的版本文件为最新版本时,运行所述版本文件。Or, compare the version file of the first new main control board with the version file in the line card storage medium, and when the version file of the first new main control board is the latest version, download and run the first For the version file of the new main control board, when the version file in the line card storage medium is the latest version, run the version file.
- 一种通信设备,所述通信设备包括处理器、存储器及通信总线;A communication device, the communication device including a processor, a memory, and a communication bus;所述通信总线用于实现处理器和存储器之间的连接通信;The communication bus is used to realize the connection and communication between the processor and the memory;所述处理器设置为执行存储器中存储的一个或者多个计算机程序,以实现如权利要求1-8中任一项所述的升级方法的步骤。The processor is configured to execute one or more computer programs stored in the memory to implement the steps of the upgrading method according to any one of claims 1-8.
- 一种计算机可读存储介质,所述计算机可读存储介质存储有一个或者多个程序,所述一个或者多个程序可被一个或者多个处理器执行,以实现如权利要求1-8中任一项所述的升级方法的步骤。A computer-readable storage medium, the computer-readable storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement any of claims 1-8 One of the steps of the upgrade method.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910804251.8A CN112445503A (en) | 2019-08-28 | 2019-08-28 | Upgrading method, communication equipment and computer readable storage medium |
CN201910804251.8 | 2019-08-28 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021036712A1 true WO2021036712A1 (en) | 2021-03-04 |
Family
ID=74684445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2020/106846 WO2021036712A1 (en) | 2019-08-28 | 2020-08-04 | Upgrading method, communication device and computer-readable storage medium |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN112445503A (en) |
WO (1) | WO2021036712A1 (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101888304A (en) * | 2009-05-15 | 2010-11-17 | 华为技术有限公司 | Updating method, device and system for routing equipment |
CN102739442A (en) * | 2012-06-06 | 2012-10-17 | 中兴通讯股份有限公司 | Method and system for carrying out software updating on equipment |
CN103414590A (en) * | 2013-08-19 | 2013-11-27 | 杭州华三通信技术有限公司 | Software upgrading method and device |
US20140351803A1 (en) * | 2012-10-17 | 2014-11-27 | Movimento Group | Module updating device |
CN105677380A (en) * | 2014-11-21 | 2016-06-15 | 中兴通讯股份有限公司 | Method and device for plate-to-plate upgrading with dual master controls isolated |
CN109525434A (en) * | 2018-12-13 | 2019-03-26 | 中国航空工业集团公司上海航空测控技术研究所 | A kind of redundancy backup method based on airborne equipment board |
-
2019
- 2019-08-28 CN CN201910804251.8A patent/CN112445503A/en active Pending
-
2020
- 2020-08-04 WO PCT/CN2020/106846 patent/WO2021036712A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101888304A (en) * | 2009-05-15 | 2010-11-17 | 华为技术有限公司 | Updating method, device and system for routing equipment |
CN102739442A (en) * | 2012-06-06 | 2012-10-17 | 中兴通讯股份有限公司 | Method and system for carrying out software updating on equipment |
US20140351803A1 (en) * | 2012-10-17 | 2014-11-27 | Movimento Group | Module updating device |
CN103414590A (en) * | 2013-08-19 | 2013-11-27 | 杭州华三通信技术有限公司 | Software upgrading method and device |
CN105677380A (en) * | 2014-11-21 | 2016-06-15 | 中兴通讯股份有限公司 | Method and device for plate-to-plate upgrading with dual master controls isolated |
CN109525434A (en) * | 2018-12-13 | 2019-03-26 | 中国航空工业集团公司上海航空测控技术研究所 | A kind of redundancy backup method based on airborne equipment board |
Also Published As
Publication number | Publication date |
---|---|
CN112445503A (en) | 2021-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5342302B2 (en) | Firmware update system, firmware distribution server, and program | |
US20030182411A1 (en) | Method for updating and restoring operating software in an active region of a network element | |
JP5346253B2 (en) | Firmware update system, information device, and program | |
JP5113700B2 (en) | Firmware update apparatus and method | |
US7698698B2 (en) | Method for over-the-air firmware update of NAND flash memory based mobile devices | |
CN110096302B (en) | Software data storage and upgrading method, device, equipment and storage medium | |
EP1077407A1 (en) | Method of upgrading a program using associated configuration data | |
CN104823160A (en) | Virtual machine-preserving host updates | |
CN101770383B (en) | Method and device for on-line upgrade of cross-platform version | |
EP2652599A1 (en) | System reset | |
CN109634638B (en) | Cluster software upgrading method, device, equipment and medium | |
US8972964B2 (en) | Dynamic firmware updating system for use in translated computing environments | |
CN109086078A (en) | Android system upgrade method, device, server and mobile terminal | |
CN104915226A (en) | Network device software starting method, device and network device | |
CN103186390A (en) | Home gateway and software upgrading method thereof | |
CN109710297B (en) | Method for upgrading and backing equipment wholly or in modules | |
US8316363B2 (en) | Concurrent embedded application update | |
US7783921B2 (en) | Code recovery system and method | |
WO2021036712A1 (en) | Upgrading method, communication device and computer-readable storage medium | |
CN107003880B (en) | Kernel updating method and device and computer equipment | |
KR100832269B1 (en) | Program update method and system for wireless communication terminal | |
CN107526615B (en) | Single-machine program upgrading method and device in service operation process | |
CN113721959A (en) | Information processing method and device and electronic equipment | |
CN104503811A (en) | Method and system for upgrading communication device based on single memory area | |
CN113722147A (en) | Method for keeping service connection and related equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20856056 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20856056 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 08.08.2022) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20856056 Country of ref document: EP Kind code of ref document: A1 |