WO2019222241A1 - Remédiation de blocage de conduite d'écoulement sous-marine à l'aide d'un dispositif de chauffage interne - Google Patents

Remédiation de blocage de conduite d'écoulement sous-marine à l'aide d'un dispositif de chauffage interne Download PDF

Info

Publication number
WO2019222241A1
WO2019222241A1 PCT/US2019/032252 US2019032252W WO2019222241A1 WO 2019222241 A1 WO2019222241 A1 WO 2019222241A1 US 2019032252 W US2019032252 W US 2019032252W WO 2019222241 A1 WO2019222241 A1 WO 2019222241A1
Authority
WO
WIPO (PCT)
Prior art keywords
coiled tubing
subsea
tubing string
flowline
insertion tool
Prior art date
Application number
PCT/US2019/032252
Other languages
English (en)
Inventor
Sam ALMERICO
Original Assignee
Oceaneering International, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oceaneering International, Inc. filed Critical Oceaneering International, Inc.
Publication of WO2019222241A1 publication Critical patent/WO2019222241A1/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/202Accessories therefor, e.g. floats, weights fixed on or to vessels
    • F16L1/207Pipe handling apparatus
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/006Combined heating and pumping means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/04Manipulators for underwater operations, e.g. temporarily connected to well heads

Definitions

  • Fig. l is a view in partial perspective of an exemplary subsea insertion tool.
  • FIG. 2 is a view in partial perspective of an exemplary subsea remediation system using the exemplary subsea insertion tool.
  • subsea insertion tool 1 comprises coiled tubing inserter 10 adapted to insert and remove coiled tubing string 100 into the flowline 120 subsea; sealer 20 configured to form a dynamic seal on an outer diameter of coiled tubing string 100; one or more gate valves 30 adapted to aid in primary sealing of flowline line fluids from the environment; one or more disconnect valves 40 adapted to aid in emergency disconnection of coiled tubing string 100; large bore connector 15 adapted to aid in venting and/or flushing the flowline during operation to de-pressurize and de-inventory the flowline, where large bore means around 500 centimeters or more; and flowline connector 50 adapted to connect with a pipeline termination.
  • subsea coiled tubing inserter 10 is adapted to push and/or pull coiled tubing string 100 into and out from flowline 120 and may comprise coiled tubing injector head 103 (not specifically shown in the figures).
  • sealer 20 comprises a stripper packer.
  • disconnect valve 40 further comprises a blowout preventor valve, shear ram 41, grip/seal ram 42, or the like, or a combination thereof.
  • coiled tubing cutter 12 may also be present and used to cut coiled tubing string 100 in case of an emergency disconnect.
  • Coiled tubing cutter 12 is typically located externally to coiled tubing inserter 10.
  • subsea insertion tool 1 may further comprise one or more flexible flowlines 122 (not specifically shown in the figures) disposed between subsea insertion tool 1 and flowline termination 123 (not specifically shown in the figures) which may be used for horizontal insertion to aid in alignment.
  • Subsea insertion tool 1 may also comprising an alignment system (not specifically shown in the figures) for aligning the tool with a pipeline termination.
  • subsea insertion tool 1 further comprises first remotely operated vehicle ROV panel 13, disposed proximate second end la of the subsea insertion tool 1 and operatively in communication with coiled tubing inserter 10, and second remotely operated vehicle ROV panel 14, disposed proximate first end la of subsea insertion tool 1 and operatively in communication with gate valve 30 and disconnect valve 40.
  • first remotely operated vehicle ROV panel 13 disposed proximate second end la of the subsea insertion tool 1 and operatively in communication with coiled tubing inserter 10
  • second remotely operated vehicle ROV panel 14 disposed proximate first end la of subsea insertion tool 1 and operatively in communication with gate valve 30 and disconnect valve 40.
  • heated coiled tubing string system 2 comprises subsea insertion tool 1, which is as described above; one or more coiled tubing control units located topside on a vessel, each comprising coiled tubing reel 70; coiled tubing string 100 comprising a predetermined length of coiled tubing 102 disposed about coiled tubing reel 70; heater 101 disposed inside coiled tubing string 100; one or more jetting nozzles 110 disposed at a predetermined end of coiled tubing string 100; and vibrator 111 (not specifically shown in the figures) located at an end of coiled tubing string 100 where vibrator 111 is adapted to provide vibration to aid in horizontal movement within flowline 120
  • heater 101 comprises a heating cable such as a mineral insulated cable. Although illustrated as heating a discrete section of coiled tubing string 100 proximate a reel end of coiled tubing string 100, heater 101 may be configured to heat the entire length of coiled tubing string 100. Heater 101 is typically used to heat chemicals which are pumped down coiled tubing string 100 to a temperature required for remediation of the blockage.
  • Vibrator 111 may comprise an agitator, a vibrator, an impact hammer, or the like, or a combination thereof.
  • Mechanical tractor 112 may further be present and adapted to aid in horizontal movement within flowline 120. In such embodiments, mechanical tractor 112 would replace vibrator 111.
  • one or more mechanical scrapers/brushes 1 13 may be present and adapted to abrade a blockage 121 and remove it from flowline 120.
  • rotator 130 may be present and operatively in communication with mechanical scraper/brush 113 where rotator 130 is configured to rotate mechanical scraper/brush 113 to provide a rotational motion to help abrade the blockage and remove it from flowline 120.
  • chemical pumping unit 80 may also be present and in fluid communication with coiled tubing string 100.
  • coiled tubing string 100 is typically disposed on an upper portion of subsea depressurizing and de-inventorying skid 200.
  • Coiled tubing may be used inside a subsea flowline to remediate blockages in the subsea flowline using heated coiled tubing string system 2, which is as described above.
  • Coiled tubing string 100 typically comprises a predetermined length of coiled tubing disposed about coiled tubing reel 70.
  • Coiled tubing string 100 is typically unspooled from coiled tubing reel 70 and the unspooled coiled tubing string 100 inserted subsea into subsea flowline 120 to where jetting nozzle 110 is positioned proximate a blockage in flowline 120.
  • Fluid is provided, e.g. pumped, from chemical pumping unit 80 to coiled tubing string 100 through to jetting nozzle 110 to remediate the blockage in flowline 120.
  • heater 101 is energized to heat fluid within coiled tubing string 100 to a temperature appropriate the achieve the remediation of the blockage.
  • Coiled tubing string 100 may be inserted subsea into the subsea flowline from a pipeline termination such as pipeline end terminations (PLET), flowline terminators (FLET), pipeline end manifolds (PLEM), or the like, from platform at a riser, or the like.
  • a pipeline termination such as pipeline end terminations (PLET), flowline terminators (FLET), pipeline end manifolds (PLEM), or the like.
  • coiled tubing string 100 is inserted subsea into flowline 120 using subsea insertion tool 1 deployed subsea, where subsea insertion tool 1 is as described above.
  • gate valve 30 may be used when coiled tubing string 100 is not in a bore of a valve.
  • subsea coiled tubing inserter 10 comprises coiled tubing injector head 103
  • subsea coiled tubing inserter 10 may be used to selectively insert coiled tubing string 100 into and remove coiled tubing string 100 out from flowline 120.
  • disconnect valve 40 may be used for emergency disconnection of coiled tubing string 100.
  • large bore connector 15 may be used to vent/flush flowline 120 and subsea insertion tool 1 during operation to de-pressurize and de- inventory flowline 120.
  • flowline connector 50 may be used to connect with a pipeline termination.
  • sealer 20 may be used to form a dynamic seal on an outer diameter of coiled tubing string 100.
  • subsea insertion tool 1 further comprises coiled tubing cutter 12 located externally to coiled tubing inserter 10, coiled tubing cutter 12 may be used to cut coiled tubing string 100 in case of emergency disconnect.
  • subsea insertion tool 1 further comprises flexible flowline 122
  • flexible flowline 122 may be used during horizontal insertion of coiled tubing string 100 to aid in alignment of the bore of subsea insertion tool 1 with the bore of flowline 120.
  • the alignment system may be to aid in aligning subsea insertion tool 1 with a pipeline termination.
  • subsea insertion tool 1 may be positioned in a substantially horizontal position, as illustrated in Fig. 2, or a substantially vertical position relative to a seabed.
  • subsea insertion tool 1 may be positioned or otherwise placed onto mudmat 60.
  • subsea insertion tool 1 may further comprise a balance structure for use in vertical position configurations and the balance structure used to transmit loads from subsea insertion tool 1 to a seabed and to provide a foundation for subsea insertion tool 1.
  • a balance structure for use in vertical position configurations and the balance structure used to transmit loads from subsea insertion tool 1 to a seabed and to provide a foundation for subsea insertion tool 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Cleaning In General (AREA)

Abstract

La présente invention concerne un tube d'intervention enroulé qui peut être placé à l'intérieur d'une conduite d'écoulement sous-marine, par exemple avec un outil d'insertion sous-marin, pour remédier à des blocages dans la conduite d'écoulement sous-marine. Dans des modes de réalisation, l'outil d'insertion sous-marin est utilisé pour dérouler une longueur de colonne de tube d'intervention enroulé à partir d'un dévidoir de tube d'intervention enroulé et insérer la colonne de tube d'intervention enroulé non enroulée au niveau sous-marin dans une conduite d'écoulement vers laquelle une buse d'éjection est positionnée à proximité d'un blocage dans une conduite d'écoulement (120). Un fluide est fourni, par exemple pompé, d'une unité de pompage chimique (80) à une colonne de tube d'intervention enroulé (100) à travers une buse d'éjection (110) pour remédier au blocage dans la conduite d'écoulement (120).
PCT/US2019/032252 2018-05-14 2019-05-14 Remédiation de blocage de conduite d'écoulement sous-marine à l'aide d'un dispositif de chauffage interne WO2019222241A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201862671346P 2018-05-14 2018-05-14
US62/671,346 2018-05-14

Publications (1)

Publication Number Publication Date
WO2019222241A1 true WO2019222241A1 (fr) 2019-11-21

Family

ID=68463514

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2019/032252 WO2019222241A1 (fr) 2018-05-14 2019-05-14 Remédiation de blocage de conduite d'écoulement sous-marine à l'aide d'un dispositif de chauffage interne

Country Status (2)

Country Link
US (1) US20190345780A1 (fr)
WO (1) WO2019222241A1 (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020117793A1 (fr) * 2018-12-03 2020-06-11 Bp Corporation North America, Inc. Systèmes et procédés d'accès à des conduits sous-marins
US11781395B2 (en) * 2019-07-23 2023-10-10 Bp Corporation North America Inc. Systems and methods for identifying blockages in subsea conduits
US11506319B2 (en) 2019-07-23 2022-11-22 Bp Corporation North America Inc. Hot tap assembly and method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4515220A (en) * 1983-12-12 1985-05-07 Otis Engineering Corporation Apparatus and method for rotating coil tubing in a well
US5738173A (en) * 1995-03-10 1998-04-14 Baker Hughes Incorporated Universal pipe and tubing injection apparatus and method
US20030178200A1 (en) * 2002-02-19 2003-09-25 Preston Fox Subsea intervention system, method and components thereof
US20040079531A1 (en) * 2002-10-28 2004-04-29 Smith Peter V. Disconnect check valve mechanism for coiled tubing
US20050263281A1 (en) * 2004-05-28 2005-12-01 Lovell John R System and methods using fiber optics in coiled tubing
US20090183881A1 (en) * 2008-01-22 2009-07-23 Andrea Sbordone Intervention system with dynamic seal
US20100018693A1 (en) * 2008-07-25 2010-01-28 Neil Sutherland Duncan Pipeline entry system
US20100307760A1 (en) * 2009-06-04 2010-12-09 Blue Ocean Technologies LLC Subsea wireline intervention system
US20110017463A1 (en) * 2009-07-23 2011-01-27 Schlumberger Technology Corporation Use of a spoolable compliant guide and coiled tubing to clean up a well
US20140318791A1 (en) * 2013-04-29 2014-10-30 Oceaneering International, Inc. System and method for subsea structure obstruction remediation using an exothermic chemical reaction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4515220A (en) * 1983-12-12 1985-05-07 Otis Engineering Corporation Apparatus and method for rotating coil tubing in a well
US5738173A (en) * 1995-03-10 1998-04-14 Baker Hughes Incorporated Universal pipe and tubing injection apparatus and method
US20030178200A1 (en) * 2002-02-19 2003-09-25 Preston Fox Subsea intervention system, method and components thereof
US20040079531A1 (en) * 2002-10-28 2004-04-29 Smith Peter V. Disconnect check valve mechanism for coiled tubing
US20050263281A1 (en) * 2004-05-28 2005-12-01 Lovell John R System and methods using fiber optics in coiled tubing
US20090183881A1 (en) * 2008-01-22 2009-07-23 Andrea Sbordone Intervention system with dynamic seal
US20100018693A1 (en) * 2008-07-25 2010-01-28 Neil Sutherland Duncan Pipeline entry system
US20100307760A1 (en) * 2009-06-04 2010-12-09 Blue Ocean Technologies LLC Subsea wireline intervention system
US20110017463A1 (en) * 2009-07-23 2011-01-27 Schlumberger Technology Corporation Use of a spoolable compliant guide and coiled tubing to clean up a well
US20140318791A1 (en) * 2013-04-29 2014-10-30 Oceaneering International, Inc. System and method for subsea structure obstruction remediation using an exothermic chemical reaction

Also Published As

Publication number Publication date
US20190345780A1 (en) 2019-11-14

Similar Documents

Publication Publication Date Title
US8707498B2 (en) Multifunctional cleaning tool
US20190345780A1 (en) Subsea Flowline Blockage Remediation Using Internal Heating Device
US7036598B2 (en) Intervention module for a well
EP3227522B1 (fr) Système de tête de puits inclinée sous-marine et système bop à deux unités de tête d'injection
US9695665B2 (en) Subsea chemical injection system
US9248478B2 (en) Method and apparatus for removal of pigs, deposits and other debris from pipelines and wellbores
MX2007007451A (es) Metodo y aparato para derivacion fluida de una herramienta de pozo.
CA2845614A1 (fr) Systeme, appareil et procede pour exploiter un puits
CA2280558A1 (fr) Systeme de pompage par colonne creuse
US11060380B2 (en) Systems and methods for accessing subsea conduits
EP1438480B1 (fr) Procede de conditionnement de fluides de puits de forage et tige de pompage associee
WO2009128926A1 (fr) Intervention sur pipeline
NO20140379A1 (no) Dobbel strippeanordning
EP2501890B1 (fr) Système de connexion capable d'enfler et procédé d'utilisation de celui-ci
EP2809874B1 (fr) Procédé et système pour le confinement et l'intervention rapides suite à l'explosion d'un puits sous-marin
US7806187B2 (en) Connector assembly for connecting a hot stab to a hydraulic hose
US12091941B2 (en) Downhole wellbore treatment system and method
US20150233516A1 (en) Local Vacuum Method of Pipeline Hydrate Remediation
US20200332606A1 (en) Device for centring and/or pulling a tool in a pipeline
EP2372206A1 (fr) Raccord intermédiaire
AU2006202233B2 (en) Top tensioned riser adaptor
US11781395B2 (en) Systems and methods for identifying blockages in subsea conduits
EP3601720B1 (fr) Agencement pour amener un agent de solidification fluide dans un puits d'hydrocarbure sous-marin
WO2016106267A1 (fr) Système d'abandon de puits sous-marin sans colonne montante
WO2019147123A1 (fr) Procédé d'installation de tuyau thermoplastique renforcé (rtp)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19803141

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19803141

Country of ref document: EP

Kind code of ref document: A1