WO2017168253A1 - Method and apparatus for controlling data transmission in v2v communication - Google Patents
Method and apparatus for controlling data transmission in v2v communication Download PDFInfo
- Publication number
- WO2017168253A1 WO2017168253A1 PCT/IB2017/000459 IB2017000459W WO2017168253A1 WO 2017168253 A1 WO2017168253 A1 WO 2017168253A1 IB 2017000459 W IB2017000459 W IB 2017000459W WO 2017168253 A1 WO2017168253 A1 WO 2017168253A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- data
- transmission
- scheduling information
- resource
- urgent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/56—Allocation or scheduling criteria for wireless resources based on priority criteria
- H04W72/566—Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient
- H04W72/569—Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient of the traffic information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/54—Allocation or scheduling criteria for wireless resources based on quality criteria
- H04W72/542—Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
Definitions
- Embodiments of the present disclosure relate to the field of wireless communication, and more specifically, to a method and apparatus for controlling data transmission in vehicle-to-vehicle (V2V) communication.
- V2V vehicle-to-vehicle
- LTE-based V2X Vehicle-to- Vehicle
- V2P Vehicle-to-Pedestrian
- V2I/N Vehicle-to-Infrastructure/Network
- the V2V communication usually involves transmission of data, such as GPS locating information, acceleration, braking state, steering wheel angle, speed and safety warnings for vehicles. Therefore, different latency requirements exist for different data transmissions in V2V communication and there is strict reliability requirement. Traditional solutions cannot satisfactorily meet different latency requirements for different types of data.
- a method for controlling data transmission in vehicle-to-vehicle communication comprising: generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information indicating whether the data is urgent data or non-urgent data; in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; and in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
- an apparatus for controlling data transmission in vehicle-to-vehicle communication comprising: a generation module configured for generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data; a first transmission module configured for in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; a second transmission module configured for in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
- Embodiments of the present disclosure propose a corresponding solution for the V2V communication with direct air interface (hereinafter referred to as "V2V communication") to satisfy both the above latency and reliability requirements.
- V2V communication direct air interface
- FIG. 1 is a schematic diagram of V2V communication environment related to embodiments of the present disclosure
- FIG. 2 is a flow chart of a method for controlling data transmission in V2V communication according to embodiments of the present disclosure
- Fig. 3 is a schematic diagram of a scheme for a resource pool configuration and scheduling allocation and data transmission according to embodiments of the present disclosure
- Fig. 4 is a schematic diagram of another scheme for a resource pool configuration and scheduling allocation and data transmission according to embodiments of the present disclosure
- Fig. 5 is a schematic diagram of a further scheme for a resource pool configuration and scheduling allocation and data transmission according to embodiments of the present disclosure
- Fig. 6 is a schematic diagram of a potential transmission collision according to embodiments of the present disclosure.
- Fig. 7 is a schematic diagram of collision alleviation according to embodiments of the present disclosure
- Fig. 8 is a flow chart of collision detection and solution according to a further embodiment of the present disclosure.
- Fig. 9 is a schematic block diagram of an apparatus for controlling data transmission in V2V communication according to embodiments of the present disclosure.
- Fig. 1 is a schematic diagram of V2V communication environment related to embodiments of the present disclosure.
- a base station 110 pre-configures an available resource pool for data transmission between on-board user equipment 120 and 130, and then the on-board user equipment 120 and 130 transmit data by means of the pre-configured resource pool.
- most latency requirements are in the range of 100ms or more for non-urgent data, such as speed and orientation data of the vehicle and so on. However, most latency requirements are 20ms for urgent data for example in the case of pre-crash warning.
- the transmission period of the resource pool is set as 40ms, 80ms, 160ms and 320ms.
- the inventive concept of the embodiments of the present disclosure lies in: preconfiguring respective resource pools for urgent data and non-urgent data at base station 110, and preconfiguring respective transmission periods for the respective resource pools based on the transmission latencies for the urgent data and the non-urgent data, e.g., configuring a relatively short transmission period for the resource pool of the urgent data (such as 10ms as an example only) and a relatively long transmission period for the resource pool of the non-urgent data (such as 40m as an example only).
- a relatively short transmission period for the resource pool of the urgent data such as 10ms as an example only
- a relatively long transmission period for the resource pool of the non-urgent data such as 40m as an example only.
- data and its scheduling information are transmitted at the on-board user equipment 120 and 130 by using resources in the resource pool preconfigured by the base station 110, wherein the scheduling information comprises information indicating whether the data is urgent data or non-urgent data.
- the latency requirements in V2V communication are satisfied.
- the scheduling information comprises information indicating whether the data is urgent data or non-urgent data
- the transmission of the scheduling information regarding the urgent data and the non-urgent data can share the system resource, so as to improve resource utilization and further enhance performance of the entire system.
- a plurality of V2V on-board user equipment each transmit data in a broadcasting mode specified in 3GPP LTE R12.
- the spectrum resources preconfigured by the base station are divided within one transmission period into scheduling allocation (SA) resource pools and data resource pools, wherein scheduling information for data transmission, including resource allocation information and data transmission modes, are transmitted at the SA resource pools using corresponding physical side-link control channels (PSCCH) while data is transmitted at the data resource pools using corresponding physical side-link data channels (PSSCH).
- SA scheduling information is transmitted prior to data transmission.
- UE first decodes the SA scheduling information and then determines whether the data is decoded based on the SA scheduling information and how to decode.
- Fig. 2 is a flow chart of a method 200 for controlling data transmission in V2V communication according to embodiments of the present disclosure.
- the method can be implemented at various on-board UEs in the V2V communication.
- As shown in Fig. 2, generate scheduling information associated with data to be transmitted at the on-board user equipment in step S210.
- the scheduling information can comprise information indicating whether the data is urgent data or non-urgent data.
- the scheduling information can comprise an indication bit, e.g., 0 or 1, for indicating whether the data is urgent data or non-urgent data.
- the scheduling information can also comprise transmission information of the data in the next transmission period.
- the scheduling information can comprise resource information employed by data transmission in the next transmission period, such as sub-frame information and frequency information etc.
- step S215 the data is determined as urgent data or not based on the indication. If the data is determined as urgent data (branch "y es ”) in step S215, the method 200 proceeds to step S220, at which data and scheduling information are transmitted in a first transmission perio using resources in a first resource pool for urgent data. From another aspect, if the data is determined as non-urgent data (branch "no") in step S215, the method 200 proceeds to step S230, at which the data and scheduling information are transmitted in a second transmission period using resources in a second resource pool for non-urgent data.
- the first transmission period and the second transmission period can be preconfigured by the base station based on different transmission latencies required by the urgent data and the non-urgent data.
- the first and second resource pools can also be preconfigured by the base station respectively for urgent data and non-urgent data.
- the scheduling information can be transmitted on PSCCH and data can be transmitted on PSSCH.
- transmission of PSCCH will act as an example of scheduling information transmission
- transmission of PSSCH will act as an example of data transmission in the following description.
- data scheduled at PSCCH from the on-board UE is transmitted at PSSCH within the next transmission period.
- PSCCH comprises information about resource allocation of all corresponding PSSCH transmissions within the next transmission period. Therefore, it allows the transmission mode to evenly occupy resources of the data resource pool in time domain, which improves system level performance for V2V communication.
- the on-board user equipment can choose to transmit PSCCH and PSSCH separately in different sub-frames.
- scheduling information is transmitted in a first sub-frame and the data is transmitted in a second sub-frame, the second sub-frame being different from the first sub-frame.
- the on-board user equipment can choose to transmit PSCCH and PSSCH simultaneously in the same sub-frame. In this case, PSSCH is not scheduled by the PSCCH transmitted simultaneously.
- a density of a plurality of on-board UE in one region is determined and whether PSSCH and PSSCH are transmitted in the same sub-frame is determined based on the determined density. If the determined density is high, more simultaneous transmissions are preferred. If the determined density is low, less simultaneous transmissions are preferred.
- FIG. 3 illustrate various examples of resource allocation schemes according to embodiments of the present disclosure.
- the resource allocation schemes can be executed at the side of the on-board UE for taking full advantage of the resources in the resource pool preconfigured by the base station to the on-board UE for scheduling allocation and data transmission.
- the bold block represents an SA resource pool and a data resource pool configured for non-urgent data in the corresponding transmission period, wherein the transmission period is set as 40ms for example.
- the thin frame denotes an SA resource pool and a data resource pool configured for urgent data in the corresponding transmission period, wherein the transmission period is set as 10ms for example.
- the scheduling information of PSCCH comprises information indicating whether the data is urgent data or non-urgent data, such as indication bit.
- the SA resource pools for urgent data and non-urgent data can be completely overlapped.
- the PSCCH for urgent data is identified based on the indication bit and the correct data resource pool is then located based on the scheduling information in PSCCH, so as to decode the corresponding PSSCH for the urgent data to obtain urgent messages.
- data resource pools for urgent data and non-urgent data are also overlapped, which can accommodate dynamic traffic efficiently.
- a common SA resource pool and a common data resource pool can be configured for urgent data and non-urgent data by designating additional transmission mechanism of PSCCH and PSSCH for urgent data.
- Fig. 4 demonstrates the situation of sharing the common SA resource pool and the common data resource pool for urgent data and non-urgent data.
- the scheduling information needs to comprise an indication bit indicating whether the data is urgent data or non-urgent data.
- an additional transmission mechanism of PSCCH and PSSCH is designated for the urgent data.
- data transmission is completed after the transmission of scheduling information.
- the span from the transmission of the scheduling information to the transmission of the data transmission in time domain is smaller than a predefined transmission latency for the urgent data, wherein the predefined transmission latency is less than a predefined time length, e.g., 20ms.
- Fig. 5 shows a different resource allocation scheme.
- the scheduling information of PSCCH can exclude indication bit, and make the SA resource pools for urgent data and non-urgent data orthogonal instead.
- a PSCCH for urgent data is differentiated from a PSCCH for non-urgent data based on a source of PSCCH, i.e., SA location.
- the data resource pools for urgent data and non-urgent data are overlapped, such that they share the same resources to accommodate dynamic traffic efficiently.
- the above describes controlling data transmission in V2V communication using appropriate resource allocation schemes, to satisfy latency requirements of V2V communication and improve system performance.
- the following content depicts a further control on data transmission in V2V communication by monitoring and solving potential collisions, to further meet strict reliability requirements in V2V communication.
- the probability mechanism can comprise random number-based mechanism in one embodiment, e.g., a random number is generated first, which random number is then compared with reselection probability p sa for SA.
- the reselection probability p sa can be set based on the balance between sensing accuracy and collision resolution capability. Therefore, whether or not to reselect the resources for scheduling information SA can be determined based on the comparison result.
- the on-board UE can generate a random number p for each transmission period, wherein p ranges from 0 to 1 or any other suitable scope. If p is smaller than p sa , the on-board UE reselects different resources for transmissions of PSCCH. In one embodiment, reselecting different resources may refer to selecting at least one different sub-frame for transmissions of PSCCH.
- Data transmission collision can be detected based on decoding of the scheduling information SA in one embodiment.
- the current on-board UE decodes other on-board UEs' SA, it can identify whether its data channel PSSCH is collided with another on-board UE. If the risks of such potential collision exist, the current on-board UE can reselect a resource for its data channel.
- resource reselection can also take situations of other on-board UE into account.
- the current on-board UE can monitor transmissions of scheduling information transmitted from another on-board UE and determine whether there is a potential collision for data transmission based on the monitored scheduling information; and reselect a resource for data transmission in response to the existence of the potential collisions.
- a reselection probability pdata which is different reselection probability p sa for SA, is set for data.
- a PSSCH channel occupies much more resource blocks RB than a PSCCH channel.
- PSSCH transmissions determine interference environment, which is used for sensing-based scheduling.
- data collision can be detected and resource reselection can be triggered promptly based on SA decoding.
- p ⁇ j ata can be set much smaller than p sa , which means resource reselection for SA transmissions is more frequent. Accordingly, the sensing accuracy and collision resolution capability are balanced.
- Fig. 8 shows an example of an embodiment of the above collision detection and solution.
- monitor transmissions of scheduling information transmitted from another on-board user equipment at step S810 and determine whether there is a potential collision for data transmission based on the monitored scheduling information at step S820.
- determine potential collision at step S820 reselect a resource for data transmission at step S850.
- step S850 If the random number is smaller than the reselection probability for data transmission, the procedure proceeds to step S850 to reselect the resource for data transmission. If the random number is not smaller than the reselection probability for data transmission, it determines that it is unnecessary to reselect the resource for data transmission.
- step S860 After detecting the potential collision and reselecting the resource for data transmission, it determines, based on the random probability, whether or not to reselect a resource for transmission of scheduling information, which corresponds to steps S860 to S880.
- a random number is generated.
- step S870 whether the random number is smaller than the reselection probability for scheduling information is determined. If the random number is determined to be smaller than the reselection probability for scheduling information at S870, the procedure proceeds to step S880 to reselect the resource for transmissions of scheduling information. If the random number is determined to be not smaller than the reselection probability for scheduling information at S870, resource reselection is not needed and the next monitoring period is started.
- the above content has already described the probability mechanism, so it will not be repeated here.
- Fig. 9 is a schematic block diagram of an apparatus 900 for controlling data transmission in V2V communication according to embodiments of the present disclosure.
- the control apparatus 900 can be implemented at each of a plurality of on-board UE in V2V communication.
- the apparatus 900 can comprise a generation module 910, a first transmission module 920 and a second transmission module 930.
- the generation module 910 can be configured for generating, at the on-board UE, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data.
- the first transmission module 920 can be configured for in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data.
- the second transmission module 930 can be configured for in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
- the resources for scheduling in the first resource pool and that in the second resource pool are completely overlapped.
- the resources for scheduling and the resources for data transmission in the first and second resource pools are shared.
- the first transmission module is also configured for: transmitting the scheduling information; and completing the data transmission after the transmission of the scheduling information, wherein the span from the transmission of the scheduling information to the transmission of the data transmission in time domain is smaller than a predefined transmission latency for the urgent data.
- the scheduling information can also comprise information about data transmission in the next transmission period.
- the first transmission module and the second transmission module can respectively be configured for: transmitting the scheduling information in a first sub-frame; and transmitting the data in a second sub-frame, the second sub-frame being different from the first sub-frame.
- the first transmission module and the second transmission module can respectively be configured for: transmitting the scheduling information and the data in the same sub-frame.
- the first transmission module and the second transmission module can respectively be configured for: determining density of a plurality of on-board user equipment in one region; and determining whether the scheduling information and the data are transmitted in the same sub-frame based on the determined density.
- the apparatus 900 further comprises: a monitoring module configured for monitoring scheduling information transmitted from another on-board user equipment; a determining module configured for determining, based on the monitored scheduling information, whether there is a potential collision for transmission of the data; and a resource reselecting module configured for reselecting a resource for the transmission of the data in response to existence of the potential collision.
- the apparatus 900 can further comprise: a first probability module configured for in response to determining that there is no potential collision for the transmission of the data, determining, based on a random probability, whether or not to reselect the resource for the transmission of the data.
- the apparatus 900 can further comprise: a second probability module configured for determining, based on a random probability, whether or not to reselect a resource for the transmission of the scheduling information.
- the above described apparatus for controlling data transmission in V2V communication is corresponds to the process of the aforementioned method for controlling data transmission in V2V communication. Therefore, the exemplary details can be seen from the above mentioned control method and will not be repeated here.
- embodiments of the present disclosure can be provided as method, apparatus or computer program product. Therefore, embodiments of the present disclosure can take the form of full-hardware embodiments, full-software embodiment and embodiments combining software and hardware. Besides, embodiments of the present disclosure can adopt the form of computer program products implemented on one or more computer-available storage media (including but not limited to disk memory, CD-ROM, optical memory and so on) having computer-available program codes therein.
- computer-available storage media including but not limited to disk memory, CD-ROM, optical memory and so on
- the computer device comprises one or more processors (CPU), input/output interfaces, network interface and internal storage, wherein the internal storage can comprise volatile memory, random-access memory (RAM) and/or non-volatile internal memory in the computer-readable medium, such as read-only memory (ROM) or flash RAM.
- the internal memory is just an example of the computer-readable medium.
- the computer-readable medium comprises non-volatile and volatile, and removable and non-removable medium that can realize information storage via any methods and techniques.
- the information can be computer-readable instructions, data structure, program modules or other data.
- An example of the storage medium of the computer comprises but not limited to phase-change memory (PRAM), static random-access memory (SRAM), dynamic random-access memory (DRAM), other types of random-access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory, or other internal storage techniques, compact disk read-only memory (CD-ROM), digital video disk (DVD), or other optical storage, magnetic tape, magnetic-tape disk storage or other magnetic storage devices or any other non-transmission medium for storing information accessible by the computer device.
- the computer-readable medium excludes transient computer-readable medium, such as modulated data signals and carriers.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Embodiments of the présent disclosure provide a method and apparatus for controlling data transmission in vehicle-to-vehicle communication. There is provided a method for controlling data transmission in vehicle-to-vehicle communication, comprising: generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data; in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; and in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on différent transmission latencies required by the urgent data and the non-urgent data. According to embodiments of the présent disclosure, the solution can satisfy différent latency requirements and strict reliability requirements in V2V communication.
Description
METHOD AND APPARATUS FOR CONTROLLING DATA TRANSMISSION IN V2V COMMUNICATION
FIELD
[0001] Embodiments of the present disclosure relate to the field of wireless communication, and more specifically, to a method and apparatus for controlling data transmission in vehicle-to-vehicle (V2V) communication.
BACKGROUND
[0002] In the recent years, telematics have gained more and more attention along with the rapid growth of the Internet technologies. The study of Long Term Revolution LTE-based V2X (Vehicle-to-X) services is also carried out in the Third Generation Partnership Project (3GPP) to explore the opportunity to realize the "Internet of Vehicles" based on the widely deployed LTE networks. The LTE-based V2X comprises of three parts: Vehicle-to- Vehicle (V2V), Vehicle-to-Pedestrian (V2P) and Vehicle-to-Infrastructure/Network (V2I/N), wherein the V2V services cover the LTE-based communication between the vehicles through direct air interface or through indirect air interface (via relaying by the eNB).
[0003] The V2V communication usually involves transmission of data, such as GPS locating information, acceleration, braking state, steering wheel angle, speed and safety warnings for vehicles. Therefore, different latency requirements exist for different data transmissions in V2V communication and there is strict reliability requirement. Traditional solutions cannot satisfactorily meet different latency requirements for different types of data.
SUMMARY
[0004] According to embodiments of the present disclosure, there is provided a method for controlling data transmission in vehicle-to-vehicle communication, comprising: generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information indicating whether the data is urgent data or non-urgent data; in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; and in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based
on different transmission latencies required by urgent data and non-urgent data.
[0005] According to embodiments of the present disclosure, there is also provided an apparatus for controlling data transmission in vehicle-to-vehicle communication, comprising: a generation module configured for generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data; a first transmission module configured for in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; a second transmission module configured for in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
[0006] Embodiments of the present disclosure propose a corresponding solution for the V2V communication with direct air interface (hereinafter referred to as "V2V communication") to satisfy both the above latency and reliability requirements. According to embodiments of the present disclosure, there is provided a solution for controlling data transmission in V2V communication, which can satisfy both the latency and reliability requirements.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007] The drawings explained here provide a further understanding of the present disclosure and form a part of the present disclosure. Example embodiments of the present disclosure and its descriptions are used to elaborate the present disclosure and do not put inappropriate limitations on the present disclosure. In the drawings:
[0008] Fig. 1 is a schematic diagram of V2V communication environment related to embodiments of the present disclosure;
[0009] Fig. 2 is a flow chart of a method for controlling data transmission in V2V communication according to embodiments of the present disclosure;
[0010] Fig. 3 is a schematic diagram of a scheme for a resource pool configuration and scheduling allocation and data transmission according to embodiments of the present disclosure;
[0011] Fig. 4 is a schematic diagram of another scheme for a resource pool configuration and
scheduling allocation and data transmission according to embodiments of the present disclosure;
[0012] Fig. 5 is a schematic diagram of a further scheme for a resource pool configuration and scheduling allocation and data transmission according to embodiments of the present disclosure;
[0013] Fig. 6 is a schematic diagram of a potential transmission collision according to embodiments of the present disclosure;
[0014] Fig. 7 is a schematic diagram of collision alleviation according to embodiments of the present disclosure; [0015] Fig. 8 is a flow chart of collision detection and solution according to a further embodiment of the present disclosure; and
[0016] Fig. 9 is a schematic block diagram of an apparatus for controlling data transmission in V2V communication according to embodiments of the present disclosure.
DETAILED DESCRIPTION
[0017] Fig. 1 is a schematic diagram of V2V communication environment related to embodiments of the present disclosure. In the V2V communication system 100 shown in Fig. 1, a base station 110 pre-configures an available resource pool for data transmission between on-board user equipment 120 and 130, and then the on-board user equipment 120 and 130 transmit data by means of the pre-configured resource pool. [0018] In V2V communication, most latency requirements are in the range of 100ms or more for non-urgent data, such as speed and orientation data of the vehicle and so on. However, most latency requirements are 20ms for urgent data for example in the case of pre-crash warning. In 3GPP LTE R12 version, the transmission period of the resource pool is set as 40ms, 80ms, 160ms and 320ms. The minimum transmission period of 40ms (which is less than 100ms/2=50ms) only allows meeting the latency requirement of 100ms for the above non-urgent data, and cannot meet the latency requirement of 20ms for the urgent data.
[0019] The inventive concept of the embodiments of the present disclosure lies in: preconfiguring respective resource pools for urgent data and non-urgent data at base station 110, and preconfiguring respective transmission periods for the respective resource pools based on the transmission latencies for the urgent data and the non-urgent data, e.g., configuring a relatively short transmission period for the resource pool of the urgent data
(such as 10ms as an example only) and a relatively long transmission period for the resource pool of the non-urgent data (such as 40m as an example only). Embodiments in this regard will be further described in the following text with reference to Figs. 3-5. Furthermore, data and its scheduling information are transmitted at the on-board user equipment 120 and 130 by using resources in the resource pool preconfigured by the base station 110, wherein the scheduling information comprises information indicating whether the data is urgent data or non-urgent data.
[0020] Accordingly, the latency requirements in V2V communication are satisfied. Besides, because the scheduling information comprises information indicating whether the data is urgent data or non-urgent data, the transmission of the scheduling information regarding the urgent data and the non-urgent data can share the system resource, so as to improve resource utilization and further enhance performance of the entire system. To make objectives, technical solutions and advantages of the present disclosure clearer, the present disclosure is further described in details with reference to example embodiments in some exemplary scenarios.
[0021] In common exemplary scenarios, a plurality of V2V on-board user equipment (on-board UE) each transmit data in a broadcasting mode specified in 3GPP LTE R12. For example, the spectrum resources preconfigured by the base station are divided within one transmission period into scheduling allocation (SA) resource pools and data resource pools, wherein scheduling information for data transmission, including resource allocation information and data transmission modes, are transmitted at the SA resource pools using corresponding physical side-link control channels (PSCCH) while data is transmitted at the data resource pools using corresponding physical side-link data channels (PSSCH). The SA scheduling information is transmitted prior to data transmission. UE first decodes the SA scheduling information and then determines whether the data is decoded based on the SA scheduling information and how to decode.
[0022] Fig. 2 is a flow chart of a method 200 for controlling data transmission in V2V communication according to embodiments of the present disclosure. The method can be implemented at various on-board UEs in the V2V communication. As shown in Fig. 2, generate scheduling information associated with data to be transmitted at the on-board user equipment in step S210.
[0023] In one embodiment, the scheduling information can comprise information indicating
whether the data is urgent data or non-urgent data. In an example embodiment, the scheduling information can comprise an indication bit, e.g., 0 or 1, for indicating whether the data is urgent data or non-urgent data. Alternatively or additionally, the scheduling information can also comprise transmission information of the data in the next transmission period. For example, the scheduling information can comprise resource information employed by data transmission in the next transmission period, such as sub-frame information and frequency information etc.
[0024] In step S215, the data is determined as urgent data or not based on the indication. If the data is determined as urgent data (branch "yes") in step S215, the method 200 proceeds to step S220, at which data and scheduling information are transmitted in a first transmission perio using resources in a first resource pool for urgent data. From another aspect, if the data is determined as non-urgent data (branch "no") in step S215, the method 200 proceeds to step S230, at which the data and scheduling information are transmitted in a second transmission period using resources in a second resource pool for non-urgent data. [0025] In one embodiment, the first transmission period and the second transmission period can be preconfigured by the base station based on different transmission latencies required by the urgent data and the non-urgent data. Alternatively or additionally, in one embodiment, the first and second resource pools can also be preconfigured by the base station respectively for urgent data and non-urgent data. [0026] For instance, in one embodiment, the scheduling information can be transmitted on PSCCH and data can be transmitted on PSSCH. For the sake of discussion, transmission of PSCCH will act as an example of scheduling information transmission and transmission of PSSCH will act as an example of data transmission in the following description. However, it should be understood that the above is only exemplary. In other environment or scenarios, it is completely feasible to transmit data and/or scheduling information on other channels.
[0027] In one embodiment, data scheduled at PSCCH from the on-board UE is transmitted at PSSCH within the next transmission period. For example, PSCCH comprises information about resource allocation of all corresponding PSSCH transmissions within the next transmission period. Therefore, it allows the transmission mode to evenly occupy resources of the data resource pool in time domain, which improves system level performance for V2V communication.
[0028] In one embodiment, the on-board user equipment can choose to transmit PSCCH and
PSSCH separately in different sub-frames. In one exemplary embodiment, scheduling information is transmitted in a first sub-frame and the data is transmitted in a second sub-frame, the second sub-frame being different from the first sub-frame. Alternatively, in another embodiment, the on-board user equipment can choose to transmit PSCCH and PSSCH simultaneously in the same sub-frame. In this case, PSSCH is not scheduled by the PSCCH transmitted simultaneously.
[0029] Transmission of PSCCH and PSSCH in the same sub-frame will increase the number of sub-frames received by the on-board UE, thereby reducing the impact of half-duplex constraint. Potentially, it can improve system level performance for V2V communication. However, the degradation of link level performance of PSCCH and PSSCH can be caused due to power sharing and increased Peak to Average Power Ratio (PAPR) in some cases. Therefore, in some embodiments, the number of simultaneous transmission of PSCCH and PSSCH in the same sub-frame can be adjusted based on the density of the on-board UE. For example, in one embodiment, a density of a plurality of on-board UE in one region is determined and whether PSSCH and PSSCH are transmitted in the same sub-frame is determined based on the determined density. If the determined density is high, more simultaneous transmissions are preferred. If the determined density is low, less simultaneous transmissions are preferred.
[0030] A plurality of examples is described about how PSCCH and PSSCH are transmitted using resources in the resource pool with reference to Figs. 3-5, which illustrate various examples of resource allocation schemes according to embodiments of the present disclosure. The resource allocation schemes can be executed at the side of the on-board UE for taking full advantage of the resources in the resource pool preconfigured by the base station to the on-board UE for scheduling allocation and data transmission. [0031] As shown in Fig. 3, the bold block represents an SA resource pool and a data resource pool configured for non-urgent data in the corresponding transmission period, wherein the transmission period is set as 40ms for example. The thin frame denotes an SA resource pool and a data resource pool configured for urgent data in the corresponding transmission period, wherein the transmission period is set as 10ms for example. [0032] In the case illustrated in Fig. 3, the scheduling information of PSCCH comprises information indicating whether the data is urgent data or non-urgent data, such as indication bit. Correspondingly, the SA resource pools for urgent data and non-urgent data can be
completely overlapped. At the on-board UE of a receiving side, the PSCCH for urgent data is identified based on the indication bit and the correct data resource pool is then located based on the scheduling information in PSCCH, so as to decode the corresponding PSSCH for the urgent data to obtain urgent messages. Furthermore, in the case illustrated in Fig. 3, data resource pools for urgent data and non-urgent data are also overlapped, which can accommodate dynamic traffic efficiently.
[0033] In the resource pool configuration shown in Fig. 3, although the SA resource pools and data resource pools for urgent data and non-urgent data are respectively overlapped, two SA resource pools and two data resource pools are still needed to be configured for urgent data and non-urgent data. To use the resources more efficiently, a common SA resource pool and a common data resource pool can be configured for urgent data and non-urgent data by designating additional transmission mechanism of PSCCH and PSSCH for urgent data.
[0034] Fig. 4 demonstrates the situation of sharing the common SA resource pool and the common data resource pool for urgent data and non-urgent data. In this case, to satisfy latency requirements, the scheduling information needs to comprise an indication bit indicating whether the data is urgent data or non-urgent data. Besides, an additional transmission mechanism of PSCCH and PSSCH is designated for the urgent data. In one embodiment, data transmission is completed after the transmission of scheduling information. The span from the transmission of the scheduling information to the transmission of the data transmission in time domain is smaller than a predefined transmission latency for the urgent data, wherein the predefined transmission latency is less than a predefined time length, e.g., 20ms. In such situation, if the on-board UE for transmitting urgent data completes transmission of PSCCH, it can transmit PSSCH by means of the following available sub-frames, which can be within the current transmission period, as shown in Fig. 4. [0035] Fig. 5 shows a different resource allocation scheme. In the case of Fig. 5, the scheduling information of PSCCH can exclude indication bit, and make the SA resource pools for urgent data and non-urgent data orthogonal instead. Thus, at the on-board UE at the receiving side, a PSCCH for urgent data is differentiated from a PSCCH for non-urgent data based on a source of PSCCH, i.e., SA location. In the case of Fig. 5, the data resource pools for urgent data and non-urgent data are overlapped, such that they share the same resources to accommodate dynamic traffic efficiently.
[0036] However, the disadvantage of the above resource pool configuration is that a dedicate
SA resource pool is needed for urgent data. Since the urgent data appears occasionally, it results into low resource utilization rate.
[0037] The resource allocation schemes described with reference with Figs. 3-5 are only exemplary and shall not limit the present disclosure to this. For instance, although the figures show that a transmission period of 10ms is configured for urgent data, it is only exemplary and bears no intention to limit the present disclosure in any manner. As an example, a transmission period of less than 10 ms or any other suitable threshold time length can be configured for urgent data based on specific application scenarios and requirements.
[0038] The above describes controlling data transmission in V2V communication using appropriate resource allocation schemes, to satisfy latency requirements of V2V communication and improve system performance. The following content depicts a further control on data transmission in V2V communication by monitoring and solving potential collisions, to further meet strict reliability requirements in V2V communication.
[0039] To facilitate sensing-based scheduling, semi-persistent resource allocation for PSSCH/PSCCH needs to be employed. As mentioned above, persistent SA collisions may happen when multiple on-board UE employ the same set of sub-frames for PSCCH transmission. Fig. 6 shows scenarios of potential transmission collisions. In this situation, the on-board UE cannot decode each other's data/messages due to half-duplex constraint, and the issue becomes more serious when transmission of PSCCH/PSSCH is allowed simultaneously in the same sub-frame.
[0040] For SA transmission collisions, resources for transmission of scheduling information SA are reselected based on random probability in one embodiment to alleviate SA transmission collisions. For instance, the probability mechanism can comprise random number-based mechanism in one embodiment, e.g., a random number is generated first, which random number is then compared with reselection probability psa for SA. In one embodiment, the reselection probability psa can be set based on the balance between sensing accuracy and collision resolution capability. Therefore, whether or not to reselect the resources for scheduling information SA can be determined based on the comparison result.
[0041] For example, in one embodiment, the on-board UE can generate a random number p for each transmission period, wherein p ranges from 0 to 1 or any other suitable scope. If p is smaller than psa, the on-board UE reselects different resources for transmissions of PSCCH. In one embodiment, reselecting different resources may refer to selecting at least one different
sub-frame for transmissions of PSCCH. Fig. 7 illustrates a schematic diagram of resource reselection for SA transmission collisions, in which one sub-frame is reselected. In a special situation in which psa=l, it means that PSCCH resources are reselected for each transmission period. [0042] Data transmission collision can be detected based on decoding of the scheduling information SA in one embodiment. When the current on-board UE decodes other on-board UEs' SA, it can identify whether its data channel PSSCH is collided with another on-board UE. If the risks of such potential collision exist, the current on-board UE can reselect a resource for its data channel. [0043] Alternatively or additionally, resource reselection can also take situations of other on-board UE into account. For example, the current on-board UE can monitor transmissions of scheduling information transmitted from another on-board UE and determine whether there is a potential collision for data transmission based on the monitored scheduling information; and reselect a resource for data transmission in response to the existence of the potential collisions.
[0044] In another embodiment, regarding transmission collision of data, the aforementioned random probability can also be employed to reselect a resource for data transmission. In an exemplary embodiment, a reselection probability pdata, which is different reselection probability psa for SA, is set for data. For V2V communication, a PSSCH channel occupies much more resource blocks RB than a PSCCH channel. PSSCH transmissions determine interference environment, which is used for sensing-based scheduling. In addition, data collision can be detected and resource reselection can be triggered promptly based on SA decoding. Hence, p<jata can be set much smaller than psa, which means resource reselection for SA transmissions is more frequent. Accordingly, the sensing accuracy and collision resolution capability are balanced.
[0045] Fig. 8 shows an example of an embodiment of the above collision detection and solution. As shown in Fig. 8, monitor transmissions of scheduling information transmitted from another on-board user equipment at step S810 and determine whether there is a potential collision for data transmission based on the monitored scheduling information at step S820. In response to determined potential collision at step S820, reselect a resource for data transmission at step S850. In response to determining that there is no potential collision for data transmission at step S820, it further determines, based on the random probability,
whether or not to reselect the resource for data transmission. Specifically, a random number is generated at step S830, and the random number is compared with the predefined reselection probability at step S840. If the random number is smaller than the reselection probability for data transmission, the procedure proceeds to step S850 to reselect the resource for data transmission. If the random number is not smaller than the reselection probability for data transmission, it determines that it is unnecessary to reselect the resource for data transmission.
[0046] After detecting the potential collision and reselecting the resource for data transmission, it determines, based on the random probability, whether or not to reselect a resource for transmission of scheduling information, which corresponds to steps S860 to S880. At step S860, a random number is generated. At step S870, whether the random number is smaller than the reselection probability for scheduling information is determined. If the random number is determined to be smaller than the reselection probability for scheduling information at S870, the procedure proceeds to step S880 to reselect the resource for transmissions of scheduling information. If the random number is determined to be not smaller than the reselection probability for scheduling information at S870, resource reselection is not needed and the next monitoring period is started. The above content has already described the probability mechanism, so it will not be repeated here.
[0047] So far, a method for controlling data transmission in V2V communication has been described, and embodiments of the present disclosure also provides a corresponding apparatus for controlling data transmission in V2V communication.
[0048] Fig. 9 is a schematic block diagram of an apparatus 900 for controlling data transmission in V2V communication according to embodiments of the present disclosure. The control apparatus 900 can be implemented at each of a plurality of on-board UE in V2V communication. As illustrated in Fig. 9, the apparatus 900 can comprise a generation module 910, a first transmission module 920 and a second transmission module 930.
[0049] In one embodiment, the generation module 910 can be configured for generating, at the on-board UE, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data. The first transmission module 920 can be configured for in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data. The second transmission module 930 can be configured for in response to the data being the non-urgent
data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data, the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data. [0050] In one embodiment, the resources for scheduling in the first resource pool and that in the second resource pool are completely overlapped.
[0051] In one embodiment, the resources for scheduling and the resources for data transmission in the first and second resource pools are shared. In the present embodiment, the first transmission module is also configured for: transmitting the scheduling information; and completing the data transmission after the transmission of the scheduling information, wherein the span from the transmission of the scheduling information to the transmission of the data transmission in time domain is smaller than a predefined transmission latency for the urgent data.
[0052] In one embodiment, the scheduling information can also comprise information about data transmission in the next transmission period.
[0053] In one embodiment, the first transmission module and the second transmission module can respectively be configured for: transmitting the scheduling information in a first sub-frame; and transmitting the data in a second sub-frame, the second sub-frame being different from the first sub-frame. [0054] In one embodiment, the first transmission module and the second transmission module can respectively be configured for: transmitting the scheduling information and the data in the same sub-frame.
[0055] In one embodiment, the first transmission module and the second transmission module can respectively be configured for: determining density of a plurality of on-board user equipment in one region; and determining whether the scheduling information and the data are transmitted in the same sub-frame based on the determined density.
[0056] In one embodiment, the apparatus 900 further comprises: a monitoring module configured for monitoring scheduling information transmitted from another on-board user equipment; a determining module configured for determining, based on the monitored scheduling information, whether there is a potential collision for transmission of the data; and a resource reselecting module configured for reselecting a resource for the transmission of the data in response to existence of the potential collision.
[0057] In one embodiment, the apparatus 900 can further comprise: a first probability module configured for in response to determining that there is no potential collision for the transmission of the data, determining, based on a random probability, whether or not to reselect the resource for the transmission of the data. [0058] In one embodiment, the apparatus 900 can further comprise: a second probability module configured for determining, based on a random probability, whether or not to reselect a resource for the transmission of the scheduling information.
[0059] The above described apparatus for controlling data transmission in V2V communication is corresponds to the process of the aforementioned method for controlling data transmission in V2V communication. Therefore, the exemplary details can be seen from the above mentioned control method and will not be repeated here.
[0060] Those skilled in the art should understand that the embodiments of the present disclosure can be provided as method, apparatus or computer program product. Therefore, embodiments of the present disclosure can take the form of full-hardware embodiments, full-software embodiment and embodiments combining software and hardware. Besides, embodiments of the present disclosure can adopt the form of computer program products implemented on one or more computer-available storage media (including but not limited to disk memory, CD-ROM, optical memory and so on) having computer-available program codes therein. [0061] In a typical configuration, the computer device comprises one or more processors (CPU), input/output interfaces, network interface and internal storage, wherein the internal storage can comprise volatile memory, random-access memory (RAM) and/or non-volatile internal memory in the computer-readable medium, such as read-only memory (ROM) or flash RAM. The internal memory is just an example of the computer-readable medium. [0062] The computer-readable medium comprises non-volatile and volatile, and removable and non-removable medium that can realize information storage via any methods and techniques. The information can be computer-readable instructions, data structure, program modules or other data. An example of the storage medium of the computer comprises but not limited to phase-change memory (PRAM), static random-access memory (SRAM), dynamic random-access memory (DRAM), other types of random-access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory, or other internal storage techniques, compact disk read-only
memory (CD-ROM), digital video disk (DVD), or other optical storage, magnetic tape, magnetic-tape disk storage or other magnetic storage devices or any other non-transmission medium for storing information accessible by the computer device. According to the definition in the text, the computer-readable medium excludes transient computer-readable medium, such as modulated data signals and carriers.
[0063] It should be explained that the technical terms "comprise" and "include" or other variants intend to encompass non-exclusive inclusion, such that the process, method, product or device consisting of a series of elements not only comprises the elements, but also other elements not explicitly listed, or further comprises the inherent elements of the process, method, product or device. In the case where no more constraints are set, the elements defined by the sentence "including one ..." do not exclude that other same elements may also exist in the process, method, produce or device having the above elements.
[0064] The above is just embodiments of the present disclosure and do not limit the present disclosure. For those skilled in the art, the present disclosure can have a variety of changes and modifications. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present disclosure shall be included within the claims of the present disclosure.
Claims
1. A method for controlling data transmission in a vehicle-to-vehicle communication, comprising:
generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information indicating whether the data is urgent data or non-urgent data;
in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data; and
in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data,
the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
2. The method of claim 1, wherein resources for scheduling allocation in the first and second resource pools are completely overlapped.
3. The method of claim 1, wherein resources for scheduling allocation and resources for data transmission in the first and second resource pools are shared.
4. The method of claim 3, wherein the transmitting the data and the scheduling information in the first transmission period comprises:
transmitting the scheduling information; and
completing the transmission of the data after the transmission of the scheduling information,
wherein a span from the transmission of the scheduling information to the transmission of the data in time domain is smaller than a predefined transmission latency for urgent data.
5. The method of claim 1, wherein the scheduling information also comprises information about transmission of the data in a next transmission period.
6. The method of claim 5, wherein the transmitting the data and the scheduling information comprises:
transmitting the scheduling information in a first sub-frame; and
transmitting the data in a second sub-frame, the second sub-frame being different from the first sub-frame.
7. The method of claim 5, wherein the transmitting the data and the scheduling information comprises:
transmitting the scheduling information and the data in a same sub-frame.
8. The method of claim 1, wherein the transmitting the data and the scheduling information comprises:
determining density of a plurality of on-board user equipment in a region; and determining whether the scheduling information and the data are transmitted in a same sub-frame based on the determined density.
9. The method of claim 1, further comprising:
monitoring scheduling information transmitted from another on-board user equipment; determining, based on the monitored scheduling information, whether there is a potential collision for transmission of the data; and
reselecting a resource for the transmission of the data in response to existence of the potential collision.
10. The method of claim 9, further comprising:
In response to determining that there is no potential collision for the transmission of the data, determining, based on a random probability, whether or not to reselect the resource for the transmission of the data.
11. The method of claim 1, further comprising:
determining, based on a random probability, whether or not to reselect a resource for the transmission of the scheduling information.
12. An apparatus for controlling data transmission in a vehicle-to-vehicle communication, comprising:
a generation module configured for generating, at an on-board user equipment, scheduling information associated with data to be transmitted, the scheduling information including information indicating whether the data is urgent data or non-urgent data;
a first transmission module configured for in response to the data being the urgent data, transmitting the data and the scheduling information in a first transmission period using a resource in a first resource pool for urgent data;
a second transmission module configured for in response to the data being the non-urgent data, transmitting the data and the scheduling information in a second transmission period using a resource in a second resource pool for non-urgent data,
the first and second transmission periods being pre-configured based on different transmission latencies required by urgent data and non-urgent data.
13. The apparatus of claim 12, wherein resources for scheduling allocation in the first and second resource pools are completely overlapped.
14. The apparatus of claim 12, wherein resources for scheduling allocation and resources for data transmission in the first and second resource pools are shared.
15. The apparatus of claim 14, wherein the first transmission module is further configured for:
transmitting the scheduling information; and
completing the transmission of the data after the transmission of scheduling information,
wherein a span from the transmission of the scheduling information to the transmission of the data in time domain is smaller than a predefined transmission latency for the urgent data.
16. The apparatus of claim 12, wherein the scheduling information also comprises information about transmission of the data in a next transmission period.
17. The apparatus of claim 16, wherein the first transmission module and the second transmission module are respectively configured for:
transmitting the scheduling information in a first sub-frame; and
transmitting the data in a second sub-frame, the second sub-frame being different from
the first sub-frame.
18. The apparatus of claim 16, wherein the first transmission module and the second transmission module are respectively configured for:
transmitting the scheduling information and the data in a same sub-frame.
19. The apparatus of claim 12, wherein the first transmission module and the second transmission module are respectively configured for:
determining density of a plurality of on-board user equipment in a region; and determining whether the scheduling information and the data are transmitted in the same sub-frame based on the determined density.
20. The apparatus of claim 12, further comprising:
a monitoring module configured for monitoring scheduling information transmitted from another on-board user equipment;
a determining module configured for determining, based on the monitored scheduling information, whether there is a potential collision for transmission of the data; and
a resource reselecting module configured for reselecting a resource for the transmission of the data in response to existence of the potential collision.
21. The apparatus of claim 20, further comprising:
a first probability module configured for in response to determining that there is no potential collision for the transmission of the data, determining, based on a random probability, whether or not to reselect the resource for the transmission of the data.
22. The apparatus of claim 12, further comprising:
a second probability module configured for determining, based on a random probability, whether or not to reselect a resource for the transmission of the scheduling information.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610200871.7 | 2016-03-31 | ||
| CN201610200871.7A CN107295494B (en) | 2016-03-31 | 2016-03-31 | Control method and device for data transmission in vehicle-to-vehicle communication |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2017168253A1 true WO2017168253A1 (en) | 2017-10-05 |
Family
ID=58707956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2017/000459 Ceased WO2017168253A1 (en) | 2016-03-31 | 2017-03-31 | Method and apparatus for controlling data transmission in v2v communication |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN107295494B (en) |
| WO (1) | WO2017168253A1 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109803378A (en) * | 2017-11-17 | 2019-05-24 | 电信科学技术研究院 | A kind of resource selection triggering method and user terminal |
| CN109905921A (en) * | 2019-01-14 | 2019-06-18 | 湖南理工学院 | A V2R/V2V collaborative data transmission scheduling method for Internet of Vehicles in a multi-channel environment |
| CN111405481A (en) * | 2019-01-02 | 2020-07-10 | 中国移动通信有限公司研究院 | Network resource scheduling method, device, system, electronic equipment and medium |
| CN112203253A (en) * | 2020-10-12 | 2021-01-08 | Oppo广东移动通信有限公司 | Data transmission method, device, storage medium and mobile terminal |
| CN113632415A (en) * | 2019-03-25 | 2021-11-09 | 美光科技公司 | Secure emergency vehicle communication |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110995615B (en) * | 2019-12-02 | 2023-05-05 | 德阳瑞能电力科技有限公司 | Communication method for multilateral master-slave switching |
| CN116939055A (en) * | 2023-07-20 | 2023-10-24 | 中国南方电网有限责任公司超高压输电公司电力科研院 | Internal data transmission method and device of converter valve submodule control system |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120003619A1 (en) * | 2010-06-23 | 2012-01-05 | Canadian National Railway Company | Method and system for assigning jobs to prevent employee qualifications from lapsing |
| CN103812786B (en) * | 2012-11-14 | 2017-04-05 | 电信科学技术研究院 | A kind of dispatching method and device of time interval resource |
| CN103906216B (en) * | 2012-12-26 | 2018-04-27 | 电信科学技术研究院 | A kind of method and device of Power Control |
| WO2015038056A1 (en) * | 2013-09-13 | 2015-03-19 | Telefonaktiebolaget L M Ericsson (Publ) | Flexible transmission scheme for wireless communication |
| CN105246025B (en) * | 2015-09-08 | 2018-09-14 | 宇龙计算机通信科技(深圳)有限公司 | A kind of method and device of control V2X business transmission |
| CN105188045B (en) * | 2015-09-08 | 2018-11-06 | 宇龙计算机通信科技(深圳)有限公司 | D2D for vehicle communication has found method, apparatus and terminal |
-
2016
- 2016-03-31 CN CN201610200871.7A patent/CN107295494B/en active Active
-
2017
- 2017-03-31 WO PCT/IB2017/000459 patent/WO2017168253A1/en not_active Ceased
Non-Patent Citations (2)
| Title |
|---|
| ALCATEL-LUCENT SHANGHAI BELL ET AL: "System level consideration and evaluation for V2V communication", vol. RAN WG1, no. Anaheim, USA; 20151115 - 20151122, 15 November 2015 (2015-11-15), XP051003294, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/> [retrieved on 20151115] * |
| HUAWEI ET AL: "SA design for V2V", vol. RAN WG1, no. St Julian's, Malta; 20160215 - 20160219, 14 February 2016 (2016-02-14), XP051053648, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/> [retrieved on 20160214] * |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109803378A (en) * | 2017-11-17 | 2019-05-24 | 电信科学技术研究院 | A kind of resource selection triggering method and user terminal |
| CN111405481A (en) * | 2019-01-02 | 2020-07-10 | 中国移动通信有限公司研究院 | Network resource scheduling method, device, system, electronic equipment and medium |
| CN111405481B (en) * | 2019-01-02 | 2022-07-19 | 中国移动通信有限公司研究院 | A network resource scheduling method, device, system, electronic device and medium |
| CN109905921A (en) * | 2019-01-14 | 2019-06-18 | 湖南理工学院 | A V2R/V2V collaborative data transmission scheduling method for Internet of Vehicles in a multi-channel environment |
| CN109905921B (en) * | 2019-01-14 | 2022-04-12 | 湖南理工学院 | A V2R/V2V collaborative data transmission scheduling method for Internet of Vehicles in a multi-channel environment |
| CN113632415A (en) * | 2019-03-25 | 2021-11-09 | 美光科技公司 | Secure emergency vehicle communication |
| CN112203253A (en) * | 2020-10-12 | 2021-01-08 | Oppo广东移动通信有限公司 | Data transmission method, device, storage medium and mobile terminal |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107295494A (en) | 2017-10-24 |
| CN107295494B (en) | 2020-11-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2017168253A1 (en) | Method and apparatus for controlling data transmission in v2v communication | |
| US20220159632A1 (en) | Transmission of Common Control Messages for Machine-Type Communication (MTC) User Equipments With Reduced Bandwidth | |
| US9781739B2 (en) | Method, base station, terminal and system for system information transmission | |
| AU2018417653C1 (en) | Multi-stage sidelink control information | |
| US20180084511A1 (en) | Synchronized radio transmission for vehicle platooning | |
| CN109478977B (en) | Implement multi-cluster transmission | |
| WO2019095226A1 (en) | Method and apparatus for transmission resource selection | |
| CN113630227B (en) | Method and equipment for acquiring general sensing system information | |
| US11871442B2 (en) | Methods and devices for resource selection | |
| CA2987274C (en) | Scheduling assignment transmissions in device-to-device communications | |
| CN118510034A (en) | Method and equipment for transmitting control channel and data channel in V2X communication | |
| WO2018028475A1 (en) | Method and apparatus for resource selection of v2x communication | |
| WO2023284271A1 (en) | Communication sensing method and device for terminal in unactivated state | |
| WO2017028699A1 (en) | Resource occupation method, device, and user equipment | |
| KR20160079048A (en) | Method and apparatus for sending d2d discovery signal, and communications system | |
| JP2023514355A (en) | Methods, Systems and Devices and Medium for Handling Resource Allocation in V2X Communications | |
| EP3691355A1 (en) | Data sending and resource scheduling methods and devices and system and computer-readable storage media | |
| US20190223195A1 (en) | Methods and devices for semi-persistent scheduling | |
| US12089185B2 (en) | Resource allocation method and device | |
| US10333666B2 (en) | Method and device for transmitting data | |
| JP7612712B2 (en) | COMMUNICATION METHOD, APPARATUS, AND SYSTEM | |
| KR101570797B1 (en) | Methods and apparatus by which periodically broadcasting nodes can resolve contention for access to a smaller pool of broadcasting resources | |
| US20240389077A1 (en) | Method, device and computer readable medium for resource selection | |
| KR102452023B1 (en) | Synchronization signal transmission method, device and computer storage medium | |
| US11089506B2 (en) | Information transmission method and apparatus and system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17723504 Country of ref document: EP Kind code of ref document: A1 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 17723504 Country of ref document: EP Kind code of ref document: A1 |