WO2018185245A1 - Système de surveillance de fluide de forage - Google Patents

Système de surveillance de fluide de forage Download PDF

Info

Publication number
WO2018185245A1
WO2018185245A1 PCT/EP2018/058774 EP2018058774W WO2018185245A1 WO 2018185245 A1 WO2018185245 A1 WO 2018185245A1 EP 2018058774 W EP2018058774 W EP 2018058774W WO 2018185245 A1 WO2018185245 A1 WO 2018185245A1
Authority
WO
WIPO (PCT)
Prior art keywords
drilling fluid
flow rate
tank
pump
monitoring
Prior art date
Application number
PCT/EP2018/058774
Other languages
English (en)
Inventor
Stein Ole ONSØYEN
Original Assignee
Rotor Offshore As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rotor Offshore As filed Critical Rotor Offshore As
Publication of WO2018185245A1 publication Critical patent/WO2018185245A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/76Devices for measuring mass flow of a fluid or a fluent solid material
    • G01F1/78Direct mass flowmeters
    • G01F1/80Direct mass flowmeters operating by measuring pressure, force, momentum, or frequency of a fluid flow to which a rotational movement has been imparted
    • G01F1/84Coriolis or gyroscopic mass flowmeters

Definitions

  • the present invention relates to monitoring the flow rate of drilling fluid return in order to detect drilling fluid gain or loss during hydrocarbon well drilling.
  • the present invention relates to a method of monitoring drilling fluid return flow rate when drilling a hydrocarbon well during which the drilling fluid is circulated down through a drill string, up through an annulus of the hydrocarbon well, through a wellhead diverter, through a flowline to a solids control and active mud system and back down through the drill string, wherein the drilling fluid, between the wellhead diverter and the solids control and active mud system, is routed through a drilling fluid flow rate monitoring system.
  • the present invention also relates to a drilling fluid flow rate monitoring system.
  • a closed loop circulating system for drilling fluids is normally used.
  • Fig. 1 schematically discloses such a system.
  • the system comprises a drill string 2 which runs inside a drilling riser 3.
  • a bottom hole assembly 4 comprising a drill bit for breaking up the rock formation 5 during drilling.
  • drilling fluid is pumped down the drill string 2 to the bottom hole assembly 4 and is returned up a well annulus 6 with drilled cuttings.
  • the drilling fluid is routed via a diverter 7 and a flowline 8 to a solids control system 9, where the drilling fluid is conditioned for reuse.
  • the drilling fluid is routed to mud tanks 10, from which the drilling fluid is pumped back down the drill string 2 via a stand pipe manifold 11 using pumps 12.
  • the well 1 on the seabed 13 needs to be monitored to detect gain, i.e. influx of fluid from the rock formation into the well, and loss, i.e. outflow of drilling fluid into the rock formation.
  • Conventional well control involves monitoring the volume of the drilling fluid in the mud tanks 10. Taking into account changing hole geometry and loss of drilling fluid in the solids control system, an increase of drilling fluid volume in the mud tanks may indicate a gain situation, whereas a decrease of volume may indicate a loss situation.
  • conventional well control also involves monitoring the drilling fluid level in the flowline 8, e.g. using a flow paddle or a radar measurement system, whereby the stability of the flow of drilling fluid out of the well can be monitored.
  • the volume of the drilling fluid in the mud tanks 10 can be measured quite accurately, but the time-response may be slow. This normally leaves monitoring of the drilling fluid level in the flowline 8 as the primary source for early gain/loss detection.
  • ECD Equivalent Circulation Density
  • paddle/radar signal is filtered to level out abnormal peaks and natural
  • the apparatus comprises a Coriolis flow sensor which is positioned in a bypass which diverts part of the drilling fluid return flow from the flowline, through the Coriolis flows sensor and back to the flowline.
  • An objective of the present invention is to provide a method and a system for accurately monitoring the circulation of the drilling fluid through the wellbore.
  • Another objective of the present invention is to provide a system and a method of using available technology in existing systems to achieve improved measurement of return flow, which method is applicable for new-builds as well as for integration or retrofitting into existing drilling systems.
  • the method according to the invention may comprise the steps of:
  • the drilling fluid flow monitoring system comprising the at least one measuring tank and the at least one tank pump is arranged between the wellhead diverter and the solids control and active mud system. Consequently, the at least one measuring tank is arranged downstream of the wellhead diverter but upstream of the solids control and active mud system and also upstream of the mud tanks.
  • the step of monitoring the flow rate of the drilling fluid going through the at least one tank pump may comprise monitoring the flow rate using a flowmeter system arranged downstream of the at least one tank pump.
  • the flowmeter system may comprise a Coriolis type flowmeter.
  • the tank pump will assist flow through the Coriolis unit.
  • the at least one tank pump may be a metering pump and the step of monitoring the flow rate of the drilling fluid going through the at least one tank pump may comprise monitoring the flow rate of the metering pump.
  • the at least one tank pump may be regulated to keep the drilling fluid in the at least one measuring tank at a predetermined level.
  • the at least one measuring tank may, during tripping in and out of the drill string, be used as a trip tank.
  • the drilling fluid flow rate monitoring system may comprise:
  • At least one measuring tank arranged to receive drilling fluid from a wellhead diverter;
  • - at least one tank pump arranged downstream of the at least one measuring tank to receive the drilling fluid from the at least one measuring tank and to deliver the drilling fluid to a downstream solids control and active mud system;
  • At least one level indicating transmitter arranged at the at least one measuring tank for measuring the level of the drilling fluid in the at least one measuring tank;
  • a pump flow rate monitoring system for monitoring the flow rate of the drilling fluid going through the at least one at least one tank pump
  • control system for establishing the flow rate of the drilling fluid received by the at least one measuring tank from the wellhead diverter based on:
  • the system according to the invention may be arranged to route return drilling fluid flowing in a return line connected between the wellhead diverter and the downstream solids control and active mud system via the at least one measuring tank, i.e. from the return line, to the at least one measuring tank and back to the return line.
  • the pump flow rate monitoring system may be arranged downstream of the at least one tank pump and may comprise a flowmeter and the flowmeter may be a Coriolis type flowmeter.
  • the at least one tank pump may be a metering pump and the pump flow rate monitoring system may comprise the metering pump.
  • the metering pump may receive control signals from the at least one level indicating transmitter to keep the drilling fluid in the at least one measuring tank at a predetermined level.
  • the at least one tank pump may be controlled by a variable frequency drive (VFD) which receives control signals from the at least one level indicating transmitter to keep the drilling fluid in the at least one measuring tank at a predetermined level.
  • VFD variable frequency drive
  • One aspect of the invention uses existing systems in combination with some new components and controls to achieve improved drilling fluid control.
  • the system according to the invention can be based on prior art trip tank systems, wherein trip tanks are used as measuring tanks. Consequently, one aspect of the present invention resides in utilising a conventional trip tank system not only during tripping, but also for monitoring the flow rate of the drilling fluid return during drilling.
  • the system according to the invention is beneficially integrated into the drilling control system which already controls and monitors the equipment in use (trip tanks, pumps, level indication, etc.), e.g. by installing volumetric trip tank pumps, VFD drive on conventional centrifugal trip tank pumps or a throttle valve on the outlets of the conventional centrifugal trip tank pumps.
  • Fig. 1 discloses a layout of a typical prior art drilling fluid circulation system.
  • Fig. 2 discloses a layout of a typical prior art trip tank system.
  • Fig. 3 discloses a first embodiment of a drilling fluid flow monitoring system according to the invention.
  • Fig. 4 discloses a second embodiment of a drilling fluid flow monitoring system according to the invention.
  • Fig. 5 discloses a third embodiment of a drilling fluid flow monitoring system according to the invention.
  • Fig. 6 discloses a fourth embodiment of a drilling fluid flow monitoring system according to the invention.
  • Fig. 7a to 7c disclose further embodiments of a drilling fluid flow monitoring system according to the invention.
  • drilling mud follows the drilling mud return conduit, or flowline, from the diverter 7 to the solids control and active mud system (cf. Fig. 1).
  • the drilling mud is circulated via a trip tank system to maintain well control.
  • trip tank(s) are designed and instrumented to ensure a high level of control of the volume in the tank(s) to enable detection of small flow variations when circulating over the wellhead diverter during tripping out/in of the well and when circulating over the wellhead to detect loss/gain in the well (so called "flow-check").
  • Fig. 2 discloses a layout of a typical prior art trip tank system 21 which is connected to the flowline 23 between the wellhead diverter 25 and the solids control and active mud system 27.
  • the system 21 comprises two trip tanks 29a, 29b and two trip tank pumps 31, 33.
  • the trip tank pumps 31, 33 are typically centrifugal pumps.
  • the system 21 comprises a plurality of trip tank inlet valves 35a, 35b, 37 allowing one or both of the tanks 29a, 29b to be connected to the flowline 23 via a trip tank system inlet conduit 24.
  • the system 21 also comprises a plurality of trip tank outlet valves 41a, 41a', 41b, 41b' allowing either trip tank 29a, 29b to be connected to either trip tank pump 31, 33.
  • the system 21 further comprises trip tank pump outlet valves 43, 45 connecting the pumps 31, 33 to a trip tank system outlet conduit 47.
  • the valves 35a, 35b, 37, 41a, 41a', 41b, 41b', 43 and 45 allow any combination of trip tank and trip tank pump to be incorporated into the trip tank system loop.
  • Level indicating transmitters 49a, 49a', 49b, 49b' are arranged in the trip tanks 29a, 29b for measuring the mud level in the tanks.
  • a flowline valve 51 is arranged between the trip tank inlet conduit 24 and the trip tank outlet conduit 47.
  • Fig. 2 discloses the trip tank system 21 in an inactive state, i.e. in a state where the trip tank system 21 is bypassed by keeping the valves 35a, 35b, 37, 43 and 45 closed, and the flowline valve 51 open.
  • This is the state a conventional trip tank system is in during drilling.
  • the flowline valve 51 is closed and a suitable combination of valves 35a, 35b, 37, 41a, 41a', 41b, 41b' 43 and 45 are opened, allowing the drilling fluid to be circulated via one or both of the trip tanks 29a, 29b by at least one of the trip tank pumps 31, 33.
  • Fig. 3 discloses a first embodiment of such a drilling fluid flow rate monitoring system 61.
  • the system 61 is similar to the system 21 disclosed in Fig. 2 and like reference numerals indicate like features.
  • the system 61 also comprises a pump flow rate monitoring system 63 which is arranged to measure the flow rate of the drilling fluid going through the pumps 31, 33.
  • the pump flow rate monitoring system 63 comprises a flowmeter 65 which is arranged in the fluid path of conduit 47.
  • the flowmeter 65 may for example be a Coriolis type flowmeter.
  • the flow rate of the drilling fluid return i.e. the flow rate of the drilling fluid emerging from the well head diverter 25 can be established accurately and in a responsive fashion.
  • the system 61 maintains the drilling fluid level in each tank 29a, 29b at a predetermined level, in which case the flow rate of the drilling fluid return at each point in time is given directly by the flow rate monitored by the flowmeter 65.
  • this will rapidly be detected by the transmitters 49a, 49a', 49b, 49b', since in such a situation the level in the tanks 29a, 29b will change.
  • the transmitters 49a, 49a', 49b, 49b' detect an increasing fluid level, this indicates that the flow rate of the drilling fluid return is higher than the flow rate monitored by the flowmeter 65, whereas a decreasing fluid level indicates that the flow rate of the drilling fluid return is lower than the flow rate monitored by the flowmeter 65. Knowing the geometry of the tanks 29a, 29b and the rate of change of the fluid level, it is possible to adjust the flow rate monitored by the flowmeter 65 to arrive at the true flow rate of the drilling fluid return, i.e. the flow rate of the drilling fluid emerging from the wellhead diverter 25.
  • the monitored signals from the level indicating transmitters 49a, 49a', 49b, 49b' and the pump flow rate monitoring system 63 are sent to a controller 100 where the signals are processed accordingly to yield the flow rate of the drilling fluid return.
  • the pumps 31, 33 are variable frequency drive pumps which are controlled by variable frequency drives (VFDs) 74, 76.
  • VFDs 74, 76 are connected to the level indicating transmitters 49a, 49a', 49b, 49b'.
  • VFD 74 is disclosed to be connected only to transmitters 49b and 49b'.
  • VFD 76 is also connected to transmitters 49a and 49a'.
  • VFD 76 is connected to transmitters 49a, 49a', 49b and 49b', although this is also not explicitly disclosed in Fig. 3 in order not to obscure other features in the figure.
  • the VFDs 74, 76 receive control signals from the transmitters 49a, 49a', 49b, 49b' which are a function of the fluid level in the tanks 29a, 29b. This allows the VFDs 74, 76 to control the pumps 31, 33 to maintain a predetermined fluid level in the tanks 29a, 29b during drilling. Consequently, as has been discussed above, in a dynamic flow rate situation, i.e. when the flow rate of the drilling fluid return changes or fluctuates over time, the flow rate is established based on monitored signals from the transmitters 49a, 49a', 49b, 49b' and the flowmeter 65.
  • tank 29b is disclosed to be active.
  • the skilled person realises that the system is equally functional if both tanks 29a and 29b are active, or if only tank 29a is active.
  • the flowmeter system 63 comprises valves 67, 69, 71 arranged down-steam, up-stream and in parallel to the flowmeter 65, allowing the flowmeter 65 to be by-passed via a bypass conduit 73.
  • the valves 67 and 69 can be closed and valve 71 opened, allowing the flowmeter 65 to be by-passed and the system 61 to be operated as a conventional trip tank system.
  • Fig. 4 discloses a second embodiment of a drilling fluid flow rate monitoring system 75 according to the invention.
  • System 75 operates in the same way as system 61, i.e. the flow rate of the drilling fluid return is established based on the monitored fluid level in the tanks 29a, 29b and the monitored flow rate of the drilling fluid going through the pumps 31, 33.
  • the valve 77 arranged down-stream of the flowmeter 65 is a variable throttle valve which receives control signals from the transmitters 49a, 49a', 49b, 49b'.
  • the predetermined levels in the tanks 29a, 29b are maintained by varying the through-put area of the throttle valve 77 based on the signals from the transmitters 49a, 49a', 49b, 49b', in which case the pumps 31, 33 need not be VFD controlled, but can be conventional, non-VFD controlled centrifugal pumps.
  • Fig. 5 discloses a third embodiment of a drilling fluid flow rate monitoring system 79 according to the invention.
  • the conventional trip tank pumps have been exchanged for volumetric pumps 81, 83, i.e. metering pumps having a flow rate which can be controlled.
  • the metered flow rate of the pumps 81, 83 can be controlled to maintain the predetermined fluid level in the tanks 29a, 29b. Since the flow rate from the tanks 29a, 29b is controlled by the volumetric pumps 81, 83 and thereby is known, there is no need to arrange a flowmeter in the flow path of conduit 47. Consequently, the flow meter system 63 of the above-discussed systems 61 and 75, i.e. the first and second embodiments, can be dispensed with.
  • Fig. 6 discloses a fourth embodiment of a drilling fluid flow rate monitoring system 85 according to the invention.
  • a volumetric pump 87 is arranged in parallel to the conventional trip tank pumps 31, 33 and a pump outlet valve 89 connects the pump 87 to the outlet conduit 47.
  • Tank outlet valves 91a, 91b allow tanks 29a and/or 29b to be brought into fluid communication with pump 87 during drilling.
  • the metered flow rate of pump 87 can be controlled to maintain the predetermined fluid level in tanks 29a and/or tank 29b. Since the flow rate from the tanks 29a, 29b is controlled by the volumetric pump 87, and consequently is known, there is no need to arrange a flowmeter in the flow path of conduit 47 in order to establish the flow rate of the drilling fluid going through pump 87.
  • valves 91 and 93 When in a non-drilling mode, e.g. during tripping in and out of the drill string, the valves 91 and 93 are closed and a suitable combination of valves 41a, 41a', 41b, 41b', 43 and 45 are opened, allowing the system 85 to operate as a conventional trip tank system.
  • systems 61, 75, 79 and 85 are based on a conventional trip tank system and can be realised by simple modifications of such a system. Also, systems 61, 75, 79 and 85 can all be operated as a conventional trip tank system when in non-drilling mode. However, it is understood that the drilling fluid flow rate monitoring system can be realised as a stand-alone system which has no other function than to establish the flow rate of the drilling fluid return.
  • Figs. 7a to 7c disclose three embodiments of a system according to the invention having only one measuring tank and one tank pump. Such systems may be suitable as
  • the system according to the invention can be retrofitted on existing drilling systems for use on smaller well hole sections as well as engineered onto new builds. Also, the system according to the invention is applicable for all kinds of conventional drilling, both on- and offshore.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Flow Control (AREA)
  • Earth Drilling (AREA)

Abstract

L'invention concerne un procédé de surveillance du débit de retour d'un fluide de forage lors du forage d'un puits d'hydrocarbures pendant lequel le fluide de forage est mis en circulation à travers un train de tiges de forage, vers le haut à travers un espace annulaire du puits d'hydrocarbures, à travers un dériveur (25) de tête de puits, à travers une conduite d'écoulement (23) vers un système de commande de matières solides et de boues actives (27) et de retour vers le bas à travers le train de tiges de forage, le fluide de forage, entre le déflecteur de tête de puits et le système de commande de matières solides et de boues actives, étant acheminé à travers un système de surveillance de débit de fluide de forage (61). Le procédé comprend les étapes consistant à acheminer le fluide de forage à travers au moins un réservoir de mesure (29a, 29b) et au moins une pompe à réservoir (31, 33) qui est disposée en aval du ou des réservoirs de mesure ; à surveiller le niveau de fluide de forage dans le ou les réservoirs de mesure ; à surveiller le débit de fluide de forage traversant la ou les pompes de réservoir ; et à établir le débit de retour de fluide de forage sur la base du niveau de fluide surveillé dans le ou les réservoirs de mesure et le débit surveillé à travers la ou les pompes de réservoir. L'invention concerne également un système de mise en œuvre du procédé.
PCT/EP2018/058774 2017-04-07 2018-04-05 Système de surveillance de fluide de forage WO2018185245A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20170596 2017-04-07
NO20170596A NO20170596A1 (en) 2017-04-07 2017-04-07 Drilling fluid monitoring system

Publications (1)

Publication Number Publication Date
WO2018185245A1 true WO2018185245A1 (fr) 2018-10-11

Family

ID=62116818

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2018/058774 WO2018185245A1 (fr) 2017-04-07 2018-04-05 Système de surveillance de fluide de forage

Country Status (2)

Country Link
NO (1) NO20170596A1 (fr)
WO (1) WO2018185245A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456659A (zh) * 2020-04-30 2020-07-28 中国石油天然气集团有限公司 一种在钻进过程中对溢流漏失进行监测的监测方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116733396B (zh) * 2023-08-11 2023-10-31 四川奥达测控装置有限公司 一种钻井出口流量监测与井控溢漏预警系统及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1227215A2 (fr) * 2001-01-26 2002-07-31 Martin-Decker Totco, Inc., (a Texas corporation) Procédé et système pour le contrôle de la pression d'un puits de forage
US20120228027A1 (en) * 2011-03-09 2012-09-13 Sehsah Ossama R Method for characterizing subsurface formations using fluid pressure response during drilling operations
US20160084024A1 (en) * 2014-09-19 2016-03-24 Weatherford Technology Holdings, Llc Coriolis Flow Meter Having Flow Tube with Equalized Pressure Differential
US20160245027A1 (en) * 2015-02-23 2016-08-25 Weatherford Technology Holdings, Llc Automatic Event Detection and Control while Drilling in Closed Loop Systems
US20170044857A1 (en) * 2014-04-22 2017-02-16 Managed Pressure Operations Pte. Ltd. Method of operating a drilling system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007005822A2 (fr) * 2005-07-01 2007-01-11 Board Of Regents, The University Of Texas System Systeme, produits-programmes et procedes de commande des parametres de fluides de forage
US9206683B2 (en) * 2013-08-01 2015-12-08 Trace Logic, Inc. Oil and gas well fracture liquid tracing using DNA

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1227215A2 (fr) * 2001-01-26 2002-07-31 Martin-Decker Totco, Inc., (a Texas corporation) Procédé et système pour le contrôle de la pression d'un puits de forage
US20120228027A1 (en) * 2011-03-09 2012-09-13 Sehsah Ossama R Method for characterizing subsurface formations using fluid pressure response during drilling operations
US20170044857A1 (en) * 2014-04-22 2017-02-16 Managed Pressure Operations Pte. Ltd. Method of operating a drilling system
US20160084024A1 (en) * 2014-09-19 2016-03-24 Weatherford Technology Holdings, Llc Coriolis Flow Meter Having Flow Tube with Equalized Pressure Differential
US20160245027A1 (en) * 2015-02-23 2016-08-25 Weatherford Technology Holdings, Llc Automatic Event Detection and Control while Drilling in Closed Loop Systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LEBLAY ET AL.: "A New Generation of Well Surveillance for Early Detection of Gains and Losses When Drilling Very High Profile Ultradeepwater Wells, Improving Safety, and Optimizing Operating Procedures (SPE 158374)", SPETT 2012 ENERGY CONFERENCE AND EXHIBITION, 11 June 2012 (2012-06-11), pages 1 - 10, XP055208505, DOI: doi:10.2118/158374-MS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456659A (zh) * 2020-04-30 2020-07-28 中国石油天然气集团有限公司 一种在钻进过程中对溢流漏失进行监测的监测方法

Also Published As

Publication number Publication date
NO20170596A1 (en) 2018-10-08

Similar Documents

Publication Publication Date Title
RU2386016C2 (ru) Регулирование потока многофазной текучей среды, поступающей из скважины
RU2553751C2 (ru) Автоматическое управление давлением в напорной линии при бурении
RU2301319C2 (ru) Устройство и способ динамического регулирования давления в кольцевом пространстве
RU2592583C2 (ru) Использование результатов измерения давления в скважине во время бурения для выявления притоков и для их уменьшения
AU2002219322B2 (en) Closed loop fluid-handing system for well drilling
US9581475B2 (en) Multiphase flowmeter
EA015325B1 (ru) Способ определения существования события управления скважиной
KR20190108547A (ko) 정성적 지표를 이용하여 시추공 유입 상태를 결정하기 위한 장치 및 방법
SA111320918B1 (ar) طريقة وجهاز لحفر ثقب حفر تحت الأرض
MX2012002169A (es) Metodo para determinar eventos de control de fluido de formacion en un orificio usando un sistema de control de presion anular dinamico.
WO2012129506A2 (fr) Forage à pression gérée à compensation de pilonnement de plateforme
WO2012122470A1 (fr) Procédé de caractérisation de formations souterraines utilisant une réponse de pression de fluide pendant des opérations de forage
WO2014183136A1 (fr) Détermination de coefficient de débit d'une vanne d'étranglement de forage régulée par pression
US20210317713A1 (en) Apparatus and method for early kick detection and loss of drilling mud in oilwell drilling operations
US20180135365A1 (en) Automatic managed pressure drilling utilizing stationary downhole pressure sensors
WO2013055706A1 (fr) Détection de flux d'entrée de puits de forage comprenant mesures de train de tiges de forage distribuées
Verde et al. Experimental investigation of pressure drop in failed Electrical Submersible Pump (ESP) under liquid single-phase and gas-liquid two-phase flow
WO2018185245A1 (fr) Système de surveillance de fluide de forage
US20200190924A1 (en) Choke system
SA113340678B1 (ar) التحكم في الضغط في عمليات الحفر مع الإزاحة المطبقة استجابة لظروف محددة سلفاً
US11603724B1 (en) Mud flow measurement system for wellheads
Mammadov et al. A Direct Comparison of Calculated vs. Measured Bottomhole Pressure Drilling Data in an HPHT Well
Bybee Managed-Pressure Drilling: Kick Detection and Well Control
Stave Evaluation of kick and loss scenarios in experimental lab facility

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18722905

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18722905

Country of ref document: EP

Kind code of ref document: A1