WO2019195986A1 PCT/CN2018/082402 CN2018082402W WO2019195986A1 WO 2019195986 A1 WO2019195986 A1 WO 2019195986A1 CN 2018082402 W CN2018082402 W CN 2018082402W WO 2019195986 A1 WO2019195986 A1 WO 2019195986A1
Authority
WO
WIPO (PCT)
Prior art keywords
preheating
hot water
water tank
working chamber
pipe
Prior art date
Application number
PCT/CN2018/082402
Other languages
French (fr)
Chinese (zh)
Inventor
龚金凤
Original Assignee
龚金凤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 龚金凤 filed Critical 龚金凤
Priority to PCT/CN2018/082402 priority Critical patent/WO2019195986A1/en
Publication of WO2019195986A1 publication Critical patent/WO2019195986A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/44Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with combinations of two or more of the types covered by groups F24H1/24 - F24H1/40 , e.g. boilers having a combination of features covered by F24H1/24 - F24H1/40
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means

Definitions

  • the utility model relates to the technical field of a hot water boiler, in particular to a hierarchical preheating energy-saving and environment-friendly hot water boiler.
  • the boiler is an energy conversion device.
  • the energy input to the boiler is chemical energy and electric energy in the fuel.
  • the boiler outputs steam with a certain heat energy, high temperature water or organic heat carrier.
  • the hot water or steam generated in the boiler can directly supply the required heat energy for industrial production and people's life. It can also be converted into mechanical energy by steam power plant, or converted into electrical energy by a generator.
  • the heating device that supplies hot water is called a hot water boiler, and is mainly used for living, and there are also a small number of applications in industrial production.
  • the high temperature of the combustion in the furnace directly discharges the high-temperature smoke into the atmosphere, and some of the fuel is directly burned into the atmosphere, causing excessive discharge of the pollutants, serious air pollution, and high heat of the high-temperature smoke. It is easy to cause thermal pollution in the air.
  • the purpose of the utility model is to provide a step-by-step preheating energy-saving and environment-friendly hot water boiler to solve the problems raised in the above background art.
  • the present invention provides the following technical solutions:
  • a grading preheating energy-saving and environment-friendly hot water boiler comprises a furnace body, wherein a first working chamber and a second working chamber are arranged in the furnace body, and the first working chamber is connected to the lower side of the second working chamber through the communication hole, the first work
  • the grate is arranged in the cavity, and the grate is uniformly provided with a plurality of slag holes, and the grate partitions the first working chamber into a combustion chamber and a slag chamber, the slag chamber is disposed below the combustion chamber, and a sidewall of the slag chamber is disposed
  • the bottom end of one side wall of the hot water tank is connected to the drain pipe, and the top end of the exhaust gas passage is connected through the connection hole.
  • a sidewall of the combustion chamber is provided with a packing hole, and a sealing cover is arranged on the filling hole; a top end of the second working chamber is connected through the exhaust pipe, and an inner wall of the exhaust pipe is provided with a preheating pipe, and the water inlet end of the preheating pipe is connected to the water supply a preheating water tank is arranged at the bottom of the second working chamber.
  • the structure of the preheating water tank is the same as that of the hot water tank.
  • the inner hole of the preheating water tank is connected with the exhaust pipe, and the side wall of the second working chamber is provided with fuel injection.
  • the nozzle is fixed on the left side wall of the working chamber, spray The nozzle is connected to the oil supply pipe, the air nozzle is fixed on the right side wall of the working chamber, and the air nozzle is connected to the air supply pipe.
  • the water outlet end of the preheating pipe is connected through the first connecting pipe to the top end of the preheating hot water tank, and the heat is preheated.
  • the bottom end of one side wall of the water tank is connected to the top end of the hot water tank through the second connecting pipe.
  • a third control valve is disposed on the drain pipe.
  • the exhaust passage is a structural design with a small top end and a large bottom end.
  • the preheating tube is a spiral structure design.
  • the first connecting pipe is provided with a first control valve.
  • the second connecting pipe is provided with a second control valve.
  • the hot water tank, the preheating hot water tank and the preheating tube provided by the utility model are spatially distributed in layers, which can fully utilize the heat of fuel combustion, thereby maximizing heat utilization and saving a large amount of Energy, and can burn some harmful gases and reduce pollution.
  • FIG. 1 is a schematic structural view of a hierarchical preheating energy-saving and environment-friendly hot water boiler according to the present invention
  • FIG. 2 is a schematic structural view of a top view of a hierarchical preheating energy-saving and environment-friendly hot water boiler according to the present invention.
  • a hierarchical preheating energy-saving and environmentally-friendly hot water boiler includes a furnace body 1 in which a first working chamber 2 and a second working chamber 3 are disposed, the first working chamber 2 is connected to the lower side of the second working chamber 3 through the communication hole 12, and the first working chamber 2 is provided with a grate 5, wherein the grate 5 is uniformly provided with a plurality of slag holes 6 and the grate 5 is first
  • the working chamber 2 is divided into a combustion chamber 7 and a slag chamber 8, the slag chamber 8 is disposed below the combustion chamber 7, and a side wall of the slag chamber 8 is provided with a slag discharge hole 9, and a top wall of the combustion chamber 7 is provided a hot water tank 10, wherein the hot water tank 10 is provided with a smoke exhausting passage 11, a bottom end of a side wall of the hot water tank 10 is connected to the drain pipe 26, and the drain pipe 26 is provided with a third control valve,
  • the exhaust passage 11 has a structural design with a
  • the top end of the exhaust passage 11 is connected to the communication hole 12, and a side wall of the combustion chamber 7 is provided with a filler hole 13 on which the filler hole 13 is provided. a sealing cover 14; a top end of the second working chamber 3 is connected to the exhaust pipe 4, and an inner wall of the exhaust pipe 4 is provided with a preheating pipe 20, and the preheating pipe 20 is a spiral structure design, and the preheating pipe 20
  • the water inlet end is connected to the water supply pipe 21, and the bottom of the second working chamber 3 is provided with a preheating water tank 19, the structure of the preheating water tank 19 is the same as that of the hot water tank 10, and the inner hole of the preheating water tank 19
  • the side wall of the second working chamber 3 is provided with a fuel injector 15 and an air nozzle 17, the fuel nozzle 15 is fixed to the left side wall of the working chamber 3, and the fuel injector 15 is connected through
  • the oil supply pipe 16 is fixed to the right side wall of the working chamber 3, and the air nozzle 17 is
  • the water outlet end of the preheating pipe 20 is connected through the first connecting pipe 22 to preheat heat.
  • a first control valve 23 is disposed on the top end of the water tank 19.
  • the bottom end of one side wall of the preheating hot water tank 19 is connected to the top end of the hot water tank 10 through the second connecting pipe 24.
  • the second connecting pipe 24 is provided with a second control valve 25.
  • the fuel is burned into the combustion chamber 7 through the filler hole 13, and the water in the hot water tank 10 can be heated, and the fuel gas and the partially combustible polluting gas which are not completely burned enter the second chamber 3, Mixing with the oil mist, performing secondary combustion, and heating the preheating hot water tank 19, the heated water is hydrating the hot water tank 10, so that the water in the hot water tank can be quickly heated to meet the required temperature, and the temperature is lowered. Energy consumption, completely and then the gas is discharged through the exhaust pipe 4, the high temperature gas heats the water in the preheating pipe 20, and the water in the preheating pipe 20 enters the preheating hot water tank 19 for secondary preheating, and the fuel is used in the ladder.
  • the heat generated by combustion maximizes heat utilization, saves a lot of energy, and can burn some harmful gases and reduce pollution.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

Provided is a graded-preheating energy-saving and environment-protective hot-water boiler. The boiler comprises a boiler body (1), wherein a first working chamber (2) and a second working chamber (3) are provided in the boiler body (1); a fire grate (5) is provided in the first working chamber (2); the first working chamber (2) is divided into a combustion room (7) and a slag room (8) by the fire grate (5); a top wall of the combustion room (7) is provided with a hot water tank (10); a smoke exhaust pore channel (11) is arranged in the hot water tank (10); one side wall of the combustion room (7) is provided with a filling hole (13); a smoke exhaust chimney (4) is in through-connection to the top of the second working chamber (3); preheating pipes (20) are provided in an inner wall of the smoke exhaust chimney (4); side walls of the second working chamber (3) are provided with an oil nozzle (15) and a gas nozzle (17); a water outlet end of each of the preheating pipes (20) is in through-connection to the top of a preheating hot water tank (19) by a first connecting pipe (22); and the bottom of one side wall of the preheating hot water tank (19) is in through-connection to the top of the hot water tank (10) by a second connecting pipe (24). The hot water tank (10), preheating hot water tank (19) and preheating pipe (20) which are provided are distributed in a spatially hierarchical manner, so that energy generated from fuel combustion can be used fully, the utilization rate of heat is maximized, a lot of energy sources are saved on, part of harmful gases can be combusted, and contamination can be reduced.

Description

一种分级预热节能环保型热水锅炉Graded preheating energy-saving and environment-friendly hot water boiler 技术领域Technical field
本实用新型涉及热水锅炉技术领域,具体为一种分级预热节能环保型热水锅炉。The utility model relates to the technical field of a hot water boiler, in particular to a hierarchical preheating energy-saving and environment-friendly hot water boiler.
背景技术Background technique
锅炉是一种能量转换设备,向锅炉输入的能量有燃料中的化学能、电能,锅炉输出具有一定热能的蒸汽、高温水或有机热载体。锅炉中产生的热水或蒸汽可直接为工业生产和人民生活提供所需热能,也可通过蒸汽动力装置转换为机械能,或再通过发电机将机械能转换为电能。The boiler is an energy conversion device. The energy input to the boiler is chemical energy and electric energy in the fuel. The boiler outputs steam with a certain heat energy, high temperature water or organic heat carrier. The hot water or steam generated in the boiler can directly supply the required heat energy for industrial production and people's life. It can also be converted into mechanical energy by steam power plant, or converted into electrical energy by a generator.
提供热水的加热装置称为热水锅炉,主要用于生活,工业生产中也有少量应用。炉膛内燃烧的高温经冲天管直接将高温烟气排入大气,部分燃料位充分燃烧就直接排放入大气内,造成排放物质超标,大气污染严重,且高温烟气的热量很高,直接排放到空气中容易造成热污染。The heating device that supplies hot water is called a hot water boiler, and is mainly used for living, and there are also a small number of applications in industrial production. The high temperature of the combustion in the furnace directly discharges the high-temperature smoke into the atmosphere, and some of the fuel is directly burned into the atmosphere, causing excessive discharge of the pollutants, serious air pollution, and high heat of the high-temperature smoke. It is easy to cause thermal pollution in the air.
实用新型内容Utility model content
本实用新型的目的在于提供一种分级预热节能环保型热水锅炉,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide a step-by-step preheating energy-saving and environment-friendly hot water boiler to solve the problems raised in the above background art.
为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种分级预热节能环保型热水锅炉,包括炉体,炉体内设有第一工作腔和第二工作腔,第一工作腔通过连通孔贯通连接在第二工作腔的下方,第一工作腔内设有炉排,炉排上均匀的设有若干排渣孔,炉排把第一工作腔分隔成燃烧室和炉渣室,炉渣室设在燃烧室的下方,炉渣室的一侧壁设有排渣孔,燃烧室的顶壁设有热水箱,热水箱内设有排烟孔道,热水箱的一侧壁底端贯通连接排水管,排烟孔道的顶端贯通连接连通孔,燃烧室的一侧壁设有填料孔,填料孔上设有密封盖;第二工作腔的顶端贯通连接排烟筒,排烟筒的内壁设有预热管,预热管的进水端贯通连接供水管,第二工作腔的底部设有预热水箱,预热水箱的结构与热水箱的结构相同,预热水箱的内孔与排烟筒贯通连接,第二工作腔的侧壁设有喷油嘴和喷气嘴,喷油嘴固定在工作腔的左侧壁,喷油嘴贯通连接供油管,喷气嘴固定在工 作腔的右侧壁,喷气嘴贯通连接供气管,预热管的出水端通过第一连接管贯通连接在预热热水箱的顶端,预热热水箱的一侧壁底端通过第二连接管贯通连接热水箱的顶端。A grading preheating energy-saving and environment-friendly hot water boiler comprises a furnace body, wherein a first working chamber and a second working chamber are arranged in the furnace body, and the first working chamber is connected to the lower side of the second working chamber through the communication hole, the first work The grate is arranged in the cavity, and the grate is uniformly provided with a plurality of slag holes, and the grate partitions the first working chamber into a combustion chamber and a slag chamber, the slag chamber is disposed below the combustion chamber, and a sidewall of the slag chamber is disposed There is a slag discharge hole, a hot water tank is arranged on the top wall of the combustion chamber, and a exhaust pipe is arranged in the hot water tank. The bottom end of one side wall of the hot water tank is connected to the drain pipe, and the top end of the exhaust gas passage is connected through the connection hole. A sidewall of the combustion chamber is provided with a packing hole, and a sealing cover is arranged on the filling hole; a top end of the second working chamber is connected through the exhaust pipe, and an inner wall of the exhaust pipe is provided with a preheating pipe, and the water inlet end of the preheating pipe is connected to the water supply a preheating water tank is arranged at the bottom of the second working chamber. The structure of the preheating water tank is the same as that of the hot water tank. The inner hole of the preheating water tank is connected with the exhaust pipe, and the side wall of the second working chamber is provided with fuel injection. Mouth and air nozzle, the nozzle is fixed on the left side wall of the working chamber, spray The nozzle is connected to the oil supply pipe, the air nozzle is fixed on the right side wall of the working chamber, and the air nozzle is connected to the air supply pipe. The water outlet end of the preheating pipe is connected through the first connecting pipe to the top end of the preheating hot water tank, and the heat is preheated. The bottom end of one side wall of the water tank is connected to the top end of the hot water tank through the second connecting pipe.
作为本实用新型更进一步的技术方案,排水管上设有第三控制阀。As a further technical solution of the present invention, a third control valve is disposed on the drain pipe.
作为本实用新型更进一步的技术方案,排烟孔道是顶端小且底端大的结构设计。As a further technical solution of the present invention, the exhaust passage is a structural design with a small top end and a large bottom end.
作为本实用新型更进一步的技术方案,预热管是螺旋型结构设计。As a further technical solution of the present invention, the preheating tube is a spiral structure design.
作为本实用新型更进一步的技术方案,第一连接管上设有第一控制阀。As a further technical solution of the present invention, the first connecting pipe is provided with a first control valve.
作为本实用新型更进一步的技术方案,第二连接管上设有第二控制阀。As a further technical solution of the present invention, the second connecting pipe is provided with a second control valve.
与现有技术相比,本实用新型设置的热水箱、预热热水箱和预热管在空间上分层次分布,能充分利用燃料燃烧的热量,使得热利用达到最大化,节省大量的能源,且能燃烧掉部分有害气体,降低污染。Compared with the prior art, the hot water tank, the preheating hot water tank and the preheating tube provided by the utility model are spatially distributed in layers, which can fully utilize the heat of fuel combustion, thereby maximizing heat utilization and saving a large amount of Energy, and can burn some harmful gases and reduce pollution.
附图说明DRAWINGS
图1为本实用新型一种分级预热节能环保型热水锅炉的结构示意图;1 is a schematic structural view of a hierarchical preheating energy-saving and environment-friendly hot water boiler according to the present invention;
图2为本实用新型一种分级预热节能环保型热水锅炉的俯视图的结构示意图。2 is a schematic structural view of a top view of a hierarchical preheating energy-saving and environment-friendly hot water boiler according to the present invention.
图中:1-炉体,2-第一工作腔,3-第二工作腔,4-排烟筒,5-炉排,6-排渣孔,7-燃烧室,8-炉渣室,9-排渣孔,10-热水箱,11-排烟孔道,12-连通孔,13-填料孔,14-密封盖,15-喷油嘴,16-供油管,17-喷气嘴,18-供气管,19-预热热水箱,20-预热管,21-供水管,22-第一连接管,23-第一控制阀,24-第二连接管,25-第二控制阀,26-排水管。In the picture: 1-furnace body, 2-first working chamber, 3-second working chamber, 4-exhaust chimney, 5-furnace, 6-slag hole, 7-combustion chamber, 8-slag chamber, 9- Slag discharge hole, 10-hot water tank, 11-exhaust smoke tunnel, 12-compass hole, 13-filler hole, 14-seal cover, 15-injector, 16-supply pipe, 17-air nozzle, 18- Air supply pipe, 19-preheating hot water tank, 20-preheating pipe, 21-water supply pipe, 22-first connecting pipe, 23-first control valve, 24-second connecting pipe, 25-second control valve, 26-Drainage pipe.
具体实施方式detailed description
下面结合具体实施方式对本专利的技术方案作进一步详细地说明。The technical solutions of the present patent are further described in detail below in conjunction with specific embodiments.
请参阅图1~2,一种分级预热节能环保型热水锅炉,包括炉体1,所述炉体1内设有第一工作腔2和第二工作腔3,所述第一工作腔2通过连通孔12贯通连接在第二工作腔3的下方,第一工作腔2内设有炉排5,所述炉排5上均匀的设有若干排渣孔6,炉排5把第一工作腔2分隔成燃烧室7和炉渣室8,所述炉渣室8设在燃烧室7的下方,炉渣室8的一侧壁设有排渣孔9,所述燃烧室7的顶壁设有热水箱10,所述热水箱10内设有排烟孔道11,热水箱10的一侧壁底端贯通连接排水管26,所述排水管26上设有第三控制阀, 所述排烟孔道11是顶端小且底端大的结构设计,排烟孔道11的顶端贯通连接连通孔12,所述燃烧室7的一侧壁设有填料孔13,所述填料孔13上设有密封盖14;所述第二工作腔3的顶端贯通连接排烟筒4,所述排烟筒4的内壁设有预热管20,所述预热管20是螺旋型结构设计,预热管20的进水端贯通连接供水管21,所述第二工作腔3的底部设有预热水箱19,所述预热水箱19的结构与热水箱10的结构相同,预热水箱19的内孔与排烟筒4贯通连接,所述第二工作腔3的侧壁设有喷油嘴15和喷气嘴17,所述喷油嘴15固定在工作腔3的左侧壁,喷油嘴15贯通连接供油管16,所述喷气嘴17固定在工作腔3的右侧壁,喷气嘴17贯通连接供气管18,所述预热管20的出水端通过第一连接管22贯通连接在预热热水箱19的顶端,所述第一连接管22上设有第一控制阀23,所述预热热水箱19的一侧壁底端通过第二连接管24贯通连接热水箱10的顶端,所述第二连接管24上设有第二控制阀25。1 to 2, a hierarchical preheating energy-saving and environmentally-friendly hot water boiler includes a furnace body 1 in which a first working chamber 2 and a second working chamber 3 are disposed, the first working chamber 2 is connected to the lower side of the second working chamber 3 through the communication hole 12, and the first working chamber 2 is provided with a grate 5, wherein the grate 5 is uniformly provided with a plurality of slag holes 6 and the grate 5 is first The working chamber 2 is divided into a combustion chamber 7 and a slag chamber 8, the slag chamber 8 is disposed below the combustion chamber 7, and a side wall of the slag chamber 8 is provided with a slag discharge hole 9, and a top wall of the combustion chamber 7 is provided a hot water tank 10, wherein the hot water tank 10 is provided with a smoke exhausting passage 11, a bottom end of a side wall of the hot water tank 10 is connected to the drain pipe 26, and the drain pipe 26 is provided with a third control valve, The exhaust passage 11 has a structural design with a small top end and a large bottom end. The top end of the exhaust passage 11 is connected to the communication hole 12, and a side wall of the combustion chamber 7 is provided with a filler hole 13 on which the filler hole 13 is provided. a sealing cover 14; a top end of the second working chamber 3 is connected to the exhaust pipe 4, and an inner wall of the exhaust pipe 4 is provided with a preheating pipe 20, and the preheating pipe 20 is a spiral structure design, and the preheating pipe 20 The water inlet end is connected to the water supply pipe 21, and the bottom of the second working chamber 3 is provided with a preheating water tank 19, the structure of the preheating water tank 19 is the same as that of the hot water tank 10, and the inner hole of the preheating water tank 19 Connected to the exhaust pipe 4, the side wall of the second working chamber 3 is provided with a fuel injector 15 and an air nozzle 17, the fuel nozzle 15 is fixed to the left side wall of the working chamber 3, and the fuel injector 15 is connected through The oil supply pipe 16 is fixed to the right side wall of the working chamber 3, and the air nozzle 17 is connected to the air supply pipe 18. The water outlet end of the preheating pipe 20 is connected through the first connecting pipe 22 to preheat heat. a first control valve 23 is disposed on the top end of the water tank 19. The bottom end of one side wall of the preheating hot water tank 19 is connected to the top end of the hot water tank 10 through the second connecting pipe 24. The second connecting pipe 24 is provided with a second control valve 25.
本实用新型使用时,燃料通过填料孔13加入燃烧室7内燃烧,对热水箱10内的水可进行加热,未完全燃烧的燃料气体和部分可燃性污染气体进入第二腔室3内,与油雾混合,进行二次燃烧,并对预热热水箱19进行加热,加热后的水为热水箱10进行补水,使得热水箱中的水能快速加热到满足要求的温度,降低能量消耗,完全然后的气体通过排烟筒4排出,高温气体对预热管20内的水进行加热,预热管20中的水进入预热热水箱19内进行二次预热,梯次利用燃料燃烧产生的热量,使得热利用达到最大化,节省大量的能源,且能燃烧掉部分有害气体,降低污染。When the utility model is used, the fuel is burned into the combustion chamber 7 through the filler hole 13, and the water in the hot water tank 10 can be heated, and the fuel gas and the partially combustible polluting gas which are not completely burned enter the second chamber 3, Mixing with the oil mist, performing secondary combustion, and heating the preheating hot water tank 19, the heated water is hydrating the hot water tank 10, so that the water in the hot water tank can be quickly heated to meet the required temperature, and the temperature is lowered. Energy consumption, completely and then the gas is discharged through the exhaust pipe 4, the high temperature gas heats the water in the preheating pipe 20, and the water in the preheating pipe 20 enters the preheating hot water tank 19 for secondary preheating, and the fuel is used in the ladder. The heat generated by combustion maximizes heat utilization, saves a lot of energy, and can burn some harmful gases and reduce pollution.
上面对本专利的较佳实施方式作了详细说明,但是本专利并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本专利宗旨的前提下作出各种变化。The preferred embodiments of the present invention have been described in detail above, but the present patent is not limited to the above embodiments, and various modifications may be made without departing from the scope of the patents of the present invention. Kind of change.

Claims (6)

  1. 一种分级预热节能环保型热水锅炉,其特征在于,包括炉体,炉体内设有第一工作腔和第二工作腔,第一工作腔通过连通孔贯通连接在第二工作腔的下方,第一工作腔内设有炉排,炉排上均匀的设有若干排渣孔,炉排把第一工作腔分隔成燃烧室和炉渣室,炉渣室设在燃烧室的下方,炉渣室的一侧壁设有排渣孔,燃烧室的顶壁设有热水箱,热水箱内设有排烟孔道,热水箱的一侧壁底端贯通连接排水管,排烟孔道的顶端贯通连接连通孔,燃烧室的一侧壁设有填料孔,填料孔上设有密封盖;第二工作腔的顶端贯通连接排烟筒,排烟筒的内壁设有预热管,预热管的进水端贯通连接供水管,第二工作腔的底部设有预热水箱,预热水箱的结构与热水箱的结构相同,预热水箱的内孔与排烟筒贯通连接,第二工作腔的侧壁设有喷油嘴和喷气嘴,喷油嘴固定在工作腔的左侧壁,喷油嘴贯通连接供油管,喷气嘴固定在工作腔的右侧壁,喷气嘴贯通连接供气管,预热管的出水端通过第一连接管贯通连接在预热热水箱的顶端,预热热水箱的一侧壁底端通过第二连接管贯通连接热水箱的顶端。A grading preheating energy-saving and environment-friendly hot water boiler is characterized in that the utility model comprises a furnace body, wherein the furnace body is provided with a first working chamber and a second working chamber, and the first working chamber is connected through the communication hole to be connected below the second working chamber a grate is arranged in the first working chamber, and a plurality of slag holes are uniformly arranged on the grate, and the grate separates the first working chamber into a combustion chamber and a slag chamber, and the slag chamber is disposed below the combustion chamber, and the slag chamber is A sidewall is provided with a slag discharge hole, a hot water tank is arranged on the top wall of the combustion chamber, and a smoke exhausting passage is arranged in the hot water tank, and a bottom end of one side wall of the hot water tank is connected to the drain pipe, and the top end of the exhaust gas passage is penetrated A connecting hole is connected, a side wall of the combustion chamber is provided with a packing hole, and a sealing cover is arranged on the filling hole; a top end of the second working chamber is connected through the exhaust pipe, and an inner wall of the exhaust pipe is provided with a preheating pipe, and the water of the preheating pipe is The end of the second working chamber is provided with a preheating water tank. The structure of the preheating water tank is the same as that of the hot water tank. The inner hole of the preheating water tank is connected with the exhaust pipe, and the side wall of the second working chamber With injector and air nozzle, the injector is fixed in the working chamber The left side wall, the fuel nozzle is connected to the oil supply pipe, the air nozzle is fixed on the right side wall of the working cavity, the air nozzle is connected to the air supply pipe, and the water outlet end of the preheating pipe is connected through the first connecting pipe to the preheating hot water tank. At the top end, the bottom end of one side wall of the preheating hot water tank is connected to the top end of the hot water tank through the second connecting pipe.
  2. 根据权利要求1所述的一种分级预热节能环保型热水锅炉,其特征在于,排水管上设有第三控制阀。The hierarchical preheating energy-saving and environment-friendly hot water boiler according to claim 1, wherein the drain pipe is provided with a third control valve.
  3. 根据权利要求1所述的一种分级预热节能环保型热水锅炉,其特征在于,排烟孔道是顶端小且底端大的结构设计。The hierarchical preheating energy-saving and environment-friendly hot water boiler according to claim 1, wherein the exhaust passage is a structural design with a small top end and a large bottom end.
  4. 根据权利要求1所述的一种分级预热节能环保型热水锅炉,其特征在于,预热管是螺旋型结构设计。The hierarchical preheating energy-saving environment-friendly hot water boiler according to claim 1, wherein the preheating pipe is a spiral structure design.
  5. 根据权利要求1所述的一种分级预热节能环保型热水锅炉,其特征在于,第一连接管上设有第一控制阀。The hierarchical preheating energy-saving environment-friendly hot water boiler according to claim 1, wherein the first connecting pipe is provided with a first control valve.
  6. 根据权利要求1所述的一种分级预热节能环保型热水锅炉,其特征在于,第二连接管上设有第二控制阀。The hierarchical preheating energy-saving environment-friendly hot water boiler according to claim 1, wherein the second connecting pipe is provided with a second control valve.
PCT/CN2018/082402 2018-04-09 2018-04-09 Graded-preheating energy-saving and environment-protective hot-water boiler WO2019195986A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/082402 WO2019195986A1 (en) 2018-04-09 2018-04-09 Graded-preheating energy-saving and environment-protective hot-water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/082402 WO2019195986A1 (en) 2018-04-09 2018-04-09 Graded-preheating energy-saving and environment-protective hot-water boiler

Publications (1)

Publication Number Publication Date
WO2019195986A1 true WO2019195986A1 (en) 2019-10-17

Family

ID=68162997

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/082402 WO2019195986A1 (en) 2018-04-09 2018-04-09 Graded-preheating energy-saving and environment-protective hot-water boiler

Country Status (1)

Country Link
WO (1) WO2019195986A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2639789Y (en) * 2003-07-02 2004-09-08 张树立 Volumetric multistage heating anthracite energy saving water heating boiler
CN201014729Y (en) * 2007-03-15 2008-01-30 李英诚 Secondary back-firing square high-efficiency energy-saving hot water boiler
US20090252277A1 (en) * 2008-04-07 2009-10-08 Korea Atomic Engergy Research Institute Upper Plenum Structure of Cooled Pressure Vessel for Prismatic Very High Temperature Reactor
CN102022823A (en) * 2011-01-04 2011-04-20 岳宝元 Boiler
CN204574463U (en) * 2015-04-10 2015-08-19 侯满车 A kind of heating stove
CN208205408U (en) * 2018-04-09 2018-12-07 龚金凤 A kind of classification preheating energy-saving environment-friendly type hot-water boiler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2639789Y (en) * 2003-07-02 2004-09-08 张树立 Volumetric multistage heating anthracite energy saving water heating boiler
CN201014729Y (en) * 2007-03-15 2008-01-30 李英诚 Secondary back-firing square high-efficiency energy-saving hot water boiler
US20090252277A1 (en) * 2008-04-07 2009-10-08 Korea Atomic Engergy Research Institute Upper Plenum Structure of Cooled Pressure Vessel for Prismatic Very High Temperature Reactor
CN102022823A (en) * 2011-01-04 2011-04-20 岳宝元 Boiler
CN204574463U (en) * 2015-04-10 2015-08-19 侯满车 A kind of heating stove
CN208205408U (en) * 2018-04-09 2018-12-07 龚金凤 A kind of classification preheating energy-saving environment-friendly type hot-water boiler

Similar Documents

Publication Publication Date Title
CN202012913U (en) Novel flue gas self-reflux low-oxygen combustor
CN100467946C (en) Combustion system for changing methanol into hydrogen fuel used in industrial furnace and thermal power plant.
CN103277799A (en) External heated combustor system
CN201803367U (en) Energy saving quaternary body
CN208205408U (en) A kind of classification preheating energy-saving environment-friendly type hot-water boiler
CN206347733U (en) The sufficient safety-type hot-water boiler of one kind burning
CN203443100U (en) Energy-saving boiler
CN206430357U (en) A kind of secondary environment protection vertical boiler utilized of waste heat
CN204901784U (en) Drying chamber waste gas burns burning furnace
WO2019195986A1 (en) Graded-preheating energy-saving and environment-protective hot-water boiler
CN207196916U (en) A kind of environmental protection energy-saving boiler
CN202938340U (en) Waste gas burner
CN205262226U (en) Industrial stoves organic matter waste gas burns equipment of recycling
CN201437987U (en) Waste gas incinerator
CN201348262Y (en) Garbage furnace waste heat recycling device
CN209801772U (en) Boiler system for burning methanol in bio-pharmaceuticals
CN203560879U (en) High-efficiency steam boiler
CN207907484U (en) A kind of boiler plant of multiloop heat exchange
CN103335400B (en) Power economized boiler
CN207831682U (en) A kind of heating boiler
CN203147773U (en) Direct heat supplying system by high-temperature incineration of waste gas
CN204438148U (en) A kind of environment-protecting type exhaust air combustion furnace
CN104676608A (en) Combustion furnace container
CN207438574U (en) A kind of quick switching type catalyzed combustion boiler device
CN205746749U (en) The boiler plant of high-efficiency environment friendly

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18914887

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 03/03/2021)

122 Ep: pct application non-entry in european phase

Ref document number: 18914887

Country of ref document: EP

Kind code of ref document: A1