WO2019196468A1 - Air conditioning unit, air conditioning unit control method, and central coordinator - Google Patents
Air conditioning unit, air conditioning unit control method, and central coordinator Download PDFInfo
- Publication number
- WO2019196468A1 WO2019196468A1 PCT/CN2018/120657 CN2018120657W WO2019196468A1 WO 2019196468 A1 WO2019196468 A1 WO 2019196468A1 CN 2018120657 W CN2018120657 W CN 2018120657W WO 2019196468 A1 WO2019196468 A1 WO 2019196468A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- air conditioner
- air conditioning
- conditioning unit
- data
- air
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/58—Remote control using Internet communication
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B3/00—Line transmission systems
- H04B3/54—Systems for transmission via power distribution lines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Definitions
- the invention relates to the field of air conditioning control, and in particular to an air conditioning unit, a control method of an air conditioning unit and a central coordinator.
- a plurality of communication devices are included, for example, an air conditioner external unit, an air conditioner internal unit, a line controller, a coordinator, and the like, and if the status data of the air conditioner internal unit changes during communication
- a status data is sent to the air conditioner
- the status data of multiple internal machines changes at the same time
- multiple data will be transmitted simultaneously on the communication line, which will cause a large increase in the amount of data transmission on the bus.
- the bandwidth of the network is constant.
- communication congestion will occur, the data transmission will be delayed, and even the transmission will not be successful, which will cause the real-time performance of the unit to deteriorate.
- the air conditioner internal machines when analyzing the operation data of the air conditioning system, the air conditioner internal machines often query each other for data, which will cause the communication burden of each air conditioner internal machine, and the data cannot be issued in time.
- the embodiment of the invention provides an air conditioning unit, a control method of the air conditioning unit and a central coordinator, so as to at least solve the technical problem that the transmission amount on the bus increases and the communication congestion occurs due to the simultaneous transmission of multiple pieces of data on the communication line.
- a control method of an air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, each of the air conditioner internal units is provided with a station, and the control method includes Receiving state change data transmitted by a plurality of stations, wherein the state change data refers to state data recorded when a running state of the air conditioner internal machine changes; if all stations corresponding to the air conditioner internal machine are determined Sending the state change data, the state change data of all the air conditioners are transmitted to the air conditioner.
- the method further includes: receiving a query instruction sent by the preset station, where the query instruction is used to query air conditioning operation data of the air conditioner internal machine corresponding to the target station, where the preset site and the target site correspond to The air conditioner internals are different; according to the query instruction, the air conditioning operation data of the air conditioner internal unit corresponding to the target station is sent to the preset station.
- the air conditioning unit further includes a control device and a display device, each of the control device and the display device is correspondingly provided with a site, and the state control method further includes: if it is determined that all the air conditioners are internal The stations all transmit the status change data, and send status change data of all the air conditioners to the control device and/or the display device.
- control device includes at least one of the following: a wire controller, a centralized controller, and the display device includes at least: a liquid crystal display.
- the state change data includes at least one of the following: boot data, shutdown data, and windshield change data.
- the air conditioning unit uses a power line carrier communication PLC communication network to transmit communication signals.
- a central coordinator of an air conditioning unit the central coordinator performing the control method of the air conditioning unit according to any one of the above.
- the air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, each of the air conditioner internal units is provided with a station, and the station records status change data of the air conditioner internal unit, and the central coordinator and A plurality of said stations perform network communication through a target information bus.
- the central coordinator is deployed on an air conditioner external unit of the air conditioning unit.
- an air conditioning unit comprising the central coordinator of any of the above.
- the state change data sent by the plurality of stations may be received first, wherein the state change data refers to the state data recorded when the operating state of the air conditioner internal machine changes, and all the air conditioners are determined.
- the corresponding stations send the status change data
- all the state change data of the air conditioner is sent to the outside air conditioner. That is, in the embodiment of the present invention, the state change data is sent to the air conditioner outside the machine after the state data of all the air conditioners are changed, instead of the transmission status data of the original single strip, so that The number of data transmissions on the communication line is reduced, thereby solving the technical problem that the transmission amount on the bus is increased due to the simultaneous transmission of multiple pieces of data on the communication line, resulting in communication congestion.
- FIG. 1 is a flow chart showing a control method of an air conditioning unit according to an embodiment of the present invention
- FIG. 2 is a schematic diagram of a state transmission mechanism of an optional air conditioning unit in accordance with the present invention.
- Power Line Communication Power line carrier communication
- Power line carrier communication refers to a technology that uses an existing power line to transmit analog or digital signals at high speed through a carrier wave.
- Central Coordinator central coordinator, used for communication management of PLC communication network.
- STA Station, site, used to record the status data of the device to realize the transmission of status data.
- the air conditioning unit can include a plurality of air conditioner internal units and an air conditioner external unit.
- the number of external units of the air conditioner is not limited, for example, one or more air conditioner units.
- Each air conditioner in the air conditioning unit may be provided with a station STA, which can record the operation data of the air conditioner internal unit, and send the changed status data to the central coordination when the operating state of the air conditioner internal machine changes.
- the central coordinator in the present application can be deployed in an air conditioner external unit, and is connected to the communication bus between the central coordinator and a plurality of stations.
- the environment for using the air conditioning unit is not specifically limited.
- the communication mode of the air conditioning unit in the present application may be performed through a PLC communication network, that is, through an air conditioning unit.
- the power line between them establishes a communication network and transmits data efficiently.
- an embodiment of a method of controlling an air conditioning unit there is provided an embodiment of a method of controlling an air conditioning unit, and it is noted that the steps illustrated in the flowchart of the accompanying drawings may be performed in a computer system such as a set of computer executable instructions, and Although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in a different order than the ones described herein.
- the air conditioning unit in the following embodiments of the present invention uses a power line carrier communication PLC communication network to transmit communication signals.
- the air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, and each air conditioner internal machine is provided with a station, as shown in FIG. step:
- Step S102 receiving state change data sent by a plurality of stations, wherein the state change data refers to state data recorded when a running state of the air conditioner internal machine changes.
- the site in the present application may refer to a control module, which can be used to record the operation data of each corresponding device, for example, the state data of the air conditioner internal machine, the control command of the wire controller, the control data of the centralized controller, and the present
- the specific content that the site needs to record is not limited, and may include, but is not limited to, status data (including power on, power off, gear position, temperature and humidity, etc.), running time, and the like.
- the station corresponding to the air conditioner may send the state change data to the controller or the coordinator.
- the central coordinator is used as the center of data processing in the present invention, but is not limited to the central coordinator as the center of data processing.
- the data transmitted by the station of the present invention is not limited to the above state change data, and may include, but is not limited to, the model of the air conditioner, the environmental data (including temperature and humidity, gas concentration) detected by the air conditioner.
- the foregoing state change data includes at least one of the following: boot data, shutdown data, and windshield change data.
- step S104 if it is determined that all the stations corresponding to the air conditioners are transmitting status change data, all the state change data of the air conditioners are transmitted to the air conditioners.
- the state change data sent by the plurality of stations may be received first, wherein the state change data refers to the state data recorded when the operating state of the air conditioner internal machine changes, and determines all the corresponding air conditioners.
- the station transmits the status change data all the status change data of the air conditioner is sent to the outside air conditioner. That is, in the embodiment of the present invention, the state change data is sent to the air conditioner outside the machine after the state data of all the air conditioners are changed, instead of the transmission status data of the original single strip, so that The number of data transmissions on the communication line is reduced, thereby solving the technical problem that the transmission amount on the bus is increased due to the simultaneous transmission of multiple pieces of data on the communication line, resulting in communication congestion.
- control method in the embodiment of the present invention further includes: receiving a query instruction sent by the preset station, where the query instruction is used to query air conditioning operation data of the air conditioner internal machine corresponding to the target site, the preset site and the target site.
- the corresponding air conditioner internal machine is different; according to the query instruction, the air conditioning operation data of the air conditioner internal machine corresponding to the target station is sent to the preset station.
- the query command can be directly sent to the central coordinator, and the central coordinator can receive the query instruction sent by the station, and according to the query instruction, the target is The air conditioning operation data of the air conditioner internal unit corresponding to the station is sent to the preset station.
- the specific location of the preset site and the target site in the present invention is not limited, and may also be the first site and the second site. These are only descriptions of the site, and do not limit the location and model of the site.
- the air conditioning unit further includes a control device and a display device, and each control device and the display device are correspondingly provided with a site, and the state control method further includes: if it is determined that all the sites corresponding to the air conditioner are transmitting state change data, All state change data of the air conditioner is sent to the control device and/or the display device.
- the control device includes at least one of the following: a wire controller and a centralized controller, and the display device includes at least: a liquid crystal display.
- the state change data is sent to the control device and/or the display device, so that the state change data of the air conditioner internal device is notified to the control device or the display device in time, and the control device is notified by the display device.
- a central coordinator of an air conditioning unit the central coordinator performing the control method of the air conditioning unit of any of the above.
- the air conditioning unit comprises a plurality of air conditioner internal units and an air conditioner external unit, each air conditioner internal machine is provided with a site, the site records the state change data of the air conditioner internal machine, and the central coordinator communicates with the plurality of stations through the target information bus. .
- the central coordinator is deployed on the air conditioner outside the air conditioning unit.
- the air conditioning unit may include a plurality of air conditioner internal units, an air conditioner external unit, and a line controller (corresponding to the above Control device), wherein each air conditioner and the line controller correspond to one station, for example, the air conditioner internal machine 1 corresponds to the station 1, the air conditioner internal machine 2 corresponds to the station 2, and the air conditioner internal machine 3 corresponds to the station 4, and the air conditioner The internal machine 4 corresponds to the station 5.
- the air conditioner internal machine 1 corresponds to the station 1
- the air conditioner internal machine 2 corresponds to the station 2
- the air conditioner internal machine 3 corresponds to the station 4
- the air conditioner The internal machine 4 corresponds to the station 5.
- the central coordinator CCO is deployed on the air conditioner external unit, and the station STA is deployed on the air conditioner internal machine.
- the state data of the air conditioner internal machine changes, such as power on, power off, wind speed change, etc.
- the state change data of the air conditioner internal machine is sent to the central coordinator through the station, and the central coordinator sends the state change to the air conditioner.
- Control devices and display devices such as the machine and the line controller connected to the station.
- the control device may be a wire controller. As shown in FIG. 2, the wire controller also corresponds to the site 3.
- the multiple stations and the central coordinator in the embodiment of the present invention are connected on the same bus, and perform data transmission through the bus.
- the control when all the stations of the air conditioning unit send the state change data, the data of all the stations will be sent out, and if there is no change, the data will not be sent.
- the status data of all the stations in the embodiment of the present invention is stored in the central coordinator CCO.
- the CCO sends the query command to the CCO (sends the query content), and reads the status data in the CCO. can.
- the central coordinator can record the status data of all stations STAs.
- a certain station wants to acquire data of other stations, it only needs to send a query command to the central coordinator, and then the central The coordinator returns the state data stored in the queried target site to the query site according to the query command, so that the replies of the queried site are no longer needed, the data interaction between the sites is reduced, and the data between the power lines is reduced. Communication, thereby reducing communication pressure.
- the air conditioner external device in the embodiment of the present invention needs to frequently check the status of each air conditioner internal machine, and record the state data of the air conditioner internal machine stored in each station through the central coordinator, so that the air conditioner external machine can be very convenient to pass.
- the bus ground obtains the state data of the air conditioner, which greatly reduces the bus load.
- an air conditioning unit comprising the central coordinator of any of the above.
- the disclosed technical contents may be implemented in other manners.
- the device embodiments described above are only schematic.
- the division of the unit may be a logical function division.
- there may be another division manner for example, multiple units or components may be combined or may be Integrate into another system, or some features can be ignored or not executed.
- the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, unit or module, and may be electrical or otherwise.
- the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
- each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
- the above integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
- the solution provided by the embodiment of the present application can be used to send the state change data of all the air conditioners to the air conditioner.
- the state data of all the air conditioners are changed.
- the state change data is sent to the air conditioner outside, instead of the transmission status data of the original single strip, so that the number of data transmissions on the communication line can be reduced, thereby solving the problem that multiple data are simultaneously transmitted on the communication line. This causes technical problems that increase the amount of transmission on the bus and cause communication congestion.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Signal Processing (AREA)
- Human Computer Interaction (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Power Engineering (AREA)
- Air Conditioning Control Device (AREA)
Abstract
An air conditioning unit, an air conditioning unit control method, and a central coordinator. The air conditioning unit comprises a plurality of air conditioner indoor units and an air conditioner outdoor unit, each of the air conditioner indoor units being provided with a station. The control method comprises: receiving state change data sent by a plurality of stations, the state change data referring to state data recorded when the operation state of the air conditioner indoor units is changed; and if it is determined that the stations corresponding to all the air conditioner indoor units all transmit the state change data, transmitting the state change data of all the air conditioner indoor units to the air conditioner outdoor unit.
Description
本申请要求于2018年04月13日提交中国专利局、申请号为201810333831.9、申请名称“空调机组、空调机组的控制方法和中央协调器”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims priority to the Chinese Patent Application of the Chinese Patent Office, Application No. 201810333831.9, and the application name "Air Conditioning Unit, Air Conditioning Unit Control Method and Central Coordinator" on April 13, 2018, the entire contents of which are incorporated by reference. In this application.
本发明涉及空调控制领域,具体而言,涉及一种空调机组、空调机组的控制方法和中央协调器。The invention relates to the field of air conditioning control, and in particular to an air conditioning unit, a control method of an air conditioning unit and a central coordinator.
在相关技术中,对于空调机组而言,会包括多个通讯设备,例如,空调外机、空调内机、线控器、协调器等设备,在通讯时,若空调内机的状态数据发生改变时,就会发送一条状态数据至空调外机中,如果同时出现多个内机的状态数据发生改变,则通讯线路上会同时传输多个数据,这样会导致总线上数据的传输量大量增加,而网络的带宽是恒定的,当数据量达到一定程度,会造成通讯拥堵,数据传输就会延时,甚至无法发送成功,这样会导致机组的实时性变差。In the related art, for an air conditioning unit, a plurality of communication devices are included, for example, an air conditioner external unit, an air conditioner internal unit, a line controller, a coordinator, and the like, and if the status data of the air conditioner internal unit changes during communication When a status data is sent to the air conditioner, if the status data of multiple internal machines changes at the same time, multiple data will be transmitted simultaneously on the communication line, which will cause a large increase in the amount of data transmission on the bus. The bandwidth of the network is constant. When the amount of data reaches a certain level, communication congestion will occur, the data transmission will be delayed, and even the transmission will not be successful, which will cause the real-time performance of the unit to deteriorate.
同时,在分析空调系统的运行数据时,空调内机往往会相互查询数据,这样会造成各个空调内机的通讯负担,数据无法及时发出。At the same time, when analyzing the operation data of the air conditioning system, the air conditioner internal machines often query each other for data, which will cause the communication burden of each air conditioner internal machine, and the data cannot be issued in time.
针对上述的相关技术中由于通讯线路上同时发送多条数据,导致总线上传输量增大,造成通讯拥堵的技术问题,目前尚未提出有效的解决方案。In view of the above-mentioned related art, since a plurality of data are simultaneously transmitted on a communication line, resulting in an increase in the amount of transmission on the bus and causing communication congestion, an effective solution has not been proposed yet.
发明内容Summary of the invention
本发明实施例提供了一种空调机组、空调机组的控制方法和中央协调器,以至少解决由于通讯线路上同时发送多条数据,导致总线上传输量增大,造成通讯拥堵的技术问题。The embodiment of the invention provides an air conditioning unit, a control method of the air conditioning unit and a central coordinator, so as to at least solve the technical problem that the transmission amount on the bus increases and the communication congestion occurs due to the simultaneous transmission of multiple pieces of data on the communication line.
根据本发明实施例的一个方面,提供了一种空调机组的控制方法,所述空调机组包括多个空调内机和空调外机,每个所述空调内机设置有站点,所述控制方法包括:接收多个站点发送的状态改变数据,其中,所述状态改变数据是指在所述空调内机的运行状态发生改变时记录的状态数据;若确定出所有的空调内机所对应的站点都发送 所述状态改变数据,则将所述所有的空调内机的状态改变数据发送至所述空调外机中。According to an aspect of an embodiment of the present invention, a control method of an air conditioning unit is provided. The air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, each of the air conditioner internal units is provided with a station, and the control method includes Receiving state change data transmitted by a plurality of stations, wherein the state change data refers to state data recorded when a running state of the air conditioner internal machine changes; if all stations corresponding to the air conditioner internal machine are determined Sending the state change data, the state change data of all the air conditioners are transmitted to the air conditioner.
可选地,还包括:接收预设站点发送的查询指令,其中,所述查询指令用于查询目标站点所对应的空调内机的空调运行数据,所述预设站点和所述目标站点所对应的空调内机不相同;根据所述查询指令,将所述目标站点所对应的空调内机的空调运行数据发送至所述预设站点中。Optionally, the method further includes: receiving a query instruction sent by the preset station, where the query instruction is used to query air conditioning operation data of the air conditioner internal machine corresponding to the target station, where the preset site and the target site correspond to The air conditioner internals are different; according to the query instruction, the air conditioning operation data of the air conditioner internal unit corresponding to the target station is sent to the preset station.
可选地,所述空调机组还包括控制设备和显示设备,每个所述控制设备和所述显示设备对应设置有站点,所述状态控制方法还包括:若确定出所有的空调内机所对应的站点都发送所述状态改变数据,将所述所有的空调内机的状态改变数据发送至所述控制设备和/或所述显示设备中。Optionally, the air conditioning unit further includes a control device and a display device, each of the control device and the display device is correspondingly provided with a site, and the state control method further includes: if it is determined that all the air conditioners are internal The stations all transmit the status change data, and send status change data of all the air conditioners to the control device and/or the display device.
可选地,所述控制设备包括下述至少之一:线控器、集中控制器,所述显示设备至少包括:液晶显示器。Optionally, the control device includes at least one of the following: a wire controller, a centralized controller, and the display device includes at least: a liquid crystal display.
可选地,所述状态改变数据包括下述至少之一:开机数据、关机数据、风档改变数据。Optionally, the state change data includes at least one of the following: boot data, shutdown data, and windshield change data.
可选地,所述空调机组采用电力线载波通讯PLC通讯网络进行通讯信号的传输。Optionally, the air conditioning unit uses a power line carrier communication PLC communication network to transmit communication signals.
根据本发明实施例的另一方面,还提供了一种空调机组的中央协调器,所述中央协调器执行上述任意一项所述的空调机组的控制方法。According to another aspect of the present invention, there is further provided a central coordinator of an air conditioning unit, the central coordinator performing the control method of the air conditioning unit according to any one of the above.
可选地,所述空调机组包括多个空调内机和空调外机,每个所述空调内机设置有站点,所述站点记录所述空调内机的状态改变数据,所述中央协调器与多个所述站点通过目标信息总线进行网络通讯。Optionally, the air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, each of the air conditioner internal units is provided with a station, and the station records status change data of the air conditioner internal unit, and the central coordinator and A plurality of said stations perform network communication through a target information bus.
可选地,所述中央协调器部署在空调机组的空调外机上。Optionally, the central coordinator is deployed on an air conditioner external unit of the air conditioning unit.
根据本发明实施例的另一方面,还提供了一种空调机组,包括上述任意一项所述的中央协调器。According to another aspect of an embodiment of the present invention, there is also provided an air conditioning unit comprising the central coordinator of any of the above.
在本发明实施例中,可以先接收多个站点发送的状态改变数据,其中,状态改变数据是指在空调内机的运行状态发生改变时记录的状态数据,并在确定出所有的空调内机所对应的站点都发送状态改变数据,则将所有的空调内机的状态改变数据发送至空调外机中。即在本发明实施例中,是在所有的空调内机的状态数据都发生改变后,才会将状态改变数据发送至空调外机中,而不是原来的单独一条条的发送状态数据,这样可以减少通讯线路上数据发送的数量,进而解决由于通讯线路上同时发送多条数据,导致总线上传输量增大,造成通讯拥堵的技术问题。In the embodiment of the present invention, the state change data sent by the plurality of stations may be received first, wherein the state change data refers to the state data recorded when the operating state of the air conditioner internal machine changes, and all the air conditioners are determined. When the corresponding stations send the status change data, all the state change data of the air conditioner is sent to the outside air conditioner. That is, in the embodiment of the present invention, the state change data is sent to the air conditioner outside the machine after the state data of all the air conditioners are changed, instead of the transmission status data of the original single strip, so that The number of data transmissions on the communication line is reduced, thereby solving the technical problem that the transmission amount on the bus is increased due to the simultaneous transmission of multiple pieces of data on the communication line, resulting in communication congestion.
此处所说明的附图用来提供对本发明的进一步理解,构成本申请的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The drawings described herein are intended to provide a further understanding of the invention, and are intended to be a part of the invention. In the drawing:
图1是根据本发明实施例的空调机组的控制方法的流程图;1 is a flow chart showing a control method of an air conditioning unit according to an embodiment of the present invention;
图2是根据本发明的一种可选的空调机组的状态发送机制的示意图。2 is a schematic diagram of a state transmission mechanism of an optional air conditioning unit in accordance with the present invention.
为了使本技术领域的人员更好地理解本发明方案,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分的实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明保护的范围。The technical solutions in the embodiments of the present invention are clearly and completely described in the following with reference to the accompanying drawings in the embodiments of the present invention. It is an embodiment of the invention, but not all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts shall fall within the scope of the present invention.
需要说明的是,本发明的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本发明的实施例能够以除了在这里图示或描述的那些以外的顺序实施。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It is to be understood that the terms "first", "second" and the like in the specification and claims of the present invention are used to distinguish similar objects, and are not necessarily used to describe a particular order or order. It is to be understood that the data so used may be interchanged where appropriate, so that the embodiments of the invention described herein can be implemented in a sequence other than those illustrated or described herein. In addition, the terms "comprises" and "comprises" and "the" and "the" are intended to cover a non-exclusive inclusion, for example, a process, method, system, product, or device that comprises a series of steps or units is not necessarily limited to Those steps or units may include other steps or units not explicitly listed or inherent to such processes, methods, products or devices.
为便于用户理解本发明,下面对本发明各实施例中涉及的部分术语或名词做出解释:To facilitate the user's understanding of the present invention, some of the terms or nouns involved in the various embodiments of the present invention are explained below:
PLC,Power Line Communication,电力线载波通讯,是电力系统特有的通信方式,电力线载波通讯是指利用现有的电力线,通过载波方式将模拟或数字信号进行高速传输的技术。PLC, Power Line Communication, power line carrier communication, is a unique communication method for power systems. Power line carrier communication refers to a technology that uses an existing power line to transmit analog or digital signals at high speed through a carrier wave.
CCO,Central Coordinator,中央协调器,用于PLC通讯网络的通讯管理。CCO, Central Coordinator, central coordinator, used for communication management of PLC communication network.
STA,Station,站点,用于记录设备的状态数据,实现状态数据的传输。STA, Station, site, used to record the status data of the device to realize the transmission of status data.
本发明下述实施例可以应用于各种空调机组中,空调机组可以包括多个空调内机和空调外机,对于空调外机的数量不做限定,例如,空调外机的数量一个或多个,在空调机组中的每个空调内机可以设置有站点STA,该站点可以记录空调内机的运行数 据,并在空调内机的运行状态发生改变时,将发生改变的状态数据发送至中央协调器中。本申请中的中央协调器可以部署在空调外机中,在中央协调器和多个站点之间连接在通讯总线上。本发明实施例中对于空调机组的使用环境不做具体限定,例如,办公区域、厂房、社区等地方,本申请中的空调机组的通讯方式可以是通过PLC通讯网络进行,即可以通过空调机组之间的电力线来建立通讯网络,并进行数据的有效传输。下面对本发明中的各项实施例进行详细说明。The following embodiments of the present invention can be applied to various air conditioning units. The air conditioning unit can include a plurality of air conditioner internal units and an air conditioner external unit. The number of external units of the air conditioner is not limited, for example, one or more air conditioner units. Each air conditioner in the air conditioning unit may be provided with a station STA, which can record the operation data of the air conditioner internal unit, and send the changed status data to the central coordination when the operating state of the air conditioner internal machine changes. In the device. The central coordinator in the present application can be deployed in an air conditioner external unit, and is connected to the communication bus between the central coordinator and a plurality of stations. In the embodiment of the present invention, the environment for using the air conditioning unit is not specifically limited. For example, in an office area, a factory building, a community, etc., the communication mode of the air conditioning unit in the present application may be performed through a PLC communication network, that is, through an air conditioning unit. The power line between them establishes a communication network and transmits data efficiently. The various embodiments of the present invention are described in detail below.
实施例一Embodiment 1
根据本发明实施例,提供了一种空调机组的控制方法实施例,需要说明的是,在附图的流程图示出的步骤可以在诸如一组计算机可执行指令的计算机系统中执行,并且,虽然在流程图中示出了逻辑顺序,但是在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤。According to an embodiment of the present invention, there is provided an embodiment of a method of controlling an air conditioning unit, and it is noted that the steps illustrated in the flowchart of the accompanying drawings may be performed in a computer system such as a set of computer executable instructions, and Although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in a different order than the ones described herein.
本发明下述实施例中的空调机组采用电力线载波通讯PLC通讯网络进行通讯信号的传输。The air conditioning unit in the following embodiments of the present invention uses a power line carrier communication PLC communication network to transmit communication signals.
图1是根据本发明实施例的空调机组的控制方法的流程图,空调机组包括多个空调内机和空调外机,每个空调内机设置有站点,如图1所示,该方法包括如下步骤:1 is a flow chart of a control method of an air conditioning unit according to an embodiment of the present invention. The air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, and each air conditioner internal machine is provided with a station, as shown in FIG. step:
步骤S102,接收多个站点发送的状态改变数据,其中,状态改变数据是指在空调内机的运行状态发生改变时记录的状态数据。Step S102, receiving state change data sent by a plurality of stations, wherein the state change data refers to state data recorded when a running state of the air conditioner internal machine changes.
其中,本申请中的站点可以是指一个控制模块,其可以用来记录各个相应设备的运行数据,例如,空调内机的状态数据,线控器的控制指令,集中控制器的控制数据,本发明中对于站点需要记录的具体内容并不做限定,可以包括但不限于:状态数据(包括开机、关机、档位、温湿度等)、运行时间等。而在空调内机的状态改变数据发生改变后,空调内机对应的站点可以将该状态改变数据发送至控制器或者协调器中。在本发明中采用中央协调器作为数据处理的中心进行说明,但不会仅限于该中央协调器作为数据处理的中心。The site in the present application may refer to a control module, which can be used to record the operation data of each corresponding device, for example, the state data of the air conditioner internal machine, the control command of the wire controller, the control data of the centralized controller, and the present In the invention, the specific content that the site needs to record is not limited, and may include, but is not limited to, status data (including power on, power off, gear position, temperature and humidity, etc.), running time, and the like. After the state change data of the air conditioner is changed, the station corresponding to the air conditioner may send the state change data to the controller or the coordinator. The central coordinator is used as the center of data processing in the present invention, but is not limited to the central coordinator as the center of data processing.
另外,本发明站点发送的数据也不限于上述的状态改变数据,还可以包括但不限于:空调内机的型号、空调内机检测到的环境数据(包括温湿度、气体浓度)等。In addition, the data transmitted by the station of the present invention is not limited to the above state change data, and may include, but is not limited to, the model of the air conditioner, the environmental data (including temperature and humidity, gas concentration) detected by the air conditioner.
一种可选的实施方式,上述的状态改变数据包括下述至少之一:开机数据、关机数据、风档改变数据。In an optional implementation manner, the foregoing state change data includes at least one of the following: boot data, shutdown data, and windshield change data.
步骤S104,若确定出所有的空调内机所对应的站点都发送状态改变数据,则将所有的空调内机的状态改变数据发送至空调外机中。In step S104, if it is determined that all the stations corresponding to the air conditioners are transmitting status change data, all the state change data of the air conditioners are transmitted to the air conditioners.
本发明中在传递数据时,是在所有的空调内机的状态都改变后,在发送全部空调内机的状态改变数据,并不会单独一条条的发送,减少通讯线的通讯压力。In the present invention, when data is transmitted, after all the states of the air conditioners are changed, the state change data of all the air conditioners is transmitted, and the transmission of the individual lines is not performed, and the communication pressure of the communication lines is reduced.
通过上述步骤,可以先接收多个站点发送的状态改变数据,其中,状态改变数据是指在空调内机的运行状态发生改变时记录的状态数据,并在确定出所有的空调内机所对应的站点都发送状态改变数据,则将所有的空调内机的状态改变数据发送至空调外机中。即在本发明实施例中,是在所有的空调内机的状态数据都发生改变后,才会将状态改变数据发送至空调外机中,而不是原来的单独一条条的发送状态数据,这样可以减少通讯线路上数据发送的数量,进而解决由于通讯线路上同时发送多条数据,导致总线上传输量增大,造成通讯拥堵的技术问题。Through the above steps, the state change data sent by the plurality of stations may be received first, wherein the state change data refers to the state data recorded when the operating state of the air conditioner internal machine changes, and determines all the corresponding air conditioners. When the station transmits the status change data, all the status change data of the air conditioner is sent to the outside air conditioner. That is, in the embodiment of the present invention, the state change data is sent to the air conditioner outside the machine after the state data of all the air conditioners are changed, instead of the transmission status data of the original single strip, so that The number of data transmissions on the communication line is reduced, thereby solving the technical problem that the transmission amount on the bus is increased due to the simultaneous transmission of multiple pieces of data on the communication line, resulting in communication congestion.
可选的,本发明实施例中的控制方法还包括:接收预设站点发送的查询指令,其中,查询指令用于查询目标站点所对应的空调内机的空调运行数据,预设站点和目标站点所对应的空调内机不相同;根据查询指令,将目标站点所对应的空调内机的空调运行数据发送至预设站点中。Optionally, the control method in the embodiment of the present invention further includes: receiving a query instruction sent by the preset station, where the query instruction is used to query air conditioning operation data of the air conditioner internal machine corresponding to the target site, the preset site and the target site. The corresponding air conditioner internal machine is different; according to the query instruction, the air conditioning operation data of the air conditioner internal machine corresponding to the target station is sent to the preset station.
即可以在空调内机对应的站点需要查询其它空调内机的状态数据时,可以直接通过发送查询指令至中央协调器,中央协调器可以接收站点发送的查询指令,并根据该查询指令,将目标站点所对应的空调内机的空调运行数据发送至预设站点。其中,本发明中的预设站点和目标站点的具体设置位置不做限定,也可以是第一站点的、第二站点,这些仅作为站点的说明,并不会限定站点的位置和型号。That is, when the corresponding station of the air conditioner internal machine needs to query the status data of other air conditioner internal machines, the query command can be directly sent to the central coordinator, and the central coordinator can receive the query instruction sent by the station, and according to the query instruction, the target is The air conditioning operation data of the air conditioner internal unit corresponding to the station is sent to the preset station. The specific location of the preset site and the target site in the present invention is not limited, and may also be the first site and the second site. These are only descriptions of the site, and do not limit the location and model of the site.
优选的,空调机组还包括控制设备和显示设备,每个控制设备和显示设备对应设置有站点,状态控制方法还包括:若确定出所有的空调内机所对应的站点都发送状态改变数据,将所有的空调内机的状态改变数据发送至控制设备和/或显示设备中。Preferably, the air conditioning unit further includes a control device and a display device, and each control device and the display device are correspondingly provided with a site, and the state control method further includes: if it is determined that all the sites corresponding to the air conditioner are transmitting state change data, All state change data of the air conditioner is sent to the control device and/or the display device.
其中,上述的控制设备包括下述至少之一:线控器、集中控制器,显示设备至少包括:液晶显示器。The control device includes at least one of the following: a wire controller and a centralized controller, and the display device includes at least: a liquid crystal display.
本发明实施例中还可以通过将状态改变数据发送至控制设备和/或显示设备中,从而实现将空调内机的状态改变数据及时通知到控制设备或者显示设备,并利用显示设备告知控制人员。In the embodiment of the present invention, the state change data is sent to the control device and/or the display device, so that the state change data of the air conditioner internal device is notified to the control device or the display device in time, and the control device is notified by the display device.
根据本发明实施例的另一方面,还提供了一种空调机组的中央协调器,中央协调器执行上述任意一项的空调机组的控制方法。According to another aspect of an embodiment of the present invention, there is also provided a central coordinator of an air conditioning unit, the central coordinator performing the control method of the air conditioning unit of any of the above.
可选的,空调机组包括多个空调内机和空调外机,每个空调内机设置有站点,站点记录空调内机的状态改变数据,中央协调器与多个站点通过目标信息总线进行网络通讯。Optionally, the air conditioning unit comprises a plurality of air conditioner internal units and an air conditioner external unit, each air conditioner internal machine is provided with a site, the site records the state change data of the air conditioner internal machine, and the central coordinator communicates with the plurality of stations through the target information bus. .
其中,中央协调器部署在空调机组的空调外机上。Among them, the central coordinator is deployed on the air conditioner outside the air conditioning unit.
实施例二Embodiment 2
下面以一种具体的空调机组的设置方式进行说明。The following describes the specific arrangement of the air conditioning unit.
图2是根据本发明的一种可选的空调机组的状态发送机制的示意图,如图2所示,该空调机组可以包括多个空调内机、空调外机、线控器(对应于上述的控制设备),其中,每个空调内机和线控器对应有一个站点,例如,空调内机1对应有站点1,空调内机2对应有站点2,空调内机3对应有站点4,空调内机4对应有站点5。2 is a schematic diagram of a state transmission mechanism of an optional air conditioning unit according to the present invention. As shown in FIG. 2, the air conditioning unit may include a plurality of air conditioner internal units, an air conditioner external unit, and a line controller (corresponding to the above Control device), wherein each air conditioner and the line controller correspond to one station, for example, the air conditioner internal machine 1 corresponds to the station 1, the air conditioner internal machine 2 corresponds to the station 2, and the air conditioner internal machine 3 corresponds to the station 4, and the air conditioner The internal machine 4 corresponds to the station 5.
可选的,在多联机空调系统中,中央协调器CCO部署在空调外机上,站点STA部署在空调内机上。当空调内机的状态数据发生改变时,如开机、关机、风档改变等,此时将空调内机的状态改变数据通过站点发送给中央协调器,中央协调器再将状态改变发送给空调外机以及和站点相连的线控器等控制设备和显示设备。其中,控制设备可以为线控器,如图2中所示,该线控器也对应有站点3。Optionally, in the multi-connected air conditioning system, the central coordinator CCO is deployed on the air conditioner external unit, and the station STA is deployed on the air conditioner internal machine. When the state data of the air conditioner internal machine changes, such as power on, power off, wind speed change, etc., the state change data of the air conditioner internal machine is sent to the central coordinator through the station, and the central coordinator sends the state change to the air conditioner. Control devices and display devices such as the machine and the line controller connected to the station. The control device may be a wire controller. As shown in FIG. 2, the wire controller also corresponds to the site 3.
其中,本发明实施例中的多个站点和中央协调器连接在同一总线上,通过总线进行数据传输。可选的,本发明在控制时,只有在空调机组的所有站点都发送状态改变数据,才会将所有站点的数据发送出去,若没有改变,则不发送。The multiple stations and the central coordinator in the embodiment of the present invention are connected on the same bus, and perform data transmission through the bus. Optionally, in the control, when all the stations of the air conditioning unit send the state change data, the data of all the stations will be sent out, and if there is no change, the data will not be sent.
另外,本发明实施例中的所有站点的状态数据存储在中央协调器CCO,当某个STA需要某些状态数据时,通过发送查询命令给CCO(发送查询内容),读取CCO中状态数据即可。In addition, the status data of all the stations in the embodiment of the present invention is stored in the central coordinator CCO. When a certain STA needs some status data, the CCO sends the query command to the CCO (sends the query content), and reads the status data in the CCO. can.
另外,本发明实施例中的多联机空调系统,中央协调器可以记录所有站点STA的状态数据,当某一个站点想要获取其它站点的数据时,只需要向中央协调器发送查询命令,然后中央协调器根据该查询命令将被查询的目标站点中存储的状态数据返回给查询站点,这样就不再需要被查询站点的答复,减少了站点之间的数据交互,同时减少了电力线之间的数据通讯,从而减少通讯压力。In addition, in the multi-connected air conditioning system in the embodiment of the present invention, the central coordinator can record the status data of all stations STAs. When a certain station wants to acquire data of other stations, it only needs to send a query command to the central coordinator, and then the central The coordinator returns the state data stored in the queried target site to the query site according to the query command, so that the replies of the queried site are no longer needed, the data interaction between the sites is reduced, and the data between the power lines is reduced. Communication, thereby reducing communication pressure.
可选的,本发明实施例中的空调外机需要经常查询各个空调内机的状态,通过中央协调器记录各个站点存储的空调内机的状态数据,这样空调外机就能非常方便的不通过总线地获取空调内机额状态数据,从而大大减轻了总线负担。Optionally, the air conditioner external device in the embodiment of the present invention needs to frequently check the status of each air conditioner internal machine, and record the state data of the air conditioner internal machine stored in each station through the central coordinator, so that the air conditioner external machine can be very convenient to pass. The bus ground obtains the state data of the air conditioner, which greatly reduces the bus load.
根据本发明实施例的另一方面,还提供了一种空调机组,包括上述任意一项的中央协调器。According to another aspect of an embodiment of the present invention, there is also provided an air conditioning unit comprising the central coordinator of any of the above.
上述本发明实施例序号仅仅为了描述,不代表实施例的优劣。The serial numbers of the embodiments of the present invention are merely for the description, and do not represent the advantages and disadvantages of the embodiments.
在本发明的上述实施例中,对各个实施例的描述都各有侧重,某个实施例中没有详述的部分,可以参见其他实施例的相关描述。In the above-mentioned embodiments of the present invention, the descriptions of the various embodiments are different, and the parts that are not detailed in a certain embodiment can be referred to the related descriptions of other embodiments.
在本申请所提供的几个实施例中,应该理解到,所揭露的技术内容,可通过其它的方式实现。其中,以上所描述的装置实施例仅仅是示意性的,例如所述单元的划分,可以为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通信连接可以是通过一些接口,单元或模块的间接耦合或通信连接,可以是电性或其它的形式。In the several embodiments provided by the present application, it should be understood that the disclosed technical contents may be implemented in other manners. The device embodiments described above are only schematic. For example, the division of the unit may be a logical function division. In actual implementation, there may be another division manner, for example, multiple units or components may be combined or may be Integrate into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, unit or module, and may be electrical or otherwise.
所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。The units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
另外,在本发明各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above description is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can also make several improvements and retouchings without departing from the principles of the present invention. It should be considered as the scope of protection of the present invention.
本申请实施例提供的方案可以用于将所有的空调内机的状态改变数据发送至空调外机中,在本申请实施例提供的技术方案中,在所有的空调内机的状态数据都发生改变后,才会将状态改变数据发送至空调外机中,而不是原来的单独一条条的发送状态数据,这样可以减少通讯线路上数据发送的数量,进而解决由于通讯线路上同时发送多条数据,导致总线上传输量增大,造成通讯拥堵的技术问题。The solution provided by the embodiment of the present application can be used to send the state change data of all the air conditioners to the air conditioner. In the technical solution provided by the embodiment of the present application, the state data of all the air conditioners are changed. After that, the state change data is sent to the air conditioner outside, instead of the transmission status data of the original single strip, so that the number of data transmissions on the communication line can be reduced, thereby solving the problem that multiple data are simultaneously transmitted on the communication line. This causes technical problems that increase the amount of transmission on the bus and cause communication congestion.
Claims (10)
- 一种空调机组的控制方法,所述空调机组包括多个空调内机和空调外机,每个所述空调内机设置有站点,所述控制方法包括:A control method for an air conditioning unit, the air conditioning unit includes a plurality of air conditioner internal units and an air conditioner external unit, each of the air conditioner internal units is provided with a station, and the control method includes:接收多个站点发送的状态改变数据,其中,所述状态改变数据是指在所述空调内机的运行状态发生改变时记录的状态数据;Receiving state change data transmitted by a plurality of stations, wherein the state change data refers to state data recorded when a running state of the air conditioner internal machine changes;若确定出所有的空调内机所对应的站点都发送所述状态改变数据,则将所述所有的空调内机的状态改变数据发送至所述空调外机中。If it is determined that all the stations corresponding to the air conditioners are transmitting the state change data, the state change data of all the air conditioners are transmitted to the air conditioners.
- 根据权利要求1所述的控制方法,其中,还包括:The control method according to claim 1, further comprising:接收预设站点发送的查询指令,其中,所述查询指令用于查询目标站点所对应的空调内机的空调运行数据,所述预设站点和所述目标站点所对应的空调内机不相同;Receiving a query instruction sent by the preset station, where the query instruction is used to query air conditioning operation data of the air conditioner internal machine corresponding to the target station, and the preset station and the air conditioner internal machine corresponding to the target station are different;根据所述查询指令,将所述目标站点所对应的空调内机的空调运行数据发送至所述预设站点中。And sending, according to the query instruction, air conditioning operation data of the air conditioner internal unit corresponding to the target station to the preset station.
- 根据权利要求1所述的控制方法,其中,所述空调机组还包括控制设备和显示设备,每个所述控制设备和所述显示设备对应设置有站点,所述状态控制方法还包括:The control method according to claim 1, wherein the air conditioning unit further comprises a control device and a display device, each of the control device and the display device being correspondingly provided with a site, the state control method further comprising:若确定出所有的空调内机所对应的站点都发送所述状态改变数据,将所述所有的空调内机的状态改变数据发送至所述控制设备和/或所述显示设备中。If it is determined that all the stations corresponding to the air conditioners transmit the state change data, the state change data of all the air conditioners are sent to the control device and/or the display device.
- 根据权利要求3所述的控制方法,其中,所述控制设备包括下述至少之一:线控器、集中控制器,所述显示设备至少包括:液晶显示器。The control method according to claim 3, wherein the control device comprises at least one of a wire controller and a centralized controller, the display device comprising at least: a liquid crystal display.
- 根据权利要求1至4中任意一项所述的控制方法,其中,所述状态改变数据包括下述至少之一:开机数据、关机数据、风档改变数据。The control method according to any one of claims 1 to 4, wherein the state change data includes at least one of: boot data, shutdown data, windshield change data.
- 根据权利要求1所述的控制方法,其中,所述空调机组采用电力线载波通讯PLC通讯网络进行通讯信号的传输。The control method according to claim 1, wherein the air conditioning unit uses a power line carrier communication PLC communication network to transmit communication signals.
- 一种空调机组的中央协调器,所述中央协调器执行权利要求1至6中任意一项所述的空调机组的控制方法。A central coordinator of an air conditioning unit, the central coordinator performing the control method of the air conditioning unit according to any one of claims 1 to 6.
- 根据权利要求7所述的中央协调器,其中,所述空调机组包括多个空调内机和空调外机,每个所述空调内机设置有站点,所述站点记录所述空调内机的状态改变 数据,所述中央协调器与多个所述站点通过目标信息总线进行网络通讯。The central coordinator according to claim 7, wherein said air conditioning unit comprises a plurality of air conditioner internal units and an air conditioner external unit, each of said air conditioner internal units being provided with a station, said station recording said air conditioner internal unit status The data is changed, and the central coordinator communicates with a plurality of the stations via a target information bus.
- 根据权利要求7所述的中央协调器,其中,所述中央协调器部署在空调机组的空调外机上。The central coordinator of claim 7 wherein said central coordinator is deployed on an air conditioning unit of an air conditioning unit.
- 一种空调机组,包括权利要求7至9中任意一项所述的中央协调器。An air conditioning unit comprising the central coordinator of any one of claims 7 to 9.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810333831.9 | 2018-04-13 | ||
CN201810333831.9A CN108800455B (en) | 2018-04-13 | 2018-04-13 | Air conditioning unit, control method of air conditioning unit and central coordinator |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019196468A1 true WO2019196468A1 (en) | 2019-10-17 |
Family
ID=64094240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2018/120657 WO2019196468A1 (en) | 2018-04-13 | 2018-12-12 | Air conditioning unit, air conditioning unit control method, and central coordinator |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN108800455B (en) |
WO (1) | WO2019196468A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111813015A (en) * | 2020-06-15 | 2020-10-23 | 深圳市金凯博自动化测试有限公司 | Analog communication module for internal and external units of household air conditioner |
WO2023037249A1 (en) | 2021-09-08 | 2023-03-16 | Pi Industries Ltd. | Sulfoximines/ sulfilimine containing aromatic caboxamide compounds and their use therof |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108800455B (en) * | 2018-04-13 | 2023-06-06 | 珠海格力电器股份有限公司 | Air conditioning unit, control method of air conditioning unit and central coordinator |
CN110160204B (en) * | 2019-06-11 | 2022-03-01 | 青岛海信日立空调系统有限公司 | Multi-split air conditioning system control method and multi-split air conditioning system |
CN213687018U (en) * | 2020-12-09 | 2021-07-13 | 广东美的暖通设备有限公司 | Air conditioning system |
CN113203190B (en) * | 2021-04-30 | 2022-05-27 | 佛山市顺德区美的电子科技有限公司 | Pairing method and device of air conditioner based on power line communication and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1763450A (en) * | 2005-09-15 | 2006-04-26 | 珠海格力电器股份有限公司 | Multi-split air conditioning unit and network communication method thereof |
CN103175284A (en) * | 2013-03-26 | 2013-06-26 | 青岛海尔空调电子有限公司 | Communication device and method of controller of multi-couple unit air conditioning unit capable of achieving simultaneous cooling and heating |
US8638189B2 (en) * | 2010-03-08 | 2014-01-28 | Lg Electronics Inc. | Air conditioner system and method for controlling the same |
CN106210170A (en) * | 2016-07-18 | 2016-12-07 | 珠海格力电器股份有限公司 | Device and method for determining address of indoor unit of multi-connected air conditioning unit network |
CN107062524A (en) * | 2017-02-27 | 2017-08-18 | 青岛海信日立空调系统有限公司 | A kind of indoor apparatus of air conditioner addressing method and air-conditioner controller, indoor apparatus of air conditioner |
CN108800455A (en) * | 2018-04-13 | 2018-11-13 | 珠海格力电器股份有限公司 | Air conditioning unit, control method of air conditioning unit and central coordinator |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201637523U (en) * | 2010-04-09 | 2010-11-17 | 西安中星测控有限公司 | Wireless pressure measuring system |
CN103036754B (en) * | 2012-11-22 | 2015-11-04 | 青岛海尔空调电子有限公司 | A kind of multi-gang air-conditioner communication system and communication means |
US9410712B2 (en) * | 2014-10-08 | 2016-08-09 | Google Inc. | Data management profile for a fabric network |
CN105681147B (en) * | 2016-01-12 | 2019-04-30 | 广东美的暖通设备有限公司 | Air-conditioning system and its communication means |
CN106453019A (en) * | 2016-09-12 | 2017-02-22 | 青岛海尔空调电子有限公司 | Communication method of multiple online internal and external machines |
CN107270484A (en) * | 2017-06-26 | 2017-10-20 | 珠海格力电器股份有限公司 | Air conditioning system and data query response method and device thereof |
CN107420998A (en) * | 2017-09-20 | 2017-12-01 | 合肥美的暖通设备有限公司 | A kind of air-conditioner system and its control method |
-
2018
- 2018-04-13 CN CN201810333831.9A patent/CN108800455B/en active Active
- 2018-12-12 WO PCT/CN2018/120657 patent/WO2019196468A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1763450A (en) * | 2005-09-15 | 2006-04-26 | 珠海格力电器股份有限公司 | Multi-split air conditioning unit and network communication method thereof |
US8638189B2 (en) * | 2010-03-08 | 2014-01-28 | Lg Electronics Inc. | Air conditioner system and method for controlling the same |
CN103175284A (en) * | 2013-03-26 | 2013-06-26 | 青岛海尔空调电子有限公司 | Communication device and method of controller of multi-couple unit air conditioning unit capable of achieving simultaneous cooling and heating |
CN106210170A (en) * | 2016-07-18 | 2016-12-07 | 珠海格力电器股份有限公司 | Device and method for determining address of indoor unit of multi-connected air conditioning unit network |
CN107062524A (en) * | 2017-02-27 | 2017-08-18 | 青岛海信日立空调系统有限公司 | A kind of indoor apparatus of air conditioner addressing method and air-conditioner controller, indoor apparatus of air conditioner |
CN108800455A (en) * | 2018-04-13 | 2018-11-13 | 珠海格力电器股份有限公司 | Air conditioning unit, control method of air conditioning unit and central coordinator |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111813015A (en) * | 2020-06-15 | 2020-10-23 | 深圳市金凯博自动化测试有限公司 | Analog communication module for internal and external units of household air conditioner |
WO2023037249A1 (en) | 2021-09-08 | 2023-03-16 | Pi Industries Ltd. | Sulfoximines/ sulfilimine containing aromatic caboxamide compounds and their use therof |
Also Published As
Publication number | Publication date |
---|---|
CN108800455B (en) | 2023-06-06 |
CN108800455A (en) | 2018-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019196468A1 (en) | Air conditioning unit, air conditioning unit control method, and central coordinator | |
WO2019196462A1 (en) | Air conditioning unit, operating method and device for air conditioning unit | |
CN103398450B (en) | Support the system and method for multi-mobile-terminal Long-distance Control central air-conditioning | |
CN100397004C (en) | Internet refrigerator with internet board and its operation method | |
US7032018B2 (en) | Home appliance networking system and method for controlling the same | |
CN103438548B (en) | Based on the system and method for the Long-distance Control central air-conditioning of mobile terminal | |
US11619415B2 (en) | Intelligent plug for controlling an air conditioner system over a PLC network | |
CN104566865B (en) | Multi-split air conditioner and control method thereof | |
WO2019196472A1 (en) | Data transmission method and device, and data converter | |
CN104676822A (en) | Method and device for controlling multi-split air-conditioning system | |
EP3764007B1 (en) | Networking method and device for air conditioner, and terminal | |
CN111901162A (en) | Internet of things equipment, network distribution method thereof and internet of things system | |
CN101835008A (en) | LED panel television display equipment communication control system | |
WO2020073614A1 (en) | Communication method and device for air conditioner, outdoor unit, indoor unit, and air conditioner | |
CN203413775U (en) | Centralized controller and centralized control system of multi-union central air conditioner | |
CN109520080A (en) | Air conditioner and its double-core control method and computer readable storage medium | |
CN112965463A (en) | Remote diagnosis system and remote diagnosis method | |
US20080270512A1 (en) | Virtual network projection system supporting multiple projection sources and method thereof | |
CN203413771U (en) | Remote control system of central air conditioner and wireless integrated controller of remote control system | |
JPH0865759A (en) | Building managing device | |
JP3855618B2 (en) | Distributed building management system | |
CN103763333A (en) | Bridge connection communication module and method | |
CN114285913B (en) | Cross-operating system data transmission method | |
US20090080392A1 (en) | Communication terminal device and communication transmission method | |
JP4592718B2 (en) | Network identification ID setting method, communication network system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18914539 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18914539 Country of ref document: EP Kind code of ref document: A1 |