WO2019242306A1 - Guide assembly and sliding door - Google Patents

Guide assembly and sliding door Download PDF

Info

Publication number
WO2019242306A1
WO2019242306A1 PCT/CN2019/072711 CN2019072711W WO2019242306A1 WO 2019242306 A1 WO2019242306 A1 WO 2019242306A1 CN 2019072711 W CN2019072711 W CN 2019072711W WO 2019242306 A1 WO2019242306 A1 WO 2019242306A1
Authority
WO
WIPO (PCT)
Prior art keywords
block
guide assembly
inclined surface
elastic
swing
Prior art date
Application number
PCT/CN2019/072711
Other languages
French (fr)
Chinese (zh)
Inventor
林孝发
林孝山
邓小清
刘启乔
郑鹏兴
Original Assignee
福建西河卫浴科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201810641875.8A external-priority patent/CN108612424A/en
Priority claimed from CN201820957119.1U external-priority patent/CN208650703U/en
Application filed by 福建西河卫浴科技有限公司 filed Critical 福建西河卫浴科技有限公司
Publication of WO2019242306A1 publication Critical patent/WO2019242306A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D13/00Accessories for sliding or lifting wings, e.g. pulleys, safety catches
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D15/00Suspension arrangements for wings
    • E05D15/06Suspension arrangements for wings for wings sliding horizontally more or less in their own plane
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B3/00Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
    • E06B3/32Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
    • E06B3/34Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement
    • E06B3/42Sliding wings; Details of frames with respect to guiding
    • E06B3/46Horizontally-sliding wings
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B3/00Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
    • E06B3/32Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
    • E06B3/50Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with more than one kind of movement

Abstract

A guide assembly (100), comprising: a fixed support having a support side portion (40); and a swing block (2) having a swing bottom (22) and a swing side portion (21). A guide groove (101) extending in the left-right direction is formed between the swing block (2) and the fixed support. The swing side portion (21) forms a front wall of the guide groove (101), the support side portion (40) forms a rear wall of the guide groove (101), and the swing bottom (22) forms a bottom wall of the guide groove (101). The swing block (2) is rotatably connected to the fixed support, so that the swing block (2) can rotate about a first rotation axis (27) extending in the left-right direction, and the guide assembly (100) can be switched between the mounting state and the open state. The swing bottom (22) has a first clamping portion (221). The first clamping portion (221) is located at the end portion of the rear side of the swing block (2). The fixed support is provided with a second clamping portion (31). At least one of the first clamping portion (221) and the second clamping portion (31) is an elastic clamping portion. In the mounting state, the second clamping portion (31) clamps the first clamping portion (221) from the upper side to prevent the swing block (2) rotating. The elastic clamping portion can deform elastically, so that the clamping between the first clamping portion (221) and the second clamping portion (31) is released, and the swing block (2) rotates to the open state.

Description

一种导向组件及推拉门Guiding component and sliding door 技术领域Technical field
本申请实施例涉及但不限于卫浴器具领域,特别地,涉及但不限于一种导向组件及使用该导向组件的推拉门。The embodiments of the present application relate to, but are not limited to, the field of sanitary appliances, and in particular, to a guide assembly and a sliding door using the guide assembly.
背景技术Background technique
推拉门已经得到了广泛的应用,其中,推拉门也常作为淋浴门使用。淋浴推拉门例如包括多块玻璃板,玻璃板可以均是能够往返运动的活动玻璃板,也可以是包括至少一块固定不动的固定玻璃板,其它玻璃板为活动玻璃板。其中,固定玻璃板通常被称为固定门,活动玻璃板通常被称为活动门。Sliding doors have been widely used, among which sliding doors are often used as shower doors. The shower sliding door includes, for example, a plurality of glass plates. The glass plates may all be movable glass plates capable of reciprocating motion, or may include at least one fixed glass plate that is immovable, and the other glass plates are movable glass plates. Among them, the fixed glass plate is usually called a fixed door, and the movable glass plate is usually called a movable door.
为了确保活动门能够顺畅稳定地滑动,避免脱落,通常设置有导向组件以限制活动门的滑动轨迹,导向组件通常包括一个导向槽,活动门穿过导向槽,并在导向槽的限位作用下保持运动轨迹,避免脱落。In order to ensure that the movable door can slide smoothly and stably to avoid falling off, a guide assembly is usually provided to limit the sliding trajectory of the movable door. The guide assembly usually includes a guide groove, and the movable door passes through the guide groove and is under the limitation of the guide groove Keep track of movement and avoid falling off.
导向组件通常设置于活动门与固定门交接处,由于活动门和固定门之间的间隙较小,活动门与固定门重叠区域的清洁非常不便。为了清洁干净,通常需要将活动门拆下,而这往往需要将导向组件同时拆下,然而,导向组件的拆卸往往需要使用工具,安装时同样需要使用工具安装,这就导致活动门的拆装不便。The guide assembly is usually disposed at the junction of the movable door and the fixed door. Due to the small gap between the movable door and the fixed door, cleaning of the overlapping area of the movable door and the fixed door is very inconvenient. In order to clean, the movable door usually needs to be removed, and this often requires the guide assembly to be removed at the same time. However, the removal of the guide assembly often requires the use of tools, and the installation also requires the use of tools to install, which leads to the disassembly of the movable door. inconvenient.
一种折叠型的导向组件能够通过折叠的方式实现打开或关闭,但是这种导向组件关闭时需要依靠折叠后的支撑力来固定,夹口处不够稳定,容易导致活动门移动时产生晃动,且折叠处容易散开而导致导向组件打开,进而导致导向组件不能夹持活动门。A folding type guide assembly can be opened or closed by folding. However, when the guide assembly is closed, it needs to be fixed by the folded support force. The grip is not stable enough, which may cause the movable door to shake when it moves. The folds are easy to fall apart, which leads to the opening of the guide assembly, which leads to the failure of the guide assembly to clamp the movable door.
发明概述Summary of invention
以下是对本文详细描述的主题的概述。本概述并非是为了限制权利要求的保护范围。The following is an overview of the topics detailed in this article. This summary is not intended to limit the scope of protection of the claims.
本申请实施例提供了一种结构简单且夹持牢固的导向组件。本申请实施 例还提供了一种推拉门,特别地,提供了一种方便活动门推开且方便清洁的淋浴推拉门。The embodiment of the present application provides a guide assembly with a simple structure and a firm clamping. The embodiment of the present application also provides a sliding door, and in particular, a shower sliding door which is convenient to open the movable door and convenient to clean.
本申请实施例提供了一种导向组件,包括:An embodiment of the present application provides a guiding component, including:
固定支架,所述固定支架具有支架侧部;和A fixed bracket having a bracket side portion; and
摆动块,所述摆动块包括摆动底部和摆动侧部,所述摆动块和所述固定支架之间形成沿左右方向延伸的导向槽,所述摆动侧部形成所述导向槽的前壁,所述支架侧部形成所述导向槽的后壁,所述摆动底部形成所述导向槽的底壁,A swinging block including a swinging bottom and a swinging side portion, a guide groove extending in the left-right direction is formed between the swinging block and the fixed bracket, and the swinging side portion forms a front wall of the guide groove; The side of the bracket forms the rear wall of the guide groove, and the swing bottom forms the bottom wall of the guide groove,
所述摆动块转动连接于所述固定支架,使所述摆动块能够绕沿左右方向延伸的第一转动轴线转动,使所述导向组件能在安装状态和打开状态之间切换,The swing block is rotatably connected to the fixed bracket, so that the swing block can rotate about a first rotation axis extending in the left-right direction, so that the guide assembly can be switched between an installed state and an opened state,
所述摆动底部具有第一卡接部,所述第一卡接部位于所述摆动块的后侧的端部,所述固定支架设置有第二卡接部,所述第一卡接部和所述第二卡接部中的至少一个为弹性卡接部,在所述安装状态下,所述第二卡接部从上侧卡接所述第一卡接部,从而阻止所述摆动块转动;所述弹性卡接部能弹性变形,使所述第一卡接部和所述第二卡接部脱离卡接,所述摆动块转动至所述打开状态。The swing bottom has a first latching portion, the first latching portion is located at an end on the rear side of the swinging block, the fixing bracket is provided with a second latching portion, the first latching portion and At least one of the second engaging portions is an elastic engaging portion. In the installed state, the second engaging portion is engaged with the first engaging portion from an upper side, thereby preventing the swinging block. Rotation; the elastic engaging portion can be elastically deformed, so that the first engaging portion and the second engaging portion are released from the engaging, and the swing block is rotated to the open state.
本申请实施例还提供了一种推拉门,其包括上文的导向组件、固定门和活动门,所述活动门安装于所述导向组件的导向槽中,所述固定门与所述导向组件的固定支架固定连接。An embodiment of the present application further provides a sliding door, which includes the above guide component, a fixed door, and a movable door, the movable door is installed in a guide groove of the guide component, and the fixed door and the guide component The fixed bracket is fixedly connected.
在阅读并理解了附图概述和本申请的实施方式后,可以明白其他方面。After reading and understanding the summary of the drawings and the embodiments of the present application, other aspects can be understood.
附图概述Overview of the drawings
图1示出了本申请实施方式中的导向组件的整体结构图。FIG. 1 shows an overall structural diagram of a guide assembly in an embodiment of the present application.
图2示出了本申请实施方式中的导向组件的结构爆炸图。FIG. 2 shows an exploded view of the structure of the guide assembly in the embodiment of the present application.
图3示出了本申请实施方式中的固定支架主体的部分剖开图。FIG. 3 is a partially cutaway view of the fixing bracket body in the embodiment of the present application.
图4示出了本申请实施方式中的固定支架主体的结构示意图。FIG. 4 is a schematic structural diagram of a fixing bracket body according to an embodiment of the present application.
图5示出了本申请实施方式中的摆动块的结构示意图。FIG. 5 is a schematic structural diagram of a wobble block in an embodiment of the present application.
图6为图1的俯视图。FIG. 6 is a top view of FIG. 1.
图6a为图6的A-A向剖视图。Fig. 6a is a sectional view taken along the line A-A in Fig. 6.
图6b为图6的B-B向剖视图。Fig. 6b is a sectional view taken along the line B-B in Fig. 6.
图6c为图6的C-C向剖视图。Fig. 6c is a sectional view taken along the line C-C in Fig. 6.
图7a-图7c示出了本申请实施方式中的第一配合部和第二配合部的原理示意图。7a-7c show schematic diagrams of the first mating portion and the second mating portion in the embodiment of the present application.
图8示出了本申请实施方式中的导向组件的结构爆炸图。FIG. 8 shows an exploded view of the structure of the guide assembly in the embodiment of the present application.
图9示出了本申请实施方式中的第一转动轴的结构示意图。FIG. 9 is a schematic structural diagram of a first rotating shaft in an embodiment of the present application.
图10示出了本申请实施方式中的导向组件的部分剖开图(不包括外壳)。FIG. 10 shows a partially cutaway view of the guide assembly (excluding the housing) in the embodiment of the present application.
图11示出了本申请实施方式中的导向组件的俯视图。FIG. 11 shows a top view of a guide assembly in an embodiment of the present application.
图11a为图11的D-D向剖视图。Fig. 11a is a sectional view taken along the line D-D in Fig. 11.
图12-图13示出了本申请实施方式中的导向组件的打开过程示意图。12 to 13 are schematic diagrams illustrating an opening process of a guide assembly according to an embodiment of the present application.
图14示出了包括本申请实施方式中的导向组件的推拉门的结构示意图。FIG. 14 is a schematic structural diagram of a sliding door including a guide assembly in an embodiment of the present application.
图15a-15c示出了本申请实施方式中的推拉门中的活动门的拆卸过程图。15a-15c show a disassembly process diagram of a movable door in a sliding door according to an embodiment of the present application.
图16a-16c示出了本申请实施方式中的推拉门中的活动门的安装过程图。16a-16c show the installation process diagram of the movable door in the sliding door according to the embodiment of the present application.
附图标记说明:Reference sign description:
100导向组件;101导向槽;102定位槽;200活动门;300固定门;100 guide assembly; 101 guide slot; 102 positioning slot; 200 movable door; 300 fixed door;
1外壳;1 壳 ; 1 shell;
2摆动块;21摆动侧部;211压紧块;22摆动底部;221第一卡接部;222第一弧形面;23第一导向槽;24第二导向槽;25第二斜面部;251第三斜面;252第四斜面;26底面;27第一转动轴;28第二弹簧;29阶梯孔;291第一中心孔;292第一安装孔;201第一转动轴安装孔;202第一螺纹孔;2 swinging block; 21 swinging side; 211 pressing block; 22 swinging bottom; 221 first engaging portion; 222 first curved surface; 23 first guide groove; 24 second guide groove; 25 second inclined surface portion; 251 third inclined surface; 252 fourth inclined surface; 26 bottom surface; 27 first rotation shaft; 28 second spring; 29 step hole; 291 first center hole; 292 first installation hole; 201 first rotation shaft installation hole; 202th A threaded hole
3弹性块;31第二卡接部;311第二弧形面;32第二安装孔;33限位凸起;34第三安装孔;35滚轮安装槽;36第二转动轴;37第一弹簧;38滚 轮;381第二中心孔;3 elastic block; 31 second engaging portion; 311 second curved surface; 32 second mounting hole; 33 limit projection; 34 third mounting hole; 35 roller mounting groove; 36 second rotation shaft; 37 first Spring; 38 rollers; 381 second center hole;
4固定支架主体;40支架侧部;41左立板;411第一板;412第二板;413第一限位卡块;42右立板;421第三板;422第四板;43上板;431第一导向块;44后板;441导向凸起;442限位板;443第二限位卡块;45底板;451第二导向块;46第一斜面部;461第一斜面;462第二斜面;463第三中心孔;47第一平面部;48导向柱;481第四中心孔;401第二转动轴安装孔;402第三转动轴安装孔;403光孔;404第二螺纹孔;4 fixed bracket main body; 40 bracket side; 41 left vertical plate; 411 first plate; 412 second plate; 413 first limit card block; 42 right vertical plate; 421 third plate; 422 fourth plate; 43 upper 431 first guide block; 44 rear plate; 441 guide projection; 442 limit plate; 443 second limit block; 45 bottom plate; 451 second guide block; 46 first inclined surface; 461 first inclined surface; 462 second inclined surface; 463 third center hole; 47 first plane portion; 48 guide post; 481 fourth center hole; 401 second rotation shaft installation hole; 402 third rotation shaft installation hole; 403 light hole; 404 second Threaded hole;
5第一转动轴;51缺口结构;511第一平面;512第二平面;513缺口线;52止转面;5 the first rotation axis; 51 notch structure; 511 first plane; 512 second plane; 513 notch line; 52 stop surface;
6第三弹簧;7缓冲垫块;8第二顶丝;9第一顶丝;F外力。6 third spring; 7 cushion pad; 8 second top wire; 9 first top wire; F external force.
详述Elaborate
下面结合具体实施方式并参照附图,对本申请进一步详细说明。应该理解,这些描述只是示例性的,而并非要限制本申请的范围。此外,在以下说明中,省略了对公知结构和技术的描述,以避免不必要地混淆本申请实施例的概念。In the following, the present application is described in further detail in combination with specific embodiments and with reference to the drawings. It should be understood that these descriptions are merely exemplary and are not intended to limit the scope of the application. In addition, in the following description, descriptions of well-known structures and technologies are omitted to avoid unnecessarily obscuring the concepts of the embodiments of the present application.
特别说明的是,本申请实施例中所提及的“上”、“下”、“左”、“右”、“前”和“后”这些方位性的描述,均是基于图1中的结构位置的,具体而言,是从摆动块2朝向固定支架的方向正视导向组件时所确立的方位。It is specifically stated that the descriptions of the orientations "up", "down", "left", "right", "front" and "rear" mentioned in the embodiments of the present application are based on FIG. 1 The structural position is, specifically, the orientation established when the guide assembly is faced from the swing block 2 toward the fixed bracket.
下面结合图1-图6c介绍根据本申请一实施方式的导向组件100的具体结构。The specific structure of the guide assembly 100 according to an embodiment of the present application is described below with reference to FIGS. 1 to 6c.
如图1-6c所示,导向组件100包括固定支架和摆动块2,固定支架包括外壳1、弹性块3、固定支架主体4和第一弹簧37(可作为第一弹性部件)。As shown in FIG. 1-6c, the guide assembly 100 includes a fixed bracket and a swing block 2. The fixed bracket includes a housing 1, an elastic block 3, a fixed bracket body 4, and a first spring 37 (which can be used as a first elastic member).
摆动块2通过沿左右方向延伸的第一转动轴27与固定支架转动连接,翻转摆动块2能够使得导向组件100在安装状态和打开状态之间切换。摆动块2与固定支架之间形成沿左右方向延伸的导向槽101,导向槽101可用于安装活动门。外壳1具有容纳空间,其套在固定支架主体4上后,固定支架的后部形成用于安装固定门的定位槽102。The swinging block 2 is rotatably connected to the fixed bracket through the first rotating shaft 27 extending in the left-right direction, and turning the swinging block 2 can switch the guide assembly 100 between an installed state and an opened state. A guide groove 101 extending in the left-right direction is formed between the swinging block 2 and the fixed bracket. The guide groove 101 can be used to install a movable door. The housing 1 has a receiving space, and after it is sleeved on the fixing bracket main body 4, a rear part of the fixing bracket forms a positioning groove 102 for mounting a fixing door.
摆动块2包括摆动侧部21和摆动底部22,摆动侧部21与摆动底部22的前端连接,摆动侧部21的上端向后侧凸起延伸、形成有压紧块211,下端向后侧延伸、形成有摆动底部22。摆动侧部21形成导向槽101的前壁,摆动底部22形成导向槽101的底壁,固定支架的支架侧部40形成导向槽101的后壁,其中,支架侧部40可位于固定支架主体4或外壳1上。The swinging block 2 includes a swinging side portion 21 and a swinging bottom portion 22. The swinging side portion 21 is connected to the front end of the swinging bottom portion 22. The upper end of the swinging side portion 21 is convexly extended to the rear side, and a pressing block 211 is formed. 。 Formed with a swing bottom 22. The swinging side portion 21 forms the front wall of the guide groove 101, the swinging bottom portion 22 forms the bottom wall of the guide groove 101, and the bracket side portion 40 of the fixed bracket forms the rear wall of the guide groove 101. The bracket side portion 40 may be located on the fixed bracket body 4 Or on the case 1.
导向组件100处于安装状态时,压紧块211可抵接于安装在导向槽101内的活动门的侧面。When the guide assembly 100 is in the installed state, the pressing block 211 can abut against the side of the movable door installed in the guide groove 101.
摆动底部22的后端具有第一卡接部221,第一卡接部221的端部包括第一弧形面222。也就是说,摆动底部22的前端设置有摆动侧部21,摆动底部21的后端设置有第一卡接部221。A rear end of the swinging bottom portion 22 has a first engaging portion 221, and an end portion of the first engaging portion 221 includes a first curved surface 222. That is, the front end of the swing bottom 22 is provided with a swing side portion 21, and the rear end of the swing bottom 21 is provided with a first engaging portion 221.
摆动侧部21和摆动底部22的连接处的右侧开设有第一导向槽23,左侧开设有第二导向槽24,其中第二导向槽24的底面形成第二配合部。第二配合部包括第二斜面部25和第二平面部26,第二斜面部25从第二平面部26凸出。A first guide groove 23 is provided on the right side of the connection between the swing side portion 21 and the swing bottom portion 22, and a second guide groove 24 is provided on the left side, wherein the bottom surface of the second guide groove 24 forms a second fitting portion. The second mating portion includes a second inclined surface portion 25 and a second planar portion 26, and the second inclined surface portion 25 protrudes from the second planar portion 26.
第二斜面部25呈锯齿状,包括第三斜面251和第四斜面252。第二斜面部25在第二配合部的周向上可设置有两个。两个第二斜面部25可在第二配合部的周向上间隔180度。The second inclined surface portion 25 has a zigzag shape and includes a third inclined surface 251 and a fourth inclined surface 252. Two second inclined surface portions 25 may be provided in the circumferential direction of the second fitting portion. The two second inclined surface portions 25 may be spaced 180 degrees apart in the circumferential direction of the second mating portion.
第一导向槽23与第二导向槽24之间开设有阶梯孔29,阶梯孔29包括小直径的第一中心孔291和大直径的第一安装孔292。其中第一中心孔291位于第一安装孔292的靠近第二导向槽24所在的一侧(即左侧),第一中心孔291中安装第一转动轴27,第一安装孔292中安装第二弹簧28(可作为第二弹性部件),第二弹簧28套设于第一转动轴27上。A step hole 29 is defined between the first guide groove 23 and the second guide groove 24. The step hole 29 includes a first center hole 291 with a small diameter and a first mounting hole 292 with a large diameter. The first center hole 291 is located on the side of the first mounting hole 292 near the second guide groove 24 (ie, the left side). The first rotation hole 27 is mounted in the first center hole 291, and the first mounting hole 292 is mounted in the first mounting hole 292. Two springs 28 (can be used as the second elastic member). The second spring 28 is sleeved on the first rotating shaft 27.
弹性块3包括本体,本体下部的左右两侧延伸设置有第二卡接部31。第二卡接部31的前端可包括第二弧形面311。导向组件100处于安装状态时,第二卡接部31从上侧卡接第一卡接部221。具体地,第二弧形面311卡接第一弧形面222,从而阻止摆动块2翻转。本体的后端面开设有第二安装孔32,第一弹簧37安装于第二安装孔32中,第二安装孔32的数量可以为多个,例如两个或三个。这些第二安装孔32可从上到下均匀分布。The elastic block 3 includes a main body, and second left and right sides of the lower portion of the main body are extended with second latching portions 31. A front end of the second engaging portion 31 may include a second curved surface 311. When the guide assembly 100 is in the installed state, the second engaging portion 31 is engaged with the first engaging portion 221 from the upper side. Specifically, the second curved surface 311 is engaged with the first curved surface 222, thereby preventing the swinging block 2 from being turned over. The rear end surface of the body is provided with a second mounting hole 32, and the first spring 37 is mounted in the second mounting hole 32. The number of the second mounting holes 32 may be multiple, for example, two or three. These second mounting holes 32 can be evenly distributed from top to bottom.
在本体的左右侧面上延伸有限位凸起33(可作为第二限位部),用于与 后述的第一限位卡块413和第二限位卡块443配合。Limiting protrusions 33 (which can be used as the second limiting portion) extend on the left and right sides of the body, and are used to cooperate with the first limiting block 413 and the second limiting block 443 described later.
在本体的前部开设有滚轮安装槽35,滚轮安装槽35的上表面与本体的上表面平行。从本体上表面、贯穿滚轮安装槽35地开设有第三安装孔34,滚轮38安装于滚轮安装槽35中。A roller mounting groove 35 is provided at the front of the body, and the upper surface of the roller mounting groove 35 is parallel to the upper surface of the body. A third mounting hole 34 is opened from the upper surface of the body and penetrates the roller mounting groove 35. The roller 38 is mounted in the roller mounting groove 35.
滚轮38上开设有第二中心孔381,沿上下方向延伸的第二转动轴36穿过第二中心孔381和第三安装孔34将滚轮38安装于弹性块3的本体上,滚轮38通过第二转动轴36可相对于弹性块3自由转动。The roller 38 is provided with a second center hole 381, and the second rotating shaft 36 extending in the vertical direction passes through the second center hole 381 and the third mounting hole 34 to mount the roller 38 on the body of the elastic block 3. The roller 38 passes through the first The two rotating shafts 36 can rotate freely with respect to the elastic block 3.
固定支架主体4可包括左立板41、右立板42、上板43、后板44和底板45。左立板41包括第一板411和第二板412(可作为第一安装部),第二板412位于第一板411下部,且从第一板411的前端面向前侧延伸设置。同样地,右立板42包括第三板421和第四板422(可作为第二安装部),第四板422位于第三板421下部,且从第三板421的前端面向前侧延伸设置。其中,第一板411的上端和第三板421的上端通过上板43连接,第一板411的后端和第三板421的后端通过后板44连接,左立板41的下端和右立板42的下端通过底板45连接,第一板411、第三板421、上板43、后板44和底板45构成用于容纳弹性块3的容纳空间。The fixing bracket body 4 may include a left upright plate 41, a right upright plate 42, an upper plate 43, a rear plate 44, and a bottom plate 45. The left vertical plate 41 includes a first plate 411 and a second plate 412 (which can be used as a first mounting portion). The second plate 412 is located at a lower portion of the first plate 411 and extends from a front end of the first plate 411 to a front side. Similarly, the right upright plate 42 includes a third plate 421 and a fourth plate 422 (which can be used as a second mounting portion). The fourth plate 422 is located at the lower portion of the third plate 421 and extends from the front end of the third plate 421 to the front side. . The upper end of the first plate 411 and the upper end of the third plate 421 are connected through the upper plate 43. The rear end of the first plate 411 and the rear end of the third plate 421 are connected through the rear plate 44. The lower end of the left vertical plate 41 and the right The lower end of the vertical plate 42 is connected by a bottom plate 45. The first plate 411, the third plate 421, the upper plate 43, the rear plate 44 and the bottom plate 45 constitute a receiving space for receiving the elastic block 3.
后板44设置有导向凸起441,导向凸起441对应于第一弹簧37设置,第一弹簧37的一端套接于导向凸起441上,弹性块3能够沿前后方向移动压缩第一弹簧37。The rear plate 44 is provided with a guide protrusion 441. The guide protrusion 441 is provided corresponding to the first spring 37. One end of the first spring 37 is sleeved on the guide protrusion 441. The elastic block 3 can move and compress the first spring 37 in the front-rear direction. .
后板44的前端面上设置有两块限位板442,两块限位板442的前端分别延伸设置有第一限位卡块413和第二限位卡块443(可作为第一限位部),第一限位卡块413和第二限位卡块443分别与弹性块3的本体的两个限位凸起33配合,进而阻止弹性块3向前移动脱离固定支架主体4。Two limiting plates 442 are provided on the front surface of the rear plate 44. The front ends of the two limiting plates 442 are respectively extended with a first limiting block 413 and a second limiting block 443 (can be used as the first limiting position). Part), the first limiting block 413 and the second limiting block 443 cooperate with the two limiting protrusions 33 of the main body of the elastic block 3, respectively, so as to prevent the elastic block 3 from moving forward from the fixed bracket body 4.
上板43的下表面上设置有两个第一导向块431,底板45的上表面设置有两个第二导向块451,两个第一导向块431位于弹性块3的本体的上端的两侧,两个第二导向块451位于弹性块3的本体的下端的两侧,第一导向块431和第二导向块451能够对弹性块3的前后移动进行导向,同时也能够对弹性块3进行左右限位。The lower surface of the upper plate 43 is provided with two first guide blocks 431, and the upper surface of the bottom plate 45 is provided with two second guide blocks 451. The two first guide blocks 431 are located on both sides of the upper end of the body of the elastic block 3. The two second guide blocks 451 are located on both sides of the lower end of the body of the elastic block 3. The first guide block 431 and the second guide block 451 can guide the forward and backward movement of the elastic block 3, and can also perform the elastic block 3. Left and right limit.
第二板412的前部向右凸起设置有第一配合部,第一配合部包括第一斜 面部46和第一平面部47。第一斜面部46从第一平面部47凸起设置。第一斜面部46在第一配合部周向上可设置有两个。The front portion of the second plate 412 is convexly provided with a first mating portion, and the first mating portion includes a first inclined surface portion 46 and a first flat portion 47. The first inclined surface portion 46 is convexly provided from the first planar portion 47. Two first inclined surface portions 46 may be provided in the circumferential direction of the first mating portion.
两个第一斜面部46可在第一配合部的周向上间隔180度。第一斜面部46呈锯齿状,且包括第一斜面461和第二斜面462。第一配合部上开设有第三中心孔463,第三中心孔463贯穿第二板412。The two first inclined surface portions 46 may be spaced 180 degrees in the circumferential direction of the first mating portion. The first inclined surface 46 is in a zigzag shape, and includes a first inclined surface 461 and a second inclined surface 462. A third central hole 463 is defined in the first mating portion, and the third central hole 463 penetrates the second plate 412.
第四板422的前部向左凸起设置有导向柱48,导向柱48位于第一导向槽23中,导向柱48抵接第二弹簧28的一端,第二弹簧28的另一端抵接第一安装孔292的端面。导向柱48用于对摆动块2进行导向,导向柱48上开设有第四中心孔481,第四中心孔481贯穿第四板422。第一转动轴27依次穿设于第三中心孔463、第一中心孔291和第四中心孔481中。The front portion of the fourth plate 422 is provided with a guide post 48 protruding to the left. The guide post 48 is located in the first guide groove 23. The guide post 48 abuts one end of the second spring 28 and the other end of the second spring 28 abuts the first An end surface of a mounting hole 292. The guide post 48 is used to guide the swing block 2. A fourth center hole 481 is defined in the guide post 48, and the fourth center hole 481 penetrates the fourth plate 422. The first rotation shaft 27 is inserted through the third center hole 463, the first center hole 291, and the fourth center hole 481 in this order.
下面结合图6a至图6c和图7a至图7b说明本实施方式中的导向组件100在安装状态和打开状态之间的转变过程。The transition process between the installed state and the opened state of the guide assembly 100 in this embodiment will be described below with reference to FIGS. 6a to 6c and 7a to 7b.
导向组件100处于安装状态时,摆动底部22基本保持在水平位置;从图6b中可以看出,摆动底部22抵接于底板45上,第一卡接部221的第一弧形面222与第二卡接部31的第二弧形面311卡接接触。由于第一弹簧37的弹性力作用,第二卡接部31将第一卡接部221卡住,阻止摆动块2翻转。从图6c中可以看出,摆动块2与第四板422之间有一定的移动空间以供摆动块2伸缩移动,此时,如图7a所示,第一斜面461与第四斜面252接触,且在第二弹簧28的弹性作用下,第四斜面252有相对于第一斜面461运动的趋势,即导致摆动块2有顺时针旋转的趋势(顺时针方向是基于图6a的视角)。When the guide assembly 100 is in the installed state, the swinging bottom 22 is basically maintained at a horizontal position; as can be seen from FIG. 6B, the swinging bottom 22 is abutted on the bottom plate 45, and the first arcuate surface 222 of the first latching portion 221 and the first The second arc-shaped surfaces 311 of the two latching portions 31 are snap-contacted. Due to the elastic force of the first spring 37, the second engaging portion 31 catches the first engaging portion 221 and prevents the swinging block 2 from turning over. It can be seen from FIG. 6c that there is a certain moving space between the swing block 2 and the fourth plate 422 for the swing block 2 to telescopically move. At this time, as shown in FIG. 7a, the first inclined surface 461 is in contact with the fourth inclined surface 252. Under the elastic action of the second spring 28, the fourth inclined surface 252 has a tendency to move relative to the first inclined surface 461, that is, the swinging block 2 has a tendency to rotate clockwise (the clockwise direction is based on the perspective of FIG. 6a).
施力于摆动侧部21以逆时针翻转摆动块2,第一卡接部221对第二卡接部31施加作用力,使得弹性块3克服第一弹簧37的作用力向后移动,直至第二卡接部31不再卡住第一卡接部221。与此同时,如图7a所示,摆动块2翻转时,由于第四斜面252与第一斜面461的相互作用,摆动块2沿着第一转动轴27的轴向移动,即摆动块2沿着第一转动轴27轴向向右侧移动一定距离,相应地使得第二弹簧28被压缩。Applying force to the swinging side portion 21 to turn the swinging block 2 counterclockwise, the first latching portion 221 applies a force to the second latching portion 31, so that the elastic block 3 moves backward against the force of the first spring 37 until the first The two latching portions 31 no longer catch the first latching portion 221. At the same time, as shown in FIG. 7a, when the swing block 2 is reversed, due to the interaction between the fourth inclined surface 252 and the first inclined surface 461, the swing block 2 moves along the axial direction of the first rotation axis 27, that is, the swing block 2 moves The first rotating shaft 27 is moved axially to the right by a certain distance, and accordingly the second spring 28 is compressed.
继续施力于摆动侧部21以翻转摆动块2,如图7b所示,摆动块2将处于一个第四斜面252与第一斜面461分离、第三斜面251与第二斜面462还未接触的临界位置,此时,摆动块2与第四板422之间的空间减小到最小, 第二弹簧28被压缩形变至最大位置,当摆动块2越过该临界位置,第二弹簧28开始复位运动,在第二弹簧28的弹性作用下,如图7c所示,第三斜面251沿着第二斜面462运动,从而带动摆动块2自动逆时针翻转到位,到此,导向组件100即转变为打开状态。Continue to apply force to the swinging side portion 21 to flip the swinging block 2. As shown in FIG. 7 b, the swinging block 2 will be separated from the fourth inclined surface 252 and the first inclined surface 461, and the third inclined surface 251 and the second inclined surface 462 are not in contact. In the critical position, at this time, the space between the swing block 2 and the fourth plate 422 is reduced to a minimum, and the second spring 28 is compressed and deformed to the maximum position. When the swing block 2 passes the critical position, the second spring 28 starts a return movement Under the elastic action of the second spring 28, as shown in FIG. 7c, the third inclined surface 251 moves along the second inclined surface 462, thereby driving the swinging block 2 to automatically turn counterclockwise into place. At this point, the guide assembly 100 is turned on. status.
导向组件100处于打开状态时,摆动底部22基本处于竖直位置,此时,施力于摆动底部22以顺时针翻转摆动块2。如图7c所示,摆动块2翻转时,由于第三斜面251与第二斜面462的相互作用,摆动块2的翻转运动伴随着摆动块2的沿着第一转动轴27的轴向移动,即摆动块2沿着第一转动轴27轴向向右侧移动一定距离,相应地使得第二弹簧28被压缩。When the guide assembly 100 is in the open state, the swinging bottom 22 is basically in a vertical position. At this time, a force is applied to the swinging bottom 22 to turn the swinging block 2 clockwise. As shown in FIG. 7c, when the swing block 2 is reversed, due to the interaction of the third inclined surface 251 and the second inclined surface 462, the reversing motion of the swing block 2 is accompanied by the axial movement of the swing block 2 along the first rotation axis 27, That is, the swing block 2 moves a certain distance to the right along the axial direction of the first rotation axis 27, and accordingly the second spring 28 is compressed.
继续施力于摆动底部22以翻转摆动块2,如图7b所示,摆动块2将处于一个第三斜面251与第二斜面462分离、第四斜面252与第一斜面461还未接触的临界位置。此时,摆动块2与第四板422之间的空间减小到最小,第二弹簧28被压缩形变至最大位置。当摆动块2越过该临界位置,第二弹簧28开始复位运动,在第二弹簧28的弹性作用下,如图7a所示,第四斜面252沿着第一斜面461运动,从而带动摆动块2自动翻转,直至摆动块2的第一卡接部221被弹性块3的第二卡接部31卡住无法翻转。此时,施力于滚轮38以使得弹性块3后移,直至第二卡接部31不再卡住第一卡接部221,接着,摆动块2将在第二弹簧28的作用下自动翻转到位。解除对滚轮38的施力,弹性块3将在第一弹簧37的作用下复位,第二卡接部31将卡住第一卡接部221以阻止摆动块2翻转,到此,导向组件100处于安装状态。Continue to apply force to the swing bottom 22 to flip the swing block 2. As shown in FIG. 7b, the swing block 2 will be at a critical point where the third inclined surface 251 is separated from the second inclined surface 462, and the fourth inclined surface 252 and the first inclined surface 461 are not yet in contact. position. At this time, the space between the swing block 2 and the fourth plate 422 is reduced to a minimum, and the second spring 28 is compressed and deformed to a maximum position. When the swing block 2 crosses this critical position, the second spring 28 starts to return. Under the elastic action of the second spring 28, as shown in FIG. 7a, the fourth inclined surface 252 moves along the first inclined surface 461, thereby driving the swing block 2 Automatically flip until the first engaging portion 221 of the swinging block 2 is caught by the second engaging portion 31 of the elastic block 3 and cannot be inverted. At this time, a force is applied to the roller 38 to move the elastic block 3 backward until the second latching portion 31 no longer catches the first latching portion 221. Then, the swinging block 2 will automatically flip under the action of the second spring 28 In place. After the biasing force on the roller 38 is released, the elastic block 3 will be reset by the action of the first spring 37, and the second latching portion 31 will catch the first latching portion 221 to prevent the swinging block 2 from turning over. At this point, the guide assembly 100 In the installed state.
图1-图6c所示的导向组件,可具有如下有益效果:The guide assembly shown in Figs. 1 to 6c can have the following beneficial effects:
1、第一弹簧37的设置,使得弹性块3可前后移动,进而使得设置在弹性块3上的第二卡接部31可视为弹性卡接部,可通过第二卡接部31随弹性块3的位移,使第一卡接部221和第二卡接部31卡接或脱离卡接。1. The arrangement of the first spring 37 allows the elastic block 3 to move back and forth, so that the second latching portion 31 provided on the elastic block 3 can be regarded as an elastic latching portion, and can be elastically elasticized through the second latching portion 31. The displacement of the block 3 causes the first engaging portion 221 and the second engaging portion 31 to be engaged or disengaged.
2、滚轮38可作为设置在弹性块3上的承力部,可通过对滚轮38施加外力,带动弹性块3后移,使第一卡接部221和第二卡接部31脱离卡接。承力部可以为其他结构,如:可以为固定在弹性块3上的凸出部等。应当理解,可以通过第一卡接部221和第二卡接部31的相互挤压,使弹性块3后移,第一卡接部221和第二卡接部31脱离卡接。2. The roller 38 can be used as a force bearing portion provided on the elastic block 3. The external force can be applied to the roller 38 to drive the elastic block 3 to move backward, so that the first engaging portion 221 and the second engaging portion 31 are released from the engaging. The bearing portion may have other structures, for example, it may be a protruding portion fixed on the elastic block 3. It should be understood that the elastic block 3 can be moved backward by squeezing the first latching portion 221 and the second latching portion 31 with each other, and the first latching portion 221 and the second latching portion 31 can be released from the latching.
3、固定支架主体4的第一板411的前端面和第三板421的前端面可作为支架侧部40,形成导向槽101的后壁;第一板411和第三板421之间的间隔可形成导向槽101的后壁上的开槽,通过第一弹簧37提供的弹性力,使滚轮38的至少一部分能够穿过开槽、凸出于导向槽101的后壁,以便对滚轮38施力,使得弹性块3后移,直至第二卡接部31不再卡住第一卡接部221。3. The front face of the first plate 411 and the third plate 421 of the fixed bracket body 4 can be used as the bracket side portion 40 to form the rear wall of the guide groove 101; the interval between the first plate 411 and the third plate 421 A slot can be formed on the rear wall of the guide groove 101. At least a part of the roller 38 can pass through the slot and protrude from the rear wall of the guide groove 101 by the elastic force provided by the first spring 37, so as to apply a force to the roller 38. The force causes the elastic block 3 to move backward until the second engaging portion 31 no longer catches the first engaging portion 221.
4、导向组件100处于安装状态时,凸出于导向槽101的后壁的滚轮38可与活动门接触,且滚轮38可绕沿上下方向延伸的第二转动轴36转动,使得在活动门沿导向槽101左右往返运动的过程中,滚轮38可与活动门滚动接触,以降低活动门与滚轮38之间的摩擦力,提高活动门运动的顺畅性。4. When the guide assembly 100 is in the installed state, the roller 38 protruding from the rear wall of the guide groove 101 can contact the movable door, and the roller 38 can rotate about the second rotating shaft 36 extending in the up-and-down direction, so that the During the process of the guide groove 101 moving back and forth from side to side, the roller 38 can be in rolling contact with the movable door to reduce the friction between the movable door and the roller 38 and improve the smoothness of the movement of the movable door.
下面结合图8-图11a介绍根据本申请实施方式的导向组件100的具体结构。The specific structure of the guide assembly 100 according to the embodiment of the present application is described below with reference to FIGS. 8 to 11 a.
本实施方式中的弹性块3的结构与图1-图6c所示的实施方式基本相同,弹性块3与固定支架主体4之间的安装结构与图1-图6c所示的实施方式基本相同,此处不再赘述。The structure of the elastic block 3 in this embodiment is basically the same as the embodiment shown in Figs. 1 to 6c, and the mounting structure between the elastic block 3 and the fixing bracket body 4 is basically the same as the embodiment shown in Figs. 1 to 6c. , Will not repeat them here.
摆动块2的结构与图1-图6c所示的实施方式中部分相同,摆动块2依然包括摆动侧部21和摆动底部22。The structure of the swinging block 2 is partly the same as that in the embodiment shown in FIGS. 1 to 6 c. The swinging block 2 still includes a swinging side portion 21 and a swinging bottom portion 22.
但是本实施方式中,摆动侧部21和摆动底部22的连接处未设置第一导向槽、第二导向槽、阶梯孔以及斜面部等结构。在本实施方式中,在摆动侧部21和摆动底部22的连接处设置有第一转动轴安装孔201,其用于安装第一转动轴5。However, in the present embodiment, the connection between the swing side portion 21 and the swing bottom portion 22 is not provided with a structure such as a first guide groove, a second guide groove, a stepped hole, and an inclined surface portion. In the present embodiment, a first rotation shaft mounting hole 201 is provided at a connection between the swing side portion 21 and the swing bottom portion 22 for mounting the first rotation shaft 5.
此外,本实施方式中的摆动底部22的中间位置开设有第一螺纹孔202,第一螺纹孔202沿前后方向设置,第一螺纹孔202的一端设置于摆动底部22的后壁上,另一端与第一转动轴安装孔201连通,第一螺纹孔202中安装有第一顶丝9。In addition, a first threaded hole 202 is opened at a middle position of the swinging bottom 22 in this embodiment. The first threaded hole 202 is provided in the front-rear direction. One end of the first threaded hole 202 is provided on the rear wall of the swinging bottom 22 and the other end. It communicates with the first rotation shaft installation hole 201, and the first threaded hole 9 is installed in the first threaded hole 202.
第一转动轴5包括缺口结构51(可作为第三配合部)和止转面52。缺口结构51可有两个,分别设置于第一转动轴5的轴向两端。缺口结构51包括第一平面511(可作为第四平面部)、第二平面512(可作为第五平面部)和 缺口线513(可作为过渡部),第一平面511和第二平面512相交于缺口线513。第一顶丝9抵接于止转面52,将摆动块2与第一转动轴5固定连接,使得摆动块2与第一转动轴5能够同步转动。摆动快2可通过其他方式实现与第一转动轴5的固定连接,如:摆动快2可通过键与第一转动轴5固定连接。The first rotation shaft 5 includes a notch structure 51 (which can serve as a third mating portion) and a rotation stop surface 52. There may be two notch structures 51, which are respectively disposed at two axial ends of the first rotating shaft 5. The notch structure 51 includes a first plane 511 (can be used as a fourth plane portion), a second plane 512 (can be used as a fifth plane portion), and a notch line 513 (can be used as a transition portion). The first plane 511 and the second plane 512 intersect于 槽 线 513. In the gap line 513. The first top wire 9 abuts on the rotation prevention surface 52 and fixedly connects the swing block 2 and the first rotation shaft 5 so that the swing block 2 and the first rotation shaft 5 can rotate synchronously. The swinging fast 2 can be fixedly connected to the first rotating shaft 5 through other methods. For example, the swinging fast 2 can be fixedly connected to the first rotating shaft 5 through a key.
固定支架主体4的结构与图1-图6c所示的实施方式中部分相同。但是左立板41上未设置第一配合部的斜面结构,右立板42上未设置导向柱。在左立板41前端开设有第二转动轴安装孔401,右立板42前端开设有第三转动轴安装孔402。第一转动轴5穿设于第一转动轴安装孔201、第二转动轴安装孔401和第三转动轴安装孔402中,使得第一转动轴5能够相对于固定支架主体4转动。The structure of the fixing bracket body 4 is partly the same as that in the embodiment shown in FIGS. 1 to 6c. However, the left vertical plate 41 is not provided with a slope structure of the first mating portion, and the right vertical plate 42 is not provided with a guide post. A second rotation shaft mounting hole 401 is opened at the front end of the left vertical plate 41, and a third rotation shaft installation hole 402 is opened at the front end of the right vertical plate 42. The first rotation shaft 5 is penetrated in the first rotation shaft installation hole 201, the second rotation shaft installation hole 401, and the third rotation shaft installation hole 402, so that the first rotation shaft 5 can rotate relative to the fixed bracket body 4.
固定支架主体4还包括弹性伸缩机构(可作为第三弹性部件),弹性伸缩机构包括第三弹簧6和缓冲垫块7(可作为第四配合部)。弹性伸缩机构可有两个,分别设置于左立板41和右立板42的内部空腔中,且分别对应第一转动轴5上的缺口结构51。The fixed bracket body 4 further includes an elastic telescopic mechanism (which can be used as a third elastic member), and the elastic telescopic mechanism includes a third spring 6 and a cushion pad 7 (which can be used as a fourth mating portion). There may be two elastic telescopic mechanisms, which are respectively disposed in the internal cavity of the left vertical plate 41 and the right vertical plate 42 and respectively correspond to the notch structures 51 on the first rotation shaft 5.
左立板41和右立板42的内部空腔结构相同,下面以右立板42的内部空腔结构为例介绍。右立板42的内部空腔结构为圆形孔结构,圆形孔结构由光孔403与第二螺纹孔404组成,光孔403一端与第二螺纹孔404相接,另一端与第三转动轴安装孔402连通。第二螺纹孔404中安装有第二顶丝8,第三弹簧6的一端位于第二螺纹孔404中,并抵接于第二顶丝8的一端,第三弹簧6的另一端位于光孔403中并与缓冲垫块7的连接,缓冲垫块7背离第三弹簧6的一端抵接于第一转动轴5的缺口结构51上。The internal cavity structure of the left vertical plate 41 and the right vertical plate 42 is the same. The internal cavity structure of the right vertical plate 42 is taken as an example to introduce below. The internal cavity structure of the right vertical plate 42 is a circular hole structure. The circular hole structure is composed of a light hole 403 and a second threaded hole 404. One end of the light hole 403 is connected to the second threaded hole 404, and the other end is rotated to the third. The shaft mounting hole 402 communicates. The second threaded hole 8 is installed in the second threaded hole 404. One end of the third spring 6 is located in the second threaded hole 404 and abuts one end of the second threaded hole 8. The other end of the third spring 6 is located in the light hole. 403 is connected to the cushion block 7, and an end of the cushion block 7 facing away from the third spring 6 abuts on the notch structure 51 of the first rotating shaft 5.
虽然在本实施方式中说明了缺口结构51中的第一平面511和第二平面512相交于缺口线513,但是本申请实施方式不限于此。第一平面511和第二平面512相交处可以是弧面结构,该弧面结构可作为第一平面511和第二平面512之间的过渡部。Although it is described in this embodiment that the first plane 511 and the second plane 512 in the notch structure 51 intersect the notch line 513, the embodiment of the present application is not limited thereto. The intersection of the first plane 511 and the second plane 512 may be an arc surface structure, and the arc surface structure may serve as a transition between the first plane 511 and the second plane 512.
下面结合图11至图13说明本实施方式中的导向组件100在安装状态和打开状态之间的转变过程。The transition process between the installed state and the opened state of the guide assembly 100 in this embodiment is described below with reference to FIGS. 11 to 13.
导向组件100处于安装状态时,如图11a所示,缺口线513位于第一转 动轴5的轴线的下方,缓冲垫块7的前端面(可作为第三平面部)抵接于缺口线513上,或者抵接于位于缺口线513上方的第二平面512,使得第一转动轴5以及摆动块2均有顺时针旋转的趋势。When the guide assembly 100 is in the installed state, as shown in FIG. 11 a, the notch line 513 is located below the axis of the first rotating shaft 5, and the front end surface of the cushion pad 7 (can be used as the third plane portion) abuts on the notch line 513. Or, it abuts on the second plane 512 located above the notch line 513, so that the first rotating shaft 5 and the swinging block 2 have a tendency to rotate clockwise.
施力于摆动块2的摆动侧部21以使得摆动块2沿逆时针方向翻转,第一转动轴5与摆动块2同步转动,缺口线513将推动缓冲垫块7克服第三弹簧6的作用力而背离第一转动轴5移动。当摆动块2翻转至图12所示的临界位置时,缺口线513与第一转动轴5的轴线处于同一水平面,缓冲垫块7运动到最大位移处,第三弹簧6被压缩形变至最大位置。此后,继续沿逆时针方向翻转摆动块2,第三弹簧6将发生复位运动,第三弹簧6通过缓冲垫块7作用于缺口线513的弹簧力将促使第一转动轴5自动沿逆时针方向旋转,使第一平面511和缓冲垫块7的前端面贴合。最终,如图13所示,导向组件100切换到打开状态。在打开状态下,第一平面511和缓冲垫块7的前端面抵接,且缺口线513位于第一转动轴5的轴线的上方。Apply force to the swinging side portion 21 of the swinging block 2 so that the swinging block 2 flips in the counterclockwise direction, the first rotating shaft 5 rotates synchronously with the swinging block 2, and the notch line 513 will push the cushion pad 7 to overcome the role of the third spring 6. Force and move away from the first rotating shaft 5. When the swing block 2 is flipped to the critical position shown in FIG. 12, the notch line 513 is at the same horizontal plane as the axis of the first rotation shaft 5, the cushion pad 7 moves to the maximum displacement, and the third spring 6 is compressed and deformed to the maximum position. . After that, continue to flip the swing block 2 in the counterclockwise direction, and the third spring 6 will return to its original position. The spring force of the third spring 6 acting on the notch line 513 through the cushion pad 7 will cause the first rotating shaft 5 to automatically rotate in the counterclockwise direction. The first flat surface 511 and the front end surface of the cushion pad 7 are brought into contact with each other by rotation. Finally, as shown in FIG. 13, the guide assembly 100 is switched to the open state. In the opened state, the first plane 511 and the front end surface of the cushion block 7 abut, and the notch line 513 is located above the axis of the first rotation shaft 5.
导向组件100处于图13所示的打开状态时,施力于摆动块2的摆动底部22以使得摆动块2沿顺时针方向翻转,同样地,第一转动轴5与摆动块2同步转动,缺口线513将推动缓冲垫块7克服第三弹簧6的作用力而背离第一转动轴5移动。当摆动块2翻转至图12所示的临界位置时,缺口线513与第一转动轴5的轴线处于同一水平面,缓冲垫块7运动到最大位移处,第三弹簧6被压缩形变至最大位置。此后,继续沿顺时针方向翻转摆动块2,第三弹簧6将发生复位运动,第三弹簧6通过缓冲垫块7作用于缺口线513的弹簧力将促使第一转动轴5自动沿顺时针方向旋转,使第二平面512趋于和缓冲垫块7的前端面贴合,最终,如图11a所示,导向组件100切换到安装状态。When the guide assembly 100 is in the open state shown in FIG. 13, a force is applied to the swinging bottom portion 22 of the swinging block 2 so that the swinging block 2 is turned in a clockwise direction. Similarly, the first rotating shaft 5 rotates synchronously with the swinging block 2 with a gap. The wire 513 will push the cushion pad 7 against the force of the third spring 6 and move away from the first rotating shaft 5. When the swing block 2 is flipped to the critical position shown in FIG. 12, the notch line 513 is at the same horizontal plane as the axis of the first rotation shaft 5, the cushion pad 7 moves to the maximum displacement, and the third spring 6 is compressed and deformed to the maximum position. . After that, continue to flip the swing block 2 in the clockwise direction, and the third spring 6 will return to its original position. The spring force of the third spring 6 acting on the notch line 513 through the cushion pad 7 will cause the first rotating shaft 5 to automatically rotate in the clockwise direction. By rotating, the second plane 512 tends to conform to the front end surface of the cushion pad 7. Finally, as shown in FIG. 11 a, the guide assembly 100 is switched to the installed state.
特别说明的是,本实施方式中弹性块3与摆动块2之间的卡接结构与图1-图6c所示的实施方式中的结构基本相同,因此,在导向组件100的状态转变过程中,摆动块2同样需要克服弹性块3施加的阻力,即在本实施方式中,在导向组件100从安装状态转变为打开状态的过程中,翻转摆动块2将促使弹性块3克服第一弹簧37的作用力而后移,在导向组件100从打开状态转变为安装状态的过程中,摆动块2将被弹性块3卡住而无法自动翻转,与图1- 图6C所示的实施方式中的方法一样,需要施力于滚轮38促使弹性块3后移直至弹性块3不再卡住摆动块2,摆动块2可以继续自动翻转。It is particularly noted that, in this embodiment, the engaging structure between the elastic block 3 and the swinging block 2 is basically the same as that in the embodiment shown in FIGS. 1 to 6 c. Therefore, during the state transition process of the guide assembly 100 The swing block 2 also needs to overcome the resistance exerted by the elastic block 3. In this embodiment, during the process of the guide assembly 100 changing from the installed state to the open state, turning the swing block 2 will cause the elastic block 3 to overcome the first spring 37. Force, the swinging block 2 will be caught by the elastic block 3 and cannot be automatically turned over during the transition process of the guide assembly 100 from the opened state to the installed state, and the method in the embodiment shown in FIG. 1 to FIG. 6C Similarly, a force needs to be applied to the roller 38 to cause the elastic block 3 to move back until the elastic block 3 no longer catches the swing block 2, and the swing block 2 can continue to automatically flip.
本申请实施例提供了一种推拉门,包括导向组件100、活动门200和固定门300,活动门200安装于导向组件100的导向槽101中,固定门300安装于导向组件100的定位槽102中。压紧块211与滚轮38配合,夹紧导向槽101中的活动门200,固定门300与导向组件100的固定支架固定连接。The embodiment of the present application provides a sliding door, which includes a guide assembly 100, a movable door 200, and a fixed door 300. The movable door 200 is installed in the guide groove 101 of the guide assembly 100, and the fixed door 300 is installed in the positioning groove 102 of the guide assembly 100. in. The pressing block 211 cooperates with the roller 38 to clamp the movable door 200 in the guide groove 101, and the fixed door 300 is fixedly connected to the fixed bracket of the guide assembly 100.
图14示出了包括图1-图6c所示的实施方式中的导向组件100的推拉门的结构示意图。在另一实施方式中,推拉门可包括图7-图13所示的实施方式中的导向组件100。FIG. 14 is a schematic structural diagram of a sliding door including the guide assembly 100 in the embodiment shown in FIGS. 1 to 6 c. In another embodiment, the sliding door may include the guide assembly 100 in the embodiment shown in FIGS. 7 to 13.
本申请实施例中的推拉门可为淋浴门。但是,导向组件不仅仅适用于淋浴门使用,也可以应用于其它场合的推拉门。The sliding door in the embodiment of the present application may be a shower door. However, the guide assembly is not only suitable for shower doors, but also can be applied to sliding doors in other occasions.
下面结合图15a-15c来简单说明包含上述任一实施方式的导向组件的推拉门的活动门拆卸过程。The following is a brief description of the movable door disassembly process of the sliding door including the guide assembly of any of the above embodiments with reference to Figs. 15a-15c.
如图15a所示,对于安装好的推拉门(例如淋浴门),导向组件100处于安装状态。拆卸活动门200时,在活动门200的例如偏下部用手或脚施加一定外力F,外力F通过活动门200的下端传递于摆动侧部21,使得摆动块2开始翻转,活动门200保持对摆动块2的摆动侧部21施力,直至摆动块2跨过其临界位置,如图15b所示。此后,活动门200与摆动块2分离,摆动块2将在第二弹簧的复位运动下自动翻转使导向组件100切换到打开状态,方便活动门200的拆卸。活动门200拆卸完成,最终如图15c所示。As shown in FIG. 15a, the guide assembly 100 is in an installed state for an installed sliding door (such as a shower door). When the movable door 200 is disassembled, a certain external force F is applied to the lower part of the movable door 200 with hands or feet, for example. The external force F is transmitted to the swing side 21 through the lower end of the movable door 200, so that the swing block 2 starts to flip, and the movable door 200 keeps facing The swinging side portion 21 of the swinging block 2 exerts a force until the swinging block 2 crosses its critical position, as shown in FIG. 15b. Thereafter, the movable door 200 is separated from the swinging block 2, and the swinging block 2 will be automatically flipped under the returning movement of the second spring to switch the guide assembly 100 to an open state to facilitate the disassembly of the movable door 200. The removal of the movable door 200 is completed, as shown in FIG. 15c.
下面结合图16a-16c来简单说明包含上述任一实施方式的导向组件的推拉门(例如淋浴门)的活动门安装过程。The following is a brief description of the movable door installation process of a sliding door (such as a shower door) including the guide assembly of any of the above embodiments with reference to FIGS. 16a-16c.
在导向组件100处于打开状态时,如图16a所示。依靠活动门200自身重力施力于摆动块2的摆动底部22,使得摆动块2开始翻转,活动门200保持对摆动块2施力,直至摆动块2跨过其临界位置,如图16b所示。此后,活动门200与摆动块2分离,摆动块2将在第三弹簧6的复位运动下自动翻转与弹性块3相接。通过活动门200施力于滚轮38,促使弹性块3后移以解除对摆动块2的卡定,然后摆动块2将继续自动翻转到位。同时,弹性块3在第一弹簧37的作用下自动复位。此时,导向组件100处于安装状态,活动 门200安装完成,如图16c所示。When the guide assembly 100 is in the open state, as shown in FIG. 16a. Relying on the gravity of the movable door 200 to the swing bottom 22 of the swing block 2, the swing block 2 starts to flip, and the movable door 200 keeps exerting force on the swing block 2 until the swing block 2 crosses its critical position, as shown in FIG. 16b . After that, the movable door 200 is separated from the swinging block 2, and the swinging block 2 will be automatically turned over to contact the elastic block 3 under the resetting movement of the third spring 6. A force is applied to the roller 38 through the movable door 200 to cause the elastic block 3 to move backward to release the lock on the swing block 2, and then the swing block 2 will continue to automatically flip into place. At the same time, the elastic block 3 is automatically reset by the action of the first spring 37. At this time, the guide assembly 100 is in the installed state, and the movable door 200 is installed, as shown in FIG. 16c.
本申请实施例提供了一种导向组件,通过第二卡接部与第一卡接部的卡接,使得导向组件能够夹持牢固活动门。本申请实施例还提供了一种包括导向组件的推拉门,通过导向组件中的配合部和弹性部件的结构设计,使得只要对推拉门中的活动门的偏下部位施加一定作用力即可自动拆卸活动门,无需操作人员下蹲操作导向组件,使得活动门的拆卸非常方便,也使得推拉门的清洁更加方便。The embodiment of the present application provides a guide assembly, which enables the guide assembly to hold the movable door firmly by the second engaging portion being engaged with the first engaging portion. The embodiment of the present application further provides a sliding door including a guide assembly. Through the structural design of the mating part and the elastic member in the guide assembly, as long as a certain force is applied to the lower part of the movable door in the sliding door, it can automatically The disassembly of the movable door does not require the operator to squat to operate the guide assembly, which makes the disassembly of the movable door very convenient, and also makes the sliding door cleaning more convenient.
本申请的保护范围不限于上述具体实施方式中的具体实施方式,而是只要满足本申请的权利要求中的技术特征的组合就落入本申请的保护范围之内。The protection scope of the present application is not limited to the specific implementation manners in the above specific implementation manners, but falls within the protection scope of the present application as long as the combination of technical features in the claims of the present application is satisfied.
应当理解的是,本申请的上述具体实施方式仅仅用于示例性说明或解释本申请的原理,而不构成对本申请的限制。因此,在不偏离本申请的精神和范围的情况下所做的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。此外,本申请所附权利要求旨在涵盖落入所附权利要求范围和边界、或者这种范围和边界的等同形式内的全部变化和修改例。It should be understood that the foregoing specific implementation manners of the present application are only used to exemplarily illustrate or explain the principles of the present application, and do not constitute a limitation on the present application. Therefore, any modification, equivalent replacement, improvement, etc. made without departing from the spirit and scope of this application shall be included in the protection scope of this application. Further, the claims appended hereto are intended to cover all changes and modifications that fall within the scope and boundary of the appended claims, or equivalents of such ranges and boundaries.

Claims (16)

  1. 一种导向组件,包括:A guide assembly including:
    固定支架,所述固定支架具有支架侧部;和A fixed bracket having a bracket side portion; and
    摆动块,所述摆动块包括摆动底部和摆动侧部,所述摆动块和所述固定支架之间形成沿左右方向延伸的导向槽,所述摆动侧部形成所述导向槽的前壁,所述支架侧部形成所述导向槽的后壁,所述摆动底部形成所述导向槽的底壁,A swinging block including a swinging bottom and a swinging side portion, a guide groove extending in the left-right direction is formed between the swinging block and the fixed bracket, and the swinging side portion forms a front wall of the guide groove; The side of the bracket forms the rear wall of the guide groove, and the swing bottom forms the bottom wall of the guide groove,
    所述摆动块转动连接于所述固定支架,使所述摆动块能够绕沿左右方向延伸的第一转动轴线转动,使所述导向组件能在安装状态和打开状态之间切换,The swing block is rotatably connected to the fixed bracket, so that the swing block can rotate about a first rotation axis extending in the left-right direction, so that the guide assembly can be switched between an installed state and an opened state,
    所述摆动底部具有第一卡接部,所述第一卡接部位于所述摆动块的后侧的端部,所述固定支架设置有第二卡接部,所述第一卡接部和所述第二卡接部中的至少一个为弹性卡接部,在所述安装状态下,所述第二卡接部从上侧卡接所述第一卡接部,从而阻止所述摆动块转动;所述弹性卡接部能弹性变形,使所述第一卡接部和所述第二卡接部脱离卡接,所述摆动块转动至所述打开状态。The swing bottom has a first latching portion, the first latching portion is located at an end on the rear side of the swinging block, the fixing bracket is provided with a second latching portion, the first latching portion and At least one of the second engaging portions is an elastic engaging portion. In the installed state, the second engaging portion is engaged with the first engaging portion from an upper side, thereby preventing the swinging block. Rotation; the elastic engaging portion can be elastically deformed, so that the first engaging portion and the second engaging portion are released from the engaging, and the swing block is rotated to the open state.
  2. 根据权利要求1所述的导向组件,其中:所述固定支架包括固定支架主体、弹性块和第一弹性部件,所述弹性块沿前后方向滑动连接到所述固定支架主体,所述第一弹性部件安装于所述固定支架主体和所述弹性块之间,所述弹性块位于所述导向槽的后侧,所述第二卡接部设置于所述弹性块上。The guide assembly according to claim 1, wherein the fixed bracket includes a fixed bracket body, an elastic block, and a first elastic member, the elastic block is slidably connected to the fixed bracket body in the front-rear direction, and the first elastic A component is installed between the main body of the fixing bracket and the elastic block, the elastic block is located at the rear side of the guide groove, and the second engaging portion is disposed on the elastic block.
  3. 根据权利要求2所述的导向组件,其中:所述固定支架主体设置有凸出的第一限位部,所述弹性块设置有凸出的第二限位部,通过所述第一弹性部件提供弹性力,能够使所述第一限位部和所述第二限位部抵接。The guide assembly according to claim 2, wherein the main body of the fixing bracket is provided with a protruding first limiting portion, and the elastic block is provided with a protruding second limiting portion, and passes through the first elastic member. Providing elastic force enables the first limiting portion and the second limiting portion to abut.
  4. 根据权利要求2所述的导向组件,其中:所述弹性块设置有承力部,通过对所述承力部施力,可压缩所述第一弹性部件,使所述第一卡接部和所述第二卡接部脱离卡接。The guide assembly according to claim 2, wherein the elastic block is provided with a bearing portion, and by applying a force to the bearing portion, the first elastic member can be compressed to make the first engaging portion and the The second engaging portion is disengaged from the engaging.
  5. 根据权利要求4所述的导向组件,其中:所述导向槽的后壁具有开槽,通过所述第一弹性部件提供弹性力,能够使所述承力部的至少一部分能够穿 过所述开槽、凸出于所述导向槽的后壁。The guide assembly according to claim 4, wherein a rear wall of the guide groove has a slot, and an elastic force is provided by the first elastic member, so that at least a part of the bearing portion can pass through the opening. A groove protruding from a rear wall of the guide groove.
  6. 根据权利要求5所述的导向组件,其中:所述承力部包括转动连接于所述弹性块的滚轮,所述滚轮能够绕着沿上下方向延伸的第二转动轴线转动。The guide assembly according to claim 5, wherein the force bearing portion includes a roller rotatably connected to the elastic block, and the roller is rotatable about a second rotation axis extending in the vertical direction.
  7. 根据权利要求2至6中任一项所述的导向组件,其中:所述固定支架主体的左右两端向前侧凸出形成第一安装部和第二安装部,所述摆动块安装在所述第一安装部和所述第二安装部之间。The guide assembly according to any one of claims 2 to 6, wherein the left and right ends of the fixing bracket main body protrude forward to form a first mounting portion and a second mounting portion, and the swinging block is mounted on the Between the first mounting portion and the second mounting portion.
  8. 根据权利要求7所述的导向组件,其中:所述导向组件还包括第二弹性部件,所述第二弹性部件安装于所述摆动块和所述第二安装部之间,所述第一安装部的内侧设置有第一配合部,在所述第二弹性部件的作用下,使所述摆动块和所述第一配合部配合。The guide assembly according to claim 7, wherein the guide assembly further comprises a second elastic member mounted between the swing block and the second mounting portion, and the first mounting A first mating portion is provided on the inner side of the portion, and the swinging block is mated with the first mating portion under the action of the second elastic member.
  9. 根据权利要求8所述的导向组件,其中:所述摆动块与所述第一安装部相对的一端具有第二配合部,所述第一配合部和所述第二配合部配合成使得所述摆动块相对所述固定支架的转动使所述摆动块沿所述第一转动轴线轴向滑动。The guide assembly according to claim 8, wherein an end of the swing block opposite to the first mounting portion has a second mating portion, and the first mating portion and the second mating portion are mated such that the Rotation of the swinging block relative to the fixed bracket causes the swinging block to slide axially along the first rotation axis.
  10. 根据权利要求9所述的导向组件,其中:所述第一配合部包括第一斜面部和第一平面部,所述第一斜面部从第一平面部突出,所述第一斜面部呈锯齿状且包括第一斜面和第二斜面;The guide assembly according to claim 9, wherein the first mating portion includes a first inclined surface portion and a first planar portion, the first inclined surface portion protrudes from the first planar portion, and the first inclined surface portion is jagged. And includes a first inclined surface and a second inclined surface;
    所述第二配合部包括第二斜面部和第二平面部,所述第二斜面部从第二平面部突出,所述第二斜面部呈锯齿状且包括第三斜面和第四斜面。The second mating portion includes a second inclined surface portion and a second planar portion. The second inclined surface portion protrudes from the second planar portion. The second inclined surface portion is jagged and includes a third inclined surface and a fourth inclined surface.
  11. 根据权利要求10所述的导向组件,其中:所述第一斜面部在所述第一配合部的周向上设置有两个,两个所述第一斜面部在所述第一配合部的周向上间隔180度;The guide assembly according to claim 10, wherein the first inclined surface portion is provided two in a circumferential direction of the first mating portion, and the two first inclined surface portions are provided in a circumferential direction of the first mating portion. 180 degrees up
    所述第二斜面部在所述第二配合部的周向上设置有两个,两个所述第二斜面部在所述第二配合部的周向上间隔180度。Two of the second inclined surface portions are provided in a circumferential direction of the second mating portion, and the two second inclined surface portions are spaced 180 degrees apart in a circumferential direction of the second engaging portion.
  12. 根据权利要求2至6中任一项所述的导向组件,其中:The guide assembly according to any one of claims 2 to 6, wherein:
    所述导向组件包括第一转动轴,所述第一转动轴沿着所述第一转动轴线穿过所述摆动块,所述第一转动轴与所述摆动块固定连接,所述第一转动轴的周面上具有第三配合部,The guide assembly includes a first rotation shaft, the first rotation shaft passes through the swing block along the first rotation axis, the first rotation shaft is fixedly connected to the swing block, and the first rotation The shaft has a third mating portion on its peripheral surface,
    所述导向组件还包括第三弹性部件,所述第三弹性部件的一端安装到所述固定支架主体,所述第三弹性部件的另一端抵接所述第三配合部。The guide assembly further includes a third elastic member, one end of the third elastic member is mounted to the fixing bracket body, and the other end of the third elastic member abuts the third mating portion.
  13. 根据权利要求12所述的导向组件,其中:所述第三弹性部件包括弹簧和第四配合部,所述第四配合部位于所述弹簧的一端,The guide assembly according to claim 12, wherein the third elastic member includes a spring and a fourth mating portion, and the fourth mating portion is located at one end of the spring,
    所述第三配合部和所述第四配合部配合成使得所述摆动块相对所述固定支架的转动使所述第四配合部沿前后方向移动。The third mating portion and the fourth mating portion are mated such that rotation of the swinging block relative to the fixed bracket causes the fourth mating portion to move in the front-rear direction.
  14. 根据权利要求13所述的导向组件,其中:所述第四配合部具有第三平面部,The guide assembly according to claim 13, wherein the fourth mating portion has a third planar portion,
    所述第三配合部具有第四平面部、第五平面部和连接所述第四平面部与第五平面部的过渡部;The third mating portion has a fourth plane portion, a fifth plane portion, and a transition portion connecting the fourth plane portion and the fifth plane portion;
    在所述安装状态下,所述第三平面部和所述过渡部或所述第五平面部抵接,所述过渡部位于所述第一转动轴的轴线的下方,所述第五平面部位于所述过渡部的上方;在所述打开状态下,所述第三平面部和所述第四平面部抵接,所述过渡部位于所述第一转动轴的轴线的上方。In the mounted state, the third planar portion is in contact with the transition portion or the fifth planar portion, the transition portion is located below the axis of the first rotation shaft, and the fifth planar portion Located above the transition portion; in the opened state, the third plane portion and the fourth plane portion abut, and the transition portion is positioned above the axis of the first rotation shaft.
  15. 根据权利要求14所述的导向组件,其中:所述第一转动轴上设置有两个所述第三配合部,两个所述第三配合部设置于所述第一转动轴的轴向两端。The guide assembly according to claim 14, wherein the first rotation shaft is provided with two of the third mating portions, and the two third engagement portions are provided in an axial direction of the first rotation shaft. end.
  16. 一种推拉门,其包括权利要求1至15中任一项所述的导向组件、固定门和活动门,所述活动门安装于所述导向组件的导向槽中,所述固定门与所述导向组件的固定支架固定连接。A sliding door comprising the guide assembly according to any one of claims 1 to 15, a fixed door, and a movable door, the movable door is installed in a guide groove of the guide assembly, and the fixed door and the The fixing bracket of the guide assembly is fixedly connected.
PCT/CN2019/072711 2018-06-21 2019-01-22 Guide assembly and sliding door WO2019242306A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201810641875.8A CN108612424A (en) 2018-06-21 2018-06-21 A kind of guidance set and sliding door
CN201820957119.1 2018-06-21
CN201810641875.8 2018-06-21
CN201820957119.1U CN208650703U (en) 2018-06-21 2018-06-21 A kind of guidance set and sliding door

Publications (1)

Publication Number Publication Date
WO2019242306A1 true WO2019242306A1 (en) 2019-12-26

Family

ID=68983496

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/072711 WO2019242306A1 (en) 2018-06-21 2019-01-22 Guide assembly and sliding door

Country Status (1)

Country Link
WO (1) WO2019242306A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08121013A (en) * 1994-10-22 1996-05-14 Kimura Shin Kk Double sliding door device
CN2806716Y (en) * 2005-02-07 2006-08-16 戴新国 Locating mechanism for sliding and side-hung two purpose door and window
CN204060358U (en) * 2014-07-16 2014-12-31 中山市列武洁具有限公司 A kind of damping mute structure of sliding door
CN207296714U (en) * 2017-05-27 2018-05-01 福建西河卫浴科技有限公司 A kind of shower house sliding block
CN108612424A (en) * 2018-06-21 2018-10-02 福建西河卫浴科技有限公司 A kind of guidance set and sliding door

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08121013A (en) * 1994-10-22 1996-05-14 Kimura Shin Kk Double sliding door device
CN2806716Y (en) * 2005-02-07 2006-08-16 戴新国 Locating mechanism for sliding and side-hung two purpose door and window
CN204060358U (en) * 2014-07-16 2014-12-31 中山市列武洁具有限公司 A kind of damping mute structure of sliding door
CN207296714U (en) * 2017-05-27 2018-05-01 福建西河卫浴科技有限公司 A kind of shower house sliding block
CN108612424A (en) * 2018-06-21 2018-10-02 福建西河卫浴科技有限公司 A kind of guidance set and sliding door

Similar Documents

Publication Publication Date Title
TWI516196B (en) Two-shaft hinge and terminal apparatus using the same
US11085487B2 (en) Positioning locking mechanism of rotational member
US8307506B2 (en) Anti-pinching structure for supporting frame
US20090231796A1 (en) Portable computer with a rotary positioning structure
US11215208B2 (en) Positioning locking mechanism of rotational member
CN109763733B (en) Door opener
WO2016019883A1 (en) Reset switch
TW201428191A (en) Locking mechanism and display device using same
JP2011166738A (en) Slide type electronic device
WO2018145471A1 (en) Movable bracket
TW201337138A (en) Supporting shelf and electronic device using same
WO2019242306A1 (en) Guide assembly and sliding door
JP2005065815A (en) Armrest device
JP3442342B2 (en) Left and right combined door system
WO2019052066A1 (en) Support frame
TWM485598U (en) Rotation shaft apparatus
CN211040247U (en) Supporting device
TWI616597B (en) Hinge structure and portable electronic device
TWI669046B (en) Locking structure and system using the same
CN215225407U (en) Folding table
JP3191204B2 (en) Hinge device
JP4393057B2 (en) Door device in cabinet
TWI744201B (en) Portable electronic device
WO2023093903A1 (en) Rotary switching type voiced and silent mechanism for key switch
JP2002327894A (en) Leg length adjusting device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19822369

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19822369

Country of ref document: EP

Kind code of ref document: A1