WO2016117864A1 - Pince réparable et procédé de réparation de plate-forme l'utilisant - Google Patents

Pince réparable et procédé de réparation de plate-forme l'utilisant Download PDF

Info

Publication number
WO2016117864A1
WO2016117864A1 PCT/KR2016/000210 KR2016000210W WO2016117864A1 WO 2016117864 A1 WO2016117864 A1 WO 2016117864A1 KR 2016000210 W KR2016000210 W KR 2016000210W WO 2016117864 A1 WO2016117864 A1 WO 2016117864A1
Authority
WO
WIPO (PCT)
Prior art keywords
deck
clip
repair
fixing
present
Prior art date
Application number
PCT/KR2016/000210
Other languages
English (en)
Korean (ko)
Inventor
이재열
조수미
Original Assignee
이재열
조수미
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020150010474A external-priority patent/KR101579965B1/ko
Priority claimed from KR1020150179788A external-priority patent/KR101779674B1/ko
Application filed by 이재열, 조수미 filed Critical 이재열
Publication of WO2016117864A1 publication Critical patent/WO2016117864A1/fr
Priority to US15/655,925 priority Critical patent/US20170314278A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0285Repairing or restoring flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02177Floor elements for use at a specific location
    • E04F15/02183Floor elements for use at a specific location for outdoor use, e.g. in decks, patios, terraces, verandas or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/04Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • E04F2015/0205Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
    • E04F2015/02066Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements
    • E04F2015/02077Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements the additional fastening elements located in-between two adjacent flooring elements
    • E04F2015/02094Engaging side grooves running along the whole length of the flooring elements

Definitions

  • the present invention relates to a deck replacement repair clip and an advanced method of deck replacement using the same, and more particularly, in the case where some decks are broken, it is simple and convenient to separate only the damaged deck from the deck assembly and replace it with a new deck.
  • the present invention relates to a deck fixing device that can be replaced at low cost and to a deck replacement method by the device.
  • the present invention is applicable not only to decks, but also to structural materials and finishes (wood, stone, steel, plastics, ceramics, etc.) can be applied to a wall or a ceiling, etc., if a shape capable of binding clips can be realized.
  • Wood decks using eco-friendly materials are used in many areas, such as park walkways, plazas, shopping malls in front of roads, hiking trails, floor pavements such as country houses, or walls of buildings and fences. Compared to other materials, this product is more natural and absorbs shocks and vibrations more efficiently to enhance walking, and the visually soft and comfortable wood has the advantages of durability and easy maintenance.
  • wood decks have been installed by arranging the decks on the structure of lower yokes and joists, etc., which are arranged in a predetermined form at the installation site, and fixing them on top of the deck material with fixing means such as nails and screws.
  • fixing means such as nails and screws.
  • this installation method is exposed to the upper part of the head of the fixing means such as nails and screws due to the expansion of the wood over time, causing inconvenience to pedestrians and users, poor appearance, and the installation of the fixing means Moisture penetrates the deck and shortens the life of the deck, and cracking of the deck occurs due to the construction error of the fixing means. Another problem arises that reduces the durability of the deck.
  • the deck clip used in such a conventional method is typically described in Korea Patent Publication No. 10-2014-0046961, when fixing the clip to the deck material, the fixing means of the screw to the lower joist, the second deck material
  • the operator cannot remove the screw directly. Therefore, the entire deck in the corresponding column of the deck should be pushed out and the replacement deck should be pushed hard to repair. there was.
  • the clip of Korean Utility Model No. 20-0449555 provided a screw insertion space for fixing the screw as a fixing device after mounting the clip on the deck material and moving the second deck horizontally to the clip.
  • a screw insertion space for fixing the screw as a fixing device after mounting the clip on the deck material and moving the second deck horizontally to the clip.
  • Korean Patent Application Publication No. 10-2011-0102977 has a fastening structure that has a good effect on the workability of the clip, but the structure in which the deck and the joist directly in contact with the bottom is a jog There is a problem that the durability of the deck is deteriorated because it does not dry on the deck of the contact portion.
  • the Applicant has applied for a repairable deck clip and a deck repair method using the same in order to improve the above problems in the application number No. 10-2015-0010474, the deck clip has a plate-like surface of the bottom line 30 and the bottom surface contact Fixing part 100; A central support part 203 protruding from the center of the upper part of the fixing part 100 and forming an inverted T with the fixing part 100; Repair platform 308 is formed in the center of the upper portion of the central support (203); Repair platform 308 is formed on the front and rear sides, the insertion portion 202 extending in the left and right inserted into the clip receiving groove (22, 22 ') of the deck; A clip body 10 including a storage box of the maintenance rotating part 300 formed at the left or right direction fixing part 100 of the central support part 203; And a repair rotation part 300 which is separably included from the storage box of the repair rotation part 300, wherein one end of the insertion part 202 is removed during repair of the deck, and the repair rotation part 300 is repaired
  • the deck After removing the molten rotating part 300 is mounted on the repair platform 308, the deck is mounted on the fixing part 100, and then rotates the repair rotating part 300 to the clip receiving groove (22, 22 ') of the deck
  • One end of the repair rotation unit 300 is inserted into the deck to repair the deck.
  • it is intended to improve the additional features so that users and builders can use and construct more conveniently.
  • the applicant of the present application is that the side fixed clip construction of the deck is constructed with various types of products, but when the deck is damaged, most products are convenient and low cost, there is no deck clip that can be restored to the original (repair)
  • the inventor of the present invention completed the present invention through numerous idea meetings and test productions.
  • the present invention was developed to improve the above-mentioned conventional problems, and an object of the present invention is to remove only the broken deck from the deck assembly when some of the deck is broken, and then convenient, fast and low cost original repair ( To provide deck repair clips and how to replace decks using them.
  • the present invention designs and manufactures a deck clip that can be restored to its original state (repair) so that a repair member is inserted into a product at the time of assembly of the first deck and no additional material is required.
  • the inventors have invented a deck repair method that is convenient, quick and inexpensive for the worker by using the deck clip thus manufactured.
  • the present invention provides a deck clip that can be restored to the original (repair), characterized in that it comprises a maintenance rotating unit 300 in the clip body.
  • Deck clip that can be restored to the original (repair) of the present invention is a fixing part 100, the spaced support 102, wing 200, the central support 203, inserts (202, 202a, 202b), fastening groove (101, 101a, 101b), characterized in that it comprises a maintenance rotating unit (300).
  • the maintenance rotating unit 300 is composed of a semi-circular structure, that is, any one structure selected from a straight surface (rotational straight edge 303) and a circle, ellipse, or polygonal structure, and is used when rotating near the center.
  • a hole (apparatus insertion groove, 301) is formed.
  • the hole (device insertion groove, 301) used in the rotation is made of a polygon, it is usually made of a quadrilateral, hexagonal or octagonal form.
  • the maintenance rotating part 300 of the present invention is rotated in the clip receiving grooves (22, 22 ') of the deck on one surface has an embossed protrusion shape for preventing the deck from being separated.
  • the present invention may have a fixed side of the left and right asymmetric centering around the central support portion 203 forming an inverted T to enable the construction of a small deck, the deck fixed iron insertion groove 103 in the configuration , Drain groove 104, Deck sliding blade 105, Deck sliding arm 106, Deck sliding grip 107, Construction scale groove 205, Rotation scale groove 311, Deck fixed hardware 400, Fixed A tooth 401 may further include a fixed hardware base 402.
  • the repair rotating part is manufactured by being fixedly mounted on the clip body. However, if the deck is required to be repaired, the repair rotating part can be easily separated from the clip body and used as a repair material for the deck. It is designed to be assembled only by work.
  • the present invention is preferably equipped with an advanced processing form for the insertion groove so that the deck to be replaced can be seated from the top to replace only the damaged deck when repairing the deck.
  • the installed rotating member does not need a special tool to be carried out by a simple maintenance work during installation, it is preferable that it can be implemented by a simple tool.
  • a simple tool may be a wrench formed in the shape of a star, a square, a hexagon, an octagon, and the like, and any tool may be used as long as it can apply rotational force.
  • the installed rotating member is preferable that there is a device that can be fixed so as not to shake the external impact or deformation even after installation.
  • the installed deck needs to take into account the aesthetic value of excessive deck spacing with adequate spacing (3 mm is preferred).
  • the present invention has the effect of the invention can be repaired at low cost by manufacturing the product so that the repair material is integrated into the construction product so that a separate material is not required when repairing the damaged deck.
  • the present invention can be easily repaired because only the damaged deck can be repaired after removing the deck from the deck assembly when some of the deck is broken, the effect of the invention that the manager or operator can work quickly and conveniently Have.
  • the construction of the deck has the effect of improving the convenience and high precision of the construction, and the stability and durability of the constructed deck.
  • FIG. 1 is a diagram illustrating a deck clip according to the present invention.
  • FIG. 2 is a view illustrating details of a rotating part inserted into a deck clip.
  • Figure 3 a, b is a view for explaining the fixed structure of the deck clip according to the present invention
  • Figure 3 c is a construction installation example for increasing the construction precision of the deck using the construction groove 205 One drawing.
  • FIG. 4 is a diagram showing an example of installation of the lateral movement preventing device of the deck using the deck fixing hardware (400).
  • 5 to 9 are diagrams showing the steps of replacing any deck constituting the deck assembly shown in FIG.
  • the clip of the present invention includes the same function throughout the drawings for the parts having the same function in the same shape in the case of the same symmetrical structure in the left and right, even if there is no sign in the drawing, in the asymmetric structure in the name of the reference numeral This is so named.
  • the present invention can be applied to walls or ceilings as well as decks, as long as structural or finishing materials (wood, stone, steel, plastics, ceramics, etc.) can realize shapes that can be clipped together.
  • Figure 1a relates to a symmetrical structure according to an embodiment of the present invention, a perspective view of the clip body 10 that is a deck connection member.
  • the clip body 10 which is a deck connection member according to an embodiment of the present invention, includes a fixing part 100, a wing part 200, and a maintenance rotating part 300. do.
  • the clip body 10 which is a connecting member for a wooden deck, has a plate-shaped fixing part 100 in which the joist 30 and the bottom surface are in surface contact, as shown in FIG.
  • a central support part 203 protruding from the center of the upper part of the fixing part 100 and forming an inverted T with the fixing part 100;
  • Repair platform 308 is formed in the center of the upper portion of the central support (203);
  • Repair platform 308 is formed on the front and rear sides, the insertion portion 202 extending in the left and right inserted into the clip receiving groove (22, 22 ') of the deck;
  • a clip body 10 including a storage box of the maintenance rotating part 300 formed at the left or right direction fixing part 100 of the central support part 203;
  • a repair rotation part 300 which is separably included from the storage box of the repair rotation part 300, wherein one end of the insertion part 202 is removed during repair of the deck, and the repair rotation part 300 is repaired in the storage box of the repair rotation part 300.
  • the deck After removing the molten rotating part 300 is mounted on the repair platform 308, the deck is mounted on the fixing part 100, and then rotates the repair rotating part 300 to the clip receiving groove (22, 22 ') of the deck One end of the repair rotation unit 300 is inserted into the deck to repair the deck.
  • the left and right are asymmetric about the fixed part 100 and the inverted T
  • the other side is a fixed part (100a) consisting of a semi-circular structure and the opposite side is It may be a fixing part 106b including the repair part 300 in the form of a triangle.
  • the present invention may further include a drain groove 104, the drain groove 104 is formed on the rear surface of the fixing portion 100 of the clip, from the fastening groove 101 and the deck fixed iron insertion groove 103
  • the groove is formed on one side of the outward direction to be small, and when raining on the fastening groove 101 and the deck fixing iron insertion groove 103 of the deck exposed to the outside serves to discharge water or water generated on the deck Durability can be increased by preventing the deck from decaying due to mold.
  • End of the clip fixing portion 100a of the present invention may be a clip sliding blade 105, the clip sliding blade 105 is an angular shape having an inclined shape, the operator includes a clip sliding grip 107 Grasping the clip sliding arm 106 can be easily inserted into the lower end of the deck installed first to increase the convenience of work.
  • Deck fixing hardware 400 of the present invention is one end of the protruding and the protruding end is a zigzag sawtooth-like structure, the fixture for fixing the horizontal movement in one direction when fixing the deck with a clip is the construction stability of the deck Will improve.
  • FIG. 2 is a plan perspective view (a of FIG. 2) and a rear perspective view (b of FIG. 2) of the repair rotating part 300 inserted and integrated in FIG. 1, respectively. Detailed description thereof will be made with reference to FIGS. 6 to 9.
  • FIG. 3 a is a schematic drawing of the deck assembly, the deck 20 is fixed by using the clip body 10, and the next step shows a state in which the other deck 20 'is installed adjacent to the clip body 10 in the next step.
  • the insertion part 202 is inserted into the clip accommodation groove 22 formed at one side of the deck 20 so that the piece 40 is vertically inserted into the fastening groove 101 after close contact. Insert into (30) and fix it.
  • the fastening groove 101 is symmetrically arranged on the left and right sides of the clip, so its use may vary depending on assembly conditions.
  • the other deck 20 ′ is seated on the spaced support 102 of the clip, and the other side deck 20 ′ is moved horizontally toward the center support 203 of the clip.
  • the insertion portion 202 of the clip is inserted into the clip receiving groove 22 ′ of the deck 20 to be easily and firmly inserted and fixed.
  • the corner angles of the 202 and the linear protrusions 204 and the like can be quickly and accurately assembled. Since the deck 20 to be mounted is repeated to assemble the deck assembly in the same order as fastening the clip body 10 attached to one side of the deck 20.
  • 3b is a side perspective view of the deck assembly.
  • Deck spacing is formed according to the extent that the lower side portions 21, 21 'of the deck are in close contact with the gap supporting portions 201, 201' of the clip. This can be adjusted by adjusting the gap to 0-6 mm according to the machining of the lower side portions 21, 21 'of the deck. In the figure, it is the illustrated example of the spacing of the decks 20 and 20 'of 3 mm which is the best for aesthetics.
  • the fixing part 100 of the clip is made to ventilate smoothly by being tightened at a predetermined distance while mitigating the shock and vibration between the deck (20, 20 ') and the joist 30, Flow of water is free and drying can be done quickly.
  • the fastening part 100 is inserted between the deck 20 and the joist 30 when the deck 20 and the joist 30 are fastened so that the deck 20 does not come into close contact with the upper plate of the joist 30 and is spaced apart.
  • the 102 to be fastened in a state spaced apart by a predetermined distance the ventilation is made smoothly, the flow of water freely can be quickly dried.
  • the rectangular fixing part 100 may have a structural limitation that cannot exceed 1/2 of the deck width length. (It is also possible to use the fixed side on one side if the deck is double-sided and the width of the deck should be at least twice the width of the next deck, so the space for the next deck can be installed.) There is a difficulty in construction), c of Figure 3 having an asymmetrical structure can be fixed in a straight line on the joist directly cross each other by combing.
  • the construction guide groove 205 installed in the clip has a function that allows the contractor to check the orthogonal situation with the eyes so that the clip is seated on the jog orthogonal line. It has the function to make it work regularly.
  • FIG 4 a, b shows an example of the installation of the deck transverse movement prevention device using the deck fixing hardware 400
  • the deck fixing hardware 400 is installed by inserting the deck fixing hardware insertion groove 103 of the clip do.
  • Deck fixing hardware 400 has one end is protruded and the protruding end has a zigzag sawtooth structure.
  • the deck fixing hardware 400 is inserted into the deck fixing hardware insertion groove 103 of the deck (2), and the next deck is installed. It is grounded on the lower part of the side and can be fixed by preventing the lateral movement of the deck (3, 4).
  • 5 to 9 is the most essential part of the present invention, when repairing a part of the deck assembly assembled as described above using a maintenance rotating unit 300 which is provided integrally to the clip body 10 deck replacement target The process of replacing and fixing to a new deck is explained using each drawing.
  • Deck repair method according to an embodiment of the present invention, the same applies in both symmetrical and asymmetrical, a) separating the deck to be replaced from the deck assembly; b) cut one end of the coupling member insert 202 which accommodates one end of the deck to be replaced; c) separating the repair rotation unit 300 integrated in the clip fixing unit 100; d) mounting the separated repair rotating part 300 to the repair platform 308 on the top of the central support 203; e) coupling the new deck to the empty space; f) rotating the repair rotating unit 300 is mounted to be coupled to the new deck and the clip receiving groove 22 of the adjacent deck at the same time.
  • the deck 20a to be replaced is separated from the deck assembly using a jigsaw blade or a rotary saw blade.
  • Figure 6 is a clip of the replacement space portion generated after the replacement of the deck 20a to be replaced, the clip of the convenient side, as shown in Figure 6 the insertion portion 202a, 202b of the clip with a sharp knife spacing support portion 201 Cut to the same plane as.
  • the wing cutting portion 202c is cut so that the same surface as the gap support 201 can be formed.
  • the connection table 307 fixing the repair rotating unit 300 integrated with the fixing unit 100 of the clip is cut and separated with a sharp knife.
  • FIG. 9 a shows that the hex wrench 50 is inserted into the device fixing groove 301 of the repair rotating part 300, and the hex wrench 50 is rotated 90 ° so that the clip receiving groove 22 of the deck 20 and the new one are new. Both sides of the clip receiving groove (22 ') of the deck (20b) so that the repair rotating portion 300 can be caught at the same time.
  • the curved protrusion 302 of the repair rotating part 300 is in close contact with the space to further solidify the binding.
  • the rotation scale groove 311 may be further added to visually determine whether the repair rotation part 300 is correctly rotated.
  • FIG. 9B is a view illustrating an apparatus for fixing without shaking in the repair platform 308 after the repair rotation unit 300 is mounted.
  • the rotating shaft projection 305 at the center of the lower surface of the repair rotating part 300 is fixed to the rotating shaft groove 309 of the repairing platform 308 so that it can be fixed after stable rotation and installation of the repair rotating part 300.
  • the rotating shaft fixing protrusion 306 of the lower surface of the repair rotating unit 300 is fixed to the fixing groove 310 of the repairing platform 308 so that the repair rotating unit 300 is not detached after installation. I can keep it.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Wood Science & Technology (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)

Abstract

La présente invention concerne une pince réparable et une structure de fixation de plate-forme l'utilisant. La présente invention est caractérisée par un procédé pour faciliter un procédé de fixation d'une partie centrale à nouveau pendant le remplacement de la partie centrale dans une plage de construction de plate-forme et, plus spécifiquement, par un procédé simple et pratique pour séparer un élément rotatif pour une réparation, qui est intégré dans la pince, le monter sur la pince, positionner un nouveau matériau de plate-forme, puis fixer le matériau de plate-forme remplacé sur un ensemble plate-forme en tournant l'élément rotatif avec un outil simple, tel qu'une clé Allen. La présente invention pour réparer un matériau de plate-forme construit à sa forme d'origine avec la performance d'une pince elle-même est une première tentative dans le monde. Dans la présente invention, un produit de construction dans lequel est intégré un matériau de réparation est fabriqué de telle sorte qu'un matériau distinct n'est pas requis lorsqu'une plate-forme endommagée est réparée, et la présente invention a un élément structural dans lequel une personne ordinaire ou un travailleur normal peut réaliser un travail de façon commode étant donné qu'un outil spécial et une technologie spéciale ne sont pas nécessaires. En outre, la présente invention peut être appliquée à un endroit quelconque tel qu'un mur, un plafond, etc., tant qu'un matériau structural ou un matériau de finition (bois, pierre, fer, plastique, céramique, ensemble composite hétérogène, etc.), ainsi qu'une plate-forme, peuvent mettre en œuvre une forme à laquelle une pince peut être accouplée.
PCT/KR2016/000210 2015-01-22 2016-01-11 Pince réparable et procédé de réparation de plate-forme l'utilisant WO2016117864A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/655,925 US20170314278A1 (en) 2015-01-22 2017-07-21 Repairable clip and method for repairing deck using same

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR1020150010474A KR101579965B1 (ko) 2015-01-22 2015-01-22 보수 가능한 데크 클립
KR10-2015-0010474 2015-01-22
KR10-2015-0179788 2015-12-16
KR1020150179788A KR101779674B1 (ko) 2015-12-16 2015-12-16 보수 가능한 클립 및 이를 이용한 데크의 보수 방법

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/655,925 Continuation US20170314278A1 (en) 2015-01-22 2017-07-21 Repairable clip and method for repairing deck using same

Publications (1)

Publication Number Publication Date
WO2016117864A1 true WO2016117864A1 (fr) 2016-07-28

Family

ID=56417341

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/000210 WO2016117864A1 (fr) 2015-01-22 2016-01-11 Pince réparable et procédé de réparation de plate-forme l'utilisant

Country Status (2)

Country Link
US (1) US20170314278A1 (fr)
WO (1) WO2016117864A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230003033A1 (en) * 2019-11-20 2023-01-05 Pontarolo Engineering S.P.A. System for fastening slats

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3019201B1 (fr) * 2014-03-28 2016-05-06 Louis Boschian Dispositif de fixation d'elements d'habillage sur une lambourde
SE541420C2 (en) 2016-12-16 2019-09-24 Vaelinge Innovation Ab A set of decking boards provided with a connecting system
EP3596283A4 (fr) 2017-03-16 2021-01-13 Välinge Innovation AB Dispositif de raccordement, élément de support et système de raccordement pour panneaux
USD945870S1 (en) 2020-11-17 2022-03-15 National Nail Corp. Fastener positioning device
US11898357B2 (en) 2017-08-15 2024-02-13 National Nail Corp. Hidden fastener unit and related method of use
US11149445B2 (en) 2017-08-15 2021-10-19 National Nail Corp. Hidden fastener unit and related method of use
USD924044S1 (en) 2019-11-20 2021-07-06 National Nail Corp. Fastener positioning device
USD1019365S1 (en) 2023-05-31 2024-03-26 National Nail Corp. Fastener positioning device
US10378218B2 (en) * 2017-08-15 2019-08-13 National Nail Corp. Hidden fastener unit and related method of use
US11111679B2 (en) 2017-08-15 2021-09-07 National Nail Corp. Hidden fastener unit and related method of use
US20210277668A1 (en) 2017-08-15 2021-09-09 National Nail Corp. Hidden fastener unit and related method of use
US11261893B2 (en) 2017-08-15 2022-03-01 National Nail Corp. Hidden fastener unit and related method of use
US11111677B2 (en) * 2018-09-19 2021-09-07 Fiber Composites, Llc Siding clip
EP3908717A4 (fr) 2019-01-08 2022-10-12 Välinge Innovation AB Système de plancher doté d'un système d'assemblage et dispositif d'assemblage associé
US11193284B2 (en) * 2019-05-21 2021-12-07 Silca System, Llc Tile-securing system and related methods
US11098489B1 (en) * 2020-09-09 2021-08-24 Thomas F Wheatley, III Deck flooring board connecting bracket
US11731252B2 (en) 2021-01-29 2023-08-22 National Nail Corp. Screw guide and related method of use
USD1022684S1 (en) 2023-02-23 2024-04-16 National Nail Corp. Fastener positioning device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005083015A (ja) * 2003-09-05 2005-03-31 Shin Nikkei Co Ltd デッキ材固定具
KR20090075446A (ko) * 2008-01-04 2009-07-08 주식회사 엘지화학 데크 교체용 클립을 사용한 데크 교체 방법
KR200449555Y1 (ko) * 2009-09-17 2010-07-20 주식회사 동양씨엠아이 데크 조립 구조
KR100993275B1 (ko) * 2010-04-08 2010-11-09 에코시티 주식회사 데크플레이트의 고정구조
KR20110102977A (ko) * 2010-03-12 2011-09-20 (주)엘지하우시스 데크 고정용 클립

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005083015A (ja) * 2003-09-05 2005-03-31 Shin Nikkei Co Ltd デッキ材固定具
KR20090075446A (ko) * 2008-01-04 2009-07-08 주식회사 엘지화학 데크 교체용 클립을 사용한 데크 교체 방법
KR200449555Y1 (ko) * 2009-09-17 2010-07-20 주식회사 동양씨엠아이 데크 조립 구조
KR20110102977A (ko) * 2010-03-12 2011-09-20 (주)엘지하우시스 데크 고정용 클립
KR100993275B1 (ko) * 2010-04-08 2010-11-09 에코시티 주식회사 데크플레이트의 고정구조

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230003033A1 (en) * 2019-11-20 2023-01-05 Pontarolo Engineering S.P.A. System for fastening slats

Also Published As

Publication number Publication date
US20170314278A1 (en) 2017-11-02

Similar Documents

Publication Publication Date Title
WO2016117864A1 (fr) Pince réparable et procédé de réparation de plate-forme l'utilisant
US7866636B1 (en) Stanchion base shoe support for railings
WO2019160233A1 (fr) Module de platelage comprenant un module à fixation rapide
WO2019199091A1 (fr) Structure de plafond ayant une constructibilité et une utilisation d'espace améliorées et son procédé de construction
CN1233306A (zh) 建筑部件
WO2017222197A1 (fr) Paroi extérieure du type à ventilation articulée et son procédé de construction
US20080163574A1 (en) Fixing System for Finishing and Decorative Profiles
WO2014021498A1 (fr) Dispositif servant à fixer des matériaux de construction intérieurs et extérieurs
KR100515187B1 (ko) 타일 시공 결합체
WO2015133768A1 (fr) Matériau de plancher utilisant un membre de couplage par insertion
CA2599513A1 (fr) Outil permettant d'installer de grands panneaux de materiau sur un plafond et methode
KR101579965B1 (ko) 보수 가능한 데크 클립
KR101779674B1 (ko) 보수 가능한 클립 및 이를 이용한 데크의 보수 방법
US6883880B2 (en) Floating sub-top and support member
JP3790341B2 (ja) 木造建築物の内装仕上構造および内装仕上施工方法
WO2012023651A1 (fr) Cloison polyvalente et écologique du type à assembler
KR101857233B1 (ko) 패널 마감용 클립 브라켓
CN112095853A (zh) 一种装配式卫浴墙板系统及安装方法
WO2017003003A1 (fr) Procédé pour la construction d'un toit d'immeuble et matériau de construction utilisé pour celui-ci
CN113279536A (zh) 一种墙板安装结构、安装方法以及拆除方法
US20060137285A1 (en) Fastener devices
JP2533504Y2 (ja) 壁面パネルの取り付け構造
CA2136187C (fr) Systeme de fixation pour planchettes de bois juxtaposees ou paralleles
KR100513152B1 (ko) 건축판재 레일식 고정구 및 그를 이용한 건축판재 부착방법
CN213773974U (zh) 一种装配式卫浴墙板系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16740337

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16740337

Country of ref document: EP

Kind code of ref document: A1