WO2019057226A2 - DEVICE FOR THE EFFICIENT EXTRACTION OF BITUMEN, SHALE OIL, VERY HEAVY OIL AND LIGHTWEIGHT USING A COMPLETELY AUTOMATED CONTROL SYSTEM AND METHOD FOR PREPARING A MINERAL OPERATING EQUIPMENT - Google Patents

DEVICE FOR THE EFFICIENT EXTRACTION OF BITUMEN, SHALE OIL, VERY HEAVY OIL AND LIGHTWEIGHT USING A COMPLETELY AUTOMATED CONTROL SYSTEM AND METHOD FOR PREPARING A MINERAL OPERATING EQUIPMENT Download PDF

Info

Publication number
WO2019057226A2
WO2019057226A2 PCT/CZ2018/000048 CZ2018000048W WO2019057226A2 WO 2019057226 A2 WO2019057226 A2 WO 2019057226A2 CZ 2018000048 W CZ2018000048 W CZ 2018000048W WO 2019057226 A2 WO2019057226 A2 WO 2019057226A2
Authority
WO
WIPO (PCT)
Prior art keywords
oil
riser
control unit
cable
inner riser
Prior art date
Application number
PCT/CZ2018/000048
Other languages
English (en)
French (fr)
Other versions
WO2019057226A3 (en
WO2019057226A8 (en
Inventor
Zdenek Koller
Pavel JABLONSKY
Vladimira BENOVA
Ladislav PAVLICKO
Original Assignee
LEMENOVSKI, Dmitri Anatoljevich
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LEMENOVSKI, Dmitri Anatoljevich filed Critical LEMENOVSKI, Dmitri Anatoljevich
Priority to US16/648,831 priority Critical patent/US20200284129A1/en
Priority to CA3076406A priority patent/CA3076406A1/en
Priority to EA202090810A priority patent/EA202090810A1/ru
Publication of WO2019057226A2 publication Critical patent/WO2019057226A2/en
Publication of WO2019057226A3 publication Critical patent/WO2019057226A3/en
Publication of WO2019057226A8 publication Critical patent/WO2019057226A8/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/18Pipes provided with plural fluid passages
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/008Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones using chemical heat generating means
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/166Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/241Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection combined with solution mining of non-hydrocarbon minerals, e.g. solvent pyrolysis of oil shale
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ
    • E21B43/247Combustion in situ in association with fracturing processes or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • E21B47/07Temperature

Definitions

  • the invention relates to a method for efficient bitumen, shale oil and very heavy oil extraction by using its partial conversion into light hydrocarbons in situ using precise real-time temperature and partly also pressure control.
  • Typical example is shale, which additionally contains kerogens. If we change the porosity and permeability of the collector, it is much easier to extract hydrocarbons from it (using hydro-fracturing, for example, but if complex hydrocarbons can be converted to synthetic lighter oil, the yield of oil from the entire deposit increases In fact, not only the yield is increased, but also in the case of shale, the oil content of the deposit can increase even more.
  • Shale generally yields 4-5% of the total stock, and the various proposed stimulating methods hypothetically shift it to 5-7%, which means a cost increase of nearly 50%.
  • Estimates of experts say that when converting kerosene to synthetic oil, yields can be 40-50%. Kerogenes are in shale 10-30% by weight with respect to the density, but exceed more than half the volume. If the wishes of the experts are fulfilled and the kerogene partially transforms into synthetic light oil and/or gas, there would be very porous rock with high permeability, and mining would not be a problem. The problem, however, remains the transport of sufficient energy to the collector.
  • hydro-fracturing hydroaulic fracturing of the rock. It is only suitable for lighter oil, it is ecologically problematic and the cost per barrel is very high.
  • bitumen conventional thermal methods use either hot water or superheated steam.
  • Superheated steam is used for the extraction of bitumen and very heavy oil into depths of 800-900 meters.
  • the vast majority of bitumen "softens" at temperatures in the range of 70-110 °C. Again, there is an important economic factor here.
  • the bitumen yield is about 20%, but the quarter is consumed on the spot for heat production.
  • the aim of the invention is to introduce a method of extracting bitumen, shale oil and very heavy oil which would be reliably operable in a fully automated mode and ap aratus for carrying it out.
  • a further aim of the present invention is a method of preparing an extraction device for monitoring the well relations for subsequent efficient mining where a mining assembly with an internal riser is arranged in the oil layer at the mining site for feeding one chemical composition, the rope is dropped into the drilling assembly and anchored in the outer riser for feeding a second chemical composition which is arranged around the inner riser, wherein the rope is provided under the exit from the inner riser by at least one sensor connected by a cable to the control unit and according to the signals from the temperature and pressure sensors the control unit controls the processing units in terms of the feeds of compositions, catalysts and water at an in advise selected working point.
  • metal-based catalysts such as aluminum, zinc, iron, vanadium, molybdenum, tungsten, manganese, preferably in the form of solutions or suspensions are added to the composition either in advance or concurrently or with delay.
  • the method is analogously used for wells driven into oil layers obliquely or horizontally.
  • the metal-based catalysts from the group such as aluminium, zinc, iron, vanadium, molybdenum, tungsten, manganese, preferably in the form of solutions, suspensions, etc. are added to the composition, subsequently supplemented with suitable acids or bases and, optionally, the amount of water necessary to convert complex hydrocarbons to synthetic oil, whereas the water, upon reaching supercritical conditions in which it can decompose itself, allows a condition where the water in the presence of catalysts breaks down the heavy polymeric molecules into the lighter and the whole process is regulated in real time irrespective of the depth of the oil layer, so that a sufficient working temperature can be set in advance, which will keep the system in the well within a narrow range and at the same time use the pressure of the gases produced for the gas-thermal breaking of the rock. It is important to bring sufficient amounts of hydrogen to the oil layer to make easier the production of synthetic light oil.
  • a further aim of the invention is a device for carrying out the above-mentioned method
  • Fig.1 is a phase diagram for water
  • Fig. 2 is a view of device for controlled oil extraction with an applied sensor for monitoring operating pameters in a deposit according to the invention
  • Fig. 3 is a flow chart illustrating the arrangement and interconnection of the elements of the process unit that is connected to the mining assembly according to the invention of Fig. 2 located in the oil layer.
  • the subject of protection is the effective method of extracting complex hydrocarbons from low permeable rocks, shale, oil-layers containing bitumen, heavy oil etc.
  • the method consists in the treatment of a large area of the oil layer surrounding the well by a complex automated controlled thermochemical reaction system, at temperatures between 450-550 C and, in the presence of supercritical water and catalysts, complex hydrocarbons are converted to synthetic oil, and also a gas-thermic breaking of the rock occurs, with the overall effect, which is ensured by both of each of the active ingredients (phenomena, activity) alone and their overall combination.
  • Shale containing oil and kerogenes, possibly phyllites and some other rocks are generally characterized by low porosity and permeability, and contain oil and kerogenes.
  • Heavy hydrocarbons have a considerable thermal expansion and, when heated at 100 °C, their volume is increased by a several percent, which helps to increase the porosity due to the breaking of the rock by the expansion of the fluid present in the rock.
  • Fig. 1 shows a phase diagram for water. Beyond 374 °C and 220 atm, the water is in a supercritical state (supercritical fluid). The presence of some substances can shift the temperature of the critical point down (eg CO2) or up (some salts and other materials). However, most substances usually shift the pressure value upwards (see Fig.).
  • supercritical fluid supercritical fluid
  • the water can be partially decomposed, even at higher temperatures, and released oxygen will exothermically oxidize the hydrocarbons present to produce CO2 and water vapor, and help maintain a high temperature while released hydrogen causes breaking of the largest hydrocarbon molecules, and the resulting CO2 will help reduce the temperature threshold to create supercritical conditions (and oil viscosity).
  • the bonds between the carbon atoms are fissioned and free hydrogen atoms are attached to the loose bonds.
  • the temperature contributes significantly, the value of which is maintained at a level of at least 450-500 °C, where the fission takes place much faster than at temperatures above 300 °C (de facto pyrolysis).
  • water which also partially fissions into hydrogen and oxygen, enters the reaction. This can significantly change the chemical composition of the fluid contained in the shale as the polymeric substances, which form kerogens, break into the molecules substantially smaller, and then to smaller ones, etc., until a "synthetic" light oil is formed permanently.
  • the degree of kerosene transformation into lighter hydrocarbons is dependent on the size of the hydrogen index (HI). By selecting suitable reagents the hydrogen index can be increased under certain conditions. In general, it can be estimated that for kerogen type I, pyrolysis can transform up to 80% of kerosene to hydrocarbons and 20% to coke. For type II, the ratio may be around 50:50 and for type III, it is 20:80.
  • the total volume of kerosene in the shale is conservatively around 15% by weight (but rarely 20-30 %), the total pore volume (including those filled with extractable hydrocarbons) is up to 5 %.
  • the kerosene density is usually 1020 - 1070 kg/m 3 , the density of the inorganic materials in the shale is around 2500 kg/m 3 .
  • the water will partially decompose to hydrogen and oxygen, which will further accelerate the conversion process of heavy hydrocarbons.
  • the calorific value already contains the enthalpy of the decomposition reactions (i.e., the energy that needs to be delivered at the beginning so that the reactions can occur at all).
  • TGEC a relatively high percentage of the soluble salts of certain metals, for example iron nitrate, or to use it directly as an oxidant.
  • metals for example iron nitrate
  • catalysts for example, aluminum and zinc (for example in the form of powders, salts or oxides dissolved in a suitable solvent to obtain as much catalyst surface as possible) or some of the catalysts used in the cracking of crude oil (usually based on molybdenum, vanadium or tungsten - e.g. tunstig acid).
  • Catalysts can be added to the active substance TGEC after the reaction has started in the collector, but they can be transported to the collector even before the reactions begin. Catalysts are added to the major active substance (TGEC) in a suitable ratio based on their efficiency. Catalysts are chosen according to wanted result: whether it is desirable to obtain a larger proportion of liquid or larger proportion of gaseous hydrocarbons.
  • catalysts in the finest form, so-called nanocatalysts or solution-based catalysts or liquids where the particle size is at the molecular level.
  • the device 1 for efficient mining consists of the mining assembly 17 in the oil layer 13 which is shown in Fig. 2 and the control unit 14 connected to the technological unit 15 shown in Fig. 2.
  • Fig. 2 schematically shows the lower part of the oil layer 13 with the mining assembly 17. It comprises some known parts as well as new parts according to the invention.
  • a known casing 2 which is provided with a perforation 3.
  • an internal riser 4 is provided which is a new element according to the invention and around this inner riser 4, inner diameter of which is preferably 1 .5 inches, outer riser 5 known per se is arranged, but is newly fitted with a perforation 7, whereas the outer riser 5 has a firm bottom 11 .
  • the inner riser 4 is open at the bottom and its lower end 16 is above the bottom 11 of the outer riser 5.
  • the space between the casing 2 and the outer riser 5 is enclosed by a packer 8.
  • compositions are not a subject of the present invention, it is mentioned in the preceding paragraphs, especially those dealing with TGEC or RIS.
  • the control unit 14 is connected to the processing unit 15, which will be described in detail with reference to Fig. 3.
  • the aim is obtaining information by means of sensors 10 about the environment in the bottom part of the oil layer, where, as a result of the reactions of the chemical components A and B, hot gases are formed which penetrates the sensors 10, which can measure the temperature, pressure or other quantities, due to perforations 18 into the oil layer 13. Therefore, in the region around the sensors 10, there is a measuring environment, which essentially corresponds with the environment under the bottom 11 of the outer riser 5.
  • the sensors 10 and the connecting cables from the control unit 14 may be of an electrical or optical nature and the information they transmit continuously to the control system serves to maintain the temperature (and sometimes the pressure) around the preselected operating point which is optimal both in terms of the spread rate of the hot fluid to the collector, and the conversion of complex hydrocarbons to light ones, whereas the temperature and partially also the pressure is controlled by the system in real time by varying the speed rate or ratios of the heated reagents or reaction inhibitors by at least two cha nnels with the possibility of using a special injection device, whereas the channels end und er the packer 8 in the vicinity of the perforation zone of the oil layer 13 (if it is an oil-based layer cased to the bottom).
  • the control unit 14 is connected to the processing unit 15, which is schematically shown in Fig. 3. There is shown an arrangement and interconnection of the individual elements of this processing unit 15.
  • Processing unit 15 generally serves to prepare composition A and composition B formed from water-mixed loose chemicals and their controlled delivery through a four-way control valve 41 and a high-pressure plunger pump 40 into an oil layer together with catalyst C where they react together and intensify oil extraction from the deposit.
  • the processing unit 15 consists of a water reservoir 18 which is connected by an overflow 45 with a reservoir 19 to which elements for composition A are fed.
  • the processing unit 15 consists of a water tank 38 which is connected to an overflow 46 with a reservoir 27 to which the elements for composition B are fed.
  • the loose chemicals are fed to the tank 27 for composition B by a screw conveyor 39 with a conventional dispenser (not shown) and with a hopper (not shown).
  • low-pressure pumps 31 for the primary water circuit 24 and the secondary water circuit 26 There are two low-pressure pumps 31 for the primary water circuit 24 and the secondary water circuit 26 and a high-pressure plunger pump 40 and a four-way control valve 41 in the space 43 for pumps.
  • the water is led from the source 37 via the low-pressure pump 31 through the secondary water circuit 26 to tank 18 and overflow 45 to tank 19 for composition A and also to tank 38 and overflow 46 to tank 27 for composition B.
  • conduit 28 for composition B is further fed through a four-way valve 41 and to a high pressure plunger pump 40.
  • the conduit 23 for composition A passes into the high pressure four-way valve 41 and also into the high-pressure plunger pump 40.
  • the primary water circuit 24 is led from the first low pressure pump 31 to the distributing valve 25 and the secondary water circuit 26 is led from the second low-pressure pump 31 also to the distributing valve 25, so they interconnected in water distributing valve 25. It was already mentioned, that from there the water flows into the water basins 38 and 18.
  • the water also flows via the conduit 24 from the circuital low-pressure valve 32 either to the four-way valve 41 or to the water pump 31 of the primary and secondary circuit.
  • the tank is connected to the high pressure system so that the water can coo I down the oil layer.
  • the water in the oil layer flows through the space between the riser 5 and the casing 2, see Fig. 2.
  • the tank 27 of composition B there a smaller tank 29 for catalyst C is arranged which is connected via conduit 30 to the catalyst C with a four-way valve 41.
  • the hot air circuit 21 leads to the tank 19 for the composition A and to the reservoir 27 for the composition B through the air valves 22.
  • the pipes 28, 23, 30, 24 are led onto the head of the oil layer 13, and on the basis of com mands from the control unit 14, compositions A, B, C or water are optionally dispensed.
  • the tank 19 for composition A and the tank 27 of composition B is further equipped with a total of three sensors (not shown), namely a level meter which controls a low-pressure pump 31 for filling the tanks 8 and 38 for water.
  • a level meter which controls a low-pressure pump 31 for filling the tanks 8 and 38 for water.
  • the high-pressure plunger pump 40 controls the pumping of compositions or water into the oil layer 13.
  • the operation of the supercharger 42 is controlled by measuring the temperature in the tanks 19 and 27 connected to the system via the control unit 14, and thus the environment in the tanks can be adjusted.
  • Another function of the sensors in the tank 27 for composition B and in the tank 19 for composition is as follows: One sensor is located at the top so as to command in advance the switching off of the filling pump. The second one measures the temperature and gives the operating instructions for the hot air supercharger 42, and the third sensor measures the concentration of the composition and gives instructions for dispensing loose chemicals into the composition.
  • the tank 19 for composition A and tank 27 for composition B are provided at the bottom with a stainless steel conduit which is located about 100 to 200 mm above the bottom and has a length of about 25,000 mm and is in the first half of its length provided with full walls and in its second half is perforated.
  • the hot air of the hot air supercharger 42 is blown into this conduit in the tank 27 of the composition B and heats the composition in the first half of its length, and the other half also heats it partially but mainly mixes it.
  • a discharge device provided with a flange with a fitting for connecting low-pressure hoses.
  • the integral part of the discharge device is a simple, manually operated spherical valve which is in the open position throughout the working time of the oil layer. After it has finished, the valve must always be closed manually.
  • the tank for composition A and tank for composition B laboratories 20 are provided with a high and low voltage switchboard, a storage room 34, a dressing room with a control room 33, a coil seat 35 with cables and a measuring device.
  • the container B also contains barrels in which catalysts are stored, which are chemicals in the liquid state that are not diluted or heated, and serve filled with tank 29 during their operation.
  • the tank 29 From the tank 29 the conduit for the high-pressure pump 41 is led.
  • the tank 29 must be provided with a screw fitting for the assembly of the low-pressure hoses and the discharge valve.
  • All pumps, hot air supercharger 42 and unit of main control valve to turn the high pressure pump on and off and basically follow the temperature and pressure measurements in the oil layer to drive the entire system, are installed in this container.
  • two screw conveyors 39 are in the container together with the pumps 27, 29, 38 and the valve device, the high and low voltage distributors.
  • the control of the four-way valve 41 and the high- pump 40 is provided with control unit connected to the sensors 10 in the oil layer 13 controlled by software that provides system security, real-time control of the process, and maintenance of temperatures and partial pressures in the range around the entered values either by the operator or automatically determined by the calculations based on the parameters in the oil layer, geological and other information.
  • the control system for the performance of the method is preferably in a mobile version, where the required pumps, working fluid distribution system, and control valve system are arranged together with the control unit in containers which can be of the standard type with a length of 12 meters or in specially modified box vans in combination with separate tanks, whereas the control system can be controlled locally and remotely by means of telecommunication means including allowing detailed recording of its activity locally and remotely and it can operate both in fully automated mode and in manual control mode, and previous results can later be used to optimize future well stimulation processes.
  • the presented technical solution is maximally flexible and mobile. Standardized containers or a specially modified box vans are designed to ensure easy handling and implementation of the entire system.
  • It also includes a measuring and dispensing (injection) unit which is sunk into the well to the perforation zone through a channel or is part of such channel.
  • the surface fitting of the well must be adapted to the selected number of channels (at least two) and the system is connected via the control and safety valves and the flap valves to the surface fitting of the well in a standard way so that the pumps that are part of the system can be driven into the well by the individual channels the predetermined reagents required at a rate that the system determines according to the reaction process itself and in quantity and order as determined by the software.
  • a suitably arranged solution enables to achieve virtually any reasonable and necessary temperature for the purpose of the present invention and also eliminates the disadvantages of all the heat and gas generators operating on the surface and injecting hot gases or liquids through the surface wells into the oil layer.
  • the system enables to achieve very fast and high pressures sufficient to cleavege in the collector, whereas hot fluid breaking using is more effective than cold water breaking because high temperature reduces rock strength. All this without the use of extremely powerful pumps and a huge amount of liquid, because all the liquid in the system (hot reagents) turns into hot gases and creates high pressures directly in the well.
  • the proposed procedure does not require any special investment (for already drilled wells), but requires the use of a considerable amount of chemicals, which can reach up to many hundreds of tonnes for longer horizontal wells (and we can draw thousands of tons of shale, with the long-term effect of extraction). It is important that the reactions will take place for the most part directly in the collector and therefore the heat losses will be minimal.
  • the whole process is controlled by a fully automated system that ensures maximum efficiency and safety, and respects the technical parameters that each well was designed and built, and thanks to up to a dozen fast-response sensors, it allows the temperature (and partly the pressure) to be kept in the well in a very narrow interval around the in advance adjusted "operating point". If we wait until the collector get hot enough and the heat extends farther from the well, we can expect a very long-term effect.
  • the presented technology is intended to return to operation wells that have been stimulated by hydraulic breaking or by thermal methods (steam, SAGD) or are strongly irrigated and have ceased to produce oil efficiently.
  • SAGD steam, SAGD
  • oil layers when supercritical water conditions are reached, it can be assumed that water is mixed with oil perfectly (supercritical water dissolves oil), and if it is a suitable deposit, the conversion of complex hydrocarbons into lighter ones occurs. Oil solubility factor in supercritical water can be applied to highly irragated oil layers.
PCT/CZ2018/000048 2017-09-19 2018-09-19 DEVICE FOR THE EFFICIENT EXTRACTION OF BITUMEN, SHALE OIL, VERY HEAVY OIL AND LIGHTWEIGHT USING A COMPLETELY AUTOMATED CONTROL SYSTEM AND METHOD FOR PREPARING A MINERAL OPERATING EQUIPMENT WO2019057226A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US16/648,831 US20200284129A1 (en) 2017-09-19 2018-09-19 Device for efficient bitumen, shale oil, very heavy and light oil extraction using a fully automated control system and method of preparation of the mining equipment
CA3076406A CA3076406A1 (en) 2017-09-19 2018-09-19 Device for efficient bitumen, shale oil, very heavy and light oil extraction using a fully automated control system and method of preparation of the mining equipment
EA202090810A EA202090810A1 (ru) 2017-09-19 2018-09-19 Устройство для эффективного извлечения битума, сланцевой нефти, очень тяжелой и лёгкой нефти с использованием полностью автоматизированной системы управления и способ подготовки добывающего оборудования

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CZ2017-562A CZ307771B6 (cs) 2017-09-19 2017-09-19 Zařízení pro efektivní těžbu bitumenu a ropy a způsob přípravy těžebního zařízení
CZPV2017-562 2017-09-19

Publications (3)

Publication Number Publication Date
WO2019057226A2 true WO2019057226A2 (en) 2019-03-28
WO2019057226A3 WO2019057226A3 (en) 2019-04-25
WO2019057226A8 WO2019057226A8 (en) 2020-04-16

Family

ID=64606692

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CZ2018/000048 WO2019057226A2 (en) 2017-09-19 2018-09-19 DEVICE FOR THE EFFICIENT EXTRACTION OF BITUMEN, SHALE OIL, VERY HEAVY OIL AND LIGHTWEIGHT USING A COMPLETELY AUTOMATED CONTROL SYSTEM AND METHOD FOR PREPARING A MINERAL OPERATING EQUIPMENT

Country Status (5)

Country Link
US (1) US20200284129A1 (cs)
CA (1) CA3076406A1 (cs)
CZ (1) CZ307771B6 (cs)
EA (1) EA202090810A1 (cs)
WO (1) WO2019057226A2 (cs)

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
GB2099049B (en) * 1981-05-18 1985-02-27 Baker Int Corp Insulating tubular well conduits
US5829519A (en) * 1997-03-10 1998-11-03 Enhanced Energy, Inc. Subterranean antenna cooling system
US6688387B1 (en) * 2000-04-24 2004-02-10 Shell Oil Company In situ thermal processing of a hydrocarbon containing formation to produce a hydrocarbon condensate
US7784533B1 (en) * 2006-06-19 2010-08-31 Hill Gilman A Downhole combustion unit and process for TECF injection into carbonaceous permeable zones
US20090260811A1 (en) * 2008-04-18 2009-10-22 Jingyu Cui Methods for generation of subsurface heat for treatment of a hydrocarbon containing formation
ES2438005T3 (es) * 2008-10-15 2014-01-15 Tctm Limited Composiciones para la reducción de la viscosidad del petróleo por emisión de gas para estimular la capa productiva de un yacimiento de petróleo
FR2944828B1 (fr) * 2009-04-23 2012-08-17 Total Sa Procede d'extraction d'hydrocarbures d'un reservoir et une installation d'extraction d'hydrocarbures
US8955591B1 (en) * 2010-05-13 2015-02-17 Future Energy, Llc Methods and systems for delivery of thermal energy
US8800651B2 (en) * 2011-07-14 2014-08-12 Halliburton Energy Services, Inc. Estimating a wellbore parameter
CN103953319B (zh) * 2014-04-28 2016-08-24 中国石油天然气股份有限公司 一种同心分层点火注气管柱及方法

Also Published As

Publication number Publication date
CZ2017562A3 (cs) 2019-04-24
CZ307771B6 (cs) 2019-04-24
WO2019057226A3 (en) 2019-04-25
WO2019057226A8 (en) 2020-04-16
CA3076406A1 (en) 2019-03-28
US20200284129A1 (en) 2020-09-10
EA202090810A1 (ru) 2020-08-10

Similar Documents

Publication Publication Date Title
RU2671880C1 (ru) Способ добычи углеводородов из нефтекерогеносодержащих пластов и технологический комплекс для его осуществления
US9399905B2 (en) Leak detection in circulated fluid systems for heating subsurface formations
RU2537712C2 (ru) Нагрев подземных углеводородных пластов циркулируемой теплопереносящей текучей средой
RU2576267C1 (ru) Способ комбинированного воздействия на пласты, содержащие углеводороды и/или твердые органические вещества, и устройство для осуществления способа
CA2325777C (en) Combined steam and vapor extraction process (savex) for in situ bitumen and heavy oil production
US20170037716A1 (en) A method for the recovery and exploration of hydrocarbons from a subterraneous reservoir by means of gases, a system and an apparatus for the execution of the method
US20150068749A1 (en) Method, Apparatus and Composition for Increased Recovery of Hydrocarbons by Paraffin and Asphaltene Control from Reaction of Fuels and Selective Oxidizers in the Subterranean Environment
US20150159917A1 (en) Method and apparatus of using heat generated by single well engineered geothermal system (swegs) to heat oil laden rock or rock with permeable fluid content for enhance oil recovery
US10907455B2 (en) System and process for recovering hydrocarbons using a supercritical fluid
CA3004204A1 (en) Reactor and method for upgrading heavy hydrocarbons with supercritical fluids
CA2837471C (en) Method of recovering heavy oil from a reservoir
US20140096958A1 (en) Method, apparatus and composition to increase recovery of hydrocarbons by reaction of selective oxidizers and fuels in the subterranean environment
WO2018084743A1 (ru) Способ стимуляции скважин путём закачки газовых композиций
US10263265B2 (en) Oilfield electricity and heat generation systems and methods
US20200284129A1 (en) Device for efficient bitumen, shale oil, very heavy and light oil extraction using a fully automated control system and method of preparation of the mining equipment
AU2011237624B2 (en) Leak detection in circulated fluid systems for heating subsurface formations
EA041433B1 (ru) Устройство для эффективного извлечения битума, сланцевой нефти, очень тяжелой и лёгкой нефти с использованием полностью автоматизированной системы управления и способ подготовки добывающего оборудования
RU2726703C1 (ru) Способ повышения эффективности добычи высокотехнологичной нефти из нефтекерогеносодержащих пластов и технологический комплекс для его осуществления
US20150285032A1 (en) Methods and apparatus for storage and recovery of hydrocarbon fluids
RU2726693C1 (ru) Способ повышения эффективности добычи углеводородов из нефтекерогеносодержащих пластов и технологический комплекс для его осуществления
RU2801030C2 (ru) Способ разработки месторождений трудноизвлекаемых углеводородов
RU2704684C1 (ru) Способ добычи высокотехнологичной нефти и технологический комплекс для его осуществления
RU2704686C1 (ru) Способ внутрипластовой молекулярной модификации глубокозалегаемых тяжелых углеводородов и устройство для его реализации
RU2583797C2 (ru) Способ создания очага горения в нефтяном пласте
El-Usta High pressure combustion tube studies of medium and light oil

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 3076406

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18814768

Country of ref document: EP

Kind code of ref document: A2

122 Ep: pct application non-entry in european phase

Ref document number: 18814768

Country of ref document: EP

Kind code of ref document: A2

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 26/10/2020)

122 Ep: pct application non-entry in european phase

Ref document number: 18814768

Country of ref document: EP

Kind code of ref document: A2