WO2017185168A1 - Système télescopique guidé pour un ensemble de curage sous pression ou de forage - Google Patents

Système télescopique guidé pour un ensemble de curage sous pression ou de forage Download PDF

Info

Publication number
WO2017185168A1
WO2017185168A1 PCT/CA2017/000100 CA2017000100W WO2017185168A1 WO 2017185168 A1 WO2017185168 A1 WO 2017185168A1 CA 2017000100 W CA2017000100 W CA 2017000100W WO 2017185168 A1 WO2017185168 A1 WO 2017185168A1
Authority
WO
WIPO (PCT)
Prior art keywords
jackplate
work basket
guiding system
pipe guiding
travelling
Prior art date
Application number
PCT/CA2017/000100
Other languages
English (en)
Inventor
Kevin Edward Peter FOLWARK
Original Assignee
Snubbertech Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Snubbertech Ltd. filed Critical Snubbertech Ltd.
Priority to CA3022042A priority Critical patent/CA3022042A1/fr
Priority to US16/096,511 priority patent/US20190112880A1/en
Publication of WO2017185168A1 publication Critical patent/WO2017185168A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/07Telescoping joints for varying drill string lengths; Shock absorbers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/086Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods with a fluid-actuated cylinder
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24Guiding or centralising devices for drilling rods or pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/068Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells

Definitions

  • the present invention relates to a guided telescoping system for a snubbing or drilling assembly providing an integrated guiding and support structure.
  • Snubbing is the act of putting drillpipe or other rigid tubing into a wellbore when pressure is contained in the well. Snubbing is necessary when tubing, with or without one or more tools on it, needs to be run into a live well which is at high pressure.
  • the drillstring or tubing string is made up by connecting multiple threaded drillpipe or tubing joints together and snubbing them into the wellbore.
  • a typical snubbing assembly comprises a gin pole mast that is raised and lowered to pick up joints of tubing or drillpipe and position them for making up the drillstring; a work basket at the top of the snubbing assembly, supported on several work basket support beams that extend down to the rig floor; a rotary jackplate, travelling slips and rotary jackplate motor, a hydraulic assembly including hydraulic cylinders, guide tubes, a set of stationary slips near the rig floor, and a blowout preventer (BOP).
  • BOP blowout preventer
  • l A tong unit is typically also used with the snubbing unit, and is located in the work basket, either loose or mounted on a hinged arm that this clamped to a side of the work basket.
  • the tong In order to make up or break out a joint of tubing, the tong is manually moved and positioned around the tubing joint by an operator, then actuated to grip and torque the joint into or out of threading with a next joint.
  • the moving, positioning and operation of the tong is a common problem area in snubbing operations, leading to either injury of operators or poor positioning leading to damage to the tubing joint during a makeup or break out attempt.
  • the rotary jackplate and travelling slips are typically supported and moved by the hydraulic cylinders.
  • the hydraulic cylinders must also provide anti-rotation resistance and support to the assembly. Hydraulic cylinders are limited to certain load limits that determine how much a cylinder can be extended or retracted in operation, depending on the loads needed to be supported and moved by the cylinders. As a result of these additional rotational, torqueing and compressive forces on the hydraulic cylinders, hydraulic cylinders in snubbing units commonly reach their load limits far short of a full stroke length. Therefore multiple strokes are required to full snub a length of pipe into the well.
  • additional jackplate supports extending down to the rig floor are added to the assembly to prevent rotation of the jackplates and the snubbing assembly as the drillpipe is threaded and snubbed into the wellbore.
  • the jackplate guide tubes reduce potential cylinder damage while rotational force is applied to the cylinder rods, but require additional space and assembly time.
  • Snubbing assemblies are traditionally assembled in a number of stages and parts, due to the number of components involved. Firstly the rotary jackplate and motor are connected to one another and then lifted and bolted onto the hydraulic cylinders and/or jackplate guiding tubes. The jackplate structure is next lifted and bolted onto the workbasket, which has been previously affixed to its working basket support beams and to the gin pole mast. The tubing guide and hydraulic cylinders are affixed to the work basket as well.
  • Erecting snubbing assemblies is therefore time consuming and complex.
  • Transportation by truck requires at least two semi-trailers to carry all of the equipment to site and the number of steps needed for assembly requires multiple operators, adding cost and time to snubbing operations.
  • Multiple components and multiple assembly personal also increase risks to workplace safety.
  • US Patent Application 20120006565 teaches pipe guide apparatus for guiding a pipe during snubbing and includes a stationary pipe guide and a travelling pipe guide each define a pipe opening and has a flexibly resilient guide member having an opening with a diameter closely matching the outside diameter of the pipe being snubbed.
  • US Patent Application 20080053661 teaches a method of guiding tubing for hydraulic jacks that includes multiple guide plates attached to the hydraulic jack rods and a lateral support section to prevent buckling.
  • US Patent 8,333,238 teaches a snubbing unit where the support frame comprises a work platform. The support frame consists of top, bottom and side plates with an opening for the tubing and is connected directly to the blow out preventer.
  • US Patent 7, 1 17,948 teaches a snubbing unit for running and retrieving a string of tubing into a well under pressure selectively operates in a standalone mode and a rig assist mode. The unit has a lower frame for mounting during the stand alone mode on a snubber blowout preventer. Stationary weight supporting slips and snubbing slips are carried by the lower frame during the stand alone mode.
  • US Patent 5, 1 15,861 describes a method to support tubing during snubbing where there are upper and lower horizontal beams which vertical support legs between the beams.
  • US Patent Application 20130126186 teaches a method for a wellbore tubular handling system having support plates attached to the snubbing device.
  • a pipe guiding system for use with a snubbing assembly.
  • the system comprises a work basket supported on one or more work basket supports; a travelling jackplate having travelling slips and supported on the one or more work basket supports; one or more hydraulic cylinders and a tubing guide.
  • the work basket supports, travelling jackplate, travelling slips, one or more hydraulic cylinders and tubing guide form a singular, integral jackplate guiding unit.
  • a method for assembling a pipe guiding system comprises the steps of assembling a singular, jackplate guiding unit to a work basket; and assembling the work basket and the singular integral jackplate guiding unit to a gin pole mast,
  • the jackplate guiding unit comprises one or more work basket supports, a travelling jackplate, one or more hydraulic cylinders and a tubing guide.
  • Figure 1 is a side elevation view of one embodiment of the present invention in a compact, transportation position
  • Figure 2 is a top perspective view of one embodiment of the present invention in a compact, transportation position
  • Figure 3 is a side elevation view of one embodiment of the present with the gin pole extended and the jackplate at the workbasket;
  • Figure 4 is a top perspective view of one embodiment of the present invention present with the gin pole extended and the jackplate at the workbasket;
  • Figure 5 is a side elevation view of one embodiment of the present invention with the jackplate in a partially extended position
  • Figure 6 is a top perspective view of one embodiment of the present invention, with the jackplate in a partially extended position;
  • Figure 7 is a side elevation view of one embodiment of the present invention with the jackplate in a fully extended position
  • Figure 8 is a top perspective view of one embodiment of the present invention, with the jackplate in a fully extended position;
  • Figure 9 is a side elevation view of one embodiment of the present invention with the jackplate in a retracted position and the work basket in an extended position;
  • Figure 10 is a top perspective view of one embodiment of the present invention, with the jackplate in a retracted position and the work basket in an extended position;
  • Figure 1 1 is a side elevation view of one embodiment of the present invention with the jackplate in a partially extended position and the work basket in an extended position;
  • Figure 12 is a top perspective view of one embodiment of the present invention, with the jackplate in a partially extended position and the work basket in an extended position;
  • Figure 13 is a side elevation view of one embodiment of the present invention with the jackplate in a fully extended position to meet the work basket in an extended position
  • Figure 14 is a top perspective view of one embodiment of the present invention, with the jackplate in a fully extended position to meet the work basket in an extended position
  • Figure 15 is a side elevation view of a second embodiment of the present invention, with the jack plate in a lower, position
  • Figure 6 is a front elevation view of Figure 15;
  • Figure 17 is a top perspective view of Figure 16;
  • Fgiure 18 is a cut-away, top perspective view of Figure 15, showing the jackplate support beams within the fixed riser;
  • Figure 19 is a cut-away top perspective view of a second embodiment of the present invention, with the jack plate in an upper position.
  • the present invention comprises a guided telescoping drilling system 2 for snubbing rigs.
  • the system 2 is used with a telescopic ginpole mast 4 with means (not shown) for picking up a drill pipe or tubing joint and raising it into an opening 6 within a work basket 8.
  • the work basket 8 is supported by telescoping work basket supports 10.
  • the telescoping work basket supports 10 can also serve as the jackplate supportslO.
  • the present invention further uniquely comprises an all-in-one jackplate guiding unit 14 consisting of the work basket 8, work basket support 10, jackplate supportslO, a jackplate 12 and associated travelling slips 18, hydraulic cylinders 20 and an extendable tubing guide 16 which are integrally built as a single jackplate guiding unit 14.
  • the jackplate guiding unit 14 is serves a number of purposes including preventing the jackplate 12 from torqueing or buckling under the extreme forces during snubbing processes.
  • the work basket supports/jackplate supports 10 are telescopic to allow travel up and down of the work basket 8 relative to the jack plate 2, as seen in the differing position of the work basket 8 relative the jackplate 12 between Figures 7 and 9, for example.
  • the combination is a faster and more compact to rig-up. Furthermore, the compact design reduces the number of trucks needed to bring the equipment to the wellbore site, less personnel are required for assembly, and with fewer assembly steps, risks are reduced and the rigging process becomes safer.
  • the hydraulic cylinders 20 serve to raise and lower, the jackplate 12, with the travelling slips 18, as the drill pipe is fed into or raised out of the wellbore.
  • the drill pipe is snubbed inside the extendable tubing guide 16, which prevents buckling or bending of the joint of tubing or drillpipe as it is moved axially downwardly in snubbing.
  • the rotary jackplate 12, with travelling slips 18 and motor provide rotational movement and torque forces during drill string snubbing.
  • the jackplate guiding unit 14 and particularly the unitary work basket supports/jackplate supports 10 reduce torqueing strain on the hydraulic cylinders.
  • the work basket supports/jackplate supports 10 also support axial loads of the jackplate 12 as it carries tubing sections and snubs them into the wellbore or pulls them out of a wellbore.
  • the support provided by the work basket supports 10 not only provides for stability to the jackplate 12 but it also allows for more sustained snubbing action, without needing to relieve rotational forces for fear of the assembly twisting. Since axial and rotational loads in the present invention are supported by the work basket supports 10, the hydraulic cylinders 20 are under reduced load and stress, and in particular, lessens torque stresses. This in turn allows the hydraulic cylinders 20 to extend and retract further before reaching their load limits.
  • the jackplate 12 with motor and travelling slips 18 is telescopically lowered on the unified jackplate guiding unit 14 to grip an upper end of a drill pipe or joint of tubing and raised to raise the string out of the ground, where it is broken out from the drill string or tubing string by rotation, picked up by the gin pole mast 4 and lowered to the rig floor.
  • the snubbing assembly 2 In both snubbing a drillstring into the ground and pulling a drillstring out of the ground, the snubbing assembly 2 must always control the forces acting on the drillstring.
  • the work basket supports 10 serve to support the jackplate guiding unit 14 and allow the hydraulic cylinder to retract and snub into the well with the necessary axial force and torque.
  • the present work basket 8 is also laterally extendable to enlarge the working surface of the work basket and provide more floor space for operators.
  • the work basket 8 can be laterally reduced to meet load and sizing requirements for shipment via truck as part of the unified jackplate guiding unit 14, and can then be laterally extended once mounted at the wellbore. More preferably, the work basket 8 is extended by hydraulic means.
  • the present work basket is built with a lower riser for housing and holding the jackplate when the hydraulic cylinders are extended.
  • This lower riser ensure that the jackplate, travelling slips and auxiliary equipment are positioned at such a height that an operator can easily reach to makeup or breakout the tubing sections, without the need to work at a height above the operator's head.
  • a snubbing unit is presented that provides a single work basket support/jackplate support that is fixed, preferably in the form of a fixed riser 10A, and does not telescope.
  • the work basket 8A is provided with an integrated, fixed tong unit 24 that is more preferably located just below a floor of the work basket 8A and is fixed in position to the fixed riser 10A.
  • an integrated tong 24 that is already fixed into positon for making up and breaking out operations, the operation of making up and breaking out becomes more automated. There are less moving parts in the work basket 8A, leading to less chance for operator injury.
  • the drillpipe or tubing joint need only be lowered into place by the ginpole 4A, leading to more precise positioning of the joints for makeup and breakout.
  • the tong unit 24 may move somewhat vertically within the riser 0A, said movement being controlled by the hydraulic cylinders 20.
  • the integrated tong 24 can be any standard tong well known in the art for makeup and breakout purposes and can particularly include any standard tongs known for use on snubbing rigs. Alternatively, the tong may be specially design to fit and operate on the riser 10A. Since the integrated tong 24 controls and manages all of the torqueing load for makeup and breakout operations, there is no need to especially design the fixed riser 10A to carry or handle any additional loads. However, customizations to the fixed riser 10A for optimal operation within the present arrangement would be understood by a person of skill in the art as being encompassed by the scope of the present invention.
  • the work basket 8A is fixed to the fixed riser 10A and does not raise or lower. More preferably, the height of the fixed riser 10A is selected such that the work basket 8A, with the integrated tong 24 positioned just below it, are at a fixed height that is higher than the full extension of the jackplate 12A. This ensures that the workbasket 8A and tong 24 extending thereblow are always clear of the travelling jackplate 12A as it is raised and lowered for snubbing operations.
  • the fixed riser 10A is supported on a lower work floor 28, said lower work floor 28 corresponding to a lowest-most height of the jackplate 12A when it is lowered.
  • the lower work floor 28 may optionally further provide a platform from which operators can inspect and maneuver parts of the snubbing unit at the level of the lower work floor 28.
  • the hydraulic cylinders 20A support the jackplate 12A to the rig floor.
  • the fixed riser 10A of the present invention while serving as the fixed support for the work basket 8A, still also serves as a support for the jackplate 12A.
  • an inner surface of the fixed riser 10A provides jack plate supports in the form of support beams 30 along which the jackplate 12A can travel as it is lifted and lowered by the hydraulic cylinders 20A.
  • torqueing and other stresses are again borne by the jack plate supports, in the form of the support beams 30, reducing the rotational and torque stress experienced by the hydraulic cylinders 20A.
  • the hydraulic cylinders 20A are able to stroke to a fuller stroke length.
  • the fixed riser 10A further preferably provides, on an outer surface thereof, means for moving equipment, controls, instrumentation and/or one or more operators vertically along the snubbing unit 2.
  • the elevator unit 32 may take the form of a smaller sized work basket in which an operator may stand, together with controls or instrumentation.
  • the smaller work basket format of the elevator unit 32 may comprise a control console from which the operator may take measurements, take images, and control operations of the snubbing unit and parts thereof, in addition to making a visual inspection. Operation of the elevator unit 32 in its small work basket form may be controlled by the operator within the small work basket, optionally via the control console or by other elevator operating means, to raise and lower the elevator unit 32 along the rails 26.
  • a raisable and lowerable platform (not shown) that is vertically moveably connected to the work basket 8A such that the raisable and lowerable platform can be raised up in to the work basket 8A to avoid contact with jackplate 12A and lowerable to a tong operating position

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

L'invention concerne un système de guidage de tuyau destiné à être utilisé avec un ensemble de curage sous pression. Le système comprend un panier support de charge supporté sur un ou plusieurs supports de panier support de charge ; une plaque Jack mobile ayant des coins de retenue mobiles et supportée sur lesdits supports de panier support de charge ; un ou plusieurs vérins hydrauliques et un guide de tube de pompage. Les supports de panier support de charge, la plaque Jack mobile, les coins de retenue mobiles, un ou plusieurs vérins hydrauliques et le guide de tube de pompage forment une unité de guidage de plaque Jack unique, intégrée. L'invention concerne en outre un procédé d'assemblage d'un système de guidage de tuyau. Le procédé comprend les étapes consistant à assembler une unité de guidage de plaque Jack unique à un panier support de charge ; et à assembler le panier support de charge et l'unité de guidage de plaque Jack intégrée unique à un mât de levage. L'unité de guidage de plaque Jack comprend un ou plusieurs supports de panier support de charge, une plaque Jack mobile, un ou plusieurs vérins hydrauliques et un guide de tube de pompage.
PCT/CA2017/000100 2016-04-26 2017-04-26 Système télescopique guidé pour un ensemble de curage sous pression ou de forage WO2017185168A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA3022042A CA3022042A1 (fr) 2016-04-26 2017-04-26 Systeme telescopique guide pour un ensemble de curage sous pression ou de forage
US16/096,511 US20190112880A1 (en) 2016-04-26 2017-04-26 Guided Telescoping System For A Snubbing or Drilling Assembly

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201662327592P 2016-04-26 2016-04-26
US62/327,592 2016-04-26

Publications (1)

Publication Number Publication Date
WO2017185168A1 true WO2017185168A1 (fr) 2017-11-02

Family

ID=60161676

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2017/000100 WO2017185168A1 (fr) 2016-04-26 2017-04-26 Système télescopique guidé pour un ensemble de curage sous pression ou de forage

Country Status (3)

Country Link
US (1) US20190112880A1 (fr)
CA (1) CA3022042A1 (fr)
WO (1) WO2017185168A1 (fr)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4085796A (en) * 1976-11-16 1978-04-25 Otis Engineering Corporation Well tubing handling system
US6158516A (en) * 1998-12-02 2000-12-12 Cudd Pressure Control, Inc. Combined drilling apparatus and method
US6386284B1 (en) * 2000-02-11 2002-05-14 David A. Buck Snubbing unit drilling system
US6412560B1 (en) * 1998-06-22 2002-07-02 Henry A. Bernat Tubular injector with snubbing jack and oscillator
US20070193778A1 (en) * 2006-02-21 2007-08-23 Blade Energy Partners Methods and apparatus for drilling open hole
US7469749B2 (en) * 2006-02-22 2008-12-30 Live Well Service, A Division Of Precision Drilling Corporation Mobile snubbing system
US20100193179A1 (en) * 2009-01-30 2010-08-05 Tucken Brian Push / pull system and support structure for snubbing unit or the like on a rig floor
US20120006565A1 (en) * 2010-07-08 2012-01-12 Snubco Manufacturing Inc. Pipe guide for snubbing units

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7789155B2 (en) * 2008-03-06 2010-09-07 Devin International, Inc. Coiled tubing well intervention system and method
US8191636B2 (en) * 2009-07-13 2012-06-05 Coles Robert A Method and apparatus for motion compensation during active intervention operations
WO2011065836A1 (fr) * 2009-11-24 2011-06-03 Odim Jmc Dispositif pour une tour pour opérations de puits et son utilisation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4085796A (en) * 1976-11-16 1978-04-25 Otis Engineering Corporation Well tubing handling system
US6412560B1 (en) * 1998-06-22 2002-07-02 Henry A. Bernat Tubular injector with snubbing jack and oscillator
US6158516A (en) * 1998-12-02 2000-12-12 Cudd Pressure Control, Inc. Combined drilling apparatus and method
US6386284B1 (en) * 2000-02-11 2002-05-14 David A. Buck Snubbing unit drilling system
US20070193778A1 (en) * 2006-02-21 2007-08-23 Blade Energy Partners Methods and apparatus for drilling open hole
US7469749B2 (en) * 2006-02-22 2008-12-30 Live Well Service, A Division Of Precision Drilling Corporation Mobile snubbing system
US20100193179A1 (en) * 2009-01-30 2010-08-05 Tucken Brian Push / pull system and support structure for snubbing unit or the like on a rig floor
US20120006565A1 (en) * 2010-07-08 2012-01-12 Snubco Manufacturing Inc. Pipe guide for snubbing units

Also Published As

Publication number Publication date
CA3022042A1 (fr) 2017-11-02
US20190112880A1 (en) 2019-04-18

Similar Documents

Publication Publication Date Title
US11499384B2 (en) Automated pipe tripping apparatus and methods
CA2646014C (fr) Appareil et procede de pose de tubes
USRE29541E (en) Hydraulic drilling rig and power swivel
RU2470137C2 (ru) Устройство и способы манипуляции трубными элементами
EP2612982B1 (fr) Appareil et procédé de positionnement d'un équipement de connexion
EP3574178B1 (fr) Mât à déploiement télescopique
US20140224499A1 (en) Modular well intervention assembly
EP3482030B1 (fr) Système de manutention tubulaire intégré
US10801280B2 (en) Integrated tubular handling system and method
CA3092490C (fr) Guide de vissage tubulaire pour ensemble pince
US20140030045A1 (en) Pipe pick-up and lay down apparatus
WO2012018937A2 (fr) Unité d'installation de ligne de commande
US20190112880A1 (en) Guided Telescoping System For A Snubbing or Drilling Assembly
EP3548414B1 (fr) Vérin de curage sous-pression pouvant faire réagir des charges de couple
US20230086326A1 (en) Work platform and method for well operations
US10519728B2 (en) Standing pipe rack back system
GB2585731A (en) Integrated tubular handling system and method
CA3024360A1 (fr) Manipulateur a articulation unique de serrage pour utilisation avec un elevateur a articulation unique

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 3022042

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17788449

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17788449

Country of ref document: EP

Kind code of ref document: A1