WO2018078750A1 - 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム - Google Patents

電力融通管理装置、電力融通管理方法及び電力融通管理プログラム Download PDF

Info

Publication number
WO2018078750A1
WO2018078750A1 PCT/JP2016/081772 JP2016081772W WO2018078750A1 WO 2018078750 A1 WO2018078750 A1 WO 2018078750A1 JP 2016081772 W JP2016081772 W JP 2016081772W WO 2018078750 A1 WO2018078750 A1 WO 2018078750A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
prosumer
amount
information
management device
Prior art date
Application number
PCT/JP2016/081772
Other languages
English (en)
French (fr)
Inventor
麻子 宮本
聡一 古屋
弘起 佐藤
卓也 赤司
イン 鍾
直史 冨田
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to PCT/JP2016/081772 priority Critical patent/WO2018078750A1/ja
Priority to JP2018546994A priority patent/JP6792629B2/ja
Priority to US16/335,279 priority patent/US20190279313A1/en
Publication of WO2018078750A1 publication Critical patent/WO2018078750A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • G01R21/1333Arrangements for measuring electric power or power factor by using digital technique adapted for special tariff measuring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0207Discounts or incentives, e.g. coupons or rebates
    • G06Q30/0208Trade or exchange of goods or services in exchange for incentives or rewards
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Definitions

  • the present invention relates to a power accommodation management device, a power accommodation management method, and a power accommodation management program.
  • Local production for local consumption power interchange means that an entity having a power generation facility belonging to a certain region interchanges (sells) power generated in that region to another entity belonging to that region.
  • the power generation of the local production for local consumption type can consume the power generated by the low-carbon distributed power source in a place close to the distance. Increase the spread of distributed power sources and contribute to a low-carbon society.
  • a distributed power source can be easily installed in a short period of time compared to a conventional large-scale power generator, and as a result, contributes to the activation of the local economy.
  • Patent Document 1 is an example of a power interchange method other than the fixed price purchase system.
  • the power supplier presents the unit price he wants to sell (presents the power supply condition) such as 12 yen / kWh or more or 5 yen / kWh or more.
  • electricity consumers schools, supermarkets, factories, etc.
  • the power supply / demand intermediary device matches the power consumer with the power supplier by comparing the power demand information with the power supply conditions.
  • Patent Document 1 the mediation (electric power interchange) in Patent Document 1 is as follows: “If the power supplier 20 wants to sell power at a high price, it is only necessary to specify a high price in the power supply conditions” (paragraph 0023 of Patent Document 1). It is assumed that the price will be determined.
  • power interchange means that a charged power storage device that has been carried from the power supplier side is connected to a power receiving device of a power consumer such as a school supermarket or a factory.
  • Patent Document 1 Even if the motivation for power interchange by money (that is, consideration (... yen / kWh)) in Patent Document 1 is attractive in the short term, the motivation for power interchange gradually weakens in the long term. Therefore, it is not effective. Therefore, more effective motivation is desired.
  • Patent Document 1 the power supplier can obtain sufficient monetary motives to supply surplus power, but the motives gradually weaken in the long term. Therefore, it is difficult for the power supplier to maintain the motivation to repeatedly supply power in the future.
  • the consideration is limited to currency. If a local product can be used as a price for electricity, it can provide a strong motivation to the local power supplier.
  • Patent Document 1 there is no such consideration. Therefore, an object of the present invention is to realize power interchange while maintaining a motivation for accommodating power in the long term.
  • the power interchange management device of the present invention has a storage facility capable of storing power from the grid, and recruitment information for recruiting power from a terminal device of a power consumer who uses power for production of goods or provision of services Publish the recruitment conditions based on the recruitment information to the terminal device of the prosumer that has the power consumer response processing unit that receives the power, the power generation facility by the reverse power flow to the private power generation facility and the grid, and the power transmission to the grid is possible,
  • a prosumer-compatible processing unit that accepts application information for applying for recruitment information from a prosumer terminal device, and a prosumer power transmission information acquisition unit that acquires information on the amount of transmitted power transmitted to the system in reverse power flow via the prosumer power transmission facility; Compare the target value of the amount of power that the prosumer should be able to accommodate to the power consumer, which is set based on the recruitment information and the application information, and the acquired transmission power amount.
  • Flip comprising a target management unit which determines incentive to be presented to prosumer and by. Other means will be
  • the power transaction entities 51a and 51b are households, the power transaction entity 51c is a stadium, and the power transaction entity 51d is a factory. In practice, the number and types of power trading entities are not limited.
  • Each power trading entity 51 includes a power management device 52, a power consumption facility 53, a power generation facility 54, a power storage facility 55, a power transmission / reception facility 56, and a terminal device 2 (in-home display, smartphone, etc.).
  • a”, “b”, “c”, and “d” attached to the end of the code of the equipment correspond to “a”, “b”, “c”, and “d” attached to the end of the code of the power trading entity to which the equipment belongs. ing.
  • the power management device 52 is a general computer.
  • the power management device 52 is connected to the power consumption facility 53, the power generation facility 54, the power storage facility 55, and the power transmission / reception facility 56, and controls and records the amount of power flowing between them.
  • the terminal device 2 can communicate with the power management device 52 of the power trading entity 51 through the network 3 or using the short-range radio wave communication technology without going through the network 3.
  • a user belonging to the power transaction entity 51 uses the terminal device 2.
  • the power interchange management device 1 can also communicate with each terminal device 2 and the power management device 52 via the network 3.
  • the power transmission / reception facility 56 not only receives power from the power system 57 but also transmits the surplus power generation amount to the power system 57 by reverse power flow so that it cannot be consumed within the power trading entity. You can also.
  • a thick solid line indicates the flow of power
  • a thin solid line and a thin broken line indicate the information flow.
  • the power consumption facilities 53a and 53b of the power trading entities 51a and 51b are home appliances such as refrigerators and water heaters, for example.
  • the power consumption facility 53c of the power trading entity 51c is a facility such as an air conditioning facility, an electrical decoration facility, or a stage facility, for example.
  • the power consumption facility 53d of the power transaction entity 51d is, for example, a food production facility when the power transaction entity 51d is a food manufacturer.
  • the power generation facilities 54a and 54b of the power trading entities 51a and 51b are, for example, solar power generation facilities.
  • the power generation facilities 54c and 54d of the power trading entities 51c and 51d are, for example, a cogeneration system and a diesel engine type private power generation facility.
  • the power storage facility 55 of each power trading entity 51 is any type of power storage facility that stores the power generated by the power generation facility 54 or the commercial power received by the power transmission / reception facility 56 from the power system 57.
  • the capacities of the power storage facilities 55c and 55d are much larger than the capacities of the power storage facilities 55a and 55b.
  • the facilities and the like possessed by each power trading entity 51 are almost the same except for the differences in the types and capacities of the power consuming facilities, the power generating facilities, and the power storage facilities.
  • Each of the power trading entities 51 receives necessary power from the power system 57 or the like, or is generated by the power generation facility 54 and the remaining surplus power not consumed by the power consumption facility 53 is stored in the power storage facility 55. To store electricity.
  • each power trading entity 51 becomes a person (prosumer) who supplies surplus power at a certain timing, and becomes a person (power consumer) who receives power at another certain timing.
  • the home is a prosumer with power generation facilities that are generally more than self-sufficient in terms of weekly averages.
  • the stadium 51c and the factory 51d do not have their own power generation facilities and need to be additionally supplied with electric power from an electric power company or their prosumers.
  • the power trading entities 51a and 51b are prosumers and the power trading entities 51c and 51d are power consumers will be described.
  • the prosumer supplies a specified amount of power to the power system 57 at a time when accommodation is specified.
  • the power consumer consumes an amount corresponding to the accommodation from the power system 57 in accordance with the accommodation time and power amount specified in advance.
  • the electric power consumer 51c is a stadium, and the electric power demand is concentrated in a specific period (time zone) in which the event is held. For example, if the “Year-forgotten Idol Concert” at the end of the year is held from 22:00 to 24:00 on December 31, 2016, air conditioning equipment, lighting equipment, stage equipment, etc. will be installed during these two hours. In order to operate, enormous power demand is generated intensively. Compared with the power demand for 2 hours, the power demand during the holiday is very small.
  • the electric power consumer 51c receives the portion corresponding to the interchangeable electric power from a plurality of prosumers (individual idol fans, etc.) in a plurality of times during the closed time in the preparation period preceding December 31, 2016, and the power storage equipment 55c To store electricity.
  • the power consumer 51c consumes the stored power at a time between 22:00 and 24:00 on December 31, 2016. This method of using the power storage facility 55c is referred to as “temporary power storage temporary consumption pattern”.
  • the power consumer 51d is a factory, and the power demand is generated almost evenly for a certain period in order to maintain the operation rate of the production line. For example, if the production line for “ ⁇ ⁇ prefecture cheese for autumn 2017” is in operation from November 1, 2016 to October 31, 2017, almost the same amount of electricity will be generated every day during that period. For example, when the power consumed on a certain day is 1,000 kWh, the power consumer 51d collects surplus power from the prosumers 51a and 51b (gourmet etc.) for 500 kWh per day for two days until the day before, The collected surplus power is stored. This method of using the power storage facility 55d is referred to as “anytime power storage occasional consumption pattern”.
  • the power consumer gives the prosumer the price of the flexible power.
  • the price was assumed to be currency.
  • an economic value other than currency is used instead of a part or all of the consideration.
  • This economic value is the above-mentioned “incentive” and is a product of a region to which a prosumer and a power consumer belong or a virtual currency (point) that is valid in the region.
  • a product produced by a certain power consumer may be used as an incentive.
  • the incentive provided by the electric power consumer 51c may be an “idle T-shirt” distributed for a fee at its own stadium, or an “admission discount coupon” for an event held at the stadium.
  • the incentive provided by the power consumer 51d may be “ ⁇ prefecture cheese” produced by its own factory.
  • the amount of power that a single prosumer can accommodate is large and small. For example, in cases where the price is several hundred yen, it is cumbersome for power consumers to prepare a small incentive together with a small amount of money. Yes, personal prosumers are also often interested only in real incentives. In such cases, only incentives are used for the settlement of consideration.
  • the biggest concern is that the amount of power determined by the prosumer can be accommodated by the end of the contract. Therefore, in this embodiment, the prosumer divides power into several times during the contract period. Then, at the timing of individual accommodation, the power accommodation management device guides the prosumer the amount of power to be accommodated at that timing in order to achieve the promised accumulated accommodation power at the end of the contract. The power accommodation management device controls the amount of power that the prosumer actually accommodates by such guidance (details will be described later).
  • the power interchange management device 1 is a general computer.
  • the power interchange management device 1 includes a central control (central processing) device 11, an input device 12, an output device 13, a main storage device 14, an auxiliary storage device 15, and a communication device 16. These are connected by a bus.
  • the auxiliary storage device 15 stores power supply and demand information 31, contract information 32, and accumulated power consumption information 33.
  • the power consumer correspondence processing unit 21, the prosumer correspondence processing unit 22, the prosumer power transmission information acquisition unit 23, and the target management unit 24 in the main storage device 14 are programs. In the following description, when the operation subject is described as “XX section”, this means that the central control device 11 executes the XX section from the main storage device 14.
  • the power supply / demand information 31 is a prediction of future power demand (or power supply when power generation exceeds that).
  • the power transaction entity name column 102 in association with the power transaction entity ID stored in the power transaction entity ID column 101, the power transaction entity name column 102 includes the power transaction entity name, and the power interchange period column 103 includes the power interchange period.
  • the excess / deficiency column 104 indicates excess / deficiency
  • the power amount column 105 indicates the amount of power
  • the desired transaction unit price column 106 indicates the desired transaction unit price
  • the incentive name column 107 indicates the incentive name
  • the incentive unit price column 108 indicates The incentive unit price is stored.
  • the power transaction entity ID in the power transaction entity ID column 101 is an identifier that uniquely identifies the power transaction entity.
  • the name of the power transaction entity in the power transaction entity name column 102 is the name or name of the power transaction entity.
  • the power accommodation period in the power accommodation period column 103 is a period in which surplus or shortage of power occurs.
  • the excess / deficiency in the excess / deficiency column 104 is either “surplus” or “insufficiency”. “Surplus” indicates that power surplus has occurred in the power trading entity during the power interchange period. “Insufficient” indicates that a shortage of power has occurred in the power trading entity during the power interchange period. That is, “surplus” indicates that the power trading entity of the record can be a prosumer, and “shortage” indicates that the power trading entity of the record can be a power consumer.
  • the amount of power in the power amount column 105 is the amount of power per day that one prosumer can supply during the power interchange period, or one power consumer wishes to receive from one prosumer during the power interchange period.
  • the desired transaction unit price in the desired transaction unit price column 106 is the sales unit price or purchase unit price of power desired by the power transaction entity.
  • the incentive name in the incentive name column 107 is the name of the incentive that the power consumer pays (presents) to the prosumer as the price for the power.
  • the incentive name is stored only in the record whose excess / deficiency is “insufficient”.
  • the incentive unit price in the incentive unit price column 108 is a unit price of the incentive.
  • the incentive unit price is stored only in the record whose excess / deficiency is “insufficient”.
  • ⁇ XX Dome is trying to accept a large amount of electricity (for example, tens of thousands of kWh) during the period from July 1, 2016 to December 31, 2016.
  • XX Dome Co., Ltd. is trying to divide the total amount of electricity required into small pieces and collect it from multiple prosumers. To make it easier for individual prosumers to sign a contract, XX Dome Co., Ltd. changes the amount of power received from one prosumer during that period to "100 kWh", "80 kWh”, "60 kWh” and "50 kWh”
  • four types of plans are available.
  • the transaction (purchase) desired unit price is 22 yen / kWh in any plan (records 143 to 146).
  • -XX Dome Co., Ltd. has incentives in descending order of the amount of power it receives, including admission discount coupons (equivalent to 1,000 yen), idol T-shirts (equivalent to 500 yen), idol ballpoint pens (equivalent to 200 yen), and idols.
  • admission discount coupons (equivalent to 1,000 yen)
  • idol T-shirts (equivalent to 500 yen)
  • idol ballpoint pens (equivalent to 200 yen)
  • idols equivalent to 100 yen) is available.
  • ⁇ ⁇ ⁇ Food is the incentive in order of the amount of electricity that is subject to accommodation, ⁇ ⁇ Prefecture beef (equivalent to 2,000 yen), ⁇ ⁇ Prefecture cheese (equivalent to 600 yen), ⁇ ⁇ Prefecture butter (Equivalent to 300 yen) and ⁇ Prefecture-made candy (equivalent to 100 yen) are available.
  • the power interchange management device 1 creates a new record of power supply and demand information 31 each time it receives member registration or application information from a prosumer or a power consumer.
  • the power supply / demand information 31 is created for each region.
  • the region is, for example, a prefecture or a municipality, and the size of the granularity is arbitrary.
  • FIG. 3 shows an example of power supply and demand information 31 in “ ⁇ prefecture”.
  • the contract information 32 will be described with reference to FIG.
  • the prosumer ID column 112 has a prosumer ID
  • the power consumer ID column 113 has a power consumer ID
  • the contract start time column 114 has a link.
  • the contract start time is the contract start time
  • the contract end time field 115 is the contract end time
  • the accommodation time decision authority field 116 is the accommodation time decision authority
  • the transaction unit price field 117 is the transaction unit price
  • the final delivered power amount field in association with the contract ID stored in the contract ID column 111
  • the prosumer ID column 112 has a prosumer ID
  • the power consumer ID column 113 has a power consumer ID
  • the contract start time column 114 has a link.
  • Is the contract start time is the contract end time
  • the accommodation time decision authority field 116 is the accommodation time decision authority
  • the transaction unit price field 117 is the transaction unit price
  • the final delivered power amount field is the final delivered power amount field.
  • the contract start time incentive name field 119 has a contract start time incentive name
  • the contract end time incentive name field 120 has a contract end time incentive name
  • the delivery confirmation field 121 has a delivery flag.
  • the summary column 133 a summary is stored.
  • the contract ID in the contract ID column 111 is an identifier that uniquely identifies the contract.
  • the contract is concluded with one prosumer and one electric power consumer.
  • the prosumer ID in the prosumer ID column 112 is an identifier that uniquely identifies the power trading entity that is the prosumer of the contract.
  • the power consumer ID in the power consumer ID column 113 is an identifier that uniquely identifies the power trading entity that is the power consumer of the contract.
  • the contract start time in the contract start time column 114 is the date of the start of the contract period.
  • the contract period is a part of the power interchange period (column 103 in FIG. 3) of the power consumer.
  • the contract start point in the contract end point column 115 is the date of the end of the contract period.
  • the interchange time determination right holder 116 is either “supplier” or “customer”.
  • the prosumer divides power into power consumers in a plurality of times. For example, the prosumer stores the daytime surplus of solar power generation in the power storage facility and outputs it to the nighttime power system 57.
  • “Supplier” indicates that the prosumer can determine the timing of individual accommodation
  • “demand” indicates that the power consumer can determine the timing of individual accommodation.
  • the transaction unit price in the transaction unit price column 117 is a unit price of the amount of power agreed by the prosumer and the power consumer. For the same reason as above, this field is not essential.
  • the final delivered electric energy in the final delivered electric energy column 118 is the total electric energy that the prosumer has made available to the electric power consumer during the contract period, and the electric energy of each plan described above (in the records 143 to 150 in FIG. 3). Column 105).
  • the incentive name at the contract start time column 120 in the contract start time incentive name column 120 is the name of the incentive that the power consumer promises to present to the prosumer on the condition that the contents of the contract are observed.
  • the incentive name at the end of contract in the incentive name column 121 at the end of contract is the name of the incentive that the power consumer has decided to present to the prosumer at the end of the contract based on the evaluation of whether or not the content of the contract has actually been observed. It is.
  • the incentive name at the end of the contract is stored at the end of the contract.
  • the delivery flag “Done” in the delivery confirmation column 121 indicates that the incentive delivery arrangement for the prosumer has been completed.
  • the delivery flag is also stored at the end of the contract.
  • the summary in the summary column 122 is arbitrary memorandum information.
  • the target management unit 24 (FIG. 2) of the power interchange management device 1 creates a new record of the contract information 32 every time a contract is concluded. Then, the target management unit 24 obtains information from each power management device 51 (FIG. 1), and updates the value of the accumulated power consumption amount twice per hour (0 minutes and 30 minutes per hour), which is a power settlement unit. To do.
  • FIG. 4 shows records that change in time series on a single sheet of paper. For example, the records 161 and 165 for the same contract “AG01” are not actually displayed at the same time. A “gap” between records indicates this.
  • -About records 162 and 166 OO Dome Co., Ltd. (CC01) is planning a year-end idol concert that ends at 24:00 on December 31, 2016. On November 10, 2016, it was decided that XX Dome Co., Ltd. will receive power interchange from Yokohama ⁇ Male (PS02) in the future. At this time, 60 kWh was reduced as the final delivered electric energy, and “idle ballpoint pen” was temporarily determined as an incentive at the start of the contract (record 162). The value of the “idol ballpoint pen” is smaller than the “idol T-shirt” of Hitachi ⁇ child example. This is due to the fact that the start time of the contract for Yokohama ⁇ man is later than the start time of contract for Hitachi ⁇ Child.
  • the accumulated accommodation power amount information 33 will be described with reference to FIG.
  • the configuration of the accumulated accommodation power amount information 33 is similar to the configuration of the contract information 32 (FIG. 4). From the contract information 32, the interchange determination right holder column 116, the transaction unit price column 117, the contract start point incentive name column 119, the contract end point incentive name column 120 and the delivery confirmation column 121 are deleted, and a new accumulated interchange power amount column ( When the column 137) of FIG. 5A is provided, the accumulated accommodation power amount information 33 is completed.
  • the power interchange management device 1 acquires the amount of power that is interchanged regularly from the power management devices 51a and 51b of the prosumers (for example, 0 minutes per hour and 2 times 30 minutes). Then, the power accommodation management device 1 calculates the accumulated delivered power amount from the contract start time, and periodically updates the accumulated accommodation power amount stored in the accumulated accommodation power amount column 137.
  • the accommodation progress graph 172 will be described with reference to FIG.
  • the power accommodation management device 1 creates the accommodation progress graph 172 based on the past history of each record of the accumulated accommodation power amount information 33.
  • the accommodation progress graph 172 is a line graph of the accumulated accommodation power amount at each time point drawn on a coordinate plane having each time point of the contract period on the horizontal axis and the accumulated accommodation power amount on the vertical axis.
  • the target line 173 is a line segment connecting the origin and the target point 174 whose coordinate value is “(contract end point, final delivered power amount)”.
  • the power accommodation management device 1 visualizes each record of FIG. 5A as an accommodation progress graph 173.
  • the accommodation progress graph 172 illustrated in FIG. 5B is a graph of the time series history of the record 171 in FIG. 5A, for example.
  • the power interchange management device 1 equally divides the target line 173 into 12 sections, and obtains the height 175 of the vertical axis per section. This height 175 is the target reaching average power amount of Hitachi ⁇ child per week.
  • the power accommodation management device 1 obtains a height difference 176 between the accommodation progress graph 172 and the target line 173 at the present time. This height difference 176 is the target required power amount at the present time.
  • FIGS. 5 and 6 are processing procedures performed in cooperation by the prosumer terminal device 2a, the power consumer terminal device 2c, and the power interchange management device 1.
  • FIG. The terminal device 2a shown in FIGS. 5 and 6 represents the terminal devices 2a and 2b shown in FIG.
  • the terminal device 2c of FIGS. 5 and 6 represents the terminal devices 2c and 2d of FIG.
  • step S201 the power consumer correspondence processing unit 21 of the power interchange management device 1 displays a registration site.
  • the registration site (not shown) is a portal site of an operator of the power interchange management device 1.
  • the power consumer correspondence processing unit 21 displays the screen of the registration site on the output device of the terminal device 2 c via the network 3.
  • a guidance message such as “Would you like to give your local prosumer your local product and make it available for electricity?” Is displayed.
  • the terminal device 2c accepts member registration. Specifically, first, the terminal device 2c accepts that the power consumer inputs the following information (recruitment information) (1) to (5) from the input device of the terminal device 2c.
  • the terminal device 2 c accepts that the power consumer inputs the following information (recruitment information) (1) to (5) from the input device of the terminal device 2c.
  • (1) Name and address of power consumer (2) Period during which power can be accepted (power interchange period) (3) A plurality of plans (for example, “100 kWh”, “80 kWh”, etc. Of the amount of power received from one prosumer during the power interchange period (4) Incentives for each plan and their values (these are called “recruitment conditions”) (5) Desired unit price of electricity and timing of individual accommodation (but not essential)
  • the terminal device 2 c transmits the recruitment information to the power interchange management device 1.
  • the power consumer response processing unit 21 of the power interchange management device 1 receives the recruitment information.
  • step S203 the power consumer correspondence processing unit 21 creates a record of power supply and demand information 31 (FIG. 3). Specifically, first, the power consumer correspondence processing unit 21 creates as many new records of power supply and demand information 31 as the number of plans. 2ndly, the electric power consumer response process part 21 fills each column of a new record using offer information. Examples of records created at this time are records 143 to 146 and 147 to 150 in FIG.
  • step S204 the prosumer corresponding processing unit 22 of the power interchange management device 1 displays the registration site. Specifically, the prosumer correspondence processing unit 22 displays the screen of the registration site on the output device of the terminal device 2 a via the network 3. On the registration site, a message such as “Would you like to make power available to your local electricity consumers and obtain local products?”
  • step S205 the terminal device 2a receives application information. Specifically, first, the terminal device 2a accepts that the prosumer inputs the following (11) as application information from the input device of the terminal device 2a. Note that the terminal device 2a accepts the following (12) to (14) as application information when the prosumer desires. In this way, the following inputs (12) to (14) are optional, because personal prosumers generally rarely manage (12) to (14) on a daily basis. is there.
  • the terminal device 2 a transmits application information to the power interchange management device 1. Then, the prosumer corresponding processing unit 22 of the power interchange management device 1 receives the application information.
  • step S206 the prosumer correspondence processing unit 22 of the power interchange management device 1 creates a record of power supply and demand information 31 (FIG. 3). Specifically, first, the prosumer handling processing unit 22 creates a new record of power supply and demand information 31. Secondly, the prosumer processing unit 22 fills in each column of the new record using the application information. Examples of records created at this time are the records 141 and 142 in FIG.
  • the prosumer may not disclose the above (12) to (14). Then, the prosumer handling unit 22 cannot fill the bold lines of the records 141 and 142 in FIG. 3 only with the information received in “second” in step S205. Therefore, the prosumer correspondence processing unit 22 stores past statistical values within a bold line.
  • the past statistical values include, for example, the amount of solar power generated during the day in a certain area in a certain season ( ⁇ kWh per household per day), the amount of power consumed by power consuming equipment ( ⁇ kWh per household per day), etc. It is.
  • the prosumer corresponding processing unit 22 may acquire such a statistical value from an external server such as a public office, or may obtain such a statistical value based on the actual value of other prosumers (for example, accumulated interchangeable energy information 33). It may be estimated.
  • the power consumer correspondence processing unit 21 and the prosumer correspondence processing unit 22 repeat the processing of steps S201 to S206 for many power consumers and prosumers. Then, power supply and demand information 31 having many records as shown in FIG. 3 is created.
  • the prosumer processing unit 22 displays the service site. Specifically, the prosumer processing unit 22 displays a service site screen on the output device of the terminal device 2a via the network 3 in response to a request from the prosumer. On the service site, icons indicating a plurality of power consumer candidates are displayed.
  • the icon is preferably a stylized product of the prosumer's area. For example, the icon is “For the period from July 1st to December 31st, 2016, you can get an entrance discount coupon of 1,000 yen if you accrue 100 kWh to the XX dome. You can get a shirt. "
  • the prosumer processing unit 22 determines a power consumer candidate that satisfies all or part of the following conditions 1 to 4, and determines the determined power consumer candidate along with the recruitment information including the recruitment conditions on the service site. (Public) and recruit prosumers. When a plurality of plans of a certain power consumer satisfies the following conditions, the prosumer correspondence processing unit 22 displays the plurality of plans. (Condition 1) The address of the power consumer is close to the address of the prosumer (or the current position of the terminal device 2a of the prosumer) to the extent that the predetermined standard is satisfied.
  • a power consumer can accept power at a future time or period when the prosumer can supply power. That is, in the power supply and demand information 31 of FIG. 3, at least a part of the power consumption period of the prosumer overlaps with at least a part of the power interchange period of the power consumer.
  • compatible process part 22 may attach a priority to an electric power consumer in order with this long duplication period.
  • step S ⁇ b> 208 the prosumer processing unit 22 receives the selection of the power consumer. Specifically, first, the prosumer correspondence processing unit 22 accepts that the prosumer presses one of a plurality of icons via the input device of the terminal device 2a. 2ndly, the prosumer corresponding
  • the prosumer handling unit 22 accepts that the prosumer presses the “contract with this power consumer” button on the screen.
  • the prosumer processing unit 22 determines a prosumer that supplies power to a certain power consumer, and as a result, a contract is concluded between the two.
  • the prosumer-compatible processing unit 22 displays a confirmation message such as “You have decided to pass power to the Dome Co., Ltd.” on the output device of the terminal device 2a.
  • the prosumer processing unit 22 creates an accommodation scenario after referring to the power supply and demand information 31 (FIG. 3).
  • a contract is signed between Hitachi Koko (record 141 in FIG. 3) and OO Dome (record 144 in FIG. 3).
  • the prosumer corresponding processing unit 22 displays an accommodation scenario “let's aim to accommodate 10 kWh / day 10 times by December 31, 2016” on the output device of the terminal device 2a.
  • the prosumer correspondence processing unit 22 for example, “8 kWh / day 10 times” as described above in the interchange scenario suggest. Prosumers can change this proposal.
  • the prosumer changes in consideration of its own capacity so that the product of the number of times of accommodation and the amount of power to be accommodated per time becomes the target value of the contract.
  • the prosumer corresponding processing unit 22 receives the changed value ( ⁇ kWh / day is ⁇ times) and stores it in the auxiliary storage device 15 in association with the power consumer ID and the prosumer ID.
  • step S209 the target management unit 24 of the power interchange management device 1 creates a record of the contract information 32 (FIG. 4). Specifically, first, the target management unit 24 creates a new record of the contract information 32. Secondly, the target management unit 24 uses the information described in the record of the prosumer and the record of the power consumer selected by the prosumer in the power supply / demand information 31 (FIG. 3) to create a new record. Fill in each field. An example of the record created at this time is the record 161 in FIG. At this time, the contract end point incentive name column 120 and the delivery confirmation column 121 of the created record are blank. After step S209 in FIG. 5, the process continues to step S210 in FIG.
  • step S210 the target management unit 24 determines whether the contract period has started. Specifically, the target management unit 24 proceeds to step S211 when the contract start point (column 114 in FIG. 4) of a certain contract has arrived (step S210 “Yes”), and otherwise (step S210 “No”). ”), Wait as it is.
  • step S211 the target management unit 24 inquires about the storage amount. Specifically, the target management unit 24 inquires of the terminal device 2a about the amount of stored electricity.
  • the power storage amount is the amount of power stored in the power storage facility 55a of the prosumer at that time, and is the amount of power that the prosumer can accommodate with the power consumer at that time. As described above, either the power consumer or the prosumer can determine the timing of step S210 in advance. If there is no such designation from both, the target management unit 24 starts step S211 at an arbitrary cycle (for example, every day at 9:00 am).
  • step S212 the terminal device 2a transmits the storage amount. Specifically, the terminal device 2a accesses the power management device 52a, acquires the storage amount (as data) of the power storage facility 55a at that time, and transmits it to the power accommodation management device 1. Then, the target management unit 24 of the power interchange management device 1 receives the amount of stored electricity.
  • step S213 the target management unit 24 of the power accommodation management device 1 determines the amount of accommodation power.
  • the target management unit 24 determines the current amount of interchangeable power according to the following rules. (Rule 1) If the amount of electricity received in step S212 is less than a predetermined threshold value (for example, the value when the prosumer determines the minimum amount of electricity to be constantly maintained for itself) The management unit 24 sets the current accommodation decision amount to “0 kWh”. Rule 1 is not essential (it is optional).
  • step S212 When the amount of stored electricity received in step S212 is equal to or greater than a predetermined threshold value and the current accumulated power consumption is less than the target line 173 level in FIG.
  • the current amount of interchange is determined as the current height difference 176 (required target power consumption).
  • the target management unit 24 sets the current accommodation decision amount as the amount of electricity received in step S212.
  • step S212 When the amount of stored electricity received in step S212 is equal to or greater than a predetermined threshold value, and in FIG. 5B, the current accumulated power consumption is equal to or greater than the level of the target line 173, the target management unit 24
  • the accommodation decision amount this time is a predetermined power amount (for example, the power amount “8 kWh” of the record 141 in FIG. 3).
  • the target management unit 24 sets the current interchange decision amount as shown in FIG. ) At a height 175 (target reached average electric energy). For the sake of simplicity, the following explanation will be continued on the assumption that the current interchangeable power amount determined here is “8 kWh”.
  • step S214 the terminal device 2a accommodates power. Specifically, the terminal device 2a sends an instruction “transmit 8 kWh of the amount of electricity stored in the electricity storage facility 55a to the electricity storage facility 55c of OO Dome” to the power management device 52a of the prosumer.
  • step S215 the terminal device 2c stores electricity. Specifically, the terminal device 2c sends an instruction to “store 8 kWh transmitted from Hitachi * in the power storage facility 55c” to the power management device 52c of the power consumer.
  • the terminal device 2c transmits a storage completion notification. Specifically, the terminal device 2 c transmits a notification that the power storage is completed (power storage completion notification) to the power accommodation management device 1.
  • the storage completion notification includes the amount of storage (referred to as “transmission power amount”) in which the storage facility 55c actually receives and stores the power transmitted to the power system 57 in reverse power flow.
  • the prosumer power transmission information acquisition unit 23 of the power accommodation management device 1 receives the power storage completion notification from the terminal device 2c.
  • step S218 the target management unit 24 determines whether or not the contract period has ended. Specifically, the target management unit 24 proceeds to step S219 when the contract end point (column 115 in FIG. 4) of a certain contract arrives (step S218 “Yes”), and otherwise (step S218 “No”). "), The process returns to step S211.
  • Steps S210 to S218 are repeated for all prosumers registered in the contract information 32 (FIG. 4). Then, each time the power is actually exchanged, the target management unit 24 updates the value of the accumulated accommodation power amount of each record of the accumulated accommodation power amount information 33 (FIG. 5A) as the sum of the transmission power amount. Go. The target management unit 24 displays the updated accumulated power amount on the prosumer terminal device 2a every time it goes through step S217.
  • step S219 the target management unit 24 performs evaluation.
  • Step S219 is started when a contract end point of any contract comes. Now, it is assumed that the contract of the record 161 of the contract information 32 (FIG. 4) is ended (December 31, 2016 is 24:00). Then, the target management unit 24 performs an evaluation on Hitachi * child (PS01). Specifically, the target management unit 24, the cumulative interchange power consumption information 33 (FIG. 5 (a)) the accumulated power interchanged amount of records 171 (actual value) W 2 of the final delivery amount of power (contract value) W 1 and Compare. And the target management part 24 acquires evaluation with respect to a prosumer according to a comparison result.
  • the target management unit 24 determines an incentive. Specifically, the target management unit 24 determines “idle T-shirt” (500 yen) corresponding to the comprehensive evaluation “excellent” for Hitachi-Ko as an incentive at the end of the contract. The overall evaluation “good” corresponds to “idol ballpoint pen” (200 yen), and the overall evaluation “possible” corresponds to “idol badge” (100 yen). Incentives determined at this stage may differ from the originally planned incentives. In this case, the target management unit 24 displays the changed incentive on the terminal device 2a of the prosumer.
  • the target management unit 24 delivers an incentive. Specifically, first, the target management unit 24 transmits delivery information to a delivery server (not shown) of a delivery company.
  • the delivery information includes the incentive name “idol T-shirt”, the address of the incentive storage warehouse of XX Co., Ltd., and the address of Hitachi XX.
  • the auxiliary storage device 15 stores an address in association with the power transaction entity ID.
  • the delivery company receives the “idle T-shirt” at the warehouse and delivers it to the Hitachi child.
  • the target management unit 24 creates a copy of the record 161 of the contract information 32 (FIG. 4) and stores it as a record 165. Then, the target management unit 24 stores “idle T-shirt” in the incentive name column 120 at the end of contract in the record 165 and stores the delivery flag “completed” in the delivery confirmation column 121.
  • step S222 the terminal device 2a receives an incentive. Specifically, Hitachi * child terminal device 2a reads the barcode attached to the “idol T-shirt” and confirms receipt. Thereafter, the processing procedure ends.
  • Prosumer's power generation facilities are not limited to solar power generation facilities. However, when a prosumer has only a power generation facility that uses natural energy, the amount of power generation depends on the weather. Therefore, the target management unit 24 of the power interchange management device 1 executes the following measures when the possibility that the final delivered power amount can be collected becomes small. “When the possibility becomes small” means, for example, “in FIG. 5A, when the accumulated power consumption at that time falls below 50% of the level of the target line 173 at that time”. is there.
  • the target management unit 24 transmits a message to the effect that “the power consumer is ready to increase the final received power amount on the contract” to the terminal device of another prosumer that has already contracted.
  • the target management unit 24 transmits a message prompting a new contract to a terminal device of a prosumer candidate that has not yet signed a contract.
  • This candidate is a person who is not registered in the contract information 32 (FIG. 4) among the prosumers registered in the power supply and demand information 31 (FIG. 3).
  • FIG. 8 (a) An example of a screen displayed on the prosumer terminal device 2a by the power interchange management device 1 is as follows.
  • -Electricity consumer selection screen (Fig. 8 (a))
  • the prosumer handling unit 22 displays the service site in step S207.
  • the power consumer selection screen in FIG. 8A is a transition screen for the service site.
  • the prosumer processing unit 22 displays a map of the region on the screen, displays the position of the power consumer in the power supply / demand information 31 (FIG. 3) with a circle 301 or the like, and displays the required amount of power inside the circle. To do.
  • an incentive picture 302 of the power consumer is displayed at the bottom of the screen.
  • the electric power consumer search screen in FIG. 8B is also a service site transition screen.
  • the prosumer processing unit 22 receives the prosumer inputting a search word in the search field 311.
  • compatible process part 22 searches the electric power supply-and-demand information 31 (FIG. 3) based on the input search term, and displays the icon or photograph 312a, 312b,. Display for each event system, food system, etc.).
  • “By presents” in FIG. 8B is a tag indicating a category.
  • the electric power consumer search result display screen of FIG. 8C is also a service site transition screen.
  • the prosumer correspondence processing unit 22 arranges and displays icons or photographs 321 of many power consumers as search results.
  • the target management unit 24 displays the interchangeable power amount display screen in FIG. 8D at an arbitrary timing.
  • the target management unit 24 displays the current power storage amount of the prosumer in the power storage amount column 331, displays the current power storage amount (vehicle power storage amount) of the prosumer vehicle in the vehicle power storage amount column 332, and the expected power consumption amount column 333. Displays the estimated power consumption for the next day.
  • the target management unit 24 calculates the interchangeable power amount using the following formula, and displays the calculation result in the interchangeable power amount column 334.
  • Interchangeable electric energy Electric energy storage + Vehicle electric energy storage-Expected electric energy consumption the next day-Predetermined safety margin
  • the target management unit 24 displays the power interchange screen of FIG. 9A at an arbitrary timing.
  • the target management unit 24 includes a power consumer's photograph or icon 341, the power consumer's current required power amount 342, the power consumer's current power storage amount 343, and the power consumer's past or future power storage amount.
  • a graph 345 showing the actual result or prediction is displayed. When the slider 344 is pressed, the graph 345 moves left and right (the time on the horizontal axis changes).
  • the target management unit 24 displays the accommodation decision column 346.
  • the accommodation decision column 346 the amount of electric power to be accommodated per person “20 kWh” is displayed, and the value of the incentive received by the prosumer when the accommodation is performed as it is is displayed “5 points”.
  • the interchange button 347 at the center of the accommodation decision field 346 is pressed, accommodation is executed. Note that when the slider 348 is pressed, the value of the amount of power to be interchanged and the value of the incentive increase or decrease.
  • FIG. 9A when “5 points” in the accommodation decision column 346 is pressed, an incentive of the real thing having the same value is displayed instead of “5 points”.
  • FIG. 9B a photograph 349 of the actual incentive (night game invitation ticket) is displayed.
  • ⁇ Accommodation cancellation screen (Fig. 9 (c))
  • the target management unit 24 periodically inquires the prosumer about the storage amount, actual accommodation is performed.
  • the target management unit 24 displays the accommodation suspension screen of FIG.
  • the accommodation stop button 350 at the bottom of the screen is pressed, the target management unit 24 stops the subsequent inquiry.
  • FIG. 10 (a), Fig. 10 (b) and Fig. 10 (c) The accommodation confirmation screen in FIG. 10 (a) is basically the same as FIG. 9 (b).
  • the design of the charged amount 343 changes dynamically at the next moment (see FIG. 10B). Further, at the next moment, the value of the charged amount 343 increases by “20 kWh” as much as it is accommodated. Thereafter, a photograph indicating that the incentive has been acquired and a guide sentence 351 are displayed (see FIG. 10C).
  • the target management unit 24 displays the incentive management screen shown in FIG. According to the value of the real incentive in the present embodiment, virtual currency (points) that can be used in the area can be exchanged for incentive.
  • the point balance 361 in FIG. 10D is the balance of prosumer points at the present time.
  • the target management unit 24 displays a photo 362 of an incentive for a replacement candidate.
  • the target management unit 24 subtracts the value of the point balance 361 by the value of the selected incentive and redisplays it. Then, the target management unit 24 transmits an instruction to the selected server to deliver the selected incentive to the prosumer.
  • the effects of the power interchange management device of this embodiment are as follows. (1) The power interchange management device can maintain the motivation for the prosumer to accommodate the amount of power to the power consumer. (2) The power interchange management device recruits prosumers that can supply power in a future period. Accordingly, it is possible to maintain the motivation for the prosumer to accommodate the amount of electric power in the future. (3) The power interchange management device can inform the prosumer of the current interchangeable power amount for reaching the target total interchangeable power amount for each interchange opportunity. (4) The power interchange management device can inform a prosumer of a power consumer who can be a partner of the contract.
  • the power accommodation management device can inform the prosumer of the amount of power to be accommodated at one time when the contract is concluded.
  • the power interchange management device displays a cumulative value of the power supply amount. Therefore, the motive of the prosumer is easily maintained.
  • the power interchange management device displays a plurality of power consumer candidates on the prosumer. Therefore, the prosumer has a sense of satisfaction when selecting a power consumer.
  • the power interchange management device can avoid misdelivery of incentives before power interchange is actually performed.
  • the power interchange management device causes the power consumer or prosumer to determine the timing for accommodating power. Therefore, the degree of freedom for equipment maintenance and the like increases.
  • this invention is not limited to an above-described Example, Various modifications are included.
  • the above-described embodiments have been described in detail for easy understanding of the present invention, and are not necessarily limited to those having all the configurations described.
  • a part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment.
  • Each of the above-described configurations, functions, processing units, processing means, and the like may be realized by hardware by designing a part or all of them with, for example, an integrated circuit.
  • Each of the above-described configurations, functions, and the like may be realized by software by interpreting and executing a program that realizes each function by the processor.
  • Information such as programs, tables, and files that realize each function can be stored in a recording device such as a memory, a hard disk, or an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, or a DVD.
  • the control lines and information lines are those that are considered necessary for the explanation, and not all the control lines and information lines on the product are necessarily shown. In practice, it may be considered that almost all the components are connected to each other.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本発明の電力融通管理装置(1)は、系統からの電力を蓄電可能な蓄電設備を有し、物の生産又は役務の提供に電力を使用する電力需要者から電力の融通を募集する募集情報を受信する電力需要者対応処理部(21)と、自家発電設備及び系統への逆潮流による送電設備を有し、系統への送電が可能であるプロシューマに募集情報に基づく募集条件を公開し、プロシューマから、募集情報へ応募する応募情報を受け付けるプロシューマ対応処理部(22)と、プロシューマの送電設備を介して逆潮流で系統へ送電された送電電力量を取得するプロシューマ送電情報取得部(23)と、募集情報及び応募情報に基づいて設定された、プロシューマが電力需要者へ融通すべき電力量の目標値と、取得した送電電力量とを比較し、比較結果に応じてプロシューマに贈呈するべきインセンティブを決定する目標管理部(24)と、を備える。

Description

電力融通管理装置、電力融通管理方法及び電力融通管理プログラム
 本発明は、電力融通管理装置、電力融通管理方法及び電力融通管理プログラムに関する。
 近年、電力の自由化が進み、大規模な商業施設から一般家庭に至るまで電力需要者は、伝統的な電力会社以外から電力を購入することが可能になっている。そして、その購買先としても、蓄電設備、太陽光発電設備及びコージェネレーションシステムを備えた一般家庭を想定することができるようになった。この流れは、蓄電池、太陽光発電等の設備がより安価に購買・運用可能となりさらに普及することによって、また、蓄電池を内部に有する電気自動車や燃料電池自動車の普及が加速することによって、益々盛んになることが予想される。
 現在、一般家庭等で電力供給能力のある需要家が余剰電力を販売する手段として、固定価格買取制度が存在する。当該制度における余剰電力の買取主体としては、例えば、電力会社等が一般的である。しかしながら、当該制度が今後どの地域においても恒久的に利用できるとは限らない。現在も多くの国や地域で、買取価格は減額の方向で修正されている。そこで、電力の“地産地消”が注目されている。これによれば、余剰電力を取引市場等で卸売り価格で売却するのではなく、他の需要家の小売価格相当の価格で売却することになり、より高い対価が期待できる。地産地消型の電力融通とは、ある地域に属する発電設備を有する主体がその地域で発電した電力を、その地域に属する別の主体に融通(販売)することである。地産地消型の電力融通は、発電場所と消費場所が距離的に離れていた従来の電力供給システムとは異なり、低炭素な分散電源で発電した電力を距離的に近い場所で消費できることから、分散電源の普及を高め、社会の低炭素化に寄与する。さらに分散電源は、従来の大規模発電装置と比較し、短期間で簡単に設置できることから、結果的に地域経済の活性化等にも寄与する。
 特許文献1は、固定価格買取制度以外の電力融通方法の例である。この特許文献1の電力需給仲介装置における電力の仲介では、電力供給者は、12円/kWh以上や、5円/kWh以上というように、売りたい単価を提示(電力供給条件を提示)する。一方、電力需要者(学校、スーパーマーケット、工場など)は、対価0円/kWhや、10円/kWh以下や、8円/kWh以下というように、買いたい単価を提示(電力需要情報を提示)する。そして、電力需給仲介装置が、電力需要情報と電力供給条件とを対比して電力需要者と電力供給者のマッチングを行う。即ち、特許文献1における仲介(電力の融通)は、“電力供給者20は、電力を高く売りたいならば電力供給条件において対価を高く指定すればよい”(特許文献1の段落0023)というように対価を決定することを前提としている。なお、電力の融通(供給)は、電力供給者側から運ばれてきた充電済みの蓄電装置が、学校スーパーマーケット、工場などの電力需要者の受電装置に接続されるというものである。
特開2014-187796号公報
 しかしながら、特許文献1での金銭(即ち対価(…円/kWh))による電力融通の動機付けは短期的には魅力があるものであっても、長期的には徐々に電力融通の動機が弱まってしまうため、有効とはいえない。したがって、さらに効果的な動機付けが望まれる。
 特許文献1においては、電力供給者は、余剰電力を供給するのに充分な金銭的動機を得ることができるが、その動機は、長期的には徐々に弱まる。したがって、電力供給者は、将来もまた繰り返し電力を供給しようという動機を維持することが難しい。また、特許文献1においては、対価が通貨に限定されている。仮に電力の対価として地域の産物が使用できれば、その地域の電力供給者に強い動機を与えることができる。しかしながら、特許文献1においては、そのような配慮はない。
 そこで、本発明は、長期的に電力を融通する動機を維持しつつ、電力融通を実現することを目的とする。
 本発明の電力融通管理装置は、系統からの電力を蓄電可能な蓄電設備を有し、物の生産又は役務の提供に電力を使用する電力需要者の端末装置から電力の融通を募集する募集情報を受信する電力需要者対応処理部と、自家発電設備及び系統への逆潮流による送電設備を有し、系統への送電が可能であるプロシューマの端末装置に募集情報に基づく募集条件を公開し、プロシューマの端末装置から、募集情報へ応募する応募情報を受け付けるプロシューマ対応処理部と、プロシューマの送電設備を介して逆潮流で系統へ送電された送電電力量の情報を取得するプロシューマ送電情報取得部と、募集情報及び応募情報に基づいて設定された、プロシューマが電力需要者へ融通すべき電力量の目標値と、取得した送電電力量とを比較し、比較結果に応じてプロシューマに贈呈するべきインセンティブを決定する目標管理部と、を備える。
 その他の手段については、発明を実施するための形態のなかで説明する。
 本発明によれば、長期的に電力を融通する動機を維持しつつ、電力融通を実現することができる。
電力融通管理装置が使用される環境を説明する図である。 電力融通管理装置の構成を説明する図である。 電力需給情報を説明する図である。 契約情報を説明する図である。 (a)は、累積融通電力量情報を説明する図である。(b)は、融通進捗グラフを説明する図である。 処理手順のフローチャートである。 処理手順のフローチャート(続き)である。 (a)、(b)、(c)及び(d)は、画面表示の一例である。 (a)、(b)及び(c)は、画面表示の一例である。 (a)、(b)、(c)及び(d)は、画面表示の一例である。
 以降、本発明を実施するための形態(“本実施形態”と言う)を、図等を参照しながら詳細に説明する。
(電力融通管理装置が使用される環境)
 図1に沿って、電力融通管理装置1が使用される環境を説明する。本実施形態においては、4つの電力取引主体51a、51b、51c及び51dが存在する。電力取引主体51a及び51bは家庭であり、電力取引主体51cはスタジアムであり、電力取引主体51dは工場である。なお、実際には、電力取引主体の数及び種類は限定されない。
 各電力取引主体51は、電力管理装置52、電力消費設備53、発電設備54、蓄電設備55、送受電設備56及び端末装置2(インホームディスプレイ、スマートフォン等)を有する。図1においては、設備等の符号の末尾に付されたa、b、c及びdは、その設備等が属する電力取引主体の符号の末尾に付されたa、b、c及びdに対応している。
 電力管理装置52は、一般的なコンピュータである。電力管理装置52は、電力消費設備53、発電設備54、蓄電設備55及び送受電設備56と接続され、これらの間を流れる電力量を制御・記録している。端末装置2は、ネットワーク3を介して、又は、ネットワーク3を介することなく近距離電波通信技術を使用して、電力取引主体51の電力管理装置52と通信可能である。電力取引主体51に属するユーザは、端末装置2を使用する。電力融通管理装置1もまた、ネットワーク3を介して、各端末装置2及び電力管理装置52と通信可能である。なお、送受電設備56は、単に電力系統57から電力を受電するだけではなく、逆潮流によって電力系統57に対して、電力取引主体内では消費し切れない等で余った発電量を送電することもできる。なお、図1において、太線の実線は電力の流れを、細線の実線及び細線の破線は情報の流れを示す。
 電力取引主体51a及び51bの電力消費設備53a及び53bは、例えば冷蔵庫、湯沸器等の家電設備である。電力取引主体51cの電力消費設備53cは、例えば空調設備、電飾設備、舞台設備等の設備である。電力取引主体51dの電力消費設備53dは、例えば電力取引主体51dが食品メーカである場合、食品製造設備である。電力取引主体51a及び51bの発電設備54a及び54bは、例えば太陽光自家発電設備である。電力取引主体51c及び51dの発電設備54c及び54dは、例えばコージェネレーションシステム及びディーゼルエンジン型自家発電設備である。
 各電力取引主体51の蓄電設備55は、発電設備54が発電した電力又は電力系統57から送受電設備56が受電した商用電力を蓄電する任意のタイプの蓄電設備である。蓄電設備55c及び55dの容量は、蓄電設備55a及び55bの容量よりも遥かに大きい。
 前記から明らかなように、各電力取引主体51が有する各設備等は、電力消費設備、発電設備及び蓄電設備の種類・容量の相違を除けば、ほぼ共通である。そして、各電力取引主体51は何れも、必要な電力を電力系等57から受電し、又は、発電設備54で発生させ、電力消費設備53が消費しなかった残りの余剰電力を、蓄電設備55に蓄電する。
 一般に余剰電力又は不足電力が発生するタイミングは、電力取引主体によって異なる。つまり、各電力取引主体51のそれぞれは、あるタイミングでは、余剰電力を供給する者(プロシューマ)となり、また他のあるタイミングでは、電力を受ける者(電力需要者)となる。本実施形態では、家庭は、週平均等では概ね自給自足以上の発電設備を伴うプロシューマであることが前提になっている。さらに、スタジアム51c及び工場51dは、それ自身の発電設備では足りず、電力会社又はこれらのプロシューマから追加的に電力供給を受ける必要があることが前提になっている。以降では、電力取引主体51a及び51bがプロシューマであり、電力取引主体51c及び51dが電力需要者である例を説明する。
 図1において、プロシューマは、融通が指定された時間において、指定の電力量を電力系統57に供給する。電力需要者は、事前に指定された融通の時間及び電力量に応じて、電力系統57から融通相当分を消費する。
(電力需要者の電力消費パターン)
 電力需要者51cはスタジアムであり、その電力需要は、イベントが開催される特定の期間(時間帯)に集中する。例えば、年末の“年忘れアイドルコンサート”が2016年12月31日22時00分~24時00分に開催される場合、この2時間の間に、空調設備、電飾設備、舞台設備等を稼働させるために、膨大な電力需要が集中的に発生する。この2時間の電力需要に比較すれば、休業中の電力需要は微小である。
 そこで、電力需要者51cは、2016年12月31日に先立つ準備期間における休業時間において、複数のプロシューマ(個人のアイドルファン等)から複数回に分けて融通電力相当分を受電し、蓄電設備55cに蓄電しておく。そして、電力需要者51cは、2016年12月31日22時00分~24時00分の間に、蓄電しておいた電力を一度に消費する。この蓄電設備55cの使用方法を“随時蓄電一時消費パターン”と呼ぶ。
 電力需要者51dは工場であり、生産ラインの稼働率を維持するために、その電力需要は、ある期間ほぼ均等に発生する。例えば、“2017年秋向け◎◎県産チーズ”の生産ラインが、2016年11月1日~2017年10月31日に稼働する場合、その期間の毎日、ほぼ同量の電力需要が発生する。例えば、ある日に消費する電力が1,000kWhである場合、電力需要者51dは、プロシューマ51a及び51b(美食家等)から、余剰電力を当日の前日までの2日間で1日500kWhずつ収集し、収集した余剰電力を蓄電しておく。この蓄電設備55dの使用方法を“随時蓄電随時消費パターン”と呼ぶ。
(インセンティブ)
 電力需要者は、プロシューマに対して、融通された電力の対価を渡す。これまで多くの場合、対価は、通貨を想定していた。しかしながら、本実施形態では、対価の一部又は全部に代替して、通貨以外の経済的価値が使用される。この経済的価値が、前記した“インセンティブ”であり、プロシューマ及び電力需要者が属する地域の産物又はその地域内で通用する仮想通貨(ポイント)である。もちろん、ある電力需要者自身が生産する産物をインセンティブとしてもよい。
 例えば、電力需要者51cが提供するインセンティブは、自社スタジアムで有料配布される“アイドルTシャツ”であってもよいし、スタジアムで開催されるイベントの“入場割引クーポン”であってもよい。また、電力需要者51dが提供するインセンティブは、自社工場が生産する“◎◎県産チーズ”であってもよい。1人のプロシューマが融通する電力量は、大小様々であるが、例えば対価が数百円等のケースでは、電力需要者は、対価としてわざわざ小額の通貨とともに小額のインセンティブを準備するのも煩雑であり、個人のプロシューマもまた、実物としてのインセンティブのみに興味を有する場合が多い。このような場合、インセンティブのみが対価の決済に使用される。
(プロシューマに対する評価)
 スタジアム等の電力需要者にとって評価が高いプロシューマと、そうではないプロシューマが存在する。当然のことながら、電力需要者は、所定の契約期間において少しでも多くの電力量を融通してくれるプロシューマを高く評価する。したがって、契約において定められた融通されるべき電力量が大きいほど、プロシューマに対してより価値の大きいインセンティブが渡される。但し、契約終了時点において、約束した電力量を融通できないことが判明した場合、そのプロシューマに対するインセンティブの価値は下げられる。
(融通される電力量の制御)
 電力需要者にとって、プロシューマが契約で定めた電力量を契約終了時点までに確実に融通してくれることが最大の関心事である。そこで、本実施形態では、プロシューマは、契約期間の途中で数回に分けて電力を融通することとする。そして、個々の融通のタイミングにおいて、電力融通管理装置は、約束した累積融通電力量を契約終了時点において達成するために、そのタイミングにおいて融通すべき電力量をプロシューマに案内する。電力融通管理装置は、このような案内によって、プロシューマが実際に融通する電力量を制御する(詳細後記)。
(電力融通管理装置)
 図2に沿って、電力融通管理装置1の構成を説明する。電力融通管理装置1は、一般的なコンピュータである。電力融通管理装置1は、中央制御(中央演算)装置11、入力装置12、出力装置13、主記憶装置14、補助記憶装置15、及び、通信装置16を備える。これらはバスで接続されている。補助記憶装置15は、電力需給情報31、契約情報32及び累積融通電力量情報33を格納している。主記憶装置14における電力需要者対応処理部21、プロシューマ対応処理部22、プロシューマ送電情報取得部23及び目標管理部24は、プログラムである。以降の説明において、“○○部は”と動作主体を記した場合、それは、中央制御装置11が主記憶装置14から○○部を実行することを意味する。
(電力需給情報)
 図3に沿って、電力需給情報31を説明する。電力需給情報31は、将来の電力需要(又は発電がそれを上回った場合の電力供給)の予測であるともいえる。電力需給情報31においては、電力取引主体ID欄101に記憶されている電力取引主体IDに関連付けて、電力取引主体名欄102には電力取引主体名が、電力融通期間欄103には電力融通期間が、過不足欄104には過不足が、電力量欄105には電力量が、取引希望単価欄106には取引希望単価が、インセンティブ名欄107にはインセンティブ名が、インセンティブ単価欄108にはインセンティブ単価が記憶されている。
 電力取引主体ID欄101の電力取引主体IDは、電力取引主体を一意に特定する識別子である。
 電力取引主体名欄102の電力取引主体名は、電力取引主体の氏名又は名称である。
 電力融通期間欄103の電力融通期間は、電力の余剰又は不足が発生する期間である。
 過不足欄104の過不足は、“余剰”又は“不足”の何れかである。“余剰”は、その電力融通期間において、電力取引主体に電力の余剰が発生していることを示す。“不足”は、その電力融通期間において、電力取引主体に電力の不足が発生していることを示す。つまり、“余剰”は、そのレコードの電力取引主体がプロシューマとなり得ることを示し、“不足”は、そのレコードの電力取引主体が電力需要者となり得ることを示す。
 電力量欄105の電力量は、その電力融通期間において1人のプロシューマが供給できる1日当たりの電力量、又は、その電力融通期間において1社の電力需要者が1人のプロシューマから受け取ることを希望する合計の電力量電力量である。
 取引希望単価欄106の取引希望単価は、電力取引主体が希望する電力の販売単価又は購入単価である。
 インセンティブ名欄107のインセンティブ名は、電力需要者が電力の対価としてプロシューマに支払う(贈呈する)インセンティブの名称である。インセンティブ名は、過不足が“不足”であるレコードのみに記憶される。
 インセンティブ単価欄108のインセンティブ単価は、インセンティブの単価である。インセンティブ単価は、過不足が“不足”であるレコードのみに記憶される。
 電力需給情報31(図3)を全体的に見ると、例えば以下のことがわかる。
・日立○子は、毎日10時00分~16時00分の期間に余剰電力量8kWh/日を発生させ、それを20円/kWhで販売する準備がある(レコード141)。
・横浜◎男は、平日12時00分~14時00分の期間に余剰電力量6kWh/日を発生させ、それを19円/kWhで販売する準備がある(レコード142)。
 なお、レコード141及び142のような情報は、電力融通管理装置1がプロシューマから登録を受けることによって取得してもよいし、わざわざ登録を受けるまでもなく、過去のデータの統計値を記憶してもよい(詳細後記)。
・(株)○○ドームは、2016年7月1日~2016年12月31日の期間に大量の電力量(例えば数万kWh)を受け入れようとしている。(株)○○ドームは、必要とする合計電力量を小口に分割し、複数のプロシューマから収集しようとしている。個人のプロシューマが契約しやすいように、(株)○○ドームは、1人のプロシューマからその期間に融通を受ける電力量を“100kWh”、“80kWh”、“60kWh”及び“50kWh”に変化させたうえで、4種のプランを用意している。取引(購入)希望単価は、何れのプランにおいても22円/kWhである(レコード143~146)。
・(株)○○ドームは、融通を受ける電力量が大きい順に、インセンティブとして、入場割引クーポン(1,000円相当)、アイドルTシャツ(500円相当)、アイドルボールペン(200円相当)及びアイドルワッペン(100円相当)を用意している。
・(株)◎◎食品は、2016年11月1日~2017年10月31日の期間に、◎◎県産の食料を生産する工場を稼働させるために大量の電力量(例えば数万kWh)を必要としている。(株)○○ドームと同様に(株)◎◎食品もまた、1人のプロシューマからその期間に融通を受ける電力量を“100kWh”、“80kWh”、“60kWh”及び“50kWh”に変化させたうえで、4種のプランを用意している。取引(購入)希望単価は、何れのプランにおいても20円/kWhである(レコード147~150)。
・(株)◎◎食品は、融通を受ける電力量が大きい順に、インセンティブとして、◎◎県産牛肉(2,000円相当)、◎◎県産チーズ(600円相当)、◎◎県産バター(300円相当)及び◎◎県産キャンデー(100円相当)を用意している。
 電力需給情報31を記憶する電力融通管理装置1の運営者が、電力需給情報31の取引希望価格(欄106)を入手できるか否かが問題になる。取引希望価格は、電力取引主体にとって、守秘義務契約を締結していない先に対して積極的に開示しにくい情報である。そこで、電力需給情報31は、取引希望単価欄106を有していなくてもよい。電力融通管理装置1は、プロシューマ又は電力需要者から会員登録又は応募情報を受け付ける都度、電力需給情報31の新たなレコードを作成する。なお、電力需給情報31は、地域ごとに作成される。地域とは、例えば都道府県、市町村であり、その粒度の大きさは任意である。図3は、“◎◎県”における電力需給情報31の例である。
(契約情報)
 図4に沿って、契約情報32を説明する。契約情報32においては、契約ID欄111に記憶された契約IDに関連付けて、プロシューマID欄112にはプロシューマIDが、電力需要者ID欄113には電力需要者IDが、契約開始時点欄114には契約開始時点が、契約終了時点欄115には契約終了時点が、融通時点決定権者欄116には、融通時点決定権者が、取引単価欄117には取引単価が、最終受渡電力量欄118には最終受渡電力量が、契約開始時点インセンティブ名欄119には契約開始時点インセンティブ名が、契約終了時点インセンティブ名欄120には契約終了時点インセンティブ名が、配送確認欄121には配送フラグが、摘要欄133には摘要が記憶されている。
 契約ID欄111の契約IDは、契約を一意に特定する識別子である。本実施形態においては、契約は、1人のプロシューマ及び1社の電力需要者との間で締結される。
 プロシューマID欄112のプロシューマIDは、その契約のプロシューマである電力取引主体を一意に特定する識別子である。
 電力需要者ID欄113の電力需要者IDは、その契約の電力需要者である電力取引主体を一意に特定する識別子である。
 契約開始時点欄114の契約開始時点は、契約期間の始期の年月日である。なお、契約期間は、電力需要者の電力融通期間(図3の欄103)の一部である。
 契約終了時点欄115の契約開始時点は、契約期間の終期の年月日である。
 融通時点決定権者欄116の融通時点決定権者は、“供給者”又は“需要者”の何れかである。契約期間においてプロシューマは、複数の回数に分けて電力需要者に電力を融通する。例えば、プロシューマは、太陽光発電の昼間の余剰分を蓄電設備に貯めて、夜間電力系統57に出力する。“供給者”は、個々の融通のタイミングをプロシューマが決定できることを示し、“需要者”は、個々の融通のタイミングを電力需要者が決定できることを示す。
 取引単価欄117の取引単価は、プロシューマ及び電力需要者が合意した電力量の単価である。なお、前記同様の理由により、当該欄は必須ではない。
 最終受渡電力量欄118の最終受渡電力量は、契約期間にプロシューマが電力需要者に融通することを約した合計電力量であり、前記した各プランの電力量(図3のレコード143~150の欄105)の何れかである。
 契約開始時点インセンティブ名欄120の契約開始時点インセンティブ名は、契約の内容が遵守されることを条件に、電力需要者がプロシューマに贈呈することを契約開始時点に約したインセンティブの名称である。
 契約終了時点インセンティブ名欄121の契約終了時点インセンティブ名は、契約の内容が実際に遵守されたか否かに対する評価に基づき、電力需要者がプロシューマに贈呈することを契約終了時点に決定したインセンティブの名称である。契約終了時点インセンティブ名は、契約終了時点に記憶される。
 配送確認欄121の配送フラグ“済”は、プロシューマに対するインセンティブの配送手配が終了したことを示す。配送フラグもまた、契約終了時点に記憶される。
 摘要欄122の摘要は、任意の備忘的な情報である。
 電力融通管理装置1の目標管理部24(図2)は、契約が締結される都度、契約情報32の新たなレコードを作成する。そして、目標管理部24は、各電力管理装置51(図1)から情報を入手し、電力決済単位である1時間当たり2度(毎時0分及び30分)、累積融通電力量の値を更新する。説明を容易にするために、図4では時系列で変化して行くレコードを1枚の紙面に表現している。例えば、同じ契約“AG01”についてのレコード161及び165は、実際には同時に表示されることはない。各レコード間の“隙間”は、このことを示している。
 契約情報32(図4)を全体的に見ると、例えば以下のことがわかる。
・レコード161及び165について
 (株)○○ドーム(CC01)は、2016年12月31日24時00分に終了する年忘れアイドルコンサートを予定している。2016年10月10日、(株)○○ドームが将来的に日立○子(PS01)から電力の融通を受けることが決まった。このとき、最終受渡電力量として、80kWhが約され、契約開始時点インセンティブとして“アイドルTシャツ”が一応決定された(レコード161)。その後、図4からは直接わからないが、2016年12月31日24時00分までの期間に、日立○子は、複数回(複数日)に分けて実際に合計80kWhの電力量を融通した。その結果、日立○子は、契約開始時点に決定された“アイドルTシャツ”を予定通り受け取ることになった(レコード165)。
・レコード162及び166について
 (株)○○ドーム(CC01)は、2016年12月31日24時00分に終了する年忘れアイドルコンサートを予定している。2016年11月10日、(株)○○ドームが将来的に横浜◎男(PS02)から電力の融通を受けることが決まった。このとき、最終受渡電力量として、60kWhが約され、契約開始時点インセンティブとして“アイドルボールペン”が一応決定された(レコード162)。“アイドルボールペン”の価値は、日立○子の例の“アイドルTシャツ”よりも小さい。これは、横浜◎男の契約開始時点が、日立○子の契約開始時点よりも遅いことに起因する。
 その後、図4からは直接わからないが、2016年12月31日24時00分までの期間に、横浜◎男は、複数回に分けて実際には合計50kWhの電力量しか融通できなかった(最終受渡電力量に対して未達)。前記した日立○子の例と異なり、(株)○○ドームは、この融通量に対して高い評価を与えていない。その結果、横浜◎男は、契約開始時点に決定された“アイドルボールペン”を受け取ることはできず、価値がより小さい“アイドルワッペン”を受け取ることになった(レコード166)。
・レコード163及び167について
 (株)◎◎食品(CC02)は、2016年11月1日から2017年10月31の期間に、自社工場の生産ラインを稼働させる。2016年11月1日、(株)◎◎食品が将来的に日立○子(PS01)から電力の融通を受けることが決まった。このとき、最終受渡電力量として、80kWhが約され、契約開始時点インセンティブとして“◎◎県産チーズ”が一応決定された(レコード163)。その後、図4からは直接わからないが、2017年10月31日までの間に、日立○子は、複数回に分けて実際に合計80kWhの電力量を融通した。その結果、日立○子は、契約開始時点に決定された“◎◎県産チーズ”を予定通り受け取ることになった(レコード167)。
・レコード164及び168について
 (株)◎◎食品(CC02)は、2016年11月1日から2017年10月31の期間に、自社工場の生産ラインを稼働させる。2016年11月1日、(株)◎◎食品が将来的に横浜◎男(PS02)から電力の融通を受けることが決まった。このとき、最終受渡電力量として、60kWhが約され、契約開始時点インセンティブとして“◎◎県産バター”が一応決定された(レコード164)。
 その後、図4からは直接わからないが、2017年10月31日までの間に、横浜◎男は、複数回に分けて実際には合計50kWhの電力量しか融通できなかった(最終受渡電力量に対して未達)。前記した日立○子の例と異なり、(株)◎◎食品は、この融通量に対して高い評価を与えていない。その結果、横浜◎男は、契約開始時点に決定された“◎◎県産バター”を受け取ることはできず、価値がより小さい“◎◎県産チーズ”を受け取ることになった(レコード168)。
(累積融通電力量情報)
 図5(a)に沿って、累積融通電力量情報33を説明する。累積融通電力量情報33の構成は、契約情報32(図4)の構成に類似している。契約情報32から、融通時点決定権者欄116、取引単価欄117、契約開始時点インセンティブ名欄119、契約終了時点インセンティブ名欄120及び配送確認欄121を削除し、新たに累積融通電力量欄(図5(a)の欄137)を設けると、累積融通電力量情報33が完成する。電力融通管理装置1は、プロシューマの電力管理装置51a及び51bから定期的に(例えば毎時0分及び30分の2度)融通された電力量を取得する。そして電力融通管理装置1は、契約開始時点からの累積受渡電力量を算出し、累積融通電力量欄137に記憶されている累積融通電力量を定期的に更新する。
(融通進捗グラフ)
 図5(b)に沿って融通進捗グラフ172を説明する。電力融通管理装置1は、累積融通電力量情報33の各レコードの過去の履歴に基づいて、融通進捗グラフ172を作成する。融通進捗グラフ172は、横軸に契約期間の各時点を有し縦軸に累積融通電力量を有する座標平面に描画された、各時点における累積融通電力量の折れ線グラフである。目標線173は、原点と、座標値が“(契約終了時点,最終受渡電力量)”である目標点174とを結ぶ線分である。電力融通管理装置1は、図5(a)の各レコードを、融通進捗グラフ173として可視化する。図5(b)に記載した融通進捗グラフ172は、例えば図5(a)のレコード171の時系列の履歴をグラフ化したものである。
 契約期間2016年10月10日~2016年12月31は、12週を有する。そこで、電力融通管理装置1は、目標線173を12の区間に等分し、1区間当たりの縦軸の高さ175を求める。この高さ175が、1週間当たりの日立○子の目標到達平均電力量である。電力融通管理装置1は、融通進捗グラフ172が目標線173の下側にある場合、現時点における、融通進捗グラフ172と目標線173との高低差176を求める。この高低差176が、現時点における目標到達必要電力量である。
(処理手順)
 図5及び図6に沿って、処理手順を説明する。図5及び図6は、プロシューマの端末装置2a、電力需要者の端末装置2c及び電力融通管理装置1が連携して行う処理手順である。なお、図5及び図6の端末装置2aは、図1の端末装置2a及び2bを代表している。同様に、図5及び図6の端末装置2cは、図1の端末装置2c及び2dを代表している。
 ステップS201において、電力融通管理装置1の電力需要者対応処理部21は、登録サイトを表示する。登録サイト(図示せず)とは、電力融通管理装置1の運営者のポータルサイトである。具体的には、電力需要者対応処理部21は、ネットワーク3を介して端末装置2cの出力装置に登録サイトの画面を表示する。登録サイトには、“あなたの地域のプロシューマにご当地の産物を渡して電力を融通してもらいませんか?”等の案内文言が表示されている。
 ステップS202において、端末装置2cは、会員登録を受け付ける。具体的には、第1に、端末装置2cは、電力需要者が端末装置2cの入力装置から、以下の(1)~(5)の情報(募集情報)を入力するのを受け付ける。
(1)電力需要者の名称及び住所
(2)電力を受け入れることが可能な期間(電力融通期間)
(3)電力融通期間において、1人のプロシューマから受け入れる電力量の複数のプラン(例えば、“100kWh”、“80kWh”、・・・)
(4)複数のプランごとのインセンティブ及びその価値(これらを“募集条件”と呼ぶ)
(5)電力の取引希望単価、及び、個々の融通タイミング(但し、必須ではない)
 第2に、端末装置2cは、募集情報を、電力融通管理装置1に送信する。すると、電力融通管理装置1の電力需要者対応処理部21は、募集情報を受信する。
 ステップS203において、電力需要者対応処理部21は、電力需給情報31(図3)のレコードを作成する。具体的には、第1に、電力需要者対応処理部21は、電力需給情報31の新たなレコードをプランの数だけ作成する。
 第2に、電力需要者対応処理部21は、募集情報を使用して、新たなレコードの各欄を埋める。このとき作成されるレコードの例が、図3のレコード143~146及び147~150である。
 ステップS204において、電力融通管理装置1のプロシューマ対応処理部22は、登録サイトを表示する。具体的には、プロシューマ対応処理部22は、ネットワーク3を介して端末装置2aの出力装置に登録サイトの画面を表示する。登録サイトには、“あなたの地域の電力需要者に電力を融通して、ご当地の産物を入手してみませんか?” 等の案内文言が表示されている。
 ステップS205において、端末装置2aは、応募情報を受け付ける。具体的には、第1に、端末装置2aは、プロシューマが端末装置2aの入力装置から、以下の(11)を応募情報として入力するのを受け付ける。なお、端末装置2aは、プロシューマが望む場合は、以下の(12)~(14)を応募情報として受け付ける。このように、以下の(12)~(14)の入力を任意としたのは、一般的に個人のプロシューマは、(12)~(14)を日常的に管理していることが稀だからである。
(11)プロシューマの氏名(本名でなくてもよい)
(12)プロシューマの住所、及び、電力を供給できる期間(電力融通期間)
(13)融通機会1回当たりに供給できる電力量
(14)電力の取引希望単価、及び、個々の融通タイミング(但し、必須ではない)
 第2に、端末装置2aは、応募情報を、電力融通管理装置1に送信する。すると、電力融通管理装置1のプロシューマ対応処理部22は、応募情報を受信する。
 ステップS206において、電力融通管理装置1のプロシューマ対応処理部22は、電力需給情報31(図3)のレコードを作成する。具体的には、第1に、プロシューマ対応処理部22は、電力需給情報31の新たなレコードを作成する。
 第2に、プロシューマ対応処理部22は、応募情報を使用して、新たなレコードの各欄を埋める。このとき作成されるレコードの例が、図3のレコード141及び142である。
 前記した(12)~(14)をプロシューマが開示しない場合がある。すると、プロシューマ対応処理部22は、ステップS205の“第2”において受信した情報だけでは、図3のレコード141及び142の太線内を埋めることはできない。そこで、プロシューマ対応処理部22は、太線内に過去の統計値を記憶する。過去の統計値とは、例えば、ある地域のある季節における日中の太陽光発電量(家庭1件1日当たり○kWh)、電力消費設備が消費する電力量(家庭1件1日当たり◎kWh)等である。プロシューマ対応処理部22は、官公庁等の外部サーバからこのような統計値を取得してもよいし、他のプロシューマの実績値(例えば累積融通電力量情報33)に基づいてこのような統計値を推定してもよい。
 電力需要者対応処理部21及びプロシューマ対応処理部22は、ステップS201~S206の処理を、多くの電力需要者及びプロシューマについて繰り返す。すると、図3に示すような多くのレコードを有する電力需給情報31が作成される。
 ステップS207において、プロシューマ対応処理部22は、サービスサイトを表示する。具体的には、プロシューマ対応処理部22は、プロシューマからの要求に応じて、ネットワーク3を介して端末装置2aの出力装置にサービスサイトの画面を表示する。サービスサイトには、複数の電力需要者の候補を示すアイコンが表示されている。アイコンは、そのプロシューマの地域の産物が図案化されたものであることが好ましい。当該アイコンは、例えば、“2016年7月1日~12月31日の期間に、○○ドームに100kWh融通すると入場割引クーポン1,000円分がもらえます。80kWh融通すると500円相当のアイドルTシャツがもらえます。”のような案内文言にリンクされている。
 なお、プロシューマ対応処理部22は、以下の条件1~条件4の全部又は一部を満たす電力需要者の候補を決定し、決定した電力需要者の候補を、募集条件を含む募集情報とともにサービスサイトに表示(公開)しプロシューマを募集する。ある電力需要者の複数のプランが以下の条件を満たす場合、プロシューマ対応処理部22は、複数のプランを表示する。
(条件1)電力需要者の住所が所定の基準を満たす程度にプロシューマの住所(又はプロシューマの端末装置2aの現時点の位置)の近傍にあること。
(条件2)プロシューマが電力を供給できる将来の時点又は期間において、電力需要者が電力を受け入れることが可能であること。つまり、図3の電力需給情報31において、プロシューマの電力融通期間の少なくとも一部が、電力需要者の電力融通期間の少なくとも一部と重複していること。なお、プロシューマ対応処理部22は、この重複期間が長い順に、電力需要者に優先順位を付してもよい。
(条件3)図3の電力需給情報31において、プロシューマが1回(1日)当たりに融通できる電力量(欄105)の、電力需要者が電力融通期間内に1人のプロシューマから受け入れる合計電力量(欄105)に対する比率が所定の範囲内であること。当該所定の範囲は、例えば、“10%以上20%以下”のように上限閾値及び下限閾値で表示される。当該比率がこの範囲よりも小さい場合、プロシューマは電力の融通をあまりにも多くの回数繰り返すうちに、契約期間の途中で疲れて動機を失ってしまう。当該比率がこの範囲よりも大きい場合、目標に向かい少しずつ融通する電力量を積み上げて行く動機が却って失われる。
(条件4)電力需要者の取引希望単価が、プロシューマの取引希望単価以上であること。なお、この条件は必須ではない。
 ステップS208において、プロシューマ対応処理部22は、電力需要者の選択を受け付ける。具体的には、第1に、プロシューマ対応処理部22は、プロシューマが端末装置2aの入力装置を介して、複数のアイコンのうちから1つを押下するのを受け付ける。
 第2に、プロシューマ対応処理部22は、電力需給情報31を参照し、押下されたアイコンの電力需要者についてのレコードを取得する。そして、プロシューマ対応処理部22は、端末装置2aの出力装置に、取得したレコードの情報を任意の態様で表示する。特に、インセンティブ名は、インセンティブの特徴を充分に示す写真及び説明文言のページにリンクするように設定されていることが望ましい。
 第3に、プロシューマ対応処理部22は、プロシューマが画面上の“この電力需要者と契約する”ボタンを押下するのを受け付ける。この段階で、プロシューマ対応処理部22は、ある電力需要者に対して電力を供給するプロシューマを決定し、その結果、両者間に契約が締結されたことになる。プロシューマ対応処理部22は、端末装置2aの出力装置に、“あなたは、(株)○○ドームさまに対して、電力を融通することになりました”のような確認文言を表示する。
 第4に、プロシューマ対応処理部22は、電力需給情報31(図3)を参照したうえで融通シナリオを作成する。いま、日立○子(図3のレコード141)と(株)○○ドーム(図3のレコード144)との間で契約が締結されたとする。このとき、プロシューマ対応処理部22は、端末装置2aの出力装置に、融通シナリオ“2016年12月31日までに、8kWh/日を10回融通することを目標としましょう”を表示する。プロシューマが契約内容の目標値として、例えば“80kWh” (図3のレコード144)を選択した場合、プロシューマ対応処理部22は、例えば前記のように“8kWh/日を10回”を融通シナリオ中で提案する。プロシューマは、この提案を変更することができる。このときプロシューマは、融通の回数と1回当たりに融通する電力量との積が、契約内容の目標値になるように、自身の融通能力を考慮したうえで変更する。プロシューマ対応処理部22は、当該変更後の値(○kWh/日を◎回)を受け付け、電力需要者ID及びプロシューマIDに関連付けて補助記憶装置15に記憶する。
 ステップS209において、電力融通管理装置1の目標管理部24は、契約情報32(図4)のレコードを作成する。具体的には、第1に、目標管理部24は、契約情報32の新たなレコードを作成する。
 第2に、目標管理部24は、電力需給情報31(図3)における、プロシューマのレコード、及び、プロシューマが選択した電力需要者のレコードに記載されている情報を使用して、新たなレコードの各欄を埋める。このとき作成されるレコードの例が、図4のレコード161である。このとき、作成されるレコードの契約終了時点インセンティブ名欄120及び配送確認欄121は、空欄である。図5のステップS209の後、図6のステップS210に続く。
 ステップS210において、目標管理部24は、契約期間が開始したか否かを判断する。具体的には、目標管理部24は、ある契約の契約開始時点(図4の欄114)が到来した場合(ステップS210“Yes”)、ステップS211に進み、それ以外の場合(ステップS210“No”)、そのまま待機する。
 ステップS211において、目標管理部24は、蓄電量を問い合わせる。具体的には、目標管理部24は、端末装置2aに蓄電量を問い合わせる。蓄電量とは、その時点でプロシューマの蓄電設備55aに蓄電されている電力量であり、その時点でプロシューマが電力需要者に対して融通可能な電力量である。前記したように、ステップS210のタイミングは、電力需要者又はプロシューマの何れかが予め決定しておくことができる。両者からそのような指定がない場合、目標管理部24は、任意の周期で(例えば毎日午前9時00分)ステップS211を開始する。
 ステップS212において、端末装置2aは、蓄電量を送信する。具体的には、端末装置2aは、電力管理装置52aにアクセスして蓄電設備55aのその時点での(データとしての)蓄電量を取得し、電力融通管理装置1に送信する。すると、電力融通管理装置1の目標管理部24は、蓄電量を受信する。
 ステップS213において、電力融通管理装置1の目標管理部24は、融通電力量を決定する。分かり易さのため、引き続き電力需要者は“(株)○○ドーム”であり、プロシューマは“日立○子”であるとして説明を続ける。目標管理部24は、以下のルールに則って今回の融通電力量を決定する。
(ルール1)ステップS212において受信した蓄電量が所定の閾値(例えば、プロシューマが、自身のために常時維持すべき最小限の蓄電量を定めている場合は、その値)未満である場合、目標管理部24は、今回の融通決定量を、“0kWh”とする。なお、ルール1は必須ではない(オプションである)。
(ルール2)ステップS212において受信した蓄電量が所定の閾値以上であり、かつ、図5(b)において現時点における累積融通電力量が目標線173の水準未満である場合、目標管理部24は、今回の融通決定量を現時点の高低差176(目標到達必要電力量)とする。但し、高低差176がステップS212において受信した蓄電量より大きい場合、目標管理部24は、今回の融通決定量を、ステップS212において受信した蓄電量とする。
(ルール3)ステップS212において受信した蓄電量が所定の閾値以上であり、かつ、図5(b)において現時点における累積融通電力量が目標線173の水準以上である場合、目標管理部24は、今回の融通決定量を、所定の電力量(例えば図3のレコード141の電力量“8kWh”)とする。
(ルール4)目標管理部24が、プロシューマが同じ水準の電力量を融通し続けることを端末装置2aから受け付けている場合は、目標管理部24は、今回の融通決定量を、図5(b)における高さ175(目標到達平均電力量)とする。
 分かり易さのため、ここで決定された今回の融通電力量が“8kWh”であったとして、以降の説明を続ける。
 ステップS214において、端末装置2aは、電力を融通する。具体的には、端末装置2aは、プロシューマの電力管理装置52aに対し“蓄電設備55aの蓄電量のうち8kWhを、(株)○○ドームの蓄電設備55cに送電する”旨の指示を送る。
 ステップS215において、端末装置2cは、蓄電する。具体的には、端末装置2cは、電力需要者の電力管理装置52cに対し“日立○子から送電される8kWhを蓄電設備55cに蓄電する”旨の指示を送る。
 ステップS216において、端末装置2cは、蓄電完了通知を送信する。具体的には、端末装置2cは、蓄電が完了した旨の通知(蓄電完了通知)を電力融通管理装置1に送信する。蓄電完了通知には、逆潮流で電力系統57へ送電された電力を蓄電設備55cが実際に受け取って蓄電した蓄電量(“送電電力量”と呼ぶ)が含まれている。
 ステップS217において、電力融通管理装置1のプロシューマ送電情報取得部23は、端末装置2cから、蓄電完了通知を受信する。
 ステップS218において、目標管理部24は、契約期間が終了したか否かを判断する。具体的には、目標管理部24は、ある契約の契約終了時点(図4の欄115)が到来した場合(ステップS218“Yes”)、ステップS219に進み、それ以外の場合(ステップS218“No”)、ステップS211に戻る。
 ステップS210~S218の処理は、契約情報32(図4)に登録されているすべてのプロシューマについて繰り返される。そして、実際に電力の融通が行われる都度、目標管理部24は、累積融通電力量情報33(図5(a))の各レコードの累積融通電力量の値を、送電電力量の和として更新して行く。目標管理部24は、ステップS217を経由する都度、更新後の累積融通電力量を、プロシューマの端末装置2aに表示する。
 ステップS219において、目標管理部24は、評価を行う。ステップS219は、何れかの契約の契約終了時点が到来することを契機として開始される。いま、契約情報32(図4)のレコード161の契約が終了した(2016年12月31日24時00分になった)とする。すると、目標管理部24は、日立○子(PS01)に対する評価を行う。具体的には、目標管理部24は、累積融通電力量情報33(図5(a))のレコード171の累積融通電力量(実績値)Wを最終受渡電力量(契約値)Wと比較する。そして、目標管理部24は、比較結果に応じて、プロシューマに対する評価を取得する。
 例えば、“W≦W”である場合、評価は“優”である。“p≦W<W”である場合、評価は“良”である。“W<p”である場合、評価は“可”である。pは、0<p<Wとなるような任意の数である。
 ステップS220において、目標管理部24は、インセンティブを決定する。具体的には、目標管理部24は、日立○子に対する総合評価“優”に対応する“アイドルTシャツ”(500円)を契約終了時点インセンティブとして決定する。なお、総合評価“良”には、“アイドルボールペン”(200円)が対応し、総合評価“可”には、“アイドルワッペン”(100円)が対応している。この段階で決定されたインセンティブが当初予定されていたインセンティブとは異なる場合がある。この場合、目標管理部24は、プロシューマの端末装置2aに変更後のインセンティブを表示する。
 ステップS221において、目標管理部24は、インセンティブを配送する。具体的には、第1に、目標管理部24は、配送会社の配送用サーバ(図示せず)に対して配送情報を送信する。配送情報には、インセンティブ名“アイドルTシャツ”、(株)○○ドームのインセンティブ保管用倉庫の住所、及び、日立○子の住所が含まれている。補助記憶装置15は、電力取引主体IDに関連付けて、住所を記憶しているものとする。すると、配送会社は、倉庫において“アイドルTシャツ”を受け取り、それを日立○子に配送する。
 第2に、目標管理部24は、契約情報32(図4)のレコード161のコピーを作成し、それをレコード165として記憶する。そして、目標管理部24は、レコード165の契約終了時点インセンティブ名欄120に“アイドルTシャツ”を記憶し、配送確認欄121に配送フラグ“済”を記憶する。
 ステップS222において、端末装置2aは、インセンティブを受け取る。具体的には、日立○子の端末装置2aは、“アイドルTシャツ”に添付されているバーコード等を読取り、受領を確認する。その後、処理手順を終了する。
(天候不順)
 プロシューマの発電設備は、太陽光発電設備に限定されない。しかしながら、プロシューマが自然エネルギーを使用する発電設備しか有さない場合、その発電量は、天候に左右される。そこで、電力融通管理装置1の目標管理部24は、最終受渡電力量が収集できる可能性が小さくなった時点で、以下の施策を実行する。“可能性が小さくなった時点”とは、例えば、“図5(a)において、その時点にける累積融通電力量が、その時点にける目標線173の水準の50%を下回った時点”である。
(施策1)目標管理部24は、契約済の他のプロシューマの端末装置に対して、“電力需要者は、契約上の最終受入電力量を増加させる用意がある”旨のメッセージを送信する。
(施策2)目標管理部24は、契約を未だ締結していないプロシューマの候補の端末装置に対して、新規契約を促すメッセージを送信する。この候補は、電力需給情報31(図3)に登録されているプロシューマのうち契約情報32(図4)に登録のない者である。
(画面例)
 電力融通管理装置1が、プロシューマの端末装置2aに表示する画面の例は以下の通りである。
・電力需要者選択画面(図8(a))
 プロシューマ対応処理部22は、ステップS207においてサービスサイトを表示する。図8(a)の電力需要者選択画面は、そのサービスサイトの遷移画面である。プロシューマ対応処理部22は、画面上に地域の地図を表示し、電力需給情報31(図3)の電力需要者の位置を円301等で表示し、円の内側に、必要な電力量を表示する。プロシューマが、ある円を押下すると、画面の下側に、その電力需要者のインセンティブの写真302が表示される。
・電力需要者検索画面(図8(b))
 図8(b)の電力需要者検索画面もまた、サービスサイトの遷移画面である。プロシューマ対応処理部22は、プロシューマが検索欄311に検索語を入力するのを受ける。そして、プロシューマ対応処理部22は、入力された検索語に基づいて電力需給情報31(図3)を検索し、該当した電力需要者のアイコン又は写真312a、312b、・・・をインセンティブのカテゴリ(イベント系、食品系、・・・、等)ごとに表示する。図8(b)の“By presents”等は、カテゴリを示すタグである。
・電力需要者検索結果表示画面(図8(c))
 図8(c)の電力需要者検索結果表示画面もまた、サービスサイトの遷移画面である。プロシューマ対応処理部22は、多くの電力需要者のアイコン又は写真321を検索結果として整列して表示する。
・融通可能電力量表示画面(図8(d))
 契約締結後、任意のタイミングで、目標管理部24は、図8(d)の融通可能電力量表示画面を表示する。目標管理部24は、蓄電量欄331にプロシューマの現時点の蓄電量を表示し、車両蓄電量欄332にプロシューマの車両の現時点の蓄電量(車両蓄電量)を表示し、予想消費電力量欄333に翌日の予想消費電力量を表示する。目標管理部24は、以下の式を用いて融通可能電力量を算出し、算出結果を融通可能電力量欄334に表示する。
 融通可能電力量=蓄電量+車両蓄電量-翌日の予想消費電力量-所定の安全マージン
・電力融通画面(図9(a)及び図8(b))
 契約締結後、任意のタイミングで、目標管理部24は、図9(a)の電力融通画面を表示する。目標管理部24は、電力需要者の写真又はアイコン341、電力需要者の現時点での必要電力量342、電力需要者の現時点での蓄電量343、及び、電力需要者の過去又は将来における蓄電量の実績又は予想を示すグラフ345を表示する。スライダ344が押下されると、グラフ345は、左右に移動(横軸の時点が変化)する。
 目標管理部24は、融通決定欄346を表示する。融通決定欄346には、1人1回当たりの融通される電力量“20kWh”が表示され、融通がその通りに行われた場合にプロシューマが受け取るインセンティブの価値“5ポイント”が表示される。融通決定欄346の中央の融通ボタン347が押下されると融通が実行される。なお、スライダ348が押下されると、融通される電力量の値及びインセンティブの価値が増減する。
 図9(a)において、融通決定欄346の“5ポイント”が押下されると、同じ価値を有する実物のインセンティブが“5ポイント”に代替して表示される。図9(b)においては、その実物のインセンティブ(ナイトゲーム招待券)の写真349が表示されている。
・融通中止画面(図9(c))
 前記したように、目標管理部24が周期的にプロシューマに対して蓄電量を問い合わせた後、実際の融通が行われる。プロシューマがこのような問い合わせ及び融通を一時的に中止したい場合、目標管理部24は、図9(c)の融通中止画面を表示する。画面下側の融通中止ボタン350が押下されると、目標管理部24は以降の問い合わせを中止する。
・融通確認画面(図10(a)、図10(b)及び図10(c))
 図10(a)の融通確認画面は、図9(b)と基本的に同じである。いま、プロシューマが融通ボタン347押下すると、次の瞬間、蓄電量343の図案が動的に変化する(図10(b)参照)。さらに次の瞬間、蓄電量343の値が、融通された分“20kWh”だけ増加する。その後、インセンティブを取得したことを示す写真及び案内文351が表示される(図10(c)参照)。
・インセンティブ管理画面(図10(d))
 契約締結後、任意のタイミングで、目標管理部24は、図10(d)のインセンティブ管理画面を表示する。本実施形態における実物のインセンティブの価値に応じて、その地域内で通用する仮想通貨(ポイント)をインセンティブに交換することができる。図10(d)のポイント残高361は、現時点でのプロシューマのポイントの残高である。目標管理部24は、プロシューマの要求があると、交換候補のインセンティブの写真362を表示する。プロシューマが、写真362を選択したうえでポイント交換ボタン363を押下すると、目標管理部24は、ポイント残高361の値を選択されたインセンティブの価値の分だけ減算して再表示する。そして、目標管理部24は、配送用サーバに対して、選択されたインセンティブをプロシューマに配送する旨の指示を送信する。
(本実施形態の効果)
 本実施形態の電力融通管理装置の効果は以下の通りである。
(1)電力融通管理装置は、プロシューマが電力需要者に対して電力量を融通する動機を維持することができる。
(2)電力融通管理装置は、将来の期間において電力を供給できるプロシューマを募集する。したがって、プロシューマが将来に亘って電力量を融通する動機を維持することができる。
(3)電力融通管理装置は、融通機会ごとに、プロシューマに対して目標とする合計融通電力量に達するための、今回の融通電力量を知らせることができる。
(4)電力融通管理装置は、契約の相手方となり得る電力需要者をプロシューマに知らせることができる。
(5)電力融通管理装置は、契約締結時にプロシューマに対して、1回当たりに融通すべき電力量を知らせることができる。
(6)電力融通管理装置は、電力供給量の累積値を表示する。したがって、プロシューマの動機が維持されやすい。
(7)電力融通管理装置は、プロシューマに、電力需要者の複数の候補を表示する。したがって、プロシューマにとって、電力需要者を選択する際の納得感がある。
(8)電力融通管理装置は、電力の融通が実際に行われる前にインセンティブが誤配送されることを回避できる。
(9)電力融通管理装置は、電力を融通するタイミングを電力需要者又はプロシューマに決定させる。したがって、設備保守等の自由度が増す。
 なお、本発明は前記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、前記した実施例は、本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明したすべての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。
 また、前記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によりハードウエアで実現してもよい。また、前記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウエアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD(Solid State Drive)等の記録装置、又は、ICカード、SDカード、DVD等の記録媒体に置くことができる。
 また、制御線や情報線は説明上必要と考えられるものを示しており、製品上必ずしもすべての制御線や情報線を示しているとは限らない。実際には殆どすべての構成が相互に接続されていると考えてもよい。
 1   電力融通管理装置
 2a、2b、2c、2d 端末装置
 3   ネットワーク
 11  中央制御装置
 12  入力装置
 13  出力装置
 14  主記憶装置
 15  補助記憶装置
 16  通信装置
 21  電力需要者対応処理部
 22  プロシューマ対応処理部
 23  プロシューマ送電情報取得部
 24  目標管理部
 31  電力需給情報
 32  契約情報
 33  累積融通電力量情報

Claims (11)

  1.  系統からの電力を蓄電可能な蓄電設備を有し、物の生産又は役務の提供に電力を使用する電力需要者の端末装置から電力の融通を募集する募集情報を受信する電力需要者対応処理部と、
     自家発電設備及び前記系統への逆潮流による送電設備を有し、前記系統への送電が可能であるプロシューマの端末装置に前記募集情報に基づく募集条件を公開し、前記プロシューマの端末装置から、前記募集情報へ応募する応募情報を受け付けるプロシューマ対応処理部と、
     前記プロシューマの送電設備を介して逆潮流で系統へ送電された送電電力量の情報を取得するプロシューマ送電情報取得部と、
     前記募集情報及び前記応募情報に基づいて設定された、前記プロシューマが前記電力需要者へ融通すべき電力量の目標値と、前記取得した送電電力量とを比較し、比較結果に応じて前記プロシューマに贈呈するべきインセンティブを決定する目標管理部と、
     を備えることを特徴とする電力融通管理装置。
  2.  前記募集情報は、
     前記電力の融通を受ける将来の期間、融通を受ける電力量、及び、前記インセンティブの内容を含み、
     前記プロシューマ対応処理部は、
     前記将来の期間、前記融通を受ける電力量、及び、前記インセンティブの内容を公開して前記プロシューマを募集すること、
     を特徴とする請求項1に記載の電力融通管理装置。
  3.  前記目標管理部は、
     前記プロシューマが前記電力需要者へ融通すべき電力量の目標値と、ある時点における累積融通電力量との大小関係に応じて、当該時点において融通すべき電力量を決定すること、
     を特徴とする請求項2に記載の電力融通管理装置。
  4.  前記プロシューマ対応処理部は、
     前記募集情報及び前記応募情報に基づいて、前記プロシューマからの電力量の融通を受けることができる前記電力需要者を決定し、前記決定した電力需要者を、前記プロシューマの端末装置に表示すること、
     を特徴とする請求項3に記載の電力融通管理装置。
  5.  前記プロシューマ対応処理部は、
     前記プロシューマと前記電力需要者との契約が締結された際に、1回の融通機会において融通すべき電力量を前記プロシューマの端末装置に表示すること、
     を特徴とする請求項4に記載の電力融通管理装置。
  6.  前記目標管理部は、
     前記送電電力量の累積値を前記プロシューマの端末装置に表示すること、
     を特徴とする請求項5に記載の電力融通管理装置。
  7.  前記プロシューマ対応処理部は、
     前記プロシューマの端末装置に、前記電力需要者の複数の候補を表示し、
     前記プロシューマが前記複数の候補の何れかを選択するのを受け付けること、
     を特徴とする請求項6に記載の電力融通管理装置。
  8.  前記目標管理部は、
     実際に電力量が送電されたことを確認した後、前記プロシューマに前記インセンティブを贈呈する指示を出力すること、
     を特徴とする請求項7に記載の電力融通管理装置。
  9.  前記電力需要者対応処理部又はプロシューマ対応処理部は、
     前記プロシューマ又は前記電力需要者から、電力を送電するタイミングを受け付けること、
     を特徴とする請求項8に記載の電力融通管理装置。
  10.  電力融通管理装置の電力需要者対応処理部は、
     系統からの電力を蓄電可能な蓄電設備を有し、物の生産又は役務の提供に電力を使用する電力需要者の端末装置から電力の融通を募集する募集情報を受信し、
     前記電力融通管理装置のプロシューマ対応処理部は、
     自家発電設備及び前記系統への逆潮流による送電設備を有し、前記系統への送電が可能であるプロシューマの端末装置に前記募集情報に基づく募集条件を公開し、前記プロシューマの端末装置から、前記募集情報へ応募する応募情報を受け付け、
     前記電力融通管理装置のプロシューマ送電情報取得部は、
     前記プロシューマの送電設備を介して逆潮流で系統へ送電された送電電力量の情報を取得し、
     前記電力融通管理装置の目標管理部は、
     前記募集情報及び前記応募情報に基づいて設定された、前記プロシューマが前記電力需要者へ融通すべき電力量の目標値と、前記取得した送電電力量とを比較し、比較結果に応じて前記プロシューマに贈呈するべきインセンティブを決定すること、
     を特徴とする電力融通管理装置の電力融通管理方法。
  11.  電力融通管理装置の電力需要者対応処理部に、
     系統からの電力を蓄電可能な蓄電設備を有し、物の生産又は役務の提供に電力を使用する電力需要者の端末装置から電力の融通を募集する募集情報を受信する処理を実行させ、
     前記電力融通管理装置のプロシューマ対応処理部に、
     自家発電設備及び前記系統への逆潮流による送電設備を有し、前記系統への送電が可能であるプロシューマの端末装置に前記募集情報に基づく募集条件を公開し、前記プロシューマの端末装置から、前記募集情報へ応募する応募情報を受け付ける処理を実行させ、
     前記電力融通管理装置のプロシューマ送電情報取得部に対し、
     前記プロシューマの送電設備を介して逆潮流で系統へ送電された送電電力量の情報を取得する処理を実行させ、
     前記電力融通管理装置の目標管理部に、
     前記募集情報及び前記応募情報に基づいて設定された、前記プロシューマが前記電力需要者へ融通すべき電力量の目標値と、前記取得した送電電力量とを比較し、比較結果に応じて前記プロシューマに贈呈するべきインセンティブを決定する処理を実行させること、
     を特徴とする電力融通管理装置を機能させるための電力融通管理プログラム。
PCT/JP2016/081772 2016-10-26 2016-10-26 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム WO2018078750A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2016/081772 WO2018078750A1 (ja) 2016-10-26 2016-10-26 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム
JP2018546994A JP6792629B2 (ja) 2016-10-26 2016-10-26 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム
US16/335,279 US20190279313A1 (en) 2016-10-26 2016-10-26 Power exchange management device, power exchange management method, and power exchange management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/081772 WO2018078750A1 (ja) 2016-10-26 2016-10-26 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム

Publications (1)

Publication Number Publication Date
WO2018078750A1 true WO2018078750A1 (ja) 2018-05-03

Family

ID=62024450

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/081772 WO2018078750A1 (ja) 2016-10-26 2016-10-26 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム

Country Status (3)

Country Link
US (1) US20190279313A1 (ja)
JP (1) JP6792629B2 (ja)
WO (1) WO2018078750A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020022182A1 (ja) * 2018-07-26 2020-01-30 ソニー株式会社 電力制御装置及び電力制御方法
JP2020108301A (ja) * 2018-12-28 2020-07-09 株式会社WaaS製作所 仮想電力システム、プログラム、管理サーバ及び情報端末
JP2021026725A (ja) * 2019-08-08 2021-02-22 東京瓦斯株式会社 処理装置、システム、プログラム
JP2021047598A (ja) * 2019-09-18 2021-03-25 三菱電機株式会社 エネルギー管理システム、統括管理装置およびエネルギー管理方法
CN114781351A (zh) * 2022-04-07 2022-07-22 国网江苏省电力有限公司泰州供电分公司 基于电力数据的投标文件解析方法、装置、设备和介质

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017205968A1 (de) * 2017-04-07 2018-10-11 Bayerische Motoren Werke Aktiengesellschaft Verfahren zum Koordinieren eines Leistungsaustauschs zwischen einer Vielzahl von technischen Kleineinheiten und einem elektrischen Übertragungsnetz
US11394573B2 (en) * 2017-06-13 2022-07-19 SynCells, Inc. Energy virtualization layer with a universal smart gateway
EP4050547A4 (en) * 2019-10-25 2023-11-15 Kyocera Corporation TENDER ASSISTANCE SYSTEM AND TENDER ASSISTANCE PROCESS
US11783390B2 (en) 2019-11-01 2023-10-10 Seth Michael Barna Model for balancing energy in a prosumer energy system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007158590A (ja) * 2005-12-02 2007-06-21 Sharp Corp 電力供給システム、端末装置、電力供給方法および決済端末
JP2011150670A (ja) * 2010-01-21 2011-08-04 Hironori Matsui 電力供給システム。
WO2011122374A1 (ja) * 2010-03-30 2011-10-06 三洋電機株式会社 系統安定化システム、電力需給調整装置、電力需給調整装置のための制御装置、電力需給調整方法および蓄電池を用いた電力需給調整方法
WO2012020756A1 (ja) * 2010-08-09 2012-02-16 三洋電機株式会社 電力制御装置
JP2014068414A (ja) * 2012-09-24 2014-04-17 Yahoo Japan Corp 充電システム、充電量管理装置、充電方法及びプログラム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6047274A (en) * 1997-02-24 2000-04-04 Geophonic Networks, Inc. Bidding for energy supply
US6598029B1 (en) * 1997-02-24 2003-07-22 Geophonic Networks, Inc. Bidding for energy supply with request for service
US6732019B2 (en) * 2001-05-10 2004-05-04 Siemens Westinghouse Power Corporation Business management system and method for a deregulated electric power market using online diagnostic services
US10069454B2 (en) * 2010-10-28 2018-09-04 Solar Chief, Llc System and method for managing distributed renewable energy systems and service providers

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007158590A (ja) * 2005-12-02 2007-06-21 Sharp Corp 電力供給システム、端末装置、電力供給方法および決済端末
JP2011150670A (ja) * 2010-01-21 2011-08-04 Hironori Matsui 電力供給システム。
WO2011122374A1 (ja) * 2010-03-30 2011-10-06 三洋電機株式会社 系統安定化システム、電力需給調整装置、電力需給調整装置のための制御装置、電力需給調整方法および蓄電池を用いた電力需給調整方法
WO2012020756A1 (ja) * 2010-08-09 2012-02-16 三洋電機株式会社 電力制御装置
JP2014068414A (ja) * 2012-09-24 2014-04-17 Yahoo Japan Corp 充電システム、充電量管理装置、充電方法及びプログラム

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020022182A1 (ja) * 2018-07-26 2020-01-30 ソニー株式会社 電力制御装置及び電力制御方法
JPWO2020022182A1 (ja) * 2018-07-26 2021-08-05 ソニーグループ株式会社 電力制御装置及び電力制御方法
JP7380563B2 (ja) 2018-07-26 2023-11-15 ソニーグループ株式会社 電力制御装置及び電力制御方法
JP2020108301A (ja) * 2018-12-28 2020-07-09 株式会社WaaS製作所 仮想電力システム、プログラム、管理サーバ及び情報端末
JP2021026725A (ja) * 2019-08-08 2021-02-22 東京瓦斯株式会社 処理装置、システム、プログラム
JP2021047598A (ja) * 2019-09-18 2021-03-25 三菱電機株式会社 エネルギー管理システム、統括管理装置およびエネルギー管理方法
JP7403264B2 (ja) 2019-09-18 2023-12-22 三菱電機株式会社 エネルギー管理システム、統括管理装置およびエネルギー管理方法
CN114781351A (zh) * 2022-04-07 2022-07-22 国网江苏省电力有限公司泰州供电分公司 基于电力数据的投标文件解析方法、装置、设备和介质
CN114781351B (zh) * 2022-04-07 2023-08-18 国网江苏省电力有限公司泰州供电分公司 基于电力数据的投标文件解析方法、装置、设备和介质

Also Published As

Publication number Publication date
US20190279313A1 (en) 2019-09-12
JP6792629B2 (ja) 2020-11-25
JPWO2018078750A1 (ja) 2019-06-27

Similar Documents

Publication Publication Date Title
WO2018078750A1 (ja) 電力融通管理装置、電力融通管理方法及び電力融通管理プログラム
US11756137B2 (en) Systems and methods for advanced energy settlements, network-based messaging, and software applications for electric power grids, microgrids, grid elements, and/or electric power networks
US11714465B2 (en) Systems and methods for aggregation and integration of distributed grid elements inputs for providing an interactive electric power grid geographic visualization
Degraeve et al. Total cost of ownership purchasing of a service: The case of airline selection at Alcatel Bell
CN102682342A (zh) 用于表示旅行服务费率的方法和系统
US20020019802A1 (en) System and methods for aggregation and liquidation of curtailment energy resources
US20170221086A1 (en) Framework for generating coupons
JP2015158750A (ja) 電源運用計画策定装置、方法及びプログラム
US20020019740A1 (en) Electric power marketing method and electric power marketing system
Mousavi et al. Hotel pricing decision in a competitive market under government intervention: A game theory approach
JP2002099770A (ja) エネルギの需給マッチング装置、システムおよび方法
Zhuo et al. A new model of manufacturer’s optimal product supply strategy in the context of precision marketing: based on real demand pattern
Harewood Coordinating the tourism supply chain using bid prices
JP2003067457A (ja) 電力販売システム及びその処理プログラム
Rubio et al. CERTS customer adoption model
CN105761121A (zh) 一种积分兑换广告系统
CN101111856A (zh) 用于表示旅行服务费率的方法和系统
KR20170106133A (ko) 온실가스 배출과 상쇄 정보공유 지도 서비스 시스템 및 그 방법
WO2023171144A1 (ja) 電力管理方法、情報処理装置、及びプログラム
WO2023112408A1 (ja) 情報処理システム、情報処理方法、及びプログラム
Bayasgalan et al. Applications of Smart Customer Model for Smart grid
Belenky et al. Estimating the Needed Volume of Investment in Developing a Chain of Charging Stations for Electric Vehicles along a Highway
Maatman Assessment of smart grid implementations at business parks in the Netherlands
JP4990514B2 (ja) 電力料金試算装置及びプログラム
Gardiner et al. Capacity and revenue management

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16919907

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018546994

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16919907

Country of ref document: EP

Kind code of ref document: A1