WO2020209712A1 - Marine vessel having a crane and method of operation - Google Patents

Marine vessel having a crane and method of operation Download PDF

Info

Publication number
WO2020209712A1
WO2020209712A1 PCT/NL2020/050202 NL2020050202W WO2020209712A1 WO 2020209712 A1 WO2020209712 A1 WO 2020209712A1 NL 2020050202 W NL2020050202 W NL 2020050202W WO 2020209712 A1 WO2020209712 A1 WO 2020209712A1
Authority
WO
WIPO (PCT)
Prior art keywords
boom
jib
section
vessel
main
Prior art date
Application number
PCT/NL2020/050202
Other languages
French (fr)
Inventor
Joop Roodenburg
Cornelis Martinus VAN VELUW
Adrianus VAN DER LINDE
Original Assignee
Itrec B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Itrec B.V. filed Critical Itrec B.V.
Publication of WO2020209712A1 publication Critical patent/WO2020209712A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules

Definitions

  • the present invention relates to a marine vessel, e.g. a jack-up type vessel, having a crane and a method of operation of such a marine crane vessel.
  • the trend is to increase the diameter of the rotor of the wind turbine and to have the hub high above the water.
  • Wind turbine blades of 60 - 90 meters in length or even longer may be very common in the near future.
  • the hub of the wind turbine, and therefore the height of the mast also is ever increasing.
  • the hub may be at 100 meters above the sea, or even higher. This also increases the size and weight of all other components of the turbine installation including the nacelle, hub, generator, blades, mast, and/or the foundation.
  • the vessel has a boom rest that is arranged on the hull spaced from the slew bearing and is adapted to rest the main boom section of the boom thereon in a parking position of the boom.
  • a fastening assembly is provided which is configured to fasten the object suspension device relative to the hull of the vessel, said fastening assembly being spaced further from the slew bearing than the boom rest.
  • the method comprise a boom parking routine wherein the boom is brought from a hoisting position into the parking position, wherein said boom parking routine comprises:
  • the vessel further comprises a jib tip end support device in proximity of the fastening assembly for the object suspension device, wherein the boom parking routine comprises bringing the tip end of the jib member into load bearing engagement with the jib tip end support device, so that in the parking position of the boom a part of the weight of the boom rests on the boom rest and a part of the weight of the boom rests on the jib tip end support device. This allows to avoid undue load on the boom rest and/or on the main boom section where it is supported by the boom rest.
  • the fastening assembly and possibly also the jib tip end support device, are located closer to the slew bearing than the upper end of the main boom section in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section.
  • This may allow for a crane having a long boom.
  • a marine vessel with a relatively smaller, shorter, hull can be provided with a crane having a relatively long boom.
  • an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 1.
  • the jib section has a second jib strut oriented at an angle from a first jib strut and configured to engage on the variable length stay mechanism, so as to maintain a lever action of the variable length stay mechanism about the pivot axis of the jib section, e.g. when the first jib strut becomes generally aligned with the main boom section, e.g. during the parking routine.
  • the vessel is a marine jack-up type vessel comprising:
  • each associated with a respective jack-up leg adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
  • the crane is a leg encircling crane comprising a foot fixed to the hull, wherein the slew bearing is supported on the foot and extends about a jack-up leg of the vessel, and wherein the revolving superstructure is supported by said slew bearing.
  • the main boom section comprises a pair of boom legs, which are connected at said upper end to each other via a head structure of the main boom section, e.g. said head structure supporting a whip hoist member extending beyond said main boom section in a central plane of the main boom section, and wherein said jib is pivotally connected to said head structure of the main boom section.
  • the main boom section in the boom parking routine, is aligned with a jack-up leg of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs of the main boom section are on opposite sides of said jack-up leg.
  • the jib member comprises a triangular jib member frame, said jib sheave assembly being mounted at a tip end of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure of the main boom section.
  • the jib structure comprises a jib strut frame having a pair of radial jib strut members each extending radially from a respective transverse end portion of the head of the main boom section and being pivotally connected to the head of the main boom section.
  • the method further comprises a hoisting step, wherein the crane is used to lift an object at an offshore location, e.g. a component of an offshore wind turbine.
  • the present invention also relates to a marine vessel as disclosed herein.
  • the present invention also relates to a marine vessel according to claim 11 , wherein the boom is movable, in a boom parking routine, from a hoisting position into the parking position, wherein said boom parking routine comprises:
  • the vessel further comprises a jib tip end support device in proximity of the fastening assembly for the object suspension device, wherein the boom parking routine comprises bringing the tip end of the jib member into load bearing engagement with the jib tip end support device, so that in the parking position of the boom a part of the weight of the boom rests on the boom rest and a part of the weight of the boom rests on the jib tip end support device.
  • the fastening assembly and possibly also the jib tip end support device, are located closer to the slew bearing than the upper end of the main boom section in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section.
  • the vessel comprises an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 11.
  • the vessel is a marine jack-up type vessel comprising:
  • each associated with a respective jack-up leg adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
  • the main boom section comprises a pair of boom legs, which are connected at said upper end to each other via a head structure of the main boom section, e.g. said head structure supporting a whip hoist member extending beyond said main boom section in a central plane of the main boom section, and wherein said jib is pivotally connected to said head structure of the main boom section.
  • the main boom section in the boom parking routine, is aligned with a jack up leg of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs of the main boom section are on opposite sides of said jack-up leg.
  • the jib member comprises a triangular jib member frame, said jib sheave assembly being mounted at a tip end of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure of the main boom section.
  • jib structure comprises a jib strut frame having a pair of radial jib strut members each extending radially from a respective transverse end portion of the head of the main boom section and being pivotally connected to the head of the main boom section.
  • Fig. 1 shows a side view of a jack-up type marine vessel according to the invention
  • Fig. 2 shows a part of the boom of the crane of fig. 1 on a larger scale
  • Fig. 3 shows a plan view of the vessel of fig. 1 with the boom in parking position
  • Fig. 4 shows the vessel of figure 1 in side view with the boom in parking position
  • Fig. 5 shows a part of the figure 4 on a larger scale
  • Fig. 6 shows a part of figure 3 on a larger scale
  • Fig. 7 shows the vessel of figure 1 , with the boom during execution of the parking routine
  • Fig. 8 shows a leg and the crane of the vessel of figure 1 in a perspective view
  • Fig. 9 shows a leg and the crane of the vessel of figure 1 in another perspective view.
  • an exemplary jack-up type marine vessel 1 comprising a buoyant hull 2.
  • the hull 2, in this example, has an accommodation and bridge structure 4 at the bow, here with a helideck. Aft of the structure 4 the vessel has a main deck 3.
  • the hull 2 comprises a plurality, here four, vertical leg openings 5 through the hull. These leg openings are spaced about the hull.
  • Jack-up legs 6a,b,c,d extend through the hull 2, each via a respective leg opening 5.
  • Each of the legs 6a-d is movable in a vertical direction with respect to the hull 2 by means of an elevating unit 7 is positioned at the vertical leg opening.
  • the elevating units 7 are adapted to lift the hull 2 free of the water surface when the legs 6a-d engage the seabed.
  • the vessel 1 comprises a crane 20, here a leg-encircling crane, also referred to in the industry as an around-the-leg crane 20.
  • a foot 10 is fixed to the hull. Here the leg 6a extends through the foot 10.
  • a slew bearing 15 is supported on the foot 10 and extends about a jack-up leg 6a of the vessel 1.
  • the crane 20 has a revolving superstructure 21 that is supported by the slew bearing 15.
  • the crane further comprises a boom 30 that is pivotally mounted to the revolving
  • the boom 30 comprises:
  • main boom section 35 comprising a lower end 36 that is pivotally mounted about pivot axis 22 to the superstructure 21 and an upper end 37,
  • jib section 40 that is mounted pivotally about a pivot axis P to the upper end 37 of the main boom section 35.
  • the tip end of the jib section 43 is shown at a height of 150 meters above the deck 3.
  • the jib section 40 comprises:
  • a jib member 41 e.g. having a length of between 15 and 35 meters, an inner end 42 of which is pivotally mounted about pivot axis P to the upper end 37 of the main boom section 35, said jib member 41 having a tip end 43, and
  • jib strut 45 having an inner end 46 that is secured to the inner end 42 of the jib member and having an outer end 47, and
  • jib stay 48 extending between the outer end of the jib strut and the jib member, here the tip end 43 thereof.
  • the jib strut 45 or first jib strut as multiple jib struts at differing angles may be possible, is generally perpendicular to the jib member 41.
  • the jib stay 48 is a fixed length jib stay, e.g. formed by one or more cables or rods.
  • a jib sheave assembly 50 is mounted on the jib member, here in proximity of the tip end thereof.
  • a variable length stay mechanism 60 is provided between the main boom section 35 and the jib strut 45.
  • a second jib strut 45b is provided oriented at an angle from the first jib strut 45 that is further away from the jib member 41. It is envisaged that said second jib strut 45b engages on the variable length stay mechanism 60, so as to maintain a lever action of the mechanism 60 about the pivot axis P, when the first jib strut 45 becomes generally aligned with the main boom section 35, e.g. during the parking routine.
  • the first and second jib struts 45, 45b may be fixed to another, e.g. by connector frame 45c.
  • the crane 20 has a luffing assembly comprising a luffing winch 70 mounted to the superstructure 21 and a luffing cable 72 extending between the luffing winch 70 on the superstructure and the main boom section 35, preferably the upper end 37 thereof;
  • the crane 20 has a hoist winch 80, a hoist cable 82, and an object suspension device 85.
  • the hoist cable 82 extends from the hoist winch 80, along the jib sheave assembly 50, to the object suspension device 85 suspended from the cable 82 below the assembly 50.
  • the cable 82 extends in a multiple falls arrangement between the sheave assembly 50 and the device 85, that is then also provided with a sheave assembly.
  • the device 85 comprises a crane hook 86, e.g. a multi prong crane hook.
  • the crane has a capacity to lift at least 800 tonnes.
  • the vessel 1 has a boom rest 90, here in proximity of leg 6b, e.g. at both sides of the leg 6b, that is arranged on the hull 2 at a location spaced from the slew bearing 15 and adapted to rest the main boom section 35 of the boom thereon in a parking position of the boom.
  • a boom rest 90 here in proximity of leg 6b, e.g. at both sides of the leg 6b, that is arranged on the hull 2 at a location spaced from the slew bearing 15 and adapted to rest the main boom section 35 of the boom thereon in a parking position of the boom.
  • the vessel has a fastening assembly 100 that is configured to fasten the object suspension device 85 relative to the hull 2 of the vessel, e.g. on a front deck 12 thereof as shown here.
  • the fastening assembly 100 is spaced further from the slew bearing 15 than the boom rest 90, here the assembly 100 is forward, so further to the bow, than the boom rest 90.
  • the boom 30 is movable, in a boom parking routine, from a hoisting position into a parking position by means of a boom parking routine.
  • the boom parking routine comprises:
  • the vessel further comprises a jib tip end support device 120 in proximity of the fastening assembly 100 for the object suspension device 85.
  • the device 120 may be integrated with the assembly 100 when desired.
  • the boom parking routine comprises bringing the tip end 43 of the jib member 41 into load bearing engagement with the jib tip end support device 120, so that in the parking position of the boom 30 a part of the weight of the boom 30 rests on the boom rest 90 and a part of the weight of the boom rests on the jib tip end support device 120.
  • the fastening assembly 100 and possibly also the jib tip end support device 120, to be located closer to the slew bearing 15 than the upper end 37 of the main boom section 35 in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section.
  • the upper end 37 of the main boom section is located beyond, that is forward of, the bow of the vessel in the parking position, with the tip end 43 being inboard of the hull of the vessel.
  • this allows for a relatively long main boom section 35 of the crane, as well as a relatively lengthy jib member 41 , resulting a significant operational height of the crane.
  • this structure is advantageous in combination with an over-the-leg crane, more preferably in combination with an over-the-leg parking position, as the parked boom then extends generally along one side of the jack-up type vessel. This, e.g. avoids undue interference of the parked boom with the
  • the jib member 41 extends rearward and downward relative to the upper end 37 of the boom section 35 in the parking position.
  • the vessel comprises an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of the boom parking routine.
  • the main boom section 35 comprises a pair of boom legs 35a, b, which are connected at said upper end 37 to each other via a head structure 38 of the main boom section 35.
  • the head structure 38 may support a whip hoist member 39 extending beyond said main boom section 35 in a central plane of the main boom section.
  • the jib section 40 is pivotally connected to the head structure 38 of the main boom section 35.
  • the main boom section 35 is aligned with a jack-up leg 6b of the vessel and is lowered over said jack-up leg 6b so that in the parking position the boom legs of the main boom section are on opposite sides of said jack- up leg. This is known as an over-the-leg parking of the boom.
  • the jib member 41 comprises a triangular jib member frame, wherein the jib sheave assembly 50 is mounted at a tip end 43 of the triangular jib member frame, and wherein a base of the triangular jib member frame is pivotally connected to the head structure 38 of the main boom section.
  • the jib strut 45 comprises a jib strut frame having a pair of radial jib strut members 45a, b each extending radially from a respective transverse end portion of the head 38 of the main boom section and being pivotally connected to the head of the main boom section.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention relates to a marine vessel and a method of operation. The vessel comprises a hull and a crane with a revolving superstructure. The crane has a boom with a main boom section and a jib section mounted pivotally to the upper end of the main boom section. A boom rest is arranged on the hull spaced from the slew bearing. A fastening assembly is configured to fasten the object suspension device of the crane relative to the hull of the vessel. The fastening assembly is spaced further from the slew bearing than the boom rest. The method comprise a boom parking routine comprising bringing the boom in a raised intermediate position wherein the boom main section is remote from the boom rest and the jib sheave assembly is vertically above the fastening assembly. The hoist cable is paid out until the object suspension device reaches the fastening assembly and is fastened thereto. The main boom section is then lowered towards the boom rest by means of a luffing assembly combined with hauling in the hoist cable, and possibly also combined with operating the variable length stay mechanism, so that the tip end of the jib member is pulled towards the fastening assembly, until the main boom section rests on the boom rest in the parking position of the boom.

Description

MARINE VESSEL HAVING A CRANE AND METHOD OF OPERATION
The present invention relates to a marine vessel, e.g. a jack-up type vessel, having a crane and a method of operation of such a marine crane vessel.
It is commonly known to use marine crane vessels for offshore hoisting purposes, such for the installation and/or maintenance of offshore wind turbines. Other applications are, for example, hoisting activities related to offshore platforms for oil and/or gas production, e.g. for decommission such offshore platforms.
Current offshore wind turbines require a foundation, e.g. in the form of a monopile. The wind turbine is then installed on the monopile, either in one piece or in several pieces.
Many known offshore wind turbine installation vessels are of the jack-up type, with extendible jack-up legs and with a crane for installation of the wind turbine. In a known design, the crane is an around-the-leg crane.
In order to make efficient use of wind energy, the trend is to increase the diameter of the rotor of the wind turbine and to have the hub high above the water. Wind turbine blades of 60 - 90 meters in length or even longer may be very common in the near future. The hub of the wind turbine, and therefore the height of the mast, also is ever increasing. For example, the hub may be at 100 meters above the sea, or even higher. This also increases the size and weight of all other components of the turbine installation including the nacelle, hub, generator, blades, mast, and/or the foundation.
The trend therefore is towards cranes on such a vessel with an increased reach and lifting capability, so generally a longer and stronger boom, allowing for hoisting operations at great height.
During transfer of the vessel, it is advantageous, even necessary, to position the boom in a parking position.
It is an object of the present invention to provide a marine vessel with a crane having a boom allowing for an advantageous parking routine and parking position. This aim is achieved by a vessel operated according to the method of claim 1. In the invention, the vessel has a boom rest that is arranged on the hull spaced from the slew bearing and is adapted to rest the main boom section of the boom thereon in a parking position of the boom. Further a fastening assembly is provided which is configured to fasten the object suspension device relative to the hull of the vessel, said fastening assembly being spaced further from the slew bearing than the boom rest.
The method comprise a boom parking routine wherein the boom is brought from a hoisting position into the parking position, wherein said boom parking routine comprises:
a. bringing the boom in a raised intermediate position wherein the boom main section is remote from the boom rest and the jib sheave assembly is vertically above the fastening assembly;
b. paying out the hoist cable and thereby lowering the object suspension device suspended from the hoisting cable below the jib sheave assembly, said lowering being continued until the object suspension device reaches the fastening assembly,
c. fastening the object suspension device to the fastening assembly,
d. lowering the main boom section towards the boom rest by means of the luffing assembly combined with hauling in the hoist cable, and possibly also combined with operating the variable length stay mechanism, so that the tip end of the jib member is pulled towards the fastening assembly, until the main boom section rests on the boom rest in the parking position of the boom.
This approach allows for a long boom that allows to meet the industry demand, which boom is then also relatively heavy, whilst assuring a reliable and effective parking of the boom.
In an embodiment, the vessel further comprises a jib tip end support device in proximity of the fastening assembly for the object suspension device, wherein the boom parking routine comprises bringing the tip end of the jib member into load bearing engagement with the jib tip end support device, so that in the parking position of the boom a part of the weight of the boom rests on the boom rest and a part of the weight of the boom rests on the jib tip end support device. This allows to avoid undue load on the boom rest and/or on the main boom section where it is supported by the boom rest.
In an embodiment, the fastening assembly, and possibly also the jib tip end support device, are located closer to the slew bearing than the upper end of the main boom section in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section. This, for instance, may allow for a crane having a long boom. For example, a marine vessel with a relatively smaller, shorter, hull can be provided with a crane having a relatively long boom.
In an embodiment, use is made of an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 1.
In an embodiment, the jib section has a second jib strut oriented at an angle from a first jib strut and configured to engage on the variable length stay mechanism, so as to maintain a lever action of the variable length stay mechanism about the pivot axis of the jib section, e.g. when the first jib strut becomes generally aligned with the main boom section, e.g. during the parking routine.
In an embodiment, the vessel is a marine jack-up type vessel comprising:
- a buoyant hull,
- at least three, preferably four or six, jack-up legs,
- a plurality of elevating units, each associated with a respective jack-up leg, adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
In an embodiment, the crane is a leg encircling crane comprising a foot fixed to the hull, wherein the slew bearing is supported on the foot and extends about a jack-up leg of the vessel, and wherein the revolving superstructure is supported by said slew bearing.
In an embodiment, the main boom section comprises a pair of boom legs, which are connected at said upper end to each other via a head structure of the main boom section, e.g. said head structure supporting a whip hoist member extending beyond said main boom section in a central plane of the main boom section, and wherein said jib is pivotally connected to said head structure of the main boom section.
In an embodiment, in the boom parking routine, the main boom section is aligned with a jack-up leg of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs of the main boom section are on opposite sides of said jack-up leg.
In an embodiment, the jib member comprises a triangular jib member frame, said jib sheave assembly being mounted at a tip end of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure of the main boom section. In an embodiment, the jib structure comprises a jib strut frame having a pair of radial jib strut members each extending radially from a respective transverse end portion of the head of the main boom section and being pivotally connected to the head of the main boom section.
In an embodiment the method further comprises a hoisting step, wherein the crane is used to lift an object at an offshore location, e.g. a component of an offshore wind turbine.
The present invention also relates to a marine vessel as disclosed herein.
The present invention also relates to a marine vessel according to claim 11 , wherein the boom is movable, in a boom parking routine, from a hoisting position into the parking position, wherein said boom parking routine comprises:
a. bringing the boom in a raised intermediate position wherein the boom main section is remote from the boom rest and the jib sheave assembly is vertically above the fastening assembly;
b. paying out the hoist cable and thereby lowering the object suspension device suspended from the hoisting cable below the jib sheave assembly, said lowering being continued until the object suspension device reaches the fastening assembly,
c. fastening the object suspension device to the fastening assembly,
d. lowering the main boom section towards the boom rest by means of the luffing assembly combined with hauling in the hoist cable, and possibly also combined with operating the variable length stay mechanism, so that the tip end of the jib member is pulled towards the fastening assembly, until the main boom section rests on the boom rest in the parking position of the boom.
In an embodiment, the vessel further comprises a jib tip end support device in proximity of the fastening assembly for the object suspension device, wherein the boom parking routine comprises bringing the tip end of the jib member into load bearing engagement with the jib tip end support device, so that in the parking position of the boom a part of the weight of the boom rests on the boom rest and a part of the weight of the boom rests on the jib tip end support device.
In an embodiment, the fastening assembly, and possibly also the jib tip end support device, are located closer to the slew bearing than the upper end of the main boom section in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section. In an embodiment, the vessel comprises an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 11.
In an embodiment, the vessel is a marine jack-up type vessel comprising:
- a hull,
- at least three jack-up legs,
- a plurality of elevating units, each associated with a respective jack-up leg, adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
In embodiments, the main boom section comprises a pair of boom legs, which are connected at said upper end to each other via a head structure of the main boom section, e.g. said head structure supporting a whip hoist member extending beyond said main boom section in a central plane of the main boom section, and wherein said jib is pivotally connected to said head structure of the main boom section.
In embodiments, in the boom parking routine, the main boom section is aligned with a jack up leg of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs of the main boom section are on opposite sides of said jack-up leg.
In embodiments, the jib member comprises a triangular jib member frame, said jib sheave assembly being mounted at a tip end of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure of the main boom section.
In embodiments, jib structure comprises a jib strut frame having a pair of radial jib strut members each extending radially from a respective transverse end portion of the head of the main boom section and being pivotally connected to the head of the main boom section.
The invention will be elucidated further in relation to the drawings, in which:
Fig. 1 shows a side view of a jack-up type marine vessel according to the invention;
Fig. 2 shows a part of the boom of the crane of fig. 1 on a larger scale,
Fig. 3 shows a plan view of the vessel of fig. 1 with the boom in parking position,
Fig. 4 shows the vessel of figure 1 in side view with the boom in parking position,
Fig. 5 shows a part of the figure 4 on a larger scale,
Fig. 6 shows a part of figure 3 on a larger scale, Fig. 7 shows the vessel of figure 1 , with the boom during execution of the parking routine, Fig. 8 shows a leg and the crane of the vessel of figure 1 in a perspective view,
Fig. 9 shows a leg and the crane of the vessel of figure 1 in another perspective view.
In the figures, an exemplary jack-up type marine vessel 1 is shown, comprising a buoyant hull 2. The hull 2, in this example, has an accommodation and bridge structure 4 at the bow, here with a helideck. Aft of the structure 4 the vessel has a main deck 3.
In figures 4, 5, 6, 7 a part of structure 4 has been left out for clarity.
The hull 2 comprises a plurality, here four, vertical leg openings 5 through the hull. These leg openings are spaced about the hull.
Jack-up legs 6a,b,c,d extend through the hull 2, each via a respective leg opening 5.
Each of the legs 6a-d is movable in a vertical direction with respect to the hull 2 by means of an elevating unit 7 is positioned at the vertical leg opening. The elevating units 7 are adapted to lift the hull 2 free of the water surface when the legs 6a-d engage the seabed.
The vessel 1 comprises a crane 20, here a leg-encircling crane, also referred to in the industry as an around-the-leg crane 20.
A foot 10 is fixed to the hull. Here the leg 6a extends through the foot 10.
A slew bearing 15 is supported on the foot 10 and extends about a jack-up leg 6a of the vessel 1.
The crane 20 has a revolving superstructure 21 that is supported by the slew bearing 15.
The crane further comprises a boom 30 that is pivotally mounted to the revolving
superstructure 21 about a horizontal pivot axis 22.
The boom 30 comprises:
- a main boom section 35 comprising a lower end 36 that is pivotally mounted about pivot axis 22 to the superstructure 21 and an upper end 37,
- a jib section 40 that is mounted pivotally about a pivot axis P to the upper end 37 of the main boom section 35. In the figure 1 , which is to scale as are the other figures, the tip end of the jib section 43 is shown at a height of 150 meters above the deck 3.
The jib section 40 comprises:
- a jib member 41 , e.g. having a length of between 15 and 35 meters, an inner end 42 of which is pivotally mounted about pivot axis P to the upper end 37 of the main boom section 35, said jib member 41 having a tip end 43, and
- a jib strut 45 having an inner end 46 that is secured to the inner end 42 of the jib member and having an outer end 47, and
- a jib stay 48 extending between the outer end of the jib strut and the jib member, here the tip end 43 thereof.
As shown here, the jib strut 45, or first jib strut as multiple jib struts at differing angles may be possible, is generally perpendicular to the jib member 41.
As preferred, the jib stay 48 is a fixed length jib stay, e.g. formed by one or more cables or rods.
A jib sheave assembly 50 is mounted on the jib member, here in proximity of the tip end thereof.
A variable length stay mechanism 60 is provided between the main boom section 35 and the jib strut 45.
In the depicted embodiment, an as optional for the crane, a second jib strut 45b is provided oriented at an angle from the first jib strut 45 that is further away from the jib member 41. It is envisaged that said second jib strut 45b engages on the variable length stay mechanism 60, so as to maintain a lever action of the mechanism 60 about the pivot axis P, when the first jib strut 45 becomes generally aligned with the main boom section 35, e.g. during the parking routine. The first and second jib struts 45, 45b may be fixed to another, e.g. by connector frame 45c.
The crane 20 has a luffing assembly comprising a luffing winch 70 mounted to the superstructure 21 and a luffing cable 72 extending between the luffing winch 70 on the superstructure and the main boom section 35, preferably the upper end 37 thereof; The crane 20 has a hoist winch 80, a hoist cable 82, and an object suspension device 85. The hoist cable 82 extends from the hoist winch 80, along the jib sheave assembly 50, to the object suspension device 85 suspended from the cable 82 below the assembly 50.
As preferred the cable 82 extends in a multiple falls arrangement between the sheave assembly 50 and the device 85, that is then also provided with a sheave assembly.
As shown here, in embodiments, the device 85 comprises a crane hook 86, e.g. a multi prong crane hook.
For example, as shown here, the crane has a capacity to lift at least 800 tonnes.
The vessel 1 has a boom rest 90, here in proximity of leg 6b, e.g. at both sides of the leg 6b, that is arranged on the hull 2 at a location spaced from the slew bearing 15 and adapted to rest the main boom section 35 of the boom thereon in a parking position of the boom.
The vessel has a fastening assembly 100 that is configured to fasten the object suspension device 85 relative to the hull 2 of the vessel, e.g. on a front deck 12 thereof as shown here.
The fastening assembly 100 is spaced further from the slew bearing 15 than the boom rest 90, here the assembly 100 is forward, so further to the bow, than the boom rest 90.
The boom 30 is movable, in a boom parking routine, from a hoisting position into a parking position by means of a boom parking routine.
The boom parking routine comprises:
a. bringing the boom 30 in a raised intermediate position, wherein the boom main section 35 still is remote from the boom rest 90 and the jib sheave assembly 50 is vertically above the fastening assembly 100;
b. paying out the hoist cable 82 and thereby lowering the object suspension device 85 suspended from the hoisting cable 82 below the jib sheave assembly 50, said lowering being continued until the object suspension device 85 reaches the fastening assembly 100, c. fastening the object suspension device 85 to the fastening assembly 100,
d. lowering the main boom section 35 towards the boom rest 90 by means of the luffing assembly combined with hauling in the hoist cable 82, and possibly also combined with operating the variable length stay mechanism 60, so that the tip end 43 of the jib member 41 is pulled towards the fastening assembly 100, until the main boom section 35 rests on the boom rest 90 in the parking position of the boom. As shown here, the vessel further comprises a jib tip end support device 120 in proximity of the fastening assembly 100 for the object suspension device 85. The device 120 may be integrated with the assembly 100 when desired.
In an embodiment the boom parking routine comprises bringing the tip end 43 of the jib member 41 into load bearing engagement with the jib tip end support device 120, so that in the parking position of the boom 30 a part of the weight of the boom 30 rests on the boom rest 90 and a part of the weight of the boom rests on the jib tip end support device 120.
As shown here, e.g. in view of the length of the vessel relative to the length of the boom, it is preferable for the fastening assembly 100, and possibly also the jib tip end support device 120, to be located closer to the slew bearing 15 than the upper end 37 of the main boom section 35 in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section.
In embodiments, as shown here, the upper end 37 of the main boom section is located beyond, that is forward of, the bow of the vessel in the parking position, with the tip end 43 being inboard of the hull of the vessel. As can be seen, this allows for a relatively long main boom section 35 of the crane, as well as a relatively lengthy jib member 41 , resulting a significant operational height of the crane. As can be seen, this structure is advantageous in combination with an over-the-leg crane, more preferably in combination with an over-the-leg parking position, as the parked boom then extends generally along one side of the jack-up type vessel. This, e.g. avoids undue interference of the parked boom with the
accommodation and bridge structure 4, e.g. with the helideck of said structure 4, e.g. as shown in figure 1.
In embodiment, as shown here, the jib member 41 extends rearward and downward relative to the upper end 37 of the boom section 35 in the parking position.
In embodiment, the vessel comprises an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of the boom parking routine.
As shown here, in an embodiment, the main boom section 35 comprises a pair of boom legs 35a, b, which are connected at said upper end 37 to each other via a head structure 38 of the main boom section 35. As shown here, the head structure 38 may support a whip hoist member 39 extending beyond said main boom section 35 in a central plane of the main boom section.
The jib section 40 is pivotally connected to the head structure 38 of the main boom section 35.
It is also shown here that in the boom parking routine, the main boom section 35 is aligned with a jack-up leg 6b of the vessel and is lowered over said jack-up leg 6b so that in the parking position the boom legs of the main boom section are on opposite sides of said jack- up leg. This is known as an over-the-leg parking of the boom.
It is also shown here that the jib member 41 comprises a triangular jib member frame, wherein the jib sheave assembly 50 is mounted at a tip end 43 of the triangular jib member frame, and wherein a base of the triangular jib member frame is pivotally connected to the head structure 38 of the main boom section.
It is also shown here that the jib strut 45 comprises a jib strut frame having a pair of radial jib strut members 45a, b each extending radially from a respective transverse end portion of the head 38 of the main boom section and being pivotally connected to the head of the main boom section.

Claims

C L A I M S
1. A method of operation of a marine vessel (1) comprising:
- a hull (2);
- a slew bearing (15) mounted on the hull (2);
- a crane (20), comprising:
- a revolving superstructure (21) mounted upon said slew bearing,
- a boom (30) pivotally mounted to the revolving superstructure, the boom comprising:
- a main boom section (35) comprising a lower end (36) that is pivotally mounted about a pivot axis (22) to the superstructure (21) and an upper end (37,38),
- a jib section (40) mounted pivotally about a pivot axis (P) to the upper end of the main boom section and comprising:
- a jib member (41), an inner end (42) of which is pivotally mounted about pivot axis (P) to the upper end (37,38) of the main boom section, said jib member having a tip end, and
- a jib strut (45) having an inner end (46) that is secured to the inner end of the jib member and having an outer end (47), and
- a jib stay (48) extending between the outer end (47) of the jib strut and the jib member (41), e.g. the tip end (43) thereof;
- a jib sheave assembly (50) that is mounted on the jib member (41), preferably in proximity of the tip end thereof,
- a variable length stay mechanism (60) provided between the main boom section and the jib strut;
- a luffing assembly comprising a luffing winch (70) mounted to the superstructure and a luffing cable (72) extending between the luffing winch on the superstructure and the main boom section, preferably the upper end thereof;
- a hoist winch (80), a hoist cable (82), and an object suspension device (85), the hoist cable extending from the hoist winch, along the jib sheave assembly (50), to the object suspension device (85),
- a boom rest (90) that is arranged on the hull (2) at a location spaced from the slew bearing (15) and adapted to rest the main boom section (35) of the boom thereon in a parking position of the boom,
- a fastening assembly (100) that is configured to fasten the object suspension device (85) relative to the hull (2) of the vessel, said fastening assembly being spaced further from the slew bearing (15) than the boom rest (90), wherein the method comprise a boom parking routine wherein the boom (30) is brought from a hoisting position into the parking position, wherein said boom parking routine comprises:
a. bringing the boom (30) in a raised intermediate position wherein the boom main section (35) is remote from the boom rest (90) and the jib sheave assembly (50) is vertically above the fastening assembly (100);
b. paying out the hoist cable (82) and thereby lowering the object suspension device (85) suspended from the hoisting cable below the jib sheave assembly (50), said lowering being continued until the object suspension device (85) reaches the fastening assembly (100),
c. fastening the object suspension device (85) to the fastening assembly (100), d. lowering the main boom section (35) towards the boom rest (90) by means of the luffing assembly (70,71) combined with hauling in the hoist cable (82), and possibly also combined with operating the variable length stay mechanism (60), so that the tip end (43) of the jib member (41) is pulled towards the fastening assembly (100), until the main boom section (35) rests on the boom rest (90) in the parking position of the boom.
2. Method according to claim 1 , wherein the vessel (1) further comprises a jib tip end support device (120) in proximity of the fastening assembly (100) for the object suspension device (85), wherein the boom parking routine comprises bringing the tip end (43) of the jib member (41) into load bearing engagement with the jib tip end support device (120), so that in the parking position of the boom a part of the weight of the boom (30) rests on the boom rest (90) and a part of the weight of the boom (30) rests on the jib tip end support device (120).
3. Method according to claim 1 or 2, wherein the fastening assembly (100), and possibly also the jib tip end support device (120), are located closer to the slew bearing (15) than the upper end (37,38) of the main boom section in the parking position thereof on the boom rest (90), so that the jib member (41) extends from the upper end (37) of the boom section (35) inwards relative to the main boom section, for example wherein the upper end (37) of the main boom section is located forward of a bow of the vessel in the parking position, with the tip end (43) being inboard of the hull of the vessel.
4. Method according to any of claims 1 - 3, wherein use is made of an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 1.
5. Method according to any of claims 1 - 4, wherein the vessel is a marine jack-up type vessel (1) comprising:
- a hull (2) with a main deck (3),
- at least three jack-up legs (6a-d),
- a plurality of elevating units (7), each associated with a respective jack-up leg, adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
6. Method according to claim 5, wherein the crane (20) is a leg encircling crane comprising a foot (10) fixed to the hull, wherein the slew bearing (15) is supported on the foot and extends about a jack-up leg (6a) of the vessel, wherein the revolving
superstructure is supported by the slew bearing.
7. Method according to any of claims 1 - 6, wherein the main boom section (35) comprises a pair of boom legs (35a, b), which are connected at said upper end to each other via a head structure (38) of the main boom section, e.g. said head structure supporting a whip hoist member (39) extending beyond said main boom section in a central plane of the main boom section, and wherein said jib section (40) is pivotally connected to said head structure of the main boom section.
8. Method according to at least claims 5 and 7, wherein in the boom parking routine, the main boom section (35) is aligned with a jack-up leg (6b) of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs (35a, b) of the main boom section are on opposite sides of said jack-up leg.
9. Method according to at least claim 7, wherein the jib member (41) comprises a triangular jib member frame, said jib sheave assembly (50) being mounted at a tip end of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure (38) of the main boom section.
10. Method according to at least claim 7, wherein jib strut (45) comprises a jib strut frame having a pair of radial jib strut members (45a, b) each extending radially from a respective transverse end portion of the head structure (38) of the main boom section and being pivotally connected to the head of the main boom section.
11. A marine vessel (1) comprising:
- a hull (2);
- a slew bearing (15) mounted on the hull (2);
- a crane (20), comprising:
- a revolving superstructure (21) mounted upon said slew bearing,
- a boom (30) pivotally mounted to the revolving superstructure, the boom
comprising:
- a main boom section (35) comprising a lower end (36) that is pivotally mounted about a pivot axis (22) to the superstructure (21) and an upper end,
- a jib section (40) mounted pivotally about a pivot axis (P) to the upper end of the main boom section and comprising:
- a jib member (41), an inner end (42) of which is pivotally mounted about pivot axis (P) to the upper end (37,38) of the main boom section, said jib member having a tip end (43), and
- a jib strut (45) having an inner end that is secured to the inner end of the jib member and having an outer end, and
- a jib stay (48) extending between the outer end of the jib strut and the jib member, e.g. the tip end thereof;
- a jib sheave assembly (50) mounted on the jib member, preferably in proximity of the tip end thereof,
- a variable length stay mechanism (60) provided between the main boom section and the jib strut;
- a luffing assembly comprising a luffing winch (70) mounted to the superstructure and a luffing cable (72) extending between the luffing winch on the superstructure and the main boom section, preferably the upper end thereof;
- a hoist winch (80), a hoist cable (82), and an object suspension device (85), the hoist cable extending from the hoist winch, along the jib sheave assembly, to the object suspension device,
- a boom rest (90) that is arranged on the hull spaced from the slew bearing and adapted to rest the main boom section of the boom thereon in a parking position of the boom, - a fastening assembly (100) that is configured to fasten the object suspension device (85) relative to the hull of the vessel, said fastening assembly being spaced further from the slew bearing than the boom rest, wherein the boom is movable, in a boom parking routine, from a hoisting position into the parking position, wherein said boom parking routine comprises:
a. bringing the boom (30) in a raised intermediate position wherein the main boom section (35) is remote from the boom rest (90) and the jib sheave assembly (50) is vertically above the fastening assembly (100);
b. paying out the hoist cable (82) and thereby lowering the object suspension device (85) suspended from the hoisting cable below the jib sheave assembly (50), said lowering being continued until the object suspension device reaches the fastening assembly (100), c. fastening the object suspension device (85) to the fastening assembly (100),
d. lowering the main boom section (35) towards the boom rest (90) by means of the luffing assembly combined with hauling in the hoist cable (82), and possibly also combined with operating the variable length stay mechanism (60), so that the tip end (43) of the jib member (41) is pulled towards the fastening assembly, until the main boom section rests on the boom rest in the parking position of the boom.
12. Vessel according to claim 11 , wherein the vessel further comprises a jib tip end support device (120) in proximity of the fastening assembly for the object suspension device (85), wherein the boom parking routine comprises bringing the tip end (43) of the jib member into load bearing engagement with the jib tip end support device, so that in the parking position of the boom a part of the weight of the boom rests on the boom rest and a part of the weight of the boom rests on the jib tip end support device.
13. Vessel according to claim 11 or 12, wherein the fastening assembly (100), and possibly also the jib tip end support device (120), are located closer to the slew bearing (15) than the upper end of the main boom section in the parking position thereof on the boom rest, so that the jib member extends from the inner end thereon inwards relative to the main boom section.
14. Vessel according to any of claims 11 - 13, wherein the vessel comprises an automated control device that is configured and programmed to perform automatically the steps a., b., and d. of claim 11.
15. Vessel according to any of claims 11 - 14, wherein the vessel is a marine jack-up type vessel (1) comprising:
- a hull (2) with a main deck (3),
- at least three jack-up legs (6a-d),
- a plurality of elevating units (7), each associated with a respective jack-up leg, adapted to move the respective jack-up leg vertically relative to the hull and to bring the vessel in an operational position wherein the legs engage the seabed and the hull is above water level.
16. Vessel according to claim 15, wherein the crane (20) is a leg encircling crane comprising a foot (10) fixed to the hull, wherein the slew bearing is supported on the foot and extends about a jack-up leg (6a) of the vessel, wherein the revolving superstructure is supported by said slew bearing.
17. Vessel according to any of claims 11 - 16, wherein the main boom section (35) comprises a pair of boom legs (35a), which are connected at said upper end to each other via a head structure of the main boom section, e.g. said head structure (38) supporting a whip hoist member (39) extending beyond said main boom section in a central plane of the main boom section, and wherein said jib section (40) is pivotally connected to said head structure of the main boom section.
18. Vessel according to at least claims 15 and 17, wherein in the boom parking routine, the main boom section (35) is aligned with a jack-up leg (6b) of the vessel and is lowered over said jack-up leg so that in the parking position the boom legs of the main boom section are on opposite sides of said jack-up leg.
19. Vessel according to at least claim 17, wherein the jib member (41) comprises a triangular jib member frame, said jib sheave assembly being mounted at a tip end (43) of said triangular jib member frame, wherein a base of the triangular jib member frame is pivotally connected to the head structure (38) of the main boom section.
20. Vessel according to at least claim 17, wherein jib strut (48) comprises a jib strut frame having a pair of radial jib strut members each extending radially from a respective transverse end portion of the head of the main boom section and being pivotally connected to the head of the main boom section.
PCT/NL2020/050202 2019-04-11 2020-03-26 Marine vessel having a crane and method of operation WO2020209712A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2022929 2019-04-11
NL2022929A NL2022929B1 (en) 2019-04-11 2019-04-11 Marine vessel having a crane and method of operation

Publications (1)

Publication Number Publication Date
WO2020209712A1 true WO2020209712A1 (en) 2020-10-15

Family

ID=67352550

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2020/050202 WO2020209712A1 (en) 2019-04-11 2020-03-26 Marine vessel having a crane and method of operation

Country Status (2)

Country Link
NL (1) NL2022929B1 (en)
WO (1) WO2020209712A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane
WO2022200230A1 (en) * 2021-03-25 2022-09-29 Itrec B.V. Offshore crane vessel and method for operating the offshore crane vessel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016159762A2 (en) * 2015-04-02 2016-10-06 Itrec B.V. Pedestal crane assembly and hoist block storage and exchange device
WO2018088900A1 (en) * 2016-11-11 2018-05-17 Itrec B.V. Marine crane vessel and method of operation
WO2018208158A1 (en) * 2017-05-12 2018-11-15 Itrec B.V. Hoisting crane for use on an offshore vessel and method of operation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016159762A2 (en) * 2015-04-02 2016-10-06 Itrec B.V. Pedestal crane assembly and hoist block storage and exchange device
WO2018088900A1 (en) * 2016-11-11 2018-05-17 Itrec B.V. Marine crane vessel and method of operation
WO2018208158A1 (en) * 2017-05-12 2018-11-15 Itrec B.V. Hoisting crane for use on an offshore vessel and method of operation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022200230A1 (en) * 2021-03-25 2022-09-29 Itrec B.V. Offshore crane vessel and method for operating the offshore crane vessel
NL2027839B1 (en) * 2021-03-25 2022-10-10 Itrec Bv Offshore crane vessel and method for operating the offshore crane vessel
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane
CN114031008B (en) * 2021-12-07 2023-10-24 南通振华重型装备制造有限公司 Modularized final assembly process of floating crane

Also Published As

Publication number Publication date
NL2022929B1 (en) 2020-10-20

Similar Documents

Publication Publication Date Title
US10894701B2 (en) Crane, vessel comprising such a crane, and a method for up-ending a longitudinal structure
EP3551567B1 (en) A wave-induced motion compensating crane for use on an offshore vessel, vessel and load transferring method
CN103502636B (en) The method of Lift-on/Lift-off System and offer Lift-on/Lift-off System
US20180347549A1 (en) Device And A Ship For Maintaining An Offshore Wind Turbine
RU2744782C1 (en) Lifting system for installing a wind turbine and method for lifting operations (options)
US20120027523A1 (en) Device and method for assembling a structure at sea
WO2020209712A1 (en) Marine vessel having a crane and method of operation
US10875748B2 (en) Marine crane vessel and method of operation
EP3857061B1 (en) Method for moving an object between a platform of a wind turbine and a deck of a vessel and frame structure used for coupling of a pulling means
EP4077197B1 (en) Offshore vessel crane
WO2020225157A1 (en) Compact jib crane
US11952245B2 (en) Hoisting crane for use on an offshore vessel and method of operation
EP4193063B1 (en) Method for exchanging an up-tower main component of an off-shore wind turbine
NL2018375B1 (en) Marine jack-up type crane vessel and methods of operation
EP3546335A1 (en) A vessel with on board jib crane
NO20211050A1 (en) Hoisting of wind turbine components
EP3020622B1 (en) System and lifting unit for lifting loads of varying weight
WO2022263566A1 (en) Marine crane and offshore vessel
GB2619106A (en) Offshore turbine assembly method
WO2024072223A1 (en) Method for decoupling a crane block from an offshore crane
EP4405586A1 (en) Method and system for handling components of an offshore wind turbine
WO2020060394A1 (en) Crane vessel

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20714303

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20714303

Country of ref document: EP

Kind code of ref document: A1