WO2018128558A1 - Procédé et système de gestion des performances d'un réservoir de fluide souterrain - Google Patents

Procédé et système de gestion des performances d'un réservoir de fluide souterrain Download PDF

Info

Publication number
WO2018128558A1
WO2018128558A1 PCT/RU2017/000001 RU2017000001W WO2018128558A1 WO 2018128558 A1 WO2018128558 A1 WO 2018128558A1 RU 2017000001 W RU2017000001 W RU 2017000001W WO 2018128558 A1 WO2018128558 A1 WO 2018128558A1
Authority
WO
WIPO (PCT)
Prior art keywords
reservoir
fluid
composition
pore space
dependencies
Prior art date
Application number
PCT/RU2017/000001
Other languages
English (en)
Inventor
Mikhail Reonaldovich STUKAN
Denis Vladimirovich Rudenko
Dmitry Anatolievich Koroteev
Original Assignee
Schlumberger Technology Corporation
Schlumberger Canada Limited
Services Petroliers Schlumberger
Schlumberger Technology B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Schlumberger Technology B.V. filed Critical Schlumberger Technology Corporation
Priority to PCT/RU2017/000001 priority Critical patent/WO2018128558A1/fr
Publication of WO2018128558A1 publication Critical patent/WO2018128558A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Medical Informatics (AREA)
  • Mathematical Physics (AREA)
  • Evolutionary Computation (AREA)
  • Data Mining & Analysis (AREA)
  • Computing Systems (AREA)
  • Fluid Mechanics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Artificial Intelligence (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Selon la présente invention, des données de réservoir obtenues à partir d'une pluralité de réservoirs de fluide et comprenant des dépendances d'une composition d'un fluide produit à partir d'un réservoir sur le temps et/ou sur une pression de réservoir et au moins un paramètre caractérisant un espace poreux de la formation de réservoir, sont stockées dans une base de données d'apprentissage dans une mémoire de stockage. Une analyse desdites données de réservoir est effectuée par un système cognitif, ladite analyse produisant des relations entre lesdites dépendances d'une composition d'un fluide produit à partir d'un réservoir sur le temps et/ou sur une pression de réservoir et lesdits paramètres caractérisant un espace poreux de la formation de réservoir. Ensuite, de nouvelles dépendances d'une composition d'un fluide produit à partir d'un nouveau réservoir sur le temps et/ou sur une pression de réservoir sont entrées dans le système cognitif et au moins un paramètre caractérisant un espace poreux de la nouvelle formation de réservoir sur la base des relations produites est prédit. Le procédé consiste également à planifier au moins une stratégie de production ou d'optimisation de récupération à l'aide des paramètres prédits caractérisant l'espace poreux, et à mettre en œuvre les stratégies planifiées à l'aide de complétions de puits appropriées et d'un équipement de surface et de sous-surface approprié pour la surveillance et la commande de la production de fluide.
PCT/RU2017/000001 2017-01-09 2017-01-09 Procédé et système de gestion des performances d'un réservoir de fluide souterrain WO2018128558A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/RU2017/000001 WO2018128558A1 (fr) 2017-01-09 2017-01-09 Procédé et système de gestion des performances d'un réservoir de fluide souterrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/RU2017/000001 WO2018128558A1 (fr) 2017-01-09 2017-01-09 Procédé et système de gestion des performances d'un réservoir de fluide souterrain

Publications (1)

Publication Number Publication Date
WO2018128558A1 true WO2018128558A1 (fr) 2018-07-12

Family

ID=62791181

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2017/000001 WO2018128558A1 (fr) 2017-01-09 2017-01-09 Procédé et système de gestion des performances d'un réservoir de fluide souterrain

Country Status (1)

Country Link
WO (1) WO2018128558A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685174A (zh) * 2020-05-19 2021-11-23 中国石油天然气股份有限公司 相态变化对致密油井产能影响计算方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2367981C2 (ru) * 2004-04-30 2009-09-20 Шлюмбергер Текнолоджи Бв Способ определения свойств пластовых флюидов
EA201300683A1 (ru) * 2010-12-10 2013-12-30 Бейкер Хьюз Инкорпорейтед Способ усовершенствования модели коллектора и повышения отдачи трещиноватых пластов
WO2016019302A1 (fr) * 2014-08-01 2016-02-04 Schlumberger Canada Limited Procédés et systèmes pour la simulation d'un champ d'hydrocarbures à l'aide d'un procédé de connexion de puits multi-point

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2367981C2 (ru) * 2004-04-30 2009-09-20 Шлюмбергер Текнолоджи Бв Способ определения свойств пластовых флюидов
EA201300683A1 (ru) * 2010-12-10 2013-12-30 Бейкер Хьюз Инкорпорейтед Способ усовершенствования модели коллектора и повышения отдачи трещиноватых пластов
WO2016019302A1 (fr) * 2014-08-01 2016-02-04 Schlumberger Canada Limited Procédés et systèmes pour la simulation d'un champ d'hydrocarbures à l'aide d'un procédé de connexion de puits multi-point

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113685174A (zh) * 2020-05-19 2021-11-23 中国石油天然气股份有限公司 相态变化对致密油井产能影响计算方法及装置
CN113685174B (zh) * 2020-05-19 2023-09-26 中国石油天然气股份有限公司 相态变化对致密油井产能影响计算方法及装置

Similar Documents

Publication Publication Date Title
US10435995B2 (en) Oilfield management method and system
US11163923B2 (en) Automated upscaling of relative permeability and capillary pressure in multi-porosity systems
US8214186B2 (en) Oilfield emulator
US8849639B2 (en) Dynamic subsurface engineering
US20160063150A1 (en) Enhanced oil recovery using digital core sample
Okpo et al. Artificial neural network model for predicting wellbore instability
WO2009073479A1 (fr) Procédé d'exécution d'opérations de production en champs pétrolifères
WO2019178432A1 (fr) Procédé pour une récupération améliorée dans des réservoirs ultra-étanches basé sur une diffusion
US8260595B2 (en) Intelligent completion design for a reservoir
Fragoso et al. Breaking a Paradigm: Can Oil Recovery from Shales be Larger than Oil Recovery from Conventional Reservoirs? The Answer is Yes!
Shelley et al. A Novel Method to Optimize Horizontal Bakken Completions in a Factory Mode Development Program
Azin et al. Production assessment of low production rate of well in a supergiant gas condensate reservoir: application of an integrated strategy
WO2020086097A1 (fr) Systèmes et procédés pour augmenter la durabilité d'acidification de réservoir de carbonate
Pankaj et al. Need for speed: data analytics coupled to reservoir characterization fast tracks well completion optimization
WO2018128558A1 (fr) Procédé et système de gestion des performances d'un réservoir de fluide souterrain
US20230003101A1 (en) Method of hydrocarbon reservoir simulation using streamline conformal grids
CA2818464A1 (fr) Prevision de production de gaz de schiste
Mollaei et al. A Novel Forecasting Tool for Water Alternative Gas (WAG) Floods
Jaripatke et al. Completion Optimization of an Unconventional Shale Play: Implementation of a Successful Completion Design Optimization Plan and the Results
Shang et al. Iterative analytical solutions for nonlinear two-phase flow with gas solubility in shale gas reservoirs
US11906697B2 (en) Method and system for a multi-level nonlinear solver for reservoir simulations
US20230332490A1 (en) Method and system for performing reservoir simulations using look-ahead models
Mercer et al. Infill drilling using horizontal wells: A field development strategy for tight fractured formations
Nes et al. Successful Cap Rock Stress Testing with a Wireline Straddle Packer Tool Configured with an Innovative Controlled Pressure Bleed off Design
US20240037300A1 (en) Modelling a condensate blockage effect in a simulation model

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17890505

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17890505

Country of ref document: EP

Kind code of ref document: A1