WO2020180054A1 - Automatic coupling device for lamp - Google Patents

Automatic coupling device for lamp Download PDF

Info

Publication number
WO2020180054A1
WO2020180054A1 PCT/KR2020/002829 KR2020002829W WO2020180054A1 WO 2020180054 A1 WO2020180054 A1 WO 2020180054A1 KR 2020002829 W KR2020002829 W KR 2020002829W WO 2020180054 A1 WO2020180054 A1 WO 2020180054A1
Authority
WO
WIPO (PCT)
Prior art keywords
lamp
cover
fixing
fixing bolt
fastening
Prior art date
Application number
PCT/KR2020/002829
Other languages
French (fr)
Korean (ko)
Inventor
김나경
Original Assignee
김나경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김나경 filed Critical 김나경
Publication of WO2020180054A1 publication Critical patent/WO2020180054A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V17/00Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
    • F21V17/10Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
    • F21V17/12Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening by screwing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21SNON-PORTABLE LIGHTING DEVICES; SYSTEMS THEREOF; VEHICLE LIGHTING DEVICES SPECIALLY ADAPTED FOR VEHICLE EXTERIORS
    • F21S8/00Lighting devices intended for fixed installation
    • F21S8/08Lighting devices intended for fixed installation with a standard
    • F21S8/085Lighting devices intended for fixed installation with a standard of high-built type, e.g. street light
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V17/00Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
    • F21V17/10Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
    • F21V17/16Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening by deformation of parts; Snap action mounting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/10Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
    • F21V21/116Fixing lighting devices to arms or standards
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21WINDEXING SCHEME ASSOCIATED WITH SUBCLASSES F21K, F21L, F21S and F21V, RELATING TO USES OR APPLICATIONS OF LIGHTING DEVICES OR SYSTEMS
    • F21W2131/00Use or application of lighting devices or systems not provided for in codes F21W2102/00-F21W2121/00
    • F21W2131/10Outdoor lighting
    • F21W2131/103Outdoor lighting of streets or roads

Definitions

  • the present invention relates to an automatic coupling device for a luminaire.
  • the conventional maintenance work as described above is exposed to safety accidents due to the high risk of falling of workers or electric shock due to high voltage lines.
  • the work is cumbersome and inconvenient as the worker has to go up to the ground to perform maintenance work, and it is necessary to mobilize a special vehicle such as a crane with high cost due to the maintenance work, and a large number of workers are required. As it must be done, it interferes with the smooth flow of traffic and there is a risk of traffic accidents.
  • an object of the present invention is to provide an automatic coupling device for luminaires that does not interfere with traffic and/or walking by facilitating the coupling process of luminaires in the lamp post and allowing work within a short time. Is in.
  • the present invention includes the following examples in order to achieve the above object.
  • An embodiment of the present invention is a luminaire having a light pole that is upright on the ground and has a plurality of fastening holes formed on the outer surface of the tip, a contour fixing portion in which a light emitting device is fixed, and a fastening portion extending from the contour fixing portion by forming a through hole on the outer surface
  • a coupling member for fixing the tip of the lamppost that is drawn into the fastening part extending from the luminaire, and the coupling member is supported by an elastic force within the fastening part, and is raised and lowered by the force applied while the tip of the lamppost is retracted at the position of the fastening hole.
  • Automatic light fixture including a plurality of fixing bolts that are lowered and inserted, an elastic part that elastically supports the fixing bolt, a support block forming a space in which the fixing bolt is accommodated in the fastening part, and a cover part that opens and closes the upper surface of the support block.
  • a coupling device can be provided.
  • a fixing fixture such as a bolt supported by an elastic force can be automatically inserted into the lamppost, thereby shortening the working time, thereby obstructing road traffic or blocking walking by replacing or maintaining streetlights.
  • FIG. 1 is a view showing a street light to which an automatic luminaire coupling device according to the present invention is applied.
  • FIG. 2 is an exploded view showing the assembly of the lamp and the lamp post.
  • FIG 3 is a cross-sectional view showing a coupling portion between the lamp and the lamp post.
  • 6 and 7 are views sequentially showing a process of combining the luminaire and the lamp post.
  • FIG 8 is a view showing a separation process between the luminaire and the light pole.
  • 9 and 10 are diagrams showing another embodiment of the present invention.
  • the present invention may be modified in various ways and may have various embodiments, but specific embodiments will be described in detail by exemplifying them in the drawings. This is not intended to limit the present invention to a specific embodiment, and to any one of all changes, equivalents, or substitutes included in the spirit and scope of the present invention for connecting and/or fixing structures extending in different directions. It should be understood as applicable.
  • FIG. 1 is a view showing a street light to which an automatic luminaire coupling device according to the present invention is applied
  • FIG. 2 is an exploded view showing an assembly between a luminaire and a lamp post.
  • the present invention is a combination between the lamp pole 20, the lamp and / or other light-emitting device installed on the ground, the lamp 10 and the lamp pole 20 And a coupling member 100 to be fixed.
  • the luminaire 10 includes a lighting fixture 11 to which a plurality of LEDs or lamps are fixed to the inside, and a fastening part that extends rearward from the lighting fixture 11 and is fastened to the tip 21 of the lamppost 20 ( 12).
  • the contour fixing part 11 forms a reflective surface on the inner surface, a lamp or a plurality of LEDs is fixed in the center, and is directed to the ground or at a set angle.
  • the fastening portion 12 extends to the rear of the contour fixing portion 11 and is formed in a pipe shape having an empty space so that electric wires can be guided therein.
  • the front end 21 of the lamp column 20 is formed in an empty space inside so that an electric wire extending to the lamp 10 can be guided inside, and is formed in a pipe shape that is introduced into the fastening part 12.
  • the front end 21 of the lamp column 20 is formed with a plurality of fastening holes 22 to which the fixing bolts 140 of the lamp 10 to be described later are fastened.
  • the coupling member 100 supports the fixing bolt with an elastic force on the front end 21 of the lamp post 20 at the fastening part 12 extended from the lamp post 11 and presses the lamp post 10 to be coupled to the lamp post 20 However, it is configured to be fastened without a separate bolt assembly process. This will be described in more detail with reference to FIGS. 3 and 4.
  • FIG. 3 is a cross-sectional view illustrating a coupling member
  • FIGS. 4 and 5 are views showing an embodiment of a fitting hole.
  • the coupling member 100 protrudes upward from the outer surface of the fastening part 12, the support block 120 forming a space in which a through hole is formed, and the inner side of the support block 120
  • the front end of the fastening part 12 and the lamp post 20 by the pressing force by the cover part 110 to seal the space, the pressing part 150 protruding downward from the inner surface of the cover part 110, and the pressing part 150 It includes a fixing bolt 140 fastened to the fastening hole 22 formed in (21), and an elastic portion 130 for elastically supporting the fixing bolt 140.
  • the support block 120 protrudes from the outer surface of the fastening part 12, and forms an inner empty space in which the fixing bolt 140 to the elastic part 130 are installed.
  • the support block 120 has a support end 121 upward from the outer surface and a fitting hole 122 downward from the support end 121.
  • the support end 121 supports the cover part 110 by forming a wall surface protruding upward from the center of the through hole 13 penetrating from the outer surface of the fastening part 12.
  • the upper surface of the support end 121 is formed with a downward fitting hole 122.
  • the fitting hole 122 may be formed of a screw thread or a protruding protrusion, as shown in FIG. 4, on the inner surface so that the cover portion 110 is inserted in a stepwise manner.
  • the fitting hole 122 may have a concave surface or a convex surface sequentially formed from the inner surface to match the joint shape of the fitting protrusion 113 to be described later. That is, in the fitting hole 122, concave surfaces in which the first and second nodes 113a and 113b are matched are sequentially formed.
  • the cover part 110 includes a first cover 111 that is forcefully fastened from the upper surface of the support end 121, a second cover 112 that is screwed with the first cover 111, and a first cover ( 111) includes a fitting protrusion 113 that extends downward from the lower surface of the fitting hole 122 and is forcibly fastened to the fitting hole 122, and a fixing screw for coupling the first cover 111 and the second cover 112 to each other.
  • the first cover 111 seals the open upper surface of the support end 121 while the second cover 112 is fixed by a fixing screw.
  • the fitting protrusion 113 protrudes downward from the lower surface of the first cover 111 and is inserted into the fitting hole 122 by force fitting.
  • the fitting protrusion 113 is a convex shape and is manufactured in a shape in which a plurality of nodes forming an oval-shaped outer surface extending outwardly form a node and extend in sequence.
  • the fitting protrusion 113 is formed of a first node 113a and a second node 113b, and has a smaller diameter between the first node 113a and the second node 113b.
  • the operator inserts the first node 113a into the fitting hole 122, and then the tip 21 of the lamp post 20 is brought into the inside of the lamp 10 to reach a predetermined position, and the fixing bolt 140 is When reaching a position capable of communicating with both the fastening hole 22 and the through hole 13 is inserted into the fitting hole 122 up to the second node 113b. A more detailed description will be given later.
  • the second cover 112 is coupled to the first cover 111 by a fixing screw 114 to seal the upper portion of the support block 120.
  • the second cover 112 is separated from the first cover 111 when the fixing screw 114 is released.
  • the pressing unit 150 is integrally formed with the second cover 112, when the second cover 112 is separated, the pressing against the fixing bolt 140 is released.
  • cover unit 110 may further include a partition wall 115 extending downward to partition spaces in which the pressing unit 150 is formed.
  • the partition wall 115 may be downward from the lower surface of the second cover 112 and may be spaced apart from each other to partition a plurality of spaces in which the pressing portion 150 is formed therebetween. Alternatively, the partition wall 115 may be formed upright on the outer surface of the fastening part 12.
  • the pressing part 150 protrudes downward from the lower surface of the second cover 112 to support the elastic part 130 at the outer surface, and press the fixing bolt 140 at the lower end.
  • the pressing part 150 supports the elastic part 130 fitted on the outer surface in a state in which the cover part 110 is firstly fitted with the first joint 113a, but the cover part 110 is secondarily removed.
  • the 2nd node (113b) When the 2nd node (113b) is inserted, it comes into contact with the fixing head 141 of the fixing bolt 140 which is in communication with the through hole 13 of the fastening part 12 and the fastening hole 22 of the tip 21 of the lamp column 20 And pressurize.
  • the pressing unit 150 may be fitted with the elastic unit 130 on the outer surface or may be adhesively fixed to the elastic unit 130 by welding, as in other embodiments described later.
  • the fixing bolt 140 is a rod body 142 communicating with the through hole 13 of the fastening part 12 and the fastening hole 22 formed in the tip 21 of the lamp post 20, and the outer surface of the fastening part 12 It includes a fixed head 141 that is caught on.
  • the rod body 142 is a tip type 142a whose diameter gradually decreases, not a downwardly inclined surface (see FIGS. 9 and 10) or a downwardly inclined surface 142a in the direction in which the tip 21 of the lamp column 20 is retracted. ) (See FIG. 6).
  • the downwardly inclined surface 142a is installed in a fixed state so that the fixing bolt 140 is not rotated, and is for receiving a force to lift the fixing bolt 140 when the end of the drawn tip 21 contacts.
  • the fixed head 141 is formed to expand in diameter in the lateral direction on the upper portion of the rod body 142 and is caught on the outer surface of the through hole 13.
  • the fixed head 141 is in direct contact with the lower end of the pressing portion 150 and the elastic portion 130.
  • the fixed head 141 may be formed integrally with the elastic part 130 and/or the pressing part 150 or may be formed in a mutually independent structure.
  • the elastic part 130 is, for example, a helical spring fitted to the outer surface of the pressing part 150 and elastically presses the fixing head 141 of the fixing bolt 140.
  • the fixing bolt 140 is moved upward when the tip 21 of the lamp column 20 is inserted, and the elastic portion 130 is contracted. And when the fixing bolt 140 reaches the fastening hole 22 of the lamp column 20, it is lowered again.
  • the elastic part 130 elastically supports it to descend again.
  • the fixing bolt 140 maintains a state spaced apart from the pressing part 150 in a state in which the fitting protrusion 113 of the first cover 111 is inserted into the fitting hole 122 only with the first joint 113a, It is in contact only with the elastic part 130. And the fixing bolt 140 is fixed by the pressing portion 150 when the fitting protrusion 113 of the first cover 111 is inserted into the fitting hole 122 up to the second joint 113b. In addition, when the second cover 112 is separated, the fixing bolt 140 is released from the pressing force by the pressing unit 150 and may be pulled out through the upper surface of the open support block 120.
  • the present invention includes the above configuration, and will be described below with reference to FIGS. 6 to 8 achieved through the above configuration.
  • 6 and 7 are views sequentially showing a process of combining the luminaire and the lamp post.
  • the operator pulls in the front end 21 of the lamp post 20 inside the fastening part 12 of the lamp 10.
  • the first cover 111 and the second cover 112 are in a state of being coupled by the fixing screw 114, and the fitting protrusion 113 is a state in which only the first joint 113a is inserted into the fitting hole 122 to be. Therefore, the pressing part 150 maintains a state spaced apart from the fixing head 141 of the fixing bolt 140, and the elastic part 130 is inserted into the outer surface of the pressing part 150, and the fixing head 141 is Elastic support.
  • the fixing bolt 140 is in a state in which the rod body 142 is inserted into the through hole 13 of the fastening part 12, and the fixing head 141 is in a state that is caught on the inner bottom surface of the support block 120. .
  • the first fixing bolt 140 when the first fixing bolt 140 is pressed while the front end 21 of the lamp column 20 is drawn in, it is raised and lowered by the force. And the first fixing bolt 140 is lowered when the first fastening hole 22 is positioned at the lower side while the lamp post 20 is continuously inserted, but is raised and lowered again as the lamp post 20 continues to move.
  • the fixing bolt 140 may generate a hitting sound while communicating the through hole 13 and the fastening hole 22 while raising and lowering the elastic force by the elastic part 130 and then descending. Therefore, it can be recognized that the entire fastening hole 22 and the fixing bolt 140 are placed in the correct position through the number of times the worker's hitting sound is heard.
  • the operator strikes the cover part 110 so that the fitting protrusion 113 is completely inserted into the fitting hole 122. Accordingly, the pressing unit 150 presses the fixed head 141 while the fitting protrusion 113 is completely inserted into the fitting hole 122. Therefore, the fixing bolt 140 communicates the through hole 13 of the lamp 10 and the fastening hole 22 of the lamp column 20 to mutually couple.
  • the luminaire 10 and the lamp post 20 assembled as above can be simply disassembled by separating the cover part 110. This will be described with reference to FIG. 8.
  • FIG 8 is a view showing a separation process between the luminaire and the light pole.
  • the operator removes the second cover 112 from the first cover 111 by releasing the fixing screw 114. Accordingly, as the second cover 112 is separated, the fixing bolt 140 whose pressurized state is released from the inside of the support block 120 may be exposed.
  • the operator can separate the light fixture 10 from the lamp post 20 after separating the open support block 120 from the through hole 13 and the fastening hole 22 through the fixing bolt 140 through the upper surface.
  • the present invention there is no process in which the operator accompanies physical force in the assembly and disassembly process, and the coupling and disassembly between the luminaire 10 and the lamppost 20 is possible by a simple operation of hitting or separating the cover part 110. Compared to the prior art, the operation is very easy and can be performed in a short time.
  • the present invention may include an embodiment in which the elastic part 130, the cover part 110, and the fixing bolt 140 are integrally configured.
  • 9 and 10 are views showing another embodiment of the present invention.
  • the cover part 110, the elastic part 130, and the fixing bolt 140 are integrally configured.
  • the elastic portion 130 is fixed to the lower surface of the second cover 112 in the cover portion 110 by welding, and the elastic portion 130 is fixed to the fixing head 141 of the fixing bolt 140 by welding. .
  • the fixing bolt 140 since the fixing bolt 140 is fixed to the elastic part 130, it is not rotated in the through hole 13 and the fastening hole 22. Accordingly, the fixing bolt 140 may form an inclined surface 142a in the direction in which the tip 21 of the lamp column 20 is retracted from the rod body 142.
  • another embodiment as described above is a fitting protrusion consisting of the first cover 111 and the second cover 112, the first joint (113a) and the second joint (113b) fixed by the fixing screw 114 ( 113) and the support block 120 including the fitting hole 122 may be selectively applied, and the pressing part 150 may also be configured in that the elastic part 130 forms a guide and a contact area. Alternatively, the pressing unit 150 may be omitted.

Abstract

The present invention can provide an automatic coupling device for a lamp, the automatic coupling device comprising: a lamp post (20) which stands on the ground and has a plurality of fastening holes (22) formed in the outer surface of a front end (21); a lamp (10) including a lamp fixing unit (11), to which a light emitting device is fixed, and a fastening part (12) which has a through hole (13) formed in an outer surface and extends from the lamp fixing unit; and a coupling member (100) for fixing the front end (21) of the lamp post (20) inserted into the fastening part (12) extending from the lamp (10). The coupling member (100) includes: a plurality of fixing bolts (140) which are supported by an elastic force in the fastening part (12), are lifted by a force applied as the front end (21) of the lamp post (20) is inserted, and descend and become inserted at the positions of the fastening holes (22); an elastic part (130) for elastically supporting the fixing bolts (140); a support block (120) for forming a space which accommodates the fixing bolts (140) in the fastening part (12); and a cover part (110) for opening and closing the upper surface of the support block (120).

Description

등기구의 자동 결합 장치Automatic coupling device for luminaires
본 발명은 등기구의 자동 결합 장치에 관한 것이다. The present invention relates to an automatic coupling device for a luminaire.
가로등 및 외등의 등주(柱)길이가 10m이상으로 가로등주에서 가로등 램프를 교체하거나 수리를 해야 할 경우 사다리를 타고 올라가거나 아니면 바스켓이 달린 크레인을 타고 올라가 보수작업을 한다.If you need to replace or repair street lamps in streetlights and streetlights with more than 10m in length, climb a ladder or climb a crane with a basket for repair work.
하지만 위와 같은 종래의 보수작업은 작업자의 낙하 위험이나 고압선에 의한 감전 위험성 등이 높아 안전사고에 노출되어 있다. 또한 작업자가 지상에 올라가 보수작업을 해야 함으로 작업이 번거롭고 불편하며, 보수작업에 따른 고가비용의 크레인과 같은 특수차량을 동원해야 하고, 다수의 작업자가 필요하며, 보수 작업시 크레인 등에 의한 도로를 점거해야 함으로 원활한 교통 흐름을 방해하기도 하고 교통사고의 위험도 있다.However, the conventional maintenance work as described above is exposed to safety accidents due to the high risk of falling of workers or electric shock due to high voltage lines. In addition, the work is cumbersome and inconvenient as the worker has to go up to the ground to perform maintenance work, and it is necessary to mobilize a special vehicle such as a crane with high cost due to the maintenance work, and a large number of workers are required. As it must be done, it interferes with the smooth flow of traffic and there is a risk of traffic accidents.
또한, 종래에는 등기구의 교체나 점검시 등주를 지면 가까이까지 내릴 수 있도록 틸팅되는 절첩식 가로 등주등을 제시하고 있으나, 통상의 가로등 높이가 10m이상이고 중량이 큰 강관주물형 등주를 직각으로 절접하는 것은 실현 가능성 낮고, 기존 가로등을 교체하여야 하며, 절접시 도로 또는 인도 방향으로 절접되어 챠량 또는 보행자의 통행을 방해하는 문제점이 있다.In addition, conventionally, a folding type street lamp that tilts so that the lamp post can be brought down close to the ground when replacing or inspecting the lamp has been proposed, but the general street lamp height is 10m or more, and the steel pipe cast lamp post having a large weight is closed at a right angle. This is unlikely to be feasible, and the existing streetlights must be replaced, and there is a problem in that it is cut in the direction of the road or sidewalk when the cut is cut, preventing the passage of vehicles or pedestrians.
그러므로 본 발명은 종래의 문제점을 해결하고자 안출된 것으로서, 본 발명의 목적은 등주에서 등기구의 결합 과정이 용이하고, 단시간 내로 작업이 가능하여 교통 및/또는 보행을 방해하지 않는 등기구 자동 결합 장치를 제공함에 있다. Therefore, the present invention was conceived to solve the problems of the prior art, and an object of the present invention is to provide an automatic coupling device for luminaires that does not interfere with traffic and/or walking by facilitating the coupling process of luminaires in the lamp post and allowing work within a short time. Is in.
본 발명은 상기와 같은 목적을 달성하기 위하여 하기와 같은 실시예를 포함한다. The present invention includes the following examples in order to achieve the above object.
본 발명의 실시예는 지면에서 직립되고, 선단의 외면에 복 수개의 체결공이 형성되는 등주와, 발광장치가 고정된 등고정부와, 외면에 관통공이 형성되어 등고정부에서 연장되는 체결부가 구비된 등기구 및 등기구에서 연장된 체결부로 인입되는 등주의 선단을 고정시키는 결합부재를 포함하고, 결합부재는 체결부 내에서 탄성력으로 지지되고, 등주의 선단이 인입되면서 가해진 힘에 의해 승강되어 체결공의 위치에서 하강 및 삽입되는 복 수개의 고정 볼트와, 고정 볼트를 탄성 지지하는 탄성부와, 체결부에서 고정 볼트가 수용되는 공간을 형성하는 지지 블럭 및 지지 블럭의 상면을 개폐하는 커버부를 포함하는 등기구의 자동 결합 장치를 제공할 수 있다. An embodiment of the present invention is a luminaire having a light pole that is upright on the ground and has a plurality of fastening holes formed on the outer surface of the tip, a contour fixing portion in which a light emitting device is fixed, and a fastening portion extending from the contour fixing portion by forming a through hole on the outer surface And a coupling member for fixing the tip of the lamppost that is drawn into the fastening part extending from the luminaire, and the coupling member is supported by an elastic force within the fastening part, and is raised and lowered by the force applied while the tip of the lamppost is retracted at the position of the fastening hole. Automatic light fixture including a plurality of fixing bolts that are lowered and inserted, an elastic part that elastically supports the fixing bolt, a support block forming a space in which the fixing bolt is accommodated in the fastening part, and a cover part that opens and closes the upper surface of the support block. A coupling device can be provided.
따라서 본 발명은 등기구를 등주에 삽입할 경우에 탄성력에 의해 지지되는 볼트등의 고정 치구가 등주에 자동으로 삽입될 수 있어 작업 시간을 단축시킬 수 있어 가로등 교체 또는 정비에 의한 도로 교통 방해 또는 보행 차단과 같은 불편함을 최소화할 수 있는 효과가 있다. Therefore, in the present invention, when a luminaire is inserted into a lamppost, a fixing fixture such as a bolt supported by an elastic force can be automatically inserted into the lamppost, thereby shortening the working time, thereby obstructing road traffic or blocking walking by replacing or maintaining streetlights. There is an effect that can minimize the discomfort such as.
도 1은 본 발명에 따른 등기구 자동 결합 장치가 적용되는 가로등을 도시한 도면이다. 1 is a view showing a street light to which an automatic luminaire coupling device according to the present invention is applied.
도 2는 등기구와 등주간의 조립을 도시한 분해 도면이다. 2 is an exploded view showing the assembly of the lamp and the lamp post.
도 3은 등기구와 등주간의 결합부분을 도시한 단면도이다. 3 is a cross-sectional view showing a coupling portion between the lamp and the lamp post.
도 4와 도 5는 끼움홀을 도시한 부분 확대 도면이다. 4 and 5 are partially enlarged views showing the fitting hole.
도 6과 도 7은 등기구와 등주간의 결합 과정을 순차 도시한 도면이다. 6 and 7 are views sequentially showing a process of combining the luminaire and the lamp post.
도 8은 등기구와 등주간의 분리 과정을 도시한 도면이다. 8 is a view showing a separation process between the luminaire and the light pole.
도 9 및 도 10은 본 발명의 다른 실시예를 도시한 도면이다. 9 and 10 are diagrams showing another embodiment of the present invention.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있지만, 특정 실시예를 도면에 예시하여 상세하게 설명하고자 한다. 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 서로 다른 방향으로 연장되는 구조물을 연결 및/또는 고정시키기 위한 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물중 어느 하나에 해당되는 것으로 이해되어야 한다.The present invention may be modified in various ways and may have various embodiments, but specific embodiments will be described in detail by exemplifying them in the drawings. This is not intended to limit the present invention to a specific embodiment, and to any one of all changes, equivalents, or substitutes included in the spirit and scope of the present invention for connecting and/or fixing structures extending in different directions. It should be understood as applicable.
본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제 하지 않는 것으로 이해되어야 한다.The terms used in the present specification are only used to describe specific embodiments, and are not intended to limit the present invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this specification, terms such as "comprise" or "have" are intended to designate the presence of features, numbers, steps, actions, components, parts, or a combination thereof described in the specification, but one or more other features. It is to be understood that the presence or addition of elements or numbers, steps, actions, components, parts, or combinations thereof, does not preclude in advance the possibility of being added.
또한, 본 발명을 설명함에 있어 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.In addition, in describing the present invention, if it is determined that a detailed description of a related known technology may unnecessarily obscure the subject matter of the present invention, a detailed description thereof will be omitted.
이하에서는 본 발명에 따른 등기구의 자동 결합 장치의 바람직한 실시예를 첨부된 도면을 참조하여 설명한다. Hereinafter, a preferred embodiment of an automatic coupling device for a luminaire according to the present invention will be described with reference to the accompanying drawings.
도 1은 본 발명에 따른 등기구 자동 결합 장치가 적용되는 가로등을 도시한 도면, 도 2는 등기구와 등주간의 조립을 도시한 분해 도면이다. 1 is a view showing a street light to which an automatic luminaire coupling device according to the present invention is applied, and FIG. 2 is an exploded view showing an assembly between a luminaire and a lamp post.
도 1 및 도 2를 참조하면, 본 발명은 지면에서 직립된 등주(20)와, 램프 및/또는 기타 발광장치가 설치되는 등기구(10)와, 등기구(10)와 등주(20)간을 결합 및 고정하는 결합부재(100)를 포함한다. Referring to Figures 1 and 2, the present invention is a combination between the lamp pole 20, the lamp and / or other light-emitting device installed on the ground, the lamp 10 and the lamp pole 20 And a coupling member 100 to be fixed.
여기서 등기구(10)는 내측에 복 수개의 LED 또는 램프등이 고정되는 등고정부(11)와, 등고정부(11)에서 후방으로 연장되어 등주(20)의 선단(21)에 체결되는 체결부(12)를 포함한다. Here, the luminaire 10 includes a lighting fixture 11 to which a plurality of LEDs or lamps are fixed to the inside, and a fastening part that extends rearward from the lighting fixture 11 and is fastened to the tip 21 of the lamppost 20 ( 12).
등고정부(11)는 내면에서 반사면을 이루고, 중심부에 램프 또는 복 수개의 LED가 고정되며, 지면 또는 설정된 각도로 지향된다. The contour fixing part 11 forms a reflective surface on the inner surface, a lamp or a plurality of LEDs is fixed in the center, and is directed to the ground or at a set angle.
체결부(12)는 등고정부(11)의 후방으로 연장되며, 내측에 전선등이 안내될 수 있도록 빈 공간을 갖는 파이프 형상으로 이루어진다. The fastening portion 12 extends to the rear of the contour fixing portion 11 and is formed in a pipe shape having an empty space so that electric wires can be guided therein.
등주(20)의 선단(21)은 내측에 등기구(10)로 연장되는 전선등이 안내될 수 있도록 내측에 빈공간으로 이루어져 체결부(12)의 내측으로 인입되는 파이프 형상으로 형성된다. 여기서 등주(20)의 선단(21)은 후술되는 등기구(10)의 고정 볼트(140)가 체결되는 복 수개의 체결공(22)이 형성된다. The front end 21 of the lamp column 20 is formed in an empty space inside so that an electric wire extending to the lamp 10 can be guided inside, and is formed in a pipe shape that is introduced into the fastening part 12. Here, the front end 21 of the lamp column 20 is formed with a plurality of fastening holes 22 to which the fixing bolts 140 of the lamp 10 to be described later are fastened.
결합부재(100)는 등고정부(11)에서 연장된 체결부(12)에서 등주(20)의 선단(21)에 탄성력으로 고정볼트를 지지하여 등기구(10)를 가압하여 등주(20)와 결합시키되, 별도의 볼트 조립 과정 없이 체결할 수 있도록 구성된다. 이는 도 3 및 도 4를 참조하여 보다 상세히 설명한다.The coupling member 100 supports the fixing bolt with an elastic force on the front end 21 of the lamp post 20 at the fastening part 12 extended from the lamp post 11 and presses the lamp post 10 to be coupled to the lamp post 20 However, it is configured to be fastened without a separate bolt assembly process. This will be described in more detail with reference to FIGS. 3 and 4.
도 3은 결합부재를 시한 단면도, 도 4와 도 5는 끼움홀의 실시예를 도시한 도면이다. 3 is a cross-sectional view illustrating a coupling member, and FIGS. 4 and 5 are views showing an embodiment of a fitting hole.
도 3 내지 도 5를 참조하면, 결합부재(100)는 체결부(12)의 외면에서 상향 돌출되되 내측에 관통공이 형성되는 공간을 형성하는 지지 블럭(120)과, 지지 블럭(120)의 내측 공간을 밀폐시키는 커버부(110)와, 커버부(110)의 내면에서 하향 돌출된 가압부(150)와, 가압부(150)에 의한 가압력으로 체결부(12) 및 등주(20)의 선단(21)에 형성된 체결공(22)에 체결되는 고정 볼트(140)와, 고정 볼트(140)를 탄성 지지하는 탄성부(130)를 포함한다. 3 to 5, the coupling member 100 protrudes upward from the outer surface of the fastening part 12, the support block 120 forming a space in which a through hole is formed, and the inner side of the support block 120 The front end of the fastening part 12 and the lamp post 20 by the pressing force by the cover part 110 to seal the space, the pressing part 150 protruding downward from the inner surface of the cover part 110, and the pressing part 150 It includes a fixing bolt 140 fastened to the fastening hole 22 formed in (21), and an elastic portion 130 for elastically supporting the fixing bolt 140.
지지 블럭(120)은 체결부(12)의 외면에서 돌출되되, 내측에서 고정 볼트(140) 내지 탄성부(130)가 설치되는 내측 빈공간을 형성한다. 여기서 지지 블럭(120)은 외면에서 상항된 지지단(121)과, 지지단(121)에서 하향된 끼움홀(122)이 형성된다. The support block 120 protrudes from the outer surface of the fastening part 12, and forms an inner empty space in which the fixing bolt 140 to the elastic part 130 are installed. Here, the support block 120 has a support end 121 upward from the outer surface and a fitting hole 122 downward from the support end 121.
지지단(121)은 체결부(12)의 외면에서 관통된 관통공(13)을 중심을 외측에서 상향 돌출되는 벽면을 이루어 커버부(110)를 지지한다. 여기서 지지단(121)의 상면은 하향된 끼움홀(122)이 형성된다.The support end 121 supports the cover part 110 by forming a wall surface protruding upward from the center of the through hole 13 penetrating from the outer surface of the fastening part 12. Here, the upper surface of the support end 121 is formed with a downward fitting hole 122.
끼움홀(122)은 커버부(110)가 단계적으로 억지 끼움식으로 인입되도록 내면에, 도 4에 도시된 바와 같이, 나사산 또는 돌출돌기로 이루어질 수 있다.The fitting hole 122 may be formed of a screw thread or a protruding protrusion, as shown in FIG. 4, on the inner surface so that the cover portion 110 is inserted in a stepwise manner.
또는 끼움홀(122)은, 도 5에 도시된 바와 같이, 내면에서 후술되는 끼움돌기(113)의 마디형상에 일치되도록 내향된 오목면 또는 볼록면이 순차적으로 형성될 수 있다. 즉, 끼움홀(122)은 제1마디(113a)와 제2마디(113b)가 일치되는 오목면들이 순차 형성된다. Alternatively, as shown in FIG. 5, the fitting hole 122 may have a concave surface or a convex surface sequentially formed from the inner surface to match the joint shape of the fitting protrusion 113 to be described later. That is, in the fitting hole 122, concave surfaces in which the first and second nodes 113a and 113b are matched are sequentially formed.
커버부(110)는 지지단(121)의 상면에서 억지 끼움식으로 체결되는 제1커버(111)와, 제1커버(111)와 나사 결합되는 제2커버(112)와, 제1커버(111)의 하면에서 하향 연장되어 끼움홀(122)에 억지 끼움식으로 체결되는 끼움돌기(113)와, 제1커버(111)와 제2커버(112)를 상호 결합시키는 고정 나사를 포함한다. The cover part 110 includes a first cover 111 that is forcefully fastened from the upper surface of the support end 121, a second cover 112 that is screwed with the first cover 111, and a first cover ( 111) includes a fitting protrusion 113 that extends downward from the lower surface of the fitting hole 122 and is forcibly fastened to the fitting hole 122, and a fixing screw for coupling the first cover 111 and the second cover 112 to each other.
제1커버(111)는 고정 나사에 의해 제2커버(112)가 고정된 상태에서 지지단(121)의 개방된 상면을 밀폐시킨다. The first cover 111 seals the open upper surface of the support end 121 while the second cover 112 is fixed by a fixing screw.
끼움돌기(113)는 제1커버(111)의 하면에서 하향 돌출되어 끼움홀(122)에 억지 끼움식으로 삽입된다. 이를 위하여 끼움돌기(113)는 볼록형으로서 외측으로 확장된 타원형의 외면을 이루는 복 수개가 마디를 이루어 순차 연장되는 형상으로 제작된다. The fitting protrusion 113 protrudes downward from the lower surface of the first cover 111 and is inserted into the fitting hole 122 by force fitting. To this end, the fitting protrusion 113 is a convex shape and is manufactured in a shape in which a plurality of nodes forming an oval-shaped outer surface extending outwardly form a node and extend in sequence.
예를 들면, 끼움돌기(113)는 제1마디(113a)와 제2마디(113b)로 형성되고, 제1마디(113a)와 제2마디(113b) 사이는 보다 작은 직경을 갖는다. For example, the fitting protrusion 113 is formed of a first node 113a and a second node 113b, and has a smaller diameter between the first node 113a and the second node 113b.
따라서 작업자는 제1마디(113a)를 끼움홀(122)에 삽입한 후, 등주(20)의 선단(21)이 등기구(10) 내측으로 인입되어 정해진 위치에 도달시키고, 고정 볼트(140)가 체결공(22) 및 관통공(13)에 모두 연통 가능한 위치에 도달되었다면 제2마디(113b)까지 끼움홀(122)에 삽입시킨다. 보다 구체적인 설명은 후술한다. Therefore, the operator inserts the first node 113a into the fitting hole 122, and then the tip 21 of the lamp post 20 is brought into the inside of the lamp 10 to reach a predetermined position, and the fixing bolt 140 is When reaching a position capable of communicating with both the fastening hole 22 and the through hole 13 is inserted into the fitting hole 122 up to the second node 113b. A more detailed description will be given later.
제2커버(112)는 고정 나사(114)에 의하여 제1커버(111)에 결합되어 지지 블럭(120)의 상부를 밀폐시킨다. 여기서 제2커버(112)는 고정 나사(114)가 해제되면 제1커버(111)로부터 분리된다. 아울러, 가압부(150)는 제2커버(112)와 일체형으로 형성됨에 따라 제2커버(112)가 분리되면 고정 볼트(140)에 대한 가압이 해제한다. The second cover 112 is coupled to the first cover 111 by a fixing screw 114 to seal the upper portion of the support block 120. Here, the second cover 112 is separated from the first cover 111 when the fixing screw 114 is released. In addition, since the pressing unit 150 is integrally formed with the second cover 112, when the second cover 112 is separated, the pressing against the fixing bolt 140 is released.
즉, 제2커버(112)는 지지 블럭(120)의 상면을 개방시킨 뒤에 고정 볼트(140)를 인출하거나 그 가압력을 해제하여 체결부(12)와 등주(20)간의 결합을 해제시킬 경우에 개방된다. That is, when the second cover 112 releases the fixing bolt 140 after opening the upper surface of the support block 120 or releases the pressing force to release the coupling between the fastening part 12 and the lamp column 20 Open.
또한, 커버부(110)는 가압부(150)가 형성된 공간들을 구획하도록 하향 연장되는 구획벽(115)을 더 포함할 수 있다. In addition, the cover unit 110 may further include a partition wall 115 extending downward to partition spaces in which the pressing unit 150 is formed.
구획벽(115)은 제2커버(112)의 하면에서 하향되되, 상호 이격되어 그 사이에 가압부(150)가 형성되는 복 수개의 공간을 구획할 수 있다. 또는 구획벽(115)은 체결부(12)의 외면에서 직립 형성될 수 있다.The partition wall 115 may be downward from the lower surface of the second cover 112 and may be spaced apart from each other to partition a plurality of spaces in which the pressing portion 150 is formed therebetween. Alternatively, the partition wall 115 may be formed upright on the outer surface of the fastening part 12.
가압부(150)는 제2커버(112)의 하면에서 하향 돌출되어 외면에서 탄성부(130)를 지지하고, 하단에서 고정 볼트(140)를 가압한다. 예를 들면, 가압부(150)는 커버부(110)가 1차로 제1마디(113a)가 끼움된 상태에서는 외면에 끼워진 탄성부(130)를 지지하나, 커버부(110)가 2차로 제2마디(113b)가 끼움되면 체결부(12)의 관통공(13)과 등주(20) 선단(21)의 체결공(22)에 연통된 고정 볼트(140)의 고정 헤드(141)에 접촉되어 가압한다. The pressing part 150 protrudes downward from the lower surface of the second cover 112 to support the elastic part 130 at the outer surface, and press the fixing bolt 140 at the lower end. For example, the pressing part 150 supports the elastic part 130 fitted on the outer surface in a state in which the cover part 110 is firstly fitted with the first joint 113a, but the cover part 110 is secondarily removed. When the 2nd node (113b) is inserted, it comes into contact with the fixing head 141 of the fixing bolt 140 which is in communication with the through hole 13 of the fastening part 12 and the fastening hole 22 of the tip 21 of the lamp column 20 And pressurize.
또한, 가압부(150)는 외면에 탄성부(130)가 끼움되거나 후술하는 다른 실시예와 같이 탄성부(130)와 용접으로 접착 고정될 수 있다. In addition, the pressing unit 150 may be fitted with the elastic unit 130 on the outer surface or may be adhesively fixed to the elastic unit 130 by welding, as in other embodiments described later.
고정 볼트(140)는 체결부(12)의 관통공(13)과 등주(20)의 선단(21)에 형성된 체결공(22)에 연통되는 봉체(142)와, 체결부(12)의 외면에 걸림되는 고정 헤드(141)를 포함한다. The fixing bolt 140 is a rod body 142 communicating with the through hole 13 of the fastening part 12 and the fastening hole 22 formed in the tip 21 of the lamp post 20, and the outer surface of the fastening part 12 It includes a fixed head 141 that is caught on.
봉체(142)는 하향 연장된 끝단이 등주(20)의 선단(21)이 인입되는 방향에서 하향 경사면(도 9 및 도 10 참조) 또는 하향 경사면(142a)이 아닌 직경이 점차 줄어드는 첨단형(142a)(도 6 참조)으로 이루어질 수 있다. The rod body 142 is a tip type 142a whose diameter gradually decreases, not a downwardly inclined surface (see FIGS. 9 and 10) or a downwardly inclined surface 142a in the direction in which the tip 21 of the lamp column 20 is retracted. ) (See FIG. 6).
여기서 하향 경사면(142a)은 고정 볼트(140)가 회전되지 않도록 고정된 상태에서 설치되며, 인입된 선단(21)의 단부가 접촉시에 고정 볼트(140)를 승강시키도록 힘을 받기 위한 것이다. Here, the downwardly inclined surface 142a is installed in a fixed state so that the fixing bolt 140 is not rotated, and is for receiving a force to lift the fixing bolt 140 when the end of the drawn tip 21 contacts.
고정 헤드(141)는 봉체(142)의 상부에 측방향으로 직경이 확장되도록 형성되어 관통공(13)의 외면에 걸림 된다. 여기서 고정 헤드(141)는 가압부(150)의 하단과 탄성부(130)와 직접 접촉된다. 예를 들면, 고정 헤드(141)는 탄성부(130) 및/또는 가압부(150)와 일체로 형성되거나 상호 독립된 구조로 형성될 수 있다. The fixed head 141 is formed to expand in diameter in the lateral direction on the upper portion of the rod body 142 and is caught on the outer surface of the through hole 13. Here, the fixed head 141 is in direct contact with the lower end of the pressing portion 150 and the elastic portion 130. For example, the fixed head 141 may be formed integrally with the elastic part 130 and/or the pressing part 150 or may be formed in a mutually independent structure.
탄성부(130)는, 예를 들면, 가압부(150)의 외면에 끼움식으로 고정된 나선형의 스프링으로서 고정 볼트(140)의 고정 헤드(141)를 탄성 가압한다. 예를 들면, 고정 볼트(140)는 등주(20)의 선단(21)이 인입되면 상측으로 이동되고, 탄성부(130)는 수축된다. 그리고 고정 볼트(140)가 등주(20)의 체결공(22)에 도달되면 다시 하강 된다. The elastic part 130 is, for example, a helical spring fitted to the outer surface of the pressing part 150 and elastically presses the fixing head 141 of the fixing bolt 140. For example, the fixing bolt 140 is moved upward when the tip 21 of the lamp column 20 is inserted, and the elastic portion 130 is contracted. And when the fixing bolt 140 reaches the fastening hole 22 of the lamp column 20, it is lowered again.
즉, 탄성부(130)는 고정 볼트(140)가 승강 후 체결공(22) 및 관통공(13)에 위치될 경우에 다시 하강되도록 탄성 지지한다. That is, when the fixing bolt 140 is positioned in the fastening hole 22 and the through hole 13 after lifting, the elastic part 130 elastically supports it to descend again.
여기서 고정 볼트(140)는 제1커버(111)의 끼움돌기(113)가 제1마디(113a)만 끼움홀(122)에 삽입된 상태에서는 가압부(150)와 이격된 상태를 유지하며, 탄성부(130)와만 접촉된다. 그리고 고정 볼트(140)는 제1커버(111)의 끼움돌기(113)가 제2마디(113b)까지 끼움홀(122)에 삽입되면 가압부(150)에 의해 고정된다. 또한 고정 볼트(140)는 제2커버(112)가 분리되면, 가압부(150)에 의한 가압력이 해제되고, 개방된 지지 블럭(120)의 상면을 통하여 인출될 수 있다. Here, the fixing bolt 140 maintains a state spaced apart from the pressing part 150 in a state in which the fitting protrusion 113 of the first cover 111 is inserted into the fitting hole 122 only with the first joint 113a, It is in contact only with the elastic part 130. And the fixing bolt 140 is fixed by the pressing portion 150 when the fitting protrusion 113 of the first cover 111 is inserted into the fitting hole 122 up to the second joint 113b. In addition, when the second cover 112 is separated, the fixing bolt 140 is released from the pressing force by the pressing unit 150 and may be pulled out through the upper surface of the open support block 120.
본 발명은 상기와 같은 구성을 포함하며, 이하에서는 상기와 같은 구성을 통하여 달성되는 도 6 내지 도 8을 참조하여 설명한다. The present invention includes the above configuration, and will be described below with reference to FIGS. 6 to 8 achieved through the above configuration.
도 6과 도 7은 등기구와 등주간의 결합 과정을 순차 도시한 도면이다. 6 and 7 are views sequentially showing a process of combining the luminaire and the lamp post.
도 6 및 도 7을 참조하면, 작업자는 등기구(10)의 체결부(12) 내측에 등주(20)의 선단(21)을 인입시킨다. 이때, 제1커버(111)와 제2커버(112)는 고정 나사(114)에 의해 결합된 상태이며, 끼움돌기(113)는 제1마디(113a)만 끼움홀(122)에 삽입된 상태이다. 따라서 가압부(150)는 고정 볼트(140)의 고정 헤드(141)와 이격된 상태를 유지하며, 탄성부(130)는 가압부(150)의 외면에 끼움된 상태에서 고정 헤드(141)를 탄성 지지한다. 6 and 7, the operator pulls in the front end 21 of the lamp post 20 inside the fastening part 12 of the lamp 10. At this time, the first cover 111 and the second cover 112 are in a state of being coupled by the fixing screw 114, and the fitting protrusion 113 is a state in which only the first joint 113a is inserted into the fitting hole 122 to be. Therefore, the pressing part 150 maintains a state spaced apart from the fixing head 141 of the fixing bolt 140, and the elastic part 130 is inserted into the outer surface of the pressing part 150, and the fixing head 141 is Elastic support.
아울러, 고정 볼트(140)는 체결부(12)의 관통공(13)에 봉체(142)가 인입된 상태이며, 고정 헤드(141)는 지지 블럭(120)의 내측 바닥면에 걸림된 상태이다. In addition, the fixing bolt 140 is in a state in which the rod body 142 is inserted into the through hole 13 of the fastening part 12, and the fixing head 141 is in a state that is caught on the inner bottom surface of the support block 120. .
따라서 첫 번째 고정 볼트(140)는 등주(20)의 선단(21)이 내측이 인입되면서 가압하면, 그 힘에 의하여 승강된다. 그리고 첫번째 고정 볼트(140)는 등주(20)가 계속 인입 되면서 첫번째 체결공(22)이 하측에 위치되면 하강되나, 등주(20)가 계속하여 이동됨에 따라 재차 승강된다. Therefore, when the first fixing bolt 140 is pressed while the front end 21 of the lamp column 20 is drawn in, it is raised and lowered by the force. And the first fixing bolt 140 is lowered when the first fastening hole 22 is positioned at the lower side while the lamp post 20 is continuously inserted, but is raised and lowered again as the lamp post 20 continues to move.
등기구(10)는 예를 들면, 고정 볼트(140)가 총 세 개이고, 체결공(22)이 세 개라면, 세 개의 고정 볼트(140)가 세 개의 체결공(22)에 모두 인입될 때까지 계속 이동된다. 고정 볼트(140)는 탄성부(130)에 의한 탄성력을 승강 후 하강되면서 관통공(13) 및 체결공(22)을 연통하면서 타격음을 발생시킬 수 있다. 따라서 작업자 타격음의 청취횟수를 통하여 전체 체결공(22)과 고정 볼트(140)가 정위치에 놓이게 됨을 인지할 수 있다.In the luminaire 10, for example, if there are three fixing bolts 140 and three fastening holes 22, until all three fixing bolts 140 are inserted into the three fastening holes 22 Keep moving. The fixing bolt 140 may generate a hitting sound while communicating the through hole 13 and the fastening hole 22 while raising and lowering the elastic force by the elastic part 130 and then descending. Therefore, it can be recognized that the entire fastening hole 22 and the fixing bolt 140 are placed in the correct position through the number of times the worker's hitting sound is heard.
그러면 작업자는 커버부(110)를 타격하여 끼움돌기(113)가 끼움홀(122)에 완전 삽입되도록 한다. 따라서 가압부(150)는 끼움돌기(113)가 끼움홀(122)에 완전 삽입되면서 고정 헤드(141)를 가압하게 된다. 그러므로 고정 볼트(140)는 등기구(10)의 관통공(13)과 등주(20)의 체결공(22)을 연통하여 상호 결합시킨다. Then, the operator strikes the cover part 110 so that the fitting protrusion 113 is completely inserted into the fitting hole 122. Accordingly, the pressing unit 150 presses the fixed head 141 while the fitting protrusion 113 is completely inserted into the fitting hole 122. Therefore, the fixing bolt 140 communicates the through hole 13 of the lamp 10 and the fastening hole 22 of the lamp column 20 to mutually couple.
또한, 위와 같이 조립된 등기구(10)와 등주(20)는 커버부(110)를 분리함에 따라 간단하게 분해할 수 있다. 이는 도 8을 참조하여 설명한다. In addition, the luminaire 10 and the lamp post 20 assembled as above can be simply disassembled by separating the cover part 110. This will be described with reference to FIG. 8.
도 8은 등기구와 등주간의 분리 과정을 도시한 도면이다. 8 is a view showing a separation process between the luminaire and the light pole.
도 8을 참조하면, 본 발명에서 작업자는 고정 나사(114)를 해제하여 제1커버(111)에서 제2커버(112)를 분리시킨다. 따라서 제2커버(112)가 분리됨에 따라 지지 블럭(120)의 내측에서 가압 상태가 해제된 고정 볼트(140)가 노출될 수 있다. Referring to FIG. 8, in the present invention, the operator removes the second cover 112 from the first cover 111 by releasing the fixing screw 114. Accordingly, as the second cover 112 is separated, the fixing bolt 140 whose pressurized state is released from the inside of the support block 120 may be exposed.
그러므로 작업자는 개방된 지지 블럭(120)을 상면을 통하여 고정 볼트(140)를 관통공(13) 및 체결공(22)에서 분리한 뒤에 등기구(10)를 등주(20)에서 분리시킬 수 있다.Therefore, the operator can separate the light fixture 10 from the lamp post 20 after separating the open support block 120 from the through hole 13 and the fastening hole 22 through the fixing bolt 140 through the upper surface.
즉, 본 발명은 조립과 분해 과정에서 작업자가 물리력을 동반하는 과정이 없고, 커버부(110)의 타격 또는 분리하는 간단한 작업으로 등기구(10)와 등주(20)간의 결합과 분해가 가능함에 따라 종래에 비하여 작업이 매우 쉽고 단축된 시간으로 진행 될수 있다. That is, in the present invention, there is no process in which the operator accompanies physical force in the assembly and disassembly process, and the coupling and disassembly between the luminaire 10 and the lamppost 20 is possible by a simple operation of hitting or separating the cover part 110. Compared to the prior art, the operation is very easy and can be performed in a short time.
또한, 본 발명은 탄성부(130)와, 커버부(110) 및 고정 볼트(140)가 일체형으로 구성된 실시예를 포함할 수 있다. In addition, the present invention may include an embodiment in which the elastic part 130, the cover part 110, and the fixing bolt 140 are integrally configured.
도 9와 도 10은 본 발명의 다른 실시예를 도시한 도면이다. 9 and 10 are views showing another embodiment of the present invention.
도 9 및 도 10를 참조하면, 본 발명의 다른 실시예는 커버부(110)와, 탄성부(130) 및 고정 볼트(140)가 일체형으로 구성된다.9 and 10, in another embodiment of the present invention, the cover part 110, the elastic part 130, and the fixing bolt 140 are integrally configured.
즉, 커버부(110)에서 제2커버(112)의 하면에 탄성부(130)가 용접으로 고정되고, 탄성부(130)가 고정 볼트(140)의 고정 헤드(141)에 용접으로 고정된다. 이때 고정 볼트(140)는 탄성부(130)에 고정된 상태임에 따라 관통공(13) 및 체결공(22)에서 회전되지 않는다. 따라서 고정 볼트(140)는 봉체(142)에서 등주(20)의 선단(21)이 인입되는 방향에 경사면(142a)을 형성할 수 있다. That is, the elastic portion 130 is fixed to the lower surface of the second cover 112 in the cover portion 110 by welding, and the elastic portion 130 is fixed to the fixing head 141 of the fixing bolt 140 by welding. . At this time, since the fixing bolt 140 is fixed to the elastic part 130, it is not rotated in the through hole 13 and the fastening hole 22. Accordingly, the fixing bolt 140 may form an inclined surface 142a in the direction in which the tip 21 of the lamp column 20 is retracted from the rod body 142.
이와 같은 구조는 등주(20)의 선단(21)이 강한 힘으로 인입되면, 고정 볼트(140)의 경사면(142a)에 힘이 가해져 고정 볼트(140)가 승강 된 후 체결공(22)의 위치에서 하강된다. 따라서 이와 같은 과정을 반복하여 전체 고정 볼트(140)가 정해진 위치로 체결될 수 있다. In such a structure, when the tip 21 of the lamp column 20 is drawn in with a strong force, a force is applied to the inclined surface 142a of the fixing bolt 140 so that the fixing bolt 140 is raised and lowered, and the position of the fastening hole 22 Descends from Therefore, by repeating this process, the entire fixing bolt 140 may be fastened to a predetermined position.
또한, 상기와 같은 다른 실시예는 고정 나사(114)에 의해 고정되는 제1커버(111)와 제2커버(112), 제1마디(113a)와 제2마디(113b)로 이루어진 끼움돌기(113)와, 끼움홀(122)이 구성된 지지 블럭(120)등이 선택적으로 적용될 수 있고, 가압부(150) 역시 탄성부(130)를 가이드 및 접촉영역을 형성한다는 점에서 구성될 수 있다. 또는 가압부(150)는 생략될 수 있다. In addition, another embodiment as described above is a fitting protrusion consisting of the first cover 111 and the second cover 112, the first joint (113a) and the second joint (113b) fixed by the fixing screw 114 ( 113) and the support block 120 including the fitting hole 122 may be selectively applied, and the pressing part 150 may also be configured in that the elastic part 130 forms a guide and a contact area. Alternatively, the pressing unit 150 may be omitted.
이상에서 설명된 본 발명의 실시예는 예시적인 것에 불과하며, 본 발명이 속한 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 잘 알 수 있을 것이다. The embodiments of the present invention described above are merely exemplary, and those of ordinary skill in the art to which the present invention pertains will appreciate that various modifications and other equivalent embodiments are possible.

Claims (6)

  1. 지면에서 직립되고, 선단(21)의 외면에 복 수개의 체결공(22)이 형성되는 등주(20); Deungju 20, which is upright on the ground and has a plurality of fastening holes 22 formed on the outer surface of the tip 21;
    발광장치가 고정된 등고정부(11)와, 외면에 관통공(13)이 형성되어 등고정부에서 연장되는 체결부(12)가 구비된 등기구(10); 및A light fixture 10 having a contour fixing portion 11 to which the light emitting device is fixed, and a fastening portion 12 extending from the contour fixing portion by forming a through hole 13 on an outer surface thereof; And
    등기구(10)에서 연장된 체결부(12)로 인입되는 등주(20)의 선단(21)을 고정시키는 결합부재(100);를 포함하고.Including; a coupling member (100) for fixing the front end (21) of the lamp pole (20) drawn into the fastening portion (12) extending from the lamp (10).
    결합부재(100)는 The coupling member 100 is
    체결부(12) 내에서 탄성력으로 지지되고, 등주(20)의 선단(21)이 인입되면서 가해진 힘에 의해 승강되어 체결공(22)의 위치에서 하강 및 삽입되는 복 수개의 고정 볼트(140);A plurality of fixing bolts 140 that are supported by an elastic force within the fastening part 12 and are raised and lowered by the force applied while the front end 21 of the lamp post 20 is drawn in, and lowered and inserted at the position of the fastening hole 22 ;
    고정 볼트(140)를 탄성 지지하는 탄성부(130); An elastic portion 130 for elastically supporting the fixing bolt 140;
    체결부(12)에서 고정 볼트(140)가 수용되는 공간을 형성하는 지지 블럭(120); 및A support block 120 forming a space in which the fixing bolt 140 is accommodated in the fastening part 12; And
    지지 블럭(120)의 상면을 개폐하는 커버부(110);를 포함하는 등기구의 자동 결합 장치.Automatic coupling device including a; cover portion 110 for opening and closing the upper surface of the support block 120.
  2. 청구항 1에 있어서, 고정 볼트(140)와 커버부(110) 및 탄성부(130)는The method according to claim 1, the fixing bolt 140, the cover portion 110, and the elastic portion 130
    일체형으로 형성된 것을 특징으로 하는 등기구의 자동 결합 장치.An automatic coupling device for a luminaire, characterized in that it is formed integrally.
  3. 청구항 2에 있어서, 고정 볼트(140)는The method of claim 2, wherein the fixing bolt 140 is
    등주(20)의 선단(21)이 인입되는 방향에서 하향된 경사면이 형성되는 등기구의 자동 결합 장치. An automatic coupling device of a luminaire having an inclined surface downward in the direction in which the tip 21 of the lamp column 20 is retracted.
  4. 청구항 1에 있어서, 커버부(110)는The method according to claim 1, the cover portion 110
    지지 블럭(120)의 상단을 이루는 지지단(121)에 삽입되는 끼움돌기(113)가 하면에 구성되는 제1커버(111); 및A first cover 111 having a fitting protrusion 113 inserted into the support end 121 forming the upper end of the support block 120 is configured on the lower surface; And
    제1커버(111)와 고정 나사(114)로 체결되어 지지 블럭(120)의 상면을 개폐시키는 제2커버(112);를 포함하는 등기구의 자동 결합 장치.The first cover 111 and the fixing screw 114 is fastened to the second cover 112 for opening and closing the upper surface of the support block 120; Automatic coupling device for a luminaire comprising a.
  5. 청구항 4에 있어서, 지지단(121)은The method according to claim 4, the support end 121 is
    끼움돌기(113)가 삽입되도록 상면에서 하향된 끼움홀(122)이 형성되고, A fitting hole 122 downward from the upper surface is formed so that the fitting protrusion 113 is inserted,
    끼움돌기(113)는The fitting protrusion 113 is
    직경이 확장된 복 수개의 마디가 순차 연장 형성되어 끼움홀(122)에 마디별로 순차 끼움되어 고정 볼트(140)의 삽입 길이를 조절하는 것을 특징으로 하는 등기구의 자동 결합 장치. An automatic coupling device for a luminaire, characterized in that a plurality of nodes having an expanded diameter are sequentially extended and inserted sequentially by nodes in the fitting hole 122 to adjust the insertion length of the fixing bolt 140.
  6. 청구항 1에 있어서, 제2커버(112)에서 하향 연장되어 고정 볼트(140)를 가압시키는 가압부(150);를 더 포함하는 등기구의 자동 결합 장치.The apparatus of claim 1, further comprising a pressing unit 150 extending downward from the second cover 112 to press the fixing bolt 140.
PCT/KR2020/002829 2019-03-06 2020-02-27 Automatic coupling device for lamp WO2020180054A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2019-0025842 2019-03-06
KR1020190025842A KR102093976B1 (en) 2019-03-06 2019-03-06 Automatic coupling apparatus for light device

Publications (1)

Publication Number Publication Date
WO2020180054A1 true WO2020180054A1 (en) 2020-09-10

Family

ID=69958713

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2020/002829 WO2020180054A1 (en) 2019-03-06 2020-02-27 Automatic coupling device for lamp

Country Status (2)

Country Link
KR (1) KR102093976B1 (en)
WO (1) WO2020180054A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102176574B1 (en) * 2020-03-27 2020-11-09 주식회사 레젠 Arm length adjusting device of lamp pole for optimizing uniformity ratio of illuminance in exterior illumination

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100117700A (en) * 2009-04-27 2010-11-04 장민선 Connecting apparatus of street lamp prop and arm bar
KR101033874B1 (en) * 2010-12-14 2011-05-11 일성물산 주식회사 Led road lighting with improved heat dissipation
KR20130117533A (en) * 2012-04-18 2013-10-28 주식회사 두리계전 Led street lamp easy to installation and removal of power supply
KR20150091807A (en) * 2014-02-04 2015-08-12 인지전기공업 주식회사 Street lamp of LED
KR101777801B1 (en) * 2016-06-17 2017-09-13 김정숙 Streetlight Pillar for Easily Connecting with the LED Light

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101498645B1 (en) 2014-08-18 2015-03-04 정혜진 Lifting apparatus combined with a pole for maintaining a streetlamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100117700A (en) * 2009-04-27 2010-11-04 장민선 Connecting apparatus of street lamp prop and arm bar
KR101033874B1 (en) * 2010-12-14 2011-05-11 일성물산 주식회사 Led road lighting with improved heat dissipation
KR20130117533A (en) * 2012-04-18 2013-10-28 주식회사 두리계전 Led street lamp easy to installation and removal of power supply
KR20150091807A (en) * 2014-02-04 2015-08-12 인지전기공업 주식회사 Street lamp of LED
KR101777801B1 (en) * 2016-06-17 2017-09-13 김정숙 Streetlight Pillar for Easily Connecting with the LED Light

Also Published As

Publication number Publication date
KR102093976B1 (en) 2020-03-26

Similar Documents

Publication Publication Date Title
WO2020180054A1 (en) Automatic coupling device for lamp
JP6138164B2 (en) Easy-to-install lighting fixtures and mounting arrangements
WO2009145580A2 (en) Street lamp using leds
CN107120586A (en) A kind of street lamp for being conveniently replaceable light fixture
CN209042106U (en) A kind of intelligent-induction puts lit corridor night-light automatically
WO2018139711A1 (en) Road lighting facility
WO2020159056A1 (en) Lifting link apparatus for pole and pole lifting system comprising same
KR20200107652A (en) Street lamp Lighting equipment lift equipment
CN212832225U (en) Safety warning device is used in elevator maintenance
CN211146271U (en) Combined garden lamp convenient to maintain
WO2020204619A1 (en) Roadside-tree-friendly streetlamp for controlling illuminance in proportion to number of passing vehicles, and streetlamp control method
KR100989152B1 (en) Dragging Apparatus For Lighting Fixture
CN207778137U (en) A kind of interior lift headlamp in court
KR200440489Y1 (en) Light mounting structure for an elevator hoistway
CZ134995A3 (en) Limiting lighting fitting
CN112577008A (en) Multi-functional solar energy wisdom light pole
CN209458764U (en) A kind of built-in fall arrest chain street lamp
CN211450656U (en) Anti-falling street lamp
CN216143650U (en) Suspension type intelligence miner's lamp with adjustable height for mine
CN219751585U (en) Detachable decorative roof
CN109539041A (en) A kind of cable tunnel temporary lighting device
CN217559680U (en) Lighting mechanism based on human body induction
CN220506619U (en) Quick assembly disassembly device for tunnel illumination lamps and lanterns
CN209837103U (en) Inspection well with anti-falling net
CN217801435U (en) Auxiliary wire perforating device for door wire sheath

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20766759

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20766759

Country of ref document: EP

Kind code of ref document: A1