WO2017040457A3 - Coning transient multi-rate test - Google Patents
Coning transient multi-rate test Download PDFInfo
- Publication number
- WO2017040457A3 WO2017040457A3 PCT/US2016/049362 US2016049362W WO2017040457A3 WO 2017040457 A3 WO2017040457 A3 WO 2017040457A3 US 2016049362 W US2016049362 W US 2016049362W WO 2017040457 A3 WO2017040457 A3 WO 2017040457A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- water
- transient
- wor
- rate
- total liquid
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Abstract
Implementations described herein generally relate to methods for transient testing of subterranean reservoirs and oil wells containing both water and hydrocarbons, and more particularly to transient testing completed with a water-cut meter, which determines reservoir and well parameters for improved well productivity. According to one implementation described herein, a method (200) for producing a well is provided. The method comprises (210) inducing a step-rate change in a total liquid flow rate (qt) of a multiphase reservoir fluid, (220) measuring a water-oil ratio (WOR) transient following the step- rate change using a water-cut meter, (240) defining a total liquid rate-WOR sensitivity model using the water-oil transient and (260) generating wellhead performance curves based on the total liquid rate-WOR sensitivity model.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201562212439P | 2015-08-31 | 2015-08-31 | |
US62/212,439 | 2015-08-31 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2017040457A2 WO2017040457A2 (en) | 2017-03-09 |
WO2017040457A3 true WO2017040457A3 (en) | 2017-09-28 |
Family
ID=56889230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2016/049362 WO2017040457A2 (en) | 2015-08-31 | 2016-08-30 | Coning transient multi-rate test |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2017040457A2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA3075989C (en) * | 2017-11-13 | 2022-06-28 | Landmark Graphics Corporation | Simulating fluid production using a reservoir model and a tubing model |
WO2021067561A1 (en) * | 2019-10-01 | 2021-04-08 | Schlumberger Technology Corporation | Downhole segregation for wireline formation fluid sampling |
CN110821485B (en) * | 2019-11-07 | 2023-03-21 | 成都北方石油勘探开发技术有限公司 | Hypertonic strip judging method based on HALL curve |
US20210301659A1 (en) * | 2020-03-31 | 2021-09-30 | Saudi Arabian Oil Company | Automated well productivity estimation and continuous average well pressure monitoring through integration of real-time surface and downhole pressure and temperature measurements |
CN113931621B (en) * | 2020-07-14 | 2023-08-22 | 中国石油天然气股份有限公司 | Method, device and storage medium for determining gas well hydrops information |
US11613957B1 (en) | 2022-01-28 | 2023-03-28 | Saudi Arabian Oil Company | Method and system for high shut-in pressure wells |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014160626A1 (en) * | 2013-03-29 | 2014-10-02 | Schlumberger Canada Limited | Optimum flow control valve setting system and procedure |
WO2015073626A1 (en) * | 2013-11-13 | 2015-05-21 | Schlumberger Canada Limited | Well testing and monitoring |
-
2016
- 2016-08-30 WO PCT/US2016/049362 patent/WO2017040457A2/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014160626A1 (en) * | 2013-03-29 | 2014-10-02 | Schlumberger Canada Limited | Optimum flow control valve setting system and procedure |
WO2015073626A1 (en) * | 2013-11-13 | 2015-05-21 | Schlumberger Canada Limited | Well testing and monitoring |
Non-Patent Citations (2)
Title |
---|
A F MAKINDE ET AL: "Water Coning in Horizontal Wells: Prediction of Post-Breakthrough Performance", INTERNATIONAL JOURNAL OF ENGINEERING & TECHNOLOGY IJET-IJENS, 1 January 2011 (2011-01-01), pages 173 - 185, XP055398807, Retrieved from the Internet <URL:http://www.ijens.org/Vol 11 I 01/1110201-4343 IJET-IJENS.pdf> [retrieved on 20170815] * |
E.A MUS ET AL: "Added Value of a Multiphase Flowmeter in Exploration Well Testing", OLD PRODUCTION & FACILITIES, 1 November 2002 (2002-11-01), pages 197 - 203, XP055398772, Retrieved from the Internet <URL:file:///C:/Users/BH52635/Desktop/SPE-80283-PA.pdf> DOI: 10.2118/80283-PA * |
Also Published As
Publication number | Publication date |
---|---|
WO2017040457A2 (en) | 2017-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017040457A3 (en) | Coning transient multi-rate test | |
GB201316681D0 (en) | Method for characterizing subsurface formations using fluid pressure response during drilling operations | |
EA201071257A1 (en) | METHOD AND TEST SYSTEM OF OIL WELLS BY FUELING WITH MIXING | |
Zhao et al. | A simulation method for modified isochronal well testing to determine shale gas well productivity | |
Boeije et al. | Fitting foam simulation model parameters to data | |
CN105569635B (en) | A kind of horizontal well produced fluid cross section technical matters tubing string and test method | |
MY175727A (en) | Method of drilling a subterranean borehole | |
RU2019142431A (en) | COMPUTER METHOD AND COMPUTING SYSTEM FOR FORECASTING FLOW RATE CHARACTERISTICS IN A WELL BORE PENETRATING INTO UNDERGROUND HYDROCARBON FORMATION | |
Checkai et al. | Towards a frequency distribution of effective permeabilities of leaky wellbores | |
CN107480383A (en) | A kind of method by pressure measurement data monitoring water filling dynamic crack | |
CN107130955B (en) | Method for determining bottom hole flowing pressure and method for determining natural energy of reservoir | |
Czarnota et al. | Semianalytical horizontal well length optimization under pseudosteady-state conditions | |
CN107437127B (en) | Oil well blowout stop stratum pressure prediction method | |
CN203729968U (en) | Simulation structure for bottom water control | |
Wei et al. | Segmentally variable density perforation optimization model for horizontal wells in heterogeneous reservoirs | |
Mazo et al. | Numerical SimulatioN of oil reServoir Polymer floodiNg by the model of fixed Stream tube | |
CN104407397A (en) | Method for determining lower limit of physical property of compact oil and gas reservoir | |
Qi et al. | Improved calculation of wellbore steady fluctuation pressure in tripping operations | |
CN111582532A (en) | Stress-sensitive oil reservoir horizontal well fluid production capacity prediction method and device | |
Xin | Development and application of flow control screen completion for horizontal wells | |
CN104948175B (en) | A kind of Experimental Method in Laboratory for monitoring interlayer liquid-producing capacity difference | |
Khosravi et al. | Well test analysis of gas condensate reservoirs from pressure build up and draw down tests | |
CN110410044A (en) | Gas drive CO2、N2Block oil production calculation method under development scheme | |
CN104197996A (en) | Tandem type double-pressure detecting system for density and mass flow rate of drilling fluid | |
Ansari et al. | Superposition of steady-state coning solutions for multiple wells with reservoir boundaries |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16763155 Country of ref document: EP Kind code of ref document: A2 |