WO2018026165A1 - Procédé de rapport de marge de puissance et équipement utilisateur correspondant - Google Patents
Procédé de rapport de marge de puissance et équipement utilisateur correspondant Download PDFInfo
- Publication number
- WO2018026165A1 WO2018026165A1 PCT/KR2017/008281 KR2017008281W WO2018026165A1 WO 2018026165 A1 WO2018026165 A1 WO 2018026165A1 KR 2017008281 W KR2017008281 W KR 2017008281W WO 2018026165 A1 WO2018026165 A1 WO 2018026165A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- subframe
- uplink
- phr
- scheduling
- carrier
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/14—Separate analysis of uplink or downlink
- H04W52/146—Uplink power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/365—Power headroom reporting
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0048—Allocation of pilot signals, i.e. of signals known to the receiver
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/367—Power values between minimum and maximum limits, e.g. dynamic range
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0473—Wireless resource allocation based on the type of the allocated resource the resource being transmission power
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
Definitions
- the present application relates to the technical field of mobile communications, and in particular to a method for reporting power headroom and a corresponding user equipment.
- the 5G or pre-5G communication system is also called a 'Beyond 4G Network' or a 'Post LTE System'.
- the 5G communication system is considered to be implemented in higher frequency (mmWave) bands, e.g., 60GHz bands, so as to accomplish higher data rates.
- mmWave e.g., 60GHz bands
- MIMO massive multiple-input multiple-output
- FD-MIMO Full Dimensional MIMO
- array antenna an analog beam forming, large scale antenna techniques are discussed in 5G communication systems.
- RANs Cloud Radio Access Networks
- D2D device-to-device
- CoMP Coordinated Multi-Points
- FQAM Hybrid FSK and QAM Modulation
- SWSC sliding window superposition coding
- ACM advanced coding modulation
- FBMC filter bank multi carrier
- NOMA non-orthogonal multiple access
- SCMA sparse code multiple access
- the Internet which is a human centered connectivity network where humans generate and consume information
- IoT Internet of Things
- IoE Internet of Everything
- sensing technology “wired/wireless communication and network infrastructure”, “service interface technology”, and “Security technology”
- M2M Machine-to-Machine
- MTC Machine Type Communication
- IoT Internet technology services
- IoT may be applied to a variety of fields including smart home, smart building, smart city, smart car or connected cars, smart grid, health care, smart appliances and advanced medical services through convergence and combination between existing Information Technology (IT) and various industrial applications.
- IT Information Technology
- 5G communication systems to IoT networks.
- technologies such as a sensor network, Machine Type Communication (MTC), and Machine-to-Machine (M2M) communication may be implemented by beamforming, MIMO, and array antennas.
- MTC Machine Type Communication
- M2M Machine-to-Machine
- Application of a cloud Radio Access Network (RAN) as the above-described Big Data processing technology may also be considered to be as an example of convergence between the 5G technology and the IoT technology.
- RAN Radio Access Network
- LAA Licensed Assisted Access
- An embodiment of the present invention provides a power allocation method, comprising the following steps of:
- a user equipment receiving uplink scheduling information, and determining a corresponding uplink transmit power on each uplink carrier according to the uplink scheduling information
- the first reference subframe being a subframe which is determined according to the uplink scheduling information to transmit an uplink channel/signal.
- An embodiment of the present invention provides a method for reporting power headroom, comprising the following steps of:
- PHR Power Headroom Report
- the second reference subframe is not prior to a subframe satisfying PHR trigger conditions, and the second reference subframe is before the first reference subframe; and, a time interval between the second reference subframe and the first reference subframe is not less than a minimum processing time required by the UE to generate the PHR.
- the second reference subframe is a subframe at a point in time when a Media Access Control (MAC) layer starts generating a PHR MAC control element; and/or, the second reference subframe is a subframe at a point in time when an MAC layer starts generating an MAC Protocol Data Unit (MAC PDU) packet containing a PHR MAC control element.
- MAC Media Access Control
- MAC PDU MAC Protocol Data Unit
- the first reference subframe probably used to transmit PHR is a subframe which is determined by a fixed offset with respect to the time of receiving a first scheduling signaling.
- the first reference subframe probably used to transmit PHR is a subframe transmitting the PHR.
- the step of determining PHR contents of each uplink carrier to be reported in the first reference subframe comprises:
- the PHR type of each corresponding uplink carrier comprising a real PHR or a virtual PHR
- the step of determining a PHR value according to the PHR contents comprises:
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following ways:
- the PHR type of the uplink carrier is a real PHR, if in the second reference subframe, it has been already determined that an uplink channel/signal on this uplink carrier is to be transmitted in the first reference subframe; for an uplink carrier, the PHR type of the uplink carrier is a virtual PHR, if in the second reference subframe, it has not been determined yet that an uplink channel/signal on this uplink carrier is to be transmitted in the first reference subframe; and
- the PHR type of the uplink carrier is a virtual PHR, if in the second reference subframe, it has already been determined that an uplink channel/signal on this uplink carrier is not to be transmitted in the first reference subframe.
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following:
- the PHR type of the uplink carrier is a real PHR, if in the second reference subframe, it has already been determined that the uplink scheduling corresponding to the first reference subframe is one-step scheduling and the scheduling information indicates the uplink transmission in the first reference subframe; or otherwise, the PHR type of the uplink carrier is a virtual PHR.
- the step of determining the PHR type of each corresponding uplink carrier further comprises:
- the PHR type of the uplink carrier is a virtual PHR, if the first scheduling signaling has been received in or before the second reference subframe, but the second scheduling signaling has not been received.
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following:
- the PHR type of the uplink carrier is a real PHR, if in the second reference subframe, it has already been determined that an uplink channel/signal on this uplink carrier is to be transmitted in the first reference subframe;
- the PHR type of the uplink carrier is a virtual PHR, if in the second reference subframe, it has already been determined that an uplink channel/signal on this uplink carrier is not to be transmitted in the first reference subframe;
- the PHR type of the uplink carrier is a real PHR, if in the second reference subframe, it has already been determined that an uplink channel/signal on this uplink carrier is to be transmitted in the first reference subframe or for an uplink channel/signal is possibly to be transmitted in the first reference subframe.
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following situations:
- the PHR type of the uplink carrier is a virtual PHR, if in or before the second reference subframe, uplink scheduling information which schedules the uplink transmission to be transmitted on the uplink carrier in the first reference subframe is not received or the received uplink scheduling information indicates the uplink transmission in a subframe other than the first reference subframe; and, if the uplink scheduling information has been received in or before the second reference subframe, and the uplink scheduling information which schedules the uplink transmission to be transmitted on the uplink carrier in the first reference subframe, the PHR type of the uplink carrier is a real PHR; and
- the PHR type of the uplink carrier is a virtual PHR, if in or before the second reference subframe, a second scheduling signaling has been received, and the subframe to transmit the uplink transmission on the uplink carrier triggered by the second scheduling signaling is not the first reference subframe,; and, if a second scheduling signaling has been received in or before the second reference subframe, and the subframe to transmit the uplink transmission on the uplink carrier triggered by the second scheduling signaling is the first reference subframe, the PHR type of the uplink carrier is a real PHR.
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following situations:
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a real PHR
- the PHR type of the uplink carrier is a virtual PHR.
- the step of determining the PHR type of each corresponding uplink carrier comprises at least one of the following situations:
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a virtual PHR
- the PHR type of the uplink carrier is a real PHR.
- the step of determining the PHR type of each corresponding uplink carrier comprises:
- both a signaling for two-step scheduling and a signaling for one-step scheduling has been received in or before the second reference subframe, and if the signaling for one-step scheduling schedules the uplink transmission of a first subframe, calculating a real PHR according to the one-step scheduling signaling; if the signaling for one-step scheduling does not schedule the uplink transmission of the first uplink subframe but the UE has received a first scheduling signaling for two-step scheduling, and the first reference subframe is within a valid time window of the first scheduling signaling, calculating, by the UE, a real PHR according to the first scheduling signaling; and/or,
- the PHR type of the corresponding uplink carrier is a real PHR. Furthermore, the UE selects, according to a predefined rule, one of the first scheduling signalings and then determine the PHR type is a real PHR,
- the step of calculating a PHR value according to the determined PHR type and/or a predefined time unit comprises:
- the PHR of other uplink carriers with relatively shorter TTI length is calculated based on the first shorter TTI within the first reference subframe.
- TTI Transmission Time Interval
- the step of calculating a PHR value according to the determined PHR type and/or a predefined time unit comprises at least one of the following situations:
- the PHR of other uplink carriers with relatively shorter TTI is calculated based on the first scheduled shorter TTI within the first reference subframe;
- UE user equipment
- a powder determination module configured to receive uplink scheduling information, and determine a corresponding uplink transmit power on each uplink carrier according to the uplink scheduling information
- an adjustment module configured to, according to an actual maximum uplink transmit power of a first reference subframe of the UE and a predefined first priority, adjust the determined uplink transmit power of each uplink carrier, and/or determine whether to transmit an uplink signal, the first reference subframe being a subframe which is determined according to the uplink scheduling information to transmit an uplink channel/signal.
- Still another embodiment of the present invention provides a user equipment (UE) for reporting power headroom, comprising:
- a selection module configured to, when conditions for reporting a Power Headroom Report (PHR) are satisfied, select, from at least one uplink carrier, one uplink carrier for reporting the PHR, and determine or assume an uplink subframe to transmit the PHR, the uplink subframe being a first reference subframe;
- PHR Power Headroom Report
- a PHR value determination module configured to, according to uplink scheduling information received in or before a second reference subframe, determine PHR contents of each uplink carrier to be reported on the first reference subframe, and determine a corresponding PHR value according to the PHR contents; or, determine the PHR contents of the uplink carrier, according to whether the carrier is a carrier adopting two-step scheduling;
- a report module configured to generate a PHR of each uplink carrier according to the determined PHR value of each uplink carrier, and report the generated PHR of each uplink carrier on the selected uplink carrier and in the selected first reference subframe.
- a power allocation method in view of adopting subframes with different lengths on more than one carrier of a UE in a communication system, a power allocation method is provided, in which the UE determines a corresponding uplink transmit power on each uplink carrier according to the uplink scheduling information, and adjusts, according to the predicted maximum uplink transmit power of the user equipment and a predefined first priority, the transmit power of each uplink carrier and/or determines whether to transmit an uplink signal or drop an uplink signal.
- the effective allocation of uplink power of the UE is realized under limited uplink processing time, and the uplink scheduling efficiency of the UE is improved. As a result, the overall network efficiency is improved.
- a UE selects, from at least one uplink carrier, one uplink carrier for reporting a PHR, and determines an uplink subframe to transmit the PHR, the uplink subframe being a first reference subframe; according to uplink scheduling information received in or before a second reference subframe or according to whether the carrier is scheduled by two-step scheduling, PHR contents of the uplink carrier are determined, and PHR contents of each uplink carrier to be reported in the first reference subframe are determined; and, a PHR of each uplink carrier is generated according to the PHR contents, and the generated PHR of each uplink carrier is reported on the selected uplink carrier and in the determined first reference subframe.
- a method for reporting a PHR is provided. It is ensured that the UE can perform efficient power headroom calculation under limited uplink processing time, so that the accuracy of reporting the PHR is improved. As a result, the uplink scheduling efficiency of the UE is improved.
- adjusting transmit power for different carriers with different TTI lengths can be efficiently performed in a 5G system.
- Fig. 1 is a schematic diagram of a combined arrangement scenario of licensed frequency bands and unlicensed frequency bands in the prior art
- Fig. 2 is a flowchart of a power allocation method according to Embodiment 1 of the present application;
- Fig. 3 is a first schematic diagram of a power adjustment method according to Embodiment 1 of the present application.
- Fig. 4 is a second schematic diagram of the power adjustment method according to Embodiment 1 of the present application.
- Fig. 5 is a third schematic diagram of the power adjustment method according to Embodiment 1 of the present application.
- Fig. 6 is a fourth schematic diagram of the power adjustment method according to Embodiment 1 of the present application.
- Fig. 7 is a fifth schematic diagram of the power adjustment method according to Embodiment 1 of the present application.
- Fig. 8 is a flowchart of a method for reporting power headroom according to Embodiment 2 of the present application.
- Fig. 9 is a first schematic diagram of a PHR calculation method according to Embodiment 2 of the present application.
- Fig. 10 is a second schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 11 is a third schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 12 is a fourth schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 13 is a fifth schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 14 is a sixth schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 15 is a seventh schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 16 is an eighth schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 17 is a first schematic diagram of a PHR calculation method according to Embodiment 3 of the present application.
- Fig. 18 is a second schematic diagram of the PHR calculation method according to Embodiment 3 of the present application.
- Fig. 19 is a third schematic diagram of the PHR calculation method according to Embodiment 3 of the present application.
- Fig. 20 is a fourth schematic diagram of the PHR calculation method according to Embodiment 3 of the present application.
- Fig. 21 is a ninth schematic diagram of the PHR calculation method according to Embodiment 2 of the present application.
- Fig. 22 is a structural diagram of a user equipment for power allocation according to Embodiment 4 of the present application.
- Fig. 23 is a structural diagram of a user equipment for reporting power headroom according to Embodiment 5 of the present application.
- Fig. 1 is a schematic diagram of a combined arrangement scenario of licensed frequency bands and unlicensed frequency bands.
- An unlicensed frequency band is generally allocated for some other purposes, for example, radar or Wireless Fidelity (WiFi) of 802.11 series.
- the interference level on the unlicensed frequency band is uncertain, and consequently, it is generally difficult to ensure the Quality of Service (QoS) of the LTE transmission.
- QoS Quality of Service
- the unlicensed frequency band can still be used for data transmission that requires a low QoS.
- an LTE system deployed on the unlicensed frequency band is called a Licensed-Assisted Access (LAA) system. How to avoid the mutual interference between the LAA system and a radar, WiFi or other wireless systems on the unlicensed frequency band is a critical issue.
- a Carrier Sensing (CS) is a collision avoidance mechanism universally adapted on the unlicensed frequency band.
- a mobile station has to detect a wireless channel before transmitting signals, and can occupy the wireless channel to transmit signals only when detecting that the wireless channel is idle. This mechanism is called Listen Before Talk (LBT).
- LBT Listen Before Talk
- the LAA system also needs to follow the LBT mechanism to ensure less interference to other signals.
- the uplink transmission of a User Equipment (UE) is still scheduled by a base station.
- the base station and the UE are located at different geographical locations and suffer different interferences, the base station cannot predict whether the UE can perform transmission in a scheduled subframe when the base station schedules the UE.
- the base station can adopt two-step scheduling, so as to trigger the UE to transmit an uplink when it is more advantageous for the UE to occupy a channel.
- the base station can transmit a first scheduling signaling at moment t 0 in order to indicate resource information for the uplink transmission of the UE, for example, Physical Resource Blocks (PRBs), a Modulation and Coding Scheme (MCS) and the like.
- PRBs Physical Resource Blocks
- MCS Modulation and Coding Scheme
- the UE can start preparing a corresponding uplink signal/channel, but the UE does not execute the uplink transmission.
- the base station can transmit a second scheduling signaling at moment t 1 in order to trigger the UE to perform the uplink transmission on the indicated or predefined subframe (at moment t 2 ), and the transmitted uplink signal/channel is the uplink signal/channel prepared by the UE upon receiving the first scheduling signaling.
- the time span from the moment t1 of receiving the second scheduling signaling to the moment t 2 of eventually transmitting the uplink signal needs to satisfy a minimum time delay ⁇ t' which can be less than ⁇ t.
- ⁇ t' is 1 ms or 2 ms.
- the maximum uplink transmit power is related to the number of simultaneously transmitted uplink carriers. It is not hard to see, when the base station adopts the two-step scheduling, the time of receiving the first/second scheduling signaling by different uplink carriers may be different, but the time for the UE to eventually transmit uplink signals on these uplink carriers is the same.
- the UE can determine, in a subframe satisfying the minimum time delay, for example, in a subframe n-4 , whether a corresponding uplink signal is transmitted on different uplink carriers in an uplink subframe n , so that the maximum transmit power of the subframe n can be determined on the subframe n-4 , and the power allocation and adjustment can be performed on each uplink carrier which is to transmit the uplink signal in the subframe n .
- the UE can determine how many uplink carriers to be simultaneously transmitted in the uplink subframe n only when receiving the second scheduling signaling, so that the maximum transmit power of the uplink subframe n is determined.
- the UE is unable to adjust the power of each carrier in time according to the second scheduling signaling.
- shorter subframes are designed. For example, instead of the 1 ms subframe duration in the conventional LTE, a time length of half a millisecond or less is used as a scheduling unit (TTI).
- TTI scheduling unit
- the shorter the TTI length is the shorter the minimum time delay from the uplink scheduling to the uplink transmission is.
- the time delay under a TTI of 0.5 ms is half of 1 ms. Then, within a same time window, it is likely to transmit signals with different TTI lengths on each uplink carrier, and the time delay from the uplink scheduling for scheduling these signal to the uplink transmission is also different.
- a scheduling signaling from a subframe n schedules the uplink transmission in a subframe n+4 , and the TTI length is 1 ms; while on an uplink carrier CC2, a scheduling signaling from a subframe n+2 schedules the uplink transmission on the subframe n+4 , and the TTI length is 0.5 ms.
- the UE is unable to adjust the power of uplink carriers on CC1 in time according to the scheduling signaling on the uplink carrier CC2.
- one carrier is an LTE carrier having a subcarrier spacing of 15 KHz and a TTI length of 1 ms
- another carrier is a 5G carrier having a subcarrier spacing of 30 KHz and a TTI length of 0.5 ms.
- the UE in order to provide a reference for the base station in scheduling uplink resources, the UE reports the remaining power headroom in a specified scheduling situation by using a Power Headroom Report (PHR).
- PHR Power Headroom Report
- the UE needs to report PHRs that is, when the trigger conditions for reporting the PHRs are satisfied, the UE needs to report PHRs of all activated uplink carriers.
- the UE needs to determine in which uplink subframe the PHRs (including PHRs of all activated uplink carriers) are to be transmitted.
- the UE can transmit the PHRs on this uplink subframe n .
- the UE needs to calculate, according to the uplink transmission situations of all activated carriers in the uplink subframe n , a PHR of each carrier and then generate a PHR report.
- a specific method for calculating a PHR in the existing LTE system can be obtained by referring to the formulae and descriptions thereof in 5.1.1.2 in TS 36.213.
- the UE Since the generation of the PHR report takes certain processing time, UE needs to calculate, before the uplink subframe n , for example, starting from the subframe n-4 in which a uplink scheduling signaling for scheduling the uplink subframe n has been received, the transmit power of the uplink subframe n according to the uplink scheduling signaling, and then determine the PHR type according to whether the uplink scheduling signaling is received. For example, if the UE has not received a signaling for scheduling the UE to transmit an uplink in a subframe n on a carrier C i , the PHR of the carrier C i is a virtual PHR; or otherwise, the PHR of the carrier C i is a real PHR.
- the UE generates a PHR report after determining the PHR type and calculating the PHR value. If the base station schedules the two-step scheduling for an uplink carrier, it is possible that the carrier determined by the UE to transmit the PHR report is scheduled by the one-step scheduling in the conventional LTE, for example, the carrier is a licensed carrier, but carriers contained in the PHR report are scheduled by the two-step scheduling. It is also possible that the carrier determined by the UE to transmit the PHR report is scheduled by the two-step scheduling, but the time of receiving a two-step scheduling signaling by each carrier contained in the PHR report is different, or the minimum time delay from uplink scheduling to uplink transmission is different for a multiple of carriers contained in the PHR report. Therefore, it is urgent to provide a novel PHR calculation and report method.
- a specific way of determining an actual transmit power of each uplink transmitting carrier to transmit an uplink signal is as follows.
- a UE adjusts the transmit power of each uplink transmitting carrier according to the received uplink scheduling information and/or the predicted maximum uplink transmit power of the user equipment (UE), and adjusts the power on the corresponding uplink carrier and/or determines whether to drop transmitting an uplink signal according to the maximum uplink transmit power during the actual transmission and a predefined priority criterion.
- Fig. 2 shows a specific flow of the power allocation method provided in this embodiment. The method comprises the following steps.
- Step 201 A UE receives uplink scheduling information, then determines a corresponding uplink transmit power on each uplink carrier according to the uplink scheduling information, and prepares uplink transmission data, where a first reference subframe is a subframe which is determined according to the uplink scheduling information to transmit an uplink channel/signal.
- the UE can operate in a one-step scheduling mode, i.e., in an existing LTE scheduling mode.
- a base station transmits an uplink scheduling signaling in a subframe t 0 to indicate the UE to transmit an uplink channel/signal in a subframe t 2 .
- the frequency-domain resource allocation, the modulation and coding scheme, the power control method and the like of the transmitted uplink channel/signal are all indicated by the uplink scheduling signaling, and the uplink transmission time is also indicated by the uplink scheduling signaling.
- a time interval between a subframe in which the uplink scheduling signaling is received and a subframe for transmitting an uplink channel/signal scheduled by the uplink scheduling signaling is predefined by the system, or is dynamically indicated by the uplink scheduling signaling.
- the time interval between the uplink scheduling signaling and the transmission of the uplink channel/signal is not less than a minimum processing time delay ⁇ t.
- the UE can also operate in a two-step scheduling mode.
- a base station transmits a first scheduling signaling in a subframe t 0 to indicate the resource allocation, modulation and coding information of the uplink channel/signal to be transmitted by the UE, and/or power control information, and/or information about the transmission time.
- the base station can semi-statically configure the scheduling as one-step scheduling or two-step scheduling.
- the base station can also dynamically configure the scheduling as one-step scheduling or two-step scheduling, for example, by using a predefined bit in the UL grant or a predefined RNTI in the UL grant.
- the information about the transmission time does not shows the time of indicating the UE to transmit the uplink channel/signal.
- the UE cannot determine the transmission time of the scheduled uplink channel/signal merely depending upon the time information.
- the time information can only comprise a time offset of the transmission time of the scheduled uplink channel/signal with respect to the second scheduling signaling.
- the second scheduling signaling can be a cell-specific trigger signaling, or a UE-group trigger signaling, or a UE-specific trigger signaling. This is not limited in the present invention.
- the second scheduling signaling triggers the UE to transmit the uplink channel/signal scheduled by the first scheduling signaling in a subframe t 2 .
- the second scheduling signaling can contain only a trigger signaling , but also information indicative of the transmission time, and/or contain power control information and the like. It is assumed that a minimum time interval from the second scheduling signaling to the transmission of the uplink channel/signal by the UE is ⁇ t'. Generally, ⁇ t' ⁇ t.
- the minimum processing time delay ⁇ t' between the uplink scheduling signaling of the second scheduling signaling for two-step scheduling and the transmission of the uplink channel/signal is generally less than the minimum processing time delay ⁇ t between the scheduling signaling for one-step scheduling and the transmission of the uplink channel/signal.
- the minimum processing time delay from the receipt of a scheduling signaling to the transmission of the scheduled uplink channel/signal by the UE may be different.
- the minimum processing time delay ⁇ t' between the second scheduling signaling for two-step scheduling and the transmission of the uplink channel/signal is generally less than the minimum processing time delay ⁇ t between the scheduling signaling for one-step scheduling and the transmission of the uplink channel/signal.
- a multiple of carriers for the UE may adopt scheduling unit TTIs (Transmission Time Intervals) with different lengths.
- TTIs Transmission Time Intervals
- one carrier has a conventional TTI length of 1 ms
- another carrier for example, can support a TTI length of 0.25 ms in order to support the low-latency transmission.
- a different TTI length may be achieved by a different subcarrier spacing.
- a TTI length corresponding to a subcarrier spacing of 15 KHz is 0.5 ms and a TTI length corresponding to a subcarrier spacing of 60 KHz is 0.125 ms.
- a different TTI length may also be achieved by a same subcarrier spacing and a different number of OFDM symbols.
- the TTI length of a carrier is a time slot having seven OFDM symbols and the TTI length of another carrier is a mini time slot having two OFDM symbols.
- the minimum processing time delay of the UE on a carrier having a short TTI length is less than the minimum processing time delay on the conventional LTE carrier.
- the minimum processing time delay on a carrier with 1 ms TTI is X ms
- the minimum processing time delay on a carrier with 0.25 ms TTI is about X/4 ms.
- a specific way of configuring the TTI length can be: semi-statically configuring some subframes on a certain carrier at TTIs of a length and other subframes at TTIs of another length, or configuring the TTI length of a subframe in real time by a dynamic signaling, or in other ways.
- the way of configuring the TTI length is not limited in the present invention.
- the UE receives uplink scheduling information from a control node.
- the uplink scheduling information is uplink scheduling information in the one-step scheduling, or a first scheduling signaling in the two-step scheduling.
- the UE can prepare an uplink transmit power according to the uplink scheduling information by at least one of the following ways.
- the UE determines, according to the received uplink scheduling signaling and on a corresponding uplink carrier, a UE transmit power expected by the base station, compares the UE transmit power with a maximum transmit power Pcmax,c of the uplink carrier, and uses the smaller one as the transmit power of the UE.
- the UE transmit power expected by the base station is calculated according to the PUSCH transmit power formula in TS 36.213.5.1:
- Way 1 is more suitable for the UE. Since the UE cannot determine when to transmit the scheduled uplink channel/signal upon receiving the first scheduling signaling and thus cannot determine the maximum transmit power Pcmax of the UE in transmitting the uplink channel/signal, at this stage, the UE cannot further adjust the transmit power on each carrier according to the Pcmax so that the power of the simultaneously transmitted carriers does not exceed the Pcmax.
- Step 1 The UE determines, according to the received first scheduling information and on a corresponding uplink carrier, a UE transmit power expected by the base station, compares the UE transmit power with the Pcmax,c of the uplink carriers, and uses the smaller one as the transmit power of the UE.
- Step 2 The UE determines whether the sum of the transmit power on all uplink carriers scheduled for transmission exceeds the maximum transmit power Pcmax' predicted by the UE; and, if exceed, the power of a corresponding uplink carrier is adjusted according to a predefined second priority, so that the sum of power on all uplink carriers does not exceed the Pcmax'.
- the two steps are not necessarily performed temporally in two steps, and can be simultaneously performed temporally.
- step 1 of Way 2 is Way 1, where for each uplink carrier, the power on each uplink carrier is determined separately according to the Pcmax,c of each uplink carrier and the uplink scheduling information from the base station; while in step 2 of Way 2, the power of each uplink carrier is further adjusted according to the total maximum transmit power Pcmax' assumed by the UE.
- the second priority can be in accordance with the prior art.
- the priority of a carrier containing uplink control information is higher than that of a carrier containing no uplink control information.
- the second priority can also be a newly defined priority.
- the priority of a licensed carrier is higher than that of an unlicensed carrier; or, the priority of a carrier to be absolutely transmitted is higher than that of a carrier to be possibly transmitted; and the like.
- Way 2 is more suitable for a UE adopting the one-step scheduling, particularly a UE that performs both bit preparation and power preparation of the uplink signal/channel.
- the UE can determine the transmission time of the scheduled uplink channel/signal upon receiving the uplink scheduling signaling. Therefore, the UE can at least predict the Pcmax' of a subframe t 2 (called the first reference subframe) for transmitting the scheduled uplink channel/signal in accordance with a predefined method, and further adjust the power of each uplink carrier on the basis of the Pcmax'. It is assumed that the UE starts to prepare a subframe t of the scheduled uplink channel/signal as a second reference subframe after receiving the uplink scheduling signaling.
- the time difference between the second reference subframe and the first reference subframe is equal to the minimum processing time delay for processing the PUSCH on this carrier.
- the minimum processing time delay ⁇ t or ⁇ t' on each carrier may be different, after the second reference subframe, the base station may still schedule other uplink carriers to perform transmission on the subframe t 2 , for example, schedule a TTI with a smaller minimum processing time delay, so that the Pcmax for the subframe t 2 is different from the Pcmax' predicted by the UE.
- Way 2 still cannot completely overcome the UE power waste or the loss of UE uplink transmission resulted from the difference between the actual Pcmax and the predicted Pcmax'. However, compared with Way 1, Way 2 can reduce the UE power waste or the possibility of giving up transmitting the uplink signal to a certain extent.
- the UE can predict the total transmit power Pcmax' of the UE in the first reference subframe by one of the following methods, and then perform the power adjustment on the corresponding carrier based on the total transmit power Pcmax'.
- the second reference subframe is a subframe next to a subframe in which the uplink scheduling signaling is received. For example, if the UE receives the uplink scheduling signaling in a subframe t 0 , the UE starts preparing, in a subframe t 0+1 , the uplink channel/signal scheduled by the uplink scheduling signaling.
- the second reference subframe is not earlier than the subframe receiving the uplink scheduling signaling, and the time difference between the second reference subframe and the first reference subframe is equal to the minimum processing time delay for the UE to process the PUSCH on this carrier.
- the UE determines, only according to the received scheduling signaling before the second reference subframe, whether the corresponding carrier performs transmission in the first reference subframe.
- the uplink carrier is considered as a transmitting uplink carrier, and other uplink carriers are all considered as not to perform transmission.
- the uplink carrier is considered as a transmitting uplink carrier; or otherwise, the uplink carrier is considered as a non-transmitting uplink carrier.
- the uplink carrier is considered as a transmitting uplink carrier when the uplink transmission triggered by the second scheduling signaling is performed in the first reference subframe; or otherwise, the uplink carrier is considered as a non-transmitting uplink carrier.
- the uplink carrier is considered as a non-transmitting uplink carrier.
- the base station configures two uplink carriers for the UE, where the CC1 is a licensed frequency band carrier and the CC2 is an unlicensed frequency band carrier. It is assumed that the CC1 is scheduled by one-step scheduling g while the CC2 is scheduled by two-step scheduling.
- the UE receives, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carrier CC1 to transmit a PUSCH in a first reference subframe t 2 .
- the UE starts preparing the transmission of the PUSCH in a subframe t , and it is required to predict the total transmit power of all carriers of the UE in the subframe t 2 .
- the UE Since the UE has not received the second scheduling information in spite of having received the first scheduling information for the CC2 before the start of the subframe t , the UE is unable to know whether the CC2 will transmit an uplink channel/signal in the subframe t 2 . Consequently, the UE can only assume that the CC2 will not transmit an uplink channel/signal in the subframe t 2 while the CC1 will transmit an uplink channel/signal in the subframe t 2 , so as to determine the maximum transmit power of the UE. Furthermore, the maximum transmit power is compared with the power of the CC1 determined by taking Pcmax,c as an upper limit, so that the power of the CC1 cannot exceed the maximum transmit power.
- the base station configures two uplink carriers for the UE, where the CC1 carrier has a TTI length of 1 ms and the CC2 carrier has a TTI length of 0.25 ms.
- the two carriers both adopt one-step scheduling.
- the minimum time delay from the scheduling signaling of the CC1 carrier to the uplink transmission is 4 ms, and the minimum time delay from the scheduling signaling of the CC2 carrier to the uplink transmission is 1 ms.
- the UE receives, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carrier CC1 to transmit a PUSCH on a first reference subframe t 2 .
- the UE starts preparing the transmission of the PUSCH in a subframe t , and it is required to predict the total transmit power of all uplink carriers of the UE in the subframe t 2 . Since the UE has not received scheduling information for the CC2 before the start of the subframe t , the UE is unable to know whether the CC2 will transmit an uplink channel/signal in the subframe t 2 . Consequently, the UE can only assume that the CC2 will not transmit an uplink channel/signal in the subframe t 2 while the CC1 will transmit an uplink channel/signal in the subframe t 2 , so as to determine the maximum transmit power of the UE.
- the maximum transmit power is compared with the power of the CC1 determined by taking Pcmax,c as an upper limit, so that the power of the CC1 cannot exceed the maximum transmit power.
- the maximum total transmit power of the UE can be determined according to the transmissions of the CC1 and the CC2.
- the UE has received a scheduling signaling for the CC1 when receiving an uplink scheduling signaling for the carrier CC2.
- the transmission condition of the CC1 and the required uplink power can be determined, and the total power of the UE in the first reference subframe can be determined.
- the UE can adjust the power of the CC2 according to a predefined rule, so that the sum of the power of the CC1 and the power of the CC2 does not exceed the maximum transmit power.
- a carrier with a maximum processing time delay from the receipt of the scheduling signaling by the UE to the transmission of the scheduled uplink channel/signal by the UE has a higher priority, that is, the power of the CC1 is ensured while the power of the CC2 is reduced; or, it is also possible to ensure, according to whether a service with higher performance requirements is contained, for example, the time delay requirements for the ultra-reliable and low-latency communications (URLLC) services should be more stringent than those for common enhanced mobile broadband (eMBB) services.
- URLLC ultra-reliable and low-latency communications
- a carrier with a shorter scheduling unit length has a higher priority, that is, the power of the CC2 is ensured. If the priority of the CC1 is lower, it is required to reduce the power. However, if the CC1 has not enough time to reduce its power, there is no choice other than dropping transmitting the CC1.
- the UE determines the uplink carrier as a non-transmitting uplink carrier; however, for an uplink carrier which can be determined in or before the second reference subframe to transmit a PUSCH in the first reference subframe or an uplink carrier which possibly transmits a PUSCH in the first reference subframe, the UE determines the uplink carrier as a transmitting uplink carrier.
- the uplink carrier is considered as a transmitting uplink carrier; or otherwise, the uplink carrier is considered as a non-transmitting uplink carrier.
- the uplink carrier is considered as a transmitting uplink carrier when the uplink transmission triggered by the second scheduling signaling is performed in the first reference subframe; or otherwise, the uplink carrier is considered as a non-transmitting uplink carrier.
- the UE can determine, according the first scheduling signaling, whether the uplink carrier is a transmitting uplink carrier. For example, if the received first scheduling signaling indicates that the uplink transmission is absolutely impossible to be performed in the first reference subframe, the UE can determine the corresponding uplink carrier as a non-transmitting uplink carrier. And/or, if the UE cannot exclude the possibility of performing uplink transmission in the first reference subframe by using the received first scheduling signaling, the UE decides that the uplink carrier is a transmitting uplink carrier.
- the UE determines the corresponding uplink carrier as a non-transmitting uplink carrier.
- the base station configures two uplink carriers for the UE, where the CC1 is a licensed frequency band carrier and the CC2 is an unlicensed frequency band carrier. It is assumed that the CC1 is scheduled by one-step scheduling while the CC2 is scheduled by two-step scheduling.
- the UE receives, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carrier CC1 to transmit a PUSCH in a first reference subframe t 2 .
- the UE starts preparing the transmission of the PUSCH in a subframe t , and it is required to predict the total transmit power of all carriers of the UE in the subframe t 2 .
- the UE Since the UE has received first scheduling information for the CC2 but not received second scheduling information before the subframe t , the UE is unable to know whether the CC2 will transmit an uplink channel/signal in the subframe t 2 . Despite this, the UE still assumes that the CC2 will transmit an uplink channel/signal in the subframe t 2 and the CC1 will transmit an uplink channel/signal in the subframe t 2 , so as to determine the maximum transmit power of the UE. Furthermore, the maximum transmit power Pcmax' assumed by the UE is compared with the power of the CC1 determined by taking Pcmax,c as an upper limit, so that the power of the CC1 cannot exceed Pcmax'.
- a relatively conservative maximum power is obtained by calculating Pcmax'. If the CC2 transmits an uplink channel/signal in the subframe t 2 , it can be no problem to enable the CC1 to perform transmission in accordance with the adjusted power. However, if the CC2 does not perform transmission in the subframe t 2 , the actual maximum transmit power Pcmax becomes higher, it is possible that the CC1 makes an unnecessary power reduction in this step.
- Step 202 The UE adjusts, according to an actual maximum uplink transmit power Pcmax of the first reference subframe and a first priority, the transmit power of each uplink carrier, and/or determines whether to transmit an uplink signal.
- the predefined first priority means that a carrier with a maximum minimum-processing time delay from the receipt of a scheduling signaling by the UE to the transmission of the scheduled uplink channel/signal by the UE has a higher priority.
- the predefined first priority means that a carrier with a shorter scheduling unit time (TTI) length has a higher priority.
- TTI scheduling unit time
- the predefined first priority means that a carrier configured to adopt one-step scheduling has a higher priority than a carrier configured to adopt two-step scheduling.
- the predefined first priority means that a licensed frequency band carrier has a higher priority than an unlicensed frequency band carrier.
- the predefined first priority means that an uplink signal containing an uplink control signaling has a higher priority than an uplink signal containing no uplink control signaling.
- the predefined first priority means that a carrier which has been determined to transmit an uplink channel/signal in or before the second reference subframe is superior to a carrier which has not been determined to transmit an uplink channel/signal before the second reference subframe.
- the power of a carrier having a lower priority can be further reduced to P j,c on the basis of the transmit power P i,c determined in step 201, so that the sum of power of all transmitting carriers does not exceed Pcmax. Or, the transmission of the power having a low priority is dropped.
- the UE can only drop transmitting a carrier having a lower priority, and transmit a carrier having a higher priority according to the transmit power P i,c determined in step 201, so that the sum of power of all transmitting carriers cannot exceed Pcmax.
- the UE can separately perform the bit preparation of the uplink signal and the power adjustment of the uplink signal.
- the base station can allocate a minimum guaranteed transmit power Pg for each carrier or a carrier group.
- the power allocated to other carriers cannot exceed Pcmax-Pg.
- the base station configures three carriers for the UE, where the CC1 and the CC2 forms a carrier group, and the CC3 forms a carrier group.
- the base station allocates Pg1 to the carrier group formed by the CC1 and the CC2, and allocates Pg2 to the CC3.
- the way of classifying a carrier group is not limited in the present application. For example, a multiple of carriers with a determined carrier index can be classified into one carrier group, or a multiple of carriers with a same TTI length can be classified into one carrier group, and so on.
- the power of each carrier is not adjusted with respect to the size of the total power.
- the sum of power of the carriers exceeds the maximum transmit power of the UE. If, for these carriers, the UE has no time to adjust the power, the UE needs to ensure the power of a carrier having a higher priority and drops a carrier having a lower priority in accordance with the priority.
- the UE can be supported to adopt different methods for power control on different carriers.
- the carriers configured for the UE have a same TTI length, and some of the carriers are configured to adopt two-step scheduling while the remaining carriers are configured to adopt one-step scheduling.
- the UE can adopt Way 1 in the step 201 and the step 202 with regard to the carriers scheduled by the two-step scheduling, and adopt Way 2 in the step 201 and the step 202 with regard to the carriers adopting the one-step scheduling.
- the UE can also be supported to adopt a same method for power control on all the carriers.
- the base station configures three uplink carriers for the UE, where the CC1 and CC2 are licensed frequency band carriers and the CC3 is an unlicensed frequency band carrier. It is assumed that the CC1 and the CC2 is scheduled by one-step scheduling while the CC3 is scheduled by two-step scheduling. If it is assumed that the UE simultaneously prepares an uplink transmission bit and a transmit power, the required minimum processing time delay is 4 ms.
- the UE adopts Way 1 in the step 201: it is assumed that the UE has received, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carriers CC1 and CC2 to transmit PUSCHs in a first reference subframe t 2 , where the PUSCH of the CC1 contains uplink control information while the PUSCH of the CC2 does not contain uplink control information.
- the UE starts preparing, in a subframe t , the transmission of the PUSCHs of the two carriers.
- the minimum time delay required by the UE to prepare the uplink transmission bit and the transmit power is 4 ms.
- a time interval between the subframe t and the subframe t 2 is 4 ms.
- the UE determines the uplink transmit power of the CC1 according to Pcmax,c of the CC1 and the uplink power scheduled by the base station indicated by the received scheduling signaling, for example, the power being 10.
- the UE determines the uplink transmit power of the CC2 according to Pcmax,c of the CC2 and the uplink power scheduled by the base station indicated by the received scheduling signaling, for example, the power being 12.
- the UE Before the subframe t , the UE has received the first scheduling information for the CC3 but not received the second scheduling information, so the UE is unable to know whether CC3 will transmit an uplink channel/signal in the subframe t 2 .
- the UE determines the uplink transmit power of the CC3 according to Pcmax,c of the CC3 and the uplink power scheduled by the base station indicated by the received first scheduling signaling, for example, the power being 8.
- the UE receives, in a subframe t 3 , a second scheduling signaling for the CC3, and determines that the UE also transmits, in the first reference subframe t 2 , a PUSCH containing no uplink control information on the CC3.
- the UE determines, according to the information about the PUSCHs to be transmitted by the three CCs, Pcmax of the first reference subframe t 2 , for example, 20.
- the base station configures three uplink carriers for the UE, where the CC1 and the CC2 are licensed frequency band carriers and the CC3 is an unlicensed frequency band carrier. It is assumed that the CC1 and the CC2 is scheduled by one-step scheduling while the CC3 is scheduled by two-step scheduling. If it is assumed that the UE simultaneously prepares an uplink transmission bit and a transmit power, the required minimum processing time delay is 4 ms.
- the UE adopts the method (a) in Way 2 in the step 201; while for the carrier CC3, the UE adopts Way 1 in the step 201: it is assumed that the UE receives, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carriers CC1 and CC2 to transmit PUSCHs in the first reference subframe t 2 , where the PUSCH of the CC1 contains uplink control information while the PUSCH of the CC2 does not contain uplink control information.
- the UE starts preparing, in a subframe t , the transmission of the PUSCHs of the two carriers.
- the minimum time delay required by the UE to prepare the uplink transmission bit and the transmit power is 4 ms. In other words, a time interval between the subframe t and the subframe t 2 is 4 ms.
- the UE determines the uplink transmit power of the CC1 according to Pcmax,c of the CC1 and the uplink power scheduled by the base station indicated by the received scheduling signaling, for example, the power being 10.
- the UE determines the uplink transmit power of the CC2 according to Pcmax,c of the CC2 and the uplink power scheduled by the base station indicated by the received scheduling signaling, for example, the power being 12.
- the UE Before the subframe t , the UE has received the first scheduling information for the CC3 but not received the second scheduling information, so the UE is unable to know whether CC3 will transmit an uplink channel/signal in the subframe t 2 .
- the UE determines the uplink transmit power of the CC3 according to Pcmax,c of the CC3 and the uplink power scheduled by the base station indicated by the received first scheduling signaling, for example, the power being 8.
- Pcmax' of the first reference subframe is calculated based on the assumption of transmitting the CC1 and the CC2 and not transmitting the CC3 in the first reference subframe, wherein the Pcmax' is e.g., 21..
- the UE ensures the uplink transmit power 10 of the CC1 and reduces the uplink transmit power of the CC2 to 11, and the UE does not adjust the power of the CC3.
- the UE receives, in a subframe t 3 , a second scheduling signaling for the CC3, and determines that the UE also transmits, on the first reference subframe t 2 , a PUSCH containing no uplink control information on the CC3.
- the UE determines, according to the information about the PUSCHs to be transmitted by the three CCs, the actual Pcmax of the first reference subframe t 2 , for example, 20.
- the UE determines the priority is CC1>CC2>CC3. Therefore, the UE transmits the CC1 and the CC2, and gives up transmitting the CC3. Since the CC3 is not transmitted, Pcmax is still 21. Therefore, no further adjustment is to be performed on the power of the CC1 and the power of the CC2.
- the UE separately determines the power of the three CCs as 10, 12 and 8.
- the UE transmits all the CC1, CC2 and CC3.
- the base station configures two uplink carriers for the UE, where the CC1 carrier has a subframe duration of 1 ms and the CC2 carrier has a subframe duration of 0.25 ms.
- the two carriers both adopt one-step scheduling.
- the minimum time delay from the uplink scheduling signaling of the CC1 carrier to the uplink transmission is 4 ms, and the minimum time delay from the uplink scheduling signaling of the CC2 carrier to the uplink transmission is 1 ms.
- the UE receives, in a subframe t 0 (a subframe t-1 in this example), a schedule for allowing the carrier CC1 to transmit a PUSCH in a first reference subframe t 2 .
- the UE starts preparing, in a subframe t , the transmission of the PUSCH.
- the UE needs to predict the total transmit power of the UE in all carriers of the subframe t 2 . Since the UE has not received scheduling information for the CC2 before the subframe t , the UE is unable to know whether the CC2 will transmit an uplink channel/signal in the subframe t 2 .
- the UE receives, in a subframe t 3 , a scheduling signaling for the CC2, and determines to transmit the CC2 in the subframe t 2 .
- the UE starts preparing the power of the CC2, and determines, according to Pcmax,c of the CC1 and the power scheduled by the base station, that the power of the CC2 is 10.
- the first priority means that a carrier containing a service with higher performance requirements has a higher priority, for example, low-latency data (URLLC data) borne by the carrier CC2, the priority of the CC2 is high.
- the transmission of the CC1 is dropped, as shown in Fig. 7.
- a specific way of generating, by a UE, a PHR report of each carrier and transmitting the PHR on the selected carrier is as below.
- the UE selects an uplink carrier and an uplink subframe probably used to transmit PHR, then uses the uplink subframe as a PHR calculation reference subframe (called a first reference subframe), and determines, according to uplink scheduling information received in or before a second reference subframe, contents of the PHR of each uplink carrier.
- the UE generates a PHR report according to the determined contents of the PHR, and reports the PHR on the selected uplink carrier in the corresponding subframe.
- the base station can semi-statically configure the scheduling mode of a certain carrier of the UE as one-step scheduling or two-step scheduling.
- the base station can also dynamically configure the scheduling mode as one-step scheduling or two-step scheduling, for example, by a predefined bit in the UL grant or a predefined RNTI in the UL grant.
- Fig. 8 shows a specific flow of the method for generating and reporting a PHR provided in this embodiment.
- the method comprises the following the steps.
- Step 801 When conditions for reporting a PHR are satisfied, a UE selects, from at least one uplink carrier, one uplink carrier for reporting the PHR, and determines an uplink subframe probably used to transmit the PHR, the uplink subframe being a first reference subframe.
- the satisfied conditions for reporting a PHR can be conditions defined in the existing LTE system, for example, the trigger conditions in TS 36.321 5.4.6 such as newly activating an uplink carrier, a large change in downlink path loss, or PHR-timer expire and the like. It is to be noted that other satisfied conditions for reporting a PHR are also applicable to the present invention and will not be limited herein.
- the UE can select, after the PHR report conditions are satisfied, an uplink carrier with initial uplink PUSCH transmission (not retransmission), and the PUSCH is sufficient to transmit a PHR on the uplink carrier bearing the PHR.
- the UE can select an uplink carrier in a licensed frequency band to transmit the PHR.
- the UE can select an uplink carrier in an unlicensed frequency band to transmit the PHR.
- the UE shall select to transmit the PHR on a one-step scheduled PUSCH.
- the UE can select to transmit the PHR on a one-step scheduled PUSCH, or transmit the PHR on a two-step scheduled PUSCH.
- the UE selects a first reference subframe reporting the PHR as a PHR reference subframe.
- the PHR calculated by the UE is determined based on the uplink transmission condition of each carrier in the first reference subframe assumed by UE.
- the first reference subframe is a subframe in which UE transmits a PUSCH containing the PHR. If the LBT fails, the UE cannot transmit the PUSCH, but still considers this subframe as the first reference subframe.
- the first reference subframe is a subframe assumed by the UE to transmit a PUSCH containing the PHR, for example, a subframe X milliseconds after receiving the first scheduling signaling for the uplink carrier.
- the first reference subframe is n+ 4.
- the PHR report is an MAC layer signaling; and it takes a certain processing time for the UE to generate the corresponding MAC layer signaling, then contain the corresponding MAC layer signaling in a corresponding MAC PDU, and then bear the corresponding MAC PDU by a physical layer PUSCH channel. It is assumed that the shortest processing time is ⁇ m.
- the PHR is transmitted on an uplink carrier of a two-step scheduled unlicensed frequency band, since the time delay from the second scheduling signaling to the first reference subframe is short, often less than ⁇ m, and is thus insufficient to prepare the PHR report by the UE, in this case, the UE cannot select such a carrier.
- the moment when the PHR report conditions are satisfied is t'
- the UE receives a first scheduling signaling for an uplink carrier CC1 at moment t'-1 ms and a first scheduling signaling for an uplink carrier CC2 at a moment t' .
- the UE receives a second scheduling signaling for the uplink carrier CC1 at moment t'+1 ms to trigger to transmit a PUSCH at moment t'+3 ms
- the UE receives a second scheduling signaling for the uplink carrier CC2 at moment t'+2 ms to trigger to transmit a PUSCH at moment t'+5 ms.
- the UE can only select the uplink carrier CC2 to transmit the PHR, and the first reference subframe is the subframe t'+5 .
- the moment t' when the PHR report conditions are satisfied and the moment when the UE selects an uplink carrier and an uplink subframe for reporting the PHR are not limited to be the same. It is possible that the UE selects, at a certain moment after the PHR report conditions are satisfied, an uplink carrier and an uplink subframe for reporting the PHR, and then starts preparing the PHR.
- the UE receives a scheduling signaling from PCell at moment t'+2 ms and it is assumed that it takes 1 ms for the UE to decode the scheduling signaling, the moment when the UE selects an uplink carrier and an uplink subframe for reporting the PHR is t'+3 ms.
- Step 802 according to uplink scheduling information received in or before a second reference subframe, PHR contents of each uplink carrier to be reported in the first reference subframe are determined, and a corresponding PHR value is determined according to the PHR contents.
- a method for determining the second reference subframe can be subdivided into the following.
- the second reference subframe in which the UE starts preparing the PHR report is a subframe in which the UE has received the UL grant. More specifically, the second reference subframe is a subframe in which the UE has decoded received the UL grant, for example a subframe following the subframe in which the UL grant is received.
- ( t 2 - t 0 ) can be a fixed value, for example, 4 ms or a fixed value related to Time Division Duplexing (TDD) configuration; or, ( t 2 - t 0 ) can also be a variable.
- the value of ( t 2 - t 0 ) is dynamically indicated by the UL grant.
- the second reference subframe t 0 in which the UE starts preparing the PHR report is a subframe when an MAC layer starts generating a PHR MAC CE, or a subframe when a physical layer starts calculating the PHR value.
- ( t 2 - t 0 ) can be a fixed value.
- the base station transmits a first scheduling signaling UL grant schedules the uplink carrier at moment t 0 and the base station transmits a second scheduling signaling at moment t 1 to trigger the UE to transmit a PUSCH on the uplink carrier at moment t 2
- the second reference subframe is a subframe in which the UE receives the first scheduling signaling UL grant or a subframe on which the UE decodes the first scheduling signaling UL grant, where the moment t 0 is not prior to the moment t' when the PHR report conditions are satisfied; and/or, the second reference subframe is the moment t' when the PHR report conditions are satisfied, where the moment t 0 is not later than the moment t' when the PHR report conditions are satisfied, and ( t 2 -t' ) is not less than ⁇ m; and/or, the second reference subframe is a subframe X following the subframe
- the base station since the base station does not know the moment t' , the base station is unable to know the second reference subframe. Despite this, the UE will report whether the PHR type is a real value or a virtual value when reporting the PHR, so the understanding of the base station to the PHR will not be influenced.
- the determining PHR contents of each uplink carrier comprises: determining whether the PHR type is a real PHR or a virtual PHR. And, a PHR value is calculated according to the determined type.
- the UE can determine the PHR type of each uplink carrier by one of the following two ways.
- the PHR type of the uplink carrier is a real PH.
- the PHR is determined according to the resource allocation information and/or Closed-loop Power Control (TPC) information indicated by the received scheduling signaling.
- TPC Closed-loop Power Control
- the PHR of the PUSCH is calculated according to the formula of type 1 of "if the UE transmits a PUSCH only but does not transmit a PUCCH in a subframe i of a carrier c " in TS 36.213.5.1, for example:
- the PHR of the PUSCH is calculated according to the formula of type 1 of "if the UE transmits both a PUSCH and a PUCCH in a subframe i of a carrier c ", for example,
- calculation of the PHR of the PUSCH regardless of whether to simultaneously transmit a PUCCH.
- This embodiment is applicable to the PHR of type 1, and is also applicable to the PHR of type 2.
- calculation of the PHR of the PUSCH For convenience of description, they are collectively called calculation of the PHR of the PUSCH.
- the UE determines the PHR type of the uplink carrier as a virtual PHR.
- the PHR is calculated according to a predefined reference format, i.e., according to the PHR formula of type 1 "if the UE does not transmit a PUSCH" in TS 36.213.5.1, for example,
- This embodiment is applicable to the PHR of type 1, and is also applicable to the PHR of type 2. For convenience of description, they are collectively called calculation of the PHR of the PUSCH.
- the uplink carrier which has been determined in the second reference subframe to transmit a PUSCH in the first reference subframe is a transmitting uplink carrier
- the uplink carrier which has not been determined in the second reference subframe to transmit a PUSCH in the first reference subframe is a non-transmitting uplink carrier.
- the UE For convenience of description, for the uplink transmission on an unlicensed frequency band carrier, regardless of whether the UE passes Clear Channel Assessment (CCA) detection (access the unlicensed frequency band carrier), only if the received scheduling/trigger signaling indicates the transmission in the first reference subframe, it is assumed that the UE performs a PUSCH transmission in the first subframe, when calculating the PHR.
- CCA Clear Channel Assessment
- the UE based on the LBT mechanism, if the UE fails to pass the CCA detection, the UE will not transmit a PUSCH in the first reference subframe.
- the UE when calculating the PHR of an uplink carrier scheduled by one-step scheduling, can determine the PHR type of the corresponding uplink carrier according to whether the UL grant signaling for scheduling transmission in the first reference subframe has been received in or before the second reference subframe. In other words, if the UE has not received until the second reference subframe, the UL grant scheduling the transmission in the first reference subframe, the UE is absolutely impossible to transmit a PUSCH in the first reference subframe, so that the PHR of the corresponding uplink carrier is a virtual PHR. If the UE has received, in or before the second reference subframe, the UL grant for scheduling transmission in the first reference subframe, the PHR of the corresponding uplink carrier is a real PHR.
- the UE when calculating the PHR of an uplink carrier scheduled by two-step scheduling, if the UE has received a second scheduling signaling in or before the second reference subframe, the UE can determine the PHR type of the corresponding uplink carrier according to whether the uplink transmission triggered by the second scheduling signaling is located in the first reference subframe.
- the UE if the UE has received the second scheduling signaling in or before the second reference subframe which triggers uplink transmission, and the triggered uplink transmission is not to be transmitted in the first reference subframe, the UE is absolutely impossible to transmit a PUSCH in the first reference subframe, and the PHR of the corresponding carrier is a virtual PHR; and, if the UE has received the second scheduling signaling in or before the second reference subframe which triggers uplink transmission, and the triggered uplink transmission is to be transmitted in the first reference subframe, the PHR of the corresponding carrier is a real PHR, even in a case eventually UE does not transmit an uplink in the first reference subframe , such as the UE possibly fails to pass the CCA detection and does not transmit an uplink in the first reference subframe.
- the PHR of an uplink carrier scheduled by two-step scheduling if the UE has not received the second scheduling signaling in or before the second reference subframe or not received the first scheduling signaling, the PHR of the corresponding uplink carrier is a virtual PHR, regardless of whether the UE eventually transmits an uplink signal in the first reference subframe.
- the PHR of the uplink carrier of the PUSCH is a real PHR which is calculated according to the received first scheduling signaling.
- the base station configures three uplink carriers for the UE, where the CC1 is a licensed frequency band carrier, and the CC2 and the CC3 are unlicensed frequency band carriers.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH in the first reference subframe t 3 on the CC1, and the UE will include the PHR report in the PUSCH.
- the second reference subframe is moment t , where t is prior to t 3 .
- the CC1 and the CC2 is scheduled by one-step scheduling while the CC3 is scheduled by two-step scheduling.
- the UE has received, in the second reference subframe t , uplink scheduling signaling for the CC1 and CC2, and the UE has received a first scheduling signaling for the CC3 but not received a second scheduling signaling for the CC3.
- the UE calculates real PHRs of the CC1 and CC2 according to the received scheduling signaling, and calculates a virtual PHR of the CC3 according to the predefined reference format, as shown in Fig. 9.
- the UE has received, in the second reference subframe t , uplink scheduling signalings for the CC1 and CC2, the UE has received the first scheduling signaling for the CC3 and the second scheduling signaling for the CC3, and the uplink transmission time triggered by the second scheduling signaling is a subframe t 2 , where t 2 is not equal to the first reference subframe t 3 .
- the UE calculates real PHRs of the CC1 and CC2 according to the received scheduling signaling, and calculates a virtual PHR of the CC3 according to the predefined reference format, as shown in Fig. 10.
- the UE has received, in the second reference subframe t , uplink scheduling signalings for the CC1 and CC2, and the UE has received a first scheduling signaling for the CC3 and a second scheduling signaling of the CC3, the uplink transmission time triggered by the second scheduling signaling is a subframe t 2 , where t 2 is equal to the first reference subframe t 3 .
- the UE separately calculates real PHRs of the CC1, CC2 and CC3 according to the received scheduling signaling, as shown in Fig. 11.
- the UE calculates a real PHR of the CC1 according to the received scheduling signaling, and calculates virtual PHRs of the CC2 and CC3 according to the predefined reference format, as shown in Fig. 12.
- the PHR type of the uplink carrier is a virtual PHR; however, for an uplink carrier which can be determined in the second reference subframe to transmit a PUSCH in the first reference subframe or for an uplink carrier which possibly transmits a PUSCH in the first reference subframe, the PHR type of the uplink carrier is a real PHR.
- the uplink carrier which can be determined in the second reference subframe to transmit a PUSCH in the first reference subframe or the uplink carrier which possibly transmits a PUSCH in the first reference subframe is a transmitting uplink carrier.
- the UE when calculating the PHR of an uplink carrier scheduled by one-step scheduling, can determine the PHR type of the corresponding uplink carrier according to whether the UL grant signaling for scheduling transmission in the first reference subframe has been received in the second reference subframe. In other words, if the UE has not received the UL grant scheduling the transmission in the first reference subframe until the second reference subframe, the UE is absolutely impossible to transmit a PUSCH in the first reference subframe, so that the PHR of the corresponding uplink carrier is a virtual PHR. If the UE has received, in or before the second reference subframe, the UL grant for scheduling transmission in the first reference subframe, the PHR of the corresponding uplink carrier is a real PHR.
- the UE when calculating the PHR of an uplink carrier scheduled by two-step scheduling, if the UE has received a second scheduling signaling in or before the second reference subframe, the UE can determine the PHR type of the corresponding uplink carrier according to whether the uplink transmission triggered by the second scheduling signaling is located in the first reference subframe.
- the UE if the UE has received the second scheduling signaling in or before the second reference subframe and then triggers uplink transmission, and the triggered transmission moment of the uplink transmission is not the first reference subframe, the UE is absolutely impossible to transmit a PUSCH in the first reference subframe, and the PHR of the corresponding carrier is a virtual PHR; and, if the UE has received the second scheduling signaling in or before the second reference subframe and then triggers uplink transmission, and the triggered transmission moment of the uplink transmission is the first reference subframe, the PHR of the corresponding carrier is a real PHR, even in a case where the UE possibly fails to pass the CCA detection and does not transmit an uplink in the first reference subframe eventually.
- the UE when calculating the PHR of an uplink carrier scheduled by two-step scheduling, if the UE has received the first scheduling signaling but not received the second scheduling signaling in the second reference subframe, the UE can determine the PHR type of the corresponding uplink carrier according to the first scheduling signaling. For example, if the received first scheduling signaling can indicate that the uplink transmission is absolutely impossible to be performed in the first reference subframe, or if the second reference subframe is out of a valid time window of the first scheduling signaling, the PHR type of the corresponding uplink carrier is a virtual PHR.
- the PHR type of the corresponding uplink carrier is a real PHR, regardless of whether the UE eventually performs uplink transmission in the first reference subframe.
- the PHR type of the corresponding uplink carrier as a real PHR, regardless of whether the UE eventually performs uplink transmission in the first reference subframe.
- the PHR type of the corresponding uplink carrier is a virtual PHR.
- the UE can determine the PHR of the corresponding uplink carrier by one or more of the following methods.
- the UE determines the PHR type of the corresponding uplink carrier according to the result of the one-step scheduling.
- the PHR type of the corresponding uplink carrier is a real PHR. Meanwhile, the UE selects, according to a predefined rule, one first scheduling signaling and then determines a real PHR, for example:
- the PHR of the uplink carrier of the PUSCH is calculated as a real PHR according to the received first scheduling signaling.
- the base station configures three uplink carriers for the UE, where the CC1 is a licensed frequency-band carrier, and the CC2 and the CC3 are unlicensed frequency band carriers.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 in the first reference subframe t 3 , and the UE will contain the PHR report in the PUSCH.
- the second reference subframe is moment t , where t is prior to t 3 .
- the CC1 and the CC2 is scheduled by one-step scheduling while the CC3 is scheduled by two-step scheduling. It is assumed that the UE has received, in or before the second reference subframe t , uplink scheduling signaling for the CC1 and CC2, and the UE has received a first scheduling signaling for the CC3 but not received a second scheduling signaling for the CC3. Then, the UE separately calculates real PHRs of the CC1, CC2 and CC3 according to the received scheduling signalings, as shown in Fig. 13.
- the UE has received, in the second reference subframe t , uplink scheduling signalings for the CC1 and CC2, and the UE has received a first scheduling signaling for the CC3 but not received a second scheduling signaling for the CC3, wherein the first scheduling signaling contains indication information about the transmission time which is delayed 6 ms with respect to the moment of the second scheduling signaling.
- the UE can decide that the uplink transmission of the CC3 is absolutely later than the first reference subframe t 3 . Even if the UE receives the second scheduling signaling as early as moment t+1 , the triggered uplink transmission is also performed at t+1+6 ms. Hence, the UE separately calculates real PHRs of the CC1 and CC2 according to the received scheduling signalings, and calculates a virtual PHR of the CC3 according to the predefined format.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 on the first reference subframe t 3 , and the UE will contain the PHR report in the PUSCH.
- the second reference subframe is moment t , where t is prior to t 3 . It is assumed that the CC1 is scheduled by one-step scheduling while the CC2 and CC3 is scheduled by two-step scheduling.
- the UE has received, in the second reference subframe t , an uplink scheduling signaling for the CC1, and the UE has received a first scheduling signaling for the CC3 but not received a second scheduling signaling for the CC3. Then, the UE calculates real PHRs of the CC1 and CC3 according to the received scheduling signalings, and calculates a virtual PHR of the CC2 according to the predefined format, as shown in Fig. 14.
- the UE After the PHR triggering conditions are satisfied, the UE receives, in the second reference subframe, a one-step scheduling signaling UL grant for the CC1, the UE decides to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 in the first reference subframe t 3 , and the UE will contain the PHR report in the PUSCH.
- the UE On the CC2, the UE has not received, before the second reference subframe, a non-triggered first scheduling signaling for two-step scheduling or a UL grant for one-step scheduling, and the UE has received the first scheduling signaling after the second reference subframe.
- the UE On the CC3, the UE has received a first scheduling signaling 1 (not triggered) before the second reference subframe, and has received another first scheduling signaling 2 (not triggered) in the second reference subframe; and, the first reference subframe is within the valid time of the two first scheduling signalings. Then, the UE calculates real PHRs of the CC1 and CC3 according to the received scheduling signalings, and calculates a virtual PHR of the CC2 according to the predefined reference format. Wherein, the real PHR of the CC3 is calculated according to the first scheduling signaling 1, as shown in Fig. 15.
- the UE can selectively transmit a PHR on a proper carrier.
- a time interval between the second scheduling signaling and the uplink transmission (containing the PHR) is generally not less than the minimum processing time delay of the uplink transmission. For example, if the PHR triggering conditions are satisfied at a subframe n , the UE receives a second scheduling signaling after the subframe n (a subframe m ) and the PUSCH transmission triggered by the second scheduling signaling is performed in a subframe m+4 or after the subframe m+4 , the UE can transmit PUSCH+PHR on this uplink carrier.
- the UE can transmit PUSCH+PHR on this uplink carrier.
- the CC1 is a licensed frequency band carrier (by one-step scheduling).
- the UE receives, in or before the second reference subframe, second scheduling signalings for the CC2 and CC3 for separately scheduling to transmit PUSCHs in a subframe p and a subframe q .
- a time interval between the subframe p and the second reference subframe is 4 ms, and a time interval between the subframe q and the second reference subframe is 6 ms.
- the UE selects to report the PHR on the CC2, the first reference subframe is t 3 (i.e., the subframe p ), and the UE contains the PHR report in the PUSCH.
- the UE When in or before the second reference subframe, the UE has not received a scheduling signaling for the CC1.
- the PHR of the CC1 is a virtual PHR.
- the PHR of the CC2 is a real PHR.
- the PHR of the CC3 is a virtual PHR because the PUSCH transmission indicated by the second scheduling signaling received in the second reference subframe is not performed in the first reference subframe.
- the second reference subframe is generally a subframe after the UE has received a first scheduling signaling for scheduling the unlicensed frequency band carrier, and can be prior to a subframe of the second scheduling signaling.
- a time interval between the first scheduling signaling and the uplink transmission (containing the PHR) is not less than the minimum processing time delay of the uplink transmission. Therefore, the UE can have enough time to generate a PHR and a PUSCH.
- the UE will not change the PHR value even if the time interval between the subsequently received second scheduling signaling and the uplink transmission (containing the PHR) is not less than the minimum processing time delay of the uplink transmission.
- the CC1 is a licensed frequency band carrier (by one-step scheduling).
- the UE receives, in a subframe n , a first scheduling signaling for the CC2, and the UE determines to transmit a PUSCH on the CC2.
- the second reference subframe is the subframe n
- the UE starts generating an MAC packet and a PHR in the second reference subframe.
- the UE receives a first scheduling signaling for the CC3 in a subframe n-2 , a second scheduling signaling in a subframe n+1 for scheduling a PUSCH in a subframe n+2 , and a one-scheduling signaling for the CC1 in the subframe n+2 for scheduling PUSCH transmission in a subframe n+6 .
- the PHR of the carrier CC2 transmitting the PHR is a real PHR. Since the CC1 adopting the one-step scheduling does not transmit a PUSCH in the first reference subframe n+4 , the PHR of the CC1 is a virtual PHR.
- the PHR of the CC3 is a real PHR.
- the UE receives a second scheduling signaling for the CC2 in a subframe n+5 for scheduling transmission of a PUSCH and a PHR in a subframe n+6 .
- the licensed carrier CC1 transmits a PUSCH in the subframe n+6
- the PHR reported by the UE is a virtual PHR
- the unlicensed CC3 transmits a PUSCH in the subframe n+6
- the PHR reported by the UE is a real PHR.
- the above description is illustrated by taking the PHR of a PUSCH as example, but the above ways are also applicable to the PHR of a PUCCH or the PHR of a PUSCH needing to take the influence of the PUCCH into consideration.
- the calculation of the PHR of type 1 or the PHR of type 2 in the TS 36.213 5.1.1.2 is also related to whether the UE will transmit a PUCCH in a subframe i .
- the UE Since the transmission of a downlink subframe is likely to occur on a multiple of carriers with different TTI lengths, and a time delay from the receipt of downlink data PDSCH by the UE to the report of an ACK/NACK in a PUCCH by the UE changes with different lengths, it is possible that the UE does not determine in the second reference subframe whether a PUCCH is to be transmitted in the first reference subframe. Then, the UE can assume whether to transmit a PUCCH in accordance with Way 1 or Way 2 in the step 802, so as to calculate a corresponding PHR.
- the UE does not determine in the second reference subframe whether a PUCCH is to be transmitted in the first reference subframe, then for an uplink carrier possibly transmitting the PUCCH, for example, Pcell, the value of the PHR is calculated on the assumption that the PUCCH is not to be transmitted. For example:
- the value of the PHR is calculated on the assumption that the PUCCH is not to be transmitted. For example:
- the UE can only select to transmit a PUSCH on an one-step scheduled PUSCH, although majority of the examples described herein show the transmission of the PHR on a licensed frequency band carrier, and are also applicable to the transmission of the PHR on an one-step scheduled unlicensed frequency band carrier, it is unable to transmit the PHR on a two-step scheduled unlicensed frequency band carrier.
- the PHR type of the uplink carrier is a virtual PHR.
- the UE reports a virtual PHR.
- the UE only needs to, when generating a PHR report, for example, in the second reference subframe, decide that the uplink carrier is an uplink carrier by two-step scheduling. Then, the UE generates a virtual PHR of the corresponding carrier. For example, if in or before the second reference subframe, a first scheduling signaling has been received, but a signaling for one-step scheduling has not been received, the UE generates a virtual PHR of the corresponding carrier.
- the UE determines the PHR type according to the scheduling information about the one-step scheduling. For example, the UE has received two pieces of scheduling information in the second reference subframe, where one piece of scheduling information is a first scheduling signaling for two-step scheduling while the other piece of scheduling information is a scheduling signaling for one-step scheduling, and the uplink subframes scheduled by the two scheduling signalings are different.
- the UE reports a real PHR regardless of the contents indicated by the two-step scheduling signaling; and, if the scheduling signaling for one-step scheduling schedules uplink transmission not in the first reference subframe, the UE reports a virtual PHR regardless of the contents indicated by the two-step scheduling signaling.
- the UE reports a virtual PHR.
- the PHR information provided for the base station in Way 3 is less effective than that provided in Way 1 and Way 2 , but Way 3 is relatively simple.
- the PHR of the uplink carrier of the PUSCH is calculated as a real PHR according to the received first scheduling signaling.
- the PHR of the uplink carrier of the PUSCH is calculated as a virtual PHR.
- Step 803 The UE generates a PHR of each uplink carrier according to the determined PHR value of each uplink carrier, and reports the generated PHR of each uplink carrier on the selected uplink carrier and in the selected first reference subframe.
- the UE can generate a PHR report of an MAC layer in accordance with the prior art and according to the PHR value calculated by the physical layer, and then transmit in the first reference subframe by the selected PUSCH of uplink carrier.
- the UE can generate a PHR report of an MAC layer in accordance with the prior art and according to the PHR value calculated by the physical layer assuming a first reference subframe, and then transmit, in a subframe indicated by a second scheduling signaling, by the selected PUSCH of uplink carrier upon receiving the second scheduling signaling.
- a subframe eventually transmitting the PUSCH and the first reference subframe for calculating the PHR can be different subframes.
- both are called as first reference subframes in the present invention.
- the PHR contains not only a PHR value, but also an indication of a real PHR or a virtual PHR, and/or a value of the maximum power Pcmax,c of the carrier.
- clocks of the uplink carriers can be not aligned completely.
- CA Carrier Aggregation
- the basic steps are the same as Embodiment 2, i.e., the steps 801, 802 and 803.
- the specific way of selecting a carrier to transmit the PHR in the step 801 and the specific way of generating a PHR report of each carrier by the UE in the step 802 are different. Specifically:
- the UE can calculate the PHR by one or more of the following four ways.
- PHRs of other corresponding carriers with a shorter TTI length within the first reference subframe is calculated based on a first shorter TTI within the first reference subframe.
- the base station configures three uplink carriers for the UE, where the CC1 carrier has a subframe duration of 1 ms, the CC2 carrier has a subframe duration of 0.5 ms and the CC3 carrier has a subframe duration of 0.25 ms.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 (subframe duration is 1ms).
- the base station schedules the UE to transmit a PUSCH on the CC1 in the first reference subframe t 3 , and the UE includes PHR reports of the CC1, CC2 and CC3 in the PUSCH.
- the PHR of the CC2 should be determined according to the uplink transmission condition of a first subframe of the CC2 within an uplink subframe L1 of the CC1, i.e., a subframe n1 of the CC2.
- the PHR of the CC3 should be determined according to the uplink transmission condition of a subframe m1 of the CC3. For example, if the UE transmits a PUSCH in a subframe n1 of the CC2, the PHR of the CC2 is a real PHR; and, if the subframe n1 of the CC2 is a downlink subframe or does not schedules a PUSCH, the PHR is a virtual PHR. This is applicable to the CC3, as shown in Fig. 17.
- the UE also decides the PHR of each carrier within the first reference subframe, according to whether has received a scheduling signaling for scheduling and/or triggering the UE to transmit a PUSCH in the first reference subframe, and/or the first scheduling signaling, and/or the second scheduling signaling has been received in or before the second reference subframe.
- the minimum time delay from the receipt of the scheduling signaling by the UE to the transmission of the PUSCH by the UE may be different.
- the minimum time delay is also short, as shown in Fig, 18.
- the carrier CC1 has a subframe duration of 1 ms, and the time delay from the scheduling signaling to the PUSCH transmission is 4ms; and, the carrier CC2 has a subframe duration of 0.25 ms, and the time delay from the scheduling signaling to the PUSCH transmission is 1 ms.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 in the first reference subframe t 3 , and the UE includes PHR reports of the CC1 and CC2 in the PUSCH.
- the UE In the second reference subframe t (after the PHR triggering conditions are satisfied), the UE starts preparing PHR reports of the CC1 and CC2. Since the UE has not received the scheduling signaling for the CC2 on the second reference subframe moment t , the UE calculates the PHR of the CC2 in accordance with the virtual PHR even if the UE has subsequently received the scheduling signaling for the CC2 for scheduling the UE to transmit a PUSCH in a subframe m1 of the CC2.
- the PHR contains not only a PHR value, but also an indication of a real PHR or a virtual PHR, and/or a value of the maximum power Pcmax,c of the carrier.
- PHRs of other corresponding carriers with a shorter TTI length within the first reference subframe is calculated based on the first scheduled shorter TTI within the first reference subframe;. If there is no shorter subframe is scheduled within the first reference subframe, reporting a PHR of the first shorter TTI within the first reference subframe, or reporting a PHR of any shorter TTI within the first reference subframe, where the PHR is a virtual PHR.
- the UE does not need to report an indication of a TTI index.
- the UE reports not only the PHR but also an indication of a TTI index.
- N bits are added in the PHR signaling to indicate index indications of N shorter TTIs in the first reference subframe.
- the base station configures three uplink carriers for the UE, where the CC1 carrier has a subframe duration of 1 ms, the CC2 carrier has a subframe duration of 0.5 ms and the CC3 carrier has a subframe duration of 0.25 ms.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 on the first reference subframe t 3 , and the UE includes PHR reports of the CC1, CC2 and CC3 in the PUSCH.
- the base station schedules the CC2 to transmit a PUSCH in a subframe n1+1 , and the UE has received an uplink scheduling signaling for scheduling the PUSCH transmission on CC2 in subframe n1+1 before preparing the PHR, the UE calculates the PHR of the CC2 in accordance with the subframe n1+1 . Since the PUSCH transmission has been scheduled, the PHR of the CC2 is a real PHR. This is applicable to the CC3, as shown in Fig. 19. If the UE needs to further report an indication of the subframe index, the PHR of the CC2 needs to indicate a second subframe within the first reference subframe, and the PHR of the CC3 indicates a second subframe within the first reference subframe.
- the UE also decides the PHR of each carrier within the first reference subframe, according to whether a scheduling signaling for scheduling and/or triggering the UE to transmit a PUSCH in the first reference subframe, and/or the first scheduling signaling, and/or the second scheduling signaling has been received in or before the second reference subframe. For example, in Fig. 9, when preparing the PHR, if the UE has not received a scheduling signaling for scheduling the subframe n1+1 of the carrier CC2 to transmit a PUSCH, the UE reports the PHR of the CC2 as a virtual PHR based on subframe n1 .
- PHRs of other corresponding carriers with a shorter TTI length within the first reference subframe is calculated based on a shorter TTI within the first reference subframe, which is up to UE implementation.
- the UE does not need to report an indication of a TTI index.
- the UE reports not only the PHR but also an indication of a TTI index.
- the base station configures three uplink carriers for the UE, where the CC1 carrier has a subframe duration of 1 ms, the CC2 carrier has a subframe duration of 0.5 ms and the CC3 carrier has a subframe duration of 0.25 ms.
- the UE selects to report the PHR on the CC1, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC1 on the first reference subframe t 3 , and the UE includes PHR reports of the CC1, CC2 and CC3 in the PUSCH.
- the UE can select to report any one of two subframes of the CC2 within an uplink subframe L1 of the CC1 to calculate the PHR of the CC2. For example, the UE can select the subframe n1+1 to calculate the PHR. Since the PUSCH transmission has been scheduled, the PHR is a real PHR. This is applicable to the CC3.
- the UE calculates the PHR by preferentially considering whether a subframe has been determined on the second reference subframe t to transmit a PUSCH. For example, if, for subframes m1 and m1+1 of the CC3, it has been determined on the second reference subframe t that the subframe m1 does not transmit a PUSCH and the subframe m+1 transmits a PUSCH, but it has not been determined on the second reference subframe t whether subframes m1+2 and m1+3 transmit a PUSCH, the UE will select one of the subframes m1 and m1+1 to calculate the PHR.
- the UE when reporting the PHR value and the PHR type (virtual or real), the UE will also report the referenced subframe.
- the referenced subframe For example, for the carrier CC3, two bits can be used to indicate that the reported PHR is which one of the subframes m1 to m1+3 .
- Way 4 When the UE selects to transmit PHRs on an uplink carrier with a shorter TTI length, PHRs of other corresponding carriers with a longer TTI length overlapping with the first reference subframe should be calculated according to a TTI containing the first reference subframe.
- the calculation of a PHR of an uplink carrier with a smaller TTI length can be performed in accordance with one of the Ways 1 to 3.
- the base station configures three uplink carriers for the UE, where the CC1 carrier has a subframe duration of 1 ms, the CC2 carrier has a subframe duration of 0.5 ms and the CC3 carrier has a subframe duration of 0.25 ms.
- the UE selects to report the PHR on the CC3, and the first reference subframe is t 3 .
- the base station schedules the UE to transmit a PUSCH on the CC3 on the first reference subframe t 3 (subframe m1+1 ), and the UE includes PHR reports of the CC1, CC2 and CC3 in the PUSCH.
- the PHR of the CC3 is a real PHR, as shown in Fig. 20.
- the UE has determined the TTI length of each carrier of the first reference subframe before the second reference subframe t .
- the change in TTI length is configured semi-statically.
- the UE if the UE is unable to determine the TTI length of each carrier within the first reference subframe before the second reference subframe t , for example, if the TTI length of some carriers changes dynamically and the UE has not received any information indicative of the TTI length before the second reference subframe t , the UE calculates a virtual PHR according to the predefined reference TTI length.
- Embodiments 2 and 3 of the present invention have been described mainly with respect to a Carrier Aggregation (CA) scenario.
- the UE reports PHRs of all activated uplink carriers.
- the present invention is also applicable to a dual-connectivity scenario.
- the UE reports, to each eNB, PHRs of all activated uplink carriers under this eNB, and PHRs of all activated uplink carriers under another eNB.
- the PHRs of the another eNB can be always reported as virtual PHRs in accordance with the higher-layer configuration; or the PHRs are reported according to the scheduling condition and in accordance with the higher-layer configuration. In this case, the calculation and reporting of the PHRs can be performed according to the methods provided by the present invention.
- the base station can also group the activated uplink carriers of the UE. For example, uplink carriers with a longer TTI and uplink carriers with a shorter TTI are classified into two groups. Each group reports PHRs in this group, and for the other group, reporting PHRs as virtual PHRs or reporting in accordance with the scheduling condition is configured by a higher layer, or only virtual PHRs are reported.
- waveforms used in different carries may be different, for example, one carrier uses the OFDM modulation while another carrier uses the SC-FDMA or OFDM modulation
- the UE selects one carrier to report the PHR, for example, selects CC1 to report the PHR
- the PHR is determined according to the waveform of CC1.
- the PHR is a virtual PHR
- the virtual PHR is calculated according to the predefined waveform.
- the power control parameters corresponding to different waveforms may be different, for example, parameters such as Po and . Therefore, the value of the virtual PHR for different waveforms may also be different.
- the predefined waveform can be determined by one of the following methods: (1) the predefined waveform is a waveform semi-statically configured for PUSCH transmission, or (2) the predefined waveform is a default waveform specified by the standard, or (3) the predefined waveform is a waveform of a PUSCH transmitted in the last time, and the UE reports, to the base station, the waveform on which the virtual PHR is based, or (4) the predefined waveform is decided by the UE itself, and the UE reports, to the base station, the waveform on which the virtual PHR is based.
- the accumulation-type closed-loop power control parameter f c (i) for waveform y should be reset as f c (0).
- Embodiment 4 of the present invention provides a user equipment for power allocation.
- the user equipment comprises a power determination module 1901 and an adjustment module 1902.
- the power determination module 1901 receives uplink scheduling information, and determines a corresponding uplink transmit power on each uplink carrier according to the uplink scheduling information, a first reference subframe being a subframe which is determined according to the uplink scheduling information to transmit an uplink channel/signal; and, the adjustment module 1902 adjusts, according to an actual maximum uplink transmit power of the first reference subframe of the user equipment and a predefined first priority, the determined uplink transmit power of each uplink carrier, and/or determines whether to transmit an uplink signal.
- the specific function implementation of the modules in the user equipment for power allocation provided in Embodiment 4 can refer to the specific the steps of the power allocation method provided in Embodiment 1, and will not be repeated here.
- Embodiment 5 of the present invention provides a user equipment for reporting power headroom.
- the user equipment comprises a selection module 2001, a PHR value determination module 2002 and a report module 2003.
- the selection module 2001 selects, from at least one uplink carrier, one uplink carrier for reporting a Power Headroom Report (PHR) when conditions for reporting the PHR are satisfied, and determines an uplink subframe to transmit the PHR, the uplink subframe being a first reference subframe;
- the PHR value determination module 2002 determines, according to uplink scheduling information received in or before a second reference subframe or according to whether or not a carrier scheduled by two-step scheduling, PHR contents of each uplink carrier to be reported on the first reference subframe, and determines a corresponding PHR value according to the PHR contents;
- the report module 2003 generates a PHR of each uplink carrier according to the determined PHR value of each uplink carrier, and reports the generated PHR of each uplink carrier on the selected uplink carrier and in the selected first reference subframe.
- the specific function implementation of the modules in the user equipment for reporting power headroom provided in Embodiment 5 can refer to the specific steps of the method for reporting power headroom provided in Embodiment 2 and Embodiment 3, and will not be repeated here.
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
L'invention concerne un procédé et un système de communication permettant de faire converger un système de communication de 5ème génération (5G) destiné à prendre en charge des débits de données supérieurs à ceux d'un système de 4ème génération (4G) avec une technologie destinée à l'Internet des objets (IdO). La présente invention peut être appliquée à des services intelligents basés sur la technologie de communication 5G et la technologie de type IdO, tels que des services de maison intelligente, de bâtiment intelligent, de ville intelligente, de voiture intelligente, de voiture connectée, de soins de santé, d'éducation numérique, de vente au détail intelligente et de sûreté et de sécurité.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020187035348A KR102400708B1 (ko) | 2016-08-01 | 2017-08-01 | 전력 헤드룸을 보고하는 방법 및 상응하는 사용자 장치 |
EP17837216.5A EP3479628B1 (fr) | 2016-08-01 | 2017-08-01 | Procédé de rapport de marge de puissance et équipement utilisateur correspondant |
US16/322,376 US10798662B2 (en) | 2016-08-01 | 2017-08-01 | Method for reporting power headroom and corresponding user equipment |
US17/038,857 US11665650B2 (en) | 2016-08-01 | 2020-09-30 | Method for reporting power headroom and corresponding user equipment |
Applications Claiming Priority (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610622019 | 2016-08-01 | ||
CN201610622019.9 | 2016-08-01 | ||
CN201610796848.9 | 2016-08-31 | ||
CN201610796848 | 2016-08-31 | ||
CN201610887661 | 2016-10-11 | ||
CN201610887661.X | 2016-10-11 | ||
CN201610941521.6 | 2016-10-25 | ||
CN201610941521 | 2016-10-25 | ||
CN201710558248.3A CN107682923B (zh) | 2016-08-01 | 2017-07-10 | 功率余量上报的方法及相应的用户设备 |
CN201710558248.3 | 2017-07-10 |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/322,376 A-371-Of-International US10798662B2 (en) | 2016-08-01 | 2017-08-01 | Method for reporting power headroom and corresponding user equipment |
US17/038,857 Continuation US11665650B2 (en) | 2016-08-01 | 2020-09-30 | Method for reporting power headroom and corresponding user equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018026165A1 true WO2018026165A1 (fr) | 2018-02-08 |
Family
ID=61073038
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2017/008281 WO2018026165A1 (fr) | 2016-08-01 | 2017-08-01 | Procédé de rapport de marge de puissance et équipement utilisateur correspondant |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR102400708B1 (fr) |
WO (1) | WO2018026165A1 (fr) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020167103A1 (fr) * | 2019-02-15 | 2020-08-20 | 엘지전자 주식회사 | Procédé de rapport de marge de puissance dans une bande sans licence dans un système de communication sans fil et appareil associé |
CN112135363A (zh) * | 2018-02-13 | 2020-12-25 | Oppo广东移动通信有限公司 | 无线通信方法和设备 |
EP3836647A4 (fr) * | 2018-08-10 | 2021-09-01 | Huawei Technologies Co., Ltd. | Procédé et dispositif détermination de puissance |
WO2022084532A1 (fr) * | 2020-10-23 | 2022-04-28 | Telefonaktiebolaget Lm Ericsson (Publ) | Procédé et appareil de détermination de temps de traitement pour une planification inter-porteuse améliorée |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120314619A1 (en) | 2010-02-22 | 2012-12-13 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods and Arrangements for Contention-Based Uplink Transmission in a Wireless Communications System |
US20130010720A1 (en) | 2010-02-12 | 2013-01-10 | Panasonic Corporation | Power headroom reporting for non-scheduled uplink component carriers |
US20130100925A1 (en) * | 2010-08-24 | 2013-04-25 | Pantech Co. Ltd. | Apparatus and method for transmitting information on power headroom in multiple component carrier system |
US20130148619A1 (en) * | 2010-08-20 | 2013-06-13 | Pantech Co., Ltd. | Apparatus and method for transmitting information on power headroom in multiple component carrier system |
WO2015041406A1 (fr) * | 2013-09-20 | 2015-03-26 | Lg Electronics Inc. | Schéma de signalement de marge de puissance pour configurations multiples de sous-trames |
US20160183290A1 (en) * | 2013-08-02 | 2016-06-23 | Electronics And Telecommunications Research Institute | Uplink scheduling method and uplink transmission method |
-
2017
- 2017-08-01 KR KR1020187035348A patent/KR102400708B1/ko active IP Right Grant
- 2017-08-01 WO PCT/KR2017/008281 patent/WO2018026165A1/fr unknown
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130010720A1 (en) | 2010-02-12 | 2013-01-10 | Panasonic Corporation | Power headroom reporting for non-scheduled uplink component carriers |
US20120314619A1 (en) | 2010-02-22 | 2012-12-13 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods and Arrangements for Contention-Based Uplink Transmission in a Wireless Communications System |
US20130148619A1 (en) * | 2010-08-20 | 2013-06-13 | Pantech Co., Ltd. | Apparatus and method for transmitting information on power headroom in multiple component carrier system |
US20130100925A1 (en) * | 2010-08-24 | 2013-04-25 | Pantech Co. Ltd. | Apparatus and method for transmitting information on power headroom in multiple component carrier system |
US20160183290A1 (en) * | 2013-08-02 | 2016-06-23 | Electronics And Telecommunications Research Institute | Uplink scheduling method and uplink transmission method |
WO2015041406A1 (fr) * | 2013-09-20 | 2015-03-26 | Lg Electronics Inc. | Schéma de signalement de marge de puissance pour configurations multiples de sous-trames |
Non-Patent Citations (1)
Title |
---|
"3GPP; TSG RAN; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Control (MAC) protocol specification (Release 13", 3GPP TS 36.321, 7 July 2016 (2016-07-07), XP055461586 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112135363A (zh) * | 2018-02-13 | 2020-12-25 | Oppo广东移动通信有限公司 | 无线通信方法和设备 |
CN112135363B (zh) * | 2018-02-13 | 2022-05-31 | Oppo广东移动通信有限公司 | 无线通信方法和设备 |
US11653351B2 (en) | 2018-02-13 | 2023-05-16 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Wireless communication method and device |
EP3836647A4 (fr) * | 2018-08-10 | 2021-09-01 | Huawei Technologies Co., Ltd. | Procédé et dispositif détermination de puissance |
US11638222B2 (en) | 2018-08-10 | 2023-04-25 | Huawei Technologies Co., Ltd. | Power determining method and apparatus |
WO2020167103A1 (fr) * | 2019-02-15 | 2020-08-20 | 엘지전자 주식회사 | Procédé de rapport de marge de puissance dans une bande sans licence dans un système de communication sans fil et appareil associé |
WO2022084532A1 (fr) * | 2020-10-23 | 2022-04-28 | Telefonaktiebolaget Lm Ericsson (Publ) | Procédé et appareil de détermination de temps de traitement pour une planification inter-porteuse améliorée |
Also Published As
Publication number | Publication date |
---|---|
KR102400708B1 (ko) | 2022-05-23 |
KR20190025828A (ko) | 2019-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3479628A1 (fr) | Procédé de rapport de marge de puissance et équipement utilisateur correspondant | |
WO2022019714A1 (fr) | Procédé et appareil de configuration et de signalisation de ressources de liaison latérale pour une coordination inter-ue | |
WO2018062832A1 (fr) | Procédé et dispositif de contrôle de congestion | |
WO2020167000A1 (fr) | Procédé et appareil de commande de puissance de transmission d'un équipement utilisateur dans un système de communication sans fil | |
WO2021015506A1 (fr) | Procédé et appareil pour une communication de véhicule à tout (v2x) dans un système de communication sans fil | |
WO2018062966A1 (fr) | Procédés et dispositifs d'émission et de réception de signaux | |
WO2018203689A1 (fr) | Appareil et procédé de gestion d'une configuration de canal d'accès aléatoire dans un système de communication sans fil | |
WO2018044080A1 (fr) | Procédé de transmission d'informations de commande de liaison descendante dans un système de communication sans fil, et dispositif associé | |
WO2017213393A1 (fr) | Procédé et équipement utilisateur pour émettre des signaux de liaison montante | |
EP3508016A1 (fr) | Procédé et dispositif de commande de puissance | |
WO2017196086A1 (fr) | Procédé et appareil pour attribuer des ressources de liaison montante pour un réseau cellulaire utilisant des bandes sans licence | |
WO2017209570A1 (fr) | Procédé de transmission de données en liaison montante, procédé d'accès aléatoire, et ue et station de base correspondants | |
WO2021221363A1 (fr) | Procédé et appareil permettant de réaliser une communication sl sur la base d'un surdébit de psfch dans v2x de nr | |
WO2016182295A1 (fr) | Procédé permettant à un terminal d'effectuer une communication v2x dans un système de communication sans fil et terminal utilisant le procédé | |
WO2016163709A1 (fr) | Procédé permettant d'attribuer des ressources dans un réseau cellulaire à l'aide d'une bande non autorisée et dispositif associé | |
WO2021029596A1 (fr) | Procédé et appareil pour émettre et recevoir une réponse harq dans un système de communication prenant en charge la communication de liaison latérale | |
WO2017171299A1 (fr) | Procédé et appareil pour le renvoi d'informations d'accusé de réception de harq | |
WO2019070095A1 (fr) | Procédé et appareil destinés à améliorer les performances de coexistence par des mesures dans des systèmes de communication sans fil | |
WO2017135573A1 (fr) | Procédé de transmission de signaux sur la base d'une technologie d'accès multi-radio dans un système de communication sans fil et appareil associé | |
EP3504897A1 (fr) | Procédé et dispositif de contrôle de congestion | |
WO2018026165A1 (fr) | Procédé de rapport de marge de puissance et équipement utilisateur correspondant | |
WO2018062969A1 (fr) | Procédé et dispositif de commande de puissance | |
WO2021071230A1 (fr) | Procédé et appareil permettant de réaliser une réservation de ressources dans nr v2x | |
WO2022086251A1 (fr) | Procédé et dispositif de sélection de ressource dans un système de communication sans fil | |
WO2021071216A1 (fr) | Procédé et dispositif pour transmettre ou recevoir une rétroaction harq dans le numéro v2x |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17837216 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 20187035348 Country of ref document: KR Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2017837216 Country of ref document: EP Effective date: 20190129 |