WO2019176847A1 - 情報処理システムおよび情報処理方法 - Google Patents

情報処理システムおよび情報処理方法 Download PDF

Info

Publication number
WO2019176847A1
WO2019176847A1 PCT/JP2019/009646 JP2019009646W WO2019176847A1 WO 2019176847 A1 WO2019176847 A1 WO 2019176847A1 JP 2019009646 W JP2019009646 W JP 2019009646W WO 2019176847 A1 WO2019176847 A1 WO 2019176847A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
unit
amount
information
solar power
Prior art date
Application number
PCT/JP2019/009646
Other languages
English (en)
French (fr)
Inventor
善之 奈須野
Original Assignee
株式会社カネカ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社カネカ filed Critical 株式会社カネカ
Priority to JP2020506506A priority Critical patent/JP7257382B2/ja
Publication of WO2019176847A1 publication Critical patent/WO2019176847A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present invention relates to an information processing system and an information processing method.
  • solar power generation devices are widely used not only by electric power companies but also by general consumers.
  • a user who is a general consumer installs and operates a solar power generation device on the home premises or on the roof of the home.
  • a user operates an electric appliance at home with the electric power generated by the solar power generation device.
  • the user sells surplus power that cannot be consumed at home to a power company at a predetermined power selling price.
  • Patent Document 1 An example of a technique related to the operation of such a solar power generation apparatus is disclosed in Patent Document 1.
  • the amount of power generation and the power selling price are calculated while varying the installation conditions such as the installation azimuth angle or inclination angle of the photovoltaic power generation panel.
  • the installation azimuth angle or inclination angle at which the power selling price is high can be specified, and the solar power generation apparatus can be installed appropriately.
  • the user may attempt to review the operation method due to various factors after installing the photovoltaic power generation apparatus and starting the operation.
  • the operation method may be revised due to various factors such as a change in the power selling price by an electric power company, occurrence of maintenance costs for a photovoltaic power generation device, or whether or not to additionally purchase a storage battery.
  • information that can be used as a judgment material regarding the operation can be provided to the user.
  • Patent Document 1 provides information regarding the installation of the solar power generation apparatus, and do not consider the operation after the installation of the solar power generation apparatus.
  • the present invention has been made in view of such a situation. And the objective is to provide the information processing system and the information processing method for providing the information regarding operation
  • the information processing system includes an acquisition unit that acquires a result of power generation amount of a solar power generation device, and the solar power generation in a predetermined period in the future based on the result of the power generation amount acquired by the acquisition unit.
  • a prediction unit that predicts the power generation amount of the device, a conversion unit that converts a value related to the operation of the solar power generation device into an amount of money in the future predetermined period based on the power generation amount predicted by the prediction unit;
  • a notification unit for notifying the amount converted by the conversion unit.
  • An information processing method is an information processing method executed by an information processing system, in which an acquisition unit acquires an actual power generation amount of a photovoltaic power generation apparatus, and a prediction unit includes the acquisition unit Based on the obtained power generation results, a prediction step for predicting the power generation amount of the solar power generation device in a predetermined future period, and the conversion unit based on the power generation amount predicted by the prediction unit, The conversion process which converts the value regarding the operation
  • FIG. 1 is a block diagram showing the overall configuration of the information processing system S according to the present embodiment.
  • the information processing system S includes an information collection device 10, a cloud server 20, a smartphone 30, an external server 40, a power conditioner 50, a solar power generation device 51, a power conditioner 60, and a DC / DC converter 61. , Storage battery 62, and home appliance group 70.
  • the information collection device 10, the power conditioner 50, the solar power generation device 51, the power conditioner 60, the DC / DC converter 61, the storage battery 62, and the home appliance group 70 are installed and used in the vicinity, for example. .
  • it is installed and used in a user's residence. This dwelling is connected to the power grid in a grid-connected manner in order to buy and sell power with the power company.
  • the electric power generated by the solar power generation device 51 is output from the power conditioner 50 and supplied to the storage battery 62, the household appliance group 70, and the information collection device 10. Further, surplus power that cannot be consumed by these devices is sent to the power system and sold to the power company.
  • the smartphone 30 is used by the user regardless of inside or outside the residence.
  • the cloud server 20 and the external server 40 are installed and used in a place managed by the operator of the information processing system S.
  • Each device included in the information processing system S is connected to be communicable with each other via the network 80.
  • the communication between the devices may be performed according to an arbitrary communication method, and the communication method is not particularly limited. Further, the communication between the devices may be performed directly between the devices without going through the network 80.
  • the information processing system S having such a configuration predicts a statistic of the power generation amount of the solar power generation device 51 in a future predetermined period based on the actual power generation amount of the solar power generation device 51. Further, the information processing system S converts the value related to the operation of the solar power generation device 51 in a predetermined future period into an amount based on the predicted statistics. Further, the information processing system S notifies the user of the converted amount. Therefore, according to the information processing system S, it is possible to provide information related to the operation of the existing solar power generation device.
  • the information collection device 10 corresponds to the solar power generation device 51 and is a device that collects various types of performance information related to the operation of the solar power generation device 51.
  • the information collection device 10 collects the results of the power generation amount of the solar power generation device 51 via the power conditioner 50, for example.
  • the information collection device 10 collects results of power consumption by monitoring the power supplied to the storage battery 62, the household appliance group 70, and the information collection device 10.
  • the information collection device 10 collects the actual power sales amount and the actual power purchase amount by monitoring the power system for selling and buying power with the power company.
  • the information collection device 10 transmits the performance information collected in this way to the cloud server 20.
  • the cloud server 20 is a device that converts the value related to the operation of the solar power generation device 51 in a future predetermined period into an amount of money by analyzing the record information received from the information collection device 10.
  • the cloud server 20 transmits the amount calculated by this conversion to the smartphone 30 in order to notify the user. Further details of the information collection device 10 and the cloud server 20 will be described later with reference to FIGS. 2 and 3.
  • the smartphone 30 is a device that notifies the user of the amount converted from the value related to the operation of the solar power generation device 51.
  • the smartphone 30 displays, for example, the amount converted from the value related to the operation of the solar power generation device 51 received from the cloud server 20 on a display included in the smartphone 30 or outputs the sound from a speaker included in the smartphone 30 by voice. To notify the user.
  • the user can grasp the amount converted from the value related to the operation of the solar power generation device 51 by this notification. And the user can consider the operation method of the solar power generation device 51 in the future using the grasped amount as one of the determination materials.
  • the external server 40 is a device that transmits information used for conversion by the information collection device 10 to the information collection device 10.
  • the external server 40 is realized by a server that provides weather information, for example. In this case, the external server 40 transmits the weather information of the area where the solar power generation device 51 is installed to the information collection device 10.
  • the external server 40 is, for example, a seller of equipment related to the operation of the solar power generation device 51 (for example, a solar power generation panel, a power conditioner, and a storage battery that are components of the solar power generation device), or It is realized by a server of a business operator that performs maintenance of the solar power generation device. In this case, the external server 40 transmits information such as replacement costs, expansion costs, additional costs, maintenance costs, and the like regarding the devices related to these operations to the information collecting apparatus 10.
  • the cloud server 20 uses the information provided by the external server 40 in addition to various performance information collected by the information collecting apparatus 10 for conversion. As a result, the cloud server 20 can improve the conversion accuracy or notify more information.
  • the solar power generation device 51 is a device that generates power by converting the light energy of sunlight into electric power by the photovoltaic effect.
  • the solar power generation device 51 uses a solar cell string in which solar cell modules are connected in series as one line, and connects each line to a connection box, thereby generating one direct current generated by each solar cell module.
  • the direct current collected in this one is output to the power conditioner 50 through a backflow preventing diode and a switch in the junction box.
  • the power conditioner 50 includes an inverter that converts a direct current output from the solar power generation device 51 into an alternating current generally used in a residence or the like.
  • the alternating current converted by the power conditioner 50 is supplied to the home appliance group 70 and the storage battery 62.
  • the storage battery 62 is a secondary battery that stores electric power. By storing power in the storage battery 62, for example, the home appliance group 70 can be used in the event of a power failure, or surplus power generated during the day can be used at night. In addition, it is possible to charge nighttime power with a low unit price and use it during the day.
  • the DC / DC converter 61 is a bidirectional DC / DC converter for stabilizing the voltage exchanged between the storage battery 62 and the power conditioner 60.
  • the power conditioner 60 includes an inverter that converts a direct current stored in the storage battery 62 output from the DC / DC converter into an alternating current generally used in a residence or the like.
  • the alternating current converted by the power conditioner 60 is supplied to the home appliance group 70.
  • the power conditioners 50 and 60 are provided as separate bodies corresponding to the solar power generation device 51 and the storage battery 62, but are not limited thereto.
  • a single power conditioner may be a hybrid power conditioner corresponding to the solar power generation device 51 and the storage battery 62.
  • the household appliance group 70 includes a plurality of electric devices that are operated by electric power generated by the solar power generation device 51 and electric power purchased from an electric power company.
  • the electric appliances included in the home appliance group 70 are not particularly limited, and for example, an air conditioner, a refrigerator, a television, and an electric water heater (for example, Eco Cute) are included in the home appliance group 70.
  • the network 80 is realized by, for example, the Internet, a LAN (Local Area Network), a mobile phone network, or a combination of these.
  • LAN Local Area Network
  • mobile phone network or a combination of these.
  • each device included in the information processing system S has been described.
  • each device is illustrated one by one, but this is merely an example, and the information processing system S may include any number of these devices.
  • the information collection device 10 includes a CPU (Central Processing Unit) 11, a ROM (Read Only Memory) 12, a RAM (Random Access Memory) 13, a communication unit 14, a storage unit 15, An input unit 16 and a display unit 17 are provided. These units are bus-connected by signal lines and transmit / receive signals to / from each other.
  • CPU Central Processing Unit
  • ROM Read Only Memory
  • RAM Random Access Memory
  • the CPU 11 executes various processes according to a program recorded in the ROM 12 or a program loaded from the storage unit 15 to the RAM 13.
  • the RAM 13 appropriately stores data necessary for the CPU 11 to execute various processes.
  • the communication unit 14 performs communication control for the CPU 11 to communicate with other devices included in the information processing system S.
  • the storage unit 15 is composed of a semiconductor memory such as a DRAM (Dynamic Random Access Memory) and stores various data.
  • the input unit 16 is configured with various buttons and a touch panel, or an external input device such as a mouse and a keyboard, and inputs various information according to a user's instruction operation.
  • the display unit 17 is composed of a liquid crystal display or the like, and displays an image corresponding to the image data output from the CPU 11.
  • the information collecting apparatus 10 performs “result information collecting processing” by cooperation of these units.
  • the performance information collection processing is a series of processing in which the information collection device 10 collects various performance information related to the operation of the solar power generation device 51 and transmits the collected performance information to the cloud server 20. is there.
  • the performance information collection unit 111 and the performance information transmission unit 112 function in the CPU 11.
  • a record information storage unit 151 is set in one area of the storage unit 15.
  • the track record information storage unit 151 stores various track record information related to the operation of the solar power generation apparatus 51 collected by the track record information collection unit 111 described later.
  • the achievement information collection unit 111 is a part that collects various kinds of achievement information related to the operation of the solar power generation device 51.
  • the track record information collection unit 111 collects track records of the amount of power generated by the solar power generation device 51 via the power conditioner 50, for example.
  • the performance information collection part 111 collects the results of power consumption by monitoring the electric power supplied to the storage battery 62, the household appliance group 70, and the performance information collection part 111.
  • the performance information collection unit 111 collects the actual power sales amount and the actual power purchase amount by monitoring the power system for selling and buying power with the power company.
  • the record information collection unit 111 may acquire record information from a wattmeter in a house that measures power or a smart meter installed by a power company. Moreover, the performance information collection unit 111 may connect to HEMS (Home Energy Management System) and collect performance information from the HEMS. Furthermore, the performance information collection unit 111 may collect the performance information from electrical devices included in the household appliance group 70 by communication based on a standard such as ECHONET Lite (registered trademark).
  • HEMS Home Energy Management System
  • the performance information collection part 111 may further be provided with the function as a wattmeter which consists of a set of a fixed coil and a movable coil, for example. And the performance information collection part 111 may acquire performance information, when the performance information collection part 111 itself performs a measurement by the function of this wattmeter.
  • the performance information collection unit 111 stores the collected performance information in the performance information storage unit 151.
  • the track record information transmission unit 112 associates track record information collected by the track record information collection unit 111 and stored in the track record information storage unit 151 with the identification information of the solar power generation device 51, based on a predetermined condition. This is a part to be transmitted to the cloud server 20. For example, the record information transmitting unit 112 transmits record information to the cloud server 20 at a predetermined time interval.
  • the present invention is not limited thereto.
  • the track record information may be transmitted directly from each device (such as the solar power generation device 51) other than the information collection device 10 to the cloud server 20 without using the track record information collection unit 111.
  • the cloud server 20 includes a CPU 21, a ROM 22, a RAM 23, a communication unit 24, a storage unit 25, an input unit 26, and a display unit 27. These units are bus-connected by signal lines and transmit / receive signals to / from each other.
  • each unit as hardware is equivalent to the function of each unit having the same name but different in reference numeral provided in the information collecting apparatus 10 described above. Therefore, the overlapping description is omitted.
  • the cloud server 20 performs a “value conversion process” by the cooperation of these units.
  • the cloud server 20 analyzes the performance information received from the information collection device 10 to convert the value related to the operation of the solar power generation device 51 in the future predetermined period into a monetary amount and to the user. It is a series of processing to notify to.
  • the performance information acquisition unit 211 When the performance information collection process is executed, as shown in FIG. 3, in the CPU 21, the performance information acquisition unit 211, the power generation amount prediction unit 212, the amount conversion unit 213, the notification information transmission unit 214, and the weather information acquisition are performed.
  • the unit 215 and the operation information acquisition unit 216 function.
  • a performance information database 251, a weather information storage unit 252, and an operation information storage unit 253 are set in one area of the storage unit 15.
  • the track record information database 251 is a database in which various track record information acquired from the information collection device 10 is stored. An example of a specific data structure of the record information database 251 will be described with reference to FIG.
  • the record information database 251 stores record information of a predetermined time unit for each solar power generation device 51 as one record. For example, performance information in units of one hour is stored as one record.
  • the time unit may be arbitrarily determined by the user. For example, the time unit may be a few minutes, a day, or a month.
  • each record includes, as columns, for example, “solar power generation device identification information”, “measurement date and time”, “power generation result”, “power consumption result”, “power sale amount result”, “power purchase amount result”, And “contract information”. Specific contents of information corresponding to each of these columns will be described.
  • “Solar power generation device identification information” is information for identifying the solar power generation device 51 transmitted from the information collection device 10 in association with various performance information.
  • the solar power generation device identification information is unique to each solar power generation device 51. For example, the serial number of each solar power generation device 51 or an ID (Identifier) assigned to each solar power generation device 51 is used as the solar power generation device identification information.
  • Measurement date and time is the date and time when various kinds of performance information included in the record was measured. For example, as described above, when performance information in units of one hour is stored as one record, the “measurement date and time” is information on what year, what month, and what time.
  • the “power generation amount record” is a record of the power generation amount of the solar power generation apparatus 51 collected by the information collection apparatus 10.
  • the “power consumption record” is a record of the power consumption of the dwelling where the photovoltaic power generation apparatus 51 is installed, which is collected by the information collecting apparatus 10.
  • “Actual amount of electric power sales” is the actual amount of electric power sales collected by the information collection device 10 in the residence where the solar power generation device 51 is installed. “Actual amount of purchased electricity” is the actual amount of purchased electricity collected by the information collecting device 10 in the residence where the solar power generation device 51 is installed.
  • the “contract information” is information indicating the contract details with the electric power company in the residence where the solar power generation device 51 is installed.
  • the contract information includes, for example, a power selling unit price and a power purchasing unit price in a contract between a user living in a residence and a power company.
  • the power sale unit price and the power purchase unit price vary depending on the time zone of day and night, the power sale unit price and the power purchase unit price in the time zone corresponding to the measurement date and time of each record are stored.
  • the contract information is set in advance in association with the solar power generation device 51, for example. In this case, for example, the contract information is set by a user input operation via the input unit 26 of the cloud server 20. Alternatively, the contract information may be transmitted from the information collection device 10 in association with various types of performance information, for example.
  • the weather information storage unit 252 stores weather information acquired from the external server 40.
  • the meteorological information is meteorological information of the area where the solar power generation device 51 is installed, and is, for example, information such as weather, sunshine duration, amount of sunshine, temperature, and humidity.
  • the weather information may be past weather information, or may be future weather information predicted by a specialized organization such as the Japan Meteorological Agency. For example, it may be an annual forecast for next year.
  • the operation information storage unit 253 stores information such as expenses related to the operation of the solar power generation apparatus 51 acquired from the external server 40.
  • the information on the cost related to the operation refers to the replacement cost for the device related to the operation of the solar power generation device 51 (for example, a solar power generation panel, a power conditioner, and a storage battery that are components of the solar power generation device). , Information on expansion costs, additional costs, maintenance costs, etc.
  • the achievement information acquisition unit 211 acquires various kinds of achievement information by receiving the information from the information collection device 10. Then, the performance information acquisition unit 211 stores various types of performance information acquired from the information collection device 10 in corresponding fields of the performance information database 251.
  • the record information acquisition unit 211 acquires various kinds of record information by receiving from each device other than the information collection device 10. Also in this case, the record information acquisition unit 211 stores various record information acquired from each device in the corresponding field of the record information database 251.
  • the power generation amount prediction unit 212 predicts the power generation amount of the solar power generation device 51 in a future predetermined period.
  • the future predetermined period can be arbitrarily determined.
  • the amount of sunlight generated by the solar power generation device 51 also changes because the amount of sunlight and the duration of sunlight change with the change of the four seasons in 12 months.
  • a predetermined future period may be determined in units of 12 months in which changes in the amount of power generated by the four seasons can be leveled.
  • the future predetermined period may be determined as a period of 12 months (that is, a period of up to 24 months) after 12 months from the present time.
  • the future may be the future or the past depending on the environment to which the present embodiment is applied.
  • the predetermined period may be longer or shorter depending on the environment to which the present embodiment is applied.
  • the future predetermined period is determined in advance prior to the prediction by the power generation amount prediction unit 212, for example, by a user input operation via the input unit 26 of the cloud server 20.
  • the predetermined period in the future may be designated by a user input operation via the input unit 26 of the cloud server 20 every time the power generation amount prediction unit 212 performs prediction.
  • the power generation amount prediction unit 212 predicts the statistic of the power generation amount of the photovoltaic power generation apparatus 51 in a predetermined future period based on the “power generation amount result” stored in the result information database 251. For example, if the predetermined period is 12 months, the power generation amount prediction unit 212 extracts the “power generation result” from the previous 12 months to the present time. Then, the power generation amount prediction unit 212 performs prediction by regarding the power generation amount obtained by adding the extracted “power generation amount results” as a statistical amount of the power generation amount in a predetermined period.
  • the power generation amount prediction unit 212 may perform the prediction by averaging the “power generation amount results” for a plurality of periods. For example, the total power generation statistics from the last 12 months to the present, and the total power generation from the last 24 months to the last 12 months Statistic of quantity, average value of statistics of three power generation amounts for the current period from the last 36 months before to the current 24 months before the current power generation total, The prediction may be performed by regarding the power generation amount as a statistic.
  • the power generation amount prediction unit 212 may correct the predicted power generation amount based on, for example, weather information stored in the weather information storage unit 252. For example, if the weather in the last 12 months is worse than usual and the amount of sunshine and duration are short, in the future it will be assumed that the weather will be normal, and the statistics of the predicted power generation will be increased. It may be.
  • the power generation amount prediction unit 212 outputs the power generation amount statistics for the predetermined period in the future predicted in this manner to the money amount conversion unit 213.
  • the money amount conversion unit 213 converts the value related to the operation of the solar power generation device 51 in a predetermined future period into a money amount. For example, the money amount conversion unit 213 multiplies the statistic of the power generation amount in the future predetermined period predicted by the power generation amount prediction unit 212 by the power sale price included in the “contract information” stored in the performance information database 251. Thus, the value related to the operation of the solar power generation device 51 is converted into an amount.
  • the power amount conversion unit 213 predicts the statistical amount of the power generation amount for a predetermined period in the future for each time zone. And the amount conversion part 213 converts the value regarding operation
  • the amount conversion unit 213 may perform conversion based on other information. For example, if it is known that the power sale price will be changed in a predetermined period in the future, conversion may be performed based on the changed power sale price.
  • the money amount conversion unit 213 calculates a maintenance cost, an additional device cost, and a replacement cost associated with the aging deterioration of the photovoltaic power generation apparatus 51 based on information stored in the operation information storage unit 253, for example. These calculated costs may be subtracted from the converted amount.
  • the money amount conversion unit 213 extracts, for example, the “power consumption” for the same period as the period during which the power generation amount prediction unit 212 predicted the statistical amount of power generation from the performance information database 251, and calculates the power consumption statistics. The amount may be calculated. Then, the money amount conversion unit 213 performs conversion by multiplying the power amount obtained by subtracting the calculated statistical amount of power consumption from the statistical amount of power generation predicted by the power generation amount prediction unit 212 by the power sale price. It may be. In addition, a result obtained by multiplying the calculated statistical amount of power consumption by the power purchase price for each time zone may be added to the conversion result.
  • the amount conversion unit 213 outputs, to the notification information transmission unit 214, an amount indicating the value related to the operation of the solar power generation device 51 in a predetermined future period calculated by conversion.
  • the notification information transmission unit 214 transmits the amount output by the amount conversion unit 213 to the smartphone 30 in order to notify the user of the amount output by the amount conversion unit 213.
  • the smartphone 30 displays the amount of money received from the cloud server 20 on, for example, a display included in the smartphone 30, or outputs by voice from a speaker included in the smartphone 30. Notify the user.
  • the user can grasp the amount converted from the value related to the operation of the solar power generation device 51 by this notification. And the user can consider the operation method of the solar power generation device 51 in the future using the grasped amount as one of the determination materials.
  • the notification information transmission unit 214 may notify the amount calculated by conversion using another method.
  • the notification information transmission unit 214 may perform notification by displaying the amount on the display unit 27 of the cloud server 20.
  • the notification information transmission unit 214 may transmit the amount of money to a device other than the smartphone 30 (for example, a personal computer included in the household appliance group 70 installed in the user's residence).
  • the notification information transmission unit 214 may notify a business operator or the like who performs maintenance of the solar power generation device 51.
  • the weather information acquisition unit 215 stores the weather information acquired from the external server 40 in the weather information storage unit 252.
  • the operation information acquisition unit 216 causes the operation information storage unit 253 to store information such as expenses related to the operation of the solar power generation apparatus 51 acquired from the external server 40. Details of these pieces of information are as described above with reference to the weather information storage unit 252 and the operation information storage unit 253.
  • step S ⁇ b> 11 the record information collection unit 111 collects various record information related to the operation of the solar power generation device 51.
  • step S12 the record information storage unit 151 stores various record information collected by the record information collection unit 111 in step S11.
  • step S ⁇ b> 13 the record information transmitting unit 112 determines whether or not a condition for transmitting various record information stored in the record information storage unit 151 to the cloud server 20 is satisfied. For example, when records are stored in units of one hour in the record information database 251 described above with reference to FIG. 4, the record information transmission unit 112 stores record information for one hour in the record information storage unit 151. This is a condition for transmission. If the condition for transmission is not satisfied, it is determined No in step S13, and the process is repeated again from step S11. On the other hand, if the condition for transmission is satisfied, it is determined Yes in step S13, and the process proceeds to step S14.
  • step S ⁇ b> 14 the record information transmission unit 112 transmits various record information stored in the record information storage unit 151 to the cloud server 20. Thereby, the record information collection process ends. Through the performance information collection process described above, the latest performance information is appropriately transmitted to the cloud server 20.
  • step S ⁇ b> 21 each of the result information acquisition unit 211, the weather information acquisition unit 215, and the operation information acquisition unit 216 determines whether or not information that should be acquired has been newly acquired.
  • the weather information acquisition unit 215, and the operation information acquisition unit 216 has acquired information, it is determined No in step S21, and the process proceeds to step S23.
  • the weather information acquisition unit 215, and the operation information acquisition unit 216 acquires information, it is determined Yes in step S21, and the process proceeds to step S22.
  • step S22 the information acquired in step S21 is stored in a portion corresponding to the acquired information in the storage unit 25.
  • step S23 the notification information transmission unit 214 determines whether a condition for performing notification is satisfied.
  • the notification information transmission unit 214 uses, for example, a condition for performing notification that a predetermined date and time has arrived or that a notification request has been received from the user.
  • the conditions for performing the notification are not satisfied, it is determined No in step S23, and the process is repeated again from step S21.
  • the conditions for performing the notification are satisfied, it is determined as Yes in step S23, and the process proceeds to step S24.
  • step S24 the power generation amount prediction unit 212 predicts a statistic of the power generation amount of the solar power generation device 51 in a future predetermined period.
  • step S25 the money amount conversion unit 213 converts the value related to the operation of the solar power generation device 51 in a future predetermined period into a money amount.
  • step S26 the notification information transmission unit 214 notifies the user of the amount output by the amount conversion unit 213 by a method such as transmitting the amount output by the amount conversion unit 213 to the smartphone 30. I do. Thereby, the value conversion process ends.
  • the user can grasp the amount of money converted from the value related to the operation of the solar power generation device 51. And the user can consider the operation method of the solar power generation device 51 in the future using the grasped amount as one of the determination materials. That is, according to this embodiment, it is possible to provide information related to the operation of an existing solar power generation device.
  • the present invention is not limited to the above-described embodiment, but includes modifications and improvements as long as the object of the present invention can be achieved.
  • the embodiment is realized by a device such as a cloud server and a smartphone.
  • the embodiment is not particularly limited thereto, and can be realized by an electronic device having an information processing function in general.
  • the series of processes described above can be executed by hardware or can be executed by software.
  • one functional block may be constituted by hardware alone, software alone, or a combination thereof.
  • the functional configuration illustrated in FIGS. 2 and 3 is merely an example, and is not particularly limited. That is, it is sufficient that the information processing system S has a function capable of executing the above-described series of processing as a whole, and what functional block is used to realize this function is not particularly limited to the example of FIG. .
  • the functional configuration included in the present embodiment can be realized by a processor that executes arithmetic processing.
  • the processors that can be used in the present embodiment include various types such as a single processor, a multiprocessor, and a multicore processor.
  • a combination of these various processing apparatuses and processing circuits such as ASIC (Application Specific Integrated Circuit) or FPGA (Field-Programmable Gate Array) is included.
  • a program constituting the software is installed on a computer or the like from a network or a recording medium.
  • the computer may be a computer incorporated in dedicated hardware.
  • the computer may be a computer capable of executing various functions by installing various programs, for example, a general-purpose personal computer.
  • a recording medium including such a program may be provided to the user by being distributed separately from the apparatus main body in order to provide the program to the user, or provided to the user in a state of being pre-installed in the apparatus main body. Also good.
  • a storage medium distributed separately from the apparatus main body is constituted by, for example, a magnetic disk (including a floppy disk), an optical disk, a magneto-optical disk, or the like.
  • the optical disc is composed of, for example, a CD-ROM (Compact Disc-Read Only Memory), a DVD (Digital Versatile Disc), a Blu-ray (registered trademark) Disc (Blu-ray Disc), and the like.
  • the magneto-optical disk is composed of an MD (Mini Disc) or the like.
  • the recording medium provided to the user in a state of being incorporated in the apparatus main body in advance is, for example, the ROM 12 in FIG. 2 and the ROM 22 in FIG. 3 in which the program is recorded, or the storage unit 15 in FIG. 2 and the storage in FIG.
  • the hard disk included in the unit 25 is configured.
  • the step of describing the program recorded on the recording medium is not limited to the processing performed in chronological order according to the order, but is not necessarily performed in chronological order, either in parallel or individually.
  • the process to be executed is also included.
  • the term “system” means an overall apparatus including a plurality of apparatuses and a plurality of means.
  • the monetary conversion unit 213 calculates one monetary value indicating the value related to the operation of the solar power generation device 51 in a predetermined future period by conversion.
  • the present invention is not limited to this, and the monetary amount conversion unit 213 may calculate a plurality of amounts corresponding to each operation state assuming a plurality of different operation states.
  • the notification information transmission unit 214 may notify the user of a plurality of amounts corresponding to each operation status. As a result, the user can compare and examine a plurality of amounts corresponding to each operation status, and thus the user can easily determine how to operate in the future.
  • the monetary value conversion unit 213 has, as operation statuses, a case where the unit price of power sold to the power company is maintained as it is and a case where the unit price of power sold to the power company is changed from the current price, respectively. May be converted to calculate the respective amounts.
  • the amount conversion unit 213 calculates each amount so that the price before and after the change can be compared when the time when the unit price of power sold to the power company is changed from the current price is fixed. You may make it do.
  • the money amount conversion unit 213 may perform conversion for each of cases where a new device is added or replaced as an operation state and when it is not performed, and may calculate each amount. For example, the money amount conversion unit 213 performs conversion for each of the case where power storage is performed rather than the purchase of a new storage battery and the sale of power, and the case where power sale is continued without purchasing a storage battery, The amount of money may be calculated.
  • each of a plurality of amounts corresponding to a plurality of operation statuses calculated in this way the user continues to use, for example, maintenance of the solar power generation apparatus 51, replacement and expansion of equipment, etc. It is possible to determine whether or not to use the current solar power generation device 51 in the future and replace the solar power generation device 51 with a new one.

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

既設の太陽光発電装置の運用に関する情報を提供する。情報処理システムSが、実績情報取得部211と、発電量予測部212と、金額換算部213と、通知情報送信部214と、を備える。実績情報取得部211は、太陽光発電装置の発電量の実績を取得する。発電量予測部212は、実績情報取得部211が取得した前記発電量の実績に基づいて、将来の所定期間における、前記太陽光発電装置の発電量を予測する。金額換算部213は、発電量予測部212により予測された発電量に基づいて、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算する。通知情報送信部214は、金額換算部213により換算された金額を通知する。

Description

情報処理システムおよび情報処理方法
 本発明は、情報処理システムおよび情報処理方法に関する。
 近年、太陽光発電装置は、電力会社のみならず、一般需要者にも広く普及している。一般需要者であるユーザは、自宅敷地内または自宅の屋根等に太陽光発電装置を設置して運用をする。そして、ユーザは、太陽光発電装置により発電される電力により自宅の電気機器を稼動させる。あるいは、ユーザは、自宅で消費しきれない電力の余剰分を、所定の売電価格で電力会社に販売する。
 このような太陽光発電装置の運用に関する技術の一例が、特許文献1に開示されている。特許文献1に開示の技術では、太陽光発電パネルの設置方位角または傾斜角といった設置条件を異ならせながら、発電量および売電価格を算出する。これにより、売電価格が高額となる設置方位角または傾斜角を特定し、太陽光発電装置を適切に設置することができる。
特開2017-174175号公報
 ところで、ユーザは、太陽光発電装置を設置して運用を開始した後に、様々な要因で運用方法の見直しを図る場合がある。例えば、電力会社による売電価格の変更、太陽光発電装置のメンテナンス費用の発生、あるいは蓄電池の追加購入をするか否かといった様々な要因で運用方法の見直しを図る場合がある。この場合に、ユーザに運用に関して判断材料となるような情報が提供できると好ましい。
 しかしながら、特許文献1に開示の技術等の従来の技術は、太陽光発電装置の設置に関しての情報を提供するものであり、太陽光発電装置を設置した後の運用について考慮したものではなかった。
 本発明は、このような状況に鑑みてなされたものである。そして、その目的は、既設の太陽光発電装置の運用に関する情報を提供するための、情報処理システムおよび情報処理方法を提供することにある。
 本発明に係る情報処理システムは、太陽光発電装置の発電量の実績を取得する取得部と、前記取得部が取得した前記発電量の実績に基づいて、将来の所定期間における、前記太陽光発電装置の発電量を予測する予測部と、前記予測部により予測された発電量に基づいて、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算する換算部と、前記換算部により換算された金額を通知する通知部と、を備える。
 本発明に係る情報処理方法は、情報処理システムが実行する情報処理方法であって、取得部が、太陽光発電装置の発電量の実績を取得する取得工程と、予測部が、前記取得部が取得した前記発電量の実績に基づいて、将来の所定期間における、前記太陽光発電装置の発電量を予測する予測工程と、換算部が、前記予測部により予測された発電量に基づいて、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算する換算工程と、通知部が、前記換算部により換算された金額を通知する通知工程と、を含む。
 本発明によれば、既設の太陽光発電装置の運用に関する情報を提供することができる。
本発明の一実施形態に係る情報処理システムの全体構成の一例を示すブロック図である。 本発明の一実施形態に係る情報収集装置の構成の一例を示すブロック図である。 本発明の一実施形態に係るクラウドサーバの構成の一例を示すブロック図である。 本発明の一実施形態に係るクラウドサーバが構築する、実績情報データベースのデータ構造の一例を示すテーブルである。 本発明の一実施形態に係る情報収集装置が実行する、実績情報収集処理の流れを説明するフローチャートである。 本発明の一実施形態に係るクラウドサーバが実行する、価値換算処理の流れを説明するフローチャートである。
 以下、添付の図面を参照して本発明の実施形態の一例について説明する。
 [システム構成]
 図1は、本実施形態に係る情報処理システムSの全体構成を示すブロック図である。図1に示すように、情報処理システムSは、情報収集装置10、クラウドサーバ20、スマートフォン30、外部サーバ40、パワーコンディショナ50、太陽光発電装置51、パワーコンディショナ60、DC/DCコンバータ61、蓄電池62、および家電群70を含む。
 ここで、情報収集装置10、パワーコンディショナ50、太陽光発電装置51、パワーコンディショナ60、DC/DCコンバータ61、蓄電池62、および家電群70は、例えば、それぞれ近傍に設置されて利用される。例えば、ユーザの住居に設置して利用される。
 この住居は、電力会社と電力の売り買いをするために系統連系型で電力系統と配線接続される。そして、太陽光発電装置51で発電された電力は、パワーコンディショナ50から出力されて、蓄電池62、家電群70、および情報収集装置10に供給される。また、これらの機器で消費しきれない余剰分の電力は、電力系統に送られて電力会社に売電される。
 スマートフォン30は、ユーザが携帯することにより、住居の内外を問わず利用される。
 また、クラウドサーバ20および外部サーバ40は、情報処理システムSの運営事業者が管理する場所に設置して利用される。
 これら情報処理システムSに含まれる各機器は、ネットワーク80を介して相互に通信可能に接続される。この各機器の間での通信は、任意の通信方式に準拠して行われてよく、その通信方式は特に限定されない。また、各機器の間での通信は、ネットワーク80を介することなく機器同士で直接行われてもよい。
 このような構成を有する情報処理システムSは、太陽光発電装置51の発電量の実績に基づいて、将来の所定期間における、太陽光発電装置51の発電量の統計量を予測する。また、情報処理システムSは、予測した統計量に基づいて、将来の所定期間における、太陽光発電装置51の運用に関する価値を金額に換算する。更に、情報処理システムSは、換算した金額を、ユーザに対して通知する。
 そのため、情報処理システムSによれば、既設の太陽光発電装置の運用に関する情報を提供することができる。
 次に、情報処理システムSに含まれる各機器について詳細に説明をする。
 情報収集装置10は、太陽光発電装置51に対応するものであり、その太陽光発電装置51の運用に関する各種の実績情報を収集する装置である。情報収集装置10は、例えば、パワーコンディショナ50を介して、太陽光発電装置51の発電量の実績を収集する。また、情報収集装置10は、蓄電池62、家電群70、および情報収集装置10に供給される電力を監視することにより、電力消費量の実績を収集する。更に、情報収集装置10は、電力会社と電力の売り買いをするための電力系統を監視することにより、売電量の実績および買電量の実績を収集する。
 情報収集装置10は、このようにして収集した実績情報を、クラウドサーバ20に対して送信する。
 クラウドサーバ20は、情報収集装置10から受信した実績情報を分析することにより、将来の所定期間における、太陽光発電装置51の運用に関する価値を金額に換算する装置である。クラウドサーバ20は、ユーザに通知を行うために、この換算により算出した金額をスマートフォン30に対して送信する。
 なお、これら情報収集装置10およびクラウドサーバ20の更なる詳細については、図2および図3を参照して後述する。
 スマートフォン30は、太陽光発電装置51の運用に関する価値を換算した金額を、ユーザに対して通知する装置である。スマートフォン30は、クラウドサーバ20から受信した、太陽光発電装置51の運用に関する価値を換算した金額を、例えばスマートフォン30が備えるディスプレイに表示したり、スマートフォン30が備えるスピーカから音声により出力したりすることにより、ユーザに対して通知する。
 ユーザは、この通知により、太陽光発電装置51の運用に関する価値を換算した金額を把握することができる。そして、ユーザは、この把握した金額を判断材料の1つとして、将来における太陽光発電装置51の運用方法を検討することができる。
 外部サーバ40は、情報収集装置10が換算のために用いる情報を、情報収集装置10に対して送信する装置である。
 外部サーバ40は、例えば、気象情報を提供するサーバにより実現される。この場合、外部サーバ40は、太陽光発電装置51が設置された地域の気象情報を情報収集装置10に対して送信する。
 他にも、外部サーバ40は、例えば、太陽光発電装置51の運用に関する機器(例えば、太陽光発電装置の構成部品である太陽光発電パネル、パワーコンディショナ、および蓄電池等)の販売者、または太陽光発電装置のメンテナンスを行う事業者のサーバにより実現される。
 この場合、外部サーバ40は、これら運用に関する機器についての、交換費用、増設費用、追加費用、およびメンテナンス費用等の情報を情報収集装置10に対して送信する。
 クラウドサーバ20は、上述したように、情報収集装置10が収集した各種の実績情報に加えて、外部サーバ40が提供した情報を更に換算に利用する。これにより、クラウドサーバ20は、換算の精度を向上させたり、より多くの情報を通知したりすることが可能となる。
 太陽光発電装置51は、太陽光の光エネルギーを、光起電力効果により電力に変換することによって発電を行う装置である。太陽光発電装置51は、例えば、太陽電池モジュールを直列につなげた太陽電池ストリングを1つの回線とし、それぞれの回線を接続箱に接続することにより、各太陽電池モジュールにより発電した直流電流を1つにまとめる。この1つにまとめられた直流電流は、接続箱内の逆流防止用のダイオードおよび開閉器等を介して、パワーコンディショナ50に対して出力される。
 パワーコンディショナ50は、太陽光発電装置51から出力される直流電流を、住居等で一般に用いられる交流電流に変換するインバータを含む。パワーコンディショナ50が変換した交流電流は家電群70および蓄電池62に対して供給される。
 蓄電池62は、電力を蓄電する二次電池である。蓄電池62に蓄電をすることにより、例えば、停電の際に家電群70を使用したり、昼間に発電された余剰電力を夜間に使用したりすることが可能となる。また、単価の安い夜間電力を充電して昼間に使用することが可能となる。
 DC/DCコンバータ61は、蓄電池62とパワーコンディショナ60との間でやり取りされる電圧を安定化させるための双方向のDC/DCコンバータである。
 パワーコンディショナ60は、DC/DCコンバータから出力される蓄電池62に蓄えられていた直流電流を、住居等で一般に用いられる交流電流に変換するインバータを含む。パワーコンディショナ60が変換した交流電流は家電群70に対して供給される。
 なお、以上では、パワーコンディショナ50、60は、太陽光発電装置51と蓄電池62とに対応して、別体として設けられているが、これに限定されるものでない。例えば、1台のパワーコンディショナで、太陽光発電装置51と蓄電池62とに対応するハイブリッド型パワーコンディショナであっても構わない。
 家電群70は、太陽光発電装置51が発電した電力、および電力会社から買電した電力によって稼働する複数の電気機器を含む。家電群70に含まれる電気機器は特に限定されず、例えば、エアコン、冷蔵庫、テレビ、および電気給湯器(例えば、エコキュート)等が家電群70に含まれる。
 ネットワーク80は、例えば、インターネット、LAN(Local Area Network)、および携帯電話網の何れかまたはこれらを組み合わせたネットワークにより実現される。
 以上、情報処理システムSに含まれる各機器について説明をした。なお、図中では、各機器を1台ずつ図示しているがこれは例示に過ぎず、情報処理システムSには、これら各機器が任意の台数含まれていてよい。
 [情報収集装置の構成]
 次に、情報収集装置10の構成について、図2のブロック図を参照して説明をする。図2に示すように、情報収集装置10は、CPU(Central Processing Unit)11と、ROM(Read Only Memory)12と、RAM(Random Access Memory)13と、通信部14と、記憶部15と、入力部16と、表示部17と、を備えている。これら各部は、信号線によりバス接続されており、相互に信号を送受する。
 CPU11は、ROM12に記録されているプログラム、または、記憶部15からRAM13にロードされたプログラムに従って各種の処理を実行する。
 RAM13には、CPU11が各種の処理を実行する上において必要なデータ等も適宜記憶される。
 通信部14は、CPU11が、情報処理システムSに含まれる他の装置との間で通信を行うための通信制御を行う。
 記憶部15は、DRAM(Dynamic Random Access Memory)等の半導体メモリで構成され、各種データを記憶する。
 入力部16は、各種ボタンおよびタッチパネル、またはマウスおよびキーボード等の外部入力装置で構成され、ユーザの指示操作に応じて各種情報を入力する。
 表示部17は、液晶ディスプレイ等で構成され、CPU11が出力する画像データに対応する画像を表示する。
 情報収集装置10では、これら各部が協働することにより、「実績情報収集処理」を行う。ここで、実績情報収集処理とは、情報収集装置10が、太陽光発電装置51の運用に関する各種の実績情報を収集して、収集した実績情報をクラウドサーバ20に対して送信する一連の処理である。
 実績情報収集処理が実行される場合、図2に示すように、CPU11において、実績情報収集部111と、実績情報送信部112と、が機能する。
 また、記憶部15の一領域には、実績情報記憶部151が設定される。
 実績情報記憶部151は、後述の実績情報収集部111が収集した、太陽光発電装置51の運用に関する各種の実績情報を記憶する。
 実績情報収集部111は、太陽光発電装置51の運用に関する各種の実績情報を収集する部分である。実績情報収集部111は、例えばパワーコンディショナ50を介して、太陽光発電装置51の発電量の実績を収集する。また、実績情報収集部111は、蓄電池62、家電群70、および実績情報収集部111に供給される電力を監視することにより、電力消費量の実績を収集する。更に、実績情報収集部111は、電力会社と電力の売り買いをするための電力系統を監視することにより、売電量の実績および買電量の実績を収集する。
 なお、実績情報収集部111は、電力を計測する住居内の電力計、または電力会社の設置したスマートメータから実績情報を取得してもよい。また、実績情報収集部111は、HEMS(Home Energy Management System)に接続し、HEMSから実績情報を収集してもよい。更に、実績情報収集部111は、家電群70に含まれる電気機器から、ECHONET Lite(登録商標)等の規格に準拠した通信により、実績情報を収集してもよい。
 あるいは、実績情報収集部111が、例えば、固定コイルと可動コイルの組からなる電力計としての機能を更に備えていてもよい。そして、実績情報収集部111は、この電力計の機能によって実績情報収集部111自身が計測を実行することにより、実績情報を取得してもよい。
 実績情報収集部111は、収集した実績情報を、実績情報記憶部151に記憶させる。
 実績情報送信部112は、実績情報収集部111が収集して実績情報記憶部151に記憶させた実績情報を、太陽光発電装置51の識別情報と紐付けた上で、所定の条件に基づいてクラウドサーバ20に対して送信する部分である。例えば、実績情報送信部112は、実績情報を、所定の時間間隔でクラウドサーバ20に対して送信する。
 なお、実績情報のクラウドサーバ20への送信は、このように実績情報収集部111により行われてもよいがこれに限らない。例えば、情報収集装置10以外の各機器(太陽光発電装置51等)から、実績情報収集部111を介することなく、直接クラウドサーバ20に対して実績情報が送信されてもよい。
 [クラウドサーバの構成]
 次に、クラウドサーバ20の構成について、図3のブロック図を参照して説明をする。図3に示すように、クラウドサーバ20は、CPU21と、ROM22と、RAM23と、通信部24と、記憶部25と、入力部26と、表示部27と、を備えている。これら各部は、信号線によりバス接続されており、相互に信号を送受する。
 ここで、これら各部のハードウェアとしての機能は、上述の情報収集装置10が備える、符号のみが異なる同名の各部のハードウェアとしての機能と同等である。従って、重複する説明を省略する。
 クラウドサーバ20は、これら各部が協働することにより、「価値換算処理」を行う。価値換算処理とは、クラウドサーバ20が、情報収集装置10から受信した実績情報を分析することにより、将来の所定期間における、太陽光発電装置51の運用に関する価値を、金額に換算してユーザに対して通知する一連の処理である。
 実績情報収集処理が実行される場合、図3に示すように、CPU21において、実績情報取得部211と、発電量予測部212と、金額換算部213と、通知情報送信部214と、気象情報取得部215と、運用情報取得部216とが機能する。
 また、記憶部15の一領域には、実績情報データベース251と、気象情報記憶部252と、運用情報記憶部253とが設定される。
 実績情報データベース251は、情報収集装置10から取得した各種の実績情報等が格納されたデータベースである。実績情報データベース251の具体的なデータ構造の一例について、図4を参照して説明する。
 図4に示すように、実績情報データベース251には、各太陽光発電装置51に関する所定の時間単位の実績情報が、それぞれ1つのレコードとして格納される。例えば、1時間単位の実績情報が、1つのレコードとして格納される。なお、この時間単位は、ユーザが任意に定めてよく、例えば、数分単位であったり、1日単位であったり、1月単位であってもよい。
 また、各レコードは、カラムとして、例えば、「太陽光発電装置識別情報」、「計測日時」、「発電量実績」、「消費電力量実績」、「売電量実績」、「買電量実績」、および「契約情報」を含む。
 これらカラムそれぞれに対応する情報の具体的な内容について説明をする。
 「太陽光発電装置識別情報」は、情報収集装置10から、各種の実績情報に紐付いて送信された太陽光発電装置51を識別するための情報である。太陽光発電装置識別情報は、各太陽光発電装置51でそれぞれ固有の情報とする。例えば、各太陽光発電装置51の製造番号、または各太陽光発電装置51に割り当てたID(Identifier)を太陽光発電装置識別情報とする。
 「計測日時」は、そのレコードに含まれる各種の実績情報が計測された日時である。例えば、上述したように、1つのレコードとして1時間単位の実績情報が格納される場合は、「計測日時」は、何年何月の何時という情報となる。
 「発電量実績」は、情報収集装置10が収集した、太陽光発電装置51の発電量の実績である。
 「消費電力量実績」は、情報収集装置10が収集した、太陽光発電装置51が設置された住居の消費電力量の実績である。
 「売電量実績」は、情報収集装置10が収集した、太陽光発電装置51が設置された住居の売電量の実績である。
 「買電量実績」は、情報収集装置10が収集した、太陽光発電装置51が設置された住居の買電量の実績である。
 「契約情報」は、太陽光発電装置51が設置された住居における、電力会社との契約内容を示す情報である。契約情報としては、例えば、住居に居住するユーザと電力会社との契約における、売電単価および買電単価が含まれる。なお、売電単価および買電単価が、昼夜の時間帯により異なる場合には、各レコードの計測日時に対応する時間帯の売電単価および買電単価が格納される。
 契約情報は、例えば、予め太陽光発電装置51と紐付けて設定される。この場合、例えば、クラウドサーバ20の入力部26を介したユーザの入力操作により契約情報を設定する。あるいは、契約情報は、例えば、各種の実績情報と紐付けて情報収集装置10から送信されるようにしてもよい。
 気象情報記憶部252は、外部サーバ40から取得した気象情報を記憶する。気象情報は、太陽光発電装置51が設置された地域の気象情報であり、例えば、天気、日照時間、日照量、温度、および湿度等の情報である。また、気象情報は、過去の気象情報であってもよく、気象庁等の専門機関により予報された未来の気象情報であってもよい。例えば、来年の年間予報等であってもよい。
 運用情報記憶部253は、外部サーバ40から取得した太陽光発電装置51の運用に関する費用等の情報を記憶する。運用に関する費用等の情報とは、例えば、太陽光発電装置51の運用に関する機器(例えば、太陽光発電装置の構成部品である太陽光発電パネル、パワーコンディショナ、および蓄電池等)についての、交換費用、増設費用、追加費用、およびメンテナンス費用等の情報である。
 実績情報取得部211は、各種の実績情報を情報収集装置10から受信することにより取得する。そして、実績情報取得部211は、情報収集装置10から取得した各種の実績情報を、実績情報データベース251の対応するフィールドに格納する。
 なお、上述したように、情報収集装置10以外の各機器(太陽光発電装置51等)から、実績情報収集部111を介することなく、直接クラウドサーバ20に対して実績情報が送信される場合もある。この場合には、実績情報取得部211は、各種の実績情報を、情報収集装置10以外の各機器から受信することにより取得する。この場合も、実績情報取得部211は、各機器から取得した各種の実績情報を、実績情報データベース251の対応するフィールドに格納する。
 発電量予測部212は、将来の所定期間における、太陽光発電装置51の発電量を予測する。ここで、将来の所定期間は、任意に決定することができる。
 例えば、日本国の一般的な気候の場合、12ヶ月の間での四季の変化に伴い、日照量および日照時間等が変化することから、太陽光発電装置51の発電量も変化する。この場合、四季による発電量の変化を平準化できる12ヶ月を単位として、将来の所定期間を決定するとよい。例えば、将来の所定期間を、現時点よりも12ヶ月経過後から、12ヶ月の期間(すなわち、24ヶ月後までの期間)と決定するとよい。
 ただし、これは一例に過ぎず、本実施形態を適用する環境等に応じて、将来は、より未来としてもよく、より過去としてもよい。また、同様に、本実施形態を適用する環境等に応じて、所定期間は、より長くしてもよく、より短くしてもよい。
 将来の所定期間は、例えば、クラウドサーバ20の入力部26を介したユーザの入力操作により、発電量予測部212による予測に先立って予め決定しておく。あるいは、将来の所定期間は、例えば、発電量予測部212による予測を行う都度、クラウドサーバ20の入力部26を介したユーザの入力操作により指定されてもよい。
 発電量予測部212は、実績情報データベース251に格納されている「発電量実績」に基づいて、将来の所定期間における、太陽光発電装置51の発電量の統計量を予測する。例えば、所定期間が12ヶ月であれば、発電量予測部212は、直近の12ヶ月前から現時点までの「発電量実績」を抽出する。そして、発電量予測部212は、抽出した「発電量実績」を合算した発電量を、所定期間における発電量の統計量とみなすことにより予測を行う。
 他にも、発電量予測部212は、複数の期間の「発電量実績」を平均することにより予測を行うようにしてもよい。例えば、直近の12ヶ月前から現時点までの「発電量実績」を合算した発電量の統計量、直近の24ヶ月前から直近の12ヶ月前までの現時点までの「発電量実績」を合算した発電量の統計量、直近の36ヶ月前から直近の24ヶ月前までの現時点までの「発電量実績」を合算した発電量の統計量、の3つの発電量の統計量の平均値を、所定期間における発電量の統計量とみなすことにより予測を行うようにしてもよい。
 また、発電量予測部212は、例えば、気象情報記憶部252に記憶されている気象情報に基づいて、予測した発電量を修正するようにしてもよい。例えば、直近の12ヶ月の天候が例年よりも悪く、日照量および日照時間が短い場合には、将来においては、天候が例年並になると想定して、予測した発電量の統計量を増加させるようにしてもよい。
 発電量予測部212は、このようにして予測した将来の所定期間における発電量の統計量を、金額換算部213に対して出力する。
 金額換算部213は、将来の所定期間における、太陽光発電装置51の運用に関する価値を金額に換算する。
 金額換算部213は、例えば、発電量予測部212が予測した将来の所定期間における発電量の統計量に、実績情報データベース251に格納されている「契約情報」に含まれる売電価格を乗算することにより、太陽光発電装置51の運用に関する価値を金額に換算する。
 また、金額換算部213は、時間帯によって売電価格が異なる場合には、発電量予測部212が将来の所定期間における発電量の統計量を時間帯毎に予測する。そして、金額換算部213が、それぞれの時間帯の統計量に、それぞれの時間帯の売電価格を乗算することにより、太陽光発電装置51の運用に関する価値を金額に換算する。
 また、金額換算部213は、他の情報に基づいて換算を行うようにしてもよい。例えば、将来の所定期間において、売電価格が変更されることが分かっていれば、その変更後の売電価格に基づいて換算を行うようにしてもよい。他にも、金額換算部213は、例えば、運用情報記憶部253に格納されている情報に基づいて、太陽光発電装置51の経年劣化に伴うメンテナンス費用、機器の追加費用および交換費用を算出し、これら算出した費用を、換算した金額から減算するようにしてもよい。
 他にも、金額換算部213は、例えば、発電量予測部212が発電量の統計量を予測した期間と同じ期間の「消費電力量」を実績情報データベース251から抽出し、消費電力量の統計量を算出するようにしてもよい。そして、金額換算部213は、発電量予測部212が予測した発電量の統計量から、算出した消費電力量の統計量を減算した電力量に売電価格を乗算することにより、換算を行うようにしてもよい。
 また、算出した消費電力量の統計量にそれぞれの時間帯ごとの買電価格を乗算した結果を、上記換算結果に加算するようにしてもよい。
 金額換算部213は、換算により算出された、将来の所定期間における、太陽光発電装置51の運用に関する価値を示す金額を、通知情報送信部214に対して出力する。
 通知情報送信部214は、金額換算部213が出力した金額をユーザに対して通知するために、金額換算部213が出力した金額をスマートフォン30に対して送信する。
 図1を参照して上述したように、スマートフォン30は、クラウドサーバ20から受信した金額を、例えばスマートフォン30が備えるディスプレイに表示したり、スマートフォン30が備えるスピーカから音声により出力したりすることにより、ユーザに対して通知する。
 ユーザは、この通知により、太陽光発電装置51の運用に関する価値を換算した金額を把握することができる。そして、ユーザは、この把握した金額を判断材料の1つとして、将来における太陽光発電装置51の運用方法を検討することができる。
 なお、通知情報送信部214は、換算により算出した金額の通知を他の方法により行ってもよい。例えば、通知情報送信部214は、金額をクラウドサーバ20の表示部27に表示することにより通知を行ってもよい。他にも、例えば、通知情報送信部214は、金額をスマートフォン30以外の装置(例えば、ユーザの住居に設置された、家電群70に含まれるパーソナルコンピュータ)に送信するようにしてもよい。他にも、例えば、通知情報送信部214は、太陽光発電装置51のメンテナンスを行う事業者等に対して通知を行ってもよい。
 気象情報取得部215は、外部サーバ40から取得した気象情報を気象情報記憶部252に記憶させる。また、運用情報取得部216は、外部サーバ40から取得した太陽光発電装置51の運用に関する費用等の情報を、運用情報記憶部253に記憶させる。これらの情報の詳細は、気象情報記憶部252および運用情報記憶部253を参照して上述した通りである。
 [実績情報収集処理]
 次に、図5のフローチャートを参照して、情報処理装置1が実行する実績情報収集処理の流れについて説明する。
 ステップS11において、実績情報収集部111は、太陽光発電装置51の運用に関する各種の実績情報を収集する。
 ステップS12において、実績情報記憶部151は、ステップS11にて実績情報収集部111が収集した各種の実績情報を記憶する。
 ステップS13において、実績情報送信部112は、実績情報記憶部151に記憶された各種の実績情報を、クラウドサーバ20に対して送信するための条件が満たされたか否かを判定する。実績情報送信部112は、例えば、図4を参照して上述した実績情報データベース251において、1時間単位でレコードが格納される場合には、1時間分の実績情報が実績情報記憶部151に記憶されたことを、送信するための条件とする。送信するための条件が満たされていない場合は、ステップS13においてNoと判定され、処理は再度ステップS11から繰り返される。一方で、送信するための条件が満たされた場合は、ステップS13においてYesと判定され、処理はステップS14に進む。
 ステップS14において、実績情報送信部112は、実績情報記憶部151に記憶された各種の実績情報を、クラウドサーバ20に対して送信する。これにより、実績情報収集処理は終了する。
 以上説明した実績情報収集処理により、クラウドサーバ20には、適宜最新の実績情報が送信される。
 [価値換算処理]
 次に、図6のフローチャートを参照して、クラウドサーバ20が実行する価値換算処理の流れについて説明する。
 ステップS21において、実績情報取得部211、気象情報取得部215、および運用情報取得部216のそれぞれは、自身が取得すべき情報を新たに取得したか否かを判定する。実績情報取得部211、気象情報取得部215、および運用情報取得部216の何れも情報を取得していない場合は、ステップS21においてNoと判定され、処理はステップS23に進む。一方で、実績情報取得部211、気象情報取得部215、および運用情報取得部216の何れかが情報を取得した場合は、ステップS21においてYesと判定され、処理はステップS22に進む。
 ステップS22において、ステップS21において取得された情報は、記憶部25における、取得された情報に対応する部分にて記憶される。
 ステップS23において、通知情報送信部214は、通知を行うための条件が満たされたか否かを判定する。通知情報送信部214は、例えば、所定の日時が到来したこと、またはユーザからの通知要求があったことを、通知を行うための条件とする。通知を行うための条件が満たされていない場合は、ステップS23においてNoと判定され、処理は再度ステップS21から繰り返される。一方で、通知を行うための条件が満たされた場合は、ステップS23においてYesと判定され、処理はステップS24に進む。
 ステップS24において、発電量予測部212は、将来の所定期間における、太陽光発電装置51の発電量の統計量を予測する。
 ステップS25において、金額換算部213は、将来の所定期間における、太陽光発電装置51の運用に関する価値を金額に換算する。
 ステップS26において、通知情報送信部214は、金額換算部213が出力した金額をユーザに対して通知するために、金額換算部213が出力した金額をスマートフォン30に対して送信する等の方法で通知を行う。これにより、価値換算処理は終了する。
 以上説明した価値換算処理により、ユーザは、太陽光発電装置51の運用に関する価値を換算した金額を把握することができる。そして、ユーザは、この把握した金額を判断材料の1つとして、将来における太陽光発電装置51の運用方法を検討することができる。
 つまり、本実施形態によれば、既設の太陽光発電装置の運用に関する情報を提供することができる。
 本発明は、上述の実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。また、上述の実施形態では、クラウドサーバおよびスマートフォン等の装置により実施形態を実現したが、特にこれに限定されず、情報処理機能を有する電子機器一般で実現することができる。
 また、上述した一連の処理は、ハードウェアにより実行させることもできるし、ソフトウェアにより実行させることもできる。また、1つの機能ブロックは、ハードウェア単体で構成してもよいし、ソフトウェア単体で構成してもよいし、それらの組み合わせで構成してもよい。
 換言すると、図2および図3に図示した機能的構成は例示に過ぎず、特に限定されない。即ち、上述した一連の処理を全体として実行できる機能が情報処理システムSに備えられていれば足り、この機能を実現するためにどのような機能ブロックを用いるのかは特に図5の例に限定されない。
 例えば、本実施形態に含まれる機能的構成を、演算処理を実行するプロセッサによって実現することができ、本実施形態に用いることが可能なプロセッサには、シングルプロセッサ、マルチプロセッサおよびマルチコアプロセッサ等の各種処理装置単体によって構成されるものの他、これら各種処理装置と、ASIC(Application Specific Integrated Circuit)またはFPGA(Field-Programmable Gate Array)等の処理回路とが組み合わせられたものを含む。
 一連の処理をソフトウェアにより実行させる場合には、そのソフトウェアを構成するプログラムが、コンピュータ等にネットワークまたは記録媒体からインストールされる。
 コンピュータは、専用のハードウェアに組み込まれているコンピュータであってもよい。また、コンピュータは、各種のプログラムをインストールすることで、各種の機能を実行することが可能なコンピュータ、例えば汎用のパーソナルコンピュータであってもよい。
 このようなプログラムを含む記録媒体は、ユーザにプログラムを提供するために装置本体とは別に配布されることによりユーザに提供されてもよく、装置本体に予め組み込まれた状態でユーザに提供されてもよい。装置本体とは別に配布される記憶媒体は、例えば、磁気ディスク(フロッピディスクを含む)、光ディスク、または光磁気ディスク等により構成される。光ディスクは、例えば、CD-ROM(Compact Disc-Read Only Memory),DVD(Digital Versatile Disc),Blu-ray(登録商標) Disc(ブルーレイディスク)等により構成される。光磁気ディスクは、MD(Mini Disc)等により構成される。また、装置本体に予め組み込まれた状態でユーザに提供される記録媒体は、例えば、プログラムが記録されている図2のROM12および図3のROM22、または図2の記憶部15および図3の記憶部25に含まれるハードディスク等で構成される。
 なお、本明細書において、記録媒体に記録されるプログラムを記述するステップは、その順序に沿って時系列的に行われる処理はもちろん、必ずしも時系列的に処理されなくとも、並列的あるいは個別に実行される処理をも含むものである。
 また、本明細書において、システムの用語は、複数の装置および複数の手段等より構成される全体的な装置を意味するものとする。
 以上、本発明のいくつかの実施形態について説明したが、これらの実施形態は、例示に過ぎず、本発明の技術的範囲を限定するものではない。本発明はその他の様々な実施形態を取ることが可能であり、さらに、本発明の要旨を逸脱しない範囲で、省略および置換等種々の変更を行うことができる。これら実施形態およびその変形は、本明細書等に記載された発明の範囲および要旨に含まれると共に、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
 例えば、本発明の実施形態を以下の変形例のように変形してもよい。
 <変形例>
 上述した実施形態では、金額換算部213は、換算によって、将来の所定期間における、太陽光発電装置51の運用に関する価値を示す金額を1つ算出していた。これに限られず、金額換算部213は、異なる複数の運用状況を想定して、各運用状況に対応する複数の金額を算出するようにしてもよい。そして、通知情報送信部214がこの各運用状況に対応する複数の金額をユーザに通知するようにしてもよい。
 これにより、ユーザは、各運用状況に対応する複数の金額を比較して検討することができるので、ユーザは、今後どのように運用を行うべきかを容易に判断することができる。
 この場合、例えば、金額換算部213は、運用状況として、電力会社への売電単価が現状のまま維持される場合と、電力会社への売電単価が現状の価格から変更される場合のそれぞれについて換算を行い、それぞれの金額を算出するようにしてもよい。また、例えば、金額換算部213は、電力会社への売電単価が現状の価格から変更される時期が確定している場合に、変更の前後の価格を対比できるように、それぞれの金額を算出するようにしてもよい。
 また、例えば、金額換算部213は、運用状況として、新たな機器の増設や交換等を行う場合と、行わない場合のそれぞれについて換算を行い、それぞれの金額を算出するようにしてもよい。例えば、金額換算部213は、蓄電池を新たに購入して売電を行うよりも蓄電を行うようにした場合と、蓄電池を購入することなく売電を継続した場合のそれぞれについて換算を行い、それぞれの金額を算出するようにしてもよい。
 ユーザは、このようにして算出された、複数の運用状況に対応する複数の金額それぞれを参照することにより、例えば、太陽光発電装置51のメンテナンス、機器の交換および増設等をして利用を継続するか、それとも、現在の太陽光発電装置51の利用を将来的に取り止めて、太陽光発電装置51自体を新たなものに交換するか等を判断することができる。
 10 情報収集装置
 11、21 CPU
 12、21 ROM
 13、23 RAM
 14、24 通信部
 15、25 記憶部
 16、26 入力部
 17、27 表示部
 20 クラウドサーバ
 30 スマートフォン
 40 外部サーバ
 50、60 パワーコンディショナ
 51 太陽光発電装置
 61 DC/DCコンバータ
 62 蓄電池
 70 家電群
 80 ネットワーク
 111 実績情報収集部
 112 実績情報送信部
 151 実績情報記憶部
 211 実績情報取得部
 212 発電量予測部
 213 金額換算部
 214 通知情報送信部
 215 気象情報所得部
 216 運用情報取得部
 251 実績情報データベース
 252 気象情報記憶部
 253 運用情報記憶部
 S 情報処理システム

Claims (6)

  1.  太陽光発電装置の発電量の実績を取得する取得部と、
     前記取得部が取得した前記発電量の実績に基づいて、将来の所定期間における、前記太陽光発電装置の発電量を予測する予測部と、
     前記予測部により予測された発電量に基づいて、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算する換算部と、
     前記換算部により換算された金額を通知する通知部と、
     を備える情報処理システム。
  2.  前記太陽光発電装置に対応して設置されると共に、前記太陽光発電装置の発電量の実績を収集し、該収集した発電量の実績を前記取得部に送信する情報収集部を更に備え、
     前記取得部は、前記情報収集部から受信した前記発電量の実績を取得する、
     請求項1に記載の情報処理システム。
  3.  前記情報収集部は、前記太陽光発電装置により発電された電力に関しての、電力消費量の実績、売電量の実績、および買電量の実績の何れか1つ以上を、他の実績情報として収集し、該収集した他の実績情報を前記取得部に送信し、
     前記取得部は、前記他の実績情報を更に取得し、
     前記換算部は、前記他の実績情報にも基づいて、前記換算をする、
     請求項2に記載の情報処理システム。
  4.  前記換算部は、前記太陽光発電装置の経年劣化による影響、および前記太陽光発電装置の設置場所の気象状況変化の影響の何れかまたは双方にも基づいて、前記換算をする、
     請求項1~3のいずれか1項に記載の情報処理システム。
  5.  前記換算部は、前記太陽光発電装置の運用に関する機器の交換、機器の増設、および機器の追加の何れか1つ以上を行った場合について、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算し、
     前記通知部は、前記機器の交換、機器の増設、および機器の追加の何れか1つ以上を行った場合の金額と、行わない場合の金額のそれぞれを通知する、
     請求項1~4のいずれか1項に記載の情報処理システム。
  6.  情報処理システムが実行する情報処理方法であって、
     取得部が、太陽光発電装置の発電量の実績を取得する取得工程と、
     予測部が、前記取得部が取得した前記発電量の実績に基づいて、将来の所定期間における、前記太陽光発電装置の発電量を予測する予測工程と、
     換算部が、前記予測部により予測された発電量に基づいて、前記将来の所定期間における、前記太陽光発電装置の運用に関する価値を金額に換算する換算工程と、
     通知部が、前記換算部により換算された金額を通知する通知工程と、
     を含む情報処理方法。
PCT/JP2019/009646 2018-03-13 2019-03-11 情報処理システムおよび情報処理方法 WO2019176847A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020506506A JP7257382B2 (ja) 2018-03-13 2019-03-11 情報処理システムおよび情報処理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-045209 2018-03-13
JP2018045209 2018-03-13

Publications (1)

Publication Number Publication Date
WO2019176847A1 true WO2019176847A1 (ja) 2019-09-19

Family

ID=67907772

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/009646 WO2019176847A1 (ja) 2018-03-13 2019-03-11 情報処理システムおよび情報処理方法

Country Status (2)

Country Link
JP (1) JP7257382B2 (ja)
WO (1) WO2019176847A1 (ja)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014186503A (ja) * 2013-03-22 2014-10-02 Toshiba Corp 発電設備に対する収益分析装置およびその方法、ならびにプログラム
JP2017049709A (ja) * 2015-08-31 2017-03-09 日本テクノ株式会社 市場購入電力情報表示システム、電力稼働システム、入出金管理システム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014186503A (ja) * 2013-03-22 2014-10-02 Toshiba Corp 発電設備に対する収益分析装置およびその方法、ならびにプログラム
JP2017049709A (ja) * 2015-08-31 2017-03-09 日本テクノ株式会社 市場購入電力情報表示システム、電力稼働システム、入出金管理システム

Also Published As

Publication number Publication date
JPWO2019176847A1 (ja) 2021-02-25
JP7257382B2 (ja) 2023-04-13

Similar Documents

Publication Publication Date Title
Lew et al. Value of wind power forecasting
Kezunovic et al. The big picture: Smart research for large-scale integrated smart grid solutions
JP4938750B2 (ja) 消費電力予測装置、消費電力予測方法およびプログラム
JP6402731B2 (ja) 電力需給予測システム、電力需給予測方法および電力需給予測プログラム
US20180123391A1 (en) System and Method for Dynamic Measurement and Control of Synchronized Remote Energy Resources
US9127963B2 (en) Selection of bellwether smart grid meters
AU2009321578A1 (en) Method and system for reducing feeder circuit loss using demand response
Numminen et al. Evaluation of the reliability of solar micro-grids in emerging markets–Issues and solutions
Fonteijn et al. Demonstrating a generic four-step approach for applying flexibility for congestion management in daily operation
JP6610059B2 (ja) 電力需要誘導装置
JP2017121133A (ja) 電力需要予測装置および電力需要予測プログラム
Exner et al. Practical implementation of the management of local flexible generation and consumption units using a quota-based grid traffic light approach
WO2020162461A1 (ja) 電力制御システムおよび電力制御方法
JP2005045899A (ja) 電力取引システムおよび電力取引方法
Ramesh et al. Using CPS Enabled Microgrid System for optimal power utilization and supply strategy
WO2019176847A1 (ja) 情報処理システムおよび情報処理方法
Kumar et al. Models of distributed energy resources markets in distribution grid operations
US20220006294A1 (en) Power control system and power control method
JP2012248642A (ja) 太陽光発電レンタルシステム
Eto et al. Demand response as a system reliability resource
WO2020195524A1 (ja) 蓄電制御システムおよび蓄電制御方法
Mbuya et al. Very Short‐Term Blackout Prediction for Grid‐Tied PV Systems Operating in Low Reliability Weak Electric Grids of Developing Countries
Zhang et al. Grid Edge Visibility: Gaps and a road map
Voronin et al. Short term forecasting peak load hours of regional power systems using machine learning methods
Eissa Smart Metering Technology and Services: Inspirations for Energy Utilities

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19766769

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2020506506

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19766769

Country of ref document: EP

Kind code of ref document: A1