WO2018139905A1 - Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치 - Google Patents

Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치 Download PDF

Info

Publication number
WO2018139905A1
WO2018139905A1 PCT/KR2018/001195 KR2018001195W WO2018139905A1 WO 2018139905 A1 WO2018139905 A1 WO 2018139905A1 KR 2018001195 W KR2018001195 W KR 2018001195W WO 2018139905 A1 WO2018139905 A1 WO 2018139905A1
Authority
WO
WIPO (PCT)
Prior art keywords
control data
air conditioning
control
energy
classification
Prior art date
Application number
PCT/KR2018/001195
Other languages
English (en)
French (fr)
Inventor
최원창
성남철
김지헌
나빌나시프
Original Assignee
가천대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가천대학교 산학협력단 filed Critical 가천대학교 산학협력단
Publication of WO2018139905A1 publication Critical patent/WO2018139905A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring

Definitions

  • This embodiment relates to a control data processing method and apparatus therefor for a BEMS-based centralized air conditioning system.
  • BEMS Building Energy Management System
  • BEMS is based on BAS (Building automation system) that monitors and controls the status of various equipment such as general machinery, electricity, lighting, disaster prevention, and alarms, and provides functions such as energy and environment management, building facility management support, and facility operation support. Will be performed. BEMS performs optimal control functions such as optimal start / stop, zero energy band, load reset, power saving cycle, and outdoor air volume control to reduce energy consumption in buildings.
  • BAS Building automation system
  • the rational management tool is an advanced simplified control, that is, an advanced function that helps the administrator's decision-making process or replaces the administrator's judgment function in a simple control function by comparing the setting value judged by the administrator with the current state value.
  • it is necessary to collect a lot of operational management information and to develop management techniques through analysis of these information.
  • the present embodiment relates to an apparatus for processing control data of a centralized air conditioning system, and provides control data classified and processed based on energy sources, facility systems, and spaces for air conditioning using energy usage information of buildings.
  • the main purpose is to provide a control data processing method and apparatus therefor for the BEMS-based centralized air conditioning system.
  • an apparatus for processing control data of a building energy management system (BEMS) -based centralized air conditioning system comprising: an information collecting unit for collecting energy usage information of a building unit; A first control processor configured to generate the first control data by classifying the energy use information for each energy source; A second control processor configured to generate a second control data by classifying a main equipment component of the centralized air conditioning system based on the first control data; A third control processor configured to generate third control data on a zone state of an air conditioning target based on the second control data; And storing the first control data, the second control data, and the third control data, and generating the data using at least one of the first control data, the second control data, and the third control data.
  • It provides a control data processing apparatus comprising a control data processing unit for providing control data.
  • the control data processing apparatus for processing the control data of the centralized air conditioning system based on the Building Energy Management System (BEMS), comprising: an information collection process of collecting energy usage information of the building unit; A first control process of classifying and processing the energy use information for each energy source to generate first control data; A second control process of generating a second control data by classifying a main equipment component of the centralized air conditioning system based on the first control data; A third control process of generating third control data on a zone state of an air conditioning target based on the second control data; And storing the first control data, the second control data, and the third control data, and generating the data using at least one of the first control data, the second control data, and the third control data.
  • BEMS Building Energy Management System
  • the centralized air conditioning system is operated by classifying and processing the information of the centralized air conditioning system into the building unit system unit and the zone unit in the building to provide the control data. It can effectively display information and performance of information, performance and information in the state system unit, and information and performance state in the state zone unit, make it easy to manage the building, and use it in conjunction with other media. It's easy.
  • FIG. 1 is a block diagram schematically showing a BEMS control data processing system based on a centralized air conditioning system according to the present embodiment.
  • FIG. 2 is a block diagram schematically showing a control data processing apparatus according to the present embodiment.
  • FIG. 3 is a flowchart illustrating a control data processing method based on a centralized air conditioning system according to the present embodiment.
  • FIG. 4 is an exemplary view showing an input / output screen interface of control data according to the present embodiment.
  • FIG. 1 is a block diagram schematically showing a BEMS control data processing system based on a centralized air conditioning system according to the present embodiment.
  • the BEMS-based centralized air conditioning system includes a building 110, a control data processing device 120, an administrator terminal 130, and a building energy management system (BEMS) 140.
  • BEMS building energy management system
  • the components included in the BEMS-based centralized air conditioning system are according to an embodiment, and not all blocks shown in FIG. 1 are essential components, and in some embodiments, some blocks included in the BEMS-based centralized air conditioning system are included. This can be added, changed or deleted.
  • the building 110 is connected to the control data processing device 120 and the building energy management system 140 and transmits and receives energy usage information and various control signals.
  • the building 110 is illustrated as one building structure, but is not necessarily limited thereto, and may be a building group including a plurality of buildings.
  • the building 110 transmits energy usage information to the control data processing apparatus 120 and may include a power measurement device (not shown) for generating energy usage information.
  • the energy usage information may include building identification information, power usage information, load identification information, and the like used in the building 110.
  • the control data processing apparatus 120 obtains energy use information from the building 110 and performs classification processing based on the energy use information to generate integrated control data.
  • the control data processing apparatus 120 controls the total amount of total energy supplied to each of the plurality of facility systems and the total consumption of each energy source based on the energy usage information obtained from the building 110, 1 Create control data.
  • the control data processing device 120 controls the information elements that can be obtained from the components of the centralized air conditioning system based on the first control data, and generates second control data therefor.
  • the control data processing device 120 generates third control data for monitoring the condition of the conditioned air (air supply) supplied based on the facility system and environmental conditions such as temperature and humidity in the space to be subjected to air conditioning. .
  • control data processing device 120 Detailed description of the control data processing device 120 will be described in FIG.
  • control data processing device 120 is shown as a separate device separate from the building energy management system 140, but is not necessarily limited to this, some modules or control data included in the building energy management system 140 It can be implemented in the form of software for processing the.
  • the manager terminal 130 transmits and receives various data in cooperation with the control data processing device 120 and the building energy management system 140.
  • the manager terminal 130 receives the integrated control data from the control data processing apparatus 120 and outputs the received integrated control data.
  • the manager terminal 130 may output the integrated control data in the form of a chart, graph, table, or the like.
  • the manager terminal 170 may be a tablet PC, a laptop, a personal computer, a portable multimedia player, a wireless communication terminal, or a smartphone. It may be any one of various digital devices such as a SmartPhone) and a mobile communication terminal, and may be a monitoring device for a building control system, a building power control system, and the like.
  • the building energy management system 140 refers to a control, management, and management system for enabling rational energy use for the building 110 and for efficiently maintaining a comfortable and functional work environment.
  • the building energy management system 140 interlocks with the control data processing device 120 to grasp information related to total energy such as electricity, water, and gas for energy and carbon dioxide management of the entire building 110, and consumes energy. Is an energy management system that controls in real time for optimal performance tuning of electrical or mechanical equipment.
  • the building energy management system 140 is preferably a building energy management system (BEMS), but is not necessarily limited thereto.
  • the building energy management system 140 may control the energy consumption of the building 110 and the operation of the load in conjunction with the control data processing plant 120. If possible, it can be implemented in various forms of energy management systems.
  • FIG. 2 is a block diagram schematically showing a control data processing apparatus according to the present embodiment.
  • the control data processing apparatus 120 includes an information collecting unit 210, a first control processing unit 220, a second control processing unit 230, a third control processing unit 240, and a control data processing unit 250.
  • the components included in the control data processing apparatus 120 are according to an embodiment, and not all blocks illustrated in FIG. 2 are essential components, and in other embodiments, the components included in the control data processing apparatus 120 are included. Some blocks may be added, changed or deleted.
  • control data processing device 120 may be an independent device for processing the control data of the building 110, but is not necessarily limited to this, it is implemented by some modules included in the building energy management system 140 or control It may be implemented in the form of software for processing data.
  • the information collector 210 obtains energy usage information from the building 110.
  • the information collecting unit 210 collects energy use information of the building unit, and the energy use information means information on the total amount of energy consumed by the building 110.
  • the energy usage information may further include identification information about a plurality of facility systems, energy sources, and the like included in the building 110.
  • the first control processor 220 controls the total amount of total energy supplied to each of the plurality of facility systems and the total consumption of each energy source based on the energy usage information, and generates first control data therefor.
  • the first control processor 220 may control the information elements for the building unit.
  • the first control data provided by the first control processor 220 may be generated as shown in [Table 1].
  • the first control processor 220 includes an energy source classifier 222 for classifying energy usage information by energy source, and a first control data generator 224 for generating first control data for the classification result.
  • the energy source classification unit 222 classifies the energy usage information into each of a plurality of energy sources used in the building 110.
  • the energy source classification unit 222 performs the primary classification process based on the type of energy source, such as electric energy, gas energy, and the like. In addition, the energy source classification unit 222 performs secondary classification processing on the basis of the entire facility system, each facility system, etc. for each energy source based on the result of the primary classification process.
  • the first control data generation unit 224 calculates energy consumption for the entire system and the facility system for each energy source, and generates first control data including the calculated information.
  • the first control data includes the total system usage of the electrical energy source and the energy usage of each system such as a blower, an absorption chiller, a geothermal heat pump, an ice storage system, a hot water heater, and the like. It can include the total system usage for each system and the energy usage of each system such as absorption chillers and boilers.
  • the second control processor 230 controls the information elements that can be obtained from the components of the centralized air conditioning system, and generates second control data therefor.
  • the second control processor 230 may control the information elements of the air conditioning system among the energy consumption elements of the building unit.
  • the centralized air conditioning system includes equipment systems such as air conditioning equipment, heat source equipment and conveying equipment, and each equipment system includes a plurality of components such as a blower, a freezer, a cooling coil, a circulation pump, a boiler, a heating coil, and an ice heat storage system. ) May be included.
  • the second control processor 230 uses the air handling unit (AHU) and the heat source device included in the centralized air conditioning system to target the refrigeration system, heat pump series, ice storage system, and the like. ] Can be created as
  • the second control processor 230 generates an air conditioning system classification unit 232 for classifying components for the centralized air conditioning system based on the first control data, and second control data for generating second control data for the classification result. Part 234 is included.
  • the air conditioning system classification unit 232 performs a classification process based on the facility system corresponding to the centralized air conditioning system based on the first control data.
  • the air conditioning system classification unit 232 is based on the type of facility system such as an air conditioner, a freezer, a heat pump, an ice heat storage, and the like corresponding to the centralized air conditioning system based on the first control data. Car sort processing is performed.
  • the air conditioning system classification unit 232 performs the secondary classification process based on the system-specific condition information for each facility system based on the result of the primary classification process.
  • the air conditioning system sorting unit 232 is based on the result of the primary sorting process, the air volume and temperature for the air supply / air to the facility system of the air conditioner, temperature and humidity for the ventilation, fan operation, etc. Can handle car classification.
  • the air conditioning system classification unit 232 may process the secondary classification by the flow rate, such as cold water / hot water / return water, temperature and humidity, fan operation for the equipment system of the refrigerator according to the primary classification processing result.
  • the air conditioning system sorting unit 232 may process the secondary sorting by the temperature of the cold water / hot water, an operating state, a flow rate, and the like with respect to the heat pump facility system according to the primary sorting result.
  • the air conditioning system sorting unit 232 may process the secondary sorting according to the heat storage tank temperature, the brine flow rate, the operation state, and the like with respect to the ice storage facility system according to the primary sorting processing result.
  • the second control data generation unit 234 calculates system state information for each condition of the facility system corresponding to the centralized air conditioning system, and generates second control data including the calculated information.
  • the second control data includes the air supply air volume, the outside air volume, the air supply air temperature, the ventilation temperature, the ventilation humidity, the air temperature, the duct static pressure, and the operating state of the air supply fan / ventilation fan for the air conditioner system.
  • Includes system status information and includes system status information such as return temperature for cold water supply, return temperature for coolant water supply, cold water flow rate, cooling water flow rate, return temperature for hot water supply, outside air temperature and humidity, and cooling tower fan operation status.
  • the second control data includes the cold and hot water supply and return pipe temperature for the heat pump system, the geothermal circulating water supply and return temperature, the cold and hot water circulation pump operation status, the differential pressure between the hot and cold water supply and return header, the heating and cooling supply flow rate, the hot water supply flow rate, loop System state information such as differential pressure is included, and system state information such as heat storage inlet temperature, brine flow rate, and brine pump operation state for the ice heat storage system.
  • the third control processor 240 is configured to monitor environmental conditions such as temperature and humidity in a space to be subjected to air conditioning and the condition of the condition of air conditioner (air supply) supplied based on the facility system of the second control processor 230. 3 Generate control data.
  • the third control processor 240 may generate third control data for the zone to be air-conditioned as shown in [Table 3].
  • the third control processor 240 includes a zone state classifier 242 and a third control data generator 244.
  • the zone state classification unit 242 performs a classification process based on the space to be air-conditioned based on the second control data.
  • the space to be subjected to the air conditioning may be determined based on the state of the facility system of the second control data or may be a preset space.
  • the third control data generation unit 244 calculates state information on the condition of the conditional air (air supply) and environmental conditions such as temperature and humidity for the space to be air-conditioned, and includes third calculated data including the calculated information. Create
  • the third control data may include zone state information such as air supply air volume, room temperature, room relative humidity, current set temperature, and the like for the zone to be air-conditioned.
  • the control data processing unit 250 generates integrated control data using the first control data, the second control data, the third control data, and the like, and generates the integrated control data as an external device (not shown) and the manager terminal 130. , Building energy management system 140, and the like.
  • the integrated control data may include all or a portion of the first control data, the second control data, and the third control data, and may include at least one control data of the first control data, the second control data, and the third control data.
  • the data may be processed to enable visualization.
  • the control data processing unit 250 may visualize the integrated control data visualized to be output in the form of a chart, a graph, a table, etc. using all or part of the first control data, the second control data, and the third control data. Can be generated.
  • FIG. 3 is a flowchart illustrating a control data processing method based on a centralized air conditioning system according to the present embodiment.
  • the control data processing apparatus 120 collects energy usage information from the building 110 (S310).
  • the energy usage information means information on the total amount of energy consumed in the building 110
  • the energy usage information may further include identification information for a plurality of facility systems, energy sources, etc. included in the building 110. have.
  • the control data processing apparatus 120 generates a classification process and first control data for each energy source based on the energy usage information (S320).
  • the control data processing apparatus 120 generates an energy source classification unit 222 for classifying energy usage information by energy source and first control data for the classification result.
  • the control data processing apparatus 120 generates a classification process and second control data based on the air conditioning system (S330).
  • the control data processing apparatus 120 classifies the components for the centralized air conditioning system based on the first control data, and generates second control data for the classification result.
  • the control data processing apparatus 120 generates a classification process and third control data for the air conditioning target (S340).
  • the control data processing device 120 uses a second control data for the facility system to control the third air conditioner for monitoring the condition of the condition of the supplied air (air supply) and environmental conditions such as temperature and humidity in the space to be air-conditioned. Generate data.
  • the control data processing apparatus 120 provides integrated control data using the first to third control data (S350).
  • the control data processing apparatus 120 provides the generated integrated control data to an external device (not shown), the manager terminal 130, the building energy management system 140, and the like.
  • the integrated control data may include all or part of the first control data, the second control data, the third control data, and may include at least one control data of the first control data, the second control data, and the third control data.
  • the data may be processed to enable visualization.
  • FIG. 4 is an exemplary view showing an input / output screen interface of control data according to the present embodiment.
  • the input / output screen interface of the integrated control data includes first control data for the building level (410), second control data for the system level (420), and zone level (Zone). It provides an interface area for providing the third control data for the level, 430 by category.
  • the input / output screen interface of the integrated control data provides an interface area 440 for selecting the facility system 442 and the equipment 444 of the system for each category and outputting all or part of the related control data 446.
  • visualized information such as a graph of the integrated control data may be provided using an input / output screen interface of the integrated control data.
  • manager terminal 140 building energy management system
  • information collecting unit 220 first control processing unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Chemical & Material Sciences (AREA)
  • Signal Processing (AREA)
  • Mathematical Physics (AREA)
  • Tourism & Hospitality (AREA)
  • Fuzzy Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Automation & Control Theory (AREA)
  • Theoretical Computer Science (AREA)
  • Air Conditioning Control Device (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

BEMS 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치를 개시한다. 중앙집중식 공조시스템의 관제 데이터를 처리하는 장치에 관한 것으로써, 건물에 대한 에너지 사용정보를 이용하여 에너지원, 설비 시스템, 공조 대상의 공간 등을 기준으로 분류 처리한 관제 데이터를 제공하는 BEMS 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치에 관한 것이다.

Description

BEMS 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치
본 실시예는 BEMS 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치에 관한 것이다.
이 부분에 기술된 내용은 단순히 본 실시예에 대한 배경 정보를 제공할 뿐 종래기술을 구성하는 것은 아니다.
건물에서의 에너지 소비는 다른 분야와는 달리 건물의 적절한 운용에 의해 효율성이 결정된다. 따라서, 에너지 절약적인 설계뿐만 아니라 건물의 운영단계에서의 효율적인 에너지 사용 및 관리를 위하여 건물에너지관리시스템(BEMS: Building Energy Management System)의 도입이 점차 확대되고 있다.
BEMS는 일반적인 기계, 전기, 조명, 방재 등 각종 설비의 상태감시 및 제어, 경보를 발령하는 BAS(Building automation system)을 기반으로, 에너지 및 환경 관리, 건물설비 관리지원, 시설운영 지원 등의 기능을 수행하게 된다. BEMS는 건물에 에너지 소비량을 절감하기 위한 최적 기동/정지, 제로 에너지 밴드, 부하 재설정, 절전 사이클, 외기도입량 제어 등의 최적 제어 기능을 수행한다.
최근 들어 기존의 건물자동화시스템(BAS)에서도 에너지 소비정보를 제공하는 기능이 추가되고 있으며, 더 진화된 관리 도구를 제공하기 위한 노력이 진행되고 있다.
또한, 일반적인 BEMS에서는 건물과 각종 설비 및 시스템의 운영과 관련된 상태감시와 기본적인 제어기능 이외에 사용자가 원하는 에너지 소비정보나 합리적 관리 도구의 제공이 매우 미흡한 실정이다. 여기서, 합리적인 관리도구란 기존의 단순화된 제어, 즉 관리자가 판단한 설정값과 현재 상태값의 비교를 통한 단순제어 기능에 관리자의 판단과정에 도움을 주거나 차제에 관리자의 판단기능을 대체하는 고도화된 기능을 수행하는 도구를 말하며, 이와 같은 진화된 관리 도구를 개발, 제공하기 위해서는 많은 운영관리 정보의 수집과 이들 정보의 분석을 통한 관리기법의 개발이 요구된다.
일반적인 BEMS 또는 BAS는 구성요소를 공유하는 것이 어렵고, 공급자의 도움이 없이는 건물의 운영정보를 공유하는 것도 매우 어렵다. 건물운영에 있어 전문성이 있는 관리자나 전문 인력의 활용이 있다면 설치된 관리도구와 운영정보를 이용해 합리적인 관리를 수행하는 것이 가능하겠지만, 현실적으로 대부분의 건물 관리체계는 전문 인력의 활용이 어렵다. 이와 같은 경우 외부 전문가나 다른 분석도구 등을 이용한 관리를 원하더라도 배타적이고 폐쇄적인 시스템 내에서는 한계점을 드러내고 있어 추가적인 다른 관리도구를 필요로 하게 된다. 또한, BEMS 또는 BAS의 구성요소 및 운영정보와 관련하여 여러 가지의 정보요소들이 임의적으로 분류체계 없이 리포팅(Reporting)되면, 전문가와 비전문가를 구분할 것 없이 정보요소의 활용도가 매우 떨어지게 된다. 따라서, BEMS의 정보들 중 중앙집중식 공조시스템에 대한 정보요소들을 분류하여 제공하는 것을 목적으로 한다.
본 실시예는 중앙집중식 공조시스템의 관제 데이터를 처리하는 장치에 관한 것으로써, 건물에 대한 에너지 사용정보를 이용하여 에너지원, 설비 시스템, 공조 대상의 공간 등을 기준으로 분류 처리한 관제 데이터를 제공하는 BEMS 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치를 제공하는 데 주된 목적이 있다.
본 실시예의 일 측면에 의하면, BEMS(Building Energy Management System) 기반 중앙집중식 공조시스템의 관제 데이터를 처리하는 장치에 있어서, 건물단위의 에너지 사용정보를 수집하는 정보 수집부; 상기 에너지 사용정보를 에너지원별로 분류 처리하여 제1 관제 데이터를 생성하는 제1 관제 처리부; 상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템 중 주요 설비 구성요소를 대상으로 분류 처리하여 제2 관제 데이터를 생성하는 제2 관제 처리부; 상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone) 상태에 대한 제3 관제 데이터를 생성하는 제3 관제 처리부; 및 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터를 저장하고, 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터 중 적어도 하나의 데이터를 이용하여 생성된 통합 관제 데이터를 제공하는 관제 데이터 처리부를 포함하는 것을 특징으로 하는 관제 데이터 처리장치를 제공한다.
또한, 본 실시예의 다른 측면에 의하면, 관제 데이터 처리장치가 BEMS(Building Energy Management System) 기반 중앙집중식 공조시스템의 관제 데이터를 처리하는 방법에 있어서, 건물단위의 에너지 사용정보를 수집하는 정보 수집과정; 상기 에너지 사용정보를 에너지원별로 분류 처리하여 제1 관제 데이터를 생성하는 제1 관제 처리과정; 상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템 중 주요 설비 구성요소를 대상으로 분류 처리하여 제2 관제 데이터를 생성하는 제2 관제 처리과정; 상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone) 상태에 대한 제3 관제 데이터를 생성하는 제3 관제 처리과정; 및 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터를 저장하고, 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터 중 적어도 하나의 데이터를 이용하여 생성된 통합 관제 데이터를 제공하는 관제 데이터 처리과정을 포함하는 것을 특징으로 하는 관제 데이터 처리 방법을 제공한다.
이상에서 설명한 바와 같이 본 실시예에 의하면, 건물에서 중앙집중식 공조 시스템의 정보를 건물단위 시스템 단위, 공간(Zone) 단위로 분류 처리하여 관제 데이터를 제공함으로 중앙집중식 공조시스템이 운전됨에 따라 건물단위에서의 정보와 성능, 상태 시스템 단위에서의 정보와 성능, 상태 존 단위에서의 정보와 성능 상태를 효과적으로 표시할 수 있는 효과가 있으며, 건물의 관리를 용이하게 할 수 있으며, 다른 매체 등과 연동하여 활용하기 쉽다는 효과가 있다.
도 1은 본 실시예에 따른 중앙집중식 공조시스템 기반의 BEMS 관제 데이터 처리 시스템을 개략적으로 나타낸 블록 구성도이다.
도 2는 본 실시예에 따른 관제 데이터 처리장치를 개략적으로 나타낸 블록 구성도이다.
도 3은 본 실시예에 따른 중앙집중식 공조시스템 기반의 관제 데이터 처리방법을 설명하기 위한 순서도이다.
도 4는 본 실시예에 따른 관제 데이터의 입출력 화면 인터페이스를 나타낸 예시도이다.
이하, 본 실시예를 첨부된 도면을 참조하여 상세하게 설명한다.
도 1은 본 실시예에 따른 중앙집중식 공조시스템 기반의 BEMS 관제 데이터 처리 시스템을 개략적으로 나타낸 블록 구성도이다.
본 실시예에 따른 BEMS 기반 중앙집중식 공조시스템은 건물(110), 관제 데이터 처리장치(120), 관리자 단말기(130) 및 빌딩에너지 관리시스템(BEMS: Building Energy Management System, 140)을 포함한다. 여기서, BEMS 기반 중앙집중식 공조시스템에 포함된 구성요소는 일 실시예에 따른 것으로서, 도 1에 도시된 모든 블록이 필수 구성요소는 아니며, 다른 실시예에서 BEMS 기반 중앙집중식 공조시스템에 포함된 일부 블록이 추가, 변경 또는 삭제될 수 있다.
건물(110)은 관제 데이터 처리장치(120) 및 빌딩에너지 관리시스템(140)과 연결되며, 에너지 사용정보 및 각종 제어신호를 송수신한다. 여기서, 건물(110)은 하나의 건축 구조물인 것으로 도시하고 있으나 반드시 이에 한정되는 것은 아니며, 복수의 건물을 포함하는 건물군일 수 있다.
건물(110)은 에너지 사용정보를 관제 데이터 처리장치(120)로 전송하며, 에너지 사용정보를 생성하기 위한 전력 측정장치(미도시)를 포함할 수 있다. 여기서, 에너지 사용정보는 건물(110)에서 사용되는 건물 식별정보, 전력 사용량 정보, 부하 식별정보 등을 포함할 수 있다.
관제 데이터 처리장치(120)는 건물(110)로부터 에너지 사용정보를 획득하고, 에너지 사용정보를 기반으로 분류 처리를 수행하여 통합 관제 데이터를 생성한다.
본 실시예에 따른 관제 데이터 처리장치(120)는 건물(110)로부터 획득한 에너지 사용정보에 근거하여 복수의 설비 시스템 각각으로 공급되는 전체 에너지의 총량과 에너지원별 전체 소비량을 관제하고, 이에 대한 제1 관제 데이터를 생성한다. 또한, 관제 데이터 처리장치(120)는 제1 관제 데이터를 기초로 중앙집중식 공조시스템의 구성요소에서 얻을 수 있는 정보요소들을 관제하고, 이에 대한 제2 관제 데이터를 생성한다. 또한, 관제 데이터 처리장치(120)는 설비 시스템에 근거하여 공급되는 조화공기(급기)의 상태 및 공조 대상이 되는 공간에서의 온도, 습도 등의 환경 조건을 모니터링하기 위한 제3 관제 데이터를 생성한다.
관제 데이터 처리장치(120)에 대한 구체적인 설명은 도 2에 기재하도록 한다.
한편, 관제 데이터 처리장치(120)는 빌딩에너지 관리시스템(140)와 별도의 독립적인 장치인 것으로 도시하고 있으나 반드시 이에 한정되는 것은 아니며, 빌딩에너지 관리시스템(140)에 포함된 일부 모듈 또는 관제 데이터를 처리하는 소프트웨어 형태로 구현될 수 있다.
관리자 단말기(130)는 관제 데이터 처리장치(120) 및 빌딩에너지 관리시스템(140)와 연동하여 각종 데이터를 송수신한다.
관리자 단말기(130)는 관제 데이터 처리장치(120)로부터 통합 관제 데이터를 수신하고, 수신된 통합 관제 데이터를 출력한다. 관리자 단말기(130)는 통합 관제 데이터를 차트, 그래프, 표 등의 형태로 출력할 수 있다.
관리자 단말기(170)는 태블릿 PC(Tablet PC), 랩톱(Laptop), 개인용 컴퓨터(PC: Personal Computer), 휴대형 멀티미디어 플레이어(PMP: Portable Multimedia Player), 무선통신 단말기(Wireless Communication Terminal), 스마트폰(SmartPhone) 및 이동통신 단말기(Mobile Communication Terminal) 등 다양한 디지털 기기 중 어느 하나일 수 있으며, 빌딩 관제 시스템, 빌딩 전력 제어 시스템 등을 위한 모니터링 장치일 수 있다.
빌딩에너지 관리시스템(140)은 건물(110)에 대해 합리적인 에너지 이용이 가능하게 하고 쾌적하고, 기능적인 업무환경을 효율적으로 유지관리하기 위한 제어, 관리, 경영시스템을 의미한다.
빌딩에너지 관리시스템(140)은 관제 데이터 처리장치(120)와 연동하여 건물(110) 전체의 에너지 및 이산화탄소 관리를 위하여 전기, 수도, 가스 등의 전체 에너지와 관련된 정보를 파악하고, 소비 에너지 사용 실적에 따라 전기 또는 기계 설비 등의 시스템을 최적 성능 운전(Tuning)하기 위해 실시간 제어하는 에너지 관리 시스템입니다.
빌딩에너지 관리시스템(140)은 BEMS(Building Energy Management System)인 것이 바람직하나 반드시 이에 한정되는 것은 아니며, 관제 데이터 처리장(120)와 연동하여 건물(110)의 소비 에너지, 부하의 동작 등을 제어할 수 있다면 다양한 형태의 에너지 관리 시스템으로 구현될 수 있다.
도 2는 본 실시예에 따른 관제 데이터 처리장치를 개략적으로 나타낸 블록 구성도이다.
관제 데이터 처리장치(120)는 정보 수집부(210), 제1 관제 처리부(220), 제2 관제 처리부(230), 제3 관제 처리부(240) 및 관제 데이터 처리부(250)를 포함한다. 여기서, 관제 데이터 처리장치(120)에 포함된 구성요소는 일 실시예에 따른 것으로서, 도 2에 도시된 모든 블록이 필수 구성요소는 아니며, 다른 실시예에서 관제 데이터 처리장치(120)에 포함된 일부 블록이 추가, 변경 또는 삭제될 수 있다.
한편, 관제 데이터 처리장치(120)는 건물(110)의 관제 데이터를 처리하기 위한 독립적인 장치일 수 있으나 반드시 이에 한정되는 것은 아니며, 빌딩에너지 관리시스템(140)에 포함된 일부 모듈로 구현되거나 관제 데이터를 처리하는 소프트웨어 형태로 구현될 수 있다.
정보 수집부(210)는 건물(110)로부터 에너지 사용정보를 획득한다. 정보 수집부(210)는 건물단위의 에너지 사용정보를 수집하며, 에너지 사용정보는 건물(110)에서 소비하는 총 에너지량에 대한 정보를 의미한다. 에너지 사용정보에는 건물(110)에 포함된 복수의 설비 시스템, 에너지원 등에 대한 식별정보가 추가로 포함될 수 있다.
제1 관제 처리부(220)는 에너지 사용정보에 근거하여 복수의 설비 시스템 각각으로 공급되는 전체 에너지의 총량과 에너지원별 전체 소비량을 관제하고, 이에 대한 제1 관제 데이터를 생성한다. 여기서, 제1 관제 처리부(220)는 건물단위에 대한 정보요소들을 관제할 수 있다.
예를 들어, 제1 관제 처리부(220)에서 제공되는 제1 관제 데이터는 [표 1]과 같이 생성될 수 있다.
Figure PCTKR2018001195-appb-T000001
제1 관제 처리부(220)는 에너지 사용정보를 에너지원별로 분류하는 에너지원 분류부(222) 및 분류 결과에 대한 제1 관제 데이터를 생성하는 제1 관제 데이터 생성부(224)를 포함한다.
에너지원 분류부(222)는 에너지 사용정보를 건물(110)에서 사용하는 복수의 에너지원 각각으로 분류하는 동작을 수행한다.
[표 1]를 참조하면, 에너지원 분류부(222)는 건물단위의 에너지 사용정보를 전기 에너지, 가스 에너지 등과 같이 에너지원의 종류를 기준으로 1차 분류 처리를 수행한다. 또한, 에너지원 분류부(222)는 1차 분류 처리 결과에 근거하여 에너지원 각각에 대해 전체 설비 시스템, 각각의 설비 시스템 등을 기준으로 2차 분류 처리를 수행한다.
제1 관제 데이터 생성부(224)는 에너지원 각각에 대한 시스템 전체 및 설비 시스템 각각에 대한 에너지 사용량을 산출하고, 산출된 정보를 포함하는 제1 관제 데이터를 생성한다.
[표 1]를 참조하면, 제1 관제 데이터는 전기 에너지원에 대한 시스템 전체 사용량과 송풍기, 흡수식냉동기, 지열히트펌프, 빙축열시스템, 급탕기 등의 각각의 시스템별 에너지 사용량을 포함하고, 가스 에너지원에 대한 시스템 전체 사용량과 흡수식냉동기, 보일러 등의 각각의 시스템별 에너지 사용량을 포함할 수 있다.
제2 관제 처리부(230)는 중앙집중식 공조시스템의 구성요소에서 얻을 수 있는 정보요소들을 관제하고, 이에 대한 제2 관제 데이터를 생성한다. 여기서, 제2 관제 처리부(230)는 건물단위의 에너지 소비요소 중 공조시스템에 대한 정보요소들을 관제할 수 있다.
중앙집중식 공조시스템은 공조설비, 열원설비, 반송설비 등의 설비 시스템을 포함하며, 각각의 설비 시스템은 송풍기, 냉동기, 냉각코일, 순환펌프, 보일러, 난방코일, 빙축열시스템 등 복수의 구성요소(Component)를 포함할 수 있다.
제2 관제 처리부(230)는 중앙집중식 공조시스템에 포함된 공기조화기(AHU: Air Handling Unit)와 열원장치를 냉동기 계열, 히트펌프 계열, 빙축열시스템 등을 대상으로 제2 관제 데이터를 [표 2]와 같이 생성할 수 있다.
Figure PCTKR2018001195-appb-T000002
제2 관제 처리부(230)는 제1 관제 데이터를 기초로 중앙집중식 공조시스템에 대한 구성요소를 분류하는 공조 시스템 분류부(232) 및 분류 결과에 대한 제2 관제 데이터를 생성하는 제2 관제 데이터 생성부(234)를 포함한다.
공조 시스템 분류부(232)는 제1 관제 데이터를 기초로 중앙집중식 공조시스템에 해당하는 설비 시스템을 기준으로 분류 처리하는 동작을 수행한다.
[표 2]를 참조하면, 공조 시스템 분류부(232)는 제1 관제 데이터를 기초로 중앙집중식 공조시스템에 해당하는 공기조화기, 냉동기, 히트펌프, 빙축열 등과 같이 설비 시스템의 종류를 기준으로 1차 분류 처리를 수행한다.
또한, 공조 시스템 분류부(232)는 1차 분류 처리 결과에 근거하여 설비 시스템 각각에 대한 시스템별 조건정보를 기준으로 2차 분류 처리를 수행한다.
[표 2]를 참조하면, 공조 시스템 분류부(232)는 1차 분류 처리 결과에 따라 공기조화기의 설비 시스템에 대하여 급기/외기에 대한 풍량 및 온도, 환기에 대한 온습도, 팬 동작 등으로 2차 분류를 처리할 수 있다. 또한, 공조 시스템 분류부(232)는 1차 분류 처리 결과에 따라 냉동기의 설비 시스템에 대하여 냉수/온수/환수 등의 유량, 온습도, 팬 동작 등으로 2차 분류를 처리할 수 있다. 또한, 공조 시스템 분류부(232)는 1차 분류 처리 결과에 따라 히트펌프의 설비 시스템에 대하여 냉수/온수의 온도, 운전상태, 유량 등으로 2차 분류를 처리할 수 있다. 또한, 공조 시스템 분류부(232)는 1차 분류 처리 결과에 따라 빙축열의 설비 시스템에 대하여 축열조 온도, 브라인의 유량, 운전 상태 등으로 2차 분류를 처리할 수 있다.
제2 관제 데이터 생성부(234)는 중앙집중식 공조시스템에 해당하는 설비 시스템 각각의 조건에 대한 시스템 상태 정보를 산출하고, 산출된 정보를 포함하는 제2 관제 데이터를 생성한다.
[표 2]를 참조하면, 제2 관제 데이터는 공기 조화기 시스템에 대한 급기풍량, 외기풍량, 급기온도, 환기온도, 환기습도, 외기온도, 덕트정압, 급기팬/환기팬의 동작상태 등의 시스템 상태정보를 포함하고, 냉동기 시스템에 대한 냉수 급수시 환수 온도, 냉각수 급수시 환수온도, 냉수유량, 냉각수유량, 온수 급수시 환수 온도, 외기 온습도, 냉각탑 팬 운전상태 등의 시스템 상태정보를 포함한다.
또한, 제2 관제 데이터는 히트펌프 시스템에 대한 냉온수 공급 및 환수 배관 온도, 지열순환수 급수 및 환수 온도, 냉온수 순환펌프 운전상태, 냉온수 공급 및 환수 헤더간의 차압, 냉난방 공급 유량, 급탕 공급 유량, 루프 차압 등의 시스템 상태정보를 포함하고, 빙축열 시스템에 대한 축열조입구 온도, 브라인 유량, 브라인 펌프 운전상태 등의 시스템 상태정보를 포함한다.
제3 관제 처리부(240)는 제2 관제 처리부(230)의 설비 시스템에 근거하여 공급되는 조화공기(급기)의 상태 및 공조 대상이 되는 공간에서의 온도, 습도 등의 환경 조건을 모니터링하기 위한 제3 관제 데이터를 생성한다.
제3 관제 처리부(240)는 공조 대상이 되는 존(Zone)에 대한 제3 관제 데이터를 [표 3]와 같이 생성할 수 있다.
Figure PCTKR2018001195-appb-T000003
제3 관제 처리부(240)는 존(Zone) 상태 분류부(242) 및 제3 관제 데이터 생성부(244)를 포함한다.
존 상태 분류부(242)는 제2 관제 데이터를 기초로 공조 대상이 되는 공간을 기준으로 분류 처리하는 동작을 수행한다. 여기서, 공조 대상이 되는 공간은 제2 관제 데이터의 설비 시스템의 상태에 근거하여 결정되거나, 기 설정된 공간일 수 있다.
제3 관제 데이터 생성부(244)는 공조 대상이 되는 공간에 대한 조화공기(급기)의 상태 및 온도, 습도 등의 환경 조건에 대한 상태정보를 산출하고, 산출된 정보를 포함하는 제3 관제 데이터를 생성한다.
[표 3]을 참조하면, 제3 관제 데이터는 공조 대상이 되는 존(Zone)에 대한 급기풍량, 실내온도, 실내상대습도, 현재 설정온도 등의 존 상태 정보를 포함할 수 있다.
관제 데이터 처리부(250)는 제1 관제 데이터, 제2 관제 데이터, 제3 관제 데이터 등을 이용하여 통합 관제 데이터를 생성하고, 생성된 통합 관제 데이터를 외부 장치(미도시), 관리자 단말기(130), 빌딩에너지 관리시스템(140) 등으로 제공한다.
통합 관제 데이터는 제1 관제 데이터, 제2 관제 데이터, 제3 관제 데이터 전체 또는 일부를 포함할 수 있으며, 제1 관제 데이터, 제2 관제 데이터 및 제3 관제 데이터 중 적어도 하나의 관제 데이터를 이용하여 시각화 처리가 가능하도록 가공된 데이터일 수 있다. 예를 들어, 관제 데이터 처리부(250)는 제1 관제 데이터, 제2 관제 데이터, 제3 관제 데이터 전체 또는 일부를 이용하여 차트, 그래프, 표 등의 형태로 출력 가능하도록 시각화 처리된 통합 관제 데이터를 생성할 수 있다.
도 3은 본 실시예에 따른 중앙집중식 공조시스템 기반의 관제 데이터 처리방법을 설명하기 위한 순서도이다.
관제 데이터 처리장치(120)는 건물(110)로부터 에너지 사용정보를 수집한다(S310). 여기서, 에너지 사용정보는 건물(110)에서 소비하는 총 에너지량에 대한 정보를 의미하며, 에너지 사용정보에는 건물(110)에 포함된 복수의 설비 시스템, 에너지원 등에 대한 식별정보가 추가로 포함될 수 있다.
관제 데이터 처리장치(120)는 에너지 사용정보에 근거하여 에너지원별로 분류 처리 및 제1 관제 데이터를 생성한다(S320). 관제 데이터 처리장치(120)는 에너지 사용정보를 에너지원별로 분류하는 에너지원 분류부(222) 및 분류 결과에 대한 제1 관제 데이터를 생성한다.
관제 데이터 처리장치(120)는 공조 시스템을 기준으로 분류 처리 및 제2 관제 데이터를 생성한다(S330). 관제 데이터 처리장치(120)는 제1 관제 데이터를 기초로 중앙집중식 공조시스템에 대한 구성요소를 분류하고, 분류 결과에 대한 제2 관제 데이터를 생성한다.
관제 데이터 처리장치(120)는 공조 대상에 대한 분류 처리 및 제3 관제 데이터를 생성한다(S340).
관제 데이터 처리장치(120)는 설비 시스템에 대한 제2 관제 데이터를 이용하여 공급되는 조화공기(급기)의 상태 및 공조 대상이 되는 공간에서의 온도, 습도 등의 환경 조건을 모니터링하기 위한 제3 관제 데이터를 생성한다.
관제 데이터 처리장치(120)는 제1 내지 제3 관제 데이터를 이용하여 통합 관제 데이터 제공한다(S350). 관제 데이터 처리장치(120)는 생성된 통합 관제 데이터를 외부 장치(미도시), 관리자 단말기(130), 빌딩에너지 관리시스템(140) 등으로 제공한다. 여기서, 통합 관제 데이터는 제1 관제 데이터, 제2 관제 데이터, 제3 관제 데이터 전체 또는 일부를 포함할 수 있으며, 제1 관제 데이터, 제2 관제 데이터 및 제3 관제 데이터 중 적어도 하나의 관제 데이터를 이용하여 시각화 처리가 가능하도록 가공된 데이터일 수 있다.
도 4는 본 실시예에 따른 관제 데이터의 입출력 화면 인터페이스를 나타낸 예시도이다.
도 4에 도시된 바와 같이, 통합 관제 데이터의 입출력 화면 인터페이스는 빌딩 레벨(Building Level, 410)에 대한 제1 관제 데이터, 시스템 레벨(System Level, 420)에 대한 제2 관제 데이터, 존 레벨(Zone Level, 430)에 대한 제3 관제 데이터를 카테고리별로 제공하는 인터페이스 영역을 제공한다.
통합 관제 데이터의 입출력 화면 인터페이스는 각각의 카테고리마다 설비 시스템(442), 시스템의 장비(444)를 선택하여 관련 관제 데이터의 전체 또는 일부(446)를 출력하는 인터페이스 영역(440)을 제공한다.
도 4에 도시된 바와 같이, 통합 관제 데이터의 입출력 화면 인터페이스를 이용하여 통합 관제 데이터에 대한 그래프와 같이 시각화된 정보를 제공할 수 있다.
이상의 설명은 본 실시예의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 실시예가 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 실시예의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 실시예들은 본 실시예의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 실시예의 기술 사상의 범위가 한정되는 것은 아니다. 본 실시예의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 실시예의 권리범위에 포함되는 것으로 해석되어야 할 것이다.
<부호의 설명>
110: 건물 120: 관제 데이터 처리장치
130: 관리자 단말기 140: 빌딩에너지 관리시스템
210: 정보 수집부 220: 제1 관제 처리부
230: 제2 관제 처리부 240: 제3 관제 처리부
250: 관제 데이터 처리부
CROSS-REFERENCE TO RELATED APPLICATION
본 특허출원은 2017년 01월 26일 한국에 출원한 특허출원번호 제10-2017-0012405호에 대해 미국 특허법 119(a)조(35 U.S.C § 119(a))에 따라 우선권을 주장하며, 그 모든 내용은 참고문헌으로 본 특허출원에 병합된다. 아울러, 본 특허출원은 미국 이외에 국가에 대해서도 위와 동일한 이유로 우선권을 주장하며 그 모든 내용은 참고문헌으로 본 특허출원에 병합된다.

Claims (12)

  1. BEMS(Building Energy Management System) 기반 중앙집중식 공조시스템의 관제 데이터를 처리하는 장치에 있어서,
    건물단위의 에너지 사용정보를 수집하는 정보 수집부;
    상기 에너지 사용정보를 에너지원별로 분류 처리하여 제1 관제 데이터를 생성하는 제1 관제 처리부;
    상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템 중 주요 설비 구성요소를 대상으로 분류 처리하여 제2 관제 데이터를 생성하는 제2 관제 처리부;
    상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone) 상태에 대한 제3 관제 데이터를 생성하는 제3 관제 처리부; 및
    상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터를 저장하고, 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터 중 적어도 하나의 데이터를 이용하여 생성된 통합 관제 데이터를 제공하는 관제 데이터 처리부
    를 포함하는 것을 특징으로 하는 관제 데이터 처리장치.
  2. 제1항에 있어서,
    상기 제1 관제 처리부는,
    상기 에너지 사용정보를 에너지원별로 분류하는 에너지원 분류부; 및
    상기 에너지원별 분류 결과에 대한 상기 제1 관제 데이터를 생성하는 제1 관제 데이터 생성부
    를 포함하는 것을 특징으로 하는 관제 데이터 처리장치.
  3. 제2항에 있어서,
    상기 에너지원 분류부는,
    전기 에너지 및 가스 에너지 중 적어도 하나를 기준으로 1차 분류 처리하고, 상기 1차 분류 처리 결과에 근거하여 에너지원 각각에 대해 전체 설비 시스템 및 각각의 설비 시스템 중 적어도 하나를 기준으로 2차 분류 처리하되,
    상기 제1 관제 데이터 생성부는 상기 에너지원 각각에 대한 시스템 전체 및 설비 시스템 각각에 대한 에너지 사용량을 산출하고, 산출된 정보를 포함하는 상기 제1 관제 데이터를 생성하는 것을 특징으로 하는 관제 데이터 처리장치.
  4. 제1항에 있어서,
    상기 제2 관제 처리부는,
    상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템의 상기 주요 설비 구성요소를 분류하는 공조 시스템 분류부; 및
    상기 주요 설비 구성요소의 분류 결과에 대한 상기 제2 관제 데이터를 생성하는 제2 관제 데이터 생성부
    를 포함하는 것을 특징으로 하는 관제 데이터 처리장치.
  5. 제4항에 있어서,
    상기 공조 시스템 분류부는,
    상기 중앙집중식 공조시스템에 해당하는 공기조화기, 냉동기, 히트펌프 및 빙축열 중 적어도 하나의 설비 시스템의 종류를 기준으로 1차 분류 처리하고, 상기 설비 시스템 각각에 대한 시스템별 조건정보를 기준으로 2차 분류 처리하되,
    상기 제2 관제 데이터 생성부는 상기 설비 시스템 각각의 조건에 대한 시스템 상태정보를 산출하고, 산출된 정보를 포함하는 상기 제2 관제 데이터를 생성하는 것을 특징으로 하는 관제 데이터 처리장치.
  6. 제1항에 있어서,
    상기 제3 관제 처리부는,
    상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone)을 기준으로 분류 처리하는 존 상태 분류부; 및
    상기 공조 대상의 존(Zone)의 분류 결과에 대한 상기 제2 관제 데이터를 생성하는 제3 관제 데이터 생성부
    를 포함하는 것을 특징으로 하는 관제 데이터 처리장치.
  7. 제6항에 있어서,
    상기 존 상태 분류부는,
    상기 공조 대상의 존(Zone)을 상기 제2 관제 데이터의 설비 시스템의 상태에 근거하여 결정하거나, 기 설정된 공간으로 분류하되,
    상기 제3 관제 데이터 생성부는 상기 공조 대상의 존(Zone)에 대한 조화공기(급기)의 상태, 온도 및 습도 중 적어도 하나의 환경 조건에 대한 상태정보를 산출하고, 산출된 정보를 포함하는 상기 제3 관제 데이터를 생성하는 것을 특징으로 하는 관제 데이터 처리장치.
  8. 제1항에 있어서,
    상기 관제 데이터 처리부는,
    제1 관제 데이터, 제2 관제 데이터 및 제3 관제 데이터 중 적어도 하나의 관제 데이터를 이용하여 시각화 처리가 가능하도록 가공된 상기 통합 관제 데이터를 생성하는 것을 특징으로 하는 관제 데이터 처리장치.
  9. 관제 데이터 처리장치가 BEMS(Building Energy Management System) 기반 중앙집중식 공조시스템의 관제 데이터를 처리하는 방법에 있어서,
    건물단위의 에너지 사용정보를 수집하는 정보 수집과정;
    상기 에너지 사용정보를 에너지원별로 분류 처리하여 제1 관제 데이터를 생성하는 제1 관제 처리과정;
    상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템 중 주요 설비 구성요소를 대상으로 분류 처리하여 제2 관제 데이터를 생성하는 제2 관제 처리과정;
    상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone) 상태에 대한 제3 관제 데이터를 생성하는 제3 관제 처리과정; 및
    상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터를 저장하고, 상기 제1 관제 데이터, 상기 제2 관제 데이터 및 상기 제3 관제 데이터 중 적어도 하나의 데이터를 이용하여 생성된 통합 관제 데이터를 제공하는 관제 데이터 처리과정
    을 포함하는 것을 특징으로 하는 관제 데이터 처리 방법.
  10. 제9항에 있어서,
    상기 제1 관제 처리과정은,
    상기 에너지 사용정보를 에너지원별로 분류하는 에너지원 분류과정; 및
    상기 에너지원별 분류 결과에 대한 상기 제1 관제 데이터를 생성하는 제1 관제 데이터 생성과정
    을 포함하는 것을 특징으로 하는 관제 데이터 처리 방법.
  11. 제9항에 있어서,
    상기 제2 관제 처리과정은,
    상기 제1 관제 데이터를 기초로 상기 중앙집중식 공조시스템의 상기 주요 설비 구성요소를 분류하는 공조 시스템 분류과정; 및
    상기 주요 설비 구성요소의 분류 결과에 대한 상기 제2 관제 데이터를 생성하는 제2 관제 데이터 생성과정
    을 포함하는 것을 특징으로 하는 관제 데이터 처리 방법.
  12. 제9항에 있어서,
    상기 제3 관제 처리과정은,
    상기 제2 관제 데이터를 기초로 공조 대상의 존(Zone)을 기준으로 분류 처리하는 존 상태 분류과정; 및
    상기 공조 대상의 존(Zone)의 분류 결과에 대한 상기 제2 관제 데이터를 생성하는 제3 관제 데이터 생성과정
    을 포함하는 것을 특징으로 하는 관제 데이터 처리 방법.
PCT/KR2018/001195 2017-01-26 2018-01-26 Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치 WO2018139905A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2017-0012405 2017-01-26
KR1020170012405A KR101986686B1 (ko) 2017-01-26 2017-01-26 Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치

Publications (1)

Publication Number Publication Date
WO2018139905A1 true WO2018139905A1 (ko) 2018-08-02

Family

ID=62979475

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/001195 WO2018139905A1 (ko) 2017-01-26 2018-01-26 Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치

Country Status (2)

Country Link
KR (1) KR101986686B1 (ko)
WO (1) WO2018139905A1 (ko)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102051600B1 (ko) * 2018-11-28 2020-01-08 주식회사 한일엠이씨 건물 냉난방 및 환기 시스템의 에너지 효율화를 위한 실시간 운영지원방법
KR102418408B1 (ko) * 2022-01-21 2022-07-06 지에스파워주식회사 열수요 시계열 데이터에 기반한 지역난방열공급망의 실시간 해석 방법 및 장치

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100128876A (ko) * 2009-05-29 2010-12-08 주식회사 한미파슨스건축사사무소 건물의 친환경 에너지 관리 시스템
KR20140010579A (ko) * 2012-07-13 2014-01-27 한국에너지기술연구원 건물 에너지 성능 평가 장치 및 방법
KR20140031549A (ko) * 2012-09-04 2014-03-13 삼성물산 주식회사 산업시설의 에너지 관리 시스템
KR20140046566A (ko) * 2012-10-05 2014-04-21 주식회사 이지빌 에너지 사용 증감을 분석하는 방법을 위한 에너지 사용 진단 시스템 및 그 방법
KR20160063470A (ko) * 2014-11-26 2016-06-07 현대건설주식회사 건물 에너지 시뮬레이션 시스템 및 방법

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140137589A (ko) * 2013-05-23 2014-12-03 대우정보시스템 주식회사 에너지 관리대상 모델링을 통한 건물에너지관리방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100128876A (ko) * 2009-05-29 2010-12-08 주식회사 한미파슨스건축사사무소 건물의 친환경 에너지 관리 시스템
KR20140010579A (ko) * 2012-07-13 2014-01-27 한국에너지기술연구원 건물 에너지 성능 평가 장치 및 방법
KR20140031549A (ko) * 2012-09-04 2014-03-13 삼성물산 주식회사 산업시설의 에너지 관리 시스템
KR20140046566A (ko) * 2012-10-05 2014-04-21 주식회사 이지빌 에너지 사용 증감을 분석하는 방법을 위한 에너지 사용 진단 시스템 및 그 방법
KR20160063470A (ko) * 2014-11-26 2016-06-07 현대건설주식회사 건물 에너지 시뮬레이션 시스템 및 방법

Also Published As

Publication number Publication date
KR20180087965A (ko) 2018-08-03
KR101986686B1 (ko) 2019-06-07

Similar Documents

Publication Publication Date Title
CN109800066B (zh) 一种数据中心节能调度方法及系统
Cho et al. Viability of datacenter cooling systems for energy efficiency in temperate or subtropical regions: Case study
CN104964351B (zh) 数据中心的二维动态送风节能系统及其控制方法
US7669433B2 (en) Multi-air conditioner central control system
WO2013176334A1 (ko) 지능형 건물 에너지 소비 관리 시스템
CN107110517B (zh) 用于环境控制冷却模式选择的冷却系统和方法
WO2018139905A1 (ko) Bems 기반 중앙집중식 공조시스템의 관제 데이터 처리방법 및 그를 위한 장치
CN208334991U (zh) 配电房监控系统
CN108050660A (zh) 一种数据中心机房冷空气按需供应控制方法及装置
CN104359152A (zh) 一种模块多联精密空调系统及其散热方法
JP2013190119A (ja) 空調機効率情報取得システム
Chen et al. Chiller plant operation planning via collaborative neurodynamic optimization
CN110418551A (zh) 一种数据中心机房和用于数据中心机房的冷却方法
Tozer et al. Air Management Metrics in Data Centers.
US20090029640A1 (en) Air Scavenging System for Removing Heated Conditioned Air from a Computer Room
Khattar Data center retrofit: heat containment and airflow management
CN104089363A (zh) 新风节能系统装置
Zhai et al. Operating points as communication bridge between energy evaluation with air temperature and velocity based on extreme learning machine (ELM) models
WO2019093575A1 (ko) 빌딩의 폐열회수 난방 시스템
CN202262196U (zh) 一种智能化一站式数据机房
CN206412924U (zh) 一种水冷循环散热的变频器
Patel et al. Energy Audit of Data Centers and Server Rooms on an Academic Campus—A Case study
Xu et al. Analyzing the cooling behavior of hot and cold aisle containment in data centers
Hurnik et al. On-site thermal diagnostics of cooling sources for air conditioning systems in office buildings
CN216409231U (zh) 区域温度控制系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18744291

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18744291

Country of ref document: EP

Kind code of ref document: A1