WO2018130993A3 - Integrated project and equipment management system and method using iot devices and software applications - Google Patents
Integrated project and equipment management system and method using iot devices and software applications Download PDFInfo
- Publication number
- WO2018130993A3 WO2018130993A3 PCT/IB2018/050221 IB2018050221W WO2018130993A3 WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3 IB 2018050221 W IB2018050221 W IB 2018050221W WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- norms
- equipment
- project
- data
- insights
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000005457 optimization Methods 0.000 abstract 3
- 238000010276 construction Methods 0.000 abstract 2
- 238000012423 maintenance Methods 0.000 abstract 2
- 238000004220 aggregation Methods 0.000 abstract 1
- 230000002776 aggregation Effects 0.000 abstract 1
- 238000004458 analytical method Methods 0.000 abstract 1
- 238000005065 mining Methods 0.000 abstract 1
- 238000007781 pre-processing Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
An integrated project and equipment management system and methods related to heavy civil construction and mining industries is disclosed. The method includes building detailed context based on project design data, execution plan; equipment efficiency norms, optimization parameters, alarm thresholds, predictive maintenance conditions; material norms and work norms; real time collection of tracking, operational and transaction data related to plants, machinery and materials usage, and populating the same on to a database; performing data pre- processing/aggregation, analytics on the real-time data applying various parameters of the context, bringing out various actionable insights; corrective actions performed based on the insights until the set optimization levels are achieved. The system facilitates equipment companies to share and update various equipment optimization parameters, norms, alarm thresholds and predictive maintenance conditions. This equipment specific dataset is used by the system to analyse project data and presents valuable insights to the construction companies.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN201641024099 | 2017-01-14 | ||
IN201641024099 | 2017-01-14 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2018130993A2 WO2018130993A2 (en) | 2018-07-19 |
WO2018130993A3 true WO2018130993A3 (en) | 2018-11-22 |
Family
ID=62839676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2018/050221 WO2018130993A2 (en) | 2017-01-14 | 2018-01-13 | Integrated project and equipment management system and method using iot devices and software applications |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2018130993A2 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11556867B2 (en) | 2019-10-16 | 2023-01-17 | Caterpillar Inc. | System and method for worksite project tracking |
WO2021182556A1 (en) * | 2020-03-11 | 2021-09-16 | 住友建機株式会社 | Construction management system and asphalt finisher |
CN112149212B (en) * | 2020-09-22 | 2022-08-05 | 广西路桥工程集团有限公司 | Visual construction management platform for engineering project |
WO2022221453A1 (en) * | 2021-04-15 | 2022-10-20 | Invento, Inc. | System and method for managing construction and mining projects using computer vision, sensing and gamification |
US11609688B2 (en) | 2021-05-25 | 2023-03-21 | Caterpillar Inc. | Systems and methods for managing on-site machines by spatial and contextual information |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
-
2018
- 2018-01-13 WO PCT/IB2018/050221 patent/WO2018130993A2/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
Also Published As
Publication number | Publication date |
---|---|
WO2018130993A2 (en) | 2018-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018130993A3 (en) | Integrated project and equipment management system and method using iot devices and software applications | |
GB2587979A (en) | Workflow optimization | |
Wang et al. | Setting new trends of integrated Building Information Modelling (BIM) for construction industry | |
AR119380A1 (en) | MODELING AND CONTROL OF HYDRAULIC FRACTURING | |
BR112018068044A2 (en) | systems and methods for cloud computing resource management for information systems | |
MY187393A (en) | Method and system for realizing data tracking by means of software development kit | |
WO2016144546A3 (en) | Systems and methods for generating data visualization applications | |
GB2590803A8 (en) | Data pipeline for process control system analytics | |
GB2601955A (en) | A flow simulator for generating reservoir management workflows and forecasts based on analysis of high-dimensional parameter data space | |
SG10201807358YA (en) | Workload automation and data lineage analysis | |
MX2017000006A (en) | Slurrification and disposal of waste by pressure pumping into a subsurface formation. | |
MX2016006764A (en) | Method and system for artificially intelligent model-based control of dynamic processes using probabilistic agents. | |
SA520420182B1 (en) | Model-based parameter estimation for directional drilling in wellbore operations | |
IN2015CH03327A (en) | ||
MX2015014246A (en) | Basin-to-reservoir modeling. | |
CN103116822A (en) | Steel-making manufacturing execution management system based on visualized heat tracking | |
Maalla | Development prospect and application feasibility analysis of robotic process automation | |
WO2018217686A3 (en) | Systems and methods for optimizing oil production | |
EA201900512A1 (en) | METHOD FOR CONTROLLING LIFE CYCLE OF A COMPLEX ENGINEERING FACILITY AND SYSTEM FOR ITS IMPLEMENTATION | |
WO2018113864A3 (en) | Distributed data analysis system for wind power plants background | |
MY197390A (en) | Power mode management system, method for providing power mode parameter combination, method for updating power mode parameter combination, computer software and storage medium | |
MX2015008690A (en) | System and method for prescriptive analytics. | |
WO2015008155A3 (en) | Process, system and computer program product for asset maintenance | |
Zhang et al. | Enabling a cutting tool iPSS based on tool condition monitoring | |
EP3798760A3 (en) | System and method for industrial automation project code analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |