WO2020037698A1 - Logistics pallet - Google Patents

Logistics pallet Download PDF

Info

Publication number
WO2020037698A1
WO2020037698A1 PCT/CN2018/102976 CN2018102976W WO2020037698A1 WO 2020037698 A1 WO2020037698 A1 WO 2020037698A1 CN 2018102976 W CN2018102976 W CN 2018102976W WO 2020037698 A1 WO2020037698 A1 WO 2020037698A1
Authority
WO
WIPO (PCT)
Prior art keywords
nail
lock
opening
pallet
bottom frame
Prior art date
Application number
PCT/CN2018/102976
Other languages
French (fr)
Chinese (zh)
Inventor
常飞鹏
Original Assignee
常飞鹏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 常飞鹏 filed Critical 常飞鹏
Publication of WO2020037698A1 publication Critical patent/WO2020037698A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/0004Rigid pallets without side walls
    • B65D19/0053Rigid pallets without side walls the load supporting surface being made of more than one element
    • B65D19/0055Rigid pallets without side walls the load supporting surface being made of more than one element forming a continuous plane contact surface
    • B65D19/0067Rigid pallets without side walls the load supporting surface being made of more than one element forming a continuous plane contact surface the base surface being made of more than one element
    • B65D19/0069Rigid pallets without side walls the load supporting surface being made of more than one element forming a continuous plane contact surface the base surface being made of more than one element forming a continuous plane contact surface
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/38Details or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00547Connections
    • B65D2519/00552Structures connecting the constitutive elements of the pallet to each other, i.e. load supporting surface, base surface and/or separate spacer
    • B65D2519/00572Structures connecting the constitutive elements of the pallet to each other, i.e. load supporting surface, base surface and/or separate spacer with separate auxiliary element, e.g. screws, nails, bayonets

Definitions

  • the invention relates to the field of logistics transportation, and in particular to a logistics tray.
  • Patent CN201810416292 discloses a multifunctional logistics pallet.
  • the pallet is composed of a plurality of structural components, and each component is fastened by a plurality of screws. Therefore, a large number of workers need to be manually assembled during the manufacturing process, resulting in its production efficiency. low. In addition, in the later use process, it is inevitable that some parts need to be repaired and replaced, thus causing problems such as tedious maintenance and repair of the tray.
  • the purpose of the present invention is to provide a logistics tray, which achieves the purpose of rapid assembly through the form of the locking of the nail and the buckle, thereby improving the production efficiency.
  • a logistics tray mainly includes: a supporting plate, the supporting plate is a flat structure arranged horizontally; a bottom frame, the bottom frame is a horizontally arranged frame structure, and the outer contour of the bottom frame is similar to the outer contour of the supporting plate; There are a plurality of pads on the side of the frame facing up, the pads are rectangular, and the top of the pads is in contact with the bottom side of the pallet; the pads are provided with a plurality of first through holes in the vertical direction, and The supporting plate is provided with a second through hole corresponding to the first opening, and the bottom frame is provided with a third through hole corresponding to the first opening; the second and third openings have the same inner diameter as the first opening;
  • the lock nail is a round nail structure including a nail tip and a first nail cap, and a hook groove is provided in the circumferential direction of the outer side wall of the lock nail near one end of the nail; the nail tip of the lock nail penetrates into the second opening, and The first opening extends in the direction
  • the hook of the lock and the nail barrel penetrate the third opening and extend in the direction of the first opening;
  • Each snap lock hook and hook groove engagement nail; a first nut and the second nut tension is applied to the pad and the direction of the bottom frame by the pallet nail with the clasp.
  • the ends of the second opening and the third opening that are away from the pad are respectively set as counterbores; the first nail cap and the second nail cap are set as countersunk heads, and are lying on the second and third openings, respectively. Shen's.
  • the first nail cap of the locking nail and the nail tip are provided separately; an end of the nail tip near the first nail cap is coaxially provided with a screw hole, and an end of the first nail cap near the nail tip is coaxially provided with a screw.
  • the screw is matched with the screw hole; the end of the first nail cap away from the nail tip is provided with a cross opening that cooperates with a screwdriver.
  • the nail tip of the lock nail is provided with a hexagonal groove extending inward along the axis, and the hexagonal groove cooperates with an internal hexagonal wrench for fixing or rotating the nail; the outer diameter of the hexagonal groove is smaller than the internal warp of the hollow portion of the lock.
  • the upper and lower ends of the cushion block are respectively provided with a first recess extending vertically in areas that do not overlap with the first opening; the supporting plate and the bottom frame are respectively provided with coaxial second recesses corresponding to the first recess.
  • Pit the diameter of the second pit is slightly smaller than the diameter of the first pit, and the second pit and the first pit form a space with a "convex" cross section, and a buffer block with a "convex" cross section is provided in the space;
  • the buffer block is provided for the cavity.
  • the bottom frame is composed of a plurality of connecting beams that are spliced horizontally and vertically in the same horizontal plane; the cushion block is arranged at the middle and the connection of the connecting beam.
  • an oblique chamfer is provided around the bottom frame on a side that does not overlap the cushion block and is close to the cushion block.
  • a first edging is provided around the pallet, and the first edging section has a U-shaped cross-section; a second edging is provided around the bottom chamfer corresponding to the oblique chamfer, and the second edging is attached to the outer side wall of the connecting beam. Suitable settings.
  • the supporting plate and the connecting beam are respectively provided with vertically penetrating punches in the first and second hemming coverage areas; the first and second hemmings are respectively provided with penetrating crankshafts corresponding to the punching holes.
  • a plurality of tines extending in the direction of the center of the circle are provided in the circumferential direction of the inner wall ring of the dentition hole; each dentition makes the dentate opening in the shape of a "meter".
  • the beneficial effect of the present invention is that during the assembly process of the logistics pallet, the assembly and fixing process of the pallet, the bottom frame and the pad is completed through the cooperation of the locking nail and the locking buckle. Since the locking nail and the locking buckle do not need thread cooperation, only the The nail tip of the lock nail is aligned with the center of the nail barrel of the lock and an external axial force is applied. Since the lock hook on the lock is elastically set according to the selection of the material, the nail tip of the nail is inserted into the lock barrel during the insertion process. Extend the lock hook outward until the lock hook slides to the hook groove of the lock nail. Under the action of elastic force, the lock hook returns inward and hooks in the hook groove to complete the positioning and fixing process.
  • the lock of the lock can also be provided with a multi-layer hook structure, so in the compression installation of the lock nail and the lock, the lock can be hooked and locked by itself according to the relative position of the lock hook and the hook groove.
  • the second opening and the third opening are respectively set at the end away from the pad as a counterbore; the first nail cap And the second nail cap is provided with a countersunk head, and lies in the sink of the second opening and the third opening respectively. Therefore, the first nail cap and the second nail cap are prevented from rising above the surface of the tray and the bottom frame.
  • the first nail cap of the lock nail is set as an detachable structure, which is connected to the nail tip by a screw. Therefore, in the disassembly of the logistics tray, the first nail cap is removed by a screwdriver. After being restrained, the lock buckle can be pulled out of the third opening. During the pull-out process of the lock buckle, the hook nails are brought out together, thereby solving the problem of disassembling the logistics tray.
  • the head of the first nail cap may be provided with a cross mouth, a flat mouth, an inner hexagonal mouth, and an inner hexagonal mouth.
  • a hexagonal groove was set up at the nail tip portion without affecting the head of the locking hook.
  • the hexagonal groove can be replaced by a hexagonal groove, a cross groove, and a flat groove.
  • the definition of the specific shape is determined by the common tool characteristics.
  • the so-called tool characteristics include the diameter of the tool shaft. , And length, so that the tool can smoothly pass through the hollow part of the lock and contact with the groove of the nail tip.
  • the large head portion of the buffer block is embedded in the first recess of the cushion block, and only the small head portion is exposed, so that the upper and lower ends are installed.
  • the cushion block of the buffer block realizes the mortise lock structure.
  • the second recesses on the supporting plate and the connecting beam are respectively matched with the small heads of the buffer blocks at the upper and lower ends of the cushion block. Because the side walls of the large head and the small head of the buffer block are tightly matched with the side walls of the first recess and the second recess, respectively, the lateral gap between the pallet and the pad, and between the bottom frame and the pad is eliminated. So as to strengthen the shearing force.
  • the buffer block may be provided in a solid or hollow manner. When it is solidly set, it can achieve the effect of shearing force buffering through the toughness and elasticity of its material; when it is hollowly set, when subjected to shearing stress, the buffering block can buffer the impact force through structural deformation.
  • connection between two adjacent connecting beams and the central position of a single connecting beam with the cushion block can better play the reinforcing effect of the connecting beam.
  • the guide renting of the fork wall is realized by the oblique chamfer to prevent the hard collision between the fork wall and the outer side wall of the connecting beam.
  • the two vertical edges on the outside of the pad can also be used as a guide for the fork wall of the forklift, so it can also be set for oblique chamfering.
  • the upper and lower two walls of the first hemming are attached to the upper and lower sides of the pallet, and a gap is left between the outer side wall of the pallet and the inner side of the first hemming. This gap is used for the first hemming collision deformation zone.
  • the first hemming buffers the impact force through deformation, thereby protecting the pallet from being damaged by the impact force.
  • the first hemming is designed to be replaceable, so when the first hemming is completely damaged, the service life of the logistics tray can be extended by replacing the first hemming with a new one.
  • you can control the cushioning strength by setting the material of the first hemming, such as stainless steel, rubber, and review materials.
  • Another second hemming is used to protect the inclined chamfer of the connecting beam to prevent the connecting beam from being damaged by the crushing friction of the forklift fork wall.
  • the second hemming of the metal or hard material can smooth the forklift fork wall.
  • the guiding function is performed, so that the fork wall can be smoothly inserted into the gap of the logistics tray.
  • a concave surface is provided at the above-mentioned matching place of the first covering edge and the supporting plate and the matching place of the second covering edge and the connecting beam, and the depth of the small concave surface is consistent with the thickness of the corresponding first covering edge and the second covering edge, respectively. Therefore, when the supporting plate and the connecting beam are installed with the first and second hemmings respectively, the outer surfaces of the first and second hemming will not be higher than the surface of the supporting plate and the connecting beam, and the supporting plate and the connecting beam will be The connecting beam always has a flat external structure.
  • the first hemming is first positioned around the pallet, and the teeth are punched by the punch of the stamping machine.
  • the center of the plate is punched.
  • the diameter of the punch is equal to or slightly smaller than the diameter of the crank hole, and the front end of the punch is set in a conical or spherical shape.
  • the punching process of the punch it first contacts the head of the canine in the crank.
  • the canine is curled and deformed downward, and rolled into the through-hole of the pallet.
  • the amplitude of each canine in the dental plate is increased until the tip of the head of the canine penetrates the penetration of the pallet.
  • the first edging is firmly fixed on the periphery of the supporting plate with the cooperation of the canine teeth and the through hole.
  • the second hemming and the connecting beam are also fixed by stamping, thereby eliminating the tedious steps of screw installation and saving productivity investment.
  • steel nail connections can be performed on the upper side of the supporting plate and the corresponding side of the spacer on the bottom side of the connecting beam.
  • the steel nail is used to reinforce the cooperation of the lock nail and the lock buckle, thereby greatly improving the installation strength of the logistics pallet.
  • FIG. 1 is a schematic diagram of a locking pre-locking buckle according to the present invention
  • FIG. 2 is an overall schematic diagram of a locking nail and a locking buckle according to the present invention
  • FIG. 3 is a schematic diagram of a locking nail unit according to the present invention.
  • FIG. 4 is a schematic diagram of a lock unit according to the present invention.
  • FIG. 5 is a schematic diagram of installing a buffer block according to the present invention.
  • FIG. 6 is another schematic diagram of installing a buffer block according to the present invention.
  • Figure 7 is a schematic diagram of the fitting of the connecting beam of the present invention.
  • FIG. 8 is a schematic diagram of a portion of a canine after the riveting and riveting of the present invention.
  • FIG. 9 is a schematic diagram of a diagonal portion of a first hemming of the present invention.
  • FIG. 10 is a schematic diagram of a method of riveting a cannulated edge tooth according to the present invention.
  • FIG. 11 is a schematic diagram of a steel nail structure of the present invention.
  • a logistics pallet mainly includes: a pallet 1, the pallet 1 is a flat structure arranged horizontally; a bottom frame 2, the bottom frame 2 is a horizontally arranged frame structure, and The outer contour of the bottom frame 2 is similar to the outer contour of the pallet 1.
  • the side of the bottom frame 2 facing upward is provided with a plurality of pads 3, which are arranged in a rectangular shape, and the top of the pad 3 is in contact with the bottom side of the pallet 1.
  • the pad 3 is provided with a plurality of first through holes 4 in the vertical direction, and the supporting plate 1 is provided with a second through hole 5 corresponding to the first opening 4, and the bottom frame 2 is provided corresponding to the first opening 4.
  • the third opening 6 has a through hole; the inner diameters of the second opening 5 and the third opening 6 are the same as those of the first opening 4; the locking nail is a round nail structure including a nail tip 8 and a first nail cap 9 And the lock nail is provided with a hook groove 10 in the circumferential direction of the outer side wall ring near one end of the nail tip 8; the nail tip 8 of the lock nail penetrates into the second opening 5 and extends toward the first opening 4; the lock buckle 11, the lock buckle 11 is a hollow rivet structure including the second nail cap 12 and the nail barrel 13, and the nail barrel 13 is connected at one end remote from the second nail cap 12 with a plurality of lock hooks 14 with hook tips facing the axial direction of the lock 11; Hook 14 with buckle 11 and The barrel 13 penetrates the third opening 6 and extends in the direction of the first opening 4; each lock hook 14 of the lock 11 cooperates with the hook groove of the lock nail; the first nail cap 9 and the second nail cap 12 pass through the lock nail The cooperation with the lock buckle 11 exerts a pulling
  • the assembly and fixing process of the pallet 1 with the bottom frame 2 and the pad 3 is completed through the cooperation of the lock nails and the lock buckles 11, because the lock nails and the lock buckles 11 do not need thread cooperation, only the lock
  • the 8 nail tips are aligned with the center of the nail barrel 13 of the lock buckle 11 and an axial external force is applied. Since the lock hook 14 on the lock buckle 11 is elastically set according to the selection of the material, the nail tips 8 of the nail are directed to the lock cylinder.
  • the lock hook 14 is spread outward until the lock hook 14 slides to the hook groove 10 of the lock nail. Under the action of the elastic force, the lock hook 14 returns inward and is hooked in the hook groove.
  • the hook grooves near the nail tips 8 are provided in multiple rows, so the lock hooks 14 on the lock buckle 11 are sequentially hooked under the action of the axial force during the installation process. In different hook grooves, and finally stay in the appropriate hook groove to complete the fastening effect.
  • the lock buckle 11 of the lock buckle 11 can also be provided with a multi-layer hook structure. Therefore, in the pressing installation of the lock nail and the lock buckle 11, the lock hook 14 can be hooked and locked by itself according to the relative position of the lock hook 14 and the hook groove.
  • the logistics pallet since the logistics pallet is used for loading goods, the flatness of the top of the pallet 1 and the bottom of the bottom frame 2 is required, so the second opening 5 and the third opening 6 are far away from the pad 3, respectively.
  • One end is provided with a counterbore; the first nail cap and the second nail cap 12 are provided with a countersunk head, and lie in the sinks of the second opening 5 and the third opening 6 respectively. Therefore, the first nail cap 9 and the second nail cap 12 are prevented from rising above the surface of the tray and the bottom frame 2.
  • the first nail cap 9 and the nail tip 8 of the lock nail are provided separately; one end of the nail tip 8 near the first nail cap 9 is provided with a screw hole 15 coaxially, and the first nail cap 9 A screw 16 is coaxially connected to an end near the nail tip 8, and the screw 16 cooperates with the screw hole 15; an end of the first nail cap 9 remote from the nail tip 8 is provided with a cross opening that cooperates with a screwdriver.
  • the purpose of the above setting is to solve the problem of disassembling the logistics tray. Since the lock nails and the buckle 11 are all docked and locked in the first opening 4, the second opening 5, and the third opening 6, it is difficult to align The hook 14 of the lock 11 is unlocked. To this end, the first nail cap 9 of the lock nail is set as an detachable structure, and the screw tip 16 is connected to the nail tip 8. Therefore, in the disassembly of the logistics tray, the first nail cap 9 is removed by a screwdriver, and the first After being restrained by a nail cap 9, the lock buckle 11 can be pulled out of the third opening 6. During the pull-out process of the lock buckle 11, the lock hook 14 is brought out together with the nail tip 8, thereby solving the logistics tray. Disassembly problem.
  • the head of the first nail cap 9 can be provided with a cross mouth, a flat mouth, an inner hexagonal mouth, and an inner hexagonal mouth.
  • the nail tips 8 are provided with hexagonal grooves 17 extending inward along the axis.
  • the hexagonal grooves 17 cooperate with internal hexagonal wrenches to fix or rotate the nails; the outer diameter of the hexagonal grooves 17 is smaller than the lock buckle 11 Inner cavity of the hollow part.
  • the purpose of the above setting is to solve the problem of disassembly failure caused by the rotation of the nail tip 8 and the first nail cap 9 during the disassembly of the first nail cap 9. Therefore, the head of the locking hook 14 is not affected at the position of the nail tip 8.
  • Hexagonal grooves 17 are set up in addition to this.
  • the hexagonal grooves 17 can be replaced by internal hexagonal grooves, cross grooves, and flat grooves.
  • the definition of the specific shape is determined by the characteristics of commonly used tools.
  • the tool features include the diameter and length of the tool shank, so that the tool can smoothly pass through the hollow portion of the lock buckle 11 and contact with the groove of the nail tip 8.
  • the upper and lower ends of the cushion block 3 are respectively provided with a first recess 18 extending vertically in an area that does not overlap with the first opening 4; the supporting plate 1 and the bottom frame 2 respectively correspond to the first
  • a recess 18 is provided with a coaxial second recess 19; the diameter of the second recess 19 is slightly smaller than the diameter of the first recess 18, and the second recess 19 and the first recess 18 form a "convex" cross section.
  • the space is provided with a buffer block 20 having a “convex” cross-section in the space; the buffer block 20 is provided for the cavity.
  • the production and processing costs can also be reduced by setting the buffer block 20 in the form of an ordinary cylinder. At the same time, both the first and second dimples 18 and 19 and the outer diameter of the cylindrical buffer block 20 can be reduced. Corresponding.
  • the purpose of the above setting is to make up for the lack of shearing force of the lock nail and the buckle 11.
  • the large head portion of the buffer block 20 is embedded in the first recess 18 of the pad 3 and only the small head portion is exposed.
  • the pad block 3 with the buffer block 20 installed at the upper and lower ends thereof realizes the mortise lock structure.
  • the second recesses 19 on the supporting plate 1 and the connecting beam 21 cooperate with the small heads of the cushion blocks 20 at the upper and lower ends of the cushion block 3, respectively. Since the side walls of the large head and the small head of the buffer block 20 fit tightly with the side walls of the first recess 18 and the second recess 19, respectively, the space between the pallet 1 and the cushion block 3, and the bottom frame 2 and the cushion block are eliminated.
  • the buffer block 20 may be provided in a solid state or in a hollow state. When it is solidly set, it can achieve the effect of shearing force buffering through the toughness and elasticity of its material; when it is hollowly set, when subjected to shearing stress, the cushioning block 20 can buffer the impacting force through structural deformation.
  • the bottom frame 2 is composed of a plurality of connecting beams 21 that are horizontally and longitudinally spliced in the same horizontal plane; the cushion block 3 is disposed at the middle portion and the connection of the connecting beam 21.
  • the purpose of the above setting is to horizontally restrain the bottom of the pad 3 to prevent the load-bearing logistics pallet from crushing the pad 3 during the movement.
  • the connection between two adjacent connecting beams 21 and the center position of a single connecting beam 21 is connected to the pad 3, so that the reinforcing effect of the connecting beam 21 can be better exerted.
  • an oblique chamfer 22 is provided around the bottom frame 2 on a side that does not overlap with the cushion block 3 and is close to the cushion block 3.
  • the inclined chamfer 22 is used to guide and rent the fork wall to prevent the hard collision between the fork wall and the outer wall of the connecting beam 21.
  • the two vertical edges on the outer side of the cushion block 3 can also be used as a guide for the fork wall of the forklift, so it can also be provided for the oblique chamfer 22.
  • a first edging 23 is provided around the pallet 1, and the cross-section of the first edging 23 is arranged in a horizontal “U” shape;
  • the 22 portion is provided with a second edging 24, and the second edging 24 is in close contact with the outer side wall of the connecting beam 21.
  • the upper and lower walls of the first hemming edge 23 are attached to the upper and lower sides of the pallet 1, and the outer wall of the pallet 1 and the inner side wall of the first hemming 23 leave a gap, which is used for the collision of the first hemming 23.
  • Deformation zone so when the logistics pallet is impacted by an external force during transportation, the first edging 23 cushions the impact force through deformation, thereby protecting the pallet 1 from being damaged by the impact force.
  • the first hemming edge 23 is a replaceable design, so when the first hemming edge 23 is completely damaged, the service life of the logistics tray can be extended by replacing the new first hemming edge 23.
  • it is possible to control the buffering strength by setting the material of the first hemming 23, such as stainless steel, rubber, and review materials.
  • Another second hemming 24 is used to protect the inclined chamfer 22 of the connecting beam 21 to prevent the connecting beam 21 from being damaged by the friction of the forklift fork wall.
  • the second hemming 24 of metal or hard material can be smoother. It guides the forklift fork wall so that the fork wall can be inserted into the gap of the logistics pallet more smoothly.
  • a concave surface is provided at the joint between the first hem 23 and the pallet 1 and the joint between the second hem 24 and the connecting beam 21, and the depth of the small concave surface is corresponding to that of the first hem 23 and the second hem respectively.
  • the thickness of the edge 24 is the same, so when the pallet 1 and the connecting beam 21 are respectively installed with the first edge 23 and the second edge 24, the outer surfaces of the first edge 23 and the second edge 24 will not be higher than the edge.
  • the surfaces of the plate 1 and the connecting beam 21 make the supporting plate 1 and the connecting beam 21 always have a flat external structure.
  • the pallet 1 and the connecting beam 21 cover the areas of the first hemming 23 and the second hemming 24, respectively.
  • a plurality of tines extending in the direction of the center of the circle are circumferentially provided on the inner side wall of the sprocket hole. 26; each canine 26 makes the tooth plate opening in a "meter" shape, so the pressing plate hole can be processed by wire cutting and laser cutting.
  • the first hemming edge 23 can be widened and widened in the area provided with the platen hole, and the narrow edge is set in the ordinary buffer function area, so the hemming material can be greatly reduced during the production process.
  • the first hemming 23 is first positioned around the pallet 1.
  • the center of the crankset is punched by a punch of a stamping machine, wherein the punch diameter is equal to or slightly smaller than the tooth.
  • the diameter of the disk hole, and the front end of the punch is set in a conical or spherical shape.
  • the punching process of the punch it first contacts the head of the canine 26 in the dental plate, and causes the canine 26 to curl downward and deform, and to the pallet.
  • the through-hole of 1 is rolled up. As the punch descends, each canine 26 in the chainring rolls up until the tip of the head of the canine 26 penetrates into the inner wall of the through-hole of the pallet 1.
  • the first hemming 23 The tooth plate is firmly fixed around the support plate 1 with the cooperation of the canine 26 and the through hole.
  • the second hemming 24 is fixed by the punching method in the same way as the connecting beam 21, thereby eliminating the tedious steps of screw installation and saving the investment in productivity.
  • steel nails can be performed on the upper side of the pallet 1 and the bottom side of the connecting beam 21 corresponding to the region of the spacer 3, respectively. 27 connections.
  • the steel nail 27 is used to reinforce the cooperation of the lock nail and the lock buckle 11, thereby greatly improving the installation strength of the logistics tray.
  • twist nails can be used for the steel nails 27.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pallets (AREA)

Abstract

A logistics pallet, mainly comprising: a support plate (1), a bottom frame (2), cushion blocks (3), and lock nails and lock catches (11) used for integral fixing, wherein the lock nails are of a round nail structure comprising a nail point (8) and a first nail head (9), and hook slots (10) are circumferentially formed on an outer side wall of one end of the lock nail close to the nail point (8); and the lock catches (11) are of a hollow rivet structure comprising a second nail head (12) and a nail cylinder (13), and one end of the nail cylinder (13) distant from the second nail head (12) is connected to a plurality of lock hooks (14) with points facing toward the axis direction of the lock catch (11). The logistics pallet achieves the purpose of rapid assembly by means of the snap-fit form of the lock nails and the lock catches (11), so that the production efficiency is improved.

Description

物流托盘Logistics tray 技术领域Technical field
本发明涉及物流运输领域,具体涉及一种物流托盘。The invention relates to the field of logistics transportation, and in particular to a logistics tray.
背景技术Background technique
专利CN201810416292公开了一种多功能物流托盘,该托盘由多个结构部件构成,并且各个部件均由若干根螺丝钉进行紧固,因此在制作过程中需要大量的工人进行手工组装,从而导致其生产效率低下。另外在后期使用过程中,难免局部零件需要维修更换,因此造成该托盘维修保养操作较为繁琐等问题。Patent CN201810416292 discloses a multifunctional logistics pallet. The pallet is composed of a plurality of structural components, and each component is fastened by a plurality of screws. Therefore, a large number of workers need to be manually assembled during the manufacturing process, resulting in its production efficiency. low. In addition, in the later use process, it is inevitable that some parts need to be repaired and replaced, thus causing problems such as tedious maintenance and repair of the tray.
发明内容Summary of the Invention
本发明的目的在于提供一种物流托盘,其通过锁钉及锁扣的卡接的形式实现了快速组装的目的,从而提高了生产效率。The purpose of the present invention is to provide a logistics tray, which achieves the purpose of rapid assembly through the form of the locking of the nail and the buckle, thereby improving the production efficiency.
为实现上述目的,一种物流托盘,主要包括:托板,托板为水平设置的平板结构;底框,底框为水平设置的框架结构,并且底框外轮廓与托板外轮廓相近;底框朝上的一侧设有多个垫块,垫块为矩形体设置,并且垫块的顶部与托板底侧接触;垫块沿竖直方向设有多个贯通的第一开孔,并且托板对应第一开孔设有贯通的第二开孔,底框对应第一开孔设有贯通的第三开孔;第二开孔、第三开孔与第一开孔的内径相同;锁钉,锁钉为包含钉尖及第一钉帽的圆钉结构,并且锁钉在靠近钉尖一端的外侧壁环周向设有钩槽;锁钉的钉尖穿入第二开孔,并向第一开孔方向延伸;锁扣,锁扣为包含第二钉帽及钉筒的空心铆钉结构,并且钉筒在远离第二钉帽的一端连接设有多个钩尖朝向锁扣轴心方向的锁钩;锁扣的锁钩及钉筒穿入第三开孔,并向第一开孔方向延伸;锁扣的各个锁钩与锁钉的钩槽配合;第一钉帽及第二钉帽通过锁钉与锁扣的配合对托板及底框施加向垫块方向的拉力。In order to achieve the above purpose, a logistics tray mainly includes: a supporting plate, the supporting plate is a flat structure arranged horizontally; a bottom frame, the bottom frame is a horizontally arranged frame structure, and the outer contour of the bottom frame is similar to the outer contour of the supporting plate; There are a plurality of pads on the side of the frame facing up, the pads are rectangular, and the top of the pads is in contact with the bottom side of the pallet; the pads are provided with a plurality of first through holes in the vertical direction, and The supporting plate is provided with a second through hole corresponding to the first opening, and the bottom frame is provided with a third through hole corresponding to the first opening; the second and third openings have the same inner diameter as the first opening; The lock nail is a round nail structure including a nail tip and a first nail cap, and a hook groove is provided in the circumferential direction of the outer side wall of the lock nail near one end of the nail; the nail tip of the lock nail penetrates into the second opening, and The first opening extends in the direction of the lock; the buckle is a hollow rivet structure including a second nail cap and a nail barrel, and a plurality of hook tips are connected to an end of the nail barrel away from the second nail cap toward the center of the lock shaft. The hook of the lock and the nail barrel penetrate the third opening and extend in the direction of the first opening; Each snap lock hook and hook groove engagement nail; a first nut and the second nut tension is applied to the pad and the direction of the bottom frame by the pallet nail with the clasp.
优选的,第二开孔以及第三开孔分别远离垫块的一端为沉孔设置;第一钉帽以及第二钉帽为沉头设置,并分别卧在第二开孔及第三开孔的沉内。Preferably, the ends of the second opening and the third opening that are away from the pad are respectively set as counterbores; the first nail cap and the second nail cap are set as countersunk heads, and are lying on the second and third openings, respectively. Shen's.
优选的,锁钉的第一钉帽与钉尖为分体设置;钉尖靠近第一钉帽的一端同轴设有螺孔,第一钉帽靠近钉尖的一端同轴连接设有螺杆,螺杆与螺孔配合;第一钉帽远离钉尖的一端设有与螺丝刀配合的十字口。Preferably, the first nail cap of the locking nail and the nail tip are provided separately; an end of the nail tip near the first nail cap is coaxially provided with a screw hole, and an end of the first nail cap near the nail tip is coaxially provided with a screw. The screw is matched with the screw hole; the end of the first nail cap away from the nail tip is provided with a cross opening that cooperates with a screwdriver.
优选的,锁钉的钉尖部设有沿轴线向内延伸的六方槽,六方槽与内六方扳手配合,用于固定或旋转锁钉;六方槽外径小于锁扣的中空部位内经。Preferably, the nail tip of the lock nail is provided with a hexagonal groove extending inward along the axis, and the hexagonal groove cooperates with an internal hexagonal wrench for fixing or rotating the nail; the outer diameter of the hexagonal groove is smaller than the internal warp of the hollow portion of the lock.
优选的,垫块的上下两端分别在不与第一开孔重叠区域设有竖直方向延伸的第一凹坑;托板与底框分别对应第一凹坑设有同轴的第二凹坑;第二凹坑直径略小于第一凹坑直径,并且第二凹坑与第一凹坑形成一个截面呈“凸”字形的空间,空间内设有剖面呈“凸”形的缓冲块;缓冲块为腔体设置。Preferably, the upper and lower ends of the cushion block are respectively provided with a first recess extending vertically in areas that do not overlap with the first opening; the supporting plate and the bottom frame are respectively provided with coaxial second recesses corresponding to the first recess. Pit; the diameter of the second pit is slightly smaller than the diameter of the first pit, and the second pit and the first pit form a space with a "convex" cross section, and a buffer block with a "convex" cross section is provided in the space; The buffer block is provided for the cavity.
优选的,底框由多根在同一水平面内横纵拼接的连接梁构成;垫块设置在连接梁的中部及连接处。Preferably, the bottom frame is composed of a plurality of connecting beams that are spliced horizontally and vertically in the same horizontal plane; the cushion block is arranged at the middle and the connection of the connecting beam.
优选的,底框的四周,在不与垫块重叠并靠近垫块的一侧设有斜倒角。Preferably, an oblique chamfer is provided around the bottom frame on a side that does not overlap the cushion block and is close to the cushion block.
优选的,托板四周设有第一包边,第一包边断面呈“U”形设置;底框四周对应斜倒角部位设有第二包边,第二包边与连接梁外侧壁贴合设置。Preferably, a first edging is provided around the pallet, and the first edging section has a U-shaped cross-section; a second edging is provided around the bottom chamfer corresponding to the oblique chamfer, and the second edging is attached to the outer side wall of the connecting beam. Suitable settings.
优选的,托板以及连接梁分别在第一包边及第二包边覆盖区域内设有竖直贯通的冲孔;第一包边及第二包边分别对应冲孔设有贯通的牙盘孔,牙盘孔内侧壁环周向设有多个向圆心方向延伸的尖牙;各个尖牙使牙盘呈“米”字形开口状。Preferably, the supporting plate and the connecting beam are respectively provided with vertically penetrating punches in the first and second hemming coverage areas; the first and second hemmings are respectively provided with penetrating crankshafts corresponding to the punching holes. A plurality of tines extending in the direction of the center of the circle are provided in the circumferential direction of the inner wall ring of the dentition hole; each dentition makes the dentate opening in the shape of a "meter".
本发明的有益效果:该物流托盘在组装过程中,通过锁钉及锁扣的配合完成托板与底框及垫块的组装固定工序,由于锁钉及锁扣不需要螺纹配合,只需将锁钉的钉尖部对齐锁扣的钉筒中心并施加一个轴向的外力,因锁扣上的锁钩根据材料的选择为弹性设置,因此锁钉的钉尖向锁筒内插入的过程中, 将锁钩向外撑开,直至锁钩滑动至锁钉的钩槽处,在弹力的作用下,锁钩向内回位并钩挂在钩槽内完成定位固定过程。The beneficial effect of the present invention is that during the assembly process of the logistics pallet, the assembly and fixing process of the pallet, the bottom frame and the pad is completed through the cooperation of the locking nail and the locking buckle. Since the locking nail and the locking buckle do not need thread cooperation, only the The nail tip of the lock nail is aligned with the center of the nail barrel of the lock and an external axial force is applied. Since the lock hook on the lock is elastically set according to the selection of the material, the nail tip of the nail is inserted into the lock barrel during the insertion process. Extend the lock hook outward until the lock hook slides to the hook groove of the lock nail. Under the action of elastic force, the lock hook returns inward and hooks in the hook groove to complete the positioning and fixing process.
此外为了适应多个厚度的安装范围,锁钉靠近钉尖部的钩槽为多条设置,因此锁扣上的锁钩在安装过程中的轴向作用力的作用下,依次钩挂在不同的钩槽内,并最终停留在适当的钩槽中完成紧固作用。In addition, in order to adapt to the installation range of multiple thicknesses, there are multiple hook grooves near the nail tip, so the lock hooks on the lock buckle are sequentially hooked in different under the axial force during the installation process. Hook groove, and finally stay in the appropriate hook groove to complete the fastening effect.
另外锁扣的锁扣也可设置成多层钩结构,因此在锁钉与锁扣的压紧安装中,可根据锁钩与钩槽的相对位置自行钩挂锁紧。In addition, the lock of the lock can also be provided with a multi-layer hook structure, so in the compression installation of the lock nail and the lock, the lock can be hooked and locked by itself according to the relative position of the lock hook and the hook groove.
由于该物流托盘用于装在货物,对托板顶部及底框的底部的平整性有要求,因此第二开孔以及第三开孔分别远离垫块的一端为沉孔设置;第一钉帽以及第二钉帽为沉头设置,并分别卧在第二开孔及第三开孔的沉内。从而避免第一钉帽及第二钉帽高出托盘及底框的表面。Since the logistics pallet is used for loading goods, the flatness of the top of the pallet and the bottom of the bottom frame are required. Therefore, the second opening and the third opening are respectively set at the end away from the pad as a counterbore; the first nail cap And the second nail cap is provided with a countersunk head, and lies in the sink of the second opening and the third opening respectively. Therefore, the first nail cap and the second nail cap are prevented from rising above the surface of the tray and the bottom frame.
上述设置中,为解决该物流托盘的拆解问题,由于锁钉及锁扣均在第一开孔、第二开孔及第三开孔内完成对接锁紧,因此很难对锁扣的锁钩进行解锁。为此将锁钉的第一钉帽设置成开拆卸结构,通过螺杆与钉尖进行连接,因此在对该物流托盘拆解中,通过螺丝刀将第一钉帽卸下,缺少第一钉帽的约束后,锁扣可向第三开孔外拔出,在锁扣的拔出过程中,锁钩挂钉尖一起带出,从而解决了该物流托盘的拆解问题。其中第一钉帽的头部可以是十字口、一字口、内六方口、内六角口设置。In the above setting, in order to solve the problem of disassembling the logistics tray, since the lock nails and the locks are all docked and locked in the first opening, the second opening and the third opening, it is difficult to lock the lock. Hook to unlock. To this end, the first nail cap of the lock nail is set as an detachable structure, which is connected to the nail tip by a screw. Therefore, in the disassembly of the logistics tray, the first nail cap is removed by a screwdriver. After being restrained, the lock buckle can be pulled out of the third opening. During the pull-out process of the lock buckle, the hook nails are brought out together, thereby solving the problem of disassembling the logistics tray. The head of the first nail cap may be provided with a cross mouth, a flat mouth, an inner hexagonal mouth, and an inner hexagonal mouth.
上述设置中,为解决第一钉帽拆卸过程中,钉尖与第一钉帽一起转动而导致的拆卸失败问题,为此专门在钉尖部位不影响撑开锁钩的头部而设立了六方槽,此外该六方槽完全可以由内六角形的凹槽、十字口凹槽、一字口凹槽所代替,其具体形状的定义根据常用工具特征所决定,所谓的工具特征包括工具杆部的直径,及长度,以便工具可顺利的穿过锁扣的中空部位并与钉尖部的凹槽接触配合。In the above setting, in order to solve the problem of disassembly failure caused by the rotation of the nail tip and the first nail cap during the disassembly of the first nail cap, a hexagonal groove was set up at the nail tip portion without affecting the head of the locking hook. In addition, the hexagonal groove can be replaced by a hexagonal groove, a cross groove, and a flat groove. The definition of the specific shape is determined by the common tool characteristics. The so-called tool characteristics include the diameter of the tool shaft. , And length, so that the tool can smoothly pass through the hollow part of the lock and contact with the groove of the nail tip.
上述设置中,为了弥补锁钉及锁扣应对剪切力不足所设置,其中的缓冲块大头部位嵌入在垫块的第一凹坑内,并只将小头部位露出,使得上下两端安装有缓冲块的垫块实现插锁结构。而托板及连接梁上的第二凹坑分别与垫块上下两端的缓冲块的小头配合。由于该缓冲块的大头及小头的侧壁分别与第一凹坑、第二凹坑的侧壁紧配合,因此消除托板与垫块之间、底框与垫块之间的横向间隙,从而起到剪切力补强的作用。In the above setting, in order to compensate for the insufficient shear force of the lock nail and the lock, the large head portion of the buffer block is embedded in the first recess of the cushion block, and only the small head portion is exposed, so that the upper and lower ends are installed. The cushion block of the buffer block realizes the mortise lock structure. The second recesses on the supporting plate and the connecting beam are respectively matched with the small heads of the buffer blocks at the upper and lower ends of the cushion block. Because the side walls of the large head and the small head of the buffer block are tightly matched with the side walls of the first recess and the second recess, respectively, the lateral gap between the pallet and the pad, and between the bottom frame and the pad is eliminated. So as to strengthen the shearing force.
该缓冲块的可以为实心设置,也可以为空心设置。当实心设置时可通过其材质的韧性与弹性实现剪切力缓冲的作用;而当空心设置时,在遭受剪切应力时,缓冲块可通过结构变形进行冲击力的缓冲。The buffer block may be provided in a solid or hollow manner. When it is solidly set, it can achieve the effect of shearing force buffering through the toughness and elasticity of its material; when it is hollowly set, when subjected to shearing stress, the buffering block can buffer the impact force through structural deformation.
上述设置中,为防止承重后的物流托盘在移动过程中将垫块挤坏。而在两根相邻的连接梁的连接处,以及单根连接梁的居中位置与垫块进行连接,可更好的发挥连接梁的补强作用。In the above setting, in order to prevent the load-bearing logistics pallet from crushing the pad during the moving process. The connection between two adjacent connecting beams and the central position of a single connecting beam with the cushion block can better play the reinforcing effect of the connecting beam.
上述设置中,为避免连接梁与叉壁发生撞击而损坏,因此通过斜倒角实现叉壁的引导租用,防止叉壁与连接梁外侧壁发生硬撞击的现象。In the above setting, in order to avoid the damage caused by the collision between the connecting beam and the fork wall, the guide renting of the fork wall is realized by the oblique chamfer to prevent the hard collision between the fork wall and the outer side wall of the connecting beam.
另外垫块的外侧的两条竖棱也可用作叉车叉壁的导向作用,因此同样可为斜倒角设置。In addition, the two vertical edges on the outside of the pad can also be used as a guide for the fork wall of the forklift, so it can also be set for oblique chamfering.
其中第一包边上下两壁与托板上侧及下侧贴合,而托板外侧壁与第一包边的内侧壁留有空隙,该空隙用于第一包边碰撞变形区,因此当该物流托盘在运输过程中受到外力碰撞后,第一包边通过变形对冲击力进行缓冲,从而保护托板不被冲击力破坏。第一包边为可更换设计,因此当第一包边完全损毁后可通过更换新的第一包边来延长物流托盘的使用寿命。同时可通过对第一包边的材质设定,来掌控缓冲力度,如:不锈钢材质、橡胶材质、复核材质等。The upper and lower two walls of the first hemming are attached to the upper and lower sides of the pallet, and a gap is left between the outer side wall of the pallet and the inner side of the first hemming. This gap is used for the first hemming collision deformation zone. After the logistics pallet is impacted by an external force during transportation, the first hemming buffers the impact force through deformation, thereby protecting the pallet from being damaged by the impact force. The first hemming is designed to be replaceable, so when the first hemming is completely damaged, the service life of the logistics tray can be extended by replacing the first hemming with a new one. At the same time, you can control the cushioning strength by setting the material of the first hemming, such as stainless steel, rubber, and review materials.
另外的第二包边用于对连接梁的斜倒角进行保护,防止连接梁被叉车叉 壁的挤压摩擦而损害,同时金属或坚硬材质的第二包边可更顺利的对叉车叉壁进行引导作用,从而使得叉壁更顺利插入物流托盘的空隙内。Another second hemming is used to protect the inclined chamfer of the connecting beam to prevent the connecting beam from being damaged by the crushing friction of the forklift fork wall. At the same time, the second hemming of the metal or hard material can smooth the forklift fork wall. The guiding function is performed, so that the fork wall can be smoothly inserted into the gap of the logistics tray.
在上述第一包边与托板配合处以及第二包边与连接梁的配合处均设有下凹面,该小凹面的深度分别与对应的第一包边及第二包边的厚度一致,因此当托板及连接梁分别安装上第一包边及第二包边后,第一包边与第二包边的外表面不会高出托板及连接梁的表面,并使托板及连接梁始终具有平整的外部结构。A concave surface is provided at the above-mentioned matching place of the first covering edge and the supporting plate and the matching place of the second covering edge and the connecting beam, and the depth of the small concave surface is consistent with the thickness of the corresponding first covering edge and the second covering edge, respectively. Therefore, when the supporting plate and the connecting beam are installed with the first and second hemmings respectively, the outer surfaces of the first and second hemming will not be higher than the surface of the supporting plate and the connecting beam, and the supporting plate and the connecting beam will be The connecting beam always has a flat external structure.
为了更快捷的对第一包边及第二包边进行安装,该物流托盘在生产线的制造过程中,首先将第一包边定位在托板的四周,此时通过冲压机械的冲头对牙盘中央进行冲压,其中的冲头直径等于或略小于牙盘孔直径,并且冲头前端为锥形或球形设置,在冲头的冲压过程中,先与牙盘内的尖牙头部接触,并使尖牙向下卷曲变形,并向托板的贯通口内翻卷,随着冲头的下行,牙盘内的各个尖牙翻卷幅度变大,直至尖牙头部的尖端刺入托板的贯通孔内侧壁内,第一包边在牙盘在尖牙的与贯通孔的配合下牢牢的固定在托板四周。同理,第二包边与连接梁同样通过冲压方式进行固定,从而省去了螺丝安装的繁琐步骤,节省了生产力的投入。In order to install the first hemming and the second hemming more quickly, during the manufacturing process of the production line, the first hemming is first positioned around the pallet, and the teeth are punched by the punch of the stamping machine. The center of the plate is punched. The diameter of the punch is equal to or slightly smaller than the diameter of the crank hole, and the front end of the punch is set in a conical or spherical shape. During the punching process of the punch, it first contacts the head of the canine in the crank. The canine is curled and deformed downward, and rolled into the through-hole of the pallet. As the punch descends, the amplitude of each canine in the dental plate is increased until the tip of the head of the canine penetrates the penetration of the pallet. In the inner side wall of the hole, the first edging is firmly fixed on the periphery of the supporting plate with the cooperation of the canine teeth and the through hole. In the same way, the second hemming and the connecting beam are also fixed by stamping, thereby eliminating the tedious steps of screw installation and saving productivity investment.
此外,当托板、垫块、连接梁为木制材料时,可分别在托板上侧及连接梁的底侧对应垫块区域进行钢钉连接。该钢钉用于对锁钉及锁扣的配合进行补强,从而大大提升了该物流托盘的安装强度。In addition, when the supporting plate, the spacer and the connecting beam are made of wooden material, steel nail connections can be performed on the upper side of the supporting plate and the corresponding side of the spacer on the bottom side of the connecting beam. The steel nail is used to reinforce the cooperation of the lock nail and the lock buckle, thereby greatly improving the installation strength of the logistics pallet.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明锁定预锁扣配合示意图;FIG. 1 is a schematic diagram of a locking pre-locking buckle according to the present invention;
图2为本发明锁钉与锁扣整体示意图;FIG. 2 is an overall schematic diagram of a locking nail and a locking buckle according to the present invention; FIG.
图3为本发明锁钉单体示意图;FIG. 3 is a schematic diagram of a locking nail unit according to the present invention; FIG.
图4为本发明锁扣单体示意图;FIG. 4 is a schematic diagram of a lock unit according to the present invention; FIG.
图5为本发明缓冲块安装示意图;5 is a schematic diagram of installing a buffer block according to the present invention;
图6为本发明缓冲块又一安装示意图;6 is another schematic diagram of installing a buffer block according to the present invention;
图7为本发明连接梁配合示意图Figure 7 is a schematic diagram of the fitting of the connecting beam of the present invention
图8为本发明包边冲铆后的尖牙部分示意图;8 is a schematic diagram of a portion of a canine after the riveting and riveting of the present invention;
图9为本发明第一包边对角部示意图;9 is a schematic diagram of a diagonal portion of a first hemming of the present invention;
图10为本发明包边尖牙铆冲方法示意图;FIG. 10 is a schematic diagram of a method of riveting a cannulated edge tooth according to the present invention; FIG.
图11为本发明钢钉结构示意图;11 is a schematic diagram of a steel nail structure of the present invention;
具体实施方式detailed description
下面将结合本发明实施例中的附图进行详细描述。Detailed description will be given below with reference to the accompanying drawings in the embodiments of the present invention.
根据图1、图2、图3、图4,一种物流托盘,主要包括:托板1,托板1为水平设置的平板结构;底框2,底框2为水平设置的框架结构,并且底框2外轮廓与托板1外轮廓相近;底框2朝上的一侧设有多个垫块3,垫块3为矩形体设置,并且垫块3的顶部与托板1底侧接触;垫块3沿竖直方向设有多个贯通的第一开孔4,并且托板1对应第一开孔4设有贯通的第二开孔5,底框2对应第一开孔4设有贯通的第三开孔6;第二开孔5、第三开孔6与第一开孔4的内径相同;锁钉,锁钉为包含钉尖8及第一钉帽9的圆钉结构,并且锁钉在靠近钉尖8一端的外侧壁环周向设有钩槽10;锁钉的钉尖8穿入第二开孔5,并向第一开孔4方向延伸;锁扣11,锁扣11为包含第二钉帽12及钉筒13的空心铆钉结构,并且钉筒13在远离第二钉帽12的一端连接设有多个钩尖朝向锁扣11轴心方向的锁钩14;锁扣11的锁钩14及钉筒13穿入第三开孔6,并向第一开孔4方向延伸;锁扣11的各个锁钩14与锁钉的钩槽配合;第一钉帽9及第二钉帽12通过锁钉与锁扣11的配合对托板1及底框2施加向垫块3方向的拉力。According to FIG. 1, FIG. 2, FIG. 3, and FIG. 4, a logistics pallet mainly includes: a pallet 1, the pallet 1 is a flat structure arranged horizontally; a bottom frame 2, the bottom frame 2 is a horizontally arranged frame structure, and The outer contour of the bottom frame 2 is similar to the outer contour of the pallet 1. The side of the bottom frame 2 facing upward is provided with a plurality of pads 3, which are arranged in a rectangular shape, and the top of the pad 3 is in contact with the bottom side of the pallet 1. ; The pad 3 is provided with a plurality of first through holes 4 in the vertical direction, and the supporting plate 1 is provided with a second through hole 5 corresponding to the first opening 4, and the bottom frame 2 is provided corresponding to the first opening 4. The third opening 6 has a through hole; the inner diameters of the second opening 5 and the third opening 6 are the same as those of the first opening 4; the locking nail is a round nail structure including a nail tip 8 and a first nail cap 9 And the lock nail is provided with a hook groove 10 in the circumferential direction of the outer side wall ring near one end of the nail tip 8; the nail tip 8 of the lock nail penetrates into the second opening 5 and extends toward the first opening 4; the lock buckle 11, the lock buckle 11 is a hollow rivet structure including the second nail cap 12 and the nail barrel 13, and the nail barrel 13 is connected at one end remote from the second nail cap 12 with a plurality of lock hooks 14 with hook tips facing the axial direction of the lock 11; Hook 14 with buckle 11 and The barrel 13 penetrates the third opening 6 and extends in the direction of the first opening 4; each lock hook 14 of the lock 11 cooperates with the hook groove of the lock nail; the first nail cap 9 and the second nail cap 12 pass through the lock nail The cooperation with the lock buckle 11 exerts a pulling force in the direction of the pad 3 on the supporting plate 1 and the bottom frame 2.
该物流托盘在组装过程中,通过锁钉及锁扣11的配合完成托板1与底框 2及垫块3的组装固定工序,由于锁钉及锁扣11不需要螺纹配合,只需将锁钉的钉尖8部对齐锁扣11的钉筒13中心并施加一个轴向的外力,因锁扣11上的锁钩14根据材料的选择为弹性设置,因此锁钉的钉尖8向锁筒内插入的过程中,将锁钩14向外撑开,直至锁钩14滑动至锁钉的钩槽钩槽10处,在弹力的作用下,锁钩14向内回位并钩挂在钩槽内完成定位固定过程。During the assembly process of the logistics pallet, the assembly and fixing process of the pallet 1 with the bottom frame 2 and the pad 3 is completed through the cooperation of the lock nails and the lock buckles 11, because the lock nails and the lock buckles 11 do not need thread cooperation, only the lock The 8 nail tips are aligned with the center of the nail barrel 13 of the lock buckle 11 and an axial external force is applied. Since the lock hook 14 on the lock buckle 11 is elastically set according to the selection of the material, the nail tips 8 of the nail are directed to the lock cylinder. During the insertion process, the lock hook 14 is spread outward until the lock hook 14 slides to the hook groove 10 of the lock nail. Under the action of the elastic force, the lock hook 14 returns inward and is hooked in the hook groove. Within the positioning and fixing process.
此外为了适应多个厚度的安装范围,锁钉靠近钉尖8部的钩槽为多条设置,因此锁扣11上的锁钩14在安装过程中的轴向作用力的作用下,依次钩挂在不同的钩槽内,并最终停留在适当的钩槽中完成紧固作用。In addition, in order to adapt to the installation range of multiple thicknesses, the hook grooves near the nail tips 8 are provided in multiple rows, so the lock hooks 14 on the lock buckle 11 are sequentially hooked under the action of the axial force during the installation process. In different hook grooves, and finally stay in the appropriate hook groove to complete the fastening effect.
另外锁扣11的锁扣11也可设置成多层钩结构,因此在锁钉与锁扣11的压紧安装中,可根据锁钩14与钩槽的相对位置自行钩挂锁紧。In addition, the lock buckle 11 of the lock buckle 11 can also be provided with a multi-layer hook structure. Therefore, in the pressing installation of the lock nail and the lock buckle 11, the lock hook 14 can be hooked and locked by itself according to the relative position of the lock hook 14 and the hook groove.
作为优选实施例,由于该物流托盘用于装在货物,对托板1顶部及底框2的底部的平整性有要求,因此第二开孔5以及第三开孔6分别远离垫块3的一端为沉孔设置;第一钉帽以及第二钉帽12为沉头设置,并分别卧在第二开孔5及第三开孔6的沉内。从而避免第一钉帽9及第二钉帽12高出托盘及底框2的表面。As a preferred embodiment, since the logistics pallet is used for loading goods, the flatness of the top of the pallet 1 and the bottom of the bottom frame 2 is required, so the second opening 5 and the third opening 6 are far away from the pad 3, respectively. One end is provided with a counterbore; the first nail cap and the second nail cap 12 are provided with a countersunk head, and lie in the sinks of the second opening 5 and the third opening 6 respectively. Therefore, the first nail cap 9 and the second nail cap 12 are prevented from rising above the surface of the tray and the bottom frame 2.
根据图2,作为优选实施例,锁钉的第一钉帽9与钉尖8为分体设置;钉尖8靠近第一钉帽9的一端同轴设有螺孔15,第一钉帽9靠近钉尖8的一端同轴连接设有螺杆16,螺杆16与螺孔15配合;第一钉帽9远离钉尖8的一端设有与螺丝刀配合的十字口。According to FIG. 2, as a preferred embodiment, the first nail cap 9 and the nail tip 8 of the lock nail are provided separately; one end of the nail tip 8 near the first nail cap 9 is provided with a screw hole 15 coaxially, and the first nail cap 9 A screw 16 is coaxially connected to an end near the nail tip 8, and the screw 16 cooperates with the screw hole 15; an end of the first nail cap 9 remote from the nail tip 8 is provided with a cross opening that cooperates with a screwdriver.
上述设置的目的为解决该物流托盘的拆解问题,由于锁钉及锁扣11均在第一开孔4、第二开孔5及第三开孔6内完成对接锁紧,因此很难对锁扣11的锁钩14进行解锁。为此将锁钉的第一钉帽9设置成开拆卸结构,通过螺杆16与钉尖8进行连接,因此在对该物流托盘拆解中,通过螺丝刀将第一钉帽9卸下,缺少第一钉帽9的约束后,锁扣11可向第三开孔6外拔出,在锁扣 11的拔出过程中,锁钩14钩挂钉尖8一起带出,从而解决了该物流托盘的拆解问题。其中第一钉帽9的头部可以是十字口、一字口、内六方口、内六角口设置。The purpose of the above setting is to solve the problem of disassembling the logistics tray. Since the lock nails and the buckle 11 are all docked and locked in the first opening 4, the second opening 5, and the third opening 6, it is difficult to align The hook 14 of the lock 11 is unlocked. To this end, the first nail cap 9 of the lock nail is set as an detachable structure, and the screw tip 16 is connected to the nail tip 8. Therefore, in the disassembly of the logistics tray, the first nail cap 9 is removed by a screwdriver, and the first After being restrained by a nail cap 9, the lock buckle 11 can be pulled out of the third opening 6. During the pull-out process of the lock buckle 11, the lock hook 14 is brought out together with the nail tip 8, thereby solving the logistics tray. Disassembly problem. The head of the first nail cap 9 can be provided with a cross mouth, a flat mouth, an inner hexagonal mouth, and an inner hexagonal mouth.
作为优选实施例,锁钉的钉尖8部设有沿轴线向内延伸的六方槽17,六方槽17与内六方扳手配合,用于固定或旋转锁钉;六方槽17外径小于锁扣11的中空部位内经。As a preferred embodiment, the nail tips 8 are provided with hexagonal grooves 17 extending inward along the axis. The hexagonal grooves 17 cooperate with internal hexagonal wrenches to fix or rotate the nails; the outer diameter of the hexagonal grooves 17 is smaller than the lock buckle 11 Inner cavity of the hollow part.
上述设置的目的是为解决第一钉帽9拆卸过程中,钉尖8与第一钉帽9一起转动而导致的拆卸失败问题,为此专门在钉尖8部位不影响撑开锁钩14的头部而设立了六方槽17,此外该六方槽17完全可以由内六角形的凹槽、十字口凹槽、一字口凹槽所代替,其具体形状的定义根据常用工具特征所决定,所谓的工具特征包括工具杆部的直径,及长度,以便工具可顺利的穿过锁扣11的中空部位并与钉尖8部的凹槽接触配合。The purpose of the above setting is to solve the problem of disassembly failure caused by the rotation of the nail tip 8 and the first nail cap 9 during the disassembly of the first nail cap 9. Therefore, the head of the locking hook 14 is not affected at the position of the nail tip 8. Hexagonal grooves 17 are set up in addition to this. In addition, the hexagonal grooves 17 can be replaced by internal hexagonal grooves, cross grooves, and flat grooves. The definition of the specific shape is determined by the characteristics of commonly used tools. The tool features include the diameter and length of the tool shank, so that the tool can smoothly pass through the hollow portion of the lock buckle 11 and contact with the groove of the nail tip 8.
根据图5,作为优选实施例,垫块3的上下两端分别在不与第一开孔4重叠区域设有竖直方向延伸的第一凹坑18;托板1与底框2分别对应第一凹坑18设有同轴的第二凹坑19;第二凹坑19直径略小于第一凹坑18直径,并且第二凹坑19与第一凹坑18形成一个截面呈“凸”字形的空间,空间内设有剖面呈“凸”形的缓冲块20;缓冲块20为腔体设置。According to FIG. 5, as a preferred embodiment, the upper and lower ends of the cushion block 3 are respectively provided with a first recess 18 extending vertically in an area that does not overlap with the first opening 4; the supporting plate 1 and the bottom frame 2 respectively correspond to the first A recess 18 is provided with a coaxial second recess 19; the diameter of the second recess 19 is slightly smaller than the diameter of the first recess 18, and the second recess 19 and the first recess 18 form a "convex" cross section. The space is provided with a buffer block 20 having a “convex” cross-section in the space; the buffer block 20 is provided for the cavity.
另外,根据图6,还可通过将缓冲块20设置成普通圆柱体的形式来降低生产加工成本,同时是第一凹坑18、第二凹坑19均与圆柱状的缓冲块20的外径相对应。In addition, according to FIG. 6, the production and processing costs can also be reduced by setting the buffer block 20 in the form of an ordinary cylinder. At the same time, both the first and second dimples 18 and 19 and the outer diameter of the cylindrical buffer block 20 can be reduced. Corresponding.
上述设置的目的是为了弥补锁钉及锁扣11应对剪切力不足所设置,其中的缓冲块20大头部位嵌入在垫块3的第一凹坑18内,并只将小头部位露出,使得上下两端安装有缓冲块20的垫块3实现插锁结构。而托板1及连接梁21上的第二凹坑19分别与垫块3上下两端的缓冲块20的小头配合。由于该缓 冲块20的大头及小头的侧壁分别与第一凹坑18、第二凹坑19的侧壁紧配合,因此消除托板1与垫块3之间、底框2与垫块3之间的横向间隙,从而起到剪切力补强的作用。The purpose of the above setting is to make up for the lack of shearing force of the lock nail and the buckle 11. The large head portion of the buffer block 20 is embedded in the first recess 18 of the pad 3 and only the small head portion is exposed. The pad block 3 with the buffer block 20 installed at the upper and lower ends thereof realizes the mortise lock structure. The second recesses 19 on the supporting plate 1 and the connecting beam 21 cooperate with the small heads of the cushion blocks 20 at the upper and lower ends of the cushion block 3, respectively. Since the side walls of the large head and the small head of the buffer block 20 fit tightly with the side walls of the first recess 18 and the second recess 19, respectively, the space between the pallet 1 and the cushion block 3, and the bottom frame 2 and the cushion block are eliminated. The horizontal gap between 3, which plays a role of reinforcing shear force.
该缓冲块20的可以为实心设置,也可以为空心设置。当实心设置时可通过其材质的韧性与弹性实现剪切力缓冲的作用;而当空心设置时,在遭受剪切应力时,缓冲块20可通过结构变形进行冲击力的缓冲。The buffer block 20 may be provided in a solid state or in a hollow state. When it is solidly set, it can achieve the effect of shearing force buffering through the toughness and elasticity of its material; when it is hollowly set, when subjected to shearing stress, the cushioning block 20 can buffer the impacting force through structural deformation.
根据图7,作为优选实施例,底框2由多根在同一水平面内横纵拼接的连接梁21构成;垫块3设置在连接梁21的中部及连接处。According to FIG. 7, as a preferred embodiment, the bottom frame 2 is composed of a plurality of connecting beams 21 that are horizontally and longitudinally spliced in the same horizontal plane; the cushion block 3 is disposed at the middle portion and the connection of the connecting beam 21.
上述设置的目的在于对垫块3底部进行横向约束,防止承重后的物流托盘在移动过程中将垫块3挤坏。而在两根相邻的连接梁21的连接处,以及单根连接梁21的居中位置与垫块3进行连接,可更好的发挥连接梁21的补强作用。The purpose of the above setting is to horizontally restrain the bottom of the pad 3 to prevent the load-bearing logistics pallet from crushing the pad 3 during the movement. The connection between two adjacent connecting beams 21 and the center position of a single connecting beam 21 is connected to the pad 3, so that the reinforcing effect of the connecting beam 21 can be better exerted.
根据图7,作为优选实施例,底框2的四周,在不与垫块3重叠并靠近垫块3的一侧设有斜倒角22。According to FIG. 7, as a preferred embodiment, an oblique chamfer 22 is provided around the bottom frame 2 on a side that does not overlap with the cushion block 3 and is close to the cushion block 3.
上述设置的目的在于叉车作业中,叉壁经常会与连接梁21发生撞击,因此通过该斜倒角22实现叉壁的引导租用,防止叉壁与连接梁21外侧壁发生硬撞击的现象。The purpose of the above setting is that the fork wall often collides with the connecting beam 21 during forklift operation. Therefore, the inclined chamfer 22 is used to guide and rent the fork wall to prevent the hard collision between the fork wall and the outer wall of the connecting beam 21.
另外垫块3的外侧的两条竖棱也可用作叉车叉壁的导向作用,因此同样可为斜倒角22设置。In addition, the two vertical edges on the outer side of the cushion block 3 can also be used as a guide for the fork wall of the forklift, so it can also be provided for the oblique chamfer 22.
根据图8、图9、图10作为优选实施例,托板1四周设有第一包边23,第一包边23断面呈横置的“U”形设置;底框2四周对应斜倒角22部位设有第二包边24,第二包边24与连接梁21外侧壁贴合设置。According to FIG. 8, FIG. 9 and FIG. 10 as a preferred embodiment, a first edging 23 is provided around the pallet 1, and the cross-section of the first edging 23 is arranged in a horizontal “U” shape; The 22 portion is provided with a second edging 24, and the second edging 24 is in close contact with the outer side wall of the connecting beam 21.
其中第一包边23上下两壁与托板1上侧及下侧贴合,而托板1外侧壁与第一包边23的内侧壁留有空隙,该空隙用于第一包边23碰撞变形区,因此 当该物流托盘在运输过程中受到外力碰撞后,第一包边23通过变形对冲击力进行缓冲,从而保护托板1不被冲击力破坏。第一包边23为可更换设计,因此当第一包边23完全损毁后可通过更换新的第一包边23来延长物流托盘的使用寿命。同时可通过对第一包边23的材质设定,来掌控缓冲力度,如:不锈钢材质、橡胶材质、复核材质等。The upper and lower walls of the first hemming edge 23 are attached to the upper and lower sides of the pallet 1, and the outer wall of the pallet 1 and the inner side wall of the first hemming 23 leave a gap, which is used for the collision of the first hemming 23. Deformation zone, so when the logistics pallet is impacted by an external force during transportation, the first edging 23 cushions the impact force through deformation, thereby protecting the pallet 1 from being damaged by the impact force. The first hemming edge 23 is a replaceable design, so when the first hemming edge 23 is completely damaged, the service life of the logistics tray can be extended by replacing the new first hemming edge 23. At the same time, it is possible to control the buffering strength by setting the material of the first hemming 23, such as stainless steel, rubber, and review materials.
另外的第二包边24用于对连接梁21的斜倒角22进行保护,防止连接梁21被叉车叉壁的挤压摩擦而损害,同时金属或坚硬材质的第二包边24可更顺利的对叉车叉壁进行引导作用,从而使得叉壁更顺利插入物流托盘的空隙内。Another second hemming 24 is used to protect the inclined chamfer 22 of the connecting beam 21 to prevent the connecting beam 21 from being damaged by the friction of the forklift fork wall. At the same time, the second hemming 24 of metal or hard material can be smoother. It guides the forklift fork wall so that the fork wall can be inserted into the gap of the logistics pallet more smoothly.
在上述第一包边23与托板1配合处以及第二包边24与连接梁21的配合处均设有下凹面,该小凹面的深度分别与对应的第一包边23及第二包边24的厚度一致,因此当托板1及连接梁21分别安装上第一包边23及第二包边24后,第一包边23与第二包边24的外表面不会高出托板1及连接梁21的表面,并使托板1及连接梁21始终具有平整的外部结构。A concave surface is provided at the joint between the first hem 23 and the pallet 1 and the joint between the second hem 24 and the connecting beam 21, and the depth of the small concave surface is corresponding to that of the first hem 23 and the second hem respectively. The thickness of the edge 24 is the same, so when the pallet 1 and the connecting beam 21 are respectively installed with the first edge 23 and the second edge 24, the outer surfaces of the first edge 23 and the second edge 24 will not be higher than the edge. The surfaces of the plate 1 and the connecting beam 21 make the supporting plate 1 and the connecting beam 21 always have a flat external structure.
根据图5,作为优选实施例,为了更快捷的对第一包边23及第二包边24进行安装,托板1以及连接梁21分别在第一包边23及第二包边24覆盖区域内设有竖直贯通的冲孔;第一包边23及第二包边24分别对应冲孔设有贯通的牙盘孔,牙盘孔内侧壁环周向设有多个向圆心方向延伸的尖牙26;各个尖牙26使牙盘孔呈“米”字形开口状,因此该压盘孔可通过线切割、激光切割的方式来完成加工。According to FIG. 5, as a preferred embodiment, in order to more quickly install the first hemming 23 and the second hemming 24, the pallet 1 and the connecting beam 21 cover the areas of the first hemming 23 and the second hemming 24, respectively. There are vertical punching holes inside; the first hemming 23 and the second hemming 24 are respectively provided with penetrating sprocket holes corresponding to the punching holes. A plurality of tines extending in the direction of the center of the circle are circumferentially provided on the inner side wall of the sprocket hole. 26; each canine 26 makes the tooth plate opening in a "meter" shape, so the pressing plate hole can be processed by wire cutting and laser cutting.
另外第一包边23可在设有压盘孔的区域进行加宽宽处理,而在普通的缓冲功能区内做窄边设置,因此在生产过程中可大大的减少包边用料。In addition, the first hemming edge 23 can be widened and widened in the area provided with the platen hole, and the narrow edge is set in the ordinary buffer function area, so the hemming material can be greatly reduced during the production process.
该物流托盘在生产线的制造过程中,首先将第一包边23定位在托板1的四周,此时通过冲压机械的冲头对牙盘中央进行冲压,其中的冲头直径等于或略小于牙盘孔直径,并且冲头前端为锥形或球形设置,在冲头的冲压过程 中,先与牙盘内的尖牙26头部接触,并使尖牙26向下卷曲变形,并向托板1的贯通口内翻卷,随着冲头的下行,牙盘内的各个尖牙26翻卷幅度变大,直至尖牙26头部的尖端刺入托板1的贯通孔内侧壁内,第一包边23在牙盘在尖牙26的与贯通孔的配合下牢牢的固定在托板1四周。同理,第二包边24与连接梁21同样通过冲压方式进行固定,从而省去了螺丝安装的繁琐步骤,节省了生产力的投入。In the manufacturing process of the production line of the logistics pallet, the first hemming 23 is first positioned around the pallet 1. At this time, the center of the crankset is punched by a punch of a stamping machine, wherein the punch diameter is equal to or slightly smaller than the tooth. The diameter of the disk hole, and the front end of the punch is set in a conical or spherical shape. During the punching process of the punch, it first contacts the head of the canine 26 in the dental plate, and causes the canine 26 to curl downward and deform, and to the pallet. The through-hole of 1 is rolled up. As the punch descends, each canine 26 in the chainring rolls up until the tip of the head of the canine 26 penetrates into the inner wall of the through-hole of the pallet 1. The first hemming 23 The tooth plate is firmly fixed around the support plate 1 with the cooperation of the canine 26 and the through hole. In the same way, the second hemming 24 is fixed by the punching method in the same way as the connecting beam 21, thereby eliminating the tedious steps of screw installation and saving the investment in productivity.
根据图11,作为优选实施例,当托板1、垫块3、连接梁21为木制材料时,可分别在托板1上侧及连接梁21的底侧对应垫块3区域进行钢钉27连接。该钢钉27用于对锁钉及锁扣11的配合进行补强,从而大大提升了该物流托盘的安装强度。另外为了使钢钉27更加的牢靠,钢钉27可选用麻花钉。According to FIG. 11, as a preferred embodiment, when the pallet 1, the spacer 3, and the connecting beam 21 are made of wooden material, steel nails can be performed on the upper side of the pallet 1 and the bottom side of the connecting beam 21 corresponding to the region of the spacer 3, respectively. 27 connections. The steel nail 27 is used to reinforce the cooperation of the lock nail and the lock buckle 11, thereby greatly improving the installation strength of the logistics tray. In addition, in order to make the steel nails 27 more secure, twist nails can be used for the steel nails 27.
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, it will remain the same for those skilled in the art. Modifications to the technical solutions described in the foregoing embodiments, or equivalent replacement of some of the technical features may be made. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention shall be included in Within the scope of the present invention.

Claims (9)

  1. 一种物流托盘,其特征在于,包括:A logistics pallet, characterized in that it includes:
    托板(1),所述托板(1)为水平设置的平板结构;A supporting plate (1), the supporting plate (1) is a flat structure arranged horizontally;
    底框(2),所述底框(2)为水平设置的框架结构,并且所述底框(2)外轮廓与所述托板(1)外轮廓相近;所述底框(2)朝上的一侧设有多个垫块(3),所述垫块(3)为矩形体设置,并且所述垫块(3)的顶部与所述托板(1)底侧接触;A bottom frame (2), the bottom frame (2) is a horizontally arranged frame structure, and an outer contour of the bottom frame (2) is similar to an outer contour of the pallet (1); the bottom frame (2) faces A plurality of pads (3) are arranged on one side, the pads (3) are arranged in a rectangular body, and the top of the pads (3) are in contact with the bottom side of the pallet (1);
    所述垫块(3)沿竖直方向设有多个贯通的第一开孔(4),并且所述托板(1)对应所述第一开孔(4)设有贯通的第二开孔(5),所述底框(2)对应所述第一开孔(4)设有贯通的第三开孔(6);所述第二开孔(5)、所述第三开孔(6)与所述第一开孔(4)的内径相同;The cushion block (3) is provided with a plurality of through first openings (4) in a vertical direction, and the supporting plate (1) is provided with a through second opening corresponding to the first opening (4). Hole (5), the bottom frame (2) corresponding to the first opening (4) is provided with a through third opening (6); the second opening (5), the third opening (6) same as the inner diameter of the first opening (4);
    锁钉,所述锁钉为包含钉尖(8)及第一钉帽(9)的圆钉结构,并且所述锁钉在靠近所述钉尖(8)一端的外侧壁环周向设有钩槽(10);所述锁钉的所述钉尖(8)穿入所述第二开孔(5),并向所述第一开孔(4)方向延伸;The nail is a round nail structure including a nail tip (8) and a first nail cap (9), and a hook groove is provided in the circumferential direction of the outer side wall of the lock nail near one end of the nail tip (8). (10); the nail tip (8) of the lock nail penetrates into the second opening (5) and extends in the direction of the first opening (4);
    锁扣(11),所述锁扣(11)为包含第二钉帽(12)及钉筒(13)的空心铆钉结构,并且所述钉筒(13)在远离所述第二钉帽(12)的一端连接设有多个钩尖朝向所述锁扣(11)轴心方向的锁钩(14);所述锁扣(11)的所述锁钩(14)及所述钉筒(13)穿入所述第三开孔(6),并向所述第一开孔(4)方向延伸;A locking buckle (11), which is a hollow rivet structure including a second nail cap (12) and a nail barrel (13), and the nail barrel (13) is away from the second nail cap ( 12) One end is connected with a plurality of hooks (14) with hook tips facing the axial direction of the lock (11); the lock hook (14) of the lock (11) and the nail barrel ( 13) penetrate into the third opening (6) and extend in the direction of the first opening (4);
    所述锁扣(11)的各个所述锁钩(14)与所述锁钉的所述钩槽(10)配合;Each of the lock hooks (14) of the lock buckle (11) cooperates with the hook groove (10) of the lock nail;
    所述第一钉帽(9)及所述第二钉帽(12)通过所述锁钩(14)与所述钩槽(10)的配合对所述托板(1)及所述底框(2)施加向所述垫块(3)方向的拉力。The first nail cap (9) and the second nail cap (12) align the pallet (1) and the bottom frame with the cooperation of the lock hook (14) and the hook groove (10). (2) A pulling force is applied in the direction of the pad (3).
  2. 根据权利要求1所述的物流托盘,其特征在于:所述第二开孔(5)以及所述第三开孔(6)分别远离所述垫块(3)的一端为沉孔设置;所述第一钉帽(9)以及所述第二钉帽(12)为沉头设置,并分别卧在所述第二开孔 (5)及第三开孔(6)的沉孔内。The logistics pallet according to claim 1, characterized in that: one end of the second opening (5) and the third opening (6) respectively far from the cushion block (3) is set as a counterbore; The first nail cap (9) and the second nail cap (12) are provided with countersunk heads, and lie in the counterbores of the second opening (5) and the third opening (6), respectively.
  3. 根据权利要求1所述的物流托盘,其特征在于:所述锁钉的所述第一钉帽(9)与所述钉尖(8)为分体设置;所述钉尖(8)靠近所述第一钉帽(9)的一端同轴设有螺孔(15),所述第一钉帽(9)靠近所述钉尖(8)的一端同轴连接设有螺杆(16),所述螺杆(16)与所述螺孔(15)配合;所述第一钉帽(9)远离所述钉尖(8)的一端设有与螺丝刀配合的十字口。The logistics pallet according to claim 1, characterized in that: the first nail cap (9) and the nail tip (8) of the lock nail are provided separately; the nail tip (8) is close to the One end of the first nail cap (9) is coaxially provided with a screw hole (15), and one end of the first nail cap (9) near the nail tip (8) is coaxially connected with a screw (16). The screw (16) is matched with the screw hole (15); an end of the first nail cap (9) away from the nail tip (8) is provided with a cross opening that cooperates with a screwdriver.
  4. 根据权利要求1所述的物流托盘,其特征在于:所述锁钉的所述钉尖(8)部设有沿轴线向内延伸的六方槽(17),所述六方槽(17)与内六方扳手配合,用于固定或旋转所述锁钉;所述六方槽(17)外径小于所述锁扣(11)的中空部位内经。The logistics pallet according to claim 1, characterized in that the nail tip (8) of the lock nail is provided with a hexagonal groove (17) extending inward along the axis, and the hexagonal groove (17) and the inner A hexagonal wrench is used to fix or rotate the locking nail; the outside diameter of the hexagonal groove (17) is smaller than the internal warp of the hollow portion of the locking buckle (11).
  5. 根据权利要求1所述的物流托盘,其特征在于:所述垫块(3)的上下两端分别在不与所述第一开孔(4)重叠区域设有竖直方向延伸的第一凹坑(18);所述托板(1)与所述底框(2)分别对应所述第一凹坑(18)设有同轴的第二凹坑(19);所述第二凹坑(19)直径略小于所述第一凹坑(18)直径,并且所述第二凹坑(19)与所述第一凹坑(18)形成一个截面呈“凸”字形的空间,所述空间内设有剖面呈“凸”形的缓冲块(20);所述缓冲块(20)为空心设置。The logistics pallet according to claim 1, characterized in that the upper and lower ends of the cushion block (3) are respectively provided with a first recess extending in a vertical direction in a region which does not overlap with the first opening (4). Pit (18); the pallet (1) and the bottom frame (2) are respectively provided with a coaxial second pit (19) corresponding to the first pit (18); the second pit (19) The diameter is slightly smaller than the diameter of the first dimple (18), and the second dimple (19) and the first dimple (18) form a space having a "convex" cross section, and A buffer block (20) having a "convex" cross section is provided in the space; the buffer block (20) is hollow.
  6. 根据权利要求1所述的物流托盘,其特征在于:所述底框(2)由多根在同一水平面内横纵拼接的连接梁(21)构成;所述垫块(3)设置在所述连接梁(21)的中部及连接处。The logistics pallet according to claim 1, characterized in that the bottom frame (2) is composed of a plurality of connecting beams (21) spliced horizontally and vertically in the same horizontal plane; and the cushion block (3) is disposed on the The middle and connection of the connecting beam (21).
  7. 根据权利要求1所述的物流托盘,其特征在于:所述底框(2)的四周,在不与所述垫块(3)重叠并靠近所述垫块(3)的一侧设有斜倒角(22)。The logistics pallet according to claim 1, characterized in that: around the bottom frame (2), a slope is provided on a side that does not overlap with the cushion block (3) and is close to the cushion block (3). Chamfer (22).
  8. 根据权利要求7所述的物流托盘,其特征在于:所述的托板(1)四周设有第一包边(23),所述第一包边(23)断面呈“U”形设置;所述底框(2)四周对应所述斜倒角(22)部位设有第二包边(24),所述第二包边(24)与所述连接梁(21)外侧壁贴合设置。The logistics pallet according to claim 7, characterized in that: the pallet (1) is provided with a first hemming edge (23) all around, and a cross-section of the first hemming (23) is provided in a "U" shape; A second edging (24) is provided around the bottom frame (2) corresponding to the oblique chamfer (22), and the second edging (24) is attached to the outer side wall of the connecting beam (21). .
  9. 根据权利要求8所述的物流托盘,其特征在于:所述托板(1)以及所述连接梁(21)分别在所述第一包边(23)及所述第二包边(24)覆盖区域内设有竖直贯通的冲孔;所述第一包边(23)及所述第二包边(24)分别对应冲孔设有贯通的牙盘孔,所述牙盘孔内侧壁环周向设有多个向圆心方向延伸的尖牙(26);各个所述的尖牙(26)使所述牙盘孔呈“米”字形开口状。The logistics pallet according to claim 8, characterized in that the pallet (1) and the connecting beam (21) are respectively on the first hemming (23) and the second hemming (24) A vertical through punching hole is provided in the covering area; the first hemming edge (23) and the second hemming edge (24) are respectively provided with a through-set crank hole corresponding to the punching hole, and the inner side wall of the crank hole A plurality of tines (26) extending in the direction of the circle center are provided in the circumferential direction of the ring; each of the tines (26) makes the dental mouth hole in a "meter" shape opening shape.
PCT/CN2018/102976 2018-08-24 2018-08-29 Logistics pallet WO2020037698A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810973362.7A CN108891715B (en) 2018-08-24 2018-08-24 Logistics tray
CN201810973362.7 2018-08-24

Publications (1)

Publication Number Publication Date
WO2020037698A1 true WO2020037698A1 (en) 2020-02-27

Family

ID=64358256

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/102976 WO2020037698A1 (en) 2018-08-24 2018-08-29 Logistics pallet

Country Status (2)

Country Link
CN (1) CN108891715B (en)
WO (1) WO2020037698A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111824550A (en) * 2020-07-10 2020-10-27 上海鸿研物流技术有限公司 Tray and connecting piece thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3771410A (en) * 1972-05-01 1973-11-13 Vsi Corp Fastener
US4604014A (en) * 1984-07-12 1986-08-05 Illinois Tool Works Inc. Pallet fastener
EP0381409A1 (en) * 1989-02-01 1990-08-08 Avdel Systems Limited Fastener
US20080105168A1 (en) * 2006-11-08 2008-05-08 Himan Lee Assembly type pallet
CN102562752A (en) * 2012-01-16 2012-07-11 东莞市华恒盛重包装有限公司 Combined rivet
CN103213734A (en) * 2013-05-03 2013-07-24 上海物豪塑料有限公司 Combined hollow plastic tray
CN106428904A (en) * 2016-10-14 2017-02-22 苏州同大机械有限公司 Bi-directional shovel arm cavity assembly type tray
US20180003208A1 (en) * 2016-06-30 2018-01-04 A. Raymond Et Cie Two-piece pallet fastener

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5579686A (en) * 1988-08-09 1996-12-03 Nucon Corporation Plastic pallet assembly
US6898918B2 (en) * 2002-02-25 2005-05-31 Textron Inc. Honeycomb rivet
US20050132937A1 (en) * 2003-12-17 2005-06-23 Branam Joe H. Pallet frame assembly
JP3114177U (en) * 2005-06-28 2005-09-29 秀樹 鈴木 Remover
US7413367B2 (en) * 2006-10-17 2008-08-19 Kenmark Industrial Co., Ltd. Combinational commodity engaging unit
US7837408B2 (en) * 2008-02-29 2010-11-23 Kenmark Industrial Co., Ltd. Board fixing module
SE1150734A1 (en) * 2011-08-08 2013-02-09 Joergen Haglund Pallet
CN202609217U (en) * 2012-05-03 2012-12-19 海尔集团公司 Split bottom support used for physical distribution
CN203111639U (en) * 2013-01-28 2013-08-07 宁波神拓塑业科技有限公司 Installation structure of supporting feet of tray
CN107399489B (en) * 2017-07-24 2023-03-24 开平雅琪塑胶机械模具厂 High-strength pallet tray and mounting method thereof
CN108394612B (en) * 2018-05-03 2024-08-09 贝贝托物流科技(深圳)有限公司 Multifunctional logistics tray
CN209051740U (en) * 2018-08-24 2019-07-02 贝贝托物流科技(深圳)有限公司 Logistics tray

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3771410A (en) * 1972-05-01 1973-11-13 Vsi Corp Fastener
US4604014A (en) * 1984-07-12 1986-08-05 Illinois Tool Works Inc. Pallet fastener
EP0381409A1 (en) * 1989-02-01 1990-08-08 Avdel Systems Limited Fastener
US20080105168A1 (en) * 2006-11-08 2008-05-08 Himan Lee Assembly type pallet
CN102562752A (en) * 2012-01-16 2012-07-11 东莞市华恒盛重包装有限公司 Combined rivet
CN103213734A (en) * 2013-05-03 2013-07-24 上海物豪塑料有限公司 Combined hollow plastic tray
US20180003208A1 (en) * 2016-06-30 2018-01-04 A. Raymond Et Cie Two-piece pallet fastener
CN106428904A (en) * 2016-10-14 2017-02-22 苏州同大机械有限公司 Bi-directional shovel arm cavity assembly type tray

Also Published As

Publication number Publication date
CN108891715A (en) 2018-11-27
CN108891715B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
JP6559205B2 (en) Punch rivet mounting mold and punch rivet mounting method
US8297899B2 (en) Clinch pin fastener
US9249823B2 (en) Self-piercing nut element and component assembly consisting of the nut element and a sheet metal part
US9222502B2 (en) Self-piercing nut element and component assembly comprising the nut element and a sheet metal part
WO2020037698A1 (en) Logistics pallet
CN107476570B (en) Connection component and mounting and dismounting method for Combined formwork and plank sheathing assembly and disassembly
US9261126B2 (en) Rivet bolt in combination with an attachment and process for making same
JP2009534612A (en) Piercing nuts and their use
US8950297B2 (en) Socket with a reinforced strength
US9377043B2 (en) Fastening method using a nail-shaped fastening element
CN208813715U (en) Bamboo and wood logistics tray
KR20090036682A (en) Nut or bolt
US8226341B2 (en) Shock absorbing fastener
JP2000205227A (en) Secured bolt and its securing method
CN209051740U (en) Logistics tray
JP2006250231A (en) Driving-in type fastener
JP3147209U (en) Screw ring nail and its connecting body
EP0181881A1 (en) Rivets
JP4721346B2 (en) Base material connection structure and accessory plate for the base material connection structure
KR200443369Y1 (en) A construction connector
CN204755527U (en) Location turn -ups round pin subassembly
KR102598438B1 (en) Connector Means For Panels And Method For Manufacturing The Same
US20220297277A1 (en) Hammer-cap fastener
TW201235575A (en) Connection
KR20100009744A (en) The method of manufacturing lock nut

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18931186

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 25.06.2021)

122 Ep: pct application non-entry in european phase

Ref document number: 18931186

Country of ref document: EP

Kind code of ref document: A1