WO2018133746A1 - Bâtiment souterrain formé de pieux et de murs, et son procédé de construction - Google Patents
Bâtiment souterrain formé de pieux et de murs, et son procédé de construction Download PDFInfo
- Publication number
- WO2018133746A1 WO2018133746A1 PCT/CN2018/072526 CN2018072526W WO2018133746A1 WO 2018133746 A1 WO2018133746 A1 WO 2018133746A1 CN 2018072526 W CN2018072526 W CN 2018072526W WO 2018133746 A1 WO2018133746 A1 WO 2018133746A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- chain
- wall
- pile
- cutter
- piles
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/15—Geometrical or physical properties including at least a hinge
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Cette invention concerne un bâtiment souterrain formé de pieux et de murs, et son procédé de construction. Pendant la construction, la base d'un mur (1) du bâtiment comprend un dispositif de coupe à chaîne (3) pour excaver la roche et la terre, et deux extrémités du mur (1) et les pieux sont mutuellement incorporés ou solidarisés. Les pieux sont des pieux avec des rainures, et deux extrémités du mur (1) sont incorporées dans les rainures des pieux lors de l'installation. La base et une face latérale des pieux avec les rainures, et la base et une face latérale du mur (1) sont pourvues d'un rail (1-1), le dispositif de coupe à chaîne (3) pour excaver la roche et la terre est monté sur le rail (1-1), un appareil d'excavation à chaîne (2) est composé du dispositif de coupe à chaîne (3), d'un pignon (6) et d'un appareil d'entraînement (4), et un rail de base (BF1) présente une différence de hauteur pour faciliter le déplacement du dispositif de coupe à chaîne (3) sur les points d'intersection. Pendant la construction, l'appareil d'entraînement (4) entraîne le dispositif de coupe à chaîne (3), le dispositif de coupe à chaîne (3) se déplace le long du rail (1-1), un dispositif de coupe (3-2) sur le rail de base de pieu (BF1) excave la roche et la terre, et lorsque le dispositif de coupe à chaîne (3) se déplace de la base vers le haut, la roche excavée et la terre sont entraînées vers le haut, et le dispositif de coupe à chaîne (3) à la base du pieu descend conjointement avec le pieu. Les murs et les pieux du bâtiment peuvent être fabriqués par segments sur un site de préfabrication, après assemblage sur le site, ils sont descendus en une seule pièce, la construction est simple, la qualité est bonne, le temps de construction est court, les coûts sont réduits, et la construction est adaptée à une variété de régions.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710038299.3 | 2017-01-18 | ||
CN201710038299.3A CN106759486A (zh) | 2017-01-18 | 2017-01-18 | 一种由桩和墙组成的地下建筑物及其施工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018133746A1 true WO2018133746A1 (fr) | 2018-07-26 |
Family
ID=58945253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2018/072526 WO2018133746A1 (fr) | 2017-01-18 | 2018-01-13 | Bâtiment souterrain formé de pieux et de murs, et son procédé de construction |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106759486A (fr) |
WO (1) | WO2018133746A1 (fr) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759486A (zh) * | 2017-01-18 | 2017-05-31 | 王燏斌 | 一种由桩和墙组成的地下建筑物及其施工法 |
CN106759463A (zh) * | 2017-01-18 | 2017-05-31 | 王燏斌 | 一种地下建筑及其施工法 |
CN107059877A (zh) * | 2017-01-18 | 2017-08-18 | 王燏斌 | 一种施工时底部带有链刀的基础及其施工法 |
CN114164929A (zh) * | 2021-10-21 | 2022-03-11 | 王树生 | 一种沉墙基础及其施工装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1049694A (zh) * | 1989-08-19 | 1991-03-06 | 陆祖荫 | 组合联锁钢筋混凝土预制构件修建地下工程直接沉插方法及其装置 |
CN1068382A (zh) * | 1991-07-10 | 1993-01-27 | 北辰工业株式会社 | 用以形成地下连续壁体的挖掘机 |
CN1108333A (zh) * | 1993-12-22 | 1995-09-13 | 北辰工业株式会社 | 循环链刀 |
JP2010229626A (ja) * | 2009-03-25 | 2010-10-14 | Ohbayashi Corp | 土留壁構造、土留壁構造の構築方法 |
CN104179214A (zh) * | 2014-09-15 | 2014-12-03 | 中国铁建重工集团有限公司 | 链刀式连续墙成槽机 |
CN106759486A (zh) * | 2017-01-18 | 2017-05-31 | 王燏斌 | 一种由桩和墙组成的地下建筑物及其施工法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62233328A (ja) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置 |
CN101619573B (zh) * | 2009-07-24 | 2011-07-13 | 徐州文鹏工程机械制造有限公司 | 地下连续挡水墙一步成型机 |
CN205475087U (zh) * | 2016-01-29 | 2016-08-17 | 俞向阳 | 一种岸堤防护墙 |
CN207228156U (zh) * | 2017-01-18 | 2018-04-13 | 王燏斌 | 一种由桩和墙组成的地下建筑物 |
-
2017
- 2017-01-18 CN CN201710038299.3A patent/CN106759486A/zh active Pending
-
2018
- 2018-01-13 WO PCT/CN2018/072526 patent/WO2018133746A1/fr active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1049694A (zh) * | 1989-08-19 | 1991-03-06 | 陆祖荫 | 组合联锁钢筋混凝土预制构件修建地下工程直接沉插方法及其装置 |
CN1068382A (zh) * | 1991-07-10 | 1993-01-27 | 北辰工业株式会社 | 用以形成地下连续壁体的挖掘机 |
CN1108333A (zh) * | 1993-12-22 | 1995-09-13 | 北辰工业株式会社 | 循环链刀 |
JP2010229626A (ja) * | 2009-03-25 | 2010-10-14 | Ohbayashi Corp | 土留壁構造、土留壁構造の構築方法 |
CN104179214A (zh) * | 2014-09-15 | 2014-12-03 | 中国铁建重工集团有限公司 | 链刀式连续墙成槽机 |
CN106759486A (zh) * | 2017-01-18 | 2017-05-31 | 王燏斌 | 一种由桩和墙组成的地下建筑物及其施工法 |
Also Published As
Publication number | Publication date |
---|---|
CN106759486A (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018133739A1 (fr) | Fondation ayant un dispositif de coupe à chaîne à la base pendant la construction et son procédé de construction | |
CN105840207B (zh) | 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法 | |
WO2018133746A1 (fr) | Bâtiment souterrain formé de pieux et de murs, et son procédé de construction | |
CN106013052B (zh) | 钢板桩与沉井组合式地下停车库的施工方法 | |
WO2018133740A1 (fr) | Bâtiment souterrain et son procédé de construction | |
AU2019439324B2 (en) | Wall sinking construction method | |
US8297885B2 (en) | Method of erecting a building structure in a water basin | |
CN102444142A (zh) | 一种群桩改柱扩建地下室及其施工工法 | |
CN104018518A (zh) | 预制式地下连续墙以及施工地下室外墙和楼板的方法 | |
CN103306289A (zh) | 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法 | |
CN111622251A (zh) | 一种装配式沉井结构及其施工方法 | |
WO2018133711A1 (fr) | Fondation de pilier et procédé de construction associé | |
WO2018177307A1 (fr) | Bâtiment souterrain préfabriqué et son procédé de construction | |
WO2023066327A1 (fr) | Procédé de construction pour bâtiment souterrain comprenant une fondation de paroi de renfoncement | |
CN112576056A (zh) | 一种用于既有建筑地下室增层改造的托换支撑体系及其施工方法 | |
CN110468873B (zh) | 一种小空间下桥台桩基托换结构及使用方法 | |
CN209923959U (zh) | 一种高地下水位软弱土场地干法作业沉井结构 | |
US20040096277A1 (en) | Subterranean structrues and methods for constructing subterranean structures | |
WO2018177304A1 (fr) | Bâtiment souterrain préfabriqué et son procédé de construction | |
CN204000925U (zh) | 预制式地下连续墙 | |
WO2018166522A1 (fr) | Dispositif de construction pour revêtement et son procédé de construction | |
CN111218939B (zh) | 一种基坑支护墙施工方法 | |
CN100443673C (zh) | 施工方法 | |
CN207228156U (zh) | 一种由桩和墙组成的地下建筑物 | |
CN106400814A (zh) | 一种基坑支护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18741230 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18741230 Country of ref document: EP Kind code of ref document: A1 |