WO2017037589A1 - Dispositif gabarit de perçage - Google Patents

Dispositif gabarit de perçage Download PDF

Info

Publication number
WO2017037589A1
WO2017037589A1 PCT/IB2016/055094 IB2016055094W WO2017037589A1 WO 2017037589 A1 WO2017037589 A1 WO 2017037589A1 IB 2016055094 W IB2016055094 W IB 2016055094W WO 2017037589 A1 WO2017037589 A1 WO 2017037589A1
Authority
WO
WIPO (PCT)
Prior art keywords
pole
hole
layer
drill
dowel
Prior art date
Application number
PCT/IB2016/055094
Other languages
English (en)
Inventor
Johannes Canisius Marie Reelick
Original Assignee
Fellrock Developments Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fellrock Developments Limited filed Critical Fellrock Developments Limited
Publication of WO2017037589A1 publication Critical patent/WO2017037589A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor
    • B23B47/28Drill jigs for workpieces
    • B23B47/281Jigs for drilling cylindrical parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27CPLANING, DRILLING, MILLING, TURNING OR UNIVERSAL MACHINES FOR WOOD OR SIMILAR MATERIAL
    • B27C3/00Drilling machines or drilling devices; Equipment therefor
    • B27C3/06Drilling machines or devices for making dowel holes

Definitions

  • the present invention relates to a drilling jig device for assembling a timber pole foundation that may support a building or other above ground structure.
  • a foundation is an element of construction that connects a building to the ground. It can transfer loads from the building to the ground. Foundations are generally considered either shallow or deep or a combination of both depending on the ground conditions below the building .
  • Shallow foundations are usually embedded about a metre or so into soil.
  • a common type of shallow foundation is the slab or raft foundation where the weight of the building is transferred to the soil through a concrete slab placed at or near the surface.
  • Slab foundations can be reinforced mat slabs, which range from 25 cm to several meters thick, depending on the size of the building, or post-tensioned slabs, which are typically at least 20 cm for houses, and thicker for heavier structures.
  • a minimum ground pressure condition is needed to ensure the foundation and structure are sufficiently supported by the ground .
  • the pit typically needs to provide 200kPa ground conditions.
  • a gravel raft may be created in the pit and may be composed of compacted gravel with layers of geocloth between. Concrete may then be poured over to create a concrete slab on top of the gravel raft. This may be approximately 150-400mm thick as an example.
  • Square timber foundation piles may be installed in the concrete as the concrete slab is being constructed. Bearers, joists, framework and / or formwork may be supported by the jack studs.
  • the weight of this sort of foundation for a 200sqm house may be in the order of
  • Typical concrete raft or slab foundations are brittle due the nature of the concrete. They are strong but not very resilient. Concrete slab foundations may also be prone to shifting and elevation by liquefaction in earthquake prone areas. This can damage the foundation.
  • the present invention may broadly be said to be an assembly jig for assembling a foundation structure comprised of a first layer of a plurality of parallel timber poles and a second layer of a plurality of parallel timber poles at an angle to and resting on said first layer of poles, the first and second layer poles at at least one intersection thereof being secured together by a dowel located in a hole in the second layer pole and in an axially aligned hole in the first layer pole, said assembly jig comprising :
  • the attachment selected from at least one of
  • an assembly attachment that (i) functions to compress the first layer pole and second layer pole before the dowel is secured and/or (ii) provides at least one drill guide for a drill to create a hole (herein after "first secondary hole") to receive a pin to pass laterally into the dowel to thereby secure the dowel as part of the foundation structure.
  • the substructure includes a drill guide provided for a drill to create a hole (herein after "second secondary hole”) to receive a pin to pass laterally into the dowel to thereby secure the dowel as part of the foundation structure.
  • second secondary hole a hole to receive a pin to pass laterally into the dowel to thereby secure the dowel as part of the foundation structure.
  • the drill guide of the substructure is provided for a drill to drill into the first layer pole.
  • the drill guide of the substructure is provided for a drill to drill into the second layer pole.
  • the drill guide of one of the substructure and assembly attachment is positioned to align the drill with the second layer pole to create the a respective first of second secondary hole when in use.
  • the drill guide of one of the substructure and assembly attachment is positioned adjacent the second layer pole to align a drill to pass into the second layer pole to a depth to at least reach said first mentioned hole.
  • the drill guide of one of the substructure and assembly attachment is positioned adjacent the second layer pole to align a drill to create said secondary hole extending radially to said second layer pole.
  • the foundation structure includes a jack stud located on said second layer pole at a said intersection said jack stud having a blind or through hole that is axially aligned with said first mentioned hole and within which said dowel is positioned, the assembly attachment functions to compress the first layer pole and second layer pole and the jack stud before the dowel is secured with said foundation.
  • the jack stud is complimentarily shaped to match the periphery of the second layer pole at where it is located.
  • the assembly attachment comprises a press that can act on said second layer pole to compress the first layer pole and second layer pole.
  • the assembly attachment comprises a press that can act directly on said second layer pole to compress the first layer pole and second layer pole.
  • the press includes a displaceable ram that, in use, acts towards said substructure to compress the first and second layer poles.
  • the displaceable ram comprises a threaded rod received in a threaded aperture of said assembly attachment.
  • the displaceable ram is located to act on said jack stud to act on said second layer pole.
  • the assembly attachment provides at least one drill guide for a drill to create a hole (herein after "additional hole”) to receive a pin to pass laterally into the dowel to thereby secure the dowel to the jack stud.
  • the assembly attachment has two drill guides, one to align a drill to create the first secondary hole and one to align a drill to create said additional hole.
  • the additional hole passes through said jack stud and is bisected by said blind or through hole.
  • the dowel is secured to the first and second layer poles at a said intersection.
  • the dowel is secured to the first layer pole and to the jack stud.
  • the dowel is secured to the first layer pole and to the jack stud but not the second layer pole.
  • a pin is used for each of said first layer pole securement and said jack stud securement.
  • a pins is used for said second layer pole securement.
  • the secondary hole is a hole passing through said second layer pole, bisected by said first mentioned hole.
  • the assembly attachment functions to compress the first layer pole and second layer pole before the dowel is secured to the first and second layer poles and provides the at least one drill guide.
  • the borer creates the first mentioned hole through the second layer pole and the axially aligned hole into said first layer pole in one operation of the borer.
  • the first mentioned hole through the second layer pole and the axially aligned hole into said first layer pole are contiguous by virtue of being created at where the second layer pole rests on said first layer pole.
  • the press compress the first and second layer poles at said intersection prior to the dowel becoming secured to said first layer pole and one or more of said second layer pole and jack stud so that once secured, the dowel is at least in part under tension.
  • the axially aligned hole into the first layer pole is a blind hole.
  • the pole is round or generally round in peripheral cross sectional shape.
  • the pole is elongate and straight.
  • the pin(s) pass through the dowel.
  • the pin(s) are made from a non ferrous material.
  • the pin(s) are made from stainless steel.
  • the pin(s) are made from a composite material.
  • the substructure is temporarily secured to said first layer pole by threaded penetrative fasteners.
  • the threaded penetrative fasteners are screws.
  • the substructure secures to each elongate side of said first layer pole (preferably said diametrically opposed regions).
  • the substructure is a frame that can be secured to two diametrically opposed sides of said first layer pole.
  • the substructure comprises or includes a registration surface to receive a level to ensure that the boring attachment is positioned relative to said first layer pole in an orientation so that the borer passes through said second layer pole and into said first layer pole in a manner radial to the centre of each said first and second layer poles.
  • the hole that receives the dowel is perpendicular to the elongate direction of the pole that is provided in.
  • the hole that receives the dowel is radial to the centre of the pole that is provided in.
  • the hole that receives the pin is perpendicular to the elongate direction of the pole that is provided in.
  • the hole that receives the pin is radial to the centre of the pole that is provided in.
  • the hole that receives the pin is perpendicular to the hole that receives the dowel.
  • the boring attachment is removable secureable to said substructure.
  • the assembly attachment is removable secureable to said substructure.
  • the boring attachment and the assembly attachment is interchangeable secureable to said substructure.
  • the present invention may be said to be a jig to fasten two horizontally extending overlapping and intersecting timber poles together using a dowel that is located in respective and axially aligned holes of the two timber poles at their intersection, the jig comprising an anchor portion to be secured to one or both of the upper and the lower of said two poles and configured to confine relative movement between said two timber poles and at least one drill guide secured by said anchor portion to the lower pole, said drill guide selected from at least one of:
  • the present invention may be said to be a drill guide for drilling a hole in two overlapping horizontally extending timber poles at the intersection of said two poles, the drill guide able to be fastened with the lower timber pole to present a drill above the upper pole in a vertically extending manner and aligned to pass into the upper pole and pass there through and into the lower pole.
  • This invention may also be said broadly to consist in the parts, elements and features referred to or indicated in the specification of the application, individually or collectively, and any or all combinations of any two or more of said parts, elements or features, and where specific integers are mentioned herein which have known
  • Figure 1 shows a perspective view of an assembled foundation.
  • Figure 2 shows a plan view of an assembled foundation.
  • Figure 3 shows a side view of an assembled foundation.
  • Figure 4 shows a side cross sectional view of an assembled foundation in a pit.
  • Figure 5 shows a breakout perspective view of at an assembled intersection.
  • Figure 6 shows a perspective view of an alternative embodiment without a jack stud.
  • Figure 7 shows a perspective view of an alternative embodiment with a threaded fastener.
  • Figure 8 shows an exploded perspective view of an intersection.
  • Figure 8A shows an exploded perspective view of an intersection of a different embodiment.
  • Figure 9 shows a side view of an assembled intersection.
  • Figure 10 shows an end view of an assembled intersection.
  • Figure 11 shows a side view of a spliced pole.
  • Figure 12 shows an end view of a spliced pole.
  • Figure 13 A shows a side view of an assembled foundation in a pit supporting a formwork and concrete slab above the jack studs.
  • Figure 13 B shows a side view of an assembled foundation in a pit supporting a framework by the jack studs.
  • Figure 13 C shows a side view of an assembled foundation in a pit supporting a gravel raft and concrete slab.
  • Figure 13 D shows a side view of an assembled foundation in a pit directly supporting a concrete slab.
  • Figure 14 shows a boring attachment and substructure located at an intersection.
  • Figure 15 shows a bottom perspective view of the sub structure.
  • Figure 16 shows a top perspective view of an assembly attachment and substructure at an intersection.
  • Figure 17 shows a schematic plan view of an alternative embodiment of a foundation of the present invention.
  • FIG. 1 With reference to Figure 1 there is shown an example of a foundation structure 1 in a perspective view. A similar foundation structure is shown in plan in Figure 2 and as a side view in Figure 3. Figures 1-3 are merely an example of a shape that a foundation structure as herein described may assume. An alternative shape is shown in Figure 17. Many other variations in shape and configuration are anticipated and a person skilled in the art will understand such variations based on the description about the foundation structure that will herein now be described.
  • the foundation is able to be used a number or purposes. Such purposes may be; a foundation for a residential building, commercial buildings, roadway foundations, railway line foundations, foundations for agricultural buildings and so on.
  • the foundation structure 1 preferably comprises of a plurality of poles 2.
  • the poles are preferably timber poles. They are preferably elongate and are substantially round in cross section. They are preferably of a substantially constant cross section.
  • the poles are of a substantial length so that they can span a substantial distance.
  • at least one and preferably a plurality of the poles used in the foundation structure are at least three metres long and preferably over four metres long.
  • the plurality of poles are arranged in a grid-like manner as can clearly be seen in Figure 2.
  • the first layer of poles is preferably the lower layer of poles and the second layer of poles are preferably the upper layer of poles.
  • poles 3A of the lower level extends substantially horizontally when in situ.
  • poles 4A of the upper level 4 extends substantially horizontally when in situ.
  • the poles 4A of the second level lie on top of poles 3A of the first level. This can be seen in Figure 1 and 3.
  • Some nesting at the intersections may be provided for by virtue of a cut-out or scallop being provided poles of one or both of the levels. In the preferred form no such cut-out or scalloping is provided.
  • poles 4A of the upper level extend at an angle to the poles 3A of the lower level.
  • the poles of the upper level are substantially parallel to each other.
  • the poles of the lower level are substantially parallel each other.
  • the poles of the lower level extend at a right angle to the poles of the upper level. It will be appreciated that the poles of the lower level may extend at another angle relative to the poles of the upper level. This can be seen in figure 17. So long as the poles of the lower level are arranged to at least overlap with some of the poles of the upper level it can be seen that at least one (and preferably a plurality) of upper to lower level pole intersections 5 are created.
  • poles of upper layer cross over the lower layer poles.
  • fastening of the upper layer to the lower layer occurs.
  • jack studs may also be fastened using the same or another fastening arrangement as is used for pole to pole fastening .
  • the foundation structure 1 is able to be supported on the ground 6.
  • the foundation structure 1 may be supported in a pit 7 that is created in-ground.
  • the pit 7 maybe of a plan perimeter shape to closely match the perimeter shape of the foundation structure 1.
  • the pit 7 is preferably a shallow pit and has a base 8 that is substantially level.
  • the level base of the pit provides the platform for supporting the lower level poles of the foundation structure. Given that the poles are preferably elongate and straight a substantially level base 8 will provide substantially uniform support to each of the lower level poles. Preferably the level base 8 is within a tolerance of 50mm in vertical height.
  • the levelling can be achieved by introducing a finer material such as sand into the pit that is easily spreadable to give a level base. Alternately, the pit itself may dug level from the outset.
  • the foundation structure may alternatively be placed or constructed on the upper surface of the ground 6 without being set at least partially into a pit. Advantages in placing or constructing the foundation structure 1 in a pit will hereinafter be described.
  • the foundation structure may include a plurality of jack studs 9.
  • jack studs 9 are preferably engaged to at least one and preferably a plurality of upper level poles.
  • the jack studs 9 have a complementary scalloped recess to fit snugly against the respective pole that supports it. Jack studs will hereinafter be described in more detail.
  • the top of the jack studs are configured to support a structure.
  • the structure may be a building or any other structure that needs a foundation to be connected to.
  • the lining 40 may be of durable and preferably waterproof material.
  • the foundation structure 1 may be placed or constructed on such lining material to separate the foundation structure from contacting at least part and preferably all of the base 8 of the pit or the ground on which the foundation structure is supported.
  • the lining 40 can divert any ground liquefaction flow. It may prevent such liquefaction from coming up through the foundation structure.
  • the lining 40 is upturned on its edges. This is an optional upturn and instead the lining 40 may be substantially flat and may have in some locations apertures therethrough to help with water drainage in a downward direction into the ground below the foundation structure.
  • the lining 40 extends up the sides of the pit to ground level.
  • the foundation structure 1 is assembled in situ.
  • the pit after having been created can receive the plurality of poles so as to be arranged in the pit in the grid-like manner that is preferred and as described herein.
  • the upper level poles can be laid laterally or diagonally on top of some and preferably most if not all of the lower level poles.
  • the poles are prefabricated for the purposes of fastening the poles together at at least one and preferably each intersection of the upper and lower level poles.
  • the poles can receive fasteners without such pre-fabrication having been done or required.
  • the provision of fastening features for fastening the poles together occurs in situ and such will hereinafter be described with reference to the accompanying drawings.
  • a dowel 10 is provided to be located in a hole 11 of the upper level pole 4A.
  • An axially aligned hole 12 of the lower level pole allows for the dowel 10 to be located therein.
  • the dowel preferably hence extends between the upper and lower level poles at an intersection region 5.
  • the dowel 10 is located in the hole 11 and hole 12 to prevent lateral sliding (shear) movement between the poles at that intersection.
  • the dowel 10 may be a tube or a rod and is preferably of a rigid material such as a composite material or a metal material. It may instead be of timber.
  • the dowel may have a circular, square or other shaped cross section. It is preferably straight, elongate and sufficiently long to be able to extend to a sufficient extent in an upper and lower level pole at an intersection.
  • the dowel needs to be able to resist relative horizontal movement between the upper and lower level. It should preferably also be able to act in tension to prevent vertical separation of upper and lower levels. It preferably also is be able to act in compressed.
  • the dowel may have a diameter of at least 30mm, or a diameter between 30 and 100 mm.
  • the dowel preferably has a diameter of 60 mm and a wall thickness of 4mm.
  • the hole in which the dowel is located in has a diameter greater than that of the dowel so as to form a locational fit.
  • the hole in which the dowel is located in has a diameter 62 mm.
  • the hole to locate the dowel is preferably the same or larger than the dowel, yet still be able to locate the dowel is a snug manner. The preferred drilling process as will herein be described should hence be performed sufficiently accurately.
  • a plurality of dowels may be used. Some may be of a different size to others. Some may be of a different length to others. Some may be cut to length on site. At least two different lengths are preferably provided, depending on whether used with fastening a jack stud or not.
  • the dowel is 830mm long. This length is approximately equal to sum of the lengths of the holes within the upper and lower layer poles and jack stud. In embodiments with no jack stud, Figure 7, the dowel may only be 550mm long. A person skilled in the art will realise these lengths are not specific.
  • a vertical separation between the poles, and to hold the poles together in a vertical orientation is achieved by the dowel 10 being secured, preferably by pinning to both the upper level pole 4A and the lower level pole 3A.
  • This is preferably achieved by pins 13 and 14 that respectively extend into lateral holes 15 and 16 of the upper and lower level poles 4A, 3A.
  • the pins extend into and preferably through the dowel by virtue of the dowel having matching apertures 17 and 18.
  • the dowel may have a friction fit with hole 11 and hole 12 and not use pins or other fasteners.
  • the holes 11 and 12 extend substantially in a radial direction to the central axis of the elongate poles.
  • the holes 15 and 16 for the pins extend radially and preferably perpendicular to the respective holes 11 and 12.
  • the holes 15 and 16 are through holes through each of the poles and are dissected by the holes 11 and 12 in which the dowel 10 is located.
  • the hole 12 is preferably a blind hole whereas the hole 11 is preferably a through hole.
  • the through hole is provided as a result of the in situ provision of the features of the foundation structure that fasten the poles at an intersection together.
  • FIG. 7 One such alternative is shown in Figure 7 where the dowel 10A is provisioned with a hole 18A to receive the pin 14A extending into the hole 16A of the lower pole 3A but no pin is provided for securing the dowel to the upper pole 4A and instead a threaded fastening arrangement 19 is provided at a distal end of the dowel 10A.
  • the third fastening arrangement may include a male threaded region 20 of the dowel and a female threaded member such as a nut 21 that can be threadingly fastened and react against an upper surface of the upper pole 4A directly or via a washer 22 or other load spreading member.
  • the jack stud is provided at an intersection between an upper level pole 4A and a lower level pole 3A.
  • the jack stud 9 is preferably secured using the dowel 10B.
  • the dowel 10B in a similar manner to the dowel described with reference to Figure 6 is provided in a hole 11B of an upper level pole 4A and extends into the hole 12B of the lower level pole 3A.
  • the hole 11B and 12B are axially aligned so that the dowel 10B can extend in both holes 11B and 12B. Whilst the dowel 10B may be pinned to the upper level pole 4A as well as the lower level pole 3A in one form no such pinning occurs with the upper level pole 4A. Instead the dowel 10B is fastened to the jack stud 9.
  • the jack stud 9 may include a blind or through hole 25 that can receive the dowel 10B.
  • the jack stud is pinned in a similar fashion to the lower pole as it is to the upper pole.
  • the dowel 10B may be provided with a hole 22 to receive the pin 23 that extends in through the lateral hole 24 of the jack stud 9 to allow for the pin 23 to reach the dowel and penetrate into the hole 22 of the dowel and preferably therethrough. This allows for a pinning of the dowel to both the jack stud 9 and the lower level pole 3A and thereby secure in a vertical direction the jack stud 9 with the upper level pole 4A and the lower level pole 3A.
  • the hole 25 of the jack stud is preferably a blind hole and likewise the hole 12B in the lower level pole 3A is also a blind hole.
  • Figures 9 and 10 show side and end views of the assembled version of the exploded view shown in Figure 8.
  • the pin 23 and the pin 14B extend parallel to each other although in an alternative configuration as shown in Figure 8A they are perpendicular each other.
  • the pins are elongate straight pins that extend perpendicular to the elongate direction of the dowel.
  • the dowel in situ preferably extends substantially vertically whereas the pins extend substantially horizontally and parallel to the elongate directions of the respective upper and lower level poles.
  • the jack stud may be at least partially coated with a plastics coating to prevent detriment to the jack stud.
  • the jack stud is at least partially coated with a polyethylene shroud.
  • the pins are composed of a metal material such as a stainless steel.
  • the pins are composed of a plastics or composites material. They are able to snugly fit into the apertures or holes of the dowel and thereby ensure that the dowel is securely connected to the components of the foundation structure.
  • R- pins or split pins 31 may be provided to help ensure the pins remain in position.
  • the holes into which the pins are pushed may provide a snug fit with the pin.
  • the pins may have a running, locational or interference tolerance fit with their respective holes.
  • the pins may need to be driven in by a mallet or hammer.
  • the pin holes have a diameter 1 mm greater than the pins they locate.
  • the pin holes have a diameter between 4 and 35 mm. Preferably the holes are 18 mm in diameter.
  • the pins may have a diameter between 3 and 30mm. Preferably the pins have a diameter of 17mm. A person skilled in the art will realise many different size pins can be used. The size of the pin determined by how much pressure is put on the assembly, what the pin material is, and many other factors.
  • poles can be end to end joined by a splint-like arrangement.
  • the splint arrangement may include side plates 32 and 33 that are rigid and elongate and provide some resistance against bending of the composite pole when assembled.
  • the plates 32 and 33 are preferably securely joined to each of the poles by fasteners that for example may come in the form of fastening pins 34 that pass through each of the two poles 38 and 39.
  • fasteners that for example may come in the form of fastening pins 34 that pass through each of the two poles 38 and 39.
  • At least two of the poles at each level are located at a peripheral region of the foundation strucute.
  • at least one of the poles at the other level extends substantially between such peripheral poles. This helps create a foundation structure that provides resistance against subsidence of the foundation structure. Should part of the ground below the foundation structure subside and a pole previously being vertically supported at such subsidence is then left unsupported thereat, the rigidity of the pole itself and that of the at least one pole above to which is secured, will help reduce or prevent movement of foundation.
  • the poles have a diameter greater than a 100mm and more preferably in one embodiment they are 275mm in diameter.
  • the diameters of the poles need to be sufficient for the forces present in the assembly and the jig (later described) needs to be designed and dimensioned appropriately.
  • the spaced parallel distance between poles of the same layer is between 1 and 3 metres. Spacing of the poles depends on the structure the foundation needs to support. Heavier structures will require closer spacing. Other factors such as ground type, local laws, environs, timber or materials used, cost will dictate the desired spacing between poles.
  • the poles are treated to prevent one or of the following; deterioration by insect, fungi, rot and moisture.
  • the poles are debarked and rounded to a generally constant diameter.
  • the timber poles will have deviations of diameter and trueness and this is acceptable and accounted for in the design of the current invention.
  • the assembly of the foundation is not perpendicular grid like as shown in Figure 17. It is appreciated that a person skilled in the art will realise this system is versatile and many different variations for different sites, uses and structures are applicable.
  • the foundation structure as shown in Figure 4 is preferably located in a pit 7.
  • the pit 7 is preferably a pit that has been created prior to establishing the foundation structure therein.
  • the depth of the pit is at least 400 mm. In some embodiments the top of the upper layer poles may protrude above the surrounding ground surface. Preferably the depth of the pit is 550 mm. Preferably, the depth of the pit is less than 800 mm.
  • a typical prior art foundation ( Type 2A, 2B, or 3A ) for a timber floor type may have a pit 800mm - 1000mm deep.
  • the earth / soil removed from the pit to create the pit is at least in part re-introduced back into the pit.
  • This soil 40 at least partially embeds the foundation structure in soil within the pit. A compacting of the soil may take place.
  • An alternative version of the foundation structure of the present invention where no jack studs are provided includes one where a concrete pad is able to be supported on or by the foundation structure.
  • Figure 13A shows a raised formwork 80 retaining a concrete slab 81 supported by the jack studs 9.
  • Figure 13B shows a framing system 82, including bearers or joists supported by the jack studs 9.
  • Figure 13C shows a concrete slab 81 supported by the foundation, preferably with a gravel raft 82 and/or lining intermediate the earth and the concrete slab.
  • the concrete slab 81 at least partially covers the second layer of poles.
  • the foundation is able to be installed under buildings that require remedial foundations or maintenance.
  • the foundation herein described is able to be moved if subsidence of it does occur. At least one or more poles can be lifted or jacked up to reposition the foundation.
  • the assembly jig is preferably of a mobile nature and can be positioned at each intersecting region between a pole of an upper level and a pole of a lower level.
  • the assembly jig allows for the poles to become secured to each other i n situ rather than having to be prefabricated offsite and for subsequent assembly onsite.
  • the prefabrication approach whilst within the scope of the foundations structure herein described, may be quite time consuming if not difficult to achieve if the timber poles have, between been prefabricated with holes and being provided for assembly at a building site, for example dried or become more moist causing timber movement.
  • the assembly jig can be positioned at each intersection to thereat perform at least one of a number of preferred operations in order to allow for a dowel to become secured at the intersection of the components of the foundation structure.
  • the assembly jig preferably includes a substructure 50.
  • the substructure 50 may be of a frame-like configuration as seen in Figures 14 and 15.
  • the substructure is able to be secured to a lower level pole 3A at an intersecting region 5 between the lower level pole and an upper level pole 4A.
  • the substructure 50 is preferably secured to a lower level pole by virtue of a threaded fastener such as a coach screw 52 passing through apertures 51 of the substructure and into the lower level pole 3A.
  • a threaded fastener such as a coach screw 52 passing through apertures 51 of the substructure and into the lower level pole 3A.
  • the substructure 50 provides two regions at where the apertures 51 are provided one on each side of the lower level pole. This allows for the substructure 50 to become securely engaged to the lower level pole.
  • the fasteners or screws 52 will hold the substructure in place in a secure and fixed manner relative to the lower level pole 3A.
  • the substructure itself may comprise of two separable component parts 50A and 50B.
  • the two component parts allows for the substructure to be assembled about the upper level pole 4A at the intersection.
  • Latches 54 may be used to conveniently and quickly allow for a releasable latching engagement between the components 50A and 50B of the substructure 50.
  • the substructure 50 presents at least one drill guide preferably for each of the holes 15 and 16 of the upper level pole 4A and lower level pole 3A respectively.
  • An upper level pole drill guide 56 and a lower level pole drill guide 57 are shown in Figure 15.
  • drill guides for each of the holes are provided to be presented on each side of a respective pole.
  • a drill guide 57 and a drill guide 57A for guiding a drill into the lower level pole 3A and there are two upper level pole drill guides 56 and 56A provided. This allows for an operator of a drill (such as a hand drill carrying a drill bit) to create the hole 16 and the hole 15 into the respective poles not just from one side of the pole but from both sides of the pole.
  • the pin may extend a substantial way through and if not out from and project out from each side of the pole having two drill guides one on each side of the pole allows for a shorter drill bit to be used but merely needs to be able to reach the centreline of the pole and/or the main hole 11/12 of a respective pole.
  • the upper level pole drill guides 56 and 56A and lower level pole drill guide 57 and 57A (not shown) have a length and diameter tolerance to allow the drill bit to accurately locate itself collinear to the holes in the dowel and not to skew or whilst drilling.
  • a level may be utilised for ensuring a desired rotational orientation of the substructure relative to the lower level pole 3A in an axis parallel to the pole and an axis perpendicular to the pole a desirable level is achieved. This is important for the purposes of ensuring that the drill guides are appropriately aligned to receive a drill to create the holes as well as for the purposes of establishi ng the primary holes 11 and 12 to receive the dowel.
  • the framework of the substructure is preferably adapted and configured to snugly fit about both the lower pole and the upper pole at the intersection. This helps to confine the lower and upper poles relative to each other during the process of drilling and fastening at the intersection 5.
  • the substructure 50 is provisioned with mounts and/or places for attachment of at least one attachment.
  • the at least one attachment is preferably temporarily attached to the substructure. This allows for the attachment to be removed and where two attachments are provided it allows for the two attachments to be interchanged.
  • attachment may instead be a permanent attachment to the
  • the boring attachment 60 as seen in Figure 14 preferably comprises of a guide 61 that can guide a borer 62 for movement to create the holes to receive the dowel.
  • the borer 62 is driven by a hydraulic motor 63 also supported for guided movement by the guide 61 of the boring attachment 60.
  • the guide 61 preferably holds a guide traveller 64 that by way of a turn handle 65 is controlled for movement along the guide. An operator can turn the handle to drive the borer down and pull the borer up.
  • a hydraulic motor is advantageous in environs where an electrical motor is not desirable. For example if it rains an electric motor may not be able to be used. In addition an electric motor is relatively heavy compared to a hydraulic motor. Using a hydraulic motor allows for the boring attachment to be of a size and weight to be able to be placed upon and taken off the substructure 50 by two if not one persons.
  • connection between the substructure and the attachment may be established using pins 66 that temporarily secure the attachment to the substructure.
  • the boring attachment when secured to the substructure presents the borer 62 in a substantially vertical orientation. It is preferably presented to first penetrate into the upper pole 4A and travel therethrough in a radial direction to that pole. It can then be driven down into the lower pole 3A to a sufficient depth so that the dowel is at least beyond the point at where the pin receiving hole is or will be established through the lower pole 3A.
  • the dowel is predrilled to receive the pins and therefore the depth of the hole into the lower pole made by the borer 62 is such as to substantially align the pin hole 18 of the dowel with the pin hole through the lower pole when the dowel sits on the bottom of the hole 12 in the lower pole. Once the holes 11 and 12 have been created by the borer the dowel can be inserted into the holes.
  • the holes to receive the pins 13 and 14 can be drilled by for an example an electric hand drill carrying a drill bit that is guided by the drill guides to reach the dowel holes.
  • the dowel holes may already have their matching pin holes pre- drilled or alternatively the drill bit may simultaneously create such holes through the dowel for the pin to then be received therein.
  • the boring attachment Prior to the dowel being inserted into the dowel holes of the upper and lower poles the boring attachment can be removed so as to allow for free access to the holes to drop the dowel into.
  • an assembly attachment 70 may be secured to the substructure 50.
  • the assembly attachment 70 is shown cooperating with a jack stud 9.
  • the assembly attachment functions to compress the first layer pole and the second layer pole before the dowel is secured.
  • a press 71 may be provided to act on the jack stud 9 and compress the jack stud to thereby compress the upper and lower poles 4A and 3A.
  • the press may include a threaded rod 73 received by a threaded aperture 74 of the assembly attachment.
  • a spanner or torque wrench for example can operate on the head 75 of the threaded rod 73 and rotate it to then cause the press 71 to press onto the jack stud 9.
  • the compression allows for a snug abutment between poles (and the jack stud when provided) .
  • the press can act directly onto the upper pole 4A prior to one or both of the pins 13 and 14 being driven into and preferably through the dowel to thereby secure the dowel as pa rt of the foundation structure.
  • the assembly attachment may be reconfigured to drop the press down where there is no jack stud provided.
  • the assembly attachment preferably includes at least one drill guide 78 to receive a drill bit for guided movement into the jack stud to create the pole 24 to receive the pin 23.
  • the assembly attachment can likewise be secured using the pins 66 or other fasteners to become secured to the substructure in a manner that holds the drill guide 78 and the press in the appropriate condition to achieve the herein described results.
  • the foundation is capable of being disassembled or modified in a nondestructive manner.
  • the pins are able to knocked out and the jack stud if present lifted off, the upper layer removed, dowel removed and subsequently the bottom layer removed. All parts may then be reused and reassembled.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

L'invention concerne un gabarit pour la construction et l'assemblage d'une fondation pour supporter une structure au-dessus. La fondation comprend une première couche de poteaux parallèles et espacés les uns des autres, et une deuxième couche de poteaux en bois parallèles et espacés les uns des autres, à un certain angle par rapport à la première couche. La première couche est au-dessus de la deuxième couche et est fixée à celle-ci. Par rapport aux fondations de l'état de la technique, la fondation est polyvalente et légère, et le gabarit permet une installation précise, facile et rapide.
PCT/IB2016/055094 2015-08-28 2016-08-26 Dispositif gabarit de perçage WO2017037589A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NZ711600 2015-08-28
NZ71160015 2015-08-28

Publications (1)

Publication Number Publication Date
WO2017037589A1 true WO2017037589A1 (fr) 2017-03-09

Family

ID=58188762

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2016/055094 WO2017037589A1 (fr) 2015-08-28 2016-08-26 Dispositif gabarit de perçage

Country Status (1)

Country Link
WO (1) WO2017037589A1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108818124A (zh) * 2018-07-23 2018-11-16 张明明 一种运用便捷的钻床
CN109702246A (zh) * 2018-11-28 2019-05-03 首都航天机械有限公司 一种保证环向上楔形螺纹托板螺母同心的装配工具及方法
CN111391020A (zh) * 2020-04-01 2020-07-10 常州市新创智能科技有限公司 一种工型长桁工艺孔的加工装置及加工方法
CN113202313A (zh) * 2021-03-30 2021-08-03 中交第四公路工程局有限公司 新型卧式装配式胎架结构及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US596375A (en) * 1897-12-28 James mfrchie
US3617140A (en) * 1969-06-30 1971-11-02 Koppers Co Inc Method and apparatus for piercing a pole to accommodate hardware-molding fasteners
US4030854A (en) * 1976-05-13 1977-06-21 Pacific Utilities Supply Co. Utility pole drill guide
WO1998016353A1 (fr) * 1996-10-15 1998-04-23 Gordon Henry Turner Appareil pour monter une perceuse sur un tuyaux
US7690162B2 (en) * 2006-03-27 2010-04-06 Accelerated Log Building, Inc. Methods, apparatuses, and assemblies for log building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US596375A (en) * 1897-12-28 James mfrchie
US3617140A (en) * 1969-06-30 1971-11-02 Koppers Co Inc Method and apparatus for piercing a pole to accommodate hardware-molding fasteners
US4030854A (en) * 1976-05-13 1977-06-21 Pacific Utilities Supply Co. Utility pole drill guide
WO1998016353A1 (fr) * 1996-10-15 1998-04-23 Gordon Henry Turner Appareil pour monter une perceuse sur un tuyaux
US7690162B2 (en) * 2006-03-27 2010-04-06 Accelerated Log Building, Inc. Methods, apparatuses, and assemblies for log building

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108818124A (zh) * 2018-07-23 2018-11-16 张明明 一种运用便捷的钻床
CN108818124B (zh) * 2018-07-23 2020-12-18 建湖国创机械制造有限公司 一种运用便捷的钻床
CN109702246A (zh) * 2018-11-28 2019-05-03 首都航天机械有限公司 一种保证环向上楔形螺纹托板螺母同心的装配工具及方法
CN109702246B (zh) * 2018-11-28 2020-06-19 首都航天机械有限公司 一种保证环向上楔形螺纹托板螺母同心的装配工具及方法
CN111391020A (zh) * 2020-04-01 2020-07-10 常州市新创智能科技有限公司 一种工型长桁工艺孔的加工装置及加工方法
CN113202313A (zh) * 2021-03-30 2021-08-03 中交第四公路工程局有限公司 新型卧式装配式胎架结构及其施工方法
CN113202313B (zh) * 2021-03-30 2022-08-30 中交第四公路工程局有限公司 新型卧式装配式胎架结构及其施工方法

Similar Documents

Publication Publication Date Title
CA2996987C (fr) Structure de fondation en poteaux en bois
CA2539466C (fr) Ancrage de poteaux en beton
US4800700A (en) Method and apparatus for lifting and supporting slabs
WO2017037589A1 (fr) Dispositif gabarit de perçage
US8528296B1 (en) Method of installing a foundation system for modular system—smart buildings
KR20120021305A (ko) 앵커 시스템
US8966855B1 (en) Foundation system for modular system smart buildings
NZ620475A (en) High-protein beverages comprising whey protein
KR100679301B1 (ko) 강관파일의 두부 보강 구조
KR101365236B1 (ko) 지주 고정용 조립식 모듈러 기초
NZ723674B2 (en) A drilling jig device
NZ723657B2 (en) Timber pole foundation structure
US9828739B2 (en) In-line battered composite foundations
US11808001B2 (en) Foundation system
AU2015100344A4 (en) Building system and method
JP2876182B2 (ja) 仮設シャッター用ジョイント基礎
WO2023053047A1 (fr) Structure de fondation en poteau en bois réglable
RU2792457C1 (ru) Свая с регулировкой по высоте
AU2019203972B2 (en) Lifting apparatus
US20240175284A1 (en) Apparatus for supporting overhead structure
AU2014101382A4 (en) Footing Improvement
Csíki et al. Prefab water towers for lower storage capacities
JP2001248171A (ja) 地下室潜函工法及びレベル調整装置
WO1995026444A1 (fr) Fondation sur puits multiples et son procede de construction
EP0886015A1 (fr) Bâtiment élevé

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16840920

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16840920

Country of ref document: EP

Kind code of ref document: A1