WO2019179328A1 - Work item management method and device - Google Patents

Work item management method and device Download PDF

Info

Publication number
WO2019179328A1
WO2019179328A1 PCT/CN2019/077747 CN2019077747W WO2019179328A1 WO 2019179328 A1 WO2019179328 A1 WO 2019179328A1 CN 2019077747 W CN2019077747 W CN 2019077747W WO 2019179328 A1 WO2019179328 A1 WO 2019179328A1
Authority
WO
WIPO (PCT)
Prior art keywords
priority
work item
processed
work
auxiliary
Prior art date
Application number
PCT/CN2019/077747
Other languages
French (fr)
Chinese (zh)
Inventor
方奕东
余鹏
夏天
Original Assignee
阿里巴巴集团控股有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 阿里巴巴集团控股有限公司 filed Critical 阿里巴巴集团控股有限公司
Publication of WO2019179328A1 publication Critical patent/WO2019179328A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work

Definitions

  • One or more embodiments of the present disclosure relate to the field of data processing technologies, and in particular, to a method and apparatus for managing work items.
  • the priority is usually only urgent, high, medium, and low, so that the processor may face many work items of the same priority at the same time, which makes it difficult for the processor to make a reasonable distinction between these work items. If the number of priorities is increased, for example, the number of priorities is increased to 1000, although the number of work items can theoretically be met, it will actually make it difficult for the submitter to set the priority of each work item reasonably.
  • one or more embodiments of the present specification provide a method and apparatus for managing work items.
  • a method for managing a work item including:
  • auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  • a method for managing a work item including:
  • a management apparatus for a work item including:
  • a setting unit configured to set an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  • a management apparatus for a work item including:
  • a setting unit configured to set a first auxiliary priority for the first to-be-processed work item and a second auxiliary priority for the second to-be-processed work item according to the received auxiliary priority setting instruction, to A work item to be processed and the second work item to be processed are divided.
  • FIG. 1 is a schematic structural diagram of a management system of a work item according to an exemplary embodiment
  • 2A is a flowchart of a method for managing a work item according to an exemplary embodiment
  • 2B is a flowchart of a method for managing a work item according to an exemplary embodiment
  • FIG. 3 is a schematic diagram of an interface for creating a work item according to an exemplary embodiment
  • FIG. 4 is a schematic diagram of an interface of a work item list provided by an exemplary embodiment
  • FIG. 5 is a schematic diagram of an editing priority provided by an exemplary embodiment
  • FIG. 6 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment
  • FIG. 7 is a schematic diagram of another interface of a work item list provided by an exemplary embodiment
  • FIG. 8 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment
  • FIG. 9 is a schematic structural diagram of an apparatus according to an exemplary embodiment.
  • FIG. 10 is a block diagram of a management apparatus for a work item according to an exemplary embodiment
  • FIG. 11 is a block diagram of a management apparatus for a work item according to an exemplary embodiment.
  • the steps of the corresponding method are not necessarily performed in the order shown and described in the specification in other embodiments. In some other embodiments, the method may include more or fewer steps than those described herein. In addition, the individual steps described in this specification may be decomposed into multiple steps for description in other embodiments; while the multiple steps described in this specification may be combined into a single step in other embodiments. description.
  • the management scheme of the work item of the present specification may be applied to an electronic device, such as a mobile phone, a PC, a tablet device, a notebook computer, a PDA (Personal Digital Assistants), and a wearable device. (such as smart glasses, smart watches, etc.), etc., one or more embodiments of the present specification are not limited thereto.
  • the electronic device can run a management system of the work item to implement the management scheme of the work item of the present specification.
  • the application of the work item management system can be pre-installed on the electronic device, so that the management system of the work item can be started and run on the electronic device; of course, when adopting technologies such as HTML5, there is no need for the electronic device The corresponding application is installed on it to get the management system for the work item.
  • FIG. 1 is a schematic structural diagram of a management system of a work item provided by an exemplary embodiment.
  • the management system of the work item may include the server 11, the network 12, and several electronic devices as shown in FIG. 1, for example, the electronic device may include the PC 13, the PC 14.
  • the server 11 can run the program on the server side of the management system of the work item to implement related processing functions; and the PC 13 and the PC 14 can run the client of the management system of the work item during the running process.
  • the program on the side implements related functions such as display and human-computer interaction, so that the management system of the work item is implemented between the server 11 and the PC 13 and the PC 14.
  • the server 11 may be a physical server including a separate host, or the server 11 may be a virtual server hosted by the host cluster.
  • the electronic device may include other types of devices as follows: mobile phones, tablet devices, notebook computers, personal digital assistants (PDAs), and wearable devices (such as smart glasses, smart watches, etc.). And the like, one or more embodiments of the present specification are not limited thereto.
  • PDAs personal digital assistants
  • wearable devices such as smart glasses, smart watches, etc.
  • the network 12 that interacts between the PC 13, the PC 14 and the server 11
  • various types of wired or wireless networks may be included.
  • the network 12 may include a Public Switched Telephone Network (PSTN) and the Internet.
  • PSTN Public Switched Telephone Network
  • the application of the client of the work item management system can be pre-installed on the electronic device so that the client can be launched and run on the electronic device; of course, when adopting an online "customer such as HTML5 technology" At the end, the client can be obtained and run without installing the corresponding application on the electronic device.
  • FIG. 2A is a flowchart of a method for managing a work item according to an exemplary embodiment.
  • the method can be applied to the submitting party side of the work item to be processed (for example, an electronic device or a server registered with the submitting party's account) or the processing side (for example, an electronic device or server registered with the processing party's account number). ), can include the following steps:
  • Step 202A Acquire a work item to be processed, and the work item to be processed is set with a corresponding main priority.
  • the primary priority may be set by the submitter of the work item to be processed.
  • the submitter may set a corresponding primary priority for the work item to be processed in advance, and then submit the pending work item with the primary priority to the processing party for processing.
  • the primary priority may also be set by other roles, such as by the processor, and this specification does not limit this.
  • Step 204A Set an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  • the auxiliary priority setting instruction may be from a processing party of the work item to be processed, and the processing party sets the auxiliary priority of the work item to be processed according to the processing plan in the actual situation.
  • the auxiliary priority may also be set by other roles, such as by the submitting party, and this specification does not limit this.
  • the submitter before submitting the work item to be processed, sets a corresponding primary priority for the work item to be processed according to factors such as a project development plan, and submits the work item to be processed to the processor;
  • the priority setting process is actually similar to the priority setting process in the related art, and thus does not bring additional workload or processing difficulty to the submitter.
  • the processing party obtains the to-be-processed work item, in particular, if there are multiple work items to be processed having the same main priority
  • the work item to be processed may be further processed according to factors such as the development progress in the actual work process. Set the auxiliary priority to further differentiate the pending work items with the same primary priority.
  • the work items to be processed may be first sorted according to the value of the corresponding primary priority; if there are multiple work items to be processed having the same value of the primary priority, further according to the corresponding
  • the auxiliary priority sorts the plurality of work items to be processed to ensure that all pending work items can be distinguished.
  • the value of the corresponding auxiliary priority may be used. Sorting the plurality of work items to be processed. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined :
  • the importance of work item 1 here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working.
  • the importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 4 are provided with auxiliary priorities, such as work item 2, the auxiliary priority is 3, work item 3 The auxiliary priority is 5, and the auxiliary priority of the work item 4 is 2. Then, it can be determined that, according to the value of the auxiliary priority of the work items 2 to 4, the importance degree of the three is determined as the work item 4> work item 2> Work item 3; therefore, according to the importance degree of work items 1 to 5, the corresponding arrangement order is: work item 1> work item 4> work item 2> work item 3> work item 5.
  • the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined :
  • the importance of work item 1 here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern
  • the importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 3 have auxiliary priorities and work items 4 do not have auxiliary priorities, it is possible to determine the importance of work items 4.
  • the degree is lower than the work items 2 to 3, and assuming that the auxiliary priority of the work item 2 is 3 and the auxiliary priority of the work item 3 is 5, it can be determined that the three priorities are determined according to the auxiliary priorities of the work items 2 to 4.
  • the importance degree is work item 2> work item 3> work item 4; therefore, according to the importance degree of work items 1 to 5, the corresponding order is: work item 1> work item 2> work item 3> work item 4> Work item 5.
  • At least one of a primary priority and an auxiliary priority of the to-be-processed work item may be adjusted according to the received priority adjustment instruction.
  • the primary priority or the auxiliary priority can be adjusted according to the actual situation, or the primary priority and the auxiliary priority can be adjusted at the same time.
  • the priority adjustment instruction may be derived from the submitter, the processor or other roles of the work item to be processed, and the present specification does not limit this.
  • the auxiliary priority may be used to divide a work item to be processed having the same primary priority in at least one of the following dimensions: importance level, urgency, degree of concern (ie, pending work)
  • importance level ie, urgency
  • degree of concern ie, pending work
  • auxiliary priority when the value of the auxiliary priority is larger, it indicates that the corresponding work item is more important; similarly, in the case of urgency, when the value of the auxiliary priority is larger, it indicates that the corresponding The more urgent the work item to be processed is; similarly, taking the degree of attention as an example, when the value of the auxiliary priority is larger, it indicates that the processor or other user of the work item to be processed pays more attention to the corresponding work item to be processed.
  • the degree of importance, urgency, degree of concern or other dimensions can exist at the same time, such as important and urgent pending work items; but there is no necessary relationship, for example, the important work items to be processed are not necessarily very Urgent, and for example, a high level of pending work items is not necessarily very important.
  • FIG. 2B is a flowchart of another method for managing work items provided by an exemplary embodiment.
  • the method can be applied to the submitting party side of the work item to be processed (for example, an electronic device or a server registered with the submitting party's account) or the processing side (for example, an electronic device or server registered with the processing party's account number). ), can include the following steps:
  • Step 202B Acquire a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to the same primary priority.
  • the primary priority may be set by the first pending work item and the submitter of the second pending work item.
  • the submitting party may set a corresponding primary priority for the first pending work item and the second pending work item, and then submit the first pending work item and the second pending work item with the primary priority to the The processor processes it.
  • the primary priority may also be set by other roles, such as by the processor, and this specification does not limit this.
  • Step 204B according to the received auxiliary priority setting instruction, set a first auxiliary priority for the first to-be-processed work item, and a second auxiliary priority for the second to-be-processed work item, to A work item to be processed and the second work item to be processed are divided.
  • the auxiliary priority setting instruction may be from the processing party of the first to-be-processed work item and the second to-be-processed work item, and the first pending work item is processed by the processing party according to the processing plan in the actual situation. And the auxiliary priority of the second to-be-processed work item is set. In other embodiments, the auxiliary priority may also be set by other roles, such as by the submitting party, and this specification does not limit this.
  • the submitter before submitting the first to-be-processed work item and the second to-be-processed work item, the submitter sets corresponding conditions for the first to-be-processed work item and the second to-be-processed work item according to factors such as a project development plan and the like.
  • the primary priority level, and the first pending work item and the second pending work item are submitted to the processing party; the setting process of the primary priority is actually similar to the priority setting process in the related art, and thus will not be given
  • the submitter brings extra work or processing difficulty.
  • the processing party may further set the first to-be-processed work item and the second to-be-processed work item according to factors such as development progress in the actual work process. Auxiliary priority to further differentiate between pending work items with the same primary priority.
  • the work items to be processed may be first sorted according to the value of the corresponding primary priority; because the values of the primary priority of the first pending work item and the second pending work item are the same, The first to-be-processed work item and the second to-be-processed work item are further sorted according to the corresponding auxiliary priority, so as to ensure that all the pending work items can be distinguished.
  • the value of the corresponding auxiliary priority may be used. Sorting the plurality of work items to be processed. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined :
  • the importance of work item 1 here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working.
  • the importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 4 are provided with auxiliary priorities, such as work item 2, the auxiliary priority is 3, work item 3 The auxiliary priority is 5, and the auxiliary priority of the work item 4 is 2. Then, it can be determined that, according to the value of the auxiliary priority of the work items 2 to 4, the importance degree of the three is determined as the work item 4> work item 2> Work item 3; therefore, according to the importance degree of work items 1 to 5, the corresponding arrangement order is: work item 1> work item 4> work item 2> work item 3> work item 5.
  • the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined :
  • the importance of work item 1 here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern
  • the importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 3 have auxiliary priorities and work items 4 do not have auxiliary priorities, it is possible to determine the importance of work items 4.
  • the degree is lower than the work items 2 to 3, and assuming that the auxiliary priority of the work item 2 is 3 and the auxiliary priority of the work item 3 is 5, it can be determined that the three priorities are determined according to the auxiliary priorities of the work items 2 to 4.
  • the importance degree is work item 2> work item 3> work item 4; therefore, according to the importance degree of work items 1 to 5, the corresponding order is: work item 1> work item 2> work item 3> work item 4> Work item 5.
  • first pending work item and the second pending work item in the present application are only for distinguishing between any two work items to be processed, such as any two work items a of the above work items 1 to 5 and
  • the work item b can be used as the first work item to be processed and the second work item to be processed as described above, so as to be applicable to the work item management scheme of the present specification.
  • At least one of a primary priority and an auxiliary priority of the first pending work item or the second pending work item may be adjusted according to the received priority adjustment instruction.
  • the primary priority or the auxiliary priority can be adjusted according to the actual situation, or the primary priority and the auxiliary priority can be adjusted at the same time.
  • the priority adjustment instruction may be derived from the submitter, the processor, or other roles of the first to-be-processed work item or the second to-be-processed work item, which is not limited in this specification.
  • the auxiliary priority may be used to divide the first pending work item and the second pending work item having the same primary priority in at least one of the following dimensions: importance, emergency Degree, degree of concern (ie, the degree of attention of the first pending work item and the second pending work item or other user to the first pending work item and the second pending work item), etc., this specification is not correct This is a limitation.
  • auxiliary priority when the value of the auxiliary priority is larger, it indicates that the corresponding work item is more important; similarly, in the case of urgency, when the value of the auxiliary priority is larger, it indicates that the corresponding The more urgent the work item to be processed is; similarly, taking the degree of attention as an example, when the value of the auxiliary priority is larger, it indicates that the processor or other user of the work item to be processed pays more attention to the corresponding work item to be processed.
  • the degree of importance, urgency, degree of concern or other dimensions can exist at the same time, such as important and urgent pending work items; but there is no necessary relationship, for example, the important work items to be processed are not necessarily very Urgent, and for example, a high level of pending work items is not necessarily very important.
  • FIG. 3 is a schematic diagram of an interface for creating a work item according to an exemplary embodiment.
  • the PC 13 can provide the user A with a work item creation interface 300, which includes several options, such as "name”, “type”, “home item”, “associated item”, “priority”. "Level”, "Assigned to”, etc., can be set by User A.
  • the “priority” option allows the user A to prioritize the work items that need to be created currently; as shown in FIG. 3, the priorities in the work item creation interface 300 may include “primary priority” and “auxiliary priority”. In the "two levels”, user A usually has to set “primary priority”, while “auxiliary priority” does not have to be set.
  • user A can trigger an optional priority type, such as emergency, high, medium, low, etc., by triggering the selection box 31 to set the primary priority of the currently created work item. Further, the user A can set the auxiliary priority of the currently created work item in the selection box 32 by triggering the selection box 32; wherein the auxiliary priority level can adopt a digital value, such as an integer or a decimal, etc. Do not limit this.
  • an optional priority type such as emergency, high, medium, low, etc.
  • FIG. 4 is a schematic diagram of an interface of a work item list provided by an exemplary embodiment; as shown in FIG. 4, the PC 14 may display the work item list interface 400 to the user B to view all pending items through the work item list interface 400.
  • Work items such as the work item "XX Problem Optimization” created by User A through the embodiment shown in FIG. 3, and other work items such as "XX Feature Development” and "AA Feature Development”.
  • the priority of each work item can be respectively displayed, for example, the work item "XX problem optimization” has priority of “emergency”, and the work item “XX feature development” has priority of "emergency”.
  • the priority of the work item "AA Feature Development” is "Medium” or the like; in other words, User A sets the primary priority only for the above work item, and does not set the auxiliary priority. Then, for the work item "XX problem optimization" and the work item "XX feature development", since the main priority is "emergency" and the auxiliary priority is not set, the importance of the two work items cannot be effectively performed.
  • the work item "XX problem optimization” is arranged above the work item "XX feature development" according to the creation order of the work item (or called “Front”; in particular, in the case where the number of work items at User B is increasing, more work items with a primary priority of "emergency" may occur, which will seriously affect the work efficiency of User B.
  • the user B can set the auxiliary priority for the work items in the work item list interface 400 to achieve the degree of importance division by the auxiliary priority.
  • an "Edit” option is displayed next to the "Priority" parameter of each work item, such as an edit option 41 corresponding to the work item "XX Problem Optimization" and an edit option corresponding to the work item "XX Feature Development”. 42.
  • the editing option 43 corresponding to the work item "AA feature development”.
  • FIG. 5 is a schematic diagram of an editing priority provided by an exemplary embodiment.
  • the PC 14 can display the option 51 corresponding to the primary priority and the option 52 corresponding to the auxiliary priority;
  • the user B can adjust the primary priority of the work item "XX problem optimization"
  • the option 52 the user B can set the value of the auxiliary priority for the work item "XX problem optimization”.
  • the auxiliary priority set in FIG. 5 is 2.
  • the above-mentioned editing option 41 is switched to the completion option 53 shown in FIG. 5.
  • the priority editing of the work item "XX problem optimization" can be completed. operating.
  • FIG. 6 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment.
  • the priority set by the user B for the work item "XX problem optimization” is "emergency-2", indicating that the primary priority is “emergency” and the auxiliary priority is "2".
  • the priority of the work item "XX feature development” is "emergency”
  • it can be considered that the work item "XX problem optimization” with the auxiliary priority is more important than the work item "XX feature development” without the auxiliary priority.
  • the work item “XX Problem Optimization” is arranged above the work item "XX Feature Development”.
  • user B can trigger editing by Option 41, continue to edit its primary or secondary priority.
  • FIG. 7 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment; as shown in FIG. 7, it is assumed that user B sets the priority of the work item “XX problem optimization” to “emergency-2”.
  • FIG. 8 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment; as shown in FIG. 8, the user B sets the priority of the work item “XX problem optimization” to “emergency-2”.
  • FIG. 9 is a schematic structural diagram of an apparatus provided by an exemplary embodiment.
  • the device includes a processor 902, an internal bus 904, a network interface 906, a memory 908, and a non-volatile memory 910, and of course may also include hardware required for other services.
  • the processor 902 reads the corresponding computer program from the non-volatile memory 910 into the memory 908 and then operates to form a management device for the work item on a logical level.
  • one or more embodiments of the present specification do not exclude other implementation manners, such as a logic device or a combination of software and hardware, etc., that is, the execution body of the following processing flow is not limited to each.
  • a logical unit which can also be a hardware or logic device.
  • the management device of the work item may include:
  • the obtaining unit 1001 is configured to obtain a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
  • the setting unit 1002 sets an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  • the primary priority is set by the submitter of the to-be-processed work item, and the auxiliary priority setting instruction is from a processing party of the to-be-processed work item.
  • it also includes:
  • the primary priority sorting unit 1003 sorts the to-be-processed work items according to the value of the corresponding primary priority.
  • the auxiliary priority sorting unit 1004 sorts the plurality of work items to be processed according to the corresponding auxiliary priority when there are multiple work items to be processed having the same value of the main priority.
  • auxiliary prioritization unit 1004 is specifically configured to:
  • the plurality of to-be-processed work items are all set with the auxiliary priority
  • the plurality of work items to be processed are sorted according to the value of the corresponding auxiliary priority.
  • auxiliary prioritization unit 1004 is specifically configured to:
  • the work items to be processed with the auxiliary priority are sorted according to the value of the corresponding auxiliary priority
  • the pending work items for which the auxiliary priority is not set are arranged after the pending work item set with the auxiliary priority.
  • it also includes:
  • the adjusting unit 1005 adjusts at least one of a primary priority and an auxiliary priority of the to-be-processed work item according to the received priority adjustment instruction.
  • the auxiliary priority is used to divide the to-be-processed work items having the same primary priority in at least one of the following dimensions: importance level, urgency, and degree of concern.
  • the management device of the work item may include:
  • the obtaining unit 1101 is configured to acquire a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
  • the setting unit 1102 according to the received auxiliary priority setting instruction, set a first auxiliary priority for the first to-be-processed work item, and set a second auxiliary priority for the second to-be-processed work item, to The first to-be-processed work item and the second to-be-processed work item are divided.
  • the system, device, module or unit illustrated in the above embodiments may be implemented by a computer chip or an entity, or by a product having a certain function.
  • a typical implementation device is a computer, and the specific form of the computer may be a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email transceiver, and a game control.
  • a computer includes one or more processors (CPUs), input/output interfaces, network interfaces, and memory.
  • processors CPUs
  • input/output interfaces network interfaces
  • memory volatile and non-volatile memory
  • the memory may include non-persistent memory, random access memory (RAM), and/or non-volatile memory in a computer readable medium, such as read only memory (ROM) or flash memory.
  • RAM random access memory
  • ROM read only memory
  • Memory is an example of a computer readable medium.
  • Computer readable media includes both permanent and non-persistent, removable and non-removable media.
  • Information storage can be implemented by any method or technology.
  • the information can be computer readable instructions, data structures, modules of programs, or other data.
  • Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read only memory.
  • PRAM phase change memory
  • SRAM static random access memory
  • DRAM dynamic random access memory
  • RAM random access memory
  • ROM read only memory
  • EEPROM electrically erasable programmable read only memory
  • flash memory or other memory technology
  • compact disk read only memory CD-ROM
  • DVD digital versatile disk
  • Magnetic cassette tape disk storage
  • quantum memory graphene-based storage media or other magnetic storage devices or any other non-transporting media
  • computer readable media does not include temporary storage of computer readable media, such as modulated data signals and carrier waves.
  • first, second, third, etc. may be used to describe various information in one or more embodiments of the specification, the information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other.
  • the first information may also be referred to as the second information without departing from the scope of one or more embodiments of the present disclosure.
  • the second information may also be referred to as the first information.
  • the word "if” as used herein may be interpreted as "when” or "when” or "in response to a determination.”

Abstract

Provided are a work item management method and device. The method comprises: acquiring a work item to be processed, and setting a corresponding main priority for the work item to be processed (202A); and setting an auxiliary priority for the work item to be processed according to a received auxiliary priority setting instruction, wherein the auxiliary priority is used for classifying work items to be processed which have the same main priority (204A).

Description

工作项的管理方法及装置Work item management method and device
本申请要求2018年03月22日递交的申请号为201810238083.6、发明名称为“工作项的管理方法及装置”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。The present application claims the priority of the Chinese Patent Application No. 20110123 808, filed on Mar. 22, 2011, the entire disclosure of which is hereby incorporated by reference.
技术领域Technical field
本说明书一个或多个实施例涉及数据处理技术领域,尤其涉及一种工作项的管理方法及装置。One or more embodiments of the present disclosure relate to the field of data processing technologies, and in particular, to a method and apparatus for managing work items.
背景技术Background technique
在相关技术中,工作项的管理往往涉及到两个角色:提交方和处理方。其中,提交方创建工作项后,为工作项设置相应的优先级,然后将工作项提交至处理方;而处理方接收到工作项后,根据工作项的优先级进行排序,从而按照优选级顺序依次处理各个工作项。In the related art, the management of work items often involves two roles: the submitter and the processor. After the submitter creates the work item, the corresponding priority is set for the work item, and then the work item is submitted to the processor; and after the work item receives the work item, the work item is sorted according to the priority of the work item, so that the work order is in order of preference. Process each work item in turn.
然而,优先级通常只有紧急、高、中、低等几个级别,使得处理方可能同时面对很多相同优先级的工作项,造成处理方难以对这些工作项予以合理区分。而如果增加优先级的数量,比如将优先级的数量增加至1000个,虽然在理论上能够满足工作项的数量需求,但实际上将导致提交方难以合理设置各个工作项的优先级。However, the priority is usually only urgent, high, medium, and low, so that the processor may face many work items of the same priority at the same time, which makes it difficult for the processor to make a reasonable distinction between these work items. If the number of priorities is increased, for example, the number of priorities is increased to 1000, although the number of work items can theoretically be met, it will actually make it difficult for the submitter to set the priority of each work item reasonably.
发明内容Summary of the invention
有鉴于此,本说明书一个或多个实施例提供一种工作项的管理方法及装置。In view of this, one or more embodiments of the present specification provide a method and apparatus for managing work items.
为实现上述目的,本说明书一个或多个实施例提供技术方案如下:To achieve the above object, one or more embodiments of the present specification provide the following technical solutions:
根据本说明书一个或多个实施例的第一方面,提出了一种工作项的管理方法,包括:According to a first aspect of one or more embodiments of the present specification, a method for managing a work item is provided, including:
获取待处理工作项,所述待处理工作项被设置了相应的主优先级;Obtaining a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。And setting an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
根据本说明书一个或多个实施例的第二方面,提出了一种工作项的管理方法,包括:According to a second aspect of one or more embodiments of the present specification, a method for managing a work item is provided, including:
获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级;Obtaining a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二 待处理工作项进行划分。And setting a first auxiliary priority for the first to-be-processed work item and a second auxiliary priority for the second to-be-processed work item, according to the received auxiliary priority setting instruction, to the first pending The work item and the second pending work item are divided.
根据本说明书一个或多个实施例的第三方面,提出了一种工作项的管理装置,包括:According to a third aspect of one or more embodiments of the present specification, a management apparatus for a work item is provided, including:
获取单元,获取待处理工作项,所述待处理工作项被设置了相应的主优先级;Acquiring a unit to obtain a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
设置单元,根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。And a setting unit, configured to set an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
根据本说明书一个或多个实施例的第四方面,提出了一种工作项的管理装置,包括:According to a fourth aspect of one or more embodiments of the present specification, a management apparatus for a work item is provided, including:
获取单元,获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级;Acquiring a unit to obtain a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
设置单元,根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二待处理工作项进行划分。a setting unit, configured to set a first auxiliary priority for the first to-be-processed work item and a second auxiliary priority for the second to-be-processed work item according to the received auxiliary priority setting instruction, to A work item to be processed and the second work item to be processed are divided.
附图说明DRAWINGS
图1是一示例性实施例提供的一种工作项的管理系统的架构示意图;FIG. 1 is a schematic structural diagram of a management system of a work item according to an exemplary embodiment;
图2A是一示例性实施例提供的一种工作项的管理方法的流程图;2A is a flowchart of a method for managing a work item according to an exemplary embodiment;
图2B是一示例性实施例提供的一种工作项的管理方法的流程图;2B is a flowchart of a method for managing a work item according to an exemplary embodiment;
图3是一示例性实施例提供的一种创建工作项的界面示意图;FIG. 3 is a schematic diagram of an interface for creating a work item according to an exemplary embodiment;
图4是一示例性实施例提供的一种工作项列表的界面示意图;4 is a schematic diagram of an interface of a work item list provided by an exemplary embodiment;
图5是一示例性实施例提供的一种编辑优先级的示意图;FIG. 5 is a schematic diagram of an editing priority provided by an exemplary embodiment; FIG.
图6是一示例性实施例提供的另一种工作项列表的界面示意图;6 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment;
图7是一示例性实施例提供的又一种工作项列表的界面示意图;FIG. 7 is a schematic diagram of another interface of a work item list provided by an exemplary embodiment; FIG.
图8是一示例性实施例提供的再一种工作项列表的界面示意图;FIG. 8 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment; FIG.
图9是一示例性实施例提供的一种设备的结构示意图;FIG. 9 is a schematic structural diagram of an apparatus according to an exemplary embodiment;
图10是一示例性实施例提供的一种工作项的管理装置的框图;FIG. 10 is a block diagram of a management apparatus for a work item according to an exemplary embodiment; FIG.
图11是一示例性实施例提供的一种工作项的管理装置的框图。FIG. 11 is a block diagram of a management apparatus for a work item according to an exemplary embodiment.
具体实施方式detailed description
这里将详细地对示例性实施例进行说明,其示例表示在附图中。下面的描述涉及附图时,除非另有表示,不同附图中的相同数字表示相同或相似的要素。以下示例性实施例中所描述的实施方式并不代表与本说明书一个或多个实施例相一致的所有实施方式。 相反,它们仅是与如所附权利要求书中所详述的、本说明书一个或多个实施例的一些方面相一致的装置和方法的例子。Exemplary embodiments will be described in detail herein, examples of which are illustrated in the accompanying drawings. The following description refers to the same or similar elements in the different figures unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with one or more embodiments of the specification. Instead, they are merely examples of devices and methods consistent with aspects of one or more embodiments of the present specification as detailed in the appended claims.
需要说明的是:在其他实施例中并不一定按照本说明书示出和描述的顺序来执行相应方法的步骤。在一些其他实施例中,其方法所包括的步骤可以比本说明书所描述的更多或更少。此外,本说明书中所描述的单个步骤,在其他实施例中可能被分解为多个步骤进行描述;而本说明书中所描述的多个步骤,在其他实施例中也可能被合并为单个步骤进行描述。It should be noted that the steps of the corresponding method are not necessarily performed in the order shown and described in the specification in other embodiments. In some other embodiments, the method may include more or fewer steps than those described herein. In addition, the individual steps described in this specification may be decomposed into multiple steps for description in other embodiments; while the multiple steps described in this specification may be combined into a single step in other embodiments. description.
在一实施例中,本说明书的工作项的管理方案可以应用于电子设备上,比如该电子设备可以包括手机、PC、平板设备、笔记本电脑、掌上电脑(PDAs,Personal Digital Assistants)、可穿戴设备(如智能眼镜、智能手表等)等,本说明书一个或多个实施例并不对此进行限制。在运行过程中,该电子设备可以运行工作项的管理系统,以实现本说明书的工作项的管理方案。其中,工作项的管理系统的应用程序可以被预先安装在电子设备上,使得该工作项的管理系统可以在该电子设备上被启动并运行;当然,当采用诸如HTML5技术时,无需在电子设备上安装相应的应用程序,即可获得并运行该工作项的管理系统。In an embodiment, the management scheme of the work item of the present specification may be applied to an electronic device, such as a mobile phone, a PC, a tablet device, a notebook computer, a PDA (Personal Digital Assistants), and a wearable device. (such as smart glasses, smart watches, etc.), etc., one or more embodiments of the present specification are not limited thereto. During operation, the electronic device can run a management system of the work item to implement the management scheme of the work item of the present specification. Wherein, the application of the work item management system can be pre-installed on the electronic device, so that the management system of the work item can be started and run on the electronic device; of course, when adopting technologies such as HTML5, there is no need for the electronic device The corresponding application is installed on it to get the management system for the work item.
在一实施例中,图1是一示例性实施例提供的一种工作项的管理系统的架构示意图。工作项的管理系统可以包括如图1所示的服务器11、网络12、若干电子设备,比如该电子设备可以包括PC13、PC14。其中,服务器11在运行过程中,可以运行工作项的管理系统的服务端侧的程序,以实现相关的处理等功能;而PC13、PC14在运行过程中,可以运行工作项的管理系统的客户端侧的程序,以实现相关的展示、人机交互等功能,从而在服务器11与PC13、PC14之间配合实现该工作项的管理系统。In an embodiment, FIG. 1 is a schematic structural diagram of a management system of a work item provided by an exemplary embodiment. The management system of the work item may include the server 11, the network 12, and several electronic devices as shown in FIG. 1, for example, the electronic device may include the PC 13, the PC 14. In the running process, the server 11 can run the program on the server side of the management system of the work item to implement related processing functions; and the PC 13 and the PC 14 can run the client of the management system of the work item during the running process. The program on the side implements related functions such as display and human-computer interaction, so that the management system of the work item is implemented between the server 11 and the PC 13 and the PC 14.
其中,服务器11可以为包含一独立主机的物理服务器,或者该服务器11可以为主机集群承载的虚拟服务器。电子设备除了上述的PC13、PC14之外,还可以包括下述其他类型的设备:手机、平板设备、笔记本电脑、掌上电脑(PDAs,Personal Digital Assistants)、可穿戴设备(如智能眼镜、智能手表等)等,本说明书一个或多个实施例并不对此进行限制。而对于PC13、PC14与服务器11之间进行交互的网络12,可以包括多种类型的有线或无线网络。在一实施例中,该网络12可以包括公共交换电话网络(Public Switched Telephone Network,PSTN)和因特网。需要指出的是:工作项的管理系统的客户端的应用程序可以被预先安装在电子设备上,使得该客户端可以在该电子设备上被启动并运行;当然,当采用诸如HTML5技术的在线“客户端”时,无需在电子 设备上安装相应的应用程序,即可获得并运行该客户端。The server 11 may be a physical server including a separate host, or the server 11 may be a virtual server hosted by the host cluster. In addition to the PC13 and PC14 described above, the electronic device may include other types of devices as follows: mobile phones, tablet devices, notebook computers, personal digital assistants (PDAs), and wearable devices (such as smart glasses, smart watches, etc.). And the like, one or more embodiments of the present specification are not limited thereto. For the network 12 that interacts between the PC 13, the PC 14 and the server 11, various types of wired or wireless networks may be included. In an embodiment, the network 12 may include a Public Switched Telephone Network (PSTN) and the Internet. It should be noted that the application of the client of the work item management system can be pre-installed on the electronic device so that the client can be launched and run on the electronic device; of course, when adopting an online "customer such as HTML5 technology" At the end, the client can be obtained and run without installing the corresponding application on the electronic device.
图2A是一示例性实施例提供的一种工作项的管理方法的流程图。如图2A所示,该方法可以应用于待处理工作项的提交方侧(例如登录有提交方的账号的电子设备或服务器)或处理方侧(例如登录有处理方的账号的电子设备或服务器),可以包括以下步骤:FIG. 2A is a flowchart of a method for managing a work item according to an exemplary embodiment. As shown in FIG. 2A, the method can be applied to the submitting party side of the work item to be processed (for example, an electronic device or a server registered with the submitting party's account) or the processing side (for example, an electronic device or server registered with the processing party's account number). ), can include the following steps:
步骤202A,获取待处理工作项,所述待处理工作项被设置了相应的主优先级。Step 202A: Acquire a work item to be processed, and the work item to be processed is set with a corresponding main priority.
在一实施例中,主优先级可由待处理工作项的提交方进行设置得到。例如,提交方可以预先为待处理工作项设置相应的主优先级,然后将设有主优先级的待处理工作项提交至处理方进行处理。在其他实施例中,主优先级也可由其他角色进行设置,例如由处理方进行设置,本说明书并不对此进行限制。In an embodiment, the primary priority may be set by the submitter of the work item to be processed. For example, the submitter may set a corresponding primary priority for the work item to be processed in advance, and then submit the pending work item with the primary priority to the processing party for processing. In other embodiments, the primary priority may also be set by other roles, such as by the processor, and this specification does not limit this.
步骤204A,根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。 Step 204A: Set an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
在一实施例中,辅助优先级设置指令可以来自于待处理工作项的处理方,由该处理方根据实际情况中的处理计划,对待处理工作项的辅助优先级进行设置。在其他实施例中,辅助优先级也可由其他角色进行设置,例如由提交方进行设置,本说明书并不对此进行限制。In an embodiment, the auxiliary priority setting instruction may be from a processing party of the work item to be processed, and the processing party sets the auxiliary priority of the work item to be processed according to the processing plan in the actual situation. In other embodiments, the auxiliary priority may also be set by other roles, such as by the submitting party, and this specification does not limit this.
在一实施例中,提交方在提交待处理工作项之前,根据诸如项目开发计划等因素,为待处理工作项设置相应的主优先级,并将该待处理工作项提交至处理方;对于主优先级的设置过程,实际上与相关技术中的优先级设置过程相似,因而不会给提交方带来额外的工作量或处理难度。然后,处理方在获得该待处理工作项后,尤其是存在多个具有相同主优先级的待处理工作项的情况下,可以根据实际工作过程中的开发进度等因素,为待处理工作项进一步设置辅助优先级,从而对具有相同主优先级的待处理工作项实现进一步区分。In an embodiment, before submitting the work item to be processed, the submitter sets a corresponding primary priority for the work item to be processed according to factors such as a project development plan, and submits the work item to be processed to the processor; The priority setting process is actually similar to the priority setting process in the related art, and thus does not bring additional workload or processing difficulty to the submitter. Then, after the processing party obtains the to-be-processed work item, in particular, if there are multiple work items to be processed having the same main priority, the work item to be processed may be further processed according to factors such as the development progress in the actual work process. Set the auxiliary priority to further differentiate the pending work items with the same primary priority.
在一实施例中,可以首先按照对应的主优先级的取值,对所述待处理工作项进行排序;如果存在主优先级的取值相同的多个待处理工作项时,进一步根据相应的辅助优先级对所述多个待处理工作项进行排序,确保所有待处理工作项都能够细化区分。In an embodiment, the work items to be processed may be first sorted according to the value of the corresponding primary priority; if there are multiple work items to be processed having the same value of the primary priority, further according to the corresponding The auxiliary priority sorts the plurality of work items to be processed to ensure that all pending work items can be distinguished.
在一实施例中,对于主优先级的取值相同的多个待处理工作项,当所述多个待处理工作项均设置有辅助优先级时,可以按照对应的辅助优先级的取值,对所述多个待处理工作项进行排序。例如,假定待处理工作项包括工作项1~5,其中工作项1的主优先级为紧急、工作项2~4的主优先级为高、工作项5的主优先级为低,那么可以确定:工作项1的重要程度(此处以重要程度为例,也可以用于表征紧急程度、关注程度等其他维 度)最高、排列在最先,工作项5的重要程度最低、排列在最后,而工作项2~4的重要程度均在工作项1与工作项5之间;进一步的,如果工作项2~4均设有辅助优先级,比如工作项2的辅助优先级为3、工作项3的辅助优先级为5、工作项4的辅助优先级为2,那么可以确定:根据工作项2~4的辅助优先级的取值,确定出三者的重要程度为工作项4>工作项2>工作项3;因此,按照工作项1~5的重要程度,相应的排列顺序为:工作项1>工作项4>工作项2>工作项3>工作项5。In an embodiment, for a plurality of to-be-processed work items having the same value of the primary priority, when the plurality of work items to be processed are set with the auxiliary priority, the value of the corresponding auxiliary priority may be used. Sorting the plurality of work items to be processed. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined : The importance of work item 1 (here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working. The importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 4 are provided with auxiliary priorities, such as work item 2, the auxiliary priority is 3, work item 3 The auxiliary priority is 5, and the auxiliary priority of the work item 4 is 2. Then, it can be determined that, according to the value of the auxiliary priority of the work items 2 to 4, the importance degree of the three is determined as the work item 4> work item 2> Work item 3; therefore, according to the importance degree of work items 1 to 5, the corresponding arrangement order is: work item 1> work item 4> work item 2> work item 3> work item 5.
在一实施例中,对于主优先级的取值相同的多个待处理工作项,当所述多个待处理工作项中存在部分未设置辅助优先级的待处理工作项时,按照对应的辅助优先级的取值,对设置有辅助优先级的待处理工作项进行排序,以及将未设置辅助优先级的待处理工作项排列于设置有辅助优先级的待处理工作项之后。例如,假定待处理工作项包括工作项1~5,其中工作项1的主优先级为紧急、工作项2~4的主优先级为高、工作项5的主优先级为低,那么可以确定:工作项1的重要程度(此处以重要程度为例,也可以用于表征紧急程度、关注程度等其他维度)最高、排列在最先,工作项5的重要程度最低、排列在最后,而工作项2~4的重要程度均在工作项1与工作项5之间;进一步的,如果工作项2~3设有辅助优先级、工作项4未设置辅助优先级,可以确定工作项4的重要程度低于工作项2~3,而假定工作项2的辅助优先级为3、工作项3的辅助优先级为5,那么可以确定:根据工作项2~4的辅助优先级,确定出三者的重要程度为工作项2>工作项3>工作项4;因此,按照工作项1~5的重要程度,相应的排列顺序为:工作项1>工作项2>工作项3>工作项4>工作项5。In an embodiment, for a plurality of to-be-processed work items having the same value of the primary priority, when there are some work items to be processed in which the auxiliary priority is not set in the plurality of to-be-processed work items, according to the corresponding auxiliary The value of the priority is sorted, and the work items to be processed with the auxiliary priority are sorted, and the work items to be processed without the auxiliary priority are arranged after the work item to be processed with the auxiliary priority set. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined : The importance of work item 1 (here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working. The importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 3 have auxiliary priorities and work items 4 do not have auxiliary priorities, it is possible to determine the importance of work items 4. The degree is lower than the work items 2 to 3, and assuming that the auxiliary priority of the work item 2 is 3 and the auxiliary priority of the work item 3 is 5, it can be determined that the three priorities are determined according to the auxiliary priorities of the work items 2 to 4. The importance degree is work item 2> work item 3> work item 4; therefore, according to the importance degree of work items 1 to 5, the corresponding order is: work item 1> work item 2> work item 3> work item 4> Work item 5.
在一实施例中,可以根据接收到的优先级调整指令,对所述待处理工作项的主优先级和辅助优先级中至少之一进行调整。在实际处理过程中,可能面临工作计划、项目需求的变化,因而可以根据实际情况对主优先级或辅助优先级进行调整,或同时对主优先级和辅助优先级进行调整。其中,优先级调整指令可以来源于待处理工作项的提交方、处理方或其他角色,本说明书并不对此进行限制。In an embodiment, at least one of a primary priority and an auxiliary priority of the to-be-processed work item may be adjusted according to the received priority adjustment instruction. In the actual processing, there may be changes in the work plan and project requirements. Therefore, the primary priority or the auxiliary priority can be adjusted according to the actual situation, or the primary priority and the auxiliary priority can be adjusted at the same time. The priority adjustment instruction may be derived from the submitter, the processor or other roles of the work item to be processed, and the present specification does not limit this.
在一实施例中,所述辅助优先级可以用于在下述维度中至少之一,对具有相同的主优先级的待处理工作项进行划分:重要程度、紧急程度、关注程度(即待处理工作项的处理者或其他用户对该待处理工作项的关注程度)等,本说明书并不对此进行限制。以重要程度为例,当辅助优先级的数值越大时,表明相应的待处理工作项的重要程度越高;类似地,以紧急程度为例,当辅助优先级的数值越大时,表明相应的待处理工作项越紧急;类似地,以关注程度为例,当辅助优先级的数值越大时,表明待处理工作项的处理 者或其他用户对相应的待处理工作项越关注。其中,重要程度、紧急程度、关注程度或其他维度之间可以同时存在,比如既重要又紧急的待处理工作项;但并不存在必然关联,比如重要程度高的待处理工作项并不一定非常紧急,再比如关注程度高的待处理工作项并不一定非常重要。In an embodiment, the auxiliary priority may be used to divide a work item to be processed having the same primary priority in at least one of the following dimensions: importance level, urgency, degree of concern (ie, pending work) The extent to which the processor of the item or other user pays attention to the work item to be processed, etc., is not limited in this specification. Taking the importance level as an example, when the value of the auxiliary priority is larger, it indicates that the corresponding work item is more important; similarly, in the case of urgency, when the value of the auxiliary priority is larger, it indicates that the corresponding The more urgent the work item to be processed is; similarly, taking the degree of attention as an example, when the value of the auxiliary priority is larger, it indicates that the processor or other user of the work item to be processed pays more attention to the corresponding work item to be processed. Among them, the degree of importance, urgency, degree of concern or other dimensions can exist at the same time, such as important and urgent pending work items; but there is no necessary relationship, for example, the important work items to be processed are not necessarily very Urgent, and for example, a high level of pending work items is not necessarily very important.
图2B是一示例性实施例提供的另一种工作项的管理方法的流程图。如图2B所示,该方法可以应用于待处理工作项的提交方侧(例如登录有提交方的账号的电子设备或服务器)或处理方侧(例如登录有处理方的账号的电子设备或服务器),可以包括以下步骤:FIG. 2B is a flowchart of another method for managing work items provided by an exemplary embodiment. As shown in FIG. 2B, the method can be applied to the submitting party side of the work item to be processed (for example, an electronic device or a server registered with the submitting party's account) or the processing side (for example, an electronic device or server registered with the processing party's account number). ), can include the following steps:
步骤202B,获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级。 Step 202B: Acquire a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to the same primary priority.
在一实施例中,主优先级可由第一待处理工作项、第二待处理工作项的提交方进行设置得到。例如,提交方可以预先为第一待处理工作项、第二待处理工作项设置相应的主优先级,然后将设有主优先级的第一待处理工作项、第二待处理工作项提交至处理方进行处理。在其他实施例中,主优先级也可由其他角色进行设置,例如由处理方进行设置,本说明书并不对此进行限制。In an embodiment, the primary priority may be set by the first pending work item and the submitter of the second pending work item. For example, the submitting party may set a corresponding primary priority for the first pending work item and the second pending work item, and then submit the first pending work item and the second pending work item with the primary priority to the The processor processes it. In other embodiments, the primary priority may also be set by other roles, such as by the processor, and this specification does not limit this.
步骤204B,根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二待处理工作项进行划分。 Step 204B, according to the received auxiliary priority setting instruction, set a first auxiliary priority for the first to-be-processed work item, and a second auxiliary priority for the second to-be-processed work item, to A work item to be processed and the second work item to be processed are divided.
在一实施例中,辅助优先级设置指令可以来自于第一待处理工作项、第二待处理工作项的处理方,由该处理方根据实际情况中的处理计划,对第一待处理工作项、第二待处理工作项的辅助优先级进行设置。在其他实施例中,辅助优先级也可由其他角色进行设置,例如由提交方进行设置,本说明书并不对此进行限制。In an embodiment, the auxiliary priority setting instruction may be from the processing party of the first to-be-processed work item and the second to-be-processed work item, and the first pending work item is processed by the processing party according to the processing plan in the actual situation. And the auxiliary priority of the second to-be-processed work item is set. In other embodiments, the auxiliary priority may also be set by other roles, such as by the submitting party, and this specification does not limit this.
在一实施例中,提交方在提交第一待处理工作项、第二待处理工作项之前,根据诸如项目开发计划等因素,为第一待处理工作项、第二待处理工作项设置相应的主优先级,并将该第一待处理工作项、第二待处理工作项提交至处理方;对于主优先级的设置过程,实际上与相关技术中的优先级设置过程相似,因而不会给提交方带来额外的工作量或处理难度。然后,处理方在获得该第一待处理工作项、第二待处理工作项后,可以根据实际工作过程中的开发进度等因素,为第一待处理工作项、第二待处理工作项进一步设置辅助优先级,从而对具有相同主优先级的待处理工作项实现进一步区分。In an embodiment, before submitting the first to-be-processed work item and the second to-be-processed work item, the submitter sets corresponding conditions for the first to-be-processed work item and the second to-be-processed work item according to factors such as a project development plan and the like. The primary priority level, and the first pending work item and the second pending work item are submitted to the processing party; the setting process of the primary priority is actually similar to the priority setting process in the related art, and thus will not be given The submitter brings extra work or processing difficulty. Then, after obtaining the first to-be-processed work item and the second to-be-processed work item, the processing party may further set the first to-be-processed work item and the second to-be-processed work item according to factors such as development progress in the actual work process. Auxiliary priority to further differentiate between pending work items with the same primary priority.
在一实施例中,可以首先按照对应的主优先级的取值,对待处理工作项进行排序; 由于第一待处理工作项、第二待处理工作项的主优先级的取值相同,因而可以进一步根据相应的辅助优先级对第一待处理工作项、第二待处理工作项进行排序,确保所有待处理工作项都能够细化区分。In an embodiment, the work items to be processed may be first sorted according to the value of the corresponding primary priority; because the values of the primary priority of the first pending work item and the second pending work item are the same, The first to-be-processed work item and the second to-be-processed work item are further sorted according to the corresponding auxiliary priority, so as to ensure that all the pending work items can be distinguished.
在一实施例中,对于主优先级的取值相同的多个待处理工作项,当所述多个待处理工作项均设置有辅助优先级时,可以按照对应的辅助优先级的取值,对所述多个待处理工作项进行排序。例如,假定待处理工作项包括工作项1~5,其中工作项1的主优先级为紧急、工作项2~4的主优先级为高、工作项5的主优先级为低,那么可以确定:工作项1的重要程度(此处以重要程度为例,也可以用于表征紧急程度、关注程度等其他维度)最高、排列在最先,工作项5的重要程度最低、排列在最后,而工作项2~4的重要程度均在工作项1与工作项5之间;进一步的,如果工作项2~4均设有辅助优先级,比如工作项2的辅助优先级为3、工作项3的辅助优先级为5、工作项4的辅助优先级为2,那么可以确定:根据工作项2~4的辅助优先级的取值,确定出三者的重要程度为工作项4>工作项2>工作项3;因此,按照工作项1~5的重要程度,相应的排列顺序为:工作项1>工作项4>工作项2>工作项3>工作项5。In an embodiment, for a plurality of to-be-processed work items having the same value of the primary priority, when the plurality of work items to be processed are set with the auxiliary priority, the value of the corresponding auxiliary priority may be used. Sorting the plurality of work items to be processed. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined : The importance of work item 1 (here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working. The importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 4 are provided with auxiliary priorities, such as work item 2, the auxiliary priority is 3, work item 3 The auxiliary priority is 5, and the auxiliary priority of the work item 4 is 2. Then, it can be determined that, according to the value of the auxiliary priority of the work items 2 to 4, the importance degree of the three is determined as the work item 4> work item 2> Work item 3; therefore, according to the importance degree of work items 1 to 5, the corresponding arrangement order is: work item 1> work item 4> work item 2> work item 3> work item 5.
在一实施例中,对于主优先级的取值相同的多个待处理工作项,当所述多个待处理工作项中存在部分未设置辅助优先级的待处理工作项时,按照对应的辅助优先级的取值,对设置有辅助优先级的待处理工作项进行排序,以及将未设置辅助优先级的待处理工作项排列于设置有辅助优先级的待处理工作项之后。例如,假定待处理工作项包括工作项1~5,其中工作项1的主优先级为紧急、工作项2~4的主优先级为高、工作项5的主优先级为低,那么可以确定:工作项1的重要程度(此处以重要程度为例,也可以用于表征紧急程度、关注程度等其他维度)最高、排列在最先,工作项5的重要程度最低、排列在最后,而工作项2~4的重要程度均在工作项1与工作项5之间;进一步的,如果工作项2~3设有辅助优先级、工作项4未设置辅助优先级,可以确定工作项4的重要程度低于工作项2~3,而假定工作项2的辅助优先级为3、工作项3的辅助优先级为5,那么可以确定:根据工作项2~4的辅助优先级,确定出三者的重要程度为工作项2>工作项3>工作项4;因此,按照工作项1~5的重要程度,相应的排列顺序为:工作项1>工作项2>工作项3>工作项4>工作项5。In an embodiment, for a plurality of to-be-processed work items having the same value of the primary priority, when there are some work items to be processed in which the auxiliary priority is not set in the plurality of to-be-processed work items, according to the corresponding auxiliary The value of the priority is sorted, and the work items to be processed with the auxiliary priority are sorted, and the work items to be processed without the auxiliary priority are arranged after the work item to be processed with the auxiliary priority set. For example, it is assumed that the work item to be processed includes work items 1 to 5, wherein the work priority of work item 1 is urgent, the work priority of work items 2 to 4 is high, and the work priority of work item 5 is low, then it can be determined : The importance of work item 1 (here, the importance level is used as an example, it can also be used to represent other dimensions such as urgency and degree of concern), the highest, the first, the work item 5 is the least important, and the last is working. The importance of items 2 to 4 is between work item 1 and work item 5; further, if work items 2 to 3 have auxiliary priorities and work items 4 do not have auxiliary priorities, it is possible to determine the importance of work items 4. The degree is lower than the work items 2 to 3, and assuming that the auxiliary priority of the work item 2 is 3 and the auxiliary priority of the work item 3 is 5, it can be determined that the three priorities are determined according to the auxiliary priorities of the work items 2 to 4. The importance degree is work item 2> work item 3> work item 4; therefore, according to the importance degree of work items 1 to 5, the corresponding order is: work item 1> work item 2> work item 3> work item 4> Work item 5.
需要指出的是:本申请中的第一待处理工作项与第二待处理工作项只是为了区分任意两个待处理工作项,比如上述的工作项1~5中的任意两个工作项a与工作项b,均可以作为上述的第一待处理工作项与第二待处理工作项,以适用于本说明书的工作项管理 方案。It should be noted that the first pending work item and the second pending work item in the present application are only for distinguishing between any two work items to be processed, such as any two work items a of the above work items 1 to 5 and The work item b can be used as the first work item to be processed and the second work item to be processed as described above, so as to be applicable to the work item management scheme of the present specification.
在一实施例中,可以根据接收到的优先级调整指令,对第一待处理工作项或第二待处理工作项的主优先级和辅助优先级中至少之一进行调整。在实际处理过程中,可能面临工作计划、项目需求的变化,因而可以根据实际情况对主优先级或辅助优先级进行调整,或同时对主优先级和辅助优先级进行调整。其中,优先级调整指令可以来源于第一待处理工作项或第二待处理工作项的提交方、处理方或其他角色,本说明书并不对此进行限制。In an embodiment, at least one of a primary priority and an auxiliary priority of the first pending work item or the second pending work item may be adjusted according to the received priority adjustment instruction. In the actual processing, there may be changes in the work plan and project requirements. Therefore, the primary priority or the auxiliary priority can be adjusted according to the actual situation, or the primary priority and the auxiliary priority can be adjusted at the same time. The priority adjustment instruction may be derived from the submitter, the processor, or other roles of the first to-be-processed work item or the second to-be-processed work item, which is not limited in this specification.
在一实施例中,所述辅助优先级可以用于在下述维度中至少之一,对具有相同的主优先级的第一待处理工作项和第二待处理工作项进行划分:重要程度、紧急程度、关注程度(即第一待处理工作项和第二待处理工作项的处理者或其他用户对该第一待处理工作项和第二待处理工作项的关注程度)等,本说明书并不对此进行限制。以重要程度为例,当辅助优先级的数值越大时,表明相应的待处理工作项的重要程度越高;类似地,以紧急程度为例,当辅助优先级的数值越大时,表明相应的待处理工作项越紧急;类似地,以关注程度为例,当辅助优先级的数值越大时,表明待处理工作项的处理者或其他用户对相应的待处理工作项越关注。其中,重要程度、紧急程度、关注程度或其他维度之间可以同时存在,比如既重要又紧急的待处理工作项;但并不存在必然关联,比如重要程度高的待处理工作项并不一定非常紧急,再比如关注程度高的待处理工作项并不一定非常重要。In an embodiment, the auxiliary priority may be used to divide the first pending work item and the second pending work item having the same primary priority in at least one of the following dimensions: importance, emergency Degree, degree of concern (ie, the degree of attention of the first pending work item and the second pending work item or other user to the first pending work item and the second pending work item), etc., this specification is not correct This is a limitation. Taking the importance level as an example, when the value of the auxiliary priority is larger, it indicates that the corresponding work item is more important; similarly, in the case of urgency, when the value of the auxiliary priority is larger, it indicates that the corresponding The more urgent the work item to be processed is; similarly, taking the degree of attention as an example, when the value of the auxiliary priority is larger, it indicates that the processor or other user of the work item to be processed pays more attention to the corresponding work item to be processed. Among them, the degree of importance, urgency, degree of concern or other dimensions can exist at the same time, such as important and urgent pending work items; but there is no necessary relationship, for example, the important work items to be processed are not necessarily very Urgent, and for example, a high level of pending work items is not necessarily very important.
为了便于理解,下面结合工作项管理过程中的界面展示内容,对本说明书一个或多个实施例的技术方案进行说明。假定用户A使用图1所示的PC13、用户B使用图1所示的PC14,其中PC13与PC14上运行有工作项的管理系统的客户端、服务器11上运行有工作项的管理系统的服务端。For ease of understanding, the technical solutions of one or more embodiments of the present specification are described below in conjunction with the interface presentation content in the work item management process. It is assumed that the user A uses the PC 13 shown in FIG. 1 and the user B uses the PC 14 shown in FIG. 1 , wherein the client 13 and the client 14 of the management system running the work item on the PC 14 and the PC 14 run the server of the management system with the work item on the server 11 . .
用户A可以通过PC13上运行的客户端创建工作项。例如,图3是一示例性实施例提供的一种创建工作项的界面示意图。如图3所示,PC13可以向用户A提供工作项创建界面300,该工作项创建界面300内包含若干选项,比如“名称”、“类型”、“归属项目”、“关联项目”、“优先级”、“指派给”等,可由用户A进行设置。其中,“优先级”选项可供用户A对当前所需创建的工作项进行优先级设置;如图3所示,工作项创建界面300中的优先级可以包括“主优先级”和“辅助优先级”两个部分,用户A通常必须设定“主优先级”,而“辅助优先级”则并非必须设定。User A can create a work item through a client running on the PC 13. For example, FIG. 3 is a schematic diagram of an interface for creating a work item according to an exemplary embodiment. As shown in FIG. 3, the PC 13 can provide the user A with a work item creation interface 300, which includes several options, such as "name", "type", "home item", "associated item", "priority". "Level", "Assigned to", etc., can be set by User A. The “priority” option allows the user A to prioritize the work items that need to be created currently; as shown in FIG. 3, the priorities in the work item creation interface 300 may include “primary priority” and “auxiliary priority”. In the "two levels", user A usually has to set "primary priority", while "auxiliary priority" does not have to be set.
在一实施例中,用户A可以通过触发选框31,唤出备选的优先级类型,比如紧急、 高、中、低等,以设定当前创建的工作项的主优先级。进一步的,用户A可以通过触发选框32,在选框32中设定当前创建的工作项的辅助优先级;其中,辅助优先级可以采用数字化的取值,比如整数或小数等,本说明书并不对此进行限制。In an embodiment, user A can trigger an optional priority type, such as emergency, high, medium, low, etc., by triggering the selection box 31 to set the primary priority of the currently created work item. Further, the user A can set the auxiliary priority of the currently created work item in the selection box 32 by triggering the selection box 32; wherein the auxiliary priority level can adopt a digital value, such as an integer or a decimal, etc. Do not limit this.
用户A可以通过触发工作项创建界面300上的“完成”选项,完成相应工作项的创建,并将该工作项“XX问题优化”指派给用户B;换言之,在本实施例中,用户A为工作项“XX问题优化”的提交者角色、用户B为该工作项的处理者角色。图4是一示例性实施例提供的一种工作项列表的界面示意图;如图4所示,PC14可以向用户B展示工作项列表界面400,使其通过该工作项列表界面400查看所有待处理的工作项,比如用户A通过图3所示的实施例创建的工作项“XX问题优化”,以及“XX特性开发”、“AA特性开发”等其他工作项。User A can complete the creation of the corresponding work item by triggering the "Complete" option on the work item creation interface 300, and assign the work item "XX Problem Optimization" to the user B; in other words, in this embodiment, the user A is The submitter role of the work item "XX Problem Optimization" and User B are the handler roles of the work item. FIG. 4 is a schematic diagram of an interface of a work item list provided by an exemplary embodiment; as shown in FIG. 4, the PC 14 may display the work item list interface 400 to the user B to view all pending items through the work item list interface 400. Work items, such as the work item "XX Problem Optimization" created by User A through the embodiment shown in FIG. 3, and other work items such as "XX Feature Development" and "AA Feature Development".
在工作项列表界面400中,可以分别展示出各个工作项的优先级,比如工作项“XX问题优化”的优先级为“紧急”、工作项“XX特性开发”的优先级为“紧急”、工作项“AA特性开发”的优先级为“中”等;换言之,用户A仅为上述工作项设置了主优先级,而并未设置辅助优先级。那么,对于工作项“XX问题优化”与工作项“XX特性开发”而言,由于主优先级均为“紧急”且未设置辅助优先级,使得无法对这两个工作项的重要程度进行有效区分,也无法据此对这两个工作项实现有效的排序,比如图4中根据工作项的创建顺序将工作项“XX问题优化”排列在工作项“XX特性开发”的上方(或称为“前方”);尤其是,在用户B处的工作项数量越来越多的情况下,可能出现更多主优先级为“紧急”的工作项,将严重影响用户B的工作效率。In the work item list interface 400, the priority of each work item can be respectively displayed, for example, the work item "XX problem optimization" has priority of "emergency", and the work item "XX feature development" has priority of "emergency". The priority of the work item "AA Feature Development" is "Medium" or the like; in other words, User A sets the primary priority only for the above work item, and does not set the auxiliary priority. Then, for the work item "XX problem optimization" and the work item "XX feature development", since the main priority is "emergency" and the auxiliary priority is not set, the importance of the two work items cannot be effectively performed. Differentiate, and can not effectively sort the two work items according to this, for example, in Figure 4, the work item "XX problem optimization" is arranged above the work item "XX feature development" according to the creation order of the work item (or called "Front"; in particular, in the case where the number of work items at User B is increasing, more work items with a primary priority of "emergency" may occur, which will seriously affect the work efficiency of User B.
因此,用户B可以通过为工作项列表界面400中的工作项设定辅助优先级,以通过辅助优先级实现重要程度的划分。例如图4所示,在每个工作项的“优先级”参数旁显示有“编辑”选项,比如工作项“XX问题优化”对应的编辑选项41、工作项“XX特性开发”对应的编辑选项42、工作项“AA特性开发”对应的编辑选项43等。Therefore, the user B can set the auxiliary priority for the work items in the work item list interface 400 to achieve the degree of importance division by the auxiliary priority. For example, as shown in FIG. 4, an "Edit" option is displayed next to the "Priority" parameter of each work item, such as an edit option 41 corresponding to the work item "XX Problem Optimization" and an edit option corresponding to the work item "XX Feature Development". 42. The editing option 43 corresponding to the work item "AA feature development".
图5是一示例性实施例提供的一种编辑优先级的示意图。以工作项“XX问题优化”为例:当检测到用户B触发图4所示的编辑选项41时,PC14可以展示出对应于主优先级的选项51、对应于辅助优先级的选项52;其中,通过触发选项51,用户B可以对工作项“XX问题优化”的主优先级进行调整,而通过触发选项52,用户B可以为工作项“XX问题优化”设定辅助优先级的取值,比如图5中设定的辅助优先级的取值为2。在图5所示的编辑状态下,上述的编辑选项41切换为图5所示的完成选项53,当用户B触发该完成选项53后,可以完成对工作项“XX问题优化”的优先级编辑操作。FIG. 5 is a schematic diagram of an editing priority provided by an exemplary embodiment. Taking the work item "XX problem optimization" as an example: when it is detected that the user B triggers the editing option 41 shown in FIG. 4, the PC 14 can display the option 51 corresponding to the primary priority and the option 52 corresponding to the auxiliary priority; By triggering the option 51, the user B can adjust the primary priority of the work item "XX problem optimization", and by triggering the option 52, the user B can set the value of the auxiliary priority for the work item "XX problem optimization". For example, the auxiliary priority set in FIG. 5 is 2. In the editing state shown in FIG. 5, the above-mentioned editing option 41 is switched to the completion option 53 shown in FIG. 5. When the user B triggers the completion option 53, the priority editing of the work item "XX problem optimization" can be completed. operating.
图6是一示例性实施例提供的另一种工作项列表的界面示意图。如图6所示,假定用户B为工作项“XX问题优化”设定的优先级为“紧急-2”,表明其主优先级为“紧急”、辅助优先级的取值为“2”,那么当工作项“XX特性开发”的优先级为“紧急”时,可以认为具有辅助优先级的工作项“XX问题优化”较之没有辅助优先级的工作项“XX特性开发”更重要,因而将工作项“XX问题优化”排列在工作项“XX特性开发”的上方。另外,如图6所示,对于已经设有(无论是用户B自行设定,或由用户A设定)主优先级和辅助优先级的工作项“XX问题优化”,用户B可以通过触发编辑选项41,继续对其主优先级或辅助优先级进行编辑。FIG. 6 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment. As shown in FIG. 6, it is assumed that the priority set by the user B for the work item "XX problem optimization" is "emergency-2", indicating that the primary priority is "emergency" and the auxiliary priority is "2". Then when the priority of the work item "XX feature development" is "emergency", it can be considered that the work item "XX problem optimization" with the auxiliary priority is more important than the work item "XX feature development" without the auxiliary priority. The work item "XX Problem Optimization" is arranged above the work item "XX Feature Development". In addition, as shown in FIG. 6, for the work item "XX problem optimization" that has been set (whether user B sets itself or set by user A) primary priority and auxiliary priority, user B can trigger editing by Option 41, continue to edit its primary or secondary priority.
与上述实施例相类似的,用户B还可以对工作项列表界面400中的其他工作项进行优先级编辑,比如通过触发编辑选项42可以对工作项“XX特性开发”进行编辑,通过触发编辑选项43可以对工作项“AA特性开发”进行编辑等。例如,图7是一示例性实施例提供的又一种工作项列表的界面示意图;如图7所示,假定用户B将工作项“XX问题优化”的优先级设定为“紧急-2”、将工作项“XX特性开发”的优先级设定为“紧急-1”,那么虽然两个工作项的主优先级均为“紧急”,但是由于辅助优先级的取值不同,可以判定为工作项“XX特性开发”的重要程度高于工作项“XX问题优化”,因而将工作项“XX问题优化”排列于工作项“XX特性开发”的上方。Similar to the above embodiment, the user B can also perform priority editing on other work items in the work item list interface 400, for example, by triggering the edit option 42 to edit the work item "XX feature development" by triggering the edit option. 43 can edit the work item "AA feature development" and the like. For example, FIG. 7 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment; as shown in FIG. 7, it is assumed that user B sets the priority of the work item “XX problem optimization” to “emergency-2”. If the priority of the work item "XX feature development" is set to "emergency-1", then although the primary priority of both work items is "emergency", since the value of the auxiliary priority is different, it can be determined as The work item "XX Feature Development" is more important than the work item "XX Problem Optimization", so the work item "XX Problem Optimization" is arranged above the work item "XX Feature Development".
另外,辅助优先级的取值并不一定为整数。例如,图8是一示例性实施例提供的再一种工作项列表的界面示意图;如图8所示,在用户B将工作项“XX问题优化”的优先级设定为“紧急-2”、将工作项“XX特性开发”的优先级设定为“紧急-1”之后,如果用户A指派了工作项“扫码付款”,且用户B认为其重要程度处于工作项“XX问题优化”、工作项“XX特性开发”之间,那么用户B可以将该工作项“扫码付款”的辅助优先级的取值设定为1.5,使得工作项“扫码付款”被排列于工作项“XX特性开发”之后、工作项“XX问题优化”之前。In addition, the value of the auxiliary priority is not necessarily an integer. For example, FIG. 8 is a schematic diagram of an interface of another work item list provided by an exemplary embodiment; as shown in FIG. 8, the user B sets the priority of the work item “XX problem optimization” to “emergency-2”. After setting the priority of the work item "XX Feature Development" to "Emergency-1", if User A assigns the work item "Scan Code Payment", and User B considers that the importance is in the work item "XX Problem Optimization" Between the work item "XX feature development", then user B can set the value of the auxiliary priority of the work item "scan code payment" to 1.5, so that the work item "scan code payment" is arranged in the work item " After the development of XX features, before the work item "optimization of XX problems".
图9是一示例性实施例提供的一种设备的示意结构图。请参考图9,在硬件层面,该设备包括处理器902、内部总线904、网络接口906、内存908以及非易失性存储器910,当然还可能包括其他业务所需要的硬件。处理器902从非易失性存储器910中读取对应的计算机程序到内存908中然后运行,在逻辑层面上形成工作项的管理装置。当然,除了软件实现方式之外,本说明书一个或多个实施例并不排除其他实现方式,比如逻辑器件抑或软硬件结合的方式等等,也就是说以下处理流程的执行主体并不限定于各个逻辑单元,也可以是硬件或逻辑器件。FIG. 9 is a schematic structural diagram of an apparatus provided by an exemplary embodiment. Referring to FIG. 9, at the hardware level, the device includes a processor 902, an internal bus 904, a network interface 906, a memory 908, and a non-volatile memory 910, and of course may also include hardware required for other services. The processor 902 reads the corresponding computer program from the non-volatile memory 910 into the memory 908 and then operates to form a management device for the work item on a logical level. Of course, in addition to the software implementation, one or more embodiments of the present specification do not exclude other implementation manners, such as a logic device or a combination of software and hardware, etc., that is, the execution body of the following processing flow is not limited to each. A logical unit, which can also be a hardware or logic device.
在一实施例中,请参考图10,在软件实施方式中,该工作项的管理装置可以包括:In an embodiment, referring to FIG. 10, in the software implementation, the management device of the work item may include:
获取单元1001,获取待处理工作项,所述待处理工作项被设置了相应的主优先级;The obtaining unit 1001 is configured to obtain a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
设置单元1002,根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。The setting unit 1002 sets an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
可选的,所述主优先级由所述待处理工作项的提交方进行设置得到,所述辅助优先级设置指令来自于所述待处理工作项的处理方。Optionally, the primary priority is set by the submitter of the to-be-processed work item, and the auxiliary priority setting instruction is from a processing party of the to-be-processed work item.
可选的,还包括:Optionally, it also includes:
主优先级排序单元1003,按照对应的主优先级的取值,对所述待处理工作项进行排序;The primary priority sorting unit 1003 sorts the to-be-processed work items according to the value of the corresponding primary priority.
辅助优先级排序单元1004,当存在主优先级的取值相同的多个待处理工作项时,根据相应的辅助优先级对所述多个待处理工作项进行排序。The auxiliary priority sorting unit 1004 sorts the plurality of work items to be processed according to the corresponding auxiliary priority when there are multiple work items to be processed having the same value of the main priority.
可选的,所述辅助优先级排序单元1004具体用于:Optionally, the auxiliary prioritization unit 1004 is specifically configured to:
当所述多个待处理工作项均设置有辅助优先级时,按照对应的辅助优先级的取值,对所述多个待处理工作项进行排序。When the plurality of to-be-processed work items are all set with the auxiliary priority, the plurality of work items to be processed are sorted according to the value of the corresponding auxiliary priority.
可选的,所述辅助优先级排序单元1004具体用于:Optionally, the auxiliary prioritization unit 1004 is specifically configured to:
当所述多个待处理工作项中存在部分未设置辅助优先级的待处理工作项时,按照对应的辅助优先级的取值,对设置有辅助优先级的待处理工作项进行排序;When there are some work items to be processed in which the auxiliary priority is not set in the plurality of to-be-processed work items, the work items to be processed with the auxiliary priority are sorted according to the value of the corresponding auxiliary priority;
将未设置辅助优先级的待处理工作项排列于设置有辅助优先级的待处理工作项之后。The pending work items for which the auxiliary priority is not set are arranged after the pending work item set with the auxiliary priority.
可选的,还包括:Optionally, it also includes:
调整单元1005,根据接收到的优先级调整指令,对所述待处理工作项的主优先级和辅助优先级中至少之一进行调整。The adjusting unit 1005 adjusts at least one of a primary priority and an auxiliary priority of the to-be-processed work item according to the received priority adjustment instruction.
可选的,所述辅助优先级用于在下述维度中至少之一,对具有相同的主优先级的待处理工作项进行划分:重要程度、紧急程度、关注程度。Optionally, the auxiliary priority is used to divide the to-be-processed work items having the same primary priority in at least one of the following dimensions: importance level, urgency, and degree of concern.
在另一实施例中,请参考图11,在软件实施方式中,该工作项的管理装置可以包括:In another embodiment, referring to FIG. 11, in the software implementation, the management device of the work item may include:
获取单元1101,获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级;The obtaining unit 1101 is configured to acquire a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
设置单元1102,根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二待处理工作项进行划分。The setting unit 1102, according to the received auxiliary priority setting instruction, set a first auxiliary priority for the first to-be-processed work item, and set a second auxiliary priority for the second to-be-processed work item, to The first to-be-processed work item and the second to-be-processed work item are divided.
上述实施例阐明的系统、装置、模块或单元,具体可以由计算机芯片或实体实现,或者由具有某种功能的产品来实现。一种典型的实现设备为计算机,计算机的具体形式可以是个人计算机、膝上型计算机、蜂窝电话、相机电话、智能电话、个人数字助理、媒体播放器、导航设备、电子邮件收发设备、游戏控制台、平板计算机、可穿戴设备或者这些设备中的任意几种设备的组合。The system, device, module or unit illustrated in the above embodiments may be implemented by a computer chip or an entity, or by a product having a certain function. A typical implementation device is a computer, and the specific form of the computer may be a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email transceiver, and a game control. A combination of a tablet, a tablet, a wearable device, or any of these devices.
在一个典型的配置中,计算机包括一个或多个处理器(CPU)、输入/输出接口、网络接口和内存。In a typical configuration, a computer includes one or more processors (CPUs), input/output interfaces, network interfaces, and memory.
内存可能包括计算机可读介质中的非永久性存储器,随机存取存储器(RAM)和/或非易失性内存等形式,如只读存储器(ROM)或闪存(flash RAM)。内存是计算机可读介质的示例。The memory may include non-persistent memory, random access memory (RAM), and/or non-volatile memory in a computer readable medium, such as read only memory (ROM) or flash memory. Memory is an example of a computer readable medium.
计算机可读介质包括永久性和非永久性、可移动和非可移动媒体可以由任何方法或技术来实现信息存储。信息可以是计算机可读指令、数据结构、程序的模块或其他数据。计算机的存储介质的例子包括,但不限于相变内存(PRAM)、静态随机存取存储器(SRAM)、动态随机存取存储器(DRAM)、其他类型的随机存取存储器(RAM)、只读存储器(ROM)、电可擦除可编程只读存储器(EEPROM)、快闪记忆体或其他内存技术、只读光盘只读存储器(CD-ROM)、数字多功能光盘(DVD)或其他光学存储、磁盒式磁带、磁盘存储、量子存储器、基于石墨烯的存储介质或其他磁性存储设备或任何其他非传输介质,可用于存储可以被计算设备访问的信息。按照本文中的界定,计算机可读介质不包括暂存电脑可读媒体(transitory media),如调制的数据信号和载波。Computer readable media includes both permanent and non-persistent, removable and non-removable media. Information storage can be implemented by any method or technology. The information can be computer readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read only memory. (ROM), electrically erasable programmable read only memory (EEPROM), flash memory or other memory technology, compact disk read only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, Magnetic cassette tape, disk storage, quantum memory, graphene-based storage media or other magnetic storage devices or any other non-transporting media can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary storage of computer readable media, such as modulated data signals and carrier waves.
还需要说明的是,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、商品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、商品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、商品或者设备中还存在另外的相同要素。It is also to be understood that the terms "comprises" or "comprising" or "comprising" or any other variations are intended to encompass a non-exclusive inclusion, such that a process, method, article, Other elements not explicitly listed, or elements that are inherent to such a process, method, commodity, or equipment. An element defined by the phrase "comprising a ..." does not exclude the presence of additional equivalent elements in the process, method, item, or device including the element.
上述对本说明书特定实施例进行了描述。其它实施例在所附权利要求书的范围内。在一些情况下,在权利要求书中记载的动作或步骤可以按照不同于实施例中的顺序来执行并且仍然可以实现期望的结果。另外,在附图中描绘的过程不一定要求示出的特定顺序或者连续顺序才能实现期望的结果。在某些实施方式中,多处理对象处理和并行处理也是可以的或者可能是有利的。The foregoing description of the specific embodiments of the specification has been described. Other embodiments are within the scope of the following claims. In some cases, the actions or steps recited in the claims can be performed in a different order than the embodiments and still achieve the desired results. In addition, the processes depicted in the figures are not necessarily in a particular order or in a sequential order to achieve the desired results. In some embodiments, multi-processing object processing and parallel processing are also possible or may be advantageous.
在本说明书一个或多个实施例使用的术语是仅仅出于描述特定实施例的目的,而非 旨在限制本说明书一个或多个实施例。在本说明书一个或多个实施例和所附权利要求书中所使用的单数形式的“一种”、“所述”和“该”也旨在包括多数形式,除非上下文清楚地表示其他含义。还应当理解,本文中使用的术语“和/或”是指并包含一个或多个相关联的列出项目的任何或所有可能组合。The terms used in one or more embodiments of the specification are for the purpose of describing particular embodiments, and are not intended to limit one or more embodiments. The singular forms "a", "the", and "the" It should also be understood that the term "and/or" as used herein refers to and encompasses any and all possible combinations of one or more of the associated listed items.
应当理解,尽管在本说明书一个或多个实施例可能采用术语第一、第二、第三等来描述各种信息,但这些信息不应限于这些术语。这些术语仅用来将同一类型的信息彼此区分开。例如,在不脱离本说明书一个或多个实施例范围的情况下,第一信息也可以被称为第二信息,类似地,第二信息也可以被称为第一信息。取决于语境,如在此所使用的词语“如果”可以被解释成为“在……时”或“当……时”或“响应于确定”。It should be understood that although the terms first, second, third, etc. may be used to describe various information in one or more embodiments of the specification, the information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, the first information may also be referred to as the second information without departing from the scope of one or more embodiments of the present disclosure. Similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "when" or "when" or "in response to a determination."
以上所述仅为本说明书一个或多个实施例的较佳实施例而已,并不用以限制本说明书一个或多个实施例,凡在本说明书一个或多个实施例的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本说明书一个或多个实施例保护的范围之内。The above is only a preferred embodiment of one or more embodiments of the present specification, and is not intended to limit one or more embodiments of the present specification, which is within the spirit and principles of one or more embodiments of the present specification, Any modifications, equivalent substitutions, improvements, etc., are intended to be included within the scope of the protection of one or more embodiments.

Claims (16)

  1. 一种工作项的管理方法,其特征在于,包括:A method for managing a work item, comprising:
    获取待处理工作项,所述待处理工作项被设置了相应的主优先级;Obtaining a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
    根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。And setting an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  2. 根据权利要求1所述的方法,其特征在于,所述主优先级由所述待处理工作项的提交方进行设置得到,所述辅助优先级设置指令来自于所述待处理工作项的处理方。The method according to claim 1, wherein the primary priority is set by a submitter of the work item to be processed, and the auxiliary priority setting instruction is from a processor of the work item to be processed. .
  3. 根据权利要求1所述的方法,其特征在于,还包括:The method of claim 1 further comprising:
    按照对应的主优先级的取值,对所述待处理工作项进行排序;Sorting the to-be-processed work items according to the value of the corresponding primary priority;
    当存在主优先级的取值相同的多个待处理工作项时,根据相应的辅助优先级对所述多个待处理工作项进行排序。When there are multiple work items to be processed having the same value of the primary priority, the plurality of work items to be processed are sorted according to the corresponding auxiliary priority.
  4. 根据权利要求3所述的方法,其特征在于,所述根据相应的辅助优先级对所述多个待处理工作项进行排序,包括:The method according to claim 3, wherein the sorting the plurality of work items to be processed according to the corresponding auxiliary priority comprises:
    当所述多个待处理工作项均设置有辅助优先级时,按照对应的辅助优先级的取值,对所述多个待处理工作项进行排序。When the plurality of to-be-processed work items are all set with the auxiliary priority, the plurality of work items to be processed are sorted according to the value of the corresponding auxiliary priority.
  5. 根据权利要求3所述的方法,其特征在于,所述根据相应的辅助优先级对所述多个待处理工作项进行排序,包括:The method according to claim 3, wherein the sorting the plurality of work items to be processed according to the corresponding auxiliary priority comprises:
    当所述多个待处理工作项中存在部分未设置辅助优先级的待处理工作项时,按照对应的辅助优先级的取值,对设置有辅助优先级的待处理工作项进行排序;When there are some work items to be processed in which the auxiliary priority is not set in the plurality of to-be-processed work items, the work items to be processed with the auxiliary priority are sorted according to the value of the corresponding auxiliary priority;
    将未设置辅助优先级的待处理工作项排列于设置有辅助优先级的待处理工作项之后。The pending work items for which the auxiliary priority is not set are arranged after the pending work item set with the auxiliary priority.
  6. 根据权利要求1所述的方法,其特征在于,还包括:The method of claim 1 further comprising:
    根据接收到的优先级调整指令,对所述待处理工作项的主优先级和辅助优先级中至少之一进行调整。And adjusting at least one of a primary priority and an auxiliary priority of the to-be-processed work item according to the received priority adjustment instruction.
  7. 根据权利要求1所述的方法,其特征在于,所述辅助优先级用于在下述维度中至少之一,对具有相同的主优先级的待处理工作项进行划分:重要程度、紧急程度、关注程度。The method according to claim 1, wherein the auxiliary priority is used to divide a work item to be processed having the same main priority in at least one of the following dimensions: importance level, urgency, attention degree.
  8. 一种工作项的管理方法,其特征在于,包括:A method for managing a work item, comprising:
    获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级;Obtaining a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
    根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二待处理工作项进行划分。And setting a first auxiliary priority for the first to-be-processed work item and a second auxiliary priority for the second to-be-processed work item, according to the received auxiliary priority setting instruction, to the first pending The work item and the second pending work item are divided.
  9. 一种工作项的管理装置,其特征在于,包括:A management device for a work item, comprising:
    获取单元,获取待处理工作项,所述待处理工作项被设置了相应的主优先级;Acquiring a unit to obtain a work item to be processed, where the to-be-processed work item is set with a corresponding primary priority;
    设置单元,根据接收到的辅助优先级设置指令,为所述待处理工作项设置辅助优先级,所述辅助优先级用于对具有相同的主优先级的待处理工作项进行划分。And a setting unit, configured to set an auxiliary priority for the to-be-processed work item according to the received auxiliary priority setting instruction, where the auxiliary priority is used to divide the to-be-processed work item having the same primary priority.
  10. 根据权利要求9所述的装置,其特征在于,所述主优先级由所述待处理工作项的提交方进行设置得到,所述辅助优先级设置指令来自于所述待处理工作项的处理方。The apparatus according to claim 9, wherein the primary priority is set by a submitter of the work item to be processed, and the auxiliary priority setting instruction is from a processing side of the work item to be processed. .
  11. 根据权利要求9所述的装置,其特征在于,还包括:The device according to claim 9, further comprising:
    主优先级排序单元,按照对应的主优先级的取值,对所述待处理工作项进行排序;The primary priority sorting unit sorts the to-be-processed work items according to the value of the corresponding primary priority;
    辅助优先级排序单元,当存在主优先级的取值相同的多个待处理工作项时,根据相应的辅助优先级对所述多个待处理工作项进行排序。The auxiliary priority sorting unit sorts the plurality of work items to be processed according to the corresponding auxiliary priority when there are multiple work items to be processed having the same value of the main priority.
  12. 根据权利要求11所述的装置,其特征在于,所述辅助优先级排序单元具体用于:The apparatus according to claim 11, wherein the auxiliary prioritization unit is specifically configured to:
    当所述多个待处理工作项均设置有辅助优先级时,按照对应的辅助优先级的取值,对所述多个待处理工作项进行排序。When the plurality of to-be-processed work items are all set with the auxiliary priority, the plurality of work items to be processed are sorted according to the value of the corresponding auxiliary priority.
  13. 根据权利要求11所述的装置,其特征在于,所述辅助优先级排序单元具体用于:The apparatus according to claim 11, wherein the auxiliary prioritization unit is specifically configured to:
    当所述多个待处理工作项中存在部分未设置辅助优先级的待处理工作项时,按照对应的辅助优先级的取值,对设置有辅助优先级的待处理工作项进行排序;When there are some work items to be processed in which the auxiliary priority is not set in the plurality of to-be-processed work items, the work items to be processed with the auxiliary priority are sorted according to the value of the corresponding auxiliary priority;
    将未设置辅助优先级的待处理工作项排列于设置有辅助优先级的待处理工作项之后。The pending work items for which the auxiliary priority is not set are arranged after the pending work item set with the auxiliary priority.
  14. 根据权利要求9所述的装置,其特征在于,还包括:The device according to claim 9, further comprising:
    调整单元,根据接收到的优先级调整指令,对所述待处理工作项的主优先级和辅助优先级中至少之一进行调整。The adjusting unit adjusts at least one of a primary priority and an auxiliary priority of the to-be-processed work item according to the received priority adjustment instruction.
  15. 根据权利要求9所述的装置,其特征在于,所述辅助优先级用于在下述维度中至少之一,对具有相同的主优先级的待处理工作项进行划分:重要程度、紧急程度、关注程度。The apparatus according to claim 9, wherein the auxiliary priority is used to divide a work item to be processed having the same main priority in at least one of the following dimensions: importance degree, urgency, attention degree.
  16. 一种工作项的管理装置,其特征在于,包括:A management device for a work item, comprising:
    获取单元,获取第一待处理工作项、第二待处理工作项,所述第一待处理工作项和所述第二待处理工作项被设置了相同的主优先级;Acquiring a unit to obtain a first to-be-processed work item and a second to-be-processed work item, where the first to-be-processed work item and the second to-be-processed work item are set to have the same primary priority;
    设置单元,根据接收到的辅助优先级设置指令,为所述第一待处理工作项设置第一辅助优先级、为所述第二待处理工作项设置第二辅助优先级,以对所述第一待处理工作项和所述第二待处理工作项进行划分。a setting unit, configured to set a first auxiliary priority for the first to-be-processed work item and a second auxiliary priority for the second to-be-processed work item according to the received auxiliary priority setting instruction, to A work item to be processed and the second work item to be processed are divided.
PCT/CN2019/077747 2018-03-22 2019-03-12 Work item management method and device WO2019179328A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810238083.6 2018-03-22
CN201810238083.6A CN110298522A (en) 2018-03-22 2018-03-22 The management method and device of work item

Publications (1)

Publication Number Publication Date
WO2019179328A1 true WO2019179328A1 (en) 2019-09-26

Family

ID=67988215

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/077747 WO2019179328A1 (en) 2018-03-22 2019-03-12 Work item management method and device

Country Status (2)

Country Link
CN (1) CN110298522A (en)
WO (1) WO2019179328A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163302A (en) * 2010-02-24 2011-08-24 北大方正集团有限公司 Link task processing method and device
CN103646338A (en) * 2013-11-19 2014-03-19 乐视网信息技术(北京)股份有限公司 Advertisement broadcasting method and apparatus
US20170213171A1 (en) * 2016-01-21 2017-07-27 Accenture Global Solutions Limited Intelligent scheduling and work item allocation
CN107644311A (en) * 2016-07-20 2018-01-30 上海致宇信息技术有限公司 A kind of outstanding work item intelligent sequencing and display methods

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7650385B2 (en) * 2003-11-20 2010-01-19 International Business Machines Corporation Assigning priorities
CN102724763B (en) * 2012-06-07 2014-11-05 西安交通大学 Time domain group scheduling method on basis of two-dimensional priority level
CN107291724A (en) * 2016-03-30 2017-10-24 阿里巴巴集团控股有限公司 Company-data clone method, priority determine method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163302A (en) * 2010-02-24 2011-08-24 北大方正集团有限公司 Link task processing method and device
CN103646338A (en) * 2013-11-19 2014-03-19 乐视网信息技术(北京)股份有限公司 Advertisement broadcasting method and apparatus
US20170213171A1 (en) * 2016-01-21 2017-07-27 Accenture Global Solutions Limited Intelligent scheduling and work item allocation
CN107644311A (en) * 2016-07-20 2018-01-30 上海致宇信息技术有限公司 A kind of outstanding work item intelligent sequencing and display methods

Also Published As

Publication number Publication date
CN110298522A (en) 2019-10-01

Similar Documents

Publication Publication Date Title
US10255108B2 (en) Parallel execution of blockchain transactions
US11782892B2 (en) Method and system for migrating content between enterprise content management systems
US10885056B2 (en) Data standardization techniques
US9721015B2 (en) Providing a query results page
US10579973B2 (en) System for efficient processing of transaction requests related to an account in a database
US10776373B2 (en) Facilitating elastic allocation of organization-specific queue resources in an on-demand services environment
WO2019179026A1 (en) Electronic device, method for automatically generating cluster access domain name, and storage medium
US11775520B2 (en) Updating of a denormalized database object after updating, deleting, or inserting a record in a source database object
WO2019041753A1 (en) Information modification method, apparatus, computer device and computer-readable storage medium
CN102938039A (en) Selective file access for applications
CN109564566B (en) Discovery of calling applications for controlling file hydration behavior
EP3188051B1 (en) Systems and methods for search template generation
US10509641B2 (en) Optimizing feature deployment based on usage pattern
US20230244680A1 (en) Systems and methods for expedited large file processing
US11886458B2 (en) Configurable data transformation between different database systems
US20160125003A1 (en) Secondary queue for index process
US10896173B2 (en) Content management in an on-demand environment
WO2019179328A1 (en) Work item management method and device
US8935710B1 (en) Unique event identification
US20210241328A1 (en) Techniques and Architectures for Customizable Modular Line Item Evaluation
US20180052696A1 (en) Providing teaching user interface activated by user action
US20210232991A1 (en) Business flow conversion mechanism
WO2019237949A1 (en) Search method and device
US20240070132A1 (en) Independently loading related data into data storage
US20240070134A1 (en) Determining references to predefined types of records

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19771431

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19771431

Country of ref document: EP

Kind code of ref document: A1