WO2016188194A1 - 一种小区功率管理的方法及网络节点 - Google Patents

一种小区功率管理的方法及网络节点 Download PDF

Info

Publication number
WO2016188194A1
WO2016188194A1 PCT/CN2016/076271 CN2016076271W WO2016188194A1 WO 2016188194 A1 WO2016188194 A1 WO 2016188194A1 CN 2016076271 W CN2016076271 W CN 2016076271W WO 2016188194 A1 WO2016188194 A1 WO 2016188194A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
cell
cells
network node
same sector
Prior art date
Application number
PCT/CN2016/076271
Other languages
English (en)
French (fr)
Inventor
廖军华
索泰克卡瑞尔
徐凯
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to EP16799083.7A priority Critical patent/EP3300436B1/en
Priority to AU2016269116A priority patent/AU2016269116B2/en
Publication of WO2016188194A1 publication Critical patent/WO2016188194A1/zh

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/34TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
    • H04W52/346TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/367Power values between minimum and maximum limits, e.g. dynamic range
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/38TPC being performed in particular situations
    • H04W52/50TPC being performed in particular situations at the moment of starting communication in a multiple access environment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/143Downlink power control

Definitions

  • the present invention relates to the field of wireless communication technologies, and in particular, to a method and a network node for cell power management.
  • the mobile communication system is a continuous network of cells, forming a cellular coverage network, and the cells generally include a Global System for Mobile Communication (GSM), a Universal Mobile Telecommunications System (UMTS), and a long-term evolution network ( LTE (Long Term Evolution), that is, a G/U/L cell, where the GSM cell is controlled by a Base Station Controller (BSC), and the UMTS cell is controlled by a Radio Network Control (RNC).
  • BSC Base Station Controller
  • RNC Radio Network Control
  • Base station NodeB, Node Base Station
  • eNodeB evolved Node Base Station
  • the power of the G/U/L cell is generally configured by manual manual operation to ensure that the total power of the G/U/L cell covered by the same sector satisfies the radiation requirement.
  • the transmission power configured for each G/U/L cell in the station does not exceed a planned value, resulting in a limited number of carriers deployed by the operator, or When the carrier deploys more carriers and reduces the maximum transmit power of the cell, the cell power is limited and the corresponding downlink rate cannot be provided.
  • the present invention provides a method and a network node for cell power management, which can solve the problem that the number of carriers can be limited to be increased without reducing the transmit power of the cell in the prior art.
  • a first aspect of the present application provides a method for cell power management, where the method is used to manage a network node of power of the same sector, where the same sector includes multiple cells, and the same sector belongs to the network node. Point, the method includes:
  • the network node configures a maximum transmit power of the same sector, and controls a transmit power of each of the cells not to be higher than a first threshold;
  • the network node allocates a first power to each of the cells according to a first allocation policy
  • the network node allocates a second power to each of the cells according to a current power of each of the cells and a required power utilization rate, where the power utilization rate is the Each of the cells in the same sector is periodically reported to the network node, so that the average power of each of the cells is not higher than a second threshold.
  • the network node determines, when the sum of power usages of all cells in the same sector is not less than the maximum transmit power, the network node Each of the cells is allocated a second power according to the current power and the required power utilization of each of the cells, and specifically includes one of the following situations:
  • the ratio of the original power is reduced for each of the cells
  • the third power of the first cell and the fourth cell of the second cell are respectively reduced according to the first policy.
  • Power including:
  • the network node when determining that the state information of the same sector changes, when the same sector is in a connected state, the network node is configured according to each The current power of the cell and the required power utilization are respectively allocated a second power for each of the cells, including:
  • the network node allocates the second power to each of the cells according to a second allocation policy.
  • the status information includes configuration information of each of the cells in the same sector, and an occupation status of the network. And before the determining, by the network node, the second power to allocate the second power to each of the cells according to the second allocation policy, the method further includes:
  • the network node determines, according to the cell state information reported by each of the cells, a target cell set that needs to be adjusted, where the target cell set includes a first cell set that needs to be reduced in power, and needs to be added. A second set of cells of power.
  • the determining, by the network node, that the state information of the same sector is changed the network node is configured according to the second allocation policy
  • Each of the cells allocates the second power, including at least one of the following:
  • the power utilization rate of each cell in the first cell set is separately increased according to the third policy.
  • the power utilization rate of each cell in the first cell set is reduced in proportion according to the cell priority from high to low;
  • the power utilization rate of each cell in the first cell set is respectively reduced according to the fourth policy.
  • the determining, by the fourth policy, reducing power usage of each cell in the first cell set Specifically include:
  • the determining, by the third policy, the power usage of each cell in the second cell set including the following: One of them:
  • the power utilization rate of each cell in the second cell set is separately increased according to the fifth policy.
  • the determining, by the fifth policy, the power usage of each cell in the second cell set, respectively includes:
  • the network node calculates a fifth total power value that is required to be added, and calculates a current sixth total power value of the first cell set;
  • the first power is allocated to each of the cells according to the first allocation policy, Includes one of the following:
  • the network node allocates power to each cell according to a priority of the cell from high to low;
  • a basic power is allocated to each of the cells, and the basic power corresponds to a service type and a network type.
  • the method further includes:
  • the network node periodically collects the sum of the actual used powers of all the cells in the same sector, and saves the sum of the actual used powers to the local;
  • the fluctuation of the power usage of the same sector is determined according to the sum of the actual used powers counted in each cycle, and the total power required for the same sector is allocated according to the fluctuation condition.
  • a second aspect of the present invention provides a network node, where the network node is configured to control power of the same sector, the same sector includes multiple cells, and the same sector belongs to the network node, and the network node includes:
  • a processing unit configured to configure a maximum transmit power of the same sector
  • control unit configured to control, that the transmit power of each of the cells is not higher than a first threshold
  • the control unit is further configured to: according to the first allocation policy, when the same sector is in an initial state Each of the cells allocates a first power;
  • each of the cells is allocated a second power according to the current power of each of the cells and the required power utilization, so that the average power of each of the cells is not Higher than the second threshold.
  • the control unit specifically includes one of the following modules:
  • the first control module is configured to reduce the original power utilization rate according to the priority of the cell from high to low, and respectively for each of the cells;
  • a second control module configured to: after the processing unit determines a first cell with a power utilization ratio higher than or equal to a second threshold, and a second cell with a power utilization lower than a third threshold, respectively, according to the first policy, respectively The third power of the first cell and the fourth power of the second cell.
  • the second control module is specifically configured to:
  • control unit when the processing unit determines that the status information of the same sector changes, the control unit is further configured to:
  • the second power is allocated to each of the cells according to a second allocation policy.
  • the status information includes configuration information of each of the cells in the same sector, and an occupation status of the network.
  • the processing unit is further configured to:
  • control unit includes at least the following mode when determining that the state information of the same sector changes.
  • a third control module configured to respectively reduce power usage of each cell in the first cell set according to the second policy
  • a fourth control module configured to separately increase power utilization of each cell in the second cell set according to the third policy.
  • the third control module is specifically configured to perform one of the following steps:
  • the power utilization rate of each cell in the first cell set is reduced in proportion according to the cell priority from high to low;
  • the power utilization rate of each cell in the first cell set is respectively reduced according to the fourth policy.
  • the third control module is specifically configured to:
  • the fourth control module is specifically configured to perform one of the following steps:
  • the power utilization rate of each cell in the second cell set is separately increased according to the fifth policy.
  • the fourth control module is specifically configured to perform one of the following steps:
  • control unit is further configured to perform the following steps.
  • the power is allocated for each cell equal ratio
  • a basic power is allocated to each of the cells, and the basic power corresponds to a service type and a network type.
  • the processing unit is further configured to:
  • the control unit is further configured to allocate, according to the fluctuation condition obtained by the processing unit, the total power required by the same sector.
  • the maximum transmit power of the same sector is configured, and the transmit power of each of the cells is not controlled to be higher than a first threshold; when the same sector is in an initial state, Allocating a first power to each of the cells according to a first allocation policy; and when the same sector is in a connected state, assigning each of the cells according to current power and required power utilization of each of the cells respectively
  • the second power is such that the average power of each of the cells is not higher than the second threshold, which enables flexible control of cell power and real-time allocation, and improves power utilization of the cell and rationalization of power allocation.
  • FIG. 1 is a schematic diagram of an interaction process between a network node and each cell in the embodiment
  • FIG. 2 is a schematic diagram of a method for performing cell power management according to an embodiment of the present disclosure
  • FIG. 3 is a schematic structural diagram of a network node in the embodiment
  • FIG. 4 is a schematic structural diagram of a control unit in a network node in the embodiment.
  • FIG. 5 is another schematic structural diagram of a control unit in a network node in the embodiment.
  • FIG. 6 is another schematic structural diagram of a network node in this embodiment.
  • the terms “comprises” and “comprises” and “the” and “the” are intended to cover a non-exclusive inclusion, for example, a process, method, system, product, or device that comprises a series of steps or modules is not necessarily limited to Those steps or modules, but may include other steps or modules not explicitly listed or inherent to such processes, methods, products or devices, the division of the modules presented herein is merely a logical division. There may be additional divisions in the implementation of the actual application, for example, multiple modules may be combined or integrated into another system, or some features may be ignored, or not executed, and the displayed or discussed mutual coupling.
  • the direct coupling or the communication connection may be through some interfaces, and the indirect coupling or communication connection between the modules may be electrical or the like, which is not limited herein.
  • the module or the sub-module described as the separate component may or may not be physically separated, may not be a physical module, or may not be divided into a plurality of circuit modules, and may select a part thereof according to actual needs or All modules are used to achieve the objectives of the embodiments of the present invention.
  • the embodiments of the present invention provide a cell management method and a network node, which are used in the field of wireless communications, and can flexibly control cell power and real-time allocation, and improve power utilization and power allocation of a cell. It is mainly applied to the application scenario of multi-network integration, that is, the signal coverage scenarios of large-scale users in dense urban areas and hotspot areas, large traffic volume, and high demand for data services.
  • the specific application scenarios may be multi-band, multi-standard and multi-carrier overlay systems (mBSC, Multi-Band, Multi-Standard, Multi-Carriers), etc., and may be multiple networks of the same carrier or different operators. A number of different networks are not specifically limited.
  • the cell in the same sector in the present disclosure includes at least one of a GSM cell, an LTE cell, and a UMTS cell.
  • the specific type and number are selected according to actual scenarios, which are not limited herein.
  • the GSM cell reports its actual power usage value and the required power value through the BSC; the LTE cell reports its actual power usage value and the required power value through the base station; the UMTS cell reports through the RNC.
  • Actual work The rate usage value and the power value to be allocated, so that the network node performs reasonable and dynamic power allocation according to the received power usage value and the required power value, and satisfies the power of each cell in the same sector. demand.
  • the network nodes in this paper are mainly responsible for the sharing and allocation of power, so as to ensure that the radiation of the station to which they are responsible is within the standard range, and provide downlink services for each cell in the same sector.
  • the network nodes in this paper are mainly responsible for the sharing and allocation of power, so as to ensure that the radiation of the station to which they are responsible is within the standard range, and provide downlink services for each cell in the same sector.
  • an embodiment of the present invention provides a method for cell power management, where the method is used to manage a network node of power of the same sector, where the same sector includes multiple cells, and the same sector belongs to The network node, the method includes:
  • the network node configures a maximum transmit power of the same sector, and controls a transmit power of each of the cells not to be higher than a first threshold.
  • the network node does not perform power control on the GSM primary band Band carrier power, the LTE pilot channel power, the UMTS pilot channel power, and the common channel power, and remains unchanged, and only controls the downlink transmit power and uplink of each cell. Transmit power.
  • the network node allocates a first power to each of the cells according to a first allocation policy.
  • the first power is allocated to each cell to ensure that the basic functions of each cell are normally performed, such as voice and other services.
  • the network node allocates a second power to each of the cells according to a current power of each of the cells and a required power utilization, so that each of the The average power of the cell is not higher than the second threshold;
  • the power utilization rate is reported to the network node periodically for each of the cells in the same sector.
  • the network node After the network node allocates the corresponding power to the cell, it sends the message to each cell in the form of a message.
  • the message includes parameter information, which is used to indicate that the cell acquires and adjusts its downlink transmit power according to the message.
  • the specific parameter information may include a cell power control parameter, a resource allocation information, a coding rate, or a signal to noise ratio compensation information, and is not limited.
  • the intra-cell is The carrier is power controlled.
  • the GSM cell After the GSM cell obtains the power authorized by the network node, the authorized power or the initial state, the power initially configured for the carrier is how many carriers can be allocated power, and the carrier with unallocated power is not enabled.
  • the GSM cell allocates traffic to one carrier according to priority by modifying the GSM channel allocation algorithm.
  • the user terminal After the LTE cell obtains the power of the network node, in order to reduce the power of the RB (Resource Block), the user terminal needs to send a signaling message with reduced power, that is, the number of RBs can be reduced to achieve the power change. the goal of.
  • the UMTS cell After obtaining the power authorized by the network node, the UMTS cell triggers load reforming (LDR, Load Reference) or overload control (OLC, Over Load Control) based on different condition thresholds.
  • LDR load reforming
  • OLC overload control
  • the maximum transmit power of the same sector is configured, and the transmit power of each of the cells is not higher than a first threshold; when the same sector is in an initial state, according to the first allocation policy Allocating a first power to each of the cells; when the same sector is in a connected state, assigning a second power to each of the cells according to current power and required power utilization of each of the cells, The average power of each of the cells is not higher than the second threshold, so that each cell can provide a corresponding downlink rate to the user, and the excess power in a period of time can be allocated to other powers that require more power.
  • the cell can flexibly control cell power and real-time allocation, and improve the power utilization of the cell and the rationalization of power allocation.
  • the network node determines a sum of power utilization rates of all cells in the same sector.
  • the network node allocates a second power to each of the cells according to the current power of each of the cells and the required power utilization, which specifically includes one of the following situations:
  • the ratio of the original power is reduced for each of the cells
  • the third power and the first cell are respectively reduced according to the first policy.
  • the fourth power of the second cell specifically includes:
  • the network node when determining that the state information of the same sector changes, the same sector When in the connected state, the network node allocates a second power to each of the cells according to the current power of each of the cells and the required power utilization, including:
  • the network node allocates the second power to each of the cells according to a second allocation policy.
  • the state information includes configuration information of each of the cells in the same sector. And the occupant state of the network, the determining, before the determining, by the network node, that the second power is allocated to each of the cells according to the second allocation policy,
  • the network node determines, according to the cell state information reported by each of the cells, a target cell set that needs to be adjusted, where the target cell set includes a first cell set that needs to be reduced in power, and needs to be added. A second set of cells of power.
  • the configuration information changes include the power configuration change, the power off function of the site, or the power control function of the site.
  • the occupation status of the network includes new cells, cell exit, new services, or service reduction. The status of the network and the network are not limited in this document.
  • the network Node based The second allocation policy allocates the second power to each of the cells, including at least one of the following:
  • the power utilization rate of each cell in the second cell set is separately increased according to the third policy.
  • the reducing, according to the second policy, respectively, reducing each cell in the first cell set Power utilization including one of the following:
  • the power utilization rate of each cell in the first cell set is reduced in proportion according to the cell priority from high to low;
  • the power utilization rate of each cell in the first cell set is respectively reduced according to the fourth policy.
  • the fourth policy is reduced according to the fourth policy, respectively.
  • the power utilization rate of each cell includes:
  • the third policy is used to increase each cell in the second cell set according to the foregoing third embodiment.
  • Power utilization including one of the following:
  • the power utilization rate of each cell in the second cell set is separately increased according to the fifth policy.
  • the fifth policy is used to increase each cell in the second cell set according to the foregoing fifth optional embodiment.
  • Power Usage rate including:
  • the network node calculates a fifth total power value that is required to be added, and calculates a current sixth total power value of the first cell set;
  • the The policy assigns a first power to each of the cells, including one of the following:
  • the network node allocates power to each cell according to a priority of the cell from high to low;
  • a basic power is allocated to each of the cells, and the basic power corresponds to a service type and a network type.
  • the method further includes:
  • the network node periodically collects the sum of the actual used powers of all the cells in the same sector, and saves the sum of the actual used powers to the local;
  • the fluctuation of the power usage of the same sector is determined according to the sum of the actual used powers counted in each cycle, and the total power required for the same sector is allocated according to the fluctuation condition.
  • the method for the power management of the cell in the embodiment of the present invention is described above.
  • a network node in the embodiment of the present invention is described in detail below.
  • the network node 20 is used to control the power of the same sector.
  • the sector includes a plurality of cells, the same sector belongs to the network node 20, and the network node 20 includes:
  • the processing unit 201 is configured to configure a maximum transmit power of the same sector.
  • the control unit 202 is configured to control, that the transmit power of each of the cells is not higher than a first threshold
  • the control unit 202 is further configured to allocate, according to the first allocation policy, a first power to each of the cells when the same sector is in an initial state;
  • each of the cells is allocated a second power according to the current power of each of the cells and the required power utilization, so that the average power of each of the cells is not Higher than the second threshold.
  • the processing unit 201 is configured to configure the maximum transmit power of the same sector, and the control unit 202 controls the transmit power of each of the cells not to be higher than a first threshold; and is in an initial state in the same sector. Allocating a first power to each of the cells according to a first allocation policy; when the same sector is in a connected state, each of the current power and required power utilization rate of each of the cells are respectively The second power is allocated by the cell, so that the average power of each of the cells is not higher than the second threshold, so that each cell can provide the corresponding downlink rate to the user, and the power allocation can be increased for a period of time. For other cells that require more power, it is possible to flexibly control cell power and real-time allocation, and improve the power utilization of the cell and the rationalization of power allocation.
  • control unit 202 specifically includes one of the following modules:
  • the first control module 2021 is configured to reduce the original power utilization rate according to the priority of the cell from high to low, respectively for each of the cells;
  • the second control module 2022 is configured to: after the processing unit 201 determines the first cell whose power utilization is higher than or equal to the second threshold, and the second cell whose power utilization is lower than the third threshold, respectively, according to the first policy, respectively The third power of the first cell and the fourth power of the second cell are small.
  • the second control module 2022 is specifically configured to:
  • control unit 202 when the processing unit 201 determines that the state information of the same sector changes, the control unit 202 is further configured to:
  • the second power is allocated to each of the cells according to a second allocation policy.
  • the state information includes configuration information of each of the cells in the same sector.
  • the processing unit 201 is further configured to:
  • the controlling Unit 202 includes at least one of the following modules:
  • the third control module 2023 is configured to respectively reduce power usage of each cell in the first cell set according to the second policy.
  • the fourth control module 2024 is configured to separately increase power utilization of each cell in the second cell set according to the third policy.
  • the third control module 2023 is specifically configured to perform one of the following steps:
  • the power utilization rate of each cell in the first cell set is reduced in proportion according to the cell priority from high to low;
  • the power utilization rate of each cell in the first cell set is respectively reduced according to the fourth policy.
  • the third control module 2023 is specifically configured to:
  • the fourth control module 2024 is specifically configured to perform one of the following steps:
  • the power utilization rate of each cell in the second cell set is separately increased according to the fifth policy.
  • the fourth control module 2024 is specifically configured to perform one of the following steps:
  • the ratio of the power of each of the cells to the sixth total power value increases the power of each cell in the second set of cells, respectively.
  • control unit 202 is specifically configured to perform one of the following steps:
  • the power is allocated for each cell equal ratio
  • a basic power is allocated to each of the cells, and the basic power corresponds to a service type and a network type.
  • the processing unit 201 is used in the foregoing embodiment corresponding to FIG. 3 and the foregoing first to ninth alternative embodiments. Also used for:
  • the control unit 202 is further configured to allocate the total power required by the same sector according to the fluctuation condition that is determined by the processing unit 201.
  • the present invention also provides a computer storage medium storing a program that, when executed, includes some or all of the steps in the method of cell power management described above.
  • the present invention also provides a computer storage medium storing a program that, when executed, includes some or all of the steps of the network node performing a cell power management.
  • FIG. 6 is another schematic structural diagram of a network node 60 according to an embodiment of the present invention.
  • Network node 60 may include at least one network interface or other communication interface, at least one receiver 601, at least one transmitter 602, at least one processor 603, and memory 604 to enable connection communication between these devices through at least one network interface (Can be wired or wireless) to realize the communication connection between the system gateway and at least one other network element, and can use the Internet, a wide area network, a local network, a metropolitan area network, and the like.
  • the memory 604 can include read-only memory and random access memory, and provides instructions and data to the processor 603.
  • a portion of the memory 604 can also include, possibly including, a high-speed random access memory (RAM), and possibly a non- Un-volatile memory.
  • RAM high-speed random access memory
  • the memory 604 stores the following elements, executable modules or data structures, or a subset thereof, or an extended set thereof:
  • Operation instructions include various operation instructions for implementing various operations.
  • Operating system Includes a variety of system programs for implementing various basic services and handling hardware-based tasks.
  • the method is used to manage a network node of the power of the same sector, where the same sector includes multiple cells, the same sector belongs to the network node, and the processor 603 calls the memory 604.
  • the stored operation instruction (which can be stored in the operating system) performs the following operations:
  • each of the cells is allocated a first power according to a first allocation policy
  • the usage rate allocates a second power to each of the cells, respectively, such that the average power of each of the cells is not higher than a second threshold.
  • the processor 603 may further perform one of the following steps:
  • the ratio of the original power is reduced for each of the cells
  • the processor 603 may further perform the following steps:
  • the processor 603 may further perform the following steps:
  • a third power is allocated to each of the cells according to a second allocation policy.
  • the status information includes configuration information of each of the cells in the same sector and an occupation status of the network.
  • the processor 603 may further perform the following steps:
  • the processor 603 may further perform at least one of the following steps:
  • the power utilization rate of each cell in the second cell set is separately increased according to the third policy.
  • the processor 603 may further perform at least one of the following steps:
  • the power utilization rate of each cell in the first cell set is reduced in proportion according to the cell priority from high to low;
  • the power utilization rate of each cell in the first cell set is respectively reduced according to the fourth policy.
  • the processor 603 may further perform the following steps:
  • the processor 603 may specifically perform one of the following steps:
  • the power utilization rate of each cell in the second cell set is separately increased according to the fifth policy.
  • the processor 603 may further perform the following steps:
  • the processor 603 may specifically perform one of the following steps:
  • the network node allocates power to each cell according to a priority of the cell from high to low;
  • a basic power is allocated to each of the cells, and the basic power corresponds to a service type and a network type.
  • the processor 603 may further perform the following steps:
  • the fluctuation of the power usage of the same sector is determined according to the sum of the actual used powers counted in each cycle, and the total power required for the same sector is allocated according to the fluctuation condition.
  • the disclosed system, apparatus, and method may be implemented in other manners.
  • the device embodiments described above are merely illustrative.
  • the division of the unit is only a logical function division.
  • there may be another division manner for example, multiple units or components may be combined or Can be integrated into another system, or some features can be ignored or not executed.
  • the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, and may be in an electrical, mechanical or other form.
  • the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
  • each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
  • the above integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
  • the integrated unit if implemented in the form of a software functional unit and sold or used as a standalone product, may be stored in a computer readable storage medium.
  • the technical solution of the present invention which is essential or contributes to the prior art, or all or part of the technical solution, may be embodied in the form of a software product stored in a storage medium.
  • a number of instructions are included to cause a computer device (which may be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention.
  • the foregoing storage medium includes: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk, and the like. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明实施例公开了一种小区功率管理的方法及网络节点,所述方法用于管理同扇区的功率的网络节点,所述同扇区包括多个小区,所述同扇区所属所述网络节点,所述方法包括:网络节点配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;所述同扇区处于初始态时,所述网络节点根据第一分配策略为每个所述小区分配第一功率;所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。能够实现灵活控制小区功率及实时分配,提高小区功率利用率。

Description

一种小区功率管理的方法及网络节点
本申请要求于2015年5月26日提交中国专利局、申请号为201510275388.0、发明名称为“一种小区功率管理的方法及网络节点”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本发明涉及无线通信技术领域,尤其涉及的是一种小区功率管理的方法及网络节点。
背景技术
移动通信系统为小区连续组网,形成蜂窝式覆盖网络,小区一般包括全球移动通信系统(GSM,Global System for Mobile Communication)、通用移动通信系统(UMTS,Universal Mobile Telecommunications System)及长期演进型网络(LTE,Long Term Evolution),即G/U/L小区,其中GSM小区由基站控制器(BSC,Base Station Controller)控制,UMTS小区由无线网络控制器(RNC,Radio Network Control)控制,LTE小区由基站(NodeB,Node Base Station)或演进型基站(eNodeB,Evoled Node Base Station)控制。
在原站点新增频段时,同扇区的总功率也随之增加,在相同辐射强度情况下,隔离区(EZ,Exclusion Zone)范围会扩大,导致无法满足EZ的实际辐射要求。
为解决这个问题,现有技术中,一般通过人工手动操作配置G/U/L小区的功率,以保证同扇区覆盖下的G/U/L小区的总功率满足辐射要求。
但目前功率管理方法,为了管控站点的辐射,需要规定为该站点内的每个G/U/L小区配置的发射功率均不超过一个规划值,导致运行商部署的载波数量受限,或者在运营商部署需要更多的载波而减少小区的最大发射功率时,小区功率受到限制,无法提供相应的下行速率。
发明内容
本申请提供了一种小区功率管理的方法及网络节点,能够解决现有技术中无法实现在不减小小区的发射功率下,有限增加载波数量。
本申请第一方面提供了一种小区功率管理的方法,所述方法用于管理同扇区的功率的网络节点,所述同扇区包括多个小区,所述同扇区所属所述网络节 点,所述方法包括:
网络节点配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;
所述同扇区处于初始态时,所述网络节点根据第一分配策略为每个所述小区分配第一功率;
所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,所述功率利用率为所述同扇区中每个所述小区分别周期上报至所述网络节点,以使每个所述小区的平均功率不高于第二阈值。
结合第一方面,本发明第一方面的第一种实现方式中,所述网络节点确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,具体包括如下情况中的一种:
按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
结合第一方面的第一种实现方式,本发明第一方面的第二种实现方式中,所述按照第一策略分别减小所述第一小区的第三功率和所述第二小区第四功率,具体包括:
计算所需减小的第一总功率值,及计算所述第三功率和所述第四功率之和,得到第二总功率值;
根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
结合第一方面,本发明第一方面的第三种实现方式中,在确定所述同扇区的状态信息发生变化时,所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,包括:
所述网络节点根据第二分配策略为每个所述小区分配所述第二功率。
结合第一方面的第三种实现方式,本发明第一方面的第四种实现方式中,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据第二分配策略为每个所述小区分配所述第二功率之前,还包括:
在预设时间内,所述网络节点根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
结合第一方面的第四种实现方式,本发明第一方面的第五种实现方式中,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据第二分配策略为每个所述小区分配所述第二功率,至少包括如下情况中的一种:
按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
按照第三策略分别增加所述第一小区集合中每个小区的功率利用率。
结合第一方面的第五种实现方式,本发明第一方面的第六种实现方式中,所述按照第二策略分别减小所述第一小区集合中每个小区的功率利用率,包括如下情况中的一种:
按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
结合第一方面的第六种实现方式,本发明第一方面的第七种实现方式中,所述按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率,具体包括:
计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值;
根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
结合第一方面的第五种实现方式,本发明第一方面的第八种实现方式中,所述按照第三策略分别增加所述第二小区集合中每个小区的功率利用率,包括如下情况中的一种:
按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
结合第一方面的第八种实现方式,本发明第一方面的第九种实现方式中,所述按照第五策略分别增加所述第二小区集合中每个小区的功率利用率,包括:
所述网络节点计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值;
根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
结合第一方面、及第一方面的第一至第九种实现方式,本发明第一方面的第十种实现方式中,所述根据第一分配策略为每个所述小区分配第一功率,包括如下情况中的一种:
所述网络节点按照小区的优先级从高至低,分别为每个小区等比率分配功率;
为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
结合第一方面、及第一方面的第一至第九种实现方式,本发明第一方面的第十一种实现方式中,所述方法还包括:
所述网络节点周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况,并根据所述波动情况对所述同扇区所需的总功率进行分配。
本发明第二方面提供一种网络节点,所述网络节点用于控制同扇区的功率,同扇区包括多个小区,所述同扇区所属所述网络节点,所述网络节点包括:
处理单元,用于配置所述同扇区的最大发射功率;
控制单元,用于控制每个所述小区的发射功率不高于第一阈值;
所述控制单元还用于在所述同扇区处于初始态时,根据第一分配策略为每 个所述小区分配第一功率;
在所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。
结合第二方面,本发明第二方面的第一种实现方式中,在所述处理单元确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述控制单元具体包括以下模块中的一个:
第一控制模块,用于按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
第二控制模块,用于在所述处理单元确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区后,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
结合第二方面的第一种实现方式,本发明第二方面的第二种实现方式中,所述第二控制模块具体用于:
通过所述处理单元计算所需减小的第一总功率值,及计算所述第三功率和所述第四功率之和,得到第二总功率值后,根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
结合第二方面的第一种实现方式,本发明第二方面的第三种实现方式中,在所述处理单元确定所述同扇区的状态信息发生变化时,所述控制单元还用于:
根据第二分配策略为每个所述小区分配所述第二功率。
结合第二方面的第三种实现方式,本发明第二方面的第四种实现方式中,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述处理单元还用于:
在预设时间内,根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
结合第二方面的第四种实现方式,本发明第二方面的第五种实现方式中,所述在确定所述同扇区的状态信息发生变化时,所述控制单元至少包括如下模 块中的一个:
第三控制模块,用于按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
第四控制模块,用于按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
结合第二方面的第五种实现方式,本发明第二方面的第六种实现方式中,所述第三控制模块具体用于执行如下步骤中的一个:
按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
结合第二方面的第六种实现方式,本发明第二方面的第七种实现方式中,所述第三控制模块具体用于:
通过所述处理单元计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值后,根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
结合第二方面的第五种实现方式,本发明第二方面的第八种实现方式中,所述第四控制模块具体用于执行如下步骤中的一个:
按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
结合第二方面的第八种实现方式,本发明第二方面的第九种实现方式中,所述第四控制模块具体用于执行如下步骤中的一个:
通过所述处理单元计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值后,根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
结合第二方面、及第二方面的第一至第九种实现方式,本发明第二方面的第十种实现方式中,其特征在于,所述控制单元具体还用于执行如下步骤中的 一个:
按照小区的优先级从高至低,分别为每个小区等比率分配功率;
为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
结合第二方面、及第二方面的第一至第九种实现方式,本发明第二方面的第十一种实现方式中,所述处理单元还用于:
周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况;
所述控制单元还用于根据所述处理单元判断得到的所述波动情况对所述同扇区所需的总功率进行分配。
从以上技术方案可以看出,本发明中,配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值,能够实现灵活控制小区功率及实时分配,提高小区的功率利用率以及功率分配的合理化。
附图说明
图1为本实施例中网络节点与各小区一交互流程示意图;
图2为本实施例中一种小区功率管理的方法一实施例示意图;
图3为本实施例中一种网络节点一结构示意图;
图4为本实施例中网络节点中控制单元一结构示意图;
图5为本实施例中网络节点中控制单元另一结构示意图;
图6为本实施例中网络节点另一结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是 全部的实施例,基于本发明中的实施例,本领域技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的实施例能够以除了在这里图示或描述的内容以外的顺序实施。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或模块的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或模块,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或模块,本文中所出现的模块的划分,仅仅是一种逻辑上的划分,实际应用中实现时可以有另外的划分方式,例如多个模块可以结合成或集成在另一个系统中,或一些特征可以忽略,或不执行,另外,所显示的或讨论的相互之间的耦合或直接耦合或通信连接可以是通过一些接口,模块之间的间接耦合或通信连接可以是电性或其他类似的形式,本文中均不作限定。并且,作为分离部件说明的模块或子模块可以是也可以不是物理上的分离,可以是也可以不是物理模块,或者可以分不到多个电路模块中,可以根据实际的需要选择其中的部分或全部模块来实现本发明实施例方案的目的。
本发明实施例提供了一种小区管理的方法及网络节点,用于无线通信领域,能够实现灵活控制小区功率及实时分配,提高小区的功率利用率以及功率分配的合理化。主要应用于多网合一的应用场景,即密集城区、热点地区的大型用户规模、话务量大、数据业务需求量高的信号覆盖场景。具体应用场景可以是多频段、多制式及多载波覆盖系统(mBSC,Multi-Band,Multi-Standard,Multi-Carriers)等,可以是同一个运营商的多个网络、也可以是不同运营商的多个不同网络,具体不作限定。
本文中的同扇区内的小区包括GSM小区、LTE小区及UMTS小区中的至少一个,具体类型、数量根据实际场景来选定,本文不作限定。
可以理解的是,GSM小区通过BSC上报自身实际的功率使用值,以及所需要分配的功率值;LTE小区通过基站上报自身实际的功率使用值,以及所需要分配的功率值;UMTS小区通过RNC上报自身实际的功 率使用值,以及所需要分配的功率值,以使网络节点根据收到的功率使用值及所需的功率值来进行合理的、动态的功率调配,满足同扇区中的每个小区的功率需求。
本文中的网络节点主要负责功率的共享和分配,以保证自身负责的站点对周边的辐射在标准范围内,并为同扇区内的各小区提供下行服务。具体网络节点与各小区的交互可参考图1。
请参照图2,本发明实施例提供一种小区功率管理的方法,所述方法用于管理同扇区的功率的网络节点,所述同扇区包括多个小区,所述同扇区所属所述网络节点,所述方法包括:
101、网络节点配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;
可以理解的是,网络节点对GSM主带Band载波功率、LTE导频信道功率、UMTS导频信道功率和公共信道功率不进行功率控制,维持不变,仅控制每个小区的下行发射功率和上行发射功率。
102、所述同扇区处于初始态时,所述网络节点根据第一分配策略为每个所述小区分配第一功率;
小区都处于初始态时,为每个小区都分配第一功率,以保证每个小区的基本功能正常进行,如语音等业务。
103、所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值;
其中,所述功率利用率为所述同扇区中每个所述小区分别周期上报至所述网络节点。
实际应用中,网络节点为小区分配相应的功率后,会以消息的形式下发至各个小区,该消息包括参数信息,用于指示小区根据该消息获取并调整自身的下行发射功率。具体参数信息可包括小区功率控制参数、资源分配信息、编码速率或信噪比补偿信息等,具体不作限定。
具体的,在同扇区下的G/U/L小区获取网络节点分配的功率后,对小区内 的载波进行功率控制。
GSM小区获取网络节点授权的功率后,授权的功率或在初始态时,为载波初始配置的功率即为有多少个载波可以分配到功率,不启用未分配功率的载波。GSM小区通过修改GSM的信道分配算法,根据优先级将话务集中分配到一个载波上。
LTE小区获取网络节点授权的功率后,考虑到降低部分资源快(RB,Resource Block)的功率,需要给用户终端发送功率降低的信令消息,即可以通过减少RB使用个数来达到改变功率大小的目的。
UMTS小区获得网络节点授权的功率后,基于不同条件门限触发负载重整(LDR,Load Reference)或过载控制(OLC,Over Load Control)。在对LDR进行切换时,同扇区内的同系统内与异系统内之间无法进行切换操作。
本发明实施例中,通过配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值,即可保证每个小区能够给用户正常提供相应的下行速率,又可以将一段时间内多出的功率分配给其它需要功率更多的小区,能够实现灵活控制小区功率及实时分配,提高小区的功率利用率以及功率分配的合理化。
可选的,在上述图2所对应的实施例的基础上,本发明实施例的第一个可选实施例中,所述网络节点确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,具体包括如下情况中的一种:
按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
可选的,在上述第一个可选实施例的基础上,本发明实施例的第二个可选实施例中,所述按照第一策略分别减小所述第一小区的第三功率和所述第二小区第四功率,具体包括:
计算所需减小的第一总功率值;及计算所述第三功率和所述第四功率之和,得到第二总功率值;
根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
可选的,在上述图2所对应的实施例的基础上,本发明实施例的第三个可选实施例中,在确定所述同扇区的状态信息发生变化时,所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,包括:
所述网络节点根据第二分配策略为每个所述小区分配所述第二功率。
可选的,在上述第三个可选实施例的基础上,本发明实施例的第四个可选实施例中,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据第二分配策略为每个所述小区分配所述第二功率之前,还包括:
在预设时间内,所述网络节点根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
其中,配置信息的变化主要包括功率配置变化、关闭站点功率控制功能或开启站点功率控制功能等,组网的占用状态包括新增小区、小区退出、新增业务或减少业务等,具体的配置信息和组网的状态,本文中均不作限定。
可选的,在上述第四个可选实施例的基础上,本发明实施例的第五个可选实施例中,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据 第二分配策略为每个所述小区分配所述第二功率,至少包括如下情况中的一种:
按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
可选的,在上述第五个可选实施例的基础上,本发明实施例的第六个可选实施例中,所述按照第二策略分别减小所述第一小区集合中每个小区的功率利用率,包括如下情况中的一种:
按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
可选的,在上述第六个可选实施例的基础上,本发明实施例的第七个可选实施例中,所述按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率,具体包括:
计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值;
根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
可选的,在上述第五个可选实施例的基础上,本发明实施例的第八个可选实施例中,所述按照第三策略分别增加所述第二小区集合中每个小区的功率利用率,包括如下情况中的一种:
按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
可选的,在上述第八个可选实施例的基础上,本发明实施例的第九个可选实施例中,所述按照第五策略分别增加所述第二小区集合中每个小区的功率利 用率,包括:
所述网络节点计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值;
根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
可选的,在上述图2所对应的实施例,及上述第一至第九个可选实施例的基础上,本发明实施例的第十个可选实施例中,所述根据第一分配策略为每个所述小区分配第一功率,包括如下情况中的一种:
所述网络节点按照小区的优先级从高至低,分别为每个小区等比率分配功率;
为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
可选的,在上述图2所对应的实施例,及上述第一至第九个可选实施例的基础上,本发明实施例的第十一个可选实施例中,所述还包括:
所述网络节点周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况,并根据所述波动情况对所述同扇区所需的总功率进行分配。
上面对本发明实施例中一种小区功率管理的方法进行举例说明,参阅图3,下面对本发明实施例中一种网络节点进行详细描述,所述网络节点20用于控制同扇区的功率,同扇区包括多个小区,所述同扇区所属所述网络节点20,所述网络节点20包括:
处理单元201,用于配置所述同扇区的最大发射功率;
控制单元202,用于控制每个所述小区的发射功率不高于第一阈值;
所述控制单元202还用于在所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;
在所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。
本发明实施例中,通过处理单元201配置所述同扇区的最大发射功率,控制单元202控制每个所述小区的发射功率不高于第一阈值;并在所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值,即可保证每个小区能够给用户正常提供相应的下行速率,又可以将一段时间内多出的功率分配给其它需要功率更多的小区,能够实现灵活控制小区功率及实时分配,提高小区的功率利用率以及功率分配的合理化。
可选的,在上述图3所对应的实施例的基础上,本发明实施例的第一个可选实施例中,参阅图4,在所述处理单元201确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述控制单元202具体包括以下模块中的一个:
第一控制模块2021,用于按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
第二控制模块2022,用于在所述处理单元201确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区后,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
可选的,在上述第一个可选实施例的基础上,本发明实施例的第二个可选实施例中,所述第二控制模块2022具体用于:
通过所述处理单元计算所需减小的第一总功率值,及计算所述第三功率和所述第四功率之和,得到第二总功率值后,根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
可选的,在上述第一个可选实施例的基础上,本发明实施例的第三个可选实施例中,在所述处理单元201确定所述同扇区的状态信息发生变化时,所述控制单元202还用于:
根据第二分配策略为每个所述小区分配所述第二功率。
可选的,在上述第三个可选实施例的基础上,本发明实施例的第四个可选实施例中,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述处理单元201还用于:
在预设时间内,根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
可选的,在上述第四个可选实施例的基础上,本发明实施例的第五个可选实施例中,所述在确定所述同扇区的状态信息发生变化时,所述控制单元202至少包括如下模块中的一个:
第三控制模块2023,用于按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
第四控制模块2024,用于按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
可选的,在上述第五个可选实施例的基础上,本发明实施例的第六个可选实施例中,所述第三控制模块2023具体用于执行如下步骤中的一个:
按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
可选的,在上述第六个可选实施例的基础上,本发明实施例的第七个可选实施例中,所述第三控制模块2023具体用于:
通过所述处理单元201计算所述第一小区集合所需减小的第三总功率值, 及计算所述第一小区集合当前的第四总功率值后,根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
可选的,在上述第五个可选实施例的基础上,本发明实施例的第八个可选实施例中,所述第四控制模块2024具体用于执行如下步骤中的一个:
按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
可选的,在上述第八个可选实施例的基础上,本发明实施例的第九个可选实施例中,所述第四控制模块2024具体用于执行如下步骤中的一个:
通过所述处理单元201计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值后,根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
可选的,在上述图3所对应的实施例,及上述第一至第九个可选实施例的基础上,本发明实施例的第十个可选实施例中,其特征在于,所述控制单元202具体还用于执行如下步骤中的一个:
按照小区的优先级从高至低,分别为每个小区等比率分配功率;
为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
可选的,在上述图3所对应的实施例,及上述第一至第九个可选实施例的基础上,本发明实施例的第十一个可选实施例中,所述处理单元201还用于:
周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况;
所述控制单元202还用于根据所述处理单元201判断得到的所述波动情况对所述同扇区所需的总功率进行分配。
本发明还提供一种计算机存储介质,该介质存储有程序,该程序执行时包括上述小区功率管理的方法中的部分或者全部步骤。
本发明还提供一种计算机存储介质,该介质存储有程序,该程序执行时包括上述网络节点执行一种小区功率管理的方法中的部分或者全部步骤。
图6是本发明实施例网络节点60的另一结构示意图。网络节点60可包括至少一个网络接口或者其它通信接口、至少一个接收器601、至少一个发射器602、至少一个处理器603和存储器604,以实现这些装置之间的连接通信,通过至少一个网络接口(可以是有线或者无线)实现该系统网关与至少一个其它网元之间的通信连接,可以使用互联网,广域网,本地网,城域网等。
存储器604可以包括只读存储器和随机存取存储器,并向处理器603提供指令和数据,存储器604的一部分还可以包括可能包含高速随机存取存储器(RAM,Random Access Memory),也可能还包括非不稳定的存储器(non-volatile memory)。
存储器604存储了如下的元素,可执行模块或者数据结构,或者它们的子集,或者它们的扩展集:
操作指令:包括各种操作指令,用于实现各种操作。
操作系统:包括各种系统程序,用于实现各种基础业务以及处理基于硬件的任务。
在本发明实施例中,所述方法用于管理同扇区的功率的网络节点,所述同扇区包括多个小区,所述同扇区所属所述网络节点,处理器603通过调用存储器604存储的操作指令(该操作指令可存储在操作系统中),执行如下操作:
配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;
所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;
所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利 用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。
在一些实施方式中,在确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,上述处理器603还可以执行以下步骤中的一种:
按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
在一些实施方式中,上述处理器603还可以执行以下步骤:
计算所需减小的第一总功率值;及计算所述第三功率和所述第四功率之和,得到第二总功率值;
根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
在一些实施方式中,在确定所述同扇区的状态信息发生变化时,所述同扇区处于连接态时,上述处理器603还可以执行以下步骤:
根据第二分配策略为每个所述小区分配第三功率。
在一些实施方式中,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,上述处理器603还可以执行以下步骤:
在预设时间内,根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
在一些实施方式中,上述处理器603还可以执行以下步骤中的至少一个:
按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
在一些实施方式中,上述处理器603还可以执行以下步骤中的至少一个:
按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
在一些实施方式中,上述处理器603还可以执行以下步骤:
计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值;
根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
在一些实施方式中,上述处理器603具体还可以执行以下步骤中的一个:
按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
在一些实施方式中,上述处理器603具体还可以执行以下步骤:
计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值;
根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
在一些实施方式中,上述处理器603具体还可以执行以下步骤中的一个:
所述网络节点按照小区的优先级从高至低,分别为每个小区等比率分配功率;
为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
在一些实施方式中,上述处理器603具体还可以执行以下步骤:
周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况,并根据所述波动情况对所述同扇区所需的总功率进行分配。
在上述实施例中,对各个实施例的描述都各有侧重,某个实施例中没有详述的部分,可以参见其他实施例的相关描述。
所属领域的技术人员可以清楚地了解到,为描述的方便和简洁,上述描述 的系统,装置和单元的具体工作过程,可以参考前述方法实施例中的对应过程,在此不再赘述。
在本申请所提供的几个实施例中,应该理解到,所揭露的系统,装置和方法,可以通过其它的方式实现。例如,以上所描述的装置实施例仅仅是示意性的,例如,所述单元的划分,仅仅为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通信连接可以是通过一些接口,装置或单元的间接耦合或通信连接,可以是电性,机械或其它的形式。
所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。
另外,在本发明各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。
所述集成的单元如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。基于这样的理解,本发明的技术方案本质上或者说对现有技术做出贡献的部分或者该技术方案的全部或部分可以以软件产品的形式体现出来,该计算机软件产品存储在一个存储介质中,包括若干指令用以使得一台计算机设备(可以是个人计算机,服务器,或者网络设备等)执行本发明各个实施例所述方法的全部或部分步骤。而前述的存储介质包括:U盘、移动硬盘、只读存储器(ROM,Read-Only Memory)、随机存取存储器(RAM,Random Access Memory)、磁碟或者光盘等各种可以存储程序代码的介质。
以上对本发明所提供的一种小区功率管理的方法及网络节点进行了详细介绍,本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域 的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本发明的限制。

Claims (24)

  1. 一种小区功率管理的方法,其特征在于,所述方法用于管理同扇区的功率的网络节点,所述同扇区包括多个小区,所述同扇区所属所述网络节点,所述方法包括:
    网络节点配置所述同扇区的最大发射功率,并控制每个所述小区的发射功率不高于第一阈值;
    所述同扇区处于初始态时,所述网络节点根据第一分配策略为每个所述小区分配第一功率;
    所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。
  2. 根据权利要求1所述的方法,其特征在于,所述网络节点确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,具体包括如下情况中的一种:
    按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
    确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
  3. 根据权利要求2所述的方法,其特征在于,所述按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率,具体包括:
    计算所需减小的第一总功率值;及计算所述第三功率和所述第四功率之和,得到第二总功率值;
    根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
    及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
  4. 根据权利要求1所述的方法,其特征在于,在确定所述同扇区的状态信息发生变化时,所述同扇区处于连接态时,所述网络节点根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,包括:
    所述网络节点根据第二分配策略为每个所述小区分配所述第二功率。
  5. 根据权利要求4所述的方法,其特征在于,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据第二分配策略为每个所述小区分配所述第二功率之前,还包括:
    在预设时间内,所述网络节点根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
  6. 根据权利要求5所述的方法,其特征在于,所述在确定所述同扇区的状态信息发生变化时,所述网络节点根据第二分配策略为每个所述小区分配所述第二功率,至少包括如下情况中的一种:
    按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
    按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
  7. 根据权利要求6所述的方法,其特征在于,所述按照第二策略分别减小所述第一小区集合中每个小区的功率利用率,包括如下情况中的一种:
    按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
    按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
  8. 根据权利要求7所述的方法,其特征在于,所述按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率,具体包括:
    计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值;
    根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
  9. 根据权利要求6所述的方法,其特征在于,所述按照第三策略分别增加所述第二小区集合中每个小区的功率利用率,包括如下情况中的一种:
    按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
    按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
  10. 根据权利要求9所述的方法,其特征在于,所述按照第五策略分别增加所述第二小区集合中每个小区的功率利用率,包括:
    所述网络节点计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值;
    根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
  11. 根据权利要求1至10任一所述的方法,其特征在于,所述根据第一分配策略为每个所述小区分配第一功率,包括如下情况中的一种:
    所述网络节点按照小区的优先级从高至低,分别为每个小区等比率分配功率;
    为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
  12. 根据权利要求1至10任一所述的方法,其特征在于,所述方法还包括:
    所述网络节点周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
    根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况,并根据所述波动情况对所述同扇区所需的总功率进行分配。
  13. 一种网络节点,其特征在于,所述网络节点用于控制同扇区的功率,同扇区包括多个小区,所述同扇区所属所述网络节点,所述网络节点包括:
    处理单元,用于配置所述同扇区的最大发射功率;
    控制单元,用于控制每个所述小区的发射功率不高于第一阈值;
    所述控制单元还用于在所述同扇区处于初始态时,根据第一分配策略为每个所述小区分配第一功率;
    在所述同扇区处于连接态时,根据每个所述小区当前的功率和所需的功率利用率分别为每个所述小区分配第二功率,以使每个所述小区的平均功率不高于第二阈值。
  14. 根据权利要求13所述的网络节点,其特征在于,在所述处理单元确定所述同扇区中所有小区的功率利用率之和不小于所述最大发射功率时,所述控制单元具体包括以下模块中的一个:
    第一控制模块,用于按照小区的优先级从高至低,分别对每个所述小区等比率减少原功率利用率;
    第二控制模块,用于在所述处理单元确定功率利用率高于等于第二阈值的第一小区,以及功率利用率低于第三阈值的第二小区后,按照第一策略分别减小所述第一小区的第三功率和所述第二小区的第四功率。
  15. 根据权利要求14所述的网络节点,其特征在于,所述第二控制模块具体用于:
    通过所述处理单元计算所需减小的第一总功率值,及计算所述第三功率和所述第四功率之和,得到第二总功率值后,根据所述第一总功率值,按照所述第三功率占所述第二总功率值的比率减小所述第三功率;
    及按照所述第四功率占所述第二总功率值的比率减小所述第四功率。
  16. 根据权利要求13所述的网络节点,其特征在于,在所述处理单元确定所述同扇区的状态信息发生变化时,所述控制单元还用于:
    根据第二分配策略为每个所述小区分配所述第二功率。
  17. 根据权利要求16所述的网络节点,其特征在于,所述状态信息包括所述同扇区中每个所述小区的配置信息及组网的占用状态,所述处理单元还用于:
    在预设时间内,根据每个所述小区上报的小区状态信息,确定需要调整功率的目标小区集合,所述目标小区集合包括需要减小功率的第一小区集合,及需要增加功率的第二小区集合。
  18. 根据权利要求17所述的网络节点,其特征在于,所述在确定所述同扇区的状态信息发生变化时,所述控制单元至少包括如下模块中的一个:
    第三控制模块,用于按照第二策略分别减小所述第一小区集合中每个小区的功率利用率;
    第四控制模块,用于按照第三策略分别增加所述第二小区集合中每个小区的功率利用率。
  19. 根据权利要求18所述的网络节点,其特征在于,所述第三控制模块具体用于执行如下步骤中的一个:
    按照小区优先级从高至低,分别等比例减小所述第一小区集合中每个小区的功率利用率;
    按照所述第四策略分别减小所述第一小区集合中每个小区的功率利用率。
  20. 根据权利要求19所述的网络节点,其特征在于,所述第三控制模块具体用于:
    通过所述处理单元计算所述第一小区集合所需减小的第三总功率值,及计算所述第一小区集合当前的第四总功率值后,根据所述第三总功率值,按照所述第一小区集合中每个小区占所述第四总功率值的比率分别减小所述第一小区集合中每个小区的功率。
  21. 根据权利要求18所述的网络节点,其特征在于,所述第四控制模块具体用于执行如下步骤中的一个:
    按照小区优先级从高至低,等比例增加所述第二小区集合中每个小区的功率利用率;
    按照第五策略分别增加所述第二小区集合中每个小区的功率利用率。
  22. 根据权利要求21所述的网络节点,其特征在于,所述第四控制模块具体用于执行如下步骤中的一个:
    通过所述处理单元计算所需增加的第五总功率值,及计算所述第一小区集合当前的第六总功率值后,根据所述第五总功率值,按照所述第二小区集合中每个小区的功率占所述第六总功率值的比率分别增加所述第二小区集合中每个小区的功率。
  23. 根据权利要求13至22任一所述的网络节点,其特征在于,所述控制单元具体还用于执行如下步骤中的一个:
    按照小区的优先级从高至低,分别为每个小区等比率分配功率;
    为每个所述小区分别分配一个基本功率,所述基本功率与业务类型和网络类型对应。
  24. 根据权利要求13至22任一所述的网络节点,其特征在于,所述处理单元还用于:
    周期性的统计所述同扇区中所有小区的实际使用功率之和,并将所述实际使用功率之和保存至本地;
    根据每个周期所统计的实际使用功率之和,判断所述同扇区的功率使用的波动情况;
    所述控制单元还用于根据所述处理单元判断得到的所述波动情况对所述同扇区所需的总功率进行分配。
PCT/CN2016/076271 2015-05-26 2016-03-14 一种小区功率管理的方法及网络节点 WO2016188194A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP16799083.7A EP3300436B1 (en) 2015-05-26 2016-03-14 Cell power management method and network node
AU2016269116A AU2016269116B2 (en) 2015-05-26 2016-03-14 Cell power management method and network node

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510275388.0A CN105101384B (zh) 2015-05-26 2015-05-26 一种小区功率管理的方法及网络节点
CN201510275388.0 2015-05-26

Publications (1)

Publication Number Publication Date
WO2016188194A1 true WO2016188194A1 (zh) 2016-12-01

Family

ID=54580650

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/076271 WO2016188194A1 (zh) 2015-05-26 2016-03-14 一种小区功率管理的方法及网络节点

Country Status (4)

Country Link
EP (1) EP3300436B1 (zh)
CN (1) CN105101384B (zh)
AU (1) AU2016269116B2 (zh)
WO (1) WO2016188194A1 (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105101384B (zh) * 2015-05-26 2019-01-25 上海华为技术有限公司 一种小区功率管理的方法及网络节点
CN107801238B (zh) * 2016-09-05 2022-08-02 中兴通讯股份有限公司 Lte场景下的小区间功率协作的方法和装置
EP4054225A1 (en) * 2021-03-04 2022-09-07 Nokia Solutions and Networks Oy Controlling radio frequency emissions in cellular system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102281619A (zh) * 2010-06-08 2011-12-14 中兴通讯股份有限公司 一种功率分配方法、装置及系统
US20130178221A1 (en) * 2006-07-31 2013-07-11 Motorola Mobility Llc Method and Apparatus for Managing Transmit Power for Device-To-Device Communication
CN104168636A (zh) * 2013-05-17 2014-11-26 中兴通讯股份有限公司 一种小小区功率控制方法和装置
CN105101384A (zh) * 2015-05-26 2015-11-25 上海华为技术有限公司 一种小区功率管理的方法及网络节点

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1793509A1 (en) * 2005-12-01 2007-06-06 Alcatel Lucent Transmit power control for a communication system
CN109511120B (zh) * 2013-01-30 2023-05-16 索尼公司 用于无线通信网络的通信方法和装置以及无线通信网络

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130178221A1 (en) * 2006-07-31 2013-07-11 Motorola Mobility Llc Method and Apparatus for Managing Transmit Power for Device-To-Device Communication
CN102281619A (zh) * 2010-06-08 2011-12-14 中兴通讯股份有限公司 一种功率分配方法、装置及系统
CN104168636A (zh) * 2013-05-17 2014-11-26 中兴通讯股份有限公司 一种小小区功率控制方法和装置
CN105101384A (zh) * 2015-05-26 2015-11-25 上海华为技术有限公司 一种小区功率管理的方法及网络节点

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3300436A4 *

Also Published As

Publication number Publication date
CN105101384A (zh) 2015-11-25
EP3300436B1 (en) 2021-05-05
AU2016269116A1 (en) 2018-01-18
AU2016269116B2 (en) 2019-01-24
CN105101384B (zh) 2019-01-25
EP3300436A4 (en) 2018-06-13
EP3300436A1 (en) 2018-03-28

Similar Documents

Publication Publication Date Title
EP3416429B1 (en) Communication method, terminal device and network side device
US11191072B2 (en) Information transmission method and radio access network device
US9060309B2 (en) Radio resource division for compensating ratio changes of other clusters
EP3001746B1 (en) Embms management method, multimedia broadcast multicast service coordination entity and base station
US9622115B2 (en) Channel negotiation method, device, and system
US20030112784A1 (en) Dynamic QoS for integrated voice and data CDMA/1XRTT networks
US20200344641A1 (en) Network configuration using cell congestion predictions
CN103814596A (zh) 传输数据的方法、装置和系统
JP6475333B2 (ja) エアインタフェース容量密度を調整する方法及び装置
Papagianni et al. Rethinking service chain embedding for cellular network slicing
WO2016188194A1 (zh) 一种小区功率管理的方法及网络节点
KR20140090495A (ko) 빔포밍 장치, 및 그의 빔 셀 형성 방법
JP7169734B2 (ja) スペクトル利用を決定するための方法
EP3197218B1 (en) Method for allocating multiple component carriers, base station and user equipment
CN112586066A (zh) 一种通信方法及装置
KR20200033330A (ko) 자원 할당 방법 및 장치
CN105519162A (zh) 一种调整小区覆盖范围的方法及装置
EP3104655B1 (en) Downlink signal transmission method, base station and user equipment
CN103874135A (zh) 无线通信的方法、装置和系统
EP3114868A1 (en) Methods and devices for managing connectivity for a service
US20230300627A1 (en) Spectrum management for dss-based networks
US10129882B1 (en) Systems and methods for allocating resource blocks based on uplink transmission parameters
JP2020523953A (ja) サービス実行方法及び装置
Hoffmann et al. Potential of dynamic spectrum allocation in LTE macro networks
KR20150133052A (ko) 주파수 대역 결정 방법 및 그 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16799083

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2016799083

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2016269116

Country of ref document: AU

Date of ref document: 20160314

Kind code of ref document: A