WO2019216612A1 - Method and apparatus for controlling uplink transmission power by terminal for dual connectivity in wireless communication system - Google Patents
Method and apparatus for controlling uplink transmission power by terminal for dual connectivity in wireless communication system Download PDFInfo
- Publication number
- WO2019216612A1 WO2019216612A1 PCT/KR2019/005401 KR2019005401W WO2019216612A1 WO 2019216612 A1 WO2019216612 A1 WO 2019216612A1 KR 2019005401 W KR2019005401 W KR 2019005401W WO 2019216612 A1 WO2019216612 A1 WO 2019216612A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transmission
- terminal
- base station
- lte
- uplink
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/14—Separate analysis of uplink or downlink
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/38—TPC being performed in particular situations
- H04W52/50—TPC being performed in particular situations at the moment of starting communication in a multiple access environment
Definitions
- the present invention relates to a transmission power control method and apparatus for uplink transmission in a wireless communication system.
- a 5G communication system or a pre-5G communication system is called a system after a 4G network (Beyond 4G Network) or a system after an LTE system (Post LTE).
- 5G communication systems are being considered for implementation in the ultra-high frequency (mmWave) band (eg, such as the 60 Gigabit (60 GHz) band).
- mmWave ultra-high frequency
- FD-MIMO massive array multiple input / output
- FD-MIMO massive array multiple input / output
- Array antenna, analog beam-forming, and large scale antenna techniques are discussed.
- 5G communication systems have advanced small cells, advanced small cells, cloud radio access network (cloud RAN), ultra-dense network (ultra-dense network) , Device to Device communication (D2D), wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), and interference cancellation
- cloud RAN cloud radio access network
- ultra-dense network ultra-dense network
- D2D Device to Device communication
- wireless backhaul moving network
- cooperative communication Coordinated Multi-Points (CoMP), and interference cancellation
- Hybrid FSK and QAM Modulation FQAM
- SWSC Slide Window Superposition Coding
- ACM Advanced Coding Modulation
- FBMC Fan Bank Multi Carrier
- NOMA non orthogonal multiple access
- SCMA sparse code multiple access
- IoT Internet of Things
- IoE Internet of Everything
- M2M machine to machine
- MTC Machine Type Communication
- IT intelligent Internet technology services can be provided that collect and analyze data generated from connected objects to create new value in human life.
- IoT is a field of smart home, smart building, smart city, smart car or connected car, smart grid, health care, smart home appliances, advanced medical services, etc. through convergence and complex of existing information technology (IT) technology and various industries. It can be applied to.
- a terminal capable of dual access to LTE and NR may transmit and receive data for LTE and NR cells, respectively, wherein the uplink transmission power of the terminal is limited by the maximum power of the terminal.
- one object of the present invention according to whether the LTE cell is a master cell group (MCG) or the NR cell is MCG, or the processing time of the uplink transmission of the terminal, if the uplink transmission occurs simultaneously in the LTE cell and the NR cell
- MCG master cell group
- a method and apparatus for controlling uplink transmit power such as reducing transmit power or dropping transmissions in a particular cell.
- a wireless communication system for solving the above problems, dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology is established.
- the terminal method Receiving a downlink signal from the first base station, the transmission timing of the first uplink signal corresponding to the downlink signal is the transmission of the second uplink signal to the second base station Checking whether the timing overlaps, and when the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the first transmission power and the second uplink transmission for the first uplink transmission are performed.
- the method may include controlling the second transmit power based on a processing time for transmitting the first uplink signal.
- a first base station method comprising: transmitting a downlink signal to the terminal and receiving a first uplink signal corresponding to the downlink signal from the terminal based on a first transmission power; The second transmission power for the transmission of the second uplink signal from the terminal to the second base station, the transmission timing of the first uplink signal overlaps with the transmission timing of the second uplink signal, the first If the sum of the transmit power and the second transmit power exceeds the maximum transmit power of the terminal, the first uplink signal processing time of the terminal is based on the It may be controlled by the horse.
- a terminal for performing dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology The transceiver is controlled to receive a downlink signal from the transceiver and the first base station, and the transmission timing of the first uplink signal corresponding to the downlink signal is transmitted to the second base station. Check whether the timing overlaps, and when the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the first transmission power and the second uplink signal for the transmission of the first uplink signal.
- Determine whether the sum of the second transmission power for the transmission exceeds the maximum transmission power of the terminal, and the first transmission power and the second transmission power If it exceeds the maximum transmit power of the terminal, on the basis of processing (processing) time for the first transmission of the uplink signal may be a control unit for controlling the second transmission power.
- the transceiver unit In the first base station, the transceiver unit to transmit a downlink signal to the transceiver and the terminal, and to receive a first uplink signal corresponding to the downlink signal from the terminal, based on a first transmission power And a control unit for controlling the second transmission power for the transmission of the second uplink signal from the terminal to the second base station, wherein the transmission timing of the first uplink signal is the transmission timing of the second uplink signal. If the sum of the first transmit power and the second transmit power exceeds the maximum transmit power of the terminal, the first uplink signal processing (p) of the terminal; rocessing) may be controlled by the terminal based on the time.
- the first uplink signal processing (p) of the terminal; rocessing may be controlled by the terminal based on the time.
- the present invention when the terminal is supported dual connectivity is set up dual connectivity from the LTE base station and the NR base station, in consideration of whether the MCG LTE or NR cell and the upstream processing time of the terminal Even if uplink transmission occurs simultaneously in the LTE cell and the NR cell, uplink transmission can be performed by controlling the transmit power within the maximum transmit power value of the UE.
- FIG. 1 illustrates a basic structure of a time-frequency domain in an LTE system.
- FIG. 2 is a diagram illustrating an example in which 5G services are multiplexed and transmitted in one system.
- FIG. 3 is a diagram illustrating an embodiment of a communication system to which the present invention is applied.
- FIG. 4 is a diagram illustrating a method of controlling power of uplink transmission according to Embodiments 1 and 2 of the present invention.
- FIG. 5 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 3 and 4 of the present invention.
- FIG. 6 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 5 and 6 of the present invention.
- FIG. 7 is a diagram illustrating a method of controlling power of uplink transmission according to Embodiment 7 of the present invention.
- Embodiment 8 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiment 8 of the present invention.
- Embodiment 9 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiment 9 of the present invention.
- FIG. 10 is a diagram illustrating a base station and a terminal procedure according to embodiments of the present invention.
- FIG. 11 illustrates a base station apparatus according to embodiments of the present invention.
- FIG. 12 is a diagram illustrating a terminal device according to embodiments of the present invention.
- each block of the flowchart illustrations and combinations of flowchart illustrations may be performed by computer program instructions. Since these computer program instructions may be mounted on a processor of a general purpose computer, special purpose computer, or other programmable data processing equipment, those instructions executed through the processor of the computer or other programmable data processing equipment may be described in flow chart block (s). It creates a means to perform the functions. These computer program instructions may be stored in a computer usable or computer readable memory that can be directed to a computer or other programmable data processing equipment to implement functionality in a particular manner, and thus the computer usable or computer readable memory. It is also possible for the instructions stored in to produce an article of manufacture containing instruction means for performing the functions described in the flowchart block (s).
- Computer program instructions may also be mounted on a computer or other programmable data processing equipment, such that a series of operating steps may be performed on the computer or other programmable data processing equipment to create a computer-implemented process to create a computer or other programmable data. Instructions for performing the processing equipment may also provide steps for performing the functions described in the flowchart block (s).
- each block may represent a portion of a module, segment, or code that includes one or more executable instructions for executing a specified logical function (s).
- logical function e.g., a module, segment, or code that includes one or more executable instructions for executing a specified logical function (s).
- the functions noted in the blocks may occur out of order.
- the two blocks shown in succession may in fact be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending on the corresponding function.
- ' ⁇ part' used in the present embodiment refers to software or a hardware component such as an FPGA or an ASIC, and ' ⁇ part' plays certain roles.
- ' ⁇ ' is not meant to be limited to software or hardware.
- ' ⁇ Portion' may be configured to be in an addressable storage medium or may be configured to play one or more processors.
- ' ⁇ ' means components such as software components, object-oriented software components, class components, and task components, and processes, functions, properties, procedures, and the like. Subroutines, segments of program code, drivers, firmware, microcode, circuits, data, databases, data structures, tables, arrays, and variables.
- the functionality provided within the components and the 'parts' may be combined into a smaller number of components and the 'parts' or further separated into additional components and the 'parts'.
- the components and ' ⁇ ' may be implemented to play one or more CPUs in the device or secure multimedia card.
- an OFDM-based wireless communication system in particular the 3GPP EUTRA standard will be the main target, but the main subject of the present invention is another communication system having a similar technical background and channel form.
- the main subject of the present invention is another communication system having a similar technical background and channel form.
- a 5G communication system or a pre-5G communication system is called a Beyond 4G network communication system or a post LTE system.
- 5G communication systems are being considered for implementation in the ultra-high frequency (mmWave) band (eg, such as the 60 Gigabit (60 GHz) band).
- mmWave ultra-high frequency
- FD-MIMO massive array multiple input / output
- FD-MIMO massive array multiple input / output
- FD-MIMO FD-MIMO
- an advanced small cell in order to improve the network of the system, in the 5G communication system, an advanced small cell, an advanced small cell, a cloud radio access network (cloud RAN), an ultra-dense network ), Device to Device communication (D2D), wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), and interference cancellation Technology development, etc.
- cloud RAN cloud radio access network
- D2D Device to Device communication
- CoMP Coordinated Multi-Points
- FQAM Hybrid FSK and QAM Modulation
- SWSC Slide Window Superposition Coding
- ACM Advanced Coding Modulation
- FBMC Fan Bank Multi Carrier
- NOMA Non-orthogonal multiple access and sparse code multiple access are being developed.
- IoT Internet of Things
- IoE Internet of Everything
- M2M machine to machine
- MTC Machine Type Communication
- IT intelligent Internet technology services can be provided that collect and analyze data generated from connected objects to create new value in human life.
- IoT is a field of smart home, smart building, smart city, smart car or connected car, smart grid, health care, smart home appliances, advanced medical services, etc. through convergence and complex of existing information technology (IT) technology and various industries. It can be applied to.
- the present invention relates to a wireless communication system, and more particularly, different wireless communication systems coexist at one carrier frequency or multiple carrier frequencies, and a terminal capable of transmitting and receiving data in at least one communication system among different communication systems.
- the present invention relates to a method and an apparatus for transmitting and receiving data with each communication system.
- mobile communication systems have been developed to provide voice services while guaranteeing user activity.
- mobile communication systems are gradually expanding to not only voice but also data services, and have now evolved to provide high-speed data services.
- a shortage of resources and users demand faster services, and thus, a more advanced mobile communication system is required.
- LTE Long Term Evolution
- 3GPP The 3rd Generation Partnership Project
- LTE is a technology that implements high-speed packet-based communication with a transmission rate of up to 100 Mbps.
- various methods are discussed.
- the network structure can be simplified to reduce the number of nodes located on the communication path, or the wireless protocols can be as close to the wireless channel as possible.
- the LTE system employs a hybrid automatic repeat request (HARQ) scheme in which the data is retransmitted in the physical layer when a decoding failure occurs in the initial transmission.
- HARQ hybrid automatic repeat request
- the receiver when the receiver does not correctly decode the data, the receiver transmits NACK (Negative Acknowledgement) indicating the decoding failure to the transmitter so that the transmitter can retransmit the corresponding data in the physical layer.
- NACK Negative Acknowledgement
- the receiver combines the data retransmitted by the transmitter with the previously decoded data to improve the data reception performance.
- the transmitter may transmit an acknowledgment (ACK) indicating the decoding success to the transmitter so that the transmitter may transmit new data.
- ACK acknowledgment
- FIG. 1 is a diagram illustrating a basic structure of a time-frequency domain, which is a radio resource region in which the data or control channel is transmitted in downlink in an LTE system.
- the horizontal axis represents the time domain and the vertical axis represents the frequency domain.
- the minimum transmission unit in the time domain is an OFDM symbol, in which Nsymb (102) OFDM symbols are gathered to form one slot 106, and two slots are gathered to form one subframe 105.
- the length of the slot is 0.5ms and the length of the subframe is 1.0ms.
- the radio frame 114 is a time domain unit consisting of 10 subframes.
- the minimum transmission unit in the frequency domain is a subcarrier, and the bandwidth of the entire system transmission bandwidth is composed of a total of NBW 104 subcarriers.
- the basic unit of a resource in the time-frequency domain may be represented by an OFDM symbol index and a subcarrier index as a resource element (RE).
- the resource block 108 (Resource Block; RB or PRB) is defined as Nsymb 102 consecutive OFDM symbols in the time domain and NRB 110 consecutive subcarriers in the frequency domain.
- one RB 108 is composed of Nsymb x NRB REs 112.
- the minimum transmission unit of data is the RB unit.
- the data rate increases in proportion to the number of RBs scheduled for the UE.
- the LTE system defines and operates six transmission bandwidths. In the case of a frequency division duplex (FDD) system in which downlink and uplink are divided into frequencies, the downlink transmission bandwidth and the uplink transmission bandwidth may be different.
- the channel bandwidth represents a radio frequency (RF) bandwidth corresponding to the system transmission bandwidth.
- RF radio frequency
- Table 1 shows the correspondence between the system transmission bandwidth and the channel bandwidth defined in the LTE system.
- an LTE system with a 10 MHz channel bandwidth consists of 50 RBs in transmission bandwidth.
- the downlink control information is transmitted within the first N OFDM symbols in the subframe.
- N ⁇ 1, 2, 3 ⁇ . Therefore, the N value varies in each subframe according to the amount of control information to be transmitted in the current subframe.
- the control information includes a control channel transmission interval indicator indicating how many control information is transmitted over the OFDM symbol, scheduling information for downlink data or uplink data, HARQ ACK / NACK signal, and the like.
- DCI downlink control information
- An uplink (UL) refers to a radio link through which a terminal transmits data or a control signal to a base station
- a downlink (DL) refers to a radio link through which a base station transmits data or a control signal to a terminal.
- DCI defines various formats to determine whether scheduling information (UL (uplink) grant) for uplink data or scheduling information (DL (downlink) grant) for downlink data and whether compact DCI having a small size of control information.
- the DCI format is determined according to whether or not it is applied, whether to use spatial multiplexing using multiple antennas, or whether the DCI for power control is applied.
- DCI format 1 which is scheduling control information (DL grant) for downlink data is configured to include at least the following control information.
- Resource allocation type 0/1 flag Notifies whether the resource allocation method is type 0 or type 1.
- Type 0 uses the bitmap method to allocate resources in resource block group (RBG) units.
- a basic unit of scheduling is a resource block (RB) represented by time and frequency domain resources, and the RBG is composed of a plurality of RBs to become a basic unit of scheduling in a type 0 scheme.
- Type 1 allows allocating a specific RB within the RBG.
- Resource block assignment Notifies the RB allocated for data transmission.
- the resource to be expressed is determined by the system bandwidth and the resource allocation method.
- Modulation and coding scheme Notifies the modulation scheme used for data transmission and the size of the transport block that is the data to be transmitted.
- HARQ process number Notifies the process number of HARQ.
- New data indicator notifies whether HARQ initial transmission or retransmission.
- Redundancy version Notifies the redundant version of the HARQ.
- TPC Transmit Power Control
- PUCCH Physical Uplink Control CHannel
- the DCI is transmitted through a physical downlink control channel (PDCCH) or an enhanced PDCCH (EPDCCH), which is a downlink physical control channel through channel coding and modulation.
- PDCH physical downlink control channel
- EPDCCH enhanced PDCCH
- the DCI is channel-coded independently for each UE, and then configured and transmitted with each independent PDCCH.
- the PDCCH is mapped and transmitted during the control channel transmission period.
- the frequency domain mapping position of the PDCCH is determined by the identifier (ID) of each terminal and spread over the entire system transmission band.
- the downlink data is transmitted through a physical downlink shared channel (PDSCH) which is a physical channel for downlink data transmission.
- PDSCH is transmitted after the control channel transmission interval, and scheduling information such as specific mapping positions and modulation schemes in the frequency domain is informed by the DCI transmitted through the PDCCH.
- the base station notifies the UE of a modulation scheme applied to a PDSCH to be transmitted and a transport block size (TBS) of data to be transmitted through an MCS configured of 5 bits among control information constituting the DCI.
- TBS corresponds to a size before channel coding for error correction is applied to data (transport block, TB) that the base station intends to transmit.
- Quadrature Phase Shift Keying QPSK
- Quadrature Amplitude Modulation (16QAM) Quadrature Amplitude Modulation
- 64QAM 64QAM.
- Each modulation order (Qm) corresponds to 2, 4, and 6. That is, 2 bits per symbol for QPSK modulation, 4 bits per symbol for 16QAM modulation, and 6 bits per symbol for 64QAM modulation.
- bandwidth extension technology has been adopted to support higher data throughput compared to LTE Rel-8.
- This technique called bandwidth extension or carrier aggregation (CA)
- CA bandwidth extension or carrier aggregation
- Each of the bands is called a component carrier (CC)
- the LTE Rel-8 terminal is defined to have one component carrier for each of downlink and uplink.
- the downlink component carrier and the uplink component carrier connected to the SIB-2 are collectively called a cell.
- the SIB-2 connection relationship between the downlink component and the uplink component is transmitted as a system signal or a higher signal.
- the terminal supporting the CA may receive downlink data through a plurality of serving cells and transmit uplink data.
- a base station when a base station is difficult to send a physical downlink control channel (PDCCH) to a specific UE from a specific serving cell, another serving cell transmits the PDCCH and the corresponding PDCCH is a physical downlink shared channel (PDSCH) of another serving cell or
- a carrier indicator field may be set to the UE.
- the CIF may be set to a terminal supporting the CA.
- the CIF is determined to indicate another serving cell by adding 3 bits to the PDCCH information in a specific serving cell.
- the CIF is included only when the CIF is set as an upper signal to perform cross carrier scheduling.
- the upper signal is not set to cross carrier scheduling or the upper signal is set to self scheduling, CIF is not included and cross carrier scheduling is not performed at this time.
- the CIF is included in downlink allocation information (DL assignment)
- the CIF indicates a serving cell to which a PDSCH scheduled by DL assignment is to be transmitted
- the CIF is included in UL resource allocation information (UL grant).
- the CIF is defined to indicate the serving cell to which the PUSCH scheduled by the UL grant is to be transmitted.
- carrier aggregation which is a bandwidth extension technology
- a plurality of serving cells may be configured in the terminal.
- the terminal transmits channel information about the plurality of serving cells periodically or aperiodically to the base station for data scheduling of the base station.
- the base station schedules and transmits data for each carrier, and the terminal transmits A / N feedback for the data transmitted for each carrier.
- it is designed to transmit A / N feedback of maximum 21 bits, and when A / N feedback and channel information overlap in one subframe, it is designed to transmit A / N feedback and discard channel information.
- up to 22 bits of A / N feedback and one cell channel information are transmitted in PUCCH format 3 from PUCCH format 3 by multiplexing channel information of one cell with A / N feedback. It was.
- LTE Rel-13 a maximum of 32 serving cell configuration scenarios are assumed.
- the concept of extending the number of serving cells to 32 by using a band in an unlicensed band as well as a licensed band is completed.
- the LTE service has been provided in an unlicensed band such as the 5 GHz band, which is called LAA (Licensed Assisted Access).
- LAA Licensed Assisted Access
- the LAA applied Carrier aggregation technology in LTE to support the operation of the LTE cell, which is a licensed band, as the P-cell, and the LAA cell, which is the unlicensed band, as the S-cell.
- LTE refers to including all of LTE evolution technology, such as LTE-A, LAA.
- a communication system after LTE i.e., a fifth generation wireless cellular communication system (hereinafter referred to as 5G or NR)
- 5G or NR a fifth generation wireless cellular communication system
- 5G or NR should be able to freely reflect various requirements such as users and service providers. Services that meet the requirements can be supported.
- 5G is referred to as increased mobile broadband communication (eMBB: Enhanced Mobile BroadBand, hereinafter referred to as eMBB), Massive Machine Type Communication (mMTC: referred to herein as mMTC), Various 5G-oriented services such as ultra reliable low delay communication (URLLC: Ultra Reliable and Low Latency Communications, hereinafter referred to as URLLC) in terms of terminal maximum transmission speed of 20Gbps, terminal maximum speed of 500km / h, and maximum delay time of 0.5ms
- URLLC Ultra Reliable and Low Latency Communications
- the terminal access density may be defined as a technology for satisfying the requirements selected for each 5G-oriented services among requirements such as 1,000,000 terminals / km 2.
- mMTC is being considered to support application services such as the Internet of Thing (IoT) in 5G.
- IoT Internet of Thing
- the mMTC needs a requirement for supporting large terminal access in a cell, improving terminal coverage, improved battery time, and reducing terminal cost.
- the IoT is attached to various sensors and various devices to provide a communication function, it must be able to support a large number of terminals (eg, 1,000,000 terminals / km 2) in a cell.
- mMTC is likely to be located in a shadow area such as the basement of a building or an area not covered by a cell, and thus requires more coverage than the coverage provided by an eMBB.
- the mMTC is likely to be composed of a low cost terminal, and very long battery life time is required because it is difficult to frequently change the battery of the terminal.
- URLLC Ultra-low latency and ultra-reliability.
- URLLC must satisfy a maximum latency of less than 0.5 ms, while simultaneously providing a packet error rate of 10-5 or less. Accordingly, a transmission time interval (TTI) smaller than a 5G service such as eMBB is required for URLLC, and a design that needs to allocate a wide resource in a frequency band is required.
- TTI transmission time interval
- the services considered in the above-mentioned fifth generation wireless cellular communication system should be provided as a framework. That is, for efficient resource management and control, it is desirable that each service is integrated and controlled and transmitted as one system rather than operated independently.
- FIG. 2 is a diagram illustrating an example in which services considered in 5G are transmitted to one system.
- the frequency-time resource 201 used by 5G in FIG. 2 may consist of a frequency axis 202 and a time axis 203. 2 illustrates that 5G operates eMBB 205, mMTC 206 and URLLC 207 in one framework.
- eMBMS enhanced mobile broadcast / multicast service
- Services considered in 5G are time-division multiplexing (TDM) or frequency within one system frequency bandwidth operating at 5G. It may be multiplexed and transmitted through frequency division multiplexing (FDM), and spatial division multiplexing may also be considered.
- TDM time-division multiplexing
- FDM frequency division multiplexing
- eMBB 205 it is desirable to occupy the maximum frequency bandwidth at a certain arbitrary time in order to provide the increased data transmission rate described above. Accordingly, in the case of the eMBB 205 service, it is preferable to transmit TDM in another service and system transmission bandwidth 201, but it is also desirable to transmit FDM in other services and system transmission bandwidth according to the needs of other services. .
- the mMTC 206 unlike other services, an increased transmission interval is required to secure wide coverage, and coverage can be secured by repeatedly transmitting the same packet within the transmission interval. At the same time, there is a limit on the transmission bandwidth that the terminal can receive in order to reduce the complexity of the terminal and the terminal price. Given this requirement, it is desirable for the mMTC 206 to be transmitted in FDM with other services within a 5G transmission system bandwidth 201.
- URLLC 207 preferably has a short Transmit Time Interval (TTI) when compared to other services to meet the ultra-delay requirements required by the service. At the same time, it is desirable to have a wide bandwidth on the frequency side because it must have a low coding rate in order to satisfy the super reliability requirements. Given this requirement of URLLC 207, URLLC 207 is preferably TDM with other services within 5G of transmission system bandwidth 201.
- TTI Transmit Time Interval
- Each of the above-described services may have different transmission / reception schemes and transmission / reception parameters in order to satisfy requirements required by each service.
- each service can have a different numerology based on each service requirement. Numerology is a cyclic prefix (CP) length and subcarrier spacing in a communication system based on Orthogonal Frequency Division Multiplexing (OFDM) or Orthogonal Frequency Division Multiple Access (OFDMA). spacing), OFDM symbol length, transmission interval length (TTI), and the like.
- OFDM Orthogonal Frequency Division Multiplexing
- OFDMA Orthogonal Frequency Division Multiple Access
- spacing OFDM symbol length
- TTI transmission interval length
- the eMBMS 208 may have a longer CP length than other services. Since eMBMS transmits broadcast-based higher traffic, all cells can transmit the same data.
- a shorter OFDM symbol length may be required as a smaller TTI is required than other services, and at the same time, a wider subcarrier interval may be required.
- one TTI may be defined as one slot, and may include 14 OFDM symbols or 7 OFDM symbols. Therefore, in the case of subcarrier spacing of 15KHz, one slot has a length of 1ms or 0.5ms.
- one TTI can be defined as one mini-slot or sub-slot for emergency transmission and transmission to unlicensed band, and one mini-slot is from 1 (total OFDM of slots).
- Symbol number) ⁇ 1 may have the number of OFDM symbols. For example, when the length of one slot is 14 OFDM symbols, the length of the mini slot may be determined from 1 to 13 OFDM symbols.
- the length, format, and repetition type of the slot or minislot may be defined by the standard or transmitted by higher level signals, system information, or physical signals, and may be received by the terminal.
- a slot instead of a mini slot or a sub slot, a slot may be determined from 1 to 14 OFDM symbols, and the length of the slot may be transmitted by an upper signal or system information and may be received by the terminal.
- Slots or mini-slots may be defined to have various transmission formats, and may be classified into the following formats.
- Downlink-only slot (DL only slot or full DL slot): Downlink-only slot consists of only a downlink period, only downlink transmission is supported.
- a DL centric slot is composed of a down period, a GP (or a flexible symbol), and an up period, and the number of OFDM symbols in the down period is larger than the number of OFDM symbols in the up period.
- the up-centric slot is composed of a downlink section, a GP (or flexible symbol), and an uplink section, and the number of OFDM symbols in the downlink section is smaller than the number of OFDM symbols in the uplink section.
- the uplink only slot consists of an uplink only, only uplink transmission is supported.
- the mini-slot may be classified in the same classification method. That is, it may be classified into a downlink only mini slot, a down center mini slot, an up center mini slot, an uplink dedicated mini slot, and the like.
- the flexible symbol may be used as a guard symbol for transmission / reception switching and may also be used for channel estimation purposes.
- LTE and 5G system will be the main target, but the main subject of the present invention greatly extends the scope of the present invention to other communication systems having a similar technical background and channel form. Applicable in a few variations without departing from the scope, which will be possible in the judgment of those skilled in the art.
- FIG. 3 is a diagram illustrating an embodiment of a communication system to which the present invention is applied.
- the drawings illustrate a form in which the 5G system is operated, and the methods proposed in the present invention can be applied to the system of FIG. 3.
- FIG. 3 is a diagram illustrating an example of an integrated system configuration combining a base station in charge of the new radio access technology and an LTE / LTE-A base station.
- relatively small coverage base stations 303, 305, 307 of coverage 304, 306, 308 may be disposed within coverage 302 of macro base station 301.
- the macro base station 301 is capable of transmitting signals at a relatively higher transmission power than the small base stations 303, 305, and 307, so that the coverage 302 of the macro base station 301 is the small base stations 303, 305, and 307.
- the macro base station represents an LTE / LTE-A system operating in a relatively low frequency band
- the small base stations 303, 305, and 307 represent a new radio access technology (NR or 5G) operating in the relatively high frequency band. ) Is applied to the system.
- NR or 5G new radio access technology
- the macro base station 301 and the small base station 303, 305, 307 are interconnected, and there may be a certain amount of backhaul delay depending on the connection state. Therefore, it may not be desirable to exchange information that is sensitive to transmission delays between the macro base station 301 and the small base station 303, 305, 307.
- FIG. 3 illustrates carrier combining between the macro base station 301 and the small base stations 303, 305, and 307.
- the present invention is not limited thereto, and the present invention is not limited thereto. Applicable for For example, according to the exemplary embodiment, the present invention may be applicable to both carrier combinations between macro base stations and macro base stations located at different locations, or carrier combinations between small base stations and small base stations located at different locations.
- the number of carriers combined is not limited.
- the macro base station 301 may use the frequency f1 for downlink signal transmission, and the small base stations 303, 305, and 307 may use the frequency f2 for downlink signal transmission.
- the macro base station 301 may transmit data or control information to the predetermined terminal 309 through the frequency f1
- the small base stations 303, 305, and 307 may transmit data or control information through the frequency f2.
- a base station adopting a new radio access technology capable of supporting ultra-wideband in a high frequency band provides an ultra high speed data service and an ultra low delay service, and simultaneously adopts LTE / LTE-A technology in a relatively low frequency band.
- the base station to be applied may support the mobility of a stable terminal.
- the configuration illustrated in FIG. 3 may be similarly applied to uplink carrier coupling as well as downlink carrier coupling.
- the terminal 309 may transmit data or control information to the macro base station 301 through the frequency f1 'for uplink signal transmission.
- the terminal 309 may transmit data or control information to the small base stations 303, 305, and 307 through a frequency f 2 ′ for uplink signal transmission.
- the f1 ' may correspond to the f1
- the f2' may correspond to the f2.
- the uplink signal transmission of the terminal may be performed at different times or simultaneously with the macro base station and the small base station. In any case, due to the physical constraints of the power amplifier elements of the terminal and the propagation restrictions on the terminal transmission power, the sum of the uplink transmission powers of the terminal at any moment should be kept within a predetermined threshold.
- the operation of the terminal 309 that connects to the macro base station 301 and the small base stations 303, 305, and 307 to perform communication is referred to as dual connectivity (DC).
- DC dual connectivity
- the upper level signal (system or radio resource control (RRC)) is used for setting information for data transmission and reception for the macro base station. Signal).
- RRC radio resource control
- configuration information for data transmission and reception for the small base station 303, 304, 305 operating as an NR system is received from an upper signal (system or RRC signal) of the macro base station 301, and the small base station 303, 304, By performing random access to 305, the macro base station 301 and the small base station (303, 304, 305) is a dual connection state that can be transmitted and received data.
- the macro base station 301 operating in the LTE / LTE-A system is referred to as a master cell group (MCG), and the small base stations 303, 304, and 305 operating in an NR system are referred to as a secondary cell group (SCG).
- MCG master cell group
- SCG secondary cell group
- E-UTRA evolved-universal mobile communications system
- the UE uses the evolved-universal mobile communications system (UMTS) terrestrial radio access (E-UTRA) and the MCG using the radio access (or LTE / LTE-A) and the SCG using the NR radio access. It can also be expressed as. Or it may be expressed that the terminal is set to EN-DC (E-UTRA NR Dual Connectivity).
- the terminal receives configuration information for data transmission and reception for the small base station from an upper signal (system or RRC signal). . Thereafter, the configuration information for data transmission and reception for the macro base station 301 operating in the LTE / LTE-A system is received from an upper signal (system or RRC signal) of the small base station 303, 304, 305 and the macro base station ( By performing random access to 301, data can be transmitted and received from the small base stations 303, 304, and 305 and the macro base station 301.
- system or RRC signal system or RRC signal
- the small base stations 303, 304, and 305 operating in the NR system are referred to as MCG, and the macro base station 301 operating in the LTE system is referred to as SCG.
- MCG the small base stations 303, 304, and 305 operating in the NR system
- SCG the macro base station 301 operating in the LTE system
- the terminal is in the dual access state as the terminal is set to MCG using NR radio access and SCG using E-UTRA radio access (or LTE / LTE-A).
- E-UTRA radio access or LTE / LTE-A
- NE-DC NR E-UTRA Dual Connectivity
- the present invention proposes another embodiment according to whether LTE cells using E-UTRA are MCG or NR cells using NR.
- the reason is that when the terminal is in a dual access state, importance should be given to uplink transmission to the MCG rather than uplink transmission to the SCG.
- timing for transmitting uplink transmission to a cell using NR for example, PDCCH to PUSCH transmission timing or PDCCH to PUCCH transmission timing may be indicated differently by the higher signal configuration and the indication from the PDCCH. Since the timing for transmitting the transmission, for example, the PDCCH to PUSCH transmission timing or the PDCCH to PUCCH transmission timing is fixed, embodiments of the present invention are proposed in consideration of these conditions.
- Embodiments 1 and 2 are diagram illustrating a method of controlling power of uplink transmission according to Embodiments 1 and 2 of the present invention.
- Embodiments 1 and 2 may be applied when the terminal is set to EN-DC (E-UTRA NR Dual Connectivity).
- the UE transmits P_LTE 402, which is the maximum transmission power for uplink transmission in MCG, P_NR 403, which is the maximum transmission power for uplink transmission in SCG, and maximum in EN-DC.
- P_total 401 which is the transmission power, is set.
- the first embodiment provides a case in which the UE has a capability for dynamic transmission power distribution.
- Embodiment 1 if the UE has the capability to perform dynamic transmission power distribution, the UE may have subframe i 404 for LTE uplink transmission and slot k 406 or k + for NR uplink transmission. When two 407 overlap, the sum of P_LTE 402 and P_NR 403 exceeds P_total 401. In this case, the UE may attach importance to the MCG using E-UTRA radio access (or LTE / LTE-A), and thus may lower transmission power of the SCG using NR. Accordingly, the transmission power for the NR transmission can be reduced (408 or 409) so that the sum of the P_LTE 402 and the P_NR 403 enters the P_total 401.
- E-UTRA radio access or LTE / LTE-A
- the terminal when the terminal has a capability for dynamic transmission power distribution, the terminal transmits the capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
- the second embodiment provides a case in which the terminal does not have a capability for dynamic transmission power distribution. .
- Embodiment 2 if the terminal does not have a capability to perform dynamic transmission power distribution and thus the capability signal is not transmitted to the base station, the terminal is to determine in which subframes LTE uplink transmission is performed
- the configuration information is received from the LTE or NR base station via a system or higher level signal.
- the configuration information may be time division duplex (TDD) configuration information indicating an up-down subframe period, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD.
- TDD time division duplex
- the UE determines that LTE uplink transmission is performed only in a subframe indicated by an uplink subframe, and does not perform NR uplink transmission in slots capable of NR transmission overlapping with the uplink subframe 405. 410. That is, even if an NR base station configures or schedules NR uplink transmission in slots overlapping with the uplink subframe 405, the UE may not perform the NR transmission.
- FIG. 5 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 3 and 4 of the present invention.
- Embodiments 3 and 4 may be applied when the terminal is set to NR E-UTRA Dual Connectivity (NE-DC).
- NE-DC NR E-UTRA Dual Connectivity
- the UE transmits P_LTE 502, which is the maximum transmission power for uplink transmission in SCG, P_NR 503, which is the maximum transmission power for uplink transmission in MCG, and NE-DC according to an upper signal.
- P_total 501 is set.
- the third embodiment provides a case in which the UE does not have a capability for dynamic transmission power distribution. .
- Embodiment 3 if the terminal does not have a capability for dynamic transmission power distribution and thus fails to transmit the capability signal to the base station, the terminal configures in which subframes LTE uplink transmission is performed Information is received from the LTE or NR base station via a system or higher signal.
- the configuration information may be TDD configuration information indicating a subframe interval up and down, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD.
- the UE may perform an operation different from the second embodiment in which the LTE uplink transmission is always performed in the LTE uplink subframe.
- the UE when the UE is configured as NE-DC, the UE must first perform NR uplink transmission, which is MCG. Accordingly, even when the UE determines that the LTE uplink transmission is performed in the subframe indicated by the uplink subframe through the reception of the configuration information, the NR uplink instead of the uplink LTE transmission in slots capable of NR transmission overlapping with the uplink subframe 504. Provides a way to perform the transmission.
- the UE may receive a PDCCH indicating NR uplink transmission.
- the start symbol that is, subframe i (504) that should transmit the LTE uplink transmission is a value 511 plus the NE-DC processing capability 510 configured to the UE from the last symbol 509 of the PDCCH indicating NR uplink transmission.
- LTE uplink transmission is dropped before the start symbol).
- the NE-DC processing capability 510 configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and has a constant X. It may also be N1 + X.
- the NE-DC processing capability 510 configured for the UE may be a symbol number N2 corresponding to the time required for preparation of the PUSCH for the PUSCH processing capability, if the UE receives the PDCCH for scheduling the PUSCH. It may also be N2 + Y.
- the NE-DC processing capability 510 is defined as a value defined as the number of N symbols from the last symbol after receiving the PDCCH. You may.
- the number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Or, conservatively determine, by setting the NE-DC processing capability 510 to a maximum value of N1 or N1 + X, N2 or N2 + Y, N, and whether the terminal drops the LTE uplink transmission using the set value. It can be determined. Before the base station sets the NE-DC processing capability 510 as an upper signal, the terminal transmits the PDSCH processing capability related information or the PUSCH processing capability related information to the base station, and the base station receives the received information from the terminal. In consideration of the processing capability related information of the terminal, the appropriate N1 or N1 + X, N2 or N2 + Y, N value is set to the upper signal, the terminal may receive the configuration.
- the fourth embodiment provides a case in which the UE does not have a capability for dynamic transmission power distribution.
- Embodiment 4 if the terminal does not have a capability for dynamic transmission power distribution and thus fails to transmit the capability signal to the base station, the terminal configures in which subframes LTE uplink transmission is performed Information is received from the LTE or NR base station via a system or higher signal.
- the configuration information may be TDD configuration information indicating a subframe interval up and down, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD.
- the UE may perform an operation different from the second embodiment in which the LTE uplink transmission is always performed in the LTE uplink subframe.
- the UE when the UE is configured as NE-DC, the UE must first perform NR uplink transmission, which is MCG. Accordingly, even when the UE determines that the uplink transmission is performed in the subframe indicated by the uplink subframe through the reception of the configuration information, the NR uplink instead of the uplink LTE transmission in slots capable of NR transmission overlapping with the uplink subframe 505. Provides a way to perform the transmission.
- the UE may receive a PDCCH indicating NR uplink transmission while performing LTE uplink transmission in the subframe 505. At this time, the UE drops the existing LTE transmission (512), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission.
- the UE drops the existing LTE transmission (512), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission.
- LTE uplink transmission is performed and NR uplink transmission is performed by the PDCCH indicating NR uplink transmission. Drop the LTE transmission from the symbol to be performed, and performs the NR transmission.
- the UE determines that the LTE uplink transmission is performed only in a subframe indicated by an uplink subframe by receiving configuration information on which the LTE uplink transmission is performed. It may be determined that NR uplink transmission is performed among the remaining subframes not indicated by the frame.
- FIG. 6 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 5 and 6 of the present invention.
- Embodiments 5 and 6 may be applied when the terminal is set to NR E-UTRA Dual Connectivity (NE-DC).
- NE-DC NR E-UTRA Dual Connectivity
- the UE transmits P_LTE 602, which is the maximum transmit power for uplink transmission in SCG, P_NR 603, which is the maximum transmit power for uplink transmission in MCG, and maximum in NE-DC.
- P_total 601, which is the transmission power is set.
- the fifth embodiment provides a case in which the UE has a capability for dynamic transmission power distribution.
- the terminal when the terminal has the capability to perform dynamic transmission power distribution, the terminal transmits the capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
- the UE has a capability for dynamic transmission power distribution, and the UE overlaps the subframe i 604 for LTE uplink transmission and the slot k 606 for NR uplink transmission.
- the UE may lower the transmission power of the SCG using E-UTRA (or LTE / LTE-A) by attaching importance to the MCG using NR.
- E-UTRA or LTE / LTE-A
- a problem may occur when the NR uplink transmission timing cannot be predicted due to the flexible timing support of the NR uplink transmission.
- 5 provides a scheme for lowering the power of LTE uplink considering the processing capability of NR uplink.
- the UE may receive a PDCCH indicating NR uplink transmission.
- a value 611 obtained by adding the NE-DC processing capability 610 set to the UE from the last symbol 609 of the PDCCH indicating NR uplink transmission is a start symbol (i.e., subframe i Earlier than the start symbol of 604) reduce the transmit power of the LTE uplink transmission (508).
- the NE-DC processing capability 610 configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and has a constant X. It may also be N1 + X.
- the NE-DC processing capability 610 configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability, if the UE receives the PDCCH for scheduling the PUSCH, and may be a constant Y. It may also be N2 + Y.
- the NE-DC processing capability 610 may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downlink semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol. It may be.
- SPS downlink semi-persistent scheduling
- the number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Or conservatively determine the NE-DC processing capability 610 with a maximum value of N1 or N1 + X, N2 or N2 + Y, N and the terminal reduces the power of the LTE uplink transmission using the set value. Can be. Before the base station sets the NE-DC processing capability 610 as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the above processing received from the terminal. In consideration of capability related information, a value of N1 or N1 + X, N2 or N2 + Y, N appropriate to the terminal is set as an upper signal, and the terminal may receive the setting.
- a sixth embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
- the terminal when the terminal has a capability for dynamic transmission power distribution, the terminal transmits a capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
- the UE may receive a PDCCH indicating NR uplink transmission while performing LTE uplink transmission in the subframe 605. At this time, the UE drops the LTE transmission that was being performed (612), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission.
- the UE drops the LTE transmission that was being performed (612), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission.
- LTE uplink transmission is performed and NR uplink transmission is performed by the PDCCH indicating NR uplink transmission. Drop the LTE transmission from the symbol to be performed, and performs the NR transmission.
- the reason for dropping the LTE uplink transmission instead of reducing the power of the LTE uplink transmission in the terminal operation as described above is because it is impossible to change the transmission power in the middle of the subframe in the case of LTE uplink transmission. Therefore, when NR uplink transmission occurs during the LTE uplink transmission as described above, the UE drops the LTE uplink transmission, is indicated to the PDCCH, or performs the NR uplink transmission set by the higher signal.
- the seventh embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
- the NE-DC terminal determines another Pcmax for LTE subframes. That is, the terminal receives the configuration of the DL, UL, flexible, reserved slots for the slots from the NR base station from the upper signal (system information, or RRC signal), so that uplink transmission for the NR in the UL slot or flexible slot Determining that this may occur, the LTE subframe 704 overlapping even in one OFDM symbol with the UL slot or flexible slot 720 where NR uplink may occur, and the DL slot or reserved slot where NR uplink cannot occur Pcmax is determined for the LTE subframe 705 that overlaps with 730, respectively.
- system information, or RRC signal system information, or RRC signal
- Pcmax the maximum value of LTE transmit power
- Pcmax the maximum value of LTE transmit power
- Pcmax the maximum value of LTE transmit power
- the value is determined to be less than or equal to 711.
- the p_LTE and p_NR may be received by the terminal from an upper signal transmitted from the LTE base station or the NR base station, and r may be set to values for each LTE subframe with a value less than or equal to 1, and the LTE base station or The terminal may receive from an upper signal transmitted from the NR base station.
- the UE may set Pcmax of NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) in order to allocate transmission power (P_NR) of NR. have.
- the UE allocates P_LTE less than or equal to the LTE Pcmax 710 for LTE uplink transmission.
- p_lte_actual 712 is allocated to perform LTE uplink transmission.
- the UE allocates P_LTE less than or equal to the LTE Pcmax 711 for the LTE uplink transmission and performs LTE uplink transmission.
- the UE may control the downlink control channel and NE uplink transmission even if the NE-DC processing capability is set by the RRC, even if the NR UL slot or the flexible slot.
- the slots are slots for which NR UL cannot be transmitted due to DC processing capability, there is no need to limit the LTE transmit power in the LTE uplink subframe overlapping the NR slots.
- the NE-DC terminal may determine Pcmax to be less than or equal to p_LTE and determine P_LTE in the LTE uplink subframe.
- r set from the NR base station or the LTE base station may be determined as 1, and P_LTE may be determined.
- the NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X.
- the NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y.
- the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downward semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol.
- SPS semi-persistent scheduling
- the constant value may be determined according to the subcarrier spacing of the NR cell.
- the number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz.
- the NE-DC processing capability is set to the maximum or minimum value of N1 or N1 + X, N2 or N2 + Y, N, and the terminal reduces the power of LTE uplink transmission by using the set value. Can be.
- the terminal Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
- an eighth embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
- the NE-DC terminal determines another Pcmax for LTE subframes. That is, the terminal receives the configuration of the DL, UL, flexible, reserved slots from the NR base station from the upper signal (system information or RRC signal), and the uplink transmission for the NR may occur in the UL slot or flexible slot It is determined that the UL subframe 804 overlapping the UL slot or flexible slot 820, which may occur in NR uplink transmission, in one OFDM symbol, and the DL slot or reserved slot 830, in which NR uplink transmission does not occur. Pcmax is determined for LTE subframe 805, respectively.
- Pcmax the maximum value of the LTE transmit power
- p_LTE 810
- Pcmax the maximum value of the LTE transmit power
- the UE may set Pcmax of the NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) in order to allocate the transmission power (P_NR) of the NR.
- the UE allocates P_LTE less than or equal to the LTE Pcmax 810 for LTE uplink transmission.
- p_lte_actual 812 is allocated to perform LTE uplink transmission.
- the subframe 805 it may be assumed that there is no NR uplink transmission, so that the UE allocates P_LTE less than or equal to the LTE Pcmax 811 for LTE uplink transmission to perform LTE uplink transmission.
- the UE may control the downlink control channel indicating the uplink transmission of the NR and the NE even if the NE UL slot or the flexible slot is used.
- the slots are slots for which NR UL cannot be transmitted due to DC processing capability, there is no need to limit the LTE transmit power in the LTE uplink subframe overlapping the NR slots. Accordingly, in such a case, the NE-DC terminal may determine to maintain Pcmax in the LTE uplink subframe and determine P_LTE.
- the NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X.
- the NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y.
- the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downward semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol.
- SPS semi-persistent scheduling
- the constant value may be determined according to the subcarrier spacing of the NR cell.
- the number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz.
- the NE-DC processing capability is set to the maximum or minimum value of N1 or N1 + X, N2 or N2 + Y, N, and the terminal reduces the power of LTE uplink transmission by using the set value. Can be.
- the terminal Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
- the ninth embodiment will be provided for the case in which the UE has a capability for dynamic transmission power distribution.
- the NE-DC terminal maintains Pcmax for LTE subframes. That is, the terminal determines to apply Pcmax, the maximum value of the LTE transmit power, to all the LTE subframes 904 and 905 (910).
- the p_LTE and p_NR may be received by the terminal from an upper signal transmitted from the LTE base station or the NR base station.
- the UE may set Pcmax of the NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) to allocate the transmission power (P_NR) of the NR.
- the UE allocates P_LTE less than or equal to the LTE Pcmax 910 for LTE uplink transmission.
- p_lte_actual 912 is allocated to perform LTE uplink transmission. Therefore, in the ninth embodiment, the LTE Pcmax 910 must be conservatively determined regardless of whether NR uplink transmission occurs, and even when there is no NR transmission, the LTE transmission power can only be limited lower.
- the UE controls the downlink control channel indicating NR uplink transmission and the NE-DC processing capability. If the slots are slots for which NR UL cannot be transmitted, there is no need to limit the LTE transmit power in the LTE uplink subframe that overlaps the NR slots. Therefore, in such a case, the NE-DC terminal may determine to maintain Pcmax in the LTE uplink subframe and determine P_LTE.
- the NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X.
- the NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y.
- the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downlink semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol.
- SPS downlink semi-persistent scheduling
- the constant value may be determined according to the subcarrier spacing of the NR cell.
- the number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz.
- the NE-DC processing capability may be set to a maximum value or a minimum value of N1 or N1 + X, N2 or N2 + Y, and N may be determined conservatively, and the terminal may reduce power of LTE uplink transmission by using the set value. have.
- the terminal Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
- the UE may perform LTE uplink transmission by applying the P_LTE and perform NR uplink transmission by applying the P_NR.
- FIG. 10 is a diagram illustrating a base station and a terminal procedure according to the embodiments proposed by the present invention.
- the base station transmits configuration information of each cell to the terminal through the system information or higher signal.
- the configuration information may be cell-related information (TDD or FDD information, up-down carrier frequency, up-down frequency band, up-down subcarrier spacing, etc.) of MCG or SCG cells required for dual access, and required for data transmission and reception in the MCG or SCG. It may be setting information. Or it may be configuration information related to the NE-DC processing capability described in the embodiments of the present invention.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- the base station sets uplink transmission to the terminal and transmits scheduling information indicating uplink transmission according to the embodiments proposed by the present invention.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- the uplink transmission configuration may mean uplink transmission in which transmission is configured by higher signal configuration instead of PDCCH like periodic channel information transmission, and uplink transmission indicated by the scheduling information is PUSCH transmission or HARQ-ACK. Like transmission, this may mean uplink transmission indicated by the PDCCH and transmitted from the UE.
- the base station receives uplink transmission from the terminal according to the embodiments proposed by the present invention.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- the terminal receives configuration information of each cell from the base station through system information or higher signal.
- the configuration information may be cell-related information (TDD or FDD information, up-down carrier frequency, up-down frequency band, up-down subcarrier spacing, etc.) of MCG or SCG cells required for dual access, and required for data transmission and reception in the MCG or SCG. It may be setting information. Or it may be configuration information related to the NE-DC processing capability described in the embodiments of the present invention.
- the terminal may transmit PDSCH processing capability or PUSCH processing capability related information to the base station before receiving the NE-DC processing capability as a higher signal from the base station.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- the terminal receives uplink transmission configuration information from the base station according to the embodiments proposed by the present invention, and receives scheduling information indicating uplink transmission.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- the uplink transmission configuration information may refer to configuration information related to uplink transmission in which transmission is configured by higher signal configuration instead of PDCCH like periodic channel information transmission.
- Uplink transmission indicated by the scheduling information is a PUSCH. Like transmission or HARQ-ACK transmission, it may mean uplink transmission indicated by the PDCCH and transmitted from the terminal.
- the terminal transmits uplink transmission to the base station by controlling the transmission power according to the embodiments proposed by the present invention.
- Controlling the transmit power may include dropping uplink transmissions of low importance or reducing uplink transmission power as described in the embodiments of the present invention.
- the base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- FIG. 11 is a diagram illustrating a base station apparatus according to embodiments proposed by the present invention.
- the controller 1101 sets necessary information according to the base station procedure according to FIG. 7 of the present invention and embodiments of the present invention, and controls uplink transmission from the terminal according to the present invention, thereby transmitting LTE or 5G control information. 1105 and the 5G data transmission and reception device 1107, and transmits the LTE or 5G data with the terminal through the LTE or 5G data transmission and reception device 1107 by scheduling the LTE or 5G data in the scheduler 1103. .
- LTE and 5G are described together for convenience, but the base station apparatus may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
- FIG. 12 is a diagram illustrating a terminal device according to the present invention.
- the controller 1201 receives
- the LTE or 5G data scheduled at the resource location is transmitted and received with the LTE or 5G base station via the LTE or 5G data transceiver 1206.
- the LTE and 5G devices are described as if for convenience, but devices for LTE or 5G may be configured separately.
- the base station for transmitting and receiving the control information and data may be an NR base station using NR radio access, or may be an E-UTRA base station using E-UTRA radio access.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present disclosure relates to a communication technique for convergence of IoT technology and a 5G communication system for supporting a higher data transfer rate beyond a 4G system, and a system therefor. The present disclosure can be applied to intelligent services (e.g., smart homes, smart buildings, smart cities, smart or connected cars, health care, digital education, retail business, and services associated with security and safety) on the basis of 5G communication technology and IoT-related technology. Disclosed are a method and an apparatus for controlling uplink-transmitted transmission power in a wireless communication system.
Description
본 발명은 무선 통신 시스템에서 상향 전송의 전송 전력 제어 방법 및 장치에 대한 것이다.The present invention relates to a transmission power control method and apparatus for uplink transmission in a wireless communication system.
4G 통신 시스템 상용화 이후 증가 추세에 있는 무선 데이터 트래픽 수요를 충족시키기 위해, 개선된 5G 통신 시스템 또는 pre-5G 통신 시스템을 개발하기 위한 노력이 이루어지고 있다. 이러한 이유로, 5G 통신 시스템 또는 pre-5G 통신 시스템은 4G 네트워크 이후 (Beyond 4G Network) 통신 시스템 또는 LTE 시스템 이후 (Post LTE) 이후의 시스템이라 불리어지고 있다. In order to meet the increasing demand for wireless data traffic since the commercialization of 4G communication systems, efforts are being made to develop improved 5G communication systems or pre-5G communication systems. For this reason, a 5G communication system or a pre-5G communication system is called a system after a 4G network (Beyond 4G Network) or a system after an LTE system (Post LTE).
높은 데이터 전송률을 달성하기 위해, 5G 통신 시스템은 초고주파(mmWave) 대역 (예를 들어, 60기가(60GHz) 대역과 같은)에서의 구현이 고려되고 있다. 초고주파 대역에서의 전파의 경로손실 완화 및 전파의 전달 거리를 증가시키기 위해, 5G 통신 시스템에서는 빔포밍(beamforming), 거대 배열 다중 입출력(massive MIMO), 전차원 다중입출력(Full Dimensional MIMO: FD-MIMO), 어레이 안테나(array antenna), 아날로그 빔형성(analog beam-forming), 및 대규모 안테나 (large scale antenna) 기술들이 논의되고 있다. 또한 시스템의 네트워크 개선을 위해, 5G 통신 시스템에서는 진화된 소형 셀, 개선된 소형 셀 (advanced small cell), 클라우드 무선 액세스 네트워크 (cloud radio access network: cloud RAN), 초고밀도 네트워크 (ultra-dense network), 기기 간 통신 (Device to Device communication: D2D), 무선 백홀 (wireless backhaul), 이동 네트워크 (moving network), 협력 통신 (cooperative communication), CoMP (Coordinated Multi-Points), 및 수신 간섭제거 (interference cancellation) 등의 기술 개발이 이루어지고 있다. In order to achieve high data rates, 5G communication systems are being considered for implementation in the ultra-high frequency (mmWave) band (eg, such as the 60 Gigabit (60 GHz) band). In order to mitigate the path loss of radio waves in the ultra-high frequency band and increase the propagation distance of radio waves, beamforming, massive array multiple input / output (FD-MIMO), and FD-MIMO are used in 5G communication systems. Array antenna, analog beam-forming, and large scale antenna techniques are discussed. In addition, in order to improve the network of the system, 5G communication systems have advanced small cells, advanced small cells, cloud radio access network (cloud RAN), ultra-dense network (ultra-dense network) , Device to Device communication (D2D), wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), and interference cancellation The development of such technology is being done.
이 밖에도, 5G 시스템에서는 진보된 코딩 변조(Advanced Coding Modulation: ACM) 방식인 FQAM (Hybrid FSK and QAM Modulation) 및 SWSC (Sliding Window Superposition Coding)과, 진보된 접속 기술인 FBMC(Filter Bank Multi Carrier), NOMA(non orthogonal multiple access), 및SCMA(sparse code multiple access) 등이 개발되고 있다.In addition, in 5G systems, Hybrid FSK and QAM Modulation (FQAM) and Slide Window Superposition Coding (SWSC), Advanced Coding Modulation (ACM), and FBMC (Filter Bank Multi Carrier) and NOMA are advanced access technologies. (non orthogonal multiple access), and sparse code multiple access (SCMA) are being developed.
한편, 인터넷은 인간이 정보를 생성하고 소비하는 인간 중심의 연결 망에서, 사물 등 분산된 구성 요소들 간에 정보를 주고 받아 처리하는 IoT(Internet of Things, 사물인터넷) 망으로 진화하고 있다. 클라우드 서버 등과의 연결을 통한 빅데이터(Big data) 처리 기술 등이 IoT 기술에 결합된 IoE (Internet of Everything) 기술도 대두되고 있다. IoT를 구현하기 위해서, 센싱 기술, 유무선 통신 및 네트워크 인프라, 서비스 인터페이스 기술, 및 보안 기술과 같은 기술 요소 들이 요구되어, 최근에는 사물간의 연결을 위한 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 연구되고 있다. IoT 환경에서는 연결된 사물들에서 생성된 데이터를 수집, 분석하여 인간의 삶에 새로운 가치를 창출하는 지능형 IT(Internet Technology) 서비스가 제공될 수 있다. IoT는 기존의 IT(information technology)기술과 다양한 산업 간의 융합 및 복합을 통하여 스마트홈, 스마트 빌딩, 스마트 시티, 스마트 카 혹은 커넥티드 카, 스마트 그리드, 헬스 케어, 스마트 가전, 첨단의료서비스 등의 분야에 응용될 수 있다.Meanwhile, the Internet is evolving from a human-centered connection network in which humans create and consume information, and an Internet of Things (IoT) network that exchanges and processes information between distributed components such as things. The Internet of Everything (IoE) technology, which combines big data processing technology through connection with cloud servers and the like, is emerging. In order to implement the IoT, technical elements such as sensing technology, wired / wireless communication and network infrastructure, service interface technology, and security technology are required, and recently, a sensor network for connection between things, a machine to machine , M2M), Machine Type Communication (MTC), etc. are being studied. In an IoT environment, intelligent Internet technology (IT) services can be provided that collect and analyze data generated from connected objects to create new value in human life. IoT is a field of smart home, smart building, smart city, smart car or connected car, smart grid, health care, smart home appliances, advanced medical services, etc. through convergence and complex of existing information technology (IT) technology and various industries. It can be applied to.
이에, 5G 통신 시스템을 IoT 망에 적용하기 위한 다양한 시도들이 이루어지고 있다. 예를 들어, 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 5G 통신 기술이 빔 포밍, MIMO, 및 어레이 안테나 등의 기법에 의해 구현되고 있는 것이다. 앞서 설명한 빅데이터 처리 기술로써 클라우드 무선 액세스 네트워크(cloud RAN)가 적용되는 것도 5G 기술과 IoT 기술 융합의 일 예라고 할 수 있을 것이다.Accordingly, various attempts have been made to apply the 5G communication system to the IoT network. For example, technologies such as sensor network, machine to machine (M2M), machine type communication (MTC), and the like, are implemented by techniques such as beamforming, MIMO, and array antennas. It is. Application of cloud radio access network (cloud RAN) as the big data processing technology described above may be an example of convergence of 5G technology and IoT technology.
한편, 통신 시스템에서 상향링크 제어채널의 전송 방안에 대한 다양한 연구가 이루어지고 있으며, 특히 PUCCH(Physical Uplink Control channel)을 전송하는 방안에 대해서도 여러 가지 각도로 논의가 이루어지고 있다. On the other hand, various studies on the transmission scheme of the uplink control channel in the communication system has been made, and in particular, the scheme for transmitting the Physical Uplink Control Channel (PUCCH) has been discussed at various angles.
LTE와 NR에 대한 이중 접속을 할 수 있는 단말은 LTE와 NR 셀들에 대해서 각각 데이터를 송수신할 수 있으며, 이때 단말의 상향 전송 전력은 단말의 전력 최대값에 의해서 제한된다. A terminal capable of dual access to LTE and NR may transmit and receive data for LTE and NR cells, respectively, wherein the uplink transmission power of the terminal is limited by the maximum power of the terminal.
이에, 본 발명의 일 목적은, LTE 셀이 Master cell group(MCG)인지 NR 셀이 MCG인지, 혹은 단말의 상향 전송의 프로세싱 타임에 따라, 상향 전송이 LTE 셀과 NR 셀에서 동시에 발생하는 경우 상향 전송 전력을 줄이거나 특정 셀에서의 전송을 드랍(drop)하는 것과 같은 상향 전송 전력을 제어하기 위한 방법 및 장치를 제공하는 것이다.Accordingly, one object of the present invention, according to whether the LTE cell is a master cell group (MCG) or the NR cell is MCG, or the processing time of the uplink transmission of the terminal, if the uplink transmission occurs simultaneously in the LTE cell and the NR cell A method and apparatus for controlling uplink transmit power, such as reducing transmit power or dropping transmissions in a particular cell.
상기와 같은 문제점을 해결하기 위한 본 발명의 일 실시 예에 따른 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반한 제1 기지국 및 제2 라디오 접속 기술에 기반한 제2 기지국과 이중 접속(Dual connectivity)을 수행하는 단말 방법에 있어서, 상기 제1 기지국으로부터, 하향링크 신호를 수신하는 단계, 상기 하향링크 신호에 대응되는 제1 상향링크 신호의 전송 타이밍이 상기 제2 기지국으로의 제2 상향링크 신호의 전송 타이밍과 겹치는지 확인하는 단계, 상기 제1 상향링크 신호의 전송 타이밍과 상기 제2 상향링크 신호의 전송 타이밍이 겹치면, 상기 제1 상향링크 전송을 위한 제1 전송 전력과 상기 제 2 상향링크 전송을 위한 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하는지 확인하는 단계 및 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 제1 상향링크 신호의 전송을 위한 프로세싱(processing) 시간에 기반하여, 상기 제2 전송 전력을 제어하는 단계를 포함할 수 있다.In a wireless communication system according to an embodiment of the present invention for solving the above problems, dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology is established. In the terminal method, Receiving a downlink signal from the first base station, the transmission timing of the first uplink signal corresponding to the downlink signal is the transmission of the second uplink signal to the second base station Checking whether the timing overlaps, and when the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the first transmission power and the second uplink transmission for the first uplink transmission are performed. Checking whether a sum of second transmission powers for the power supply exceeds a maximum transmission power of the terminal, and adding the first transmission power and the second transmission power If the maximum transmit power of the terminal is exceeded, the method may include controlling the second transmit power based on a processing time for transmitting the first uplink signal.
또한, 본 발명의 일 실시 예에 따른 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반하고, 제2 라디오 접속 기술에 기반한 제2 기지국과의 사이에서 단말에 대한 이중 접속(Dual connectivity)을 지원하는 제1 기지국 방법에 있어서, 상기 단말로, 하향링크 신호를 전송하는 단계 및 상기 단말로부터, 제1 전송 전력에 기반하여, 상기 하향링크 신호에 대응하는 제1 상향링크 신호를 수신하는 단계를 포함하고, 상기 단말에서 상기 제2 기지국으로의 제2 상향링크 신호의 전송을 위한 제2 전송 전력은, 상기 제1 상향링크 신호의 전송 타이밍이 상기 제2 상향링크 신호의 전송 타이밍과 겹치고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 단말의 상기 제1 상향링크 신호 프로세싱(processing) 시간에 기반하여 상기 단말에 의하여 제어될 수 있다.In addition, in the wireless communication system according to an embodiment of the present invention, based on the first radio access technology, and supports a dual connectivity (dual connectivity) to the terminal between the second base station based on the second radio access technology A first base station method, comprising: transmitting a downlink signal to the terminal and receiving a first uplink signal corresponding to the downlink signal from the terminal based on a first transmission power; The second transmission power for the transmission of the second uplink signal from the terminal to the second base station, the transmission timing of the first uplink signal overlaps with the transmission timing of the second uplink signal, the first If the sum of the transmit power and the second transmit power exceeds the maximum transmit power of the terminal, the first uplink signal processing time of the terminal is based on the It may be controlled by the horse.
또한, 본 발명의 일 실시 예에 따른 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반한 제1 기지국 및 제2 라디오 접속 기술에 기반한 제2 기지국과 이중 접속(Dual connectivity)을 수행하는 단말에 있어서, 송수신부 및 상기 제1 기지국으로부터, 하향링크 신호를 수신하도록 상기 송수신부를 제어하고, 상기 하향링크 신호에 대응되는 제1 상향링크 신호의 전송 타이밍이 상기 제2 기지국으로의 제2 상향링크 신호의 전송 타이밍과 겹치는지 확인하며, 상기 제1 상향링크 신호의 전송 타이밍과 상기 제2 상향링크 신호의 전송 타이밍이 겹치면, 상기 제1 상향링크 신호의 전송을 위한 제1 전송 전력과 상기 제2 상향링크 신호의 전송을 위한 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하는지 확인하고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 제1 상향링크 신호의 전송을 위한 프로세싱(processing) 시간에 기반하여, 상기 제2 전송 전력을 제어하는 제어부를 포함할 수 있다.In addition, in a wireless communication system according to an embodiment of the present invention, a terminal for performing dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology, The transceiver is controlled to receive a downlink signal from the transceiver and the first base station, and the transmission timing of the first uplink signal corresponding to the downlink signal is transmitted to the second base station. Check whether the timing overlaps, and when the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the first transmission power and the second uplink signal for the transmission of the first uplink signal. Determine whether the sum of the second transmission power for the transmission exceeds the maximum transmission power of the terminal, and the first transmission power and the second transmission power If it exceeds the maximum transmit power of the terminal, on the basis of processing (processing) time for the first transmission of the uplink signal may be a control unit for controlling the second transmission power.
또한, 본 발명의 일 실시 예에 따른 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반하고, 제2 라디오 접속 기술에 기반한 제2 기지국과의 사이에서 단말에 대한 이중 접속(Dual connectivity)을 지원하는 제1 기지국에 있어서, 송수신부 및 상기 단말로, 하향링크 신호를 전송하고, 상기 단말로부터, 제1 전송 전력에 기반하여, 상기 하향링크 신호에 대응하는 제1 상향링크 신호를 수신하도록 상기 송수신부를 제어하는 제어부를 포함하고, 상기 단말에서 상기 제2 기지국으로의 제2 상향링크 신호의 전송을 위한 제2 전송 전력은, 상기 제1 상향링크 신호의 전송 타이밍이 상기 제2 상향링크 신호의 전송 타이밍과 겹치고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 단말의 상기 제1 상향링크 신호 프로세싱(processing) 시간에 기반하여 상기 단말에 의하여 제어될 수 있다.In addition, in the wireless communication system according to an embodiment of the present invention, based on the first radio access technology, and supports a dual connectivity (dual connectivity) to the terminal between the second base station based on the second radio access technology In the first base station, the transceiver unit to transmit a downlink signal to the transceiver and the terminal, and to receive a first uplink signal corresponding to the downlink signal from the terminal, based on a first transmission power And a control unit for controlling the second transmission power for the transmission of the second uplink signal from the terminal to the second base station, wherein the transmission timing of the first uplink signal is the transmission timing of the second uplink signal. If the sum of the first transmit power and the second transmit power exceeds the maximum transmit power of the terminal, the first uplink signal processing (p) of the terminal; rocessing) may be controlled by the terminal based on the time.
본 발명의 일 실시예에 따르면, 본 발명은 이중 접속이 지원되는 단말이 LTE 기지국과 NR 기지국으로부터 이중 접속을 설정 받는 경우, MCG가 LTE 셀인지 NR 셀인지 여부 및 단말의 상향 프로세싱 타임을 고려하여, LTE 셀과 NR 셀에서 동시에 상향 전송이 발생하더라도, 단말의 전송전력 최대값 내로 전송 전력을 제어하여 상향 전송을 수행할 수 있는 효과가 있다.According to an embodiment of the present invention, the present invention, when the terminal is supported dual connectivity is set up dual connectivity from the LTE base station and the NR base station, in consideration of whether the MCG LTE or NR cell and the upstream processing time of the terminal Even if uplink transmission occurs simultaneously in the LTE cell and the NR cell, uplink transmission can be performed by controlling the transmit power within the maximum transmit power value of the UE.
도 1은 LTE 시스템에서 시간-주파수영역의 기본 구조를 도시한 도면이다.1 illustrates a basic structure of a time-frequency domain in an LTE system.
도 2는 5G 서비스들이 하나의 시스템에서 다중화되어 전송되는 예를 도시한 도면이다.2 is a diagram illustrating an example in which 5G services are multiplexed and transmitted in one system.
도 3은 본 발명이 적용되는 통신 시스템의 실시예를 도시하는 도면이다.3 is a diagram illustrating an embodiment of a communication system to which the present invention is applied.
도 4는 본 발명의 실시예 1과 2에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다.4 is a diagram illustrating a method of controlling power of uplink transmission according to Embodiments 1 and 2 of the present invention.
도 5는 본 발명의 실시예 3와 4에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다.FIG. 5 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 3 and 4 of the present invention.
도 6은 본 발명의 실시예 5와 6에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다. FIG. 6 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 5 and 6 of the present invention.
도 7은 본 발명의 실시예 7에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다. 7 is a diagram illustrating a method of controlling power of uplink transmission according to Embodiment 7 of the present invention.
도 8은 본 발명의 실시예 8에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다.8 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiment 8 of the present invention.
도 9는 본 발명의 실시예 9에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다.9 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiment 9 of the present invention.
도 10은 본 발명의 실시예들에 따른 기지국 및 단말 절차를 도시한 도면이다.10 is a diagram illustrating a base station and a terminal procedure according to embodiments of the present invention.
도 11은 본 발명의 실시예들에 따른 기지국 장치를 도시한 도면이다.11 illustrates a base station apparatus according to embodiments of the present invention.
도 12는 본 발명의 실시예들에 따른 단말 장치를 도시한 도면이다.12 is a diagram illustrating a terminal device according to embodiments of the present invention.
이하, 본 발명의 실시예를 첨부한 도면과 함께 상세히 설명한다. 또한, 본 발명을 설명함에 있어서 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단된 경우 그 상세한 설명은 생략한다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, embodiments of the present invention will be described in detail with the accompanying drawings. In addition, in describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. Terms to be described later are terms defined in consideration of functions in the present invention, and may be changed according to intentions or customs of users or operators. Therefore, the definition should be made based on the contents throughout the specification.
본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시 예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭한다.Advantages and features of the present invention, and methods for achieving them will be apparent with reference to the embodiments described below in detail in conjunction with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, but can be implemented in various forms. It is provided to fully convey the scope of the invention to those skilled in the art, and the present invention is defined only by the scope of the claims. Like reference numerals refer to like elements throughout.
이때, 처리 흐름도 도면들의 각 블록과 흐름도 도면들의 조합들은 컴퓨터 프로그램 인스트럭션들에 의해 수행될 수 있음을 이해할 수 있을 것이다. 이들 컴퓨터 프로그램 인스트럭션들은 범용 컴퓨터, 특수용 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비의 프로세서에 탑재될 수 있으므로, 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비의 프로세서를 통해 수행되는 그 인스트럭션들이 흐름도 블록(들)에서 설명된 기능들을 수행하는 수단을 생성하게 된다. 이들 컴퓨터 프로그램 인스트럭션들은 특정 방식으로 기능을 구현하기 위해 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비를 지향할 수 있는 컴퓨터 이용 가능 또는 컴퓨터 판독 가능 메모리에 저장되는 것도 가능하므로, 그 컴퓨터 이용가능 또는 컴퓨터 판독 가능 메모리에 저장된 인스트럭션들은 흐름도 블록(들)에서 설명된 기능을 수행하는 인스트럭션 수단을 내포하는 제조 품목을 생산하는 것도 가능하다. 컴퓨터 프로그램 인스트럭션들은 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비 상에 탑재되는 것도 가능하므로, 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비 상에서 일련의 동작 단계들이 수행되어 컴퓨터로 실행되는 프로세스를 생성해서 컴퓨터 또는 기타 프로그램 가능한 데이터 프로세싱 장비를 수행하는 인스트럭션들은 흐름도 블록(들)에서 설명된 기능들을 실행하기 위한 단계들을 제공하는 것도 가능하다.At this point, it will be appreciated that each block of the flowchart illustrations and combinations of flowchart illustrations may be performed by computer program instructions. Since these computer program instructions may be mounted on a processor of a general purpose computer, special purpose computer, or other programmable data processing equipment, those instructions executed through the processor of the computer or other programmable data processing equipment may be described in flow chart block (s). It creates a means to perform the functions. These computer program instructions may be stored in a computer usable or computer readable memory that can be directed to a computer or other programmable data processing equipment to implement functionality in a particular manner, and thus the computer usable or computer readable memory. It is also possible for the instructions stored in to produce an article of manufacture containing instruction means for performing the functions described in the flowchart block (s). Computer program instructions may also be mounted on a computer or other programmable data processing equipment, such that a series of operating steps may be performed on the computer or other programmable data processing equipment to create a computer-implemented process to create a computer or other programmable data. Instructions for performing the processing equipment may also provide steps for performing the functions described in the flowchart block (s).
또한, 각 블록은 특정된 논리적 기능(들)을 실행하기 위한 하나 이상의 실행 가능한 인스트럭션들을 포함하는 모듈, 세그먼트 또는 코드의 일부를 나타낼 수 있다. 또, 몇 가지 대체 실행 예들에서는 블록들에서 언급된 기능들이 순서를 벗어나서 발생하는 것도 가능함을 주목해야 한다. 예컨대, 잇달아 도시되어 있는 두 개의 블록들은 사실 실질적으로 동시에 수행되는 것도 가능하고 또는 그 블록들이 때때로 해당하는 기능에 따라 역순으로 수행되는 것도 가능하다.In addition, each block may represent a portion of a module, segment, or code that includes one or more executable instructions for executing a specified logical function (s). It should also be noted that in some alternative implementations, the functions noted in the blocks may occur out of order. For example, the two blocks shown in succession may in fact be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending on the corresponding function.
이때, 본 실시 예에서 사용되는 '~부'라는 용어는 소프트웨어 또는 FPGA또는 ASIC과 같은 하드웨어 구성요소를 의미하며, '~부'는 어떤 역할들을 수행한다. 그렇지만 '~부'는 소프트웨어 또는 하드웨어에 한정되는 의미는 아니다. '~부'는 어드레싱할 수 있는 저장 매체에 있도록 구성될 수도 있고 하나 또는 그 이상의 프로세서들을 재생시키도록 구성될 수도 있다. 따라서, 일 예로서 '~부'는 소프트웨어 구성요소들, 객체지향 소프트웨어 구성요소들, 클래스 구성요소들 및 태스크 구성요소들과 같은 구성요소들과, 프로세스들, 함수들, 속성들, 프로시저들, 서브루틴들, 프로그램 코드의 세그먼트들, 드라이버들, 펌웨어, 마이크로코드, 회로, 데이터, 데이터베이스, 데이터 구조들, 테이블들, 어레이들, 및 변수들을 포함한다. 구성요소들과 '~부'들 안에서 제공되는 기능은 더 작은 수의 구성요소들 및 '~부'들로 결합되거나 추가적인 구성요소들과 '~부'들로 더 분리될 수 있다. 뿐만 아니라, 구성요소들 및 '~부'들은 디바이스 또는 보안 멀티미디어카드 내의 하나 또는 그 이상의 CPU들을 재생시키도록 구현될 수도 있다.In this case, the term '~ part' used in the present embodiment refers to software or a hardware component such as an FPGA or an ASIC, and '~ part' plays certain roles. However, '~' is not meant to be limited to software or hardware. '~ Portion' may be configured to be in an addressable storage medium or may be configured to play one or more processors. Thus, as an example, '~' means components such as software components, object-oriented software components, class components, and task components, and processes, functions, properties, procedures, and the like. Subroutines, segments of program code, drivers, firmware, microcode, circuits, data, databases, data structures, tables, arrays, and variables. The functionality provided within the components and the 'parts' may be combined into a smaller number of components and the 'parts' or further separated into additional components and the 'parts'. In addition, the components and '~' may be implemented to play one or more CPUs in the device or secure multimedia card.
이하 본 발명의 실시예를 첨부한 도면과 함께 상세히 설명한다. 또한 본 발명을 설명함에 있어서 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단된 경우 그 상세한 설명은 생략한다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, embodiments of the present invention will be described in detail with the accompanying drawings. In addition, in describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. Terms to be described later are terms defined in consideration of functions in the present invention, and may be changed according to intentions or customs of users or operators. Therefore, the definition should be made based on the contents throughout the specification.
또한, 본 발명의 실시예들을 구체적으로 설명함에 있어서, OFDM 기반의 무선통신 시스템, 특히 3GPP EUTRA 표준을 주된 대상으로 할 것이지만, 본 발명의 주요한 요지는 유사한 기술적 배경 및 채널 형태를 가지는 여타의 통신 시스템에도 본 발명의 범위를 크게 벗어나지 아니하는 범위에서 약간의 변형으로 적용 가능하며, 이는 본 발명의 기술 분야에서 숙련된 기술적 지식을 가진 자의 판단으로 가능할 것이다.In addition, in describing the embodiments of the present invention in detail, an OFDM-based wireless communication system, in particular the 3GPP EUTRA standard will be the main target, but the main subject of the present invention is another communication system having a similar technical background and channel form. In addition, it is possible to apply with a slight modification in the range without departing greatly from the scope of the present invention, which will be possible in the judgment of those skilled in the art.
4G 통신 시스템 상용화 이후 증가 추세에 있는 무선 데이터 트래픽 수요를 충족시키기 위해, 개선된 5G 통신 시스템 또는 pre-5G 통신 시스템을 개발하기 위한 노력이 이루어지고 있다. 이러한 이유로, 5G 통신 시스템 또는 pre-5G 통신 시스템은 4G 네트워크 이후 (Beyond 4G Network) 통신 시스템 또는 LTE 시스템 이후 (Post LTE) 시스템이라 불리어지고 있다. 높은 데이터 전송률을 달성하기 위해, 5G 통신 시스템은 초고주파(mmWave) 대역 (예를 들어, 60기가(60GHz) 대역과 같은)에서의 구현이 고려되고 있다. 초고주파 대역에서의 전파의 경로손실 완화 및 전파의 전달 거리를 증가시키기 위해, 5G 통신 시스템에서는 빔포밍(beamforming), 거대 배열 다중 입출력(massive MIMO), 전차원 다중입출력(Full Dimensional MIMO: FD-MIMO), 어레이 안테나(array antenna), 아날로그 빔형성(analog beam-forming), 및 대규모 안테나 (large scale antenna) 기술들이 논의되고 있다. In order to meet the increasing demand for wireless data traffic since the commercialization of 4G communication systems, efforts are being made to develop improved 5G communication systems or pre-5G communication systems. For this reason, a 5G communication system or a pre-5G communication system is called a Beyond 4G network communication system or a post LTE system. In order to achieve high data rates, 5G communication systems are being considered for implementation in the ultra-high frequency (mmWave) band (eg, such as the 60 Gigabit (60 GHz) band). In order to mitigate the path loss of radio waves in the ultra-high frequency band and increase the propagation distance of radio waves, beamforming, massive array multiple input / output (FD-MIMO), and FD-MIMO are used in 5G communication systems. Array antenna, analog beam-forming, and large scale antenna techniques are discussed.
또한, 시스템의 네트워크 개선을 위해, 5G 통신 시스템에서는 진화된 소형 셀, 개선된 소형 셀 (advanced small cell), 클라우드 무선 액세스 네트워크 (cloud radio access network: cloud RAN), 초고밀도 네트워크 (ultra-dense network), 기기 간 통신 (Device to Device communication: D2D), 무선 백홀 (wireless backhaul), 이동 네트워크 (moving network), 협력 통신 (cooperative communication), CoMP (Coordinated Multi-Points), 및 수신 간섭제거 (interference cancellation) 등의 기술 개발이 이루어지고 있다. 이 밖에도, 5G 시스템에서는 진보된 코딩 변조(Advanced Coding Modulation: ACM) 방식인 FQAM (Hybrid FSK and QAM Modulation) 및 SWSC (Sliding Window Superposition Coding)과, 진보된 접속 기술인 FBMC(Filter Bank Multi Carrier), NOMA(non-orthogonal multiple access), 및 SCMA(sparse code multiple access) 등이 개발되고 있다.In addition, in order to improve the network of the system, in the 5G communication system, an advanced small cell, an advanced small cell, a cloud radio access network (cloud RAN), an ultra-dense network ), Device to Device communication (D2D), wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), and interference cancellation Technology development, etc. In addition, in 5G systems, Hybrid FSK and QAM Modulation (FQAM) and Slide Window Superposition Coding (SWSC), Advanced Coding Modulation (ACM), and FBMC (Filter Bank Multi Carrier) and NOMA are advanced access technologies. Non-orthogonal multiple access and sparse code multiple access are being developed.
한편, 인터넷은 인간이 정보를 생성하고 소비하는 인간 중심의 연결망에서, 사물 등 분산된 구성 요소들 간에 정보를 주고받아 처리하는 IoT(Internet of Things, 사물인터넷) 망으로 진화하고 있다. 클라우드 서버 등과의 연결을 통한 빅데이터(Big data) 처리 기술 등이 IoT 기술에 결합된 IoE (Internet of Everything) 기술도 대두되고 있다. IoT를 구현하기 위해서, 센싱 기술, 유무선 통신 및 네트워크 인프라, 서비스 인터페이스 기술, 및 보안 기술과 같은 기술 요소 들이 요구되어, 최근에는 사물간의 연결을 위한 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 연구되고 있다. IoT 환경에서는 연결된 사물들에서 생성된 데이터를 수집, 분석하여 인간의 삶에 새로운 가치를 창출하는 지능형 IT(Internet Technology) 서비스가 제공될 수 있다. IoT는 기존의 IT(information technology)기술과 다양한 산업 간의 융합 및 복합을 통하여 스마트홈, 스마트 빌딩, 스마트 시티, 스마트 카 혹은 커넥티드 카, 스마트 그리드, 헬스 케어, 스마트 가전, 첨단의료서비스 등의 분야에 응용될 수 있다.Meanwhile, the Internet is evolving from a human-centered connection network where humans create and consume information, and an Internet of Things (IoT) network that exchanges and processes information among distributed components such as things. The Internet of Everything (IoE) technology, which combines big data processing technology through connection with cloud servers and the like, is emerging. In order to implement the IoT, technical elements such as sensing technology, wired / wireless communication and network infrastructure, service interface technology, and security technology are required, and recently, a sensor network for connection between things, a machine to machine , M2M), Machine Type Communication (MTC), etc. are being studied. In an IoT environment, intelligent Internet technology (IT) services can be provided that collect and analyze data generated from connected objects to create new value in human life. IoT is a field of smart home, smart building, smart city, smart car or connected car, smart grid, health care, smart home appliances, advanced medical services, etc. through convergence and complex of existing information technology (IT) technology and various industries. It can be applied to.
이에, 5G 통신 시스템을 IoT 망에 적용하기 위한 다양한 시도들이 이루어지고 있다. 예를 들어, 센서 네트워크(sensor network), 사물 통신(Machine to Machine, M2M), MTC(Machine Type Communication)등의 기술이 5G 통신 기술이 빔 포밍, MIMO, 및 어레이 안테나 등의 기법에 의해 구현되고 있는 것이다. 앞서 설명한 빅데이터 처리 기술로써 클라우드 무선 액세스 네트워크(cloud RAN)가 적용되는 것도 5G 기술과 IoT 기술 융합의 일 예라고 할 수 있을 것이다.Accordingly, various attempts have been made to apply the 5G communication system to the IoT network. For example, technologies such as sensor network, machine to machine (M2M), machine type communication (MTC), and the like, are implemented by techniques such as beamforming, MIMO, and array antennas. It is. Application of cloud radio access network (cloud RAN) as the big data processing technology described above may be an example of convergence of 5G technology and IoT technology.
한편, 이동통신 시스템에서 새로운 5G 통신(또는 본 발명에서 NR 통신이라 함.)과 기존의 LTE 통신이 같은 스펙트럼에서 공존시키는 것에 대한 연구가 진행 중에 있다.On the other hand, the research on the coexistence of the new 5G communication (or NR communication in the present invention) and the existing LTE communication in the same spectrum in the mobile communication system.
본 발명은 무선통신 시스템에 관한 것으로, 보다 구체적으로 서로 다른 무선통신 시스템들이 한 개의 캐리어 주파수 혹은 다수의 캐리어 주파수들에서 공존하고, 서로 다른 통신 시스템 중 적어도 한 통신 시스템에서 데이터를 송수신할 수 있는 단말이 각 통신 시스템과 데이터를 송수신하는 방법 및 장치에 관한 것이다.The present invention relates to a wireless communication system, and more particularly, different wireless communication systems coexist at one carrier frequency or multiple carrier frequencies, and a terminal capable of transmitting and receiving data in at least one communication system among different communication systems. The present invention relates to a method and an apparatus for transmitting and receiving data with each communication system.
일반적으로 이동 통신 시스템은 사용자의 활동성을 보장하면서 음성 서비스를 제공하기 위해 개발되었다. 그러나 이동 통신 시스템은 점차로 음성뿐 아니라 데이터 서비스까지 영역을 확장하고 있으며, 현재에는 고속의 데이터 서비스를 제공할 수 있는 정도까지 발전하였다. 그러나 현재 서비스가 제공되고 있는 이동 통신 시스템에서는 자원의 부족 현상 및 사용자들이 보다 고속의 서비스를 요구하므로, 보다 발전된 이동 통신 시스템이 요구되고 있다.In general, mobile communication systems have been developed to provide voice services while guaranteeing user activity. However, mobile communication systems are gradually expanding to not only voice but also data services, and have now evolved to provide high-speed data services. However, in the mobile communication system in which a service is currently provided, a shortage of resources and users demand faster services, and thus, a more advanced mobile communication system is required.
이러한 요구에 부응하여 차세대 이동 통신 시스템으로 개발 중인 중 하나의 시스템으로써 3GPP(The 3rd Generation Partnership Project)에서 LTE(Long Term Evolution)에 대한 규격 작업이 진행 중이다. LTE는 최대 100 Mbps정도의 송신 속도를 가지는 고속 패킷 기반 통신을 구현하는 기술이다. 이를 위해 여러 가지 방안이 논의되고 있는데, 예를 들어 네트워크의 구조를 간단히 해서 통신로 상에 위치하는 노드의 수를 줄이는 방안이나, 무선 프로토콜들을 최대한 무선 채널에 근접시키는 방안 등이 있다.In response to these demands, one of the systems being developed as a next-generation mobile communication system, a specification work for Long Term Evolution (LTE) is underway in the 3GPP (The 3rd Generation Partnership Project). LTE is a technology that implements high-speed packet-based communication with a transmission rate of up to 100 Mbps. To this end, various methods are discussed. For example, the network structure can be simplified to reduce the number of nodes located on the communication path, or the wireless protocols can be as close to the wireless channel as possible.
LTE 시스템은 초기 전송에서 복호 실패가 발생된 경우, 물리 계층에서 해당 데이터를 재전송하는 HARQ(Hybrid Automatic Repeat reQuest) 방식을 채용하고 있다. HARQ 방식이란 수신기가 데이터를 정확하게 디코딩하지 못한 경우, 수신기가 송신기에게 디코딩 실패를 알리는 정보(NACK; Negative Acknowledgement)를 전송하여 송신기가 물리 계층에서 해당 데이터를 재전송할 수 있게 한다. 수신기는 송신기가 재전송한 데이터를 기존에 디코딩 실패한 데이터와 결합하여 데이터 수신성능을 높이게 된다. 또한, 수신기가 데이터를 정확하게 복호한 경우 송신기에게 디코딩 성공을 알리는 정보(ACK; Acknowledgement)를 전송하여 송신기가 새로운 데이터를 전송할 수 있도록 할 수 있다.The LTE system employs a hybrid automatic repeat request (HARQ) scheme in which the data is retransmitted in the physical layer when a decoding failure occurs in the initial transmission. In the HARQ scheme, when the receiver does not correctly decode the data, the receiver transmits NACK (Negative Acknowledgement) indicating the decoding failure to the transmitter so that the transmitter can retransmit the corresponding data in the physical layer. The receiver combines the data retransmitted by the transmitter with the previously decoded data to improve the data reception performance. In addition, when the receiver correctly decodes the data, the transmitter may transmit an acknowledgment (ACK) indicating the decoding success to the transmitter so that the transmitter may transmit new data.
도 1은 LTE 시스템에서 하향링크에서 상기 데이터 혹은 제어채널이 전송되는 무선자원영역인 시간-주파수영역의 기본 구조를 나타낸 도면이다. 1 is a diagram illustrating a basic structure of a time-frequency domain, which is a radio resource region in which the data or control channel is transmitted in downlink in an LTE system.
도 1에서 가로축은 시간영역을, 세로축은 주파수영역을 나타낸다. 시간영역에서의 최소 전송단위는 OFDM 심벌로서, Nsymb (102)개의 OFDM 심벌이 모여 하나의 슬롯(106)을 구성하고, 2개의 슬롯이 모여 하나의 서브프레임(105)을 구성한다. 상기 슬롯의 길이는 0.5ms이고, 서브프레임의 길이는 1.0ms이다. 그리고 라디오 프레임(114)은 10개의 서브프레임으로 구성되는 시간영역 단위이다. 주파수 영역에서의 최소 전송단위는 서브캐리어로서, 전체 시스템 전송 대역 (Transmission bandwidth)의 대역폭은 총 NBW (104)개의 서브캐리어로 구성된다.In FIG. 1, the horizontal axis represents the time domain and the vertical axis represents the frequency domain. The minimum transmission unit in the time domain is an OFDM symbol, in which Nsymb (102) OFDM symbols are gathered to form one slot 106, and two slots are gathered to form one subframe 105. The length of the slot is 0.5ms and the length of the subframe is 1.0ms. The radio frame 114 is a time domain unit consisting of 10 subframes. The minimum transmission unit in the frequency domain is a subcarrier, and the bandwidth of the entire system transmission bandwidth is composed of a total of NBW 104 subcarriers.
시간-주파수영역에서 자원의 기본 단위는 리소스 엘리먼트(112, Resource Element; RE)로서 OFDM 심벌 인덱스 및 서브캐리어 인덱스로 나타낼 수 있다. 리소스 블록(108, Resource Block; RB 혹은 Physical Resource Block; PRB)은 시간영역에서 Nsymb (102)개의 연속된 OFDM 심벌과 주파수 영역에서 NRB (110)개의 연속된 서브캐리어로 정의된다. 따라서, 하나의 RB(108)는 Nsymb x NRB 개의 RE(112)로 구성된다. 일반적으로 데이터의 최소 전송단위는 상기 RB 단위이다. LTE 시스템에서 일반적으로 상기 Nsymb = 7, NRB=12 이고, NBW 및 NRB 는 시스템 전송 대역의 대역폭에 비례한다. The basic unit of a resource in the time-frequency domain may be represented by an OFDM symbol index and a subcarrier index as a resource element (RE). The resource block 108 (Resource Block; RB or PRB) is defined as Nsymb 102 consecutive OFDM symbols in the time domain and NRB 110 consecutive subcarriers in the frequency domain. Thus, one RB 108 is composed of Nsymb x NRB REs 112. In general, the minimum transmission unit of data is the RB unit. In the LTE system, the above Nsymb = 7, NRB = 12, NBW and NRB is proportional to the bandwidth of the system transmission band.
단말에게 스케쥴링되는 RB 개수에 비례하여 데이터 레이트가 증가하게 된다. LTE 시스템은 6개의 전송 대역폭을 정의하여 운영한다. 하향링크와 상향링크를 주파수로 구분하여 운영하는 FDD(frequency division duplex) 시스템의 경우, 하향링크 전송 대역폭과 상향링크 전송 대역폭이 서로 다를 수 있다. 채널 대역폭은 시스템 전송 대역폭에 대응되는 RF(radio frequency) 대역폭을 나타낸다. The data rate increases in proportion to the number of RBs scheduled for the UE. The LTE system defines and operates six transmission bandwidths. In the case of a frequency division duplex (FDD) system in which downlink and uplink are divided into frequencies, the downlink transmission bandwidth and the uplink transmission bandwidth may be different. The channel bandwidth represents a radio frequency (RF) bandwidth corresponding to the system transmission bandwidth.
[표 1]은 LTE 시스템에 정의된 시스템 전송 대역폭과 채널 대역폭 (Channel bandwidth)의 대응관계를 나타낸다. 예를 들어, 10MHz 채널 대역폭을 갖는 LTE 시스템은 전송 대역폭이 50개의 RB로 구성된다. [Table 1] shows the correspondence between the system transmission bandwidth and the channel bandwidth defined in the LTE system. For example, an LTE system with a 10 MHz channel bandwidth consists of 50 RBs in transmission bandwidth.
[표 1]TABLE 1
하향링크 제어정보의 경우 상기 서브프레임 내의 최초 N 개의 OFDM 심벌 이내에 전송된다. 일반적으로 N = {1, 2, 3} 이다. 따라서 현재 서브프레임에 전송해야 할 제어정보의 양에 따라 상기 N 값이 서브프레임마다 가변하게 된다. 상기 제어정보로는 제어정보가 OFDM 심벌 몇 개에 걸쳐 전송되는지를 나타내는 제어채널 전송구간 지시자, 하향링크 데이터 혹은 상향링크 데이터에 대한 스케쥴링 정보, HARQ ACK/NACK 신호 등을 포함한다. The downlink control information is transmitted within the first N OFDM symbols in the subframe. Generally N = {1, 2, 3}. Therefore, the N value varies in each subframe according to the amount of control information to be transmitted in the current subframe. The control information includes a control channel transmission interval indicator indicating how many control information is transmitted over the OFDM symbol, scheduling information for downlink data or uplink data, HARQ ACK / NACK signal, and the like.
LTE 시스템에서 하향링크 데이터 혹은 상향링크 데이터에 대한 스케줄링 정보는 하향링크 제어정보(Downlink Control Information; DCI)를 통해 기지국으로부터 단말에게 전달된다. 상향링크 (uplink; UL) 는 단말이 기지국으로 데이터 혹은 제어신호를 전송하는 무선링크를 뜻하고, 하향링크 (downlink; DL)는 기지국이 단말로 데이터 혹은 제어신호를 전송하는 무선링크를 뜻한다. DCI 는 여러 가지 포맷을 정의하여, 상향링크 데이터에 대한 스케줄링 정보 (UL(uplink) grant) 인지 하향링크 데이터에 대한 스케줄링 정보 (DL(downlink) grant) 인지 여부, 제어정보의 크기가 작은 컴팩트 DCI 인지 여부, 다중안테나를 사용한 공간 다중화 (spatial multiplexing)을 적용하는지 여부, 전력제어용 DCI 인지 여부 등에 따라 정해진 DCI 포맷을 적용하여 운용한다. 예컨대, 하향링크 데이터에 대한 스케줄링 제어정보(DL grant)인 DCI format 1 은 적어도 다음과 같은 제어정보들을 포함하도록 구성된다. In the LTE system, scheduling information on downlink data or uplink data is transmitted from the base station to the terminal through downlink control information (DCI). An uplink (UL) refers to a radio link through which a terminal transmits data or a control signal to a base station, and a downlink (DL) refers to a radio link through which a base station transmits data or a control signal to a terminal. DCI defines various formats to determine whether scheduling information (UL (uplink) grant) for uplink data or scheduling information (DL (downlink) grant) for downlink data and whether compact DCI having a small size of control information. The DCI format is determined according to whether or not it is applied, whether to use spatial multiplexing using multiple antennas, or whether the DCI for power control is applied. For example, DCI format 1 which is scheduling control information (DL grant) for downlink data is configured to include at least the following control information.
- 자원 할당 유형 0/1 플래그(Resource allocation type 0/1 flag): 리소스 할당 방식이 유형 0 인지 유형 1 인지 통지한다. 유형 0 은 비트맵 방식을 적용하여 RBG (resource block group) 단위로 리소스를 할당한다. LTE 시스템에서 스케줄링의 기본 단위는 시간 및 주파수 영역 리소스로 표현되는 RB(resource block)이고, RBG 는 복수개의 RB로 구성되어 유형 0 방식에서의 스케줄링의 기본 단위가 된다. 유형 1 은 RBG 내에서 특정 RB를 할당하도록 한다. Resource allocation type 0/1 flag: Notifies whether the resource allocation method is type 0 or type 1. Type 0 uses the bitmap method to allocate resources in resource block group (RBG) units. In the LTE system, a basic unit of scheduling is a resource block (RB) represented by time and frequency domain resources, and the RBG is composed of a plurality of RBs to become a basic unit of scheduling in a type 0 scheme. Type 1 allows allocating a specific RB within the RBG.
- 자원 블록 할당(Resource block assignment): 데이터 전송에 할당된 RB를 통지한다. 시스템 대역폭 및 리소스 할당 방식에 따라 표현하는 리소스가 결정된다.Resource block assignment: Notifies the RB allocated for data transmission. The resource to be expressed is determined by the system bandwidth and the resource allocation method.
- 변조 및 코딩 방식(Modulation and coding scheme; MCS): 데이터 전송에 사용된 변조방식과 전송하고자 하는 데이터인 transport block 의 크기를 통지한다.Modulation and coding scheme (MCS): Notifies the modulation scheme used for data transmission and the size of the transport block that is the data to be transmitted.
- HARQ 프로세스 번호(HARQ process number): HARQ 의 프로세스 번호를 통지한다.HARQ process number: Notifies the process number of HARQ.
- 새로운 데이터 지시자(New data indicator): HARQ 초기전송인지 재전송인지를 통지한다.New data indicator: notifies whether HARQ initial transmission or retransmission.
- 중복 버전(Redundancy version): HARQ의 중복 버전(redundancy version) 을 통지한다. Redundancy version: Notifies the redundant version of the HARQ.
- PUCCH를 위한 전송 전력 제어 명령(TPC(Transmit Power Control) command for PUCCH(Physical Uplink Control CHannel): 상향링크 제어 채널인 PUCCH 에 대한 전송 전력 제어 명령을 통지한다.Transmit Power Control (TPC) command for PUCCH (Physical Uplink Control CHannel): Notifies a transmit power control command for PUCCH, which is an uplink control channel.
상기 DCI는 채널코딩 및 변조과정을 거쳐 하향링크 물리제어채널인 PDCCH(Physical downlink control channel) 혹은 EPDCCH(Enhanced PDCCH)를 통해 전송된다.The DCI is transmitted through a physical downlink control channel (PDCCH) or an enhanced PDCCH (EPDCCH), which is a downlink physical control channel through channel coding and modulation.
일반적으로 상기 DCI는 각 단말에 대해 독립적으로 채널 코딩된 후, 각각 독립적인 PDCCH로 구성되어 전송된다. 시간영역에서 PDCCH는 상기 제어채널 전송구간 동안 매핑되어 전송된다. PDCCH 의 주파수영역 매핑 위치는 각 단말의 식별자(ID) 에 의해 결정되고, 전체 시스템 전송 대역에 퍼뜨려진다. In general, the DCI is channel-coded independently for each UE, and then configured and transmitted with each independent PDCCH. In the time domain, the PDCCH is mapped and transmitted during the control channel transmission period. The frequency domain mapping position of the PDCCH is determined by the identifier (ID) of each terminal and spread over the entire system transmission band.
하향링크 데이터는 하향링크 데이터 전송용 물리채널인 PDSCH(Physical Downlink Shared Channel) 를 통해 전송된다. PDSCH는 상기 제어채널 전송구간 이후부터 전송되는데, 주파수 영역에서의 구체적인 매핑 위치, 변조 방식 등의 스케줄링 정보는 상기 PDCCH 를 통해 전송되는 DCI가 알려준다. The downlink data is transmitted through a physical downlink shared channel (PDSCH) which is a physical channel for downlink data transmission. PDSCH is transmitted after the control channel transmission interval, and scheduling information such as specific mapping positions and modulation schemes in the frequency domain is informed by the DCI transmitted through the PDCCH.
상기 DCI 를 구성하는 제어정보 중에서 5 비트로 구성되는 MCS를 통해서, 기지국은 단말에게 전송하고자 하는 PDSCH에 적용된 변조방식과 전송하고자 하는 데이터의 크기(transport block size; TBS)를 통지한다. 상기 TBS는 기지국이 전송하고자 하는 데이터 (transport block, TB)에 오류정정을 위한 채널코딩이 적용되기 이전의 크기에 해당한다. The base station notifies the UE of a modulation scheme applied to a PDSCH to be transmitted and a transport block size (TBS) of data to be transmitted through an MCS configured of 5 bits among control information constituting the DCI. The TBS corresponds to a size before channel coding for error correction is applied to data (transport block, TB) that the base station intends to transmit.
LTE 시스템에서 지원하는 변조방식은 QPSK(Quadrature Phase Shift Keying), 16QAM(Quadrature Amplitude Modulation), 64QAM 으로서, 각각의 변조오더(Modulation order) (Qm) 는 2, 4, 6 에 해당한다. 즉, QPSK 변조의 경우 심벌 당 2 비트, 16QAM 변조의 경우 심볼 당 4 비트, 64QAM 변조의 경우 심벌 당 6 비트를 전송할 수 있다. Modulation methods supported by the LTE system are Quadrature Phase Shift Keying (QPSK), Quadrature Amplitude Modulation (16QAM), and 64QAM. Each modulation order (Qm) corresponds to 2, 4, and 6. That is, 2 bits per symbol for QPSK modulation, 4 bits per symbol for 16QAM modulation, and 6 bits per symbol for 64QAM modulation.
3GPP LTE Rel-10에서 LTE Rel-8과 비교하여 더 높은 데이터 송신량을 지원하기 위하여 대역폭 확장 기술이 채택되었다. 대역폭 확장(Bandwidth extension) 또는 반송파 결합(Carrier Aggregation, CA)이라 불리는 상기 기술은 대역을 확장하여 한 대역에서 데이터를 송신하는 LTE Rel-8 단말에 비하여 확장한 대역만큼 데이터 송신량을 증가시킬 수 있다. 상기의 대역들 각각을 구성 반송파(Component Carrier, CC)라고 부르며, LTE Rel-8 단말은 하향과 상향에 대해서 각각 한 개의 구성 반송파를 가지도록 규정되어 있다. 또한, 하향 구성 반송파와 SIB-2 연결되어 있는 상향 구성 반송파를 묶어서 셀(cell)이라고 부른다. 하향 구성 반송파와 상향 구성 반송파의 SIB-2 연결 관계는 시스템 신호 혹은 상위 신호로 송신된다. CA를 지원하는 단말은 다수의 서빙 셀(serving cell)을 통하여 하향 데이터를 수신할 수 있고, 상향 데이터를 송신할 수 있다. In 3GPP LTE Rel-10, bandwidth extension technology has been adopted to support higher data throughput compared to LTE Rel-8. This technique, called bandwidth extension or carrier aggregation (CA), can increase the amount of data transmission by an extended band compared to an LTE Rel-8 terminal that transmits data in one band by extending the band. . Each of the bands is called a component carrier (CC), and the LTE Rel-8 terminal is defined to have one component carrier for each of downlink and uplink. In addition, the downlink component carrier and the uplink component carrier connected to the SIB-2 are collectively called a cell. The SIB-2 connection relationship between the downlink component and the uplink component is transmitted as a system signal or a higher signal. The terminal supporting the CA may receive downlink data through a plurality of serving cells and transmit uplink data.
Rel-10에서 기지국이 특정 단말에게 특정 서빙 셀에서 PDCCH(Physical Downlink Control Channel)를 보내기가 어려운 상황일 때 다른 서빙 셀에서 PDCCH를 송신하고 해당 PDCCH가 다른 서빙 셀의 PDSCH(Physical Downlink Shared Channel)나 PUSCH(Physical Uplink Shared Channel)를 지시한다는 것을 알려주는 필드로써 반송파 지시 필드(Carrier Indicator Field, CIF)를 단말에게 설정할 수 있다. CIF는 CA를 지원하는 단말에게 설정될 수 있다. CIF는 특정 서빙 셀에서 PDCCH 정보에 3비트를 추가하여 다른 서빙 셀을 지시할 수 있도록 결정되었으며, 교차 반송파 스케줄링(cross carrier scheduling)를 하도록 상위 신호로 설정할 때만 CIF가 포함된다. 교차 반송파 스케줄링을 하도록 상위 신호로 설정을 하지 않거나 셀프 스케줄링을 하도록 상위 신호로 설정한 경우, CIF가 포함되지 않으며, 이때는 교차 반송파 스케줄링을 수행하지 않는다. 상기 CIF가 하향링크 할당 정보(DL assignment)에 포함되어 있을 때, 상기 CIF는 DL assignment에 의해 스케줄링 되는 PDSCH가 송신될 서빙 셀을 가리키며, 상기 CIF가 상향링크 자원 살당 정보(UL grant)에 포함되어 있을 때, 상기 CIF는 UL grant에 의해 스케줄링 되는 PUSCH가 송신될 서빙 셀을 가리키도록 정의된다. In Rel-10, when a base station is difficult to send a physical downlink control channel (PDCCH) to a specific UE from a specific serving cell, another serving cell transmits the PDCCH and the corresponding PDCCH is a physical downlink shared channel (PDSCH) of another serving cell or As a field indicating that a PUSCH (Physical Uplink Shared Channel) is indicated, a carrier indicator field (CIF) may be set to the UE. The CIF may be set to a terminal supporting the CA. The CIF is determined to indicate another serving cell by adding 3 bits to the PDCCH information in a specific serving cell. The CIF is included only when the CIF is set as an upper signal to perform cross carrier scheduling. If the upper signal is not set to cross carrier scheduling or the upper signal is set to self scheduling, CIF is not included and cross carrier scheduling is not performed at this time. When the CIF is included in downlink allocation information (DL assignment), the CIF indicates a serving cell to which a PDSCH scheduled by DL assignment is to be transmitted, and the CIF is included in UL resource allocation information (UL grant). When present, the CIF is defined to indicate the serving cell to which the PUSCH scheduled by the UL grant is to be transmitted.
상기한 바와 같이, LTE Rel-10에서는 대역폭 확장 기술인 반송파 결합(Carrier Aggregation, CA)이 정의되어, 다수의 서빙 셀들이 단말에게 설정될 수 있다. 그리고 단말은 기지국의 데이터 스케쥴링을 위하여 상기 다수의 서빙 셀들에 대한 채널 정보를 주기적 또는 비주기적으로 기지국으로 송신한다. 기지국은 데이터를 각 반송파별로 스케줄링하여 전송하고, 단말은 각 반송파 별로 전송된 데이터에 대한 A/N 피드백을 전송한다. LTE Rel-10에서는 최대 21비트의 A/N 피드백을 전송하도록 설계하였으며, A/N 피드백과 채널 정보의 전송이 한 서브프레임에서 겹치는 경우, A/N 피드백을 전송하고 채널 정보는 버리도록 설계하였다. LTE Rel-11에서는 A/N 피드백과 함께 한 개 셀의 채널 정보를 다중화하여 최대 22비트의 A/N 피드백과 한 개 셀의 채널 정보가 PUCCH format 3의 전송 자원에서 PUCCH format 3에 전송되도록 설계하였다. As described above, in LTE Rel-10, carrier aggregation (CA), which is a bandwidth extension technology, is defined, and a plurality of serving cells may be configured in the terminal. The terminal transmits channel information about the plurality of serving cells periodically or aperiodically to the base station for data scheduling of the base station. The base station schedules and transmits data for each carrier, and the terminal transmits A / N feedback for the data transmitted for each carrier. In LTE Rel-10, it is designed to transmit A / N feedback of maximum 21 bits, and when A / N feedback and channel information overlap in one subframe, it is designed to transmit A / N feedback and discard channel information. . In LTE Rel-11, up to 22 bits of A / N feedback and one cell channel information are transmitted in PUCCH format 3 from PUCCH format 3 by multiplexing channel information of one cell with A / N feedback. It was.
LTE Rel-13에서는 최대 32개의 서빙 셀 설정 시나리오를 가정하게 되는데, 면허대역 뿐만 아니라 비 면허대역인 unlicensed band에서의 대역을 이용하여 서빙 셀의 수를 최대 32개까지 확장하는 개념을 완료하였다. 또한, LTE 주파수와 같은 면허 대역의 수가 제한되어 있는 것을 고려하여, 5GHz 대역과 같은 비 면허대역에서 LTE 서비스를 제공하는 것을 완료하였으며, 이것을 LAA(Licensed Assisted Access)라고 부른다. LAA에서는 LTE에서의 Carrier aggregation 기술을 적용하여, 면허 대역인 LTE 셀은 P셀, 비면허 대역인 LAA셀은 S셀로 운영하는 것을 지원하였다. 따라서, LTE에서처럼 S셀인 LAA 셀에서 발생하는 피드백은 P셀에서만 전송되어야 하며, LAA셀은 하향 서브프레임과 상향 서브프레임이 자유롭게 적용될 수 있다. 본 명세서에서 따로 기술하지 않는 경우, LTE는 LTE-A, LAA와 같은 LTE의 진화 기술을 모두 포함하여 일컫는 것으로 한다.In LTE Rel-13, a maximum of 32 serving cell configuration scenarios are assumed. The concept of extending the number of serving cells to 32 by using a band in an unlicensed band as well as a licensed band is completed. In addition, in consideration of the limited number of licensed bands such as the LTE frequency, the LTE service has been provided in an unlicensed band such as the 5 GHz band, which is called LAA (Licensed Assisted Access). The LAA applied Carrier aggregation technology in LTE to support the operation of the LTE cell, which is a licensed band, as the P-cell, and the LAA cell, which is the unlicensed band, as the S-cell. Therefore, as in LTE, feedback generated in the LAA cell, which is the SCell, should be transmitted only in the Pcell, and the LAA cell may be freely applied with the downlink subframe and the uplink subframe. Unless stated otherwise in this specification, LTE refers to including all of LTE evolution technology, such as LTE-A, LAA.
한편, LTE 이후의 통신 시스템으로서, 즉, 5세대 무선 셀룰러 통신시스템(본 명세서에서 이하 5G 또는 NR로 부르도록 한다)은 사용자 및 서비스 제공자 등의 다양한 요구 사항을 자유롭게 반영할 수 있어야 하기 때문에 다양한 요구사항을 만족하는 서비스가 지원될 수 있다.On the other hand, as a communication system after LTE, i.e., a fifth generation wireless cellular communication system (hereinafter referred to as 5G or NR), should be able to freely reflect various requirements such as users and service providers. Services that meet the requirements can be supported.
따라서, 5G는 증가된 모바일 광대역 통신 (eMBB: Enhanced Mobile BroadBand, 본 명세서에서는 이하 eMBB로 부르도록 한다), 대규모 기계형 통신 (mMTC: Massive Machine Type Communication, 본 명세서에서는 이하 mMTC로 부르도록 한다), 초신뢰저지연 통신 (URLLC: Ultra Reliable and Low Latency Communications, 본 명세서에서는 이하 URLLC로 부르도록 한다)와 같은 다양한 5G향 서비스들을 단말 최대전송속도 20Gbps, 단말 최대속도 500km/h, 최대지연시간 0.5ms, 단말접속밀도 1,000,000 단말/km2 등의 요구사항들 중 각 5G향 서비스들을 위해 선택된 요구사항들을 만족시키기 위한 기술로 정의할 수 있다. Thus, 5G is referred to as increased mobile broadband communication (eMBB: Enhanced Mobile BroadBand, hereinafter referred to as eMBB), Massive Machine Type Communication (mMTC: referred to herein as mMTC), Various 5G-oriented services such as ultra reliable low delay communication (URLLC: Ultra Reliable and Low Latency Communications, hereinafter referred to as URLLC) in terms of terminal maximum transmission speed of 20Gbps, terminal maximum speed of 500km / h, and maximum delay time of 0.5ms In addition, the terminal access density may be defined as a technology for satisfying the requirements selected for each 5G-oriented services among requirements such as 1,000,000 terminals / km 2.
예를 들어, 5G에서 eMBB를 제공하기 위해 하나의 기지국 관점에서 하향링크에서는 20Gbps의 단말 최대전송속도, 상향링크에서는 10Gbps의 단말 최대전송속도를 제공할 수 있어야 한다. 동시에, 단말의 실제 체감할 수 있는 평균전송속도도 증가 시켜야 한다. 이와 같은 요구 사항을 만족시키기 위해, 더욱 향상된 다중 입력 다중 출력 (Multiple-Input Multiple Output) 전송 기술을 포함하여 송수신 기술의 향상이 요구된다. For example, in order to provide eMBB in 5G, it is necessary to provide a maximum transmission rate of 20 Gbps terminal in downlink and a maximum transmission rate of 10 Gbps terminal in uplink from one base station perspective. At the same time, the actual transmission speed of the terminal should be increased. In order to meet these requirements, improvements in transmission and reception techniques are required, including more advanced multiple-input multiple output transmission techniques.
동시에, 5G에서 사물 인터넷(Internet of Thing: IoT)와 같은 응용 서비스를 지원하기 위해 mMTC가 고려되고 있다. mMTC는 효율적으로 사물 인터넷을 제공하기 위해 셀 내에서 대규모 단말의 접속 지원, 단말의 커버리지 향상, 향상된 배터리 시간, 단말의 비용 감소의 요구사항이 필요로 된다. 사물 인터넷은 여러 가지 센서 및 다양한 기기에 부착되어 통신 기능을 제공하므로 셀 내에서 많은 수의 단말(예를 들어, 1,000,000 단말/km2)을 지원할 수 있어야 한다. 또한, mMTC는 서비스의 특성상 단말이 건물의 지하나 셀이 커버하지 못하는 영역 등 음영지역에 위치할 가능성이 높으므로 eMBB에서 제공하는 커버리지 대비 더욱 넓은 커버리지를 요구한다. mMTC는 저가의 단말로 구성될 가능성이 높으며, 단말의 배터리를 자주 교환하기 힘들기 때문에 매우 긴 배터리 생명시간(battery life time)이 요구되게 된다. At the same time, mMTC is being considered to support application services such as the Internet of Thing (IoT) in 5G. In order to efficiently provide the Internet of Things, the mMTC needs a requirement for supporting large terminal access in a cell, improving terminal coverage, improved battery time, and reducing terminal cost. Since the IoT is attached to various sensors and various devices to provide a communication function, it must be able to support a large number of terminals (eg, 1,000,000 terminals / km 2) in a cell. In addition, because of the nature of the service, mMTC is likely to be located in a shadow area such as the basement of a building or an area not covered by a cell, and thus requires more coverage than the coverage provided by an eMBB. The mMTC is likely to be composed of a low cost terminal, and very long battery life time is required because it is difficult to frequently change the battery of the terminal.
마지막으로, URLLC의 경우, 특정한 목적으로 사용되는 셀룰러 기반 무선 통신으로서, 로봇 또는 기계 장치에 대한 원격 제어(remote control), 산업 자동화, 무인 비행장치, 원격 건강 제어, 비상 상황 알림 등에 사용되는 서비스로서, 초 저지연 및 초 신뢰도를 제공하는 통신을 제공해야 한다. 예를 들어, URLLC는 0.5 ms보다 작은 최대지연시간을 만족해야 하며, 동시에 10-5 이하의 패킷 오류율을 제공해야 하는 요구사항을 갖는다. 따라서, URLLC를 위해 eMBB와 같은 5G 서비스보다 작은 전송 시간 구간(Transmit Time Interval: TTI)를 제공해야 하며, 동시에 주파수 대역에서 넓은 리소스를 할당해야 하는 설계사항이 요구된다. Finally, in the case of URLLC, it is a cellular-based wireless communication used for a specific purpose, as a service used for remote control of robots or mechanical devices, industrial automation, unmanned aerial vehicles, remote health control, emergency alerts, etc. In addition, it must provide communications that provide ultra-low latency and ultra-reliability. For example, URLLC must satisfy a maximum latency of less than 0.5 ms, while simultaneously providing a packet error rate of 10-5 or less. Accordingly, a transmission time interval (TTI) smaller than a 5G service such as eMBB is required for URLLC, and a design that needs to allocate a wide resource in a frequency band is required.
상기에서 전술한 5세대 무선 셀룰러 통신 시스템에서 고려되는 서비스들은 하나의 프레임워크(Framework)로 제공되어야 한다. 즉, 효율적인 리소스 관리 및 제어를 위해 각 서비스들이 독립적으로 운영되기 보다는 하나의 시스템으로 통합되어 제어되고 전송되는 것이 바람직하다. The services considered in the above-mentioned fifth generation wireless cellular communication system should be provided as a framework. That is, for efficient resource management and control, it is desirable that each service is integrated and controlled and transmitted as one system rather than operated independently.
도 2는 5G에서 고려되는 서비스들이 하나의 시스템으로 전송되는 예를 도시하는 도면이다. 2 is a diagram illustrating an example in which services considered in 5G are transmitted to one system.
도 2에서 5G가 사용하는 주파수-시간 리소스(201)은 주파수 축(202)과 시간 축(203)으로 구성될 수 있다. 도 2에서는 5G가 하나의 프레임워크 안에서 eMBB(205), mMTC(206), URLLC(207)를 운영하는 것을 예시하였다. 또한, 5G에서 추가적으로 고려될 수 있는 서비스로서, 셀룰러 기반에서 방송 서비스를 제공하기 위한 enhanced Mobile Broadcast/Multicast Service(eMBMS, 208)를 고려할 수도 있다. The frequency-time resource 201 used by 5G in FIG. 2 may consist of a frequency axis 202 and a time axis 203. 2 illustrates that 5G operates eMBB 205, mMTC 206 and URLLC 207 in one framework. In addition, as a service that may be additionally considered in 5G, an enhanced mobile broadcast / multicast service (eMBMS) 208 for providing a broadcast service on a cellular basis may be considered.
eMBB(205), mMTC(206), URLLC(207), eMBMS(208) 등, 5G에서 고려되는 서비스들은 5G에서 운영하는 하나의 시스템 주파수 대역폭 내에서 시분할 다중화(Time-Division Multiplexing: TDM) 또는 주파수 분할 다중화(Frequency Division Multiplexing: FDM)을 통해 다중화되어 전송될 수 있으며, 또한 공간분할 다중화(Spatial Division Multiplexing)도 고려될 수 있다. eMBB(205)의 경우, 상기에서 전술한 증가된 데이터 전송 속도를 제공하기 위해 특정 임의의 시간에 최대의 주파수 대역폭을 점유하여 전송하는 것이 바람직하다. 따라서, eMBB(205)서비스의 경우 다른 서비스와 시스템 전송 대역폭(201) 내에서 TDM되어 전송되는 것이 바람직하나, 다른 서비스들의 필요에 따라 다른 서비스들과 시스템 전송 대역폭 내에서 FDM되어 전송되는 것도 바람직하다. Services considered in 5G, such as eMBB 205, mMTC 206, URLLC 207, and eMBMS 208, are time-division multiplexing (TDM) or frequency within one system frequency bandwidth operating at 5G. It may be multiplexed and transmitted through frequency division multiplexing (FDM), and spatial division multiplexing may also be considered. In the case of the eMBB 205, it is desirable to occupy the maximum frequency bandwidth at a certain arbitrary time in order to provide the increased data transmission rate described above. Accordingly, in the case of the eMBB 205 service, it is preferable to transmit TDM in another service and system transmission bandwidth 201, but it is also desirable to transmit FDM in other services and system transmission bandwidth according to the needs of other services. .
mMTC(206)의 경우, 다른 서비스들과 달리 넓은 커버리지를 확보하기 위해 증가된 전송 구간이 요구되며, 전송 구간 내에서 동일한 패킷을 반복 전송 함으로써 커버리지를 확보할 수 있다. 동시에 단말의 복잡도 및 단말 가격을 줄이기 위해 단말이 수신할 수 있는 전송 대역폭에 제한이 발생한다. 이와 같은 요구사항을 고려했을 때 mMTC(206)은 5G의 전송 시스템 대역폭(201)내에서 다른 서비스들과 FDM 되어 전송되는 것이 바람직하다. In the case of the mMTC 206, unlike other services, an increased transmission interval is required to secure wide coverage, and coverage can be secured by repeatedly transmitting the same packet within the transmission interval. At the same time, there is a limit on the transmission bandwidth that the terminal can receive in order to reduce the complexity of the terminal and the terminal price. Given this requirement, it is desirable for the mMTC 206 to be transmitted in FDM with other services within a 5G transmission system bandwidth 201.
URLLC(207)은 서비스가 요구하는 초지연 요구 사항을 만족시키기 위해 다른 서비스들과 비교했을 때 짧은 전송 시간 구간(Transmit Time Interval: TTI)를 갖는 것이 바람직하다. 동시에, 초신뢰 요구사항을 만족하기 위해서는 낮은 부호화율(coding rate)을 가져야 하므로, 주파수 측에서 넓은 대역폭을 갖는 것이 바람직하다. 이와 같은 URLLC(207)의 요구사항을 고려했을 때, URLLC(207)은 5G의 전송 시스템 대역폭(201)내에서 다른 서비스들과 TDM되는 것이 바람직하다. URLLC 207 preferably has a short Transmit Time Interval (TTI) when compared to other services to meet the ultra-delay requirements required by the service. At the same time, it is desirable to have a wide bandwidth on the frequency side because it must have a low coding rate in order to satisfy the super reliability requirements. Given this requirement of URLLC 207, URLLC 207 is preferably TDM with other services within 5G of transmission system bandwidth 201.
상기에서 전술한 각 서비스들은 각 서비스 들이 요구하는 요구사항을 만족시키기 위해 서로 다른 송수신 기법 및 송수신 파라메터를 가질 수 있다. 예를 들어 각각의 서비스는 각 서비스 요구사항에 따라 다른 Numerology를 가질 수 있다. 여기서 Numerology는 직교 다중 주파수 다중화 (Orthogonal Frequency Division Multiplexing: OFDM) 또는 직교 다중 주파수 다중 접속(Orthogonal Frequency Division Multiple Access: OFDMA) 기반의 통신 시스템에서 순환 전치(Cyclic Prefix: CP) 길이, 서브캐리어 간격(Subcarrier spacing), OFDM 심볼의 길이, 전송 구간 길이(TTI) 등을 포함한다. 상기의 서비스간에 서로 다른 Numerology를 갖는 예로서, eMBMS(208)은 다른 서비스에 비해 긴 CP 길이를 가질 수 있다. eMBMS는 방송 기반의 상위 트래픽을 전송하므로, 모든 셀에서 동일한 데이터를 전송할 수 있다. Each of the above-described services may have different transmission / reception schemes and transmission / reception parameters in order to satisfy requirements required by each service. For example, each service can have a different numerology based on each service requirement. Numerology is a cyclic prefix (CP) length and subcarrier spacing in a communication system based on Orthogonal Frequency Division Multiplexing (OFDM) or Orthogonal Frequency Division Multiple Access (OFDMA). spacing), OFDM symbol length, transmission interval length (TTI), and the like. As an example of having different numerologies between the above services, the eMBMS 208 may have a longer CP length than other services. Since eMBMS transmits broadcast-based higher traffic, all cells can transmit the same data.
이때, 단말 입장에서 복수개의 셀에서 수신되는 신호가 CP 길이 이내로 도달한다면, 단말은 이 신호들을 모두 수신하여 복호할 수 있기 때문에 단일 주파수 네트워크 다이버시티(Single Frequency Network: SFN) 이득을 얻을 수 있으며, 따라서 셀 경계에 위치한 단말도 커버리지 제약 없이 방송 정보를 수신할 수 있는 장점이 있다. 하지만 5G에서 eMBMS를 지원하는데 있어 CP 길이가 다른 서비스에 비해 상대적으로 길 경우에는 CP 오버헤드에 의한 낭비가 발생하므로, 동시에 다른 서비스에 비해 긴 OFDM 심볼 길이가 요구되며, 이는 동시에 다른 서비스에 비해 더욱 좁은 서브캐리어 간격을 요구하게 된다. In this case, if a signal received from a plurality of cells arrives within a CP length from the terminal's point of view, since the terminal may receive and decode all of these signals, a single frequency network diversity (SFN) gain may be obtained. Therefore, there is an advantage that the terminal located at the cell boundary can receive broadcast information without coverage limitation. However, when the CP length is relatively long compared to other services in 5G to support eMBMS, a waste of CP overhead is generated, and thus, a long OFDM symbol length is required at the same time as other services. Narrow subcarrier spacing is required.
또한, 5G에서 서비스 간에 다른 Numerology가 사용되는 예로서, URLLC의 경우, 다른 서비스에 비해 작은 TTI가 요구됨에 따라 더욱 짧은 OFDM 심볼 길이가 요구될 수 있으며, 동시에 더욱 넓은 서브캐리어 간격을 요구할 수 있다.In addition, as an example in which different numerology is used between services in 5G, in the case of URLLC, a shorter OFDM symbol length may be required as a smaller TTI is required than other services, and at the same time, a wider subcarrier interval may be required.
한편, 5G에서 한 TTI는 한 슬롯(slot)으로 정의될 수 있으며, 14개의 OFDM 심볼 혹은 7개의 OFDM 심볼로 구성될 수 있다. 따라서, 15KHz의 subcarrier spacing의 경우 한 슬롯은 1ms 혹은 0.5ms의 길이를 갖게 된다. 또한, 5G에서 긴급 전송 및 비면허대역에의 전송을 위해 한 TTI가 한 미니 슬롯(mini-slot) 혹은 서브 슬롯(sub-slot)으로 정의될 수 있으며, 한 미니 슬롯은 1로부터 (슬롯의 전체 OFDM 심볼 개수)-1의 OFDM 심볼 수를 가질 수 있다. 가령 한 슬롯의 길이가 14 OFDM 심볼인 경우 미니 슬롯의 길이는 1부터 13개의 OFDM 심볼까지 중에 결정될 수 있다. 상기 슬롯 혹은 미니슬롯의 길이와 포맷, 반복 형태는 규격에 정의되거나 상위 신호 혹은 시스템 정보 혹은 물리 신호에 의해 전송되어 단말이 수신할 수 있다. 또한 미니 슬롯이나 서브 슬롯 대신에 슬롯이 1로부터 14개의 OFDM 심볼까지 중에 결정될 수 있고, 상기 슬롯의 길이가 상위 신호 혹은 시스템 정보에 의해 전송되어 단말이 수신할 수 있다. Meanwhile, in 5G, one TTI may be defined as one slot, and may include 14 OFDM symbols or 7 OFDM symbols. Therefore, in the case of subcarrier spacing of 15KHz, one slot has a length of 1ms or 0.5ms. In addition, in 5G, one TTI can be defined as one mini-slot or sub-slot for emergency transmission and transmission to unlicensed band, and one mini-slot is from 1 (total OFDM of slots). Symbol number) −1 may have the number of OFDM symbols. For example, when the length of one slot is 14 OFDM symbols, the length of the mini slot may be determined from 1 to 13 OFDM symbols. The length, format, and repetition type of the slot or minislot may be defined by the standard or transmitted by higher level signals, system information, or physical signals, and may be received by the terminal. In addition, instead of a mini slot or a sub slot, a slot may be determined from 1 to 14 OFDM symbols, and the length of the slot may be transmitted by an upper signal or system information and may be received by the terminal.
슬롯 혹은 미니 슬롯은 다양한 전송 포맷을 가지도록 정의될 수 있고, 다음의 포맷으로 분류될 수 있다.Slots or mini-slots may be defined to have various transmission formats, and may be classified into the following formats.
- 하향 전용 슬롯(DL only slot or full DL slot): 하향 전용 슬롯은 하향 구간만으로 이루어지며, 하향 전송만이 지원된다.Downlink-only slot (DL only slot or full DL slot): Downlink-only slot consists of only a downlink period, only downlink transmission is supported.
- 하향 중심 슬롯(DL centric slot): 하향 중심 슬롯은 하향 구간, GP(혹은 플렉서블 심볼(flexible symbol)), 상향 구간으로 이루어지며, 하향 구간의 OFDM 심볼 개수가 상향 구간의 OFDM 심볼 개수보다 많다.DL centric slot: A DL centric slot is composed of a down period, a GP (or a flexible symbol), and an up period, and the number of OFDM symbols in the down period is larger than the number of OFDM symbols in the up period.
- 상향 중심 슬롯(UL centric slot): 상향 중심 슬롯은 하향 구간, GP(혹은 플렉서블 심볼), 상향 구간으로 이루어지며, 하향 구간의 OFDM 심볼 개수가 상향 구간의 OFDM 심볼 개수보다 적다.UL centric slot: The up-centric slot is composed of a downlink section, a GP (or flexible symbol), and an uplink section, and the number of OFDM symbols in the downlink section is smaller than the number of OFDM symbols in the uplink section.
- 상향 전용 슬롯(UL only slot or full UL slot): 상향 전용 슬롯은 상향 구간만으로 이루어지며, 상향 전송만이 지원된다.UL dedicated slot (UL only slot or full UL slot): The uplink only slot consists of an uplink only, only uplink transmission is supported.
상기에서는 슬롯 포맷만을 분류하였으나, 미니슬롯도 같은 분류 방식으로 구분될 수 있다. 즉, 하향 전용 미니 슬롯, 하향 중심 미니 슬롯, 상향 중심 미니 슬롯, 상향 전용 미니 슬롯 등으로 구분될 수 있다. 상기에서 플렉서블 심볼은 송수신 스위칭을 위한 가드 심볼로써 활용될 수 있으며, 채널 추정을 위한 목적으로도 활용될 수 있다.In the above, only the slot format is classified, but the mini-slot may be classified in the same classification method. That is, it may be classified into a downlink only mini slot, a down center mini slot, an up center mini slot, an uplink dedicated mini slot, and the like. The flexible symbol may be used as a guard symbol for transmission / reception switching and may also be used for channel estimation purposes.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예들을 상세히 설명한다. 이때, 첨부된 도면에서 동일한 구성 요소는 가능한 동일한 부호로 나타내고 있음에 유의해야 한다. 또한, 본 발명의 요지를 흐리게 할 수 있는 공지 기능 및 구성에 대한 상세한 설명은 생략할 것이다. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this case, it should be noted that like elements are denoted by like reference numerals as much as possible. In addition, detailed descriptions of well-known functions and configurations that may blur the gist of the present invention will be omitted.
또한, 본 발명의 실시 예들을 구체적으로 설명함에 있어서, LTE와 5G 시스템을 주된 대상으로 할 것이지만, 본 발명의 주요한 요지는 유사한 기술적 배경 및 채널형태를 가지는 여타의 통신 시스템에도 본 발명의 범위를 크게 벗어나지 아니하는 범위에서 약간의 변형으로 적용 가능하며, 이는 본 발명의 기술분야에서 숙련된 기술적 지식을 가진 자의 판단으로 가능할 것이다. In addition, the embodiments of the present invention will be described in detail, LTE and 5G system will be the main target, but the main subject of the present invention greatly extends the scope of the present invention to other communication systems having a similar technical background and channel form. Applicable in a few variations without departing from the scope, which will be possible in the judgment of those skilled in the art.
하기에서 상기의 5G 셀에서 데이터의 송수신을 수행하는 5G 시스템에 대하여 설명할 것이다.Hereinafter, a 5G system for transmitting and receiving data in the 5G cell will be described.
도 3은 본 발명이 적용되는 통신 시스템의 실시예를 도시하는 도면이다. 상기 도면들은 5G 시스템이 운영되는 형태를 도시한 도면이며, 본 발명에서 제안하는 방안들은 도 3의 시스템에 적용이 가능하다. 3 is a diagram illustrating an embodiment of a communication system to which the present invention is applied. The drawings illustrate a form in which the 5G system is operated, and the methods proposed in the present invention can be applied to the system of FIG. 3.
도 3은 상기 신규 라디오 억세스 기술을 담당하는 기지국과 LTE/LTE-A 기지국을 결합한 통합 시스템 구성의 일 예를 나타낸 도면이다. 3 is a diagram illustrating an example of an integrated system configuration combining a base station in charge of the new radio access technology and an LTE / LTE-A base station.
도 3을 참고하면, 매크로 기지국(301)의 커버리지(302) 내에 상대적으로 적은 커버리지(304, 306, 308)의 소형 기지국(303, 305, 307)이 배치될 수 있다. 일반적으로 매크로 기지국(301)은 소형 기지국(303, 305, 307)보다 상대적으로 높은 전송전력으로 신호전송이 가능하여, 매크로 기지국(301)의 커버리지(302)가 소형 기지국(303, 305, 307)의 커버리지(304, 306, 308) 보다 상대적으로 큰 특징이 있다. 도 3의 예에서 매크로 기지국은 상대적으로 저주파수 대역에서 동작하는 LTE/LTE-A 시스템을 나타내고, 소형 기지국(303, 305, 307)은 상기 상대적으로 고주파 대역에서 동작하는 신규 라디오 억세스 기술(NR 혹은 5G)을 적용한 시스템을 나타낸다.Referring to FIG. 3, relatively small coverage base stations 303, 305, 307 of coverage 304, 306, 308 may be disposed within coverage 302 of macro base station 301. In general, the macro base station 301 is capable of transmitting signals at a relatively higher transmission power than the small base stations 303, 305, and 307, so that the coverage 302 of the macro base station 301 is the small base stations 303, 305, and 307. Has a relatively larger feature than coverage 304, 306, 308. In the example of FIG. 3, the macro base station represents an LTE / LTE-A system operating in a relatively low frequency band, and the small base stations 303, 305, and 307 represent a new radio access technology (NR or 5G) operating in the relatively high frequency band. ) Is applied to the system.
매크로 기지국(301)과 소형기지국(303, 305, 307)은 상호 연결되어 있으며, 연결 상태에 따라 일정 정도의 백홀 딜레이(backhaul delay)가 존재할 수 있다. 따라서 매크로 기지국(301)과 소형기지국(303, 305, 307) 사이에 전송 지연에 민감한 정보를 교환하는 것은 바람직하지 않을 수 있다. The macro base station 301 and the small base station 303, 305, 307 are interconnected, and there may be a certain amount of backhaul delay depending on the connection state. Therefore, it may not be desirable to exchange information that is sensitive to transmission delays between the macro base station 301 and the small base station 303, 305, 307.
한편, 도 3의 예는 매크로 기지국(301)과 소형 기지국(303, 305, 307) 사이의 반송파 결합을 예시하고 있으나, 본 발명은 이에 국한되지 않고 지리적으로 서로 다른 곳에 위치한 기지국들 사이의 반송파 결합에 대해 적용할 수 있다. 예컨대, 실시예에 따라 서로 다른 곳에 위치한 매크로 기지국과 매크로 기지국 사이의 반송파 결합, 혹은 서로 다른 곳에 위치한 소형 기지국과 소형 기지국 사이의 반송파 결합 등에도 모두 적용 가능하다. 또한, 결합되는 반송파의 개수에도 제한되지 않는다.Meanwhile, the example of FIG. 3 illustrates carrier combining between the macro base station 301 and the small base stations 303, 305, and 307. However, the present invention is not limited thereto, and the present invention is not limited thereto. Applicable for For example, according to the exemplary embodiment, the present invention may be applicable to both carrier combinations between macro base stations and macro base stations located at different locations, or carrier combinations between small base stations and small base stations located at different locations. In addition, the number of carriers combined is not limited.
도 3을 참고하면, 매크로 기지국(301)은 하향링크 신호 전송을 위한 주파수 f1을 사용하고, 소형 기지국(303, 305, 307)은 하향링크 신호 전송을 위한 주파수 f2를 사용할 수 있다. 이때, 소정의 단말(309)에게 매크로 기지국(301)은 주파수 f1을 통해 데이터 혹은 제어 정보 전송을 하고, 소형 기지국(303, 305, 307)은 주파수 f2를 통해 데이터 혹은 제어 정보 전송을 할 수 있다. 상기와 같은 반송파 결합을 통해, 고주파 대역에서 초광대역 지원이 가능한 신규 라디오 액세스 기술을 적용하는 기지국은 초고속 데이터 서비스 및 초저지연 서비스를 제공하고, 이와 함께 상대적으로 저주파 대역에서 LTE/LTE-A 기술을 적용하는 기지국은 안정적인 단말의 이동성을 지원할 수 있다. Referring to FIG. 3, the macro base station 301 may use the frequency f1 for downlink signal transmission, and the small base stations 303, 305, and 307 may use the frequency f2 for downlink signal transmission. In this case, the macro base station 301 may transmit data or control information to the predetermined terminal 309 through the frequency f1, and the small base stations 303, 305, and 307 may transmit data or control information through the frequency f2. . Through such carrier combination, a base station adopting a new radio access technology capable of supporting ultra-wideband in a high frequency band provides an ultra high speed data service and an ultra low delay service, and simultaneously adopts LTE / LTE-A technology in a relatively low frequency band. The base station to be applied may support the mobility of a stable terminal.
한편, 도 3에 예시된 구성은 하향링크 반송파 결합뿐만 아니라, 상향링크 반송파 결합에 대해서도 마찬가지로 적용 가능하다. 예컨대, 단말(309)은 매크로 기지국(301)에게 상향링크 신호 전송을 위한 주파수 f1'을 통해 데이터 혹은 제어 정보 전송을 할 수 있다. 그리고 단말(309)은 소형 기지국(303, 305, 307)에게 상향링크 신호 전송을 위한 주파수 f2'을 통해 데이터 혹은 제어 정보 전송을 할 수 있다. 상기 f1'은 상기 f1과 대응되고, 상기 f2'은 상기 f2와 대응될 수 있다. Meanwhile, the configuration illustrated in FIG. 3 may be similarly applied to uplink carrier coupling as well as downlink carrier coupling. For example, the terminal 309 may transmit data or control information to the macro base station 301 through the frequency f1 'for uplink signal transmission. The terminal 309 may transmit data or control information to the small base stations 303, 305, and 307 through a frequency f 2 ′ for uplink signal transmission. The f1 'may correspond to the f1, and the f2' may correspond to the f2.
상기 단말의 상향링크 신호 전송은 매크로 기지국과 소형 기지국으로 각각 서로 다른 시점에 이뤄질 수도 있고, 또는 동시에 이뤄질 수도 있다. 어느 경우에든, 단말의 파워 앰프 소자의 물리적인 제약과 단말 송출 전력에 대한 전파 규제로 인해, 임의의 순간 단말의 상향링크 전송 전력의 총합은 소정의 임계값 이내로 유지되어야 한다.The uplink signal transmission of the terminal may be performed at different times or simultaneously with the macro base station and the small base station. In any case, due to the physical constraints of the power amplifier elements of the terminal and the propagation restrictions on the terminal transmission power, the sum of the uplink transmission powers of the terminal at any moment should be kept within a predetermined threshold.
도 3에 예시된 것과 같은 환경에서 매크로 기지국(301)과 소형 기지국(303, 305, 307)에 접속해서 통신을 수행하는 단말(309) 동작을 이중 접속(DC: Dual Connectivity)이라고 한다. 단말이 이중 접속을 수행하는 경우 다음 두 가지 구성 방안이 가능하다.In the environment as illustrated in FIG. 3, the operation of the terminal 309 that connects to the macro base station 301 and the small base stations 303, 305, and 307 to perform communication is referred to as dual connectivity (DC). When the terminal performs dual access, two configuration schemes are possible.
첫 번째는 LTE/LTE-A 시스템으로 동작하는 매크로 기지국(301)에 단말이 초기 접속을 수행한 이후, 상기 매크로 기지국에 대한 데이터 송수신을 위한 설정 정보를 상위 신호(시스템 혹은 RRC(radio resource control) 신호)로부터 수신한다. 이후 NR 시스템으로 동작하는 소형 기지국(303, 304, 305)에 대한 데이터 송수신을 위한 설정 정보를 상기 매크로 기지국(301)의 상위 신호(시스템 혹은 RRC 신호)로부터 수신하고 상기 소형 기지국(303, 304, 305)에 대한 랜덤 접속을 수행하여, 상기 매크로 기지국(301)과 소형 기지국(303, 304, 305)으로부터 데이터 송수신이 가능한 이중 접속 상태로 된다. First, after the terminal performs initial access to the macro base station 301 operating as an LTE / LTE-A system, the upper level signal (system or radio resource control (RRC)) is used for setting information for data transmission and reception for the macro base station. Signal). Thereafter, configuration information for data transmission and reception for the small base station 303, 304, 305 operating as an NR system is received from an upper signal (system or RRC signal) of the macro base station 301, and the small base station 303, 304, By performing random access to 305, the macro base station 301 and the small base station (303, 304, 305) is a dual connection state that can be transmitted and received data.
이때, LTE/LTE-A 시스템으로 동작하는 매크로 기지국(301)은 MCG(Master Cell Group)라고 하며, NR 시스템으로 동작하는 소형 기지국(303, 304, 305)는 SCG(Secondary Cell Group)이라고 칭한다. 단말이 상기의 이중 접속 상태인 것을 단말이 E-UTRA(evolved-universal mobile communications system (UMTS) terrestrial radio access) radio access(혹은 LTE/LTE-A)를 사용하는 MCG와 NR radio access를 사용하는 SCG로 설정되었다고 표현할 수도 있다. 혹은 단말이 EN-DC(E-UTRA NR Dual Connectivity)로 설정되었다고 표현할 수 있다.In this case, the macro base station 301 operating in the LTE / LTE-A system is referred to as a master cell group (MCG), and the small base stations 303, 304, and 305 operating in an NR system are referred to as a secondary cell group (SCG). When the UE is in the dual connection state, the UE uses the evolved-universal mobile communications system (UMTS) terrestrial radio access (E-UTRA) and the MCG using the radio access (or LTE / LTE-A) and the SCG using the NR radio access. It can also be expressed as. Or it may be expressed that the terminal is set to EN-DC (E-UTRA NR Dual Connectivity).
두 번째는 NR 시스템으로 동작하는 소형 기지국(303, 304, 305)에 단말이 초기 접속을 수행한 이후, 상기 소형 기지국에 대한 데이터 송수신을 위한 설정 정보를 상위 신호(시스템 혹은 RRC 신호)로부터 수신한다. 이후 LTE/LTE-A 시스템으로 동작하는 매크로 기지국(301)에 대한 데이터 송수신을 위한 설정 정보를 상기 소형 기지국(303, 304, 305)의 상위 신호(시스템 혹은 RRC 신호)로부터 수신하고 상기 매크로 기지국(301)에 대한 랜덤 접속을 수행하여, 상기 소형 기지국(303, 304, 305)과 매크로 기지국(301)로부터 데이터 송수신이 가능한 이중 접속 상태로 된다. Second, after the UE performs initial access to the small base stations 303, 304, and 305 operating as NR systems, the terminal receives configuration information for data transmission and reception for the small base station from an upper signal (system or RRC signal). . Thereafter, the configuration information for data transmission and reception for the macro base station 301 operating in the LTE / LTE-A system is received from an upper signal (system or RRC signal) of the small base station 303, 304, 305 and the macro base station ( By performing random access to 301, data can be transmitted and received from the small base stations 303, 304, and 305 and the macro base station 301.
이때, NR 시스템으로 동작하는 소형 기지국(303, 304, 305)은 MCG라고 하며, LTE 시스템으로 동작하는 매크로 기지국(301)은 SCG라고 칭한다. 단말이 상기의 이중 접속 상태인 것을 단말이 NR radio access를 사용하는 MCG와 E-UTRA radio access(혹은 LTE/LTE-A)를 사용하는 SCG로 설정되었다고 표현할 수도 있다. 혹은 단말이 NE-DC(NR E-UTRA Dual Connectivity)로 설정되었다고 표현할 수 있다.At this time, the small base stations 303, 304, and 305 operating in the NR system are referred to as MCG, and the macro base station 301 operating in the LTE system is referred to as SCG. It may be expressed that the terminal is in the dual access state as the terminal is set to MCG using NR radio access and SCG using E-UTRA radio access (or LTE / LTE-A). Or it can be expressed that the terminal is set to NR E-UTRA Dual Connectivity (NE-DC).
이후 본 발명에서 설명하는 실시예들은 상기의 첫 번째 이중 접속 구성 방안과 두 번째 이중 접속 구성 방안을 고려하여 제안하도록 한다. 즉, 본 발명에서는 E-UTRA를 사용하는 LTE 셀들이 MCG인지 NR를 사용하는 NR 셀이 MCG인지에 따라 다른 실시예를 제안하도록 한다. 그 이유는 단말이 이중 접속 상태일 때, SCG로의 상향 전송보다는 MCG로의 상향 전송에 중요성을 부여해야 하기 때문이다. 또한, NR을 사용하는 셀로 상향 전송을 전송하기 위한 타이밍 가령 PDCCH 대 PUSCH 전송 타이밍 혹은 PDCCH 대 PUCCH 전송 타이밍은 상위 신호 설정과 PDCCH로부의 지시에 의해 다르게 지시하는 것이 가능하지만, LTE를 사용하는 셀로 상향 전송을 전송하기 위한 타이밍 가령 PDCCH 대 PUSCH 전송 타이밍 혹은 PDCCH 대 PUCCH 전송 타이밍은 고정되어 있기 때문에, 이런 조건들을 고려하여 본 발명의 실시예들을 제안하도록 한다.Hereinafter, the embodiments described in the present invention will be proposed in consideration of the first dual connectivity configuration and the second dual connectivity configuration. That is, the present invention proposes another embodiment according to whether LTE cells using E-UTRA are MCG or NR cells using NR. The reason is that when the terminal is in a dual access state, importance should be given to uplink transmission to the MCG rather than uplink transmission to the SCG. In addition, timing for transmitting uplink transmission to a cell using NR, for example, PDCCH to PUSCH transmission timing or PDCCH to PUCCH transmission timing may be indicated differently by the higher signal configuration and the indication from the PDCCH. Since the timing for transmitting the transmission, for example, the PDCCH to PUSCH transmission timing or the PDCCH to PUCCH transmission timing is fixed, embodiments of the present invention are proposed in consideration of these conditions.
도 4는 본 발명의 실시예 1과 2에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다. 실시예 1과 2는 단말이 EN-DC(E-UTRA NR Dual Connectivity)로 설정된 경우에 적용할 수 있다. 4 is a diagram illustrating a method of controlling power of uplink transmission according to Embodiments 1 and 2 of the present invention. Embodiments 1 and 2 may be applied when the terminal is set to EN-DC (E-UTRA NR Dual Connectivity).
실시예 1과 2에서 단말은 상위 신호에 의해 MCG에서의 상향 전송을 위한 최대 전송 전력인 P_LTE(402)와 SCG에서의 상향 전송을 위한 최대 전송 전력인 P_NR(403) 그리고 EN-DC에서의 최대 전송 전력인 P_total(401)을 설정 받는다. 이 때, P_LTE(402)와 P_NR(403)을 합한 값이 P_total보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 1을 제공하도록 한다. In Embodiments 1 and 2, the UE transmits P_LTE 402, which is the maximum transmission power for uplink transmission in MCG, P_NR 403, which is the maximum transmission power for uplink transmission in SCG, and maximum in EN-DC. P_total 401, which is the transmission power, is set. In this case, in the case where the sum of the P_LTE 402 and the P_NR 403 is larger than P_total, the first embodiment provides a case in which the UE has a capability for dynamic transmission power distribution.
[실시예 1]Example 1
실시예 1 (420)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우, 단말은 LTE 상향 전송을 위한 서브프레임 i(404)와 NR 상향 전송을 위한 슬롯 k(406) 혹은 k+2(407)가 겹치는 경우, P_LTE(402)와 P_NR(403)을 합한 값이 P_total(401)을 넘게 된다. 이때, 단말은 E-UTRA radio access(혹은 LTE/LTE-A)를 사용하는 MCG에 중요성을 부여하여, NR을 사용하는 SCG의 전송 전력을 낮출 수 있다. 따라서, P_LTE(402)와 P_NR(403)을 합한 값이 P_total(401) 내에 들어오도록, NR 전송을 위한 전송 전력을 줄일 수 있다(408 혹은 409). In Embodiment 1 (420), if the UE has the capability to perform dynamic transmission power distribution, the UE may have subframe i 404 for LTE uplink transmission and slot k 406 or k + for NR uplink transmission. When two 407 overlap, the sum of P_LTE 402 and P_NR 403 exceeds P_total 401. In this case, the UE may attach importance to the MCG using E-UTRA radio access (or LTE / LTE-A), and thus may lower transmission power of the SCG using NR. Accordingly, the transmission power for the NR transmission can be reduced (408 or 409) so that the sum of the P_LTE 402 and the P_NR 403 enters the P_total 401.
상기 실시예 1에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에, 단말은 사전에 상기 동적 전송 전력 분배를 위한 capability 신호를 LTE 기지국 혹은 NR 기지국에 전송한다. In the first embodiment, when the terminal has a capability for dynamic transmission power distribution, the terminal transmits the capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
다음으로 P_LTE(402)와 P_NR(403)을 합한 값이 P_total(401)보다 큰 경우에 대해서, 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 않은 경우에 대한 실시예 2을 제공하도록 한다. Next, in the case where the sum of the P_LTE 402 and the P_NR 403 is larger than the P_total 401, the second embodiment provides a case in which the terminal does not have a capability for dynamic transmission power distribution. .
[실시예 2]Example 2
실시예 2(430)에서, 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 못하여 기지국에게 상기 capability 신호를 전송하지 못한 경우, 단말은 어떤 서브프레임들 내에서 LTE 상향 전송이 수행되는지에 대한 설정 정보를, 시스템 혹은 상위 신호를 통해, LTE 혹은 NR 기지국으로부터 수신한다. 상기 설정 정보는 상하향 서브프레임 구간을 지시하는 TDD(time division duplex) 설정 정보일 수 있으며, 상기 설정 정보는 LTE 셀이 TDD인지 FDD인지에 관계없이 단말이 수신하여 상기 LTE 셀에 적용할 수 있다. 상기 설정 정보 수신을 통해 단말은 상향 서브프레임으로 지시된 서브프레임에서만 LTE 상향 전송이 수행된다고 판단하며, 상기 상향 서브프레임(405)과 겹친, NR 전송이 가능한 슬롯들에서 NR 상향 전송을 수행하지 않는다(410). 즉, NR 기지국이 상기 상향 서브프레임(405)과 겹친 슬롯들에서 NR 상향 전송을 설정하거나 스케줄링 하더라도 단말은 상기 NR 전송을 수행하지 않을 수 있다. In Embodiment 2 (430), if the terminal does not have a capability to perform dynamic transmission power distribution and thus the capability signal is not transmitted to the base station, the terminal is to determine in which subframes LTE uplink transmission is performed The configuration information is received from the LTE or NR base station via a system or higher level signal. The configuration information may be time division duplex (TDD) configuration information indicating an up-down subframe period, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD. Upon reception of the configuration information, the UE determines that LTE uplink transmission is performed only in a subframe indicated by an uplink subframe, and does not perform NR uplink transmission in slots capable of NR transmission overlapping with the uplink subframe 405. 410. That is, even if an NR base station configures or schedules NR uplink transmission in slots overlapping with the uplink subframe 405, the UE may not perform the NR transmission.
도 5는 본 발명의 실시예 3와 4에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다. 실시예 3과 4는 단말이 NE-DC(NR E-UTRA Dual Connectivity)로 설정된 경우에 적용할 수 있다. FIG. 5 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 3 and 4 of the present invention. Embodiments 3 and 4 may be applied when the terminal is set to NR E-UTRA Dual Connectivity (NE-DC).
실시예 3과 4에서 단말은 상위 신호에 의해, SCG에서의 상향 전송을 위한 최대 전송 전력인 P_LTE(502)와 MCG에서의 상향 전송을 위한 최대 전송 전력인 P_NR(503), 그리고 NE-DC에서의 최대 전송 전력인 P_total(501)을 설정 받는다. 이 때, P_LTE(502)와 P_NR(503)을 합한 값이 P_total(501)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 않은 경우에 대한 실시예 3을 제공하도록 한다. In Embodiments 3 and 4, the UE transmits P_LTE 502, which is the maximum transmission power for uplink transmission in SCG, P_NR 503, which is the maximum transmission power for uplink transmission in MCG, and NE-DC according to an upper signal. P_total 501 is set. In this case, in the case where the sum of the P_LTE 502 and the P_NR 503 is larger than the P_total 501, the third embodiment provides a case in which the UE does not have a capability for dynamic transmission power distribution. .
[실시예 3]Example 3
실시예 3(520)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 못하여 기지국에게 상기 capability 신호를 전송하지 못한 경우, 단말은 어떤 서브프레임들 내에서 LTE 상향 전송이 수행되는지에 대한 설정 정보를 시스템 혹은 상위 신호를 통해 LTE 혹은 NR 기지국으로부터 수신한다. 상기 설정 정보는 상하향 서브프레임 구간을 지시하는 TDD 설정 정보일 수 있으며, 상기 설정 정보는 LTE 셀이 TDD인지 FDD인지에 관계없이 단말이 수신하여 상기 LTE 셀에 적용할 수 있다. In Embodiment 3 (520), if the terminal does not have a capability for dynamic transmission power distribution and thus fails to transmit the capability signal to the base station, the terminal configures in which subframes LTE uplink transmission is performed Information is received from the LTE or NR base station via a system or higher signal. The configuration information may be TDD configuration information indicating a subframe interval up and down, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD.
여기서 단말이 EN-DC로 설정된 경우에 상기 LTE 상향 서브프레임에서 항상 LTE 상향 전송을 수행하는 상기 실시예 2와는 다른 동작을 단말이 수행할 수 있다. 그 이유는 NE-DC로 단말이 설정된 경우 MCG인 NR 상향 전송을 단말이 우선적으로 수행해야 하기 때문이다. 따라서, 상기 설정 정보 수신을 통해 단말은 상향 서브프레임으로 지시된 서브프레임에서 LTE 상향 전송이 수행된다고 판단하더라도, 상기 상향 서브프레임(504)과 겹친 NR 전송이 가능한 슬롯들에서 LTE 상향 전송 대신 NR 상향 전송을 수행하기 위한 방안을 제공한다. In this case, when the UE is set to EN-DC, the UE may perform an operation different from the second embodiment in which the LTE uplink transmission is always performed in the LTE uplink subframe. This is because, when the UE is configured as NE-DC, the UE must first perform NR uplink transmission, which is MCG. Accordingly, even when the UE determines that the LTE uplink transmission is performed in the subframe indicated by the uplink subframe through the reception of the configuration information, the NR uplink instead of the uplink LTE transmission in slots capable of NR transmission overlapping with the uplink subframe 504. Provides a way to perform the transmission.
실시예 3(520)에서 단말은 NR 상향 전송을 지시하는 PDCCH를 수신할 수 있다. 이때, NR 상향 전송을 지시하는 PDCCH의 마지막 심볼(509)에서부터 단말에게 설정된 NE-DC 프로세싱 capability(510)를 더한 값(511)이 LTE 상향 전송을 전송해야 하는 시작 심볼(즉 서브프레임 i(504)의 시작 심볼)보다 이전인 경우 LTE 상향 전송을 드랍한다(508). In Embodiment 3 (520), the UE may receive a PDCCH indicating NR uplink transmission. In this case, the start symbol (that is, subframe i (504) that should transmit the LTE uplink transmission is a value 511 plus the NE-DC processing capability 510 configured to the UE from the last symbol 509 of the PDCCH indicating NR uplink transmission. LTE uplink transmission is dropped before the start symbol).
상기의 단말에게 설정된 NE-DC 프로세싱 capability(510)는 단말이 PDSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PDSCH 프로세싱 capability를 위한 PDSCH 수신에 걸리는 시간에 대응하는 심볼 개수(N1)일 수도 있고 상수 X를 더한 N1+X일 수도 있다. 상기의 단말에게 설정된 NE-DC 프로세싱 capability(510)는 단말이 PUSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PUSCH 프로세싱 capability를 위한 PUSCH 준비에 걸리는 시간에 대응하는 심볼 개수(N2)일 수도 있고 상수 Y를 더한 N2+Y일 수도 있다. 혹은 하향 SPS(Semi-Persistent Scheduling) release에 대응하는 HARQ-ACK 전송을 위해 필요한 프로세싱 capability를 위해, PDCCH를 수신하고 마지막 심볼로부터 N개의 심볼 개수로써 정의한 값으로 NE-DC 프로세싱 capability(510)를 정의할 수도 있다. The NE-DC processing capability 510 configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and has a constant X. It may also be N1 + X. The NE-DC processing capability 510 configured for the UE may be a symbol number N2 corresponding to the time required for preparation of the PUSCH for the PUSCH processing capability, if the UE receives the PDCCH for scheduling the PUSCH. It may also be N2 + Y. Alternatively, for the processing capability required for HARQ-ACK transmission corresponding to the downlink semi-persistent scheduling (SPS) release, the NE-DC processing capability 510 is defined as a value defined as the number of N symbols from the last symbol after receiving the PDCCH. You may.
상기 N개의 심볼 개수는 LTE 셀 혹은 NR 셀의 서브캐리어 스페이싱에 따라 다른 값이 결정될 수 있다. 가령, 15KHz의 경우 13, 30KHz의 경우 15, 60KHz의 경우 22, 120KHz의 경우 25로 결정될 수 있다. 혹은 보수적으로 판단하여 N1 혹은 N1+X, N2 혹은 N2+Y, N 중 최대값으로, 상기 NE-DC 프로세싱 capability(510)를 set하고 단말은 상기 set된 값을 이용하여 LTE 상향 전송을 드랍할지 여부를 판단할 수 있다. 상기의 NE-DC 프로세싱 capability(510)를 기지국이 상위 신호로 설정하기 전에, 단말은 기지국으로 상기의 PDSCH 프로세싱 capability 관련 정보 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송하고, 기지국은 단말로부터 수신한 상기의 프로세싱 capability 관련 정보를 고려하여, 단말에게 적절한 N1 혹은 N1+X, N2 혹은 N2+Y, N 값을 상위 신호로 설정하고, 단말은 상기 설정을 수신할 수 있다.The number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Or, conservatively determine, by setting the NE-DC processing capability 510 to a maximum value of N1 or N1 + X, N2 or N2 + Y, N, and whether the terminal drops the LTE uplink transmission using the set value. It can be determined. Before the base station sets the NE-DC processing capability 510 as an upper signal, the terminal transmits the PDSCH processing capability related information or the PUSCH processing capability related information to the base station, and the base station receives the received information from the terminal. In consideration of the processing capability related information of the terminal, the appropriate N1 or N1 + X, N2 or N2 + Y, N value is set to the upper signal, the terminal may receive the configuration.
다음으로 P_LTE(502)와 P_NR(503)을 합한 값이 P_total(501)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 않은 경우에 대한 실시예 4를 제공하도록 한다. Next, in the case where the sum of the P_LTE 502 and the P_NR 503 is larger than the P_total 501, the fourth embodiment provides a case in which the UE does not have a capability for dynamic transmission power distribution.
[실시예 4]Example 4
실시예 4(530)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있지 못하여 기지국에게 상기 capability 신호를 전송하지 못한 경우, 단말은 어떤 서브프레임들 내에서 LTE 상향 전송이 수행되는지에 대한 설정 정보를 시스템 혹은 상위 신호를 통해 LTE 혹은 NR 기지국으로부터 수신한다. 상기 설정 정보는 상하향 서브프레임 구간을 지시하는 TDD 설정 정보일 수 있으며, 상기 설정 정보는 LTE 셀이 TDD인지 FDD인지에 관계없이 단말이 수신하여 상기 LTE 셀에 적용할 수 있다. In Embodiment 4 (530), if the terminal does not have a capability for dynamic transmission power distribution and thus fails to transmit the capability signal to the base station, the terminal configures in which subframes LTE uplink transmission is performed Information is received from the LTE or NR base station via a system or higher signal. The configuration information may be TDD configuration information indicating a subframe interval up and down, and the configuration information may be received and applied to the LTE cell regardless of whether the LTE cell is TDD or FDD.
여기서 단말이 EN-DC로 설정된 경우에 상기 LTE 상향 서브프레임에서 항상 LTE 상향 전송을 수행하는 상기 실시예 2와는 다른 동작을 단말이 수행할 수 있다. 그 이유는 NE-DC로 단말이 설정된 경우 MCG인 NR 상향 전송을 단말이 우선적으로 수행해야 하기 때문이다. 따라서, 상기 설정 정보 수신을 통해 단말은 상향 서브프레임으로 지시된 서브프레임에서 LTE 상향 전송이 수행된다고 판단하더라도, 상기 상향 서브프레임(505)와 겹친 NR 전송이 가능한 슬롯들에서 LTE 상향 전송 대신 NR 상향 전송을 수행하기 위한 방안을 제공한다. In this case, when the UE is set to EN-DC, the UE may perform an operation different from the second embodiment in which the LTE uplink transmission is always performed in the LTE uplink subframe. This is because, when the UE is configured as NE-DC, the UE must first perform NR uplink transmission, which is MCG. Accordingly, even when the UE determines that the uplink transmission is performed in the subframe indicated by the uplink subframe through the reception of the configuration information, the NR uplink instead of the uplink LTE transmission in slots capable of NR transmission overlapping with the uplink subframe 505. Provides a way to perform the transmission.
단말은 상기 서브프레임(505)에 LTE 상향 전송을 수행하는 중에 NR 상향 전송을 지시하는 PDCCH를 수신할 수 있다. 이때, 단말은 수행하던 LTE 전송을 드랍하고(512), NR 상향 전송을 지시하는 PDCCH에 의해 NR 상향 전송을 수행한다. 혹은 PDCCH 수신의 마지막 심볼과 상기 실시예 3에서 NE-DC 프로세싱 capability(510)를 합한 값이 LTE 전송 시작 심볼보다 늦은 경우 LTE 상향 전송을 수행하고, NR 상향 전송을 지시하는 PDCCH에 의해 NR 상향 전송을 수행해야 하는 심볼부터 LTE 전송을 드랍하고, 상기 NR 전송을 수행한다. The UE may receive a PDCCH indicating NR uplink transmission while performing LTE uplink transmission in the subframe 505. At this time, the UE drops the existing LTE transmission (512), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission. Alternatively, when the sum of the last symbol of PDCCH reception and the NE-DC processing capability 510 in the third embodiment is later than the LTE transmission start symbol, LTE uplink transmission is performed and NR uplink transmission is performed by the PDCCH indicating NR uplink transmission. Drop the LTE transmission from the symbol to be performed, and performs the NR transmission.
본 실시예에서는 표시하지 않았지만, 또 다른 실시예로써, 상기 LTE 상향 전송이 수행되는 설정 정보 수신을 통해 단말은 상향 서브프레임으로 지시된 서브프레임에서만 LTE 상향 전송이 수행된다고 판단하며, 상기 LTE 상향 서브프레임으로 지시되지 않은 나머지 서브프레임들 중에서 NR 상향 전송이 수행된다고 판단할 수 있다.Although not shown in the present embodiment, as another embodiment, the UE determines that the LTE uplink transmission is performed only in a subframe indicated by an uplink subframe by receiving configuration information on which the LTE uplink transmission is performed. It may be determined that NR uplink transmission is performed among the remaining subframes not indicated by the frame.
도 6은 본 발명의 실시예 5와 6에 따라 상향 전송의 전력을 제어하는 방안을 도시하는 도면이다. 실시예 5와 6은 단말이 NE-DC(NR E-UTRA Dual Connectivity)로 설정된 경우에 적용할 수 있다. FIG. 6 is a diagram illustrating a scheme for controlling power of uplink transmission according to Embodiments 5 and 6 of the present invention. Embodiments 5 and 6 may be applied when the terminal is set to NR E-UTRA Dual Connectivity (NE-DC).
실시예 5와 6에서 단말은 상위 신호에 의해 SCG에서의 상향 전송을 위한 최대 전송 전력인 P_LTE(602)와 MCG에서의 상향 전송을 위한 최대 전송 전력인 P_NR(603) 그리고 NE-DC에서의 최대 전송 전력인 P_total(601)을 설정 받는다. 이 때, P_LTE(602)와 P_NR(603)을 합한 값이 P_total(601)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 5을 제공하도록 한다.In Embodiments 5 and 6, the UE transmits P_LTE 602, which is the maximum transmit power for uplink transmission in SCG, P_NR 603, which is the maximum transmit power for uplink transmission in MCG, and maximum in NE-DC. P_total 601, which is the transmission power, is set. In this case, in case the sum of the P_LTE 602 and the P_NR 603 is larger than the P_total 601, the fifth embodiment provides a case in which the UE has a capability for dynamic transmission power distribution.
[실시예 5]Example 5
상기 실시예 5(620)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 단말은 사전에 상기 동적 전송 전력 분배를 위한 capability 신호를 LTE 기지국 혹은 NR 기지국에 전송한다. In the fifth embodiment 620, when the terminal has the capability to perform dynamic transmission power distribution, the terminal transmits the capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
실시예 5(620)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있고, 단말은 LTE 상향 전송을 위한 서브프레임 i(604)와 NR 상향 전송을 위한 슬롯 k(606)가 겹치는 경우, P_LTE(602)와 P_NR(603)을 합한 값이 P_total(601)을 넘게 된다. 이 경우, 단말은 NR을 사용하는 MCG에 중요성을 부여하여 E-UTRA(혹은 LTE/LTE-A)를 사용하는 SCG의 전송 전력을 낮출 수 있다. 이때, E-UTRA를 사용하는 SCG의 전송 전력을 낮추어야 하는 경우 NR 상향 전송의 flexible 한 타이밍 지원으로 인해 언제 나타날지 모르는 문제가 발생하게 된다.즉, NR 상향 전송 시점을 예측할 수 없기 때문에, 본 실시예 5에서는 NR 상향 전송의 프로세싱 capability를 고려하여 LTE 상향 전송의 전력을 낮추기 위한 방안을 제공한다. In Embodiment 5 (620), the UE has a capability for dynamic transmission power distribution, and the UE overlaps the subframe i 604 for LTE uplink transmission and the slot k 606 for NR uplink transmission. The sum of P_LTE 602 and P_NR 603 exceeds P_total 601. In this case, the UE may lower the transmission power of the SCG using E-UTRA (or LTE / LTE-A) by attaching importance to the MCG using NR. In this case, when the transmission power of the SCG using E-UTRA needs to be lowered, a problem may occur when the NR uplink transmission timing cannot be predicted due to the flexible timing support of the NR uplink transmission. 5 provides a scheme for lowering the power of LTE uplink considering the processing capability of NR uplink.
실시예 5(620)에서 단말은 NR 상향 전송을 지시하는 PDCCH를 수신할 수 있다. 이때, NR 상향 전송을 지시하는 PDCCH의 마지막 심볼(609)에서부터 단말에게 설정된 NE-DC 프로세싱 capability(610)를 더한 값(611)이, LTE 상향 전송을 전송해야 하는 시작 심볼(즉 서브프레임 i(604)의 시작 심볼)보다 이전인 경우, LTE 상향 전송의 전송 전력을 줄인다(508). 이때, P_LTE(602)와 P_NR(603)을 합한 값이 P_total(601) 내에 들어오도록 LTE 상향 전송을 위한 전송 전력을 줄일 수 있다(508).In Embodiment 5 (620), the UE may receive a PDCCH indicating NR uplink transmission. In this case, a value 611 obtained by adding the NE-DC processing capability 610 set to the UE from the last symbol 609 of the PDCCH indicating NR uplink transmission is a start symbol (i.e., subframe i Earlier than the start symbol of 604) reduce the transmit power of the LTE uplink transmission (508). In this case, it is possible to reduce the transmit power for LTE uplink transmission such that the sum of the P_LTE 602 and the P_NR 603 is within the P_total 601 (508).
상기의 단말에게 설정된 NE-DC 프로세싱 capability(610)는 단말이 PDSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PDSCH 프로세싱 capability를 위한 PDSCH 수신에 걸리는 시간에 대응하는 심볼 개수(N1)일 수도 있고 상수 X를 더한 N1+X일 수도 있다. 상기의 단말에게 설정된 NE-DC 프로세싱 capability(610)는 단말이 PUSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PUSCH 프로세싱 capability를 위한 PUSCH 준비에 걸리는 시간에 대응하는 심볼 개수(N2)일 수도 있고 상수 Y를 더한 N2+Y일 수도 있다. 혹은 하향 SPS(Semi-Persistent Scheduling) release에 대응하는 HARQ-ACK 전송을 위해 필요한 프로세싱 capability를 위해 PDCCH를 수신하고 마지막 심볼로부터 N개의 심볼 개수로써 정의한 값으로 NE-DC 프로세싱 capability(610)를 정의할 수도 있다. The NE-DC processing capability 610 configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and has a constant X. It may also be N1 + X. The NE-DC processing capability 610 configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability, if the UE receives the PDCCH for scheduling the PUSCH, and may be a constant Y. It may also be N2 + Y. Alternatively, the NE-DC processing capability 610 may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downlink semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol. It may be.
상기 N개의 심볼 개수는 LTE 셀 혹은 NR 셀의 서브캐리어 스페이싱에 따라 다른 값이 결정될 수 있다. 가령, 15KHz의 경우 13, 30KHz의 경우 15, 60KHz의 경우 22, 120KHz의 경우 25로 결정될 수 있다. 혹은 보수적으로 판단하여 N1 혹은 N1+X, N2 혹은 N2+Y, N 중 최대값으로 상기 NE-DC 프로세싱 capability(610)를 set하고 단말은 상기 set된 값을 이용하여 LTE 상향 전송의 전력을 줄일 수 있다. 상기의 NE-DC 프로세싱 capability(610)을 기지국이 상위 신호로 설정하기 전에, 단말은 기지국으로 상기의 PDSCH 프로세싱 capability 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송하고, 기지국은 단말로부터 수신한 상기의 프로세싱 capability 관련 정보를 고려하여 단말에게 적절한 N1 혹은 N1+X, N2 혹은 N2+Y, N 값을 상위 신호로 설정하고, 단말은 상기 설정을 수신할 수 있다. The number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Or conservatively determine the NE-DC processing capability 610 with a maximum value of N1 or N1 + X, N2 or N2 + Y, N and the terminal reduces the power of the LTE uplink transmission using the set value. Can be. Before the base station sets the NE-DC processing capability 610 as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the above processing received from the terminal. In consideration of capability related information, a value of N1 or N1 + X, N2 or N2 + Y, N appropriate to the terminal is set as an upper signal, and the terminal may receive the setting.
다음으로 P_LTE(602)와 P_NR(603)을 합한 값이 P_total(601)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 6을 제공하도록 한다.Next, in the case where the sum of the P_LTE 602 and the P_NR 603 is larger than the P_total 601, a sixth embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
[실시예 6]Example 6
상기 실시예 6(630)에서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 단말은 사전에 상기 동적 전송 전력 분배를 위한 capability 신호를 LTE 기지국 혹은 NR 기지국에 전송한다. In the sixth embodiment 630, when the terminal has a capability for dynamic transmission power distribution, the terminal transmits a capability signal for the dynamic transmission power distribution to the LTE base station or the NR base station in advance.
단말은 상기 서브프레임(605)에 LTE 상향 전송을 수행하는 중에 NR 상향 전송을 지시하는 PDCCH를 수신할 수 있다. 이 때, 단말은 수행하던 LTE 전송을 드랍하고(612), NR 상향 전송을 지시하는 PDCCH에 의해 NR 상향 전송을 수행한다. 혹은 PDCCH 수신의 마지막 심볼과 상기 실시예 5에서 NE-DC 프로세싱 capability(610)를 합한 값이 LTE 전송 시작 심볼보다 늦은 경우 LTE 상향 전송을 수행하고, NR 상향 전송을 지시하는 PDCCH에 의해 NR 상향 전송을 수행해야 하는 심볼부터 LTE 전송을 드랍하고, 상기 NR 전송을 수행한다. The UE may receive a PDCCH indicating NR uplink transmission while performing LTE uplink transmission in the subframe 605. At this time, the UE drops the LTE transmission that was being performed (612), and performs NR uplink transmission by the PDCCH indicating NR uplink transmission. Alternatively, when the sum of the last symbol of PDCCH reception and the NE-DC processing capability 610 in the fifth embodiment is later than the LTE transmission start symbol, LTE uplink transmission is performed and NR uplink transmission is performed by the PDCCH indicating NR uplink transmission. Drop the LTE transmission from the symbol to be performed, and performs the NR transmission.
상기와 같은 단말 동작에서 LTE 상향 전송의 전력을 줄이는 것 대신에 LTE 상향 전송을 드랍하는 이유는 LTE 상향 전송의 경우 서브프레임 중간에 전송전력을 변경하는 것이 불가능하기 때문이다. 따라서, 상기와 같이 LTE 상향 전송을 수행하는 도중 NR 상향 전송이 발생하는 경우, 단말은 LTE 상향 전송을 드랍하고, PDCCH에 지시되거나, 상위 신호에 의해 설정된 NR 상향 전송을 수행한다.The reason for dropping the LTE uplink transmission instead of reducing the power of the LTE uplink transmission in the terminal operation as described above is because it is impossible to change the transmission power in the middle of the subframe in the case of LTE uplink transmission. Therefore, when NR uplink transmission occurs during the LTE uplink transmission as described above, the UE drops the LTE uplink transmission, is indicated to the PDCCH, or performs the NR uplink transmission set by the higher signal.
[실시예 7]Example 7
다음으로 P_LTE(702)와 P_NR(703)을 합한 값이 P_total(701)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 7을 제공하도록 한다.Next, in the case where the sum of the P_LTE 702 and the P_NR 703 is larger than the P_total 701, the seventh embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
실시예 7에서 NE-DC 단말은 LTE 서브프레임들에 대해서 다른 Pcmax를 결정한다. 즉, 단말이 NR 기지국으로부터 slot들에 대한 DL, UL, flexible, reserved slot 들에 대한 설정을 상위 신호(시스템 정보, 혹은 RRC 신호)로부터 수신하여, NR에 대한 상향 전송이 UL slot 혹은 flexible slot에서 발생할 수 있다는 것을 판단하고, NR 상향 전송이 발생할 수 있는 UL slot 혹은 flexible slot들(720)과 하나의 OFDM 심볼에서라도 겹치는 LTE 서브프레임(704)과, NR 상향 전송이 발생할 수 없는 DL slot 혹은 reserved slot(730)과 겹치는 LTE 서브프레임(705)에 대해서 Pcmax를 각각 결정한다. In Embodiment 7, the NE-DC terminal determines another Pcmax for LTE subframes. That is, the terminal receives the configuration of the DL, UL, flexible, reserved slots for the slots from the NR base station from the upper signal (system information, or RRC signal), so that uplink transmission for the NR in the UL slot or flexible slot Determining that this may occur, the LTE subframe 704 overlapping even in one OFDM symbol with the UL slot or flexible slot 720 where NR uplink may occur, and the DL slot or reserved slot where NR uplink cannot occur Pcmax is determined for the LTE subframe 705 that overlaps with 730, respectively.
LTE 서브프레임(704)에 대해서는 LTE 전송전력의 최대값인 Pcmax를 p_LTE*r보다 작거나 같은 값으로 결정하고(710), LTE 서브프레임(705)에 대해서는 LTE 전송전력의 최대값인 Pcmax를 p_LTE보다 작거나 같은 값으로 결정한다(711). 상기의 p_LTE, p_NR는 LTE 기지국 혹은 NR 기지국에서 전송되는 상위 신호로부터 단말이 수신할 수 있으며, r은 1보다 작거나 같은 값으로 각 LTE 서브프레임들에 대해서 값들이 설정될 수 있으며, LTE 기지국 혹은 NR 기지국으로부터 전송되는 상위 신호로부터 단말이 수신할 수 있다. For LTE subframe 704, Pcmax, the maximum value of LTE transmit power, is determined to be less than or equal to p_LTE * r (710), and Pcmax, the maximum value of LTE transmit power, is p_LTE for LTE subframe 705. The value is determined to be less than or equal to 711. The p_LTE and p_NR may be received by the terminal from an upper signal transmitted from the LTE base station or the NR base station, and r may be set to values for each LTE subframe with a value less than or equal to 1, and the LTE base station or The terminal may receive from an upper signal transmitted from the NR base station.
상기 LTE 서브프레임(704)에서 NR 상향 전송이 발생하는 경우, 단말은 NR의 전송 전력(P_NR)을 할당하기 위해서, NR의 Pcmax를 min(p_NR, P_total-p_lte_actual)보다 작거나 같은 값으로 설정할 수 있다. 상기 LTE 서브프레임(704)에서 단말은, LTE 상향 전송에 대해서 LTE Pcmax(710)보다 작거나 같은 P_LTE를 할당하며, 실시예 7에서는 p_lte_actual(712)을 할당하여 LTE 상향 전송을 수행한다. When NR uplink transmission occurs in the LTE subframe 704, the UE may set Pcmax of NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) in order to allocate transmission power (P_NR) of NR. have. In the LTE subframe 704, the UE allocates P_LTE less than or equal to the LTE Pcmax 710 for LTE uplink transmission. In the seventh embodiment, p_lte_actual 712 is allocated to perform LTE uplink transmission.
상기 서브프레임(705)에서는 NR 상향 전송이 없다고 가정할 수 있으므로, 단말이 LTE 상향 전송에 대해서 LTE Pcmax(711)보다 작거나 같은 P_LTE를 할당하여 LTE 상향 전송을 수행한다.In the subframe 705, it may be assumed that there is no NR uplink transmission, so that the UE allocates P_LTE less than or equal to the LTE Pcmax 711 for the LTE uplink transmission and performs LTE uplink transmission.
또 다른 실시예로써 단말은 상기의 실시예 7이 적용하더라도, NE-DC processing capability가 RRC에 의해 설정될 때, NR UL 슬롯이나 flexible 슬롯이더라도, NR 상향 전송을 지시하는 하향 제어 채널과 상기의 NE-DC processing capability에 의해 상기의 슬롯들이 NR UL이 전송될 수 없는 슬롯인 경우, 상기의 NR 슬롯들과 겹치는 LTE 상향 서브프레임에서 LTE 전송 전력을 제한할 필요가 없다. 따라서, 상기와 같은 경우에 NE-DC 단말은 상기의 LTE 상향 서브프레임에서 Pcmax를 p_LTE보다 작거나 같은 값으로 결정하고 P_LTE를 결정할 수 있다. 혹은 NR 기지국 혹은 LTE 기지국으로부터 설정된 r을 1로써 결정하고, P_LTE를 결정할 수 있다.In another embodiment, even if the above-described embodiment 7 is applied, the UE may control the downlink control channel and NE uplink transmission even if the NE-DC processing capability is set by the RRC, even if the NR UL slot or the flexible slot. When the slots are slots for which NR UL cannot be transmitted due to DC processing capability, there is no need to limit the LTE transmit power in the LTE uplink subframe overlapping the NR slots. Accordingly, in the above case, the NE-DC terminal may determine Pcmax to be less than or equal to p_LTE and determine P_LTE in the LTE uplink subframe. Alternatively, r set from the NR base station or the LTE base station may be determined as 1, and P_LTE may be determined.
상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PDSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PDSCH 프로세싱 capability를 위한 PDSCH 수신에 걸리는 시간에 대응하는 심볼 개수(N1)일 수도 있고 상수 X를 더한 N1+X일 수도 있다. 상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PUSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PUSCH 프로세싱 capability를 위한 PUSCH 준비에 걸리는 시간에 대응하는 심볼 개수(N2)일 수도 있고 상수 Y를 더한 N2+Y일 수도 있다. 혹은 하향 SPS(Semi-Persistent Scheduling) release에 대응하는 HARQ-ACK 전송을 위해 필요한 프로세싱 capability를 위해 PDCCH를 수신하고 마지막 심볼로부터 N개의 심볼 개수로써 정의한 값으로 NE-DC 프로세싱 capability를 정의할 수도 있다. 혹은 NR 셀의 서브캐리어 스페이싱에 따른 결정된 상수 값일 수도 있다.The NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X. The NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y. Alternatively, the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downward semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol. Alternatively, the constant value may be determined according to the subcarrier spacing of the NR cell.
상기 N개의 심볼 개수는 LTE 셀 혹은 NR 셀의 서브캐리어 스페이싱에 따라 다른 값이 결정될 수 있다. 가령, 15KHz의 경우 13, 30KHz의 경우 15, 60KHz의 경우 22, 120KHz의 경우 25로 결정될 수 있다. 혹은 보수적으로 판단하여, N1 혹은 N1+X, N2 혹은 N2+Y, N 중 최대값 혹은 최소값으로 상기 NE-DC 프로세싱 capability를 set하고 단말은 상기 set된 값을 이용하여 LTE 상향 전송의 전력을 줄일 수 있다. 상기의 NE-DC 프로세싱 capability를 기지국이 상위 신호로 단말에게 설정하기 전에, 단말은 기지국으로 상기의 PDSCH 프로세싱 capability 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송하고, 기지국은 단말로부터 수신한 상기의 프로세싱 capability 관련 정보를 고려하여 단말에게 적절한 N1 혹은 N1+X, N2 혹은 N2+Y, N 값을 상위 신호로 설정하고, 단말은 상기 설정을 수신할 수 있다. The number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Alternatively, to determine conservatively, the NE-DC processing capability is set to the maximum or minimum value of N1 or N1 + X, N2 or N2 + Y, N, and the terminal reduces the power of LTE uplink transmission by using the set value. Can be. Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
[실시예 8]Example 8
다음으로 P_LTE(802)와 P_NR(803)을 합한 값이 P_total(801)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 8을 제공하도록 한다.Next, in the case where the sum of the P_LTE 802 and the P_NR 803 is larger than the P_total 801, an eighth embodiment will be provided for a case in which the UE has a capability for dynamic transmission power distribution.
실시예 8에서 NE-DC 단말은 LTE 서브프레임들에 대해서 다른 Pcmax를 결정한다. 즉, 단말이 NR 기지국으로부터 DL, UL, flexible, reserved slot 들에 대한 설정을 상위 신호(시스템 정보, 혹은 RRC 신호)로부터 수신하고, NR에 대한 상향 전송이 UL slot 혹은 flexible slot에서 발생할 수 있다는 것을 판단하여 NR 상향 전송이 발생할 수 있는 UL slot 혹은 flexible slot들(820)과 하나의 OFDM 심볼에서라도 겹치는 LTE 서브프레임(804)과, NR 상향 전송이 발생할 수 없는 DL slot 혹은 reserved slot(830)과 겹치는 LTE 서브프레임 (805)에 대해서 Pcmax를 각각 결정한다. In Embodiment 8, the NE-DC terminal determines another Pcmax for LTE subframes. That is, the terminal receives the configuration of the DL, UL, flexible, reserved slots from the NR base station from the upper signal (system information or RRC signal), and the uplink transmission for the NR may occur in the UL slot or flexible slot It is determined that the UL subframe 804 overlapping the UL slot or flexible slot 820, which may occur in NR uplink transmission, in one OFDM symbol, and the DL slot or reserved slot 830, in which NR uplink transmission does not occur. Pcmax is determined for LTE subframe 805, respectively.
LTE 서브프레임(804)에 대해서는 LTE 전송전력의 최대값인 Pcmax를 p_LTE보다 작거나 같은 값으로 결정하고(810), LTE 서브프레임(805)에 대해서는 LTE 전송전력의 최대값인 Pcmax를 유지하도록 결정한다(811). 상기의 p_LTE, p_NR는 LTE 기지국 혹은 NR 기지국에서 전송되는 상위 신호로부터 단말이 수신할 수 있다. For the LTE subframe 804, Pcmax, the maximum value of the LTE transmit power, is determined to be less than or equal to p_LTE (810), and for the LTE subframe 805, the Pcmax, the maximum value of the LTE transmit power, is determined. (811). The p_LTE and p_NR may be received by the terminal from an upper signal transmitted from the LTE base station or the NR base station.
상기 LTE 서브프레임(804)에서 NR 상향 전송이 발생하는 경우 단말은 NR의 전송 전력(P_NR)을 할당하기 위해서 NR의 Pcmax를 min(p_NR, P_total-p_lte_actual)보다 작거나 같은 값으로 설정할 수 있다. 상기 LTE 서브프레임(804)에서 단말은 LTE 상향 전송에 대해서 LTE Pcmax(810)보다 작거나 같은 P_LTE를 할당하며, 실시예 8에서는 p_lte_actual(812)를 할당하여 LTE 상향 전송을 수행한다. 상기 서브프레임(805)에서는 NR 상향 전송이 없다고 가정할 수 있으므로, 단말이 LTE 상향 전송에 대해서 LTE Pcmax(811)보다 작거나 같은 P_LTE를 할당하여 LTE 상향 전송을 수행한다.When NR uplink transmission occurs in the LTE subframe 804, the UE may set Pcmax of the NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) in order to allocate the transmission power (P_NR) of the NR. In the LTE subframe 804, the UE allocates P_LTE less than or equal to the LTE Pcmax 810 for LTE uplink transmission. In the eighth embodiment, p_lte_actual 812 is allocated to perform LTE uplink transmission. In the subframe 805, it may be assumed that there is no NR uplink transmission, so that the UE allocates P_LTE less than or equal to the LTE Pcmax 811 for LTE uplink transmission to perform LTE uplink transmission.
또 다른 실시예로써 단말은 상기의 실시예 8이 적용하더라도, NE-DC processing capability가 RRC에 의해 설정될 때, NR UL 슬롯이나 flexible 슬롯이더라도, NR 상향 전송을 지시하는 하향 제어 채널과 상기의 NE-DC processing capability에 의해 상기의 슬롯들이 NR UL이 전송될 수 없는 슬롯인 경우, 상기의 NR 슬롯들과 겹치는 LTE 상향 서브프레임에서 LTE 전송 전력을 제한할 필요가 없다. 따라서, 상기와 같은 경우에 NE-DC 단말은 상기의 LTE 상향 서브프레임에서 Pcmax를 유지하는 것으로 결정하고 P_LTE를 결정할 수 있다. In another embodiment, even if the NE-DC processing capability is set by the RRC, even if the NE-DC processing capability is set by the RRC, the UE may control the downlink control channel indicating the uplink transmission of the NR and the NE even if the NE UL slot or the flexible slot is used. When the slots are slots for which NR UL cannot be transmitted due to DC processing capability, there is no need to limit the LTE transmit power in the LTE uplink subframe overlapping the NR slots. Accordingly, in such a case, the NE-DC terminal may determine to maintain Pcmax in the LTE uplink subframe and determine P_LTE.
상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PDSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PDSCH 프로세싱 capability를 위한 PDSCH 수신에 걸리는 시간에 대응하는 심볼 개수(N1)일 수도 있고 상수 X를 더한 N1+X일 수도 있다. 상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PUSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PUSCH 프로세싱 capability를 위한 PUSCH 준비에 걸리는 시간에 대응하는 심볼 개수(N2)일 수도 있고 상수 Y를 더한 N2+Y일 수도 있다. 혹은 하향 SPS(Semi-Persistent Scheduling) release에 대응하는 HARQ-ACK 전송을 위해 필요한 프로세싱 capability를 위해 PDCCH를 수신하고 마지막 심볼로부터 N개의 심볼 개수로써 정의한 값으로 NE-DC 프로세싱 capability를 정의할 수도 있다. 혹은 NR 셀의 서브캐리어 스페이싱에 따른 결정된 상수 값일 수도 있다.The NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X. The NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y. Alternatively, the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downward semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol. Alternatively, the constant value may be determined according to the subcarrier spacing of the NR cell.
상기 N개의 심볼 개수는 LTE 셀 혹은 NR 셀의 서브캐리어 스페이싱에 따라 다른 값이 결정될 수 있다. 가령, 15KHz의 경우 13, 30KHz의 경우 15, 60KHz의 경우 22, 120KHz의 경우 25로 결정될 수 있다. 혹은 보수적으로 판단하여, N1 혹은 N1+X, N2 혹은 N2+Y, N 중 최대값 혹은 최소값으로 상기 NE-DC 프로세싱 capability를 set하고 단말은 상기 set된 값을 이용하여 LTE 상향 전송의 전력을 줄일 수 있다. 상기의 NE-DC 프로세싱 capability을 기지국이 상위 신호로 단말에게 설정하기 전에, 단말은 기지국으로 상기의 PDSCH 프로세싱 capability 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송하고, 기지국은 단말로부터 수신한 상기의 프로세싱 capability 관련 정보를 고려하여 단말에게 적절한 N1 혹은 N1+X, N2 혹은 N2+Y, N 값을 상위 신호로 설정하고, 단말은 상기 설정을 수신할 수 있다. The number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Alternatively, to determine conservatively, the NE-DC processing capability is set to the maximum or minimum value of N1 or N1 + X, N2 or N2 + Y, N, and the terminal reduces the power of LTE uplink transmission by using the set value. Can be. Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
[실시예 9]Example 9
다음으로 P_LTE(902)와 P_NR(903)을 합한 값이 P_total(901)보다 큰 경우에 대해서 단말이 동적 전송 전력 분배를 할 수 있는 capability를 갖고 있는 경우에 대한 실시예 9를 제공하도록 한다.Next, in the case where the sum of the P_LTE 902 and the P_NR 903 is larger than the P_total 901, the ninth embodiment will be provided for the case in which the UE has a capability for dynamic transmission power distribution.
실시예 9에서 NE-DC 단말은 LTE 서브프레임들에 대해서 Pcmax를 유지한다. 즉, 단말이 모든 LTE 서브프레임들(904, 905)에 대해서 LTE 전송전력의 최대값인 Pcmax를 적용하도록 결정한다(910). 상기의 p_LTE, p_NR는 LTE 기지국 혹은 NR 기지국에서 전송되는 상위 신호로부터 단말이 수신할 수 있다. 상기 LTE 서브프레임(904)에서 NR 상향 전송이 발생하는 경우 단말은 NR의 전송 전력(P_NR)을 할당하기 위해서 NR의 Pcmax를 min(p_NR, P_total-p_lte_actual)보다 작거나 같은 값으로 설정할 수 있다. In Embodiment 9, the NE-DC terminal maintains Pcmax for LTE subframes. That is, the terminal determines to apply Pcmax, the maximum value of the LTE transmit power, to all the LTE subframes 904 and 905 (910). The p_LTE and p_NR may be received by the terminal from an upper signal transmitted from the LTE base station or the NR base station. When NR uplink transmission occurs in the LTE subframe 904, the UE may set Pcmax of the NR to a value less than or equal to min (p_NR, P_total-p_lte_actual) to allocate the transmission power (P_NR) of the NR.
상기 LTE 서브프레임들(904, 905)에서 단말은 LTE 상향 전송에 대해서 LTE Pcmax(910)보다 작거나 같은 P_LTE를 할당하며, 실시예 9에서는 p_lte_actual(912)를 할당하여 LTE 상향 전송을 수행한다. 따라서, 상기 실시예 9에서는 NR 상향 전송이 발생 유무에 상관 없이 보수적으로 LTE Pcmax(910)을 결정하여야 하며, NR 전송이 없는 경우에도 LTE 전송 전력을 낮게 제한할 수 밖에 없는 단점이 있다.In the LTE subframes 904 and 905, the UE allocates P_LTE less than or equal to the LTE Pcmax 910 for LTE uplink transmission. In the ninth embodiment, p_lte_actual 912 is allocated to perform LTE uplink transmission. Therefore, in the ninth embodiment, the LTE Pcmax 910 must be conservatively determined regardless of whether NR uplink transmission occurs, and even when there is no NR transmission, the LTE transmission power can only be limited lower.
또 다른 실시예로써 단말은 상기의 실시예 9를 적용하더라도, NE-DC processing capability가 RRC에 의해 설정될 때, NR 상향 전송을 지시하는 하향 제어 채널과 상기의 NE-DC processing capability에 의해 상기의 슬롯들이 NR UL가 전송될 수 없는 슬롯인 경우, 상기의 NR 슬롯들과 겹치는 LTE 상향 서브프레임에서 LTE 전송 전력을 제한할 필요가 없다. 따라서, 상기와 같은 경우에 NE-DC 단말은 상기의 LTE 상향 서브프레임에서 Pcmax를 유지하는 것으로 결정하고 P_LTE를 결정할 수 있다. In another embodiment, even when the UE applies the ninth embodiment, when the NE-DC processing capability is set by the RRC, the UE controls the downlink control channel indicating NR uplink transmission and the NE-DC processing capability. If the slots are slots for which NR UL cannot be transmitted, there is no need to limit the LTE transmit power in the LTE uplink subframe that overlaps the NR slots. Therefore, in such a case, the NE-DC terminal may determine to maintain Pcmax in the LTE uplink subframe and determine P_LTE.
상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PDSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PDSCH 프로세싱 capability를 위한 PDSCH 수신에 걸리는 시간에 대응하는 심볼 개수(N1)일 수도 있고 상수 X를 더한 N1+X일 수도 있다. 상기의 단말에게 설정된 NE-DC 프로세싱 capability는 단말이 PUSCH를 스케줄링하기 위한 PDCCH를 수신한다면, PUSCH 프로세싱 capability를 위한 PUSCH 준비에 걸리는 시간에 대응하는 심볼 개수(N2)일 수도 있고 상수 Y를 더한 N2+Y일 수도 있다. 혹은 하향 SPS(Semi-Persistent Scheduling) release에 대응하는 HARQ-ACK 전송을 위해 필요한 프로세싱 capability를 위해 PDCCH를 수신하고 마지막 심볼로부터 N개의 심볼 개수로써 정의한 값으로 NE-DC 프로세싱 capability를 정의할 수도 있다. 혹은 NR 셀의 서브캐리어 스페이싱에 따른 결정된 상수 값일 수도 있다.The NE-DC processing capability configured for the UE may be a symbol number N1 corresponding to the time taken for PDSCH reception for the PDSCH processing capability if the UE receives the PDCCH for scheduling the PDSCH, and N1 + plus a constant X. It may be X. The NE-DC processing capability configured for the UE may be the symbol number N2 corresponding to the time taken for PUSCH preparation for the PUSCH processing capability if the UE receives the PDCCH for scheduling the PUSCH, and N2 + plus a constant Y. It may be Y. Alternatively, the NE-DC processing capability may be defined by receiving a PDCCH for processing capability required for HARQ-ACK transmission corresponding to a downlink semi-persistent scheduling (SPS) release and defining the number of N symbols from the last symbol. Alternatively, the constant value may be determined according to the subcarrier spacing of the NR cell.
상기 N개의 심볼 개수는 LTE 셀 혹은 NR 셀의 서브캐리어 스페이싱에 따라 다른 값이 결정될 수 있다. 가령, 15KHz의 경우 13, 30KHz의 경우 15, 60KHz의 경우 22, 120KHz의 경우 25로 결정될 수 있다. 혹은 보수적으로 판단하여 N1 혹은 N1+X, N2 혹은 N2+Y, N 중 최대값 혹은 최소값으로 상기 NE-DC 프로세싱 capability를 set하고 단말은 상기 set된 값을 이용하여 LTE 상향 전송의 전력을 줄일 수 있다. 상기의 NE-DC 프로세싱 capability을 기지국이 상위 신호로 단말에게 설정하기 전에, 단말은 기지국으로 상기의 PDSCH 프로세싱 capability 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송하고, 기지국은 단말로부터 수신한 상기의 프로세싱 capability 관련 정보를 고려하여 단말에게 적절한 N1 혹은 N1+X, N2 혹은 N2+Y, N 값을 상위 신호로 설정하고, 단말은 상기 설정을 수신할 수 있다. The number of N symbols may be determined differently according to the subcarrier spacing of the LTE cell or the NR cell. For example, it can be determined as 13 for 15KHz, 15 for 30KHz, 22 for 60KHz, and 25 for 120KHz. Alternatively, the NE-DC processing capability may be set to a maximum value or a minimum value of N1 or N1 + X, N2 or N2 + Y, and N may be determined conservatively, and the terminal may reduce power of LTE uplink transmission by using the set value. have. Before the base station sets the NE-DC processing capability to the terminal as a higher signal, the terminal transmits the PDSCH processing capability or PUSCH processing capability related information to the base station, and the base station receives the processing capability received from the terminal. In consideration of the related information, an appropriate N1 or N1 + X, N2 or N2 + Y, N value is set as an upper signal to the terminal, and the terminal may receive the setting.
상기의 모든 실시예들에서 P_LTE와 P_NR을 합한 값이 P_total보다 작은 경우에 대해서 단말은 상기의 P_LTE를 적용하여 LTE 상향 전송을 수행하고, 상기의 P_NR을 적용하여 NR 상향 전송을 수행할 수 있다.In all the above embodiments, for the case where the sum of P_LTE and P_NR is smaller than P_total, the UE may perform LTE uplink transmission by applying the P_LTE and perform NR uplink transmission by applying the P_NR.
다음으로 도 10은 본 발명에서 제안하는 실시예들에 따른 기지국과 단말 절차를 도시한 도면이다. 10 is a diagram illustrating a base station and a terminal procedure according to the embodiments proposed by the present invention.
먼저 기지국 절차를 설명하도록 한다.First, the base station procedure will be described.
단계 1011에서 기지국은 단말에게 각 셀들의 설정 정보를 시스템 정보 혹은 상위 신호를 통하여 단말에게 전송한다. 상기 설정 정보는 이중 접속을 위해 필요한 MCG 혹은 SCG 셀들의 셀 관련 정보(TDD 혹은 FDD 정보, 상하향 캐리어 주파수, 상하향 주파수 대역, 상하향 서브캐리어 스페이싱 등)일 수도 있고, 상기 MCG 혹은 SCG에서 데이터 송수신에 필요한 설정 정보일 수도 있다. 혹은 본 발명의 실시예들에서 설명한 NE-DC 프로세싱 capability에 관련한 설정 정보일 수 있다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.In step 1011, the base station transmits configuration information of each cell to the terminal through the system information or higher signal. The configuration information may be cell-related information (TDD or FDD information, up-down carrier frequency, up-down frequency band, up-down subcarrier spacing, etc.) of MCG or SCG cells required for dual access, and required for data transmission and reception in the MCG or SCG. It may be setting information. Or it may be configuration information related to the NE-DC processing capability described in the embodiments of the present invention. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
단계 1012에서 기지국은 본 발명에서 제안하는 실시 예들에 따라 단말에게 상향 전송을 설정하고, 상향 전송을 지시하는 스케줄링 정보를 전송한다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다. 상기 상향 전송 설정은 주기적 채널 정보 전송과 같이 PDCCH에 의해 지시되지 않고 상위 신호 설정에 의해 전송이 설정되는 상향 전송을 의미할 수 있으며, 상기 스케줄링 정보에 의해 지시되는 상향 전송은 PUSCH 전송 혹은 HARQ-ACK 전송과 같이 PDCCH에 의해 지시되어 단말로부터 전송되는 상향 전송을 의미할 수 있다.In step 1012, the base station sets uplink transmission to the terminal and transmits scheduling information indicating uplink transmission according to the embodiments proposed by the present invention. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access. The uplink transmission configuration may mean uplink transmission in which transmission is configured by higher signal configuration instead of PDCCH like periodic channel information transmission, and uplink transmission indicated by the scheduling information is PUSCH transmission or HARQ-ACK. Like transmission, this may mean uplink transmission indicated by the PDCCH and transmitted from the UE.
단계 1013에서 기지국은 본 발명에서 제안하는 실시 예들에 따라 상향 전송을 단말로부터 수신한다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.In step 1013, the base station receives uplink transmission from the terminal according to the embodiments proposed by the present invention. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
다음으로 단말 절차를 설명하도록 한다. Next, the terminal procedure will be described.
단계 1021에서 단말은 각 셀들의 설정 정보를 시스템 정보 혹은 상위 신호를 통하여 기지국으로부터 수신한다. 상기 설정 정보는 이중 접속을 위해 필요한 MCG 혹은 SCG 셀들의 셀 관련 정보(TDD 혹은 FDD 정보, 상하향 캐리어 주파수, 상하향 주파수 대역, 상하향 서브캐리어 스페이싱 등)일 수도 있고, 상기 MCG 혹은 SCG에서 데이터 송수신에 필요한 설정 정보일 수도 있다. 혹은 본 발명의 실시예들에서 설명한 NE-DC 프로세싱 capability에 관련한 설정 정보일 수 있다. 본 발명의 실시예들에서 설명한 바와 같이 상기의 NE-DC 프로세싱 capability를 기지국으로부터 상위 신호로 수신하기 전에, 단말은 기지국으로 PDSCH 프로세싱 capability 혹은 PUSCH 프로세싱 capability 관련 정보를 기지국에게 전송할 수 있다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.In step 1021, the terminal receives configuration information of each cell from the base station through system information or higher signal. The configuration information may be cell-related information (TDD or FDD information, up-down carrier frequency, up-down frequency band, up-down subcarrier spacing, etc.) of MCG or SCG cells required for dual access, and required for data transmission and reception in the MCG or SCG. It may be setting information. Or it may be configuration information related to the NE-DC processing capability described in the embodiments of the present invention. As described in the embodiments of the present invention, the terminal may transmit PDSCH processing capability or PUSCH processing capability related information to the base station before receiving the NE-DC processing capability as a higher signal from the base station. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
단계 1022에서 단말은 본 발명에서 제안하는 실시예들에 따라 기지국으로부터 상향 전송 설정 정보를 수신하고, 상향 전송을 지시하는 스케줄링 정보를 수신한다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다. 상기 상향 전송 설정 정보는 주기적 채널 정보 전송과 같이 PDCCH에 의해 지시되지 않고 상위 신호 설정에 의해 전송이 설정되는 상향 전송에 관련한 설정 정보를 의미할 수 있으며, 상기 스케줄링 정보에 의해 지시되는 상향 전송은 PUSCH 전송 혹은 HARQ-ACK 전송과 같이 PDCCH에 의해 지시되어 단말로부터 전송되는 상향 전송을 의미할 수 있다.In step 1022, the terminal receives uplink transmission configuration information from the base station according to the embodiments proposed by the present invention, and receives scheduling information indicating uplink transmission. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access. The uplink transmission configuration information may refer to configuration information related to uplink transmission in which transmission is configured by higher signal configuration instead of PDCCH like periodic channel information transmission. Uplink transmission indicated by the scheduling information is a PUSCH. Like transmission or HARQ-ACK transmission, it may mean uplink transmission indicated by the PDCCH and transmitted from the terminal.
단계 1023에서 단말은 본 발명에서 제안하는 실시예들에 따라 전송 전력을 제어하여 상향 전송을 기지국에게 전송한다. 상기의 전송 전력을 제어하는 것은 본 발명의 실시예들에서 설명한 바와 같이 중요성이 낮은 상향 전송을 드랍하거나 상향 전송 전력을 줄이는 동작을 포함할 수 있다. 상기 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.In step 1023, the terminal transmits uplink transmission to the base station by controlling the transmission power according to the embodiments proposed by the present invention. Controlling the transmit power may include dropping uplink transmissions of low importance or reducing uplink transmission power as described in the embodiments of the present invention. The base station may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
다음으로 도 11은 본 발명에서 제안하는 실시 예들에 따른 기지국 장치를 도시한 도면이다.11 is a diagram illustrating a base station apparatus according to embodiments proposed by the present invention.
제어기(1101)는 본 발명의 도 7에 따른 기지국 절차와 본 발명의 실시예들에 따라 필요한 정보를 설정하고, 본 발명에 따라 단말로부터의 상향 전송 수신을 제어하여, LTE 혹은 5G 제어 정보 전송 장치(1105) 및 5G 데이터 송수신 장치(1107)를 통해 단말에 전송하고, 스케줄러(1103)에서 LTE 혹은 5G 데이터를 스케줄링하여 LTE 혹은 5G 데이터 송수신 장치(1107)을 통해 단말과 LTE 혹은 5G 데이터를 송수신한다. 본 기지국 장치에서는 편의상 LTE와 5G를 함께 설명했지만, 상기 기지국 장치는 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.The controller 1101 sets necessary information according to the base station procedure according to FIG. 7 of the present invention and embodiments of the present invention, and controls uplink transmission from the terminal according to the present invention, thereby transmitting LTE or 5G control information. 1105 and the 5G data transmission and reception device 1107, and transmits the LTE or 5G data with the terminal through the LTE or 5G data transmission and reception device 1107 by scheduling the LTE or 5G data in the scheduler 1103. . In the present base station apparatus, LTE and 5G are described together for convenience, but the base station apparatus may be an NR base station using NR radio access or an E-UTRA base station using E-UTRA radio access.
다음으로 도 12는 본 발명에 따른 단말 장치를 도시한 도면이다.12 is a diagram illustrating a terminal device according to the present invention.
본 발명의 도 10에 따른 단말 절차와 본 발명의 실시예들에 따라 필요한 설정 정보 및 스케줄링을 기지국으로부터 수신하고, 본 발명에 따라 상향 전송 전력을 제어하여 기지국으로부터 설정되거나 스케줄링에 의해 지시된 상향 전송을 수행한다. LTE 혹은 5G 제어 정보 수신 장치(1205) 및 LTE 혹은 5G 데이터 송수신 장치(1206)를 통해 기지국으로부터 상향 데이터 채널 전송 자원 위치를 수신하거나 상향 제어 정보를 상향 데이터 채널에 다중화하고, 제어기(1201)는 수신된 자원 위치에서 스케줄링 된 LTE 혹은 5G 데이터에 대해 LTE 혹은 5G 데이터 송수신 장치(1206)을 통해 LTE 혹은 5G 기지국과 송수신한다. 본 도면에서는 편의상 LTE 와 5G 장치를 함께 있는 것처럼 설명했지만, LTE 혹은 5G를 위한 장치들은 별개로 구성되어 있을 수 있다. 상기의 제어 정보 및 데이터를 송수신하는 기지국은 NR radio access를 사용하는 NR 기지국일 수도 있고, E-UTRA radio access를 사용하는 E-UTRA 기지국일 수도 있다.Receiving necessary configuration information and scheduling according to the terminal procedure according to FIG. 10 of the present invention and embodiments of the present invention from the base station, and controlling uplink transmission power according to the present invention to be configured from the base station or indicated by scheduling Do this. Receive an uplink data channel transmission resource position from the base station through the LTE or 5G control information receiving device 1205 and LTE or 5G data transmission and reception device 1206 or multiplexes the uplink control information to the uplink data channel, the controller 1201 receives The LTE or 5G data scheduled at the resource location is transmitted and received with the LTE or 5G base station via the LTE or 5G data transceiver 1206. In this figure, the LTE and 5G devices are described as if for convenience, but devices for LTE or 5G may be configured separately. The base station for transmitting and receiving the control information and data may be an NR base station using NR radio access, or may be an E-UTRA base station using E-UTRA radio access.
그리고 본 명세서와 도면에 개시된 실시 예들은 본 발명의 내용을 쉽게 설명하고, 이해를 돕기 위해 특정 예를 제시한 것일 뿐이며, 본 발명의 범위를 한정하고자 하는 것은 아니다. 따라서 본 발명의 범위는 여기에 개시된 실시 예들 이외에도 본 발명의 기술적 사상을 바탕으로 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.In addition, the embodiments disclosed in the specification and the drawings merely present specific examples to easily explain and easily understand the contents of the present invention, and are not intended to limit the scope of the present invention. Therefore, the scope of the present invention should be construed that all changes or modifications derived based on the technical spirit of the present invention are included in the scope of the present invention in addition to the embodiments disclosed herein.
Claims (15)
- 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반한 제1 기지국 및 제2 라디오 접속 기술에 기반한 제2 기지국과 이중 접속(Dual connectivity)을 수행하는 단말 방법에 있어서,In a wireless communication system, a terminal method for performing dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology,상기 제1 기지국으로부터, 하향링크 신호를 수신하는 단계;Receiving a downlink signal from the first base station;상기 하향링크 신호에 대응되는 제1 상향링크 신호의 전송 타이밍이 상기 제2 기지국으로의 제2 상향링크 신호의 전송 타이밍과 겹치는지 확인하는 단계;Checking whether a transmission timing of a first uplink signal corresponding to the downlink signal overlaps with a transmission timing of a second uplink signal to the second base station;상기 제1 상향링크 신호의 전송 타이밍과 상기 제2 상향링크 신호의 전송 타이밍이 겹치면, 상기 제1 상향링크 전송을 위한 제1 전송 전력과 상기 제 2 상향링크 전송을 위한 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하는지 확인하는 단계; 및When the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the sum of the first transmission power for the first uplink transmission and the second transmission power for the second uplink transmission is Checking whether the maximum transmission power of the terminal is exceeded; And상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 제1 상향링크 신호의 전송을 위한 프로세싱(processing) 시간에 기반하여, 상기 제2 전송 전력을 제어하는 단계를 포함하는 것을 특징으로 하는 단말 방법.If the sum of the first transmit power and the second transmit power exceeds the maximum transmit power of the terminal, the second transmit power is controlled based on a processing time for transmitting the first uplink signal. Terminal method characterized in that it comprises a step.
- 제1항에 있어서,The method of claim 1,상기 프로세싱 시간은, The processing time is상기 하향링크 신호가 PDCCH(physical downlink control channel)이면, 상기 PDCCH에 의하여 스케줄링된, PDSCH(Physical downlink shared channel)를 수신하는 시간 또는 PUSCH(physical uplink shared channel)의 전송을 위한 준비 시간을 포함하고, If the downlink signal is a physical downlink control channel (PDCCH), includes a time for receiving a physical downlink shared channel (PDSCH) scheduled by the PDCCH or a preparation time for transmission of a physical uplink shared channel (PUSCH),상기 하향링크 신호가 PDSCH이면, 수신된 PDSCH에 대응하는 HARQ(hybrid automatic repeat and request) ACK/NACK(acknowledgement/negative ack) 전송을 위한 준비 시간을 포함하는 것을 특징으로 하는 단말 방법.And if the downlink signal is a PDSCH, a preparation time for transmitting a hybrid automatic repeat and request (HARQ) acknowledgment / negative ack (HACK) corresponding to the received PDSCH.
- 제1항에 있어서,The method of claim 1,제2 전송 전력을 제어하는 단계는,Controlling the second transmission power,상기 제2 기지국에 대하여 설정된 최대 전송 전력을, 기 설정된 전송 전력 값으로 낮추는 단계를 포함하는 것을 특징으로 하는 단말 방법.And decreasing the maximum transmission power set for the second base station to a predetermined transmission power value.
- 제3항에 있어서,The method of claim 3,상기 제1 기지국으로부터, 상기 기 설정된 전송 전력 값을 수신하는 단계를 더 포함하고,Receiving the predetermined transmission power value from the first base station,상기 제1 라디오 접속 기술은 NR(new radio)이고, The first radio access technology is NR (new radio),상기 제2 라디오 접속 기술은, E-UTRA(evolved-universal mobile communication system (UMTS) terrestrial radio access)인 것을 특징으로 하는 단말 방법.The second radio access technology is a terminal method, characterized in that e-UTRA (evolved-universal mobile communication system (UMTS) terrestrial radio access).
- 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반하고, 제2 라디오 접속 기술에 기반한 제2 기지국과의 사이에서 단말에 대한 이중 접속(Dual connectivity)을 지원하는 제1 기지국 방법에 있어서,In a wireless communication system, a first base station method that is based on a first radio access technology, and supports dual connectivity for a terminal with a second base station based on a second radio access technology,상기 단말로, 하향링크 신호를 전송하는 단계; 및Transmitting a downlink signal to the terminal; And상기 단말로부터, 제1 전송 전력에 기반하여, 상기 하향링크 신호에 대응하는 제1 상향링크 신호를 수신하는 단계를 포함하고,Receiving, from the terminal, a first uplink signal corresponding to the downlink signal based on a first transmission power;상기 단말에서 상기 제2 기지국으로의 제2 상향링크 신호의 전송을 위한 제2 전송 전력은, 상기 제1 상향링크 신호의 전송 타이밍이 상기 제2 상향링크 신호의 전송 타이밍과 겹치고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 단말의 상기 제1 상향링크 신호 프로세싱(processing) 시간에 기반하여 상기 단말에 의하여 제어되는 것을 특징으로 하는 제1 기지국 방법.The second transmission power for the transmission of the second uplink signal from the terminal to the second base station, the transmission timing of the first uplink signal overlaps with the transmission timing of the second uplink signal, the first transmission A first base station controlled by the terminal based on the first uplink signal processing time of the terminal when a sum of power and the second transmit power exceeds a maximum transmit power of the terminal; Way.
- 제5항에 있어서,The method of claim 5,상기 단말의 프로세싱 시간은, The processing time of the terminal,상기 하향링크 신호가 PDCCH(physical downlink control channel)이면, 상기 PDCCH에 의하여 스케줄링된, PDSCH(Physical downlink shared channel)를 수신하는 시간 또는 PUSCH(physical uplink shared channel)의 전송을 위한 준비 시간을 포함하고, If the downlink signal is a physical downlink control channel (PDCCH), includes a time for receiving a physical downlink shared channel (PDSCH) scheduled by the PDCCH or a preparation time for transmission of a physical uplink shared channel (PUSCH),상기 하향링크 신호가 PDSCH이면, 수신된 PDSCH에 대응하는 HARQ(hybrid automatic repeat and request) ACK/NACK(acknowledgement/negative ack)의 전송을 위한 준비 시간을 포함하는 것을 특징으로 하는 제1 기지국 방법.And if the downlink signal is a PDSCH, a preparation time for transmitting a hybrid automatic repeat and request (HARQ) acknowledgment / negative ack (ACK / NACK) corresponding to the received PDSCH.
- 제5항에 있어서,The method of claim 5,제2 전송 전력은, 상기 단말에 설정된 상기 제2 기지국에 대한 최대 전송 전력이, 기 설정된 전송 전력 값으로 낮게 설정되는 것에 의하여 제어되는 것을 특징으로 하는 제1 기지국 방법.The second transmission power is controlled by setting the maximum transmission power for the second base station set in the terminal to a low value at a predetermined transmission power value.
- 제7항에 있어서,The method of claim 7, wherein상기 단말로, 상기 기 설정된 전송 전력 값을 전송하는 단계를 더 포함하고,Transmitting the preset transmission power value to the terminal;상기 제1 라디오 접속 기술은 NR(new radio)이고, The first radio access technology is NR (new radio),상기 제2 라디오 접속 기술은, E-UTRA(evolved-universal mobile communication system (UMTS) terrestrial radio access)인 것을 특징으로 하는 제1 기지국 방법.The second radio access technology is an evolved-universal mobile communication system (UMTS) terrestrial radio access (E-UTRA).
- 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반한 제1 기지국 및 제2 라디오 접속 기술에 기반한 제2 기지국과 이중 접속(Dual connectivity)을 수행하는 단말에 있어서,In a wireless communication system, a terminal for performing dual connectivity with a first base station based on a first radio access technology and a second base station based on a second radio access technology,송수신부; 및A transceiver; And상기 제1 기지국으로부터, 하향링크 신호를 수신하도록 상기 송수신부를 제어하고, 상기 하향링크 신호에 대응되는 제1 상향링크 신호의 전송 타이밍이 상기 제2 기지국으로의 제2 상향링크 신호의 전송 타이밍과 겹치는지 확인하며, 상기 제1 상향링크 신호의 전송 타이밍과 상기 제2 상향링크 신호의 전송 타이밍이 겹치면, 상기 제1 상향링크 신호의 전송을 위한 제1 전송 전력과 상기 제2 상향링크 신호의 전송을 위한 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하는지 확인하고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 제1 상향링크 신호의 전송을 위한 프로세싱(processing) 시간에 기반하여, 상기 제2 전송 전력을 제어하는 제어부를 포함하는 것을 특징으로 하는 단말.The transceiver is controlled to receive a downlink signal from the first base station, and a transmission timing of a first uplink signal corresponding to the downlink signal overlaps with a transmission timing of a second uplink signal to the second base station. If the transmission timing of the first uplink signal and the transmission timing of the second uplink signal overlap, the transmission of the first transmission power for transmitting the first uplink signal and the transmission of the second uplink signal are performed. Determine whether the sum of the second transmission power exceeds the maximum transmission power of the terminal, and when the sum of the first transmission power and the second transmission power exceeds the maximum transmission power of the terminal, the first uplink signal And a controller for controlling the second transmission power based on a processing time for transmission of the.
- 제9항에 있어서,The method of claim 9,상기 프로세싱 시간은, The processing time is상기 하향링크 신호가 PDCCH(physical downlink control channel)이면, 상기 PDCCH에 의하여 스케줄링된, PDSCH(Physical downlink shared channel)를 수신하는 시간 또는 PUSCH(physical uplink shared channel)의 전송을 위한 준비 시간을 포함하고, If the downlink signal is a physical downlink control channel (PDCCH), includes a time for receiving a physical downlink shared channel (PDSCH) scheduled by the PDCCH or a preparation time for transmission of a physical uplink shared channel (PUSCH),상기 하향링크 신호가 PDSCH이면, 수신된 PDSCH에 대응하는 HARQ(hybrid automatic repeat and request) ACK/NACK(acknowledgement/negative ack)의 전송을 위한 준비 시간을 포함하는 것을 특징으로 하는 단말.And if the downlink signal is a PDSCH, a UE comprising a preparation time for transmission of a hybrid automatic repeat and request (HARQ) acknowledgment / negative ack (HACK) corresponding to the received PDSCH.
- 제9항에 있어서, 상기 제어부는, The method of claim 9, wherein the control unit,상기 제2 기지국에 대하여 설정된 최대 전송 전력을 기 설정된 전송 전력 값으로 낮추고, 상기 기 설정된 전송 전력 값에 기반하여 상기 제2 전송 전력을 제어하는 것을 특징으로 하는 단말 방법.And reducing the maximum transmit power set for the second base station to a preset transmit power value and controlling the second transmit power based on the preset transmit power value.
- 제11항에 있어서,The method of claim 11,상기 제어부는, 상기 제1 기지국으로부터, 상기 기 설정된 전송 전력 값을 수신하도록 상기 송수신부를 제어하고,The controller controls the transceiver to receive the preset transmission power value from the first base station,상기 제1 라디오 접속 기술은, NR(new radio)이고, The first radio access technology is NR (new radio),상기 제2 라디오 접속 기술은, E-UTRA(evolved-universal mobile communication system (UMTS) terrestrial radio access)인 것을 특징으로 하는 단말.The second radio access technology, the terminal characterized in that the evolved-universal mobile communication system (UMTS) terrestrial radio access (E-UTRA).
- 무선 통신 시스템에서, 제1 라디오 접속 기술에 기반하고, 제2 라디오 접속 기술에 기반한 제2 기지국과의 사이에서 단말에 대한 이중 접속(Dual connectivity)을 지원하는 제1 기지국에 있어서,In a wireless communication system, a first base station that is based on a first radio access technology, and supports dual connectivity for a terminal with a second base station based on a second radio access technology,송수신부; 및A transceiver; And상기 단말로, 하향링크 신호를 전송하고, 상기 단말로부터, 제1 전송 전력에 기반하여, 상기 하향링크 신호에 대응하는 제1 상향링크 신호를 수신하도록 상기 송수신부를 제어하는 제어부를 포함하고,A control unit which transmits a downlink signal to the terminal and controls the transceiver to receive a first uplink signal corresponding to the downlink signal based on a first transmission power from the terminal;상기 단말에서 상기 제2 기지국으로의 제2 상향링크 신호의 전송을 위한 제2 전송 전력은, 상기 제1 상향링크 신호의 전송 타이밍이 상기 제2 상향링크 신호의 전송 타이밍과 겹치고, 상기 제1 전송 전력과 상기 제2 전송 전력의 합이 상기 단말의 최대 전송 전력을 초과하면, 상기 단말의 상기 제1 상향링크 신호 프로세싱(processing) 시간에 기반하여 상기 단말에 의하여 제어되는 것을 특징으로 하는 제1 기지국.The second transmission power for the transmission of the second uplink signal from the terminal to the second base station, the transmission timing of the first uplink signal overlaps with the transmission timing of the second uplink signal, the first transmission A first base station controlled by the terminal based on the first uplink signal processing time of the terminal when the sum of the power and the second transmit power exceeds the maximum transmit power of the terminal; .
- 제13항에 있어서,The method of claim 13,상기 단말의 프로세싱 시간은, The processing time of the terminal,상기 하향링크 신호가 PDCCH(physical downlink control channel)이면, 상기 PDCCH에 의하여 스케줄링된, PDSCH(Physical downlink shared channel)를 수신하는 시간 또는 PUSCH(physical uplink shared channel)의 전송을 위한 준비 시간을 포함하고, If the downlink signal is a physical downlink control channel (PDCCH), includes a time for receiving a physical downlink shared channel (PDSCH) scheduled by the PDCCH or a preparation time for transmission of a physical uplink shared channel (PUSCH),상기 하향링크 신호가 PDSCH이면, 수신된 PDSCH에 대응하는 HARQ(hybrid automatic repeat and request) ACK/NACK(acknowledgement/negative ack)의 전송을 위한 준비 시간을 포함하는 것을 특징으로 하는 제1 기지국.If the downlink signal is a PDSCH, the first base station comprising a preparation time for transmission of a hybrid automatic repeat and request (HARQ) acknowledgment / negative acknowledgment (ACK / NACK) corresponding to the received PDSCH.
- 제13항에 있어서,The method of claim 13,상기 제어부는, 상기 단말로, 상기 기 설정된 전송 전력 값을 전송하도록 상기 송수신부를 제어하고,The controller controls the transceiver to transmit the preset transmission power value to the terminal.상기 제2 전송 전력은, 상기 단말에 설정된 상기 제2 기지국에 대한 최대 전송 전력이, 기 설정된 전송 전력 값으로 낮게 설정되는 것에 의하여 제어되며, The second transmit power is controlled by setting the maximum transmit power for the second base station set in the terminal to a low value at a preset transmit power value.상기 제1 라디오 접속 기술은, NR(new radio)이고, The first radio access technology is NR (new radio),상기 제2 라디오 접속 기술은, E-UTRA(evolved-universal mobile communication system (UMTS) terrestrial radio access)인 것을 특징으로 하는 제1 기지국.The second radio access technology is a first base station, characterized in that the evolved-universal mobile communication system (UMTS) terrestrial radio access (E-UTRA).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19798865.2A EP3780782B1 (en) | 2018-05-11 | 2019-05-07 | Method and apparatus for controlling uplink transmission power by terminal for dual connectivity in wireless communication system |
US17/053,000 US11399346B2 (en) | 2018-05-11 | 2019-05-07 | Method and apparatus for controlling uplink transmission power by terminal for dual connectivity in wireless communication system |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20180054527 | 2018-05-11 | ||
KR10-2018-0054527 | 2018-05-11 | ||
KR1020180133477A KR20190129674A (en) | 2018-05-11 | 2018-11-02 | Method and apparatus for controlling uplink transmission powers of ues for dual connectivity in wireless communication system |
KR10-2018-0133477 | 2018-11-02 | ||
KR10-2018-0137298 | 2018-11-09 | ||
KR1020180137298A KR20190129676A (en) | 2018-05-11 | 2018-11-09 | Method and apparatus for controlling uplink transmission powers of ues for dual connectivity in wireless communication system |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019216612A1 true WO2019216612A1 (en) | 2019-11-14 |
Family
ID=68466985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2019/005401 WO2019216612A1 (en) | 2018-05-11 | 2019-05-07 | Method and apparatus for controlling uplink transmission power by terminal for dual connectivity in wireless communication system |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2019216612A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113316240A (en) * | 2020-02-27 | 2021-08-27 | 大唐移动通信设备有限公司 | Method and device for adjusting power of terminal equipment in NSA (non-volatile memory Access) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013048172A2 (en) * | 2011-09-29 | 2013-04-04 | 엘지전자 주식회사 | Method for transmitting uplink and wireless device using same |
WO2013141647A1 (en) * | 2012-03-22 | 2013-09-26 | 엘지전자 주식회사 | Method and device for controlling uplink transmit power in wireless access system |
WO2014107050A1 (en) * | 2013-01-03 | 2014-07-10 | 엘지전자 주식회사 | Method and apparatus for transmitting uplink signals in wireless communication system |
KR20160053939A (en) * | 2013-09-04 | 2016-05-13 | 엘지전자 주식회사 | Method and apparatus for controlling uplink power in wireless communication system |
WO2017039167A1 (en) * | 2015-09-04 | 2017-03-09 | 삼성전자 주식회사 | Method and apparatus for controlling uplink transmission power in wireless communication system |
-
2019
- 2019-05-07 WO PCT/KR2019/005401 patent/WO2019216612A1/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013048172A2 (en) * | 2011-09-29 | 2013-04-04 | 엘지전자 주식회사 | Method for transmitting uplink and wireless device using same |
WO2013141647A1 (en) * | 2012-03-22 | 2013-09-26 | 엘지전자 주식회사 | Method and device for controlling uplink transmit power in wireless access system |
WO2014107050A1 (en) * | 2013-01-03 | 2014-07-10 | 엘지전자 주식회사 | Method and apparatus for transmitting uplink signals in wireless communication system |
KR20160053939A (en) * | 2013-09-04 | 2016-05-13 | 엘지전자 주식회사 | Method and apparatus for controlling uplink power in wireless communication system |
WO2017039167A1 (en) * | 2015-09-04 | 2017-03-09 | 삼성전자 주식회사 | Method and apparatus for controlling uplink transmission power in wireless communication system |
Non-Patent Citations (1)
Title |
---|
See also references of EP3780782A4 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113316240A (en) * | 2020-02-27 | 2021-08-27 | 大唐移动通信设备有限公司 | Method and device for adjusting power of terminal equipment in NSA (non-volatile memory Access) |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018203657A1 (en) | Method and device for transmitting uplink control channel in wireless communication system | |
WO2020189997A1 (en) | Method and device for priority-based control and data information transmission in wireless communication system | |
WO2020197220A1 (en) | Scheduling in communication systems with multiple service types | |
WO2015190844A1 (en) | Harq procedure and frame structure for lte cells on unlicensed spectrum | |
WO2018143741A1 (en) | Method for transmitting physical uplink shared channel in wireless communication system and device therefor | |
WO2017078425A1 (en) | Method and device for transmitting or receiving control information in wireless communication system | |
WO2021025543A1 (en) | Method and apparatus for performing dual connectivity for ues in wireless communication system | |
WO2016208991A1 (en) | Method and apparatus for transmitting and receiving using reduced transmission time interval in wireless cellular communication system | |
WO2019160319A1 (en) | Method and apparatus for transmitting or receiving data and control information in wireless communication system | |
WO2017196042A1 (en) | Method and device for transmitting/receiving synchronization signal in wireless cellular communication system | |
AU2018262995B2 (en) | Method and apparatus for identifying uplink signal transmission timing in wireless communication system | |
WO2019156466A1 (en) | Method for transmitting or receiving signal in wireless communication system and device therefor | |
WO2018124702A1 (en) | Method and device for transmitting/receiving uplink control information in wireless communication system | |
WO2011004989A2 (en) | Uplink receiving method for a base station and uplink transmitting method for a terminal using a shared wireless resource | |
WO2019013606A1 (en) | Method and apparatus for setting downlink control channel reception time in wireless communication system | |
WO2018174639A1 (en) | Method and device for setting control and data channel transmission time in wireless communication system | |
WO2017196059A1 (en) | Method and device for determining uplink data and control signal transmission timing in wireless communication system | |
EP3850903A1 (en) | Method and apparatus for determining of transmission resources for uplink channels of use for dual connectivity in wireless communication system | |
AU2019320610B2 (en) | Method and device for configuring demodulation reference signal for uplink control channel in wireless cellular communication system | |
WO2021075768A1 (en) | Method and apparatus for reporting harq feedback in nr v2x | |
WO2018147568A1 (en) | Method and device for executing random access in wireless cellular communication system | |
WO2019074282A1 (en) | Method and apparatus for operating bandwidth part in wireless communication system | |
WO2018084600A1 (en) | Method and device for supporting various services in mobile communication system | |
WO2018203610A1 (en) | Uplink transmission power control method and device in wireless cellular communication system | |
WO2021075903A1 (en) | Method and apparatus for performing sl communication on basis of mcs in nr v2x |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19798865 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019798865 Country of ref document: EP Effective date: 20201102 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |