WO2019051763A1 - Test bed data management system and working method thereof - Google Patents

Test bed data management system and working method thereof Download PDF

Info

Publication number
WO2019051763A1
WO2019051763A1 PCT/CN2017/101859 CN2017101859W WO2019051763A1 WO 2019051763 A1 WO2019051763 A1 WO 2019051763A1 CN 2017101859 W CN2017101859 W CN 2017101859W WO 2019051763 A1 WO2019051763 A1 WO 2019051763A1
Authority
WO
WIPO (PCT)
Prior art keywords
test
unit
data management
management system
reducer
Prior art date
Application number
PCT/CN2017/101859
Other languages
French (fr)
Chinese (zh)
Inventor
刘为峰
Original Assignee
苏州大成有方数据科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苏州大成有方数据科技有限公司 filed Critical 苏州大成有方数据科技有限公司
Priority to PCT/CN2017/101859 priority Critical patent/WO2019051763A1/en
Publication of WO2019051763A1 publication Critical patent/WO2019051763A1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • G01M13/02Gearings; Transmission mechanisms

Definitions

  • the invention belongs to the field of data management, and in particular relates to a test bed data management system.
  • the invention also relates to a method of working with a test bed data management system.
  • the Test Data Management System is part of Product Lifecycle Management (PLM) and helps companies build an accurate and consistent database of test data that manages test data and information about the test process. Powerful aids help users efficiently scale the system and efficiently classify, index, and calculate data to improve data utilization. At present, there is no complete system that can comprehensively manage the test data. The test data of the test is kept on each independent test bench. Although the data can be retained, there are still many test-related settings on the test bed. So data management is very confusing.
  • the object of the present invention is to provide a test bed data management system and a working method thereof, and to improve the distributed management of existing test data on a test bed, and cannot form unified management of data, and analyze test data.
  • Product performance creates a very large barrier and may even result in the loss of test data.
  • a test bed data management system comprising a sensor unit, a test test unit unit, a test test unit, a test sample unit, a test data management unit, a communication unit and a subscriber unit, wherein the test sample unit is fixed and tested On the test bench unit, the sensor unit is disposed inside or on the surface of the test sample unit, the test test unit and the test test stand unit are electrically connected, and the test data management unit receives the test of the test test unit through the communication unit.
  • the data is stored and the subscriber unit mounts the test sample unit on the test test unit unit and mounts the sensor unit on the test sample unit, which is used by the subscriber unit.
  • the separately set test bench in the test site and the data stored on the test bench can be centrally and uniformly managed, so that the test data can be retrieved for the later performance verification of the product, and the test is avoided.
  • the decentralized management of data is inconvenient for the work of testers and R&D personnel.
  • the sensor unit includes a temperature sensor, a strain gauge, and a torque sensor.
  • the data that is often tested is temperature and Torque
  • the torque sensor is set to monitor the change of torque during the test of the reducer.
  • the strain gauge can record the slight change of the structure of the reducer casing.
  • the test test stand unit comprises a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high power test stand, a strain tester, a vibration tester and a noise tester.
  • different test stands are designed to test different types of reducers.
  • the test test unit comprises a 200KW test bench test system, a 400KW test bench test system, an excavator reducer test bench test system, a high power test bench test system, a temperature test system, and a DASP. Test system.
  • Different test and test systems are designed according to different hardware test benches, which can be used to set the test time and torque value of the reducer, and can be combined with the temperature test system and the DASP test system through the temperature sensor and strain gauge set on the reducer. Track and record temperature, strain is worth changing.
  • the test sample unit includes a pump truck reducer, a cutter reducer, an excavator reducer, a travel reducer, and a winch reducer. According to different customers, different speed reducer products are also produced. Different test procedures and test data records are also required.
  • the test data management unit includes a test data storage unit, a test report storage unit, a test input unit, a query unit, and a tester unit.
  • the set test data management unit can centrally store and manage the test data, which is convenient for the test data user to retrieve the data and test report.
  • the communication unit uses serial port, Ethernet or CAN communication. Set different communication methods, and set different communication methods according to different devices.
  • the subscriber unit includes a test owner, a reducer designer, a test participant, and a manager. According to the personnel related to the speed reducer test, the identity of different people is set, and different rights can be set for different identity personnel.
  • the invention also provides a working method of a test bed data management system, comprising the following steps:
  • the subscriber unit sets the test conditions in the test test unit according to the test task list and starts the test;
  • test test unit continuously records the test data of the test sample unit during the test
  • the user unit removes the test sample unit from the test test bench unit, and the user unit takes a photo of the disassembled test sample unit;
  • the user unit uploads the test report and the disassembled photos of the test sample unit in the established test task;
  • the subscriber unit completes the test information in the test data management unit and completes the test data management.
  • test bed data management system further comprises the steps of:
  • the subscriber unit can query and download the relevant reducer product test data and report in the test data management unit according to the requirements.
  • the test data management system of the invention can manage the test test results and the test reports dispersed on different test stands in the same management, and is convenient for the user to consult.
  • the test bed data management system of the present invention can provide a unified data management platform for the test and related designers, facilitates unified management of test data, and performs data analysis. It can retain all the photos of the reducer disassembly after the whole test process until the end of the test, which can effectively manage the test data, change the original messy archiving method, and provide the staff with comprehensive test data.
  • FIG. 1 is a block diagram of a test bed data management system according to the present invention.
  • FIG. 2 is a block diagram of a sensor unit of a test bed data management system according to the present invention.
  • FIG. 3 is a block diagram of a test bench unit of a test bed data management system according to the present invention.
  • FIG. 4 is a block diagram of a test and test unit of a test bed data management system according to the present invention.
  • Figure 5 is a block diagram of a test sample unit of the test bed data management system according to the present invention.
  • FIG. 6 is a block diagram of a test data management unit of a test bed data management system according to the present invention.
  • Figure 7 is a block diagram of a subscriber unit of a test bed data management system according to the present invention.
  • 1 sensor unit 1 test test bench unit, 3 test test unit, 4 test sample unit, 5 test data management unit, 6 communication unit, 7 user unit.
  • the test bed data management system shown in FIG. 1 includes a sensor unit 1, a test test unit unit 2, a test test unit 3, a test sample unit 4, a test data management unit 5, a communication unit 6, and a subscriber unit 7,
  • the test sample unit 4 is mounted and fixed on the test test stand unit 2, the sensor unit 1 is disposed inside or on the surface of the test sample unit 4, and the test test unit 3 and the test test stand unit 2 are electrically connected,
  • the test data management unit 5 receives and stores the test data of the test test test unit 3 via the communication unit 6, and the user unit 7 mounts the test sample unit 4 on the test test stand unit 2, and mounts the sensor unit 1 in the test.
  • the test data management unit 5 is used by the subscriber unit 7.
  • test test stand unit 2 shown in FIG. 3 includes a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high-power test stand, a strain tester, a vibration tester, and a noise tester, and each test stand is Used for testing of different speed reducers.
  • test test unit 3 shown in FIG. 3 includes a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high-power test stand, a strain tester, a vibration tester, and a noise tester, and each test stand is Used for testing of different speed reducers.
  • test-related subscriber unit 7 shown in FIG. 7 includes a test owner, a reducer designer, a test participant, and a manager.
  • a working method of a test bed data management system comprising the following steps:
  • the subscriber unit 7 establishes a test task in the test data management unit 5 according to the test requirements;
  • the subscriber unit 7 mounts the test sample unit 4 on the test test bench unit 2;
  • the subscriber unit 7 sets the test conditions in the test test unit 3 according to the test task list, and starts the test;
  • test test unit 3 continuously records the test data of the test sample unit 4 during the test;
  • the user unit 7 detaches the test sample unit 4 from the test test stand unit 2, and the user unit 7 takes a photograph of the disassembled test sample unit 4;
  • the subscriber unit 7 uploads the test report and the disassembled photo of the test sample unit 4 in the established test task;
  • the subscriber unit 7 completes the test information in the test data management unit 5, and completes the test data management.
  • test bed data management system further includes the following steps:
  • the subscriber unit 7 can query and download the relevant reducer product test data and report in the test data management unit 5 according to requirements.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

Disclosed is a test bed data management system, comprising a sensor unit, a test bed unit, a test unit, a test sample unit, a test data management unit, a communication unit, and a user unit. The test sample unit is mounted and fixed on the test bed unit. The sensor unit is provided inside or on the surface of the test sample unit. The test unit is electrically connected to the test bed unit. The test data management unit receives test data of the test unit by means of the communication unit and stores the test data. The user unit mounts the test sample unit on the test bed unit, and mounts the sensor unit on the test sample unit. The test data management unit is used by the user unit. The management system can manage test data in a centralized and unified manner. The working method is reasonable so that a user can invoke test data at any time and performs data comparison.

Description

一种试验台数据管理系统及其工作方法Test bed data management system and working method thereof 技术领域Technical field
本发明属于数据管理领域,特别涉及一种试验台数据管理系统。本发明还涉及一种试验台数据管理系统的工作方法。The invention belongs to the field of data management, and in particular relates to a test bed data management system. The invention also relates to a method of working with a test bed data management system.
背景技术Background technique
试验数据管理系统是产品生命周期管理(PLM)的组成部分,能帮助企业组建一个准确一致的试验数据资源库,这个资源库管理了试验数据以及围绕试验过程的相关信息。功能强大的辅助工具能够帮助用户高效扩展该系统,并对数据进行有效的分类、索引和计算,提高数据的利用率。目前还没有能对试验数据进行全面管理的完整系统,将做完试验的试验数据保留在各个独立的试验台上,虽然能够将数据保留,但是试验台上的主机还存有很多试验相关设置,因此数据管理非常混乱。The Test Data Management System is part of Product Lifecycle Management (PLM) and helps companies build an accurate and consistent database of test data that manages test data and information about the test process. Powerful aids help users efficiently scale the system and efficiently classify, index, and calculate data to improve data utilization. At present, there is no complete system that can comprehensively manage the test data. The test data of the test is kept on each independent test bench. Although the data can be retained, there are still many test-related settings on the test bed. So data management is very confusing.
发明内容Summary of the invention
发明目的:为了克服以上不足,本发明的目的是提供一种试验台数据管理系统及其工作方法,改善现有试验数据分散管理在试验台上,不能形成数据的统一管理,对于采用试验数据分析产品性能形成非常大的障碍,更甚可能造成试验数据丢失。OBJECT OF THE INVENTION In order to overcome the above deficiencies, the object of the present invention is to provide a test bed data management system and a working method thereof, and to improve the distributed management of existing test data on a test bed, and cannot form unified management of data, and analyze test data. Product performance creates a very large barrier and may even result in the loss of test data.
技术方案:一种试验台数据管理系统,包括传感器单元、试验测试台单元、试验测试单元、试验样件单元、试验数据管理单元、通讯单元和用户单元,所述试验样件单元安装固定于试验测试台单元上,所述传感器单元设置于试验样件单元的内部或者表面,所述试验测试单元和试验测试台单元电性连接,所述试验数据管理单元通过通讯单元接收试验试验测试单元的试验数据并进行存储,所述用户单元将试验样件单元安装于试验测试台单元上,并将传感器单元安装于试验样件单元上,所述试验数据管理单元供用户单元使用。采用本发明的试验台数据管理系统,可将试验场地内的单独设置的试验台并保存在试验台上的数据进行集中统一管理,便于为后期进行产品性能验证的时候调取试验数据,避免试验数据的分散管理,对试验人员及研发人员的工作造成不便。Technical solution: a test bed data management system, comprising a sensor unit, a test test unit unit, a test test unit, a test sample unit, a test data management unit, a communication unit and a subscriber unit, wherein the test sample unit is fixed and tested On the test bench unit, the sensor unit is disposed inside or on the surface of the test sample unit, the test test unit and the test test stand unit are electrically connected, and the test data management unit receives the test of the test test unit through the communication unit. The data is stored and the subscriber unit mounts the test sample unit on the test test unit unit and mounts the sensor unit on the test sample unit, which is used by the subscriber unit. By adopting the test bed data management system of the invention, the separately set test bench in the test site and the data stored on the test bench can be centrally and uniformly managed, so that the test data can be retrieved for the later performance verification of the product, and the test is avoided. The decentralized management of data is inconvenient for the work of testers and R&D personnel.
进一步的,上述的试验台数据管理系统,所述传感器单元包括温度传感器、应变片和扭矩传感器。在减速机测试过程中,经常测试的数据是温度和 扭矩,通过温度变化来记录减速机齿轮的磨损程度,同时设置扭矩传感器是为了监视减速机测试过程中扭矩的变化,同时结合应变片可记录减速机外壳的结构的微小变化。Further, in the above test bed data management system, the sensor unit includes a temperature sensor, a strain gauge, and a torque sensor. During the speed reducer test, the data that is often tested is temperature and Torque, the degree of wear of the reducer gear is recorded by temperature change. The torque sensor is set to monitor the change of torque during the test of the reducer. At the same time, the strain gauge can record the slight change of the structure of the reducer casing.
进一步的,上述的试验台数据管理系统,所述试验测试台单元包括200KW试验台、400KW试验台、挖机减速机试验台、大功率试验台、应变测试仪、振动测试仪和噪声测试仪。根据减速机所需测试的性能,分别设计了不同的试验台可进行不同型号减速机的测试。Further, in the above test bed data management system, the test test stand unit comprises a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high power test stand, a strain tester, a vibration tester and a noise tester. According to the performance of the required test of the reducer, different test stands are designed to test different types of reducers.
进一步的,上述的试验台数据管理系统,所述试验测试单元包括200KW试验台测试系统、400KW试验台测试系统、挖机减速机试验台测试系统、大功率试验台测试系统、温度测试系统、DASP测试系统。分别根据不同的硬件试验台设计了不同的试验测试系统,可进行减速机试验时间,扭矩值的设定,并且可以通过设置在减速机上的温度传感器和应变片结合温度测试系统和DASP测试系统实时跟踪并记录温度,应变值得变化。Further, in the above test bed data management system, the test test unit comprises a 200KW test bench test system, a 400KW test bench test system, an excavator reducer test bench test system, a high power test bench test system, a temperature test system, and a DASP. Test system. Different test and test systems are designed according to different hardware test benches, which can be used to set the test time and torque value of the reducer, and can be combined with the temperature test system and the DASP test system through the temperature sensor and strain gauge set on the reducer. Track and record temperature, strain is worth changing.
进一步的,上述的试验台数据管理系统,所述试验样件单元包括泵车减速机、截割机减速机、挖机减速机、行走减速机和卷扬减速机。根据不同的客户生产有不同的减速机产品同时也需要进行不同的试验过程和试验数据记录。Further, in the above test bed data management system, the test sample unit includes a pump truck reducer, a cutter reducer, an excavator reducer, a travel reducer, and a winch reducer. According to different customers, different speed reducer products are also produced. Different test procedures and test data records are also required.
进一步的,上述的试验台数据管理系统,所述试验数据管理单元包括试验数据存储单元、试验报告存储单元、试验录入单元、查询单元,试验人员单元。设置的试验数据管理单元,可集中将试验数据进行存储管理,便于试验数据使用人员进行数据和试验报告的调取。Further, in the above test bed data management system, the test data management unit includes a test data storage unit, a test report storage unit, a test input unit, a query unit, and a tester unit. The set test data management unit can centrally store and manage the test data, which is convenient for the test data user to retrieve the data and test report.
进一步的,上述的试验台数据管理系统,所述通讯单元采用串口、以太网或者CAN通讯。设置不同的通讯方式,可根据不同的设备设置不同的通讯方式。Further, in the above test bed data management system, the communication unit uses serial port, Ethernet or CAN communication. Set different communication methods, and set different communication methods according to different devices.
进一步的,上述的试验台数据管理系统,所述用户单元包括试验责任人、减速机设计人员、试验参与人员和管理者。根据与减速机试验相关的人员,设置了不同人员的身份,并且给不同身份的人员可设置不同的权限。Further, in the above test bed data management system, the subscriber unit includes a test owner, a reducer designer, a test participant, and a manager. According to the personnel related to the speed reducer test, the identity of different people is set, and different rights can be set for different identity personnel.
本发明还提供一种试验台数据管理系统的工作方法,包括以下步骤:The invention also provides a working method of a test bed data management system, comprising the following steps:
1)用户单元根据试验需求在试验数据管理单元中建立试验任务;1) The subscriber unit establishes a test task in the test data management unit according to the test requirements;
2)用户单元将试验样件单元安装于试验测试台单元上; 2) The subscriber unit mounts the test sample unit on the test test bench unit;
3)用户单元根据试验任务单在试验测试单元中设置试验条件,开始试验;3) The subscriber unit sets the test conditions in the test test unit according to the test task list and starts the test;
4)试验测试单元在试验过程中不断记录试验样件单元的试验数据;4) The test test unit continuously records the test data of the test sample unit during the test;
5)试验结束,用户单元将试验样件单元从试验测试台单元拆下,用户单元拍摄试验样件单元的拆解后照片;5) At the end of the test, the user unit removes the test sample unit from the test test bench unit, and the user unit takes a photo of the disassembled test sample unit;
6)将试验测试单元中的试验数据通过通讯单元传输至试验数据管理单元中建立的该试验任务中;6) transmitting the test data in the test test unit to the test task established in the test data management unit through the communication unit;
7)用户单元在建立的试验任务中上传试验报告和试验样件单元的拆解后照片;7) The user unit uploads the test report and the disassembled photos of the test sample unit in the established test task;
8)用户单元在试验数据管理单元中完善试验信息,完成试验数据管理。8) The subscriber unit completes the test information in the test data management unit and completes the test data management.
本发明提供的一种试验台数据管理系统的工作方法,还包括步骤:The working method of the test bed data management system provided by the invention further comprises the steps of:
9)用户单元可根据需求,在试验数据管理单元中查询并下载相关的减速机产品试验数据和报告。9) The subscriber unit can query and download the relevant reducer product test data and report in the test data management unit according to the requirements.
本发明的试验数据管理系统,可将分散在不同试验台上的试验测试结果和试验报告同一管理,便于使用者进行查阅。The test data management system of the invention can manage the test test results and the test reports dispersed on different test stands in the same management, and is convenient for the user to consult.
上述技术方案可以看出,本发明具有如下有益效果:本发明所述的试验台数据管理系统,能够提供试验和相关设计人员一个统一的数据管理平台,方便将试验数据统一管理,并进行数据分析,能够将试验全过程直至试验结束后减速机拆解照片全部保留,能够有效的对试验数据进行管理,改变了原来杂乱的归档方式,同时能够给工作人员提供全面的试验数据。The above technical solution can be seen that the invention has the following beneficial effects: the test bed data management system of the present invention can provide a unified data management platform for the test and related designers, facilitates unified management of test data, and performs data analysis. It can retain all the photos of the reducer disassembly after the whole test process until the end of the test, which can effectively manage the test data, change the original messy archiving method, and provide the staff with comprehensive test data.
附图说明DRAWINGS
图1为本发明所述的试验台数据管理系统的框图;1 is a block diagram of a test bed data management system according to the present invention;
图2为本发明所述的试验台数据管理系统传感器单元的框图;2 is a block diagram of a sensor unit of a test bed data management system according to the present invention;
图3为本发明所述的试验台数据管理系统试验测试台单元的框图;3 is a block diagram of a test bench unit of a test bed data management system according to the present invention;
图4为本发明所述的试验台数据管理系统试验测试单元的框图;4 is a block diagram of a test and test unit of a test bed data management system according to the present invention;
图5为本发明所述的试验台数据管理系统试验样件单元的框图;Figure 5 is a block diagram of a test sample unit of the test bed data management system according to the present invention;
图6为本发明所述的试验台数据管理系统试验数据管理单元的框图;6 is a block diagram of a test data management unit of a test bed data management system according to the present invention;
图7为本发明所述的试验台数据管理系统用户单元的框图。Figure 7 is a block diagram of a subscriber unit of a test bed data management system according to the present invention.
图中:1传感器单元、2试验测试台单元、3试验测试单元、4试验样件单元、5试验数据管理单元、6通讯单元、7用户单元。 In the figure: 1 sensor unit, 2 test test bench unit, 3 test test unit, 4 test sample unit, 5 test data management unit, 6 communication unit, 7 user unit.
具体实施方式Detailed ways
下面结合附图和具体实施例,进一步阐明本发明。The invention will be further elucidated with reference to the drawings and specific embodiments.
实施例Example
如图1所示的试验台数据管理系统,包括传感器单元1、试验测试台单元2、试验测试单元3、试验样件单元4、试验数据管理单元5、通讯单元6和用户单元7,所述试验样件单元4安装固定于试验测试台单元2上,所述传感器单元1设置于试验样件单元4的内部或者表面,所述试验测试单元3和试验测试台单元2电性连接,所述试验数据管理单元5通过通讯单元6接收试验试验测试单元3的试验数据并进行存储,所述用户单元7将试验样件单元4安装于试验测试台单元2上,并将传感器单元1安装于试验样件单元4上,所述试验数据管理单元5供用户单元7使用。其中,如图2所示的传感器单元1包括温度传感器、应变片和扭矩传感器,采用传感器采集减速机试验样件的温度,同时对于温度的控制可结合手持式温度测试仪进行,采用双重温度监控。此外,如图3所示的试验测试台单元2包括200KW试验台、400KW试验台、挖机减速机试验台、大功率试验台、应变测试仪、振动测试仪和噪声测试仪,各个试验台均用于不同减速机的测试。再次,如图4所示的试验测试单元3包括200KW试验台测试系统、400KW试验台测试系统、挖机减速机试验台测试系统、大功率试验台测试系统、温度测试系统、DASP测试系统,各个测试系统设置减速机测试的条件,同时记录试验数据。进一步的,如图5所示的试验样件单元4包括泵车减速机、截割机减速机、挖机减速机、行走减速机和卷扬减速机。进一步的,如图6所示的试验数据管理单元5包括试验数据存储单元、试验报告存储单元、试验录入单元、查询单元,试验人员单元。为了进行数据传递,设置的通讯单元6,通讯单元6可采用串口、以太网或者CAN通讯。另,如图7所示的与试验相关的用户单元7包括试验责任人、减速机设计人员、试验参与人员和管理者。The test bed data management system shown in FIG. 1 includes a sensor unit 1, a test test unit unit 2, a test test unit 3, a test sample unit 4, a test data management unit 5, a communication unit 6, and a subscriber unit 7, The test sample unit 4 is mounted and fixed on the test test stand unit 2, the sensor unit 1 is disposed inside or on the surface of the test sample unit 4, and the test test unit 3 and the test test stand unit 2 are electrically connected, The test data management unit 5 receives and stores the test data of the test test test unit 3 via the communication unit 6, and the user unit 7 mounts the test sample unit 4 on the test test stand unit 2, and mounts the sensor unit 1 in the test. On the sample unit 4, the test data management unit 5 is used by the subscriber unit 7. The sensor unit 1 shown in FIG. 2 includes a temperature sensor, a strain gauge and a torque sensor, and uses the sensor to collect the temperature of the test piece of the reducer, and the temperature control can be combined with the handheld temperature tester, and the dual temperature monitoring is adopted. . In addition, the test test stand unit 2 shown in FIG. 3 includes a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high-power test stand, a strain tester, a vibration tester, and a noise tester, and each test stand is Used for testing of different speed reducers. Again, the test test unit 3 shown in FIG. 4 includes a 200KW test bench test system, a 400KW test bench test system, an excavator reducer test bench test system, a high power test bench test system, a temperature test system, and a DASP test system. The test system sets the conditions for the reducer test and records the test data. Further, the test sample unit 4 shown in FIG. 5 includes a pump truck reducer, a cutter reducer, an excavator reducer, a travel reducer, and a hoist reducer. Further, the test data management unit 5 shown in FIG. 6 includes a test data storage unit, a test report storage unit, a test entry unit, a query unit, and a tester unit. For data transmission, the communication unit 6 and the communication unit 6 can be configured to use serial port, Ethernet or CAN communication. In addition, the test-related subscriber unit 7 shown in FIG. 7 includes a test owner, a reducer designer, a test participant, and a manager.
一种试验台数据管理系统的工作方法,包括以下步骤:A working method of a test bed data management system, comprising the following steps:
1)用户单元7根据试验需求在试验数据管理单元5中建立试验任务;1) The subscriber unit 7 establishes a test task in the test data management unit 5 according to the test requirements;
2)用户单元7将试验样件单元4安装于试验测试台单元2上;2) The subscriber unit 7 mounts the test sample unit 4 on the test test bench unit 2;
3)用户单元7根据试验任务单在试验测试单元3中设置试验条件,开始试验; 3) The subscriber unit 7 sets the test conditions in the test test unit 3 according to the test task list, and starts the test;
4)试验测试单元3在试验过程中不断记录试验样件单元4的试验数据;4) The test test unit 3 continuously records the test data of the test sample unit 4 during the test;
5)试验结束,用户单元7将试验样件单元4从试验测试台单元2拆下,用户单元7拍摄试验样件单元4的拆解后照片;5) At the end of the test, the user unit 7 detaches the test sample unit 4 from the test test stand unit 2, and the user unit 7 takes a photograph of the disassembled test sample unit 4;
6)将试验测试单元3中的试验数据通过通讯单元6传输至试验数据管理单元5中建立的该试验任务中;6) transmitting the test data in the test test unit 3 to the test task established in the test data management unit 5 through the communication unit 6;
7)用户单元7在建立的试验任务中上传试验报告和试验样件单元4的拆解后照片;7) The subscriber unit 7 uploads the test report and the disassembled photo of the test sample unit 4 in the established test task;
8)用户单元7在试验数据管理单元5中完善试验信息,完成试验数据管理。8) The subscriber unit 7 completes the test information in the test data management unit 5, and completes the test data management.
另,一种试验台数据管理系统的工作方法,还包括以下步骤:In addition, a working method of the test bed data management system further includes the following steps:
9)用户单元7可根据需求,在试验数据管理单元5中查询并下载相关的减速机产品试验数据和报告。9) The subscriber unit 7 can query and download the relevant reducer product test data and report in the test data management unit 5 according to requirements.
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进,这些改进也应视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can make several improvements without departing from the principles of the present invention. The scope of protection of the invention.

Claims (10)

  1. 一种试验台数据管理系统,其特征在于:包括传感器单元(1)、试验测试台单元(2)、试验测试单元(3)、试验样件单元(4)、试验数据管理单元(5)、通讯单元(6)和用户单元(7),所述试验样件单元(4)安装固定于试验测试台单元(2)上,所述传感器单元(1)设置于试验样件单元(4)的内部或者表面,所述试验测试单元(3)和试验测试台单元(2)电性连接,所述试验数据管理单元(5)通过通讯单元(6)接收试验试验测试单元(3)的试验数据并进行存储,所述用户单元(7)将试验样件单元(4)安装于试验测试台单元(2)上,并将传感器单元(1)安装于试验样件单元(4)上,所述试验数据管理单元(5)供用户单元(7)使用。A test bed data management system, comprising: a sensor unit (1), a test test bench unit (2), a test test unit (3), a test sample unit (4), a test data management unit (5), a communication unit (6) and a subscriber unit (7), the test sample unit (4) is mounted and fixed on the test test bench unit (2), and the sensor unit (1) is disposed on the test sample unit (4) Internal or surface, the test test unit (3) and the test test stand unit (2) are electrically connected, and the test data management unit (5) receives test data of the test test test unit (3) through the communication unit (6) And storing, the subscriber unit (7) mounts the test sample unit (4) on the test test bench unit (2), and mounts the sensor unit (1) on the test sample unit (4), The test data management unit (5) is used by the subscriber unit (7).
  2. 根据权利要求1所述的试验台数据管理系统,其特征在于:所述传感器单元(1)包括温度传感器、应变片和扭矩传感器。The test bed data management system according to claim 1, characterized in that the sensor unit (1) comprises a temperature sensor, a strain gauge and a torque sensor.
  3. 根据权利要求2所述的试验台数据管理系统,其特征在于:所述试验测试台单元(2)包括200KW试验台、400KW试验台、挖机减速机试验台、大功率试验台、应变测试仪、振动测试仪和噪声测试仪。The test bed data management system according to claim 2, wherein the test test bench unit (2) comprises a 200KW test stand, a 400KW test stand, an excavator reducer test stand, a high power test stand, and a strain tester. , vibration tester and noise tester.
  4. 根据权利要求3所述的试验台数据管理系统,其特征在于:所述试验测试单元(3)包括200KW试验台测试系统、400KW试验台测试系统、挖机减速机试验台测试系统、大功率试验台测试系统、温度测试系统、DASP测试系统。The test bed data management system according to claim 3, wherein the test test unit (3) comprises a 200KW test bench test system, a 400KW test bench test system, an excavator reducer test bench test system, and a high power test. Bench test system, temperature test system, DASP test system.
  5. 根据权利要求1所述的试验台数据管理系统,其特征在于:所述试验样件单元(4)包括泵车减速机、截割机减速机、挖机减速机、行走减速机和卷扬减速机。The test bed data management system according to claim 1, wherein said test sample unit (4) comprises a pump reducer, a cutter reducer, an excavator reducer, a travel reducer, and a winch reduction. machine.
  6. 根据权利要求1所述的试验台数据管理系统,其特征在于:所述试验数据管理单元(5)包括试验数据存储单元、试验报告存储单元、试验录入单元、查询单元,试验人员单元。The test bed data management system according to claim 1, characterized in that said test data management unit (5) comprises a test data storage unit, a test report storage unit, a test entry unit, a query unit, and a tester unit.
  7. 根据权利要求3所述的试验台数据管理系统,其特征在于:所述通讯单元(6)采用串口、以太网或者CAN通讯。The test bed data management system according to claim 3, characterized in that the communication unit (6) uses serial port, Ethernet or CAN communication.
  8. 根据权利要求7所述的试验台数据管理系统,其特征在于:所述用户单元(7)包括试验责任人、减速机设计人员、试验参与人员和管理者。The test bed data management system according to claim 7, characterized in that said subscriber unit (7) comprises a test owner, a reducer designer, a test participant and a manager.
  9. 根据权利要求1-8任一项所述的试验台数据管理系统的工作方法,其特征在于:包括以下步骤: The working method of the test bed data management system according to any one of claims 1-8, comprising the steps of:
    1)用户单元(7)根据试验需求在试验数据管理单元(5)中建立试验任务;1) The subscriber unit (7) establishes a test task in the test data management unit (5) according to the test requirements;
    2)用户单元(7)将试验样件单元(4)安装于试验测试台单元(2)上;2) The subscriber unit (7) mounts the test sample unit (4) on the test tester unit (2);
    3)用户单元(7)根据试验任务单在试验测试单元(3)中设置试验条件,开始试验;3) The subscriber unit (7) sets the test conditions in the test test unit (3) according to the test task list and starts the test;
    4)试验测试单元(3)在试验过程中不断记录试验样件单元(4)的试验数据;4) The test test unit (3) continuously records the test data of the test sample unit (4) during the test;
    5)试验结束,用户单元(7)将试验样件单元(4)从试验测试台单元(2)拆下,用户单元(7)拍摄试验样件单元(4)的拆解后照片;5) At the end of the test, the user unit (7) removes the test sample unit (4) from the test test bench unit (2), and the user unit (7) takes a photograph of the disassembled test sample unit (4);
    6)将试验测试单元(3)中的试验数据通过通讯单元(6)传输至试验数据管理单元(5)中建立的该试验任务中;6) transmitting the test data in the test test unit (3) to the test task established in the test data management unit (5) through the communication unit (6);
    7)用户单元(7)在建立的试验任务中上传试验报告和试验样件单元(4)的拆解后照片;7) The subscriber unit (7) uploads the test report and the disassembled photo of the test sample unit (4) in the established test task;
    8)用户单元(7)在试验数据管理单元(5)中完善试验信息,完成试验数据管理。8) The subscriber unit (7) completes the test information in the test data management unit (5) and completes the test data management.
  10. 根据权利要求8所述的试验台数据管理系统的工作方法,其特征在于:还包括以下步骤:The working method of the test bed data management system according to claim 8, further comprising the steps of:
    9)用户单元(7)可根据需求,在试验数据管理单元(5)中查询并下载相关的减速机产品试验数据和报告。 9) The subscriber unit (7) can query and download the relevant reducer product test data and report in the test data management unit (5) according to the requirements.
PCT/CN2017/101859 2017-09-15 2017-09-15 Test bed data management system and working method thereof WO2019051763A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/101859 WO2019051763A1 (en) 2017-09-15 2017-09-15 Test bed data management system and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/101859 WO2019051763A1 (en) 2017-09-15 2017-09-15 Test bed data management system and working method thereof

Publications (1)

Publication Number Publication Date
WO2019051763A1 true WO2019051763A1 (en) 2019-03-21

Family

ID=65722247

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/101859 WO2019051763A1 (en) 2017-09-15 2017-09-15 Test bed data management system and working method thereof

Country Status (1)

Country Link
WO (1) WO2019051763A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5083471A (en) * 1990-06-25 1992-01-28 Ehret John B Method and apparatus for capturing torque for testing the rigidity and strength of torque transmission components
CN106289767A (en) * 2016-09-13 2017-01-04 天津沃都电气设备有限公司 A kind of robot is with high-end speed reducer drive accuracy testing platform
CN107655645A (en) * 2017-09-15 2018-02-02 苏州大成有方数据科技有限公司 A kind of testing stand data management system and its method of work

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5083471A (en) * 1990-06-25 1992-01-28 Ehret John B Method and apparatus for capturing torque for testing the rigidity and strength of torque transmission components
CN106289767A (en) * 2016-09-13 2017-01-04 天津沃都电气设备有限公司 A kind of robot is with high-end speed reducer drive accuracy testing platform
CN107655645A (en) * 2017-09-15 2018-02-02 苏州大成有方数据科技有限公司 A kind of testing stand data management system and its method of work

Similar Documents

Publication Publication Date Title
CN109784758B (en) Engineering quality supervision early warning system and method based on BIM model
TWI488050B (en) Analysis module, cloud analysis system and method thereof
CN107680194A (en) A kind of information system for power enterprise automates cruising inspection system
CN104917803A (en) Autonomous inspection system based on user behavior control
JP2019088847A (en) Data analysis processing method for elasticity detection device and elasticity detection device
US20140136139A1 (en) Optical fiber analysis device, system, and method
CN106643897A (en) Remote metering quality inspection system and remote metering quality inspection method
CN105279138B (en) A kind of information research report automatic creation system
WO2019051763A1 (en) Test bed data management system and working method thereof
CN115952521A (en) Clinical research data monitoring method and system and readable storage medium
CN205941719U (en) Removal operation management end that power equipment detected
CN108932590A (en) A kind of wholesale market of agricultural products management system
CN105119760A (en) 3D cloud monitoring method and 3D cloud monitoring device based on BIM (Building Information modelling)
CN108334045A (en) A kind of three-dimensional digital detecting system and method based on MBD
CN107655645A (en) A kind of testing stand data management system and its method of work
CN109993320A (en) A kind of device intelligence alarm management system
CN110796335A (en) Audit project implementation quality monitoring system and equipment based on data analysis
Friedman et al. The Atlassian Data Lake: consolidating enriched software development data in a single, queryable system
CN103246854B (en) Method of data capture, information security management method and information security management main frame
CN110322952A (en) A kind of medical care system and its working method based on block chain
TWI229996B (en) Operation system for accessing test function log file
CN110659878A (en) Power transmission and transformation project cost supervises detecting system
CN117806912B (en) Method and system for monitoring server abnormality
CN103714435A (en) Method for recording and monitoring checking-in state
TW201322027A (en) Multi-layer building chart monitoring system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17924872

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17924872

Country of ref document: EP

Kind code of ref document: A1