WO2017213296A1 - Apparatus for disassembling slab formwork support - Google Patents

Apparatus for disassembling slab formwork support Download PDF

Info

Publication number
WO2017213296A1
WO2017213296A1 PCT/KR2016/008604 KR2016008604W WO2017213296A1 WO 2017213296 A1 WO2017213296 A1 WO 2017213296A1 KR 2016008604 W KR2016008604 W KR 2016008604W WO 2017213296 A1 WO2017213296 A1 WO 2017213296A1
Authority
WO
WIPO (PCT)
Prior art keywords
support
pin
slab formwork
locking
bar
Prior art date
Application number
PCT/KR2016/008604
Other languages
French (fr)
Korean (ko)
Inventor
김두일
Original Assignee
주식회사 진아스틸
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 진아스틸 filed Critical 주식회사 진아스틸
Publication of WO2017213296A1 publication Critical patent/WO2017213296A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/061Shores or struts; Chocks telescopic with parts held together by positive means by pins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut

Definitions

  • the present invention relates to a support dismantling device for supporting slab formwork, and more particularly, to enable stable installation at the time of slab formwork installation, and at the same time, the support can be easily and stably separated by a worker when removing the formwork from the slab, thereby simplifying work and Together, the present invention relates to a support dismantling device for supporting slab formwork, which can shorten the air and greatly reduce the dismantling cost.
  • formwork is installed in a horizontal direction orthogonal to the wall surface in a state where a wall of the building is formed, and the formwork is arranged to support the formwork by arranging a plurality of clubs on the formwork. After the concrete is put into the formwork so that the slab is cured, the installed formwork is removed to complete the slab.
  • the wall formwork is constructed, and then the formwork is installed in the horizontal direction on the wall formwork, and then the concrete is poured and the same construction is repeated to construct the multi-layered building structure.
  • the support for supporting the slab formwork is provided with a bottom contact support piece at the bottom in a hollow shape and a fixed bar having a threaded portion formed along the periphery of the upper outer circumferential surface, and is coupled to the threaded portion and screwed together according to the forward and reverse rotation. And a support handle to support the slab formwork at the upper end, and a lower end is inserted into the slide bar downward through the upper side of the fixing bar, and the lifting bar having a plurality of locking holes formed at equal intervals on the outside and the fixing bar.
  • the support handle can be separated by rotating the support handle during disassembly. There is a problem in that the support handle is not easily rotated because it is kept in close contact with the screw through.
  • the locking pin must be removed in a state in which a large load is applied from the upper side, but the locking pin has a load, so that it is difficult for a worker to manually remove the locking pin.
  • Korean Patent Registration No. 10-0765090 has been presented for construction copper barrier, which is to apply the hydraulic jack to support and dismantle the slab formwork, which will damage the slab formwork by accidentally acting hydraulic force during installation.
  • the hydraulic jack shrinks when the expansion force acts in the curing process.
  • Republic of Korea Patent Registration No. 10-1514395 has been proposed to support the slab formwork, which is the main purpose to perform the installation and dismantling work of the slab formwork in a short time, but in the case of the above-described technology, the number of parts In addition, there was a problem in addition to the cost of increased parts and reinstallation after installation.
  • the structure that locks and unlocks the support consists of a minimum of parts and is not separated after being combined to allow the parts to be used safely for a long time.
  • the threaded portion is formed on the outside of the upper end and the slide bar is inserted through the upper end of the fixed bar and the vertical guide hole formed on both sides of the threaded portion, the upper end is supported by the slab formwork and the position fixed to the screw
  • the slab formwork support dismantling device made of a clamp for passing through the adjusted support bar in the locked state and both ends of the clamp to lock the locking pins located in both vertical guide holes
  • the clamp the support handle is screwed to the upper threaded portion of the fixing bar and the support surface is formed on the upper surface is smooth along the circumference;
  • a bottom surface is slide-supported to an upper support surface of the support handle, and guide holes are formed to guide both ends of the locking pins on both outer sides thereof.
  • the guide jaw is formed to protrude along the periphery of the outer surface, the both ends of the locking pin passing through the guide hole on the guide jaw are fixed so that they can be moved in one direction with respect to the center axis of the fixing bar
  • a pin holder having a predetermined width along a circumference horizontally from a lower end of the vertical end and the vertical end so as to vertically fall when the locking pin moves on one side of the jaw and the fixing jaw; It wraps around the outer shape of the pin holder and is coupled to the lower end of the guide jaw and slides, and the upper end of the pin holder is engaged with the upper extension end of the pin holder, and both ends of the locking pin mounted on the fixing jaw on one side are downward. And a pin locking member which is pinned upwardly and downwardly inserted into the guide groove on one side of the pin fixing groove and the pin fixing groove so as to be wrapped and coupled downward.
  • a handle bar for rotation is provided on both sides of the support handle, it is possible to apply that at least one handle bar of the handle bar is rotatably folded around the upper hinge.
  • the slide groove is formed in the lower side of the pin holder to be opened downward along the circumference, and the slide jaw fitted into the slide groove to the upper end of the support handle is formed to protrude outward.
  • a locking means is provided at the lower side of the pin holder to fix the pin holder to the support handle, and the locking means is formed with a hooked end so that the bent lower end is engaged with the slide jaw of the support handle.
  • the clip is in close contact with the pin holder, and a fastener for fixing the clip to the pin holder can be applied.
  • the present invention is a.
  • the clamp wraps around the structure to lock and dismantle the support, thereby preventing foreign matter from penetrating from the outside, and thus, the support handle can be easily rotated when dismantling the support.
  • FIG. 1 is a perspective view of a support dismantling device for supporting a slab formwork according to the present invention
  • FIG. 1 is an exploded perspective view of FIG. 1;
  • FIG. 3 is an enlarged cross-sectional view of the main portion of FIG. 1;
  • Figure 4 is a flow chart showing the installation and dismantling process of the support dismantling device according to the present invention
  • FIG. 5 is an enlarged view of FIG. 4;
  • FIG. 6 shows another embodiment of the handle for rotation according to the locking and unlocking in FIG. 1;
  • the present invention relates to a support dismantling device for supporting a slab formwork, which is easy to be dismantled after installation in a support having a plurality of upper surfaces to support the slab formwork.
  • the present invention is a fixed bar 100 standing on the bottom surface shown in Figures 1 to 3, the support handle 200 is screwed to the upper end of the fixed bar 100, the top slab formwork (SL) To support any one of the pin bar 320 formed in the support bar 300 and the support bar 300 is inserted into the fixed bar 100 in the coaxial direction slide on the top of the fixed bar 100 Passing through both ends of the locking pin 400 is located in the orthogonal direction with respect to the fixing bar 100 and is movable up and down, and is mounted on the support handle 200 is rotatable and the locking pin 400 is caught It is configured to include a clamp 500 to be guided to be released and fixed with a fixed distance fall with the support bar 300.
  • SL top slab formwork
  • the fixing bar 100 is provided in the bottom in the hollow shape, the bottom contact support piece 110, the threaded portion 120 is formed along the circumference of the outer peripheral surface.
  • vertical guide holes 140 are formed on both sides of the screw part 120 in the axial direction.
  • the ground contact support piece 110 one surface is in close contact with the bottom surface made of a metal plate and has an expanded form than the outer diameter of the fixing bar (100).
  • the support handle 200, the screw hole 210 is formed so as to be screwed up and down to the screw portion 120 of the fixing bar 100 in the center is moved up and down in the axial direction according to the forward and reverse rotation, the rotation on both sides Handle bar 220 for protruding is formed, the smooth support surface 230 is formed on the upper surface.
  • the handle bar 220 may be applied to be folded rotatably around the upper hinge.
  • the handlebars 220 for rotation are protruded on both outer sides of the support handle 200, and one side of the handle bar 220 is provided on the holder 262 provided on the outside of the support handle 200.
  • the hinge pins 264 may be hinged so as to be rotatable. (See FIG. 6).
  • the support bar 300 is provided with a support piece 310 to support the bottom surface of the slab formwork at the upper end in a solid or hollow shape, the lower end is inserted through the slide downward from the upper side of the fixing bar (100). .
  • the plurality of locking holes 320 are formed at equal intervals in the vertical direction.
  • the locking pin 400 is to be fixed to the support bar 300 with respect to the fixing bar 100, is positioned in an orthogonal state with respect to the fixing bar 100 and the support bar 300 Pass through the locking hole 320 and both ends are located in the vertical guide groove 140 formed in the screw portion 120 of the fixing bar (100).
  • the clamp 500 is a core technical means of the present invention, and is fixed and guided at both ends of the locking pin 400 by being mounted on the support surface 230 formed on the upper surface of the support handle 200. It is composed of a pin holder 540 and a pin locking member 560 coupled to the pin holder 540 to regulate the locking pin 400.
  • the pin holder 540 the bottom surface is slide-supported on the upper support surface 230 of the support handle 200, guide holes 541 are formed so that both ends of the locking pin 400 is guided on both sides of the outer side. .
  • the guide jaw 542 is formed to protrude along the periphery of the outer surface, and both ends of the locking pin 400 passing through the guide hole 541 are respectively raised on the guide jaw 542 to the fixing bar 100.
  • the fixed end 543 and the vertical end 544 and the vertical end to be vertically dropped during the movement of the locking pin 400 on one side of the fixed jaw 543 and the fixed jaw 543 to be moved in one direction based on the central axis of the (
  • a guide groove 545 of a predetermined width is formed along the perimeter horizontally from the bottom of the 544.
  • the fixing jaw 543 is preferably formed to be inclined toward the vertical end 544 rather than horizontal, so that the locking pin 400 slides downward.
  • the locking pin 400 when both ends of the locking pin 400 is mounted on the fixing jaw 543 and moved in one direction, the locking pin 400 is positioned at the bottom of the guide groove 545 through the vertical end 544. ) Moves downward with the support bar 300 by the height of the vertical end 544, so that the upper support piece 310 of the support bar 300 is separated from the slab formwork.
  • the pin locking member 560 is coupled to surround the outer shape of the pin holder 540, the lower end is mounted on the guide jaw 542 and slide, and the upper end of the pin holder 540 when the upper end is moved upward ( 546, the pin fixing groove 562 and the pin fixing groove 562 on one side of the pin fixing groove 562 so as to surround and engage both ends of the locking pin 400 mounted on the fixing jaw 543 on one side.
  • the pin locking pieces 564 are inserted into the grooves 545 and fixed to prevent rotation thereof to protrude downward.
  • a lower end of the pin holder 540 constituting the clamp 500 may be locked to the support surface 230 of the support handle 200 through both clip fixing means 600.
  • 240 and one side vertical piece 622 is fixed to the outside of the pin holder 540 by a fastener 630 and the other horizontal piece 624 is caught by the locking protrusion 240.
  • the pin holder 540 from the support handle 200 is composed of a locking clip 620 to be fixed so as not to be separated.
  • the horizontal piece 624 of the locking clip 620 coupled to the pin holder 540 through the vertical piece 622 is prevented from being separated upward from the upper locking protrusion 240 of the support handle 200. It is latched so as to prevent the clamp 500 from being separated from the support handle 200.
  • the support handle 200 is coupled to the threaded portion 120 of the fixing bar 100, and at the same time, the clamp 500 is placed on the support surface 230 of the support handle 200.
  • the lower ground contact support piece 110 of the fixing bar 100 is supported on the bottom surface, and the upper support piece 310 of the support bar 300 is positioned to support the slab formwork, and then the locking pin 400 is positioned.
  • both ends of the locking pin 400 to pass through the pin The locking pin 400 is positioned in the pin fixing groove 562 of the pin locking piece 564 by moving the pin locking member 560 downward while being positioned at the fixing jaw 543 of the holder 540. Then, the movement of the locking pin 400 is controlled by the pin locking piece 564 to maintain a fixed state. Thereafter, the support handle 200 is rotated so that the support piece 310 of the support bar 300 supports the slab formwork, and the locking clip 620 vertically forming the clip fixing means 600 to the pin holder 540 in succession. When the piece 622 is fixed with the fastener 630 and the horizontal piece 624 of the locking clip 620 is caught by the upper locking protrusion 240 of the support handle 200, the installation is completed.
  • the fastener 630 constituting the clip fixing means 600 is dismantled so that the locking clip 620 is dismantled.
  • the pin locking member 560 constituting the clamp 500 is moved upward.
  • the pin locking piece 564 is moved upward from the guide groove 545 and the pin locking member 560 is continuously rotated, the pin locking member 560 with respect to the pin holder 540 guide jaw 542
  • the lock pin 400 is rotated by the guide of one side is open to the state that can be dropped.
  • the pin holder 540 is slide-rotated about the support surface 240 of the support handle 200 and at the same time fixed to the locking pin 400.
  • the jaw 545 is moved so that both ends of the locking pin 400 is downwardly dropped by the vertical end 544 section and positioned at the bottom of the guide groove 545. At this time, the upper end of the support bar 300 with respect to the fixing bar 100 is spaced apart from the slab formwork by the downward movement distance of the locking pin 400 and then the worker dismantles the support.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to an apparatus for disassembling a slab formwork support. The present invention comprises: a fixing bar (100) which stands on the ground, and has a threaded portion (120) formed on the outer surface of the upper end thereof and vertical guide holes (140) formed on both sides of the threaded portion (120); a supporting bar (300) which is slidingly inserted into the upper end of the fixing bar (100) and the upper end of which is supported against a slab formwork; and a clamp (500) which is positioned and fixed on the threaded portion (120) so as to selectively clamp and unclamp a locking pin (400) that engagingly passes through the supporting bar (300) at an adjusted height and is disposed in both the vertical guide holes (140) at both ends thereof. The present invention has an advantage in that, when a worker hits a supporting handle included in the clamp (500) in a process of disassembling a slab formwork support after the support has supported a slab formwork, the clamp (500) is rotated and simultaneously moves downward by a predetermined distance together with the supporting bar, and thus the worker can simply and easily disassemble the support.

Description

슬래브 거푸집 지지용 서포트 해체장치Support dismantling device for supporting slab formwork
본 발명은 슬래브 거푸집 지지용 서포트 해체장치에 관한 것으로서, 더욱 상세하게는 슬래브 거푸집 설치시 안정된 설치가 가능하도록 하고 동시에 슬래브로부터 거푸집 분리시 서포트가 작업자에 의해 간편하게 안정되게 분리될 수 있도록 하여 작업 간편화와 함께 공기 단축은 물론 해체 비용을 크게 절감시킬 수 있는 슬래브 거푸집 지지용 서포트 해체장치에 관한 것이다.The present invention relates to a support dismantling device for supporting slab formwork, and more particularly, to enable stable installation at the time of slab formwork installation, and at the same time, the support can be easily and stably separated by a worker when removing the formwork from the slab, thereby simplifying work and Together, the present invention relates to a support dismantling device for supporting slab formwork, which can shorten the air and greatly reduce the dismantling cost.
통상적으로, 건축 구조물 시공시 슬래브를 성형하기 위해서는 건축물의 벽체가 형성된 상태에서 상기 벽체면에 대해 직교하는 수평방향으로 거푸집을 설치하고, 상기 거푸집에 복수개의 동바리를 배열시켜 상기 거푸집을 지지하도록 한 다음, 상기 거푸집에 콘크리트를 투입하여 슬래브가 양생되도록 한 후 설치된 거푸집을 제거하여 슬래브를 완성하게 된다.In general, in order to mold the slab during construction of a building structure, formwork is installed in a horizontal direction orthogonal to the wall surface in a state where a wall of the building is formed, and the formwork is arranged to support the formwork by arranging a plurality of clubs on the formwork. After the concrete is put into the formwork so that the slab is cured, the installed formwork is removed to complete the slab.
다층 구조물의 경우에도 마찬가지로 벽체면 거푸집을 시공한 다음, 벽체면 거푸집 상부에 수평방향으로 거푸집을 설치한 후 콘크리트를 타설하여 시공하고, 이와 같은 시공을 반복하여 다층의 건축 구조물을 건설하고 있다.In the case of a multi-layered structure, likewise, the wall formwork is constructed, and then the formwork is installed in the horizontal direction on the wall formwork, and then the concrete is poured and the same construction is repeated to construct the multi-layered building structure.
상기에서 슬래브 거푸집을 지지하는 서포트는, 중공형상으로 하단에 지면 밀착용 받침편이 구비되고 상단 외주면에 둘레를 따라 나사부가 형성되는 고정바와, 상기 나사부에 결합되어 정역 회전에 따라 나사 결합되며 위치를 달리하는 지지핸들과, 상단에 상기 슬래브 거푸집을 지지하도록 지지편이 구비되고 하단이 상기 고정바의 상측에서 하향으로 슬라이드 통과하여 삽입되며 외측에 복수의 잠금홀이 등간격 형성되는 승하강바와, 상기 고정바에 형성된 장홀과 상기 승하강바의 잠금홀을 통과하고 동시에 양단이 상기 지지핸들에 지지되어 승하강바를 고정하게 되는 잠금핀으로 구성되어 설치시에는 지지핸들을 회전시켜 승하강바가 슬래브 거푸집을 지지하도록 하고 일정시간 지나 양생후 해체시에는 지지핸들을 반대방향으로 회전시켜 슬래브 거푸집으로부터 분리하게 된다.The support for supporting the slab formwork is provided with a bottom contact support piece at the bottom in a hollow shape and a fixed bar having a threaded portion formed along the periphery of the upper outer circumferential surface, and is coupled to the threaded portion and screwed together according to the forward and reverse rotation. And a support handle to support the slab formwork at the upper end, and a lower end is inserted into the slide bar downward through the upper side of the fixing bar, and the lifting bar having a plurality of locking holes formed at equal intervals on the outside and the fixing bar. It consists of a locking pin that passes through the formed hole and the locking hole of the elevating bar and at the same time both ends are supported by the support handle to fix the elevating bar, and the elevating bar supports the slab formwork by rotating the support handle. After curing for some time, dismantle the slab by rotating the support handle in the opposite direction. It will separate from the formwork.
하지만, 서포트의 경우 설치 상태에서 양생시간 동안 슬래브를 지지해야 함에 따라 하중이 지속적으로 작용하게 되고 이후, 해체과정에서 지지핸들을 회전시켜야 분리가 가능하게 되는데 이때, 지지핸들이 오랜 시간의 하중력을 통해 나사부에 밀착된 상태를 유지하고 있어 지지핸들이 쉽게 회전되지 않는 문제점이 있었다.However, in the case of the support, as the slab must be supported during curing time in the installed state, the load is continuously operated, and afterwards, the support handle can be separated by rotating the support handle during disassembly. There is a problem in that the support handle is not easily rotated because it is kept in close contact with the screw through.
다시말해, 상부측으로부터 하중이 크게 작용하는 상태에서 잠금핀을 분리해야 하는데 잠금핀에 하중이 걸린 상태이어서 작업자가 수작업으로 잠금핀을 분리시키기 힘든 문제점이 있어왔다.In other words, the locking pin must be removed in a state in which a large load is applied from the upper side, but the locking pin has a load, so that it is difficult for a worker to manually remove the locking pin.
또한, 슬래브 거푸집에 타설되는 콘크리트가 서포트를 타고 흘러내려 지지핸들에 쌓이게 되면 잠금핀의 분리 또는 지지핸들을 회전시키지 못하고 훼손후 분리해야 하는 문제점이 있었다.In addition, when the concrete poured into the slab formwork flows down the support and accumulated on the support handle, there is a problem in that the separation of the locking pin or the support handle cannot be rotated and then removed after the damage.
종래 상기 문제점을 해결하고자 슬래브 거푸집을 지지하는 서포트를 작업자가 간편하게 해제하는 구조물이 다수 제시된 바 있다.In order to solve the above problem, a number of structures for easily releasing a support for supporting a slab formwork have been presented.
한 예로서, 대한민국 특허등록 제10-0765090호 건축용 동바리가 제시된 바 있으며, 이는 유압잭을 적용하여 슬래브 거푸집을 지지 및 해체할 수 있도록 하는 것이어서 설치시 자칫 실수로 유압력을 작용시켜 슬래브 거푸집을 훼손시킬 수 있는 우려가 있고 더불어 양생과정에 있어 팽창력이 작용하게 되면 유압잭이 수축되는 문제점이 있어왔다.As an example, Korean Patent Registration No. 10-0765090 has been presented for construction copper barrier, which is to apply the hydraulic jack to support and dismantle the slab formwork, which will damage the slab formwork by accidentally acting hydraulic force during installation. In addition, there is a concern that there is a problem that the hydraulic jack shrinks when the expansion force acts in the curing process.
또한, 대한민국 특허등록 제10-1514395호 슬래브 거푸집의 지지장치가 제시된 바 있으며, 이는 슬래브 거푸집의 설치 및 해체작업을 단시간에 수행할 수 있도록 한 것이 주된 목적이나 상기한 기술의 경우 부품수가 많아 조립의 불편함이 있고 또한 부품 증가에 따른 비용추가 그리고 설치 후 재설치가 힘든 문제점이 있었다.In addition, the Republic of Korea Patent Registration No. 10-1514395 has been proposed to support the slab formwork, which is the main purpose to perform the installation and dismantling work of the slab formwork in a short time, but in the case of the above-described technology, the number of parts In addition, there was a problem in addition to the cost of increased parts and reinstallation after installation.
이에 본 발명은 상기한 문제점을 해결하기 위해 창안된 것으로,Accordingly, the present invention was made to solve the above problems,
본 발명의 목적은,The object of the present invention,
첫째; 서포트를 통한 슬래브 거푸집 지지후 해체 과정시 지지핸들의 풀림이 간편한 동작에 의해 이루어지도록 하여 작업자가 간편하게 해체할 수 있도록 하는데 있다.first; In the dismantling process after supporting the slab formwork through the support, the loosening of the support handle is made by simple operation so that the worker can easily dismantle it.
둘째; 슬래브 거푸집을 지지하는 서포트의 해체 작업후 서포트를 이루는 구성 부품을 재사용 할 수 있도록 하는데 있다.second; After dismantling the support supporting the slab formwork, it is possible to reuse the components that make up the support.
셋째; 서포트를 잠금 및 해제시키는 구조물이 최소한의 부품으로 이루어지며 결합후 분리되지 않아 부품을 오랜시간 안전하게 사용할 수 있도록 하는데 있다.third; The structure that locks and unlocks the support consists of a minimum of parts and is not separated after being combined to allow the parts to be used safely for a long time.
상기 목적을 달성하기 위하여 본 발명은,The present invention to achieve the above object,
지면에 세워지며 상단 외측에 나사부가 형성되고 상기 나사부의 양쪽에 수직 가이드홀이 형성된 고정바와 상기 고정바의 상단을 통해 슬라이드 삽입되며 상단이 슬래브 거푸집에 지지되는 지지바 및 상기 나사부에 위치 고정되어 높이 조절된 상기 지지바를 걸림 상태로 통과하여 양단이 양쪽 수직 가이드홀에 위치된 잠금핀을 잠금 고정시키는 클램프로 이루어지는 슬래브 거푸집 지지용 서포트 해체장치에 있어서,Standing on the ground, the threaded portion is formed on the outside of the upper end and the slide bar is inserted through the upper end of the fixed bar and the vertical guide hole formed on both sides of the threaded portion, the upper end is supported by the slab formwork and the position fixed to the screw In the slab formwork support dismantling device made of a clamp for passing through the adjusted support bar in the locked state and both ends of the clamp to lock the locking pins located in both vertical guide holes,
상기 클램프가, 상기 고정바의 상단 나사부에 나사결합되며 상면에 둘레를 따라 평활한 받침면이 형성되는 지지핸들; 저면이 상기 지지핸들의 상측 받침면에 슬라이드 지지되고, 외측 양쪽에 상기 잠금핀의 양단이 안내되도록 안내홀이 형성되며. 외면 하측에 둘레를 따라 가이드턱이 돌출 형성되고, 상기 가이드턱에 상기 안내홀을 통과하는 상기 잠금핀의 양단이 각각 올려져 상기 고정바의 중심축을 기준으로 한쪽 방향으로 이동될 수 있도록 걸림되는 고정턱과 상기 고정턱의 일측에 상기 잠금핀의 이동시 수직 낙하되도록 수직단 및 상기 수직단의 하단으로부터 수평하게 둘레를 따라 일정폭의 가이드홈이 형성된 핀 홀더; 상기 핀 홀더의 외형을 감싸며 결합되며 하단이 상기 가이드턱에 올려져 슬라이드 되고, 상단이 상향 이동시 상기 핀 홀더의 상측 확개단에 걸림되며, 일측에 상기 고정턱에 올려진 상기 잠금핀의 양단을 하향으로 감싸며 결합하도록 핀고정홈 및 상기 핀고정홈의 일측에 상기 가이드홈에 상하로 끼워져 회전이 방지되게 고정되는 핀잠금편이 하향 돌출 형성되는 핀 잠금부재;를 포함한다.The clamp, the support handle is screwed to the upper threaded portion of the fixing bar and the support surface is formed on the upper surface is smooth along the circumference; A bottom surface is slide-supported to an upper support surface of the support handle, and guide holes are formed to guide both ends of the locking pins on both outer sides thereof. The guide jaw is formed to protrude along the periphery of the outer surface, the both ends of the locking pin passing through the guide hole on the guide jaw are fixed so that they can be moved in one direction with respect to the center axis of the fixing bar A pin holder having a predetermined width along a circumference horizontally from a lower end of the vertical end and the vertical end so as to vertically fall when the locking pin moves on one side of the jaw and the fixing jaw; It wraps around the outer shape of the pin holder and is coupled to the lower end of the guide jaw and slides, and the upper end of the pin holder is engaged with the upper extension end of the pin holder, and both ends of the locking pin mounted on the fixing jaw on one side are downward. And a pin locking member which is pinned upwardly and downwardly inserted into the guide groove on one side of the pin fixing groove and the pin fixing groove so as to be wrapped and coupled downward.
여기서, 상기 지지핸들의 양측에 회전을 위한 핸들바가 돌출 구비되며, 상기 핸들바 중 적어도 하나의 핸들바가 상단 힌지를 중심으로 회전 가능하게 접힘된 것을 적용할 수 있다.Here, a handle bar for rotation is provided on both sides of the support handle, it is possible to apply that at least one handle bar of the handle bar is rotatably folded around the upper hinge.
또한, 상기 핀 홀더의 하측에 둘레를 따라 하향 개방되게 슬라이드홈이 형성되고, 상기 지지핸들의 상측 단부에 상기 슬라이드홈에 끼워져 결합되는 슬라이드턱이 외향으로 돌출 형성되도록 함이 바람직할 것이다. In addition, it is preferable that the slide groove is formed in the lower side of the pin holder to be opened downward along the circumference, and the slide jaw fitted into the slide groove to the upper end of the support handle is formed to protrude outward.
또한, 상기 핀 홀더의 외측에 회전을 위한 회전돌기가 돌출 형성되도록 함이 바람직 할 것이다.In addition, it will be desirable to have a rotating protrusion for rotation on the outside of the pin holder protruding.
또한, 상기 핀 홀더의 하측에 상기 핀 홀더가 상기 지지핸들에 고정되도록 잠금수단이 제공되며, 상기 잠금수단이, 절곡된 하단이 상기 지지핸들의 슬라이드턱에 걸림되도록 걸림단이 형성되고 절곡된 상단이 상기 핀 홀더에 밀착되는 클립과, 상기 클립을 상기 핀 홀더에 고정시키는 체결구로 이루어진 것을 적용할 수 있다. In addition, a locking means is provided at the lower side of the pin holder to fix the pin holder to the support handle, and the locking means is formed with a hooked end so that the bent lower end is engaged with the slide jaw of the support handle. The clip is in close contact with the pin holder, and a fastener for fixing the clip to the pin holder can be applied.
본 발명은 The present invention
첫째; 서포트를 통한 슬래브 거푸집 지지후 해체 과정시 지지핸들을 타격하여 회전 동작을 하게 되면 회전과 동시에 지지바와 함께 일정폭 하향 이동되어져 작업자의 지지핸들 회전이 간편하게 되는 장점이 있다.first; When supporting the slab formwork through the support and then rotating the handle by hitting the support handle during the dismantling process, there is an advantage that the support handle of the operator can be easily rotated by being moved downward downward with the support bar.
둘째; 슬래브 거푸집을 지지하는 서포트의 해체 작업후 서포트를 이루는 구성 부품을 재사용 할 수 있는 장점이 있다.second; After dismantling of the support supporting the slab formwork, there is an advantage of reusing the components that make up the support.
셋째; 서포트를 잠금 및 해체시키는 구조물을 클램프가 감싸게 되어 외부로부터 이물질이 침투되지 않도록 보호하게 되고 이에따라 서포트 해체시 지지핸들이 쉽게 회전될 수 있는 장점이 있다.third; The clamp wraps around the structure to lock and dismantle the support, thereby preventing foreign matter from penetrating from the outside, and thus, the support handle can be easily rotated when dismantling the support.
도 1은 본 발명에 따른 슬래브 거푸집 지지용 서포트 해체장치의 사시도,1 is a perspective view of a support dismantling device for supporting a slab formwork according to the present invention,
도 2는 도 1의 분리 사시도,2 is an exploded perspective view of FIG. 1;
도 3은 도 1의 요부 단면 확대도,3 is an enlarged cross-sectional view of the main portion of FIG. 1;
도 4는 본 발명에 따른 서포트 해체장치의 설치 및 해체 과정을 도시한 흐름도,Figure 4 is a flow chart showing the installation and dismantling process of the support dismantling device according to the present invention,
도 5는 도 4의 확대도,5 is an enlarged view of FIG. 4;
도 6은 도 1에서 잠금 및 해제에 따른 회전을 위한 핸들의 다른 실시예.6 shows another embodiment of the handle for rotation according to the locking and unlocking in FIG. 1;
이하, 본 발명에 따른 바람직한 실시예를 첨부된 도면을 참조로 하여 상세히 설명하며 본 발명을 설명함에 있어 관련된 공지기술 등은 본 발명의 요지를 흐리게 할 수 있다고 판단되는 경우 그 자세한 설명은 생략하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings, and in describing the present invention, if it is determined that related related arts may blur the gist of the present invention, the detailed description thereof will be omitted. do.
본 발명은 바닥면에 복수개 위치되어 상단이 슬래브 거푸집을 지지하도록 하는 서포트에 있어 설치후 해체가 간편하도록 한 슬래브 거푸집 지지용 서포트 해체장치에 관한 것이다.The present invention relates to a support dismantling device for supporting a slab formwork, which is easy to be dismantled after installation in a support having a plurality of upper surfaces to support the slab formwork.
본 발명은 도 1 내지 도 3의 도시에 의하여 바닥면에 세워지는 고정바(100)와, 상기 고정바(100)의 상단에 나사결합되는 지지핸들(200)과, 상단이 슬래브 거푸집(SL)을 지지하며 상기 고정바(100)의 상단에 동축 방향으로 슬라이드 삽입되는 지지바(300)와, 상기 고정바(100)에 삽입되는 상기 지지바(300)에 형성된 핀홀(320) 중 어느 하나를 통과하며 양단이 상기 고정바(100)에 대해 직교방향으로 위치되어 상하 이동가능하게 되는 잠금핀(400)과, 상기 지지핸들(200)에 올려져 회전 가능하게 되며 상기 잠금핀(400)이 걸림 고정 및 상기 지지바(300)와 함께 일정거리 낙하되면서 해제 될 수 있도록 안내하게 되는 클램프(500)를 포함하여 구성된다.The present invention is a fixed bar 100 standing on the bottom surface shown in Figures 1 to 3, the support handle 200 is screwed to the upper end of the fixed bar 100, the top slab formwork (SL) To support any one of the pin bar 320 formed in the support bar 300 and the support bar 300 is inserted into the fixed bar 100 in the coaxial direction slide on the top of the fixed bar 100 Passing through both ends of the locking pin 400 is located in the orthogonal direction with respect to the fixing bar 100 and is movable up and down, and is mounted on the support handle 200 is rotatable and the locking pin 400 is caught It is configured to include a clamp 500 to be guided to be released and fixed with a fixed distance fall with the support bar 300.
상기 고정바(100)는, 중공형상으로 하단에 지면 밀착용 받침편(110)이 구비되고, 상단 외주면에 둘레를 따라 나사부(120)가 형성된다. 그리고, 상기 나사부(120)의 양쪽에 축방향을 따라 수직하게 수직 가이드홀(140)이 형성된다.The fixing bar 100 is provided in the bottom in the hollow shape, the bottom contact support piece 110, the threaded portion 120 is formed along the circumference of the outer peripheral surface. In addition, vertical guide holes 140 are formed on both sides of the screw part 120 in the axial direction.
상기 지면 밀착용 받침편(110)은, 일면이 바닥면에 밀착되는 것으로 금속판으로 이루어지며 상기 고정바(100)의 외경보다 확장된 형태를 가진다.The ground contact support piece 110, one surface is in close contact with the bottom surface made of a metal plate and has an expanded form than the outer diameter of the fixing bar (100).
상기 지지핸들(200)은, 중심에 상기 고정바(100)의 나사부(120)에 상하로 나사 결합되도록 나사홀(210)이 형성되어 정역 회전에 따라 축방향으로 상하 이동되고, 양쪽에 회전을 위한 핸들바(220)가 돌출 형성되며, 상면에 평활한 받침면(230)이 형성된다. The support handle 200, the screw hole 210 is formed so as to be screwed up and down to the screw portion 120 of the fixing bar 100 in the center is moved up and down in the axial direction according to the forward and reverse rotation, the rotation on both sides Handle bar 220 for protruding is formed, the smooth support surface 230 is formed on the upper surface.
여기서, 상기 핸들바(220)는 상단 힌지를 중심으로 회전 가능하게 접힘되는 것을 적용하여도 무방하다.Here, the handle bar 220 may be applied to be folded rotatably around the upper hinge.
즉, 상기 지지핸들(200)의 외측 양측에 회전을 위한 핸들바(220)가 돌출 구비되도록 하고, 상기 핸들바(220)의 일측이 상기 지지핸들(200)의 외측에 제공된 홀더(262)에 힌지핀(264)을 통해 회동 가능하게 힌지 결합되도록 하면 된다.(도 6 참조)That is, the handlebars 220 for rotation are protruded on both outer sides of the support handle 200, and one side of the handle bar 220 is provided on the holder 262 provided on the outside of the support handle 200. The hinge pins 264 may be hinged so as to be rotatable. (See FIG. 6).
상기 지지바(300)는, 중실 또는 중공 형상으로 상단에 상기 슬래브 거푸집의 저면을 지지하도록 지지편(310)이 구비되고, 하단이 상기 고정바(100)의 상측에서 하향으로 슬라이드 통과하여 삽입된다. 그리고 외측에는 상하 방향으로 복수의 잠금홀(320)이 등간격 형성된다.The support bar 300 is provided with a support piece 310 to support the bottom surface of the slab formwork at the upper end in a solid or hollow shape, the lower end is inserted through the slide downward from the upper side of the fixing bar (100). . In addition, the plurality of locking holes 320 are formed at equal intervals in the vertical direction.
상기 잠금핀(400)은, 상기 고정바(100)에 대해 상기 지지바(300)가 고정될 수 있도록 하기 위한 것으로, 상기 고정바(100)에 대해 직교상태로 위치되며 상기 지지바(300)의 상기 잠금홀(320)을 통과하게 되며 양단이 상기 고정바(100)의 나사부(120)에 형성되는 수직 가이드홈(140)에 위치된다.The locking pin 400 is to be fixed to the support bar 300 with respect to the fixing bar 100, is positioned in an orthogonal state with respect to the fixing bar 100 and the support bar 300 Pass through the locking hole 320 and both ends are located in the vertical guide groove 140 formed in the screw portion 120 of the fixing bar (100).
상기 클램프(500)는, 본 발명의 핵심적인 기술 수단이며, 상기 지지핸들(200)의 상면에 형성된 받침면(230)에 올려져 회전되는 것으로 상기 잠금핀(400)의 양단을 고정 및 안내하는 핀홀더(540)과, 상기 핀홀더(540)에 결합되어 상기 잠금핀(400)을 규제하는 핀 잠금부재(560)로 구성된다.The clamp 500 is a core technical means of the present invention, and is fixed and guided at both ends of the locking pin 400 by being mounted on the support surface 230 formed on the upper surface of the support handle 200. It is composed of a pin holder 540 and a pin locking member 560 coupled to the pin holder 540 to regulate the locking pin 400.
상기 핀 홀더(540)는, 저면이 상기 지지핸들(200)의 상측 받침면(230)에 슬라이드 지지되고, 외측 양쪽에 상기 잠금핀(400)의 양단이 안내되도록 안내홀(541)이 형성되며. 외면 하측에 둘레를 따라 가이드턱(542)이 돌출 형성되고, 상기 가이드턱(542)에 상기 안내홀(541)을 통과하는 상기 잠금핀(400)의 양단이 각각 올려져 상기 고정바(100)의 중심축을 기준으로 한쪽 방향으로 이동될 수 있도록 걸림되는 고정턱(543)과 상기 고정턱(543)의 일측에 상기 잠금핀(400)의 이동시 수직 낙하되도록 수직단(544) 및 상기 수직단(544)의 하단으로부터 수평하게 둘레를 따라 일정폭의 가이드홈(545)이 형성된다.The pin holder 540, the bottom surface is slide-supported on the upper support surface 230 of the support handle 200, guide holes 541 are formed so that both ends of the locking pin 400 is guided on both sides of the outer side. . The guide jaw 542 is formed to protrude along the periphery of the outer surface, and both ends of the locking pin 400 passing through the guide hole 541 are respectively raised on the guide jaw 542 to the fixing bar 100. The fixed end 543 and the vertical end 544 and the vertical end to be vertically dropped during the movement of the locking pin 400 on one side of the fixed jaw 543 and the fixed jaw 543 to be moved in one direction based on the central axis of the ( A guide groove 545 of a predetermined width is formed along the perimeter horizontally from the bottom of the 544.
여기서, 상기 고정턱(543)은 수평이 아닌 상기 수직단(544) 방향으로 경사지게 형성되어 상기 잠금핀(400)이 하향 슬라이드 되도록 함이 바람직하다.Here, the fixing jaw 543 is preferably formed to be inclined toward the vertical end 544 rather than horizontal, so that the locking pin 400 slides downward.
이에따라, 상기 잠금핀(400)의 양단이 상기 고정턱(543)에 올려진 상태에서 한 쪽 방향으로 이동하여 수직단(544)을 통해 가이드홈(545)의 바닥에 위치되면 상기 잠금핀(400)이 상기 지지바(300)와 함께 상기 수직단(544)의 높이만큼 하향 이동하게 되어 결국 상기 지지바(300)의 상단 지지편(310)이 상기 슬래브 거푸집으로부터 분리되게 된다.Accordingly, when both ends of the locking pin 400 is mounted on the fixing jaw 543 and moved in one direction, the locking pin 400 is positioned at the bottom of the guide groove 545 through the vertical end 544. ) Moves downward with the support bar 300 by the height of the vertical end 544, so that the upper support piece 310 of the support bar 300 is separated from the slab formwork.
상기 핀 잠금부재(560)는, 상기 핀 홀더(540)의 외형을 감싸며 결합되며 하단이 상기 가이드턱(542)에 올려져 슬라이드 되고, 상단이 상향 이동시 상기 핀 홀더(540)의 상측 확개단(546)에 걸림되며, 일측에 상기 고정턱(543)에 올려진 상기 잠금핀(400)의 양단을 하향으로 감싸며 결합하도록 핀고정홈(562) 및 상기 핀고정홈(562)의 일측에 상기 가이드홈(545)에 상하로 끼워져 회전이 방지되게 고정되는 핀잠금편(564)이 하향 돌출 형성된다.The pin locking member 560 is coupled to surround the outer shape of the pin holder 540, the lower end is mounted on the guide jaw 542 and slide, and the upper end of the pin holder 540 when the upper end is moved upward ( 546, the pin fixing groove 562 and the pin fixing groove 562 on one side of the pin fixing groove 562 so as to surround and engage both ends of the locking pin 400 mounted on the fixing jaw 543 on one side. The pin locking pieces 564 are inserted into the grooves 545 and fixed to prevent rotation thereof to protrude downward.
이에따라 상기 잠금핀(400)의 양단이 상기 고정턱(543)에 올려진 상태에서 상기 핀잠금편(564)이 상기 가이드홈(545)에 위치되면 상기 잠금핀(400)의 회전이 제어되어 안정된 잠금상태를 유지할 수 있게 된다.Accordingly, when the pin locking piece 564 is located in the guide groove 545 in the state in which both ends of the locking pin 400 is placed on the fixing jaw 543, the rotation of the locking pin 400 is controlled and stabilized. It can be kept locked.
그리고, 상기 클램프(500)를 이루는 핀홀더(540)의 하단은 양쪽 클립 고정수단(600)을 통해 상기 지지핸들(200)의 받침면(230)에 잠금 고정될 수 있다.In addition, a lower end of the pin holder 540 constituting the clamp 500 may be locked to the support surface 230 of the support handle 200 through both clip fixing means 600.
상기 클립 고정수단(600)은, 상기 핀홀더(540)의 하측에 형성된 하향 안내홈(548)과, 상기 지지핸들(200)의 상측을 이루며 상기 하향 안내홈(548)에 슬라이드 삽입되는 걸림돌기(240)와, "ㄴ" 형상으로 일측 수직편(622)이 상기 핀홀더(540)의 외측에 체결구(630)로 고정되고 타측 수평편(624)이 상기 걸림돌기(240)에 걸림되어 상기 지지핸들(200)로부터 상기 핀홀더(540)가 이탈되지 않도록 고정하게 되는 잠금클립(620)으로 구성된다.The clip fixing means 600, the downward guide groove 548 formed on the lower side of the pin holder 540, the locking projection which is inserted into the downward guide groove 548 to form an upper side of the support handle 200. 240 and one side vertical piece 622 is fixed to the outside of the pin holder 540 by a fastener 630 and the other horizontal piece 624 is caught by the locking protrusion 240. The pin holder 540 from the support handle 200 is composed of a locking clip 620 to be fixed so as not to be separated.
상기한 경우 상기 핀홀더(540)에 수직편(622)을 통해 결합되는 상기 잠금클립(620)의 수평편(624)이 상기 지지핸들(200)의 상단 걸림돌기(240)에 상향 이탈이 방지되도록 걸림되어 상기 지지핸들(200)으로부터 상기 클램프(500)가 이탈되지 않도록 하게 된다.In this case, the horizontal piece 624 of the locking clip 620 coupled to the pin holder 540 through the vertical piece 622 is prevented from being separated upward from the upper locking protrusion 240 of the support handle 200. It is latched so as to prevent the clamp 500 from being separated from the support handle 200.
이상에서와 같이 구성되는 본 발명에 따른 슬래프 거푸집 지지용 서포트 해체장치의 설치 과정 및 해체 과정을 설명하면 다음과 같다.Referring to the installation process and dismantling process of the support dismantling device for supporting slab formwork according to the present invention configured as described above are as follows.
설치시에는,At the time of installation,
도 2 및 도 3에 도시된 바와같이 고정바(100)의 나사부(120)에 지지핸들(200)을 회전시켜 결합하고 동시에 지지핸들(200)의 받침면(230)에 클램프(500)를 올려놓은 다음 고정바(100)에 지지바(300)를 삽입시킨다. 그런다음 고정바(100)의 하단 지면 밀착용 받침편(110)이 바닥면에 지지되도록 하고 지지바(300)의 상단 지지편(310)이 슬래브 거푸집를 지지하도록 위치시킨 후 잠금핀(400)을 클램프(500)를 이루는 핀홀더(540)의 안내홀(541)과 수직 가이드홀(140) 및 핀홀(320)을 순차적으로 통과되도록 한 후, 통과되는 상기 잠금핀(400)의 양단을 상기 핀홀더(540)의 고정턱(543)에 위치되도록 하고 동시에 핀 잠금부재(560)를 하향 이동시켜 핀잠금편(564)의 핀고정홈(562)에 잠금핀(400)이 위치되도록 한다. 그러면 상기 잠금핀(400)의 이동이 핀잠금편(564)에 의해 제어되어 고정상태가 유지되도록 하게 된다. 이후 지지핸들(200)을 회전시켜 지지바(300)의 지지편(310)이 슬래브 거푸집를 지지하도록 하고, 연속해서 핀홀더(540)에 클립 고정수단(600)을 이루는 잠금클립(620)의 수직편(622)을 체결구(630)로 고정하고 상기 잠금클립(620)의 수평편(624)이 상기 지지핸들(200)의 상단 걸림돌기(240)에 걸림되도록 하면 설치가 완료된다.As shown in FIGS. 2 and 3, the support handle 200 is coupled to the threaded portion 120 of the fixing bar 100, and at the same time, the clamp 500 is placed on the support surface 230 of the support handle 200. Lay out and then insert the support bar 300 into the fixing bar (100). Then, the lower ground contact support piece 110 of the fixing bar 100 is supported on the bottom surface, and the upper support piece 310 of the support bar 300 is positioned to support the slab formwork, and then the locking pin 400 is positioned. After passing through the guide hole 541, the vertical guide hole 140 and the pin hole 320 of the pin holder 540 constituting the clamp 500 in sequence, both ends of the locking pin 400 to pass through the pin The locking pin 400 is positioned in the pin fixing groove 562 of the pin locking piece 564 by moving the pin locking member 560 downward while being positioned at the fixing jaw 543 of the holder 540. Then, the movement of the locking pin 400 is controlled by the pin locking piece 564 to maintain a fixed state. Thereafter, the support handle 200 is rotated so that the support piece 310 of the support bar 300 supports the slab formwork, and the locking clip 620 vertically forming the clip fixing means 600 to the pin holder 540 in succession. When the piece 622 is fixed with the fastener 630 and the horizontal piece 624 of the locking clip 620 is caught by the upper locking protrusion 240 of the support handle 200, the installation is completed.
해체시에는, At the time of disassembly,
도 3 내지 도 5에 도시된 바와같이 먼저 클립 고정수단(600)을 이루는 체결구(630)를 해체시켜 잠금클립(620)이 해체되도록 한다. 그런다음 클램프(500)를 이루는 핀 잠금부재(560)를 상향 이동시킨다. 그러면 핀잠금편(564)이 가이드홈(545)으로부터 상향 이동되고 연속해서 상기 핀 잠금부재(560)를 회전시키면 상기 핀홀더(540)에 대해 상기 핀 잠금부재(560)가 가이드턱(542)의 안내로 회전되고 동시에 상기 잠금핀(400)은 일측 방향이 개방되어 낙하 가능한 상태가 된다. 이후 작업자가 직접 손으로 또느 기구를 통해 핀홀더(540)를 회전시키면 상기 핀홀더(540)가 지지핸들(200)의 받침면(240)에 대해 슬라이드 회전되고 동시에 잠금핀(400)에 대해 고정턱(545)이 이동되어져 상기 잠금핀(400)의 양단이 수직단(544) 구간만큼 하향 낙하되어 가이드홈(545) 바닥에 위치된다. 이때 고정바(100)에 대해 지지바(300)의 상단이 상기 잠금핀(400)의 하향 이동거리만큼 슬래브 거푸집로부터 이격되고 그러면 작업자가 서포트를 해체시키면 된다.3 to 5, first, the fastener 630 constituting the clip fixing means 600 is dismantled so that the locking clip 620 is dismantled. Then, the pin locking member 560 constituting the clamp 500 is moved upward. Then, when the pin locking piece 564 is moved upward from the guide groove 545 and the pin locking member 560 is continuously rotated, the pin locking member 560 with respect to the pin holder 540 guide jaw 542 At the same time the lock pin 400 is rotated by the guide of one side is open to the state that can be dropped. Then, when the worker directly rotates the pin holder 540 by hand or through the mechanism, the pin holder 540 is slide-rotated about the support surface 240 of the support handle 200 and at the same time fixed to the locking pin 400. The jaw 545 is moved so that both ends of the locking pin 400 is downwardly dropped by the vertical end 544 section and positioned at the bottom of the guide groove 545. At this time, the upper end of the support bar 300 with respect to the fixing bar 100 is spaced apart from the slab formwork by the downward movement distance of the locking pin 400 and then the worker dismantles the support.
건축 구조물에서 슬래브 지지 용도로 적용하는 것임.Application for supporting slabs in building structures.

Claims (5)

  1. 지면에 세워지며 상단 외측에 나사부(120)가 형성되고 상기 나사부(120)의 양쪽에 수직 가이드홀(140)이 형성된 고정바(100)와 상기 고정바(100)의 상단을 통해 슬라이드 삽입되며 상단이 슬래브 거푸집에 지지되는 지지바(300) 및 상기 나사부(120)에 위치 고정되어 높이 조절된 상기 지지바(300)를 걸림 상태로 통과하여 양단이 양쪽 수직 가이드홀(140)에 위치된 잠금핀(400)을 잠금 고정시키는 클램프(500)로 이루어지는 슬래브 거푸집 지지용 서포트 해체장치에 있어서,Standing on the ground and the threaded portion 120 is formed on the outside of the top and the vertical guide hole 140 is formed on both sides of the threaded portion 120 and the slide is inserted through the top of the fixing bar 100 and the top Lock pins located at both ends of the vertical guide hole 140 by passing through the support bar 300 supported by the slab formwork and the support bar 300 fixed in position and fixed to the screw part 120 at both ends thereof. In the support dismantling device for supporting slab formwork consisting of a clamp (500) for locking and fixing (400),
    상기 클램프(500)가,The clamp 500,
    상기 고정바(100)의 상단 나사부에 나사결합되며 상면에 둘레를 따라 평활한 받침면(230)이 형성되는 지지핸들(200); A support handle 200 screwed to the upper threaded portion of the fixing bar 100 and having a smooth support surface 230 formed around the upper surface thereof;
    저면이 상기 지지핸들(200)의 상측 받침면(230)에 슬라이드 지지되고, 외측 양쪽에 상기 잠금핀(400)의 양단이 안내되도록 안내홀(541)이 형성되며. 외면 하측에 둘레를 따라 가이드턱(542)이 돌출 형성되고, 상기 가이드턱(542)에 상기 안내홀(541)을 통과하는 상기 잠금핀(400)의 양단이 각각 올려져 상기 고정바(100)의 중심축을 기준으로 한쪽 방향으로 이동될 수 있도록 걸림되는 고정턱(543)과 상기 고정턱(543)의 일측에 상기 잠금핀(400)의 이동시 수직 낙하되도록 수직단(544) 및 상기 수직단(544)의 하단으로부터 수평하게 둘레를 따라 일정폭의 가이드홈(545)이 형성된 핀 홀더(540);A bottom surface is slide supported on the upper support surface 230 of the support handle 200, the guide hole 541 is formed so that both ends of the locking pin 400 is guided on both sides. The guide jaw 542 is formed to protrude along the periphery of the outer surface, and both ends of the locking pin 400 passing through the guide hole 541 are respectively raised on the guide jaw 542 to the fixing bar 100. The fixed end 543 and the vertical end 544 and the vertical end to be vertically dropped during the movement of the locking pin 400 on one side of the fixed jaw 543 and the fixed jaw 543 to be moved in one direction based on the central axis of the ( A pin holder 540 in which a guide groove 545 of a predetermined width is formed along the circumference horizontally from the bottom of the 544;
    상기 핀 홀더(540)의 외형을 감싸며 결합되며 하단이 상기 가이드턱(542)에 올려져 슬라이드 되고, 상단이 상향 이동시 상기 핀 홀더(540)의 상측 확개단(546)에 걸림되며, 일측에 상기 고정턱(543)에 올려진 상기 잠금핀(400)의 양단을 하향으로 감싸며 결합하도록 핀고정홈(562) 및 상기 핀고정홈(562)의 일측에 상기 가이드홈(545)에 상하로 끼워져 회전이 방지되게 고정되는 핀잠금편(564)이 하향 돌출 형성되는 핀 잠금부재(560);를 포함하여 구성됨을 특징으로 하는 슬래브 거푸집 지지용 서포트 해체장치.It is coupled to wrap around the outer shape of the pin holder 540, the lower end is slid to the guide jaw 542, the upper end of the pin holder 540 is locked to the upper extension end 546 of the upward movement, The pin fixing groove 562 and one side of the pin fixing groove 562 are inserted into the guide groove 545 up and down so as to surround both ends of the locking pin 400 mounted on the fixing jaw 543 downward and rotate. Slab formwork support dismantling device, characterized in that comprises a; pin lock piece 564 that is prevented fixed to the pin locking member 560 is formed projecting downward.
  2. 제1항에 있어서,The method of claim 1,
    상기 지지핸들(200)의 외측 양측에 회전을 위한 핸들바(220)가 돌출 구비되며, 상기 핸들바(220)의 일측이 상기 지지핸들(200)의 외측에 제공된 홀더(262)에 힌지핀(264)을 통해 회동 가능하게 힌지 결합됨을 특징으로 하는 슬래브 거푸집 지지용 서포트 해체장치.Handle bars 220 for rotation are provided on both sides of the outer side of the support handle 200, one side of the handle bar 220 is hinge pin (holder) provided on the holder 262 on the outer side of the support handle 200 ( Slab formwork support dismantling device, characterized in that the hinge is rotatably coupled via 264.
  3. 제1항에 있어서,The method of claim 1,
    상기 핀 홀더의 하측에 둘레를 따라 하향 개방되게 슬라이드홈이 형성되고,A slide groove is formed in the lower side of the pin holder to open downward along the circumference,
    상기 지지핸들의 상측 단부에 상기 슬라이드홈에 끼워져 결합되는 슬라이드턱이 외향으로 돌출 형성됨을 특징으로 하는 슬래브 거푸집 지지용 서포트 해체장치.Slab formwork support dismantling device, characterized in that the slide jaw is inserted into the slide groove coupled to the upper end of the support handle protruding outward.
  4. 제1항에 있어서,The method of claim 1,
    상기 핀 홀더의 외측에 회전을 위한 회전돌기가 돌출 형성됨을 특징으로 하는 슬래브 거푸집 지지용 서포트 해체장치.Slab formwork support dismantling device, characterized in that the protrusion formed for rotation on the outside of the pin holder protruding.
  5. 제1항에 있어서,The method of claim 1,
    상기 핀 홀더의 하측에 상기 핀 홀더가 상기 지지핸들에 고정되도록 클립 고정수단(600)이 제공되며,Clip fixing means 600 is provided below the pin holder to fix the pin holder to the support handle.
    상기 클립 고정수단(600)이,The clip fixing means 600,
    상기 핀홀더(540)의 하측에 형성된 하향 안내홈(548)과, 상기 지지핸들(200)의 상측을 이루며 상기 하향 안내홈(548)에 슬라이드 삽입되는 걸림돌기(240)와, "ㄴ" 형상으로 일측 수직편(622)이 상기 핀홀더(540)의 외측에 체결구(630)로 고정되고 타측 수평편(624)이 상기 걸림돌기(240)에 걸림되어 상기 지지핸들(200)로부터 상기 핀홀더(540)가 이탈되지 않도록 고정하게 되는 잠금클립(620)으로 구성됨을 특징으로 하는 슬래브 거푸집 지지용 서포트 해체장치.A downward guide groove 548 formed on the lower side of the pin holder 540, an engaging protrusion 240 slid into the downward guide groove 548, forming an upper side of the support handle 200, and a “b” shape. One side of the vertical piece 622 is fixed to the outside of the pin holder 540 by the fastener 630 and the other horizontal piece 624 is caught on the locking projection 240 is the pin from the support handle 200 Slab formwork support dismantling device, characterized in that consisting of a locking clip 620 to be fixed so that the holder 540 is not separated.
PCT/KR2016/008604 2016-06-10 2016-08-04 Apparatus for disassembling slab formwork support WO2017213296A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020160072405A KR101860866B1 (en) 2016-06-10 2016-06-10 A support descent equipment for slab form safety
KR10-2016-0072405 2016-06-10

Publications (1)

Publication Number Publication Date
WO2017213296A1 true WO2017213296A1 (en) 2017-12-14

Family

ID=60578747

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/008604 WO2017213296A1 (en) 2016-06-10 2016-08-04 Apparatus for disassembling slab formwork support

Country Status (2)

Country Link
KR (1) KR101860866B1 (en)
WO (1) WO2017213296A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059756A (en) * 2021-12-23 2022-02-18 重庆拓达建设(集团)有限公司 Cantilever beam support system
CN114737792A (en) * 2022-04-19 2022-07-12 张学荣 Quick detachable support fore-set of building site
CN114961237A (en) * 2022-06-23 2022-08-30 中建八局第一建设有限公司 Top fixing support frame for building construction and mounting method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037492A (en) * 1996-07-26 1998-02-10 Daido Kiko Kk Instantaneous load releasing method of pipe post and instantaneous heap down component thereof
KR200177941Y1 (en) * 1994-03-07 2000-04-15 민병이 Manhole structure
JP2006063653A (en) * 2004-08-27 2006-03-09 Kenji Kobayashi Cap for pin bearing nut for temporary work support
KR100756266B1 (en) * 2006-10-20 2007-09-06 김종완 Supporting post for construction
KR200479487Y1 (en) * 2015-10-30 2016-02-12 주식회사 진아스틸 A support descent equipment for slab form safety

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200177941Y1 (en) * 1994-03-07 2000-04-15 민병이 Manhole structure
JPH1037492A (en) * 1996-07-26 1998-02-10 Daido Kiko Kk Instantaneous load releasing method of pipe post and instantaneous heap down component thereof
JP2006063653A (en) * 2004-08-27 2006-03-09 Kenji Kobayashi Cap for pin bearing nut for temporary work support
KR100756266B1 (en) * 2006-10-20 2007-09-06 김종완 Supporting post for construction
KR200479487Y1 (en) * 2015-10-30 2016-02-12 주식회사 진아스틸 A support descent equipment for slab form safety

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059756A (en) * 2021-12-23 2022-02-18 重庆拓达建设(集团)有限公司 Cantilever beam support system
CN114737792A (en) * 2022-04-19 2022-07-12 张学荣 Quick detachable support fore-set of building site
CN114961237A (en) * 2022-06-23 2022-08-30 中建八局第一建设有限公司 Top fixing support frame for building construction and mounting method thereof

Also Published As

Publication number Publication date
KR101860866B1 (en) 2018-05-24
KR20170139880A (en) 2017-12-20

Similar Documents

Publication Publication Date Title
WO2017213296A1 (en) Apparatus for disassembling slab formwork support
RU2369703C1 (en) Removable lifting pad
US7748193B2 (en) Pumping tower support system and method of use
WO2015178584A1 (en) Prefabrication method for rebar net
KR20110128413A (en) Method of assembling and disassembling slab panel
CN211971505U (en) Hoisting structure of steel reinforcement cage
CA2848441A1 (en) Hoisting apparatus and method of use
KR20190113468A (en) Gang form falling prevention apparatus with locker
WO2019190078A1 (en) Apparatus and method for constructing slab of building
JP6567631B2 (en) How to prevent scattering when building is demolished
KR101641576B1 (en) A support descent equipment for slab form safety
CN111219046B (en) Composite scaffold erecting structure and construction process thereof
CN111255221B (en) Supporting structure for erecting pipe fittings
KR200412991Y1 (en) Pipe support for construction
WO2018203587A1 (en) Moving apparatus for leader
WO2011052854A1 (en) Scaffold-tightening apparatus and method
CN111017751A (en) Tower crane counterweight balance block and use method thereof
KR200479487Y1 (en) A support descent equipment for slab form safety
EP1524386A1 (en) A scaffold clamp for supporting a barrier post
JP6676002B2 (en) Electric pole main hole reconstruction tool, electric pole main hole reconstruction work vehicle and electric pole main hole reconstruction method
KR101101115B1 (en) Device system for setting and removing slab panel
KR101781067B1 (en) Casing Apparatus and Method for Constructing In-situ Concrete Pile
CN220378018U (en) Safety isolation board for chemical engineering safety
KR102199396B1 (en) Device for lifting formwork system having automatic dismantling function from anchor and formwork system having the same
KR200278096Y1 (en) Mold system for manufacturing inner wall of segment in bridge in which ilm pc box girder is applied

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16904729

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16904729

Country of ref document: EP

Kind code of ref document: A1